JP5380119B2 - Power supply capacity estimation apparatus for small-scale power system, power supply capacity estimation method and power capacity estimation program - Google Patents

Power supply capacity estimation apparatus for small-scale power system, power supply capacity estimation method and power capacity estimation program Download PDF

Info

Publication number
JP5380119B2
JP5380119B2 JP2009063482A JP2009063482A JP5380119B2 JP 5380119 B2 JP5380119 B2 JP 5380119B2 JP 2009063482 A JP2009063482 A JP 2009063482A JP 2009063482 A JP2009063482 A JP 2009063482A JP 5380119 B2 JP5380119 B2 JP 5380119B2
Authority
JP
Japan
Prior art keywords
power
capacity
demand
power supply
error
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009063482A
Other languages
Japanese (ja)
Other versions
JP2010220363A (en
Inventor
保博 田口
康宏 野呂
保幸 宮崎
真也 數澤
健一 相川
努 小野田
義博 竹井
隆雄 緒方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Tokyo Gas Co Ltd
Original Assignee
Toshiba Corp
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tokyo Gas Co Ltd filed Critical Toshiba Corp
Priority to JP2009063482A priority Critical patent/JP5380119B2/en
Publication of JP2010220363A publication Critical patent/JP2010220363A/en
Application granted granted Critical
Publication of JP5380119B2 publication Critical patent/JP5380119B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、小規模電力系統(マイクログリッド)が商用電力系統と連系しつつ、受電電力一定制御及び同時同量制御を行うシステムを実現するために必要な発電機等の電源容量を推定する小規模電力系統の電源容量推定装置、その電源容量推定方法及び電源容量推定用プログラムに関する。   The present invention estimates the power supply capacity of a generator or the like necessary for realizing a system that performs constant control of received power and simultaneous control of the same amount while a small-scale power system (microgrid) is linked to a commercial power system. The present invention relates to a power source capacity estimation device for a small-scale power system, a power source capacity estimation method thereof, and a power source capacity estimation program.

近年、CO2削減等の観点から、一般需要者が供給を受けている商用電力系統とは別に自ら発電できる分散電源や蓄電池等の電力貯蔵システムとを組み合わせ、電力需要状況に合せて、分散電源の発電量や電力貯蔵システムの充電量や放電量を制御し、電力の需要供給バランスを保つ小規模電力供給網(以下、小規模電力系統と呼ぶ)の実証試験や検討がなされている。   In recent years, from the viewpoint of CO2 reduction, etc., combined with a commercial power system supplied by general consumers, a distributed power source that can generate power by itself, or a power storage system such as a storage battery, Demonstration tests and studies are being conducted on small-scale power supply networks (hereinafter referred to as small-scale power systems) that control the amount of power generation and the amount of charge and discharge in the power storage system to maintain the power supply and demand balance.

分散電源としては、発電出力が制御可能なガスタービン発電機、ディーゼル発電機等のような出力可変可能制御分散電源や発電出力を制御できない太陽光発電、風力発電等のような出力可変不可制御分散電源が使用されている。   Distributed power sources include controllable power sources such as gas turbine generators, diesel generators, etc. that can control power generation output, and non-variable control power sources such as solar power generation, wind power generation, etc. that cannot control power generation output. The power supply is in use.

小規模電力系統は、商用電力系統と連系せずに自立して電力需給バランスを保つ場合と、商用電力系統と連系して連系点の電力潮流が一定となるように小規模電力系統内で電力需給バランスを保つ場合とがある。   A small-scale power system is a small-scale power system that maintains its power supply and demand balance independently without being connected to the commercial power system, and that the power flow at the connection point is constant by connecting to the commercial power system. In some cases, the balance between electricity supply and demand is maintained.

本出願で取り扱う小規模電力系統は、後者の商用電力系統と連系する場合を対象とする。このとき、連系点を通過する有効電力は受電点電力と呼ぶ。   The small-scale power system dealt with in this application is intended for the case where it is connected to the latter commercial power system. At this time, the active power passing through the interconnection point is referred to as power receiving point power.

小規模電力系統が商用電力系統と連系している場合、小規模電力系統内の需給バランス制御としては、受電点電力一定制御や同時同量制御がある。受電点電力一定制御は、数秒程度の連系点の電力変動を抑制し、電力の単位であるワット(W)の追従性を確保する制御であって、受電点電力一定制御の目標値を受電点電力目標値と呼ぶ。一方、同時同量制御は、一定時間における受電点電力量と受電点電力量目標値との差を需要電力量で割ったものを所定の範囲(例えば3%以内)に抑える制御であって、一定時間ごとの電力量の単位であるワットアワー(Wh)の目標値(積分値)を一定とする制御である。この同時同量制御の目標値を受電点電力量目標値と呼ぶ。   When a small-scale power system is linked to a commercial power system, supply / demand balance control in the small-scale power system includes constant power reception point power control and simultaneous equal amount control. Power reception point constant power control is a control that suppresses power fluctuations at the connection point for several seconds and ensures followability of watts (W), which is a unit of power, and receives the target value of power reception point constant power control. This is called a point power target value. On the other hand, the same amount control is a control for suppressing the difference between the power reception point power amount and the power reception point power target value for a certain time by the demand power amount within a predetermined range (for example, within 3%). In this control, the target value (integrated value) of watt hour (Wh), which is a unit of electric energy for every fixed time, is made constant. The target value for this simultaneous equal amount control is referred to as a power receiving point power amount target value.

しかし、小規模電力系統を完成した後に受電点電力一定制御や同時同量制御を実施するものであって、受電点電力一定制御や同時同量制御を実施する前に小規模電力系統の運用計画を立て、その運用計画の中で如何なる容量の発電機や蓄電池等の出力可変制御可能な分散電源を必要とするか、また受電点電力目標値を決定する必要がある。   However, after completing the small-scale power system, the receiving point power constant control and the simultaneous equal amount control are performed. In the operation plan, it is necessary to determine the capacity of the distributed power source capable of variable output control such as a generator and a storage battery, and to determine the power receiving point power target value.

運用計画の段階では、過去の電力需要実績や気象予報から小規模電力系統内の負荷や出力可変不可制御分散電源の設定時間間隔毎の電力負荷予測、電熱負荷予測、発電出力仮設定を行う。発電出力の仮設定とするのは、実際の出力指令は当日の実電力需要を考慮して行うので、運用計画段階ではおよその計画値を決める為である。   In the stage of operation planning, power load prediction, electric heat load prediction, and power generation output provisional setting are performed for each set time interval of the load in the small-scale power system and the output variable control disabled power source from the past power demand record and weather forecast. The temporary setting of the power generation output is to determine an approximate plan value at the operation planning stage because the actual output command is performed in consideration of the actual power demand on the day.

次に、電熱予測値から計算される電熱需給バランスと小規模電力系統内の設備運転制約等を考慮し、燃料費等の運転コスト、二酸化炭素等の温暖化ガス排出量などの評価指標を最小化する出力可変可能制御分散電源の発電出力や電力貯蔵システムの充放電や受電点電力等の目標値を算出する。   Next, taking into consideration the electric power supply and demand balance calculated from the predicted electric heat value and equipment operation constraints in a small-scale power system, etc., minimize the evaluation indices such as operating costs such as fuel costs and greenhouse gas emissions such as carbon dioxide Target values such as the power generation output of the controllable distributed power source, the charge / discharge of the power storage system, the power at the receiving point, and the like are calculated.

従来、この種の電力需給制御システムは、熱電需要と自然エネルギー利用の分散電源の発電量とを予測し、エネルギー蓄積量を考慮してエネルギーコストを最小化する運用計画を立案するエネルギー需給制御方法が提案されている(特許文献1)。   Conventionally, this type of power supply and demand control system predicts thermoelectric demand and the amount of power generated by distributed power sources using natural energy, and formulates an operation plan that minimizes energy costs in consideration of the energy storage amount. Has been proposed (Patent Document 1).

通常、運用計画の時間間隔は、計算量や予測値の精度等の理由により、数分から数十分間隔とするのが一般的である。例えば、5分毎の運用計画であれば、受電点電力目標値は5分間一定値となる。一方、受電点電力量目標値は受電点電力目標値を設定時間で積分したものであり、例えば5分毎の運用計画であれば、5分毎の受電点電力目標値を5分間に亘って時間積分したものが受電点電力量目標値となる。従って、運用計画では、受電点電力目標値に受電点電力を追従させ、受電点電力量目標値に受電点電力量を追従させることで、運転コストや温暖化ガス排出量の最適化を図ることができる。   Usually, the time interval of the operation plan is generally set to be several minutes to several tens of minutes for reasons such as the amount of calculation and the accuracy of the predicted value. For example, if the operation plan is every 5 minutes, the power receiving point power target value is a constant value for 5 minutes. On the other hand, the power receiving point power amount target value is obtained by integrating the power receiving point power target value with the set time. For example, if the operation plan is every 5 minutes, the power receiving point power target value every 5 minutes is taken over 5 minutes. The result of time integration is the power receiving point power amount target value. Therefore, in the operation plan, optimize the operating cost and greenhouse gas emissions by making the receiving point power follow the receiving point power target value and making the receiving point power amount follow the receiving point power amount target value. Can do.

以上要するに、受電点電力や受電点電力量を目標値に追従させる受電点電力一定制御や同時同量制御を実施できれば、小規模電力系統内の出力可変不可制御分散電源の変動出力による商用電力系統への影響を回避でき、また小規模電力系統におけるコストや環境影響面で最適に運用することが可能となる。   In short, if power receiving point power constant control or simultaneous same amount control that makes receiving point power and receiving point power follow the target value can be implemented, commercial power system by variable output of distributed variable power supply in a small scale power system Can be avoided, and can be optimally operated in terms of cost and environmental impact in a small-scale power system.

特開2005−86953号公報JP 2005-86953 A

ところで、前述したように受電点電力一定制御や同時同量制御を実施する場合、ガスタービン発電機やディーゼルエンジン発電機等の出力可変可能制御分散電源や蓄電池等の出力制御が可能な設備が必要となる。一般に、設備容量が大きいほど制御が容易となるが、その反面、コストが高くなる。   By the way, as mentioned above, when receiving point power constant control and simultaneous same amount control are performed, variable output power control such as gas turbine generators and diesel engine generators and equipment capable of output control such as storage batteries are required. It becomes. In general, the larger the equipment capacity, the easier the control, but the higher the cost.

また、小規模電力系統や需給制御、受電点電力一定制御や同時同量制御を模擬したシミュレーションモデルにより、必要設備容量,ひいては所要の発電機の選定が可能となるが、シミュレーションモデルを実施するために非常に大きな労力と手間がかかる問題がある。   In addition, a simulation model that simulates a small-scale power system, supply and demand control, constant receiving point power control, and simultaneous equal amount control makes it possible to select the required equipment capacity and eventually the required generator. However, there is a problem that takes a lot of labor and labor.

よって、経済性を考慮し、最小容量で受電点電力一定制御や同時同量制御を精度良く実施するためには、電源設備の必要電源容量を推定することが重要となってくる。   Therefore, in consideration of economy, it is important to estimate the required power capacity of the power supply equipment in order to accurately perform the constant power reception point power control and the simultaneous same amount control with the minimum capacity.

本発明は上記事情に鑑みてなされたもので、受電点電力一定制御や同時同量制御を精度良く実施するために、小規模電力系統で必要とする電源設備の必要電源容量を簡便に推定する小規模電力系統の電源容量推定装置、その電源容量推定方法及び電源容量推定用プログラムを提供することを目的とする。   The present invention has been made in view of the above circumstances, and in order to accurately perform power receiving point power constant control and simultaneous equal amount control, the required power capacity of power supply equipment required in a small-scale power system is simply estimated. It is an object of the present invention to provide a power source capacity estimation device, a power source capacity estimation method, and a power capacity estimation program for a small-scale power system.

(1) 上記課題を解決するために、本発明は、商用電力系統と連系し、商用電力系統からの電力と分散電源の発電出力とを需要家設備である負荷設備に供給する小規模電力系統に対して、受電点電力一定制御や同時同量制御を実施して電力需給バランスをとるために、当該小規模電力系統の出力可変可能制御分散電源の必要電源容量を推定する小規模電力系統の電源容量推定装置であって、
現時点以前の電力需要実データ及び少なくとも気温や天気から予測される前記負荷設備に供給する電力需要予測結果とが記憶された記憶手段と、所定期間における前記電力需要実データ>電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、最大需要誤差及び平均誤差を演算し(後記する式12、式13参照)、それぞれ電力需要予測誤差補正容量(後記する式15a、式15b〜式17a、式17b参照)とする補正容量算出手段と、所定期間における前記電力需要実データ>電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、当該所定期間内の同時同量制御の制御周期毎における電力需要実データの始点と終点の値の差分の絶対値の中から電力需要実データ差分最大値を取得し(後記する式8b、式16、式18参照)、電力需要最大変動分必要容量とする変動容量算出手段と、前記電力需要実データ>前記電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、前記最大需要誤差、前記平均誤差及び前記電力需要実データ差分最大値を用いて、所定の演算式(後記する19a〜19d)に基づいて出力可変可能制御分散電源の必要電源容量を推定する暫定必要電源容量推定手段と、前記最大需要誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量前記平均誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量(後記する式20a,式20b参照)と前記出力可変可能制御分散電源の容量下限値と電源設備保護・耐久性から定める容量マージン(後記する式21〜式23参照)とから、前記最大需要誤差及び平均誤差を適用した最終解となる必要電源容量(後記する式24〜式27参照)を推定する最終必要電源容量推定手段とを備えた構成である。
(1) In order to solve the above-mentioned problems, the present invention is a small-scale electric power that is connected to a commercial power system and supplies the power from the commercial power system and the power generation output of the distributed power source to a load facility that is a customer facility. A small-scale power system that estimates the required power capacity of a variable distributed power source that can control the output of the small-scale power system in order to balance power supply and demand by implementing constant power reception point control and simultaneous equal amount control for the system. A power capacity estimation device of
Storage means storing power demand actual data before the current time and at least power demand prediction results to be supplied to the load equipment predicted from temperature and weather; and the power demand actual data in a predetermined period> power demand prediction results; The maximum demand error and the average error are calculated separately for the power demand actual data <the power demand prediction result (see formulas 12 and 13 described later), and the power demand prediction error correction capacity (the formulas 15a and 15 described later), respectively. 15b to 17a and 17b), the power demand actual data in a predetermined period> the power demand prediction result, and the power demand actual data <the power demand prediction result. Obtain the maximum power demand data difference maximum value from the absolute value of the difference between the actual power demand data start point and end point value for each control period of the same amount control within the period. (See formulas 8b, 16 and 18 to be described later), a fluctuation capacity calculation means for obtaining a required capacity for the maximum fluctuation of power demand, the power demand actual data> the power demand prediction result, and the power demand actual data <the power demand Using the maximum demand error, the average error, and the power demand actual data difference maximum value separately from the prediction result, the necessity of a control distributed power source capable of variable output based on a predetermined arithmetic expression (19a to 19d described later) and provisional required power capacity estimation means for estimating the power capacity, the capacity from the required power capacity was determined using the average error and the great need power capacity of the capacitor from the required power capacity was determined using the maximum demand error Required power capacity (see formulas 20a and 20b to be described later), a capacity margin determined from the capacity lower limit value of the output-variable control distributed power supply and protection and durability of power supply facilities (described later) 21 to Equation 23), and a final required power source capacity estimating means for estimating a required power source capacity (see Equations 24 to 27 described later) as a final solution to which the maximum demand error and the average error are applied. It is.

(2) 本発明は、商用電力系統と連系し、商用電力系統からの電力と分散電源の発電出力とを負荷設備に供給する小規模電力系統に対して、受電点電力一定制御や同時同量制御を実施して電力需給バランスをとるために、当該小規模電力系統の前記分散電源の必要電源容量を推定する小規模電力系統の電源容量推定方法であって、
制御指示を入力する入力部と、現時点以前の電力需要実データ及び少なくとも気温や天気から現時点以降の前記負荷設備に供給する電力需要予測結果を記憶する第1の記憶部と、CPUで構成された電源容量推定処理部とを有し、
前記電源容量推定処理部は、前記入力部から電源容量推定の制御指示を受けたとき、前記記憶部から所定期間の電力需要実データと電力需要予測結果とを取り出し、前記電力需要実データ>電力需要予測結果と、前記電力需要実データ<電力需要予測結果とに分けて、最大需要誤差及び平均誤差を演算し(後記式12、式13)、それぞれ電力需要予測誤差補正容量(後記式15a、式15b〜式17a、式17b)を取得する補正容量算出ステップと、所定期間内の同時同量制御の制御周期毎における前記電力需要実データの始点と終点の値の差分を求めた後、それら差分の中から前記電力需要実データ>前記電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、最大値となる電力需要実データ差分最大値である電力需要最大変動分必要容量(後記式8b、式16、式18)を取得する変動容量算出ステップと、前記電力需要実データ>前記電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、前記最大需要誤差、前記平均誤差及び前記電力需要実データ差分最大値を用いて、所定の演算式(後記式19a〜式19d)に基づいて出力可変可能制御分散電源の必要電源容量を推定する暫定必要電源容量推定ステップと、前記最大需要誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量を選定し、かつ、前記平均誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量を選定(後記式20a,式20b)する必要電源容量選定ステップと、この選定された各容量大の必要電源容量と小規模電力系統の出力可変可能制御分散電源の容量下限値と電源設備保護・耐久性から定める容量マージンとから、前記最大需要誤差を適用した最終必要電源容量と前記平均誤差を適用した最終必要電源容量を推定(後記式24〜式27)する最終必要電源容量推定ステップとを有する方法である。
(2) The present invention is connected to a commercial power system, and for a small-scale power system that supplies power from the commercial power system and power generation output of a distributed power source to a load facility, constant power reception point power control and simultaneous A power capacity estimation method for a small-scale power system that estimates the required power capacity of the distributed power supply of the small-scale power system in order to balance the power supply and demand by performing quantity control,
An input unit that inputs a control instruction, a first storage unit that stores actual power demand data before the current time, and a power demand prediction result that is supplied to the load equipment after the current time from at least temperature and weather, and a CPU A power capacity estimation processing unit,
When the power capacity estimation processing unit receives a control instruction for power capacity estimation from the input unit, the power capacity estimation processing unit retrieves power demand actual data and power demand prediction results for a predetermined period from the storage unit, and the power demand actual data> power The maximum demand error and the average error are calculated by dividing the demand prediction result and the power demand actual data <the power demand prediction result (the following formulas 12 and 13), respectively, and the power demand prediction error correction capacity (the following formula 15a, After calculating the correction capacity calculating step for obtaining Equations 15b to 17a, Equation 17b), and the difference between the values of the start point and the end point of the actual power demand data for each control period of the same amount control within a predetermined period, The difference between the power demand actual data> the power demand prediction result and the power demand actual data <the power demand prediction result among the differences, and the power demand actual data difference maximum value that is the maximum value. Fluctuation capacity calculation step for obtaining required capacity (maximum power demand fluctuation required amount (formulas 8b, 16 and 18 described later)), the actual power demand data> the power demand prediction result, and the actual power demand data <the power demand prediction Using the maximum demand error, the average error, and the actual power demand actual data difference maximum value separately based on the result, it is necessary to control the distributed power source capable of variable output based on a predetermined arithmetic expression (Expression 19a to Expression 19d below) Temporary required power capacity estimation step for estimating power capacity and a required power capacity with a large capacity selected from the required power capacity determined using the maximum demand error, and the required power determined using the average error A necessary power source capacity selection step for selecting a large necessary power source capacity from among the capacities (formula 20a and 20b described later), and a necessary power capacity and a small-scale power for each selected large capacity Estimate the final required power capacity applying the maximum demand error and the final required power capacity applying the average error from the lower limit of the capacity of the controllable distributed power supply and the capacity margin determined from the protection and durability of the power supply equipment And a final required power capacity estimation step (formula 24 to formula 27 below).

なお、前記(2)に記載した小規模電力系統の電源容量推定方法の一連の処理は、プログラムデータとして規定し、コンピュータに読み込ませることにより、同様に電源設備の最終必要電源容量を推定することが可能である。   The series of processes of the power capacity estimation method for the small-scale power system described in (2) above is defined as program data, and similarly estimated by the computer to read the final required power capacity of the power equipment. Is possible.

また、小規模電力系統内に出力可変可能制御分散電源の他、新たに出力可変不可制御分散電源を設けた場合、出力可変不可制御分散電源に関する予測誤差を算出し、出力可変可能制御分散電源の暫定必要電源容量に加えることにより、出力可変不可制御分散電源をも考慮した最終必要電源容量を推定することも可能である。   In addition to the control variable power supply with variable output in addition to the variable output controllable power supply in the small-scale power system, a prediction error regarding the variable power supply with controllable output cannot be calculated. By adding to the provisional required power supply capacity, it is also possible to estimate the final required power supply capacity in consideration of the output variable non-controllable distributed power supply.

本発明によれば、受電点電力一定制御や同時同量制御を精度良く実施するために、小規模電力系統で必要とする電源設備の必要設備容量を簡便に推定できる小規模電力系統の電源容量推定装置、その電源容量推定方法及び電源容量推定用プログラムを提供できる。   According to the present invention, the power supply capacity of a small-scale power system that can easily estimate the required facility capacity of the power supply facility required in a small-scale power system in order to accurately perform constant power reception point power control and simultaneous equal amount control. An estimation apparatus, a power capacity estimation method thereof, and a power capacity estimation program can be provided.

本発明に係る小規模電力系統の電源容量推定装置の第1の実施形態を示す構成図。BRIEF DESCRIPTION OF THE DRAWINGS The block diagram which shows 1st Embodiment of the power supply capacity estimation apparatus of the small scale electric power system which concerns on this invention. 本発明に係る小規模電力系統の電源容量推定装置における第1の実施の形態の動作及びその電源容量推定方法による処理(プログラム処理を含む)の流れを説明するフロー図。The flowchart explaining the flow of the process (a program process is included) by the operation | movement of 1st Embodiment in the power supply capacity estimation apparatus of the small-scale electric power system which concerns on this invention, and its power supply capacity estimation method. 受電点電力一定制御や同時同量制御を実施するための機能を備えた小規模電力系統の一般的な構成図。The general block diagram of the small-scale electric power system provided with the function for implementing receiving power constant power control and simultaneous same amount control. 需給制御システムの機能構成を示す図。The figure which shows the function structure of a supply-and-demand control system. 図4に示す需給制御システムの長期電力需要処理部を説明するための電力需要実データと翌日等電力需要予測結果とが実需要>予測結果となるケースを説明する図。The figure explaining the case where the power demand actual data for explaining the long-term power demand processing part of the supply-demand control system shown in FIG. 図4に示す需給制御システムの受電点電力目標値計算処理部で行う受電点電力目標値を算出する例を説明する図。The figure explaining the example which calculates the receiving point power target value performed in the receiving point power target value calculation process part of the supply-and-demand control system shown in FIG. 電力需要実データと翌日等電力需要予測結果が一致している例を説明する図。The figure explaining the example with which electric power demand actual data and electric power demand prediction results, such as the next day, correspond. 電力需要実データと翌日等電力需要予測結果が実需要<予測結果となるケースを説明する図。The figure explaining the case where the power demand actual data and the power demand prediction result such as the next day are the actual demand <the prediction result. 本発明に係る小規模電力系統の電源容量推定装置の第2の実施形態を示す構成図。The block diagram which shows 2nd Embodiment of the power supply capacity estimation apparatus of the small scale electric power system which concerns on this invention. 本発明に係る小規模電力系統の電源容量推定装置における第2の実施の形態の動作及びその電源容量推定方法による処理(プログラム処理を含む)の流れを説明するフロー図。The flowchart explaining the flow of the process (a program process is included) by the operation | movement of 2nd Embodiment in the power supply capacity estimation apparatus of the small-scale electric power system which concerns on this invention, and its power supply capacity estimation method. 出力可変可能制御分散電源の他、太陽光発電もしくは風力発電等の制御が難しい出力可変不可制御分散電源を並列に接続した場合を考慮し、必要設備容量を推定する小規模電力系統の一般的な構成図。In general, small-scale power systems that estimate required equipment capacity in consideration of the case of connecting variable power sources that are difficult to control, such as photovoltaic power generation or wind power generation, in addition to variable power sources that can control output, in parallel. Diagram. 需給制御システムの機能構成を示す図。The figure which shows the function structure of a supply-and-demand control system.

以下、本発明の実施の形態について図面を参照して説明する。
(第1の実施の形態)
図1は本発明に係る小規模電力系統の電源容量推定装置の第1の実施の形態を示す構成図である。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
(First embodiment)
FIG. 1 is a block diagram showing a first embodiment of a power source capacity estimating apparatus for a small-scale power system according to the present invention.

小規模電力系統の電源容量推定装置は、オペレータが必要なデータや制御指示を入力するキーボード、ポインティングデバイスなどの入力部1と、負荷設備の過去の電力需要実データ36及び気温や天気等の気象データから予測される前記負荷設備への翌日等電力需要予測結果23を取り出し記憶するデータベース2と、小規模電力系統の必要電源容量を推定するための各種の演算式や設定データを記憶する設定データメモリ21と、CPUで構成された電源容量推定処理部3と、表示部4とで構成される。   The power supply capacity estimation device for a small-scale power system includes an input unit 1 such as a keyboard and pointing device for inputting necessary data and control instructions by an operator, past actual power demand data 36 of load equipment, and weather such as temperature and weather. Database 2 that extracts and stores the next day power demand prediction result 23 for the load facility predicted from the data, and setting data that stores various arithmetic expressions and setting data for estimating the required power capacity of the small-scale power system The memory 21 is composed of a power source capacity estimation processing unit 3 constituted by a CPU and a display unit 4.

なお、小規模電力系統の必要電源容量を推定するための各種の演算式や必要なデータは、設定データメモリ21に記憶したが、当該設定データメモリ21に代えて、データベース2に記憶してもよい。また、小規模電力系統の必要電源容量を推定する一連の処理については、予めプログラムデータに従って処理することも可能であるが、その場合には新たに一連の処理を実行するためのプログラムメモリ22を設けた構成とする。   Various arithmetic expressions and necessary data for estimating the required power capacity of the small-scale power system are stored in the setting data memory 21, but may be stored in the database 2 instead of the setting data memory 21. Good. The series of processes for estimating the required power capacity of the small-scale power system can be performed in advance according to the program data. In this case, a program memory 22 for newly executing the series of processes is provided. The configuration is provided.

前記電源容量推定処理部3は、後記する図3で具体的に説明するように、商用電力系統と連系し、商用電力系統からの電力と分散電源設備の発電出力とを需要家設備である負荷設備に供給する小規模電力系統に対して、受電点電力一定制御や同時同量制御を実施するために、当該小規模電力系統の分散電源設備の必要電源容量を推定するものであって、機能的には、補正容量算出手段3A、変動容量算出手段3B、暫定必要電源容量推定手段3C及び最終必要電源容量推定手段3Dを備えている。   The power source capacity estimation processing unit 3 is a customer facility that is connected to a commercial power system and generates power from the commercial power system and the power generation output of the distributed power facility as will be described in detail with reference to FIG. In order to implement constant power receiving point power control and simultaneous equal amount control for a small-scale power system supplied to a load facility, the required power capacity of the distributed power facility of the small-scale power system is estimated, Functionally, it includes correction capacity calculation means 3A, variable capacity calculation means 3B, provisional required power supply capacity estimation means 3C, and final required power supply capacity estimation means 3D.

補正容量算出手段3Aは、入力部1から読み出し指示に従って、データベース2から所定期間(例えば一日24時間)の電力需要実データ36と電力需要予測結果23とを取り出し、所定期間での電力需要実データ36と電力需要予測結果23とから、電力需要実データ36>電力需要予測結果23の場合と電力需要実データ36<電力需要予測結果23の場合とに分けて、最大需要誤差及び平均誤差を演算し(後記する式12、式13参照)、それぞれ電力需要予測誤差補正容量(後記する式15a、式15b〜式17a、式17b参照)とする機能を有する。   The correction capacity calculation means 3A takes out the power demand actual data 36 and the power demand prediction result 23 for a predetermined period (for example, 24 hours a day) from the database 2 in accordance with a read instruction from the input unit 1, and calculates the actual power demand for the predetermined period. From the data 36 and the power demand prediction result 23, the maximum demand error and the average error are divided into the case of the power demand actual data 36> the power demand prediction result 23 and the case of the power demand actual data 36 <the power demand prediction result 23. It has a function of calculating (see formulas 12 and 13 described later) and setting the power demand prediction error correction capacity (see formulas 15a, 15b to 17a, and formula 17b described later).

変動容量算出手段3Bは、所定期間内の同時同量制御の制御周期毎における電力需要実データ36の始点と終点の値の差分の絶対値の中から、電力需要実データ36>電力需要予測結果23の場合と電力需要実データ36<電力需要予測結果23の場合とに分けて、電力需要実データ差分最大値を取得し、電力需要最大変動分必要容量(後記式8b、式16、式18参照)とする機能を有する。   The fluctuating capacity calculation means 3B calculates the actual power demand data 36> the power demand prediction result from the absolute value of the difference between the values of the start point and the end point of the actual power demand data 36 in the control period of the same amount control within the predetermined period. The power demand actual data difference maximum value is acquired separately for the case of 23 and the case of the power demand actual data 36 <the power demand forecast result 23, and the required capacity for the power demand maximum fluctuation (formula 8b, formula 16, formula 18 described later) Function).

暫定必要電源容量推定手段3Cは、電力需要実データ36>電力需要予測結果23の場合と電力需要実データ36<電力需要予測結果23の場合とに分けて、前記最大需要誤差、前記平均誤差及び前記電力需要実データ差分最大値を用いて、所定の演算式に基づいて出力可変可能制御分散電源設備の必要電源容量(後記式19a〜式19d参照)を推定する機能を有する。   The temporary required power capacity estimation means 3C is divided into the case of the power demand actual data 36> the power demand prediction result 23 and the case of the power demand actual data 36 <the power demand prediction result 23, and the maximum demand error, the average error and Using the power demand actual data maximum difference value, it has a function of estimating the required power capacity (see formulas 19a to 19d to be described later) of the output variable controllable distributed power facility based on a predetermined arithmetic expression.

最終必要電源容量推定手段3Dは、前記最大需要誤差を用いて求めた容量の大きな必要電源容量、前記平均誤差を用いて求めた容量の大きな必要電源容量(後記式20a,式20b参照)と小規模電力系統の出力可変可能制御分散電源設備の容量上限値及び容量下限値と電源設備保護・耐久性から定める容量マージン(後記式21〜式23参照)とから、前記最大需要誤差を適用した電源設備容量である最終必要電源容量と前記平均誤差を適用した電源設備容量で最終必要電源容量(後記式24〜式27参照)を推定する機能を有する。   The final required power capacity estimation means 3D has a large required power capacity determined using the maximum demand error, a large required power capacity determined using the average error (see formulas 20a and 20b described later) and a small required power capacity. The power supply to which the maximum demand error is applied from the capacity upper limit value and the capacity lower limit value of the controllable distributed power supply facility of the scale power system and the capacity margin (see Equations 21 to 23 below) determined from the protection and durability of the power supply facility It has a function of estimating the final required power supply capacity (see formulas 24 to 27 below) from the final required power supply capacity as the equipment capacity and the power supply equipment capacity to which the average error is applied.

次に、以上のような小規模電力系統の電源容量推定装置の動作ないし本発明の電源容量推定方法について、図2を参照して説明する。   Next, the operation of the power source capacity estimating apparatus for a small-scale power system as described above or the power source capacity estimating method of the present invention will be described with reference to FIG.

先ず、需要家設備である負荷設備及び自ら発電可能な分散電源,充放電可能な電力貯蔵システム等よりなる分散電源設備を備えた小規模電力系統に対して、受電点電力一定制御や同時同量制御を実施するために、負荷設備による過去の電力需要実データ36の他、気温・天候等に関する気象予測データから翌日等の電力需要予測結果23を取得し、電源容量推定の基礎データを取得し、データベース2に蓄積する。   First, for a small-scale power system with a load facility that is a customer facility, a distributed power source that can generate power by itself, and a distributed power source system that can be charged and discharged, etc. In order to carry out the control, in addition to the past actual power demand data 36 by the load facility, the power demand forecast result 23 for the next day, etc. is obtained from the weather forecast data related to temperature, weather, etc., and basic data for power source capacity estimation is obtained. , Stored in database 2.

以上の状態において、入力部1からの電源容量推定の制御指示を受けたとき(S1)、電源容量推定処理部3は補正容量算出手段3Aを実行する。   In the above state, when a control instruction for power source capacity estimation is received from the input unit 1 (S1), the power source capacity estimation processing unit 3 executes the correction capacity calculation means 3A.

補正容量算出手段3Aは、入力部1から読み出し指示に従って、データベース2から所定期間(例えば一日24時間)の電力需要実データ36と電力需要予測結果23とを取り出し、所定期間での電力需要実データ36と電力需要予測結果23とから、電力需要実データ36>電力需要予測結果23の場合と電力需要実データ36<電力需要予測結果23の場合とに分けて、最大需要誤差及び平均誤差を演算し(後記する式12、式13参照)、それぞれ電力需要予測誤差補正容量を取得する処理を行う(後記する式15a、式15b〜式17a、式17b参照)(S2:補正容量算出ステップ)。   The correction capacity calculation means 3A takes out the power demand actual data 36 and the power demand prediction result 23 for a predetermined period (for example, 24 hours a day) from the database 2 in accordance with a read instruction from the input unit 1, and calculates the actual power demand for the predetermined period. From the data 36 and the power demand prediction result 23, the maximum demand error and the average error are divided into the case of the power demand actual data 36> the power demand prediction result 23 and the case of the power demand actual data 36 <the power demand prediction result 23. Calculation (see formulas 12 and 13 to be described later) and processing for obtaining the power demand prediction error correction capacity (see formulas 15a, 15b to 17a and 17b, which will be described later) (S2: correction capacity calculation step) .

引き続き、電源容量推定処理部3は変動容量算出手段3Bを実行する。この変動容量算出手段3Bは、所定期間内の同時同量制御の制御周期毎における電力需要実データ36の始点と終点の値の差分を求め(S3)、それら差分の中から電力需要実データ36>電力需要予測結果23の場合と電力需要実データ36<電力需要予測結果23の場合とに分けて、最大値となる電力需要実データ差分最大値を取り出し、電力需要実データ差分最大値=電力需要最大変動分必要容量(後記する式8b、式16、式18参照)を算出する(S4)。このステップS3,S4は変動容量算出ステップに相当する。   Subsequently, the power source capacity estimation processing unit 3 executes the variable capacity calculation means 3B. The fluctuating capacity calculation means 3B obtains a difference between the starting point value and the ending point value of the actual power demand data 36 for each control period of the simultaneous same amount control within a predetermined period (S3), and the actual power demand data 36 from these differences. > In the case of the power demand prediction result 23 and the case of the power demand actual data 36 <the case of the power demand prediction result 23, the maximum power demand actual data difference maximum value is extracted, and the power demand actual data difference maximum value = power The required capacity for the maximum demand fluctuation (see formula 8b, formula 16, and formula 18 described later) is calculated (S4). Steps S3 and S4 correspond to a variable capacity calculation step.

しかる後、電源容量推定処理部3は、暫定必要電源容量推定手段3Cを実行する。暫定必要電源容量推定手段3Cは、予め設定データメモリ21に定める設定データである電力需要予測誤差補正容量+電力需要最大変動分必要容量=必要電源容量(後記する式44参照)に基づき、電力需要実データ>電力需要予測結果の場合と電力需要実データ<電力需要予測結果の場合とに分けて、最大需要誤差、平均誤差及び電力需要実データ差分最大値を用いて、所定の演算式に基づいて出力可変可能制御分散電源設備の必要電源容量(後記式19a〜式19d参照)を推定した後(S5:暫定必要電源容量推定ステップ)、最終必要電源容量推定手段3Dを実行する。   Thereafter, the power supply capacity estimation processing unit 3 executes provisional necessary power supply capacity estimation means 3C. The temporary required power capacity estimating means 3C is a power demand based on power demand prediction error correction capacity + power demand maximum fluctuation required capacity = required power capacity (refer to formula 44 described later), which is setting data predetermined in the setting data memory 21. Actual data> Electric power demand prediction results and electric power demand actual data <Electric power demand prediction results, using the maximum demand error, average error, and maximum electric power actual data difference maximum value, based on a predetermined arithmetic expression After estimating the required power supply capacity of the control-distributed power supply equipment with variable output (see formulas 19a to 19d described later) (S5: provisional required power supply capacity estimation step), the final required power supply capacity estimation means 3D is executed.

この最終必要電源容量推定手段3Dは、前記最大需要誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量を選定し、かつ、前記平均誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量(後記式20a,式20b参照)を選定し(S6:必要電源容量選定ステップ)、さらに選定された各容量大の必要電源容量と小規模電力系統の出力可変可能制御分散電源設備の容量上限値及び容量下限値と電源設備保護・耐久性から定める容量マージン(後記式21〜式23参照)とから、前記最大需要誤差を適用した電源設備容量である最終必要電源容量と前記平均誤差を適用した電源設備容量で最終必要電源容量(後記式24〜式27参照)を推定するものである(S7:最終必要電源容量推定ステップ)。   The final required power capacity estimating means 3D selects a required power capacity having a large capacity from the required power capacity determined using the maximum demand error, and includes the required power capacity determined using the average error. The required power capacity with a large capacity is selected from the following (see formulas 20a and 20b below) (S6: required power capacity selection step), and the required power capacity of each selected large capacity and the output variable control of the small power system The final required power supply capacity that is the power supply equipment capacity to which the maximum demand error is applied, from the capacity upper limit value and capacity lower limit value of the distributed power supply equipment and the capacity margin determined from the power supply equipment protection / durability (see Equations 21 to 23 below) The final required power supply capacity (see formulas 24 to 27 below) is estimated based on the power supply equipment capacity to which the average error is applied (S7: final required power supply capacity estimation step).

なお、以上のような電源容量推定方法による一連の処理の流れは、予めプログラムメモリ22に一連の処理の流れを規定し、電源容量推定処理部3であるCPUに読み込ませることにより、ソフトウエア的な処理することも可能である。   Note that the flow of a series of processes according to the power supply capacity estimation method as described above is defined as a software flow by prescribing the flow of a series of processes in the program memory 22 and reading it into the CPU that is the power supply capacity estimation processing unit 3. Can also be processed.

本発明に係る電源容量推定装置は、小規模電力系統に対して、受電点電力一定制御や同時同量制御を実施するために分散電源設備の発電機等の必要電源容量を推定するが、前述のように推定結果である最終必要設備容量が正確であることの根拠について、以下、商用電力系統と連系する実際の小規模電力系統を用いて、計算をしながら具体的に実証してみる。   The power source capacity estimation apparatus according to the present invention estimates the required power capacity of a generator of a distributed power source facility to perform constant power reception point power control and simultaneous equal amount control for a small-scale power system. In the following, we will demonstrate the basis for the fact that the final required installed capacity, which is the estimation result, is accurate, using a real small-scale power grid that is linked to the commercial power grid. .

(1) 実際の小規模電力系統を用いて必要設備容量を推定する実証例について。 (1) Demonstration example of estimating the required installed capacity using an actual small-scale power system.

(1−1) 図3は受電点電力一定制御や同時同量制御を実施するための機能を備えた小規模電力系統の一般的な構成図である。 (1-1) FIG. 3 is a general configuration diagram of a small-scale power system having a function for performing constant power reception point power control and simultaneous equal amount control.

小規模電力系統5は、商用電力系統6と連系線7を通じて連系し、小規模電力系統5内には需要家設備である負荷設備8及び自ら発電可能な分散電源,充放電可能な電力貯蔵システム等よりなる電源設備(出力可変可能制御分散電源)9が設けられ、商用電力系統6からの商用電力12と小規模電力系統5内の電源設備9から得られる電源設備電力10が負荷設備8に供給される。   The small-scale power system 5 is connected to the commercial power system 6 through the connection line 7. The small-scale power system 5 includes a load facility 8 that is a customer facility, a distributed power source that can generate power by itself, and a power that can be charged and discharged. A power supply facility (variable output controllable power source) 9 comprising a storage system or the like is provided, and the commercial power 12 from the commercial power system 6 and the power facility power 10 obtained from the power facility 9 in the small-scale power system 5 are load facilities. 8 is supplied.

ここで、本発明により推定しようとする小規模電力系統5の必要電源容量Xは、小規模電力系統5の小規模電力系統結果データを関数とすることから、
必要電源容量X=f(小規模電力系統結果データ) …(1)
により算出することが可能である。
Here, the required power capacity X of the small-scale power system 5 to be estimated according to the present invention is obtained by using the small-scale power system result data of the small-scale power system 5 as a function.
Required power capacity X = f (small-scale power system result data) (1)
It is possible to calculate by

また、負荷設備8に供給される電力を電力需要11とすると、これら電源設備電力10、電力需要11及び商用電力12の間には、電力ロス分を無視すると、式(2)の関係が成立する。
電力需要11=商用電力12+電源設備電力10 …(2)
ところで、小規模電力系統5では、通常、需給制御と呼ばれる制御を行う需給制御システム13及び同時同量制御システム14が設けられている。
If the power supplied to the load facility 8 is the power demand 11, the relationship of the formula (2) is established between the power supply facility power 10, the power demand 11, and the commercial power 12 if the power loss is ignored. To do.
Electric power demand 11 = commercial power 12 + power supply facility power 10 (2)
By the way, in the small scale electric power system 5, the supply / demand control system 13 and the simultaneous equal amount control system 14 which perform control called supply / demand control are usually provided.

需給制御システム13における需要制御としては、経済性重視の場合と同時同量制御モードを行う場合とで異なる。経済性重視の場合は、商用電力12や電力需要11が入力され、最も経済性となりうる運転指令値を計算して電源設備9に送出するが、本願出願の発明は、同時同量制御を実施することを前提とするので、以下、同時同量制御モードについて説明する。   The demand control in the supply and demand control system 13 is different between the case where the economy is emphasized and the case where the simultaneous same amount control mode is performed. In the case of emphasis on economy, commercial power 12 and power demand 11 are inputted, and the operation command value that can be most economical is calculated and sent to the power supply facility 9. The invention of the present application implements the same amount control simultaneously. Therefore, the simultaneous and same amount control mode will be described below.

需給制御システム13は、同時同量制御モードの場合には、商用電力12や電力需要11等の電力データから、同時同量制御が可能となる商用電力12の目標値(以下、受電点電力目標値15)を求め、同時同量制御システム14に送出する。逆潮流でない場合、商用電力12は連系線7を通って受電点に流れる電力となる。   In the simultaneous and same amount control mode, the supply and demand control system 13 uses a target value of the commercial power 12 (hereinafter referred to as a power receiving point power target) that allows simultaneous and same amount control from power data such as the commercial power 12 and the power demand 11. The value 15) is obtained and sent to the simultaneous same amount control system 14. When it is not a reverse power flow, the commercial power 12 becomes the power that flows through the interconnection line 7 to the power receiving point.

同時同量制御システム14は、受電点電力目標値15をもとに発電指令値16を計算し、この発電指令値16のもとに電源設備9の発電出力を制御する。   The simultaneous equal amount control system 14 calculates a power generation command value 16 based on the power receiving point power target value 15 and controls the power generation output of the power supply facility 9 based on the power generation command value 16.

(1−2) 小規模電力系統5に付加される需給制御システム13について、図4ないし図6を参照して具体的に説明する。
図4は需給制御システム13の機能構成を示す図である。この需給制御システム13は、機能的には、長期電力需要予測処理部18と、受電点電力目標値計算処理部19とが設けられる。
(1-2) The supply and demand control system 13 added to the small-scale power system 5 will be specifically described with reference to FIGS. 4 to 6.
FIG. 4 is a diagram showing a functional configuration of the supply and demand control system 13. Functionally, the supply and demand control system 13 includes a long-term power demand prediction processing unit 18 and a power receiving point power target value calculation processing unit 19.

長期電力需要予測処理部18は、電力需要データベース20に蓄積される現時点以前の電力需要11の蓄積データ(以下、電力需要蓄積データ21と呼ぶ)と、現時点以後の気温や天候等に関する気象予測データ22とを用いて、例えば翌日の電力需要の予測を行い、翌日等電力需要予測結果23として出力する。   The long-term power demand prediction processing unit 18 stores the power demand 11 stored in the power demand database 20 before the current time (hereinafter referred to as power demand stored data 21) and the weather prediction data related to the temperature and weather after the current time. 22, for example, the next day power demand is predicted and output as the next day power demand prediction result 23.

受電点電力目標値計算処理部19は、翌日等電力需要予測結果23に基づき、電源設備データベース24から翌日に利用できる小規模電力系統5に並列可能な電源設備9の電源設備容量25から受電点電力目標値15を計算する。   The power receiving point power target value calculation processing unit 19 receives the power receiving point from the power facility capacity 25 of the power facility 9 that can be paralleled to the small power system 5 that can be used the next day from the power facility database 24 based on the next power demand prediction result 23. The power target value 15 is calculated.

図5は長期電力需要予測処理部18を説明する図である。この図は、縦軸に電力(単位は例えばkW)、横軸に一日にわたる時間tをとり、長期電力需要予測処理部18で予測した翌日の一日の電力需要予測結果23(点線)と、電力需要データベース20に蓄積される同時期(日時),気象状況等を同じくする電力需要11の実データ(以下,電力需要実データ36(実線)とを表した例である。   FIG. 5 is a diagram illustrating the long-term power demand prediction processing unit 18. In this figure, the vertical axis represents power (unit: kW, for example), the horizontal axis represents time t for one day, and the long-term power demand prediction processing unit 18 predicts the power demand forecast result 23 (dotted line) for the next day. This is an example representing the actual data of the power demand 11 (hereinafter referred to as the actual power demand data 36 (solid line)) having the same time period (date and time) accumulated in the power demand database 20 and the same weather conditions.

その結果、翌日等電力需要予測結果23と電力需要実データ36との間には、通常、誤差が生じるが、このとき誤差の最大値を最大需要誤差37、その誤差の平均値を平均需要誤差38とし、以下の式(4),式(5)から求められる。
最大需要誤差37=max[電力需要実データi36−翌日等電力需要予測結果i23]
(i=i0,iN; i0:サンプリングの初期値、iN:サンプリングの最終値)
……(4)
平均需要誤差38=aver[電力需要実データi36−翌日等電力需要予測結果i23]
(i=i0,iN; i0:サンプリングの初期値、iN:サンプリングの最終値)
……(5)
ここで、電力需要実データi36は電力需要実データ36のサンプリングi番目のデータ、翌日等電力需要予測結果i23は翌日等電力需要予測結果23のサンプリングi番目のデータである。なお、需給制御のサンプリング周期は例えば1分とする。また、max[データA]はデータAの最大値、aver[データB]は一日24時間のデータBの平均値を示す。
As a result, an error usually occurs between the power demand prediction result 23 such as the next day and the actual power demand data 36. At this time, the maximum value of the error is the maximum demand error 37, and the average value of the error is the average demand error. 38 and obtained from the following equations (4) and (5).
Maximum demand error 37 = max [Electric power demand actual data i36−Electric power demand forecast result i23 such as next day]
(I = i0, iN; i0: initial value of sampling, iN: final value of sampling)
...... (4)
Average demand error 38 = aver [actual power demand data i36-next day power demand forecast result i23]
(I = i0, iN; i0: initial value of sampling, iN: final value of sampling)
...... (5)
Here, the actual power demand data i36 is the i-th sampling data of the actual power demand data 36, and the next-day power demand prediction result i23 is the i-th sampling data of the next-day power demand prediction result 23. In addition, the sampling cycle of supply and demand control is set to 1 minute, for example. Further, max [data A] indicates the maximum value of data A, and aver [data B] indicates the average value of data B for 24 hours a day.

図6は受電点電力目標値計算処理部19で行う受電点電力目標値15を算出する例を説明する図である。   FIG. 6 is a diagram for explaining an example of calculating the power receiving point power target value 15 performed by the power receiving point power target value calculation processing unit 19.

同時同量制御を実施する場合、予め決定された同時同量制御周期T1毎に受電点電力目標値15を算出する。受電点電力目標値15は、図6に示すように同時同量制御周期T1毎に階段状に変化していることが分かる。これは電源設備9の電源設備容量25に能力等による電力出力の限界があるために、電力出力上限値及び電力出力下限値があり、これらをそれぞれ電源設備容量上限値26、電源設備容量下限値27とする。   When performing the same amount control at the same time, the power receiving point power target value 15 is calculated for every predetermined amount control period T1. It can be seen that the power receiving point power target value 15 changes in a stepped manner for each simultaneous equal amount control period T1, as shown in FIG. This is because there is a power output upper limit value and a power output lower limit value because the power supply facility capacity 25 of the power supply facility 9 has a power output limit due to its capacity, etc., and these are respectively the power supply facility capacity upper limit value 26 and the power supply facility capacity lower limit value. 27.

ここで、受電点電力目標値15の算出式は、式(2)に示しているが、電力需要11を翌日等電力需要予測結果23、商用電力12を受電点電力目標値15とそれぞれ置き換えると、式(2)は式(6)と置き換えることができる。   Here, the calculation formula of the power receiving point power target value 15 is shown in the formula (2). However, if the power demand 11 is replaced with the power demand prediction result 23 such as the next day, and the commercial power 12 is replaced with the power receiving point power target value 15, respectively. Equation (2) can be replaced with Equation (6).

翌日等電力需要予測結果23=受電点電力目標値15+電源設備電力10…(6)
電源設備電力10は、電源設備容量上限値26、電源設備容量下限値27の間しか出力調整ができず、同時同量制御周期T1毎に、電源設備電力10が電源設備容量上限値26と電源設備容量下限値27の間に入るように、受電点電力目標値15を決める必要がある。
Next-day power demand forecast result 23 = reception point power target value 15 + power supply facility power 10 (6)
The power supply facility power 10 can be adjusted only between the power supply facility capacity upper limit value 26 and the power supply facility capacity lower limit value 27, and the power supply facility power 10 and the power supply facility capacity upper limit value 26 and the power It is necessary to determine the power receiving point power target value 15 so as to fall between the equipment capacity lower limit value 27.

ところで、電源設備容量上限値26から電源設備容量下限値27の範囲までの値を電源設備可変可能制御範囲28とすると、式(6)から電源設備可変可能制御範囲28が大きいほど受電点電力目標値15の変化が小さくなることが分かる。なぜなら、同時同量制御周期T1毎の翌日等電力需要予測結果23の変化が大きくても、その変化幅を電源設備電力10の電源設備可変可能制御範囲28内の出力調整で吸収でき、余り受電点電力目標値15を変える必要が無いからである。   By the way, if a value from the power supply facility capacity upper limit value 26 to the power supply facility capacity lower limit value 27 is defined as the power supply facility variable control range 28, the larger the power supply facility variable control range 28 is, the larger the power supply facility variable control range 28 is. It can be seen that the change in value 15 is small. This is because even if there is a large change in the power demand forecast result 23 such as the next day every simultaneous control period T1, the change width can be absorbed by the output adjustment within the power supply facility variable control range 28 of the power supply facility power 10, and the remaining power is received. This is because there is no need to change the point power target value 15.

逆に、電源設備可変可能制御範囲28が小さいと、同時同量制御周期T1毎に、受電点電力目標値15を絶えず大きく変化させる必要がある。   On the contrary, if the power supply facility variable control range 28 is small, it is necessary to constantly change the power receiving point power target value 15 for every simultaneous equal amount control cycle T1.

さらに、同時同量制御を実施する場合、電源設備可変可能制御範囲28に比べて、電力需要実データ36の変動が大きい場合、この変動分を同時同量制御で吸収することが難しくなり、同時同量制御が困難もしくは不可能となる。   Furthermore, when performing the same amount control, if the fluctuation of the actual power demand data 36 is larger than the power facility variable control range 28, it becomes difficult to absorb the fluctuation by the same amount control. The same amount control becomes difficult or impossible.

(1−3) 小規模電力系統5に付加される図3に示す同時同量制御システム14について説明する。
需給制御システム13では、同時同量制御周期T1毎の受電点電力目標値15が決定されると、同時同量制御システム14では、受電点電力目標値15の同時同量制御周期T2区間毎の積分値を受電点電力量目標値29とし、同時同量制御周期T2区間毎の実受電点電力30の積分値を実受電点電力量31とすると、同時同量制御周期T2区間毎に実受電点電力量31が受電点電力量目標値29に一致するような発電指令値16を演算し、電源設備9への発電指令値16とする。
(1-3) The simultaneous same amount control system 14 shown in FIG. 3 added to the small-scale power system 5 will be described.
In the supply and demand control system 13, when the power receiving point power target value 15 for each simultaneous equal amount control cycle T1 is determined, in the simultaneous same amount control system 14, the power receiving point power target value 15 for each simultaneous same amount control cycle T2 section. Assuming that the integral value is the power receiving point power amount target value 29 and the integral value of the actual power receiving point power 30 for each simultaneous equal amount control cycle T2 section is the actual power receiving point power amount 31, actual power reception is performed every simultaneous same amount control cycle T2 section. A power generation command value 16 such that the point power amount 31 matches the power reception point power amount target value 29 is calculated and set as a power generation command value 16 to the power supply facility 9.

同時同量制御の精度を評価する場合には、式(7a)に示す同時同量制御精度33を求めるための同時同量制御精度評価式が一般に用いられる。
同時同量制御精度33=(実受電点電力量31−受電点電力量目標値29)÷実電力需要積分値34 (7a)
ここで、実電力需要積分値34は、同時同量制御周期T2区間毎の電力需要実データ36の積分値である。
When evaluating the accuracy of the simultaneous equal amount control, the simultaneous equal amount control accuracy evaluation formula for obtaining the simultaneous equal amount control accuracy 33 shown in the equation (7a) is generally used.
Simultaneous same amount control accuracy 33 = (actual receiving point power amount 31−receiving point power amount target value 29) ÷ actual power demand integrated value 34 (7a)
Here, the actual power demand integrated value 34 is an integrated value of the actual power demand data 36 for each section of the simultaneous equal amount control period T2.

(a) 同時同量制御精度33が規定値を満たすための電源設備容量25の説明:電力需要実データ36の変化と電源設備容量25との関係。 (A) Description of the power supply facility capacity 25 for the simultaneous equal amount control accuracy 33 to satisfy the specified value: the relationship between the change in the actual power demand data 36 and the power supply facility capacity 25.

ここでは、同時同量制御精度33が規定値を満たすための電源設備容量25を検討する。まず、簡単のために、翌日等電力需要予測結果23と電力需要実データ36とが完全に一致すれば、式(7b)に示す予測誤差45が零である場合を考える。   Here, the power supply facility capacity 25 for the simultaneous equal amount control accuracy 33 to satisfy the specified value is examined. First, for the sake of simplicity, a case will be considered in which the prediction error 45 shown in Expression (7b) is zero if the next-day power demand prediction result 23 and the actual power demand data 36 coincide completely.

予測誤差45=電力需要実データ36−翌日等電力需要予測結果23…(7b)
図7は、図6にて予測誤差45が零である場合、すなわち、翌日等電力需要予測結果23と電力需要実データ36が一致している例である。
Prediction error 45 = power demand actual data 36-next day etc. power demand forecast result 23 ... (7b)
FIG. 7 shows an example in which the prediction error 45 is zero in FIG. 6, that is, the next day power demand prediction result 23 and the actual power demand data 36 match.

従って、この場合には、前述した式(6)は下記式(8a)に置き換えることができる。
電力需要実データ36=受電点電力目標値15+電源設備電力10 …(8a)
すなわち、この式(8a)から言えることは、受電点電力目標値15が需給制御システム13によって決定されていることから、電力需要実データ36の変化分を吸収するために、電源設備電力10を調整する必要がある。
Therefore, in this case, the above-described equation (6) can be replaced with the following equation (8a).
Power demand actual data 36 = reception point power target value 15 + power supply facility power 10 (8a)
That is, what can be said from this equation (8a) is that the power receiving facility power 10 is determined in order to absorb the change in the actual power demand data 36 because the power receiving point power target value 15 is determined by the supply and demand control system 13. It needs to be adjusted.

一般に、同時同量制御周期T2区間毎に電力需要実データ36が異なるだけでなく、同時同量制御周期T2区間の始点の電力需要実データ36(以下、始点電力需要実データ36staと呼ぶ)と、同時同量制御周期T2区間の終点の電力需要実データ36(以下、終点電力需要実データ36endと呼ぶ)とも異なる。終点電力需要実データ36endと始点電力需要実データ36staの間に最大値,最小値がある場合もあるが、少なくとも終点電力需要実データ36endと始点電力需要実データ36staの差分(以下、電力需要実データ差分43)は電源設備電力10で出力調整する必要がある。   Generally, not only the actual power demand data 36 is different for each simultaneous same amount control cycle T2 section, but also the actual power demand data 36 at the start point of the simultaneous same amount control period T2 section (hereinafter referred to as the start power demand actual data 36sta). This is also different from the actual power demand data 36 at the end point of the simultaneous same amount control period T2 (hereinafter referred to as the actual end power demand data 36end). There may be a maximum value and a minimum value between the actual power demand data 36end and the actual power demand data 36sta, but at least the difference between the actual power demand data 36end and the actual power demand data 36sta (hereinafter referred to as the actual power demand data). The output of the data difference 43) needs to be adjusted with the power supply facility power 10.

なお、終点電力需要実データ36endと始点電力需要実データ36staの間に最大値,最小値がある場合を考慮すれば、一日における電力需要実データ36において、全ての同時同量制御周期T2の時間間隔毎における電力需要実データ36の始点と終点の値の差となる電力需要実データ差分43を計算し、電源設備電力10にて電力需要実データ差分43に見合う出力調整を実施する必要がある。   In consideration of the case where the maximum value and the minimum value are between the end point power demand actual data 36end and the start point power demand actual data 36sta, all the same amount control periods T2 in the actual power demand data 36 for one day are considered. It is necessary to calculate the power demand actual data difference 43 that is the difference between the value of the start point and the end point of the power demand actual data 36 at each time interval, and to perform output adjustment corresponding to the power demand actual data difference 43 in the power supply facility power 10. is there.

従って、少なくとも電力需要実データ差分43の絶対値の最大値分(以下、電力需要実データ差分最大値48と呼ぶ)は、電源設備電力10にて出力調整する必要があるため、電源設備容量25は出力調整可能な容量である必要がある。このため、最大出力調整可能な容量を電力需要最大変動分必要容量44とする。   Accordingly, at least the maximum value of the absolute value of the power demand actual data difference 43 (hereinafter referred to as the power demand actual data difference maximum value 48) needs to be adjusted by the power facility power 10, so that the power facility capacity 25 Need to have an output adjustable capacity. For this reason, the capacity capable of adjusting the maximum output is set as the required capacity 44 for the power demand maximum fluctuation.

電力需要実データ差分最大値48はプラスとマイナスのどちらかの符号となるが、ここではプラス側のみを考えれば、次式のようになる。   The power demand actual data difference maximum value 48 is either plus or minus, but here, if only the plus side is considered, the following equation is obtained.

電力需要最大変動分必要容量44=電力需要実データ差分最大値48 …(8b)
(b) 同時同量制御精度33が規定値を満たすための電源設備容量25の説明:予測誤差45と電源設備容量25との関係。
図6に示すように、翌日等電力需要予測結果23と電力需要実データ36との間に誤差があれば、この誤差分を吸収するための容量を電源設備容量25が持っている必要がある。この必要とされる容量を電力需要予測誤差補正容量46とする。
Power demand maximum fluctuation required capacity 44 = power demand actual data difference maximum value 48 (8b)
(B) Description of the power supply facility capacity 25 for the simultaneous equal amount control accuracy 33 to satisfy the specified value: the relationship between the prediction error 45 and the power supply facility capacity 25.
As shown in FIG. 6, if there is an error between the next day power demand prediction result 23 and the actual power demand data 36, the power supply facility capacity 25 needs to have a capacity for absorbing this error. . This required capacity is referred to as a power demand prediction error correction capacity 46.

この点について、式(6)と式(8a)を使って説明する。需給制御システム13では、翌日等電力需要予測結果23を用いて、受電点電力目標値15を決めている。しかし、同時同量制御システム14では、式(8a)に示すように、受電点電力目標値15と電力需要実データ36とを用いて、電源設備電力10を求めている。   This point will be described using Equation (6) and Equation (8a). In the supply and demand control system 13, the power receiving point power target value 15 is determined using the power demand prediction result 23 such as the next day. However, in the simultaneous equal amount control system 14, as shown in the equation (8a), the power supply facility power 10 is obtained using the power receiving point power target value 15 and the actual power demand data 36.

その結果、予測誤差45が無い場合は、翌日等電力需要予測結果23と電力需要実データ36が等しくなり、式(6)の電源設備電力10と式(8a)の電源設備電力10とが等しくなる。   As a result, when there is no prediction error 45, the next-day power demand prediction result 23 and the actual power demand data 36 are equal, and the power supply facility power 10 of equation (6) and the power supply facility power 10 of equation (8a) are equal. Become.

一方、予測誤差45がある場合は、翌日等電力需要予測結果23と電力需要実データ36が異なるため、式(6)の電源設備電力10と式(8a)の電源設備電力10は異なる。すなわち、下記する式(8c)の関係となる。   On the other hand, when there is a prediction error 45, the next-day power demand prediction result 23 and the actual power demand data 36 are different, so that the power supply facility power 10 in Expression (6) and the power supply facility power 10 in Expression (8a) are different. That is, the relationship of the following formula (8c) is established.

式(8a)の電源設備電力10=式(6)の電源設備電力10+予測誤差45…(8c)
また、予測誤差45がある場合、電力需要実データ36と翌日等電力需要予測結果23との間に、次の2通りのケースがある。
Power supply facility power 10 in equation (8a) = Power supply facility power 10 in equation (6) + Prediction error 45 (8c)
When there is a prediction error 45, there are the following two cases between the actual power demand data 36 and the next day power demand forecast result 23.

電力需要実データ36>翌日等電力需要予測結果23(以下、実需要>予測結果のケース55と呼ぶ) …(9a)
電力需要実データ36<翌日等電力需要予測結果23(以下、実需要<予測結果のケース56と呼ぶ) …(9b)
実需要>予測結果のケース55では、予測誤差45>0となるので、式(8c)から、
式(6)の電源設備電力10>式(8a)の電源設備電力10 …(10a)
となる。
Actual power demand data 36> Next day power demand forecast result 23 (hereinafter referred to as actual demand> forecast result case 55) (9a)
Actual power demand data 36 <Next day power demand forecast result 23 (hereinafter referred to as actual demand <forecast case 56) (9b)
In the case of actual demand> prediction result 55, the prediction error 45> 0, so from equation (8c)
Power supply facility power 10 of formula (6)> Power supply power 10 of formula (8a) (10a)
It becomes.

また、実需要<予測結果のケース56では、予測誤差45<0となるので、式(8c)から、
式(6)の電源設備電力10<式(8a)の電源設備電力10 …(10b)
となる。
Further, in the case of actual demand <prediction result 56, since the prediction error 45 <0, the equation (8c)
Power supply facility power 10 in equation (6) <Power supply facility power 10 in equation (8a) (10b)
It becomes.

すなわち、式(7b)に示すように、予測誤差45=電力需要実データ36−翌日等電力需要予測結果23であることから、実需要>予測結果のケース55では、式(10a)から、電源設備電力10が増加するため、電源設備9としては増加分を吸収するための容量である電力需要予測誤差補正容量46を持つ必要がある。   That is, as shown in the equation (7b), since the prediction error 45 = the actual power demand data 36−the next day power demand forecast result 23, in the case 55 where the actual demand is greater than the forecast result, the power source is calculated from the formula (10a). Since the facility power 10 increases, the power source facility 9 needs to have a power demand prediction error correction capacity 46 that is a capacity for absorbing the increase.

この電力需要予測誤差補正容量46は、式(8a)、式(7b)、式(6)から予測誤差45となる。その理由は、
式(8a)の電源設備電力10=式(6)の電源設備電力10+電力需要予測誤差補正容量46 …(9c)
とすれば、式(7b)から
予測誤差45=式(8a)−式(6)=電力需要予測誤差補正容量46となる為である。なお、式(6),式(8a)を再掲すると、
翌日等電力需要予測結果23=受電点電力目標値15+電源設備電力10…(6)
電力需要実データ36=受電点電力目標値15+電源設備電力10 …(8a)
となる。
The power demand prediction error correction capacity 46 becomes the prediction error 45 from the equations (8a), (7b), and (6). The reason is,
Power supply facility power 10 in equation (8a) = power supply facility power 10 in equation (6) + power demand prediction error correction capacity 46 (9c)
Then, from equation (7b)
This is because the prediction error 45 = equation (8a) −equation (6) = power demand prediction error correction capacity 46. In addition, when the expressions (6) and (8a) are re-displayed,
Next-day power demand forecast result 23 = reception point power target value 15 + power supply facility power 10 (6)
Power demand actual data 36 = reception point power target value 15 + power supply facility power 10 (8a)
It becomes.

以上のように電力需要予測誤差補正容量46は、予測誤差45を吸収するために必要な容量であるが、その計算方法としては前記式(4)に示す最大需要誤差37から求める方法と、前記式(5)に示す平均需要誤差38から求める方法とが考えられる。   As described above, the power demand prediction error correction capacity 46 is a capacity necessary to absorb the prediction error 45. As a calculation method thereof, a method of obtaining from the maximum demand error 37 shown in the equation (4), A method of obtaining from the average demand error 38 shown in Equation (5) is conceivable.

* 最大需要誤差37から求める方法(方法1と呼ぶ)
この方法1は、最大需要誤差37から下記式(10c)により電力需要予測誤差補正容量46を求める方法である。
電力需要予測誤差補正容量46=最大需要誤差37 …(10c)
長所:最大需要誤差37から電力需要予測誤差補正容量46を求めた場合、予測誤差45は全て吸収され、容量不足となることはない。
短所:同時同量制御精度33は式(7)の同時同量制御周期T2区間毎の積分値を用いた式で表されることから、同時同量制御周期T2区間中常に最大需要誤差37に相当する予測誤差45を発生することは少なく、過剰容量となる場合が考えられる。
* Method to obtain from maximum demand error 37 (referred to as method 1)
This method 1 is a method for obtaining the power demand prediction error correction capacity 46 from the maximum demand error 37 by the following equation (10c).
Electricity demand prediction error correction capacity 46 = maximum demand error 37 (10c)
Advantages: When the power demand prediction error correction capacity 46 is obtained from the maximum demand error 37, the prediction error 45 is all absorbed and the capacity does not become insufficient.
Disadvantages: Since the simultaneous equal amount control accuracy 33 is expressed by an equation using an integral value for each interval of the simultaneous equal amount control period T2 in the equation (7), the maximum demand error 37 is always set during the simultaneous equal amount control period T2 interval. A corresponding prediction error 45 is rarely generated, and an excessive capacity may be considered.

* 平均需要誤差38から求める方法(方法2と呼ぶ)
この方法1は、平均需要誤差38から下記式(10d)により電力需要予測誤差補正容量46を求める方法である。
電力需要予測誤差補正容量46=平均需要誤差38 …(10d)
長所:同時同量制御周期T2区間に、予測誤差45が大きくなったり、小さくなったりしており、平均値をとると過不足ない容量になると考えられる。
短所:同時同量制御周期T2区間中常に最大需要誤差37に相当する予測誤差45が稀に発生したとき、不足容量となる場合が考えられる。
* Method to obtain from average demand error 38 (referred to as method 2)
This method 1 is a method for obtaining the power demand prediction error correction capacity 46 from the average demand error 38 by the following equation (10d).
Electricity demand prediction error correction capacity 46 = average demand error 38 (10d)
Advantages: The prediction error 45 increases or decreases in the same period control period T2 interval, and it is considered that the capacity is not excessive or insufficient when the average value is taken.
Disadvantages: When the prediction error 45 corresponding to the maximum demand error 37 always occurs in the simultaneous same amount control period T2 section, there may be a case where the capacity becomes insufficient.

これら方法1,2はそれぞれ長所、短所があるので、電力需要予測誤差補正容量46を求める場合には常に2つの方法を考える必要がある。   Since these methods 1 and 2 have advantages and disadvantages, respectively, when obtaining the power demand prediction error correction capacity 46, it is necessary to always consider two methods.

(1−4) 小規模電力系統5内の出力可変可能制御分散電源設備の必要電源容量について。 (1-4) Necessary power capacity of the controllable distributed power supply with variable output in the small-scale power system 5.

以上のように電力需要実データ36と翌日等電力需要予測結果23が異なることにより予測誤差45が発生し、それに伴って電源設備電力10の出力を調整する必要がある。その結果、電源設備9としては、電源設備電力10の増減調整分を吸収するために、電力需要予測誤差補正容量46を持つ必要があること。また、一日の間の全ての同時同量制御周期T1の時間間隔毎の電力需要実データ36の始点と終点の値の差となる電力需要実データ差分43のうち、少なくとも電力需要実データ差分43の絶対値の最大値となる電力需要実データ差分最大値についても、電源設備電力10の出力を調整する必要があることから、最大出力調整可能な電力需要最大変動分必要容量44が必要である。   As described above, when the actual power demand data 36 and the next day power demand prediction result 23 are different, a prediction error 45 occurs, and the output of the power supply facility power 10 needs to be adjusted accordingly. As a result, the power supply facility 9 needs to have a power demand prediction error correction capacity 46 in order to absorb the increase / decrease adjustment amount of the power supply facility power 10. Further, at least the actual power demand data difference 43 among the actual power demand data difference 43 which is the difference between the start point and end point values of the actual power demand data 36 for every time interval of the simultaneous same amount control period T1 during the day. For the power demand actual data difference maximum value which is the maximum value of the absolute value of 43, it is necessary to adjust the output of the power supply facility power 10, and therefore, the required capacity 44 for the maximum power demand fluctuation that can be adjusted to the maximum output is required. is there.

従って、小規模電力系統5を構築する際に設置すべき出力可変可能制御分散電源設備としては、下式に基づく必要電源容量Xが必要となる。   Therefore, the required power capacity X based on the following equation is required as the variable output controllable power supply equipment to be installed when the small-scale power system 5 is constructed.

必要電源容量X=電力需要予測誤差補正容量46+電力需要最大変動分必要容量44
…(11)
ところで、これまでは主に、実需要>予測のケース55について説明してきたが、例えば図8に示すように、一日に亘って実需要<予測結果のケース56となることも考えられる。この場合には、最大需要誤差37はマイナス側の最大値をとる必要がある。
Required power capacity X = Power demand prediction error correction capacity 46 + Required capacity 44 for maximum power demand fluctuation
... (11)
By the way, the actual demand> prediction case 55 has been mainly described so far. However, for example, as shown in FIG. In this case, the maximum demand error 37 needs to take a negative maximum value.

そこで、マイナス側の最大値となる最大需要誤差37を、最大需要誤差m47とすれば、式(12)で定義できる。
最大需要誤差m47=max[翌日等電力需要誤差予測結果i23−電力需要実データi36] …(12)
同様に、プラス側の最大値となる最大需要誤差37を、最大需要誤差p50とすれば、式(13)で定義できる。
最大需要誤差p50=max[電力需要実データi36−翌日等電力需要誤差予測結果i23] …(13)
また、式(8b)に示す電力需要実データ差分最大値48についても、プラス側とマイナス側の符号をとるため、プラス側最大値とマイナス側最大値とを区別し、プラス側の電力需要実データ差分最大値をp49、マイナス側の電力需要実データ差分最大値をm51とすると、それぞれ式(13A)、式(13B)で定義できる。
Therefore, if the maximum demand error 37 which is the maximum value on the minus side is the maximum demand error m47, it can be defined by Expression (12).
Maximum demand error m47 = max [next day power demand error prediction result i23−power demand actual data i36] (12)
Similarly, if the maximum demand error 37, which is the maximum value on the plus side, is the maximum demand error p50, it can be defined by equation (13).
Maximum demand error p50 = max [Electric power demand actual data i36−Electric power demand error prediction result i23 such as next day] (13)
Also, the maximum power demand data difference value 48 shown in the equation (8b) also has a sign on the plus side and the minus side, so the plus side maximum value and the minus side maximum value are distinguished, and the plus side power demand actual value Assuming that the maximum data difference value is p49 and the negative power demand actual data difference maximum value is m51, they can be defined by equations (13A) and (13B), respectively.

電力需要実データ差分最大値p49=max(電力需要実データ差分43)…(13A)
電力需要実データ差分最大値m51=min(電力需要実データ差分43)…(13B)
従って、実需要>予測結果のケース55と実需要<予測結果のケース56とに分けると、次のようになる。
* 実需要>予測結果のケース55の場合
方法1における電力需要予測誤差補正容量46は式(13)を用いて、下記式(15a)で表され、方法2の場合には式(10d)から下記式(15b)で表される。
電力需要予測誤差補正容量46=最大需要誤差p50 …(15a)
または、電力需要予測誤差補正容量46=平均需要誤差38 …(15b)
電力需要最大変動分必要容量44=電力需要実データ差分最大値p49…(16)
* 実需要<予測結果のケース56の場合
方法1における電力需要予測誤差補正容量46は下記式(17a)で表され、方法2の場合には下記式(17b)で表される。
電力需要予測誤差補正容量46=最大需要誤差m52 …(17a)
電力需要予測誤差補正容量46=平均需要誤差38 …(17b)
電力需要最大変動分必要容量44=電力需要実データ差分最大値m51…(18)
従って、これらの関係式から、式(11)に示す必要電源容量Xは、式(19a)、式(19b)となる。
Power demand actual data difference maximum value p49 = max (power demand actual data difference 43) (13A)
Power demand actual data difference maximum value m51 = min (power demand actual data difference 43) (13B)
Therefore, it is as follows when the actual demand> the predicted result case 55 and the actual demand <the predicted result case 56 are divided.
* Actual demand> Case 55 of the prediction result The power demand prediction error correction capacity 46 in the method 1 is expressed by the following equation (15a) using the equation (13), and in the case of the method 2, from the equation (10d) It is represented by the following formula (15b).
Electricity demand prediction error correction capacity 46 = maximum demand error p50 (15a)
Or, power demand prediction error correction capacity 46 = average demand error 38 (15b)
Power demand maximum fluctuation required capacity 44 = power demand actual data difference maximum value p49 (16)
* In the case of actual demand <forecast case 56 The power demand prediction error correction capacity 46 in the method 1 is expressed by the following equation (17a), and in the case of the method 2, it is expressed by the following equation (17b).
Electricity demand prediction error correction capacity 46 = maximum demand error m52 (17a)
Electric power demand prediction error correction capacity 46 = average demand error 38 (17b)
Electric power demand maximum fluctuation required capacity 44 = power demand actual data difference maximum value m51 (18)
Therefore, from these relational expressions, the necessary power source capacity X shown in Expression (11) is expressed by Expression (19a) and Expression (19b).

* 実需要>予測結果のケース55の場合
方法1(最大需要誤差37から求める方法)の適用
必要電源容量X=電力需要予測誤差補正容量46+電力需要最大変動分必要容量44
=最大需要誤差p50+電力需要実データ差分最大値p49
=必要電源容量pa53 …(19a)
方法2(平均需要誤差38から求める方法)の適用
必要電源容量X=電力需要予測誤差補正容量46+電力需要最大変動分必要容量44
=平均需要誤差38+電力需要実データ差分最大値p49
=必要電源容量pb54 …(19b)
* 実需要<予測結果のケース56の場合
この場合には、電力需要予測誤差補正容量46と電力需要最大変動分必要容量44は通常マイナスとなるので、絶対値をとる。
* Actual demand> Case 55 of forecast results Application of method 1 (method obtained from maximum demand error 37)
Required power capacity X = Power demand prediction error correction capacity 46 + Required capacity 44 for maximum power demand fluctuation
= Maximum demand error p50 + power demand actual data difference maximum value p49
= Required power capacity pa53 (19a)
Application of Method 2 (method obtained from average demand error 38)
Required power capacity X = Power demand prediction error correction capacity 46 + Required capacity 44 for maximum power demand fluctuation
= Average demand error 38 + power demand actual data difference maximum value p49
= Required power supply capacity pb54 (19b)
* In the case of actual demand <forecast case 56 In this case, the power demand prediction error correction capacity 46 and the power demand maximum fluctuation required capacity 44 are usually negative, and therefore take absolute values.

方法1(最大需要誤差37から求める方法)の適用
必要電源容量X=abs(電力需要予測誤差補正容量46+電力需要最大変動分必要容量44)=abs(最大需要誤差m52+電力需要実データ差分最大値m51)=必要電源容量ma57 …(19c)
方法2(平均需要誤差38から求める方法)の適用
必要電源容量X=abs(電力需要予測誤差補正容量46+電力需要最大変動分必要容量44)=abs(平均需要誤差38+電力需要実データ差分最大値m51)=必要電源容量mb58 …(19d)
上式において、関数abs(x)は、引数xの絶対値を示す。
従って、必要電源容量Xは、実需要と予測結果との大きさと、方法1,2の適用とに応じて、式(19a)〜式(19d)の必要電源容量pa53、pb54,ma57,mb58が求められる。
Application of method 1 (method obtained from maximum demand error 37)
Required power capacity X = abs (power demand prediction error correction capacity 46 + power demand maximum fluctuation required capacity 44) = abs (maximum demand error m52 + power demand actual data difference maximum value m51) = required power capacity ma57 (19c)
Application of Method 2 (method obtained from average demand error 38)
Required power capacity X = abs (power demand prediction error correction capacity 46 + power demand maximum fluctuation required capacity 44) = abs (average demand error 38 + power demand actual data difference maximum value m51) = required power capacity mb58 (19d)
In the above equation, the function abs (x) indicates the absolute value of the argument x.
Therefore, the required power supply capacity X is determined by the required power supply capacity pa53, pb54, ma57, mb58 in the equations (19a) to (19d) according to the size of the actual demand and the prediction result and the application of the methods 1 and 2. Desired.

ところで、必要電源容量Xとしては、前述した方法1の適用により得られた必要電源容量pa53,ma57のうち、より多くの容量を必要とする方を考えれば式(20a)となり、方法2の適用により得られた必要電源容量pb54,mb58のうち、より多くの容量を必要とする方を考えれば式(20b)となる。
方法1→必要電源容量X=max[必要電源容量pa53、必要電源容量ma57]
…(20a)
方法2→必要電源容量X=max[必要電源容量pb54、必要電源容量mb58]
…(20b)
次に、電源設備の容量上限値26及び容量下限値27を考慮するものとする。
電源設備容量出力可変値59=電源設備容量上限値26−電源設備容量下限値27
…(21)
とすると、必要電源容量Xは、通常,電源設備容量出力可変値59よりも大きくなる。
電源設備容量上限値26=電源設備容量出力可変値59+電源設備容量下限値27
…(22)
となる。
By the way, the required power supply capacity X is expressed by Equation (20a) in consideration of the need for a larger capacity among the required power supply capacity pa53 and ma57 obtained by the application of Method 1 described above. Of the necessary power source capacities pb54 and mb58 obtained by the above, equation (20b) is obtained when considering the one requiring a larger capacity.
Method 1 → Required power supply capacity X = max [Required power supply capacity pa53, Required power supply capacity ma57]
... (20a)
Method 2 → Required power supply capacity X = max [Required power supply capacity pb54, Required power supply capacity mb58]
... (20b)
Next, the capacity upper limit value 26 and the capacity lower limit value 27 of the power supply equipment are considered.
Power supply capacity output variable value 59 = Power supply capacity upper limit 26-Power supply capacity lower limit 27
... (21)
Then, the necessary power supply capacity X is usually larger than the power supply facility capacity output variable value 59.
Power supply capacity upper limit 26 = Power supply capacity output variable value 59 + Power supply capacity lower limit 27
... (22)
It becomes.

電源設備容量25としては、電源設備容量上限値26に機器保護(安全性)や耐久性等を考慮し、多少のマージンを持たせて構築する場合もあるので、このマージンを容量マージン60とすれば、式(22)にマージンを加えることになり、下式(23)となる。
電源設備容量25=電源設備容量上限値26+容量マージン60
=電源設備容量出力可変値59+電源設備容量下限値27+容量マージン60 …(23)
さらに、上式(20a),(20b)の必要電源容量Xは、式(23)の中の電源電源設備容量出力可変値59に相当すると考えられるので、当該式(23)の電源電源設備容量出力可変値59に式(20a)の必要電源容量Xを代入すると、式(24)、式(25)となる。
As the power supply facility capacity 25, the power supply facility capacity upper limit value 26 may be constructed with some margin in consideration of equipment protection (safety), durability, and the like. For example, a margin is added to Expression (22), and the following Expression (23) is obtained.
Power supply capacity 25 = Power supply capacity upper limit 26 + Capacity margin 60
= Power supply capacity output variable value 59 + Power supply capacity lower limit 27 + Capacity margin 60 (23)
Furthermore, since the required power capacity X of the above equations (20a) and (20b) is considered to correspond to the power supply facility capacity output variable value 59 in the equation (23), the power supply facility capacity of the equation (23) Substituting the required power capacity X of the equation (20a) into the output variable value 59 yields the equations (24) and (25).

方法1→電源設備容量25=max[必要電源容量pa53、必要電源容量ma57]+電源設備容量下限値27+容量マージン60 …(24)
方法2→電源設備容量25=max[必要電源容量pb54、必要電源容量mb58]+電源設備容量下限値27+容量マージン60 …(25)
となる。
Method 1 → Power supply capacity 25 = max [Required power capacity pa53, Required power capacity ma57] + Power supply capacity lower limit 27 + Capacity margin 60 (24)
Method 2 → Power supply capacity 25 = max [Required power capacity pb54, Required power capacity mb58] + Power supply capacity lower limit 27 + Capacity margin 60 (25)
It becomes.

従って、最終的に求めたい必要電源容量は、式(24)、式(25)で示す電源設備容量25であって、これらをそれぞれ最終必要電源容量61、最終必要電源容量62とすると、式(24)、式(25)は下式(26)、式(27)となり、本発明に係る小規模電力系統の電源容量推定装置で推定する必要電源容量の最終解となる。   Accordingly, the required power supply capacity to be finally obtained is the power supply facility capacity 25 represented by the equations (24) and (25). If these are the final required power supply capacity 61 and the final required power supply capacity 62, respectively, 24) and Expression (25) become the following Expression (26) and Expression (27), which are the final solutions of the necessary power supply capacity estimated by the power supply capacity estimation device for the small-scale power system according to the present invention.

方法1→最終必要電源容量61=max[必要電源容量pa53、必要電源容量ma57]+電源設備容量下限値27+容量マージン60 …(26)
方法2→最終必要電源容量62=max[必要電源容量pb54、必要電源容量mb58]+電源設備容量下限値27+容量マージン60 …(27)
従って、以上のような実施の形態によれば、現時点以前の電力需要実データ及び気温や天気等から予測される負荷設備8に供給する電力需要予測結果とを用い、所定期間にわたる電力需要実データ>電力需要予測結果と、電力需要実データ<電力需要予測結果とに分けて、最大需要誤差及び平均誤差から電力需要予測誤差補正容量を算出し、また、当該所定期間内の同時同量制御の制御周期毎における電力需要実データの始点と終点の値の差分の絶対値の中から電力需要最大変動分必要容量を算出し、所定の演算式(後記する19a〜19d)に基づいて出力可変可能制御分散電源の必要電源容量を推定し、さらに容量マージン等を考慮しつつ、所定の演算式(後記する19a〜19d)に基づいて簡便に出力可変可能制御分散電源の必要電源容量を推定することができる。
Method 1 → final required power supply capacity 61 = max [required power supply capacity pa53, required power supply capacity ma57] + power supply facility capacity lower limit 27 + capacity margin 60 (26)
Method 2 → final required power capacity 62 = max [necessary power capacity pb54, required power capacity mb58] + power supply capacity lower limit 27 + capacity margin 60 (27)
Therefore, according to the embodiment as described above, the actual power demand data over a predetermined period using the actual power demand data before the present time and the predicted power demand supplied to the load facility 8 predicted from the temperature, weather, and the like. > The power demand prediction result and the power demand actual data <power demand prediction result are divided into the maximum demand error and average error, and the power demand prediction error correction capacity is calculated. The required capacity for the maximum power demand fluctuation is calculated from the absolute value of the difference between the start point and end point values of the actual power demand data for each control cycle, and the output can be varied based on a predetermined arithmetic expression (19a to 19d described later). Estimate the required power capacity of the control distributed power source, and further consider the capacity margin, etc., and easily output based on a predetermined arithmetic expression (19a to 19d described later). It is possible to estimate the capacity.

(第2の実施の形態)
図9は本発明に係る小規模電力系統の電源容量推定装置の第2の実施の形態を示す構成図である。なお、同図において、図1と同一または等価な部分には同一符号を付し、重複部分は省略する。
(Second Embodiment)
FIG. 9 is a block diagram showing a second embodiment of a power source capacity estimating apparatus for a small-scale power system according to the present invention. In the figure, parts that are the same as or equivalent to those in FIG.

第2の実施の形態において、特に異なるところは、図11に示すよう小規模電力系統5内に出力可変可能制御分散電源9Aの他に、太陽光発電や風力発電等の制御が難しい出力可変不可制御分散電源9Bを並列に設けたことにあり、これに伴って出力可変不可制御分散電源9Bに関する予測誤差も考慮し、電源設備9の必要電源容量を推定するものである。   In the second embodiment, a particularly different point is that, as shown in FIG. 11, in addition to the control distributed power supply 9A that can output variable in the small-scale power system 5, it is difficult to control output such as solar power generation or wind power generation. Since the control distributed power supply 9B is provided in parallel, the required power capacity of the power supply facility 9 is estimated in consideration of the prediction error related to the output variable control non-control distributed power supply 9B.

小規模電力系統の電源容量推定装置は、データベース2に新たに、出力可変不可制御分散電源9Bの実出力結果(以下、出力可変不可制御分散電源実出力データ68と、当該出力可変不可制御分散電源9Bの翌日以降の長期予測結果である出力可変不可制御分散電源出力予測結果65を記憶する。   The power source capacity estimation device for the small-scale power system newly adds the actual output result of the output variable non-controllable distributed power source 9B to the database 2 (hereinafter, the output variable non-controllable distributed power source actual output data 68 and the output variable non-controllable distributed power source). The output variable non-controllable distributed power output prediction result 65 that is a long-term prediction result after the next day of 9B is stored.

さらに、電源容量推定処理部3には新たに、データベース2に記憶される出力可変不可制御分散電源実出力データ及び翌日等出力可変不可制御分散電源出力予測結果を読み出し、所定期間における前記出力可変不可制御分散電源実出力データ>前記翌日等出力可変不可制御分散電源出力予測結果と、前記出力可変不可制御分散電源実出力データ<前記翌日等出力可変不可制御分散電源出力予測結果とに分けて、それぞれ出力可変不可制御分散電源最大予測誤差を求める予測誤差算出手段3Eを設け、この予測誤差算出手段3Eで求めた出力可変不可制御分散電源最大予測誤差を第2の暫定必要電源容量推定手段3C´に反映させるようにする。   Further, the power capacity estimation processing unit 3 newly reads the output variable non-controllable distributed power actual output data stored in the database 2 and the next day or the like output variable non-controllable distributed power output prediction result, and the output variable cannot be controlled in a predetermined period. Control distributed power source actual output data> The next day, etc., non-variable output controllable distributed power output prediction result, and Output variable non-controllable, distributed power source actual output data <The following day, etc., non-variable output control, distributed power output prediction result, Prediction error calculation means 3E for obtaining the output variable non-controllable distributed power supply maximum prediction error is provided, and the output variable non-controllable distributed power supply maximum prediction error obtained by the prediction error calculation means 3E is supplied to the second provisional necessary power capacity estimation means 3C ′. Reflect it.

次に、図9に示す小規模電力系統の電源容量推定装置の動作ないし本発明の電源容量推定方法について、図10を参照して説明する。   Next, the operation of the power source capacity estimating apparatus for a small-scale power system shown in FIG. 9 or the power source capacity estimating method of the present invention will be described with reference to FIG.

先ず、需要家設備である負荷設備及び自ら発電可能な分散電源,充放電可能な電力貯蔵システム等よりなる分散電源設備を備えた小規模電力系統に対して、受電点電力一定制御や同時同量制御を実施するために、負荷設備による過去の電力需要実データ36、気温・天候等に関する気象予測データから翌日等の電力需要予測結果23の他、出力可変不可制御分散電源9Bの出力可変不可制御分散電源実出力データ68及び出力可変不可制御分散電源出力予測結果65を取得し、データベース2に蓄積する。   First, for a small-scale power system with a load facility that is a customer facility, a distributed power source that can generate power by itself, and a distributed power source system that can be charged and discharged, etc. In order to carry out the control, the past power demand actual data 36 by the load facility, the power demand forecast result 23 of the next day etc. from the weather forecast data related to temperature, weather, etc., as well as the output variable impossible control The output variable impossible control of the distributed power supply 9B The distributed power source actual output data 68 and the output variable impossible control distributed power source output prediction result 65 are obtained and stored in the database 2.

以上の状態において、入力部1からの電源容量推定の制御指示を受けたとき(S1)、図2で説明したように、出力可変可能制御分散電源の電力需要予測誤差補正容量(S2)及び電力需要最大変動分必要容量(S3,S4)を算出する。   In the above state, when a control instruction for power source capacity estimation is received from the input unit 1 (S1), as described with reference to FIG. 2, the power demand prediction error correction capacity (S2) and power of the output variable control distributed power source The required capacity (S3, S4) for the maximum demand fluctuation is calculated.

一方、電源容量推定の制御指示を受けたとき(S1)、並行的に出力可変不可制御分散電源有りかを判断し(S11)、有りの場合には予測誤差算出手段3Eを実行する。   On the other hand, when a control instruction for power supply capacity estimation is received (S1), it is determined in parallel whether or not there is an output variable disable control distributed power supply (S11), and if there is, the prediction error calculation means 3E is executed.

この予測誤差算出手段3Eは、データベース2から出力可変不可制御分散電源実出力データ68及び翌日等出力可変不可制御分散電源出力予測結果65を読み出し、所定期間における出力可変不可制御分散電源実出力データ>翌日等出力可変不可制御分散電源出力予測結果と、出力可変不可制御分散電源実出力データ<翌日等出力可変不可制御分散電源出力予測結果とに分けて、それぞれ出力可変不可制御分散電源の最大予測誤差(後記式28a,式28b)を算出し(S12:予測誤差算出ステップ)、図9に示す暫定必要電源容量推定手段3C´に供給する。   This prediction error calculation means 3E reads the output variable non-controllable distributed power source actual output data 68 and the next day output non-variable control distributed power source output prediction result 65 from the database 2, and outputs the output variable non-controllable distributed power source actual output data in a predetermined period> The next day's output variable non-control distributed power output prediction result and the output variable non-control distributed power source actual output data <the next day's output variable non-control distributed power output prediction result, respectively. (Expression 28a and Expression 28b described later) are calculated (S12: prediction error calculation step) and supplied to provisional necessary power capacity estimation means 3C 'shown in FIG.

ここで、暫定必要電源容量推定手段3C´は、図1の暫定必要電源容量推定ステップS5で推定された必要電源容量に前記予測誤差算出ステップS12で算出された出力可変不可制御分散電源最大予測誤差を加えて暫定的な電源必要容量を推定する(S5a:暫定必要電源容量推定ステップ)。   Here, the provisional necessary power capacity estimation means 3C ′ adds the output variable impossible control distributed power supply maximum prediction error calculated in the prediction error calculation step S12 to the required power capacity estimated in the provisional necessary power capacity estimation step S5 of FIG. Is added to estimate the provisional required power supply capacity (S5a: provisional necessary power supply capacity estimation step).

さらに、暫定必要電源容量推定ステップS5aによって前記最大需要誤差を用いて求めた容量の大きな必要電源容量、前記平均誤差を用いて求めた容量の大きな必要電源容量(後記する式30a,式30b参照)を選定した後、この容量の大きな必要電源容量と分散電源の容量下限値と電源設備保護・耐久性から定める容量マージンとから、最大需要誤差及び平均誤差を適用した最終解となる必要電源容量(後記する式31〜式32)を推定する(S7a:最終必要電源容量推定ステップ)。   Further, a large necessary power capacity obtained using the maximum demand error in the provisional necessary power capacity estimating step S5a, and a large necessary power capacity obtained using the average error (see formulas 30a and 30b described later). From the required power capacity with a large capacity, the capacity lower limit value of the distributed power supply, and the capacity margin determined from the protection and durability of the power supply equipment, the required power capacity (the final solution applying the maximum demand error and average error) ( Equations 31 to 32, which will be described later, are estimated (S7a: final required power source capacity estimation step).

(2) 実際の小規模電力系統に出力可変不可制御分散電源9Bを用いたときの必要設備容量を推定する実証例について。 (2) About a demonstration example for estimating a required facility capacity when using an output variable non-controllable distributed power source 9B in an actual small-scale power system.

図11は本発明に係る小規模電力系統の電源容量推定装置の第2の実施の形態を説明するために用いられる受電点電力一定制御や同時同量制御を実施するための機能を備えた小規模電力系統の一般的な構成図である。なお、同図において、図3と同一または等価な部分には同一符号を付し、その詳しい説明を省略する。   FIG. 11 is a small diagram with a function for performing constant power reception point power control and simultaneous equal amount control used for explaining the second embodiment of the power source capacity estimating apparatus for a small-scale power system according to the present invention. It is a general block diagram of a scale power system. In the figure, the same or equivalent parts as in FIG. 3 are denoted by the same reference numerals, and detailed description thereof is omitted.

この小規模電力系統には、第1の実施の形態で説明した出力可変可能制御分散電源9Aの他に、太陽光発電もしくは風力発電等の制御が難しい出力可変不可制御分散電源9Bが並列に接続されている。   In addition to the output variable controllable control distributed power supply 9A described in the first embodiment, this small scale power system is connected in parallel with an output variable non-controllable distributed power supply 9B that is difficult to control such as solar power generation or wind power generation. Has been.

図12は出力可変不可制御分散電源9Bを考慮した場合の需給制御システム13の機能構成を示す図である。
需給制御システム13は、長期電力需要予測処理部18の他に、出力可変不可分散電源9Bの翌日以降の長期予測を行う出力可変不可分散電源出力長期予測処理部64を追加し、前述した翌日等電力需要予測結果23とともに翌日等出力可変不可分散電源出力予測結果65を出力し、受電点電力目標値計算部19に送出する。
FIG. 12 is a diagram showing a functional configuration of the supply and demand control system 13 in consideration of the output variable non-controllable distributed power source 9B.
In addition to the long-term power demand prediction processing unit 18, the supply and demand control system 13 adds an output variable non-distributed distributed power output long-term prediction processing unit 64 that performs long-term prediction after the next day of the output variable non-distributed power supply 9B. The next day's output variable non-distributed power output prediction result 65 is output together with the power demand prediction result 23 and sent to the power receiving point power target value calculation unit 19.

受電点電力目標値計算部19は、出力可変不可分散電源出力長期予測処理部64から受け取る翌日等出力可変不可分散電源出力予測結果65を考慮し、受電点電力目標値15を出力する。   The power receiving point power target value calculation unit 19 outputs the power receiving point power target value 15 in consideration of the next day output variable non-distributable power source output prediction result 65 received from the output variable non-distributable power source long-term prediction processing unit 64.

そこで、本発明に係る小規模電力系統の電源容量推定装置においては、推定しようとする必要電源容量Xについても、翌日等出力可変不可分散電源出力予測結果65の誤差分を考慮する必要がある。   Therefore, in the power source capacity estimation device for a small-scale power system according to the present invention, it is necessary to consider the error of the output variable non-distributed power source output prediction result 65 such as the next day for the necessary power source capacity X to be estimated.

先ず、図6に示すように、翌日等電力需要予測結果23と電力需要実データ36との間に誤差があれば、当該誤差分を吸収するための容量を電源設備9は持っている必要があり、この必要とされる容量を電力需要予測誤差補正容量46とすると説明した。   First, as shown in FIG. 6, if there is an error between the next-day power demand prediction result 23 and the actual power demand data 36, the power supply facility 9 needs to have a capacity for absorbing the error. It has been described that the required capacity is the power demand prediction error correction capacity 46.

従って、小規模電力系統の電源設備9としては、少なくとも翌日等出力可変不可分散電源出力予測結果65の誤差分を吸収するための容量を持つ必要がある。この必要とされる容量を、出力可変不可制御電源予測誤差補正容量69とする。   Therefore, the power supply equipment 9 of the small-scale power system needs to have a capacity for absorbing at least the error of the output variable non-distributed power output prediction result 65 such as the next day. This required capacity is assumed to be an output variable non-control power supply prediction error correction capacity 69.

また、前記式(13)に記述する最大需要誤差p50の説明と同様に、出力可変不可制御分散電源9Bの実出力の結果(以下、出力可変不可制御分散電源実出力データ68)と翌日等出力可変不可分散電源出力予測結果65との間には通常予測誤差がある。この予測誤差のうち、プラス側の予測誤差最大値を、出力可変不可制御分散電源最大予測誤差p66とし、マイナス側の予測誤差最大値を、出力可変不可制御分散電源最大予測誤差m67とすると、以下の式(28a)、式(28b)のように定義できる。   Similarly to the description of the maximum demand error p50 described in the above equation (13), the actual output result of the output variable non-controllable distributed power supply 9B (hereinafter, output variable non-controllable distributed power supply actual output data 68) and the next day output, etc. There is usually a prediction error between the variable non-distributed power supply output prediction result 65. Of these prediction errors, assuming that the positive-side prediction error maximum value is the output variable non-controllable distributed power supply maximum prediction error p66 and the negative-side prediction error maximum value is the output variable non-controllable distributed power supply maximum prediction error m67, (28a) and (28b).

出力可変不可制御分散電源最大予測誤差p66=max[出力可変不可制御分散電源実出力データi68−翌日等出力可変不可分散電源出力予測結果i65](i=i0,iN;i0:サンプリングの初期値、iN:サンプリングの最終値) …(28a)
出力可変不可制御分散電源最大予測誤差m67=max[翌日等出力可変不可分散電源出力予測結果i65−出力可変不可制御分散電源実出力データi68](i=i0,iN;i0:サンプリングの初期値、iN:サンプリングの最終値) …(28b)
ここで、出力可変不可制御分散電源実出力データi68は出力可変不可制御分散電源実出力データ68のサンプリングi番目のデータ、翌日等出力可変不可分散電源出力予測結果i65は翌日等出力可変不可分散電源出力予測結果65のサンプリングi番目のデータである。サンプリング区間は一日のある区間,例えば0時〜24時である。
Output variable non-controllable distributed power supply maximum prediction error p66 = max [output variable non-controllable distributed power source actual output data i68-next day etc. non-variable power supply output prediction result i65] (i = i0, iN; i0: initial value of sampling, iN: Final value of sampling) (28a)
Output variable uncontrollable distributed power supply maximum prediction error m67 = max [next day etc. output variable undistributable distributed power output prediction result i65−output variable uncontrollable distributed power source actual output data i68] (i = i0, iN; i0: initial value of sampling, iN: Final value of sampling) (28b)
Here, the output variable non-controllable distributed power source actual output data i68 is the sampling i-th data of the output variable non-controllable distributed power source actual output data 68, the next day output non-variable non-distributed power source output prediction result i65 is the next day non-output variable non-distributable power source, etc. This is the i-th sampling data of the output prediction result 65. The sampling period is a certain part of the day, for example, 0:00 to 24:00.

その結果、小規模電力系統の電源容量推定装置としては、翌日等出力可変不可分散電源出力予測結果65の誤差分を考慮すると、推定しようとする必要電源容量X´は、前述した式(19a)〜式(19d)に代わり、それぞれ式(29a)〜式(29d)となる。   As a result, the power source capacity estimation apparatus for a small-scale power system takes into consideration the error of the output variable non-distributed power output prediction result 65 such as the next day, and the required power capacity X ′ to be estimated is given by the above-described equation (19a). Instead of the expression (19d), the expressions (29a) to (29d) are obtained, respectively.

*実需要>予測結果のケース55の場合
* 方法1(最大需要誤差37から求める方法)の適用
必要電源容量X´=電力需要予測誤差補正容量46+電力需要最大変動分必要容量44+出力可変不可制御電源予測誤差補正容量69
=最大需要誤差p50+電力需要実データ差分最大値p49+出力可変不可制御分散電源最大予測誤差m67=必要電源容量pa71 …(29a)
* 方法2(平均需要誤差38から求める方法)の適用
必要電源容量X´=電力需要予測誤差補正容量46+電力需要最大変動分必要容量44+出力可変不可制御電源予測誤差補正容量69
=平均需要誤差38+電力需要実データ差分最大値p49+出力可変不可制御分散電源最大予測誤差m67=必要電源容量pb72 …(29b)
*実需要<予測結果のケース56の場合
この場合には、電力需要予測誤差補正容量46と電力需要最大変動分必要容量44は通常マイナスとなるので、絶対値をとる。
* Actual demand> Case 55 of forecast results * Application of method 1 (method obtained from maximum demand error 37)
Required power capacity X ′ = Power demand prediction error correction capacity 46 + Power demand maximum fluctuation required capacity 44 + Output variable control impossible power supply prediction error correction capacity 69
= Maximum demand error p50 + Maximum power demand actual data difference value p49 + Output non-variable control Distributed power source maximum prediction error m67 = Required power source capacity pa71 (29a)
* Application of method 2 (method obtained from average demand error 38)
Required power capacity X ′ = Power demand prediction error correction capacity 46 + Power demand maximum fluctuation required capacity 44 + Output variable control impossible power supply prediction error correction capacity 69
= Average demand error 38 + power demand actual data difference maximum value p49 + output variable impossible control distributed power supply maximum prediction error m67 = required power supply capacity pb72 (29b)
* In the case of actual demand <forecast result case 56 In this case, the power demand prediction error correction capacity 46 and the power demand maximum fluctuation required capacity 44 are usually negative, and therefore take absolute values.

* 方法1(最大需要誤差37から求める方法)の適用
必要電源容量X´=abs(電力需要予測誤差補正容量46+電力需要最大変動分必要容量44+出力可変不可制御電源予測誤差補正容量69)
=abs(最大需要誤差m52+電力需要実データ差分最大値m51+出力可変不可制御分散電源最大予測誤差p66)=必要電源容量ma73 …(29c)
* 方法2(平均需要誤差38から求める方法)の適用
必要電源容量X´=abs(電力需要予測誤差補正容量46+電力需要最大変動分必要容量44+出力可変不可制御電源予測誤差補正容量69)
=abs(平均需要誤差38+電力需要実データ差分最大値m51+出力可変不可制御分散電源最大予測誤差p66)=必要電源容量mb74 …(29d)
なお、上式において、関数abs(x)は引数xの絶対値を示す。
* Application of method 1 (method obtained from maximum demand error 37)
Required power capacity X ′ = abs (power demand prediction error correction capacity 46 + power demand maximum fluctuation required capacity 44 + output variable control impossible power supply prediction error correction capacity 69)
= Abs (maximum demand error m52 + power demand actual data difference maximum value m51 + output variable non-controllable distributed power supply maximum prediction error p66) = required power supply capacity ma73 (29c)
* Application of method 2 (method obtained from average demand error 38)
Required power capacity X ′ = abs (power demand prediction error correction capacity 46 + power demand maximum fluctuation required capacity 44 + output variable control impossible power supply prediction error correction capacity 69)
= Abs (average demand error 38 + power demand actual data difference maximum value m51 + output variable impossible control distributed power supply maximum prediction error p66) = required power supply capacity mb74 (29d)
In the above equation, the function abs (x) indicates the absolute value of the argument x.

従って、必要電源容量X´としては、実需要と予測結果との大きさと、方法1,2の適用とに応じて、式(29a)〜式(29d)の必要電源容量pa71、pb72,ma73,mb74が求められる。   Therefore, as the required power capacity X ′, the required power capacity pa 71, pb 72, ma 73, Expression (29a) to Expression (29d) according to the size of the actual demand and the prediction result and the application of the methods 1 and 2, mb74 is determined.

ところで、必要電源容量X´としては、前述した方法1の適用により得られた必要電源容量pa71、ma73のうち、より多くの容量を必要とする方であることから式(30a)により、また方法2の適用により得られた必要電源容量pb72,mb74のうち、より多くの容量を必要とする方であることから式(30b)により求めることができる。
方法1→必要電源容量X´=max[必要電源容量pa71、必要電源容量ma73]
…(30a)
方法2→必要電源容量X=max[必要電源容量pb72、必要電源容量mb74]
…(30b)
また、第1の実施の形態で説明した式(26)や式(27)の電源設備容量下限値27+容量マージン60は、第2の実施の形態でも共用できるので、必要電源容量の最終解は式(31)、式(32)となる。
By the way, as the required power supply capacity X ′, the required power supply capacity pa71, ma73 obtained by applying the method 1 described above is the one that requires a larger capacity, so that the method (30a) and the method are used. Of the necessary power source capacities pb72 and mb74 obtained by application of 2, it is the one that requires a larger capacity, and therefore can be obtained by the equation (30b).
Method 1 → Required power supply capacity X ′ = max [Required power supply capacity pa71, Required power supply capacity ma73]
... (30a)
Method 2 → required power capacity X = max [necessary power capacity pb72, necessary power capacity mb74]
... (30b)
In addition, since the power supply facility capacity lower limit 27 + capacity margin 60 in the equations (26) and (27) described in the first embodiment can be shared also in the second embodiment, the final solution of the necessary power capacity is Equations (31) and (32) are obtained.

方法1→必要電源容量X´=max[必要電源容量pa71、必要電源容量ma73]+電源設備容量下現値27+容量マージン60=最終必要電源容量75 …(31)
方法2→必要電源容量X´=max[必要電源容量pb72、必要電源容量mb74]+電源設備容量下現値27+容量マージン60=最終必要電源容量76 …(32)
従って、以上のような第2の実施の形態によれば、小規模電力系統5内に出力可変不可制御分散電源9bを設置したとき、当該出力可変不可制御分散電源9bに関する最大予測誤差p66,m67を算出し、必要電源容量Xに反映させて式31,式32に示す必要電源容量X´を推定するようにしたので、小規模電力系統5内の電源設備9の必要電源容量を高精度に推定することができる。
Method 1 → Required power supply capacity X ′ = max [Required power supply capacity pa71, Required power supply capacity ma73] + Power supply capacity lower current value 27 + Capacity margin 60 = Final required power supply capacity 75 (31)
Method 2 → required power supply capacity X ′ = max [necessary power supply capacity pb72, required power supply capacity mb74] + power supply capacity lower current value 27 + capacity margin 60 = final required power supply capacity 76 (32)
Therefore, according to the second embodiment as described above, when the output variable non-controllable distributed power source 9b is installed in the small-scale power system 5, the maximum prediction error p66, m67 related to the output variable non-controllable distributed power source 9b. Is calculated and reflected in the required power supply capacity X to estimate the required power supply capacity X ′ shown in Expressions 31 and 32, so that the required power supply capacity of the power supply facility 9 in the small-scale power system 5 can be calculated with high accuracy. Can be estimated.

その他、本発明は、上記実施の形態に限定されるものでなく、その要旨を逸脱しない範囲で種々変形して実施できる。   In addition, the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the scope of the invention.

1…入力部、2…データベース、3…電源容量推定処理部、3A…補正容量算出手段、3B…変動容量算出手段、3C,3C´…暫定必要電源容量推定手段、3D,3D´…最終必要電源容量推定手段、3E…予測誤差算出手段、4…表示部、5…小規模電力系統、6…商用電力系統、7…連系線、8…負荷設備、9…電源設備、9A…出力可変可能制御分散電源、9B…出力可変不可制御分散電源、13…需給制御システム、14…同時同量制御システム、22…プログラムメモリ、65…翌日等出力可変不可分散電源出力予測結果、68…出力可変不可制御分散電源実出力データ。   DESCRIPTION OF SYMBOLS 1 ... Input part, 2 ... Database, 3 ... Power supply capacity estimation process part, 3A ... Correction capacity calculation means, 3B ... Fluctuation capacity calculation means, 3C, 3C '... Temporary required power supply capacity estimation means, 3D, 3D' ... Final need Power supply capacity estimation means, 3E ... prediction error calculation means, 4 ... display unit, 5 ... small power system, 6 ... commercial power system, 7 ... interconnection line, 8 ... load equipment, 9 ... power supply equipment, 9A ... variable output Possible control distributed power supply, 9B ... Output variable control impossible control power supply, 13 ... Demand and supply control system, 14 ... Same simultaneous control system, 22 ... Program memory, 65 ... Next day etc. Uncontrolled distributed power supply actual output data.

Claims (5)

商用電力系統と連系し、商用電力系統からの電力と分散電源の発電出力とを需要家設備である負荷設備に供給する小規模電力系統に対して、受電点電力一定制御や同時同量制御を実施して電力需給バランスをとるために、当該小規模電力系統の出力可変可能制御分散電源の必要電源容量を推定する小規模電力系統の電源容量推定装置であって、
現時点以前の電力需要実データ及び少なくとも気温や天気から予測される前記負荷設備に供給する電力需要予測結果とが記憶された第1の記憶手段と、
所定期間における前記電力需要実データ>電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、最大需要誤差及び平均誤差を演算し、それぞれ電力需要予測誤差補正容量とする補正容量算出手段と、
所定期間における前記電力需要実データ>電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、当該所定期間内の同時同量制御の制御周期毎における電力需要実データの始点と終点の値の差分の絶対値の中から電力需要実データ差分最大値を取得し、電力需要最大変動分必要容量とする変動容量算出手段と、
前記電力需要実データ>前記電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、前記最大需要誤差、前記平均誤差及び前記電力需要実データ差分最大値を用いて、所定の演算式に基づいて出力可変可能制御分散電源の必要電源容量を推定する第1の暫定必要電源容量推定手段と、
前記最大需要誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量前記平均誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量と前記出力可変可能制御分散電源の容量下限値と電源設備保護・耐久性から定める容量マージンとから、前記最大需要誤差及び平均誤差を適用した最終解となる必要電源容量を推定する第1の最終必要電源容量推定手段と
を備えたことを特徴とする小規模電力系統の電源容量推定装置。
Power receiving point constant power control and simultaneous equal amount control for small-scale power systems that are connected to the commercial power system and supply the power from the commercial power system and the power generation output of the distributed power source to the load facility that is the customer facility In order to balance the power supply and demand by implementing the power supply capacity estimation device of the small-scale power system for estimating the required power capacity of the output variable control distributed power supply of the small-scale power system,
First storage means storing power demand actual data before the present time and power demand prediction results to be supplied to at least the load facility predicted from temperature and weather ;
The maximum power error and the average error are calculated separately for the power demand actual data in a predetermined period> the power demand prediction result and the power demand actual data <the power demand prediction result, and each is used as a power demand prediction error correction capacity. Correction capacity calculation means;
The power demand actual data in a predetermined period> The power demand prediction result and the power demand actual data <the power demand prediction result, and the power demand actual data in each control period of the same amount control within the predetermined period. Fluctuation capacity calculation means for obtaining the power demand actual data difference maximum value from the absolute value of the difference between the start point and the end point value, and making it the required capacity for the power demand maximum fluctuation,
The power demand actual data> the power demand prediction result, and the power demand actual data <the power demand prediction result, and using the maximum demand error, the average error, and the power demand actual data difference maximum value, A first provisional necessary power capacity estimating means for estimating a required power capacity of the output variable controllable distributed power supply based on a predetermined arithmetic expression;
Great need power capacity and large power requirements capacitance of the capacitance from the required power capacity was determined using the average error and the output variable controllable distributed power capacity from the required power capacity was determined using the maximum demand error First required power capacity estimation means for estimating a required power capacity as a final solution to which the maximum demand error and average error are applied, from a capacity lower limit value and a capacity margin determined from protection and durability of power equipment. A power source capacity estimation device for a small-scale power system.
商用電力系統と連系し、商用電力系統からの電力と分散電源の発電出力とを負荷設備に供給する小規模電力系統に対して、受電点電力一定制御や同時同量制御を実施して電力需給バランスをとるために、当該小規模電力系統の前記分散電源の必要電源容量を推定する小規模電力系統の電源容量推定方法であって、
制御指示を入力する入力部と、現時点以前の電力需要実データ及び少なくとも気温や天気から現時点以降の前記負荷設備に供給する電力需要予測結果を記憶する第1の記憶部と、CPUで構成された電源容量推定処理部とを有し、
前記電源容量推定処理部は、
前記入力部から電源容量推定の制御指示を受けたとき、前記記憶部から所定期間の電力需要実データと電力需要予測結果とを取り出し、前記電力需要実データ>電力需要予測結果と、前記電力需要実データ<電力需要予測結果とに分けて、最大需要誤差及び平均誤差を演算し(後記式12、式13)、それぞれ電力需要予測誤差補正容量(後記式15a、式15b〜式17a、式17b)を取得する補正容量算出ステップと、
所定期間内の同時同量制御の制御周期毎における前記電力需要実データの始点と終点の値の差分を求めた後、それら差分の中から前記電力需要実データ>前記電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、最大値となる電力需要実データ差分最大値である電力需要最大変動分必要容量(後記式8b、式16、式18)を取得する変動容量算出ステップと、
前記電力需要実データ>前記電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、前記最大需要誤差、前記平均誤差及び前記電力需要実データ差分最大値を用いて、所定の演算式(後記式19a〜式19d)に基づいて出力可変可能制御分散電源の必要電源容量を推定する第1の暫定必要電源容量推定ステップと、
前記最大需要誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量を選定し、かつ、前記平均誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量を選定(後記式20a,式20b)する第1の必要電源容量選定ステップと、
この選定された各容量大の必要電源容量と小規模電力系統の出力可変可能制御分散電源の容量下限値と電源設備保護・耐久性から定める容量マージンとから、前記最大需要誤差を適用した最終必要電源容量と前記平均誤差を適用した最終必要電源容量を推定(後記式24〜式27)する第1の最終必要電源容量推定ステップとを有することを特徴とする小規模電力系統の電源容量推定方法。
Conduct power receiving point constant power control and simultaneous equal amount control for small-scale power systems that are connected to the commercial power system and supply the load facility with the power from the commercial power system and the power generation output of the distributed power source A power capacity estimation method for a small-scale power system that estimates a required power capacity of the distributed power supply of the small-scale power system in order to balance supply and demand,
An input unit that inputs a control instruction, a first storage unit that stores actual power demand data before the current time, and a power demand prediction result that is supplied to the load equipment after the current time from at least temperature and weather, and a CPU A power capacity estimation processing unit,
The power source capacity estimation processing unit
When receiving a control instruction for power supply capacity estimation from the input unit, the power demand actual data and the power demand prediction result for a predetermined period are extracted from the storage unit, and the power demand actual data> the power demand prediction result, and the power demand The maximum demand error and the average error are calculated separately from actual data <power demand prediction results (formula 12 and formula 13 below), and power demand forecast error correction capacities (formula 15a, formula 15b to formula 17a, formula 17b, respectively). ) To obtain a corrected capacity,
After obtaining the difference between the value of the start point and the end point of the actual power demand data for each control cycle of the same amount control within a predetermined period, the actual power demand data> the power demand prediction result from the difference, Fluctuation to obtain the required power (maximum power demand actual data difference required value (the following formulas 8b, 16 and 18), divided into the actual power demand data <the power demand forecast result). A capacity calculation step;
The power demand actual data> the power demand prediction result, and the power demand actual data <the power demand prediction result, and using the maximum demand error, the average error, and the power demand actual data difference maximum value, A first provisional required power supply capacity estimating step for estimating a required power supply capacity of the output variable control distributed power supply based on a predetermined arithmetic expression (following expressions 19a to 19d);
A required power capacity having a large capacity is selected from the required power capacity determined using the maximum demand error, and a required power capacity having a large capacity is selected from the required power capacity determined using the average error ( A first required power source capacity selection step to be described later (formula 20a, formula 20b);
Based on the required power capacity of each selected large capacity, the lower limit of the capacity of the distributed power supply that can control the output of the small-scale power system, and the capacity margin determined from the protection and durability of the power supply facilities, the final required application of the maximum demand error is applied. A power capacity estimation method for a small-scale power system, comprising: a first power capacity capacity estimation step for estimating a power capacity capacity and a final necessary power capacity by applying the average error (formulas 24 to 27 described later). .
制御指示を入力する入力部と、現時点以前の電力需要実データ及び少なくとも気温や天気から現時点以降の前記負荷設備に供給する電力需要予測結果を記憶する記憶部と、電源容量推定処理部を備えたコンピュータとによって、小規模電力系統の分散電源設備の必要電源容量を推定する電源容量推定用プログラムであって、
前記コンピュータに、
前記電源容量推定処理部によって、前記入力部から電源容量推定の制御指示を受けたとき、前記記憶部から所定期間の電力需要実データと電力需要予測結果とを取り出し、前記電力需要実データ>電力需要予測結果と、前記電力需要実データ<電力需要予測結果とに分けて、最大需要誤差及び平均誤差を演算し(後記式12、式13)、それぞれ電力需要予測誤差補正容量(後記式15a、式15b〜式17a、式17b)を取得する補正容量算出機能と、所定期間内の同時同量制御の制御周期毎における前記電力需要実データの始点と終点の値の差分を求めた後、それら差分の中から前記電力需要実データ>前記電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、最大値となる電力需要実データ差分最大値である電力需要最大変動分必要容量(後記式8b、式16、式18)を取得する変動容量算出機能と、前記電力需要実データ>前記電力需要予測結果と、前記電力需要実データ<前記電力需要予測結果とに分けて、前記最大需要誤差、前記平均誤差及び前記電力需要実データ差分最大値を用いて、所定の演算式(後記式19a〜式19d)に基づいて出力可変可能制御分散電源の必要電源容量を推定する暫定必要電源容量推定機能と、前記最大需要誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量を選定し、かつ、前記平均誤差を用いて求めた必要電源容量の中から容量の大きな必要電源容量(後記式20a,式20b)を選定する必要電源容量選定機能と、この選定された各容量大の必要電源容量と小規模電力系統の出力可変可能制御分散電源の容量下限値と電源設備保護・耐久性から定める容量マージンとから、前記最大需要誤差を適用した最終必要電源容量と前記平均誤差を適用した最終必要電源容量(後記式24〜式27)を推定する最終必要電源容量推定機能を実現させることを特徴とする電源容量推定用プログラム。
An input unit for inputting a control instruction, a storage unit for storing power demand actual data before and after the current time, and at least a power demand prediction result supplied to the load facility after the current time from temperature and weather, and a power capacity estimation processing unit A power capacity estimation program for estimating the required power capacity of a distributed power facility of a small-scale power system with a computer,
In the computer,
When the power supply capacity estimation processing unit receives a control instruction for power supply capacity estimation from the input unit, the power demand actual data and the power demand prediction result for a predetermined period are extracted from the storage unit, and the power demand actual data> power The maximum demand error and the average error are calculated by dividing the demand prediction result and the power demand actual data <the power demand prediction result (the following formulas 12 and 13), respectively, and the power demand prediction error correction capacity (the following formula 15a, After calculating the correction capacity calculating function for acquiring Expressions 15b to 17a, Expression 17b) and the difference between the start point and end point values of the actual power demand data for each control period of the same amount control within a predetermined period, The difference between the power demand actual data> the power demand forecast result and the power demand actual data <the power demand forecast result among the differences, and the power demand actual data difference maximum value which is the maximum value. A fluctuation capacity calculation function for acquiring a required capacity (hereinafter described with formulas 8b, 16, and 18), the power demand actual data> the power demand prediction result, and the power demand actual data <the power demand. Using the maximum demand error, the average error, and the actual power demand actual data difference maximum value separately from the prediction results, the output of the control distributed power source capable of variable output based on a predetermined arithmetic expression (formulas 19a to 19d described later) Necessary power supply capacity estimation function for estimating the required power supply capacity and a required power supply capacity having a large capacity from the required power supply capacity obtained using the maximum demand error, and obtained using the average error Necessary power capacity selection function for selecting a large required power capacity from the power capacity (formula 20a and 20b described later), the required power capacity of each selected large capacity and the output of the small power system The final required power capacity to which the maximum demand error is applied and the final required power capacity to which the average error is applied (formula 24 to be described later) from the lower limit of the capacity of the variable control distributed power supply and the capacity margin determined from the protection and durability of the power supply equipment A program for estimating a power supply capacity, which realizes a function of estimating a required power supply capacity for estimating Equation 27).
請求項1に記載の小規模電力系統の電源容量推定装置において、
前記小規模電力系統に前記出力可変可能制御分散電源の他に、出力可変不可制御分散電源を設けた場合、
前記電源容量推定処理部は、
前記第1の記憶手段に記憶された前記電力需要実データ及び前記電力需要予測結果に、新たに前記出力可変不可制御分散電源に関する出力可変不可制御分散電源実出力データ及び翌日等出力可変不可制御分散電源出力予測結果が記憶された第2の記憶手段と、
この第2の記憶手段から出力可変不可制御分散電源実出力データ及び翌日等出力可変不可制御分散電源出力予測結果を読み出し、所定期間における前記出力可変不可制御分散電源実出力データ>前記翌日等出力可変不可制御分散電源出力予測結果と、前記出力可変不可制御分散電源実出力データ<前記翌日等出力可変不可制御分散電源出力予測結果とに分けて、それぞれ出力可変不可制御分散電源最大予測誤差を求める予測誤差算出手段と、
前記第1の暫定必要電源容量推定手段で推定された必要電源容量に前記予測誤差算出手段で算出された出力可変不可制御分散電源最大予測誤差を加えて電源必要容量を求める第2の暫定必要電源容量推定手段と、
前記第1の暫定必要電源容量推定手段により前記最大需要誤差を用いて求めた容量の大きな必要電源容量前記平均誤差を用いて求めた容量の大きな必要電源容量と前記分散電源の容量下限値と電源設備保護・耐久性から定める容量マージンとから、前記最大需要誤差及び平均誤差を適用した最終解となる必要電源容量を推定する第2の最終必要電源容量推定手段と
を備えたことを特徴とする小規模電力系統の電源容量推定装置。
In the apparatus for estimating a power capacity of a small-scale power system according to claim 1,
In addition to the output variable controllable distributed power supply in the small-scale power system, when an output variable non-controllable distributed power supply is provided,
The power source capacity estimation processing unit
The power demand actual data and the power demand prediction result stored in the first storage means are newly added to the output variable non-control distributed power source related to the output variable non-control distributed power source and the next day etc. Second storage means for storing a power output prediction result;
The output variable uncontrollable distributed power source actual output data and the next day non-variable control distributed power source output prediction result are read from the second storage means, and the output variable uncontrollable control distributed power source actual output data in a predetermined period> the next day equal output variable. Dividing into the non-controllable distributed power output prediction result and the output variable non-controllable distributed power actual output data <the next day's output variable non-controllable distributed power output prediction result, and the prediction for obtaining the output variable non-controllable distributed power supply maximum prediction error respectively. An error calculating means;
The second provisional necessary power supply for obtaining the required power supply capacity by adding the output variable impossible control distributed power supply maximum prediction error calculated by the prediction error calculating means to the required power supply capacity estimated by the first provisional required power supply capacity estimating means. Capacity estimation means;
And capacity lower limit value of the great need power capacity and the dispersed power source capacity which is obtained by using a great need power capacity and the average error of the capacity obtained by using the maximum demand error by the first provisional required power capacity estimating means And a second final required power capacity estimating means for estimating a required power capacity as a final solution to which the maximum demand error and the average error are applied from a capacity margin determined from protection and durability of power equipment. A power capacity estimation device for a small power system.
請求項2に記載の小規模電力系統の電源容量推定方法において、
前記小規模電力系統に前記出力可変可能制御分散電源の他に、出力可変不可制御分散電源を設けた場合、
前記第1の記憶部に記憶された前記電力需要実データ及び前記電力需要予測結果に、新たに前記出力可変不可制御分散電源に関する出力可変不可制御分散電源実出力データ及び翌日等出力可変不可制御分散電源出力予測結果が記憶された第2の記憶部が設けられ、
前記電源容量推定処理部は、前記第2の記憶部から出力可変不可制御分散電源実出力データ及び翌日等出力可変不可制御分散電源出力予測結果を読み出し、所定期間における前記出力可変不可制御分散電源実出力データ>前記翌日等出力可変不可制御分散電源出力予測結果と、前記出力可変不可制御分散電源実出力データ<前記翌日等出力可変不可制御分散電源出力予測結果とに分けて、それぞれ出力可変不可制御分散電源最大予測誤差(後記式28a,式28b)を求める予測誤差算出ステップと、
前記第1の暫定必要電源容量推定ステップで推定された必要電源容量に前記予測誤差算出ステップで算出された出力可変不可制御分散電源最大予測誤差を加えて電源必要容量を求める第2の暫定必要電源容量推定ステップと、
前記第2の暫定必要電源容量推定ステップにより前記最大需要誤差を用いて求めた容量の大きな必要電源容量前記平均誤差を用いて求めた容量の大きな必要電源容量(後記する式30a,式30b参照)と前記分散電源の容量下限値と電源設備保護・耐久性から定める容量マージンとから、前記最大需要誤差及び平均誤差を適用した最終解となる必要電源容量(後記する式31〜式32)を推定する第2の最終必要電源容量推定ステップと
を有することを特徴とする小規模電力系統の電源容量推定方法。
In the power source capacity estimation method of the small-scale power system according to claim 2,
In addition to the output variable controllable distributed power supply in the small-scale power system, when an output variable non-controllable distributed power supply is provided,
The power demand actual data and the power demand prediction result stored in the first storage unit are newly added to the output variable non-control distributed power source related to the output variable non-control distributed power source and the next day output variable non-control distributed. A second storage unit storing the power output prediction result is provided;
The power source capacity estimation processing unit reads output variable non-controllable distributed power source actual output data and output variable non-controllable control distributed power source output prediction results such as next day from the second storage unit, and outputs the output variable non-controllable distributed power source actual result in a predetermined period. Output data> The next day's output variable non-controllable distributed power output prediction result and the output variable non-control distributed power source actual output data <The next day's output variable non-control distributed power output prediction result A prediction error calculating step for obtaining a distributed power source maximum prediction error (formula 28a and formula 28b described later);
The second provisional necessary power source for obtaining the required power source capacity by adding the output variable non-controllable distributed power source maximum prediction error calculated in the prediction error calculating step to the required power source capacity estimated in the first provisional necessary power source capacity estimating step. A capacity estimation step;
The second provisional required power capacity estimation step by a great need power capacity of the capacitor obtained by using the great need power capacity and the average error of the capacity obtained by using the maximum demand error (hereinafter Formula 30a, Formula 30b reference ) And the capacity lower limit value of the distributed power source and the capacity margin determined from the protection and durability of the power source equipment, the required power source capacity (formula 31 to formula 32 described later) as the final solution applying the maximum demand error and the average error is obtained. A method for estimating a power source capacity of a small-scale power system, comprising: a second final required power source capacity estimating step.
JP2009063482A 2009-03-16 2009-03-16 Power supply capacity estimation apparatus for small-scale power system, power supply capacity estimation method and power capacity estimation program Expired - Fee Related JP5380119B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009063482A JP5380119B2 (en) 2009-03-16 2009-03-16 Power supply capacity estimation apparatus for small-scale power system, power supply capacity estimation method and power capacity estimation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009063482A JP5380119B2 (en) 2009-03-16 2009-03-16 Power supply capacity estimation apparatus for small-scale power system, power supply capacity estimation method and power capacity estimation program

Publications (2)

Publication Number Publication Date
JP2010220363A JP2010220363A (en) 2010-09-30
JP5380119B2 true JP5380119B2 (en) 2014-01-08

Family

ID=42978591

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009063482A Expired - Fee Related JP5380119B2 (en) 2009-03-16 2009-03-16 Power supply capacity estimation apparatus for small-scale power system, power supply capacity estimation method and power capacity estimation program

Country Status (1)

Country Link
JP (1) JP5380119B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2479060B (en) * 2011-03-24 2012-05-02 Reactive Technologies Ltd Energy consumption management
US9523992B2 (en) 2012-09-13 2016-12-20 Rkc Instrument Inc. Power control device and power control method
TWI601387B (en) * 2016-06-22 2017-10-01 晨星半導體股份有限公司 Decoding apparatus and decoding method including error correction process
KR102455647B1 (en) * 2020-07-07 2022-10-19 한국지역난방공사 Apparatus, method and computer program for diagnosing electric power distribution
CN111987720B (en) * 2020-08-26 2021-11-30 国网江苏省电力有限公司 Method for evaluating power receiving and power supply margin intervals of receiving-end power grid under constraint of multichannel quota

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4296140B2 (en) * 2004-08-31 2009-07-15 株式会社東芝 Plant optimum operation support system and method, program
JP4189930B2 (en) * 2006-06-06 2008-12-03 株式会社Nttファシリティーズ Microgrid power monitoring measurement control system, power monitoring measurement control method thereof, and power monitoring measurement control program thereof
JP4864803B2 (en) * 2007-04-23 2012-02-01 株式会社東芝 Electric power supply and demand control apparatus and method
JP4864839B2 (en) * 2007-08-27 2012-02-01 株式会社東芝 Power fluctuation prediction system

Also Published As

Publication number Publication date
JP2010220363A (en) 2010-09-30

Similar Documents

Publication Publication Date Title
Comodi et al. Multi-apartment residential microgrid with electrical and thermal storage devices: Experimental analysis and simulation of energy management strategies
JP5537304B2 (en) Information processing apparatus and program thereof
Mazidi et al. A model for flexibility analysis of RESS with electric energy storage and reserve
US10289088B2 (en) Systems and methods to control a power split between energy generation and energy storage assets
CA3030490A1 (en) Intelligent energy management system for distributed energy resources and energy storage systems using machine learning
JP5380119B2 (en) Power supply capacity estimation apparatus for small-scale power system, power supply capacity estimation method and power capacity estimation program
Zhang et al. Optimized generation capacity expansion using a further improved screening curve method
JP6515640B2 (en) Tidal current calculation apparatus, tidal current calculation method, and program
JP6365069B2 (en) Energy management system, power supply / demand plan optimization method, and power supply / demand plan optimization program
Khawaja et al. Optimal cost-based model for sizing grid-connected PV and battery energy system
WO2020219078A1 (en) Intelligent energy management system for distributed energy resources and energy storage systems using machine learning
Budiman et al. Stochastic optimization for the scheduling of a grid-connected microgrid with a hybrid energy storage system considering multiple uncertainties
JP6623514B2 (en) Supply and demand control device, supply and demand control method, and power supply system
JP2018185609A (en) Operation plan calculation device, operation plan calculation method and computer program
Mohammed et al. Extended method for the sizing, energy management, and techno-economic optimization of autonomous solar Photovoltaic/Battery systems: Experimental validation and analysis
Hermans et al. Analysis on the interaction between short-term operating reserves and adequacy
Grote et al. Modeling of electricity pricing in European market simulations
JP6711074B2 (en) Power generation plan automatic generation program, power generation plan automatic generation method, and power generation plan generation device
JP2020022339A (en) Power management system, power management device and program
JP2019213374A (en) Power generation plan formulation device
CN110544033A (en) Wind power consumption assessment method for power system after flexibility transformation of thermal power plant
Pirnia et al. An affine arithmetic approach for microgrid dispatch with variable generation and load
Hübel et al. Evaluation of Flexibility Optimization for Thermal Power Plants
Pourkhalili et al. Utility Scale Battery as Capacity Source for Electric Grid Systems
Wikander Dispatch Optimization of the TES. POD Cluster using Mixed-Integer Linear Programming Models

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110818

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130329

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130409

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130530

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130903

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130930

R150 Certificate of patent or registration of utility model

Ref document number: 5380119

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees