JP5934013B2 - Scaffolding structure of reinforced earth wall and its installation jig - Google Patents

Scaffolding structure of reinforced earth wall and its installation jig Download PDF

Info

Publication number
JP5934013B2
JP5934013B2 JP2012086428A JP2012086428A JP5934013B2 JP 5934013 B2 JP5934013 B2 JP 5934013B2 JP 2012086428 A JP2012086428 A JP 2012086428A JP 2012086428 A JP2012086428 A JP 2012086428A JP 5934013 B2 JP5934013 B2 JP 5934013B2
Authority
JP
Japan
Prior art keywords
wall
scaffold
installation jig
wall surface
surface material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012086428A
Other languages
Japanese (ja)
Other versions
JP2013217041A (en
Inventor
直紀 志村
直紀 志村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hirose and Co Ltd
Original Assignee
Hirose and Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hirose and Co Ltd filed Critical Hirose and Co Ltd
Priority to JP2012086428A priority Critical patent/JP5934013B2/en
Publication of JP2013217041A publication Critical patent/JP2013217041A/en
Application granted granted Critical
Publication of JP5934013B2 publication Critical patent/JP5934013B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Description

本発明は、補強土壁の足場構造及びその設置治具に関する。   The present invention relates to a scaffold structure for a reinforced earth wall and its installation jig.

図6に、補強土壁に設置する仮設足場の従来例を示す。
補強土壁は、壁面材aと、該壁面材aの背面に設けた盛土bと、前記壁面材aと連結し、且つ前記盛土bの内部に配する補強材cと、を少なくとも含んで構成する土留構造物である。
FIG. 6 shows a conventional example of a temporary scaffold installed on a reinforced earth wall.
The reinforcing earth wall includes at least a wall surface material a, a bank b provided on the back surface of the wall surface material a, and a reinforcing material c connected to the wall surface material a and disposed inside the bank b. It is a soil retaining structure.

補強土壁の天端に笠コンクリートfを打設する際、補強土壁の上方前面に仮設足場dを設置して、当該仮設足場dから型枠eを配置する必要がある。
この仮設足場dは、ブラケットd1の上部に足場板d1を設けた構成であり、このブラケットd2を壁面材aにボルトgで固定することで、補強土壁に仮設足場を固定している。
そして、型枠eの撤去後には、ボルトgを外しながら仮設足場dを順次撤去していく。
When casting the cap concrete f on the top edge of the reinforced earth wall, it is necessary to install the temporary scaffolding d on the upper front surface of the reinforced earth wall and arrange the formwork e from the temporary scaffolding d.
This temporary scaffold d has a structure in which a scaffold plate d1 is provided on the upper part of the bracket d1, and the temporary scaffold is fixed to the reinforced soil wall by fixing the bracket d2 to the wall surface material a with bolts g.
And after removing the formwork e, the temporary scaffolding d is sequentially removed while removing the bolt g.

しかし、前記した従来例によれば、以下の様な問題のうち、少なくとも何れか一つの問題が生じうる。
(1)効率性の限界
ブラケットと壁面材とをボルト固定しているため、足場の撤去には、順次ボルトを外す作業が必要となり、効率性の向上に限界がある。
(2)安全性の限界
仮設足場の撤去には、高所作業車を用いることが一般的であるところ、補強土壁の前面に高所作業車を配置するだけの作業空間が確保できない場合には、足場そのものから別の足場を撤去したり、天端からのクレーン若しくはゴンドラなどを用いて足場を撤去する必要がある。したがって、前記したボルトの撤去作業と併せて、より安全性の高い足場の撤去方法が望まれている。
However, according to the conventional example described above, at least one of the following problems may occur.
(1) Limit of efficiency Since the bracket and the wall surface material are fixed with bolts, the removal of the scaffold requires the work of removing the bolts in sequence, and there is a limit to improving the efficiency.
(2) Limits on safety It is common to use an aerial work platform to remove the temporary scaffolding, but it is not possible to secure a work space to place an aerial work vehicle in front of the reinforced soil wall. It is necessary to remove another scaffold from the scaffold itself, or to remove the scaffold using a crane or a gondola from the top. Therefore, in conjunction with the above-described bolt removal work, a more secure method for removing the scaffold is desired.

したがって、本発明は、効率性及び安全性に優れる補強土壁の足場構造及びその設置治具を提供するものである。   Therefore, this invention provides the scaffold structure of the reinforced earth wall excellent in efficiency and safety, and its installation jig.

上記の課題を解決すべくなされた本願発明は、補強土壁を構築する壁面材の前面に仮設足場を構築するための足場構造であって、前記壁面材の躯体に貫通して壁面材の前背面に移動自在に設けた設置治具と、前記壁面材の前面側で前記設置治具と掛止または掛止解除可能な仮設足場と、からなり、前記仮設足場は足場板を載置するブラケットと、前記ブラケットの前記壁面材の前面と対向する部位に付設した連結板とを具備し、前記連結板はその上部に前記設置治具と係脱可能な穴を有し、前記設置治具は前記壁面材を貫通して前背面に移動自在な摺動部と、前記壁面材の背面側に設け、前記摺動部を背面方向へと付勢する弾性部とを有し、前記連結板のスライドにより、壁面材の前方へ突出させた設置治具の摺動部と前記連結板の穴とを係脱可能に構成したことを特徴とする、補強土壁の足場構造を提供するものである
た、前記発明において、前記仮設足場の連結板はその下部に、前記壁面材への設置時に、前記壁面との間に隙間を形成する段差面を有するよう構成することができる。
また、前記発明において、前記段差面に緩衝材を設けてもよい。
また、本願発明は、既述したした何れか一つの補強土壁の足場構造に用いる設置治具であって、前記壁面材を貫通して前背面に移動自在な摺動部と、前記壁面材の背面側に設け、前記摺動部を背面方向へと付勢する弾性部と、を有し、前記壁面材の前方へ突出させた設置治具の摺動部が前記連結板の穴に係脱可能であることを特徴とする、設置治具を提供するものである。
The present invention, which has been made to solve the above problems, is a scaffold structure for constructing a temporary scaffold on the front surface of a wall surface material for constructing a reinforced soil wall, and penetrates through the wall of the wall material to the front of the wall material. placing an installation jig provided movably in the back, and the installation jig and latching or locking releasable temporary scaffold front side of the wall member, Tona is, the temporary scaffold the scaffold plate A bracket, and a connection plate attached to a portion of the bracket facing the front surface of the wall surface material, the connection plate having a hole that can be engaged with and disengaged from the installation jig at an upper portion thereof; Has a sliding portion that passes through the wall surface material and is movable to the front and back surfaces, and an elastic portion that is provided on the back surface side of the wall surface material and biases the sliding portion toward the back surface, The sliding part of the installation jig that protrudes forward of the wall surface material and the hole of the connecting plate are It can be characterized by being configured to, there is provided a scaffolding structure of the reinforced soil walls.
Also, in the invention, the connecting plate of the temporary scaffold thereunder, at the time of installation to the wall member may be configured to have a stepped surface forming a gap between the wall member.
Moreover, in the said invention, you may provide a buffer material in the said level | step difference surface.
Further, the present invention is an installation jig used for the scaffold structure of any one of the above-described reinforcing earth walls, the sliding portion penetrating the wall surface material and movable to the front and back surfaces, and the wall surface material of provided on the back side, have a, an elastic portion for urging said sliding portion and toward the rear, the engagement hole of the sliding portion the connecting plate installation jig is protruded forwardly of the wall member An installation jig characterized by being removable is provided.

本発明によれば、以下に記載する効果のうち、少なくとも何れか一つの効果を得ることができる。
(1)効率性の向上
足場を上方から引き上げるのみで掛止状態を解除することができ、足場の撤去が容易である。また設置治具が初期位置へと復帰するため、設置治具を手作業で戻す作業も必要無い。
(2)安全性の向上
足場を撤去する際には、クレーンなどのフックで足場を係止して上方に引き上げて掛止構造を解除するのみであるため、作業員が足場の撤去に直接関与する必要が無く、安全である。
(3)不陸性の確保
足場と壁面材との間に隙間を設けることにより、壁面材のデザインに起因する不陸に対する追従性を確保できる。
(4)設置性の確保
足場と壁面材との間に緩衝材を設けることにより、不陸性を確保しながら足場を壁面材に確実に固定した状態を維持できる。
(5)景観性の確保
足場の撤去後には、足場を掛け止めるフック部が壁面材へと自動的に初期位置へ復帰するため、壁面材の外観を損ねることがない。
According to the present invention, at least one of the effects described below can be obtained.
(1) Improvement of efficiency The hooked state can be released simply by lifting the scaffold from above, and the scaffold can be easily removed. Moreover, since the installation jig returns to the initial position, there is no need to manually return the installation jig.
(2) Improving safety When removing the scaffold, it is only necessary to lock the scaffold with a hook such as a crane and lift it upward to release the latching structure, so that the workers are directly involved in the removal of the scaffold. There is no need to do so and it is safe.
(3) Securing of unevenness By providing a gap between the scaffold and the wall material, it is possible to ensure followability to the unevenness caused by the design of the wall material.
(4) Ensuring installation property By providing a cushioning material between the scaffold and the wall surface material, it is possible to maintain a state in which the scaffold is securely fixed to the wall surface material while ensuring unevenness.
(5) Ensuring landscape characteristics After the scaffold is removed, the hook part that holds the scaffold automatically returns to the initial position on the wall surface material, so that the appearance of the wall surface material is not impaired.

本発明の設置治具の実施例を示す概略図。Schematic which shows the Example of the installation jig of this invention. 本発明の仮設足場の実施例を示す概略図。Schematic which shows the Example of the temporary scaffold of this invention. 本発明の足場構造の第1実施例を示す概略図。Schematic which shows 1st Example of the scaffold structure of this invention. 本発明の足場構造の参考例を示す概略図。Schematic which shows the reference example of the scaffold structure of this invention. 本発明の足場構造の第実施例を示す概略図。Schematic which shows 2nd Example of the scaffold structure of this invention. 従来の仮設足場を示す概略図。Schematic which shows the conventional temporary scaffold.

以下、図面を参照しながら、本発明の実施例について説明する。   Embodiments of the present invention will be described below with reference to the drawings.

<1>設置治具
本発明の足場構造に用いる設置治具について、図1を参照しながら説明する。
本発明の設置治具Aは、補強土壁を構築する壁面材aの前方に露出自在に構成する部材である。
本発明の設置治具Aは、大別して、前記壁面材aを貫通して前背面に移動(進退)自在な摺動部1と、前記壁面材aの背面側に設け、前記摺動部1を背面方向へと付勢する弾性部2と、を少なくとも有する。
<1> Installation Jig The installation jig used for the scaffold structure of the present invention will be described with reference to FIG.
The installation jig A of the present invention is a member configured to be exposed in front of a wall surface material a that constructs a reinforced earth wall.
The installation jig A of the present invention is roughly divided into a sliding portion 1 that penetrates the wall surface material a and is movable (advanced / retracted) to the front and back surfaces, and is provided on the back surface side of the wall surface material a. And at least the elastic portion 2 that urges the back toward the back.

(1)摺動部
摺動部1は、該摺動部1の一部を壁面材aの前方へと露出する為の部材である。
摺動部1は、壁面材aを貫通してなる貫通孔a1に挿通するボルト11と、ボルト11の後端に取り付けたプレートからなる鍔部12で構成することができる。
上記構成により、ボルト11の頭部と鍔部12との範囲内で、ボルト11が壁面材a内の貫通孔a1を摺動することができる。
(1) Sliding part The sliding part 1 is a member for exposing a part of the sliding part 1 to the front of the wall surface material a.
The sliding part 1 can be comprised by the volt | bolt part 12 which consists of the volt | bolt 11 inserted in the through-hole a1 which penetrates the wall surface material a, and the plate attached to the rear end of the volt | bolt 11. FIG.
With the above configuration, the bolt 11 can slide through the through hole a1 in the wall surface material a within the range of the head portion of the bolt 11 and the flange portion 12.

(2)弾性部
弾性部2は、前記摺動部1を背面方向へと付勢するための部材である。
弾性部2は、壁面材aの背面側に設置する。
弾性部2は、ゴムやバネなどの弾性力を持つ部材であり、本実施例ではバネ21を用いている。
弾性部2の一端は壁面材aの背面と接触するよう構成し、他端は前記摺動部1(本例では鍔部12)と接触するよう構成する。
(2) Elastic part The elastic part 2 is a member for urging the sliding part 1 in the back direction.
The elastic part 2 is installed on the back side of the wall surface material a.
The elastic part 2 is a member having an elastic force such as rubber or a spring, and a spring 21 is used in this embodiment.
One end of the elastic part 2 is configured to be in contact with the back surface of the wall surface material a, and the other end is configured to be in contact with the sliding part 1 (the flange part 12 in this example).

(3)機能
このような構成とすることで、初期状態において、摺動部1は、弾性部の弾性力でもって、壁面材aの背面側の方向へと付勢された状態を呈する(図1(a))。
そして、鍔部12を壁面材a側に押し込んだ際には、弾性部2が壁面材aと鍔部12に挟まれて圧縮した状態となり、摺動部1の頭部が壁面材aの前面側に突出した状態となる(図1(b))。この突出部分が掛止しろ3となる。
(3) Function By adopting such a configuration, in the initial state, the sliding portion 1 exhibits a state of being urged toward the back side of the wall surface material a by the elastic force of the elastic portion (see FIG. 1 (a)).
And when the collar part 12 is pushed in to the wall surface material a side, the elastic part 2 will be in the state compressed between the wall material a and the collar part 12, and the head of the sliding part 1 will be the front surface of the wall material a. It will be in the state protruded to the side (FIG.1 (b)). This protruding portion becomes the latching margin 3.

<2>仮設足場
本発明の足場構造に用いる仮設足場について図2を参照しながら説明する。
本発明の仮設足場Bは、前記設置治具Aと共働して連結機構を構成するための部材である。
本実施例では、仮設足場Bを、ブラケット4とブラケット4の上方に設ける足場板5と、ブラケット4の前面に設けた連結板6とで構成している(図2(a))。
ブラケット4及び足場板5は周知構造であるため、詳細な説明を省略する。
<2> Temporary scaffold The temporary scaffold used for the scaffold structure of this invention is demonstrated referring FIG.
The temporary scaffold B of the present invention is a member for constituting a coupling mechanism in cooperation with the installation jig A.
In this embodiment, the temporary scaffold B is composed of the bracket 4, a scaffold plate 5 provided above the bracket 4, and a connecting plate 6 provided on the front surface of the bracket 4 (FIG. 2A).
Since the bracket 4 and the scaffolding plate 5 have a well-known structure, detailed description is omitted.

(1)連結板
連結板6は、前記設置治具Aの摺動部1と連結するための部材である。
本実施例では、前記摺動部1に掛止側としてのボルト11を設けている為、前記連結板6に被掛止側の機構を設けている。
(1) Connecting plate The connecting plate 6 is a member for connecting with the sliding part 1 of the installation jig A.
In this embodiment, since the sliding part 1 is provided with the bolt 11 as the latching side, the coupling plate 6 is provided with the mechanism on the latching side.

前記連結板6は、前記ボルト11を差し込むための差し込み穴61と、差し込み部61の上方に連通して設けた摺動溝62と、前記ボルト11を固定するための固定穴63で構成する(図2(b))。
前記差し込み穴61は、前記ボルト11の頭部の断面形状より大きな形状とする。前記摺動溝62は、前記ボルト11のねじ部の断面形状よりやや大きな形状とする。前記固定穴63は、前記ボルト11のねじ部の断面形状より大きく、前記ボルト11の頭部の断面形状より小さな形状とする。
The connecting plate 6 includes an insertion hole 61 for inserting the bolt 11, a sliding groove 62 provided in communication above the insertion portion 61, and a fixing hole 63 for fixing the bolt 11 ( FIG. 2 (b)).
The insertion hole 61 has a shape larger than the cross-sectional shape of the head of the bolt 11. The sliding groove 62 has a shape slightly larger than the cross-sectional shape of the threaded portion of the bolt 11. The fixing hole 63 is larger than the cross-sectional shape of the threaded portion of the bolt 11 and smaller than the cross-sectional shape of the head of the bolt 11.

(2)段差面
なお、本発明の仮設足場には、前記壁面材aとの掛止時において、前記壁面材aとの間に隙間65を設けるための段差面64を形成するようにしてもよい(図2(a))。
この段差面64を形成するにあたっては、前記連結板6の一部を仮設足場Bの後方側にオフセットする方法がある。
前記段差面64と壁面材aとの間に生じた隙間65は、壁面材a前面のデザイン(はつり、割石、ストライプなど)による不陸を吸収することができる。
(2) Stepped surface In the temporary scaffold according to the present invention, a stepped surface 64 for forming a gap 65 between the wall surface material a and the wall surface material a may be formed when the wall surface material a is hooked. Good (FIG. 2 (a)).
In forming the stepped surface 64, there is a method in which a part of the connecting plate 6 is offset to the rear side of the temporary scaffold B.
The gap 65 formed between the stepped surface 64 and the wall surface material a can absorb unevenness due to the design of the front surface of the wall surface material a (e.g., a hanger, a crushed stone, and a stripe).

(3)緩衝材
また、前記段差面64の一部には、前記隙間65の厚さに相当する緩衝材66を適宜配置しておくこともよい(図2(a))。
緩衝材66は、木材などの周知の部材を用いることができる。
前記緩衝材66によれば、仮設足場Bの接触に起因する壁面材aの破損を防止したり、仮設足場Bと壁面材aとの接地面積の増大による、設置後の安定性の向上にも寄与することができる。
(3) Buffer material Further, a buffer material 66 corresponding to the thickness of the gap 65 may be appropriately disposed on a part of the stepped surface 64 (FIG. 2A).
As the buffer material 66, a known member such as wood can be used.
According to the buffer material 66, it is possible to prevent damage to the wall surface material a due to contact with the temporary scaffold B, and to improve stability after installation by increasing the ground contact area between the temporary scaffold B and the wall surface material a. Can contribute.

<3>使用方法
本発明の設置治具A及び仮設足場Bの使用方法について、図3を参照しながら説明する。
(1)取付時
前提として、仮設足場Bの設置は、該仮設足場Bを設置する壁面材aを取付けた後であって、壁面材aの背面に完全に盛土bがなされるまでの間に行う必要がある。
まず、設置治具Aの摺動部1のボルト11の頭部を壁面材aの前方側へと突出させて掛止しろ3を確保する。このボルト11を突出させる方法としては、壁面材aの背面において、鍔部12を押し込む方法がある。
<3> Usage Method A usage method of the installation jig A and the temporary scaffold B of the present invention will be described with reference to FIG.
(1) At the time of installation As a premise, the temporary scaffold B is installed after the wall surface material a for installing the temporary scaffold B is mounted and until the embankment b is completely formed on the back surface of the wall surface material a. There is a need to do.
First, the head 3 of the bolt 11 of the sliding part 1 of the installation jig A is projected to the front side of the wall surface material a to secure the latching margin 3. As a method of projecting the bolt 11, there is a method of pushing the flange portion 12 on the back surface of the wall surface material a.

なお、ボルト11を突出させた壁面材aの背面側における設置治具Aの周辺には、別途カバー7を設けておく。これは、盛土した土が摺動部1の後端と干渉して、摺動部1が初期位置へ復帰しない問題を防止するためである。   A separate cover 7 is provided around the installation jig A on the back side of the wall surface material a from which the bolt 11 is projected. This is to prevent the problem that the earth filled up interferes with the rear end of the sliding portion 1 and the sliding portion 1 does not return to the initial position.

ボルト11を突出させた状態のまま、仮設足場Bをボルト11の近辺へクレーンで吊り上げる。そして、仮設足場Bの連結板6に設けた差し込み穴61に、ボルト11を差し込む。
この状態から、仮設足場Bを下方へと押し下げると、ボルト11は摺動溝62を介して固定穴63へとスライドして掛止され、図3の状態を呈する(図3)。
The temporary scaffold B is lifted by a crane in the vicinity of the bolt 11 with the bolt 11 protruding. Then, the bolt 11 is inserted into the insertion hole 61 provided in the connection plate 6 of the temporary scaffold B.
When the temporary scaffold B is pushed downward from this state, the bolt 11 is slid into the fixing hole 63 via the sliding groove 62 and is hooked, resulting in the state of FIG. 3 (FIG. 3).

(2)取り外し時
仮設足場Bの撤去時には、仮設足場Bをクレーンで上方に引き上げ、ボルト11が差し込み穴61の位置に達してから仮設足場Bを後方へと引き戻す動作のみで、掛止構造が解除され、取り外しが可能となる。
ボルト11は、前記弾性部によって壁面材aの背面方向へと付勢されているため、初期位置まで自動的に復帰することとなる。
(2) At the time of removal When removing the temporary scaffold B, the temporary scaffold B is lifted upward with a crane, and only the operation of pulling back the temporary scaffold B backward after the bolt 11 reaches the position of the insertion hole 61 is achieved. It is released and can be removed.
Since the bolt 11 is urged toward the back surface of the wall surface material a by the elastic portion, the bolt 11 automatically returns to the initial position.

足場構造の参考例について、図4を参照しながら説明する。
この足場構造では、設置治具Aと仮設足場Bの連結機構を入れ換えても良い。
すなわち、設置治具Aを被掛止側とし、仮設足場Bを掛止側とすることができる。
このとき、設置治具Aにおける摺動部1は、先端に挿通孔81を設けた平板部材8を用いることができる。
そして、仮設足場Bには、前記挿通孔81に挿通自在なフック9を設けておく。
上記構成であっても、仮設足場Bの脱着方法に大きな違いはない。
A reference example of the scaffold structure will be described with reference to FIG.
In this scaffold structure, the connecting mechanism of the installation jig A and the temporary scaffold B may be interchanged.
That is, the installation jig A can be the hooked side, and the temporary scaffold B can be the hooking side.
At this time, the sliding member 1 in the installation jig A can use the flat plate member 8 provided with the insertion hole 81 at the tip.
The temporary scaffold B is provided with a hook 9 that can be inserted through the insertion hole 81.
Even if it is the said structure, there is no big difference in the removal | desorption method of the temporary scaffold B. FIG.

本発明の足場構造の第3実施例について、図5を参照しながら説明する。
本発明の足場構造では、壁面材aの貫通孔a1の前面側に凹部a2を設けることもできる。
上記構成によれば、初期状態において、設置治具Aを構成する摺動部1の頭部が壁面材aの前面から突出せずに凹部a2内に隠れるため、景観性に優れる。
A third embodiment of the scaffold structure of the present invention will be described with reference to FIG.
In the scaffold structure of the present invention, the recess a2 can be provided on the front side of the through hole a1 of the wall material a.
According to the said structure, since the head of the sliding part 1 which comprises the installation jig | tool A is hidden in the recessed part a2 without protruding from the front surface of the wall surface material a in an initial state, it is excellent in scenery property.

a 壁面材
a1 貫通孔
a2 凹部
b 盛土
c 補強材
d 仮設足場
e 型枠
f 笠コンクリート
A 設置治具
1 摺動部
11 ボルト
12 鍔部
2 弾性部
3 掛止しろ
B 仮設足場
4 ブラケット
5 足場板
6 連結板
61 差し込み穴
62 摺動溝
63 固定穴
64 段差面
65 隙間
66 緩衝材
7 カバー
8 平板部材
81 挿通孔
9 フック
a Wall material a1 Through-hole a2 Recess b Filling c Reinforcement material d Temporary scaffolding e Formwork f Shade concrete A Installation jig 1 Sliding part 11 Bolt 12 Rigid part 2 Elastic part 3 Suspension B Temporary scaffolding 4 Bracket 5 Scaffolding plate 6 connecting plate 61 insertion hole 62 sliding groove 63 fixing hole 64 step surface 65 gap 66 cushioning material 7 cover 8 flat plate member 81 insertion hole 9 hook

Claims (4)

補強土壁を構築する壁面材の前面に仮設足場を構築するための足場構造であって、
前記壁面材の躯体に貫通して壁面材の前背面に移動自在に設けた設置治具と、
前記壁面材の前面側で前記設置治具と掛止または掛止解除可能な仮設足場と、からなり、
前記仮設足場は足場板を載置するブラケットと、
前記ブラケットの前記壁面材の前面と対向する部位に付設した連結板とを具備し、
前記連結板はその上部に前記設置治具と係脱可能な穴を有し、
前記設置治具は前記壁面材を貫通して前背面に移動自在な摺動部と、
前記壁面材の背面側に設け、前記摺動部を背面方向へと付勢する弾性部とを有し、
前記連結板のスライドにより、壁面材の前方へ突出させた設置治具の摺動部と前記連結板の穴とを係脱可能に構成したことを特徴とする、
補強土壁の足場構造。
A scaffold structure for constructing a temporary scaffold on the front surface of a wall material for constructing a reinforced earth wall,
An installation jig that penetrates the housing of the wall surface material and is provided movably on the front and back surfaces of the wall surface material ;
And the installation jig and latching or locking releasable temporary scaffold front side of the wall member, Ri Tona,
The temporary scaffold is a bracket for placing a scaffold plate,
A connecting plate attached to a portion of the bracket facing the front surface of the wall surface material;
The connecting plate has a hole in the upper part thereof that can be detached from the installation jig,
The installation jig penetrates the wall surface material and is freely movable to the front and back surfaces, and
Provided on the back side of the wall material, and having an elastic part for biasing the sliding part in the back direction,
The slide of the connecting plate is configured to be detachable from the sliding portion of the installation jig that protrudes forward of the wall material and the hole of the connecting plate .
Scaffolding structure of reinforced earth wall.
前記仮設足場の連結板はその下部に、前記壁面材への設置時に、前記壁面との間に隙間を形成する段差面を有することを特徴とする、請求項1に記載の補強土壁の足場構造。 The connecting plate the lower portion thereof of said temporary scaffold, upon installation into the wall material, characterized by having a step surface forming a gap between the wall member, the reinforced soil wall according to claim 1 Scaffold structure. 前記段差面に緩衝材を設けたことを特徴とする、請求項に記載の補強土壁の足場構造。 The scaffold structure for reinforcing earth wall according to claim 2 , wherein a buffer material is provided on the step surface. 請求項1乃至3の何れか一項に記載した補強土壁の足場構造に用いる設置治具であって、
前記壁面材を貫通して前背面に移動自在な摺動部と、
前記壁面材の背面側に設け、前記摺動部を背面方向へと付勢する弾性部と、を有し、
前記壁面材の前方へ突出させた設置治具の摺動部が前記連結板の穴に係脱可能であることを特徴とする、
設置治具。
An installation jig used for the scaffold structure of the reinforced earth wall according to any one of claims 1 to 3 ,
A sliding portion that penetrates the wall surface material and is movable to the front and back surfaces;
Provided on the back side of the wall member, have a, an elastic portion for urging said sliding portion and toward the rear,
The sliding portion of the installation jig that protrudes forward of the wall surface material is detachable from the hole of the connecting plate ,
Installation jig.
JP2012086428A 2012-04-05 2012-04-05 Scaffolding structure of reinforced earth wall and its installation jig Active JP5934013B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012086428A JP5934013B2 (en) 2012-04-05 2012-04-05 Scaffolding structure of reinforced earth wall and its installation jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012086428A JP5934013B2 (en) 2012-04-05 2012-04-05 Scaffolding structure of reinforced earth wall and its installation jig

Publications (2)

Publication Number Publication Date
JP2013217041A JP2013217041A (en) 2013-10-24
JP5934013B2 true JP5934013B2 (en) 2016-06-15

Family

ID=49589471

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012086428A Active JP5934013B2 (en) 2012-04-05 2012-04-05 Scaffolding structure of reinforced earth wall and its installation jig

Country Status (1)

Country Link
JP (1) JP5934013B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7255790B2 (en) 2018-06-15 2023-04-11 三菱重工業株式会社 semiconductor equipment

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2123584A6 (en) * 1971-01-11 1972-09-15 Noel Lucien
JPS57114043U (en) * 1980-12-31 1982-07-14
JPS58138764U (en) * 1982-03-15 1983-09-19 ナショナル住宅産業株式会社 scaffolding equipment
FR2555228B1 (en) * 1983-11-23 1986-03-28 Fournier & Cie DEVICE FOR ANCHORING SECURITY ELEMENTS TO EXTERIOR WALLS OF A CONSTRUCTION AND CONSTRUCTIONS IN AT LEAST ONE OF THE WALLS OF WHICH SUCH A DEVICE IS PROVIDED
JPH01235773A (en) * 1988-03-14 1989-09-20 Kunio Futai Structure provided with foundation for erecting scaffolding
JPH0629356Y2 (en) * 1989-10-12 1994-08-10 川鉄商事株式会社 Brackets and other mounting hardware for reinforced soil walls
JPH0557205U (en) * 1991-12-27 1993-07-30 ミサワホーム株式会社 Scaffolding device with built-in outer wall
JP3018735U (en) * 1995-05-29 1995-11-28 賢次 久保 Wall joint mounting hardware
JP2003020797A (en) * 2001-07-06 2003-01-24 Kawatetsu Civil Kk Fall preventive jig and method for constructing fall preventive fence using the same
JP2004183391A (en) * 2002-12-05 2004-07-02 Clion Co Ltd Stage for erecting outer wall panel, and outer wall panel erecting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7255790B2 (en) 2018-06-15 2023-04-11 三菱重工業株式会社 semiconductor equipment

Also Published As

Publication number Publication date
JP2013217041A (en) 2013-10-24

Similar Documents

Publication Publication Date Title
KR101210833B1 (en) Automatic safety device for quick coupler
KR101338036B1 (en) Automatic safety device for quick coupler
WO2007123653A3 (en) Wear assembly
JP5934013B2 (en) Scaffolding structure of reinforced earth wall and its installation jig
KR101676530B1 (en) Housing with self-mounting feature
JP3202170U (en) Reinforced earth wall scaffolding equipment
AU2013216670B2 (en) Automatic safety device for quick coupler
CN210164042U (en) Beam and floor assembled composite structure
CN209637149U (en) Light energy saving brick
KR101668667B1 (en) Mounting structure of weight which is mounted on front of tractor
JP3152695U (en) Hook device
JP5629396B1 (en) Lining plate fastening device
JP5765972B2 (en) Composite panel for tunnel wall
JP2013096157A (en) Structure and method for fitting wall surface panel
JP6505305B1 (en) Water blocking panel mounting device
CN210003597U (en) furnace lining quick push-out device
KR101581915B1 (en) Fixing structure of wall and construction for using fastener
JP3193873U (en) Concrete formwork fixing device
US20180080244A1 (en) Vehicle Mounted T-Post Remover
WO2011102482A1 (en) L-shaped retaining wall and l-shaped retaining wall unit
CN214784982U (en) Cast-in-place wall body component of housing construction
CN217870097U (en) Noise isolation wall for highway
JP5753553B2 (en) Retaining wall or repair method
CN204326545U (en) A kind of concrete placing boom and the support that climbs
CN102383599A (en) Casting method for concrete wall and special mould thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150831

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150908

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151104

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160426

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160506

R150 Certificate of patent or registration of utility model

Ref document number: 5934013

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250