JP5537073B2 - Power system monitoring and control system - Google Patents

Power system monitoring and control system Download PDF

Info

Publication number
JP5537073B2
JP5537073B2 JP2009144404A JP2009144404A JP5537073B2 JP 5537073 B2 JP5537073 B2 JP 5537073B2 JP 2009144404 A JP2009144404 A JP 2009144404A JP 2009144404 A JP2009144404 A JP 2009144404A JP 5537073 B2 JP5537073 B2 JP 5537073B2
Authority
JP
Japan
Prior art keywords
power system
monitoring control
control means
database
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009144404A
Other languages
Japanese (ja)
Other versions
JP2011004495A (en
Inventor
敏幸 清水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2009144404A priority Critical patent/JP5537073B2/en
Publication of JP2011004495A publication Critical patent/JP2011004495A/en
Application granted granted Critical
Publication of JP5537073B2 publication Critical patent/JP5537073B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、例えば電力系統設備の変更等の際に、それに伴ない設備データベースを更新して監視、制御を継続して行うようにした電力系統監視制御システムに関する。 The present invention is, for example, when the change of the power system equipment, it monitors update the companion no facility database relates to the so continues to perform control power system monitoring control system.

従来、電力系統監視制御システムでは、電力系統設備データベース格納エリアを予め複数エリア用意しておき、電力系統設備の変更が行なわれた場合、現在使用している電力系統設備データベースの格納エリアと違う格納エリアに、変更が行なわれた後の電力系統設備データベースを格納し、データベースの格納後、電力系統監視制御手段による電力系統の監視、制御を一旦終了する。そして、新たに格納した変更後の電力系統設備データベースを読み出し、電力系統監視制御手段による電力系統の監視、制御を再開するようにしている。   Conventionally, in a power system monitoring and control system, a plurality of power system facility database storage areas are prepared in advance, and when the power system facility is changed, the storage area is different from the storage area of the currently used power system facility database. The power system facility database after the change is stored in the area, and after the database is stored, the monitoring and control of the power system by the power system monitoring control means are temporarily terminated. Then, the newly stored power system facility database after the change is read, and monitoring and control of the power system by the power system monitoring control means are resumed.

こうした電力系統監視制御システムは、例えば図5に示す電力系統監視制御システム101のように、入力装置102、電力系統設備データベースメンテナンス手段103、電力系統監視制御システム構成制御手段104、複数の電力系統設備情報データ105a,105b,…105n、電力系統監視制御手段106、電力系統監視制御情報データ107を備えた構成となっており、電力系統監視制御システム101の各装置、手段における各機能は、それぞれコンピュータで実行可能にプログラムされ、コンピュータによる制御のもとに実行されるようになっている。   Such a power system monitoring control system includes, for example, an input device 102, a power system equipment database maintenance means 103, a power system monitoring control system configuration control means 104, and a plurality of power system equipments as in the power system monitoring control system 101 shown in FIG. .., 105n, power system monitoring control means 106, power system monitoring control information data 107, and each function in each device and means of the power system monitoring control system 101 is a computer. It is programmed to be executable by the computer and executed under the control of the computer.

そして、この構成のシステムでは、電力系統設備の変更等に伴うメンテナンスを行なう場合、電力系統監視制御システム101の保守員が、入力装置102を介し電力系統設備データベースメンテナンス手段103によって電力系統設備データベースの変更を実施し、現在使用している電力系統設備情報データ105aと重複しない使用していない電力系統設備情報データ105bに変更した電力系統設備データベースのコピーを行う。コピーの完了後、電力系統監視制御情報データ107に保存されたデータベースに基づき運用される電力系統監視制御手段106に対して機能の再起動通知を行う。再起動の通知を受けることにより電力系統監視制御手段106は、電力系統設備情報データ105aによる電力系統の監視、制御の機能を一旦終了した後、電力系統設備情報データ105bの変更した電力系統設備データベースの読み込みを行い、電力系統の監視、制御を再開する。   In the system configured as described above, when maintenance is performed in accordance with a change in the power system facility or the like, a maintenance person of the power system monitoring and control system 101 uses the power system facility database maintenance means 103 via the input device 102 to store the power system facility database. The changed power system equipment database is copied to the unused power system equipment information data 105b that does not overlap with the currently used power system equipment information data 105a. After the copying is completed, a function restart notification is sent to the power system monitoring control means 106 operated based on the database stored in the power system monitoring control information data 107. Upon receiving the restart notification, the power system monitoring control means 106 temporarily ends the power system monitoring and control functions based on the power system equipment information data 105a, and then changes the power system equipment database of the power system equipment information data 105b. To resume monitoring and control of the power system.

そのため、このような電力系統監視制御システム101では、電力系統設備データベースのメンテナンスの際、電力系統の監視制御機能を一旦終了させ、新たに変更後の電力系統設備データベースを読み込み、電力系統の監視制御機能を再開させる必要があり、メンテナンスを完了するまでに時間を要し、一時的に電力系統の監視制御に空白が生じる虞があった。   Therefore, in such a power system monitoring and control system 101, during maintenance of the power system facility database, the power system monitoring control function is temporarily terminated, the newly changed power system facility database is read, and the power system monitoring control is performed. It is necessary to resume the function, and it takes time to complete the maintenance, and there is a possibility that the monitoring control of the electric power system temporarily becomes blank.

なお、その他の電力系統の監視、制御を行うシステムの設備データベースのメンテナンス方式として、オンラインで変更したデータ個別のメンテナンス情報を記憶するメンテナンス情報ファイルと、このメンテナンス情報ファイルを参照して設備データファイルからオンライン用設備データファイルへのデータ更新時、データ個別に更新の有無を判別することにより、オンライン更新されたデータを保持するデータ更新機能部を設けることで、オペレータがオンライン変更した情報の再入力を不要とする構成のものがある(例えば、特許文献1参照)。   In addition, as a maintenance method for the equipment database of the system that monitors and controls other power systems, a maintenance information file that stores maintenance information for individual data that has been changed online, and a facility data file that refers to this maintenance information file When data is updated to the equipment data file for online use, it is possible to re-enter the information changed online by the operator by providing a data update function section that holds the data updated online by determining whether data is updated individually. There is a configuration that is unnecessary (for example, see Patent Document 1).

特開平5−204737号公報Japanese Patent Laid-Open No. 5-204737

本発明は、上記の状況に鑑みてなされたもので、その目的とするところは、電力系統設備データベースのメンテナンスを行う際に、電力系統の監視制御機能を一旦終了させることなく、メンテナンスを完了させることができ、またメンテナンスに要する時間を短縮でき、電力系統の監視制御に一時的に空白が生じる虞がなく、連続して稼動させることができる電力系統監視システムを提供することにある。 The present invention has been made in view of the above situation, and the object of the present invention is to complete the maintenance without once ending the monitoring control function of the power system when performing maintenance of the power system facility database. it can, also possible to shorten the time required for maintenance, temporarily no possibility that a blank is generated in the monitoring control of the power system is to provide a power system monitoring system that can be operated continuously.

本発明の電力系統監視システムは、電力系統の監視、制御を行う電力系統監視制御システムであって、複数の電力系統設備データベースを夫々保存する複数の電力系統設備情報データと、前記電力系統の監視制御を行う複数の電力系統監視制御手段と、電力系統設備データベースメンテナンス手段と、電力系統監視制御システム構成制御手段と、電力系統監視制御機能コントロール手段と、電力系統設備データベース切替え順位編集手段と、電力系統設備データベース切替え順位保存手段と、を備え、前記電力系統設備データベースメンテナンス手段は、入力装置からの指示に基づいて前記複数の電力系統設備データベースのうちメンテナンス対象の電力系統設備データベースのメンテナンスを実行し、メンテナンス後の前記電力系統設備データベースを前記複数の電力系統設備情報データのうち前記電力系統監視制御手段にて使用されていない電力系統設備情報データに保存し、メンテナンス後の前記電力系統設備データベースを保存した前記電力系統設備情報データを前記電力系統監視制御システム構成制御手段に通知し、前記電力系統監視制御システム構成制御手段は、前記複数の電力系統監視制御手段のうち運用していない前記電力系統監視制御手段及びメンテナンス後の前記電力系統設備データベースを保存した前記電力系統設備情報データを前記電力系統監視制御機能コントロール手段に通知し、前記電力系統監視制御機能コントロール手段は、運用していない前記電力系統監視制御手段にメンテナンス後の前記電力系統設備データベースの読み込みを指令し、前記電力系統設備データベース切替え順位編集手段は、前記入力装置によって入力された前記電力系統設備データベースの切替え順位を前記電力系統監視制御機能コントロール手段の下で実行する各実行プログラム単位に編集し、前記電力系統設備データベース切替え順位保存手段は、前記電力系統設備データベース切替え順位編集手段により編集された前記電力系統設備データベースの切替え順位を前記各実行プログラムの起動順位と直前に実行された実行プログラムからの起動間隔とを対応付けたデータ構成で保存し、更に、前記電力系統監視制御機能コントロール手段は、前記電力系統設備データベース切替え順位保存手段に保存された前記各実行プログラムの起動順位と前記起動間隔に基づいて、実行プログラム毎に、運用している前記電力系統監視制御手段に対して監視制御の機能を終了するよう終了通知を行い、運用していない前記電力系統監視制御手段に対して運用している前記電力系統監視制御手段の監視制御の機能の終了から前記起動間隔を置いて監視制御の機能を開始するよう開始通知を行う、ことを特徴とする電力系統監視制御システムである。 Power system monitoring system of the present invention, the monitoring of the power system, a control row power sale power system monitoring and control system, a plurality of power system equipment information data respectively storing a plurality of power system equipment database, the electric power system A plurality of power system monitoring control means, power system equipment database maintenance means, power system monitoring control system configuration control means, power system monitoring control function control means , power system equipment database switching order editing means, Power system equipment database switching order storage means, and the power system equipment database maintenance means performs maintenance of the power system equipment database to be maintained among the plurality of power system equipment databases based on instructions from the input device. The power system equipment The power system facility information data stored in the power system facility information data not used by the power system monitoring control means among the plurality of power system facility information data, and storing the power system facility database after maintenance To the power system monitoring control system configuration control means, the power system monitoring control system configuration control means, the power system monitoring control means not in operation among the plurality of power system monitoring control means and the maintenance after the maintenance Notifying the power system monitoring control function control means of the power system equipment information data storing the power system equipment database, the power system monitoring control function control means to the power system monitoring control means not in operation after maintenance Command the reading of the power system equipment database, and The grid facility database switching order editing means edits the switching order of the power system facility database input by the input device for each execution program executed under the power system monitoring control function control means, and the power grid facility The database switching order storage means includes the switching order of the power system equipment database edited by the power system equipment database switching order editing means, the starting order of each execution program and the starting interval from the execution program executed immediately before. The power system monitoring control function control means executes the execution based on the start order and the start interval of each execution program stored in the power system facility database switching order storage means. The power used for each program An end notification is issued to the grid monitoring control means to terminate the monitoring control function, and the monitoring control function of the power grid monitoring control means operating to the power grid monitoring control means not operating is terminated. The power system monitoring and control system is characterized in that a start notification is made so as to start the monitoring control function at the start interval .

本発明によれば、電力系統設備データベースのメンテナンスを行う際に、電力系統の監視制御機能を一旦終了させることなく、メンテナンスを完了させることができ、またメンテナンスに要する時間を短縮でき、電力系統の監視制御に一時的に空白が生じる虞がなく、連続して稼動させることができる等の効果を有する。   According to the present invention, when the maintenance of the power system facility database is performed, the maintenance can be completed without once ending the monitoring control function of the power system, and the time required for the maintenance can be shortened. There is no possibility that a blank space is temporarily generated in the monitoring control, and there is an effect that it can be continuously operated.

本発明の第1の実施形態に係る電力系統監視制御システムの機能ブロック図である。1 is a functional block diagram of a power system monitoring control system according to a first embodiment of the present invention. 本発明の第2の実施形態に係る電力系統監視制御システムの機能ブロック図である。It is a functional block diagram of the electric power system monitoring control system which concerns on the 2nd Embodiment of this invention. 本発明の第2の実施形態における電力系統設備データベース切替え順位保存手段を説明するために示す図である。It is a figure shown in order to demonstrate the power system equipment database switching order preservation | save means in the 2nd Embodiment of this invention. 本発明の第3の実施形態に係る電力系統監視制御システムの機能ブロック図である。It is a functional block diagram of the electric power system monitoring control system which concerns on the 3rd Embodiment of this invention. 背景技術に係る電力系統監視制御システムの機能ブロック図である。It is a functional block diagram of the electric power system monitoring control system which concerns on background art.

以下本発明の実施の形態を、図面を参照して説明する。なお、背景技術と同一部分には同一符号を付して説明を省略し、背景技術と異なる本発明の実施の形態の構成について説明する。   Embodiments of the present invention will be described below with reference to the drawings. In addition, the same code | symbol is attached | subjected to the same part as background art, description is abbreviate | omitted, and the structure of embodiment of this invention different from background technology is demonstrated.

(第1の実施形態)
先ず本発明の第1の実施形態を図1により説明する。
(First embodiment)
First, a first embodiment of the present invention will be described with reference to FIG.

図1に示すように、電力系統監視制御システム1は、保守員が入力を行う入力装置102と、電力系統設備データベースメンテナンス機能を有して入力装置102への入力内容に応じて電力系統設備データベースの変更等に伴うメンテナンスを行なう電力系統設備データベースメンテナンス手段103と、電力系統で使用する電力系統設備データベースやメンテナンスがなされた電力系統設備データベースなどを保存するファイルである複数備えられた電力系統設備情報データ(A)105a,電力系統設備情報データ(B)105b,…,電力系統設備情報データ(N)105nを備えている。   As shown in FIG. 1, the power system monitoring and control system 1 includes an input device 102 that is input by a maintenance staff, and a power system facility database that has a power system facility database maintenance function in accordance with the contents input to the input device 102. Power system facility database maintenance means 103 that performs maintenance associated with changes in the power system, and a plurality of power system facility information that is a file for storing a power system facility database used in the power system, a power system facility database that has been maintained, and the like Data (A) 105a, power system facility information data (B) 105b,..., Power system facility information data (N) 105n.

さらに、電力系統監視制御システム1は、電力系統の監視、制御を行うための電力系統監視制御データベースを保存するファイルである電力系統監視制御情報データ2と、電力系統監視制御機能を有して電力系統監視制御データベースに基づき電力系統を監視、制御する少なくとも2つ設けられた電力系統監視制御手段(I)3a,電力系統監視制御手段(II)3bと、電力系統監視制御システム構成制御機能を有して電力系統監視制御システム1のシステム全体の運転モードを管理する電力系統監視制御システム構成制御手段104と、電力系統監視制御機能内の各実行プログラムの開始停止をコントロールする電力系統監視制御機能コントロール機能を有して電力系統監視制御システム構成制御手段104からの通知等に基づき電力系統監視制御手段(I)3a,電力系統監視制御手段(II)3bに指令等行う電力系統監視制御機能コントロール手段4を備えて構成されている。   Furthermore, the power system monitoring control system 1 has power system monitoring control information data 2 which is a file for storing a power system monitoring control database for monitoring and controlling the power system, and has a power system monitoring control function. At least two power system monitoring control means (I) 3a, power system monitoring control means (II) 3b provided for monitoring and controlling the power system based on the system monitoring control database, and a power system monitoring control system configuration control function are provided. The power system monitoring control system configuration control means 104 for managing the operation mode of the entire system of the power system monitoring control system 1 and the power system monitoring control function control for controlling the start and stop of each execution program in the power system monitoring control function Power system based on notification from the power system monitoring control system configuration control means 104 having a function Viewing control means (I) 3a, is configured to include a power system monitoring control function control means 4 for the command and the like to the power system monitoring control means (II) 3b.

そして、上述の構成の電力系統監視制御システム1では、電力系統の設備変更等に伴う電力系統設備データベースのメンテナンスを実行する場合、先ず、電力系統監視制御システム1の保守員が、入力装置102を介し電力系統設備データベースメンテナンス手段103によって電力系統設備データベースを変更等するメンテナンス作業を実施する。メンテナンス作業が完了すると、電力系統設備データベースメンテナンス手段103は、例えば電力系統で運用中の電力系統監視制御手段(I)3aが使用している電力系統設備情報データ105aと重複しない使用していない電力系統設備情報データ105bにメンテナンス後の電力系統設備データベースの保存を行う。   In the power system monitoring and control system 1 having the above-described configuration, when performing maintenance of the power system facility database accompanying a power system facility change or the like, first, a maintenance person of the power system monitoring and control system 1 sets the input device 102 to Through the power system facility database maintenance means 103, maintenance work for changing the power system facility database is performed. When the maintenance work is completed, the power system facility database maintenance means 103 uses, for example, unused power that does not overlap with the power system facility information data 105a used by the power system monitoring control means (I) 3a operating in the power system. The power system facility database after maintenance is stored in the system facility information data 105b.

電力系統設備情報データ105bへのメンテナンス後の電力系統設備データベースの保存が完了すると、電力系統設備データベースメンテナンス手段103は電力系統監視制御システム構成制御手段104に、メンテナンス後の電力系統設備データベースを電力系統設備情報データ105bに保存したとの保存先通知を行う。そして電力系統監視制御システム構成制御手段104は、電力系統監視制御手段(I)3aと電力系統監視制御手段(II)3bのどちらを電力系統で運用中であるかの判断を行い、現在運用していないのは電力系統監視制御手段(II)3bであること及びメンテナンス後の電力系統設備データベースの保存先が電力系統設備情報データ105bであることを電力系統監視制御機能コントロール手段4に通知する。   When the storage of the power system facility database after maintenance in the power system facility information data 105b is completed, the power system facility database maintenance means 103 stores the power system facility database after maintenance in the power system monitoring control system configuration control means 104. The storage location notification that storage is performed in the facility information data 105b is performed. The power system monitoring control system configuration control means 104 determines whether the power system monitoring control means (I) 3a or the power system monitoring control means (II) 3b is operating in the power system, and is currently operating. Notify the power system monitoring control means (II) 3b and notify the power system monitoring control function control means 4 that the storage destination of the power system equipment database after maintenance is the power system equipment information data 105b.

この通知を受けた電力系統監視制御機能コントロール手段4は、運用していない電力系統監視制御手段(II)3bに、メンテナンス後の電力系統設備データベースの保存先が電力系統設備情報データ105bであることを通知し、その電力系統設備情報データ105bからメンテナンス後の電力系統設備データベースを読み込むことを指令する。さらに、電力系統監視制御機能コントロール手段4は、メンテナンス後の電力系統設備データベースの読み込の完了を確認した後、運用中の電力系統監視制御手段(I)3aに対し機能終了通知を行い、また運用していない電力系統監視制御手段(II)3bに対して、運用中の電力系統監視制御手段(I)3aの機能終了と同時に機能開始するように機能開始通知を行い、使用する電力系統設備データベースの切替えを完了する。   The power system monitoring / control function control means 4 that has received this notification is that the storage system of the power system equipment database after maintenance is the power system equipment information data 105b in the power system monitoring control means (II) 3b that is not in operation. Is instructed to read the power system facility database after maintenance from the power system facility information data 105b. Further, the power system monitoring control function control means 4 confirms the completion of the reading of the power system equipment database after the maintenance, and then sends a function end notification to the operating power system monitoring control means (I) 3a. The power system equipment to be used is notified to the power system monitoring control means (II) 3b which is not in operation so that the function starts at the same time as the function of the power system monitoring control means (I) 3a in operation is started. Complete the database switchover.

その結果、上述の構成の本実施形態によれば、電力系統監視制御システム1における現在使用している電力系統設備データベースからメンテナンス後の電力系統設備データベースへの切替えを、監視制御機能の停止を伴わず、電力系統の監視、制御に空白が生じることなく、短時間で完了させることができるという効果を有する。   As a result, according to the present embodiment having the above-described configuration, switching from the power system facility database currently used in the power system monitoring control system 1 to the power system facility database after maintenance is accompanied by the suspension of the monitoring control function. In addition, there is an effect that the power system can be completed in a short time without causing a blank in monitoring and control of the power system.

(第2の実施形態)
次に本発明の第2の実施形態を図2及び図3により説明する。なお、本実施形態は、第1の実施形態と電力系統設備データベースの切替え順位を編集可能とする点が異なるのみで、他の点については第1の実施形態と同様の構成であるため、同一部分は同一符号を付して説明を省略し、異なる点について説明する。
(Second Embodiment)
Next, a second embodiment of the present invention will be described with reference to FIGS. Note that the present embodiment is different from the first embodiment only in that the switching order of the power system facility database can be edited, and the other points are the same as the first embodiment, and are the same. Parts are denoted by the same reference numerals, description thereof is omitted, and different points will be described.

図2及び図3に示すように、電力系統監視制御システム11は、電力系統監視制御機能内の各実行プログラム単位に電力系統設備データベースの切替え順位を編集する電力系統設備データベース切替え順位編集機能を有して入力装置102への入力内容に応じて電力系統設備データベースの切替え順位の編集を行う電力系統設備データベース切替え順位編集手段12と、編集された電力系統設備データベース切替え順位を保存する電力系統設備データベース切替え順位保存手段13とを、第1の実施形態の電力系統監視制御システム1における入力装置102と電力系統監視制御機能コントロール手段4との間に追加した構成となっている。   As shown in FIGS. 2 and 3, the power system monitoring control system 11 has a power system equipment database switching order editing function for editing the switching order of the power system equipment database for each execution program unit in the power system monitoring control function. Then, the power system equipment database switching order editing means 12 for editing the switching order of the power system equipment database in accordance with the input contents to the input device 102, and the power system equipment database for storing the edited power system equipment database switching order The switching order storage unit 13 is added between the input device 102 and the power system monitoring control function control unit 4 in the power system monitoring control system 1 of the first embodiment.

また電力系統設備データベース切替え順位保存手段13は、例えば図3に示すようなデータ構成で保存されている。すなわち、図3の起動順位には、各実行プログラムの起動を行う順位1、2、3、…、nが格納され、起動プログラム名には対象のプログラム名称である例えば順位1に対応してプログラム001、順位2に対応してプログラム021、順位3に対応してプログラム033、…、順位nに対応してプログラム111が格納され、さらに起動間隔には直前に起動された実行プログラムからの起動間隔、例えばプログラム001に対しては0ms、プログラム021に対しては0ms(すなわち、プログラム001の終了と同時)、またプログラム033に対しては50ms(すなわち、プログラム021の終了から50ms後に起動)、…、プログラム111に対しては20ms(すなわち、直前のプログラムの終了から20ms後に起動)がそれぞれ格納される。   Further, the power system facility database switching order storage means 13 is stored in a data configuration as shown in FIG. 3, for example. That is, the starting order of FIG. 3 stores the order 1, 2, 3,..., N for starting each execution program, and the starting program name is a program corresponding to the target program name, eg, order 1 001, program 021 corresponding to rank 2, program 033 corresponding to rank 3, program 111 corresponding to rank n, and the launch interval from the immediately preceding execution program For example, 0 ms for the program 001, 0 ms for the program 021 (ie, simultaneously with the end of the program 001), 50 ms for the program 033 (ie, starting 50 ms after the end of the program 021),. , 20 ms for the program 111 (that is, 20 ms after the end of the previous program) Re respectively it is stored.

そして、上述の構成の電力系統監視制御システム11では、電力系統設備データベースの切替え順位を設定して電力系統を監視制御する場合、先ず、電力系統監視制御システム11の保守員が、入力装置102に入力することによって電力系統設備データベースの切替えの順番を電力系統設備データベース切替え順位編集手段12に設定する。切替えの順番が設定されると、電力系統設備データベース切替え順位編集手段12で電力系統設備データベースの切替えを行う順番を、電力系統監視制御機能コントロール手段4の下で実行する各実行プログラム単位に編集を行う。その後、電力系統設備データベース切替え順位保存手段13に編集された電力系統設備データベースの切替え順位を、例えば図3に示すように実行プログラムの起動を行う順位として保存する。   In the power system monitoring and control system 11 having the above-described configuration, when setting the switching order of the power system facility database and monitoring and controlling the power system, first, a maintenance person of the power system monitoring and control system 11 controls the input device 102. By inputting, the switching order of the power system equipment database is set in the power system equipment database switching order editing means 12. When the order of switching is set, the order of switching the power system facility database by the power system facility database switching order editing unit 12 is edited for each execution program executed under the power system monitoring control function control unit 4. Do. Thereafter, the switching order of the power system equipment database edited by the power system equipment database switching order storage means 13 is stored as the order of starting the execution program as shown in FIG. 3, for example.

電力系統設備データベースの切替え順位の保存が行なわれると、電力系統監視制御機能コントロール手段4は、電力系統設備データベース切替え順位保存手段13に保存された実行プログラムの起動順位に従い、実行プログラム毎に、例えば運用中の電力系統監視制御手段(I)3aに対し機能終了通知を行い、また運用していない電力系統監視制御手段(II)3bに対して、運用中の電力系統監視制御手段(I)3aの機能終了から指定された起動間隔を置いて機能開始するように機能開始通知を行い、使用する電力系統設備データベースの切替えを完了する。   When the switching order of the power system facility database is stored, the power system monitoring control function control unit 4 performs, for example, for each execution program according to the startup order of the execution program stored in the power system facility database switching order storage unit 13. A function end notification is sent to the operating power system monitoring control means (I) 3a, and the operating power system monitoring control means (I) 3a to the operating power system monitoring control means (II) 3b. The function start notification is made so that the function starts at a specified start interval after the function is completed, and the switching of the power system facility database to be used is completed.

その結果、上述の構成の本実施形態によれば、第1の実施形態と同様の効果を有すると共に、電力系統監視制御システム11における電力系統監視制御手段(I)3a、電力系統監視制御手段(II)3b内の各機能の連続性を確保したまま電力系統設備データベースの切替えが可能となるという効果を有する。   As a result, according to this embodiment having the above-described configuration, the power system monitoring control means (I) 3a and the power system monitoring control means (in the power system monitoring control system 11) have the same effects as those of the first embodiment. II) It has an effect that the power system facility database can be switched while ensuring the continuity of each function in 3b.

(第3の実施形態)
次に本発明の第3の実施形態を図4により説明する。なお、本実施形態は、第1の実施形態と使用する電力系統設備データベースの切戻しを可能とする点が異なるのみで、他の点については第1の実施形態と同様の構成であるため、同一部分は同一符号を付して説明を省略し、異なる点について説明する。
(Third embodiment)
Next, a third embodiment of the present invention will be described with reference to FIG. In addition, since this embodiment is different from the first embodiment only in that the power system facility database to be used can be switched back, the other points have the same configuration as the first embodiment. The same parts are denoted by the same reference numerals, description thereof is omitted, and different points will be described.

図4に示すように、電力系統監視制御システム21は、電力系統設備データベースの切戻しを即座に実施する電力系統設備データベース切戻し機能を有して入力装置102への入力内容に応じて電力系統設備データベースを切替え前の電力系統設備データベースに切戻しを行う電力系統設備データベース切戻し手段22を、第1の実施形態の電力系統監視制御システム1における入力装置102と電力系統監視制御システム構成制御手段104との間に追加した構成となっている。   As shown in FIG. 4, the power system monitoring and control system 21 has a power system facility database switchback function for immediately switching back the power system facility database, and the power system monitoring system 21 has a power system according to the input contents to the input device 102. The power system facility database switch-back means 22 for switching back the facility database to the power system facility database before switching is replaced with the input device 102 and the power system monitor control system configuration control means in the power system monitor control system 1 of the first embodiment. 104 is added to the configuration 104.

そして、上述の構成の電力系統監視制御システム21では、切替え前の電力系統設備データベースに切戻しを行う場合、先ず、電力系統監視制御システム21の保守員が、入力装置102を介し電力系統設備データベース切戻し手段22に電力系統設備データベースの切戻しの指示をする。指示を受けた電力系統設備データベース切戻し手段22は、切戻しを行う切替え前の電力系統設備データベースを保存する、例えば電力系統設備情報データ105aを電力系統監視制御システム構成制御手段104に通知する。   In the power system monitoring and control system 21 configured as described above, when switching back to the power system equipment database before switching, first, a maintenance person of the power system monitoring and control system 21 receives the power system equipment database via the input device 102. The switch-back means 22 is instructed to switch back the power system facility database. Receiving the instruction, the power system facility database switch-back means 22 stores the power system facility database before switching for switching back, for example, notifies the power system monitoring control system configuration control means 104 of power system facility information data 105a.

その後、電力系統監視制御機能コントロール手段4は、電力系統監視制御システム構成制御手段104からの例えば運用していないのが電力系統監視制御手段(I)3aであり、切替え前の電力系統設備データベースを保存するのが電力系統設備情報データ105aであるとの通知を受け、運用していない電力系統監視制御手段(I)3aに切替え前の電力系統設備データベースの読み込みを指令する。さらに、運用していない電力系統監視制御手段(I)3aの読込みが完了すると、電力系統監視制御機能コントロール手段4の指令により、運用している電力系統監視制御手段(II)3bによる電力系統の監視、制御を終了させると同時に、電力系統設備情報データ105aに保存されている切替え前の電力系統設備データベースを使用して運用していない電力系統監視制御手段(I)3aによる電力系統の監視、制御を開始させる。   Thereafter, the power system monitoring control function control means 4 is, for example, the power system monitoring control means (I) 3a that is not operated from the power system monitoring control system configuration control means 104, and stores the power system equipment database before switching. In response to the notification that the power system facility information data 105a is stored, the power system monitoring / control means (I) 3a that is not in operation is instructed to read the power system facility database before switching. Further, when the reading of the power system monitoring control means (I) 3a that is not in operation is completed, the power system monitoring and control means (II) 3b that is in operation is instructed by the command of the power system monitoring control function control means 4 Monitoring the power system by the power system monitoring control means (I) 3a not operating using the pre-switching power system equipment database stored in the power system equipment information data 105a at the same time as the monitoring and control ends. Start control.

その結果、上述の構成の本実施形態によれば、第1の実施形態と同様の効果を有すると共に、電力系統監視制御システム21における監視制御機能の停止を伴わず、電力系統の監視、制御に空白が生じることなく、短時間で電力系統設備データベースの切戻しを完了させることができるという効果を有する。   As a result, according to this embodiment having the above-described configuration, the same effect as that of the first embodiment can be obtained, and monitoring and control of the power system can be performed without stopping the monitoring control function in the power system monitoring control system 21. There is an effect that the switch back of the power system facility database can be completed in a short time without generating a blank.

なお、上記の各実施形態の電力系統監視制御システム1,11,21の各装置、手段で電力系統の監視、制御を実行するための各機能はコンピュータ上に構築されていて、それぞれコンピュータで実行可能となるようにプログラムされ、形成された電力系統監視プログラムをロードすることによって、コンピュータによる監視、制御が実行されるようになっている。   In addition, each function for performing monitoring and control of the power system by the devices and means of the power system monitoring and control systems 1, 11 and 21 of the above-described embodiments is constructed on a computer and executed by the computer. Monitoring and control by a computer are executed by loading a power system monitoring program that has been programmed and formed to be possible.

また、各機能を実行するための電力系統監視プログラムは、例えば磁気ディスク、光ディスク、半導体メモリなどの記録媒体に書き込み、各システム、装置のコンピュータに読み込ませることによって適用したり、通信媒体より伝送して各システムのコンピュータに読み込ませることによって適用するようにしてもよい。   In addition, the power system monitoring program for executing each function can be applied by writing to a recording medium such as a magnetic disk, an optical disk, or a semiconductor memory, and reading it by a computer of each system or device, or transmitted from a communication medium. It may be applied by being read by a computer of each system.

1,11,21…電力系統監視制御システム、2…電力系統設備情報データ、3a,3b…電力系統監視制御手段、4…電力系統監視制御機能コントロール手段、12…電力系統設備データベース切替え順位編集手段、13…電力系統設備データベース切替え順位保存手段、22…電力系統設備データベース切戻し手段、102…入力装置、103…電力系統設備データベースメンテナンス手段、104…電力系統監視制御システム構成制御手段、105a,105b,…,105n…電力系統設備情報データ DESCRIPTION OF SYMBOLS 1,11,21 ... Power system monitoring control system, 2 ... Power system equipment information data, 3a, 3b ... Power system monitoring control means, 4 ... Power system monitoring control function control means, 12 ... Power system equipment database switching order editing means , 13 ... Power system equipment database switching order storage means, 22 ... Power system equipment database switch-back means, 102 ... Input device, 103 ... Power system equipment database maintenance means, 104 ... Power system monitoring control system configuration control means, 105a, 105b , ..., 105n ... Power system facility information data

Claims (1)

電力系統の監視、制御を行う電力系統監視制御システムであって、
複数の電力系統設備データベースを夫々保存する複数の電力系統設備情報データと、
前記電力系統の監視制御を行う複数の電力系統監視制御手段と、
電力系統設備データベースメンテナンス手段と、電力系統監視制御システム構成制御手段と、電力系統監視制御機能コントロール手段と、電力系統設備データベース切替え順位編集手段と、電力系統設備データベース切替え順位保存手段と、
を備え、
前記電力系統設備データベースメンテナンス手段は、入力装置からの指示に基づいて前記複数の電力系統設備データベースのうちメンテナンス対象の電力系統設備データベースのメンテナンスを実行し、メンテナンス後の前記電力系統設備データベースを前記複数の電力系統設備情報データのうち前記電力系統監視制御手段にて使用されていない電力系統設備情報データに保存し、メンテナンス後の前記電力系統設備データベースを保存した前記電力系統設備情報データを前記電力系統監視制御システム構成制御手段に通知し、
前記電力系統監視制御システム構成制御手段は、前記複数の電力系統監視制御手段のうち運用していない前記電力系統監視制御手段及びメンテナンス後の前記電力系統設備データベースを保存した前記電力系統設備情報データを前記電力系統監視制御機能コントロール手段に通知し、
前記電力系統監視制御機能コントロール手段は、運用していない前記電力系統監視制御手段にメンテナンス後の前記電力系統設備データベースの読み込みを指令し、
前記電力系統設備データベース切替え順位編集手段は、前記入力装置によって入力された前記電力系統設備データベースの切替え順位を前記電力系統監視制御機能コントロール手段の下で実行する各実行プログラム単位に編集し、
前記電力系統設備データベース切替え順位保存手段は、前記電力系統設備データベース切替え順位編集手段により編集された前記電力系統設備データベースの切替え順位を前記各実行プログラムの起動順位と直前に実行された実行プログラムからの起動間隔とを対応付けたデータ構成で保存し、
更に、前記電力系統監視制御機能コントロール手段は、前記電力系統設備データベース切替え順位保存手段に保存された前記各実行プログラムの起動順位と前記起動間隔に基づいて、実行プログラム毎に、運用している前記電力系統監視制御手段に対して監視制御の機能を終了するよう終了通知を行い、運用していない前記電力系統監視制御手段に対して運用している前記電力系統監視制御手段の監視制御の機能の終了から前記起動間隔を置いて監視制御の機能を開始するよう開始通知を行う、
ことを特徴とする電力系統監視制御システム。
Monitoring of the power system, control a line power sale power system monitoring and control system,
A plurality of power system facility information data respectively storing a plurality of power system facility databases;
A plurality of power system monitoring control means for monitoring and controlling the power system;
Power system equipment database maintenance means, power system monitoring control system configuration control means, power system monitoring control function control means , power system equipment database switching order editing means, power system equipment database switching order storage means,
With
The power system facility database maintenance means performs maintenance of a power system facility database to be maintained among the plurality of power system facility databases based on an instruction from an input device, and stores the plurality of power system facility databases after maintenance. The power system facility information data stored in the power system facility information data that is not used by the power system monitoring control means in the power system facility information data and the power system facility database after maintenance is stored in the power system Notify the supervisory control system configuration control means,
The power system monitoring control system configuration control means includes the power system monitoring control means that is not operated among the plurality of power system monitoring control means and the power system equipment information data storing the power system equipment database after maintenance. Notifying the power system monitoring control function control means,
The power system monitoring control function control means instructs the power system monitoring control means not in operation to read the power system equipment database after maintenance,
The power system equipment database switching order editing means edits the switching order of the power system equipment database input by the input device for each execution program unit executed under the power system monitoring control function control means,
The power system facility database switching order storage means stores the switching order of the power system equipment database edited by the power system equipment database switching order editing means from the start order of each execution program and the execution program executed immediately before. Save with a data structure that correlates the startup interval,
Further, the power system monitoring control function control means is operating for each execution program based on the start order and the start interval of each execution program stored in the power system facility database switching order storage means. An end notification is issued to the power system monitoring control means to end the monitoring control function, and the monitoring control function of the power system monitoring control means operating to the power system monitoring control means not operating Start notification to start the monitoring control function at the start interval from the end,
A power system monitoring control system characterized by that.
JP2009144404A 2009-06-17 2009-06-17 Power system monitoring and control system Active JP5537073B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009144404A JP5537073B2 (en) 2009-06-17 2009-06-17 Power system monitoring and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009144404A JP5537073B2 (en) 2009-06-17 2009-06-17 Power system monitoring and control system

Publications (2)

Publication Number Publication Date
JP2011004495A JP2011004495A (en) 2011-01-06
JP5537073B2 true JP5537073B2 (en) 2014-07-02

Family

ID=43561966

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009144404A Active JP5537073B2 (en) 2009-06-17 2009-06-17 Power system monitoring and control system

Country Status (1)

Country Link
JP (1) JP5537073B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104238497A (en) * 2014-08-11 2014-12-24 广东电网公司电力科学研究院 Power grid across-business integrated remote regulation and control system
CN104578409A (en) * 2014-12-16 2015-04-29 国家电网公司 Cluster measurement and control device for intelligent transformer substation and system with cluster measurement and control device
CN104600844A (en) * 2015-01-30 2015-05-06 国网河南省电力公司郑州供电公司 Power grid disaster monitoring and rush repairing system and method based on geographic information system (GIS)
CN105471106A (en) * 2015-12-18 2016-04-06 国网山东省电力公司电力科学研究院 Distribution power automation terminal with equipment state monitoring function and monitoring method

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102355063A (en) * 2011-10-27 2012-02-15 广东省电力设计研究院 Power equipment monitoring system
CN105305628B (en) * 2011-10-28 2017-11-21 江苏省电力公司常州供电公司 A kind of method of the data concentrated collection of cities and counties' scheduling power equipment
CN102510134A (en) * 2011-11-25 2012-06-20 清华大学 Method for dynamically monitoring and controlling power system
CN102710023B (en) * 2012-06-13 2016-01-20 东方电气集团国际合作有限公司 Be applicable to the supervisory control system of dissimilar wind-light storage micro-grid system
CN103401316A (en) * 2013-08-16 2013-11-20 国家电网公司 Integrated type monitoring and processing method for state data of intelligent power network equipment
CN103887882B (en) * 2014-03-31 2016-05-18 国网上海市电力公司 A kind of prefabricated cover half blocking secondary device system for transformer station
CN104319883B (en) * 2014-10-17 2017-04-19 云南电网公司西双版纳供电局 Dynamic panoramic monitoring system for power grid net rack
CN104467187B (en) * 2014-12-16 2016-04-27 重庆邮电大学 A kind of intelligent grid long distance control system based on IOS system
CN105529704B (en) * 2016-02-22 2018-03-23 东北大学 A kind of Out of step islanding control system and method
CN105871066A (en) * 2016-05-06 2016-08-17 国网山东省电力公司青岛供电公司 Intelligent power grid monitoring system and method
CN106787208A (en) * 2017-01-18 2017-05-31 南京卓高电气有限公司 A kind of intellectual monitoring O&M method based on switch cubicle
CN112713658A (en) * 2020-12-30 2021-04-27 国网北京市电力公司 Intelligent control method and system for monitoring defects of power grid equipment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61166243A (en) * 1985-01-18 1986-07-26 Hitachi Ltd Automatic control supervisory method
JPH05204737A (en) * 1992-01-24 1993-08-13 Toshiba Corp Maintenance system for database
JP3374067B2 (en) * 1998-02-25 2003-02-04 株式会社日立製作所 Distributed monitoring and control system and its database switching method
JP2002354668A (en) * 2001-05-23 2002-12-06 Toshiba Corp Power system supervisory control apparatus
JP3887751B2 (en) * 2002-10-03 2007-02-28 株式会社日立製作所 Power system distributed monitoring and control system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104238497A (en) * 2014-08-11 2014-12-24 广东电网公司电力科学研究院 Power grid across-business integrated remote regulation and control system
CN104238497B (en) * 2014-08-11 2017-07-18 广东电网公司电力科学研究院 A kind of integrated remote control and regulation system of trans-sectoral business of power network
CN104578409A (en) * 2014-12-16 2015-04-29 国家电网公司 Cluster measurement and control device for intelligent transformer substation and system with cluster measurement and control device
CN104600844A (en) * 2015-01-30 2015-05-06 国网河南省电力公司郑州供电公司 Power grid disaster monitoring and rush repairing system and method based on geographic information system (GIS)
CN105471106A (en) * 2015-12-18 2016-04-06 国网山东省电力公司电力科学研究院 Distribution power automation terminal with equipment state monitoring function and monitoring method
CN105471106B (en) * 2015-12-18 2018-09-07 国网山东省电力公司电力科学研究院 Distribution power automation terminal with equipment condition monitoring function and monitoring method

Also Published As

Publication number Publication date
JP2011004495A (en) 2011-01-06

Similar Documents

Publication Publication Date Title
JP5537073B2 (en) Power system monitoring and control system
US9594522B2 (en) Backup method and information processing apparatus
JP2008282130A5 (en)
JP2010272076A (en) Multiprocessor system
US8312211B2 (en) Disk array apparatus, method for application of control firmware, and controlling unit for controlling application of control firmware
JP5962088B2 (en) PLC simulation system, PLC simulator, control program, and recording medium
JPS6364144A (en) Inter-memory data transfer system
JP4591178B2 (en) Power supply control apparatus, power supply control method, and program
JP2017138707A (en) Display control device, display control method, and display control program
JP4824345B2 (en) Active firmware exchange device
JP2008041178A (en) Device, method and program for controlling magnetic tape device
WO2016071974A1 (en) Remote control device and control system
JP6870664B2 (en) Control systems, controls and programs
JP2019049917A (en) Numerical control device and device included in industrial machine
JP2010011125A (en) Image forming apparatus, control method and control program
CN105045138B (en) The control device of output switching anticipating signal during transfer sequence program
JP2012034218A (en) Program edit and transmit system
JP6405972B2 (en) Operation verification apparatus, operation verification method, and operation verification program
WO2022014444A1 (en) Robot control system
JP2000347884A (en) Job network control system
JP2007018417A (en) Ata disk array device, and operation control method and operation control program for ata disk array device
JP5749197B2 (en) Server apparatus and program stop method
JP2000221950A (en) Guide display system and recording medium
JP2005165600A (en) Transaction processing system and method, and program
JP2005149106A (en) Backup system and control program for backup operation

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20110421

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120208

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130830

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130910

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131106

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20140110

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140401

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140425

R151 Written notification of patent or utility model registration

Ref document number: 5537073

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151