JP5837342B2 - Fishway - Google Patents

Fishway Download PDF

Info

Publication number
JP5837342B2
JP5837342B2 JP2011145631A JP2011145631A JP5837342B2 JP 5837342 B2 JP5837342 B2 JP 5837342B2 JP 2011145631 A JP2011145631 A JP 2011145631A JP 2011145631 A JP2011145631 A JP 2011145631A JP 5837342 B2 JP5837342 B2 JP 5837342B2
Authority
JP
Japan
Prior art keywords
megalithic
megalith
fishway
paving stone
megaliths
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011145631A
Other languages
Japanese (ja)
Other versions
JP2013011135A (en
Inventor
一信 大手
一信 大手
井上 誠
誠 井上
勝美 国本
勝美 国本
Original Assignee
株式会社大手組
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社大手組 filed Critical 株式会社大手組
Priority to JP2011145631A priority Critical patent/JP5837342B2/en
Publication of JP2013011135A publication Critical patent/JP2013011135A/en
Application granted granted Critical
Publication of JP5837342B2 publication Critical patent/JP5837342B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/60Ecological corridors or buffer zones

Landscapes

  • Revetment (AREA)

Description

本発明は堰堤等の構築物が設けられた河川等の魚が遡上し難い箇所において、魚が遡上できるようにする魚道に関し、さらに詳しくは巨石を用いて構成する魚道に関するものである。   The present invention relates to a fishway that allows fish to go up in places where fish such as rivers provided with structures such as dams are difficult to go up, and more particularly to a fishway constructed using megaliths.

魚の遡上を助けるために川に設けられる魚道としては、従来はコンクリートの三面張り水路の中に一定間隔でコンクリートの仕切壁を設けてプール部を形成した構造のものが多く用いられていた。このような全体をコンクリート構造物で構成した魚道にあっては、工期が長くかかるとともに、自然環境に合わせた施工が難しいものであった。   Conventionally, as a fishway to be provided in a river to help the fish run up, a structure in which a pool portion is formed by providing concrete partition walls at regular intervals in a concrete three-sided waterway has been used. In such a fishway constructed of a concrete structure as a whole, it takes a long construction period and it is difficult to construct it in accordance with the natural environment.

そこで、これらを解消するために、複数のコンクリートブロックを組み合わせて魚道を構成する技術が開発されている。例えば、特許文献1では、コンクリートブロック本体上に水勢を和らげる水制用突起と凹状部を形成した魚道ブロックを傾斜した水路に多段に並べて魚道を構成する提案がなされている。このような魚道ブロックを用いた場合には、予めブロックを工場で製造しておくことができるので、工期を短縮することができる。   Therefore, in order to solve these problems, a technique for constructing a fishway by combining a plurality of concrete blocks has been developed. For example, Patent Document 1 proposes that a fishway is configured by arranging a fishway block formed with a water-control projection and a concave portion on a concrete block body in a multi-stage on a sloping waterway. When such a fishway block is used, since the block can be manufactured in a factory in advance, the construction period can be shortened.

また、自然環境に溶け込ませる魚道としては、自然石のみを用いて魚の遡上を可能にした堰堤構造も提案されている。例えば、特許文献2は、河川下流部に巨石積堰堤を配し、上流部に沈水型堰堤を設置し、その両堰堤間を石樋魚道で連結して魚道を構成するものであり、前記両堰堤を自然石で構成したものである。また、特許文献3にあっては、巨石の下部に小岩石を詰めて巨石を固定したものもある。   In addition, a dam structure that allows only fish to run up using only natural stones has been proposed as a fishway to be melted into the natural environment. For example, in Patent Document 2, a megalithic dam is arranged in a downstream part of a river, a submerged dam is installed in an upstream part, and the two dams are connected by a stalagmite fishway to form a fishway. The dam is made of natural stone. Moreover, in patent document 3, there exists one which stuffed a small rock in the lower part of a megalith, and fixed the megalith.

特開平11−241328JP-A-11-241328 特開2005−133301JP-A-2005-133301 実用新案登録第3144408Utility Model Registration No. 3144408

しかしながら、上記特許文献1のように魚道ブロックを用いた魚道にあっては、複数のコンクリートブロックを並べて構成するために、各ブロックを緊結金具で連結し、基礎へアンカー止めを行う必要がある。そのために、河川に既設の強固な構造物を基礎として構築する必要があり、かつ、それぞれのブロックを緊結していかなければならない。   However, in the fishway using a fishway block as in Patent Document 1, in order to configure a plurality of concrete blocks side by side, it is necessary to connect the blocks with fastening hardware and anchor them to the foundation. Therefore, it is necessary to build on the basis of a strong structure already existing in the river, and each block must be connected.

また、特許文献2、特許文献3に示されるように自然石のみを用いて魚道を構成した場合、魚道を自然環境に溶け込ませる効果はある。しかし、巨石を安定して固定することは容易でなく、巨石の下部に小岩石などを詰めて固定するにあたっては、固定が安定するように巨石下部の形状を楔形状等にする必要があった。   Moreover, when a fishway is comprised using only a natural stone as shown by patent document 2 and patent document 3, there exists an effect which dissolves a fishway in a natural environment. However, it is not easy to stably fix megaliths, and it was necessary to make the shape of the megalithic lower part into a wedge shape, etc. so that the fixation would be stable when fixing small rocks or the like underneath the megaliths. .

本発明は上記課題を解決するものであり、その目的は、基礎構造物を設置しなくても巨石を安定して固定することが可能な魚道を提供するものである。   This invention solves the said subject, The objective provides the fishway which can fix a megalith stably without installing a foundation structure.

上記目的を達成するための本発明に係る代表的な構成は、自然石よりなる巨石を配置して構成する魚道において、河床部に前記巨石を固定するために敷石を敷設した固定部と、前記固定部に下部を埋めて配置された複数の巨石を組み合わせて下流に向かって凹形状部を形成する複数の巨石組と、前記巨石相互間であって前記固定部の上部に打設されたコンクリート部と、前記凹形状部に形成されたプール部と、を有し、前記複数の巨石組は、上流の隣接する巨石組の間を流れた水が、その下流に配置された巨石組の前記プール部に入るように千鳥状に配置されていることを特徴とする。 A typical configuration according to the present invention for achieving the above-described object is a fishway that is configured by arranging megaliths made of natural stones, and a fixing portion in which paving stones are laid to fix the megaliths to a riverbed portion, A plurality of megalith sets that form a concave-shaped portion toward the downstream by combining a plurality of megaliths that are arranged with their lower portions buried in the fixed portion, and concrete that is placed between the megaliths and above the fixed portion. And a pool portion formed in the concave-shaped portion, and the plurality of megalithic groups are the ones of the megalithic group in which the water flowing between the adjacent megalithic groups upstream is arranged downstream thereof. It is arranged in a staggered pattern so as to enter the pool part.

上記構成にあっては、河床部に敷石を敷設し、この敷石に巨石の下部を埋めるように配置した巨石安定構造のため、巨石を固定するための基礎構造物が不要となる。そのため、巨石の設置が容易となり、工期を短縮することができる。   In the above configuration, a paving stone is laid on the river bed, and the stable structure of the megalith arranged so that the lower part of the megalith is buried in the paving stone, so that a foundation structure for fixing the megalith becomes unnecessary. Therefore, the installation of megaliths becomes easy and the construction period can be shortened.

また、巨石相互間であって敷石上にコンクリートを打設したために、巨石の固定がより安定し、また敷石が水流によって移動することもない。さらに、コンクリートの打設により凹部の形成が容易にでき、プール部の形成が容易になし得る。   Further, since concrete is placed on the paving stones between the megaliths, the fixing of the megaliths is more stable and the paving stones are not moved by the water flow. Furthermore, the concave portion can be easily formed by placing concrete, and the pool portion can be easily formed.

さらに、複数の巨石により上流に向かって凹形状となるように巨石組を形成してプール部を形成し、上流の隣接する巨石組の間を流れた水が、その下流に配置された巨石組のプール部に入るように複数の巨石組を千鳥状に配置したために、魚が遡上するためのプール部の形成が容易となるとともに、減水時には多数箇所に形成されたプール部に水を貯えることができ、ここに水が流れ込むようになるために、魚の遡上を妨げることがない。 Further, a megalith set is formed by a plurality of megaliths so as to form a concave shape toward the upstream to form a pool portion, and the water that has flowed between the upstream adjacent megalith sets is arranged downstream of the megalith set Since multiple megalithic groups are arranged in a zigzag pattern so as to enter the pool part of the pool, it is easy to form a pool part for fish to run up, and water is stored in the pool part formed at many places when water is reduced And the water will flow into it, so it won't interfere with the fish going up.

また、コンクリート部の上部に砂利等を敷設するようにすれば、コンクリート部が見えなくなり、水流も自然な流れとなって魚道が自然環境により溶け込むようになる。   Moreover, if gravel etc. is laid on the upper part of a concrete part, a concrete part will become invisible, a water flow will also become a natural flow, and a fishway will melt | dissolve by a natural environment.

本発明の実施形態に係る魚道の上視説明図である。It is an upper view explanatory drawing of the fishway which concerns on embodiment of this invention. 本発明の実施形態に係る魚道の側断面説明図である。It is side sectional explanatory drawing of the fishway which concerns on embodiment of this invention. 本発明の実施形態に係る魚道の各部の高さを示す説明図である。It is explanatory drawing which shows the height of each part of the fishway which concerns on embodiment of this invention. 本発明の実施形態に係る巨石組の説明図である。It is explanatory drawing of the megalith set which concerns on embodiment of this invention. 本発明の実施形態に係る巨石組の配置説明図である。It is arrangement | positioning explanatory drawing of the megalith set which concerns on embodiment of this invention. 本発明の実施形態に係る各部の部分拡大側断面説明図である。It is a partial expansion side sectional explanatory view of each part concerning an embodiment of the present invention.

次に本発明に係る魚道の一実施形態について、図面を参照して具体的に説明する。図1は本発明の実施形態に係る魚道の上視説明図であり、図2は側断面説明図、図3は魚道を構成する各部のおよその高さを示す説明図である。   Next, an embodiment of a fishway according to the present invention will be specifically described with reference to the drawings. FIG. 1 is a top view explanatory view of a fishway according to an embodiment of the present invention, FIG. 2 is an explanatory side sectional view, and FIG. 3 is an explanatory view showing the approximate height of each part constituting the fishway.

本実施形態では、図1に示すように、下流側の河床に向けて扇状に設けられる扇形魚道を例示して説明する。もっとも、本発明は扇形魚道に限らず、全断面魚道等の他の形式の魚道にも適用できる。   In the present embodiment, as shown in FIG. 1, a fan-shaped fishway provided in a fan shape toward the downstream riverbed will be described as an example. However, the present invention is not limited to the fan-shaped fishway, but can be applied to other types of fishways such as a full-section fishway.

本実施形態に係る魚道は、図1及び図2に示すように、河床部1に敷石2を敷設して固定部を構成し、この敷石2の上に複数の巨石3を配置する。そして、配置した巨石相互間であって前記敷石上にコンクリートを打設してコンクリート部を形成し、このコンクリート部にプール部を形成するものである。以下、本実施形態の魚道構成について、構築工程に沿って説明する。   As shown in FIGS. 1 and 2, the fishway according to the present embodiment forms a fixed portion by laying a paving stone 2 on the river bed portion 1, and a plurality of megaliths 3 are arranged on the paving stone 2. And between the arranged megaliths, concrete is placed on the paving stone to form a concrete portion, and a pool portion is formed in this concrete portion. Hereinafter, the fishway configuration of the present embodiment will be described along the construction process.

<敷石の敷設>
河川には必要に応じて堰堤4等の構築物が川の流れ(矢印F)と交差する方向の川幅全体に所定の段差をもって構築されている。本実施形態の魚道を構築するにあたっては、まず前記堰堤4の下流側の河床部1に敷石2を敷設する。この敷石2は直径5cm〜15cm程度の石であって、砕石、栗石、割栗石、玉石等を好適に用いることができる。この敷石2を、魚道を形成する河床部1の全体に、高さが数十cm程度(本実施形態では50cm程度)となるように敷設する。
<Laying paving stones>
In the river, a structure such as a dam 4 is constructed with a predetermined step in the entire river width in a direction intersecting the river flow (arrow F) as necessary. In constructing the fishway of this embodiment, first, a paving stone 2 is laid on the river bed portion 1 on the downstream side of the dam 4. This paving stone 2 is a stone having a diameter of about 5 cm to 15 cm, and crushed stone, chestnut stone, cracked stone, cobblestone, etc. can be suitably used. The paving stone 2 is laid on the entire river bed portion 1 forming the fishway so that the height is about several tens of centimeters (in the present embodiment, about 50 centimeters).

敷石層の形成は、後述するように最初は河床部1の所定高さの敷石2の層を形成し、その敷石層の上に巨石3を配置した後、その巨石3の下部を埋めるように更に敷石を敷設して全体として高さが数十cm程度となる敷石層を敷設するものである。   As will be described later, the paving stone layer is formed by first forming a paving stone 2 layer having a predetermined height on the river bed portion 1, placing a megalith 3 on the paving stone layer, and then filling the lower portion of the paving stone 3. Furthermore, paving stones are laid and a paving stone layer having a height of about several tens of centimeters is laid.

敷設した敷石2の層が巨石3を固定するための固定部となる。したがって、巨石3の下部に詰めるために前述した程度のサイズが好ましいが、前記サイズに限定する必要はない。   The layer of the laid paving stone 2 becomes a fixing portion for fixing the megalith 3. Therefore, although the size of the above-mentioned size is preferable in order to pack it under the megalith 3, it is not necessary to limit to the said size.

<巨石の配置・固定>
巨石3は敷石2の上に配置して、敷石層によって固定する。この巨石3は自然石であって、大きさは直径0.7m〜1.5m程度、重量は1t〜5t程度のものが好適であって、河川等にそのまま存在するものを用いることができる。したがって、巨石は他所から運搬等しなくても、現地で調達することが可能である。
<Arrangement and fixation of megaliths>
The megalith 3 is placed on the paving stone 2 and fixed by a paving stone layer. The megalith 3 is a natural stone, preferably having a diameter of about 0.7 m to 1.5 m and a weight of about 1 t to 5 t, and can be used as it is in a river or the like. Therefore, megaliths can be procured locally without being transported from other locations.

本実施形態の魚道に用いる巨石3は、下部を敷石層に埋めることにより、巨石自体の重量で固定する。そのため、小さすぎると設置しても安定せず、また逆に大きすぎると設置自体が困難になる。したがって、前記程度の大きさ、重量のものが好適に用いられる。   The megalith 3 used for the fishway of this embodiment is fixed by the weight of the megalith itself by filling the bottom with a paving stone layer. Therefore, if it is too small, it will not be stable even if installed, and conversely if too large, installation itself will be difficult. Accordingly, those having the size and weight described above are preferably used.

しかし、巨石3は水勢を緩和するとともに、後述するようにその上流側にプール部を形成するためのものであるため、河川の幅、水勢、あるいは水量によって大きさや重量を適宜選択すればよく、必ずしも前述した大きさ、重量に限定する必要はない。   However, the megalith 3 is for relaxing the water force and forming a pool part on the upstream side as will be described later, so the size and weight may be appropriately selected according to the width of the river, the water force, or the amount of water. The size and weight are not necessarily limited to those described above.

前記巨石3の固定は、魚道を形成する河床部1の全体に所定の高さ(本実施形態では20cm程度)に敷石2の層(第1敷石層)を敷設し、その敷石層の上に巨石3を配置する。そして、巨石3の配置が終了した後、それぞれの巨石3の下部が所定深さで埋められるように最初に敷設した敷石層の上にさらに所定高さ(本実施形態では30cm程度)で敷石2の層(第2敷石層)を敷設する。このとき、配置した巨石相互間に敷石を詰め、また巨石と敷石層との間に隙間が生じないように巨石3の下部を敷石2で埋める。このようにして巨石3の下部を敷石によって深さ数十cm程度埋め戻す。   The megalith 3 is fixed by laying a layer of paving stone 2 (first paving stone layer) at a predetermined height (about 20 cm in the present embodiment) on the entire river bed portion 1 forming the fishway, and on the paving stone layer. Place boulder 3 Then, after the arrangement of the megaliths 3 is finished, the paving stones 2 are further set to a predetermined height (about 30 cm in the present embodiment) on the paving stone layer first laid so that the lower part of each megalith 3 is buried at a predetermined depth. Lay the second layer (second paving stone layer). At this time, paving stones are packed between the arranged megaliths, and the lower part of the megaliths 3 is filled with paving stones 2 so that no gap is formed between the megaliths and the paving stone layer. In this way, the lower part of the megalith 3 is backfilled with paving stones by a depth of several tens of centimeters.

これにより、河床部1の上に所定高さの敷石層が形成され、その敷石層に下部が埋められた巨石3が配置され、かつ、巨石3は敷石層と巨石自体の自重により固定される。   As a result, a paving stone layer having a predetermined height is formed on the river bed portion 1, and the megalith 3 whose lower portion is buried in the paving stone layer is disposed, and the megalith 3 is fixed by the weight of the paving stone layer and the megalith itself. .

なお、図2にあっては、下流側の巨石3は下部が第2敷石層によって埋められた状態を示しており、上流側の巨石3は第2敷石層の図示を省略し、第2敷石層の上部のみを一点鎖線で示している。   In FIG. 2, the downstream megalith 3 shows a state in which the lower part is filled with the second paving stone layer, and the upstream masonry 3 omits the illustration of the second paving stone layer, and the second paving stone Only the upper part of the layer is indicated by a dashed line.

ここで、巨石3の固定は前述のように、敷石層を第1敷石層、第2敷石層に分けて敷設する以外にも、河床部1の上に最初から50cm程度の敷石層を敷設する構成でもよい。この場合は、巨石3を敷石2上に配置するにあたり、巨石3を配置する部分の敷石2を数十cm程度(本実施形態の場合ならば30cm程度)掘り出して凹部を形成する。この凹部に巨石3を配置することで、巨石3の下部が敷石2に埋め込まれるようにする。さらに、配置した巨石相互間に敷石を詰め、また巨石3と敷石層に形成した凹部との隙間に敷石2を埋める。このようにして巨石3の下部を敷石層に深さ数十cm程度埋め込むようにしてもよい。   Here, the megalith 3 is fixed by laying a paving stone layer of about 50 cm from the beginning on the river bed portion 1 in addition to laying the paving stone layer into the first paving stone layer and the second paving stone layer as described above. It may be configured. In this case, when the megalith 3 is placed on the paving stone 2, the portion of the paving stone 2 where the megalith 3 is placed is dug out by about several tens of centimeters (about 30 cm in the case of this embodiment) to form a recess. By arranging the megalith 3 in the recess, the lower part of the megalith 3 is embedded in the paving stone 2. Furthermore, a paving stone is filled between the arranged megaliths, and the paving stone 2 is buried in a gap between the megalith 3 and a recess formed in the paving stone layer. In this way, the lower part of the megalith 3 may be embedded in the paving stone layer with a depth of several tens of centimeters.

このように、本実施形態の魚道にあっては、河床部に敷設した敷石層に巨石3の下部を埋めるように配置した巨石安定構造のため、巨石3を固定するための基礎構造物が不要となる。そのため、巨石の設置が容易となり、工期を短縮することが可能である。   Thus, in the fishway of this embodiment, since the megalith stable structure is arranged so that the lower part of the megalith 3 is buried in the paving stone layer laid on the river bed, a foundation structure for fixing the megalith 3 is unnecessary. It becomes. Therefore, it is easy to install megaliths, and the construction period can be shortened.

また、本実施形態にあっては、巨石3を配置するときに複数の巨石を組み合わせて上流に向かって凹形状となる巨石組を形成し、この巨石組を千鳥状に配置するようにしている。   Moreover, in this embodiment, when arranging the megaliths 3, a plurality of megaliths are combined to form a megalith set that is concave toward the upstream, and the megalith sets are arranged in a staggered manner. .

具体的には、図4に示すように、3個の巨石3を組み合わせて上流に向かって凹形状となる凹部5a1が形成されるように配置した第1巨石組5aと、その下流側に2個の巨石3を前記第1の巨石組と接触するように組み合わせて配置した第2巨石組5bとで1つの巨石組5を構成している。   Specifically, as shown in FIG. 4, a first megalithic set 5a arranged by combining three megaliths 3 so as to form a concave portion 5a1 that is concave toward the upstream, and 2 on the downstream side thereof. One megalith set 5 is constituted by the second megalith set 5b in which the single megaliths 3 are combined and arranged so as to come into contact with the first megalith set.

前記第1巨石組5aは巨石の上流側にプール部を形成するためのものであり、水勢を緩和するとともに、水流を集めやすい形状になるように複数の巨石を組み合わせることで形成している。   The first boulder set 5a is for forming a pool portion on the upstream side of the boulder, and is formed by combining a plurality of boulders so as to relieve the water force and form a shape that easily collects the water flow.

一方、第2巨石組5bは前記第1巨石組5aを下流側から支持するためのものである。したがって、第2巨石組5bは第1巨石組5aよりもより確実に固定されていることが望ましい。このため、本実施形態では第2巨石組5bを構成するそれぞれの巨石3を、第1巨石組5aを構成するそれぞれの巨石3よりも深く敷石層に埋め込んで固定している。これにより、第2巨石組5bを構成する巨石は第1巨石組5aの巨石よりも安定して固定され、凹部5a1により水流の影響を受け易い第1巨石組5aを下流から確実に支持する。   On the other hand, the second megalithic set 5b is for supporting the first megalithic set 5a from the downstream side. Therefore, it is desirable that the second megalithic set 5b is more securely fixed than the first megalithic set 5a. For this reason, in this embodiment, each boulder 3 constituting the second boulder set 5b is buried and fixed deeper than each boulder 3 constituting the first boulder set 5a. Thereby, the megaliths constituting the second megalithic set 5b are fixed more stably than the megaliths of the first megalithic set 5a, and the concave portion 5a1 reliably supports the first megalithic set 5a that is easily affected by the water flow from the downstream.

なお、第2巨石組の巨石として第1巨石組の巨石よりも重い石を用いれば、前記のように第2巨石組の巨石を敷石層に深く埋めなくても、第1巨石組の巨石を下流側から確実に支持することができる。   In addition, if the stones heavier than the megalithic stones of the first megalithic group are used as the megalithic stones of the second megalithic group, the megalithic stones of the first megalithic group can be used without deeply embedding the megalithic stones of the second megalithic group as described above It can be reliably supported from the downstream side.

また、本実施形態では前記第1巨石組5aを3個の巨石で、第2巨石組5bを2個の巨石で構成した例を示したが、これら巨石の個数は前記個数に限定する必要はなく、適宜数個の巨石を組み合わせて第1巨石組5a及び第2巨石組5bを構成すればよい。   In the present embodiment, the first megalithic set 5a is composed of three megaliths, and the second megalithic set 5b is composed of two megaliths, but the number of these megaliths needs to be limited to the above number. The first megalithic set 5a and the second megalithic set 5b may be configured by combining several megaliths as appropriate.

上記のように第1巨石組5aと第2巨石組5bとよりなる巨石組5を、図5に示すように、千鳥状に配置する。すなわち、巨石組5を河川の川幅方向に所定間隔を隔てて配置し、隣接する巨石組5の間に魚が遡上する通路となるスリット部6を形成する。そして、前記スリット部6の下流に次の巨石組5を配置し、スリット部6を通って流れた水が下流に配置された巨石組5の凹部5a1に入るように配置している。   As described above, the megalithic groups 5 including the first megalithic groups 5a and the second megalithic groups 5b are arranged in a staggered manner as shown in FIG. That is, the megalith set 5 is arranged at a predetermined interval in the river width direction of the river, and the slit portion 6 is formed between the adjacent megalith sets 5 as a passage through which fish goes up. And the next megalith set 5 is arrange | positioned downstream of the said slit part 6, and it has arrange | positioned so that the water which flowed through the slit part 6 may enter into the recessed part 5a1 of the megalith set 5 arrange | positioned downstream.

前記スリット部6の幅は広すぎると水勢を緩和できなくなり、幅が狭すぎると魚が遡上し難くなる。そのため、本実施形態ではスリット部6の幅が30cm〜50cm程度となるように巨石組5を配置している。そして、前記巨石組5を、図1及び図2に示すように、堰堤4の下流側に扇形に、かつ、下流から上流に向かって段階的に高くなるように配置して魚道を構成する。   If the width of the slit portion 6 is too wide, the water cannot be relaxed, and if the width is too narrow, it is difficult for the fish to go up. Therefore, in this embodiment, the megalith set 5 is arranged so that the width of the slit portion 6 is about 30 cm to 50 cm. Then, as shown in FIGS. 1 and 2, the megalith set 5 is arranged in a fan shape on the downstream side of the dam 4 and so as to increase stepwise from the downstream side to the upstream side to constitute a fishway.

<コンクリート部の形成>
前記のようにして巨石組5を配置固定した後、巨石相互間であって敷石層の上に所定の高さ(本実施形態では30cm程度、図3参照)コンクリートを打設してコンクリート部7を形成する。このように敷石層の上にコンクリート部7を設けることにより、流れが急な河川であっても敷石2が移動したり、河床部がえぐれたりするおそれがなくなる。さらに、巨石相互間をコンクリートで固定することにより、巨石3をより安定して固定することができる。
<Formation of concrete part>
After arranging and fixing the megalith assembly 5 as described above, concrete is placed by placing concrete at a predetermined height (in this embodiment, about 30 cm, see FIG. 3) between the megaliths and on the paving stone layer. Form. By providing the concrete portion 7 on the paving stone layer in this manner, there is no possibility that the paving stone 2 moves or the river bed portion is swept away even in a river with a rapid flow. Furthermore, megalith 3 can be more stably fixed by fixing between megaliths with concrete.

そして、コンクリート部7を形成する際に、第1巨石組5aの凹部5a1の部分が所定深さになるように該部分の敷石2を除去した後、所定高さでコンクリートを打設する。これにより、図6に示すように、凹部5a1が他の部分よりも低くなり、ここに遡上する魚が休息可能なプール部8が形成される。本実施形態では前記プール部8の深さDが20cm〜30cm程度となるようにしている。   And when forming the concrete part 7, after removing the paving stone 2 of this part so that the part of the recessed part 5a1 of the 1st boulder set 5a may become predetermined depth, concrete is laid by predetermined height. Thereby, as shown in FIG. 6, the recessed part 5a1 becomes lower than other parts, and the pool part 8 in which the fish which goes up here can rest is formed. In the present embodiment, the depth D of the pool portion 8 is set to about 20 cm to 30 cm.

前記コンクリート部7を設けることにより、プール部8を形成することが容易になし得る。すなわち、凹部5a1の敷石2を除去してコンクリートを打設するだけで、凹部5a1に所定深さのプール部を簡単に形成することができる。   By providing the concrete part 7, the pool part 8 can be easily formed. That is, a pool portion having a predetermined depth can be easily formed in the recess 5a1 simply by removing the paving stone 2 of the recess 5a1 and placing concrete.

本実施形態にあっては、敷石層の上に打設したコンクリート部7によりプール部8を形成しているために、プール部8に貯えられた水が敷石層にしみ込むことがない。そして、スリット部6を通って流れた水はスリット部6の下流に位置するプール部8へ案内されるため、水流が弱い河川、あるいは乾期で水量が少ない河川であってもプール部8には水が確実に貯えられるようになる。   In the present embodiment, since the pool portion 8 is formed by the concrete portion 7 placed on the paving stone layer, the water stored in the pool portion 8 does not soak into the paving stone layer. And since the water which flowed through the slit part 6 is guided to the pool part 8 located in the downstream of the slit part 6, even if it is a river with a weak water flow or a river with a small amount of water in the dry season, Water will be stored reliably.

このため、減水時でも魚は下流のプール部8から上流のプール部8へと順次移動でき、遡上が妨げられることがない。   For this reason, even when the amount of water is reduced, the fish can move sequentially from the downstream pool section 8 to the upstream pool section 8, and the run-up is not hindered.

<切込砂利の敷設>
さらに、本実施形態の魚道は、図6に示すように、前記コンクリート部の上に切込砂利9を敷設し、高さ10cm程度の切込砂利層を形成している。これにより、コンクリート部7が露出することがなくなり、魚道全体からは自然石よりなる巨石3と、切込砂利9が露出するのみとなる。
<Laying of cutting gravel>
Furthermore, as shown in FIG. 6, the fishway of this embodiment lays the cutting gravel 9 on the concrete part to form a cutting gravel layer having a height of about 10 cm. As a result, the concrete portion 7 is not exposed, and only the megalith 3 made of natural stone and the cut gravel 9 are exposed from the entire fishway.

このため、魚道全体が自然環境に溶け込むようになり、川の流れも自然になるため、魚の遡上がより容易に行われることになる。   For this reason, the entire fishway will be integrated into the natural environment, and the river flow will be natural, so that it will be easier to go up the fish.

1 …河床部
2 …敷石
3 …巨石
4 …堰堤
5 …巨石組
5a …第1巨石組
5b …第2巨石組
6 …スリット部
7 …コンクリート部
8 …プール部
9 …切込砂利
DESCRIPTION OF SYMBOLS 1 ... River bed part 2 ... Paving stone 3 ... Megalithic stone 4 ... Weir 5

Claims (3)

自然石よりなる巨石を配置して構成する魚道において、
河床部に前記巨石を固定するために敷石を敷設した固定部と、
前記固定部に下部を埋めて配置された複数の巨石を組み合わせて下流に向かって凹形状部を形成する複数の巨石組と、
前記巨石相互間であって前記固定部の上部に打設されたコンクリート部と、
前記凹形状部に形成されたプール部と、
を有し、
前記複数の巨石組は、上流の隣接する巨石組の間を流れた水が、その下流に配置された巨石組の前記プール部に入るように千鳥状に配置されている
ことを特徴とする魚道。
In a fishway that consists of huge stones made of natural stone,
A fixing part in which a paving stone is laid to fix the megalith on the river bed ,
A plurality of megalithic groups that form a concave-shaped portion toward the downstream by combining a plurality of megaliths arranged with the lower portion buried in the fixed portion, and
A concrete portion placed between the boulders and placed on top of the fixed portion;
A pool portion formed in the concave shape portion;
Have
The plurality of megalithic groups are arranged in a staggered manner so that water flowing between adjacent upstream megalithic groups enters the pool part of the megalithic group arranged downstream thereof. .
前記巨石組は、数個の巨石により下流に向かって凹形状を形成する第1巨石組と、前記第1巨石組の下流側に配置され、前記第1巨石組を支持する数個の巨石からなる第2巨石組とで構成されていることを特徴とする請求項1記載の魚道。   The boulder set is composed of a first boulder set that forms a concave shape downstream with several boulders, and a few boulders that are arranged on the downstream side of the first boulder set and support the first boulder set. The fishway according to claim 1, comprising: a second megalithic set. 前記コンクリート部の上に切込砂利を敷設したことを特徴とする請求項1又は請求項2に記載の魚道。   The fishway according to claim 1 or 2, wherein cutting gravel is laid on the concrete part.
JP2011145631A 2011-06-30 2011-06-30 Fishway Active JP5837342B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011145631A JP5837342B2 (en) 2011-06-30 2011-06-30 Fishway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011145631A JP5837342B2 (en) 2011-06-30 2011-06-30 Fishway

Publications (2)

Publication Number Publication Date
JP2013011135A JP2013011135A (en) 2013-01-17
JP5837342B2 true JP5837342B2 (en) 2015-12-24

Family

ID=47685225

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011145631A Active JP5837342B2 (en) 2011-06-30 2011-06-30 Fishway

Country Status (1)

Country Link
JP (1) JP5837342B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018199898A (en) * 2017-05-25 2018-12-20 塚本建設株式会社 River structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0748823A (en) * 1993-08-07 1995-02-21 Miyata Kankyo Sekizai:Kk Rock work greening method
JP2912937B2 (en) * 1997-02-27 1999-06-28 株式会社山辰組 Fishways and fishway blocks
JP3620026B2 (en) * 2001-11-20 2005-02-16 財団法人リバーフロント整備センター Masonry block
JP3144408U (en) * 2008-06-17 2008-08-28 群馬石積協同組合 Weir structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018199898A (en) * 2017-05-25 2018-12-20 塚本建設株式会社 River structure

Also Published As

Publication number Publication date
JP2013011135A (en) 2013-01-17

Similar Documents

Publication Publication Date Title
JP2006144539A (en) Underwater ecosystem restoration method in river management
KR101346103B1 (en) Penetrating type debris barrier able to construct fast
JP5837342B2 (en) Fishway
KR100775357B1 (en) Slope stabilizing structure using the arch type block
JP4457384B2 (en) Fishway construction method using a fishway block and this fishway block
JP6503412B2 (en) River structure
JP5518795B2 (en) Floor stopper
CN105714736A (en) Novel ecological ditch and building method thereof
KR101219658B1 (en) Method for constructing spur dike of pool type
KR101352884B1 (en) Fundamental Structure Fabricating Method For Fixing a Steel Assembly
KR101229009B1 (en) Grade-control Structure for Natural Bed-wave Movement and Ecological Corridor
CN210829286U (en) Shield tunnel passes river course scour prevention structure down
JP2018127865A (en) Reinforcement soil wall using large-sized sandbag, and earth retaining method using large-sized sandbag
KR20120086075A (en) Structure for planting environment and improvement
JP2008025119A (en) Block for edge of water
KR100743550B1 (en) Scour prevention block
JP3763062B2 (en) Construction method of bridge structure
RU2601802C1 (en) Erection method of batter drainage earth structures
KR101147468B1 (en) Fabricated stepping-stones
KR101685153B1 (en) River foundation with eco-corridor
KR100988941B1 (en) A method for construction the vegetation mat in incline
KR200429763Y1 (en) Scour prevention block
KR200405490Y1 (en) Basic structure of a bank
JP3249048B2 (en) Bridge type fishway
JP7228284B1 (en) Reinforcement structure and reinforcement method for erosion control dam

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141125

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20141128

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150126

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150804

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150902

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151027

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151105

R150 Certificate of patent or registration of utility model

Ref document number: 5837342

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250