JP5241027B2 - Grout filling bracket - Google Patents

Grout filling bracket Download PDF

Info

Publication number
JP5241027B2
JP5241027B2 JP2009154663A JP2009154663A JP5241027B2 JP 5241027 B2 JP5241027 B2 JP 5241027B2 JP 2009154663 A JP2009154663 A JP 2009154663A JP 2009154663 A JP2009154663 A JP 2009154663A JP 5241027 B2 JP5241027 B2 JP 5241027B2
Authority
JP
Japan
Prior art keywords
grout
metal fitting
filling metal
lock bolt
grout filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009154663A
Other languages
Japanese (ja)
Other versions
JP2011012389A (en
Inventor
和徳 前田
直樹 徳永
隆 大河内
Original Assignee
岡部株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 岡部株式会社 filed Critical 岡部株式会社
Priority to JP2009154663A priority Critical patent/JP5241027B2/en
Publication of JP2011012389A publication Critical patent/JP2011012389A/en
Application granted granted Critical
Publication of JP5241027B2 publication Critical patent/JP5241027B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、ロックボルト頭部の支圧板下方側の外周部へグラウト材を簡便かつ的確に充填し得るように改良し、ロックボルトの頭部に対する防錆処理技術の向上を図ったグラウト充填用金具に関する。   The present invention is an improved grout material for improving the anticorrosion treatment technology for the head of the lock bolt by improving the grout material to the outer peripheral portion below the bearing plate of the lock bolt head in a simple and accurate manner. Related to brackets.

図19〜図21はロックボルトの頭部に関する従来の施工例を示したものである。図19は、斜面に形成した削孔101に対してロックボルト102を挿入し、そのロックボルト102と削孔101の内面との間にグラウト材103を注入して固化させた状態を例示したものである。図示のように、この状態においては、グラウト材103の上方に空隙部104が形成されることになる。そこで、図20に示したように、その空隙部104に硬練りのモルタル105を詰めて支圧板の下方のロックボルトの頭部に対する防錆効果を期待する養生が広く行われている。しかしながら、そのモルタル105の後部に空隙部106が残留してしまうことが多く、この空隙部106が防錆効果を低下させる大きな要因になるといった厄介な技術的問題があった。また、図21に示したように、支圧板107を設置して、上方へ露出したロックボルト102に締付ナット108を螺合して締付ける際には、その支圧板107とモルタル105の表面との不均一な接触状態や残留する空隙部106によってモルタル105や支圧板107にクラック109が入ることもあった。なお、モルタル105の表面を養生して支圧板107の下面との均一な接触状態を確保すれば、クラック109の低減にきわめて有効であるが、その養生には手間がかかりコストが嵩む要因にもなった。   19 to 21 show examples of conventional construction related to the head of the lock bolt. FIG. 19 illustrates a state in which the lock bolt 102 is inserted into the hole 101 formed on the slope, and the grout material 103 is injected and solidified between the lock bolt 102 and the inner surface of the hole 101. It is. As shown in the figure, in this state, the gap 104 is formed above the grout material 103. Therefore, as shown in FIG. 20, curing is widely performed in which the gap 104 is filled with a hardened mortar 105 to expect a rust prevention effect on the head of the lock bolt below the bearing plate. However, the void 106 often remains in the rear portion of the mortar 105, and there is a troublesome technical problem that the void 106 becomes a major factor for reducing the rust prevention effect. Further, as shown in FIG. 21, when the bearing plate 107 is installed and the tightening nut 108 is screwed onto the lock bolt 102 exposed upward, the bearing plate 107 and the surface of the mortar 105 are In some cases, cracks 109 may enter the mortar 105 or the bearing plate 107 due to the uneven contact state or the remaining gap 106. Note that curing the surface of the mortar 105 to ensure a uniform contact state with the lower surface of the bearing plate 107 is extremely effective in reducing the crack 109. became.

そこで、非防錆性の鋼棒からなる一般的なロックボルト等のアンカー材の頭部側に対してステンレス鋼棒からなる頭部部材を螺着し、その頭部部材の一部を支圧板の上方へ突出して締付ナットにより締付け固定するように構成することにより、アンカー材の頭部に対して防錆効果を付与するという技術が開発されている(特許文献1)。しかしながら、この従来技術の場合には、前記頭部部材の材質が限定され、ステンレス鋼棒からなる高価な材料が必要とされるだけでなく、支圧板の下方の空隙部を解消することはできないことから、その空隙部に起因する、頭部部材の下部に連結される非防錆性の鋼棒からなるロックボルト等に対する防錆効果の低下の問題までは解決されなかった。   Therefore, a head member made of a stainless steel rod is screwed to the head side of an anchor material such as a general lock bolt made of a non-rust-proof steel rod, and a part of the head member is a bearing plate. A technique has been developed in which a rust prevention effect is imparted to the head portion of the anchor material by projecting upwardly and fixing with a tightening nut (Patent Document 1). However, in the case of this prior art, the material of the head member is limited, and not only an expensive material made of a stainless steel rod is required, but also the gap below the bearing plate cannot be eliminated. For this reason, the problem of a decrease in the rust prevention effect with respect to a lock bolt made of a non-rust-proof steel rod connected to the lower portion of the head member due to the voids has not been solved.

特許第3998180号公報Japanese Patent No. 3998180

本発明は、以上のような従来の技術的状況に鑑み、支圧板の下方に対してグラウト材を隅々まで満遍なく確実に充填することができ、残留する空隙部を的確に解消することによりロックボルトの頭部に対する防錆効果の向上を図った使い勝手のよいグラウト充填用金具を提供することを目的とするものである。   In the present invention, in view of the above-described conventional technical situation, the grout material can be filled evenly and uniformly into the lower part of the bearing plate, and the lock can be obtained by accurately eliminating the remaining voids. An object of the present invention is to provide an easy-to-use grout filling metal fitting that improves the rust prevention effect on the head of the bolt.

前記課題を解決するため、本発明に係るグラウト充填用金具は、ロックボルトの頭部側に螺合可能な雌ネジを有し、かつ締付ナットに螺合可能な雄ネジを有するとともに、内部にグラウト材の注入路を有し、その注入路に連通した排出口を介してグラウト材をロックボルトの頭部側外周部に形成される空隙部へ充填するように構成したことを特徴とする。なお、前記ロックボルトの頭部側に螺合可能な雌ネジを、前記グラウト充填用金具を貫通させて形成するとともに、その雌ネジの途中に連通路を形成して前記排出口に連通し、前記雌ネジをグラウト材の注入路として兼用するようにしてもよい。   In order to solve the above-mentioned problems, a grout filling metal fitting according to the present invention has a female screw that can be screwed to the head side of the lock bolt, a male screw that can be screwed to a tightening nut, and an internal The grouting material has a pouring path, and the grouting material is filled into a gap formed in the outer peripheral portion on the head side of the lock bolt through a discharge port communicating with the pouring path. . A female screw that can be screwed to the head side of the lock bolt is formed through the grout filling metal fitting, and a communication path is formed in the middle of the female screw to communicate with the discharge port. The female screw may also be used as a grout material injection path.

本発明に係るグラウト充填用金具によれば、次の効果を得ることができる。
(1)支圧板から突出したグラウト充填用金具の内部に形成した注入路を介してロックボルトの頭部側外周部に形成される空隙部へグラウト材を充填するように構成したので、改めてグラウト材充填用の専用の注入路を形成することなく、グラウト材の充填が可能であるとともに、その支圧板から突出したグラウト充填用金具に対して締付ナットによる締付け作業が可能なことから、施工性が大幅に向上される。
(2)グラウト充填用金具の内部に形成した注入路を介して直接ロックボルト頭部の支圧板下方側の外周部に形成される空隙部の内部からグラウト材を充填することができるので、その空隙部の隅々まで満遍なくグラウト材を的確に充填することが可能であり、ロックボルト頭部の支圧板下方側外周部に残存する空隙部を確実に解消することができる。
(3)したがって、支圧板の下方のロックボルトの頭部側全体及びそのロックボルトの頭部側に装着されるグラウト充填用金具が、充填されたグラウト材によって的確に包まれ、空気との接触が確実に遮断されるので、きわめて有効な防錆効果が得られる。
(4)また、支圧板の下方の空隙部に対してグラウト材を簡便かつ的確に充填することができ、グラウト材が支圧板の下面の全面において密着した状態が容易に得られるので、その支圧板設置及びグラウト材充填作業の簡便化に有効であるとともに、締付ナットによる締付力に対しても支圧板の全面において的確に抵抗し得ることから従来のクラックの問題も解消できる。
According to the grout filling metal fitting according to the present invention, the following effects can be obtained.
(1) Since the grout material is filled in the gap formed in the outer peripheral portion of the head side of the lock bolt through the injection path formed inside the grout filling metal fitting protruding from the bearing plate, the grout is renewed. The grout material can be filled without forming a dedicated injection path for filling the material, and the grout filling metal fitting protruding from the bearing plate can be tightened with a tightening nut. Is greatly improved.
(2) Since the grout material can be filled directly from the inside of the gap formed in the outer peripheral portion on the lower side of the bearing plate of the lock bolt head through the injection path formed inside the grout filling metal fitting, It is possible to accurately fill the grout material evenly to every corner of the gap, and the gap remaining in the outer peripheral portion on the lower side of the bearing plate of the lock bolt head can be surely eliminated.
(3) Therefore, the entire head side of the lock bolt below the bearing plate and the grout filling fitting attached to the head side of the lock bolt are accurately wrapped by the filled grout material, and contact with air Is reliably cut off, so that an extremely effective rust prevention effect can be obtained.
(4) In addition, the grout material can be easily and accurately filled in the gap below the bearing plate, and the grout material can be easily adhered to the entire lower surface of the bearing plate. It is effective for simplifying the pressure plate installation and the grout material filling operation, and can also accurately resist the entire surface of the bearing plate against the tightening force of the tightening nut, so that the conventional cracking problem can be solved.

本発明の実施例に係るグラウト充填用金具の装着前の状態を示した正面図である。It is the front view which showed the state before mounting | wearing of the grout filling metal fitting based on the Example of this invention. 同グラウト充填用金具の装着状態を示した片側断面図である。It is the one side sectional view showing the wearing state of the metal fitting for grout filling. 同グラウト充填用金具を示した正面図である。It is the front view which showed the metal fitting for grout filling. 同グラウト充填用金具を示した底面図である。It is the bottom view which showed the metal fitting for grout filling. 同グラウト充填用金具を示した縦断面図である。It is the longitudinal cross-sectional view which showed the metal fitting for grout filling. 本発明の実施例に係るグラウト充填用金具を適用する場合の施工手順を示した作業説明図である。It is work explanatory drawing which showed the construction procedure in the case of applying the grout filling metal fitting which concerns on the Example of this invention. 同施工手順を示した作業説明図である。It is work explanatory drawing which showed the construction procedure. 同施工手順を片側断面で示した作業説明図である。It is operation | work explanatory drawing which showed the construction procedure in the one-side cross section. 同施工手順を片側断面で示した作業説明図である。It is operation | work explanatory drawing which showed the construction procedure in the one-side cross section. 同施工手順を片側断面で示した作業説明図である。It is operation | work explanatory drawing which showed the construction procedure in the one-side cross section. 他の適用場面における施工手順を片側断面で示した作業説明図である。It is the operation | work explanatory drawing which showed the construction procedure in the other application scene in the one-side cross section. 同施工手順を片側断面で示した作業説明図である。It is operation | work explanatory drawing which showed the construction procedure in the one-side cross section. 同施工手順を片側断面で示した作業説明図である。It is operation | work explanatory drawing which showed the construction procedure in the one-side cross section. 締付ナットによる他の締付け方法を片側断面で示した作業説明図である。It is operation | work explanatory drawing which showed the other clamping method with a clamping nut in the one-side cross section. 同締付け方法を片側断面で示した作業説明図である。It is operation | work explanatory drawing which showed the tightening method in the one-side cross section. 同締付け方法を片側断面で示した作業説明図である。It is operation | work explanatory drawing which showed the tightening method in the one-side cross section. 同締付け方法を片側断面で示した作業説明図である。It is operation | work explanatory drawing which showed the tightening method in the one-side cross section. 他の実施例を示した片側断面図である。It is the one side sectional view showing other examples. 従来の施工手順を示した作業説明図である。It is work explanatory drawing which showed the conventional construction procedure. 従来の施工手順を示した作業説明図である。It is work explanatory drawing which showed the conventional construction procedure. 従来の施工手順を示した作業説明図である。It is work explanatory drawing which showed the conventional construction procedure.

本発明に係るグラウト充填用金具は、ロックボルト側の具体的な構成に拘束されることはなく、種々の種類のロックボルトに対して広く適用することが可能である。また、そのグラウト充填用金具の材質に関しても特段の制約はなく、前記従来技術のようにステンレス棒鋼に限られるものではない。グラウト充填用金具のロックボルトの頭部側に形成される雌ネジは、そのグラウト充填用金具を貫通して形成し、グラウト材の注入路として兼用する形態でもよいし、有底状にグラウト充填用金具の途中まで形成し、その反対側にグラウト材の注入路を別個に形成する形態でもよい。また、その注入路に連通する排出口の設置数や設置部位は、グラウト材の充填のし易さなどに応じて自由な選定が可能である。なお、グラウト充填用金具に形成する締付ナットに螺合される雄ネジは、その余長の調整に十分な長さを有するものが望ましい。グラウト充填用金具の外周面の軸線方向全長に形成するようにしてもよい。   The grout filling metal fitting according to the present invention is not restricted by a specific configuration on the lock bolt side, and can be widely applied to various types of lock bolts. Moreover, there is no special restriction | limiting also regarding the material of the metal fitting for the grout, and it is not restricted to a stainless steel bar like the said prior art. The female screw formed on the head side of the lock bolt of the grout filling metal fitting may be formed so as to penetrate the grout filling metal fitting and also serve as a grout material injection path, or it may be grout filled with a bottom. It may be formed in the middle of the metal fitting, and a grout material injection path may be separately formed on the opposite side. In addition, the number and location of the outlets communicating with the injection path can be freely selected according to the ease of filling the grout material. It is desirable that the male screw screwed into the tightening nut formed on the grout filling metal has a sufficient length for adjusting the extra length. You may make it form in the axial direction full length of the outer peripheral surface of the metal fitting for grout filling.

図1〜図5は本発明の実施例に係るグラウト充填用金具を示したものである。図1はグラウト充填用金具の装着前の状態を示した正面図であり、図2はそのグラウト充填用金具の装着状態を示した片側断面図である。図示のように、本実施例に係るグラウト充填用金具1の場合には、内部を貫通する雌ネジ2が形成されており、この雌ネジ2をロックボルト3の外周面に形成された雄ネジ4に螺合することにより、ロックボルト3の頭部側に連結し得るように構成されている。この雌ネジ2は、グラウト充填用金具1を貫通して形成されていることから、本実施例の場合には、グラウト材の注入路としても用いられる。因みに、この雌ネジ2をグラウト充填用金具1の途中まで形成し、その反対側に専用のグラウト材注入路を形成する形態も可能である。   1 to 5 show a grout filling metal fitting according to an embodiment of the present invention. FIG. 1 is a front view showing a state before mounting a grout filling metal fitting, and FIG. 2 is a one-side sectional view showing a mounting state of the grout filling metal fitting. As shown in the figure, in the case of the grout filling metal fitting 1 according to the present embodiment, a female screw 2 penetrating the inside is formed, and this female screw 2 is a male screw formed on the outer peripheral surface of the lock bolt 3. 4 so that it can be connected to the head side of the lock bolt 3. Since the female screw 2 is formed so as to penetrate the grout filling metal fitting 1, it is also used as a grout material injection path in this embodiment. Incidentally, a form in which the female screw 2 is formed partway through the grout filling metal fitting 1 and a dedicated grout material injection path is formed on the opposite side is also possible.

図3はグラウト充填用金具1を示した正面図であり、図4はその底面図、図5は縦断面図である。図示のように、本実施例のグラウト充填用金具1の場合には、その外周面の地上側の上半部には締付ナットに螺合可能な雄ネジ5が形成され、地中側の下半部には複数のリブ6が形成されており、それらの雄ネジ5とリブ6との間の円周上にグラウト材の複数の排出口7が形成されている。また、図5の縦断面図に示したように、前記雌ネジ2の内部空間は連通路8を介して排出口7に連通され、それらの雌ネジ2の内部空間、連通路8、排出口7によりグラウト材の充填用流路が形成されている。なお、グラウト材との付着が十分確保できるなら、前記リブ6は設けなくてもよいし、さらに前記リブ6に替えてグラウト充填用金具1の外周面全長に雄ネジ5を形成することも可能である。   3 is a front view showing the grout filling metal fitting 1, FIG. 4 is a bottom view thereof, and FIG. 5 is a longitudinal sectional view thereof. As shown in the figure, in the case of the grout filling metal fitting 1 of this embodiment, a male screw 5 that can be screwed into a tightening nut is formed on the upper half of the outer peripheral surface of the ground side, A plurality of ribs 6 are formed in the lower half, and a plurality of outlets 7 for grout material are formed on the circumference between the male screw 5 and the rib 6. Further, as shown in the longitudinal sectional view of FIG. 5, the internal space of the female screw 2 is communicated with the discharge port 7 via the communication path 8, and the internal space of these female screw 2, the communication path 8, the discharge port 7, a grout filling path is formed. If the adhesion with the grout material can be sufficiently secured, the rib 6 may not be provided, and the male screw 5 may be formed on the entire outer peripheral surface of the grout filling fitting 1 in place of the rib 6. It is.

次に、図6〜図10に従い、本発明の実施例に係る前記グラウト充填用金具1を適用する場合の施工手順に関して説明する。図6に示したように、斜面からなる地盤9に形成した削孔10の内部にロックボルト3が設置された場合には、先ず前記ロックボルト3の外周面に形成した雄ネジ4の頭部側端部に対してグラウト充填用金具1の雌ネジ2を螺合し、そのグラウト充填用金具1の地盤9から突出する突出部分の長さを、支圧板の厚さや締付ナットの設置に必要な余長分を勘案しながら調整する。   Next, according to FIGS. 6-10, the construction procedure in the case of applying the said grout filling metal fitting 1 which concerns on the Example of this invention is demonstrated. As shown in FIG. 6, when the lock bolt 3 is installed inside the drilling hole 10 formed in the ground 9 having a slope, first, the head of the male screw 4 formed on the outer peripheral surface of the lock bolt 3. The female screw 2 of the grout filling metal fitting 1 is screwed into the side end, and the length of the protruding portion protruding from the ground 9 of the grout filling metal fitting 1 is set to the thickness of the bearing plate and the installation of the tightening nut. Adjust while taking into account the necessary extra length.

次に、図7に示したように、地盤9に形成した削孔10とグラウト充填用金具1との間の間隙部へ適宜方法によりセメントミルクなどのグラウト材11を注入する。これにより、図示のように、グラウト充填用金具1の一部がグラウト材11中に埋り、そのグラウト充填用金具1の下半部に形成した一部のリブ6もグラウト材11中に埋ることになる。したがって、このグラウト材11の固化によりグラウト充填用金具1の回転が防止される。因みに、このグラウト材11の注入時期に関しては、施工形態により変更も可能である。   Next, as shown in FIG. 7, a grout material 11 such as cement milk is injected into the gap between the hole 10 formed in the ground 9 and the grout filling metal fitting 1 by an appropriate method. As a result, as shown in the drawing, a part of the grout filling metal fitting 1 is buried in the grout material 11, and a part of the ribs 6 formed in the lower half of the grout filling metal fitting 1 is also buried in the grout material 11. Will be. Therefore, rotation of the grout filling metal fitting 1 is prevented by the solidification of the grout material 11. Incidentally, the injection time of the grout material 11 can be changed depending on the construction form.

さらに、図8に示したように、地盤9上に削孔10の上部を閉塞するように支圧板12を設置し、その支圧板12の中央部に形成した挿通孔を介して上方へ突出したグラウト充填用金具1の頭部側端部に対して締付ナット13を螺合して締付け作業が行われる。しかる後、図9に示したように、グラウト充填用金具1の内部に形成した雌ネジ2の内部空間をグラウト材の注入路として兼用し、前記連通路8と排出口7を介して支圧板12の下方の、先に注入された前記グラウト材11の上方に形成されるロックボルト3の頭部側外周部の空隙部に対してグラウト材14を充填する。しかして、本実施例に係るグラウト充填用金具1の場合には、前記排出口7の設置位置や設置数を適宜選定することにより、削孔10内でロックボルト3の頭部側外周部に形成される前記空隙部の内部へ直接的にグラウト材14を注入でき円滑な充填が可能なことから、その空隙部の隅々まで満遍なくグラウト材14を簡便かつ的確に充填することが可能である。その結果、支圧板12の下方に位置するロックボルト3の頭部側やグラウト充填用金具1がグラウト材11,14によって確実に包囲され空気との接触が遮断されるので、的確な防錆効果を簡便に確保することができる。図10はそのグラウト材14の充填後の状態を示したものである。因みに、前記支圧板12としては、図示のような平板状のものに限らず、種々の形態のものに適応可能である。   Further, as shown in FIG. 8, the bearing plate 12 is installed on the ground 9 so as to close the upper portion of the drilling hole 10, and protrudes upward through the insertion hole formed in the center portion of the bearing plate 12. A tightening operation is performed by screwing the tightening nut 13 into the head side end of the grout filling metal fitting 1. Thereafter, as shown in FIG. 9, the internal space of the female screw 2 formed inside the grout filling metal fitting 1 is also used as a grout material injection path, and the bearing plate is connected via the communication passage 8 and the discharge port 7. The grouting material 14 is filled in the gap portion of the outer peripheral portion on the head side of the lock bolt 3 formed below the grouting material 11 previously injected below 12. Thus, in the case of the grout filling metal fitting 1 according to the present embodiment, by appropriately selecting the installation position and the number of installation of the discharge port 7, the head bolt side outer peripheral portion of the lock bolt 3 is formed in the hole 10. Since the grout material 14 can be poured directly into the formed gap and smooth filling is possible, it is possible to fill the grout material 14 easily and accurately evenly to every corner of the gap. . As a result, the head side of the lock bolt 3 located below the bearing plate 12 and the grout filling fitting 1 are reliably surrounded by the grout materials 11 and 14 and the contact with air is cut off, so that an accurate rust prevention effect is achieved. Can be secured easily. FIG. 10 shows a state after the grout material 14 is filled. Incidentally, the pressure bearing plate 12 is not limited to a flat plate as shown, but can be applied to various forms.

以上のように、本発明の実施例に係るグラウト充填用金具1を適用した場合には、グラウト充填用金具1をロックボルト3の頭部側に螺合して連結するだけでグラウト材14を注入する充填用流路が同時に備えられ、その充填用流路のための新たな設置作業を省略できることから、グラウト材14の充填作業の作業性が大幅に向上される。しかも、グラウト充填用金具1の内部に形成されたグラウト材の注入路を経て、ロックボルト3の頭部側外周部に形成される空隙部の内部からグラウト材14をより円滑に注入できるので、その空隙部の隅々まで満遍なくグラウト材14を簡便かつ的確に充填することが可能であり、延いてはロックボルト3の頭部側やグラウト充填用金具1に対する的確な防錆効果が得られる。したがって、このグラウト充填用金具1の材質に関し、前記従来技術のようにステンレス棒鋼に限定する必要もない。   As described above, when the grout filling metal fitting 1 according to the embodiment of the present invention is applied, the grout material 14 is simply connected by screwing the grout filling metal fitting 1 to the head side of the lock bolt 3. Since the filling flow path to be injected is provided at the same time and a new installation work for the filling flow path can be omitted, the workability of the filling work of the grout material 14 is greatly improved. Moreover, since the grout material 14 can be injected more smoothly from the inside of the gap formed in the outer periphery of the head side of the lock bolt 3 through the injection path of the grout material formed inside the grout filling metal fitting 1, It is possible to easily and accurately fill the grout material 14 evenly to every corner of the gap, and as a result, an accurate rust prevention effect on the head side of the lock bolt 3 and the grout filling metal fitting 1 can be obtained. Therefore, it is not necessary to limit the material of the grout filling metal fitting 1 to the stainless steel bar as in the prior art.

図11〜図13は他の適用場面における施工手順を片側断面で示した作業説明図である。図示のように、この適用場面では、前記地盤9に形成した削孔10の上部が崩れて凹部15が形成され、空隙部が大きくなった場合に対して前記グラウト充填用金具1を適用した場合を例示したものであり、その施工手順に関しては上述の施工手順と異なるところはなく、上述の施工手順がそのまま適用されることになる。このように、本発明に係るグラウト充填用金具は、種々の形態の空隙部に対応してグラウト材を簡便かつ的確に充填して空隙部を確実に解消することができる。   FIG. 11 to FIG. 13 are work explanatory views showing the construction procedure in other application scenes in a cross section on one side. As shown in the figure, in this application scene, when the grout filling metal fitting 1 is applied to the case where the upper portion of the drilling hole 10 formed in the ground 9 collapses to form a recess 15 and the gap becomes larger. The construction procedure is not different from the construction procedure described above, and the construction procedure is applied as it is. As described above, the grout filling metal fitting according to the present invention can easily and accurately fill the grout material in correspondence with various types of voids to reliably eliminate the voids.

なお、上述の実施例においては、図8に示したように、締付ナット13による締付け作業を行う際には、グラウト充填用金具1の一部がグラウト材11中に埋り回転が阻止された状態にあり、締付ナット13の締付力によるグラウト充填用金具1の供回りは防止されるが、グラウト充填用金具1の全体がグラウト材11の外方に位置する場合など、当該施工形態によっては、グラウト充填用金具1の供回りの問題が生じる場合がある。図14〜図17はそのような場合にグラウト充填用金具1の供回りを防止するための他の締付け方法を片側断面で示した作業説明図である。   In the above-described embodiment, as shown in FIG. 8, when performing the tightening operation with the tightening nut 13, a part of the grout filling metal fitting 1 is buried in the grout material 11 and rotation is prevented. The grout filling metal fitting 1 is prevented from being rotated by the tightening force of the tightening nut 13, but the grout filling metal fitting 1 is located outside the grout material 11, for example. Depending on the form, there may be a problem with the rotation of the grout filling metal fitting 1. FIG. 14 to FIG. 17 are operation explanatory views showing other tightening methods for preventing the rotation of the grout filling metal fitting 1 in such a case in a cross section on one side.

しかして、地盤9に形成された削孔10の内部にロックボルト3が設置され、そのロックボルト3の頭部側に対してグラウト充填用金具1が装着され、削孔10の上部に支圧板12が設置されるとともに、支圧板12から上方へ突出するグラウト充填用金具1の突出長さの調整が済んだ場合には、締付ナット13による仮締め作業が行われることになる。その際の締付ナット13とグラウト充填用金具1との供回りを防ぐ締付け方法として、次のような手法が可能である。先ず、図14に示したように、ロックボルト3と同様の構成で短尺の部材からなるトルク導入治具16をグラウト充填用金具1の雌ネジ2に螺入して締め込む。これにより、ロックボルト3、グラウト充填用金具1及びトルク導入治具16が一体化され、ロックボルト3に対するグラウト充填用金具1の相対的回転が防止された状態が得られる。そこで、次に図15に示したように、締付ナット13を支圧板12の上方からグラウト充填用金具1の雄ネジ5に螺合し、図16のように締付けてもグラウト充填用金具1の供回りが防止されるので、締付ナット13を簡便かつ的確に締付けることができる。しかる後、図17に示したように、トルク導入治具16をグラウト充填用金具1の雌ネジ2から取外すことにより締付け作業が完了することになる。   Thus, the lock bolt 3 is installed inside the drilling hole 10 formed in the ground 9, and the grout filling metal fitting 1 is attached to the head side of the lock bolt 3. 12 is installed, and when the adjustment of the protruding length of the grout filling metal fitting 1 protruding upward from the bearing plate 12 is completed, a temporary tightening operation using the tightening nut 13 is performed. As a tightening method for preventing the rotation of the tightening nut 13 and the grout filling metal fitting 1 at that time, the following method is possible. First, as shown in FIG. 14, a torque introducing jig 16 made of a short member having the same configuration as that of the lock bolt 3 is screwed into the female screw 2 of the grout filling metal fitting 1 and tightened. Thereby, the lock bolt 3, the grout filling metal fitting 1 and the torque introduction jig 16 are integrated, and a state in which the relative rotation of the grout filling metal fitting 1 with respect to the lock bolt 3 is prevented is obtained. Therefore, as shown in FIG. 15, the grout filling metal fitting 1 is screwed into the male screw 5 of the grout filling metal fitting 1 from above the bearing plate 12 and tightened as shown in FIG. Therefore, the tightening nut 13 can be easily and accurately tightened. Thereafter, as shown in FIG. 17, the tightening operation is completed by removing the torque introducing jig 16 from the female screw 2 of the grout filling metal fitting 1.

図18は他の実施例を示した片側断面図である。本実施例は、前記支圧板12の下面に凹部を形成して適宜のパッキン17を嵌入したものであり、そのパッキン17により地盤9と支圧板12との間からグラウト材が外部へ流出しないように構成したものである。これにより、グラウト充填用金具1の内部に形成した雌ネジ2などからなるグラウト材の注入路を介して、支圧板12の下方のロックボルト3の頭部側やグラウト充填用金具1の外周部に形成される空隙部に対してグラウト材14を充填する際の、グラウト材14の外部への流出が効果的に防止され、前記空隙部の隅々までグラウト材14をより的確に充填することができる。   FIG. 18 is a half sectional view showing another embodiment. In this embodiment, a concave portion is formed on the lower surface of the bearing plate 12 and an appropriate packing 17 is inserted. The packing 17 prevents the grout material from flowing out between the ground 9 and the bearing plate 12. It is configured. As a result, the head side of the lock bolt 3 below the bearing plate 12 and the outer peripheral portion of the grout filling metal 1 through the grout material injection path formed of the female screw 2 and the like formed inside the grout filling metal 1. When the grouting material 14 is filled in the gap portion formed in the outer space, the grouting material 14 is effectively prevented from flowing out to the outside, and the grouting material 14 is more accurately filled to every corner of the gap portion. Can do.

1:グラウト充填用金具、2:雌ネジ、3:ロックボルト、4,5:雄ネジ、6:リブ、7:排出口、8:連通路、9:地盤、10:削孔、11:グラウト材、12:支圧板、13:締付ナット、14:グラウト材、15:凹部、16:トルク導入治具、17:パッキン   1: Grouting metal fitting, 2: Female screw, 3: Lock bolt, 4, 5: Male screw, 6: Rib, 7: Discharge port, 8: Communication path, 9: Ground, 10: Drilling hole, 11: Grout Material: 12: bearing plate, 13: tightening nut, 14: grout material, 15: recess, 16: torque introduction jig, 17: packing

Claims (2)

ロックボルトの頭部側に螺合可能な雌ネジを有し、かつ締付ナットに螺合可能な雄ネジを有するとともに、内部にグラウト材の注入路を有し、その注入路に連通した排出口を介してグラウト材をロックボルトの頭部側外周部に形成される空隙部へ充填するように構成したことを特徴とするグラウト充填用金具。   The lock bolt has a female screw that can be screwed to the head side, a male screw that can be screwed to the tightening nut, and an injection path for grout material inside, and a drain communicating with the injection path. A grout filling metal fitting configured to fill a gap formed in the outer periphery of the lock bolt with a grout material through an outlet. 前記ロックボルトの頭部側に螺合可能な雌ネジを、前記グラウト充填用金具を貫通させて形成するとともに、その雌ネジの途中に連通路を形成して前記排出口に連通し、前記雌ネジをグラウト材の注入路として兼用することを特徴とする請求項1に記載のグラウト充填用金具。   A female screw that can be screwed to the head side of the lock bolt is formed by penetrating the grout filling metal fitting, and a communication path is formed in the middle of the female screw to communicate with the discharge port, 2. The grout filling metal fitting according to claim 1, wherein the screw is also used as a grout material injection path.
JP2009154663A 2009-06-30 2009-06-30 Grout filling bracket Active JP5241027B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009154663A JP5241027B2 (en) 2009-06-30 2009-06-30 Grout filling bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009154663A JP5241027B2 (en) 2009-06-30 2009-06-30 Grout filling bracket

Publications (2)

Publication Number Publication Date
JP2011012389A JP2011012389A (en) 2011-01-20
JP5241027B2 true JP5241027B2 (en) 2013-07-17

Family

ID=43591555

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009154663A Active JP5241027B2 (en) 2009-06-30 2009-06-30 Grout filling bracket

Country Status (1)

Country Link
JP (1) JP5241027B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE427764B (en) * 1979-03-09 1983-05-02 Atlas Copco Ab MOUNTAIN CULTURAL PROCEDURES REALLY RUCH MOUNTED MOUNTAIN
AU2008207662B2 (en) * 2007-09-04 2015-02-05 Fci Holdings Delaware, Inc. End coupling for a rock bolt

Also Published As

Publication number Publication date
JP2011012389A (en) 2011-01-20

Similar Documents

Publication Publication Date Title
CN201202890Y (en) Novel flexible water-proof sleeve pipe for pipeline mounting construction
KR20100037696A (en) A embeded anchor
JP5322300B2 (en) How to install rock bolts
JP5241027B2 (en) Grout filling bracket
JP3195881U (en) Concave hardware for filling grout material
JP6480269B2 (en) Formwork support
JP2009280958A (en) Steel plate concrete structure and construction method for steel plate concrete structure
JP4421123B2 (en) Construction method of underground outer wall of structure
JP2976292B2 (en) Construction method of pre-installed waterproof underground wall and separator device applied to the construction method
JP3929386B2 (en) Repair method and construction method
JP6711779B2 (en) Fixing material injection method for post injection type rock bolt
JP2715947B2 (en) Ceramic fasteners for burying concrete walls
CN110778028A (en) Grouting sleeve assembly and construction method thereof
JP3889994B2 (en) Muscle joint device and concrete structure
JP2004270155A (en) Water stopping material injection method and levee body
JP3529561B2 (en) segment
KR20010072580A (en) Device for a rock wall
JP4141888B2 (en) segment
JP3053221U (en) Separator device applied to the construction of a waterproof underground wall
JP2010001644A (en) Crack-inducing joint, screw for fixing the same, and crack-inducing waterproof structure and crack-inducing waterproofing method for concrete structure using them
KR200295874Y1 (en) Anchor plate
JP3459629B2 (en) Anchor anchoring method and anchor anchoring structure
JP2003294189A (en) Plug for testing of piping work
JP2002294665A (en) Work method for lining inner surfaces of water channel
JP2004124469A (en) Metal cylindrical joint installable in manhole formed with rubber ring

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120511

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130325

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130327

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130401

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160412

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5241027

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150