JP5866909B2 - Allocation management device, allocation management method, and allocation management program - Google Patents

Allocation management device, allocation management method, and allocation management program Download PDF

Info

Publication number
JP5866909B2
JP5866909B2 JP2011202996A JP2011202996A JP5866909B2 JP 5866909 B2 JP5866909 B2 JP 5866909B2 JP 2011202996 A JP2011202996 A JP 2011202996A JP 2011202996 A JP2011202996 A JP 2011202996A JP 5866909 B2 JP5866909 B2 JP 5866909B2
Authority
JP
Japan
Prior art keywords
allocation
order
warehouse
allocated
reserve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011202996A
Other languages
Japanese (ja)
Other versions
JP2013065166A (en
Inventor
芳明 大野
芳明 大野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ricoh Co Ltd
Original Assignee
Ricoh Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ricoh Co Ltd filed Critical Ricoh Co Ltd
Priority to JP2011202996A priority Critical patent/JP5866909B2/en
Publication of JP2013065166A publication Critical patent/JP2013065166A/en
Application granted granted Critical
Publication of JP5866909B2 publication Critical patent/JP5866909B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、引当管理装置、引当管理方法及び引当管理プログラムに関する。   The present invention relates to an allocation management device, an allocation management method, and an allocation management program.

従来、例えば、製造分野や物流分野において、各地の倉庫にある商品の在庫を管理するために、在庫を引当する技術が存在する。例えば、この技術では、顧客から商品を受注した際に、顧客の希望納品日や各倉庫における商品の在庫状況が考慮され、ある倉庫に管理される在庫が引当される。   2. Description of the Related Art Conventionally, for example, in the manufacturing field and the distribution field, there is a technique for allocating inventory in order to manage the inventory of goods in various warehouses. For example, in this technology, when an order for a product is received from a customer, the customer's desired delivery date and the inventory status of the product in each warehouse are taken into consideration, and inventory managed in a certain warehouse is allocated.

しかしながら、上記従来技術では、必ずしも適切に引当されていないという問題があった。例えば、受注の変更によって引当可能な在庫の数が増減したり、受注のキャンセルによって引当されていた在庫がリリース(解放)されたりするなど、在庫の数は日々変動する。このため、例えば、受注時点で適切に引当された在庫が、出荷時点でも適切に引当されているとは限らない。つまり、日々の在庫の変動を考慮すると、引当された在庫が必ずしも適切に引当されているとは言えなかった。   However, the above-described prior art has a problem that it is not always adequately allocated. For example, the number of stocks fluctuates from day to day, for example, the number of stocks that can be allocated increases or decreases due to changes in orders, or the stocks that are allocated due to cancellations of orders are released (released). For this reason, for example, stock appropriately allocated at the time of receiving an order is not always appropriately allocated at the time of shipping. In other words, taking into account daily fluctuations in inventory, the allocated inventory was not necessarily adequately allocated.

開示の技術は、上記に鑑みてなされたものであって、適切に引当することができる引当管理装置、引当管理方法及び引当管理プログラムを提供することを目的とする。   The disclosed technology has been made in view of the above, and an object thereof is to provide an allocation management device, an allocation management method, and an allocation management program that can allocate appropriately.

上述した課題を解決し、目的を達成するために、本発明は、倉庫に存在する商品の数量を示す現物在庫と、当該倉庫に入庫される当該商品の数量を示す入庫計画とを含む引当原資を引当済みの一又は複数の受注のうち、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出する抽出手段と、前記抽出手段により抽出された受注に引当された前記引当原資を解放する解放手段と、前記抽出手段により抽出された受注に対して、当該受注の特性に応じて、前記解放手段により解放された引当原資を含む前記倉庫の前記引当原資のうち、前記現物在庫及び前記入庫計画のいずれかを優先して引当し、引当可能な引当原資が存在する前記受注を引当済とし、引当可能な引当原資が存在しない前記受注を引当保留として、引当済の前記受注に対して引当された引当原資を見直す引当見直し処理を実行し、引当保留の前記受注に対して引当原資を引当する保留引当処理を実行する引当手段と、前記抽出手段に前記受注を抽出させ、前記抽出手段により抽出された受注に引当された前記引当原資を前記解放手段に解放させ、前記解放手段により解放された引当原資を前記抽出手段により抽出された受注に対して前記引当手段に引当させる処理を任意のタイミングで繰り返し実行する制御手段とを備えることを特徴とする。 In order to solve the above-described problems and achieve the object, the present invention provides a reserve resource including a physical inventory indicating the quantity of goods existing in a warehouse and a warehousing plan indicating the quantity of goods received in the warehouse. Extracting means for extracting one or a plurality of orders relating to a predetermined product existing in a predetermined warehouse from one or a plurality of received orders, and releasing the allocation resources allocated to the orders extracted by the extracting means The physical inventory and the goods receipt among the allocation resources of the warehouse including the allocation resources released by the release means according to the characteristics of the order for the orders extracted by the release means and the extraction means in favor of one of the planned allowance, the orders reservable reserve funds are present as a reserve already, the reservable reserve funds are not present orders as reserve pending vs. the orders provision already Provisions have been reserve funds running reserve reviewing process to review the Te, and provision unit for executing a hold provision process to reserve the provision funds to the order of provision pending, by extracting the orders to the extraction means, the extraction A process of causing the release means to release the allocation resources allocated to the order extracted by the means, and allowing the allocation means to allocate the allocation resources released by the release means to the order extracted by the extraction means. And a control means for repeatedly executing at an arbitrary timing.

また、本発明は、倉庫に存在する商品の数量を示す現物在庫と、当該倉庫に入庫される当該商品の数量を示す入庫計画とを含む引当原資を引当済みの一又は複数の受注のうち、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出する抽出工程と、前記抽出工程により抽出された受注に引当された前記引当原資を解放する解放工程と、前記抽出工程により抽出された受注に対して、当該受注の特性に応じて、前記解放工程により解放された引当原資を含む前記倉庫の前記引当原資のうち、前記現物在庫及び前記入庫計画のいずれかを優先して引当し、引当可能な引当原資が存在する前記受注を引当済とし、引当可能な引当原資が存在しない前記受注を引当保留として、引当済の前記受注に対して引当された引当原資を見直す引当見直し処理を実行し、引当保留の前記受注に対して引当原資を引当する保留引当処理を実行する引当工程とを含み、任意のタイミングで前記抽出工程と、前記解放工程と、前記引当工程とを繰り返し実行することを特徴とする。 Further, the present invention is, among one or more orders that have been allocated a reserve resource including a physical inventory indicating the quantity of goods existing in the warehouse and a warehousing plan indicating the quantity of the goods received in the warehouse, An extraction process for extracting one or a plurality of orders related to a predetermined product existing in a predetermined warehouse, a release process for releasing the allocated resources allocated to the orders extracted by the extraction process, and an order extracted by the extraction process In response to the characteristics of the order, the physical reserve and the warehousing plan are preferentially allocated from the allocation resources of the warehouse including the allocation resources released in the release step , Reassessment of provisions that have been allocated to the orders that have been allocated, with the orders for which there are possible reserve resources existing as reserved and the orders for which there are no reserve resources available for allocation as reserve pending Processing is executed, the provision funds to the order of the provision pending and a provision step of executing the pending provision process of allowance, repeatedly and the extraction step at an arbitrary timing, and said releasing step, and the provision step It is characterized by performing.

また、本発明は、倉庫に存在する商品の数量を示す現物在庫と、当該倉庫に入庫される当該商品の数量を示す入庫計画とを含む引当原資を引当済みの一又は複数の受注のうち、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出する抽出ステップと、前記抽出ステップにより抽出された受注に引当された前記引当原資を解放する解放ステップと、前記抽出ステップにより抽出された受注に対して、当該受注の特性に応じて、前記解放ステップにより解放された引当原資を含む前記倉庫の前記引当原資のうち、前記現物在庫及び前記入庫計画のいずれかを優先して引当し、引当可能な引当原資が存在する前記受注を引当済とし、引当可能な引当原資が存在しない前記受注を引当保留として、引当済の前記受注に対して引当された引当原資を見直す引当見直し処理を実行し、引当保留の前記受注に対して引当原資を引当する保留引当処理を実行する引当ステップとを任意のタイミングで繰り返しコンピュータに実行させる。 Further, the present invention is, among one or more orders that have been allocated a reserve resource including a physical inventory indicating the quantity of goods existing in the warehouse and a warehousing plan indicating the quantity of the goods received in the warehouse, An extraction step for extracting one or a plurality of orders related to a predetermined product existing in a predetermined warehouse, a release step for releasing the allocated resources allocated to the orders extracted by the extraction step, and an order extracted by the extraction step relative, depending on the characteristics of the orders, among the reserve funds of the warehouse including provision funds that have been released by said release step, and reserve in favor of one of the physical inventory and the warehousing plan provision Provisions reserved for the orders that have been allocated, with the orders for which there is a possible reserve resource set as reserved and the orders for which there is no reserve resource available for allocation as reserve pending Run the provision reviewing process to review the capital to execute the reserve executing a hold provision process reserves funds for provision to the orders of the provision pending repeated computer at any time.

本願の開示する技術の一つの態様によれば、適切に引当することができるという効果を奏する。   According to one aspect of the technology disclosed in the present application, there is an effect that it is possible to appropriately reserve.

図1は、本実施形態に係る引当管理装置の構成を示す図である。FIG. 1 is a diagram illustrating a configuration of an allocation management apparatus according to the present embodiment. 図2は、引当管理装置が引当する引当原資について説明するための図である。FIG. 2 is a diagram for explaining the allocation resources allocated by the allocation management apparatus. 図3は、受注テーブルの一例を示す図である。FIG. 3 is a diagram illustrating an example of an order reception table. 図4は、入庫計画テーブルの一例を示す図である。FIG. 4 is a diagram illustrating an example of the warehousing plan table. 図5は、現物在庫テーブルの一例を示す図である。FIG. 5 is a diagram illustrating an example of a physical inventory table. 図6は、在庫区決定テーブルの一例を示す図である。FIG. 6 is a diagram illustrating an example of the stock area determination table. 図7は、上位倉庫決定テーブルの一例を示す図である。FIG. 7 is a diagram illustrating an example of the upper warehouse determination table. 図8は、受注引当処理の処理手順を示すフローチャートである。FIG. 8 is a flowchart showing a processing procedure of order reservation processing. 図9は、受注引当処理の処理手順を示すフローチャートである。FIG. 9 is a flowchart showing a processing procedure of order reservation processing. 図10は、引当見直し処理の処理手順を示すフローチャートである。FIG. 10 is a flowchart showing the processing procedure of the allocation review process. 図11は、保留引当処理の処理手順を示すフローチャートである。FIG. 11 is a flowchart showing the processing procedure of the reserve allocation process.

以下に、図面を参照して、この発明にかかる引当管理装置、引当管理方法及び引当管理プログラムの一実施の形態を詳細に説明する。   Exemplary embodiments of an allocation management device, an allocation management method, and an allocation management program according to the present invention will be described below in detail with reference to the drawings.

まず、本実施形態に係る引当管理装置の構成について説明する。図1は、本実施形態に係る引当管理装置の構成を示す図である。引当管理装置100は、顧客からの受注に対して、顧客の希望納品日や各地の倉庫における商品の在庫状況に基づき、ある倉庫に管理される在庫、すなわち引当原資を引当する処理を行うPC(Personal Computer)やサーバ装置などの情報処理装置である。   First, the configuration of the allocation management apparatus according to the present embodiment will be described. FIG. 1 is a diagram illustrating a configuration of an allocation management apparatus according to the present embodiment. The allocation management apparatus 100 performs processing for allocating inventory managed in a certain warehouse, that is, allocation resources, based on the customer's desired delivery date and the inventory status of products in each warehouse in response to an order from the customer. An information processing apparatus such as a personal computer or a server apparatus.

ここで、引当管理装置100が引当する引当原資について説明する。図2は、引当管理装置が引当する引当原資について説明するための図である。図2には、顧客2aからの受注に対して、各地の倉庫の引当原資のいずれかが引当される場合を示す。この引当原資は、例えば、倉庫に存在する商品の数量を示す現物在庫と、倉庫に入庫される商品の数量を示す入庫計画とを含む。また、入庫計画は、例えば、工場において生産される商品の数量を含む。図2に示すように、御殿場工場2bに管理される引当原資は、入庫計画2c及び現物在庫2dを含む。また、大阪倉庫2eに管理される引当原資は、入庫計画2f及び現物在庫2gを含む。また、鳥栖倉庫2hに管理される引当原資は、入庫計画2i及び現物在庫2jを含む。図2に示す例では、引当管理装置100が各地の倉庫の引当原資のいずれかを引当することで、引当原資は作業店2kを介して顧客2aに納品される。なお、図2に示した地域倉庫とは、顧客が指定した納品先に商品を出荷する上での最寄りの倉庫を示し、上位倉庫とは、地域倉庫から納品できない場合に次に商品を出荷する候補となる倉庫を示し、本部倉庫とは、商品を出荷する最後の候補となる倉庫を示す。   Here, the reserve resources allocated by the allocation management apparatus 100 will be described. FIG. 2 is a diagram for explaining the allocation resources allocated by the allocation management apparatus. FIG. 2 shows a case where any of the reserve resources of the warehouses in each location is allocated for the order received from the customer 2a. This reserve resource includes, for example, a physical inventory indicating the quantity of goods existing in the warehouse, and a receipt plan indicating the quantity of goods received in the warehouse. The warehousing plan includes, for example, the quantity of commodities produced at the factory. As shown in FIG. 2, the reserve resources managed by the Gotemba factory 2b include a warehousing plan 2c and a physical inventory 2d. Further, the reserve resources managed by the Osaka warehouse 2e include a warehousing plan 2f and a physical inventory 2g. Further, the reserve resources managed by the Tosu warehouse 2h include a warehousing plan 2i and a physical inventory 2j. In the example shown in FIG. 2, the allocation management device 100 allocates any of the allocation resources of the warehouses in each location, and the allocation resources are delivered to the customer 2a via the work shop 2k. Note that the regional warehouse shown in FIG. 2 indicates the nearest warehouse for shipping the product to the delivery destination designated by the customer, and the upper warehouse is the next product to be shipped when delivery from the regional warehouse is not possible. A candidate warehouse is indicated, and the headquarters warehouse indicates a warehouse that is the last candidate to ship a product.

図1の説明に戻る。図1に示すように、引当管理装置100は、CPU(Central Processing Unit)11、ROM(Read Only Memory)12、RAM(Random Access Memory)13、入力部14、表示部15、記憶部16及び通信部17等を備える。   Returning to the description of FIG. As shown in FIG. 1, the allocation management apparatus 100 includes a CPU (Central Processing Unit) 11, a ROM (Read Only Memory) 12, a RAM (Random Access Memory) 13, an input unit 14, a display unit 15, a storage unit 16, and a communication. Part 17 and the like.

CPU11は、ROM12や記憶部16に記憶された所定のプログラムと協働することで、引当管理装置100の動作を統括的に制御する。また、CPU11は、ROM12や記憶部16に記憶された所定のプログラムと協働することで、後述する受注引当処理部111、引当見直し処理部112及び保留引当処理部113の機能を実現する。   The CPU 11 comprehensively controls the operation of the allocation management apparatus 100 by cooperating with a predetermined program stored in the ROM 12 or the storage unit 16. Further, the CPU 11 realizes functions of an order allocation processing unit 111, an allocation review processing unit 112, and a pending allocation processing unit 113, which will be described later, in cooperation with a predetermined program stored in the ROM 12 or the storage unit 16.

ROM12は、引当管理装置100の制御に係る種々のプログラムを記憶する不揮発性記憶媒体である。RAM13は、CPU11のワークメモリとして使用される主記憶装置である。   The ROM 12 is a non-volatile storage medium that stores various programs related to the control of the allocation management apparatus 100. The RAM 13 is a main storage device used as a work memory for the CPU 11.

入力部14は、キーボードやマウス等の入力デバイスであり、ユーザが操作した内容をCPU11に出力する。例えば、入力部14は、顧客、又は、顧客から注文を受けた者(例えば、営業担当者)による受注のデータの入力を受け付けて、受け付けた受注データをCPU11に出力する。   The input unit 14 is an input device such as a keyboard or a mouse, and outputs contents operated by the user to the CPU 11. For example, the input unit 14 receives input of order data from a customer or a person who has received an order from the customer (for example, a sales representative), and outputs the received order data to the CPU 11.

表示部15は、ディスプレイ等の表示デバイスであり、CPU11の制御に従い所定の情報(例えばUI(ユーザインターフェース)等)を表示する。例えば、表示部15は、ユーザの操作に応じて、後述する記憶部16に記憶された各種情報を表示する。   The display unit 15 is a display device such as a display, and displays predetermined information (for example, UI (user interface)) according to the control of the CPU 11. For example, the display unit 15 displays various types of information stored in the storage unit 16 to be described later in response to a user operation.

記憶部16は、HDD(Hard Disk Drive)やSSD(Solid State Drive)等の補助記憶装置であって、CPU11により実行される種々のプログラムや、当該プログラムの実行に係る各種の設定情報を記憶する。また、記憶部16は、後述する受注テーブル161、入庫計画テーブル162、現物在庫テーブル163、在庫区決定テーブル164及び上位倉庫決定テーブル165の情報を記憶する。   The storage unit 16 is an auxiliary storage device such as an HDD (Hard Disk Drive) or an SSD (Solid State Drive), and stores various programs executed by the CPU 11 and various setting information related to the execution of the programs. . In addition, the storage unit 16 stores information on an order reception table 161, a warehousing plan table 162, a physical inventory table 163, an inventory area determination table 164, and a higher-level warehouse determination table 165, which will be described later.

通信部17は、図示しないネットワークに接続された外部装置と情報の送受信を行うネットワークI/Fである。例えば、通信部17は、顧客、又は、顧客から注文を受けた者により外部装置に入力された受注データを受け付けて、受け付けた受注データをCPU11に出力する。   The communication unit 17 is a network I / F that transmits / receives information to / from an external device connected to a network (not shown). For example, the communication unit 17 receives order data input to an external device by a customer or a person who has received an order from the customer, and outputs the received order data to the CPU 11.

次に、引当管理装置100が記憶する各種の情報について説明する。図1に示すように、引当管理装置100は、記憶部16が記憶する情報として、受注テーブル161と、入庫計画テーブル162と、現物在庫テーブル163と、在庫区決定テーブル164と、上位倉庫決定テーブル165とを有する。   Next, various information stored in the allocation management apparatus 100 will be described. As shown in FIG. 1, the allocation management apparatus 100 includes, as information stored in the storage unit 16, an order reception table 161, a warehousing plan table 162, a physical inventory table 163, an inventory area determination table 164, and a higher-level warehouse determination table. 165.

受注テーブル161は、受注のデータを記憶する。例えば、受注テーブル161には、受注データをCPU11が受け付けるごとに、1つのレコードがCPU11により登録される。図3は、受注テーブルの一例を示す図である。図3に示すように、受注テーブル161は、受注ごとに、受注番号と、引当優先番号と、受注日と、在庫区と、商品と、数量と、希望納品日と、出荷倉庫と、確定納品日と、状況とを対応付けて記憶する。このうち、受注番号は、受注データを識別する識別情報であり、例えば、受注データを受け付けるごとにCPU11により採番される。引当優先番号は、受注の特性に応じてCPU11により採番される番号である。ここで、受注の特性とは、該当する受注に特有の性質を示し、例えば、工場キッティング受注であるか、受注チャネルがインターネット経由であったか、あるいは受注チャネルが電話であったか等を示す情報である。例えば、引当優先番号には、工場キッティング受注には「1」が、受注チャネルが電話であった受注には「9」が格納され、特筆すべき受注の特性を有しない受注にはデフォルト値として「5」が格納される。受注日は、受注データを受け付けた日付を示す。在庫区は、顧客が指定した納品先に商品を出荷する上での最寄りの倉庫を示す。商品は、顧客から受注した商品を示す。数量は、顧客から受注した商品の数量を示す。希望納品日は、顧客が希望する商品の納品日を示す。出荷倉庫は、引当された商品を出荷する倉庫を示す。確定納品日は、確定した納品日を示す。状況は、該当する受注データの状況を示し、例えば、引当されたことを示す「引当済」や引当が保留されたことを示す「保留」が格納される。   The order receipt table 161 stores order receipt data. For example, in the order reception table 161, one record is registered by the CPU 11 every time the CPU 11 accepts the order reception data. FIG. 3 is a diagram illustrating an example of an order reception table. As shown in FIG. 3, the order table 161 includes an order number, an allocation priority number, an order date, a stock area, a product, a quantity, a desired delivery date, a shipping warehouse, and a confirmed delivery for each order. The date and the situation are stored in association with each other. Among these, the order number is identification information for identifying the order data, and is numbered by the CPU 11 every time the order data is received, for example. The allocation priority number is a number assigned by the CPU 11 in accordance with the characteristics of the order. Here, the characteristic of the order indicates a characteristic specific to the corresponding order, for example, information indicating whether it is a factory kitting order, whether the order receiving channel is via the Internet, or whether the order receiving channel is a telephone. For example, in the allocation priority number, “1” is stored for factory kitting orders, “9” is stored for orders where the order channel is telephone, and default values are used for orders that do not have special order characteristics. “5” is stored. The order date indicates the date when the order data is received. The stock zone indicates the nearest warehouse for shipping the product to the delivery destination designated by the customer. The product indicates a product ordered from a customer. The quantity indicates the quantity of the product ordered from the customer. The desired delivery date indicates the delivery date of the product desired by the customer. The shipping warehouse indicates a warehouse for shipping the allocated goods. The confirmed delivery date indicates the confirmed delivery date. The status indicates the status of the corresponding order data. For example, “allocated” indicating that allocation has been made and “hold” indicating that allocation has been held are stored.

入庫計画テーブル162は、入庫計画を記憶する。図4は、入庫計画テーブルの一例を示す図である。図4には、本部倉庫における商品Aの入庫計画を例示する。図4に示すように、入庫計画テーブル162は、日付ごとに、入庫計画数と、引当可能数と、引当済数とを対応付けて記憶する。このうち、入庫計画数は、倉庫に入庫される商品の数量を示す。引当可能数は、入庫計画数のうち引当可能な数量を示す。引当済数は、入庫計画数のうち引当された数量を示す。つまり、入庫計画数は、引当可能数と引当済数との和となる。図4に示す例では、入庫計画テーブル162は、3月31日について、入庫計画数「10」と、引当可能数「3」と、引当済数「7」とを記憶する。つまり、入庫計画テーブル162は、本部倉庫に3月31日に入庫される商品Aが10個であり、このうち7個が受注データに引当されており、3個が引当可能であることを記憶する。   The warehousing plan table 162 stores the warehousing plan. FIG. 4 is a diagram illustrating an example of the warehousing plan table. In FIG. 4, the warehousing plan of the goods A in a headquarters warehouse is illustrated. As illustrated in FIG. 4, the warehousing plan table 162 stores the warehousing plan number, the allocable number, and the allocated number for each date in association with each other. Of these, the planned number of receipts indicates the quantity of goods received in the warehouse. The reservable number indicates the amount that can be reserved among the number of warehousing plans. The reserved number indicates the reserved quantity among the number of warehousing plans. In other words, the planned number of warehousing is the sum of the number that can be allocated and the number that has been allocated. In the example illustrated in FIG. 4, the warehousing plan table 162 stores the warehousing plan number “10”, the allocable number “3”, and the allocated number “7” for March 31. In other words, the warehousing plan table 162 stores that there are 10 products A that are received in the headquarters warehouse on March 31, 7 of which are reserved in the order data, and 3 can be allocated. To do.

現物在庫テーブル163は、現物在庫を記憶する。図5は、現物在庫テーブルの一例を示す図である。図5に示すように、現物在庫テーブル163は、倉庫と、商品と、現物在庫数と、引当可能数と、引当済数とを対応付けて記憶する。このうち、現物在庫数は、該当倉庫に存在する該当商品の数量を示す。つまり、現物在庫数は、引当可能数と引当済数との和となる。図5に示す例では、現物在庫テーブル163は、本部倉庫について、商品「A」と、現物在庫数「20」と、引当可能数「15」と、引当済数「5」とを記憶する。つまり、現物在庫テーブル163は、本部倉庫に商品Aが20個存在し、このうち5個が受注データに引当されており、15個が引当可能であることを記憶する。   The physical inventory table 163 stores physical inventory. FIG. 5 is a diagram illustrating an example of a physical inventory table. As illustrated in FIG. 5, the physical inventory table 163 stores a warehouse, a product, a physical inventory number, an allocation possible number, and an allocated number in association with each other. Of these, the physical inventory number indicates the quantity of the corresponding product existing in the corresponding warehouse. In other words, the actual stock quantity is the sum of the available number and the reserved number. In the example illustrated in FIG. 5, the physical inventory table 163 stores the product “A”, the physical inventory number “20”, the possible allocation number “15”, and the allocated number “5” for the headquarters warehouse. In other words, the physical inventory table 163 stores that there are 20 commodities A in the headquarters warehouse, 5 of which are allocated to the order data, and 15 can be allocated.

在庫区決定テーブル164は、顧客が指定した納品先に商品を出荷する上での最寄りの倉庫を記憶する。図6は、在庫区決定テーブルの一例を示す図である。図6に示すように、在庫区決定テーブル164は、納品エリアと、商品と、在庫区とを対応付けて記憶する。納品エリアは、顧客に指定された商品の納品先を含む地域を示す。図6に示す例では、在庫区決定テーブル164は、納品エリア「静岡県」と、商品「A」と、在庫区「本部倉庫」とを対応付けて記憶する。つまり、在庫区決定テーブル164は、商品Aを納品する際に、顧客から指定された納品先が静岡県である場合には、最適な倉庫は本部倉庫である旨を記憶する。   The stock zone determination table 164 stores the nearest warehouse for shipping the product to the delivery destination designated by the customer. FIG. 6 is a diagram illustrating an example of the stock area determination table. As shown in FIG. 6, the stock area determination table 164 stores delivery areas, products, and stock areas in association with each other. The delivery area indicates an area including the delivery destination of the product designated by the customer. In the example illustrated in FIG. 6, the stock area determination table 164 stores the delivery area “Shizuoka Prefecture”, the product “A”, and the stock area “Headquarters warehouse” in association with each other. In other words, when the product A is delivered, the stock area determination table 164 stores that the optimal warehouse is the headquarters warehouse when the delivery destination designated by the customer is Shizuoka Prefecture.

上位倉庫決定テーブル165は、ある倉庫から納品できない場合に次に商品を出荷する候補となる倉庫を記憶する。図7は、上位倉庫決定テーブルの一例を示す図である。図7に示すように、上位倉庫決定テーブル165は、倉庫と、上位倉庫とを対応付けて記憶する。このうち、上位倉庫は、該当する倉庫から納品できない場合に次に商品を出荷する候補となる倉庫を示す。図7に示す例では、上位倉庫決定テーブル165は、倉庫「大阪倉庫」と、上位倉庫「本部倉庫」とを対応付けて記憶する。つまり、上位倉庫決定テーブル165は、大阪倉庫の上位倉庫が本部倉庫である旨を記憶する。   The higher-level warehouse determination table 165 stores a warehouse that is a candidate for shipping a product next when it cannot be delivered from a certain warehouse. FIG. 7 is a diagram illustrating an example of the upper warehouse determination table. As shown in FIG. 7, the upper warehouse determination table 165 stores the warehouse and the upper warehouse in association with each other. Of these, the higher-level warehouse indicates a warehouse that is a candidate for shipping a product next when the goods cannot be delivered from the corresponding warehouse. In the example illustrated in FIG. 7, the upper warehouse determination table 165 stores the warehouse “Osaka Warehouse” and the upper warehouse “Headquarter Warehouse” in association with each other. That is, the upper warehouse determination table 165 stores that the upper warehouse of the Osaka warehouse is the head office warehouse.

次に、引当管理装置100の機能構成について説明する。図1に戻り、引当管理装置100は、CPU11と所定のプログラムとの協働により実現される機能部として、受注引当処理部111と、引当見直し処理部112と、保留引当処理部113とを有する。   Next, the functional configuration of the allocation management apparatus 100 will be described. Returning to FIG. 1, the allocation management apparatus 100 includes an order allocation processing unit 111, an allocation review processing unit 112, and a pending allocation processing unit 113 as functional units realized by the cooperation of the CPU 11 and a predetermined program. .

受注引当処理部111は、受注の際に引当原資を引当する受注引当処理を実行する。例えば、受注引当処理部111は、受注データを受け付けると、受注データの希望納品日に引当可能な引当原資を引当する。例えば、受注引当処理部111は、本部倉庫の入庫計画、本部倉庫の現物在庫、地域倉庫の入庫計画、地域倉庫の現物在庫、上位倉庫の入庫計画、上位倉庫の現物在庫の順に、優先して引当する。受注引当処理部111は、希望納品日に引当可能な引当原資が存在する場合には、受け付けた受注データの状況を「引当済」とし、希望納品日に引当可能な引当原資が存在しない場合には、受け付けた受注データの状況を「引当保留」とする。   The order allocation processing unit 111 executes an order allocation process for allocating allocation resources when an order is received. For example, when receiving the order data, the order allocation processing unit 111 allocates an allocation resource that can be allocated on the desired delivery date of the order data. For example, the order allocation processing unit 111 gives priority to the receipt plan of the headquarters warehouse, the physical inventory of the central warehouse, the receipt plan of the regional warehouse, the physical inventory of the regional warehouse, the receipt plan of the upper warehouse, and the physical inventory of the upper warehouse. Reserve. When there is a reserve resource that can be allocated on the desired delivery date, the order reservation processing unit 111 sets the status of the received order data to “allocated” and there is no reserve resource that can be allocated on the desired delivery date. The status of the received order data is “reservation pending”.

引当見直し処理部112は、引当済の受注に対して引当された引当原資を見直す引当見直し処理を実行する。例えば、引当見直し処理部112は、引当原資を引当済みの一又は複数の受注のうち、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出する。引当見直し処理部112は、抽出した受注に引当された引当原資をリリース(解放)する。引当見直し処理部112は、抽出した受注に対して、受注の特性に応じて、リリースした引当原資を含む所定倉庫の引当原資のうち、現物在庫及び入庫計画のいずれかを優先して引当する。引当見直し処理部112は、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出し、抽出した受注に引当された引当原資をリリースし、抽出した受注に対してリリースした引当原資を引当する処理を、任意のタイミングで繰り返し実行する。   The allocation review processing unit 112 executes an allocation review process for reviewing the allocation resources allocated to the allocated orders. For example, the allocation review processing unit 112 extracts one or a plurality of orders related to a predetermined product existing in a predetermined warehouse from one or a plurality of orders for which allocation resources have been allocated. The allocation review processing unit 112 releases (releases) the allocation resources allocated to the extracted orders. The allocation review processing unit 112 preferentially allocates either the physical inventory or the warehousing plan among the allocation resources of the predetermined warehouse including the allocated allocation resources for the extracted orders according to the characteristics of the orders. The allocation review processing unit 112 extracts one or a plurality of orders related to the predetermined product existing in the predetermined warehouse, releases the allocation resources allocated to the extracted orders, and allocates the allocated allocation resources to the extracted orders The process is repeatedly executed at an arbitrary timing.

また、引当見直し処理部112は、例えば、確定納品日に引当可能な引当原資を引当し、引当可能な引当原資が存在しない場合に、確定納品日に引当された全ての受注を出力する。   In addition, for example, the allocation review processing unit 112 allocates a reserve resource that can be allocated on the fixed delivery date, and outputs all orders that are allocated on the fixed delivery date when there is no reserve resource that can be allocated.

保留引当処理部113は、引当保留の受注に対して引当原資を引当する保留引当処理を実行する。例えば、保留引当処理部113は、受け付けた受注データのうち、引当保留の受注データを抽出する。保留引当処理部113は、抽出した受注データの希望納品日に引当可能な引当原資を引当する。例えば、保留引当処理部113は、地域倉庫の入庫計画、地域倉庫の現物在庫、上位倉庫の入庫計画、上位倉庫の現物在庫の順に、優先して引当する。保留引当処理部113は、希望納品日に引当可能な引当原資が存在する場合には、抽出した受注データの状況を「引当済」とし、希望納品日に引当可能な引当原資が存在しない場合には、抽出した受注データの状況を「引当保留」とする。   The reserve allocation processing unit 113 executes a reserve allocation process for allocating allocation resources for an allocation-pending order. For example, the pending allocation processing unit 113 extracts allocation pending order data from the received order data. The reserve allocation processing unit 113 allocates allocation resources that can be allocated on the desired delivery date of the extracted order data. For example, the reserve allocation processing unit 113 preferentially allocates in the order of the storage plan of the regional warehouse, the actual stock of the regional warehouse, the storage plan of the upper warehouse, and the actual inventory of the upper warehouse. When there is a reserve resource that can be allocated on the desired delivery date, the hold allocation processing unit 113 sets the status of the extracted order data to “allocated” and there is no reserve resource that can be allocated on the desired delivery date. Sets the status of the extracted order data as “reservation pending”.

次に、引当管理装置100の処理手順について説明する。図8及び図9は、受注引当処理の処理手順を示すフローチャートである。図8に示すように、受注データを受け付けると(ステップS101;Yes)、受注引当処理部111は、本部倉庫の入庫計画で希望納品日を遵守できるか否かを判定する(ステップS102)。例えば、受注引当処理部111は、3月25日に、商品「A」、数量「5」、希望納品日「4月2日」及び納品エリア(納品先住所など)「宮崎県・・・」等のデータを受注データとして受け付ける。そして、受注引当処理部111は、図4に例示した本部倉庫の入庫計画テーブル162を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を遵守できるか否かを判定する。本部倉庫の入庫計画で希望納品日を遵守できると判定した場合には(ステップS102;Yes)、受注引当処理部111は、ステップS110に移行する。   Next, the processing procedure of the allocation management device 100 will be described. 8 and 9 are flowcharts showing the processing procedure of the order reservation process. As shown in FIG. 8, when order data is received (step S101; Yes), the order allocation processing unit 111 determines whether or not the desired delivery date can be observed in the warehousing plan of the headquarters warehouse (step S102). For example, on the 25th of March, the order allocation processing unit 111 receives a product “A”, a quantity “5”, a desired delivery date “April 2”, and a delivery area (such as a delivery address) “Miyazaki Prefecture. Are received as order data. Then, the order allocation processing unit 111 refers to the warehousing plan table 162 of the headquarters warehouse illustrated in FIG. 4 and can observe the desired delivery date “April 2” of the order data after calculating the number of days required for delivery. It is determined whether or not. If it is determined that the desired delivery date can be observed in the warehouse plan at the headquarters warehouse (step S102; Yes), the order acceptance processing unit 111 proceeds to step S110.

本部倉庫の入庫計画で希望納品日を遵守できないと判定した場合には(ステップS102;No)、受注引当処理部111は、本部倉庫の現物在庫で希望納品日を遵守できるか否かを判定する(ステップS103)。例えば、受注引当処理部111は、図5に例示した現物在庫テーブル163を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を遵守できるか否かを判定する。本部倉庫の現物在庫で希望納品日を遵守できると判定した場合には(ステップS103;Yes)、受注引当処理部111は、ステップS110に移行する。   When it is determined that the desired delivery date cannot be observed in the receipt plan of the main warehouse (step S102; No), the order reservation processing unit 111 determines whether the desired delivery date can be observed in the actual stock in the main warehouse. (Step S103). For example, the order allocation processing unit 111 refers to the physical inventory table 163 illustrated in FIG. 5, calculates the number of days required for delivery, and confirms whether the desired delivery date “April 2” of the order data can be observed. Determine. When it is determined that the desired delivery date can be observed in the actual stock in the headquarters warehouse (step S103; Yes), the order allocation processing unit 111 proceeds to step S110.

本部倉庫の現物在庫で希望納品日を遵守できないと判定した場合には(ステップS103;No)、受注引当処理部111は、地域倉庫の入庫計画で希望納品日を遵守できるか否かを判定する(ステップS104)。例えば、受注引当処理部111は、図6に例示した在庫区決定テーブル164を参照し、受注データの納品エリア「宮崎県・・・」及び商品「A」に対応する在庫区「鳥栖倉庫」を決定する。そして、受注引当処理部111は、鳥栖倉庫の入庫計画テーブル162を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を遵守できるか否かを判定する。地域倉庫の入庫計画で希望納品日を遵守できると判定した場合には(ステップS104;Yes)、受注引当処理部111は、ステップS110に移行する。   When it is determined that the desired delivery date cannot be observed in the actual stock in the headquarters warehouse (step S103; No), the order allocation processing unit 111 determines whether the desired delivery date can be observed in the warehousing plan of the regional warehouse. (Step S104). For example, the order allocation processing unit 111 refers to the inventory area determination table 164 illustrated in FIG. 6, and determines the inventory area “Tosu Warehouse” corresponding to the delivery area “Miyazaki Prefecture ...” and the product “A” of the order data. decide. Then, the order acceptance processing unit 111 refers to the warehousing plan table 162 of the Tosu warehouse and determines whether or not the desired delivery date “April 2” of the order data can be observed after calculating the number of days required for delivery. To do. If it is determined that the desired delivery date can be observed in the warehouse plan of the regional warehouse (step S104; Yes), the order reservation processing unit 111 proceeds to step S110.

地域倉庫の入庫計画で希望納品日を遵守できないと判定した場合には(ステップS104;No)、受注引当処理部111は、地域倉庫の現物在庫で希望納品日を遵守できるか否かを判定する(ステップS105)。例えば、受注引当処理部111は、図5に例示した現物在庫テーブル163を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を遵守できるか否かを判定する。地域倉庫の現物在庫で希望納品日を遵守できると判定した場合には(ステップS105;Yes)、受注引当処理部111は、ステップS110に移行する。   When it is determined that the desired delivery date cannot be observed in the warehouse plan of the regional warehouse (step S104; No), the order reservation processing unit 111 determines whether the desired delivery date can be observed in the actual stock of the regional warehouse. (Step S105). For example, the order allocation processing unit 111 refers to the physical inventory table 163 illustrated in FIG. 5, calculates the number of days required for delivery, and confirms whether the desired delivery date “April 2” of the order data can be observed. Determine. If it is determined that the desired delivery date can be observed in the actual stock in the regional warehouse (step S105; Yes), the order allocation processing unit 111 proceeds to step S110.

地域倉庫の現物在庫で希望納品日を遵守できないと判定した場合には(ステップS105;No)、受注引当処理部111は、上位倉庫の入庫計画で希望納品日を遵守できるか否かを判定する(ステップS106)。例えば、受注引当処理部111は、図7に例示した上位倉庫決定テーブル165を参照し、判定した地域倉庫「鳥栖倉庫」に対応する上位倉庫「山口倉庫」を決定する。そして、受注引当処理部111は、山口倉庫の入庫計画テーブル162を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を遵守できるか否かを判定する。上位倉庫の入庫計画で希望納品日を遵守できると判定した場合には(ステップS106;Yes)、受注引当処理部111は、ステップS110に移行する。   If it is determined that the desired delivery date cannot be observed in the actual stock in the regional warehouse (step S105; No), the order reservation processing unit 111 determines whether the desired delivery date can be observed in the warehousing plan of the upper warehouse. (Step S106). For example, the order allocation processing unit 111 refers to the upper warehouse determination table 165 illustrated in FIG. 7 and determines the upper warehouse “Yamaguchi Warehouse” corresponding to the determined regional warehouse “Tosu Warehouse”. Then, the order reservation processing unit 111 refers to the warehousing plan table 162 of the Yamaguchi warehouse, and after calculating the number of days required for delivery, determines whether or not the desired delivery date “April 2” of the order data can be observed. To do. When it is determined that the desired delivery date can be observed in the storage plan of the upper warehouse (step S106; Yes), the order reservation processing unit 111 proceeds to step S110.

上位倉庫の入庫計画で希望納品日を遵守できないと判定した場合には(ステップS106;No)、受注引当処理部111は、上位倉庫の現物在庫で希望納品日を遵守できるか否かを判定する(ステップS107)。例えば、受注引当処理部111は、図5に例示した現物在庫テーブル163を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を遵守できるか否かを判定する。上位倉庫の現物在庫で希望納品日を遵守できると判定した場合には(ステップS107;Yes)、受注引当処理部111は、ステップS110に移行する。   When it is determined that the desired delivery date cannot be observed in the storage plan of the upper warehouse (step S106; No), the order reservation processing unit 111 determines whether the desired delivery date can be observed in the actual stock of the upper warehouse. (Step S107). For example, the order allocation processing unit 111 refers to the physical inventory table 163 illustrated in FIG. 5, calculates the number of days required for delivery, and confirms whether the desired delivery date “April 2” of the order data can be observed. Determine. When it is determined that the desired delivery date can be observed in the actual stock in the upper warehouse (step S107; Yes), the order reservation processing unit 111 proceeds to step S110.

上位倉庫の現物在庫で希望納品日を遵守できないと判定した場合には(ステップS107;No)、受注引当処理部111は、上位倉庫が存在するか否かを判定する(ステップS108)。例えば、受注引当処理部111は、図7に例示した上位倉庫決定テーブル165を参照し、判定した上位倉庫「山口倉庫」に対応する上位倉庫「大阪倉庫」を決定する。上位倉庫が存在すると判定した場合には(ステップS108;Yes)、受注引当処理部111は、ステップS106に移行する。   When it is determined that the desired delivery date cannot be observed in the actual stock of the upper warehouse (step S107; No), the order allocation processing unit 111 determines whether the upper warehouse exists (step S108). For example, the order allocation processing unit 111 refers to the upper warehouse determination table 165 illustrated in FIG. 7 and determines the upper warehouse “Osaka Warehouse” corresponding to the determined upper warehouse “Yamaguchi Warehouse”. When it is determined that the upper warehouse exists (step S108; Yes), the order reservation processing unit 111 proceeds to step S106.

上位倉庫が存在しないと判定した場合には(ステップS108;No)、図9に示すように、受注引当処理部111は、地域倉庫の入庫計画で納品日を確定できるか否かを判定する(ステップS109)。例えば、受注引当処理部111は、ステップS104において決定した在庫区「鳥栖倉庫」の入庫計画テーブル162を参照し、納品にかかる日数を逆算した上で、納品日を確定できるか否かを判定する。納品日を確定できると判定した場合には(ステップS109;Yes)、受注引当処理部111は、ステップS110に移行する。   When it is determined that there is no upper warehouse (step S108; No), as shown in FIG. 9, the order allocation processing unit 111 determines whether or not the delivery date can be determined by the warehousing plan of the regional warehouse ( Step S109). For example, the order reservation processing unit 111 refers to the warehousing plan table 162 of the stock area “Tosu Warehouse” determined in step S104, and determines whether or not the delivery date can be confirmed after calculating the number of days required for delivery. . If it is determined that the delivery date can be confirmed (step S109; Yes), the order reservation processing unit 111 proceeds to step S110.

納品日を確定できないと判定した場合には(ステップS109;No)、受注引当処理部111は、上位倉庫が存在するか否かを判定する(ステップS111)。例えば、受注引当処理部111は、図7に例示した上位倉庫決定テーブル165を参照し、判定した地域倉庫「鳥栖倉庫」に対応する上位倉庫「山口倉庫」を決定する。   When it is determined that the delivery date cannot be determined (step S109; No), the order reservation processing unit 111 determines whether there is a higher warehouse (step S111). For example, the order allocation processing unit 111 refers to the upper warehouse determination table 165 illustrated in FIG. 7 and determines the upper warehouse “Yamaguchi Warehouse” corresponding to the determined regional warehouse “Tosu Warehouse”.

上位倉庫が存在すると判定した場合には(ステップS111;Yes)、受注引当処理部111は、上位倉庫の入庫計画で納品日を確定できるか否かを判定する(ステップS112)。例えば、受注引当処理部111は、ステップS111において決定した上位倉庫「山口倉庫」の入庫計画テーブル162を参照し、納品にかかる日数を逆算した上で、納品日を確定できるか否かを判定する。納品日を確定できないと判定した場合には(ステップS112;No)、受注引当処理部111は、ステップS111に移行する。   When it is determined that the upper warehouse exists (step S111; Yes), the order reservation processing unit 111 determines whether or not the delivery date can be determined by the warehousing plan of the upper warehouse (step S112). For example, the order reservation processing unit 111 refers to the warehousing plan table 162 of the higher-level warehouse “Yamaguchi Warehouse” determined in step S111, and determines whether or not the delivery date can be confirmed after calculating the number of days required for delivery. . When it is determined that the delivery date cannot be determined (step S112; No), the order reservation processing unit 111 proceeds to step S111.

納品日を確定できると判定した場合には(ステップS112;Yes)、受注引当処理部111は、受け付けた受注データに引当原資を引当し(ステップS110)、処理を終了する。例えば、受注引当処理部111は、受け付けた受注データと、決定した在庫区と、引当原資を出荷する出荷倉庫と、確定した確定納品日と、受注データの状況とを、図3に例示した受注テーブル161に格納する。また、例えば、受注引当処理部111は、入庫計画テーブル162及び現物在庫テーブル163の引当可能数及び引当済数を更新する。例えば、受注データに山口倉庫の商品「A」の現物在庫を10個引当した場合には、現物在庫テーブル163の引当済数に10個加算し、引当可能数から10個減算する。   If it is determined that the delivery date can be determined (step S112; Yes), the order allocation processing unit 111 allocates allocation resources to the received order data (step S110) and ends the process. For example, the order allocation processing unit 111 accepts the received order data, the determined stock area, the shipping warehouse for shipping the allocation resources, the confirmed fixed delivery date, and the status of the order data illustrated in FIG. Store in table 161. In addition, for example, the order reservation processing unit 111 updates the available allocation number and the allocated number in the warehousing plan table 162 and the physical inventory table 163. For example, when 10 in-stock inventory of the product “A” in Yamaguchi Warehouse is allocated to the order data, 10 is added to the allocated number in the actual inventory table 163 and 10 is subtracted from the available number.

上位倉庫が存在しないと判定した場合には(ステップS111;No)、受注引当処理部111は、受け付けた受注データを引当保留とし(ステップS113)、処理を終了する。例えば、受注引当処理部111は、受け付けた受注データと、決定した在庫区と、受注データの状況とを、図3に例示した受注テーブル161に格納する。なお、受注引当処理部111は、出荷倉庫及び確定納品日には「−」を格納する。   If it is determined that there is no upper warehouse (step S111; No), the order reservation processing unit 111 places the received order data on hold (step S113) and ends the process. For example, the order allocation processing unit 111 stores the received order data, the determined stock area, and the status of the order data in the order table 161 illustrated in FIG. The order allocation processing unit 111 stores “-” in the shipping warehouse and the confirmed delivery date.

図10は、引当見直し処理の処理手順を示すフローチャートである。図10に示すように、処理タイミングになると(ステップS201;Yes)、引当見直し処理部112は、処理対象となる受注データを抽出する(ステップS202)。例えば、引当見直し処理部112は、毎日定刻(例えば、午前0時)になると、処理を開始する。また、例えば、引当見直し処理部112は、受注テーブル161の状況「引当済」の受注データのうち、所定の出荷倉庫から引当された所定商品に関する受注データを処理対象とする。つまり、例えば、引当見直し処理部112は、受注テーブル161の受注データのうち、出荷倉庫「大阪倉庫」、商品「A」及び状況「引当済」に該当する全ての受注データを処理対象として抽出する。なお、図10の引当見直し処理は出荷倉庫と商品との組み合わせごとに実行されるので、複数の引当見直し処理が平行して実行されても良い。例えば、出荷倉庫「大阪倉庫」及び商品「A」に関する引当見直し処理と、出荷倉庫「大阪倉庫」及び商品「B」に関する引当見直し処理と、出荷倉庫「鳥栖倉庫」及び商品「A」に関する引当見直し処理とが、平行して実行されても良い。   FIG. 10 is a flowchart showing the processing procedure of the allocation review process. As shown in FIG. 10, when the processing timing comes (step S201; Yes), the allocation review processing unit 112 extracts order data to be processed (step S202). For example, the allocation review processing unit 112 starts processing every day (for example, midnight). Further, for example, the allocation review processing unit 112 processes the order data related to a predetermined product allocated from a predetermined shipping warehouse among the order data of the status “allocated” in the order table 161. That is, for example, the allocation review processing unit 112 extracts all the order data corresponding to the shipping warehouse “Osaka Warehouse”, the product “A”, and the status “allocated” from the order data in the order table 161 as processing targets. . Since the allocation review process in FIG. 10 is executed for each combination of the shipping warehouse and the product, a plurality of allocation review processes may be executed in parallel. For example, an allocation review process for the shipping warehouse “Osaka Warehouse” and the product “A”, an allocation review process for the shipping warehouse “Osaka Warehouse” and the product “B”, and an allocation review for the shipping warehouse “Tosu Warehouse” and the product “A” The processing may be executed in parallel.

引当見直し処理部112は、処理対象となる受注データに引当された引当原資をリリースする(ステップS203)。例えば、引当見直し処理部112は、抽出した全ての受注データに引当された引当原資をリリースする。例えば、処理対象となる受注データに大阪倉庫の商品「A」の現物在庫が10個引当されていた場合には、現物在庫テーブル163の引当済数から10個減算し、引当可能数に10個加算する。   The allocation review processing unit 112 releases the allocation resources allocated to the order data to be processed (step S203). For example, the allocation review processing unit 112 releases allocation resources allocated to all the extracted order data. For example, when 10 in-stock inventory of the product “A” in the Osaka warehouse is allocated to the order data to be processed, 10 is subtracted from the allocated number in the actual inventory table 163, and 10 is allocated to the allowable number. to add.

引当見直し処理部112は、処理対象となる受注データを引当優先番号で並べる(ステップS204)。例えば、引当見直し処理部112は、抽出した全ての受注データを引当優先番号で昇順に並べる。   The allocation review processing unit 112 arranges the order data to be processed by the allocation priority number (step S204). For example, the allocation review processing unit 112 arranges all the extracted order data in ascending order by allocation priority number.

引当見直し処理部112は、処理対象となる受注データを受注日で並べる(ステップS205)。例えば、引当見直し処理部112は、受注データが引当優先番号で昇順に並べられた場合には、引当優先番号ごとに受注日で昇順に並べる。   The allocation review processing unit 112 arranges the order data to be processed by order date (step S205). For example, when the order data is arranged in ascending order by the allocation priority number, the allocation review processing unit 112 arranges the order data in ascending order by the order date for each allocation priority number.

引当見直し処理部112は、処理対象となる受注データから一つ選択する(ステップS206)。例えば、引当見直し処理部112は、受注データが引当優先番号及び受注日で昇順に並べられた場合には、引当優先番号及び受注日の値が最小の受注データを一つ選択する。   The allocation review processing unit 112 selects one piece of order data to be processed (step S206). For example, when the order data is arranged in ascending order by the allocation priority number and the order date, the allocation review processing unit 112 selects one order data having the smallest allocation priority number and order date value.

引当見直し処理部112は、入庫計画で確定納品日を遵守できるか否かを判定する(ステップS207)。例えば、引当見直し処理部112は、出荷倉庫「大阪倉庫」の商品「A」の入庫計画テーブル162を参照し、納品にかかる日数を逆算した上で、受注データの確定納品日「4月2日」を遵守できるか否かを判定する。入庫計画で確定納品日を遵守できると判定した場合には(ステップS207;Yes)、引当見直し処理部112は、ステップS209に移行する。   The allocation review processing unit 112 determines whether or not the fixed delivery date can be observed in the warehousing plan (step S207). For example, the allocation review processing unit 112 refers to the warehousing plan table 162 of the product “A” in the shipping warehouse “Osaka warehouse”, calculates the number of days required for delivery, and then confirms the confirmed delivery date “April 2” of the order data. It is determined whether or not it can be observed. When it is determined in the warehousing plan that the confirmed delivery date can be observed (step S207; Yes), the allocation review processing unit 112 proceeds to step S209.

入庫計画で確定納品日を遵守できないと判定した場合には(ステップS207;No)、引当見直し処理部112は、現物在庫で確定納品日を遵守できるか否かを判定する(ステップS208)。例えば、引当見直し処理部112は、図5に例示した現物在庫テーブル163を参照し、納品にかかる日数を逆算した上で、受注データの確定納品日「4月2日」を出荷倉庫「大阪倉庫」の商品「A」の現物在庫で遵守できるか否かを判定する。   When it is determined in the warehousing plan that the fixed delivery date cannot be observed (step S207; No), the allocation review processing unit 112 determines whether the fixed delivery date can be observed in the actual stock (step S208). For example, the allocation review processing unit 112 refers to the physical inventory table 163 illustrated in FIG. 5, calculates the number of days required for delivery, and sets the confirmed delivery date “April 2” of the order data to the shipping warehouse “Osaka Warehouse”. It is determined whether or not compliance can be made with the actual stock of the product “A”.

現物在庫で確定納品日を遵守できると判定した場合には(ステップS208;Yes)、引当見直し処理部112は、引当原資を引当する(ステップS209)。例えば、引当見直し処理部112は、選択した受注データに、引当原資を出荷する出荷倉庫と、確定した確定納品日と、受注データの状況とを対応付けて、図3に例示した受注テーブル161に格納する。また、例えば、受注引当処理部111は、入庫計画テーブル162及び現物在庫テーブル163の引当可能数及び引当済数を更新する。   When it is determined that the confirmed delivery date can be observed in the actual stock (step S208; Yes), the allocation review processing unit 112 allocates the allocation resources (step S209). For example, the allocation review processing unit 112 associates the selected order data with the shipping warehouse for shipping the allocation resources, the confirmed confirmed delivery date, and the status of the order data in the order table 161 illustrated in FIG. Store. In addition, for example, the order reservation processing unit 111 updates the available allocation number and the allocated number in the warehousing plan table 162 and the physical inventory table 163.

引当見直し処理部112は、未選択の受注データがあるか否かを判定する(ステップS210)。未選択の受注データがあると判定した場合には(ステップS210;Yes)、引当見直し処理部112は、ステップS206に移行する。未選択の受注データがないと判定した場合には(ステップS210;No)、引当見直し処理部112は、処理を終了する。   The allocation review processing unit 112 determines whether there is unselected order data (step S210). If it is determined that there is unselected order data (step S210; Yes), the allocation review processing unit 112 proceeds to step S206. If it is determined that there is no unselected order data (step S210; No), the allocation review processing unit 112 ends the process.

現物在庫で確定納品日を遵守できないと判定した場合には(ステップS208;No)、引当見直し処理部112は、処理を中断及びリセットする(ステップS211)。また、例えば、引当見直し処理部112は、遵守できなかった確定納品日に引当原資が引当されている全ての受注データのリストを生成し、生成したリストを警告リストとして出力する。なお、警告リストは、表示部15に出力する形態としても良く、通信部17を介して外部装置に送信する形態としても良い。   When it is determined that the confirmed delivery date cannot be observed in the actual stock (step S208; No), the allocation review processing unit 112 interrupts and resets the process (step S211). Further, for example, the allocation review processing unit 112 generates a list of all received order data for which allocation resources are allocated on the fixed delivery date that could not be observed, and outputs the generated list as a warning list. Note that the warning list may be output to the display unit 15 or may be transmitted to an external device via the communication unit 17.

図11は、保留引当処理の処理手順を示すフローチャートである。図11に示すように、処理タイミングになると(ステップS301;Yes)、保留引当処理部113は、処理対象となる受注データを抽出する(ステップS302)。例えば、保留引当処理部113は、引当見直し処理が実行された後に、処理を開始する。また、例えば、保留引当処理部113は、受注テーブル161の状況「引当保留」の受注データのうち、所定の出荷倉庫から引当された所定商品に関する受注データを処理対象とする。つまり、例えば、保留引当処理部113は、受注テーブル161の受注データのうち、出荷倉庫「大阪倉庫」、商品「A」及び状況「引当保留」に該当する全ての受注データを処理対象として抽出する。なお、図11の保留引当処理は出荷倉庫と商品との組み合わせごとに実行されるので、複数の保留引当処理が平行して実行されても良い。例えば、出荷倉庫「大阪倉庫」及び商品「A」に関する保留引当処理と、出荷倉庫「大阪倉庫」及び商品「B」に関する保留引当処理と、出荷倉庫「鳥栖倉庫」及び商品「A」に関する保留引当処理とが、平行して実行されても良い。   FIG. 11 is a flowchart showing the processing procedure of the reserve allocation process. As shown in FIG. 11, when the processing timing comes (step S301; Yes), the reservation allocation processing unit 113 extracts order data to be processed (step S302). For example, the pending allocation processing unit 113 starts processing after the allocation review processing is executed. In addition, for example, the pending allocation processing unit 113 processes the order data related to a predetermined product allocated from a predetermined shipping warehouse among the order data of the status “reservation pending” in the order table 161. That is, for example, the pending allocation processing unit 113 extracts all the received order data corresponding to the shipping warehouse “Osaka warehouse”, the product “A”, and the situation “reserved pending” from the order data in the order table 161 as processing targets. . 11 is executed for each combination of the shipping warehouse and the merchandise, a plurality of hold allocation processes may be executed in parallel. For example, a reserve allocation process for the shipping warehouse “Osaka Warehouse” and the product “A”, a reserve allocation process for the shipping warehouse “Osaka Warehouse” and the product “B”, and a reserve allocation for the shipping warehouse “Tosu Warehouse” and the product “A”. The processing may be executed in parallel.

保留引当処理部113は、処理対象となる受注データを受注日で並べる(ステップS303)。例えば、保留引当処理部113は、抽出した全ての受注データを受注日で昇順に並べる。   The reserve allocation processing unit 113 arranges the order data to be processed according to the order date (step S303). For example, the pending allocation processing unit 113 arranges all the extracted order data in ascending order by order date.

保留引当処理部113は、処理対象となる受注データから一つ選択する(ステップS304)。例えば、保留引当処理部113は、受注データが受注日で昇順に並べられた場合には、受注日の値が最小の受注データを一つ選択する。   The reserve allocation processing unit 113 selects one piece of order data to be processed (step S304). For example, when the order data is arranged in ascending order by order date, the reservation allocation processing unit 113 selects one order data having the smallest order date value.

保留引当処理部113は、在庫区の入庫計画で希望納品日を遵守できるか否かを判定する(ステップS305)。例えば、保留引当処理部113は、選択した受注データの在庫区「大阪倉庫」の商品「B」の入庫計画テーブル162を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を遵守できるか否かを判定する。入庫計画で希望納品日を遵守できると判定した場合には(ステップS305;Yes)、保留引当処理部113は、ステップS310に移行する。   The reserve allocation processing unit 113 determines whether or not the desired delivery date can be observed in the inventory plan for the inventory area (step S305). For example, the reserve allocation processing unit 113 refers to the warehousing plan table 162 of the product “B” in the inventory section “Osaka warehouse” of the selected order data, and after calculating the number of days required for delivery, the desired delivery date of the order data It is determined whether or not “April 2” can be observed. When it is determined in the warehousing plan that the desired delivery date can be observed (step S305; Yes), the suspension allocation processing unit 113 proceeds to step S310.

入庫計画で希望納品日を遵守できないと判定した場合には(ステップS305;No)、保留引当処理部113は、在庫区の現物在庫で希望納品日を遵守できるか否かを判定する(ステップS306)。例えば、保留引当処理部113は、図5に例示した現物在庫テーブル163を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を在庫区「大阪倉庫」の商品「B」の現物在庫で遵守できるか否かを判定する。現物在庫で希望納品日を遵守できると判定した場合には(ステップS306;Yes)、保留引当処理部113は、ステップS310に移行する。   If it is determined in the warehousing plan that the desired delivery date cannot be observed (step S305; No), the reserve allocation processing unit 113 determines whether the desired delivery date can be observed in the actual stock in the inventory area (step S306). ). For example, the reserve allocation processing unit 113 refers to the physical inventory table 163 illustrated in FIG. 5, calculates the number of days required for delivery, and sets the desired delivery date “April 2” in the order data to the inventory section “Osaka Warehouse”. It is determined whether or not compliance can be made with the actual stock of the product “B”. When it is determined that the desired delivery date can be observed with the actual stock (step S306; Yes), the suspension allocation processing unit 113 proceeds to step S310.

現物在庫で希望納品日を遵守できないと判定した場合には(ステップS306;No)、保留引当処理部113は、上位倉庫が存在するか否かを判定する(ステップS307)。例えば、保留引当処理部113は、図7に例示した上位倉庫決定テーブル165を参照し、判定した在庫区「大阪倉庫」に対応する上位倉庫が存在するか否かを判定する。上位倉庫が存在しないと判定した場合には(ステップS307;No)、保留引当処理部113は、ステップS311に移行する。   When it is determined that the desired delivery date cannot be observed in the actual stock (step S306; No), the hold allocation processing unit 113 determines whether there is a higher-level warehouse (step S307). For example, the reserve allocation processing unit 113 refers to the upper warehouse determination table 165 illustrated in FIG. 7 and determines whether there is an upper warehouse corresponding to the determined stock area “Osaka Warehouse”. When it is determined that there is no upper warehouse (step S307; No), the reservation allocation processing unit 113 proceeds to step S311.

上位倉庫が存在すると判定した場合には(ステップS307;Yes)、保留引当処理部113は、上位倉庫の入庫計画で希望納品日を遵守できるか否かを判定する(ステップS308)。例えば、保留引当処理部113は、上位倉庫「本部倉庫」の商品「B」の入庫計画テーブル162を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を遵守できるか否かを判定する。入庫計画で希望納品日を遵守できると判定した場合には(ステップS308;Yes)、保留引当処理部113は、ステップS310に移行する。   If it is determined that the upper warehouse exists (step S307; Yes), the hold allocation processing unit 113 determines whether or not the desired delivery date can be observed in the warehousing plan of the upper warehouse (step S308). For example, the reserve allocation processing unit 113 refers to the warehousing plan table 162 of the product “B” of the upper warehouse “headquarter warehouse”, calculates the number of days required for delivery, and then selects the desired delivery date “April 2” of the order data. It is determined whether or not it can be observed. If it is determined in the warehousing plan that the desired delivery date can be observed (step S308; Yes), the suspension allocation processing unit 113 proceeds to step S310.

入庫計画で希望納品日を遵守できないと判定した場合には(ステップS308;No)、保留引当処理部113は、上位倉庫の現物在庫で希望納品日を遵守できるか否かを判定する(ステップS309)。例えば、保留引当処理部113は、図5に例示した現物在庫テーブル163を参照し、納品にかかる日数を逆算した上で、受注データの希望納品日「4月2日」を上位倉庫「本部倉庫」の商品「B」の現物在庫で遵守できるか否かを判定する。現物在庫で希望納品日を遵守できないと判定した場合には(ステップS309;No)、保留引当処理部113は、ステップS307に移行する。   When it is determined in the warehousing plan that the desired delivery date cannot be observed (step S308; No), the reserve allocation processing unit 113 determines whether or not the desired delivery date can be observed in the actual stock in the upper warehouse (step S309). ). For example, the reserve allocation processing unit 113 refers to the physical inventory table 163 illustrated in FIG. 5, calculates the number of days required for delivery, and sets the desired delivery date “April 2” of the order data to the upper warehouse “main warehouse It is determined whether or not compliance can be made with the actual stock of the product “B”. When it is determined that the desired delivery date cannot be observed with the actual stock (step S309; No), the suspension allocation processing unit 113 proceeds to step S307.

現物在庫で希望納品日を遵守できると判定した場合には(ステップS309;Yes)、保留引当処理部113は、引当原資を引当する(ステップS310)。例えば、保留引当処理部113は、選択した受注データに、引当原資を出荷する出荷倉庫と、確定した確定納品日と、受注データの状況とを対応付けて、図3に例示した受注テーブル161に格納する。   When it is determined that the desired delivery date can be complied with the actual stock (step S309; Yes), the pending allocation processing unit 113 allocates allocation resources (step S310). For example, the pending allocation processing unit 113 associates the selected order data with the shipping warehouse for shipping the allocation resources, the confirmed confirmed delivery date, and the status of the order data in the order table 161 illustrated in FIG. Store.

保留引当処理部113は、未選択の受注データがあるか否かを判定する(ステップS311)。未選択の受注データがあると判定した場合には(ステップS311;Yes)、保留引当処理部113は、ステップS304に移行する。未選択の受注データがないと判定した場合には(ステップS311;No)、保留引当処理部113は、処理を終了する。   The reserve allocation processing unit 113 determines whether there is unselected order data (step S311). If it is determined that there is unselected order data (step S311; Yes), the hold allocation processing unit 113 proceeds to step S304. When it is determined that there is no unselected order data (step S311; No), the reservation processing unit 113 ends the process.

次に、引当管理装置100の効果について説明する。引当管理装置100は、引当原資を引当済みの一又は複数の受注のうち、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出する。引当管理装置100は、抽出した受注に引当された引当原資をリリースする。引当管理装置100は、抽出した受注に対して、受注の特性に応じて、リリースした引当原資を含む所定倉庫の引当原資のうち、現物在庫及び入庫計画のいずれかを優先して引当する。引当管理装置100は、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出し、抽出した受注に引当された引当原資をリリースし、抽出した受注に対してリリースした引当原資を引当する処理を、任意のタイミングで繰り返し実行する。このため、引当管理装置100は、日々の引当原資の変動を考慮した上で、引当原資を適切に引当することができる。例えば、引当管理装置100は、受注の特性に応じて現物在庫及び入庫計画のいずれかを優先して引当するので、受注の特性に応じて引当原資を適切に引当することができる。例えば、引当管理装置100は、工場キッティング受注の場合には、入庫計画を優先して引当するので、工場キッティングを効率よく行うことができる。つまり、引当管理装置100は、工場で商品のセッティングを行ってからの出荷を効率よく行うことができる。   Next, the effect of the allocation management device 100 will be described. The allocation management apparatus 100 extracts one or a plurality of orders relating to a predetermined product existing in a predetermined warehouse from one or a plurality of orders for which allocation resources have been allocated. The allocation management device 100 releases the allocation resources allocated to the extracted orders. The allocation management device 100 preferentially allocates either the physical inventory or the warehousing plan among the allocation resources of the predetermined warehouse including the allocated allocation resources for the extracted orders according to the characteristics of the orders. The allocation management apparatus 100 extracts one or a plurality of orders related to a predetermined product existing in a predetermined warehouse, releases allocation resources allocated to the extracted orders, and allocates allocated allocation resources to the extracted orders Are repeatedly executed at an arbitrary timing. For this reason, the allocation management apparatus 100 can appropriately allocate allocation resources in consideration of daily fluctuations in allocation resources. For example, since the allocation management apparatus 100 allocates priority to either the physical inventory or the warehousing plan according to the characteristics of the order, it is possible to appropriately allocate the allocation resources according to the characteristics of the order. For example, in the case of a factory kitting order, the allocation management apparatus 100 allocates the warehousing plan with priority, so that factory kitting can be performed efficiently. In other words, the allocation management device 100 can efficiently perform shipment after setting a product in a factory.

また、例えば、引当管理装置100は、受注の特性に応じて現物在庫より入庫計画を優先して引当するので、倉庫間移動費、荷役費及び保管料などの中間物流コストを削減することができる。また、このため、引当管理装置100は、現物在庫を納品を急ぐ顧客に引当することができるので、緊急対応のために確保しておく引当原資を低減することができる。   In addition, for example, the allocation management apparatus 100 allocates the warehousing plan in preference to the physical inventory according to the characteristics of the order, so that it is possible to reduce intermediate logistics costs such as inter-warehouse transportation costs, cargo handling costs, and storage fees. . For this reason, since the allocation management apparatus 100 can allocate the physical inventory to the customer who hurries delivery, it is possible to reduce allocation resources reserved for emergency response.

また、例えば、引当管理装置100は、所定の倉庫に引当可能な引当原資が存在しない場合には、所定の倉庫の上位倉庫の引当原資を段階的に判定するので、顧客への納期回答率を向上させることができる。   In addition, for example, when there is no reserve resource that can be allocated in a predetermined warehouse, the allocation management apparatus 100 determines the allocation resource in the upper warehouse of the predetermined warehouse step by step. Can be improved.

以上、本発明に係る実施形態について説明したが、これに限定されるものではなく、本発明の趣旨を逸脱しない範囲で種々の変更、置換、追加等が可能である。   The embodiment according to the present invention has been described above, but the present invention is not limited to this, and various changes, substitutions, additions, and the like are possible without departing from the spirit of the present invention.

例えば、上記実施形態では、図10において、引当見直し処理部112は、引当優先番号が小さい受注データから順に、ステップS207の処理を実行し、その後、ステップS208の処理を実行するものと説明したが、これに限定されるものではない。例えば、引当見直し処理部112は、引当優先番号が大きい受注データから順に、ステップS208の処理を実行し、その後、ステップS207の処理を実行しても良い。また、例えば、引当見直し処理部112は、所定の引当優先番号を有する受注データについてはステップS207の処理を優先して実行し、所定の引当優先番号を有しない受注データについてはステップS208の処理を優先して実行するようにしても良い。   For example, in the above-described embodiment, it has been described in FIG. 10 that the allocation review processing unit 112 executes the process of step S207 in order from the order data having the smallest allocation priority number, and then executes the process of step S208. However, the present invention is not limited to this. For example, the allocation review processing unit 112 may execute the process of step S208 in order from the order data having a larger allocation priority number, and then execute the process of step S207. Further, for example, the allocation review processing unit 112 prioritizes the process of step S207 for order data having a predetermined allocation priority number, and performs the process of step S208 for order data not having the predetermined allocation priority number. Priority may be given to execution.

また、上記実施形態では、PCで実行されるプログラムを、ROM12や記憶部16に記憶した状態で提供する形態としたが、これに限らず、インストール可能な形式又は実行可能な形式のファイルでCD−ROM、フレキシブルディスク(FD)、CD−R、DVD(Digital Versatile Disk)等のコンピュータで読み取り可能な記録媒体に記録して提供する形態としてもよい。   In the above embodiment, the program executed on the PC is provided in a state stored in the ROM 12 or the storage unit 16. However, the present invention is not limited to this, and the program can be installed in an installable or executable format file. -It is good also as a form which records and provides on computer-readable recording media, such as ROM, flexible disk (FD), CD-R, DVD (Digital Versatile Disk).

また、上記実施形態のPCで実行されるプログラムを、インターネット等のネットワークに接続されたコンピュータ上に格納し、ネットワーク経由でダウンロードさせることにより提供する形態としてもよい。また、上記実施形態のPCで実行されるプログラムを、インターネット等のネットワーク経由で提供又は配布する形態としてもよい。   The program executed on the PC according to the above embodiment may be provided by being stored on a computer connected to a network such as the Internet and downloaded via the network. The program executed on the PC of the above embodiment may be provided or distributed via a network such as the Internet.

11 CPU
12 ROM
13 RAM
14 入力部
15 表示部
16 記憶部
17 通信部
100 引当管理装置
111 受注引当処理部
112 引当見直し処理部
113 保留引当処理部
161 受注テーブル
162 入庫計画テーブル
163 現物在庫テーブル
164 在庫区決定テーブル
165 上位倉庫決定テーブル
11 CPU
12 ROM
13 RAM
14 Input unit 15 Display unit 16 Storage unit 17 Communication unit 100 Allocation management device 111 Order allocation processing unit 112 Allocation review processing unit 113 Reserve allocation processing unit 161 Order reception table 162 Receipt plan table 163 Physical inventory table 164 Inventory area determination table 165 Upper warehouse Decision table

特開2003−99507号公報JP 2003-99507 A 特開平10−214298号公報JP-A-10-214298 特開平5−324685号公報Japanese Patent Application Laid-Open No. 5-324585 特開平4−289967号公報JP-A-4-289967 特開2002−251552号公報JP 2002-251552 A 特開2003−316416号公報JP 2003-316416 A

Claims (4)

倉庫に存在する商品の数量を示す現物在庫と、当該倉庫に入庫される当該商品の数量を示す入庫計画とを含む引当原資を引当済みの一又は複数の受注から、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出する抽出手段と、
前記抽出手段により抽出された受注に引当された前記引当原資を解放する解放手段と、
前記抽出手段により抽出された受注に対して、当該受注の特性に応じて、前記解放手段により解放された引当原資を含む前記所定倉庫の引当原資のうち、前記現物在庫及び前記入庫計画のいずれかを優先して引当し、引当可能な引当原資が存在する前記受注を引当済とし、引当可能な引当原資が存在しない前記受注を引当保留として、引当済の前記受注に対して引当された引当原資を見直す引当見直し処理を実行し、引当保留の前記受注に対して引当原資を引当する保留引当処理を実行する引当手段と、
前記抽出手段に前記受注を抽出させ、前記抽出手段により抽出された受注に引当された前記引当原資を前記解放手段に解放させ、前記解放手段により解放された引当原資を前記抽出手段により抽出された受注に対して前記引当手段に引当させる処理を任意のタイミングで繰り返し実行する制御手段と
を備えたことを特徴とする引当管理装置。
Predetermined goods that exist in a given warehouse from one or more orders that have been allocated reserve resources, including physical inventory that indicates the quantity of goods that exist in the warehouse and a warehousing plan that indicates the quantity of the goods that are received in the warehouse Extracting means for extracting one or a plurality of orders relating to;
Release means for releasing the provision resources allocated to the order extracted by the extraction means;
For the orders extracted by the extraction means, one of the physical inventory and the warehousing plan out of the allocation resources of the predetermined warehouse including the allocation resources released by the release means according to the characteristics of the order. Is allocated, the order for which there is a reserve resource available for allocation is reserved, the order for which there is no reserve resource available for allocation is reserved, and the reserve resource allocated for the received order is allocated. An allocation means for executing a reserve review process for executing a reserve review process for reserving and reserving a reserve resource for the order that has been reserved .
The extraction means is made to extract the order, the allocation resources allocated to the order extracted by the extraction means are released to the release means, and the allocation resources released by the release means are extracted by the extraction means An allocation management apparatus comprising: a control unit that repeatedly executes the process of allowing the allocation unit to allocate an order at an arbitrary timing.
前記受注は、前記商品の納品日を含み、
前記引当手段は、前記受注に含まれる納品日に引当可能な引当原資を引当し、当該引当可能な引当原資が存在しない場合に、当該納品日に引当された全ての受注を出力することを特徴とする請求項1に記載の引当管理装置。
The order includes a delivery date of the product,
The allocation means allocates reserve resources that can be allocated on the delivery date included in the order, and outputs all orders allocated on the delivery date when there is no reserve resource that can be allocated The allocation management device according to claim 1.
引当管理装置で実行される引当管理方法であって、
倉庫に存在する商品の数量を示す現物在庫と、当該倉庫に入庫される当該商品の数量を示す入庫計画とを含む引当原資を引当済みの一又は複数の受注から、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出する抽出工程と、
前記抽出工程により抽出された受注に引当された前記引当原資を解放する解放工程と、
前記抽出工程により抽出された受注に対して、当該受注の特性に応じて、前記解放工程により解放された引当原資を含む前記倉庫の前記引当原資のうち、前記現物在庫及び前記入庫計画のいずれかを優先して引当し、引当可能な引当原資が存在する前記受注を引当済とし、引当可能な引当原資が存在しない前記受注を引当保留として、引当済の前記受注に対して引当された引当原資を見直す引当見直し処理を実行し、引当保留の前記受注に対して引当原資を引当する保留引当処理を実行する引当工程とを含み、
任意のタイミングで前記抽出工程と、前記解放工程と、前記引当工程とを繰り返し実行することを特徴とする引当管理方法。
An allocation management method executed by an allocation management device,
Predetermined goods that exist in a given warehouse from one or more orders that have been allocated reserve resources, including physical inventory that indicates the quantity of goods that exist in the warehouse and a warehousing plan that indicates the quantity of the goods that are received in the warehouse An extraction process for extracting one or more orders for
Releasing the allocation resources allocated to the orders extracted by the extraction step;
For the orders extracted by the extraction process, either the physical inventory or the warehousing plan among the allocation resources of the warehouse including the allocation resources released by the release process according to the characteristics of the order. Is allocated, the order for which there is a reserve resource available for allocation is reserved, the order for which there is no reserve resource available for allocation is reserved, and the reserve resource allocated for the received order is allocated. An allocation process for executing a reserve review process for executing a reserve review process for executing a reserve review process for reserving a reserve resource for the order that has been reserved ,
An allocation management method comprising repeatedly executing the extraction step, the release step, and the allocation step at an arbitrary timing.
倉庫に存在する商品の数量を示す現物在庫と、当該倉庫に入庫される当該商品の数量を示す入庫計画とを含む引当原資を引当済みの一又は複数の受注から、所定倉庫に存在する所定商品に関する一又は複数の受注を抽出する抽出ステップと、
前記抽出ステップにより抽出された受注に引当された前記引当原資を解放する解放ステップと、
前記抽出ステップにより抽出された受注に対して、当該受注の特性に応じて、前記解放ステップにより解放された引当原資を含む前記倉庫の前記引当原資のうち、前記現物在庫及び前記入庫計画のいずれかを優先して引当し、引当可能な引当原資が存在する前記受注を引当済とし、引当可能な引当原資が存在しない前記受注を引当保留として、引当済の前記受注に対して引当された引当原資を見直す引当見直し処理を実行し、引当保留の前記受注に対して引当原資を引当する保留引当処理を実行する引当ステップとを
任意のタイミングで繰り返しコンピュータに実行させるための引当管理プログラム。
Predetermined goods that exist in a given warehouse from one or more orders that have been allocated reserve resources, including physical inventory that indicates the quantity of goods that exist in the warehouse and a warehousing plan that indicates the quantity of the goods that are received in the warehouse An extraction step of extracting one or more orders for
Releasing the allocation resources allocated to the orders extracted by the extraction step;
For the orders extracted by the extraction step, either the physical inventory or the warehousing plan among the allocation resources of the warehouse including the allocation resources released by the release step according to the characteristics of the order. Is allocated, the order for which there is a reserve resource available for allocation is reserved, the order for which there is no reserve resource available for allocation is reserved, and the reserve resource allocated for the received order is allocated. An allocation management program for executing an allocation review process for reviewing a reserve and executing a reserve allocation process for executing a reserve allocation process for allocating a reserve resource for an order with an allocation pending .
JP2011202996A 2011-09-16 2011-09-16 Allocation management device, allocation management method, and allocation management program Expired - Fee Related JP5866909B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011202996A JP5866909B2 (en) 2011-09-16 2011-09-16 Allocation management device, allocation management method, and allocation management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011202996A JP5866909B2 (en) 2011-09-16 2011-09-16 Allocation management device, allocation management method, and allocation management program

Publications (2)

Publication Number Publication Date
JP2013065166A JP2013065166A (en) 2013-04-11
JP5866909B2 true JP5866909B2 (en) 2016-02-24

Family

ID=48188606

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011202996A Expired - Fee Related JP5866909B2 (en) 2011-09-16 2011-09-16 Allocation management device, allocation management method, and allocation management program

Country Status (1)

Country Link
JP (1) JP5866909B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7104594B2 (en) * 2018-09-10 2022-07-21 株式会社オービック Order / sales management device, order / sales management method and order / sales management program
JP7222645B2 (en) * 2018-09-27 2023-02-15 株式会社オービック Inventory re-allocation execution device, inventory re-allocation execution method and inventory re-allocation execution program
JP6545347B1 (en) * 2018-10-29 2019-07-17 三菱電機株式会社 Correspondence destination determination device, correspondence destination determination method and correspondence destination determination program
CN111222816A (en) * 2018-11-27 2020-06-02 北京京东振世信息技术有限公司 Warehouse order processing method and device, electronic equipment and computer readable medium
JP7387266B2 (en) * 2019-02-01 2023-11-28 株式会社オービック Inventory management device, inventory management method, and inventory management program
JP7445582B2 (en) 2020-03-18 2024-03-07 株式会社オービック Shipping warehouse determination device, shipping warehouse determination method, and shipping warehouse determination program

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004002013A (en) * 2002-03-29 2004-01-08 Fujitsu Ltd Device and method for reserving shipment, and program for the same
JP2003321122A (en) * 2002-05-08 2003-11-11 Fujikura Ltd Physical distribution system for electric wire and method for management shipment of electric wire in physical distribution system
JP2005060108A (en) * 2003-07-30 2005-03-10 Matsushita Electric Ind Co Ltd Physical distribution management system
JP4128968B2 (en) * 2003-12-04 2008-07-30 エスアーペー アーゲー Inventory re-allocation apparatus and method, and computer program
JP4363279B2 (en) * 2004-09-03 2009-11-11 株式会社日立製作所 Production planning system
JP4846284B2 (en) * 2005-07-05 2011-12-28 エスアーペー アーゲー Product allocation device, product allocation method, and product allocation program

Also Published As

Publication number Publication date
JP2013065166A (en) 2013-04-11

Similar Documents

Publication Publication Date Title
JP5866909B2 (en) Allocation management device, allocation management method, and allocation management program
TWI486885B (en) Efficient inventory management for providing distinct service qualities for multiple demand groups
JP7242258B2 (en) Inventory control device
JP6594801B2 (en) Supply and demand adjustment device, supply and demand adjustment system, and supply and demand adjustment method
US20150368044A1 (en) Systems and methods for allocating the demand in a product order
JP2022132601A (en) Inventory reservation processing device, inventory reservation processing method, and inventory reservation processing program
Lima et al. Simulation‐Based Planning and Control of Transport Flows in Port Logistic Systems
JPWO2011121703A1 (en) Production management apparatus, production management program, and production management method
US20150112742A1 (en) System and method of automatically allocating tasks
JP6929433B2 (en) Production control equipment, production control methods and programs
JP7226117B2 (en) Order entry device, order entry method and order entry program
JP7104594B2 (en) Order / sales management device, order / sales management method and order / sales management program
JP2022050648A (en) Electronic device for providing item picking information and method thereof
KR20220026560A (en) Cycle and safety stock determination systems
JP2013054674A (en) Commodity order management device and program
JP6684594B2 (en) Vehicle allocation plan editing method, vehicle allocation plan editing device, and vehicle allocation plan editing program
JP2010198340A (en) Inventory management device and inventory management method
JP4890860B2 (en) Shelf management apparatus and method, and computer program
JP2006318280A (en) Stock allocation management system and stock allocation management method
JP7394005B2 (en) Transport judgment support device, transport judgment support method and program
JP7131989B2 (en) Inventory allocation processing device, inventory allocation processing method, and inventory allocation processing program
JP2018120515A (en) Product management device, product management method, and product management program
JP2019148945A (en) Production managing device, production managing method and program
JP2009211242A (en) Business management device, business management program, business management system and business management method
JP2024063256A (en) Business support device, business support method, and business support program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140812

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150521

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150609

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150807

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151208

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151221

R151 Written notification of patent or utility model registration

Ref document number: 5866909

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

LAPS Cancellation because of no payment of annual fees