JP5279972B1 - Power prediction device - Google Patents

Power prediction device Download PDF

Info

Publication number
JP5279972B1
JP5279972B1 JP2013514430A JP2013514430A JP5279972B1 JP 5279972 B1 JP5279972 B1 JP 5279972B1 JP 2013514430 A JP2013514430 A JP 2013514430A JP 2013514430 A JP2013514430 A JP 2013514430A JP 5279972 B1 JP5279972 B1 JP 5279972B1
Authority
JP
Japan
Prior art keywords
power
value
prediction
mesh
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2013514430A
Other languages
Japanese (ja)
Other versions
JPWO2014118973A1 (en
Inventor
祐志 谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Application granted granted Critical
Publication of JP5279972B1 publication Critical patent/JP5279972B1/en
Publication of JPWO2014118973A1 publication Critical patent/JPWO2014118973A1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Abstract

【解決手段】第1電力が供給される電力負荷と、前記電力負荷に対して電力を供給するべく第2電力を出力する分散型電源と、が接続されている電力線における、前記分散型電源よりも上流側において発生させるべき第3電力の値を予測する電力予測装置であって、第1時間における前記第1電力の値と、前記第1時間よりも前の第2時間における前記第1電力の値及び前記第2時間における前記電力負荷が設けられている位置の気象情報と、の相関を示す相関式に基づいて、前記第1電力の値を予測する第1予測部と、前記分散型電源が設けられている位置の気象情報の予測値に応じて、前記第2電力の値を予測する第2予測部と、前記第1予測部の予測結果と前記第2予測部の予測結果との差に応じて、前記第3電力の値を予測する第3予測部と、を備える。 A distributed power source in a power line to which a power load to which a first power is supplied and a distributed power source that outputs second power to supply power to the power load are connected to each other. Is a power predicting device for predicting the value of the third power to be generated on the upstream side, the value of the first power in the first time and the first power in the second time before the first time. A first prediction unit that predicts the value of the first power based on a correlation equation that indicates a correlation between the value of the first load and the weather information of the position where the power load is provided in the second time, and the distributed type A second prediction unit that predicts a value of the second power according to a predicted value of weather information at a position where a power source is provided, a prediction result of the first prediction unit, and a prediction result of the second prediction unit; The third power value is predicted according to the difference between the third power It includes a measuring unit.

Description

本発明は、電力予測装置に関する。   The present invention relates to a power prediction apparatus.

例えば、負荷と分散型電源とが接続されるとともに、当該分散型電源よりも上流側の電源から電力が供給される配電線を有する配電系統が知られている(例えば特許文献1)。   For example, a distribution system having a distribution line to which a load and a distributed power source are connected and power is supplied from a power source upstream of the distributed power source is known (for example, Patent Document 1).

特開2012−147576号公報JP 2012-147576 A

一般に、特許文献1の配電系統を含め、負荷と分散型電源とが接続されるとともに、当該分散型電源よりも上流側の電源から電力が供給される配電線を有する配電系統において、電源から配電線に供給されるべき電力の値の予測が行われることがある。この電力の値の予測は、例えば、電源から配電線に過去に供給された電力の値に基づいて行われる。しかし、電源から配電線に過去に供給された電力の値は、例えば天気の変動に応じた分散型電源の出力電力の値の変動等に基づいて、比較的大きく変動することがある。よって、電源から配電線に供給されるべき電力の値を予測する予測精度が低下する虞がある。   In general, a distribution system including a distribution system of Patent Document 1 is connected to a load and a distributed power source, and has a distribution line to which power is supplied from a power source upstream of the distributed power source. The value of power to be supplied to the electric wire may be predicted. The prediction of the power value is performed based on the value of power previously supplied from the power source to the distribution line, for example. However, the value of power supplied in the past from the power source to the distribution line may fluctuate relatively greatly based on, for example, fluctuations in the value of output power of the distributed power source in response to weather fluctuations. Therefore, the prediction accuracy for predicting the value of power to be supplied from the power source to the distribution line may be reduced.

前述した課題を解決する主たる本発明は、第1電力が供給される電力負荷と、前記電力負荷に対して電力を供給するべく第2電力を出力する分散型電源と、が接続されている電力線における、前記分散型電源よりも上流側において発生させるべき第3電力の値を予測する電力予測装置であって、第1時間における前記第1電力の値と、前記第1時間よりも前の第2時間における前記第1電力の値及び前記第2時間における前記電力負荷が設けられている位置の気象情報と、の相関を示す相関式に基づいて、前記第1電力の値を予測する第1予測部と、前記分散型電源が設けられている位置の気象情報の予測値に応じて、前記第2電力の値を予測する第2予測部と、前記第1予測部の予測結果と前記第2予測部の予測結果との差に応じて、前記第3電力の値を予測する第3予測部と、を備えたことを特徴とする電力予測装置である。   The main present invention for solving the above-described problems is a power line to which a power load to which first power is supplied and a distributed power source that outputs second power to supply power to the power load are connected. A power predicting device for predicting a value of the third power to be generated on the upstream side of the distributed power source, wherein the value of the first power at the first time and the first power before the first time. First predicting the value of the first power based on a correlation equation indicating a correlation between the value of the first power in two hours and the weather information of the position where the power load is provided in the second time A prediction unit; a second prediction unit that predicts a value of the second power according to a predicted value of weather information at a position where the distributed power source is provided; a prediction result of the first prediction unit; According to the difference with the prediction result of 2 prediction units, 3 a third prediction unit that predicts a power value of a power prediction device characterized by comprising a.

本発明の他の特徴については、添付図面及び本明細書の記載により明らかとなる。   Other features of the present invention will become apparent from the accompanying drawings and the description of this specification.

本発明によれば、電力線における分散型電源よりも上流側において発生させるべき電力の値の予測精度を向上させることができる。   ADVANTAGE OF THE INVENTION According to this invention, the prediction precision of the value of the electric power which should be generated in the upstream from the distributed power supply in a power line can be improved.

本発明の第1実施形態における配電系統を示す図である。It is a figure which shows the power distribution system in 1st Embodiment of this invention. 本発明の第1実施形態におけるメッシュを示す図である。It is a figure which shows the mesh in 1st Embodiment of this invention. 本発明の第1及び第2実施形態における予測装置の機能を示すブロック図である。It is a block diagram which shows the function of the prediction apparatus in 1st and 2nd embodiment of this invention. 本発明の第1実施形態における設備情報を示す図である。It is a figure which shows the installation information in 1st Embodiment of this invention. 本発明の第1実施形態における潮流情報を示す図である。It is a figure which shows the tidal current information in 1st Embodiment of this invention. 本発明の第1及び第2実施形態における気象情報を示す図である。It is a figure which shows the weather information in 1st and 2nd embodiment of this invention. 本発明の第1及び第2実施形態における過去情報を示す図である。It is a figure which shows the past information in 1st and 2nd embodiment of this invention. 本発明の第1実施形態における未来情報を示す図である。It is a figure which shows the future information in 1st Embodiment of this invention. 本発明の第1実施形態における予測部による、メッシュの第2需要電力の値の予測結果を示す図である。It is a figure which shows the prediction result of the value of the 2nd demand power of a mesh by the prediction part in 1st Embodiment of this invention. 本発明の第1実施形態における予測部による、所定地域の第2需要電力の値の予測結果を示す図である。It is a figure which shows the prediction result of the value of the 2nd demand power of a predetermined area by the prediction part in 1st Embodiment of this invention. 本発明の第1実施形態における予測装置の動作を示すフローチャートである。It is a flowchart which shows operation | movement of the prediction apparatus in 1st Embodiment of this invention. 本発明の第1実施形態における予測装置の予測結果の一例を示す図である。It is a figure which shows an example of the prediction result of the prediction apparatus in 1st Embodiment of this invention. 本発明の第2実施形態における配電系統を示す図である。It is a figure which shows the power distribution system in 2nd Embodiment of this invention.

本明細書および添付図面の記載により、少なくとも以下の事項が明らかとなる。   At least the following matters will become apparent from the description of this specification and the accompanying drawings.

[第1実施形態]
===配電系統===
以下、図1を参照して、本実施形態における配電系統について説明する。図1は、本実施形態における配電系統を示す図である。
[First embodiment]
=== Distribution system ===
Hereinafter, the power distribution system in the present embodiment will be described with reference to FIG. FIG. 1 is a diagram showing a power distribution system in the present embodiment.

配電系統100は、例えば負荷R3乃至R5(電力負荷)に対して変電所200からの電力を供給するための電力系統である。   The distribution system 100 is a power system for supplying power from the substation 200 to, for example, loads R3 to R5 (power load).

配電系統100は、変電所200、予測装置8、気象観測装置71、72(観測装置)、気象情報装置73、需要家300、400、500、配電線L10(電力線)を有する。尚、例えば、配電系統100に設けられる配電線の本数は、2本以上の複数本であってもよい。又、配電系統100においては、説明の便宜上、メッシュN1乃至N15(図2)のうちの、メッシュN1内の需要家300、400と、メッシュN2内の需要家500が示されている。尚、メッシュN1乃至N15が、複数の区域に相当する。メッシュN1乃至N15については後述する。   The distribution system 100 includes a substation 200, a prediction device 8, a weather observation device 71, 72 (observation device), a weather information device 73, consumers 300, 400, 500, and a distribution line L10 (power line). For example, the number of distribution lines provided in the distribution system 100 may be two or more. In the power distribution system 100, for convenience of explanation, of the meshes N1 to N15 (FIG. 2), the consumers 300 and 400 in the mesh N1 and the consumers 500 in the mesh N2 are shown. The meshes N1 to N15 correspond to a plurality of areas. The meshes N1 to N15 will be described later.

変電所200は、上流側から供給された電力を降圧して、当該降圧された電力を配電線L10に供給するための、例えば配電用変電所である。変電所200は、配電用変圧器201、母線L2を有する。   The substation 200 is, for example, a distribution substation for stepping down the power supplied from the upstream side and supplying the stepped down power to the distribution line L10. The substation 200 includes a distribution transformer 201 and a bus L2.

配電用変圧器201は、例えば一次側の電圧を所定の変圧比で変圧して、当該変圧された電圧を二次側から出力する装置である。配電用変圧器201の一次側は、送電線L200の一端に接続される。尚、送電線L200は、例えば変電所200よりも上流側の一次変電所(不図示)からの電圧を、変電所200に供給するための送電線である。配電用変圧器201の二次側は、母線L2に接続される。   The distribution transformer 201 is a device that transforms, for example, a primary side voltage at a predetermined transformation ratio and outputs the transformed voltage from the secondary side. The primary side of distribution transformer 201 is connected to one end of transmission line L200. The transmission line L200 is a transmission line for supplying, for example, a voltage from a primary substation (not shown) upstream of the substation 200 to the substation 200. The secondary side of distribution transformer 201 is connected to bus L2.

母線L2は、配電用変圧器201からの電力を配電線L10に供給するための電力線であり、例えば変電所200内に設けられる。   The bus L2 is a power line for supplying the power from the distribution transformer 201 to the distribution line L10, and is provided in the substation 200, for example.

配電線L10は、上流側の変電所200から下流側に向かって延在する電力線である。配電線L10における上流側の一端は、母線L2における接続点C2に接続される。   The distribution line L10 is a power line extending from the upstream substation 200 toward the downstream side. One end on the upstream side of the distribution line L10 is connected to a connection point C2 on the bus L2.

需要家300、400、500は、配電線L10に接続されている。尚、需要家300、400、500については、後述する。   The consumers 300, 400, 500 are connected to the distribution line L10. The customers 300, 400, and 500 will be described later.

気象観測装置71は、気象観測装置71が設けられている位置の気象を観測するための装置である。気象観測装置71は、メッシュN1(図2)の気象を観測できるように、メッシュN1内の所定位置に設けられる。尚、気象観測装置71については、後述する。気象観測装置72は、気象観測装置72が設けられている位置の気象を観測するための装置である。気象観測装置72は、メッシュN2(図2)の気象を観測できるように、メッシュN2内の所定位置に設けられる。尚、気象観測装置72については、後述する。   The meteorological observation apparatus 71 is an apparatus for observing the meteorology at the position where the meteorological observation apparatus 71 is provided. The weather observation device 71 is provided at a predetermined position in the mesh N1 so that the weather of the mesh N1 (FIG. 2) can be observed. The weather observation device 71 will be described later. The weather observation device 72 is a device for observing the weather at the position where the weather observation device 72 is provided. The weather observation device 72 is provided at a predetermined position in the mesh N2 so that the weather of the mesh N2 (FIG. 2) can be observed. The weather observation device 72 will be described later.

気象情報装置73は、例えば、気象庁700に設けられ、GPV(Grid Point Value)データを示す気象信号S73を出力する装置である。尚、GPVデータには、例えば、メッシュN1乃至N15夫々における、気温、湿度、降水量、雲量、気圧、風向、風速、日射量(以下、「気温等」とも称する)を示す情報が含まれているものとする。GPVデータには、過去の気温等を示す情報、及び、未来の気温等の予測値を示す情報が含まれているものとする。又、気象情報装置73は、メッシュN1乃至N15夫々における、過去及び未来の、気温等を、例えば所定のプログラムに基づいてシミュレーション等によって推定及び予測しているものとする。   The weather information device 73 is a device that is provided in the Japan Meteorological Agency 700, for example, and outputs a weather signal S73 indicating GPV (Grid Point Value) data. The GPV data includes, for example, information indicating the temperature, humidity, precipitation, cloud cover, atmospheric pressure, wind direction, wind speed, and solar radiation (hereinafter also referred to as “temperature etc.”) in each of the meshes N1 to N15. It shall be. It is assumed that the GPV data includes information indicating a past temperature and the like and information indicating a predicted value such as a future temperature. In addition, the weather information device 73 is assumed to estimate and predict past and future temperatures and the like in each of the meshes N1 to N15, for example, by simulation based on a predetermined program.

予測装置8は、例えば、メッシュN1乃至N15夫々における第1需要電力の値、メッシュN1乃至N15夫々における第2需要電力の値を予測する装置である。尚、メッシュN1乃至N15夫々における第1需要電力、メッシュN1乃至N15夫々における第2需要電力については、後述する。更に、予測装置8は、例えば、所定地域N100(図2)における第2需要電力の値を予測する。尚、予測装置8、所定地域N100における第2需要電力については後述する。   The prediction device 8 is a device that predicts the value of the first demand power in each of the meshes N1 to N15 and the value of the second demand power in each of the meshes N1 to N15, for example. The first demand power in each of the meshes N1 to N15 and the second demand power in each of the meshes N1 to N15 will be described later. Further, the prediction device 8 predicts the value of the second demand power in the predetermined area N100 (FIG. 2), for example. Note that the second demand power in the prediction device 8 and the predetermined area N100 will be described later.

===メッシュ===
以下、図2を参照して、本実施形態におけるメッシュについて説明する。図2は、本実施形態におけるメッシュを示す図である。
=== Mesh ===
Hereinafter, the mesh in the present embodiment will be described with reference to FIG. FIG. 2 is a diagram showing a mesh in the present embodiment.

メッシュN1乃至N15は、例えば日本列島における中国地方等の所定地域N100及び当該所定地域N100の周辺を所定の規則に基づいて区画して形成される領域である。メッシュN1乃至N15は、例えば、気象情報装置73から出力される気象信号S73に示されるGPVデータに対応した領域である。メッシュN1乃至N15は夫々、例えば、20キロメートル四方の略矩形の領域である。尚、メッシュN1乃至N15は夫々、例えば、5キロメートル四方の略矩形の領域であることとしてもよい。   The meshes N1 to N15 are regions formed by dividing a predetermined region N100 such as the Chugoku region in the Japanese archipelago and the periphery of the predetermined region N100 based on a predetermined rule. The meshes N1 to N15 are regions corresponding to GPV data indicated by the weather signal S73 output from the weather information device 73, for example. Each of the meshes N1 to N15 is, for example, a substantially rectangular area of 20 km square. Each of the meshes N1 to N15 may be, for example, a substantially rectangular area of 5 kilometers square.

メッシュN1には、説明の便宜上、需要家300、400の例えば2個の需要家が設けられ、メッシュN2には、説明の便宜上、需要家500の例えば1個の需要家が設けられていることとする。メッシュN3乃至N15には、説明の便宜上、例えば、需要家300乃至500のうちの何れかと同様な構成の需要家が所定個数だけ設けられていることとする。   The mesh N1 is provided with, for example, two consumers 300 and 400 for convenience of explanation, and the mesh N2 is provided with, for example, one consumer 500 of the customer 500 for convenience of explanation. And For the convenience of explanation, for example, it is assumed that a predetermined number of consumers having the same configuration as any of the consumers 300 to 500 are provided in the meshes N3 to N15.

===需要家===
以下、図1を参照して、本実施形態における需要家について説明する。
=== Customer ===
Hereinafter, with reference to FIG. 1, the consumer in this embodiment is demonstrated.

需要家300は、例えば、メッシュN1内に設けられる。需要家300は、配電線L3、負荷R3、発電機G3、測定装置M3を有する。   The consumer 300 is provided in the mesh N1, for example. The customer 300 includes a distribution line L3, a load R3, a generator G3, and a measuring device M3.

配電線L3は、配電線L10と、負荷R3及び発電機G3(分散型電源)との間に接続される電力線である。配電線L3の一端は、配電線L10における接続点C31に接続される。配電線L3の他端は、接続点C32を介して負荷R3及び発電機G3に接続される。   The distribution line L3 is a power line connected between the distribution line L10, the load R3, and the generator G3 (distributed power supply). One end of the distribution line L3 is connected to a connection point C31 in the distribution line L10. The other end of the distribution line L3 is connected to the load R3 and the generator G3 via the connection point C32.

負荷R3は、配電線L3を介して配電線L10の接続点C31に接続される電力負荷である。負荷R3は、負荷R3の動作状態に応じて、電力P311(第1電力)が供給される。つまり、電力P311は、負荷R3で消費されることとなる。   The load R3 is a power load connected to the connection point C31 of the distribution line L10 via the distribution line L3. The load R3 is supplied with electric power P311 (first electric power) according to the operating state of the load R3. That is, the power P311 is consumed by the load R3.

発電機G3は、例えば太陽光発電装置又は風力発電装置等の分散型電源である。発電機G3は、配電線L3を介して配電線L10の接続点C31に接続される。発電機G3は、発電機G3の発電量に応じて、電力P312(第2電力)を出力する。つまり、発電機G3は、例えば負荷R3に対して電力を供給するべく電力P312を出力している。   The generator G3 is a distributed power source such as a solar power generation device or a wind power generation device. The generator G3 is connected to the connection point C31 of the distribution line L10 via the distribution line L3. The generator G3 outputs power P312 (second power) according to the amount of power generated by the generator G3. That is, the generator G3 outputs electric power P312 to supply electric power to the load R3, for example.

測定装置M3は、配電線L3における負荷R3に供給される電力P311を測定し、当該測定結果を示す測定信号S3を出力する装置である。尚、測定信号S3は、測定装置M3の測定結果を示す情報と当該測定が行われた時刻(現在の時刻)を示す情報とが対応付けられている信号であることとする。   The measuring device M3 is a device that measures the power P311 supplied to the load R3 in the distribution line L3 and outputs a measurement signal S3 indicating the measurement result. Note that the measurement signal S3 is a signal in which information indicating the measurement result of the measurement apparatus M3 is associated with information indicating the time (current time) when the measurement is performed.

需要家400は、例えば、メッシュN1内に設けられる。需要家400は、配電線L4、負荷R4、発電機G4、測定装置M4を有する。配電線L4、負荷R4、発電機G4、測定装置M4の構成は夫々、需要家300における配電線L3、負荷R3、発電機G3、測定装置M3の構成と同様であるので、その説明については省略する。尚、負荷R4に供給される電力P411が、第1電力に相当する。発電機G4から出力される電力P412が、第2電力に相当する。   The consumer 400 is provided in the mesh N1, for example. The customer 400 includes a distribution line L4, a load R4, a generator G4, and a measuring device M4. The configurations of the distribution line L4, the load R4, the generator G4, and the measuring device M4 are the same as the configurations of the distribution line L3, the load R3, the generator G3, and the measuring device M3 in the customer 300, respectively, and thus the description thereof is omitted. To do. Note that the power P411 supplied to the load R4 corresponds to the first power. The power P412 output from the generator G4 corresponds to the second power.

需要家500は、例えば、メッシュN2内に設けられる。需要家500は、配電線L5、負荷R5、発電機G5、測定装置M5を有する。配電線L5、負荷R5、発電機G5、測定装置M5の構成は夫々、需要家300における配電線L3、負荷R3、発電機G3、測定装置M3の構成と同様であるので、その説明については省略する。尚、負荷R5に供給される電力P511が、第1電力に相当する。発電機G5から出力される電力P512が、第2電力に相当する。   The customer 500 is provided in the mesh N2, for example. The customer 500 includes a distribution line L5, a load R5, a generator G5, and a measuring device M5. The configurations of the distribution line L5, the load R5, the generator G5, and the measuring device M5 are the same as the configurations of the distribution line L3, the load R3, the generator G3, and the measuring device M3 in the customer 300, respectively, and thus the description thereof is omitted. To do. The power P511 supplied to the load R5 corresponds to the first power. The power P512 output from the generator G5 corresponds to the second power.

尚、メッシュN3乃至N15に設けられている需要家の構成は、需要家300の構成と同様であるので、その説明は省略する。   In addition, since the structure of the consumer provided in mesh N3 thru | or N15 is the same as the structure of the consumer 300, the description is abbreviate | omitted.

尚、予測装置8、気象観測装置71、72、測定装置M3、M4、M5が、電力予測装置に相当する。   Note that the prediction device 8, the weather observation devices 71 and 72, and the measurement devices M3, M4, and M5 correspond to a power prediction device.

===第1需要電力、第2需要電力===
以下、図1を参照して、本実施形態における第1需要電力及び第2需要電力について説明する。メッシュN1乃至N15夫々における第1需要電力の値、メッシュN1乃至N15夫々における第2需要電力の値、所定地域N100における第2需要電力の値に分けて説明する。
=== First Demand Power, Second Demand Power ===
Hereinafter, with reference to FIG. 1, the 1st demand power and 2nd demand power in this embodiment are demonstrated. The description will be divided into the value of the first demand power in each of the meshes N1 to N15, the value of the second demand power in each of the meshes N1 to N15, and the value of the second demand power in the predetermined area N100.

=メッシュN1乃至N15夫々における第1需要電力の値=
メッシュN1乃至N15夫々における第1需要電力(尚、「メッシュN1乃至N15夫々の第1需要電力」とも称する)(第1電力)とは、メッシュN1乃至N15夫々における負荷に供給される電力を示している。メッシュN1乃至N15夫々の第1需要電力の値は夫々、例えば、メッシュN1乃至N15夫々における負荷に供給される電力の値となる。
= Value of first demand power in each of meshes N1 to N15 =
The first demand power in each of the meshes N1 to N15 (hereinafter also referred to as “first demand power of each of the meshes N1 to N15”) (first power) indicates the power supplied to the load in each of the meshes N1 to N15. ing. The value of the first demand power of each of the meshes N1 to N15 is, for example, the value of the power supplied to the load in each of the meshes N1 to N15.

メッシュN1の第1需要電力の値は、メッシュN1内の負荷夫々に供給される電力の値の総和を示している。例えば、メッシュN1の第1需要電力PN1の値は、負荷R3に供給される電力P311の値と、負荷R4に供給される電力P411の値との合計となる。又、メッシュN2の第1需要電力の値は、メッシュN2内の負荷夫々に供給される電力の値の総和を示している。例えば、メッシュN2の第1需要電力の値は、負荷R5に供給される電力P511の値となる。尚、メッシュN3乃至N15の第1需要電力の値は夫々、メッシュN1の第1需要電力の値と同様な構成であるので、その説明については省略する。   The value of the 1st demand power of the mesh N1 has shown the sum total of the value of the electric power supplied to each load in the mesh N1. For example, the value of the first demand power PN1 of the mesh N1 is the sum of the value of the power P311 supplied to the load R3 and the value of the power P411 supplied to the load R4. Moreover, the value of the 1st demand power of the mesh N2 has shown the sum total of the value of the electric power supplied to each load in the mesh N2. For example, the value of the first demand power of the mesh N2 is the value of the power P511 supplied to the load R5. In addition, since the value of the 1st demand power of the meshes N3 to N15 has the same configuration as the value of the 1st demand power of the mesh N1, the description thereof is omitted.

=メッシュN1乃至N15夫々における第2需要電力の値=
メッシュN1乃至N15夫々における第2需要電力(尚、「メッシュN1乃至N15夫々の第2需要電力」とも称する)(第3電力)とは、メッシュN1乃至N15夫々に対して例えば変電所200から供給されるべき電力を示している。メッシュN1乃至N15夫々の第2需要電力の値は、例えば、メッシュN1乃至N15夫々の第1需要電力の値に対する、メッシュN1乃至N15夫々の発電機の出力電力の値の差分に基づく値となる。尚、メッシュN1乃至N15夫々の発電機の出力電力については、後述する。
= The value of the second demand power in each of the meshes N1 to N15 =
The second demand power in each of the meshes N1 to N15 (hereinafter also referred to as “second demand power of each of the meshes N1 to N15”) (third power) is supplied from, for example, the substation 200 to each of the meshes N1 to N15. Indicates the power to be done. The value of the second demand power of each of the meshes N1 to N15 is, for example, a value based on the difference in the value of the output power of each generator of the meshes N1 to N15 with respect to the value of the first demand power of each of the meshes N1 to N15. . Note that the output power of each of the generators of the meshes N1 to N15 will be described later.

例えば、メッシュN1の第2需要電力PL1の値は、メッシュN1の第1需要電力PN1の値から、メッシュN1の発電機の出力電力PG1の値を差し引いた値となる。メッシュN2乃至N15夫々の第2需要電力の値は、メッシュN1の第2需要電力PL1の値と同様な構成であるので、その説明は省略する。   For example, the value of the second demand power PL1 of the mesh N1 is a value obtained by subtracting the value of the output power PG1 of the generator of the mesh N1 from the value of the first demand power PN1 of the mesh N1. Since the value of the second demand power of each of the meshes N2 to N15 has the same configuration as the value of the second demand power PL1 of the mesh N1, the description thereof is omitted.

メッシュN1乃至N15夫々の発電機の出力電力とは、メッシュN1乃至N15毎の発電機から出力される電力を示す。メッシュN1乃至N15夫々の発電機の出力電力の値は夫々、例えば、メッシュN1乃至N15夫々における発電機から出力される電力の値となる。メッシュN1の発電機の出力電力の値は、メッシュN1内の発電機夫々から出力される電力の値の総和を示している。例えば、メッシュN1の発電機の出力電力PG1の値は、発電機G3から出力される電力P312の値と、発電機G4から出力される電力P412の値との合計となる。又、メッシュN2の発電機の出力電力の値は、メッシュN2内の発電機夫々から出力される電力の値の総和を示している。例えば、メッシュN2の発電機の出力電力の値は、発電機G5から出力される電力P512の値となる。尚、メッシュN3乃至N15の発電機の出力電力の値は夫々、メッシュN1の発電機の出力電力の値と同様な構成であるので、その説明については省略する。   The output power of the generators of the meshes N1 to N15 indicates the power output from the generators of the meshes N1 to N15. The value of the output power of each of the generators of the meshes N1 to N15 is, for example, the value of the power output from the generator of each of the meshes N1 to N15. The value of the output power of the generator of the mesh N1 indicates the total sum of the values of power output from each of the generators in the mesh N1. For example, the value of the output power PG1 of the generator of the mesh N1 is the sum of the value of the power P312 output from the generator G3 and the value of the power P412 output from the generator G4. Further, the value of the output power of the generator of the mesh N2 indicates the sum of the values of the power output from the generators in the mesh N2. For example, the value of the output power of the mesh N2 generator is the value of the power P512 output from the generator G5. Note that the output power values of the generators of the meshes N3 to N15 have the same configuration as that of the output power of the generator of the mesh N1, and thus the description thereof is omitted.

=所定地域N100における第2需要電力の値=
所定地域N100における第2需要電力(尚、「所定地域N100の第2需要電力」とも称する)(第3電力)とは、所定地域N100に対して例えば変電所200から供給されるべき電力を示している。つまり、所定地域N100における第2需要電力は、配電線L10における分散型電源G3乃至G4よりも上流側において発生させるべき電力を示している。所定地域N100の第2需要電力の値は、所定地域N100における電力会社の発電機で発電されるべき電力の値を示している。所定地域N100における第2需要電力PLの値は、例えば、メッシュN1乃至N15夫々の第2需要電力の値の総和となる。
= Value of the second demand power in the predetermined area N100 =
The second demand power in the predetermined area N100 (hereinafter, also referred to as “second demand power in the predetermined area N100”) (third power) indicates the power to be supplied from the substation 200 to the predetermined area N100, for example. ing. That is, the second demand power in the predetermined area N100 indicates the power that should be generated on the upstream side of the distributed power sources G3 to G4 in the distribution line L10. The value of the 2nd demand power of the predetermined area N100 has shown the value of the electric power which should be generated with the generator of the electric power company in the predetermined area N100. The value of the second demand power PL in the predetermined area N100 is, for example, the sum of the values of the second demand power of each of the meshes N1 to N15.

===気象観測装置===
以下、図1を参照して、本実施形態における気象観測装置について説明する。
=== Meteorological observation equipment ===
Hereinafter, the meteorological observation apparatus according to the present embodiment will be described with reference to FIG.

気象観測装置71は、前述したように、メッシュN1における気象を観測する。気象観測装置71は、メッシュN1における、気温、湿度、降水量、雲量、気圧、風向、風速を観測して、当該観測結果を示す観測信号S71を出力する。尚、観測信号S71は、気象観測装置71の観測結果を示す情報と当該観測が行われた時刻(現在の時刻)を示す情報とが対応付けられている信号であることとする。   The weather observation device 71 observes the weather on the mesh N1 as described above. The weather observation device 71 observes the temperature, humidity, precipitation, cloud cover, atmospheric pressure, wind direction, and wind speed in the mesh N1, and outputs an observation signal S71 indicating the observation result. Note that the observation signal S71 is a signal in which information indicating the observation result of the weather observation device 71 and information indicating the time (current time) when the observation is performed are associated with each other.

気象観測装置72は、前述したように、メッシュN2における気象を観測する。気象観測装置72は、メッシュN2における、気温、湿度、降水量、雲量、気圧、風向、風速を観測して、当該観測結果を示す観測信号S72を出力する。尚、観測信号S72は、気象観測装置72の観測結果を示す情報と当該観測が行われた時刻(現在の時刻)を示す情報とが対応付けられている信号であることとする。   As described above, the meteorological observation device 72 observes the weather in the mesh N2. The weather observation device 72 observes the temperature, humidity, precipitation, cloud cover, atmospheric pressure, wind direction, and wind speed in the mesh N2, and outputs an observation signal S72 indicating the observation result. Note that the observation signal S72 is a signal in which information indicating the observation result of the meteorological observation device 72 is associated with information indicating the time (current time) when the observation is performed.

尚、メッシュN3乃至N15にも夫々、メッシュN3乃至N15夫々における気象を観測する気象観測装置(不図示)が設けられる。メッシュN3乃至N15夫々における気象を観測する気象観測装置の構成は、気象観測装置71の構成と同様であるので、その説明については省略する。   The meshes N3 to N15 are also provided with meteorological observation devices (not shown) for observing the weather in each of the meshes N3 to N15. The configuration of the meteorological observation device that observes the weather in each of the meshes N3 to N15 is the same as the configuration of the meteorological observation device 71, and thus the description thereof is omitted.

===予測装置===
以下、図1及び図3を参照して、本実施形態における予測装置について説明する。図3は、本実施形態における予測装置の機能を示すブロック図である。
=== Prediction device ===
Hereinafter, with reference to FIG.1 and FIG.3, the prediction apparatus in this embodiment is demonstrated. FIG. 3 is a block diagram illustrating functions of the prediction device according to the present embodiment.

予測装置8は、例えば、メッシュN1乃至N15夫々の第1需要電力の値を予測(メッシュN1乃至N15夫々の第1需要電力の予測値を算出)する。具体的には、予測装置8は、測定信号S3、S4、観測信号S71等に基づいて、メッシュN1における第1需要電力の値を予測する。又、予測装置8は、測定信号S5、観測信号S72等に基づいて、メッシュN2における第1需要電力の値を予測する。又、予測装置8は、メッシュN3乃至N15夫々に設けられている需要家の測定装置から出力される測定信号、メッシュN3乃至N15夫々に設けられている気象観測装置から出力される観測信号等に基づいて、メッシュN3乃至N15夫々の第1需要電力の値を予測する。   For example, the prediction device 8 predicts the value of the first demand power of each of the meshes N1 to N15 (calculates the predicted value of the first demand power of each of the meshes N1 to N15). Specifically, the prediction device 8 predicts the value of the first demand power in the mesh N1 based on the measurement signals S3 and S4, the observation signal S71, and the like. Further, the prediction device 8 predicts the value of the first demand power in the mesh N2 based on the measurement signal S5, the observation signal S72, and the like. In addition, the prediction device 8 outputs a measurement signal output from a customer measurement device provided in each of the meshes N3 to N15, an observation signal output from a weather observation device provided in each of the meshes N3 to N15, and the like. Based on this, the value of the first demand power of each of the meshes N3 to N15 is predicted.

更に、予測装置8は、例えば、メッシュN1乃至N15夫々の第2需要電力の値を予測(メッシュN1乃至N15夫々の第2需要電力の予測値を算出)する。具体的には、予測装置8は、上述のメッシュN1乃至N15夫々の第1需要電力の値と、気象信号S73等に基づいて、メッシュN1乃至N15夫々の第2需要電力の値を予測する。   Further, for example, the prediction device 8 predicts the value of the second demand power of each of the meshes N1 to N15 (calculates the predicted value of the second demand power of each of the meshes N1 to N15). Specifically, the prediction device 8 predicts the value of the second demand power of each of the meshes N1 to N15 based on the value of the first demand power of each of the meshes N1 to N15, the weather signal S73, and the like.

更に、予測装置8は、例えば、所定地域N100の第2需要電力の値を予測する。   Furthermore, the prediction device 8 predicts the value of the second demand power in the predetermined area N100, for example.

ここで、測定信号S3、S4、S5、メッシュN3乃至N15夫々に設けられている需要家の測定装置から出力される測定信号、観測信号S71、S72、メッシュN3乃至N15夫々に設けられている気象観測装置から出力される観測信号を、「各信号」とも称することとする。又、測定装置M3、M4、M5、メッシュN3乃至N15夫々に設けられている需要家の測定装置、気象観測装置71、72、メッシュN3乃至N15夫々に設けられている気象観測装置を、「各装置」とも称することとする。   Here, the measurement signals S3, S4, S5, the measurement signals output from the customer measuring devices provided in the meshes N3 to N15, the observation signals S71, S72, and the weather provided in the meshes N3 to N15, respectively. The observation signal output from the observation apparatus is also referred to as “each signal”. In addition, the measuring devices M3, M4, M5, the customer measuring devices provided in each of the meshes N3 to N15, the meteorological observation devices 71 and 72, and the meteorological observation devices provided in the meshes N3 to N15 are referred to as “each”. Also referred to as “apparatus”.

予測装置8は、入力部81、出力部82、表示部83、送受信部84、記憶部85、予測式生成部86、予測部87、制御部88を有する。   The prediction device 8 includes an input unit 81, an output unit 82, a display unit 83, a transmission / reception unit 84, a storage unit 85, a prediction formula generation unit 86, a prediction unit 87, and a control unit 88.

入力部81は、予測装置8に対して情報を入力するための例えばキーボードである。
出力部82は、予測装置8の外部に情報を出力するための例えばプリンタである。
表示部83は、予測装置8に入力された情報を表示したり、予測装置8から出力される情報を表示したりするための例えばモニタである。
The input unit 81 is, for example, a keyboard for inputting information to the prediction device 8.
The output unit 82 is, for example, a printer for outputting information to the outside of the prediction device 8.
The display unit 83 is, for example, a monitor for displaying information input to the prediction device 8 or displaying information output from the prediction device 8.

送受信部84は、各装置と通信を行う。予測装置8は、各装置との間で通信できるように、例えば通信ケーブル(不図示)又は無線通信ネットワーク(不図示)を介して各装置と接続されているものとする。送受信部84は、各装置から出力された各信号を、例えば30分毎等の所定周期で受信する。尚、各信号は、例えば、所定周期で各装置から出力されることとしてもよい。又、各信号は、例えば、所定周期で送受信部84から各装置に対して送信される要求信号(不図示)に基づいて出力されることとしてもよい。尚、送受信部84が受信する各信号に示されている現在の時刻(測定が行われた時刻)は、例えば相互に同期がとれているものとする。   The transmission / reception unit 84 communicates with each device. It is assumed that the prediction device 8 is connected to each device via, for example, a communication cable (not shown) or a wireless communication network (not shown) so as to be able to communicate with each device. The transmission / reception unit 84 receives each signal output from each device at a predetermined cycle, for example, every 30 minutes. Each signal may be output from each device at a predetermined cycle, for example. Further, each signal may be output based on a request signal (not shown) transmitted from the transmission / reception unit 84 to each device at a predetermined cycle, for example. It is assumed that the current time (measurement time) indicated in each signal received by the transmission / reception unit 84 is synchronized with each other, for example.

更に、送受信部84は、気象情報装置73とも通信を行う。予測装置8は、気象情報装置73との間で通信できるように、例えば通信ケーブル(不図示)又は無線通信ネットワーク(不図示)を介して気象情報装置73とも接続されているものとする。   Further, the transmission / reception unit 84 also communicates with the weather information device 73. It is assumed that the prediction device 8 is also connected to the weather information device 73 via, for example, a communication cable (not shown) or a wireless communication network (not shown) so as to be able to communicate with the weather information device 73.

記憶部85は、例えば、第1の領域851、第2の領域852、第3の領域853を有する。   The storage unit 85 includes, for example, a first area 851, a second area 852, and a third area 853.

第1の領域851には、例えば、予測装置8を動作させるためのプログラムが記憶されている。第1の領域851には、更に、例えば、予測式(相関式)を生成するためのプログラム、予測を行うためのプログラムが記憶されている。尚、予測式については、後述する。   In the first area 851, for example, a program for operating the prediction device 8 is stored. The first area 851 further stores, for example, a program for generating a prediction formula (correlation formula) and a program for performing prediction. The prediction formula will be described later.

第2の領域852には、例えば、設備情報Z1(図4)、潮流情報Z2(図5)、気象情報Z3(図6)、未来情報Z5(図8)が記憶される。尚、設備情報Z1、潮流情報Z2、気象情報Z3、未来情報Z5については、後述する。   In the second area 852, for example, facility information Z1 (FIG. 4), tidal current information Z2 (FIG. 5), weather information Z3 (FIG. 6), and future information Z5 (FIG. 8) are stored. The facility information Z1, tidal current information Z2, weather information Z3, and future information Z5 will be described later.

第3の領域853には、例えば、過去情報Z4(図7)が記憶される。尚、過去情報Z4については、後述する。   In the third area 853, for example, past information Z4 (FIG. 7) is stored. The past information Z4 will be described later.

予測式生成部86は、例えば設備情報Z1、潮流情報Z2、気象情報Z3等に基づいて、過去情報Z4を生成し、当該過去情報Z4を第3の領域853に記憶させる。予測式生成部86は、過去情報Z4等に基づいて、メッシュN1乃至N15毎に予測式を生成する。尚、予測式は、メッシュN1乃至N15夫々における第1需要電力の値を予測するための数式である。尚、メッシュN1における第1需要電力を予測するための予測式と、メッシュN2乃至N15における第1需要電力を予測するための予測式夫々とは、同様な構成であるので、メッシュN1における第1需要電力を予測するための予測式についてのみ説明し、メッシュN2乃至N15における第1需要電力を予測するための予測式夫々については、その説明を省略する。尚、予測式については、後述する。   The prediction formula generation unit 86 generates past information Z4 based on, for example, facility information Z1, tidal current information Z2, weather information Z3, and the like, and stores the past information Z4 in the third area 853. The prediction formula generation unit 86 generates a prediction formula for each of the meshes N1 to N15 based on the past information Z4 and the like. The prediction formula is a formula for predicting the value of the first demand power in each of the meshes N1 to N15. Since the prediction formula for predicting the first demand power in the mesh N1 and the prediction formula for predicting the first demand power in the meshes N2 to N15 have the same configuration, the first formula in the mesh N1 Only the prediction formula for predicting the demand power will be described, and the description of each prediction formula for predicting the first demand power in the meshes N2 to N15 will be omitted. The prediction formula will be described later.

予測部87は、予測式生成部86で生成された予測式に基づいて、メッシュN1乃至N15夫々における第1需要電力の予測値を算出する。又、予測部87は、メッシュN1乃至N15夫々の発電機の出力電力を予測(メッシュN1乃至N15夫々の発電機の出力電力の予測値を算出)する。又、予測部87は、算出されたメッシュN1乃至N15夫々における第1需要電力の予測値と、メッシュN1乃至N15夫々の発電機の出力電力の予測値とに基づいて、所定地域N100における第2需要電力の予測値を算出する。尚、予測部87については、後述する。   The prediction unit 87 calculates the predicted value of the first demand power in each of the meshes N1 to N15 based on the prediction formula generated by the prediction formula generation unit 86. Further, the prediction unit 87 predicts the output power of each generator of the meshes N1 to N15 (calculates the predicted value of the output power of each generator of the meshes N1 to N15). Further, the prediction unit 87 generates a second value in the predetermined area N100 based on the calculated predicted value of the first demand power in each of the meshes N1 to N15 and the predicted value of the output power of the generator in each of the meshes N1 to N15. Calculate the predicted value of power demand. The prediction unit 87 will be described later.

制御部88は、例えば予測式を生成するためのプログラムに基づいて、予測式生成部86を制御する。制御部88は、例えば予測を行うためのプログラムに基づいて、予測部87を制御する。制御部88は、例えば予測装置8を動作させるためのプログラムに基づいて、予測装置8の動作を制御する。   The control unit 88 controls the prediction formula generation unit 86 based on, for example, a program for generating a prediction formula. The control unit 88 controls the prediction unit 87 based on, for example, a program for performing prediction. The control unit 88 controls the operation of the prediction device 8 based on, for example, a program for operating the prediction device 8.

===設備情報===
以下、図4を参照して、本実施形態における設備情報について説明する。図4は、本実施形態における設備情報を示す図である。尚、設備情報Z1においては、説明の便宜上、メッシュN1、N2に設けられた測定装置M3、M4、M5が示されている。
=== Facility information ===
Hereinafter, the facility information in the present embodiment will be described with reference to FIG. FIG. 4 is a diagram showing facility information in the present embodiment. In the facility information Z1, for convenience of explanation, measuring devices M3, M4, and M5 provided on the meshes N1 and N2 are shown.

設備情報Z1は、所定地域N100(図2)内の需要家に設けられている測定装置(例えば測定装置M3、M4、M5)が、メッシュN1乃至N15のうちの何れのメッシュ内に設けられているかを示す情報である。設備情報Z1では、測定装置M3、M4、M5に対して、当該測定装置M3、M4、M5が設けられているメッシュが対応付けられている。設備情報Z1においては、測定装置M3に対してメッシュN1が対応付けられ、測定装置M4に対してメッシュN1が対応付けられ、測定装置M5に対してメッシュN2が対応付けられている。   In the facility information Z1, the measuring devices (for example, measuring devices M3, M4, and M5) provided to consumers in the predetermined area N100 (FIG. 2) are provided in any mesh among the meshes N1 to N15. It is information indicating whether or not. In the facility information Z1, meshes provided with the measurement devices M3, M4, and M5 are associated with the measurement devices M3, M4, and M5. In the facility information Z1, the mesh N1 is associated with the measuring device M3, the mesh N1 is associated with the measuring device M4, and the mesh N2 is associated with the measuring device M5.

尚、例えば、設備情報Z1においては、測定装置M3、M4、M5夫々に対して固有の番号を付し、当該番号とメッシュとが対応付けられていることとしてもよい。   For example, in the facility information Z1, a unique number may be assigned to each of the measuring devices M3, M4, and M5, and the number and the mesh may be associated with each other.

設備情報Z1は、例えば、入力部81を用いて、入力されたり更新されたりすることとする。   The facility information Z1 is input or updated using the input unit 81, for example.

===潮流情報===
以下、図5を参照して、本実施形態における潮流情報について説明する。図5は、本実施形態における潮流情報を示す図である。尚、図5の潮流情報Z2においては、説明の便宜上、メッシュN1、N2に設けられた測定装置M3、M4、M5夫々から出力された測定信号S3、S4、S5に基づく潮流情報が示されている。
=== Tidal current information ===
Hereinafter, tidal current information in the present embodiment will be described with reference to FIG. FIG. 5 is a diagram showing tidal current information in the present embodiment. In the tidal current information Z2 in FIG. 5, tidal current information based on the measurement signals S3, S4, and S5 output from the measuring devices M3, M4, and M5 provided in the meshes N1 and N2 is shown for convenience of explanation. Yes.

潮流情報Z2とは、送受信部84で受信した測定信号S3、S4、S5に基づく情報である。つまり、潮流情報Z2は、過去における情報である。潮流情報Z2では、測定信号S3、S4、S5に示されている時刻と、測定信号S3に示されている電力P311(以下、「潮流P311」とも称する)の値と、測定信号S4に示されている電力P411(以下、「潮流P411」とも称する)の値と、測定信号S5に示されている電力P511(以下、「潮流P511」とも称する)の値とが対応付けられている。潮流情報Z2においては、送受信部84が各信号を受信する毎に、当該対応付けられた情報が順次記憶される。   The tidal current information Z2 is information based on the measurement signals S3, S4, and S5 received by the transmission / reception unit 84. That is, the tidal current information Z2 is information in the past. In the tidal current information Z2, the time indicated by the measurement signals S3, S4, S5, the value of the power P311 (hereinafter also referred to as “tidal current P311”) indicated by the measurement signal S3, and the measurement signal S4 are indicated. The value of the power P411 (hereinafter also referred to as “tidal current P411”) and the value of the power P511 (hereinafter also referred to as “tidal current P511”) indicated in the measurement signal S5 are associated with each other. In the tidal current information Z2, the associated information is sequentially stored each time the transmitting / receiving unit 84 receives each signal.

潮流情報Z2においては、時刻T1乃至Tnは、時刻T1乃至Tnのうち時刻T1が最も現在に近い過去の時刻であり、時刻Tnが最も現在から遠い過去の時刻となるように時系列に並べられている。   In the tidal current information Z2, the times T1 to Tn are arranged in time series so that the time T1 is the past time closest to the present among the times T1 to Tn, and the time Tn is the past time farthest from the present. ing.

又、潮流情報Z2における、潮流P311(T1)、P311(T2)、P311(Tn)は夫々、時刻T1、T2、Tnにおける潮流P311の値を示し、潮流P411(T1)、P411(T2)、P411(Tn)は夫々、時刻T1、T2、Tnにおける潮流P411の値を示し、潮流P511(T1)、P511(T2)、P511(Tn)は夫々、時刻T1、T2、Tnにおける潮流P511の値を示している。   In the tidal current information Z2, tidal currents P311 (T1), P311 (T2), and P311 (Tn) indicate the values of the tidal current P311 at times T1, T2, and Tn, respectively, and the tidal currents P411 (T1), P411 (T2), P411 (Tn) indicates the value of the tidal current P411 at times T1, T2, and Tn, respectively, and the tidal currents P511 (T1), P511 (T2), and P511 (Tn) indicate the values of the tidal current P511 at times T1, T2, and Tn, respectively. Is shown.

===気象情報===
以下、図6を参照して、本実施形態における気象情報について説明する。図6は、本実施形態における気象情報を示す図である。尚、図6の気象情報Z3においては、説明の便宜上、メッシュN1における気象を観測する気象観測装置71から出力された観測信号S71に基づく気象情報が示されている。
=== Weather information ===
Hereinafter, weather information in the present embodiment will be described with reference to FIG. FIG. 6 is a diagram showing the weather information in the present embodiment. In the weather information Z3 in FIG. 6, for convenience of explanation, weather information based on the observation signal S71 output from the weather observation device 71 that observes the weather in the mesh N1 is shown.

気象情報Z3は、送受信部84で受信した観測信号S71に基づく情報である。つまり、気象情報Z3は、メッシュN1に関する過去における情報である。気象情報Z3では、観測信号S71に示されている時刻と、観測信号S71に示されている気温、湿度、降水量、雲量、気圧、風向、風速夫々を示す値とが対応付けられている。尚、気温、湿度、降水量、雲量、気圧、風向、風速夫々を示す値を夫々、単に、気温、湿度、降水量、雲量、気圧、風向、風速とも称することとする。気象情報Z3においては、送受信部84が各信号を受信する毎に、当該対応付けられた情報が順次記憶される。   The weather information Z3 is information based on the observation signal S71 received by the transmission / reception unit 84. That is, the weather information Z3 is information in the past regarding the mesh N1. In the weather information Z3, the time indicated by the observation signal S71 is associated with the values indicated by the temperature, humidity, precipitation, cloud cover, atmospheric pressure, wind direction, and wind speed indicated by the observation signal S71. Note that values indicating temperature, humidity, precipitation, cloud cover, atmospheric pressure, wind direction, and wind speed are also simply referred to as temperature, humidity, precipitation, cloud cover, atmospheric pressure, wind direction, and wind speed, respectively. In the weather information Z3, each time the transmission / reception unit 84 receives each signal, the associated information is sequentially stored.

気象情報Z3における時刻T1乃至Tnは、潮流情報Z2における時刻T1乃至Tnと同様な構成である。   Times T1 to Tn in the weather information Z3 have the same configuration as the times T1 to Tn in the tidal current information Z2.

又、気象情報Z3における、気温A(T1)、A(T2)、A(Tn)は夫々、時刻T1、T2、TnにおけるメッシュN1での気温を示し、湿度B(T1)、B(T2)、B(Tn)は夫々、時刻T1、T2、TnにおけるメッシュN1での湿度を示し、降水量D(T1)、D(T2)、D(Tn)は夫々、時刻T1、T2、TnにおけるメッシュN1での降水量を示し、雲量E(T1)、E(T2)、E(Tn)は夫々、時刻T1、T2、TnにおけるメッシュN1での雲量を示し、気圧F(T1)、F(T2)、F(Tn)は夫々、時刻T1、T2、TnにおけるメッシュN1での気圧を示し、風向H(T1)、H(T2)、H(Tn)は夫々、時刻T1、T2、TnにおけるメッシュN1での風向を示し、風速Q(T1)、Q(T2)、Q(Tn)は夫々、時刻T1、T2、TnにおけるメッシュN1での風速を示している。   In the weather information Z3, temperatures A (T1), A (T2), and A (Tn) indicate temperatures at the mesh N1 at times T1, T2, and Tn, respectively, and humidity B (T1) and B (T2). , B (Tn) indicate the humidity at mesh N1 at times T1, T2, and Tn, respectively, and precipitation amounts D (T1), D (T2), and D (Tn) are meshes at times T1, T2, and Tn, respectively. N1 represents the precipitation amount, and cloud amounts E (T1), E (T2), and E (Tn) respectively represent the cloud amount at the mesh N1 at times T1, T2, and Tn, and atmospheric pressures F (T1) and F (T2). ), F (Tn) indicate the atmospheric pressure at the mesh N1 at times T1, T2, and Tn, respectively, and the wind directions H (T1), H (T2), and H (Tn) indicate the mesh at times T1, T2, and Tn, respectively. Indicates the wind direction at N1, and wind speeds Q (T1), Q (T2 , Q (Tn) are, respectively, it shows the wind speed of a mesh N1 at time T1, T2, Tn.

===過去情報===
以下、図7を参照して、本実施形態における過去情報について説明する。図7は、本実施形態における過去情報を示す図である。
=== Past Information ===
Hereinafter, the past information in the present embodiment will be described with reference to FIG. FIG. 7 is a diagram showing past information in the present embodiment.

過去情報Z4は、メッシュN1における過去情報である。尚、メッシュN2乃至N15夫々における過去情報の構成は、メッシュN1における過去情報Z4の構成と同様であるので、その説明については省略する。   The past information Z4 is past information in the mesh N1. Note that the configuration of the past information in each of the meshes N2 to N15 is the same as the configuration of the past information Z4 in the mesh N1, and thus description thereof is omitted.

過去情報Z4では、潮流情報Z2及び気象情報Z3に示されている時刻と、メッシュN1における第1需要電力PN1の値と、気象情報Z3に示されているメッシュN1における気温、湿度、降水量、雲量、気圧、風向、風速とが対応付けられている。尚、メッシュN1における第1需要電力PN1の値は、潮流P311の値と潮流P411の値との和である。   In the past information Z4, the time indicated in the tidal current information Z2 and the weather information Z3, the value of the first demand power PN1 in the mesh N1, the temperature, humidity, precipitation in the mesh N1 indicated in the weather information Z3, Cloud amount, atmospheric pressure, wind direction, and wind speed are associated with each other. The value of the first demand power PN1 in the mesh N1 is the sum of the value of the power flow P311 and the value of the power flow P411.

又、過去情報Z4における、第1需要電力PN1(T1)、PN1(T2)、PN1(Tn)は夫々、メッシュN1における時刻T1、T2、Tnの第1需要電力の値を示す。第1需要電力PN1(T1)は、潮流P311(T1)と、潮流P411(T1)との和となる。第1需要電力PN1(T2)は、潮流P311(T2)と、順潮流P411(T2)の値との和となる。第1需要電力PN1(Tn)は、潮流P31(Tn)と、順潮流P41(Tn)との和となる。尚、これらの演算は、例えば、予測式生成部86によって行われる。   In the past information Z4, the first demand power PN1 (T1), PN1 (T2), and PN1 (Tn) indicate the values of the first demand power at the times T1, T2, and Tn in the mesh N1, respectively. The first demand power PN1 (T1) is the sum of the tidal current P311 (T1) and the tidal current P411 (T1). The first demand power PN1 (T2) is the sum of the power flow P311 (T2) and the value of the forward power flow P411 (T2). The first demand power PN1 (Tn) is the sum of the tidal current P31 (Tn) and the forward tidal current P41 (Tn). In addition, these calculations are performed by the prediction formula production | generation part 86, for example.

===未来情報===
以下、図8を参照して、本実施形態における未来情報について説明する。図8は、本実施形態における未来情報を示す図である。
=== Future information ===
Hereinafter, the future information in the present embodiment will be described with reference to FIG. FIG. 8 is a diagram showing future information in the present embodiment.

未来情報Z5は、送受信部34で受信した気象信号S73に基づく情報である。つまり、未来情報Z5は、GPVデータにおける予測値を示す情報である。未来情報Z5は、例えば、現在の時刻の30分後から1日経過(24時間経過)後までの間における30分毎の各時刻と、当該各時刻におけるメッシュN1における、気温、湿度、降水量、雲量、気圧、風向、風速、日射量の予測値とが対応付けられている。尚、未来情報Z5は、例えば、翌日の午前0時から翌々日の午前0時までの間における30分毎の各時刻と、当該各時刻におけるメッシュN1における、気温、湿度、降水量、雲量、気圧、風向、風速、日射量の予測値とが対応付けられていることとしてもよい。未来情報Z5は、例えば送受信部34が気象信号S73を受信する毎に、直近の気象信号S73に基づく情報に更新されることとしてもよい。   The future information Z5 is information based on the weather signal S73 received by the transmission / reception unit 34. That is, the future information Z5 is information indicating a predicted value in the GPV data. The future information Z5 includes, for example, each time every 30 minutes from 30 minutes after the current time until one day has passed (24 hours), and the temperature, humidity, and precipitation amount at the mesh N1 at each time. Are associated with predicted values of cloud cover, atmospheric pressure, wind direction, wind speed, and solar radiation. The future information Z5 is, for example, each time every 30 minutes from midnight to midnight the next day, and the temperature, humidity, precipitation, cloud cover, atmospheric pressure in the mesh N1 at each time. The wind direction, the wind speed, and the predicted value of the amount of solar radiation may be associated with each other. The future information Z5 may be updated to information based on the latest weather signal S73, for example, every time the transmitter / receiver 34 receives the weather signal S73.

未来情報Z5では、時刻Tf1乃至Tfnは、時刻Tf1乃至Tfnのうち時刻Tf1が最も現在に近い未来の時刻であり、時刻Tfnが最も現在から遠い未来の時刻となるように時系列に並べられている。   In the future information Z5, the times Tf1 to Tfn are arranged in time series so that the time Tf1 of the times Tf1 to Tfn is the future time closest to the current time, and the time Tfn is the future time farthest from the current time. Yes.

又、未来情報Z5においては、気温の予測値A1(Tf1)、A1(Tf2)、A1(Tfn)は夫々、時刻Tf1、Tf2、TfnにおけるメッシュN1の気温の予測値を示している。湿度の予測値B1(Tf1)、B1(Tf2)、B1(Tfn)は夫々、時刻Tf1、Tf2、TfnにおけるメッシュN1の湿度の予測値を示している。降水量の予測値D1(Tf1)、D1(Tf2)、D1(Tfn)は夫々、時刻Tf1、Tf2、TfnにおけるメッシュN1の降水量の予測値を示している。雲量の予測値E1(Tf1)、E1(Tf2)、E1(Tfn)は夫々、時刻Tf1、Tf2、TfnにおけるメッシュN1の雲量の予測値を示している。気圧の予測値F1(Tf1)、F1(Tf2)、F1(Tfn)は夫々、時刻Tf1、Tf2、TfnにおけるメッシュN1の気圧の予測値を示している。風向の予測値H1(Tf1)、H1(Tf2)、H1(Tfn)は夫々、時刻Tf1、Tf2、TfnにおけるメッシュN1の気圧の予測値を示している。風速の予測値Q1(Tf1)、Q1(Tf2)、Q1(Tfn)は夫々、時刻Tf1、Tf2、TfnにおけるメッシュN1の風速の予測値を示している。日射量の予測値U1(Tf1)、U1(Tf2)、U1(Tfn)は夫々、時刻Tf1、Tf2、TfnにおけるメッシュN1の気温の予測値を示している。   Further, in the future information Z5, predicted temperatures A1 (Tf1), A1 (Tf2), and A1 (Tfn) indicate predicted temperatures of the mesh N1 at times Tf1, Tf2, and Tfn, respectively. The predicted humidity values B1 (Tf1), B1 (Tf2), and B1 (Tfn) indicate the predicted humidity values of the mesh N1 at times Tf1, Tf2, and Tfn, respectively. Predicted precipitation values D1 (Tf1), D1 (Tf2), and D1 (Tfn) indicate predicted precipitation values of the mesh N1 at times Tf1, Tf2, and Tfn, respectively. Cloud amount prediction values E1 (Tf1), E1 (Tf2), and E1 (Tfn) indicate prediction values of the cloud amount of the mesh N1 at times Tf1, Tf2, and Tfn, respectively. The predicted atmospheric pressure values F1 (Tf1), F1 (Tf2), and F1 (Tfn) indicate the predicted atmospheric pressure values of the mesh N1 at times Tf1, Tf2, and Tfn, respectively. Predicted values H1 (Tf1), H1 (Tf2), and H1 (Tfn) of the wind direction indicate predicted values of the atmospheric pressure of the mesh N1 at times Tf1, Tf2, and Tfn, respectively. The predicted wind speed values Q1 (Tf1), Q1 (Tf2), and Q1 (Tfn) indicate the predicted wind speed values of the mesh N1 at times Tf1, Tf2, and Tfn, respectively. Predicted values of solar radiation U1 (Tf1), U1 (Tf2), and U1 (Tfn) indicate predicted values of the temperature of the mesh N1 at times Tf1, Tf2, and Tfn, respectively.

尚、メッシュN2乃至N15夫々における気温等の予測値が示されている未来情報も、第2の領域852に記憶されているものとする。尚、メッシュN2乃至N15夫々における気温等の予測値が示されている未来情報の構成は、未来情報Z5の構成と同様であるので、その説明については省略する。   It is assumed that future information indicating predicted values such as temperatures in the meshes N2 to N15 is also stored in the second area 852. The configuration of the future information in which the predicted values such as the temperature in each of the meshes N2 to N15 are shown is the same as the configuration of the future information Z5, and thus the description thereof is omitted.

===予測式生成部===
以下、図3乃至図7を参照して、本実施形態における予測式生成部について説明する。
=== Prediction Formula Generation Unit ===
Hereinafter, with reference to FIGS. 3 to 7, the prediction formula generation unit in the present embodiment will be described.

=過去情報の生成・記憶=
予測式生成部86は、設備情報Z1、潮流情報Z2、気象情報Z3等に基づいて、メッシュN1に関する過去情報Z4を生成する。予測式生成部86は、過去情報Z4を第3の領域853に記憶させる。
= Generation and storage of past information =
The prediction formula generation unit 86 generates past information Z4 related to the mesh N1 based on the facility information Z1, the tidal current information Z2, the weather information Z3, and the like. The prediction formula generation unit 86 stores the past information Z4 in the third area 853.

=予測式の生成=
予測式生成部86は、過去情報Z4に基づいて、メッシュN1における第1需要電力を予測するための予測式(式1)を生成する。

Figure 0005279972

尚、係数p1乃至pi、係数a1乃至ai、係数b1乃至bi、係数d1乃至di、係数e1乃至ei、係数f1乃至fi、係数h1乃至hi、係数q1乃至qiは、過去情報Z4に示されている情報等に基づいて、例えば重回帰分析、例えば重回帰分析を用いて、予測式生成部86により算出(決定)される定数である。= Generation of prediction formula =
The prediction formula generation unit 86 generates a prediction formula (Formula 1) for predicting the first demand power in the mesh N1 based on the past information Z4.
Figure 0005279972

The coefficients p1 to pi, coefficients a1 to ai, coefficients b1 to bi, coefficients d1 to di, coefficients e1 to ei, coefficients f1 to fi, coefficients h1 to hi, coefficients q1 to qi are shown in the past information Z4. The constant is calculated (determined) by the prediction formula generation unit 86 using, for example, multiple regression analysis, for example, multiple regression analysis, based on the information and the like.

尚、係数p1乃至piは、第1定数に相当し、夫々同様な定数であってもよく、相互に異なる定数であってもよい。又、係数a1乃至ai、係数b1乃至bi、係数d1乃至di、係数e1乃至ei、係数f1乃至fi、係数h1乃至hi、係数q1乃至qiは、第2定数に相当し、夫々同様な定数であってもよく、相互に異なる定数であってもよい。   The coefficients p1 to pi correspond to first constants, and may be the same constants or different constants. The coefficients a1 to ai, the coefficients b1 to bi, the coefficients d1 to di, the coefficients e1 to ei, the coefficients f1 to fi, the coefficients h1 to hi, and the coefficients q1 to qi correspond to the second constants, and are the same constants. There may be constants different from each other.

整数iは、例えば整数1以上且つ過去情報Z4における整数nよりも小さい整数に対応した整数である。過去の需要電力PN1(t−1)、PN1(t−2)、PN1(t−i)は夫々、例えば、過去情報Z4の過去の需要電力PN1(T1)、PN1(T2)、PN1(Ti)に対応している。過去の気温A(t−1)、A(t−2)、A(t−i)は夫々、例えば、過去情報Z4の過去の気温A(T1)、A(T2)、A(Ti)に対応している。過去の湿度B(t−1)、B(t−2)、B(t−i)は夫々、例えば、過去情報Z4の過去の湿度B(T1)、B(T2)、B(Ti)に対応している。過去の降水量D(t−1)、D(t−2)、D(t−i)は夫々、例えば、過去情報Z4の過去の降水量D(T1)、D(T2)、D(Ti)に対応している。過去の雲量E(t−1)、E(t−2)、E(t−i)は夫々、例えば、過去情報Z4の過去の雲量E(T1)、E(T2)、E(Ti)に対応している。過去の気圧F(t−1)、F(t−2)、F(t−i)は夫々、例えば、過去情報Z4の過去の気圧F(T1)、F(T2)、F(Ti)に対応している。過去の風向H(t−1)、H(t−2)、H(t−i)は夫々、例えば、過去情報Z4の過去の風向H(T1)、H(T2)、H(Ti)に対応している。過去の風速Q(t−1)、Q(t−2)、Q(t−i)は夫々、例えば、過去情報Z4の過去の風速Q(T1)、Q(T2)、Q(Ti)に対応している。   The integer i is an integer corresponding to an integer that is greater than or equal to the integer 1 and smaller than the integer n in the past information Z4, for example. The past demand powers PN1 (t-1), PN1 (t-2), and PN1 (t-i) are respectively the past demand powers PN1 (T1), PN1 (T2), and PN1 (Ti) of the past information Z4, for example. ). The past temperatures A (t-1), A (t-2), and A (t-i) are, for example, the past temperatures A (T1), A (T2), and A (Ti) in the past information Z4, respectively. It corresponds. The past humidity B (t-1), B (t-2), and B (t-i) are, for example, the past humidity B (T1), B (T2), and B (Ti) in the past information Z4, respectively. It corresponds. The past precipitations D (t−1), D (t−2), and D (t−i) are, for example, past precipitations D (T1), D (T2), and D (Ti) of the past information Z4, respectively. ). The past cloud amounts E (t-1), E (t-2), and E (t-i) are, for example, the past cloud amounts E (T1), E (T2), and E (Ti) in the past information Z4, respectively. It corresponds. The past atmospheric pressures F (t-1), F (t-2), and F (t-i) are, for example, the past atmospheric pressures F (T1), F (T2), and F (Ti) in the past information Z4, respectively. It corresponds. The past wind directions H (t−1), H (t−2), and H (t−i) are, for example, the past wind directions H (T1), H (T2), and H (Ti) in the past information Z4, respectively. It corresponds. The past wind speeds Q (t-1), Q (t-2), and Q (t-i) are, for example, the past wind speeds Q (T1), Q (T2), and Q (Ti) of the past information Z4, respectively. It corresponds.

式1においては、時刻t(第1時間)における第1需要電力PN1(t)の値と、時刻tよりも過去(前)の時間帯(第2時間)における例えば時刻t−1、t−2乃至t−i夫々における第1需要電力の値及び時刻t−1、t−2乃至t−i夫々における気象情報を示す値との相関が示されている。   In Equation 1, the value of the first demand power PN1 (t) at time t (first time) and, for example, time t-1 and t− in the past (previous) time zone (second time) before time t. A correlation is shown between the value of the first demand power at 2 to ti and the value indicating the weather information at times t-1 and t-2 to ti.

式1においては、所定時刻tにおけるメッシュN1の第1需要電力PN1(t)は、当該所定時刻tよりも過去の時刻(例えば、時刻t−1、t−2、・・・、t−i)夫々におけるメッシュN1の第1需要電力、気温、湿度、降水量、雲量、気圧、風向、風速等に基づいて算出されることが示されている。従って、当該式1を用いて、メッシュN1における第1需要電力の予測値を算出することが可能となる。   In Equation 1, the first demand power PN1 (t) of the mesh N1 at the predetermined time t is a time past the predetermined time t (for example, time t-1, t-2, ..., ti). It is shown that the calculation is based on the first demand power, temperature, humidity, precipitation, cloud cover, atmospheric pressure, wind direction, wind speed, etc. of each mesh N1. Therefore, it is possible to calculate the predicted value of the first demand power in the mesh N1 using the formula 1.

予測式生成部86は、生成された予測式(例えば式1)を示す情報を、例えば、第3の領域853に記憶することとしてもよい。   The prediction formula generation unit 86 may store information indicating the generated prediction formula (for example, Formula 1) in, for example, the third region 853.

予測式生成部86は、メッシュN1における第1需要電力を予測するための予測式の生成と同様に、メッシュN2乃至N15における第1需要電力を予測するための予測式を夫々生成する。   The prediction formula generation unit 86 generates prediction formulas for predicting the first demand power in the meshes N2 to N15, similarly to the generation of the prediction formula for predicting the first demand power in the mesh N1.

===予測部===
以下、図9及び図10を参照して、本実施形態における予測部について説明する。図9は、本実施形態における予測部による、メッシュの第2需要電力の値の予測結果を示す図である。図10は、本実施形態における予測部による、所定地域の第2需要電力の値の予測結果を示す図である。
=== Prediction unit ===
Hereinafter, the prediction unit in the present embodiment will be described with reference to FIGS. 9 and 10. FIG. 9 is a diagram illustrating a prediction result of the value of the second demand power of the mesh by the prediction unit in the present embodiment. FIG. 10 is a diagram illustrating a prediction result of the value of the second demand power in the predetermined area by the prediction unit in the present embodiment.

図9において、時刻Tf1乃至Tfnは夫々、未来情報Z5における時刻Tf1乃至Tfnと同様な構成であることとする。又、図9における、メッシュN1の第1需要電力PN1(Tf1)、PN1(Tf2)、PN1(Tfn)は夫々、例えば、未来の時刻Tf1、Tf2、TfnにおけるメッシュN1の第1需要電力の予測値を示している。メッシュN1の発電機の出力電力PG1(Tf1)、PG1(Tf2)、PG1(Tfn)は夫々、例えば、未来の時刻Tf1、Tf2、TfnにおけるメッシュN1の発電機の出力電力の予測値を示している。メッシュN1の第2需要電力PL1(Tf1)、PL1(Tf2)、PL1(Tfn)は夫々、例えば、未来の時刻Tf1、Tf2、TfnにおけるメッシュN1の第2需要電力の予測値を示している。   In FIG. 9, the times Tf1 to Tfn have the same configuration as the times Tf1 to Tfn in the future information Z5. Further, in FIG. 9, the first demand power PN1 (Tf1), PN1 (Tf2), and PN1 (Tfn) of the mesh N1, for example, predict the first demand power of the mesh N1 at future times Tf1, Tf2, and Tfn, respectively. The value is shown. The output powers PG1 (Tf1), PG1 (Tf2), and PG1 (Tfn) of the generator of the mesh N1 indicate predicted values of the output power of the generator of the mesh N1 at, for example, future times Tf1, Tf2, and Tfn, respectively. Yes. The second demand power PL1 (Tf1), PL1 (Tf2), and PL1 (Tfn) of the mesh N1 indicate predicted values of the second demand power of the mesh N1 at, for example, future times Tf1, Tf2, and Tfn, respectively.

図10において、時刻Tf1乃至Tfnは夫々、例えば、未来情報Z5における時刻Tf1乃至Tfnと同様な構成であることとする。又、図10における、メッシュN1の第2需要電力PL1(Tf1)、PL1(Tf2)、PL1(Tfn)は夫々、例えば、未来の時刻Tf1、Tf2、TfnにおけるメッシュN1の第2需要電力の予測値を示している。メッシュN2の第2需要電力PL2(Tf1)、PL2(Tf2)、PL2(Tfn)は夫々、例えば、未来の時刻Tf1、Tf2、TfnにおけるメッシュN2の第2需要電力の予測値を示している。メッシュN15の第2需要電力PL15(Tf1)、PL15(Tf2)、PL15(Tfn)は夫々、例えば、未来の時刻Tf1、Tf2、TfnにおけるメッシュN15の第2需要電力の予測値を示している。   In FIG. 10, each of the times Tf1 to Tfn has the same configuration as the times Tf1 to Tfn in the future information Z5, for example. Further, in FIG. 10, the second demand power PL1 (Tf1), PL1 (Tf2), and PL1 (Tfn) of the mesh N1, for example, predict the second demand power of the mesh N1 at the future times Tf1, Tf2, and Tfn, respectively. The value is shown. The second demand power PL2 (Tf1), PL2 (Tf2), and PL2 (Tfn) of the mesh N2 indicate predicted values of the second demand power of the mesh N2 at, for example, future times Tf1, Tf2, and Tfn, respectively. The second demand power PL15 (Tf1), PL15 (Tf2), and PL15 (Tfn) of the mesh N15 indicate predicted values of the second demand power of the mesh N15 at, for example, future times Tf1, Tf2, and Tfn, respectively.

=メッシュN1乃至N15夫々の第1需要電力の値の予測=
予測部87は、予測式生成部86で生成された予測式に基づいて、メッシュN1乃至N15夫々における第1需要電力の予測値(例えば、第1需要電力PN1乃至PN15の予測値)を算出する。
= Prediction of the value of the first demand power of each of the meshes N1 to N15 =
The prediction unit 87 calculates the predicted value of the first demand power in each of the meshes N1 to N15 (for example, the predicted value of the first demand power PN1 to PN15) based on the prediction formula generated by the prediction formula generation unit 86. .

尚、メッシュN1乃至N15夫々の第1需要電力の値を予測する予測部87の機能が、第1予測部に相当する。   The function of the prediction unit 87 that predicts the value of the first demand power of each of the meshes N1 to N15 corresponds to the first prediction unit.

=メッシュN1乃至N15夫々の発電機の出力電力の値の予測=
予測部87は、未来情報Z5等に基づいて、メッシュN1乃至N15夫々の発電機の出力電力の予測値を算出する。尚、メッシュN1の発電機の出力電力の値の予測と、メッシュN2乃至N15夫々の発電機の出力電力の値の予測とは、同様な構成であるので、メッシュN1の発電機の出力電力の値の予測についてのみ説明し、メッシュN2乃至N15夫々の発電機の出力電力の値の予測については、その説明を省略する。
= Prediction of output power value of each generator of meshes N1 to N15 =
The prediction unit 87 calculates the predicted value of the output power of each of the generators of the meshes N1 to N15 based on the future information Z5 and the like. Since the prediction of the output power value of the generator of the mesh N1 and the prediction of the output power value of the generators of the meshes N2 to N15 have the same configuration, the output power of the generator of the mesh N1 Only the prediction of the value will be described, and the description of the prediction of the output power value of each generator of the meshes N2 to N15 will be omitted.

例えば、発電機G3、G4が太陽光発電装置である場合、予測部87は、メッシュN1における日射量の予測値U1(Tf1)乃至U1(Tfn)夫々を示す値と所定定数との積を、未来の時刻Tf1乃至Tfnにおける発電機G3の出力電力の予測値P312(Tf1)乃至P312(Tfn)、及び、未来の時刻Tf1乃至Tfnにおける発電機G4の出力電力の予測値P412(Tf1)乃至P412(Tfn)とする。尚、所定定数とは、過去のメッシュN1における日射量と、発電機G3、G4の出力電力の値との関係に基づいて、予め定められている実数であることとする。予測部87は、各未来の時刻Tf1乃至Tfnにおいて、発電機G3の出力電力P312の予測値と、発電機G4の出力電力P412の予測値との合計を、メッシュN1の発電機の出力電力の予測値PG1として算出する。   For example, when the generators G3 and G4 are solar power generation devices, the prediction unit 87 calculates a product of a value indicating a predicted value U1 (Tf1) to U1 (Tfn) of the solar radiation amount in the mesh N1 and a predetermined constant, Predicted values P312 (Tf1) to P312 (Tfn) of output power of the generator G3 at future times Tf1 to Tfn, and predicted values P412 (Tf1) to P412 of output power of the generator G4 at future times Tf1 to Tfn. (Tfn). The predetermined constant is a real number determined in advance based on the relationship between the amount of solar radiation in the past mesh N1 and the output power values of the generators G3 and G4. The prediction unit 87 calculates the sum of the predicted value of the output power P312 of the generator G3 and the predicted value of the output power P412 of the generator G4 at each future time Tf1 to Tfn as the output power of the generator of the mesh N1. Calculated as the predicted value PG1.

例えば、予測部87は、時刻Tf1における発電機G3の出力電力の予測値P312(Tf1)と発電機G4の出力電力の予測値P412(Tf1)との合計を、時刻Tf1におけるメッシュN1の発電機の出力電力PG1(Tf1)とする。又、例えば、予測部87は、時刻Tf2における発電機G3の出力電力の予測値P312(Tf2)と発電機G4の出力電力の予測値P412(Tf2)との合計を、時刻Tf2におけるメッシュN1の発電機の出力電力PG1(Tf2)とする。又、例えば、予測部87は、時刻Tfnにおける発電機G3の出力電力の予測値P312(Tfn)と発電機G4の出力電力の予測値P412(Tfn)との合計を、時刻TfnにおけるメッシュN1の発電機の出力電力PG1(Tfn)とする。   For example, the prediction unit 87 calculates the sum of the predicted value P312 (Tf1) of the output power of the generator G3 at the time Tf1 and the predicted value P412 (Tf1) of the output power of the generator G4 as the generator of the mesh N1 at the time Tf1. Output power PG1 (Tf1). For example, the prediction unit 87 calculates the sum of the predicted value P312 (Tf2) of the output power of the generator G3 at the time Tf2 and the predicted value P412 (Tf2) of the output power of the generator G4 of the mesh N1 at the time Tf2. The output power PG1 (Tf2) of the generator is assumed. Further, for example, the prediction unit 87 calculates the sum of the predicted value P312 (Tfn) of the output power of the generator G3 at the time Tfn and the predicted value P412 (Tfn) of the output power of the generator G4 of the mesh N1 at the time Tfn. The output power PG1 (Tfn) of the generator is assumed.

尚、メッシュN1乃至N15夫々の発電機の出力電力の値を予測する予測部87の機能が、第2予測部に相当する。   Note that the function of the prediction unit 87 that predicts the output power values of the generators of the meshes N1 to N15 corresponds to the second prediction unit.

=メッシュN1乃至N15夫々の第2需要電力の値の予測=
予測部87は、メッシュN1乃至N15夫々の第1需要電力の予測値及びメッシュN1乃至N15夫々の発電機の出力電力の予測値等に基づいて、メッシュN1乃至N15夫々の第2需要電力の予測値を算出する。尚、メッシュN1の第2需要電力の予測と、メッシュN2乃至N15夫々の第2需要電力の予測とは、同様な構成であるので、メッシュN1の第2需要電力の予測についてのみ説明し、メッシュN2乃至N15夫々の第2需要電力の予測については、その説明を省略する。
= Prediction of the value of the second demand power of each of the meshes N1 to N15 =
The predicting unit 87 predicts the second demand power of each of the meshes N1 to N15 based on the predicted value of the first demand power of each of the meshes N1 to N15 and the predicted value of the output power of each of the generators of the meshes N1 to N15. Calculate the value. Note that the second demand power prediction for the mesh N1 and the second demand power prediction for each of the meshes N2 to N15 have the same configuration, so only the second demand power prediction for the mesh N1 will be described. The description of the prediction of the second demand power for each of N2 to N15 is omitted.

予測部87は、未来の各時刻におけるメッシュN1の第1需要電力の予測値から、未来の各時刻におけるメッシュN1の発電機の出力電力PG1の予測値を差し引いた値を、未来の各時刻におけるメッシュN1の第2需要電力の予測値とする。   The prediction unit 87 subtracts the predicted value of the output power PG1 of the generator of the mesh N1 at each future time from the predicted value of the first demand power of the mesh N1 at each future time at each future time. The predicted value of the second demand power of the mesh N1.

例えば、予測部87は、時刻Tf1における第1需要電力の予測値PN1(Tf1)から発電機の出力電力の予測値PG1(Tf1)を差し引いた値を、メッシュN1の第2需要電力の予測値PL1(Tf1)とする。又、例えば、予測部87は、時刻Tf2における第1需要電力の予測値PN1(Tf2)から発電機の出力電力の予測値PG1(Tf2)を差し引いた値を、メッシュN1の第2需要電力の予測値PL1(Tf2)とする。又、例えば、予測部87は、時刻Tfnにおける第1需要電力の予測値PN1(Tfn)から発電機の出力電力の予測値PG1(Tfn)を差し引いた値を、メッシュN1の第2需要電力の予測値PL1(Tfn)とする。   For example, the prediction unit 87 subtracts the predicted value PG1 (Tf1) of the output power of the generator from the predicted value PN1 (Tf1) of the first demand power at the time Tf1, and the predicted value of the second demand power of the mesh N1. It is assumed that PL1 (Tf1). Further, for example, the prediction unit 87 subtracts the predicted value PG1 (Tf2) of the output power of the generator from the predicted value PN1 (Tf2) of the first demand power at the time Tf2 as the second demand power of the mesh N1. The predicted value is PL1 (Tf2). Further, for example, the prediction unit 87 subtracts the predicted value PG1 (Tfn) of the output power of the generator from the predicted value PN1 (Tfn) of the first demand power at the time Tfn as the second demand power of the mesh N1. The predicted value is PL1 (Tfn).

尚、メッシュN1乃至N15夫々の第2需要電力の値を予測する予測部87の機能が、第3予測部に相当する。   The function of the prediction unit 87 that predicts the value of the second demand power of each of the meshes N1 to N15 corresponds to the third prediction unit.

=所定地域N100の第2需要電力の値の予測=
予測部87は、メッシュN1乃至N15夫々の第2需要電力の予測値に基づいて、所定地域N100の第2需要電力PLの予測値を算出する。予測部87は、メッシュN1乃至N15夫々の第2需要電力の予測値の総和を、所定地域N100の第2需要電力PLの予測値とする。
= Prediction of the value of the second demand power in the predetermined area N100 =
The prediction unit 87 calculates the predicted value of the second demand power PL in the predetermined area N100 based on the predicted value of the second demand power of each of the meshes N1 to N15. The prediction unit 87 sets the sum of the predicted values of the second demand power of each of the meshes N1 to N15 as the predicted value of the second demand power PL of the predetermined area N100.

例えば、予測部87は、時刻Tf1における第2需要電力の予測値PL1(Tf1)、PL2(Tf1)乃至PL15(Tf1)の総和を、時刻Tf1の所定地域N100における第2需要電力PLの予測値PL(Tf1)とする。又、例えば、予測部87は、時刻Tf2における第2需要電力の予測値PL1(Tf2)、PL2(Tf2)乃至PL15(Tf2)の総和を、時刻Tf2の所定地域N100における第2需要電力PLの予測値PL(Tf2)とする。又、例えば、予測部87は、時刻Tfnにおける第2需要電力の予測値PL1(Tfn)、PL2(Tfn)乃至PL15(Tfn)の総和を、時刻Tfnの所定地域N100における第2需要電力PLの予測値PL(Tfn)とする。   For example, the prediction unit 87 calculates the sum of the predicted values PL1 (Tf1) and PL2 (Tf1) to PL15 (Tf1) of the second demand power at time Tf1 as the predicted value of the second demand power PL at the predetermined area N100 at time Tf1. Let PL (Tf1). In addition, for example, the prediction unit 87 calculates the sum of the predicted values PL1 (Tf2) and PL2 (Tf2) to PL15 (Tf2) of the second demand power at time Tf2 as the second demand power PL in the predetermined area N100 at time Tf2. The predicted value PL (Tf2) is used. Further, for example, the prediction unit 87 calculates the sum of the predicted values PL1 (Tfn) and PL2 (Tfn) to PL15 (Tfn) of the second demand power at the time Tfn as the second demand power PL in the predetermined area N100 at the time Tfn. The predicted value PL (Tfn) is used.

尚、所定地域N100の第2需要電力の値を予測する予測部87の機能が、第4予測部に相当する。   The function of the prediction unit 87 that predicts the value of the second demand power in the predetermined area N100 corresponds to the fourth prediction unit.

===予測装置の動作===
以下、図11及び図12を参照して、本実施形態における予測装置の動作について説明する。図11は、本実施形態における予測装置の動作を示すフローチャートである。図12は、本実施形態における予測装置の予測結果の一例を示す図である。尚、図12は、例えば翌日の一日における、所定地域N100における第2需要電力の予測値PLが示されている。横軸X1は、翌日の一日における時間を示している。横軸X1におけるTa1は例えば午前0時を示し、時刻Ta2は日の出の時刻に対応する例えば午前7時を示し、時刻Ta3は日の入りの時刻に対応する例えば午後5時を示していることとする。縦軸Y1は、所定地域N100における需要電力の予測値PLの大きさを示している。
=== Operation of Prediction Device ===
Hereinafter, the operation of the prediction apparatus according to the present embodiment will be described with reference to FIGS. 11 and 12. FIG. 11 is a flowchart showing the operation of the prediction apparatus according to this embodiment. FIG. 12 is a diagram illustrating an example of a prediction result of the prediction device according to the present embodiment. FIG. 12 shows the predicted value PL of the second demand power in the predetermined area N100, for example, on the next day. The horizontal axis X1 indicates the time in one day of the next day. Ta1 on the horizontal axis X1 represents, for example, midnight, time Ta2 represents, for example, 7 am corresponding to the sunrise time, and time Ta3 represents, for example, 5 pm, corresponding to the sunset time. The vertical axis Y1 indicates the magnitude of the predicted value PL of demand power in the predetermined area N100.

例えば、第1の領域851に記憶されている予測装置8を動作させるためのプログラムの実行が開始されて、制御部88が、予測装置8の制御動作を開始したところから説明する。予測装置8は、予測要求の受付を開始する(ステップSt11)。尚、予測要求とは、予測装置8による予測動作を開始させるための命令である。予測要求は、例えば、入力部81を介して予測装置8に入力されることとしてもよい。予測装置8は、予測要求が入力された後、メッシュN1乃至N15毎に予測式(例えば式1等)を生成する。(ステップSt12)。予測装置8は、当該生成された予測式に基づいて、メッシュN1乃至N15夫々における第1需要電力の予測値(例えば、第1需要電力の予測値PN1乃至PN15)を算出する(ステップSt13)。予測装置8は、未来情報Z5等に基づいて、メッシュN1乃至N15夫々の発電機の出力電力の予測値を算出する(ステップSt14)。予測装置8は、ステップSt13での算出結果及びステップSt14での算出結果に基づいて、メッシュN1乃至N15夫々における第2需要電力の予測値(例えば、第1需要電力PL1乃至PL15)を算出する(ステップSt15)。予測装置8は、ステップSt15での算出結果に基づいて、所定地域N100の第2需要電力の予測値PLを算出する(ステップSt16)。予測装置8は、前述したように、各時刻(例えば、時刻Tf1乃至Tfn)における各メッシュの第2需要電力の予測値(例えば、PL1乃至PL15)の総和を、所定地域N100にける各時刻の第2需要電力の予測値PLとして算出する。予測装置8は、ステップSt16での算出結果を出力する(ステップSt17)。予測装置8は、例えば、当該算出結果を示す情報を表示部83に表示させたり出力部82から出力したりする。尚、予測装置8は、例えば、図12のように翌日における一日の時間に対応付けた状態で、ステップSt16での算出結果を出力することとしてもよい。   For example, a description will be given from the start of execution of a program for operating the prediction device 8 stored in the first area 851 and the control unit 88 starting the control operation of the prediction device 8. The prediction device 8 starts accepting a prediction request (step St11). The prediction request is a command for starting a prediction operation by the prediction device 8. The prediction request may be input to the prediction device 8 via the input unit 81, for example. After the prediction request is input, the prediction device 8 generates a prediction formula (for example, Formula 1) for each of the meshes N1 to N15. (Step St12). The prediction device 8 calculates predicted values of the first demand power (for example, predicted values PN1 to PN15 of the first demand power) in the meshes N1 to N15 based on the generated prediction formula (step St13). The prediction device 8 calculates the predicted value of the output power of each of the meshes N1 to N15 based on the future information Z5 and the like (step St14). The prediction device 8 calculates the predicted value of the second demand power (for example, the first demand power PL1 to PL15) in each of the meshes N1 to N15 based on the calculation result in step St13 and the calculation result in step St14 ( Step St15). The prediction device 8 calculates the predicted value PL of the second demand power in the predetermined area N100 based on the calculation result in step St15 (step St16). As described above, the prediction device 8 calculates the sum of the predicted values (for example, PL1 to PL15) of the second demand power of each mesh at each time (for example, times Tf1 to Tfn) at each time in the predetermined area N100. Calculated as the predicted value PL of the second demand power. The prediction device 8 outputs the calculation result at step St16 (step St17). For example, the prediction device 8 displays information indicating the calculation result on the display unit 83 or outputs the information from the output unit 82. Note that the prediction device 8 may output the calculation result in step St16 in a state in which the prediction device 8 is associated with the time of the day on the next day, for example, as shown in FIG.

[第2実施形態]
===配電系統、予測装置===
以下、図13を参照して、本実施形態における配電系統及び予測装置について説明する。図13は、本実施形態における配電系統を示す図である。尚、図1と同様な構成については、同一の符号を付し、その説明については省略する。
[Second Embodiment]
=== Distribution system, prediction device ===
Hereinafter, with reference to FIG. 13, a power distribution system and a prediction device in the present embodiment will be described. FIG. 13 is a diagram showing a power distribution system in the present embodiment. In addition, about the structure similar to FIG. 1, the same code | symbol is attached | subjected and the description is abbreviate | omitted.

配電系統100Aは、予測装置8Aを有する。尚、予測装置8A、測定装置M3、M4、M5、気象情報装置73が、電力予測装置に相当する。   The power distribution system 100A includes a prediction device 8A. Note that the prediction device 8A, the measurement devices M3, M4, M5, and the weather information device 73 correspond to a power prediction device.

予測装置8A(図3)は、記憶部85A、予測式生成部86Aを有する。   The prediction device 8A (FIG. 3) includes a storage unit 85A and a prediction formula generation unit 86A.

記憶部85Aは、例えば、第2の領域852Aを有する。   The storage unit 85A has, for example, a second area 852A.

第2の領域852Aには、気象情報Z23(図6)が記憶される。尚、気象情報Z23は、送受信部84で受信した気象信号S73に基づく情報である。   Meteorological information Z23 (FIG. 6) is stored in the second area 852A. The weather information Z23 is information based on the weather signal S73 received by the transmission / reception unit 84.

予測式生成部86Aは、気象情報Z23等に基づいて、過去情報Z24(図6)を生成し、当該過去情報Z24等に基づいて、予測式を生成する。つまり、予測式生成部86Aは、気象情報装置73(推定装置)の推定結果に基づいて、式1における係数p1乃至pi、係数a1乃至ai、係数b1乃至bi、係数d1乃至di、係数e1乃至ei、係数f1乃至fi、係数h1乃至hi、係数q1乃至qiを例えば重回帰分析等を用いて算出(決定)する。   The prediction formula generation unit 86A generates past information Z24 (FIG. 6) based on the weather information Z23 and the like, and generates a prediction formula based on the past information Z24 and the like. That is, the prediction formula generation unit 86A, based on the estimation result of the weather information device 73 (estimation device), the coefficients p1 to pi, the coefficients a1 to ai, the coefficients b1 to bi, the coefficients d1 to di, the coefficients e1 to ei, coefficients f1 to fi, coefficients h1 to hi, and coefficients q1 to qi are calculated (determined) using, for example, multiple regression analysis.

前述したように、予測装置8は、配電線L10における分散型電源G3乃至G5よりも上流側において発生させるべき電力(例えばメッシュN1の第2需要電力)の値を予測する。配電線L10には、負荷R3、R4、分散型電源G3、G4が接続されている。負荷R3、R4に対しては夫々、電力P311、P411が供給される。分散型電源G3、G4からは夫々、電力P312、P412が出力される。予測部87は、予測式(式1)に基づいて、例えば、メッシュN1の第1需要電力の予測値を算出する。予測式においては、時刻tにおけるメッシュN1の第1需要電力の値と、時刻tよりも過去(前)の時間帯における例えば時刻t−1、t−2乃至t−i夫々におけるメッシュN1の第1需要電力の値及び時刻t−1、t−2乃至t−i夫々における気象情報を示す値との相関が示されている。又、予測部87は、未来情報Z5に基づいて、例えば、メッシュN1の発電機の出力電力の予測値を算出する。更に、予測部87は、メッシュN1の第1需要電力の予測値から、メッシュN1の発電機の出力電力の予測値を差し引いて、メッシュN1の第2需要電力の予測値を算出する(図9)。以上より、予測装置8は、メッシュN1の第1需要電力の予測値と、メッシュN1の発電機の出力電力の予測値と、を別個に予測した上で、当該予測結果に基づいて、メッシュN1の第2需要電力の値を予測している。従って、予測装置8は、メッシュN1の第2需要電力の値を予測する際に、メッシュN1の発電機の出力電力の予測値を当該予測に反映させて、メッシュN1の第2需要電力の値を予測する予測精度を向上させることができる。又、予測装置8は、第1の領域851に記憶されているプログラムに基づいて、例えば自動的に動作することになる。従って、メッシュN1の第2需要電力の値を予測する作業者は、メッシュN1の第2需要電力の値を予測するための演算等を、例えば手計算で行うことが不要となる。従って、当該作業者によるメッシュN1の第2需要電力の値を予測する作業の作業効率を向上させることができる。   As described above, the prediction device 8 predicts the value of power (for example, the second demand power of the mesh N1) to be generated on the upstream side of the distributed power sources G3 to G5 in the distribution line L10. Loads R3 and R4 and distributed power sources G3 and G4 are connected to the distribution line L10. Electric power P311 and P411 are supplied to the loads R3 and R4, respectively. Electric power P312 and P412 are output from the distributed power sources G3 and G4, respectively. The prediction unit 87 calculates a predicted value of the first demand power of the mesh N1, for example, based on the prediction formula (Formula 1). In the prediction formula, the value of the first demand power of the mesh N1 at the time t and the mesh N1 of the mesh N1 at each of the times t-1, t-2 to ti, for example, in the past (previous) time zone from the time t. The correlation between the value of 1 demand power and the value indicating the weather information at each of the times t-1, t-2 to ti is shown. Further, the prediction unit 87 calculates a predicted value of the output power of the generator of the mesh N1, for example, based on the future information Z5. Further, the prediction unit 87 calculates the predicted value of the second demand power of the mesh N1 by subtracting the predicted value of the output power of the generator of the mesh N1 from the predicted value of the first demand power of the mesh N1 (FIG. 9). ). As described above, the prediction device 8 separately predicts the predicted value of the first demand power of the mesh N1 and the predicted value of the output power of the generator of the mesh N1, and then based on the prediction result, the mesh N1. The value of the second demand power is predicted. Therefore, when the prediction device 8 predicts the value of the second demand power of the mesh N1, the value of the second demand power of the mesh N1 is reflected on the prediction of the output power of the generator of the mesh N1 in the prediction. The prediction accuracy for predicting can be improved. Further, the prediction device 8 automatically operates, for example, based on the program stored in the first area 851. Therefore, the operator who predicts the value of the second demand power of the mesh N1 does not need to perform, for example, manual calculation for predicting the value of the second demand power of the mesh N1. Therefore, the work efficiency of the work for predicting the value of the second demand power of the mesh N1 by the worker can be improved.

又、式1においては、時刻tにおける第1需要電力の値と、時刻tよりも過去(前)の時間帯における例えば時刻t−1、t−2乃至t−i夫々における第1需要電力の値との相関が示されている。測定装置M3、M4は夫々、電力P311、P411を測定する。予測式生成部86は、測定装置M3、M4の測定結果に応じた過去情報Z4に基づいて、係数p1乃至piを算出(決定)する。メッシュN1における第1需要電力の値を予測する際に、測定装置M3、M4の測定結果を当該予測に反映させることができる。従って、予測装置8は、メッシュN1における第2需要電力の値を予測する予測精度を向上させることができる。   Further, in the expression 1, the value of the first demand power at the time t and the first demand power at the times (t−1), t−2 to ti in the past (previous) time time t, for example. Correlation with value is shown. Measuring devices M3 and M4 measure electric power P311 and P411, respectively. The prediction formula generation unit 86 calculates (determines) the coefficients p1 to pi based on the past information Z4 corresponding to the measurement results of the measuring devices M3 and M4. When predicting the value of the first demand power in the mesh N1, the measurement results of the measuring devices M3 and M4 can be reflected in the prediction. Therefore, the prediction device 8 can improve the prediction accuracy for predicting the value of the second demand power in the mesh N1.

又、式1においては、時刻tにおける第1需要電力の値と、時刻tよりも過去(前)の時間帯における例えば時刻t−1、t−2乃至t−i夫々における気象情報を示す値との相関が更に示されている。気象観測装置71は、メッシュN1における気象を観測する。予測式生成部86は、気象観測装置71の観測結果に応じた過去情報Z4に基づいて、係数a1乃至ai、係数b1乃至bi、係数d1乃至di、係数e1乃至ei、係数f1乃至fi、係数h1乃至hi、係数q1乃至qiを算出(決定)する。メッシュN1における第1需要電力の値を予測する際に、気象観測装置71の観測結果を当該予測に反映させることができる。従って、予測装置8は、メッシュN1における第2需要電力の値の値を予測する予測精度を向上させることができる。   Moreover, in Formula 1, the value which shows the weather information in each of the value of the 1st demand electric power in the time t, and the time t-1, t-2 thru | or ti in the time zone before (before) the time t, for example. Further correlation is shown. The weather observation device 71 observes the weather on the mesh N1. The prediction formula generation unit 86, based on the past information Z4 according to the observation result of the weather observation device 71, coefficients a1 to ai, coefficients b1 to bi, coefficients d1 to di, coefficients e1 to ei, coefficients f1 to fi, coefficients h1 to hi and coefficients q1 to qi are calculated (determined). When predicting the value of the first demand power in the mesh N1, the observation result of the weather observation device 71 can be reflected in the prediction. Therefore, the prediction device 8 can improve the prediction accuracy for predicting the value of the second demand power value in the mesh N1.

又、気象情報装置73(図13)は、メッシュN1における気温、湿度、降水量、雲量、気圧、風向、風速、日射量を推定する。予測式生成部86Aは、気象情報装置73の推定結果に応じた過去情報Z24に基づいて、式1における係数a1乃至ai、係数b1乃至bi、係数d1乃至di、係数e1乃至ei、係数f1乃至fi、係数h1乃至hi、係数q1乃至qiを算出(決定)する。メッシュN1における第1需要電力の値を予測する際に、気象情報装置73の推定結果を当該予測に反映させることができる。従って、予測装置8A(図13)は、メッシュN1における第2需要電力の値を予測する予測精度を向上させることができる。又、例えば、配電系統100Aにおいて、メッシュN1における気象を観測するための観測装置を設ける必要がない。よって、当該観測装置を配電系統100Aに設けるためのコストを削減することができる。従って、予測装置8Aは、メッシュN1における第2需要電力の値を比較的低コストで予測することができる。   The weather information device 73 (FIG. 13) estimates the temperature, humidity, precipitation, cloud cover, atmospheric pressure, wind direction, wind speed, and solar radiation in the mesh N1. The prediction formula generation unit 86A, based on the past information Z24 according to the estimation result of the weather information device 73, the coefficients a1 to ai, coefficients b1 to bi, coefficients d1 to di, coefficients e1 to ei, coefficients f1 to f1 in Formula 1. fi, coefficients h1 to hi, and coefficients q1 to qi are calculated (determined). When predicting the value of the first demand power in the mesh N1, the estimation result of the weather information device 73 can be reflected in the prediction. Therefore, the prediction device 8A (FIG. 13) can improve the prediction accuracy for predicting the value of the second demand power in the mesh N1. Further, for example, in the power distribution system 100A, it is not necessary to provide an observation device for observing the weather in the mesh N1. Therefore, the cost for providing the observation device in the power distribution system 100A can be reduced. Therefore, the prediction device 8A can predict the value of the second demand power in the mesh N1 at a relatively low cost.

又、気象情報Z3においては、メッシュN1の気温を示す情報が含まれている。メッシュN1における第1需要電力の値を予測する際に、メッシュN1の気温を示す情報を当該予測に反映させることができる。よって、例えば第1需要電力の値との相関が比較的強い気温を示す情報を、メッシュN1における第1需要電力の値の予測に反映させることができる。従って、予測装置8における、メッシュN1における第2需要電力の値を予測する予測精度を更に向上させることができる。   The weather information Z3 includes information indicating the temperature of the mesh N1. When predicting the value of the first demand power in the mesh N1, information indicating the temperature of the mesh N1 can be reflected in the prediction. Therefore, for example, information indicating the temperature having a relatively strong correlation with the value of the first demand power can be reflected in the prediction of the value of the first demand power in the mesh N1. Therefore, the prediction accuracy for predicting the value of the second demand power in the mesh N1 in the prediction device 8 can be further improved.

又、気象情報Z3においては、メッシュN1の湿度を示す情報が含まれている。メッシュN1における第1需要電力の値を予測する際に、メッシュN1の湿度を示す情報を当該予測に反映させることができる。よって、例えば第1需要電力の値との相関が比較的強い湿度を示す情報を、メッシュN1における第1需要電力の値の予測に反映させることができる。従って、予測装置8における、メッシュN1における第2需要電力の値を予測する予測精度を更に向上させることができる。   Further, the weather information Z3 includes information indicating the humidity of the mesh N1. When predicting the value of the first demand power in the mesh N1, information indicating the humidity of the mesh N1 can be reflected in the prediction. Therefore, for example, information indicating humidity having a relatively strong correlation with the value of the first demand power can be reflected in the prediction of the value of the first demand power in the mesh N1. Therefore, the prediction accuracy for predicting the value of the second demand power in the mesh N1 in the prediction device 8 can be further improved.

又、気象情報Z3においては、メッシュN1の降水量を示す情報が含まれている。メッシュN1における第1需要電力の値を予測する際に、メッシュN1の降水量を示す情報を当該予測に反映させることができる。よって、例えば第1需要電力の値との相関が比較的強い降水量を示す情報を、メッシュN1における第1需要電力の値の予測に反映させることができる。従って、予測装置8における、メッシュN1における第2需要電力の値を予測する予測精度を更に向上させることができる。   The weather information Z3 includes information indicating the precipitation amount of the mesh N1. When predicting the value of the first demand power in the mesh N1, information indicating the precipitation amount of the mesh N1 can be reflected in the prediction. Therefore, for example, information indicating precipitation having a relatively strong correlation with the value of the first demand power can be reflected in the prediction of the value of the first demand power in the mesh N1. Therefore, the prediction accuracy for predicting the value of the second demand power in the mesh N1 in the prediction device 8 can be further improved.

又、発電機G3乃至G5は、例えば太陽光発電装置である。よって、太陽光発電装置からの出力電力の値を、メッシュN1における第2需要電力の値の予測に反映させることができる。従って、予測装置8における、メッシュN1における第2需要電力の値を予測する予測精度を更に向上させることができる。   Further, the generators G3 to G5 are, for example, solar power generation devices. Therefore, the value of the output power from the photovoltaic power generator can be reflected in the prediction of the value of the second demand power in the mesh N1. Therefore, the prediction accuracy for predicting the value of the second demand power in the mesh N1 in the prediction device 8 can be further improved.

又、発電機G3乃至G5は、例えば風力発電装置である。よって、風力発電装置からの出力電力の値を、メッシュN1における第2需要電力の値の予測に反映させることができる。従って、予測装置8における、メッシュN1における第2需要電力の値を予測する予測精度を更に向上させることができる。   The generators G3 to G5 are, for example, wind power generators. Therefore, the value of the output power from the wind turbine generator can be reflected in the prediction of the value of the second demand power in the mesh N1. Therefore, the prediction accuracy for predicting the value of the second demand power in the mesh N1 in the prediction device 8 can be further improved.

又、負荷R3、R4はメッシュN1内に設けられ、負荷R5はメッシュN2内に設けられる。発電機G3、G4はメッシュN1内に設けれ、発電機G5はメッシュN2内に設けられる。予測装置8は、メッシュN1乃至N15夫々における第1需要電力の予測値を夫々算出する。又、予測装置8は、メッシュN1乃至N15夫々における発電機の出力電力の予測値を夫々算出する。又、予測装置8は、メッシュN1乃至N15夫々における第2需要電力の予測値を夫々算出する。そして、予測装置8は、所定地域N100における第2需要電力の予測値を夫々算出する。更に、予測装置8は、メッシュN1乃至N15夫々における第2需要電力の予測値の総和を、所定地域N100の第2需要電力の予測値として算出する。よって、例えば、メッシュN1乃至N15夫々における第1需要電力の値及び気象情報を、所定地域N100における第2需要電力の値の予測に反映させることができる。従って、予測装置8は、所定地域N100における第2需要電力の値を予測する予測精度を向上させることができる。   The loads R3 and R4 are provided in the mesh N1, and the load R5 is provided in the mesh N2. The generators G3 and G4 are provided in the mesh N1, and the generator G5 is provided in the mesh N2. The prediction device 8 calculates a predicted value of the first demand power in each of the meshes N1 to N15. Further, the prediction device 8 calculates a predicted value of the output power of the generator in each of the meshes N1 to N15. Further, the prediction device 8 calculates a predicted value of the second demand power in each of the meshes N1 to N15. And the prediction apparatus 8 calculates the predicted value of the 2nd demand power in the predetermined area N100, respectively. Furthermore, the prediction device 8 calculates the sum of the predicted values of the second demand power in each of the meshes N1 to N15 as the predicted value of the second demand power in the predetermined area N100. Therefore, for example, the value of the first demand power and the weather information in each of the meshes N1 to N15 can be reflected in the prediction of the value of the second demand power in the predetermined area N100. Therefore, the prediction device 8 can improve the prediction accuracy for predicting the value of the second demand power in the predetermined area N100.

尚、上記第1及び第2実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得るとともに、本発明にはその等価物も含まれる。   The first and second embodiments are intended to facilitate understanding of the present invention and are not intended to limit the present invention. The present invention can be changed and improved without departing from the gist thereof, and the present invention includes equivalents thereof.

第2実施形態においては、気象情報装置73から出力される気象信号S73に基づいて、予測式生成部86Aが過去情報Z24を生成することについて説明したが、これに限定されるものではない。例えば、配電系統100A(図13)に対して、第1実施形態における気象観測装置71、72を設けて、予測式生成部86Aが、観測信号S71、S72に示されている情報に基づいて、気象信号S73に示されている情報を補正することとしてもよい。そして、当該補正された情報に基づいて、予測式生成部86Aが過去情報Z24を生成することとしてもよい。   In 2nd Embodiment, although the prediction formula production | generation part 86A produced | generated the past information Z24 based on the weather signal S73 output from the weather information apparatus 73 was demonstrated, it is not limited to this. For example, the weather observation apparatuses 71 and 72 in the first embodiment are provided for the power distribution system 100A (FIG. 13), and the prediction formula generation unit 86A is based on the information indicated in the observation signals S71 and S72. The information indicated in the weather signal S73 may be corrected. Then, based on the corrected information, the prediction formula generation unit 86A may generate the past information Z24.

8、8A 予測装置
71、72 気象観測装置
73 気象情報装置
86、86A 予測式生成部
87 予測部
100、100A 配電系統
200 変電所
300、400、500 需要家
L10、L3、L4、L5 配電線
M3、M4、M5 測定装置
N1乃至N15 メッシュ
N100 所定地域
8, 8A Prediction device 71, 72 Weather observation device 73 Weather information device 86, 86A Prediction formula generation unit 87 Prediction unit 100, 100A Distribution system 200 Substation 300, 400, 500 Consumer L10, L3, L4, L5 Distribution line M3 , M4, M5 Measuring devices N1 to N15 Mesh N100 Predetermined area

Claims (10)

第1電力が供給される電力負荷と、前記電力負荷に対して電力を供給するべく第2電力を出力する分散型電源と、が接続されている電力線における、前記分散型電源よりも上流側において発生させるべき第3電力の値を予測する電力予測装置であって、
第1時間における前記第1電力の値と、前記第1時間よりも前の第2時間における前記第1電力の値及び前記第2時間における前記電力負荷が設けられている位置の気象情報と、の相関を示す相関式に基づいて、前記第1電力の値を予測する第1予測部と、
前記分散型電源が設けられている位置の気象情報の予測値に応じて、前記第2電力の値を予測する第2予測部と、
前記第1予測部の予測結果と前記第2予測部の予測結果との差に応じて、前記第3電力の値を予測する第3予測部と、
を備えたことを特徴とする電力予測装置。
On the upstream side of the distributed power source in the power line to which the power load to which the first power is supplied and the distributed power source that outputs the second power to supply power to the power load are connected A power prediction device for predicting a value of third power to be generated,
The value of the first power at a first time, the value of the first power at a second time prior to the first time, and the weather information of the position at which the power load at the second time is provided; A first prediction unit for predicting a value of the first power based on a correlation equation indicating the correlation of
A second prediction unit for predicting a value of the second power according to a predicted value of weather information at a position where the distributed power source is provided;
A third prediction unit that predicts a value of the third power according to a difference between a prediction result of the first prediction unit and a prediction result of the second prediction unit;
A power prediction apparatus comprising:
前記相関式は、前記第1時間における前記第1電力の値と、前記第2時間における1以上の前記第1電力の値夫々と前記1以上の前記第1電力の値毎に値が定められる第1定数との積の総和と、の相関を示し、
前記第1電力を測定する測定装置と、
前記測定装置の測定結果に基づいて、前記第1定数の値を決定する第1決定部と、を更に備える
ことを特徴とする請求項1に記載の電力予測装置。
The correlation equation is determined for each value of the first power in the first time, one or more values of the first power in the second time, and each value of the one or more first powers. Shows the correlation with the sum of products with the first constant,
A measuring device for measuring the first power;
The power prediction device according to claim 1, further comprising: a first determination unit that determines a value of the first constant based on a measurement result of the measurement device.
前記相関式は、前記第1時間における前記第1電力の値と、前記第2時間における1以上の前記気象情報を示す値夫々と前記1以上の前記気象情報を示す値毎に値が定められる第2定数との積の総和と、の相関を更に示し、
前記電力負荷が設けられている位置の気象を観測する観測装置と、
前記観測装置の観測結果に基づいて、前記第2定数の値を決定する第2決定部と、を更に備える
ことを特徴とする請求項2に記載の電力予測装置。
The correlation formula is determined for each value indicating the value of the first power in the first time, a value indicating the one or more weather information in the second time, and a value indicating the one or more weather information. Further shows the correlation with the sum of products with the second constant,
An observation device for observing the weather at a position where the power load is provided;
The power prediction device according to claim 2, further comprising: a second determination unit that determines a value of the second constant based on an observation result of the observation device.
前記相関式は、前記第1時間における前記第1電力の値と、前記第2時間における1以上の前記気象情報を示す値夫々と前記1以上の前記気象情報を示す値毎に値が定められる第2定数との積の総和と、の相関を更に示し、
前記電力負荷が設けられている位置の気象を推定する推定装置と、
前記推定装置の推定結果に基づいて、前記第2定数の値を決定する第2決定部と、を更に備える
ことを特徴とする請求項2に記載の電力予測装置。
The correlation formula is determined for each value indicating the value of the first power in the first time, a value indicating the one or more weather information in the second time, and a value indicating the one or more weather information. Further shows the correlation with the sum of products with the second constant,
An estimation device for estimating the weather at a position where the power load is provided;
The power prediction device according to claim 2, further comprising: a second determination unit that determines a value of the second constant based on an estimation result of the estimation device.
前記気象情報は、前記電力負荷が設けられている位置の気温を示す情報、を含む
ことを特徴とする請求項1乃至4の何れかに記載の電力予測装置。
5. The power prediction apparatus according to claim 1, wherein the weather information includes information indicating an air temperature at a position where the power load is provided.
前記気象情報は、前記電力負荷が設けられている位置の湿度を示す情報、を含む
ことを特徴とする請求項1乃至5の何れかに記載の電力予測装置。
6. The power prediction apparatus according to claim 1, wherein the weather information includes information indicating humidity at a position where the power load is provided.
前記気象情報は、前記電力負荷が設けられている位置の降水量を示す情報、を含む
ことを特徴とする請求項1乃至6の何れかに記載の電力予測装置。
The said weather information contains the information which shows the precipitation of the position in which the said electric power load is provided. The electric power prediction apparatus in any one of the Claims 1 thru | or 6 characterized by the above-mentioned.
前記分散型電源は、太陽光発電装置である
ことを特徴とする請求項1乃至7の何れかに記載の電力予測装置。
The electric power prediction apparatus according to claim 1, wherein the distributed power source is a photovoltaic power generation apparatus.
前記分散型電源は、風力発電装置である
ことを特徴とする請求項1乃至7の何れかに記載の電力予測装置。
The electric power prediction apparatus according to claim 1, wherein the distributed power source is a wind power generator.
前記電力負荷は、所定地域における複数区域内に夫々設けられ、
前記分散型電源は、前記複数区域内に夫々設けられ、
前記第1予測部は、前記複数の区域毎の前記第1電力の値を夫々予測し、
前記第2予測部は、前記複数の区域毎の前記第2電力の値を夫々予測し、
前記第3予測部は、前記複数の区域毎の前記第3電力の値を夫々予測し、
前記第3予測部の予測結果の総和に基づいて、前記所定地域における前記第3電力の値を予測する第4予測部、を更に備える
ことを特徴とする請求項1乃至9の何れかに記載の電力予測装置。
The power load is provided in each of a plurality of areas in a predetermined area,
The distributed power source is provided in each of the plurality of areas,
The first prediction unit predicts a value of the first power for each of the plurality of areas,
The second prediction unit predicts a value of the second power for each of the plurality of areas,
The third prediction unit predicts a value of the third power for each of the plurality of areas,
The fourth prediction unit for predicting the value of the third power in the predetermined area based on the sum of the prediction results of the third prediction unit. Power prediction device.
JP2013514430A 2013-02-01 2013-02-01 Power prediction device Expired - Fee Related JP5279972B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/052394 WO2014118973A1 (en) 2013-02-01 2013-02-01 Power prediction device

Publications (2)

Publication Number Publication Date
JP5279972B1 true JP5279972B1 (en) 2013-09-04
JPWO2014118973A1 JPWO2014118973A1 (en) 2017-01-26

Family

ID=49273943

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013514430A Expired - Fee Related JP5279972B1 (en) 2013-02-01 2013-02-01 Power prediction device

Country Status (2)

Country Link
JP (1) JP5279972B1 (en)
WO (1) WO2014118973A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016129442A (en) * 2015-01-09 2016-07-14 中国電力株式会社 Power generation amount prediction device, and control method and program of the same
CN110610280A (en) * 2018-10-31 2019-12-24 山东大学 Short-term prediction method, model, device and system for power load

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5897518B2 (en) * 2013-08-23 2016-03-30 中国電力株式会社 Voltage regulator
JP6582418B2 (en) * 2015-01-23 2019-10-02 中国電力株式会社 Power generation amount prediction device, power generation amount prediction method, and program

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007097304A (en) * 2005-09-29 2007-04-12 Hitachi Ltd System and method for controlling cogeneration equipment
JP2009171823A (en) * 2007-12-21 2009-07-30 Nippon Telegr & Teleph Corp <Ntt> Power supply control system and method of controlling the same
JP2012147576A (en) * 2011-01-12 2012-08-02 Chugoku Electric Power Co Inc:The Distribution system operation method, distribution system operation device, distribution system operation system, and program
JP2012175825A (en) * 2011-02-22 2012-09-10 Mitsubishi Electric Corp Power management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007097304A (en) * 2005-09-29 2007-04-12 Hitachi Ltd System and method for controlling cogeneration equipment
JP2009171823A (en) * 2007-12-21 2009-07-30 Nippon Telegr & Teleph Corp <Ntt> Power supply control system and method of controlling the same
JP2012147576A (en) * 2011-01-12 2012-08-02 Chugoku Electric Power Co Inc:The Distribution system operation method, distribution system operation device, distribution system operation system, and program
JP2012175825A (en) * 2011-02-22 2012-09-10 Mitsubishi Electric Corp Power management system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016129442A (en) * 2015-01-09 2016-07-14 中国電力株式会社 Power generation amount prediction device, and control method and program of the same
CN110610280A (en) * 2018-10-31 2019-12-24 山东大学 Short-term prediction method, model, device and system for power load

Also Published As

Publication number Publication date
WO2014118973A1 (en) 2014-08-07
JPWO2014118973A1 (en) 2017-01-26

Similar Documents

Publication Publication Date Title
JP5984601B2 (en) System control device and system control method
JP5159695B2 (en) Distribution system state estimation method and distribution system state estimation apparatus
JP5279972B1 (en) Power prediction device
JP5989732B2 (en) Power generation amount prediction device, power generation amount prediction method, and program
JP5914231B2 (en) Method and apparatus for calculating settling value of line voltage drop compensator
US10211777B2 (en) Photovoltaic power generator output estimation method and device, and power system monitoring device using same
JP5989754B2 (en) Prediction device
JP5616385B2 (en) Power system control apparatus and power system control method
KR101545143B1 (en) Auto Generation Control Method based on maximum power transmission
JP6225383B2 (en) Distribution line impedance estimation apparatus and estimation method
JP5937167B2 (en) Demand forecasting device, demand forecasting method, and program
JP4919903B2 (en) Overhead transmission line dynamic capacity dynamic determination device, computer program used therefor, and overload transmission line dynamic capacity dynamic determination method
JP2016187286A (en) Power distribution monitoring controller
JP2009055713A (en) Power fluctuation prediction system
JP7049218B2 (en) Transmission loss calculation device and transmission loss calculation method
JP5461717B1 (en) Power prediction device
JP5502243B1 (en) Power prediction device
JP5989731B2 (en) Power prediction apparatus, power prediction method, and program
JP5946742B2 (en) Fluctuation estimation method, fluctuation estimation apparatus and fluctuation estimation program for total output of natural energy type distributed power supply group
JP5897518B2 (en) Voltage regulator
JP5897519B2 (en) Voltage adjustment device and voltage adjustment method
JP5819162B2 (en) Method and apparatus for estimating power generation output of photovoltaic power generation facility
JP5300892B2 (en) Automatic operation control device, automatic operation control method, and automatic operation control program
JP2015042130A (en) Voltage adjustment device, and voltage adjustment method
JP2015156738A (en) Solar isolation estimating device

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130514

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130521

R150 Certificate of patent or registration of utility model

Ref document number: 5279972

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees