JP5646239B2 - Power supply system - Google Patents

Power supply system Download PDF

Info

Publication number
JP5646239B2
JP5646239B2 JP2010167807A JP2010167807A JP5646239B2 JP 5646239 B2 JP5646239 B2 JP 5646239B2 JP 2010167807 A JP2010167807 A JP 2010167807A JP 2010167807 A JP2010167807 A JP 2010167807A JP 5646239 B2 JP5646239 B2 JP 5646239B2
Authority
JP
Japan
Prior art keywords
load facility
voltage drop
load
unit price
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010167807A
Other languages
Japanese (ja)
Other versions
JP2012029511A (en
Inventor
岡田 武
武 岡田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2010167807A priority Critical patent/JP5646239B2/en
Publication of JP2012029511A publication Critical patent/JP2012029511A/en
Application granted granted Critical
Publication of JP5646239B2 publication Critical patent/JP5646239B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、電力供給システムに関し、特に、スマートメータを用いた負荷設備の切断・投入制御により安定な電力供給を行うのに好適な電力供給システムに関する。   The present invention relates to a power supply system, and more particularly, to a power supply system suitable for performing stable power supply by cutting and turning on load equipment using a smart meter.

電力の需要は、気候などに大きく影響を受けるため、想定が難しい。一方、需要電力が供給電力を上回る事態が想定される場合には、電力会社は、他の電力会社からの電力融通などにより停電の危機を逃れたり、夏季にテレビコマーシャルなどで節電の呼び掛けを行ったりしている。   Electricity demand is greatly affected by the climate and so is difficult to estimate. On the other hand, when it is assumed that the demand power will exceed the supplied power, the power company will escape the power outage crisis due to the power interchange from other power companies, etc. It is.

また、下記の特許文献1には、空調機のデマンド制御を行うために、単位時間当たりの電力使用量が予め設定された規定電力値を超えた場合はデマンド信号を発し、規定電力値を下回り一定時間経過すればデマンド信号を解除することにより、デマンド信号が発せられた場合には、デマンド信号が解除されるまで一定時間間隔で複数個の空調機を予め設定された順番で1台ずつ順次停止させ、デマンド信号が解除された場合には、最後に停止させた空調機から逆の順番で停止を解除することが記載されている。   Further, in Patent Document 1 below, in order to perform demand control of an air conditioner, a demand signal is issued when the power usage amount per unit time exceeds a preset specified power value, and falls below the specified power value. If a demand signal is issued by canceling the demand signal after a certain period of time has passed, a plurality of air conditioners are sequentially placed one by one in a preset order at regular time intervals until the demand signal is released. It is described that when the demand signal is canceled after being stopped, the stop is canceled in the reverse order from the air conditioner that was stopped last.

なお、下記の特許文献2には、電気機器をコンセントに接続したままの状態であってもその消費電力を抑制するために、コンセントおよび電気機器と接続された際、コンセントから電気機器に電源供給を行う電力使用量送信装置と、電力使用量送信装置と通信可能な電力使用量管理装置とを有し、電力使用量送信装置が、電気機器の消費電力を測定して電力使用量管理装置に電気機器の消費電力データを送信し、電力使用量管理装置から電力供給停止データを受信したことに応じて電気機器の電力供給を停止し、電力使用量管理装置が、消費電力データに基づいて電力供給停止データを生成して、電力停止データを電力使用量送信装置に送る電力使用量管理システムが開示されている。   In addition, in Patent Document 2 below, in order to suppress power consumption even when the electrical device remains connected to the outlet, power is supplied from the outlet to the electrical device when connected to the outlet and the electrical device. A power usage transmitter that performs communication with the power usage transmitter, and a power usage transmitter that can communicate with the power usage transmitter. The power consumption data of the electrical equipment is transmitted, the power supply of the electrical equipment is stopped in response to receiving the power supply stop data from the power usage management device, and the power usage management device A power usage management system that generates supply stop data and sends the power stop data to a power usage transmitter is disclosed.

特開平1−114655号公報JP-A 1-1114655 特開2010−114967号公報JP 2010-114967 A

しかしながら、他の電力会社からの電力融通では、重要設備の停電リスクを必ずしも回避することができないという問題のほか、電力融通にかかるコストが増大するという問題があった。
また、上記の特許文献1に記載されている方法では、重要度が同じ複数個の空調機を予め設定された順番で1台ずつ順次停止させるため、重要度が異なる種々の負荷設備を顧客が満足する順番で停止させることはできないという問題がある。
However, power interchange from other electric power companies has a problem that the cost of power interchange increases in addition to the problem that the power failure risk of important facilities cannot always be avoided.
Further, in the method described in Patent Document 1, a plurality of air conditioners having the same importance are sequentially stopped one by one in a preset order. There is a problem that it cannot be stopped in the order of satisfaction.

本発明の目的は、重要設備の停電リスクの回避、電力融通にかかるコストの削減および顧客の満足度の向上が図れる電力供給システムを提供することにある。   An object of the present invention is to provide a power supply system capable of avoiding a power outage risk of an important facility, reducing cost for power interchange, and improving customer satisfaction.

本発明の電力供給システムは、スマートメータを用いた負荷設備の切断・投入制御により安定な電力供給を行うための電力供給システムであって、複数個のスマートメータ(21〜23)と、該複数個のスマートメータと通信回線(3)を介して接続された遠隔切断・投入システム(10)とを具備し、前記複数個のスマートメータの各スマートメータに、電圧降下が生じても投入され続けるA負荷設備(1A 1 〜1A 3 )および電圧降下が生じると切断されるB負荷設備(1B 1 〜1B 3 )が接続されており、前記各スマートメータが、使用電力量を算出する際に計測した電圧値を示す電圧情報と前記A負荷設備および前記B負荷設備が投入されているか切断されているかを示す投入/切断情報とを前記通信回線を介して前記遠隔切断・投入システムに送信する機能と、前記遠隔切断・投入システムから前記通信回線を介して送信されてくる切断指令信号および投入指令信号に応じて前記B負荷設備を切断および再投入する機能とを備え、前記遠隔切断・投入システムが、前記各スマートメータに接続された前記A負荷設備の課金単価と該各スマートメータに接続された前記B負荷設備の課金単価および月単位の停電時間とが格納されたメモリ(17)と、前記各スマートメータから前記通信回線を介して受信した前記電圧情報に基づいて電圧降下を監視し、所定の第1の電圧値以上の電圧降下が所定の第1の時間以上継続すると、前記各スマートメータに接続された前記B負荷設備の課金単価を前記メモリから読み出して、該各スマートメータに接続された前記B負荷設備のうち投入されているB負荷設備を電圧降下が前記第1の電圧値未満になるまで該読み出した課金単価が低い順に切断していく切断手段と、前記第1の電圧値以上の電圧降下の解消後所定の第2の時間以上電圧降下が該第1の電圧値よりも小さい所定の第2の電圧値未満であると、前記切断していったB負荷設備を電圧降下が前記第2の電圧値以上にならない限り前記読み出した課金単価が高い順に再投入していく再投入手段と、前記切断したB負荷設備の前月停電時間と前記複数個のスマートメータのうち該切断したB負荷設備が接続されたスマートメータに接続された前記A負荷設備である対応A負荷設備の課金単価とを前記メモリから読み出し、該切断したB負荷設備の新しい課金単価を次式によって算出する算出手段とを備え、
B =a×P A −b×T
ここで、P A は、前記メモリから読み出され前記対応A負荷設備の課金単価
B は、前記切断したB負荷設備の新しい課金単価
Tは、前記メモリから読み出された前記切断したB負荷設備の前月停電時間
aは、“1”未満の係数
bは、“1”よりも大きい比例係数
A ,P B の単位は、円
Tの単位は、時間
前記切断したB負荷設備の新しい課金単価P B が、前記対応A負荷設備の課金単価P A よりも安くされるとともに、前月停電時間1時間当り1円よりも安くかつ該切断したB負荷設備の前月停電時間Tに比例して安くされるが、該切断したB負荷設備の新しい課金単価P B の最低金額が所定の金額にされていることを特徴とする。
ここで、前記遠隔切断・投入システムが、前記通信回線を介して前記各スマートメータとの間で前記電圧情報、前記投入/切断情報、前記切断指令信号および前記投入指令信号を送受信するための送受信装置(11)と、前記各スマートメータから前記通信回線および前記送受信装置を介して入力される前記電圧情報に基づいて電圧降下を監視し、前記第1の電圧値以上の電圧降下が前記第1の時間以上継続すると電圧降下発生信号を出力するとともに、前記第1の電圧値以上の電圧降下の解消後前記第2の時間以上電圧降下が前記第2の電圧値未満であると電圧降下解消信号を出力する電圧降下監視装置(12)と、前記各スマートメータから前記通信回線および前記送受信装置を介して入力される前記投入/切断情報に基づいて該各スマートメータに接続された前記B負荷設備が投入されているか切断されているかを監視し、その監視結果であるB負荷設備状態信号を出力する負荷設備監視装置(13)と、前記電圧降下監視装置から前記電圧降下発生信号が入力されると、前記負荷設備監視装置から入力される前記B負荷設備状態信号に基づいて前記各スマートメータに接続された前記B負荷設備のうち投入されているB負荷設備を確認したのち、前記切断指令信号を前記送受信装置および前記通信回線を介して前記各スマートメータに出力して、前記投入されているB負荷設備を電圧降下が前記第1の電圧値未満になるまで課金単価が低い順に切断していくとともに、前記第1の電圧値以上の電圧降下の解消後前記第2の時間以上電圧降下が前記第2の電圧値未満であると、前記負荷設備監視装置から入力される前記B負荷設備状態信号に基づいて前記切断したB負荷設備が切断されたままかを確認したのち、前記投入指令信号を前記送受信装置および前記通信回線を介して前記各スマートメータに出力して、前記切断されたままのB負荷設備を電圧降下が前記第2の電圧値以上にならない限り課金単価が高い順に再投入していく切断・投入制御装置(14)と、前記切断・投入制御装置から入力される前記切断指令信号および前記投入指令信号と前記負荷設備監視装置から入力される前記B負荷設備状態信号とに基づいて、前記切断したB負荷設備の停電時間を計測し、前記メモリから読み出した該切断したB負荷設備の今月の停電時間に該計測した停電時間を足して該B負荷設備の今月の停電時間を更新して該メモリに格納する停電時間算出装置(15)と、前記切断したB負荷設備の前月停電時間と前記対応A負荷設備の課金単価とを前記メモリから読み出して、前記式であるP B =a×P A −b×Tを用いて前記切断したB負荷設備の新しい課金単価P B を算出する単価算出装置(16)とを備えてもよい。
The power supply system of the present invention is a power supply system for performing stable power supply by cutting and turning on load equipment using a smart meter, and includes a plurality of smart meters (2 1 to 2 3 ), A remote disconnection / throwing system (10) connected to the plurality of smart meters via a communication line (3) is provided, and even if a voltage drop occurs in each smart meter of the plurality of smart meters. is connected to to continue a load facility (1A 1 ~1A 3) and B load facility which voltage drop is cut to occur (1B 1 ~1B 3), wherein each smart meter, when calculating the amount of electric power used the remote cutting-projecting the on / off information indicating whether the a load facility and the B load facility and voltage information indicating the voltage value measured is disconnected or has been turned through the communication line A function of transmitting to the system, and a function of disconnecting and re-inputting the B load facility in response to a disconnection command signal and an input command signal transmitted from the remote disconnection / input system via the communication line, A memory in which the remote disconnection / insertion system stores the unit price of the A load facility connected to each smart meter, the unit price of the B load facility connected to each smart meter, and the monthly power failure time (17) and a voltage drop is monitored based on the voltage information received from each smart meter via the communication line, and a voltage drop equal to or higher than a predetermined first voltage value continues for a predetermined first time or longer. Then, the charging unit price of the B load facility connected to each smart meter reading from the memory, before Symbol B load facility connected to the respective smart meter Cutting means for charging unit price read said is gradually cut in ascending order of the B load facility which is turned until the voltage drop is less than the first voltage value, after elimination of the first voltage value or voltage drop When the voltage drop is less than a predetermined second voltage value that is smaller than the first voltage value for a predetermined second time or more, the voltage drop is applied to the disconnected B load facility by the second voltage value. Unless the above is true, the re-input means for re-inputting the read billing unit price in descending order, the previous blackout time of the disconnected B load equipment and the disconnected B load equipment among the plurality of smart meters are connected. A calculation unit that reads out the charge unit price of the corresponding A load facility, which is the A load facility connected to the smart meter, from the memory, and calculates a new charge unit price of the disconnected B load facility according to the following equation:
P B = a × P A −b × T
Here, P A is read from the memory and is the unit price of the corresponding A load facility
P B is the new unit price of the disconnected B load equipment
T is the previous power outage time of the disconnected B load equipment read from the memory
a is a coefficient less than "1"
b is a proportional coefficient larger than “1”
The unit of P A and P B is a circle
The unit of T is time
The new charge unit price P B of the disconnected B load facility is made lower than the charge unit price P A of the corresponding A load facility, and is less than 1 yen per hour in the previous month's power outage time. Although it is reduced in proportion to the previous month power outage time T, the new charge unit price P B of the disconnected B load facility is set to a predetermined amount .
Here, the remote disconnection / input system transmits / receives the voltage information, the input / disconnect information, the disconnection command signal, and the input command signal to / from each smart meter via the communication line. A voltage drop is monitored based on the voltage information inputted from the device (11) and each smart meter via the communication line and the transmitting / receiving device, and a voltage drop equal to or higher than the first voltage value is detected in the first voltage value. A voltage drop occurrence signal is output when the voltage drop exceeds the first voltage value and the voltage drop is less than the second voltage value for the second time or more after the voltage drop of the first voltage value or more is eliminated. based voltage drop monitoring device for output (12), the said on / off information input through the communication line and the transceiver device from the smart meter the respective Suma Wherein B load facility connected to Tometa monitors whether is disconnected or has been turned on, and its load facility monitoring device for outputting a B load equipment status signal is a monitoring result (13), from the voltage drop monitoring device When the voltage drop occurrence signal is input, the B load facility that is input among the B load facilities connected to the smart meters based on the B load facility state signal input from the load facility monitoring device After confirming the above, the disconnection command signal is output to each smart meter via the transmission / reception device and the communication line, and the voltage drop of the loaded B load equipment becomes less than the first voltage value. it intends to cut in ascending order charging unit price until, when the first voltage value or voltage resolved after the second time or more voltage drop drop is less than the second voltage value After B load facility which is the cutting based on the B load facility status signal input from the load equipment monitoring device has check remains disconnected, the feed command signal via the transceiver device and said communication line A cutting / closing control device (14) that outputs to each smart meter and re-inserts the disconnected B load equipment in ascending order of charging unit price unless the voltage drop exceeds the second voltage value. And a power failure of the disconnected B load facility based on the disconnection command signal and the input command signal input from the disconnection / release control device and the B load facility state signal input from the load facility monitoring device. The time is measured, and the current power failure time of the B load facility is updated by adding the measured power failure time to the current power failure time of the disconnected B load facility read from the memory. The power failure time calculation device (15) stored in the memory, the previous month power failure time of the disconnected B load facility and the charge unit price of the corresponding A load facility are read from the memory, and P B = a × P which is the above formula And a unit price calculation device (16) for calculating a new charge unit price P B of the disconnected B load facility using A− b × T.

本発明の電力供給システムは、以下の効果を奏する。
(1)所定の電圧値以上の電圧降下が所定の第1の時間以上継続すると、複数個のスマートメータに接続された少なくとも1個ずつのB負荷設備のうち投入されているB負荷設備を電圧降下が所定の電圧値未満になるまで課金単価が低い順に切断していくことにより、重要設備の停電リスクの回避、電力融通にかかるコストの削減および顧客の満足度の向上を図ることができる。
(2)電圧降下により負荷設備が切断されるという意識を顧客に持たせることができるため、顧客の節電意識の向上を図ることができる。
The power supply system of the present invention has the following effects.
(1) When a voltage drop equal to or higher than a predetermined voltage value continues for a predetermined first time or more, a voltage is applied to a B load facility that is input among at least one B load facility connected to a plurality of smart meters. By cutting the billing unit price in ascending order until the drop becomes less than a predetermined voltage value, it is possible to avoid the risk of power outage of important facilities, reduce the cost for power interchange, and improve customer satisfaction.
(2) Since the customer can be aware that the load facility is disconnected due to the voltage drop, the customer's awareness of power saving can be improved.

本発明の一実施例による電力供給システムの構成を説明するための図である。It is a figure for demonstrating the structure of the electric power supply system by one Example of this invention. 図1に示した遠隔切断・投入システム10の構成を示すブロック図である。It is a block diagram which shows the structure of the remote cutting | disconnection and injection | throwing-in system 10 shown in FIG. 図1に示した遠隔切断・投入システム10の動作を説明するためのフローチャートである。It is a flowchart for demonstrating operation | movement of the remote cutting | disconnection and injection | throwing-in system 10 shown in FIG.

上記の目的を、1V以上の電圧降下が30秒以上継続すると、複数個のスマートメータに接続された少なくとも1個ずつのB負荷設備のうち投入されているB負荷設備を電圧降下が1V未満になるまで単価が低い順に遠隔切断・投入システムによって切断していくことにより実現した。   If the voltage drop of 1V or more continues for 30 seconds or more for the above purpose, the voltage drop of the installed B load equipment among at least one B load equipment connected to a plurality of smart meters is less than 1V. This was realized by cutting with a remote cutting / loading system in ascending order of unit price.

以下、本発明の電力供給システムの実施例について図面を参照して説明する。
本発明の一実施例による電力供給システムは、図1に示すように、第1乃至第3の需給契約者宅にそれぞれ設置された第1乃至第3のスマートメータ21〜23と、第1乃至第3のスマートメータ21〜23と通信回線3を介して相互接続された遠隔切断・投入システム10とを具備する。
なお、以下の説明では、後述する第1乃至第3のA負荷設備1A 1 〜1A 3 および第1乃至第3のB負荷設備1B 1 〜1B 3 の課金単価を「単価」と称する。
Embodiments of the power supply system of the present invention will be described below with reference to the drawings.
As shown in FIG. 1, the power supply system according to an embodiment of the present invention includes first to third smart meters 2 1 to 2 3 installed in first to third supply and demand contractor's houses, 1 to 3 smart meters 2 1 to 2 3 and a remote disconnection / insertion system 10 interconnected via a communication line 3.
In the following description, the charging unit price of the first to third A load equipment 1A 1 to 1A 3 and the first to third B load facility 1B 1 ~1B 3 described later is referred to as "unit price".

ここで、第1のスマートメータ21は、第1の需給契約者宅に設置されたかつ電圧降下が生じても投入(電力供給)され続ける負荷設備である第1のA負荷設備1A1と、第1の需給契約者宅に設置されたかつ1V以上の電圧降下が30秒以上継続した場合に遠隔切断・投入システム10によって切断(電力供給停止)されるとともに1V以上の電圧降下の解消が1時間以上継続した場合に遠隔切断・投入システム10によって再投入(電力供給再開)される第1のB負荷設備1B1とに接続されている。
また、第1のスマートメータ21は、使用電力量を算出する際に計測した電圧値を示す電圧情報と第1のA負荷設備1A1および第1のB負荷設備1B1が投入されているか切断されているかを示す投入/切断情報とを通信回線3を介して遠隔切断・投入システム10に送信する機能と、遠隔切断・投入システム10から通信回線3を介して送信されてくる切断指令信号および投入指令信号に応じて第1のB負荷設備1B1を切断および再投入する機能とを備える。
Here, the first smart meter 2 1, first an A load facility 1A 1 that the installed and voltage drop in the first supply contract's house is also turned on (power supply) to continue load facility occurs When the voltage drop of 1V or more is installed in the first supply and demand contractor's house and the voltage drop of 1V or more continues for 30 seconds or more, it is disconnected (power supply is stopped) by the remote disconnection / release system 10 and the voltage drop of 1V or more is resolved It is connected to the first B load facility 1B 1 that is re-input (resumption of power supply) by the remote disconnection / input system 10 when it continues for one hour or longer.
The first smart meter 2 1, whether the voltage information and the first A load equipment 1A 1 and the first B load facility 1B 1 showing the voltage value measured at the time of calculating the power usage is turned A function of transmitting the disconnection / disconnection information indicating whether or not disconnection is performed to the remote disconnection / disconnection system 10 via the communication line 3, and a disconnection command signal transmitted from the remote disconnection / disposition system 10 via the communication line 3 And a function of disconnecting and re-inserting the first B load facility 1B 1 in response to the input command signal.

第2のスマートメータ22は、第2の需給契約者宅に設置されたかつ電圧降下が生じても投入され続ける負荷設備である第2のA負荷設備1A2と、第2の需給契約者宅に設置されたかつ1V以上の電圧降下が30秒以上継続した場合に遠隔切断・投入システム10によって切断されるとともに1V以上の電圧降下の解消が1時間以上継続した場合に遠隔切断・投入システム10によって再投入される負荷設備である第2のB負荷設備1B2とに接続されている。
また、第2のスマートメータ22は、電力量を算出する際に計測した電圧値を示す電圧情報と第2のA負荷設備1A2および第2のB負荷設備1B2が投入されているか切断されているかを示す投入/切断情報とを通信回線3を介して遠隔切断・投入システム10に送信する機能と、遠隔切断・投入システム10から通信回線3を介して送信されてくる切断指令信号および投入指令信号に応じて第2のB負荷設備1B2を切断および再投入する機能とを備える。
Second smart meter 2 2, the second and the A load facility 1A 2 second supply contractor home in the installed and voltage drop is also introduced to continue load facility occur, the second supply contractor Remote disconnection / input system when installed at home and when the voltage drop of 1V or more continues for 30 seconds or more, it is disconnected by the remote disconnection / input system 10 and the elimination of the voltage drop of 1V or more continues for 1 hour or more 10 is connected to a second B load facility 1B 2 which is a load facility re-entered.
The second smart meter 2 2 is connected to the voltage information indicating the voltage value measured when calculating the amount of electric power, and whether the second A load facility 1A 2 and the second B load facility 1B 2 are turned on or off. A function for transmitting the on / off information indicating whether or not to the remote disconnection / offset system 10 via the communication line 3, a disconnection command signal transmitted from the remote disconnection / offset system 10 via the communication line 3, and The second B load facility 1B 2 is provided with a function of cutting and recharging in response to the charging command signal.

第3のスマートメータ23は、第3の需給契約者宅に設置されたかつ電圧降下が生じても投入され続ける負荷設備である第3のA負荷設備1A3と、第3の需給契約者宅に設置されたかつ1V以上の電圧降下が30秒以上継続した場合に遠隔切断・投入システム10によって切断されるとともに1V以上の電圧降下の解消が1時間以上継続した場合に遠隔切断・投入システム10によって再投入される第3のB負荷設備1B3とに接続されている。
また、第3のスマートメータ23は、電力量を算出する際に計測した電圧値を示す電圧情報と第3のA負荷設備1A3および第3のB負荷設備1B3が投入されているか切断されているかを示す投入/切断情報とを通信回線3を介して遠隔切断・投入システム10に送信する機能と、遠隔切断・投入システム10から通信回線3を介して送信されてくる切断指令信号および投入指令信号に応じて第3のB負荷設備1B3を切断および再投入する機能とを備える。
The third smart meter 2 3 includes a third A load facility 1A 3 that is installed at the third supply and demand contractor's house and continues to be input even if a voltage drop occurs, and a third supply and demand contractor. Remote disconnection / input system when installed at home and when the voltage drop of 1V or more continues for 30 seconds or more, it is disconnected by the remote disconnection / input system 10 and the elimination of the voltage drop of 1V or more continues for 1 hour or more 10 is connected to the third B load facility 1B 3 to be recharged.
The third smart meter 2 3, or cut the voltage information and the third A load equipment 1A 3 and the third B load facility 1B 3 showing the voltage value measured when calculating the amount of power being turned on A function for transmitting the on / off information indicating whether or not to the remote disconnection / offset system 10 via the communication line 3, a disconnection command signal transmitted from the remote disconnection / offset system 10 via the communication line 3, and A third B load facility 1B 3 according to the input command signal.

なお、第1乃至第3のB負荷設備1B1〜1B3は、数時間使用できなくても日常生活に支障をきたさない負荷設備であり、たとえば、屋内の一部の照明器具、屋内の一部のエアコン、空気清浄機、テレビ受信機、オーディオ製品などである。 Note that the first to third B load facilities 1B 1 to 1B 3 are load facilities that do not interfere with daily life even if they cannot be used for several hours. Some air conditioners, air purifiers, television receivers, audio products, etc.

遠隔切断・投入システム10は、1V以上の電圧降下が30秒以上継続すると、「需要電力が供給電力を上回る危険がある」と判断して、投入されている第1乃至第3のB負荷設備1B1〜1B3を電圧降下が1V未満になるまで単価が低い順に切断していくとともに、1V以上の電圧降下の解消後1時間以上電圧降下が0.1V未満であると、「需要電力が供給電力を上回る危険がなくなった」と判断して、遠隔切断・投入システム10によって切断された第1乃至第3のB負荷設備1B1〜1B3を電圧降下が1V以上にならない限り単価が高い順に再投入していくためのものである。 When the voltage drop of 1V or more continues for 30 seconds or more, the remote disconnection / input system 10 judges that “the demand power exceeds the supply power”, and the first to third B load facilities that are input 1B 1 to 1B 3 are cut in order of the unit price until the voltage drop becomes less than 1V, and when the voltage drop is less than 0.1V for 1 hour or more after the voltage drop of 1V or more is resolved, The unit price is high as long as the voltage drop of the first to third B load facilities 1B 1 to 1B 3 disconnected by the remote disconnection / input system 10 is 1V or more because it is determined that there is no danger of exceeding the power supply. It is for re-introducing in order.

第1乃至第3のB負荷設備1B1〜1B3の単価(以下、「第1乃至第3のB単価PB1〜PB3」と称する。)は、第1乃至第3のA負荷設備1A1〜1A3の単価(以下、「第1乃至第3のA単価PA1〜PA3」と称する。)と第1乃至第3のB負荷設備1B1〜1B3の前月停電時間(切断された累計時間。以下、「第1乃至第3の前月停電時間T1〜T3」と称する。)とに基づいて決定される。
たとえば、第1のB負荷設備1B1の単価である第1のB単価PB1は、第1のA負荷設備1A 1 の単価よりも安くなるとともに、前月停電時間1時間当り1円よりも安くなりかつ前月停電時間に比例して安くなるようにするために、第1のA負荷設備1A1の単価である第1のA単価PA1に“1”未満の係数a(a<1)を掛けた値から、第1のB負荷設備1B1の前月停電時間である第1の前月停電時間T1に“1”よりも大きい比例係数b(b>1)を掛けた値を引くことにより算出される。
すなわち、第1のB単価P B1 を第1のA単価P A1 の半分とするために係数a=0.5および前月停電時間1時間当り2円ほど安くしかつ前月停電時間に比例して安くするために比例係数b=2とすると、第1のB単価PB1は、第1のA単価PA1が100円であり、第1の前月停電時間T1が5時間であった場合には、次式に示すように、40円とされる。
B1=0.5×PA1−2×T1
=0.5×100(円)−2×5(時間)
=40(円)
ただし、最低限度の課金をするために、第1乃至第3のB単価PB1〜PB3は、たとえば最低30円とされている。
Unit prices of the first to third B load facilities 1B 1 to 1B 3 (hereinafter referred to as “first to third B unit prices P B1 to P B3 ”) are the first to third A load facilities 1A. 1 to 1A 3 unit price (hereinafter referred to as “first to third A unit prices P A1 to P A3 ”) and first to third B load facilities 1B 1 to 1B 3 last month power outage time (disconnected) In the following, it is determined based on “ first to third previous month power outage times T 1 to T 3 ”).
For example, the first B unit price P B1 , which is the unit price of the first B load facility 1B 1 , is lower than the unit price of the first A load facility 1A 1 and less than 1 yen per hour of the previous month power outage time. In order to make it cheaper in proportion to the power outage time of the previous month, a coefficient a (a <1) less than “1” is added to the first A unit price P A1 which is the unit price of the first A load facility 1A 1 By subtracting a value obtained by multiplying the first previous month power outage time T 1 which is the previous month power outage time of the first B load facility 1B 1 by a proportional coefficient b (b> 1) larger than “1” from the multiplied value. Calculated.
That is, in order to make the first B unit price P B1 half of the first A unit price P A1 , the coefficient a = 0.5 and the previous month power outage time is reduced by about 2 yen, and in proportion to the previous month power outage time. If the proportional coefficient b = 2, the first B unit price P B1 is 100 yen for the first A unit price P A1 and the first previous month power outage time T 1 is 5 hours. As shown in the following formula, it is 40 yen.
P B1 = 0.5 × P A1 -2 × T 1
= 0.5 x 100 (yen)-2 x 5 (hours)
= 40 (yen)
However, in order to perform the minimum charge, the first to third B unit prices P B1 to P B3 are set to, for example, a minimum of 30 yen.

遠隔切断・投入システム10は、図2に示すように、送受信装置11と、電圧降下監視装置12と、負荷設備監視装置13と、切断・投入制御装置14と、停電時間算出装置15と、単価算出装置16と、メモリ17とを備える。   As shown in FIG. 2, the remote disconnection / insertion system 10 includes a transmission / reception device 11, a voltage drop monitoring device 12, a load facility monitoring device 13, a disconnection / input control device 14, a power failure time calculation device 15, a unit price. A calculation device 16 and a memory 17 are provided.

ここで、送受信装置11は、通信回線3を介して第1乃至第3のスマートメータ21〜23との間で各種情報(電圧情報および投入/切断情報など)や各種信号(切断指令信号および投入指令信号など)を送受信するためのものである。 Here, the transmission / reception device 11 communicates with the first to third smart meters 2 1 to 2 3 via the communication line 3 and various information (voltage information, on / off information, etc.) and various signals (disconnection command signal). And an input command signal).

電圧降下監視装置12は、第1乃至第3のスマートメータ21〜23から通信回線3および送受信装置11を介して入力される電圧情報に基づいて電圧降下を監視し、1V以上の電圧降下が30秒以上継続すると電圧降下発生信号を切断・投入制御装置14に出力するとともに、1V以上の電圧降下の解消後1時間以上電圧降下が0.1V未満であると電圧降下解消信号を切断・投入制御装置14に出力する。 The voltage drop monitoring device 12 monitors the voltage drop based on the voltage information input from the first to third smart meters 2 1 to 2 3 through the communication line 3 and the transmission / reception device 11, and the voltage drop is 1 V or more. When the voltage drop continues for 30 seconds or more, the voltage drop occurrence signal is output to the cutting / closing control device 14, and the voltage drop elimination signal is cut if the voltage drop is less than 0.1V for 1 hour or more after the voltage drop of 1V or more is resolved. Output to the loading control device 14.

負荷設備監視装置13は、第1乃至第3のスマートメータ21〜23から通信回線3および送受信装置11を介して入力される投入/切断情報に基づいて第1乃至第3のB負荷設備1B1〜1B3が投入されているか切断されているかを監視し、その監視結果であるB負荷設備状態信号を切断・投入制御装置14および停電時間算出装置15に出力する。 The load facility monitoring device 13 includes first to third B load facilities based on on / off information input from the first to third smart meters 2 1 to 2 3 via the communication line 3 and the transmission / reception device 11. Whether 1B 1 to 1B 3 is turned on or off is monitored, and a B load facility state signal as a monitoring result is output to the cutting / closing control device 14 and the power failure time calculating device 15.

切断・投入制御装置14は、電圧降下監視装置12から電圧降下発生信号が入力されると、負荷設備監視装置13から入力されるB負荷設備状態信号に基づいて第1乃至第3のB負荷設備1B1〜1B3のうち投入されているB負荷設備を確認したのち、第1乃至第3のB負荷設備1B1〜1B3のうち投入されているB負荷設備の単価データをメモリ17から読み出して、読み出した単価データに基づいて単価が最も低いB負荷設備を調べ、このB負荷設備を切断するように指令する切断指令信号を生成して、生成した切断指令信号を停電時間算出装置15に出力するとともに送受信装置11および通信回線3を介して第1乃至第3のスマートメータ21〜23に送信する。
このB負荷設備を切断しても電圧降下が1V以上であると、切断・投入制御装置14は、単価が次に低いB負荷設備を調べ、このB負荷設備を切断するように指令する切断指令信号を生成して、生成した切断指令信号を停電時間算出装置15に出力するとともに送受信装置11および通信回線3を介して第1乃至第3のスマートメータ21〜23に送信する。
以下、切断・投入制御装置14は、同様の動作を繰り返す。
When the voltage drop generation signal is input from the voltage drop monitoring device 12, the disconnection / turn-on control device 14 receives the first to third B load equipments based on the B load equipment state signal input from the load equipment monitoring device 13. After confirming the B load facility which is turned out of 1B 1 ~1B 3, read from the first to third B load facility 1B 11B memory 17 the unit price data of the B load facility which is turned out of 3 Then, based on the read unit price data, the B load facility having the lowest unit price is checked, a disconnect command signal for instructing to disconnect this B load facility is generated, and the generated disconnect command signal is sent to the power failure time calculation device 15. The data is output and transmitted to the first to third smart meters 2 1 to 2 3 via the transmission / reception device 11 and the communication line 3.
If the voltage drop is 1 V or more even when the B load equipment is disconnected, the disconnection / input control device 14 checks the B load equipment with the next lowest unit price, and instructs to disconnect the B load equipment. A signal is generated, and the generated disconnection command signal is output to the power failure time calculation device 15 and transmitted to the first to third smart meters 2 1 to 2 3 via the transmission / reception device 11 and the communication line 3.
Thereafter, the cutting / feeding control device 14 repeats the same operation.

また、切断・投入制御装置14は、電圧降下監視装置12から電圧降下解消信号が入力されると、負荷設備監視装置13から入力されるB負荷設備状態信号に基づいて第1乃至第3のB負荷設備1B1〜1B3のうち電圧降下により切断していったB負荷設備を確認したのち、第1乃至第3のB負荷設備1B1〜1B3のうち電圧降下により切断したB負荷設備の単価データをメモリ17から読み出して、読み出した単価データに基づいて単価が最も高いB負荷設備を調べ、このB負荷設備を再投入するように指令する投入指令信号を生成して、生成した投入指令信号を停電時間算出装置15に出力するとともに送受信装置11および通信回線3を介して第1乃至第3のスマートメータ21〜23に送信する。
このB負荷設備を再投入しても電圧降下が0.1V未満であると、切断・投入制御装置14は、単価が次に高いB負荷設備を調べ、このB負荷設備を再投入するように指令する投入指令信号を生成して、生成した投入指令信号を停電時間算出装置15に出力するとともに送受信装置11および通信回線3を介して第1乃至第3のスマートメータ21〜23に送信する。
以下、切断・投入制御装置14は、同様の動作を繰り返す。
In addition, when the voltage drop elimination signal is input from the voltage drop monitoring device 12, the disconnection / turn-on control device 14 receives the first to third B based on the B load facility state signal input from the load facility monitoring device 13. After confirming the B load facility which began to cut the voltage drop of the load equipment 1B 1 ~1B 3, the cut B load equipment by the voltage drop of the first to third B load facility 1B 1 ~1B 3 The unit price data is read from the memory 17, the B load equipment having the highest unit price is checked based on the read unit price data, and an input command signal is issued to instruct the B load equipment to be input again. The signal is output to the power failure time calculation device 15 and transmitted to the first to third smart meters 2 1 to 2 3 via the transmission / reception device 11 and the communication line 3.
If the voltage drop is less than 0.1 V even when the B load equipment is turned on again, the disconnection / turn-on control device 14 checks the B load equipment with the next highest unit price, and turns on the B load equipment again. A closing command signal to be commanded is generated, and the generated charging command signal is output to the power failure time calculation device 15 and transmitted to the first to third smart meters 2 1 to 2 3 via the transmission / reception device 11 and the communication line 3. To do.
Thereafter, the cutting / feeding control device 14 repeats the same operation.

停電時間算出装置15は、切断・投入制御装置14から入力される切断指令信号および投入指令信号と負荷設備監視装置13から入力されるB負荷設備状態信号とに基づいて、電圧降下により切断された第1乃至第3のB負荷設備1B1〜1B3の停電時間を月単位で算出し、算出した第1乃至第3のB負荷設備1B1〜1B3の月単位の停電時間をメモリ17に格納する。
これにより、メモリ17には第1乃至第3のB負荷設備1B1〜1B3の停電時間が月単位で格納されるため、切断・投入制御装置14および単価算出装置16は、第1乃至第3の前月停電時間T1〜T3をメモリ17から読み出すことができる。
The power failure time calculation device 15 was disconnected due to a voltage drop based on the disconnection command signal and the input command signal input from the disconnection / input control device 14 and the B load facility state signal input from the load facility monitoring device 13. the power failure time of the first to third B load facility 1B 1 ~1B 3 calculated on a monthly basis, the power failure time of the calculated first to third B load facility 1B 1 ~1B 3 monthly in the memory 17 Store.
Thus, since the memory 17 has a power failure time of the first to third B load facility 1B 1 ~1B 3 are stored on a monthly basis, cut-input control unit 14 and the unit price calculation device 16, first to Three previous month power outage times T 1 to T 3 can be read from the memory 17.

単価算出装置16は、月初めに第1乃至第3のA単価PA1〜PA3および第1乃至第3の前月停電時間T1〜T3をメモリ17から読み出して、読み出した第1乃至第3のA単価PA1〜PA3および第1乃至第3の前月停電時間T1〜T3に基づいて第1乃至第3のB単価PB1〜PB3を算出し、算出した第1乃至第3のB単価PB1〜PB3をメモリ17に格納する。
これにより、切断・投入制御装置14は、今月の第1乃至第3のB単価PB1〜PB3をメモリ17から読み出すことができる。
The unit price calculation device 16 reads the first to third A unit prices P A1 to P A3 and the first to third previous month power outage times T 1 to T 3 from the memory 17 at the beginning of the month, and reads the read first to third units. The first to third B unit prices P B1 to P B3 are calculated based on the three A unit prices P A1 to P A3 and the first to third previous month power outage times T 1 to T 3 , and the calculated first to third units are calculated. 3 B unit prices P B1 to P B3 are stored in the memory 17.
Thereby, the cutting / closing control device 14 can read out the first to third B unit prices P B1 to P B3 of this month from the memory 17.

次に、遠隔切断・投入システム10の動作について、図3に示すフローチャートを参照して説明する。
なお、以下の説明では、第1乃至第3のA負荷設備1A1〜1A3および第1乃至第3のB負荷設備1B1〜1B3はすべて投入されており、第1乃至第3のB単価PB1〜PB3はこの順で高くなっているとする。
Next, the operation of the remote disconnection / throwing system 10 will be described with reference to the flowchart shown in FIG.
In the following description, the first to third A load facilities 1A 1 to 1A 3 and the first to third B load facilities 1B 1 to 1B 3 are all turned on, and the first to third B load facilities The unit prices P B1 to P B3 are assumed to increase in this order.

電圧降下監視装置12は、第1乃至第3のスマートメータ21〜23から通信回線3および送受信装置11を介して入力される電圧情報に基づいて、1V以上の電圧降下が発生していないかを監視し、1V以上の電圧降下が発生して30秒以上継続すると、電圧降下発生信号を切断・投入制御装置14に出力する(ステップS11〜S13)。
一方、1V以上の電圧降下が発生したが30秒未満に解消すると、電圧降下監視装置12は、第1乃至第3のスマートメータ21〜23から通信回線3および送受信装置11を介して入力される電圧情報に基づいて、1V以上の電圧降下が発生していないかを再び監視する(ステップS13)
The voltage drop monitoring device 12 does not generate a voltage drop of 1 V or more based on voltage information input from the first to third smart meters 2 1 to 2 3 via the communication line 3 and the transmission / reception device 11. When a voltage drop of 1 V or more occurs and continues for 30 seconds or more, a voltage drop generation signal is output to the cutting / closing control device 14 (steps S11 to S13).
On the other hand, when a voltage drop of 1 V or more has occurred but is resolved in less than 30 seconds, the voltage drop monitoring device 12 is input from the first to third smart meters 2 1 to 2 3 via the communication line 3 and the transmission / reception device 11. Based on the voltage information to be monitored, it is monitored again whether a voltage drop of 1 V or more has occurred (step S13).

切断・投入制御装置14は、電圧降下監視装置12から電圧降下発生信号が入力されると、負荷設備監視装置13から入力されるB負荷設備状態信号に基づいて、第1乃至第3のB負荷設備1B1〜1B3が投入されているか切断されているかを調べる。
第1乃至第3のB負荷設備1B1〜1B3のすべてが投入されていることを確認すると、切断・投入制御装置14は、第1乃至第3のB負荷設備1B1〜1B3の単価データ(第1乃至第3のB単価PB1〜PB3)をメモリ17から読み出して、読み出した単価データに基づいて第1乃至第3のB負荷設備1B1〜1B3の単価のどれが最も低いかを調べる。
その結果、第1のB負荷設備1B1の単価(第1のB単価PB1)が最も低いことを確認すると、切断・投入制御装置14は、第1のB負荷設備1B1を切断するように指令する切断指令信号を生成して、生成した切断指令信号を停電時間算出装置15に出力するとともに送受信装置11および通信回線3を介して第1乃至第3のスマートメータ21〜23に送信する(ステップS14)。
When the voltage drop occurrence signal is input from the voltage drop monitoring device 12, the disconnection / turn-on control device 14 receives the first to third B loads based on the B load facility state signal input from the load facility monitoring device 13. It is checked whether the facilities 1B 1 to 1B 3 are inserted or disconnected.
When it is confirmed that all of the first to third B load facilities 1B 1 to 1B 3 have been turned on, the cutting / feeding control device 14 determines the unit price of the first to third B load facilities 1B 1 to 1B 3 . Data (first to third B unit prices P B1 to P B3 ) is read from the memory 17, and the unit price of the first to third B load facilities 1B 1 to 1B 3 is the most based on the read unit price data. Check if it is low.
As a result, when it is confirmed that the unit price (first B unit price P B1 ) of the first B load facility 1B 1 is the lowest, the cutting / feeding control device 14 disconnects the first B load facility 1B 1. A disconnection command signal to be commanded is generated, and the generated disconnection command signal is output to the power failure time calculation device 15 and is transmitted to the first to third smart meters 2 1 to 2 3 via the transmission / reception device 11 and the communication line 3. Transmit (step S14).

これにより、第1のB負荷設備1B1が第1のスマートメータ21によって切断される。
また、停電時間算出装置15は、切断された第1のB負荷設備1B1の停電時間の計測を開始する。
Thereby, the first B load facility 1B 1 is disconnected by the first smart meter 2 1 .
Moreover, the power failure time calculation device 15 starts measuring the power failure time of the disconnected first B load facility 1B 1 .

第1のB負荷設備1B1を切断しても1V以上の電圧降下が継続していると、電圧降下監視装置12は電圧降下発生信号を切断・投入制御装置14に出力したままとなる(ステップS15)。 If the voltage drop of 1V or more continues even if the first B load facility 1B 1 is disconnected, the voltage drop monitoring device 12 continues to output the voltage drop generation signal to the disconnection / turn-on control device 14 (step). S15).

切断・投入制御装置14は、電圧降下監視装置12から電圧降下発生信号が入力されたままであると、メモリ17から読み出した単価データに基づいて第2および第3のB負荷設備1B2,1B3の単価のどちらが低いかを調べる。
その結果、第2のB負荷設備1B2の単価の方が低いことを確認すると、切断・投入制御装置14は、第2のB負荷設備1B2を切断するように指令する切断指令信号を生成して、生成した切断指令信号を停電時間算出装置15に出力するとともに送受信装置11および通信回線3を介して第1乃至第3のスマートメータ21〜23に送信する(ステップS14)。
When the voltage drop generation signal is still input from the voltage drop monitoring device 12, the disconnection / turn-on control device 14 is based on the unit price data read from the memory 17, and the second and third B load facilities 1B 2 , 1B 3 Find out which of the unit prices is lower.
As a result, when it is confirmed that the unit price of the second B load facility 1B 2 is lower, the cutting / feeding control device 14 generates a disconnect command signal for instructing to disconnect the second B load facility 1B 2. Then, the generated disconnection command signal is output to the power failure time calculation device 15 and transmitted to the first to third smart meters 2 1 to 2 3 via the transmission / reception device 11 and the communication line 3 (step S14).

これにより、第2のB負荷設備1B2が第2のスマートメータ22によって切断される。
また、停電時間算出装置15は、切断された第2のB負荷設備1B2の停電時間の計測を開始する。
Thereby, the second B load facility 1B 2 is disconnected by the second smart meter 2 2 .
Further, the power failure time calculation device 15 starts measuring the power failure time of the disconnected second B load facility 1B 2 .

第2のB負荷設備1B2を切断することにより電圧降下が0.1V未満になり、この状態が1時間以上継続すると、電圧降下監視装置12は電圧降下解消信号を切断・投入制御装置14に出力する(ステップS15〜S17)。 By disconnecting the second B load facility 1B 2 , the voltage drop becomes less than 0.1 V, and when this state continues for one hour or longer, the voltage drop monitoring device 12 sends a voltage drop elimination signal to the disconnection / turn-on control device 14. Output (steps S15 to S17).

一方、第2のB負荷設備1B2を切断しても電圧降下が0.1V以上である場合や第2のB負荷設備1B2を切断することにより電圧降下が0.1V未満になったがこの状態が1時間以上継続しなかった場合にはステップS11からの動作が繰り返されるが(ステップS16,S17)、第1および第2のB負荷設備1B1,1B2は切断されているため、ステップS16からの動作が繰り返される(ステップS12)。 On the other hand, even if the second B load facility 1B 2 is disconnected, the voltage drop is 0.1V or more, or the second B load facility 1B 2 is disconnected, so that the voltage drop is less than 0.1V. If this state does not continue for more than 1 hour, the operation from step S11 is repeated (steps S16 and S17), but the first and second B load facilities 1B 1 and 1B 2 are disconnected, The operation from step S16 is repeated (step S12).

切断・投入制御装置14は、電圧降下監視装置12から電圧降下解消信号が入力されると、負荷設備監視装置13から入力されるB負荷設備状態信号に基づいて、切断していった第1および第2のB負荷設備1B1,1B2が切断されたままかを調べる。
第1および第2のB負荷設備1B1,1B2が切断されたままであることを確認すると、切断・投入制御装置14は、単価が高い方である第2のB負荷設備1B2を再投入するように指令する投入指令信号を生成して、生成した投入指令信号を停電時間算出装置15に出力するとともに送受信装置11および通信回線3を介して第1乃至第3のスマートメータ21〜23に送信する(ステップS18)。
When the voltage drop elimination signal is input from the voltage drop monitoring device 12, the disconnection / turn-on control device 14 disconnects the first and the first cuts based on the B load facility state signal input from the load facility monitoring device 13. It is examined whether the second B load facilities 1B 1 and 1B 2 remain disconnected.
When it is confirmed that the first and second B load facilities 1B 1 and 1B 2 remain disconnected, the cutting / introduction control device 14 reinjects the second B load facility 1B 2 having the higher unit price. The charging command signal for instructing to be generated is generated, the generated charging command signal is output to the power failure time calculation device 15, and the first to third smart meters 2 1 to 2 are transmitted via the transmission / reception device 11 and the communication line 3. 3 is transmitted (step S18).

これにより、第2のB負荷設備1B2が第2のスマートメータ22によって再投入される。
また、停電時間算出装置15は、再投入された第2のB負荷設備1B2の停電時間の計測を終了するとともに、第2のB負荷設備1B2の今月の停電時間データをメモリ17から読み出し、読み出した停電時間データが示す停電時間に計測した停電時間を足して第2のB負荷設備1B2の今月の停電時間データを更新してメモリ17に格納する。
As a result, the second B load facility 1B 2 is turned on again by the second smart meter 2 2 .
In addition, the power failure time calculation device 15 ends the measurement of the power failure time of the second B load facility 1B 2 that has been turned on again, and reads out the current power failure time data of the second B load facility 1B 2 from the memory 17. Then, the power failure time measured by the power failure time indicated by the read power failure time data is added to update the current power failure time data of the second B load facility 1B 2 and stored in the memory 17.

第2のB負荷設備1B2が再投入されても電圧降下が0.1V未満であると、電圧降下監視装置12は電圧降下解消信号を切断・投入制御装置14に出力したままである(ステップS19)。 Even if the second B load facility 1B 2 is turned on again, if the voltage drop is less than 0.1 V, the voltage drop monitoring device 12 still outputs the voltage drop elimination signal to the disconnection / turn-on control device 14 (step). S19).

切断・投入制御装置14は、電圧降下監視装置12から電圧降下解消信号が入力されたままであると、単価が次に高い第1のB負荷設備1B1を再投入するように指令する投入指令信号を生成して、生成した投入指令信号を停電時間算出装置15に出力するとともに送受信装置11および通信回線3を介して第1乃至第3のスマートメータ21〜23に送信する(ステップS18)。 When the voltage drop elimination signal is still input from the voltage drop monitoring device 12, the disconnection / turn-on control device 14 instructs the resumption of the first B load facility 1B 1 having the next highest unit price. And the generated input command signal is output to the power failure time calculation device 15 and transmitted to the first to third smart meters 2 1 to 2 3 via the transmission / reception device 11 and the communication line 3 (step S18). .

これにより、第1のB負荷設備1B1が第1のスマートメータ21によって再投入される。
また、停電時間算出装置15は、再投入された第1のB負荷設備1B1の停電時間の計測を終了するとともに、第1のB負荷設備1B1の今月の停電時間データをメモリ17から読み出し、読み出した停電時間データが示す停電時間に計測した停電時間を足して第1のB負荷設備1B1の今月の停電時間データを更新してメモリ17に格納する。
As a result, the first B load facility 1B 1 is turned on again by the first smart meter 2 1 .
In addition, the power failure time calculation device 15 ends the measurement of the power failure time of the first B load facility 1B 1 that has been turned on again, and reads out the current power failure time data of the first B load facility 1B 1 from the memory 17. The power outage time measured for the power outage time indicated by the read out power outage time data is added to the current power outage time data of the first B load facility 1B 1 and stored in the memory 17.

第1のB負荷設備1B1が再投入されることにより電圧降下が0.1V以上になると、ステップS11からの動作が繰り返される(ステップS19)。 When the voltage drop becomes equal to or higher than 0.1V since the first B load equipment 1B 1 is turned on again, to repeat the operation from step S11 (step S19).

以上の説明では、電圧降下監視装置12が電圧降下発生信号を出力する条件として「1V以上の電圧降下が30秒以上継続」とし、電圧降下監視装置12が電圧降下解消信号を出力する条件として「1V以上の電圧降下の解消後1時間以上電圧降下が0.1V未満」としたが、これに限定するものではない。
すなわち、電圧降下監視装置12が電圧降下発生信号を出力する条件として「所定の第1の電圧値以上の電圧降下が所定の第1の時間以上継続」とすると、第1の電圧値は1V以外であってもよいし、第1の時間は30秒以外であってもよい。
同様に、電圧降下監視装置12が電圧降下解消信号を出力する条件として「第1の電圧値以上の電圧降下の解消後所定の第2の時間以上電圧降下が所定の第2の電圧値未満」とすると、第2の電圧値は0Vに近い電圧値であれば0.1V以外であってもよいし、第2の時間は1時間以外であってもよい。
In the above description, the condition that the voltage drop monitoring device 12 outputs the voltage drop occurrence signal is “a voltage drop of 1 V or more continues for 30 seconds or more”, and the condition that the voltage drop monitoring device 12 outputs the voltage drop elimination signal is “ Although the voltage drop is less than 0.1 V for 1 hour or more after elimination of the voltage drop of 1 V or more, it is not limited to this.
That is, if the voltage drop monitoring device 12 outputs a voltage drop occurrence signal as "a voltage drop of a predetermined first voltage value or more continues for a predetermined first time", the first voltage value is other than 1V. The first time may be other than 30 seconds.
Similarly, as a condition for the voltage drop monitoring device 12 to output a voltage drop elimination signal, “the voltage drop is less than a predetermined second voltage value for a predetermined second time after the voltage drop equal to or higher than the first voltage value is canceled”. Then, the second voltage value may be other than 0.1 V as long as the voltage value is close to 0 V, and the second time may be other than one hour.

また、第1乃至第3の需給契約者宅には1個のA負荷設備(第1乃至第3のA負荷設備1A1〜1A3)および1個のB負荷設備(第1乃至第3のB負荷設備1B1〜1B3)しか設置されていない場合を例として説明したが、複数個のA負荷設備および複数個のB負荷設備が設置されていても、遠隔切断・投入システム10によって同様の処理を行ってB負荷設備を切断・再投入することにより、同様の効果を得ることができる。 In addition, the first to third supply and demand contractor's houses have one A load facility (first to third A load facilities 1A 1 to 1A 3 ) and one B load facility (first to third The case where only the B load equipment 1B 1 to 1B 3 ) is installed has been described as an example, but even if a plurality of A load equipments and a plurality of B load equipments are installed, the remote cutting / feeding system 10 similarly applies. The same effect can be obtained by performing the above process and disconnecting / re-introducing the B load equipment.

1A1〜1A3 第1乃至第3のA負荷設備
1B1〜1B3 第1乃至第3のB負荷設備
1〜23 第1乃至第3のスマートメータ
3 通信回線
10 遠隔切断・投入システム
11 送受信装置
12 電圧降下監視装置
13 負荷設備監視装置
14 切断・投入制御装置
15 停電時間算出装置
16 単価算出装置
17 メモリ
係数
b 比例係数
B1〜PB3 第1乃至第3のB単価
A1〜PA3 第1乃至第3のA単価
1〜T3 第1乃至第3の前月停電時間
S11〜S19 ステップ
1A 1 to 1A 3 1st to 3rd A load facilities 1B 1 to 1B 3 1st to 3rd B load facilities 2 1 to 2 3 1st to 3rd smart meters 3 Communication line 10 Remote disconnection / loading system DESCRIPTION OF SYMBOLS 11 Transmission / reception apparatus 12 Voltage drop monitoring apparatus 13 Load equipment monitoring apparatus 14 Cutting | disconnection / turn-on control apparatus 15 Power failure time calculation apparatus 16 Unit price calculation apparatus 17 Memory
a coefficient
b Proportional coefficient P B1 to P B3 1st to 3rd B unit price P A1 to P A3 1st to 3rd A unit price T 1 to T 3 1st to 3rd previous month power failure time S11 to S19 Step

Claims (2)

スマートメータを用いた負荷設備の切断・投入制御により安定な電力供給を行うための電力供給システムであって、
複数個のスマートメータ(21〜23)と、
該複数個のスマートメータと通信回線(3)を介して接続された遠隔切断・投入システム(10)とを具備し、
前記複数個のスマートメータの各スマートメータに、電圧降下が生じても投入され続けるA負荷設備(1A 1 〜1A 3 )および電圧降下が生じると切断されるB負荷設備(1B 1 〜1B 3 )が接続されており、
前記各スマートメータが、
使用電力量を算出する際に計測した電圧値を示す電圧情報と前記A負荷設備および前記B負荷設備が投入されているか切断されているかを示す投入/切断情報とを前記通信回線を介して前記遠隔切断・投入システムに送信する機能と、
前記遠隔切断・投入システムから前記通信回線を介して送信されてくる切断指令信号および投入指令信号に応じて前記B負荷設備を切断および再投入する機能とを備え、
前記遠隔切断・投入システムが、
前記各スマートメータに接続された前記A負荷設備の課金単価と該各スマートメータに接続された前記B負荷設備の課金単価および月単位の停電時間とが格納されたメモリ(17)と、
前記各スマートメータから前記通信回線を介して受信した前記電圧情報に基づいて電圧降下を監視し、所定の第1の電圧値以上の電圧降下が所定の第1の時間以上継続すると、前記各スマートメータに接続された前記B負荷設備の課金単価を前記メモリから読み出して、該各スマートメータに接続された前記B負荷設備のうち投入されているB負荷設備を電圧降下が前記第1の電圧値未満になるまで該読み出した課金単価が低い順に切断していく切断手段と、
前記第1の電圧値以上の電圧降下の解消後所定の第2の時間以上電圧降下が該第1の電圧値よりも小さい所定の第2の電圧値未満であると、前記切断していったB負荷設備を電圧降下が前記第2の電圧値以上にならない限り前記読み出した課金単価が高い順に再投入していく再投入手段と
前記切断したB負荷設備の前月停電時間と前記複数個のスマートメータのうち該切断したB負荷設備が接続されたスマートメータに接続された前記A負荷設備である対応A負荷設備の課金単価とを前記メモリから読み出し、該切断したB負荷設備の新しい課金単価を次式によって算出する算出手段とを備え、
B =a×P A −b×T
ここで、P A は、前記メモリから読み出され前記対応A負荷設備の課金単価
B は、前記切断したB負荷設備の新しい課金単価
Tは、前記メモリから読み出された前記切断したB負荷設備の前月停電時間
aは、“1”未満の係数
bは、“1”よりも大きい比例係数
A ,P B の単位は、円
Tの単位は、時間
前記切断したB負荷設備の新しい課金単価P B が、前記対応A負荷設備の課金単価P A よりも安くされるとともに、前月停電時間1時間当り1円よりも安くかつ該切断したB負荷設備の前月停電時間Tに比例して安くされるが、該切断したB負荷設備の新しい課金単価P B の最低金額が所定の金額にされている、
ことを特徴とする、電力供給システム。
A power supply system for supplying a stable power by controlling the cutting and turning on of load equipment using a smart meter,
A plurality of smart meters (2 1 to 2 3 ),
A remote disconnection / injection system (10) connected to the plurality of smart meters via a communication line (3);
Wherein each smart meter of a plurality of smart meters, A load equipment even if the voltage drop continues to be turned (1A 1 ~1A 3) and B load facility which voltage drop is cut to occur (1B 1 ~1B 3) Is connected,
Each of the smart meters is
The voltage information indicating the voltage value measured when calculating the amount of power used and the on / off information indicating whether the A load facility and the B load facility are turned on or off are sent via the communication line. A function to send to the remote disconnection and input system,
A function of disconnecting and re-injecting the B load facility in response to a disconnection command signal and an input command signal transmitted from the remote disconnection / injection system via the communication line;
The remote disconnection / input system is
A memory (17) in which a billing unit price of the A load facility connected to each smart meter, a billing unit price of the B load facility connected to each smart meter, and a monthly power failure time are stored;
A voltage drop is monitored based on the voltage information received from each smart meter via the communication line, and when a voltage drop equal to or higher than a predetermined first voltage value continues for a predetermined first time or more, each smart reads the charging unit price of the B load facility connected to the meter from the memory, the voltage drop of the B load facility which is turned out of the pre-Symbol B load facility connected to the respective smart meter the first voltage Cutting means for cutting the read billing unit price in ascending order until it becomes less than the value;
When the voltage drop is less than a predetermined second voltage value smaller than the first voltage value after the elimination of the voltage drop equal to or higher than the first voltage value , the disconnection is performed. Re-injection means for re-injecting the B load facility in order of the read billing unit price as long as the voltage drop does not exceed the second voltage value ;
The previous month power outage time of the disconnected B load facility and the charge unit price of the corresponding A load facility which is the A load facility connected to the smart meter to which the disconnected B load facility is connected among the plurality of smart meters. A calculation unit that reads out from the memory and calculates a new charging unit price of the disconnected B load facility by the following equation:
P B = a × P A −b × T
Here, P A is read from the memory and is the unit price of the corresponding A load facility
P B is the new unit price of the disconnected B load equipment
T is the previous power outage time of the disconnected B load equipment read from the memory
a is a coefficient less than "1"
b is a proportional coefficient larger than “1”
The unit of P A and P B is a circle
The unit of T is time
The new charge unit price P B of the disconnected B load facility is made lower than the charge unit price P A of the corresponding A load facility, and is less than 1 yen per hour in the previous month's power outage time. It is reduced in proportion to the previous month power outage time T, but the minimum amount of the new billing unit price P B of the disconnected B load equipment is set to a predetermined amount.
A power supply system characterized by that.
前記遠隔切断・投入システムが、
前記通信回線を介して前記各スマートメータとの間で前記電圧情報、前記投入/切断情報、前記切断指令信号および前記投入指令信号を送受信するための送受信装置(11)と、
前記各スマートメータから前記通信回線および前記送受信装置を介して入力される前記電圧情報に基づいて電圧降下を監視し、前記第1の電圧値以上の電圧降下が前記第1の時間以上継続すると電圧降下発生信号を出力するとともに、前記第1の電圧値以上の電圧降下の解消後前記第2の時間以上電圧降下が前記第2の電圧値未満であると電圧降下解消信号を出力する電圧降下監視装置(12)と、
前記各スマートメータから前記通信回線および前記送受信装置を介して入力される前記投入/切断情報に基づいて該各スマートメータに接続された前記B負荷設備が投入されているか切断されているかを監視し、その監視結果であるB負荷設備状態信号を出力する負荷設備監視装置(13)と、
前記電圧降下監視装置から前記電圧降下発生信号が入力されると、前記負荷設備監視装置から入力される前記B負荷設備状態信号に基づいて前記各スマートメータに接続された前記B負荷設備のうち投入されているB負荷設備を確認したのち、前記切断指令信号を前記送受信装置および前記通信回線を介して前記各スマートメータに出力して、前記投入されているB負荷設備を電圧降下が前記第1の電圧値未満になるまで課金単価が低い順に切断していくとともに、前記第1の電圧値以上の電圧降下の解消後前記第2の時間以上電圧降下が前記第2の電圧値未満であると、前記負荷設備監視装置から入力される前記B負荷設備状態信号に基づいて前記切断したB負荷設備が切断されたままかを確認したのち、前記投入指令信号を前記送受信装置および前記通信回線を介して前記各スマートメータに出力して、前記切断されたままのB負荷設備を電圧降下が前記第2の電圧値以上にならない限り課金単価が高い順に再投入していく切断・投入制御装置(14)と、
前記切断・投入制御装置から入力される前記切断指令信号および前記投入指令信号と前記負荷設備監視装置から入力される前記B負荷設備状態信号とに基づいて、前記切断したB負荷設備の停電時間を計測し、前記メモリから読み出した該切断したB負荷設備の今月の停電時間に該計測した停電時間を足して該B負荷設備の今月の停電時間を更新して該メモリに格納する停電時間算出装置(15)と、
前記切断したB負荷設備の前月停電時間と前記対応A負荷設備の課金単価とを前記メモリから読み出して、前記式であるP B =a×P A −b×Tを用いて前記切断したB負荷設備の新しい課金単価P B を算出する単価算出装置(16)と、
を備えることを特徴とする、請求項1記載の電力供給システム。
The remote disconnection / input system is
A transmission / reception device (11) for transmitting / receiving the voltage information, the on / off information, the disconnection command signal, and the input command signal to / from each smart meter via the communication line;
A voltage drop is monitored based on the voltage information input from each smart meter via the communication line and the transmitting / receiving device, and a voltage drop when the voltage drop equal to or higher than the first voltage value continues for the first time or longer. Voltage drop monitoring that outputs a drop occurrence signal and outputs a voltage drop elimination signal when the voltage drop is less than the second voltage value for the second time or more after elimination of the voltage drop greater than the first voltage value A device (12);
Monitoring whether the B load facility connected to each smart meter is turned on or off based on the turning on / off information inputted from each smart meter via the communication line and the transmitting / receiving device , A load facility monitoring device (13) that outputs a B load facility state signal that is the monitoring result;
When the voltage drop occurrence signal is input from the voltage drop monitoring device, the B load facility connected to each smart meter is turned on based on the B load facility state signal input from the load facility monitoring device After confirming the loaded B load facility, the disconnection command signal is output to each smart meter via the transmission / reception device and the communication line, and a voltage drop is applied to the loaded B load facility. The billing unit price is cut in ascending order until the voltage value is less than the first voltage value, and the voltage drop is less than the second voltage value for the second time or more after the voltage drop equal to or more than the first voltage value is resolved. the load facility after B load facility which is the cutting based on the B load facility status signal input from the monitoring device to confirm whether or remains disconnected, the feed command signal the transceiver instrumentation And outputs to the each smart meter via the communication line, cutting the B load facility remains the cutting voltage drop and then re-introduced in order charging unit price is high unless the above said second voltage value A dosing control device (14);
Based on the disconnection command signal and the input command signal input from the disconnection / release control device and the B load facility status signal input from the load facility monitoring device, the power failure time of the disconnected B load facility is determined. A power failure time calculation device that measures and updates the current power failure time of the B load facility by adding the measured power failure time to the current power failure time of the disconnected B load facility read from the memory and stores the same in the memory (15) and
The previous month power outage time of the disconnected B load equipment and the charge unit price of the corresponding A load equipment are read from the memory, and the disconnected B load is calculated using the formula P B = a × P A −b × T. A unit price calculation device (16) for calculating a new charge unit price P B of the facility ;
The power supply system according to claim 1, further comprising:
JP2010167807A 2010-07-27 2010-07-27 Power supply system Active JP5646239B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010167807A JP5646239B2 (en) 2010-07-27 2010-07-27 Power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010167807A JP5646239B2 (en) 2010-07-27 2010-07-27 Power supply system

Publications (2)

Publication Number Publication Date
JP2012029511A JP2012029511A (en) 2012-02-09
JP5646239B2 true JP5646239B2 (en) 2014-12-24

Family

ID=45781784

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010167807A Active JP5646239B2 (en) 2010-07-27 2010-07-27 Power supply system

Country Status (1)

Country Link
JP (1) JP5646239B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6179590B2 (en) * 2013-04-08 2017-08-16 パナソニックIpマネジメント株式会社 Link adapter, distribution board, distribution board system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4022A (en) * 1845-05-01 Improvement in machines for hackling and cleaning hemp and flax
JP2002369385A (en) * 2001-06-06 2002-12-20 Toshiba Eng Co Ltd Power transmission control system, power reception control system and power transmission and reception control system
JP2003111311A (en) * 2001-09-26 2003-04-11 Toyota Industries Corp Apparatus and method for reducing cost of electric power
JP4468257B2 (en) * 2005-07-13 2010-05-26 株式会社日立製作所 Power supply adjustment loss prediction system, power supply adjustment loss prediction method, power supply adjustment loss prediction program

Also Published As

Publication number Publication date
JP2012029511A (en) 2012-02-09

Similar Documents

Publication Publication Date Title
JP6081375B2 (en) Energy interface system
EP2518854B1 (en) Electric power supply system
US10298056B2 (en) Power control system, power control method, and recording medium
JP5788591B2 (en) Power monitoring apparatus and power monitoring system
KR101522858B1 (en) Energy management system having maximum power saving control and method thereof
WO2015122196A1 (en) Occupancy state determination device, delivery system, occupancy state determination method, occupancy state determination program, and delivery terminal
EP2976822A1 (en) Energy management device and its associated method
JP6386064B2 (en) Power management apparatus, power management method, and power management system
US8121743B2 (en) Power restoration management method and system
EP2503503A1 (en) Systems and methods for generating a utility bill
KR20120041498A (en) System and method for managing charger of electric vehicle using a network of ami system
EP2503659A1 (en) Systems and methods for managing an energy distribution network
EP3089309A1 (en) Storage battery device, device-control apparatus, and control method
EP2503504A1 (en) Systems and methods for generating a bill
JP5646239B2 (en) Power supply system
EP3509185A1 (en) Electric power management method, electric power management server, local control device, and electric power management system
US20200373758A1 (en) System for frequency regulation on a power distribution network
JP6143420B2 (en) System and method for generating billing
US8666831B2 (en) Power generation leveling system and power generation leveling method
KR20110058418A (en) Electric appliance for power management
JP2016103890A (en) Power control unit and power control system
WO2021060143A1 (en) Electrical power management system and electrical power management method
JP7162819B2 (en) Power control device, power control system and power control method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130709

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140702

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140818

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141029

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141105

R150 Certificate of patent or registration of utility model

Ref document number: 5646239

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250