JP5610748B2 - Crane overload prevention device control method - Google Patents

Crane overload prevention device control method Download PDF

Info

Publication number
JP5610748B2
JP5610748B2 JP2009265724A JP2009265724A JP5610748B2 JP 5610748 B2 JP5610748 B2 JP 5610748B2 JP 2009265724 A JP2009265724 A JP 2009265724A JP 2009265724 A JP2009265724 A JP 2009265724A JP 5610748 B2 JP5610748 B2 JP 5610748B2
Authority
JP
Japan
Prior art keywords
crane
switch
prevention device
boom
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009265724A
Other languages
Japanese (ja)
Other versions
JP2011105511A (en
Inventor
崇弘 大木
崇弘 大木
Original Assignee
Ihi建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ihi建機株式会社 filed Critical Ihi建機株式会社
Priority to JP2009265724A priority Critical patent/JP5610748B2/en
Publication of JP2011105511A publication Critical patent/JP2011105511A/en
Application granted granted Critical
Publication of JP5610748B2 publication Critical patent/JP5610748B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

本発明は、クレーンの過負荷防止装置の制御方法に関するものである。 The present invention relates to a control method for a crane overload prevention device.

移動式クレーンの1つとして、図3に示す如き自走式のクローラクレーンが知られている。これは、クローラにて走行するようにしてある下部走行体2の上側に、運転室4を備えた上部旋回体3を旋回可能に設けてクレーン本体1が構成してある。   As one of mobile cranes, a self-propelled crawler crane as shown in FIG. 3 is known. The crane main body 1 is configured such that an upper swing body 3 provided with a cab 4 is turnably provided on an upper side of a lower travel body 2 that is to be driven by a crawler.

上記上部旋回体3には、ブーム(ポスト)5の基端部を起伏可能に取り付け、該ブーム5の先端部に、ブームフック(主フック)6が吊上げ下げ可能に装備してある。更に、必要に応じて、上記ブーム5の先端に、ジブ7の基端部を俯仰可能に連結し、該ジブ7の先端部にジブフック(副フック)8を吊上げ下げ可能に装備した構成としてある(たとえば、特許文献1参照)。   A base end portion of a boom (post) 5 is attached to the upper swing body 3 so as to be able to be raised and lowered, and a boom hook (main hook) 6 is provided at the distal end portion of the boom 5 so as to be lifted and lowered. Further, if necessary, the base end of the jib 7 is connected to the tip of the boom 5 so as to be able to be lifted, and a jib hook (sub hook) 8 is mounted on the tip of the jib 7 so as to be lifted and lowered. (For example, refer to Patent Document 1).

ところで、吊上げ荷重が所定のトン数以上となる移動式クレーンには、過負荷防止装置(モーメントリミッタ)を装備することが定められている。   By the way, it is stipulated that an overload prevention device (moment limiter) is provided in a mobile crane in which a lifting load is a predetermined tonnage or more.

ブームを備えたクレーンでは、ブームの長さ寸法(ブーム長)とブームの傾斜角に応じて作業半径が変化し、又、ブーム(ポスト)の先端側にジブを備えたクレーンでは、上記と同様のブーム長(ポスト長)とブームの傾斜角に加えて、ジブの長さ寸法(ジブ長)とジブの傾斜角に応じて作業半径が変化するが、この際、ブーム長やブーム傾斜角、更に、ジブ長やジブ傾斜角に応じて、クレーンの定格総荷重(許容吊上げ荷重)も変化する。   In a crane with a boom, the working radius changes according to the boom length (boom length) and the tilt angle of the boom, and in a crane with a jib on the tip side of the boom (post), the same as above In addition to the boom length (post length) and boom inclination angle, the working radius varies depending on the jib length dimension (jib length) and the jib inclination angle. Furthermore, the rated total load (allowable lifting load) of the crane also changes according to the jib length and jib inclination angle.

そこで、上記過負荷防止装置では、上記ブーム長及びブーム傾斜角の変化、ジブを備えたクレーンでは、更に、ジブ長及びジブ傾斜角の変化と、それに対応する定格総荷重の変化との関連を示すデータを定格総荷重表のような形で蓄積しておき、たとえば、或るブーム長のブームと或るジブ長のジブを用いてクレーン作業を実施する場合は、使用しているブームのブーム長とジブのジブ長に対応する定格総荷重表に基づいて、上記ブームの傾斜角やジブの傾斜角に応じて定まる或る作業半径となるときの定格総荷重を求め、該求められた定格総荷重を参照して、ブームフックあるいはジブフックに吊った吊荷よりクレーンに作用している実荷重を対比することにより、該実荷重が、その作業半径での定格総荷重を超えそうになるときには、該定格総荷重を超える以前に、運転室にある過負荷防止装置のディスプレイに警報を表示させたり、該過負荷防止装置に接続してある警報ランプを点灯させるようにしたり、該過負荷防止装置に接続してあるブザーやスピーカより、ブザー音やメッセージ等による音声警報を出力させるようにしてある。更に、上記実荷重が、その作業半径での定格総荷重を超過した場合は、上記過負荷防止装置により上記クレーンの駆動系へ該クレーンの動作を停止(緩停止)させるための指令を出力させるようにすることで、クレーンに過大な負荷が作用しないようにして、該クレーンの破損や転倒に繋がる虞を回避できるようにしてある。   Therefore, in the overload prevention device, the change in the boom length and the boom inclination angle, and in the crane equipped with the jib, the relationship between the change in the jib length and the jib inclination angle and the corresponding change in the rated total load is further obtained. For example, when carrying out crane work using a boom with a certain boom length and a jib with a certain jib length, the data shown is accumulated in the form of a rated total load table. Based on the total rated load table corresponding to the length and the jib length of the jib, the total rated load at a certain working radius determined according to the tilt angle of the boom or the tilt angle of the jib is obtained, and the determined rating When the actual load is likely to exceed the rated total load at the working radius by comparing the actual load acting on the crane with the suspended load suspended on the boom hook or jib hook with reference to the total load. The Before the rated total load is exceeded, an alarm is displayed on the display of the overload prevention device in the operator's cab, an alarm lamp connected to the overload prevention device is turned on, or the overload prevention device is A sound alarm based on a buzzer sound or a message is output from a connected buzzer or speaker. Further, when the actual load exceeds the rated total load at the working radius, the overload prevention device outputs a command for stopping (slowly stopping) the operation of the crane to the crane drive system. By doing so, an excessive load does not act on the crane, and the possibility of the crane being damaged or falling can be avoided.

なお、上記図3に示したクローラクレーンのようにラチス形式のブーム(ポスト)5やジブ7を装備したクレーンでは、クレーン作業に所望される作業半径や吊上げ高さに応じて、上記ブーム(ポスト)5のブーム長(ポスト長)や上記ジブ7のジブ長を適宜選定して組み立てるようにしてある。   In addition, in the crane equipped with the lattice type boom (post) 5 and the jib 7 like the crawler crane shown in FIG. 3, the boom (post) according to the work radius and the lifting height desired for the crane work. ) The boom length (post length) of 5 and the jib length of the jib 7 are appropriately selected and assembled.

そのため、上記のように使用するブーム5やジブ7の長さ寸法が変わる場合は、クレーンにおける定格総荷重(許容吊上げ荷重)が変化することから、上記過負荷防止装置については、クレーンの作業半径に対応する定格総荷重を求めるための基準とする定格総荷重表を、実際にクレーン作業に使用する上記ブーム5やジブ7の長さ寸法に対応する定格総荷重表に切り替える必要があるが、上記ラチス形式のブーム5やジブ7では、その長さ寸法を自動的に検出させることは難しいことから、運転室4に設けてある上記過負荷防止装置の操作パネル(図示せず)にて、作業者、通常はクレーンのオペレータが、上記クレーン作業に実際に使用するブーム5やジブ7のブーム長やジブ長に応じた設定値を入力して過負荷防止装置に設定するようにしてある(たとえば、特許文献2参照)。   Therefore, when the length of the boom 5 or jib 7 used as described above changes, the rated total load (allowable lifting load) in the crane changes. It is necessary to switch the rated total load table as a reference for obtaining the rated total load corresponding to the above to the rated total load table corresponding to the length of the boom 5 or jib 7 actually used for crane work. In the lattice type boom 5 and jib 7, it is difficult to automatically detect the length of the boom, and the jib 7. Therefore, in the operation panel (not shown) of the overload prevention device provided in the cab 4, An operator, usually a crane operator, inputs a set value corresponding to the boom length or jib length of the boom 5 or jib 7 actually used for the crane operation and sets it in the overload prevention device. It is to (e.g., see Patent Document 2).

更に、上記過負荷防止装置には、上記ブーム長やジブ長の他にも、クレーンの作業半径に直接関係することから、ブームフック6とジブフック8のいずれをクレーン作業に実際に用いるか、すなわち、主吊りと補吊りのいずれでクレーン作業を行うかという項目や、クレーンの定格総荷重の制限に関与する上記ブームフック6やジブフック8にワイヤロープを何条掛けるかと云うワイヤロープ掛数に関する項目、更には、上記ブームフック6やジブフック8の自重(フック重量)に関する項目等について、それぞれ設定値を入力するようにしてある。   Furthermore, in addition to the boom length and jib length, the overload prevention device is directly related to the working radius of the crane, so which of the boom hook 6 and the jib hook 8 is actually used for crane work, Items relating to whether the crane work is carried out by main suspension or auxiliary suspension, and items relating to the number of wire rope hooks, such as how many wire ropes are to be hung on the boom hook 6 or jib hook 8 involved in limiting the total rated load of the crane Furthermore, setting values are input for items relating to the weight (hook weight) of the boom hook 6 and the jib hook 8, respectively.

特開2009−137666号公報JP 2009-137666 A 特公平6−94350号公報Japanese Patent Publication No. 6-94350

ところが、従来の過負荷防止装置は、上記したように、運転室4内に装備された過負荷防止装置の操作パネルにて、クレーン作業を実施する主吊り又は補吊りの選択、ブーム長、ジブ長、ワイヤロープ掛数、フック重量等のクレーンの作業モード(作業形態)に関する各設定項目を入力して設定するようにしてあるが、その入力、設定作業は、入力者、通常はクレーンのオペレータに一任されているため、上記オペレータが間違った設定値を入力してしまったり、設定値の入力作業を忘れたとしても、そのことをチェックすることができないというのが実状である。   However, in the conventional overload prevention device, as described above, on the operation panel of the overload prevention device installed in the cab 4, selection of main suspension or auxiliary suspension for carrying out crane work, boom length, jib Each setting item related to the crane's work mode (work form) such as length, number of wire rope hooks, hook weight, etc. is entered and set. The input and setting work are the input person, usually the crane operator. Therefore, even if the operator inputs a wrong set value or forgets to enter the set value, the fact is that it cannot be checked.

よって、万一、上記のようなクレーンのオペレータによる作業モードに関する各設定項目の設定値の入力ミスや、設定値の入力作業のし忘れが生じた場合は、過負荷防止装置が、実際のクレーン作業を実施しているクレーンの作業モードに対応する定格総重量表以外の定格総重量表に基づいて作動するようになることから、上記過負荷防止装置による、クレーンに過大な負荷が作用しないようにして、該クレーンの破損や転倒に繋がる虞を回避するという機能を正確に果たせなくなる虞がある。   Therefore, in the unlikely event that an input error of each setting item related to the operation mode by the crane operator as described above or forgetting to enter the setting value occurs, the overload prevention device will Since it operates based on the rated gross weight table other than the rated gross weight table corresponding to the work mode of the crane that is performing the work, the overload prevention device prevents the excessive load from acting on the crane. Thus, there is a possibility that the function of avoiding the possibility of damage to the crane or falling over cannot be performed accurately.

更に、上記従来の過負荷防止装置では、クレーンの作業モードに関する各設定項目の入力、設定作業は、任意の時点で行うことが可能なため、万一、クレーン作業中にクレーンに過大な負荷が作用するような問題が生じた場合、その問題発生後に過負荷防止装置の各設定項目の設定値の変更が行われると、問題の原因の特定が困難になることも考えられる。   Furthermore, in the above-described conventional overload prevention device, it is possible to input and set each setting item related to the work mode of the crane at an arbitrary time, so that an excessive load is applied to the crane during the crane operation. When a problem that acts is caused, if the setting value of each setting item of the overload prevention device is changed after the problem occurs, it may be difficult to identify the cause of the problem.

そこで、本発明は、クレーンの過負荷防止装置におけるクレーンの作業モードに関する各設定項目の入力作業が、入力者以外の者が立ち会う条件の下で行われるようにして、上記過負荷防止装置におけるクレーンの作業モードに関する各設定項目の設定値の入力の正確性を高めることが可能なクレーンの過負荷防止装置の制御方法を提供しようとするものである。 Therefore, the present invention provides a crane in the overload prevention device in which the input work of each setting item related to the work mode of the crane in the crane overload prevention device is performed under the condition that a person other than the input person is present. It is an object of the present invention to provide a crane overload prevention device control method capable of improving the accuracy of input of set values of the respective setting items relating to the work mode.

本発明は、上記課題を解決するために、請求項1に対応して、ブームを備えたクレーンの過負荷防止装置の制御方法において、クレーンのオペレータが、上記過負荷防止装置の制御器のエンジンキースイッチをオン操作する工程と、該エンジンキースイッチのオン操作に伴い上記制御器が起動し、上記クレーンのオペレータとは異なるスイッチキーの管理者が、該スイッチキーにより作業モード設定許可スイッチをオン操作することで、上記制御器が作業モード設定プロセスに移行して、該作業モード設定プロセスにて、上記クレーンのオペレータが、上記スイッチキーの管理者の立会いの下、上記クレーンの定格総荷重を定める基礎となる該クレーンの作業モードの設定項目の設定値の入力を行う工程と、上記スイッチキーの管理者がスイッチキーを抜き取ることで、上記作業モード設定許可スイッチがオフ状態となり、上記制御器がクレーン作業監視プロセスへ移行して、上記クレーンの作業中に吊荷より該クレーンに作用する実荷重を計測すると共に、該計測された実荷重と、上記ブームの傾斜角の変化に応じて変化するクレーンの定格総荷重との関係を基に、上記クレーンに過負荷が作用することを防止する工程と、を有するクレーンの過負荷防止装置の制御方法とする。 In order to solve the above-mentioned problem, the present invention provides a control method for an overload prevention device for a crane equipped with a boom, according to claim 1, wherein an operator of the crane controls the engine of the controller of the overload prevention device. When the key switch is turned on and the engine key switch is turned on, the controller is activated, and a switch key administrator different from the crane operator turns on the work mode setting permission switch using the switch key. By operating, the controller shifts to a work mode setting process, and in the work mode setting process, the operator of the crane sets the rated total load of the crane in the presence of the switch key administrator. The process of inputting the setting value of the setting item of the crane working mode as the basis to be determined, and the switch key administrator By extracting the Chiki, the working mode setting permission switch is turned off, with the controller is shifted to crane operation monitoring process measures the actual load acting on the crane from the suspended load during operation of the crane has a actual load which is the measurement, based on the relationship between the rated load of the crane that changes in accordance with change in the tilt angle of the boom, and a step of preventing the overload acting on the crane A control method for the crane overload prevention device is provided.

又、請求項2に対応して、ブームと該ブームの先端側に取り付けたジブを備えたクレーンの過負荷防止装置の制御方法において、クレーンのオペレータが、上記過負荷防止装置の制御器のエンジンキースイッチをオン操作する工程と、該エンジンキースイッチのオン操作に伴い上記制御器が起動し、上記クレーンのオペレータとは異なるスイッチキーの管理者が、該スイッチキーにより作業モード設定許可スイッチをオン操作することで、上記制御器が作業モード設定プロセスに移行して、該作業モード設定プロセスにて、上記クレーンのオペレータが、上記スイッチキーの管理者の立会いの下、上記クレーンの定格総荷重を定める基礎となる該クレーンの作業モードの設定項目の設定値の入力を行う工程と、上記スイッチキーの管理者がスイッチキーを抜き取ることで、上記作業モード設定許可スイッチがオフ状態となり、上記制御器がクレーン作業監視プロセスへ移行して、上記クレーンの作業中に吊荷より該クレーンに作用する実荷重を計測すると共に、該計測された実荷重と、上記ブーム及びジブの傾斜角の変化に応じて変化するクレーンの定格総荷重との関係を基に、上記クレーンに過負荷が作用することを防止する工程と、を有するクレーンの過負荷防止装置の制御方法とするAccording to a second aspect of the present invention, there is provided a control method for an overload prevention device for a crane provided with a boom and a jib attached to the tip of the boom. When the key switch is turned on and the engine key switch is turned on, the controller is activated, and a switch key administrator different from the crane operator turns on the work mode setting permission switch using the switch key. By operating, the controller shifts to a work mode setting process, and in the work mode setting process, the operator of the crane sets the rated total load of the crane in the presence of the switch key administrator. The process of inputting the setting value of the setting item of the work mode of the crane as the basis to be determined, and the administrator of the switch key By extracting the Tchiki, the working mode setting permission switch is turned off, with the controller is shifted to crane operation monitoring process measures the actual load acting on the crane from the suspended load during operation of the crane a step of preventing the actual load which is the measurement, based on the relationship between the boom and the crane of rated load which varies according to the change of the inclination angle of the jib, that overload the crane acts, A control method for an overload prevention device for a crane having

本発明のクレーンの過負荷防止装置の制御方法によれば、以下のような優れた効果を発揮する。
(1)ブームを備えたクレーンの過負荷防止装置の制御方法において、クレーンのオペレータが、上記過負荷防止装置の制御器のエンジンキースイッチをオン操作する工程と、該エンジンキースイッチのオン操作に伴い上記制御器が起動し、上記クレーンのオペレータとは異なるスイッチキーの管理者が、該スイッチキーにより作業モード設定許可スイッチをオン操作することで、上記制御器が作業モード設定プロセスに移行して、該作業モード設定プロセスにて、上記クレーンのオペレータが、上記スイッチキーの管理者の立会いの下、上記クレーンの定格総荷重を定める基礎となる該クレーンの作業モードの設定項目の設定値の入力を行う工程と、上記スイッチキーの管理者がスイッチキーを抜き取ることで、上記作業モード設定許可スイッチがオフ状態となり、上記制御器がクレーン作業監視プロセスへ移行して、上記クレーンの作業中に吊荷より該クレーンに作用する実荷重を計測すると共に、該計測された実荷重と、上記ブームの傾斜角の変化に応じて変化するクレーンの定格総荷重との関係を基に、上記クレーンに過負荷が作用することを防止する工程と、を有するクレーンの過負荷防止装置の制御方法としてあるので、クレーンの作業モードの設定作業を、入力者の他に、作業モード設定許可スイッチのスイッチキーの管理者の立ち会いの下で行わせることができるため、上記クレーンの作業モードに関する各設定項目の設定値について、上記入力者と上記スイッチキーの管理者の二人による確認を行わせることができて、該作業モードの各設定項目の設定値の入力ミスを抑制することができると共に、設定値の入力作業のし忘れを未然に防止することができる。よって、クレーンの作業モードに関する各設定項目の設定値の正確性を高めることができるため、クレーン作業の安全性をより高めることが可能になる。
(2)又、上記スイッチキーの管理者が立ち会っていない状態でのクレーンの作業モードに関する各設定項目の設定値を勝手な変更を防止できるため、クレーンに過大な負荷が作用しないようにして、該クレーンの破損や転倒に繋がる虞を回避するというクレーンの過負荷防止装置本来の機能を正確に発揮させることができる。
(3)ブームと該ブームの先端側に取り付けたジブを備えたクレーンの過負荷防止装置の制御方法において、クレーンのオペレータが、上記過負荷防止装置の制御器のエンジンキースイッチをオン操作する工程と、該エンジンキースイッチのオン操作に伴い上記制御器が起動し、上記クレーンのオペレータとは異なるスイッチキーの管理者が、該スイッチキーにより作業モード設定許可スイッチをオン操作することで、上記制御器が作業モード設定プロセスに移行して、該作業モード設定プロセスにて、上記クレーンのオペレータが、上記スイッチキーの管理者の立会いの下、上記クレーンの定格総荷重を定める基礎となる該クレーンの作業モードの設定項目の設定値の入力を行う工程と、上記スイッチキーの管理者がスイッチキーを抜き取ることで、上記作業モード設定許可スイッチがオフ状態となり、上記制御器がクレーン作業監視プロセスへ移行して、上記クレーンの作業中に吊荷より該クレーンに作用する実荷重を計測すると共に、該計測された実荷重と、上記ブーム及びジブの傾斜角の変化に応じて変化するクレーンの定格総荷重との関係を基に、上記クレーンに過負荷が作用することを防止する工程と、を有するクレーンの過負荷防止装置の制御方法とすることによっても、上記(1)(2)と同様の効果を得ることができる。
According to the control method of the crane overload prevention device of the present invention, the following excellent effects are exhibited.
(1) In a method for controlling an overload prevention device for a crane equipped with a boom, a crane operator performs an on operation of an engine key switch of a controller of the overload prevention device, and an on operation of the engine key switch. As a result, the controller is activated, and an administrator of a switch key different from the crane operator turns on the work mode setting permission switch with the switch key, so that the controller shifts to the work mode setting process. In the work mode setting process, the crane operator inputs the set value of the work mode setting item of the crane that is the basis for determining the rated total load of the crane in the presence of the switch key administrator. And the switch key manager removes the switch key so that the work mode setting permission Pitch is turned off, the controller is shifted to crane operation monitoring process, as well as measuring the actual load acting on the crane from the suspended load during operation of the crane, the actual load which is the measurement, the based on the relationship between the rated load of the crane that changes in accordance with change in the tilt angle of the boom, as a control method of the overload prevention device of a crane with a step to prevent overload to the crane acts Therefore, since the setting work of the crane work mode can be performed in the presence of the administrator of the switch key of the work mode setting permission switch in addition to the input person, each setting item regarding the crane work mode is set. The setting value of each work item can be checked by the input person and the switch key administrator. It is possible to suppress the scan, it is possible to prevent the input operation forgetting settings in advance. Therefore, the accuracy of the setting values of the setting items related to the work mode of the crane can be increased, so that the safety of the crane work can be further increased.
(2) Moreover, since the setting value of each setting item regarding the work mode of the crane in the state where the manager of the switch key is not present can be prevented, an excessive load is not applied to the crane. The original function of the crane overload prevention device that avoids the possibility of damage to the crane or overturning can be exhibited accurately.
(3) In a method for controlling a crane overload prevention device having a boom and a jib attached to the tip of the boom , the crane operator turns on the engine key switch of the controller of the overload prevention device. When the engine key switch is turned on, the controller is activated, and an administrator of a switch key different from the crane operator turns on the work mode setting permission switch with the switch key. The crane moves to the work mode setting process, and in the work mode setting process, the crane operator becomes the basis for determining the rated total load of the crane in the presence of the switch key manager. The process of inputting the setting value of the setting item of the work mode, and the switch key administrator extracts the switch key. It is, together with the working mode setting permission switch is turned off, the controller is shifted to crane operation monitoring process measures the actual load acting on the crane from the suspended load during operation of the crane, the measurement And a step of preventing an overload from acting on the crane based on the relationship between the actual load applied and the rated total load of the crane that changes in accordance with changes in the inclination angle of the boom and jib. The same effects as in the above (1) and (2) can also be obtained by adopting the control method for the overload prevention device .

本発明におけるクレーンの過負荷防止装置の概要を示す図である。It is a figure which shows the outline | summary of the overload prevention apparatus of the crane in this invention. 図1の過負荷防止装置の制御器における制御手順を示すフロー図である。It is a flowchart which shows the control procedure in the controller of the overload prevention apparatus of FIG. クローラクレーンの一例を示す概略側面図である。It is a schematic side view which shows an example of a crawler crane.

以下、本発明を実施するための形態を図面を参照して説明する。   Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings.

図1及び図2は本発明におけるクレーンの過負荷防止装置の実施の一形態として図3に示したと同様にブーム5とジブ7を備えた形式のクレーンに適用する例を示すもので、以下のような構成としてある。 FIGS. 1 and 2 show an example applied to a crane having a boom 5 and a jib 7 as shown in FIG. 3 as an embodiment of the crane overload prevention apparatus according to the present invention. The configuration is as follows.

すなわち、本発明におけるクレーンの過負荷防止装置は、図1に示す如く、過負荷防止装置の制御器9を、電源ライン(制御母線)10に、クレーンのエンジンキースイッチ11を介して接続し、該エンジンキースイッチ11のオン操作に伴って上記過負荷防止装置の制御器9を起動できるようにする。 In other words, the crane overload prevention apparatus according to the present invention connects the controller 9 of the overload prevention apparatus to the power line (control bus) 10 via the engine key switch 11 of the crane, as shown in FIG. As the engine key switch 11 is turned on, the controller 9 of the overload prevention device can be activated.

更に、上記過負荷防止装置の制御器9に、図示しないスイッチキーを差し込んだ場合にのみオン操作が可能な作業モード設定許可スイッチ12を接続してなる構成とする。   Further, the controller 9 of the overload prevention device is connected to a work mode setting permission switch 12 that can be turned on only when a switch key (not shown) is inserted.

なお、上記過負荷防止装置の制御器9には、クレーンにおけるブーム5やジブ7(図3参照)の傾斜角を計測するためのセンサ類13より上記ブームやジブの傾斜角の計測信号を入力できるようにしてあると共に、吊荷の荷重を計測するための荷重センサ14より吊荷の荷重の計測信号が入力できるようにしてあるものとする。更に、上記過負荷防止装置の制御器9には、音声警報出力用のスピーカ(ブザーを含む)15と警報ランプ16が接続してある。   The controller 9 of the overload prevention device receives a measurement signal of the boom or jib inclination angle from the sensors 13 for measuring the inclination angle of the boom 5 or jib 7 (see FIG. 3) in the crane. It is assumed that a measurement signal for the load of the suspended load can be input from the load sensor 14 for measuring the load of the suspended load. Furthermore, a speaker (including a buzzer) 15 for outputting an audio alarm and an alarm lamp 16 are connected to the controller 9 of the overload prevention device.

詳述すると、上記過負荷防止装置の制御器9は、図2に示す如き処理機能を有するものとする。   More specifically, the controller 9 of the overload prevention device has a processing function as shown in FIG.

具体的には、上記過負荷防止装置の制御器9は、図1に示したエンジンキースイッチ11のオン操作に伴って起動すると(ステップ1:S1)、先ず、上記作業モード設定許可スイッチ12がオンあるいはオフのいずれの操作状態であるかの判断を行い(ステップ2:S2)、上記作業モード設定許可スイッチ12がオフ操作状態であると判断されるときには、ステップ3(S3)のクレーン作業監視プロセスへ進み、該クレーン作業監視プロセス(ステップ3:S3)において、本発明におけるクレーンの過負荷防止装置を装備したクレーンによるクレーン作業を行う際に、上記荷重センサ14より入力される計測信号を基に吊荷によりクレーンに作用している実荷重を計測すると共に、上記センサ類13により検出される上記ブーム5やジブ7の傾斜角に応じて定まる作業半径となるときのクレーンの定格総荷重を定格総荷重表を基に求め、該求められた定格総荷重と、上記計測された実荷重とを対比させて、該実荷重が、上記求められた定格総荷重を超えそうになるときには、該定格総荷重を超える以前に、運転室にある過負荷防止装置の図示しないディスプレイに警報を表示させると共に、上記警報ランプ16の点灯と、上記スピーカ15からの音声警報の出力を行わせることができるようにしてあり、更に、上記実荷重が、上記求められた定格総荷重を超過した場合は、図示しないクレーンの駆動系へ動作を停止(緩停止)させるための指令を出力することができるようにしてある。 Specifically, when the controller 9 of the overload prevention device is activated in response to the ON operation of the engine key switch 11 shown in FIG. 1 (step 1: S1), first, the work mode setting permission switch 12 is activated. It is determined whether the operation state is on or off (step 2: S2), and when it is determined that the work mode setting permission switch 12 is in the off operation state, the crane work monitoring in step 3 (S3). proceeds to the process, the crane work monitoring process: (step 3 S3), when performing a crane operation by the crane equipped with overload protection apparatus for a crane according to the present invention, based on a measurement signal input from the load sensor 14 The actual load acting on the crane by the suspended load is measured, and the boom 5 detected by the sensors 13 and The total rated load of the crane when the working radius determined according to the inclination angle of the hub 7 is obtained based on the rated total load table, and the calculated rated total load is compared with the measured actual load. When the actual load is likely to exceed the calculated rated total load, an alarm is displayed on a display (not shown) of the overload prevention device in the cab before the rated total load is exceeded. When the lamp 16 is turned on and a sound alarm is output from the speaker 15, and the actual load exceeds the determined rated total load, a crane (not shown) A command for stopping the operation (slow stop) can be output to the drive system.

なお、上記クレーン作業監視プロセス(ステップ3:S3)における上記実荷重が上記求められた定格総荷重を超えそうになる場合に行う処理、及び、上記実荷重が上記求められた定格総荷重を超過した場合に行う処理としては、従来用いられているクレーンの過負荷防止装置で実施している処理であれば、上記した以外のいかなる処理を行わせるようにしてもよい。   In addition, the process performed when the actual load in the crane work monitoring process (step 3: S3) is likely to exceed the determined rated total load, and the actual load exceeds the determined total rated load. As a process to be performed, any process other than those described above may be performed as long as the process is performed by a conventionally used crane overload prevention device.

一方、上記過負荷防止装置の制御器9は、上記ステップ2(S2)において、上記作業モード設定許可スイッチ12が、スイッチキーを差し込んでオン操作状態であると判断されると、ステップ4(S4)の作業モード設定プロセスへ進み、該作業モード設定プロセス(ステップ4:S4)において、クレーン作業を実施する主吊り又は補吊りの選択、ブーム長、ジブ長、ワイヤロープ掛数、フック重量等のクレーンの作業モード(作業形態)の各設定項目に関する設定値の入力を行うことができるようにしてある。   On the other hand, when the controller 9 of the overload prevention device determines in step 2 (S2) that the work mode setting permission switch 12 is in the ON operation state by inserting a switch key, the controller 9 performs step 4 (S4). ) To the work mode setting process, and in the work mode setting process (step 4: S4), selection of main suspension or auxiliary suspension for carrying out the crane operation, boom length, jib length, number of wire rope hooks, hook weight, etc. The setting value regarding each setting item of the work mode (work form) of the crane can be input.

以上の構成としてある本発明におけるクレーンの過負荷防止装置を装備したクレーンを使用する場合は、先ず、クレーンの運転室4(図3参照)にて、クレーンのエンジンキースイッチ11をオン操作してクレーンを起動すると、上記過負荷防止装置の制御器9も同時に起動される。 When using a crane equipped with the overload prevention device of the crane in the present invention, first, in the cab 4 of the crane (see FIG. 3), the engine key switch 11 of the crane by turning on with a higher structure When the crane is activated, the controller 9 of the overload prevention device is also activated simultaneously.

この状態で、作業モード設定許可スイッチ12の図示しないスイッチキーの管理者が、該スイッチキーにより上記作業モード設定許可スイッチ12をオン操作すると、上記過負荷防止装置の制御器9では、作業モード設定プロセスに移行して、クレーンの作業モードに関する各設定項目の入力設定が可能になるため、この状態で、オペレータが、クレーン作業を実施する主吊り又は補吊りの選択、ブーム長、ジブ長、ワイヤロープ掛数、フック重量等の各設定項目の設定値の入力を行うようにする。   In this state, when an administrator of a switch key (not shown) of the work mode setting permission switch 12 turns on the work mode setting permission switch 12 with the switch key, the controller 9 of the overload prevention device sets the work mode setting. Since it is possible to enter each setting item related to the work mode of the crane by shifting to the process, in this state, the operator selects the main suspension or supplementary suspension for carrying out the crane operation, boom length, jib length, wire Input the setting values for each setting item such as the number of hooks and hook weight.

次いで、上記作業モード設定許可スイッチ12の図示しないスイッチキーの管理者が、該スイッチキーを抜き取ることで上記作業モード設定許可スイッチ12がオフ操作状態とされると、上記過負荷防止装置の制御器9は、自動的にクレーン作業監視プロセスへ移行される。   Next, when an administrator of a switch key (not shown) of the work mode setting permission switch 12 pulls out the switch key and the work mode setting permission switch 12 is turned off, the controller of the overload prevention device 9 is automatically transferred to the crane work monitoring process.

したがって、その後は、上記荷重センサ14により計測される吊荷よりクレーンに作用している実荷重が、上記センサ類13により計測される上記ブーム5やジブ7(図3参照)の傾斜角に応じて定まる作業半径と上記作業モード設定プロセスで設定された作業モードに対応する定格総荷重表とから求まるクレーンの定格総荷重を超えそうになると、該定格総荷重を超える以前に、運転室の過負荷防止装置の図示しないディスプレイに警報が表示されると共に、上記警報ランプ16が点灯され、更に、上記スピーカ15より音声警報が出力される。   Therefore, thereafter, the actual load acting on the crane from the suspended load measured by the load sensor 14 depends on the inclination angle of the boom 5 or jib 7 (see FIG. 3) measured by the sensors 13. If the total rated load of the crane, which is determined from the working radius determined in this way and the rated total load table corresponding to the working mode set in the above-described working mode setting process, is exceeded, the operator's cab will exceed the rated total load before the rated total load is exceeded. An alarm is displayed on a display (not shown) of the load prevention device, the alarm lamp 16 is turned on, and an audio alarm is output from the speaker 15.

更に、上記実荷重が、その作業半径での定格総荷重を超過すると、上記クレーンの駆動系が速やかに停止(緩停止)されるようになる。   Further, when the actual load exceeds the rated total load at the working radius, the crane drive system is quickly stopped (slowly stopped).

このように、本発明におけるクレーンの過負荷防止装置によれば、上記作業モード設定許可スイッチ12の図示しないスイッチキーを、クレーンの作業モードを設定する入力者であるオペレータとは別の者に管理させるようにすることで、上記クレーンに装備した本発明におけるクレーンの過負荷防止装置に対して上記オペレータがクレーンの作業モードの入力設定作業を行う際には、上記作業モード設定許可スイッチ12の図示しないスイッチキーの管理者の立ち会いが必要になることから、上記クレーンの作業モードに関する各設定項目について、上記オペレータと上記スイッチキーの管理者の二人による確認を行うことができるようになることから、該作業モードの各設定項目の設定値の入力ミスを抑制することができると共に、設定値の入力作業のし忘れを未然に防止することができる。よって、クレーン作業の安全性をより高めることが可能になる。 Thus, according to the overload preventing apparatus for a crane according to the present invention, manages the switch key (not shown) of the working mode setting permission switch 12, to another person and the operator is input who sets the working mode of the crane by so as to, when the operator against overload preventing apparatus for a crane according to the present invention equipped with the crane performs input setting work of the working mode of the crane, the illustration of the working mode setting permission switch 12 Since it is necessary to be present by the switch key manager, the operator and the switch key manager can confirm each setting item related to the work mode of the crane. In addition, it is possible to suppress input errors in the setting values of the setting items of the work mode and to It is possible to prevent the input work forgetting of in advance. Therefore, it is possible to further increase the safety of crane work.

又、本発明におけるクレーンの過負荷防止装置では、作業モード設定許可スイッチ12の図示しないスイッチキーの管理者が立ち会っていない状態では、オペレータがクレーンの作業モードに関する各設定項目の設定値を勝手に変更することはできない。 Further, in the crane overload prevention device according to the present invention, the operator can arbitrarily set the setting values of the setting items related to the work mode of the crane when the administrator of the switch key (not shown) of the work mode setting permission switch 12 is not present. It cannot be changed.

よって、本発明におけるクレーンの過負荷防止装置によるクレーンに過大な負荷が作用しないようにして、該クレーンの破損や転倒に繋がる虞を回避するという機能を正確に発揮させることができる。
Therefore, it is possible to an excessive load on the crane by overload preventing apparatus for a crane according to the present invention is not to act, to accurately perform the function of avoiding the risk of leading to damage or overturning of the crane.

しかも、万一、クレーン作業中にクレーンに過大な負荷が作用するような問題が生じた場合、その問題の原因が、クレーンの作業モードの各設定項目の設定ミスか、あるいは、機械的、装置的な要因によるものかといった問題の原因の特定が容易になる効果も期待できる。   Moreover, in the unlikely event that an excessive load is applied to the crane during crane operation, the cause of the problem may be a setting error in each setting item of the crane work mode, or a mechanical or device The effect of facilitating the identification of the cause of a problem such as whether it is due to a general factor can also be expected.

なお、本発明は、上記実施の形態にのみ限定されるものではなく、クレーンの作業モード(作業形態)に応じて定格総荷重(許容吊上げ荷重)を求めるための基準とする定格総荷重表等のデータを切り替える必要が生じる形式の過負荷防止装置を装備するクレーンであれば、いかなる形式のクレーンに適用してもよい。ブームの先端側にジブを装備することなくブームのみでクレーン作業を行う形式のクレーンに適用してもよい。   In addition, this invention is not limited only to the said embodiment, The rated total load table etc. used as a reference | standard for calculating | requiring a rated total load (allowable lifting load) according to the work mode (work form) of a crane The crane may be applied to any type of crane as long as the crane is equipped with an overload prevention device of a type in which it is necessary to switch the data. You may apply to the crane of the type which performs a crane operation only with a boom, without equip | installing a jib on the front end side of a boom.

よって、適用するクレーンの形式に応じて、クレーンの作業モードの設定項目は適宜変更してもよい。又、クレーンの実荷重を計測するための荷重センサ14や、該クレーンの作業半径を検出するためのセンサ類13のセンサ形式、取付位置、設置数等は、適用するクレーンの形式に応じて自在に設定してよい。   Therefore, the setting item of the crane work mode may be changed as appropriate according to the type of crane to be applied. The sensor type, mounting position, number of installations, etc. of the load sensor 14 for measuring the actual load of the crane and the sensor 13 for detecting the working radius of the crane can be freely selected according to the type of crane to be applied. May be set to

更に、実荷重が定格総荷重を超えそうになるときに出力させる警報の種類は、適用するクレーンの形式に応じて適宜変更してよい。又、実荷重が定格総荷重を超過した場合に、実荷重が定格総荷重を超えそうになるときに出力させる警報と識別可能な警報を出力させるようにしてもよい。   Further, the type of alarm that is output when the actual load is likely to exceed the rated total load may be appropriately changed according to the type of crane to be applied. Further, when the actual load exceeds the rated total load, an alarm that can be distinguished from an alarm that is output when the actual load is likely to exceed the rated total load may be output.

その他本発明の要旨を逸脱しない範囲内で種々変更を加え得ることは勿論である。   Of course, various modifications can be made without departing from the scope of the present invention.

5 ブーム
7 ジブ
12 作業モード設定許可スイッチ
5 Boom 7 Jib 12 Work mode setting enable switch

Claims (2)

ブームを備えたクレーンの過負荷防止装置の制御方法において、クレーンのオペレータが、上記過負荷防止装置の制御器のエンジンキースイッチをオン操作する工程と、該エンジンキースイッチのオン操作に伴い上記制御器が起動し、上記クレーンのオペレータとは異なるスイッチキーの管理者が、該スイッチキーにより作業モード設定許可スイッチをオン操作することで、上記制御器が作業モード設定プロセスに移行して、該作業モード設定プロセスにて、上記クレーンのオペレータが、上記スイッチキーの管理者の立会いの下、上記クレーンの定格総荷重を定める基礎となる該クレーンの作業モードの設定項目の設定値の入力を行う工程と、上記スイッチキーの管理者がスイッチキーを抜き取ることで、上記作業モード設定許可スイッチがオフ状態となり、上記制御器がクレーン作業監視プロセスへ移行して、上記クレーンの作業中に吊荷より該クレーンに作用する実荷重を計測すると共に、該計測された実荷重と、上記ブームの傾斜角の変化に応じて変化するクレーンの定格総荷重との関係を基に、上記クレーンに過負荷が作用することを防止する工程と、を有することを特徴とするクレーンの過負荷防止装置の制御方法In a control method for an overload prevention device for a crane equipped with a boom, a step in which an operator of the crane turns on an engine key switch of a controller of the overload prevention device, and the control according to an on operation of the engine key switch. The controller is activated, and the administrator of the switch key different from the crane operator turns on the work mode setting permission switch with the switch key, so that the controller shifts to the work mode setting process, and the work In the mode setting process, the operator of the crane inputs the set value of the setting item of the crane working mode which is the basis for determining the rated total load of the crane in the presence of the administrator of the switch key. And the switch key administrator pulls out the switch key to enable the work mode setting permission switch. Turned off, the controller is shifted to crane operation monitoring process, as well as measuring the actual load acting on the crane from the suspended load during operation of the crane, the actual load which is the measurement, the inclination of the boom based on the relationship between the rated load of the crane, which changes in accordance with a change of the angular control of the overload preventing apparatus for a crane, characterized in that and a step to prevent overload to the crane acts Way . ブームと該ブームの先端側に取り付けたジブを備えたクレーンの過負荷防止装置の制御方法において、クレーンのオペレータが、上記過負荷防止装置の制御器のエンジンキースイッチをオン操作する工程と、該エンジンキースイッチのオン操作に伴い上記制御器が起動し、上記クレーンのオペレータとは異なるスイッチキーの管理者が、該スイッチキーにより作業モード設定許可スイッチをオン操作することで、上記制御器が作業モード設定プロセスに移行して、該作業モード設定プロセスにて、上記クレーンのオペレータが、上記スイッチキーの管理者の立会いの下、上記クレーンの定格総荷重を定める基礎となる該クレーンの作業モードの設定項目の設定値の入力を行う工程と、上記スイッチキーの管理者がスイッチキーを抜き取ることで、上記作業モード設定許可スイッチがオフ状態となり、上記制御器がクレーン作業監視プロセスへ移行して、上記クレーンの作業中に吊荷より該クレーンに作用する実荷重を計測すると共に、該計測された実荷重と、上記ブーム及びジブの傾斜角の変化に応じて変化するクレーンの定格総荷重との関係を基に、上記クレーンに過負荷が作用することを防止する工程と、を有すること
を特徴とするクレーンの過負荷防止装置の制御方法
In a control method for an overload prevention device for a crane provided with a boom and a jib attached to the tip of the boom , the crane operator turns on an engine key switch of a controller of the overload prevention device; and When the engine key switch is turned on, the controller is activated, and a switch key administrator different from the crane operator turns on the work mode setting permission switch with the switch key, so that the controller operates. Transition to the mode setting process, and in the work mode setting process, in the presence of the switch key manager, the crane operator sets the crane's work mode as a basis for determining the rated total load of the crane. The process of inputting the setting value of the setting item, and the switch key administrator must remove the switch key The working mode setting permission switch is turned off, the controller is shifted to crane operation monitoring process, as well as measuring the actual load acting on the crane from the suspended load during operation of the crane, which is the measured A step of preventing an overload from acting on the crane on the basis of a relationship between an actual load and a rated total load of the crane that changes in accordance with a change in the inclination angle of the boom and jib. A control method for an overload prevention device for a crane.
JP2009265724A 2009-11-20 2009-11-20 Crane overload prevention device control method Active JP5610748B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009265724A JP5610748B2 (en) 2009-11-20 2009-11-20 Crane overload prevention device control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009265724A JP5610748B2 (en) 2009-11-20 2009-11-20 Crane overload prevention device control method

Publications (2)

Publication Number Publication Date
JP2011105511A JP2011105511A (en) 2011-06-02
JP5610748B2 true JP5610748B2 (en) 2014-10-22

Family

ID=44229463

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009265724A Active JP5610748B2 (en) 2009-11-20 2009-11-20 Crane overload prevention device control method

Country Status (1)

Country Link
JP (1) JP5610748B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5632615B2 (en) * 2010-01-21 2014-11-26 株式会社タダノ Crane safety equipment

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07291589A (en) * 1994-04-22 1995-11-07 Furukawa Co Ltd Overload prevention device for crane
JPH1087281A (en) * 1996-09-13 1998-04-07 Komatsu Mec Corp Device and method for displaying rated work radius of overload preventing device for crane
JP2000318981A (en) * 1999-04-30 2000-11-21 Komatsu Ltd Movable range limiting device for machine of working vehicle

Also Published As

Publication number Publication date
JP2011105511A (en) 2011-06-02

Similar Documents

Publication Publication Date Title
EP1180490B1 (en) Load moment indicator of crane
KR20100008769A (en) Load monitoring and control system with selective boom-up lockout
US10919739B2 (en) Overload preventing device
US10865080B2 (en) Overload preventing device
JP5136633B2 (en) crane
JP5610748B2 (en) Crane overload prevention device control method
JPH01256496A (en) Load vibration preventer at time of ungrounding of slinging load of crane with boom
JP7167618B2 (en) Lateral pulling detection device and crane
JP6693307B2 (en) Mobile crane control system
JP5028880B2 (en) Crane overload prevention device
JP2009126641A (en) Device for displaying operating condition of safety device for crane
JP3350251B2 (en) Crane hook position detector
JP5169087B2 (en) Mobile crane safety device
JP3548124B2 (en) Crane safety management system with movable jib
JP5632615B2 (en) Crane safety equipment
JP2873498B2 (en) Boom-type work vehicle safety device
JP5255822B2 (en) Safety equipment for truck mounted cranes
JP6923848B2 (en) Wire rope hook number determination device and mobile crane
JP3205142B2 (en) Crane movable range display device
JP2000007283A (en) Judging device for abnormality due to shaft force of traveling crane
JP2507247Y2 (en) Limit value selection safety device for overload prevention device of mobile crane
JPH107379A (en) Detecting device for number of wrapping turns of crane hook rope
JP2945823B2 (en) Crane boom length detector
JP4113278B2 (en) Work machine moment calculation device
JPH07291589A (en) Overload prevention device for crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121119

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131217

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131224

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140221

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140902

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140902

R150 Certificate of patent or registration of utility model

Ref document number: 5610748

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250