JP5408646B2 - Hammering operation schedule control system for waste heat boiler - Google Patents

Hammering operation schedule control system for waste heat boiler Download PDF

Info

Publication number
JP5408646B2
JP5408646B2 JP2008316998A JP2008316998A JP5408646B2 JP 5408646 B2 JP5408646 B2 JP 5408646B2 JP 2008316998 A JP2008316998 A JP 2008316998A JP 2008316998 A JP2008316998 A JP 2008316998A JP 5408646 B2 JP5408646 B2 JP 5408646B2
Authority
JP
Japan
Prior art keywords
heat transfer
boiler
hammering
block
transfer surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2008316998A
Other languages
Japanese (ja)
Other versions
JP2010139186A (en
Inventor
朝彦 白石
俊樹 大橋
達也 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Motors Ltd
Original Assignee
Kawasaki Jukogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Jukogyo KK filed Critical Kawasaki Jukogyo KK
Priority to JP2008316998A priority Critical patent/JP5408646B2/en
Publication of JP2010139186A publication Critical patent/JP2010139186A/en
Application granted granted Critical
Publication of JP5408646B2 publication Critical patent/JP5408646B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)
  • Incineration Of Waste (AREA)

Description

本発明は、伝熱管に付着・堆積したダストを除去するハンマリング装置を備える廃熱ボイラーに関し、さらに詳しくは、廃熱ボイラーの伝熱管に付着・堆積したダストを環境にやさしく、かつ効果的に除去することができるハンマリング運転スケジュールの制御システムに関する。   The present invention relates to a waste heat boiler having a hammering device that removes dust adhering and accumulating on a heat transfer tube, and more specifically, the dust adhering and accumulating on the heat transfer tube of the waste heat boiler is environmentally friendly and effective. The present invention relates to a control system for a hammering operation schedule that can be eliminated.

ハンマリング装置(ダスト除去装置)を備える廃熱ボイラーは、例えば、特公昭59−28813号公報(廃熱ボイラーのダスト付着防止装置)に記載されているように、セメントプラント用廃熱ボイラー等として既に公知のものである。
上記公知の廃熱ボイラーでは、それに流入する排ガス中に多量のダストが含まれており、このダストの伝熱管への付着が汚れ抵抗(Fouling Resistance)となり、ボイラー性能を著しく低下させていた。この排ガス中のダスト含有量は100〜130gr/Nmであり、ダスト粒度は5μm以下のものが95%を占めており、このダストの顕微鏡組織は繊維状であるため伝熱管への付着性が強く、かつ熱伝導率が小さいため僅かの厚さ(数mm厚さ)の付着・堆積があった場合でも大きな汚れ抵抗となる。
A waste heat boiler provided with a hammering device (dust removal device) is, for example, as a waste heat boiler for a cement plant as described in Japanese Patent Publication No. 59-28813 (a dust adhesion prevention device for a waste heat boiler). It is already known.
In the known waste heat boiler, a large amount of dust is contained in the exhaust gas flowing into the waste heat boiler, and adhesion of this dust to the heat transfer tube becomes fouling resistance, and the boiler performance is remarkably lowered. The dust content in the exhaust gas is 100 to 130 gr / Nm 3 and the dust particle size is 5 μm or less occupies 95%, and since the microstructure of the dust is fibrous, it has an adhesive property to the heat transfer tube. Since it is strong and has a low thermal conductivity, even if there is a slight thickness (several millimeters) of adhesion / deposition, a large stain resistance is obtained.

上記特公昭59−28813号公報(特許文献1)に記載されている廃熱ボイラー40は、図16及び図17に示されるように、吊下げ式蛇管型伝熱管41のベンド部下端に当板46を介して配管列ピッチ設定金具47を垂設しており、連結軸42に固定する各突片48の間には、それぞれ前記設定金具47を挿着し固定する。吊下げ伝熱管41のガス流れ方向の配管列ピッチの乱れを防止するために、固定軸51と止め金52が設けられている。   The waste heat boiler 40 described in the above Japanese Patent Publication No. 59-28813 (Patent Document 1) has an abutting plate at the lower end of the bend portion of the suspended serpentine type heat transfer tube 41 as shown in FIGS. A pipe row pitch setting metal fitting 47 is suspended via 46, and the setting metal fitting 47 is inserted and fixed between the projecting pieces 48 fixed to the connecting shaft 42. A fixed shaft 51 and a stopper plate 52 are provided in order to prevent disturbance of the pipe row pitch in the gas flow direction of the suspended heat transfer tube 41.

上記廃熱ボイラー40において、吊下げ式蛇管型伝熱管41に付着したダストを除去するために、ハンマー(回転式槌打型ハンマー)45の衝突エネルギーを中間軸43を介して連結軸42に伝達すると(図16(b)を参照)、この連結軸42は突片48、配管列ピッチ設定金具47、及び当板46を介して、伝熱管41のベンド部下端に衝撃エネルギーを伝達して該伝熱管41を振動させる。これにより、伝熱管41に付着していたダストが剥離され、ホッパー53に自然落下してコンベア55によって排出される。
このように、廃熱ボイラーでは、流入する排ガス中の微粉ダストが伝熱管の表面に付着・堆積して熱伝達を阻害し、ダストによる汚れ抵抗が増大しボイラー性能を著しく低下させるため、ハンマリング装置を設けることにより伝熱管に付着したダストを除去している。
In the waste heat boiler 40, the collision energy of the hammer (rotating hammer hammer) 45 is transmitted to the connecting shaft 42 via the intermediate shaft 43 in order to remove dust adhering to the suspended serpentine heat transfer tube 41. Then (see FIG. 16B), the connecting shaft 42 transmits impact energy to the lower end of the bend portion of the heat transfer tube 41 via the projecting piece 48, the pipe row pitch setting fitting 47, and the abutting plate 46. The heat transfer tube 41 is vibrated. As a result, the dust adhering to the heat transfer tube 41 is peeled off, falls naturally onto the hopper 53 and is discharged by the conveyor 55.
In this way, in waste heat boilers, fine dust in the exhaust gas that flows in adheres to and accumulates on the surface of the heat transfer tube, hinders heat transfer, increases dirt resistance due to dust, and significantly reduces boiler performance. By providing the device, dust adhering to the heat transfer tube is removed.

更に、廃熱ボイラーの伝熱面積は、上述のダストの付着による汚れ抵抗を見込んで、例えば、伝熱面がクリーンな状態に対して数倍の伝熱面を有しており、通常のボイラーに比較して伝熱面の余裕度は大きく設定されているため、廃熱ボイラーの設備全体に対して占めるコストの割合は小さくない。
上記のように、廃熱ボイラーが余裕度の大きい伝熱面積を有していても、なおかつ、伝熱面へのダストの付着が進み汚れ抵抗が所定以上に大きくならないよう(ボイラーの性能低下を来たさないよう)、ハンマリング装置を運転して所定の性能を維持する必要がある。
Furthermore, the heat transfer area of the waste heat boiler is expected to be resistant to dirt due to the adhesion of dust as described above. For example, the heat transfer surface has a heat transfer surface several times that of a clean state. Since the margin of the heat transfer surface is set to be large compared to the above, the ratio of the cost to the entire waste heat boiler equipment is not small.
As described above, even if the waste heat boiler has a large heat transfer area, dust adheres to the heat transfer surface and the dirt resistance does not increase beyond a predetermined level (reducing the boiler's performance). It is necessary to operate the hammering device to maintain the predetermined performance.

特公昭59−28813号公報Japanese Patent Publication No.59-28813

しかし、上記従来の廃熱ボイラーに設置されているハンマリング装置では、構造上汚れ抵抗を改善するための操作手順に種々限界がある。
例えば、槌打式ハンマーは一本の回転軸に多数設定されているため、各伝熱面に対して一律に打撃が加えられるので、実際にはそれ程汚れていない状態であっても必要以上に打撃力が加えられる箇所があり、一方で、相当汚れている状態であっても必要な打撃力が加えられない箇所もある。このような打撃力のアンバランスは設備全体の寿命、特に、ハンマリング装置の耐久性に悪影響を及ぼしていた。
However, in the hammering apparatus installed in the conventional waste heat boiler, there are various limitations in the operation procedure for improving the dirt resistance due to the structure.
For example, since a number of hammering hammers are set on a single rotating shaft, a uniform impact is applied to each heat transfer surface, so even if it is actually not so dirty, it is more than necessary. There are places where the striking force is applied, while there are places where the necessary striking force is not applied even in a considerably dirty state. Such imbalance of the impact force has had an adverse effect on the life of the entire equipment, in particular, the durability of the hammering device.

そして、ハンマリング装置の耐久性は、打撃回数や打撃力により大きく影響を受けるので、各伝熱面に対して一律に打撃を加えることは、ハンマリング装置の平均的な寿命を短くするばかりでなく、騒音対策用の防音カバーを必要としたり、打撃時の大きな騒音(約110dB)により近隣の民家に多大な迷惑をかけることにもなる。
また、ハンマリング装置のハンマー部が損傷すると伝熱管に加える打撃力が弱くなり、ボイラー性能が低下する。ボイラー性能が著しく低下する場合には、単位時間当たりの打撃回数を増加することもあるが、あまり効果は期待できず、却ってハンマリング装置の損傷を増長することになる。
And since the durability of the hammering device is greatly affected by the number of hits and the hitting force, applying uniform hitting to each heat transfer surface not only shortens the average life of the hammering device. In addition, a soundproof cover for noise countermeasures is required, and a large noise (about 110 dB) at the time of hitting may cause a great inconvenience to neighboring private houses.
Moreover, if the hammer part of a hammering apparatus is damaged, the striking force applied to a heat exchanger tube will become weak, and boiler performance will fall. When the boiler performance is remarkably deteriorated, the number of hits per unit time may be increased. However, the effect cannot be expected so much and the damage to the hammering device is increased.

ここで、伝熱管に付着・堆積したダストにより伝熱面の汚れ抵抗が大きくなる各種要因ついて、図4〜図8を参照しながら説明する。図4〜図8は、それぞれの要因と汚れ抵抗との関係を図式化したものである。
(1) ハンマリング打撃点からの伝熱管の長さと汚れ抵抗との関係
廃熱ボイラーの伝熱管におけるハンマリング打撃点からの伝熱管の長さLと汚れ抵抗fr1との関係は、図4に示されるように、ハンマリング打撃点からの伝熱管の長さLに反比例して汚れ抵抗fr1が小さくなる。このような現象は、衝撃波の振幅の減少により生じるものである。
Here, various factors that increase the dirt resistance of the heat transfer surface due to the dust adhered to and accumulated on the heat transfer tubes will be described with reference to FIGS. 4 to 8 are diagrams schematically showing the relationship between each factor and the dirt resistance.
(1) Relationship between the heat transfer tube length from the hammering strike point and dirt resistance The relationship between the heat transfer tube length L from the hammering strike point and the dirt resistance fr1 in the heat transfer tube of the waste heat boiler is shown in FIG. As shown, the dirt resistance fr1 decreases in inverse proportion to the length L of the heat transfer tube from the hammering strike point. Such a phenomenon is caused by a decrease in the amplitude of the shock wave.

(2) 管群の長さと汚れ抵抗との関係
廃熱ボイラーにおける管群の長さLgと汚れ抵抗fr2との関係は、図5に示されるように、管群の長さLgに反比例して汚れ抵抗fr2が小さくなる。このような現象は、ボイラーの入口から出口に到るダスト濃度の減少により生じるものである。
(3) ガス温度と汚れ抵抗との関係
廃熱ボイラーに流入するガス温度tgと汚れ抵抗fr3との関係は、図6に示されるように、流入するガス温度tgがtg1からtg2に下がるとこれに比例して汚れ抵抗fr3も小さくなる。このような現象は、ダスト粒子の結合力の減少により生じるものである。
(2) Relationship between tube group length and soil resistance The relationship between tube group length Lg and soil resistance fr2 in a waste heat boiler is inversely proportional to tube group length Lg, as shown in FIG. The dirt resistance fr2 is reduced. Such a phenomenon is caused by a decrease in dust concentration from the inlet to the outlet of the boiler.
(3) Relation between gas temperature and dirt resistance As shown in FIG. 6, the relation between the gas temperature tg flowing into the waste heat boiler and the dirt resistance fr3 is shown in FIG. 6 when the inflowing gas temperature tg falls from tg1 to tg2. The dirt resistance fr3 also becomes smaller in proportion to. Such a phenomenon is caused by a decrease in the bonding force of dust particles.

(4) ガス流れの管群での左右方向の偏流と汚れ抵抗との関係
廃熱ボイラーにおけるガス流れの管群での左右方向の偏流と汚れ抵抗fr4との関係は、図7において実線矢印又は点線矢印で示されるように、ボイラー入口/出口ダクトの形状及び管群のダスト付着状態により生じるものである。
(5) ガス流れの管群での上下方向の偏流と汚れ抵抗との関係
廃熱ボイラーにおけるガス流れの管群での上下方向の偏流と汚れ抵抗fr5との関係は、図8において実線矢印及び点線矢印で示されるように、ボイラー入口/出口ダクトの形状及び管群のダスト付着状態により生じるものである。
(4) Relationship between left-right drift in the gas flow tube group and dirt resistance The relationship between the left-right drift in the gas flow tube group and the dirt resistance fr4 in the waste heat boiler is shown by a solid arrow in FIG. As indicated by the dotted arrows, this is caused by the shape of the boiler inlet / outlet duct and the dust adhesion state of the tube group.
(5) Relationship between vertical drift in the gas flow tube group and dirt resistance The relationship between vertical drift in the gas flow tube group and the dirt resistance fr5 in the waste heat boiler is shown in FIG. As indicated by the dotted arrows, this is caused by the shape of the boiler inlet / outlet duct and the dust adhesion state of the tube group.

上記のような各種要因によって大きくなる汚れ抵抗を各伝熱面ブロック(各管群)毎に数値的に把握して、これに応じてハンマリング装置の運転制御を行うことが可能になれば、それぞれの伝熱面ブロックの汚れ抵抗の大きさ(ダストの付着・堆積厚さ)に応じて、必要とする打撃力を加えることができる。
そこで、本発明の課題は、上記従来の問題点を解決するために、廃熱ボイラーの各伝熱面ブロックの汚れ抵抗の大きさに応じて、各伝熱面ブロックの伝熱管に打撃を加えることができるように、ハンマリング装置の運転について工夫することである。
If it becomes possible to numerically grasp the dirt resistance that increases due to the various factors as described above for each heat transfer surface block (each tube group) and perform operation control of the hammering device according to this, The required striking force can be applied according to the level of dirt resistance (dust adhesion / deposition thickness) of each heat transfer surface block.
Therefore, in order to solve the above-mentioned conventional problems, the object of the present invention is to hit the heat transfer tubes of each heat transfer surface block according to the level of dirt resistance of each heat transfer surface block of the waste heat boiler. It is to devise the operation of the hammering device so that it can.

本発明に係る廃熱ボイラーは、伝熱面ブロックの汚れ抵抗の大きさに応じて、伝熱面ブロックに対して必要とする適正な打撃エネルギーを加えることによって、ハンマリング装置の耐久性を損なうことなく、環境に優しい効果的なダスト除去を行うことを意図したものである。   The waste heat boiler according to the present invention impairs the durability of the hammering device by applying appropriate impact energy required for the heat transfer surface block according to the level of dirt resistance of the heat transfer surface block. It is intended to perform environmentally friendly and effective dust removal.

以下に、上記課題を解決するために講じた手段を作用と共に説明する。
(1) 本発明に係る廃熱ボイラー(請求項1に対応)は、多数の伝熱管を配列した伝熱面ブロックと、この伝熱面ブロックの各伝熱管に振動を加えて付着したダストを除去するハンマリング装置と、このハンマリング装置の運転を制御するハンマリング運転制御装置とを備える廃熱ボイラーのハンマリング運転スケジュール制御システムを前提として、次の(イ)〜(ニ)から成るものである。
(イ)定格負荷運転におけるボイラー蒸発量とボイラー入口/出口ガス温度に基づいて、ガス流量を算出するガス流量演算手段と、
(ロ)上記ガス流量と上記伝熱面ブロックの入口/出口ガス温度に基づいて、該伝熱面ブロックの汚れ抵抗計測値を算出する汚れ抵抗演算手段と、
(ハ) 上記伝熱面ブロックの汚れ抵抗計測値と、予め定められた汚れ抵抗計画値に基づいて、上記ハンマリング装置の打撃回数、打撃時間、又は打撃力の少なくとも1つを変更するハンマリング運転スケジュール演算手段とを備えて成り、
(ニ) 上記伝熱面ブロックに対して、その汚れ度合に応じて適正な打撃を加えること。
The means taken to solve the above problems will be described below together with the action.
(1) A waste heat boiler according to the present invention (corresponding to claim 1) includes a heat transfer surface block in which a large number of heat transfer tubes are arranged, and dust adhered to each heat transfer tube of the heat transfer surface block by applying vibration. Assuming a hammering operation schedule control system for a waste heat boiler equipped with a hammering device to be removed and a hammering operation control device for controlling the operation of this hammering device, the system consists of the following (a) to (d) It is.
(A) Gas flow rate calculation means for calculating the gas flow rate based on the boiler evaporation amount and the boiler inlet / outlet gas temperature in the rated load operation ,
(B) based on the inlet / outlet gas temperature of the gas flow rate and the heat transfer Netsumen block, and fouling resistance calculating means for calculating a stain which resistance measurements of said transmission Netsumen block,
(C) fouling which the resistance measurement values of the heat transfer Netsumen block, based on the stain resistance planned value set in advance, the hammer to change at least one of the number of hits the hammering device, striking time, or impact force A ring operation schedule calculation means,
(D) Appropriate blow should be applied to the heat transfer surface block according to the degree of contamination.

上記のような構成にすることにより、ガス流量と、伝熱面ブロックのガス入口側とガス出口側のガス温度に基づいて、該伝熱面ブロックの汚れ抵抗計画値と汚れ抵抗計測値を算出することができ、この汚れ抵抗計画値と汚れ抵抗計測値を比較することによって、伝熱面ブロックの汚れ度合を認識することができる。
そして、この伝熱面ブロックの汚れ度合に応じて、ハンマリング装置により伝熱面ブロックに加える打撃回数、打撃時間、又は打撃力を変更することができるので、伝熱面ブロックに対してその汚れ度合に応じて必要とする適正な打撃エネルギーを加えることができる。
By adopting the configuration as described above, based on the gas flow rate and the gas temperatures on the gas inlet side and the gas outlet side of the heat transfer surface block, the dirt resistance planned value and the dirt resistance measurement value of the heat transfer surface block are calculated. The degree of dirt on the heat transfer surface block can be recognized by comparing the dirt resistance planned value with the dirt resistance measurement value.
And, according to the degree of contamination of the heat transfer surface block, the number of hits, hitting time, or hitting force applied to the heat transfer surface block by the hammering device can be changed. Appropriate impact energy required according to the degree can be applied.

(2) 上記(1)における廃熱ボイラーのハンマリング運転スケジュール制御システムにおいて、伝熱面ブロックが複数設けられ、各伝熱面ブロックの入口/出口ガス温度に基づいて、各伝熱面ブロックの汚れ抵抗計画値と汚れ抵抗計測値を算出し、各伝熱面ブロックに対してそれぞれの汚れ度合に応じて適正な打撃を加えることができる。(請求項2に対応)
このような構成によれば、周囲の伝熱面ブロックのガス入口側とガス出口側のガス温度による影響を考慮しながら、各伝熱面ブロックの汚れ抵抗計画値と汚れ抵抗計測値を算出することができるので、より正確な汚れ抵抗計測値を算出することが可能であり、汚れ度合に応じて適正な打撃を加えることができる。
(2) In the waste heat boiler hammering operation schedule control system in (1) above, a plurality of heat transfer surface blocks are provided, and based on the inlet / outlet gas temperature of each heat transfer surface block, The dirt resistance planned value and the dirt resistance measurement value are calculated, and an appropriate blow can be applied to each heat transfer surface block according to the degree of dirt. (Corresponding to claim 2)
According to such a configuration, the soil resistance plan value and the soil resistance measurement value of each heat transfer surface block are calculated while considering the influence of the gas temperature on the gas inlet side and gas outlet side of the surrounding heat transfer surface block. Therefore, it is possible to calculate a more accurate dirt resistance measurement value, and it is possible to apply an appropriate blow according to the degree of dirt.

(3) 上記(2)における廃熱ボイラーのハンマリング運転スケジュール制御システムにおいて、複数の伝熱面ブロックそれぞれの汚れ抵抗計画値と汚れ抵抗計測値に基づいて、各伝熱面ブロックにおけるハンマリング装置の打撃回数、打撃時間、又は打撃力の少なくとも1つを変更することができる。(請求項3に対応)
このような構成によれば、周囲の伝熱面ブロックの汚れ度合による影響を考慮しながら、各伝熱面ブロックにおけるハンマリング装置の打撃回数、打撃時間、又は打撃力を変更することができるので、より適正な打撃エネルギーを各伝熱面ブロックに与えることが可能である。
(3) In the hammering operation schedule control system for the waste heat boiler in (2) above, the hammering device in each heat transfer surface block is based on the planned dirt resistance value and the measured dirt resistance value of each of the plurality of heat transfer surface blocks. At least one of the number of hits, hitting time, or hitting force can be changed. (Corresponding to claim 3)
According to such a configuration, it is possible to change the number of hits, the hitting time, or the hitting force of the hammering device in each heat transfer surface block while considering the influence of the degree of contamination of the surrounding heat transfer surface blocks. It is possible to give a more appropriate impact energy to each heat transfer surface block.

本発明の効果を整理すると次ぎのとおりである。
伝熱面ブロックの汚れ抵抗計画値と汚れ抵抗計測値に基づいて、該伝熱面ブロックの汚れ度合を認識することができ、この汚れ度合に応じて該伝熱面ブロックに加えるハンマリング装置の打撃回数、打撃時間、又は打撃力を変更することができるので、ハンマリング装置は、伝熱面ブロックに対してその汚れ度合に応じて必要とする適正な打撃エネルギーを加えることができる。
その結果、ハンマリング装置の耐久性を損なうことなく、装置全体の損傷を最小限にすることが可能であり、騒音を低減して環境に優しい効果的なダスト除去を行うことができる。
The effects of the present invention are summarized as follows.
Based on the dirt resistance planned value and dirt resistance measurement value of the heat transfer surface block, the degree of dirt of the heat transfer surface block can be recognized, and the hammering device applied to the heat transfer surface block according to the degree of dirt Since the number of hits, the hitting time, or the hitting force can be changed, the hammering device can apply appropriate hitting energy required for the heat transfer surface block according to the degree of contamination.
As a result, it is possible to minimize the damage of the entire device without impairing the durability of the hammering device, and it is possible to reduce noise and perform environmentally friendly and effective dust removal.

また、複数の伝熱面ブロックが配置される場合でも、周囲の伝熱面ブロックのガス入口側とガス出口側のガス温度による影響を考慮しながら、各伝熱面ブロックの汚れ抵抗計画値と汚れ抵抗計測値を算出することが可能であり、さらに、周囲の伝熱面ブロックの汚れ抵抗計画値と汚れ抵抗計測値による影響を考慮しながら、各伝熱面ブロックにおけるハンマリング装置の打撃回数、打撃時間、又は打撃力を変更することができるので、各伝熱面ブロックに対してより適正な打撃エネルギーを与えることが可能である。
その結果、複数の伝熱面ブロックおいて、ハンマリング装置の耐久性を損なうことなく、装置全体の損傷を最小限にすることが可能であり、騒音を低減して環境に優しい効果的なダスト除去を行うことができる。
In addition, even when a plurality of heat transfer surface blocks are arranged, the contamination resistance planned value of each heat transfer surface block is considered while considering the influence of the gas temperature on the gas inlet side and gas outlet side of the surrounding heat transfer surface blocks. It is possible to calculate the dirt resistance measurement value, and further consider the influence of the dirt resistance planned value and dirt resistance measurement value of the surrounding heat transfer surface block, and the number of hammering device hits in each heat transfer surface block Since the striking time or striking force can be changed, more appropriate striking energy can be given to each heat transfer surface block.
As a result, in multiple heat transfer surface blocks, it is possible to minimize damage to the entire device without compromising the durability of the hammering device, reducing noise and providing effective environmentally friendly dust. Removal can be performed.

本発明の実施例による廃熱ボイラーのハンマリング運転スケジュールの制御システムについて、図1〜図3及び図9〜図15に基づいて説明する。
〔廃熱ボイラーの伝熱面ブロックとハンマリング装置の構成〕
廃熱ボイラーのボイラー本体内には、多数の伝熱管から構成される複数の伝熱面ブロック(管群)が配置されると共に、それぞれの伝熱面ブロックにはハンマリング装置が組み込まれている。
先ず、本実施例の廃熱ボイラーにおける伝熱面ブロックの基本的な構成について、図1〜図3を参照しながら説明する。図1は廃熱ボイラーの要部の概略正面図、図2は同じく廃熱ボイラーの要部の概略平面図、図3は同じく廃熱ボイラーの要部の概略側面図である。
A control system for a hammering operation schedule of a waste heat boiler according to an embodiment of the present invention will be described with reference to FIGS. 1 to 3 and FIGS. 9 to 15.
[Configuration of heat transfer surface block and hammering device of waste heat boiler]
In the boiler body of the waste heat boiler, a plurality of heat transfer surface blocks (tube groups) composed of a large number of heat transfer tubes are arranged, and a hammering device is incorporated in each heat transfer surface block. .
First, the basic structure of the heat transfer surface block in the waste heat boiler of the present embodiment will be described with reference to FIGS. 1 is a schematic front view of the main part of the waste heat boiler, FIG. 2 is a schematic plan view of the main part of the waste heat boiler, and FIG. 3 is a schematic side view of the main part of the waste heat boiler.

ボイラー本体25は、中央部のボイラー外殻壁4a〜4eと、上部のボイラー外殻壁5a〜5eと、下部のボイラー外殻壁6a〜6dにより形成される。このボイラー本体25の内部空間には、多数の伝熱管(蛇管型伝熱管)1(1a,1b)が一定間隔で配列され、伝熱面ブロックG(G-A,G-B)を構成している。これらの伝熱管1(1a,1b)の各端部は、上部のボイラー外殻壁5a〜5eの外部で入口管寄せ2又は出口管寄せ3(3a,3b)に接続されている。
上記中央部のボイラー外殻壁4a〜4eで囲まれる中央空間(図3のイ、ロ、ハ、ニで囲まれた空間)には直接排ガスが流れるが、上部のボイラー外殻壁5a〜5eで囲まれる上部空間(図3のイ、ロ、ホ、ヘで囲まれた空間)には直接排ガスは流れない。また、下部のボイラー外殻壁6a〜6dで囲まれる下部空間はホッパーを形成している。
The boiler body 25 is formed by the boiler outer shell walls 4a to 4e at the center, the upper boiler outer shell walls 5a to 5e, and the lower boiler outer shell walls 6a to 6d. In the internal space of the boiler body 25, a large number of heat transfer tubes (conduit-type heat transfer tubes) 1 (1a, 1b) are arranged at regular intervals to form a heat transfer surface block G (GA, GB). ing. Each end of the heat transfer tubes 1 (1a, 1b) is connected to the inlet header 2 or the outlet header 3 (3a, 3b) outside the upper boiler outer shell walls 5a to 5e.
Exhaust gas flows directly into the central space surrounded by the boiler outer shell walls 4a to 4e (the space surrounded by a, b, c, and d in FIG. 3), but the upper boiler outer walls 5a to 5e. The exhaust gas does not flow directly into the upper space surrounded by (a space surrounded by a, b, e, and f in FIG. 3). A lower space surrounded by the lower boiler outer shell walls 6a to 6d forms a hopper.

上記ボイラー外殻壁5a〜5eで囲まれる上部空間において、多数の伝熱管1(1a,1b)の奇数番目と偶数番目の間には連結軸7(7a,7b)が設けられている。これらの連結軸7(7a,7b)の両側に位置する各伝熱管1(1a,1b)の管部分は、連結金具17(17a,17b)を介して隣接する連結軸7(7a,7b)に溶接によって結合されている(図1及び図2を参照)。
このように両側に伝熱管1(1a,1b)が固定された各連結軸7(7a,7b)は、一対のヒンジ機構27(27a,27b)によって、ボイラー本体25に固定された吊りビーム16(16a,16b)に対して、各連結軸7(7a,7b)の長手方向へ揺動可能に支持されている。上記ヒンジ機構27(27a,27b)は、吊り金具11(11a,11b)、ヒンジ部材12(12a,12b)、ピン13(13a,13b)、吊りロッド14(14a,14b)、及びナット15(15a,15b)から成っている。
このような構成により、一対の伝熱管1(1a,1b)は、それぞれの連結軸7(7a,7b)とヒンジ機構27(27a,27b)を介して、ボイラー本体25に対して支持されている。
In the upper space surrounded by the boiler outer shell walls 5a to 5e, connecting shafts 7 (7a, 7b) are provided between the odd-numbered and even-numbered heat transfer tubes 1 (1a, 1b). The pipe portions of the heat transfer tubes 1 (1a, 1b) located on both sides of these connecting shafts 7 (7a, 7b) are connected to the adjacent connecting shafts 7 (7a, 7b) via connecting fittings 17 (17a, 17b). (See FIGS. 1 and 2).
In this way, the connecting shafts 7 (7a, 7b), to which the heat transfer tubes 1 (1a, 1b) are fixed on both sides, are suspended beams 16 fixed to the boiler body 25 by a pair of hinge mechanisms 27 (27a, 27b). (16a, 16b) is supported so as to be swingable in the longitudinal direction of each connecting shaft 7 (7a, 7b). The hinge mechanism 27 (27a, 27b) includes the suspension fitting 11 (11a, 11b), the hinge member 12 (12a, 12b), the pin 13 (13a, 13b), the suspension rod 14 (14a, 14b), and the nut 15 ( 15a, 15b).
With such a configuration, the pair of heat transfer tubes 1 (1a, 1b) are supported with respect to the boiler body 25 via the respective connecting shafts 7 (7a, 7b) and the hinge mechanisms 27 (27a, 27b). Yes.

上記各連結軸7(7a,7b)のボイラー外殻壁5a,5bから突出した部分には、連結軸7(7a,7b)の貫通部をガスシールするべローズ8a,8bが装着されている。また、各連結軸7(7a,7b)の突出部分の先端部には、弾性体(例えば、皿バネ等)9a,9bを介してそれぞれラッピングロッド10a,10bが結合されている。
上記ラッピングロッド10a,10bの外側には、これに対向する位置にエアーノッカー(打撃装置)20a,20bが設けられている。このエアーノッカー20a,20bによりラッピングロッド10a,10bに打撃を加えると、弾性体9a,9bを介して各連結軸7(7a,7b)とこれに結合されている一対の伝熱管1(1a,1b)に振動を加えることができる。このとき、弾性体9a,9bは打撃エネルギーを貯えて、衝撃力を軽減する役割を果たす。
このように、連結軸7、連結金具17、ヒンジ機構27、べローズ8a,8b、弾性体9a,9b、ラッピングロッド10a,10b、及びエアーノッカー20a,20bは、伝熱管1(1a、1b)に振動を加えるハンマリング装置を構成する。
なお、図1及び図3中の符号18及び19は、バッフルプレート及びダスト排出装置である。
Bellows 8a and 8b for gas-sealing through portions of the connecting shaft 7 (7a and 7b) are mounted on portions of the connecting shaft 7 (7a and 7b) protruding from the boiler outer shell walls 5a and 5b. . In addition, wrapping rods 10a and 10b are coupled to distal ends of protruding portions of the connecting shafts 7 (7a and 7b) via elastic bodies (for example, disc springs) 9a and 9b, respectively.
Outside the wrapping rods 10a and 10b, air knockers (blowing devices) 20a and 20b are provided at positions facing the wrapping rods 10a and 10b. When the air knockers 20a and 20b are used to strike the wrapping rods 10a and 10b, the connecting shafts 7 (7a and 7b) and the pair of heat transfer tubes 1 (1a and 1b) connected thereto are connected via the elastic bodies 9a and 9b. Vibration can be applied to 1b). At this time, the elastic bodies 9a and 9b play a role of storing impact energy and reducing the impact force.
In this way, the connecting shaft 7, the connecting fitting 17, the hinge mechanism 27, the bellows 8a and 8b, the elastic bodies 9a and 9b, the wrapping rods 10a and 10b, and the air knockers 20a and 20b are composed of the heat transfer tubes 1 (1a and 1b). A hammering device that applies vibrations to the device is configured.
Reference numerals 18 and 19 in FIGS. 1 and 3 denote a baffle plate and a dust discharge device.

〔廃熱ボイラー全体の構成〕
次に、本実施例による廃熱ボイラー全体の構成について、図9〜図11を参照しながら説明する。図9は廃熱ボイラーの模式的な正面図、図10は同じく廃熱ボイラーの模式的な平面図、図11は同じく廃熱ボイラーの模式的な側面図である。
廃熱ボイラーの排ガスが流れる内部空間には、ハンマリング装置が組み込まれた伝熱面ブロックGが配置されている。この伝熱面ブロックGは、排ガスの流れ方向に沿ってA系列とB系列の2系列に配置され、各系列にはそれぞれ5個ずつの伝熱面ブロックG1〜G5(A/B)が配置されている。(なお、(A/B)は、A系列とB系列に同様に配置されていることを表す。)
[Configuration of the entire waste heat boiler]
Next, the overall configuration of the waste heat boiler according to the present embodiment will be described with reference to FIGS. 9 is a schematic front view of the waste heat boiler, FIG. 10 is a schematic plan view of the waste heat boiler, and FIG. 11 is a schematic side view of the waste heat boiler.
A heat transfer surface block G in which a hammering device is incorporated is disposed in an internal space through which exhaust gas from the waste heat boiler flows. The heat transfer surface blocks G are arranged in two series of A and B series along the flow direction of the exhaust gas, and five heat transfer surface blocks G1 to G5 (A / B) are arranged in each series. Has been. ((A / B) indicates that they are similarly arranged in the A series and the B series.)

上記各伝熱面ブロックG1〜G5(A/B)には、それぞれ多数のハンマリング装置が組み込まれているが、その数は各伝熱面ブロック毎に異なっている。各伝熱面ブロックG1〜G5(A/B)毎のハンマリング装置の集合体をハンマリング装置ブロックB-1〜B-5(A/B)という。
最も上流側の伝熱面ブロックG1(A/B)には、それぞれハンマリング装置14台(n1〜n14)を有するハンマリング装置ブロックB-1(A/B)が、次の伝熱面ブロックG2(A/B)には、それぞれハンマリング装置15台(n15〜n29)を有するハンマリング装置ブロックB-2(A/B)が、3番目の伝熱面ブロックG3(A/B)には、それぞれハンマリング装置16台(n30〜n45)を有するハンマリング装置ブロックB-3(A/B)が、4番目の伝熱面ブロックG4(A/B)には、それぞれハンマリング装置17台(n46〜n62)を有するハンマリング装置ブロックB-4(A/B)が、最も下流側の伝熱面ブロックG5(A/B)には、それぞれハンマリング装置18台(n63〜n80)を有するハンマリング装置ブロックB-5(A/B)が、それぞれ設けられている。(図9及び図10を参照)
A large number of hammering devices are incorporated in each of the heat transfer surface blocks G1 to G5 (A / B), but the number is different for each heat transfer surface block. The assembly of hammering devices for each of the heat transfer surface blocks G1 to G5 (A / B) is referred to as hammering device blocks B-1 to B-5 (A / B).
The most upstream heat transfer surface block G1 (A / B) includes a hammering device block B-1 (A / B) having 14 hammering devices (n1 to n14), respectively. In G2 (A / B), a hammering device block B-2 (A / B) having 15 hammering devices (n15 to n29) is added to the third heat transfer surface block G3 (A / B). The hammering device block B-3 (A / B) having 16 hammering devices (n30 to n45) is connected to the fourth heat transfer surface block G4 (A / B), respectively. Hammering device block B-4 (A / B) having pedestals (n46 to n62) has 18 hammering devices (n63 to n80) in the most downstream heat transfer surface block G5 (A / B). Hammering device block B- (A / B) are respectively provided. (See FIGS. 9 and 10)

また、上記各伝熱面ブロックG1〜G5(A/B)におけるガス入口側とガス出口側の上部、中央部、及び下部のガス温度測定点には、それぞれガス温度検知器t1〜t18(a/b)が設けられている。(なお、(a/b)は、A系列とB系列に同様に配置されていることを表す。)   In addition, gas temperature detectors t1 to t18 (a / B) is provided. ((A / b) indicates that they are similarly arranged in the A series and the B series.)

〔ハンマリング運転制御装置の構成〕
ハンマリング運転制御装置の構成について、図12及び図13を参照しながら説明する。図12はハンマリング運転制御装置のブロック図、図13はハンマリング運転動作を説明するブロック図である。
ハンマリング運転制御装置30は、図12に示されるように、CPU、RAM、ROM、及びタイマー等を有する制御手段31と、それぞれのハンマリング装置ブロックB-1〜B-5(A/B)の各エアーノッカー20a,20bを駆動する駆動回路32a〜32eを備えている。この制御手段31は、キーボード等の操作部や各伝熱面ブロックのガス温度検知器t1〜t18(a/b)からの入力信号を受けると共に、ボイラー蒸気圧力、ボイラー蒸気温度、ボイラー給水温度、ボイラー蒸発量、ボイラー入口ガス温度、ボイラー出口ガス温度、ボイラー入口/出口ガス圧力、及びガス組成に関する入力信号を受けて各種演算を行い、この演算結果に基づいて、ハンマリング装置ブロックの駆動回路32a〜32eや操作空気圧力設定手段33へ制御信号を出力して、各エアーノッカー20a,20bを適正な(伝熱面ブロックの汚れ抵抗に見合った)打撃回数、打撃時間、及び打撃力で駆動する。
このようにして、各伝熱面ブロックG1〜G5(A/B)の伝熱管1a,1bに付着・堆積したダストは、効果的に除去することができる。
[Configuration of Hammering Operation Control Device]
The configuration of the hammering operation control device will be described with reference to FIGS. FIG. 12 is a block diagram of the hammering operation control device, and FIG. 13 is a block diagram for explaining the hammering operation.
As shown in FIG. 12, the hammering operation control device 30 includes a control means 31 having a CPU, a RAM, a ROM, a timer and the like, and respective hammering device blocks B-1 to B-5 (A / B). Drive circuits 32a to 32e for driving the air knockers 20a and 20b. The control means 31 receives input signals from an operation unit such as a keyboard and gas temperature detectors t1 to t18 (a / b) of each heat transfer surface block, as well as boiler steam pressure, boiler steam temperature, boiler feed water temperature, Various calculations are performed in response to input signals related to the amount of boiler evaporation, boiler inlet gas temperature, boiler outlet gas temperature, boiler inlet / outlet gas pressure, and gas composition, and the driving circuit 32a of the hammering device block is based on the calculation results. ~ 32e and the operation air pressure setting means 33 are output with a control signal to drive each air knocker 20a, 20b with an appropriate number of hits, hitting time, and hitting force (corresponding to dirt resistance of the heat transfer surface block). .
In this way, the dust adhered and deposited on the heat transfer tubes 1a and 1b of the heat transfer surface blocks G1 to G5 (A / B) can be effectively removed.

上記制御手段31は、図13に示されるように、ボイラーガス流量演算手段35、各伝熱面ブロックの汚れ抵抗演算手段36a,36b…、及び各ハンマリング装置ブロックの運転スケジュール演算手段37a,37b…を有している。
このボイラーガス流量演算手段35は、ボイラー蒸気圧力、ボイラー蒸気温度、ボイラー給水温度、ボイラー蒸発量、ボイラー入口ガス温度、ボイラー出口ガス温度、ボイラー入口/出口ガス圧力、及びガス組成に関する入力信号を受けて、ガス流量Gcを算出する。各伝熱面ブロックの汚れ抵抗演算手段36a,36b…は、ガス流量Gc、及び各伝熱面ブロックG1(A/B),G2(A/B)…のガス温度に関する入力信号を受けて、それぞれの汚れ抵抗計画値DA,DB…、及び汚れ抵抗計測値Da,Db…を算出する。
As shown in FIG. 13, the control means 31 includes boiler gas flow rate calculation means 35, dirt resistance calculation means 36a, 36b... For each heat transfer surface block, and operation schedule calculation means 37a, 37b for each hammering device block. …have.
The boiler gas flow rate calculation means 35 receives input signals relating to boiler steam pressure, boiler steam temperature, boiler feed water temperature, boiler evaporation amount, boiler inlet gas temperature, boiler outlet gas temperature, boiler inlet / outlet gas pressure, and gas composition. Then, the gas flow rate Gc is calculated. The dirt resistance calculating means 36a, 36b... For each heat transfer surface block receive input signals relating to the gas flow rate Gc and the gas temperature of each heat transfer surface block G1 (A / B), G2 (A / B). The respective dirt resistance planned values DA, DB... And the dirt resistance measured values Da, Db.

また、上記各ハンマリング装置ブロックB-1〜B-5(A/B)の運転スケジュール演算手段37a,37b…は、各伝熱面ブロックの汚れ抵抗計画値DA,DB…、及び汚れ抵抗計測値Da,Db…に関する入力信号を受けて、各伝熱面ブロック毎の汚れ抵抗計画値DA,DB…と汚れ抵抗計測値Da,Db…の偏差を算出し、さらにこの偏差に基づいてハンマリング装置ブロックの順次運転間隔T1、打撃間隔T2、運転時間T3、休止時間T4、及び操作空気圧力Psを算出する。これにより、各ハンマリング装置ブロックの打撃回数R、打撃時間H、及び打撃力Fが設定される。   Further, the operation schedule calculation means 37a, 37b,... Of each of the hammering device blocks B-1 to B-5 (A / B) include the soil resistance planned values DA, DB,. In response to the input signal relating to the values Da, Db..., The deviation between the dirt resistance planned values DA, DB... And the dirt resistance measurement values Da, Db. The sequential operation interval T1, the striking interval T2, the operation time T3, the downtime T4, and the operating air pressure Ps of the device block are calculated. Thereby, the number R of hits, the hitting time H, and the hitting force F of each hammering device block are set.

〔ハンマリング装置の運転動作〕
次に、本実施例による廃熱ボイラーのハンマリング運転動作について、図12〜図15を参照しながら説明する。図14はハンマリング装置ブロックの運転スケジュール、図15はハンマリング運転動作のフロー図である。
廃熱ボイラーの運転を開始する前に、各ハンマリング装置ブロックB-1〜B-5(A/B)の運転スケジュールの初期設定を行う。この初期設定は、これまでの経験に基づいてハンマリング装置ブロック毎に、図14に示されるような、ハンマリングの順次運転間隔T1、打撃間隔T2、運転時間T3、及び休止時間T4と共に、操作空気圧力Psを決めることによって、打撃回数R、打撃時間H、及び打撃力Fの設定を行う。
[Operation of hammering device]
Next, the hammering operation of the waste heat boiler according to the present embodiment will be described with reference to FIGS. FIG. 14 is an operation schedule of the hammering device block, and FIG. 15 is a flowchart of the hammering operation.
Before the operation of the waste heat boiler is started, the operation schedule of each hammering device block B-1 to B-5 (A / B) is initialized. This initial setting is performed for each hammering device block based on experience so far, as shown in FIG. 14, along with the sequential operation interval T1, hammering interval T2, operation time T3, and pause time T4. By determining the air pressure Ps, the number of hits R, the hitting time H, and the hitting force F are set.

廃熱ボイラーの運転を開始して定格負荷運転になれば(ステップS1)、ボイラー蒸発量とボイラー入口/出口ガス温度から、ボイラーガス流量Gcを算出する(ステップS2)。 このガス流量Gcは、次の式により算出することができる。

Figure 0005408646
但し、E:時間当りのボイラーの蒸発量(Kg/Hr)
is:発生蒸気のエンタルピー(Kcal/Kg)
iw:給水のエンタルピー(Kcal/Kg)
ig:ボイラー入口ガスのエンタルピー(Kcal/Nm
ig:ボイラー出口ガスのエンタルピー(Kcal/Nm
η:ボイラー効率 When the operation of the waste heat boiler is started and the rated load operation is started (step S1), the boiler gas flow rate Gc is calculated from the boiler evaporation amount and the boiler inlet / outlet gas temperature (step S2). This gas flow rate Gc can be calculated by the following equation.
Figure 0005408646
E: Boiler evaporation per hour (Kg / Hr)
is: Enthalpy of generated steam (Kcal / Kg)
iw: Enthalpy of water supply (Kcal / Kg)
ig 1 : Boiler inlet gas enthalpy (Kcal / Nm 3 )
ig 2: enthalpy of the boiler exit gas (Kcal / Nm 3)
η B : Boiler efficiency

次に、上記算出されたガス流量Gcと各伝熱面ブロックの入口/出口ガス温度から、各伝熱面ブロックにおける汚れ抵抗の計画値DAと計測値Daを算出する(ステップS3)。
上記汚れ抵抗の計画値DAは、次の式から算出することができる。

Figure 0005408646

但し、k:熱貫流率(Kcal/mh℃)
α:管外の熱伝達係数(Kcal/mh℃)
α:管内の熱伝達係数(Kcal/mh℃)
λ:管の熱伝導率(Kcal/mh℃)
t:管の厚さ(m)
DA(fr):汚れ抵抗の計画値(mh℃/Kcal) Next, from the calculated gas flow rate Gc and the inlet / outlet gas temperature of each heat transfer surface block, a planned value DA and a measured value Da of the dirt resistance in each heat transfer surface block are calculated (step S3).
The contamination resistance planned value DA can be calculated from the following equation.

Figure 0005408646

However, k: Thermal conductivity (Kcal / m 2 h ° C)
α o : Heat transfer coefficient outside the tube (Kcal / m 2 h ° C)
α i : Heat transfer coefficient in the tube (Kcal / m 2 h ° C)
λ: Thermal conductivity of tube (Kcal / mh ° C)
t: tube thickness (m)
DA (fr): Planned value of dirt resistance (m 2 h ° C / Kcal)

上記一般式を利用して計測データから運転中の汚れ抵抗の計測値Daを逆算できるが、ここでは詳細な計算方法は省略する。   The measured value Da of the dirt resistance during operation can be calculated backward from the measurement data using the above general formula, but a detailed calculation method is omitted here.

次に、上記汚れ抵抗の計画値DAと計測値Daを比較して(ステップS4)、略同じ値であればハンマリング運転スケジュールの初期設定を変更することなく(ステップS7)、ハンマリング運転を実行する(ステップS9,S10)。
上記ステップS4において、計画値DAと計測値Daが略同じ値でなく、計測値Daが計画値DAより大きい場合には(ステップS5)、各伝熱面ブロック毎の汚れ抵抗計画値DA,DB…と汚れ抵抗計測値Da,Db…の偏差に基づいて、ハンマリングの順次運転間隔T1、打撃間隔T2、運転時間T3、休止時間T4、及び操作空気圧力Psを算出し、ハンマリング装置ブロックの打撃回数R、打撃時間H、又は打撃力Fを初期設定から増加させて(ステップS6)、ハンマリング運転を実行する(ステップS9,S10)。
Next, the planned value DA and the measured value Da of the dirt resistance are compared (step S4). If the values are substantially the same, the initial setting of the hammering operation schedule is not changed (step S7), and the hammering operation is performed. Execute (Steps S9 and S10).
In step S4, when the planned value DA and the measured value Da are not substantially the same value and the measured value Da is larger than the planned value DA (step S5), the dirt resistance planned values DA and DB for each heat transfer surface block. .. And dirt resistance measured values Da, Db... Are calculated to calculate the hammering sequential operation interval T1, the striking interval T2, the operation time T3, the downtime T4, and the operating air pressure Ps. The hammering operation is executed (steps S9 and S10) by increasing the number of hits R, the hitting time H, or the hitting force F from the initial setting (step S6).

また、上記ステップS5において、計測値Daが計画値DAより大きくない場合(計測値Daが計画値DAより小さい場合)には、上記ステップS6と同様に、各伝熱面ブロック毎の汚れ抵抗計画値DA,DB…と汚れ抵抗計測値Da,Db…の偏差に基づいて、ハンマリングの順次運転間隔T1、打撃間隔T2、運転時間T3、休止時間T4、及び操作空気圧力Psを算出し、ハンマリング装置ブロックの打撃回数R、打撃時間H、又は打撃力Fを初期設定から減少させて(ステップS8)、ハンマリング運転を実行する(ステップS9,S10)。   If the measured value Da is not larger than the planned value DA in step S5 (if the measured value Da is smaller than the planned value DA), the dirt resistance plan for each heat transfer surface block is the same as in step S6. Based on the deviation between the values DA, DB... And the dirt resistance measurement values Da, Db... The hammering operation is executed (steps S9 and S10) by reducing the number of hits R, the hitting time H, or the hitting force F from the initial setting (step S8).

上記ハンマリング運転が終了すると(ステップS10)、ハンマリング運転は休止時間T4の間だけ休止する。このとき、休止時間が終了するか、又は廃熱ボイラーの運転が停止されるまで休止状態で待機する(ステップS11、S12)。ステップS11において休止時間が終了すれば、上記ステップ2に戻りこれ以降の動作を繰り返し実行する。また、上記ステップS12においてボイラーの運転が停止されると、このハンマリング運転動作を終了する(ステップS13)。   When the hammering operation is completed (step S10), the hammering operation is stopped only during the stop time T4. At this time, it waits in a resting state until the resting time ends or the operation of the waste heat boiler is stopped (steps S11 and S12). When the pause time ends in step S11, the process returns to step 2 and the subsequent operations are repeated. When the boiler operation is stopped in step S12, the hammering operation is terminated (step S13).

以上のように、廃熱ボイラーの運転中において、各伝熱面ブロック毎の汚れ抵抗の大きさに対応して、それぞれの伝熱面ブロック毎の打撃回数R、打撃時間H、又は打撃力Fを変更することができるので、無駄な損傷部品を軽減することができ、省力化及び騒音の小さい設備となり、広義に地球、人、環境に配慮したハンマリングシステムとすることが可能となる。   As described above, during the operation of the waste heat boiler, the number of hits R, the hitting time H, or the hitting force F for each heat transfer surface block corresponding to the magnitude of the dirt resistance for each heat transfer surface block. Therefore, it is possible to reduce useless damaged parts, to save labor and to reduce noise, and to make a hammering system in consideration of the earth, people, and the environment in a broad sense.

は、本発明の実施例における廃熱ボイラーの要部の概略正面図である。These are the schematic front views of the principal part of the waste heat boiler in the Example of this invention. は、同じく実施例における廃熱ボイラーの要部の概略平面図である。These are the schematic plan views of the principal part of the waste-heat boiler in an Example. は、同じく実施例における廃熱ボイラーの要部の概略側面図である。These are the schematic side views of the principal part of the waste-heat boiler in an Example. は、廃熱ボイラーの伝熱管において、ハンマリング打撃点からの長さと汚れ抵抗との関係を図式化したものである。Fig. 4 is a schematic diagram showing the relationship between the length from the hammering strike point and the dirt resistance in a heat transfer tube of a waste heat boiler. は、同じく廃熱ボイラーの伝熱管において、管群の長さと汚れ抵抗との関係を図式化したものである。Is a schematic diagram of the relationship between the length of the tube group and the dirt resistance in the heat transfer tube of the waste heat boiler. は、同じく廃熱ボイラーの伝熱管において、ガス温度と汚れ抵抗との関係を図式化したものである。Is a schematic diagram showing the relationship between gas temperature and dirt resistance in a heat transfer tube of a waste heat boiler. は、同じく廃熱ボイラーの伝熱管において、ガス流れの管群の左右方向での偏流と汚れ抵抗との関係を図式化したものである。Fig. 2 is a schematic diagram showing the relationship between the drift in the left-right direction of the gas flow tube group and the dirt resistance in the heat transfer tube of the waste heat boiler. は、同じく廃熱ボイラーの伝熱管において、ガス流れの管群の上下方向での偏流と汚れ抵抗との関係を図式化したものである。Fig. 4 is a schematic diagram showing the relationship between the drift in the vertical direction of the gas flow tube group and the dirt resistance in the heat transfer tube of the waste heat boiler. は、本発明の実施例における廃熱ボイラーの模式的な正面図である。These are the typical front views of the waste-heat boiler in the Example of this invention. は、本発明の実施例における廃熱ボイラーの模式的な平面図である。These are the typical top views of the waste-heat boiler in the Example of this invention. は、同じく実施例における廃熱ボイラーの模式的な側面図である。These are the typical side views of the waste-heat boiler in an Example. は、同じく実施例による廃熱ボイラーのハンマリング運転制御装置のブロック図である。These are the block diagrams of the hammering operation control apparatus of the waste heat boiler by the same Example. は、同じく実施例による廃熱ボイラーのハンマリング運転動作を説明するブロック図である。These are the block diagrams explaining the hammering driving | operation operation | movement of the waste-heat boiler by an Example. は、同じく実施例によるハンマリング装置ブロックの運転スケジュールである。These are the operation schedules of the hammering device block according to the embodiment. は、同じく実施例による廃熱ボイラーのハンマリング運転動作のフロー図である。These are the flowcharts of the hammering driving | operation operation | movement of the waste heat boiler by the Example similarly. は、従来の廃熱ボイラーの概略図であり、(a)は正面図、(b)は側面図である。These are the schematic diagrams of the conventional waste heat boiler, (a) is a front view, (b) is a side view. は、同じく従来の廃熱ボイラーの要部拡大図であり、(a)は正面図、(b)は側面図である。These are the principal part enlarged views of the conventional waste heat boiler, (a) is a front view, (b) is a side view.

符号の説明Explanation of symbols

1,1a,1b…伝熱管(廃熱ボイラーの)
2…入口管寄せ
3a,3b…出口管寄せ 4a〜4e…ボイラー外殻壁(中央部)
5a〜5e…ボイラー外殻壁(上部) 6a〜6d…ボイラー外殻壁(下部)
7,7a,7b…連結軸 8a,8b…ベローズ
9a,9b…弾性体(皿バネ)
10a,10b…ラッピングロッド 11,11a,11b…吊り金具 12,12a,12b…ヒンジ部材 13,13a,13b…ピン 14,14a,14b…吊りロッド 15,15a,15b…ナット 16,16a,16b…吊りビーム 17,17a,17b…連結金具 18…バッフルプレート 19…ダスト排出装置
20a,20b…エアノッカー(打撃装置) 25…ボイラー本体
27,27a,27b…ヒンジ機構
30…制御装置
31…制御手段
32a〜32e…ハンマリング装置ブロックの駆動回路
33…操作空気圧力設定手段
35…ボイラーガス流量演算手段
36a,36b…汚れ抵抗演算手段
37a,37b…ハンマリング運転スケジュール演算手段
B-1〜B-5…ハンマリング装置ブロック
G,G1〜G5…伝熱面ブロック(管群)
n1〜n80…ハンマリング装置の数 t1〜t18…ガス温度検知器
T1…順次運転間隔 T2…打撃間隔
T3…運転時間 T4…休止時間
1, 1a, 1b ... Heat transfer tube (for waste heat boiler)
2 ... Inlet header 3a, 3b ... Outlet header 4a-4e ... Boiler shell wall (central part)
5a to 5e ... boiler outer shell wall (upper part) 6a to 6d ... boiler outer shell wall (lower part)
7, 7a, 7b ... connecting shaft 8a, 8b ... bellows 9a, 9b ... elastic body (disc spring)
10a, 10b ... Wrapping rods 11, 11a, 11b ... Suspension brackets 12, 12a, 12b ... Hinge members 13, 13a, 13b ... Pins 14, 14a, 14b ... Suspension rods 15, 15a, 15b ... Nuts 16, 16a, 16b ... Suspension beam 17, 17a, 17b ... Connecting bracket 18 ... Baffle plate 19 ... Dust ejecting device 20a, 20b ... Air knocker (blowing device) 25 ... Boiler body 27, 27a, 27b ... Hinge mechanism 30 ... Control device 31 ... Control means 32a ~ 32e ... Hammering device block drive circuit 33 ... Operating air pressure setting means 35 ... Boiler gas flow rate calculating means 36a, 36b ... Dirt resistance calculating means 37a, 37b ... Hammering operation schedule calculating means B-1 to B-5 ... Hammer Ring device block G, G1-G5 ... Heat transfer surface blow (Tube group)
n1 to n80 ... number of hammering devices t1 to t18 ... gas temperature detector T1 ... sequential operation interval T2 ... striking interval T3 ... operation time T4 ... pause time

Claims (3)

多数の伝熱管を配列した伝熱面ブロックと、この伝熱面ブロックの各伝熱管に振動を加えて付着したダストを除去するハンマリング装置と、このハンマリング装置の運転を制御するハンマリング運転制御装置とを備える廃熱ボイラーのハンマリング運転スケジュール制御システムにおいて、
定格負荷運転におけるボイラー蒸発量とボイラー入口/出口ガス温度に基づいて、ガス流量を算出するガス流量演算手段と、
上記ガス流量と上記伝熱面ブロックの入口/出口ガス温度に基づいて、該伝熱面ブロックの汚れ抵抗計測値を算出する汚れ抵抗演算手段と、
上記伝熱面ブロックの汚れ抵抗計測値と、予め定められた汚れ抵抗計画値に基づいて、上記ハンマリング装置の打撃回数、打撃時間、又は打撃力の少なくとも1つを変更するハンマリング運転スケジュール演算手段とを備えて成り、
上記伝熱面ブロックに対して、その汚れ度合に応じて適正な打撃を加えることを特徴とする廃熱ボイラーのハンマリング運転スケジュール制御システム。
A heat transfer surface block in which a large number of heat transfer tubes are arranged, a hammering device that removes dust adhering to each heat transfer tube of this heat transfer surface block, and a hammering operation that controls the operation of this hammering device In a hammering operation schedule control system for a waste heat boiler comprising a control device,
A gas flow rate calculation means for calculating a gas flow rate based on the boiler evaporation amount and the boiler inlet / outlet gas temperature in the rated load operation ;
Based on the inlet / outlet gas temperature of the gas flow rate and the heat transfer Netsumen block, and fouling resistance calculating means for calculating a stain which resistance measurements of said transmission Netsumen block,
Fouling is a resistance measurement of the heat transfer Netsumen block, based on the stain resistance planned value set in advance, hit number of the hammering device, striking time, or hammering operation schedule for changing at least one of the striking force Comprising a computing means,
A waste heat boiler hammering operation schedule control system, wherein an appropriate blow is applied to the heat transfer surface block in accordance with the degree of contamination.
上記伝熱面ブロックが複数設けられ、各伝熱面ブロックの入口/出口ガス温度に基づいて、各伝熱面ブロックの汚れ抵抗計測値を算出し、各伝熱面ブロックに対してそれぞれの汚れ度合に応じて適正な打撃を加えることを特徴とする請求項1に記載の廃熱ボイラーのハンマリング運転スケジュール制御システム。 The heat transfer Netsumen block provided with a plurality of, based on the inlet / outlet gas temperature of Kakuden'netsumen block calculates the stain is resistance measurements of Kakuden'netsumen blocks, each relative Kakuden'netsumen block The hammering operation schedule control system for a waste heat boiler according to claim 1, wherein an appropriate blow is applied according to the degree of contamination. 上記複数の伝熱面ブロックそれぞれの汚れ抵抗計測値に基づいて、各伝熱面ブロックにおけるハンマリング装置の打撃回数、打撃時間、又は打撃力の少なくとも1つを変更することを特徴とする請求項2に記載の廃熱ボイラーのハンマリング運転スケジュール制御システム。 The plurality of heat-transfer surface blocks each stain is based on the resistance measurement values, number of hits hammering apparatus in Kakuden'netsumen block shot time, or claims, characterized in modifying at least one of the striking force Item 3. A waste heat boiler hammering operation schedule control system according to Item 2.
JP2008316998A 2008-12-12 2008-12-12 Hammering operation schedule control system for waste heat boiler Active JP5408646B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008316998A JP5408646B2 (en) 2008-12-12 2008-12-12 Hammering operation schedule control system for waste heat boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008316998A JP5408646B2 (en) 2008-12-12 2008-12-12 Hammering operation schedule control system for waste heat boiler

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2013100327A Division JP5596209B2 (en) 2013-05-10 2013-05-10 Hammering operation schedule control system for waste heat boiler

Publications (2)

Publication Number Publication Date
JP2010139186A JP2010139186A (en) 2010-06-24
JP5408646B2 true JP5408646B2 (en) 2014-02-05

Family

ID=42349461

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008316998A Active JP5408646B2 (en) 2008-12-12 2008-12-12 Hammering operation schedule control system for waste heat boiler

Country Status (1)

Country Link
JP (1) JP5408646B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5589806B2 (en) * 2010-11-30 2014-09-17 住友金属鉱山株式会社 Shielding equipment for smelting furnace waste heat recovery boiler
JP5434892B2 (en) * 2010-11-30 2014-03-05 住友金属鉱山株式会社 Shielding equipment for smelting furnace waste heat recovery boiler
JP6407508B2 (en) * 2012-12-27 2018-10-17 川崎重工業株式会社 Waste heat boiler, heat exchanger, dust removing device provided in heat exchanger, and method of manufacturing heat exchanger
CN107654988A (en) * 2017-10-12 2018-02-02 苏州海陆重工股份有限公司 A kind of combustion engine waste heat boiler
JP6891860B2 (en) * 2018-06-05 2021-06-18 Jfeエンジニアリング株式会社 Dust removal device for heat transfer tubes
CN114199036A (en) * 2020-09-18 2022-03-18 川崎重工业株式会社 Waste heat recovery boiler and dust removal operation planning device thereof
CN113695169B (en) * 2021-09-23 2022-09-27 湖南弘钧电子科技有限公司 Dispensing machine

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1221284A (en) * 1984-02-17 1987-05-05 John R. Wynnyckyj Convection section ash monitoring
JPS6415031U (en) * 1987-07-07 1989-01-25
JP2553089B2 (en) * 1987-07-17 1996-11-13 株式会社東芝 Boiler soot blow control device
JPH06180105A (en) * 1992-12-08 1994-06-28 Mitsubishi Heavy Ind Ltd Method and apparatus for diagnosing dirt on tube in exhaust gas economizer

Also Published As

Publication number Publication date
JP2010139186A (en) 2010-06-24

Similar Documents

Publication Publication Date Title
JP5408646B2 (en) Hammering operation schedule control system for waste heat boiler
JP2005513394A (en) Steam superheater formed of non-circular tubes
JP5201729B2 (en) Waste heat recovery power plant of lime calcining plant
US3997000A (en) Mechanical cleaning device for boilers with gas flow containing sticky dust
JP5596209B2 (en) Hammering operation schedule control system for waste heat boiler
JP5234948B2 (en) Vertical heat exchanger
EP0716282B1 (en) Rappable steam generator tube bank
JP5274709B2 (en) Circulating fluidized bed boiler
US1565304A (en) Economizer for steam boilers
JP5580661B2 (en) Boiler dust removal mechanism
JP2001141391A (en) Method of removing ash or dust adhering to heat conductive pipe of exhaust gas heat exchanger, and its device
JP2011512246A (en) Method and apparatus for controlling ESP wrapping
AU2007202566B2 (en) Boiler tube wall and device for cleaning thereof
JP6735890B1 (en) Boiler tube bank ash removal system
JP5209952B2 (en) High dust exhaust gas heat recovery treatment equipment
TWI774366B (en) System for removing ash adhering to pipe groups of boiler
JPS59142399A (en) Dust removing device of boiler tube by hammer stroke
JP4215894B2 (en) Dust removal method
KR101994903B1 (en) Adhesion dust removal device for horizontal tail end Boiler capable of side abrasion restraining, and Boiler using the same
JP4218157B2 (en) Soot blowing method for heat exchanger for exhaust gas
SU334467A1 (en) DEVICE FOR VIBRATION-SHOCK CLEANING OF TUBULAR SURFACES OF THERMAL EXCHANGE
CN219531812U (en) Dry dust remover applied to heat exchange device
JPS5928813B2 (en) Waste heat boiler dust adhesion prevention device
US1474162A (en) pratt
JPH11132429A (en) Dust eliminator of waste incinerator

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20110324

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20110324

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111116

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130315

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20130423

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130510

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20130423

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20130517

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20130517

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131004

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131030

R150 Certificate of patent or registration of utility model

Ref document number: 5408646

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250