Prior art keywords
disaster
priority
storage means
consumers
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014053125A
Other languages
Japanese (ja)
Other versions
JP2015177665A (en
Inventor
政彦 和田
政彦 和田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2014053125A priority Critical patent/JP5903121B2/en
Publication of JP2015177665A publication Critical patent/JP2015177665A/en
Application granted granted Critical
Publication of JP5903121B2 publication Critical patent/JP5903121B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Description

この発明は、災害によって停電が発生した場合に、給電の復旧を支援する災害復旧支援システムおよび災害復旧支援プログラムに関する。   The present invention relates to a disaster recovery support system and a disaster recovery support program that support power supply recovery when a power failure occurs due to a disaster.

地震や台風などの災害によって広範囲な停電が発生した場合、従来、優先順位を設けずに公正に給電の復旧を行うのが通常であった。このため、優先的に電力を供給すべき需要家・施設が存在しても、これらの需要家に対する復旧が遅れてしまい、地域の災害救助に支障をきたすおそれがある。   When a wide range of power outages occur due to disasters such as earthquakes and typhoons, it has been usual to restore power supply fairly without setting priorities. For this reason, even if there are customers / facility to which power should be preferentially supplied, recovery for these customers may be delayed, which may hinder local disaster relief.

これに対して、予め負荷(需要家)に重要度・優先順位を定め、復旧の際に重要度の高い負荷から順に復旧する、というシステムが知られている(例えば、特許文献1参照。)。このシステムは、供給支障地域に含まれる停電負荷で復旧可能な負荷に対して、優先順位の高い負荷から順に負荷送電手順を作成するものである。   On the other hand, a system is known in which importance (priority) is assigned to a load (customer) in advance, and the load is restored in order from the most important load at the time of restoration (for example, see Patent Document 1). . This system creates a load transmission procedure for loads that can be recovered by a power outage load included in a supply-prone area in order from the load with the highest priority.

特開平05−191925号公報JP 05-191925 A

ところで、災害時に優先的に電力を供給すべき需要家は、一義的に定まるものではなく、災害によって生じた需要家の状況によって決定されるべきものである。しかしながら、特許文献1のシステムでは、優先順位が予め一義的に定まっているため、需要家の状況に応じた適正な優先順位で復旧することができない場合が生じる。   By the way, the consumer who should supply power preferentially at the time of a disaster is not uniquely determined, but should be determined by the situation of the customer caused by the disaster. However, in the system of Patent Document 1, since the priority order is uniquely determined in advance, there may be a case where recovery cannot be performed with an appropriate priority order according to the situation of the customer.

そこでこの発明は、需要家の状況に応じた適正な優先順位で復旧することを可能にする、災害復旧支援システムおよび災害復旧支援プログラムを提供することを目的とする。   SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a disaster recovery support system and a disaster recovery support program that enable recovery with an appropriate priority according to the situation of a customer.

上記課題を解決するために、請求項1の発明は、災害によって停電が発生した場合に、電力供給の復旧を支援する災害復旧支援システムであって、各需要家への電力供給系統を記憶する供給系統記憶手段と、公共施設である需要家や、病院である需要家、生命維持に必要な電動医療機器を使用する需要家を含む、特定需要家の位置を含む需要家情報を記憶する需要家情報記憶手段と、災害の発生日時や内容、規模を含む災害情報を取得する災害情報取得手段と、現在時刻と、前記供給系統記憶手段に記憶された前記電力供給系統と、前記需要家情報記憶手段に記憶された前記需要家情報と、前記災害情報取得手段で取得した前記災害情報とに基づいて、公益性が高くなっていると予測される需要家や、被災者が集まっていると予測される需要家、生命の危機にさらされるおそれがあると予測される需要家を含む、優先需要家を割り出し、該優先需要家の復旧優先順位を高く策定する復旧順位策定手段と、前記復旧順位策定手段で策定された復旧優先順位に従って電力を供給するために、電源側から復旧すべき系統ルートを、前記供給系統記憶手段に記憶された前記電力供給系統に基づいて策定する復旧ルート策定手段と、巡視の際に発見された不良内容や不良位置を含む巡視情報を記憶する巡視情報記憶手段と、前記復旧ルート策定手段で策定された系統ルートにおいて、作業員を配置すべき位置を、前記巡視情報記憶手段に記憶された前記巡視情報に基づいて策定する作業員策定手段と、を備えることを特徴とする。 In order to solve the above problems, the invention of claim 1 is a disaster recovery support system that supports recovery of power supply when a power failure occurs due to a disaster, and stores a power supply system to each customer Demand for storing customer information including the location of specific consumers, including supply system storage means, consumers who are public facilities, consumers who are hospitals, and consumers who use electric medical equipment necessary for life support House information storage means, disaster information acquisition means for acquiring disaster information including disaster occurrence date and time, content, scale, current time, the power supply system stored in the supply system storage means, and customer information Based on the customer information stored in the storage means and the disaster information acquired by the disaster information acquisition means, consumers and victims who are predicted to have high public interest are gathered Forecasted demand , Including a demand who is predicted that there is a risk of being exposed to the crisis of life, indexing the priority customers, and the recovery order develop means to increase develop a restoration priority of the priority customers, developed in the recovery order established means In order to supply power in accordance with the restoration priority order, a restoration route formulating means for formulating a system route to be restored from the power source side based on the power supply system stored in the supply system storage means; In the inspection information storage means, the inspection information storage means for storing inspection information including the defect content and the defect position discovered in the above, and the position where the worker should be arranged in the system route established by the recovery route establishment means is stored in the inspection information storage means. And a worker formulating unit that formulates based on the stored inspection information .

この発明によれば、災害情報取得手段によって災害の発生日時や内容、規模などの災害情報が取得されると、復旧順位策定手段によって、現在時刻と、各需要家への電力供給系統と、特定需要家の位置などの需要家情報と、取得された災害情報とに基づいて、公益性が高くなっていると予測される需要家や、被災者が集まっていると予測される需要家、生命の危機にさらされるおそれがあると予測される需要家、などの優先需要家が割り出され、この優先需要家の復旧優先順位が高く策定される。   According to the present invention, when disaster information such as the date and time of occurrence, contents, and scale of the disaster is acquired by the disaster information acquisition means, the current time, the power supply system to each customer, and the identification are determined by the recovery order formulation means Based on the customer information such as the customer's location and the acquired disaster information, consumers who are expected to have high public interest, consumers who are predicted to have gathered victims, and life A priority customer such as a customer who is predicted to be exposed to a crisis is determined, and the priority of restoration of the priority customer is set high.

請求項の発明は、災害によって停電が発生した場合に、電力供給の復旧を支援するための災害復旧支援プログラムであって、コンピュータを、各需要家への電力供給系統を記憶する供給系統記憶手段と、公共施設である需要家や、病院である需要家、生命維持に必要な電動医療機器を使用する需要家を含む、特定需要家の位置を含む需要家情報を記憶する需要家情報記憶手段と、災害の発生日時や内容、規模を含む災害情報を取得する災害情報取得手段と、現在時刻と、前記供給系統記憶手段に記憶された前記電力供給系統と、前記需要家情報記憶手段に記憶された前記需要家情報と、前記災害情報取得手段で取得した前記災害情報とに基づいて、公益性が高くなっていると予測される需要家や、被災者が集まっていると予測される需要家、生命の危機にさらされるおそれがあると予測される需要家を含む、優先需要家を割り出し、該優先需要家の復旧優先順位を高く策定する復旧順位策定手段前記復旧順位策定手段で策定された復旧優先順位に従って電力を供給するために、電源側から復旧すべき系統ルートを、前記供給系統記憶手段に記憶された前記電力供給系統に基づいて策定する復旧ルート策定手段と、巡視の際に発見された不良内容や不良位置を含む巡視情報を記憶する巡視情報記憶手段と、前記復旧ルート策定手段で策定された系統ルートにおいて、作業員を配置すべき位置を、前記巡視情報記憶手段に記憶された前記巡視情報に基づいて策定する作業員策定手段、として機能させることを特徴とする。 The invention of claim 2 is a disaster recovery support program for supporting recovery of power supply in the event of a power failure due to a disaster, wherein the computer stores the power supply system for each consumer. Customer information storage that stores customer information including the location of specific consumers, including means, consumers who are public facilities, consumers who are hospitals, and consumers who use electric medical equipment necessary for life support Means, disaster information acquisition means for acquiring disaster information including disaster occurrence date and time, content, scale, current time, the power supply system stored in the supply system storage means, and customer information storage means Based on the stored customer information and the disaster information acquired by the disaster information acquisition means, it is predicted that consumers and disaster victims are expected to have high public interest. Consumer Including a demand who is expected that there is a risk of being exposed to the crisis of life, indexing the priority customers, and the recovery order develop means to increase develop a restoration priority of the priority customers, it is developed in the recovery order established means In order to supply power in accordance with the restoration priority, a restoration route formulating means for formulating a system route to be restored from the power supply side based on the power supply system stored in the supply system storage means; In the inspection information storage means for storing inspection information including the detected defect content and the defect position, and in the system route established by the recovery route establishment means, the position where the worker should be arranged is stored in the inspection information storage means. It is made to function as a worker formulating means that formulates based on the inspection information .

請求項1、の発明によれば、現在時刻と電力供給系統と需要家情報と災害情報とに基づいて、公益性が高くなっていると予測される需要家や、被災者が集まっていると予測される需要家、生命の危機にさらされるおそれがあると予測される需要家、などの優先需要家が割り出され、この優先需要家の復旧優先順位が高く策定される。すなわち、災害の発生によって真に早期電力供給が必要となった需要家が割り出され、この需要家の復旧優先順位が高く策定されるため、需要家の状況に応じた適正かつ柔軟な優先順位で復旧することが可能となる。 According to the first and second aspects of the present invention, consumers and victims who are expected to have high public interest are gathered based on the current time, power supply system, customer information, and disaster information. Priority consumers such as a predicted consumer and a consumer who is predicted to be at risk of life are determined, and the priority order of restoration of the priority consumer is set high. In other words, a customer who really needed early power supply due to the occurrence of a disaster is identified, and the recovery priority of this customer is set high. Therefore, an appropriate and flexible priority according to the situation of the customer Can be recovered.

また、復旧優先順位に従って電力を供給するために、電源側から復旧すべき系統ルート(送電手順)が策定されるため、この系統ルートに従って復旧させることで、真に早期電力供給が必要となった需要家に対して、早期かつ確実に復旧することが可能となる。 In addition , in order to supply power according to the restoration priority order, a system route (transmission procedure) to be restored from the power source side is formulated, and by restoring according to this system route, a truly early power supply is required. It is possible to restore the customer early and reliably.

さらに、系統ルートにおいて作業員を配置すべき位置が、巡視の際に発見された不良内容や不良位置などに基づいて策定されるため、この位置に作業員を配置することで、不良箇所を早期かつ適正に解消して、真に早期電力供給が必要となった需要家に対して、早期かつ確実に復旧することが可能となる。
In addition , the location where workers should be placed on the system route is determined based on the details of defects and locations discovered during patrols. In addition, it is possible to quickly and surely recover a consumer who has been properly eliminated and who really needed an early power supply.

この発明の実施の形態に係る災害復旧支援システムを示す概略構成ブロック図である。It is a schematic block diagram showing a disaster recovery support system according to an embodiment of the present invention. 図1の災害復旧支援システムの系統データベースの電力供給系統の例を示す図である。It is a figure which shows the example of the electric power supply system of the system | strain database of the disaster recovery assistance system of FIG. 図1の災害復旧支援システムの区間データベースのデータ例を示す図である。It is a figure which shows the example of data of the area database of the disaster recovery assistance system of FIG. 図1の災害復旧支援システムによる送電優先順位と送電手順と作業員配置手順の第1の例を示す図である。It is a figure which shows the 1st example of the power transmission priority, the power transmission procedure, and worker arrangement | positioning procedure by the disaster recovery assistance system of FIG. 図1の災害復旧支援システムによる送電優先順位と送電手順と作業員配置手順の第2の例を示す図である。It is a figure which shows the 2nd example of the power transmission priority, the power transmission procedure, and worker arrangement | positioning procedure by the disaster recovery assistance system of FIG. 図1の災害復旧支援システムの作用を示すフローチャートである。It is a flowchart which shows the effect | action of the disaster recovery assistance system of FIG.

以下、この発明を図示の実施の形態に基づいて説明する。   The present invention will be described below based on the illustrated embodiments.

図1は、この発明の実施の形態に係る災害復旧支援システム1を示す概略構成ブロック図である。この災害復旧支援システム1は、地震や台風などの災害によって停電が発生した場合に、電力供給の復旧を支援するシステムであり、主として、系統データベース(供給系統記憶手段)2と、区間データベース(需要家情報記憶手段、巡視情報記憶手段)3と、通信部(災害情報取得手段)4と、順位策定タスク(復旧順位策定手段)5と、ルート策定タスク(復旧ルート策定手段)6と、作業員策定タスク(作業員策定手段)7と、これらを制御などする中央処理部8とを備えている。   FIG. 1 is a schematic block diagram showing a disaster recovery support system 1 according to an embodiment of the present invention. This disaster recovery support system 1 is a system that supports recovery of power supply in the event of a power failure due to a disaster such as an earthquake or a typhoon, and mainly includes a system database (supply system storage means) 2 and a section database (demand). House information storage means, patrol information storage means) 3, communication section (disaster information acquisition means) 4, order formulation task (recovery order formulation means) 5, route development task (recovery route formulation means) 6, and workers A formulation task (worker formulation means) 7 and a central processing unit 8 that controls these tasks are provided.

系統データベース2は、各需要家への電力供給系統を記憶するデータベースである。具体的には、図2に示すように、各変電所(電源側)から各需要家に電力を供給するための送配電線の経路(電力供給系統図)が記憶されている。ここで、柱上開閉器DM間を1区間とする。また、図2に示すA区間〜I区間が停電した場合について、主として以下に説明する。   The system database 2 is a database that stores a power supply system to each consumer. Specifically, as shown in FIG. 2, a route (power supply system diagram) of transmission and distribution lines for supplying power from each substation (power supply side) to each consumer is stored. Here, a section between the pole switches DM is defined as one section. Moreover, the case where the A section-I section shown in FIG.

区間データベース3は、公共施設である需要家や、病院である需要家、生命維持に必要な電動医療機器(例えば、呼吸器)を使用する需要家を含む、特定需要家の位置を含む需要家情報や、巡視の際に発見された不良内容や不良位置を含む巡視情報を記憶するデータベースである。この実施の形態では、区間ごとに、需要家情報や巡視情報を含む情報が記憶されている。   The section database 3 includes customers who are public facilities, consumers who are hospitals, and consumers who use electric medical devices (for example, respiratory organs) necessary for life support, including consumers of specific consumers. This is a database that stores information and inspection information including defect contents and defect positions discovered during inspection. In this embodiment, information including customer information and patrol information is stored for each section.

具体的には、図3に示すように、区間ごとに、特定需要家31、巡視結果32、停電履歴33、停電予定34、戸数35、区間情報36などが記憶されている。特定需要家31には、この区間に特定需要家が存在するか否か、存在する場合の内容・種別などの需要家情報が記憶されている。このように、この実施の形態では、区間ごとに特定需要家が存在するか否かなどを記憶することで、特定需要家の位置(区間)を含む需要家情報が記憶されている。ここで、特定需要家には、役所(公共施設である需要家)や病院、呼吸器を使用する需要家、避難所に指定されている学校、インフラの拠点(通信施設、ガス施設)などが含まれ、1区間に複数の特定需要家が存在してもよいことは勿論である。   Specifically, as shown in FIG. 3, a specific customer 31, a patrol result 32, a power outage history 33, a power outage schedule 34, the number of units 35, section information 36, and the like are stored for each section. The specific customer 31 stores customer information such as whether or not there is a specific customer in this section, and the content and type in the case of the specific customer. Thus, in this embodiment, by storing whether or not a specific customer exists for each section, customer information including the position (section) of the specific consumer is stored. Here, specific consumers include government offices (customers that are public facilities), hospitals, consumers who use respiratory equipment, schools designated as shelters, infrastructure bases (communication facilities, gas facilities), etc. Of course, a plurality of specific consumers may exist in one section.

巡視結果32には、この区間において過去に行った巡視点検の際に、発見された不良内容や良否判定などを含む巡視情報が記憶されている。このように、この実施の形態では、区間ごとに巡視情報を記憶することで、不良位置(不良区間)を含む巡視情報が記憶されている。停電履歴33には、過去1年以内に発生した停電の有無と回数が記憶され、停電予定34には、所定期間内に予定されている停電の有無が記憶され、戸数35には、この区間内の需要家数が記憶されている。区間情報36には、この区間が都市部か田園地帯か、あるいは山間部であるかの地域情報や、変電所からこの区間までの距離、変電所からこの区間までの移動時間が記憶されている。   The patrol result 32 stores patrol information including defective contents and pass / fail judgments, etc., which were found during a patrol inspection performed in the past in this section. Thus, in this embodiment, the patrol information including the defective position (defective section) is stored by storing the patrol information for each section. The power outage history 33 stores the presence and number of power outages that occurred within the past year, the power outage schedule 34 stores the presence or absence of a power outage scheduled within a predetermined period, and the number of units 35 includes this section. The number of consumers is stored. The section information 36 stores regional information on whether this section is an urban area, a rural area, or a mountainous area, the distance from the substation to this section, and the travel time from the substation to this section. .

通信部4は、外部と情報・データを送受信するための通信インターフェイスであり、外部から、災害の発生日時や内容、規模を含む災害情報を受信・取得するようになっている。ここで、外部には、災害情報を収集、管理する機関のサーバ・コンピュータなどが含まれ、災害情報には、避難所の名称や位置、避難者数、災害によって孤立した地域、後述するような情報なども含まれる。また、停電範囲や停電発生日時、復旧状況などを含む停電情報を生成する配電自動化システムも外部に含まれ、停電情報を災害情報として受信するようにもなっている。   The communication unit 4 is a communication interface for transmitting / receiving information / data to / from the outside, and receives / acquires disaster information including the date / time, contents, and scale of disaster occurrence from the outside. Here, the outside includes server computers, etc. of organizations that collect and manage disaster information. Disaster information includes the name and location of shelters, the number of evacuees, areas isolated due to disasters, as described below. Information is also included. In addition, a power distribution automation system that generates power outage information including a power outage range, the date and time of occurrence of power outage, recovery status, and the like is included outside, and the power outage information is received as disaster information.

順位策定タスク5は、現在時刻と、系統データベース2に記憶された電力供給系統と、区間データベース3に記憶された需要家情報と、通信部4で取得した災害情報とに基づいて、公益性が高くなっていると予測される需要家や、被災者が集まっていると予測される需要家、生命の危機にさらされるおそれがあると予測される需要家を含む、優先需要家を割り出し、この優先需要家の復旧優先順位を高く策定するタスク・プログラムである。すなわち、停電情報の停電範囲に含まれる供給系統を系統データベース2から取得し、この供給系統・停電範囲内の需要家の中から、真に早期電力供給が必要とされる優先需要家を割り出し、この優先需要家が含まれる区間の送電優先順位(復旧優先順位)を高く設定するものである。   The rank formulation task 5 has a public benefit based on the current time, the power supply system stored in the grid database 2, the customer information stored in the section database 3, and the disaster information acquired by the communication unit 4. Identify priority consumers, including those who are expected to be high, those who are expected to be affected, and those who are predicted to be at risk of life. It is a task program that sets high priority for restoration of priority customers. That is, the power supply system included in the power outage range of the power outage information is acquired from the system database 2, and the priority customers that are required to supply power at an early stage are determined from the customers in the power supply system / power outage range. The power transmission priority (recovery priority) of the section including this priority consumer is set high.

具体的には、次のような需要家を優先需要家として割り出す。   Specifically, the following consumers are determined as priority consumers.

第1に、需要家が避難所に指定されている学校(特定需要家)であり、災害情報の災害内容と規模とから住民の避難が予測される場合、あるいは災害情報に避難勧告の発令が含まれている場合に、この需要家を、被災者が集まっている、あるいは集まると予測される優先需要家とする。   First, if a customer is a school (specified customer) designated as an evacuation center and the evacuation of residents is predicted based on the disaster content and scale of the disaster information, or an evacuation advisory is issued in the disaster information If included, this consumer is a priority consumer where the victims are or are expected to gather.

第2に、需要家が病院(特定需要家)であり、災害情報の災害内容と規模とから多くの住民が病院に搬送されると予測される場合、あるいは災害情報に多くの住民が負傷した情報や病院に搬送された情報が含まれている場合に、この需要家を、被災者が集まっている、あるいは集まると予測される優先需要家とする。   Second, if the consumer is a hospital (specific consumer) and it is predicted that many residents will be transported to the hospital based on the disaster content and scale of the disaster information, or many residents were injured in the disaster information When the information or the information conveyed to the hospital is included, this consumer is set as a priority consumer where the victims are gathered or predicted to gather.

第3に、需要家が市役所(特定需要家)であり、災害情報の災害内容と規模とから災害非常対策室などが設置されると予測される場合、あるいは災害情報に災害非常対策室が設置された情報が含まれている場合に、この需要家を、公益性が高くなっていると予測される優先需要家とする。   Third, if the customer is a city hall (specified customer) and a disaster emergency room is expected to be installed based on the disaster content and scale of the disaster information, or a disaster emergency room is installed in the disaster information If this information is included, this consumer is designated as a priority consumer that is expected to have high public interest.

第4に、需要家が呼吸器を使用する需要家(特定需要家)であり、災害情報(停電情報)の停電発生日時と現在時刻とから、呼吸器の電池が所定容量以下になる(切れる)と予測される場合に、この需要家を、生命の危機にさらされるおそれがあると予測される優先需要家とする。   Fourth, the consumer is a consumer (specific consumer) who uses the respiratory organs, and the battery of the respiratory organ becomes less than a predetermined capacity (runs out) from the power failure occurrence date and time of the disaster information (power failure information) and the current time. If this is predicted, this customer is made a priority consumer that is predicted to be at risk of life.

第5に、需要家が山間部に位置する需要家であり、災害情報の災害内容と規模とから、例えば、積雪による孤立が予測される場合、あるいは災害情報に孤立された地域の情報が含まれている場合に、この需要家を優先需要家とする。   Fifth, the customer is a customer located in a mountainous area, and, for example, when isolated due to snow is predicted from the disaster content and scale of the disaster information, or information on the isolated area is included in the disaster information If this is the case, this consumer is designated as the priority consumer.

第6に、需要家がインフラの拠点(特定需要家)であり、バックアップ電源(非常用発電機等)を有しているが、停電発生日時と現在時刻とから、バックアップ電源が所定容量以下になる(切れる)と予測される場合に、この需要家を優先需要家とする。   Sixth, the customer is an infrastructure base (special customer) and has a backup power source (emergency generator, etc.). When it is predicted that it will be (cut), this consumer is set as a priority consumer.

そして、このようして割り出した優先需要家が含まれる区間の送電優先順位を高く設定する。このとき、優先需要家を含む区間が複数ある場合には、所定のルールに基づいて、より多くの優先需要家を含む区間の優先順位をより高く設定したり、生命の危機にさらされるおそれがあると予測される優先需要家を含む区間の優先順位をより高く設定したり、被災者が集まっていると予測される優先需要家を含む区間の優先順位をより高く設定したりする。また、過去の停電回数が多く今後の停電予定がある区間や、戸数(停電戸数)が多い区間の優先順位をより高く設定してもよい。   And the power transmission priority of the section including the priority consumer calculated in this way is set high. At this time, when there are a plurality of sections including priority consumers, there is a possibility that the priority order of sections including more priority consumers may be set higher based on a predetermined rule or exposed to a life crisis. The priority of the section including the priority consumer predicted to be higher is set higher, or the priority of the section including the priority consumer predicted to be gathered with the disaster is set higher. Moreover, you may set the priority of a section with many past power failure frequency and a future power failure plan, and a section with many houses (the number of power outages) higher.

ルート策定タスク6は、順位策定タスク5で策定された復旧優先順位に従って電力を供給するために、電源側から復旧すべき系統ルートを、系統データベース2に記憶された電力供給系統に基づいて策定するタスク・プログラムである。すなわち、順位策定タスク5で送電優先順位が高く設定された区間に早期に電力を供給するために、電源側のどの区間からどの区間を順に復旧・送電すればよいか、という送電手順・復旧ルートを電力供給系統に基づいて策定するものである。   The route formulation task 6 formulates a system route to be restored from the power source side based on the power supply system stored in the system database 2 in order to supply power according to the recovery priority order formulated in the order formulation task 5. It is a task program. That is, a power transmission procedure / recovery route indicating which section on the power source side should be restored / transmitted in order to supply power early to the section set with a high power transmission priority in the ranking formulation task 5 Is formulated based on the power supply system.

具体的には、例えば、図4に示すように、H区間が第1の優先順位、I区間が第2の優先順位、A区間が第3の優先順位に策定された場合(ケース1の場合)、まず、第1の優先順位のH区間に送電するために、変電所(電源側)からH区間に至る中間地に位置するA区間とG区間を送電し、続いて、H区間を送電する。次に、第2の優先順位のI区間に送電するために、I区間を送電する。これにより、優先順位が高いH区間、I区間、A区間がすべて送電され、系統の幹線が送電されるため、分岐であるB区間、E区間、F区間に送電する。このとき、変電所(電源側)に近いB区間、E区間およびF区間の順に送電する。そして、残りのC区間とD区間に送電する、という送電手順を策定する。   Specifically, for example, as shown in FIG. 4, the H section is set to the first priority, the I section is set to the second priority, and the A section is set to the third priority (case 1). ) First, in order to transmit power to the H section of the first priority, power is transmitted through the A section and G section located at the intermediate point from the substation (power supply side) to the H section, and then the H section is transmitted. To do. Next, in order to transmit power to the I section having the second priority, the I section is transmitted. As a result, the H, I, and A sections with high priority are all transmitted, and the trunk line of the system is transmitted, so that power is transmitted to the B section, E section, and F section that are branches. At this time, power is transmitted in the order of B section, E section, and F section close to the substation (power supply side). Then, a power transmission procedure of transmitting power to the remaining C section and D section is formulated.

また、図5に示すように、A区間が第1の優先順位、H区間が第2の優先順位、I区間が第3の優先順位に策定された場合(ケース2の場合)、まず、第1の優先順位のA区間に送電するために、最初にA区間を送電する。次に、第2の優先順位のH区間に送電するために、変電所(電源側)からH区間に至る中間地に位置するG区間を送電してから、H区間を送電し、続いて、第3の優先順位のI区間に送電する。これにより、優先順位が高いA区間、H区間、I区間がすべて送電され、系統の幹線が送電されるため、分岐であるB区間、E区間、F区間に送電する。このとき、変電所(電源側)に近いB区間、E区間およびF区間の順に送電する。そして、残りのC区間とD区間に送電する、という送電手順を策定する。   Further, as shown in FIG. 5, when the A section is set to the first priority, the H section is set to the second priority, and the I section is set to the third priority (case 2), first, In order to transmit power to the A section having the priority of 1, the A section is first transmitted. Next, in order to transmit power to the second priority H section, the G section located at the intermediate point from the substation (power supply side) to the H section is transmitted, then the H section is transmitted, Power is transmitted to the I section of the third priority. As a result, the A section, the H section, and the I section with high priority are all transmitted, and the trunk line of the system is transmitted, so that power is transmitted to the B section, E section, and F section that are branches. At this time, power is transmitted in the order of B section, E section, and F section close to the substation (power supply side). Then, a power transmission procedure of transmitting power to the remaining C section and D section is formulated.

作業員策定タスク7は、ルート策定タスク6で策定された系統ルートにおいて、作業員を配置すべき位置を、区間データベース3に記憶された巡視情報に基づいて策定するタスク・プログラムである。すなわち、過去の巡視点検で不良(樹木接触や不良箇所など)が発見された区間に対して、ルート策定タスク6で策定された送電手順の順序が高い区間を優先して、作業員の配置手順(配置優先度)を策定するものである。この際、移動時間が長い区間を優先して策定してもよい。   The worker formulation task 7 is a task program that formulates the position where the worker is to be placed in the system route formulated in the route formulation task 6 based on the inspection information stored in the section database 3. In other words, for the section where defects (such as tree contact and defective parts) were found in the past inspection, the section in which the order of the power transmission procedure formulated in the route development task 6 is given priority is given. (Placement priority) is formulated. At this time, a section with a long travel time may be preferentially formulated.

具体的には、例えば、上記のケース1で、D区間とH区間で樹木接触が発見され、G区間で不良箇所が発見されている場合、図4に示すように、まず、送電手順の順序が高いG区間に、最初に作業員を配置する。次に、送電手順の順序がD区間よりも高い(移動時間も長い)H区間に作業員を配置し、その後、D区間に作業員を配置する、という作業員の配置手順を策定する。   Specifically, for example, in the case 1 described above, when a tree contact is found in the D section and the H section and a defective portion is found in the G section, first, as shown in FIG. First, workers are placed in the G section where is high. Next, a worker arrangement procedure is arranged in which workers are arranged in the H section where the order of the power transmission procedure is higher than that in the D section (travel time is longer), and then workers are arranged in the D section.

また、上記のケース2で、A区間とH区間で樹木接触が発見され、G区間で不良箇所が発見されている場合、図5に示すように、まず、送電手順の順序が高いA区間に、最初に作業員を配置する。次に、送電手順の順序がH区間よりも高いG区間に作業員を配置し、その後、H区間に作業員を配置する、という作業員の配置手順を策定する。   Further, in the case 2 described above, when a tree contact is found in the A section and the H section, and a defective part is found in the G section, first, as shown in FIG. First, arrange the workers. Next, a worker placement procedure is defined in which workers are placed in the G section where the power transmission procedure is higher than the H section, and then workers are placed in the H section.

次に、このような構成の災害復旧支援システム1の作用および、災害復旧支援システム1による災害復旧支援方法について説明する。   Next, the operation of the disaster recovery support system 1 having such a configuration and a disaster recovery support method by the disaster recovery support system 1 will be described.

災害によって停電が発生し、電力供給の復旧作業を行う前に、まず、図6に示すように、通信部4によって外部からの災害情報が受信・取得される(ステップS1)。次に、順位策定タスク5が起動され、上記のようにして、優先需要家が割り出され、この優先需要家を含む区間の復旧優先順位・送電優先順位が高く策定される(ステップS2)。続いて、ルート策定タスク6が起動され、復旧すべき区間の系統ルート・送電手順が策定され(ステップS3)、さらに、作業員策定タスク7が起動され、上記のようにして、各区間に対する作業員の配置手順が策定される(ステップS4)。   Before a power failure occurs due to a disaster and the power supply is restored, disaster information from the outside is first received / acquired by the communication unit 4 as shown in FIG. 6 (step S1). Next, the priority formulating task 5 is activated, the priority consumers are determined as described above, and the recovery priority / power transmission priority of the section including the priority consumers is set high (step S2). Subsequently, the route formulation task 6 is activated, the system route / power transmission procedure for the section to be restored is formulated (step S3), and the worker formulation task 7 is activated to perform the work for each segment as described above. A staff placement procedure is formulated (step S4).

ここで、各ステップS2〜S4で策定された送電優先順位や送電手順、作業員の配置手順は、図4、図5に示すようにして、ディスプレイなどに出力される。そして、これらの策定結果を見て、復旧作業を順次行う。つまり、配置手順に従って順次各区間に作業員を配置するとともに、送電手順に従って順次各区間を送電・復旧するものである。   Here, the power transmission priority order, the power transmission procedure, and the worker arrangement procedure formulated in steps S2 to S4 are output to a display or the like as shown in FIGS. Then, looking at these formulation results, recovery work is performed sequentially. That is, workers are sequentially arranged in each section according to the arrangement procedure, and each section is sequentially transmitted and restored according to the power transmission procedure.

また、各ステップS2〜S4による策定は、所定時間ごとに自動的に行うようにしてもよい。すなわち、災害状況や需要家の状況などが時間の経過とともに変化し、早期電力供給が必要とされる優先需要家も変化するため、所定時間ごとに策定を行って、送電優先順位や送電手順、作業員の配置手順を適宜最適化するようにしてもよい。同様に、各ステップS2〜S4による策定を、通信部4によって外部から災害情報を取得する度に、自動的に行うようにしてもよい。すなわち、災害状況が時間の経過とともに変化し、早期電力供給が必要とされる優先需要家も変化するため、新たな災害情報を取得する度に策定を行って、送電優先順位や送電手順、作業員の配置手順を適宜最適化するようにしてもよい。さらに、状況に応じて任意の時に、各ステップS2〜S4による策定を行ってもよい。ここで、このような複数回の策定は、状況に応じて、復旧作業を開始する前に行ってもよいし、復旧作業を開始した後(作業進行中)に行ってもよい。   Further, the formulation in steps S2 to S4 may be automatically performed every predetermined time. In other words, disaster situations and customer situations change over time, and priority consumers that need early power supply also change. You may make it optimize the arrangement | positioning procedure of a worker suitably. Similarly, the formulation in steps S2 to S4 may be automatically performed every time disaster information is acquired from the outside by the communication unit 4. In other words, the disaster situation changes over time, and the priority customers who need early power supply also change. You may make it optimize the arrangement | positioning procedure of a member suitably. Furthermore, the formulation according to steps S2 to S4 may be performed at any time according to the situation. Here, such a plurality of times may be formulated before the start of the recovery work or after the start of the recovery work (while the work is in progress) depending on the situation.

以上のように、本災害復旧支援システム1および災害復旧支援方法によれば、現在時刻と電力供給系統と需要家情報と災害情報とに基づいて、公益性が高くなっていると予測される需要家や、被災者が集まっていると予測される需要家、生命の危機にさらされるおそれがあると予測される需要家、などの優先需要家が割り出され、この優先需要家を含む区間の復旧優先順位・送電優先順位が高く策定される。すなわち、災害の発生によって真に早期電力供給が必要となった需要家が割り出され、この需要家の区間の送電優先順位が高く策定されるため、需要家の状況に応じた適正かつ柔軟な優先順位で送電復旧することが可能となる。   As described above, according to the disaster recovery support system 1 and the disaster recovery support method, the demand that is expected to increase the public interest based on the current time, the power supply system, the customer information, and the disaster information. Priority consumers, such as homes, consumers who are expected to gather disaster victims, and consumers who are predicted to be at risk of life, are determined. The recovery priority and transmission priority are set high. In other words, the customers who really needed early power supply due to the occurrence of a disaster are identified, and the transmission priority of this customer's section is set high, so appropriate and flexible according to the situation of the customer It becomes possible to restore power transmission in priority order.

また、送電優先順位に従って各区間に電力を供給するために、電源側から復旧すべき系統ルート・送電手順が策定されるため、この送電手順に従って各区間を復旧させることで、真に早期電力供給が必要となった需要家に対して、早期かつ確実に復旧することが可能となる。   In addition, in order to supply power to each section according to the transmission priority order, the system route and power transmission procedure to be restored from the power source side are formulated. It is possible to quickly and surely recover customers who need to.

さらに、系統ルートにおいて作業員を配置すべき区間とその順序(配置手順)が策定されるため、この配置手順に従って作業員を配置することで、不良箇所などを早期かつ適正に解消して、真に早期電力供給が必要となった需要家に対して、早期かつ確実に復旧することが可能となる。   Furthermore, since sections and order (placement procedure) in which workers should be placed in the system route are formulated, the placement of workers according to this placement procedure can be used to quickly and properly resolve defective parts, etc. Therefore, it is possible to quickly and surely restore a consumer who needs an early power supply.

しかも、送電優先順位や送電手順、作業員の配置手順が自動で策定されるため、労力が軽減されるばかりでなく、適正かつ迅速な策定が可能となり、その結果、迅速な復旧が可能となる。   In addition, the transmission priority, transmission procedure, and worker placement procedure are automatically formulated, which not only reduces labor, but also enables appropriate and rapid formulation, resulting in rapid recovery. .

以上、この発明の実施の形態について説明したが、具体的な構成は、上記の実施の形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。例えば、上記の実施の形態では、通信部4によって外部から災害情報を受信することで災害情報を取得しているが、外部から災害情報を入力することで災害情報を取得するようにしてもよい。また、需要家の位置や巡視で発見された不良位置などを区間で特定しているが、電柱番号や緯度、経度で特定してもよい。さらに、区間データベース3において区間ごとに情報・データを記憶しているが、需要家ごとに記憶したり、巡視箇所ごとに記憶したりしてもよい。また、優先需要家は、上記のような需要家に限らない。   Although the embodiment of the present invention has been described above, the specific configuration is not limited to the above embodiment, and even if there is a design change or the like without departing from the gist of the present invention, Included in the invention. For example, in the above embodiment, the disaster information is acquired by receiving the disaster information from the outside by the communication unit 4, but the disaster information may be acquired by inputting the disaster information from the outside. . Moreover, although the position of a customer, the defective position discovered by patrol, etc. are specified in a section, you may specify by a telephone pole number, latitude, and longitude. Further, although information / data is stored for each section in the section database 3, it may be stored for each customer or for each inspection location. Moreover, a priority consumer is not restricted to the above consumers.

一方、次のような災害復旧支援プログラムを汎用のコンピュータにインストールするようにしてもよい。   On the other hand, the following disaster recovery support program may be installed in a general-purpose computer.

災害によって停電が発生した場合に、電力供給の復旧を支援するための災害復旧支援プログラムであって、コンピュータを、   A disaster recovery support program for supporting the restoration of power supply in the event of a power outage due to a disaster,

各需要家への電力供給系統を記憶する供給系統記憶手段(系統データベース2)と、   Supply system storage means (system database 2) for storing the power supply system to each consumer;

公共施設である需要家や、病院である需要家、生命維持に必要な電動医療機器を使用する需要家を含む、特定需要家の位置を含む需要家情報を記憶する需要家情報記憶手段(区間データベース3)と、   Consumer information storage means (section) for storing customer information including the location of specific consumers, including consumers who are public facilities, consumers who are hospitals, and consumers who use electric medical devices necessary for life support Database 3),

災害の発生日時や内容、規模を含む災害情報を取得する災害情報取得手段(通信部4)と、   Disaster information acquisition means (communication unit 4) for acquiring disaster information including disaster occurrence date and time, content and scale;

現在時刻と、供給系統記憶手段に記憶された電力供給系統と、需要家情報記憶手段に記憶された需要家情報と、災害情報取得手段で取得した災害情報とに基づいて、公益性が高くなっていると予測される需要家や、被災者が集まっていると予測される需要家、生命の危機にさらされるおそれがあると予測される需要家を含む、優先需要家を割り出し、該優先需要家の復旧優先順位を高く策定する復旧順位策定手段(順位策定タスク5)と、   Based on the current time, the power supply system stored in the supply system storage means, the customer information stored in the customer information storage means, and the disaster information acquired by the disaster information acquisition means, the public interest is increased. Priority consumers, including those who are predicted to be, those who are expected to be affected, and those who are predicted to be at risk of life. A recovery order formulating means (rank formulating task 5) for formulating a high priority for home restoration;

復旧順位策定手段で策定された復旧優先順位に従って電力を供給するために、電源側から復旧すべき系統ルートを、供給系統記憶手段に記憶された電力供給系統に基づいて策定する復旧ルート策定手段(ルート策定タスク6)と、   In order to supply power in accordance with the restoration priority established by the restoration order formulation means, a restoration route formulation means for formulating a system route to be restored from the power source side based on the power supply system stored in the supply system storage means ( Route development task 6)

巡視の際に発見された不良内容や不良位置を含む巡視情報を記憶する巡視情報記憶手段(区間データベース3)と、   Patrol information storage means (section database 3) for storing patrol information including defect contents and defect positions discovered during patrol;

復旧ルート策定手段で策定された系統ルートにおいて、作業員を配置すべき位置を、巡視情報記憶手段に記憶された巡視情報に基づいて策定する作業員策定手段(作業員策定タスク7)、
として機能させることを特徴とする災害復旧支援プログラム。
Worker formulation means (worker formulation task 7) for formulating the position where the worker should be placed in the system route established by the recovery route formulation means based on the inspection information stored in the inspection information storage means;
Disaster recovery support program characterized by functioning as

1 災害復旧支援システム
2 系統データベース(供給系統記憶手段)
3 区間データベース(需要家情報記憶手段、巡視情報記憶手段)
4 通信部(災害情報取得手段)
5 順位策定タスク(復旧順位策定手段)
6 ルート策定タスク(復旧ルート策定手段)
7 作業員策定タスク(作業員策定手段)
1 Disaster recovery support system 2 System database (Supply system storage means)
3 Section database (customer information storage means, patrol information storage means)
4 communication department (disaster information acquisition means)
5 rank formulation task (recovery rank formulation means)
6 Route development task (Recovery route development means)
7 Worker formulation task (worker formulation method)

Claims (2)

災害によって停電が発生した場合に、電力供給の復旧を支援する災害復旧支援システムであって、
各需要家への電力供給系統を記憶する供給系統記憶手段と、
公共施設である需要家や、病院である需要家、生命維持に必要な電動医療機器を使用する需要家を含む、特定需要家の位置を含む需要家情報を記憶する需要家情報記憶手段と、
災害の発生日時や内容、規模を含む災害情報を取得する災害情報取得手段と、
現在時刻と、前記供給系統記憶手段に記憶された前記電力供給系統と、前記需要家情報記憶手段に記憶された前記需要家情報と、前記災害情報取得手段で取得した前記災害情報とに基づいて、公益性が高くなっていると予測される需要家や、被災者が集まっていると予測される需要家、生命の危機にさらされるおそれがあると予測される需要家を含む、優先需要家を割り出し、該優先需要家の復旧優先順位を高く策定する復旧順位策定手段と、
前記復旧順位策定手段で策定された復旧優先順位に従って電力を供給するために、電源側から復旧すべき系統ルートを、前記供給系統記憶手段に記憶された前記電力供給系統に基づいて策定する復旧ルート策定手段と、
巡視の際に発見された不良内容や不良位置を含む巡視情報を記憶する巡視情報記憶手段と、
前記復旧ルート策定手段で策定された系統ルートにおいて、作業員を配置すべき位置を、前記巡視情報記憶手段に記憶された前記巡視情報に基づいて策定する作業員策定手段と、
を備えることを特徴とする災害復旧支援システム。
A disaster recovery support system that supports recovery of power supply in the event of a power outage due to a disaster,
Supply system storage means for storing the power supply system to each consumer;
Consumer information storage means for storing customer information including the location of specific consumers, including consumers who are public facilities, consumers who are hospitals, and consumers who use electric medical equipment necessary for life support;
Disaster information acquisition means to acquire disaster information including disaster occurrence date and time, content and scale,
Based on the current time, the power supply system stored in the supply system storage means, the customer information stored in the customer information storage means, and the disaster information acquired by the disaster information acquisition means Priority consumers, including those who are expected to have high public interest, those who are expected to be affected, and those who are predicted to be at risk of life And a recovery order formulating means for formulating a high priority for restoration of the priority consumer,
In order to supply power in accordance with the restoration priority established by the restoration order formulation means, a restoration route is established based on the power supply system stored in the supply system storage means to restore the system route to be restored from the power supply side. A formulating means,
Patrol information storage means for storing patrol information including defect contents and defect positions discovered during patrol;
In the system route formulated by the recovery route formulating means, a worker formulating means for formulating a position where a worker is to be arranged based on the patrol information stored in the patrol information storage means,
A disaster recovery support system characterized by comprising:
災害によって停電が発生した場合に、電力供給の復旧を支援するための災害復旧支援プログラムであって、コンピュータを、
各需要家への電力供給系統を記憶する供給系統記憶手段と、
公共施設である需要家や、病院である需要家、生命維持に必要な電動医療機器を使用する需要家を含む、特定需要家の位置を含む需要家情報を記憶する需要家情報記憶手段と、
災害の発生日時や内容、規模を含む災害情報を取得する災害情報取得手段と、
現在時刻と、前記供給系統記憶手段に記憶された前記電力供給系統と、前記需要家情報記憶手段に記憶された前記需要家情報と、前記災害情報取得手段で取得した前記災害情報とに基づいて、公益性が高くなっていると予測される需要家や、被災者が集まっていると予測される需要家、生命の危機にさらされるおそれがあると予測される需要家を含む、優先需要家を割り出し、該優先需要家の復旧優先順位を高く策定する復旧順位策定手段
前記復旧順位策定手段で策定された復旧優先順位に従って電力を供給するために、電源側から復旧すべき系統ルートを、前記供給系統記憶手段に記憶された前記電力供給系統に基づいて策定する復旧ルート策定手段と、
巡視の際に発見された不良内容や不良位置を含む巡視情報を記憶する巡視情報記憶手段と、
前記復旧ルート策定手段で策定された系統ルートにおいて、作業員を配置すべき位置を、前記巡視情報記憶手段に記憶された前記巡視情報に基づいて策定する作業員策定手段、
として機能させることを特徴とする災害復旧支援プログラム。
A disaster recovery support program for supporting the restoration of power supply in the event of a power outage due to a disaster,
Supply system storage means for storing the power supply system to each consumer;
Consumer information storage means for storing customer information including the location of specific consumers, including consumers who are public facilities, consumers who are hospitals, and consumers who use electric medical equipment necessary for life support;
Disaster information acquisition means to acquire disaster information including disaster occurrence date and time, content and scale,
Based on the current time, the power supply system stored in the supply system storage means, the customer information stored in the customer information storage means, and the disaster information acquired by the disaster information acquisition means Priority consumers, including those who are expected to have high public interest, those who are expected to be affected, and those who are predicted to be at risk of life the indexing, and a recovery order established means to increase develop a restoration priority of the priority customers,
In order to supply power in accordance with the restoration priority established by the restoration order formulation means, a restoration route is established based on the power supply system stored in the supply system storage means to restore the system route to be restored from the power supply side. A formulating means,
Patrol information storage means for storing patrol information including defect contents and defect positions discovered during patrol;
In the system route formulated by the recovery route formulating means, a worker formulating means for formulating a position where a worker is to be arranged based on the patrol information stored in the patrol information storage means,
Disaster recovery support program characterized by functioning as
JP2014053125A 2014-03-17 2014-03-17 Disaster recovery support system and disaster recovery support program Active JP5903121B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014053125A JP5903121B2 (en) 2014-03-17 2014-03-17 Disaster recovery support system and disaster recovery support program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014053125A JP5903121B2 (en) 2014-03-17 2014-03-17 Disaster recovery support system and disaster recovery support program

Publications (2)

Publication Number Publication Date
JP2015177665A JP2015177665A (en) 2015-10-05
JP5903121B2 true JP5903121B2 (en) 2016-04-13

Family

ID=54256342

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014053125A Active JP5903121B2 (en) 2014-03-17 2014-03-17 Disaster recovery support system and disaster recovery support program

Country Status (1)

Country Link
JP (1) JP5903121B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6565717B2 (en) * 2016-01-29 2019-08-28 東芝三菱電機産業システム株式会社 Solar power plant monitoring device
JP7445410B2 (en) * 2018-12-18 2024-03-07 旭化成ホームズ株式会社 Disaster response server, disaster response method and program
JPWO2022259298A1 (en) * 2021-06-07 2022-12-15
JP2023064352A (en) * 2021-10-26 2023-05-11 株式会社日立製作所 Restoration intention determination support device and restoration intention determination support method
JP2023163194A (en) * 2022-04-28 2023-11-10 株式会社日立製作所 Power supply management apparatus, power supply management method, and power supply management system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03183323A (en) * 1989-12-08 1991-08-09 Toshiba Corp Power system trouble recovering apparatus
JPH08275394A (en) * 1995-03-27 1996-10-18 Toshiba Corp Trouble releasing system of power system
JP2002152932A (en) * 2000-11-10 2002-05-24 Hitachi Ltd Failure point search support system
JP5235544B2 (en) * 2008-07-17 2013-07-10 中国電力株式会社 Accident recovery support system

Also Published As

Publication number Publication date
JP2015177665A (en) 2015-10-05

Similar Documents

Publication Publication Date Title
JP5903121B2 (en) Disaster recovery support system and disaster recovery support program
JP6001841B2 (en) Method and system for managing a power grid
WO2014057835A1 (en) Disaster information management device, disaster information system, management method for disaster information, and program for managing disaster information
CN106161092A (en) A kind of network distributing failure emergency repair work order distributing method and device
Davis et al. The future of distribution system resiliency
JP2013074692A (en) Data collection device and method thereof
JP5616311B2 (en) System stabilization system and system stabilization method
JP2007025911A (en) Damage restoration status management system
Kocatepe et al. Co-resilience assessment of hurricane-induced power grid and roadway network disruptions: A case study in Florida with a focus on critical facilities
CN110580553A (en) Unmanned repair analysis and order distribution method based on GIS map
US20130197702A1 (en) Systems and Methods for Managing a Power Distribution System
JP2017167926A (en) Information processing device
JP4386955B1 (en) Distributed monitoring and control system and data updating method for the same
Vasenev et al. A hazus-based method for assessing robustness of electricity supply to critical smart grid consumers during flood events
JP2005126216A (en) Disaster information network
JP6278887B2 (en) Facility management system
JP5197639B2 (en) Construction and construction management device, construction and construction management system, and construction and construction management method
JP2012242870A (en) Call name list creation system
JP5036776B2 (en) Blackout plan evaluation system and blackout plan evaluation program
JP6286935B2 (en) Accident recovery support device
JP2009159198A (en) Power failure information providing system
CN108875974A (en) Electric power plant station equipment is based on the tactful extensive system and method for generating production plan
Jacoby et al. Government and Private-Sector Coordination and the Potential Role of Solar-Power in Disaster Response: Hurricanes Irma and Maria in Puerto Rico
JP7422915B1 (en) Information processing device, information processing method and program
JP2004145734A (en) Group inspection management system of building and maintenance program management system

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20151228

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160105

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160208

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160301

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160311

R150 Certificate of patent or registration of utility model

Ref document number: 5903121

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150