JP5352683B2 - キャパシティ計画及び作業負荷管理を統合するためのシステム及び方法 - Google Patents
キャパシティ計画及び作業負荷管理を統合するためのシステム及び方法 Download PDFInfo
- Publication number
- JP5352683B2 JP5352683B2 JP2011547900A JP2011547900A JP5352683B2 JP 5352683 B2 JP5352683 B2 JP 5352683B2 JP 2011547900 A JP2011547900 A JP 2011547900A JP 2011547900 A JP2011547900 A JP 2011547900A JP 5352683 B2 JP5352683 B2 JP 5352683B2
- Authority
- JP
- Japan
- Prior art keywords
- resource
- resource allocation
- workload
- options
- planned
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007726 management method Methods 0.000 title claims abstract description 41
- 238000013439 planning Methods 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 title claims description 18
- 238000013468 resource allocation Methods 0.000 claims abstract description 51
- 238000004088 simulation Methods 0.000 claims abstract description 30
- 238000012552 review Methods 0.000 claims abstract description 5
- 238000011156 evaluation Methods 0.000 claims description 24
- 230000006870 function Effects 0.000 claims description 16
- 230000008859 change Effects 0.000 claims description 2
- 238000000605 extraction Methods 0.000 claims 1
- 238000004891 communication Methods 0.000 abstract description 6
- 238000012544 monitoring process Methods 0.000 description 10
- 238000005192 partition Methods 0.000 description 8
- 230000008569 process Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000013475 authorization Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000007774 longterm Effects 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 230000004913 activation Effects 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000009849 deactivation Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012854 evaluation process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/34—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
- G06F11/3442—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment for planning or managing the needed capacity
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/34—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
- G06F11/3457—Performance evaluation by simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/40—Data acquisition and logging
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Software Systems (AREA)
- Business, Economics & Management (AREA)
- Computer Hardware Design (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Economics (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Mathematical Physics (AREA)
- Debugging And Monitoring (AREA)
Description
Claims (20)
- 適当なコンピューティング装置上のプログラムとして実施される、資源キャパシティ計画システムの機能及び作業負荷管理システムの機能を統合するためのシステムであって、
複数の作業負荷の実行、資源タイプ、数、及びキャパシティに関するデータを前記資源キャパシティ計画システムから受信して、1つ又は2つ以上の考え得る資源構成の選択肢を生成する、シミュレーションモジュールと、
該1つ又は2つ以上の考え得る資源構成の選択肢を該シミュレーションモジュールから受信し、及び1つ又は2つ以上の特定の基準を前記作業負荷管理システムから受信し、該1つ又は2つ以上の考え得る資源構成の選択肢及び該1つ又は2つ以上の特定の基準に基づいて、前記複数の作業負荷間での1つ又は2つ以上の計画された資源割り当ての選択肢を作成する、モデル化モジュールとを備えており、
前記資源キャパシティ計画システムが、前記モデル化モジュールから前記1つ又は2つ以上の計画された資源割り当ての選択肢を受信し、及び該1つ又は2つ以上の計画された資源割り当ての選択肢をユーザによる再検討のために提示する、
資源キャパシティ計画システムの機能及び作業負荷管理システムの機能を統合するためのシステム。 - 前記1つ又は2つ以上の計画された資源割り当ての選択肢を前記モデル化モジュールから受信し、及び該1つ又は2つ以上の計画された資源割り当ての選択肢を特定の基準に従って評価する、評価モジュールを更に備えており、前記資源キャパシティ計画システムが、前記1つ又は2つ以上の計画された資源割り当ての選択肢とその評価結果とを該評価モジュールから受信して、該1つ又は2つ以上の計画された資源割り当ての選択肢とその評価結果とをユーザによる再検討のために提示する、請求項1に記載のシステム。
- 前記1つ又は2つ以上の特定の基準が、サービスレベル目標、性能評価基準、及び作業負荷−資源割り当てポリシーを含む、請求項1又は請求項2に記載のシステム。
- 前記資源が、完全に認可された資源及びインスタントキャパシティ資源である、請求項1ないし請求項3の何れか一項に記載のシステム。
- 前記モデル化モジュールが、前記1つ又は2つ以上の計画された資源割り当て計画の選択肢の各々毎に資源コストを計算する、請求項1ないし請求項4の何れか一項に記載のシステム。
- 前記評価モジュールが、
更なる資源構成の選択肢を作成することを前記シミュレーションモジュールに指示する手段と、
前記1つ又は2つ以上の計画された資源割り当ての選択肢のうちの1つ又は2つ以上が前記特定の基準に達さなかったときをユーザに知らせる手段と、
ポリシー設定を変更して、該変更の前記1つ又は2つ以上の計画された資源割り当ての選択肢に対する影響を評価する手段と
を含む、請求項2及び請求項2を直接的又は間接的に引用する請求項3ないし請求項5の何れか一項に記載のシステム。 - 前記1つ又は2つ以上の資源割り当ての選択肢が、時間と共に変動する、請求項1ないし請求項6の何れか一項に記載のシステム。
- 適当にプログラミングされたコンピューティング装置上で実施される、キャパシティ計画システムの機能及び作業負荷管理システムの機能を統合するための方法であって、
複数の作業負荷の実行による資源の使用に関する履歴データ及びシミュレートされたデータの1つ又は2つ以上を前記キャパシティ計画システム及び/又は前記作業負荷管理システムから受信し、
該受信した履歴データ及びシミュレートされたデータの1つ又は2つ以上に基づいて考え得る資源需要構成を計算し、
該考え得る資源需要構成を前記作業負荷管理システムへ送信し、
該作業負荷管理システムにおいて該考え得る資源需要構成に基づいて前記複数の作業負荷間での1つ又は2つ以上の資源割り当ての選択肢を作成し、
該1つ又は2つ以上の資源割り当ての選択肢をユーザに対する表示のために前記キャパシティ計画システムへ送信する、
という各ステップを含む、キャパシティ計画システムの機能及び作業負荷管理システムの機能を統合するための方法。 - 前記1つ又は2つ以上の資源割り当ての選択肢を特定の基準に従って評価し、
その評価結果を前記ユーザに対する表示のために前記キャパシティ計画システムへ送信する、
という各ステップを更に含む、請求項8に記載の方法。 - 前記作業負荷管理システムの1つの設定ファイルから、前記複数の作業負荷に関するポリシー、性能評価基準、及びサービスレベル目標を抽出し、
その抽出結果を使用して前記複数の作業負荷間での前記1つ又は2つ以上の資源割り当ての選択肢を作成する、
という各ステップを更に含む、請求項8又は請求項9に記載の方法。 - 前記1つ又は2つ以上の資源割り当ての選択肢が時間と共に変動する、請求項8ないし請求項10の何れか一項に記載の方法。
- 前記考え得る資源需要構成の何れかがインスタントキャパシティ資源を含むか否かを判定し、この際に該インスタントキャパシティ資源に関するコストが計算され、
該コストをユーザに対する表示のために前記キャパシティ計画システムへ送信する、
という各ステップを更に含む、請求項8ないし請求項11の何れか一項に記載の方法。 - 適当にプログラミングされた装置上で実施される、コンピュータシステムにおけるキャパシティ計画システムの機能及び作業負荷管理システムの機能を統合するためのアーキテクチャであって、
複数の作業負荷の実行、資源タイプ、数、及びキャパシティに関するデータを前記キャパシティ計画システムから受信する手段と、
該受信したデータに基づいて1つ又は2つ以上の考え得る資源構成の選択肢を生成するための手段と、
該1つ又は2つ以上の考え得る資源構成の選択肢と前記作業負荷管理システムから受信した1つ又は2つ以上の特定の基準とに基づいて、前記複数の作業負荷間での1つ又は2つ以上の計画された資源割り当ての選択肢を作成するための手段と、
前記1つ又は2つ以上の計画された資源割り当ての選択肢をユーザに伝える手段と
を含む、コンピュータシステムにおけるキャパシティ計画システムの機能及び作業負荷管理システムの機能を統合するためのアーキテクチャ。 - 特定の基準に従って前記1つ又は2つ以上の計画された資源割り当ての選択肢を評価するための手段を更に備えており、
前記1つ又は2つ以上の計画された資源割り当ての選択肢をユーザに伝える前記手段が、前記評価の結果を前記ユーザに伝えるための手段を更に備えている、
請求項13に記載のアーキテクチャ。 - 前記1つ又は2つ以上の特定の基準が、サービスレベル目標、性能評価基準、及び作業負荷−資源割り当てポリシーを含む、請求項13又は請求項14に記載のアーキテクチャ。
- 前記資源が、完全に認可された資源である、請求項13ないし請求項15の何れか一項に記載のアーキテクチャ。
- 前記資源が、オンデマンドのインスタントキャパシティ資源を含む、請求項13ないし請求項15の何れか一項に記載のアーキテクチャ。
- 前記1つ又は2つ以上の計画された資源割り当ての選択肢を作成するための前記手段が、前記1つ又は2つ以上の計画された資源割り当ての選択肢の各々毎に資源コストを計算する手段を含む、請求項17に記載のアーキテクチャ。
- 前記1つ又は2つ以上の計画された資源割り当ての選択肢が時間と共に変動する、請求項13ないし請求項18の何れか一項に記載のアーキテクチャ。
- 前記サービスレベル目標、性能評価基準、及び作業負荷−資源割り当てポリシーが、前記作業負荷管理システムの設定ファイル内に格納される、請求項15及び請求項15を直接的又は間接的に引用する請求項16ないし請求項19の何れか一項に記載のアーキテクチャ。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2009/032633 WO2010087850A1 (en) | 2009-01-30 | 2009-01-30 | System and method for integrating capacity planning and workload management |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2012515971A JP2012515971A (ja) | 2012-07-12 |
JP5352683B2 true JP5352683B2 (ja) | 2013-11-27 |
Family
ID=42395899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2011547900A Expired - Fee Related JP5352683B2 (ja) | 2009-01-30 | 2009-01-30 | キャパシティ計画及び作業負荷管理を統合するためのシステム及び方法 |
Country Status (6)
Country | Link |
---|---|
US (1) | US8689227B2 (ja) |
EP (1) | EP2391961B1 (ja) |
JP (1) | JP5352683B2 (ja) |
KR (1) | KR101564481B1 (ja) |
CN (1) | CN102301370B (ja) |
WO (1) | WO2010087850A1 (ja) |
Families Citing this family (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8732310B2 (en) * | 2010-04-22 | 2014-05-20 | International Business Machines Corporation | Policy-driven capacity management in resource provisioning environments |
US9245246B2 (en) | 2010-04-22 | 2016-01-26 | International Business Machines Corporation | Capacity over-commit management in resource provisioning environments |
US9734461B2 (en) * | 2010-08-18 | 2017-08-15 | International Business Machines Corporation | Resource usage calculation for process simulation |
US8806003B2 (en) * | 2011-06-14 | 2014-08-12 | International Business Machines Corporation | Forecasting capacity available for processing workloads in a networked computing environment |
US8732291B2 (en) * | 2012-01-13 | 2014-05-20 | Accenture Global Services Limited | Performance interference model for managing consolidated workloads in QOS-aware clouds |
CN104981782B (zh) * | 2013-02-01 | 2019-03-26 | 日本电气株式会社 | 用于控制资源的系统、控制模式生成装置 |
TW201447763A (zh) * | 2013-06-06 | 2014-12-16 | Hon Hai Prec Ind Co Ltd | 虛擬主機控制系統及方法 |
GB2520972A (en) | 2013-12-05 | 2015-06-10 | Ibm | Workload management |
CN103713955B (zh) * | 2013-12-31 | 2017-02-15 | 曙光云计算技术有限公司 | 资源动态分配的管理方法和装置 |
US9244747B2 (en) * | 2014-03-13 | 2016-01-26 | Qualcomm Incorporated | System and method for providing dynamic clock and voltage scaling (DCVS) aware interprocessor communication |
US9983911B2 (en) * | 2014-08-19 | 2018-05-29 | Nec Corporation | Analysis controller, analysis control method and computer-readable medium |
US9130844B1 (en) | 2014-11-11 | 2015-09-08 | Citigroup Technology, Inc. | Systems and methods for harvesting excess compute capacity across domains |
US9569271B2 (en) * | 2015-02-03 | 2017-02-14 | Dell Products L.P. | Optimization of proprietary workloads |
US9575811B2 (en) | 2015-02-03 | 2017-02-21 | Dell Products L.P. | Dynamically controlled distributed workload execution |
US9678798B2 (en) | 2015-02-03 | 2017-06-13 | Dell Products L.P. | Dynamically controlled workload execution |
US9684540B2 (en) | 2015-02-03 | 2017-06-20 | Dell Products L.P. | Dynamically controlled workload execution by an application |
US9747121B2 (en) | 2015-04-14 | 2017-08-29 | Dell Products L.P. | Performance optimization of workloads in virtualized information handling systems |
US20170061378A1 (en) * | 2015-09-01 | 2017-03-02 | International Business Machines Corporation | Sharing simulated data storage system management plans |
WO2017039680A1 (en) | 2015-09-04 | 2017-03-09 | Halliburton Energy Services, Inc. | Time-to-finish simulation forecaster |
EP3147786A1 (en) * | 2015-09-23 | 2017-03-29 | Siemens Aktiengesellschaft | Allocating resources for a number of applications |
US10198307B2 (en) * | 2016-03-31 | 2019-02-05 | Netapp, Inc. | Techniques for dynamic selection of solutions to storage cluster system trouble events |
US10200461B2 (en) | 2016-04-07 | 2019-02-05 | Virtustream Ip Holding Company Llc | Virtualized capacity management |
US10223131B1 (en) * | 2016-06-30 | 2019-03-05 | EMC IP Holding Company LLC | Implementing continues PaaS apps resource optimization using production workload replay with intelligent configuration permutations |
US10666570B2 (en) * | 2016-11-28 | 2020-05-26 | Intel Corporation | Computing infrastructure resource-workload management methods and apparatuses |
KR101889657B1 (ko) * | 2017-04-27 | 2018-08-20 | 서울대학교산학협력단 | 빅데이터 워크로드 처리를 위한 메모리 서브시스템 자원 관리 방법 |
US10692031B2 (en) | 2017-11-02 | 2020-06-23 | International Business Machines Corporation | Estimating software as a service cloud computing resource capacity requirements for a customer based on customer workflows and workloads |
EP3495952A1 (en) * | 2017-12-11 | 2019-06-12 | Accenture Global Solutions Limited | Prescriptive analytics based committed compute reservation stack for cloud computing resource scheduling |
US10922141B2 (en) | 2017-12-11 | 2021-02-16 | Accenture Global Solutions Limited | Prescriptive analytics based committed compute reservation stack for cloud computing resource scheduling |
US10860007B2 (en) * | 2018-07-17 | 2020-12-08 | Accenture Global Solutions Limited | Smart resource manager in unified automation platforms for robotic process automation |
JP6842447B2 (ja) * | 2018-09-12 | 2021-03-17 | 株式会社日立製作所 | リソース割当ての最適化を支援するシステム及び方法 |
US10855532B2 (en) | 2018-10-08 | 2020-12-01 | Dell Products L.P. | System and method to perform solution aware server compliance and configuration |
US20200143293A1 (en) * | 2018-11-01 | 2020-05-07 | Microsoft Technology Licensing, Llc | Machine Learning Based Capacity Management Automated System |
US11520634B2 (en) * | 2019-06-21 | 2022-12-06 | Kyndryl, Inc. | Requirement-based resource sharing in computing environment |
KR102251328B1 (ko) * | 2019-06-28 | 2021-05-12 | (주)브이엠에스 솔루션스 | 시뮬레이션 기반의 공장 내 자원 플래닝 방법 및 그 장치와, 컴퓨터 판독 가능한 기록 매체 |
US11334393B2 (en) * | 2020-01-07 | 2022-05-17 | Bank Of America Corporation | Resource cluster chaining architecture |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4018900B2 (ja) * | 2001-11-22 | 2007-12-05 | 株式会社日立製作所 | 仮想計算機システム及びプログラム |
US7171668B2 (en) * | 2001-12-17 | 2007-01-30 | International Business Machines Corporation | Automatic data interpretation and implementation using performance capacity management framework over many servers |
JP2005099973A (ja) * | 2003-09-24 | 2005-04-14 | Hitachi Ltd | 運用管理システム |
US8417499B2 (en) * | 2004-03-31 | 2013-04-09 | International Business Machines Corporation | Enabling real-time testing of on-demand infrastructure to predict service level agreement compliance |
US7752624B2 (en) * | 2004-12-21 | 2010-07-06 | Hewlett-Packard Development Company, L.P. | System and method for associating workload management definitions with computing containers |
JP2006309691A (ja) | 2005-03-28 | 2006-11-09 | Hitachi Ltd | リソース割当管理装置およびリソース割当方法 |
US9135074B2 (en) * | 2005-05-19 | 2015-09-15 | Hewlett-Packard Development Company, L.P. | Evaluating performance of workload manager based on QoS to representative workload and usage efficiency of shared resource for plurality of minCPU and maxCPU allocation values |
US8713179B2 (en) * | 2005-10-04 | 2014-04-29 | International Business Machines Corporation | Grid computing accounting and statistics management system |
JP4752767B2 (ja) | 2007-01-12 | 2011-08-17 | 日本電気株式会社 | システム構成候補導出装置、方法およびプログラム |
US8255906B2 (en) * | 2007-08-24 | 2012-08-28 | Opnet Technologies, Inc. | Modeling overhead for a plurality of virtualization technologies in a computer system |
US8301742B2 (en) * | 2008-04-07 | 2012-10-30 | International Business Machines Corporation | Systems and methods for coordinated management of power usage and runtime performance in performance-managed computing environments |
CA2674402C (en) * | 2009-07-31 | 2016-07-19 | Ibm Canada Limited - Ibm Canada Limitee | Optimizing on demand allocation of virtual machines using a stateless preallocation pool |
-
2009
- 2009-01-30 KR KR1020117017908A patent/KR101564481B1/ko active IP Right Grant
- 2009-01-30 JP JP2011547900A patent/JP5352683B2/ja not_active Expired - Fee Related
- 2009-01-30 WO PCT/US2009/032633 patent/WO2010087850A1/en active Application Filing
- 2009-01-30 EP EP09839423.2A patent/EP2391961B1/en active Active
- 2009-01-30 US US13/145,544 patent/US8689227B2/en active Active
- 2009-01-30 CN CN200980155758.XA patent/CN102301370B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
JP2012515971A (ja) | 2012-07-12 |
EP2391961A1 (en) | 2011-12-07 |
CN102301370B (zh) | 2015-04-08 |
US20110307901A1 (en) | 2011-12-15 |
EP2391961A4 (en) | 2012-07-18 |
EP2391961B1 (en) | 2016-10-05 |
CN102301370A (zh) | 2011-12-28 |
WO2010087850A1 (en) | 2010-08-05 |
US8689227B2 (en) | 2014-04-01 |
KR101564481B1 (ko) | 2015-10-29 |
KR20110117670A (ko) | 2011-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5352683B2 (ja) | キャパシティ計画及び作業負荷管理を統合するためのシステム及び方法 | |
US20110202655A1 (en) | Data Center Manager | |
US7979857B2 (en) | Method and apparatus for dynamic memory resource management | |
US8046767B2 (en) | Systems and methods for providing capacity management of resource pools for servicing workloads | |
EP1769352B1 (en) | Method and apparatus for dynamic cpu resource management | |
US7640231B2 (en) | Approach based on self-evolving models for performance guarantees in a shared storage system | |
CN100530133C (zh) | 用于在网格环境内管理工作负荷的方法和系统 | |
US20100115095A1 (en) | Automatically managing resources among nodes | |
US8433675B2 (en) | Optimization and staging | |
CN103890714A (zh) | 涉及基于集群的资源池的主机感知资源管理的系统和方法 | |
WO2009061432A1 (en) | Predicting and managing resource allocation according to service level agreements | |
US8949429B1 (en) | Client-managed hierarchical resource allocation | |
CN101821997A (zh) | 分层保留资源调度基础结构 | |
CN103765408A (zh) | 利用真实数据中心测试的服务质量感知捕获型聚集 | |
CN111443870B (zh) | 一种数据处理的方法、设备及存储介质 | |
Gmach et al. | Satisfying service level objectices in a self-managing resource pool | |
KR20190051878A (ko) | 단말 장치의 유휴 컴퓨팅 자원 활용 시스템 및 이를 이용한 유휴 컴퓨팅 자원 활용 방법 | |
Zhang et al. | PRMRAP: A proactive virtual resource management framework in cloud | |
CN101390056A (zh) | 应用系统智能优化器 | |
Jiang et al. | Resource allocation in contending virtualized environments through VM performance modeling and feedback | |
US20140165058A1 (en) | System resource management method for virtual system | |
US20090320020A1 (en) | Method and System for Optimising A Virtualisation Environment | |
KR101142237B1 (ko) | 그리드 생체정보 인증 시스템에서의 부하 분산 스케줄링을 위한 시뮬레이션 기반 작업부하 예측모델 선택 시스템 및 방법 | |
Huang et al. | You can't always get what you want: achieving differentiated service levels with pricing agents in a storage grid | |
Owen et al. | Using MCC Facility Metrics to Size, Inform, and Troubleshoot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130207 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130305 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130523 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130820 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130826 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5352683 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
R371 | Transfer withdrawn |
Free format text: JAPANESE INTERMEDIATE CODE: R371 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |