JP5225875B2 - Gas shut-off device - Google Patents

Gas shut-off device Download PDF

Info

Publication number
JP5225875B2
JP5225875B2 JP2009015206A JP2009015206A JP5225875B2 JP 5225875 B2 JP5225875 B2 JP 5225875B2 JP 2009015206 A JP2009015206 A JP 2009015206A JP 2009015206 A JP2009015206 A JP 2009015206A JP 5225875 B2 JP5225875 B2 JP 5225875B2
Authority
JP
Japan
Prior art keywords
inspection
count
inspection interval
output
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009015206A
Other languages
Japanese (ja)
Other versions
JP2010175267A (en
Inventor
光男 横畑
三男 難波
和男 久保
尚 齋藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
High Pressure Gas Safety Institute of Japan
Panasonic Corp
Panasonic Holdings Corp
Original Assignee
High Pressure Gas Safety Institute of Japan
Panasonic Corp
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by High Pressure Gas Safety Institute of Japan, Panasonic Corp, Matsushita Electric Industrial Co Ltd filed Critical High Pressure Gas Safety Institute of Japan
Priority to JP2009015206A priority Critical patent/JP5225875B2/en
Publication of JP2010175267A publication Critical patent/JP2010175267A/en
Application granted granted Critical
Publication of JP5225875B2 publication Critical patent/JP5225875B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Description

本発明は、ガス供給設備やガス消費設備の定期的な点検の管理を行うガス遮断装置に関するものである。   The present invention relates to a gas shut-off device that manages periodic inspection of gas supply facilities and gas consumption facilities.

近年、ガス機器の経年劣化等による事故が増加し、また消費生活用製品安全法の改正により特定機器の点検が求められている。また、事業者においても供給設備の点検や機器の調査等の保安業務が重要視されている。   In recent years, accidents due to aging of gas appliances have increased, and inspection of specific appliances has been required due to revisions to the Consumer Product Safety Act. Business operators also place importance on security operations such as inspection of supply facilities and investigation of equipment.

従来この種のガス遮断装置としては、図7に示すように、制御部10がボンベ交換する際にボンベリセット手段14からボンベ交換信号を受信すると、遮断弁1の閉及び開動作を行わせ、弁閉状態検出部5及び弁開状態検出部6からの出力により、そのいずれもが正常であることを検出して、検査終了信号が予め定められた所定の時間内に制御部10に入力されるか否かにより遮断弁1の正常、異常を判定し、センターに通信などで通報することにより、自動的に点検作業を行うことができるようになっていた(例えば特許文献1参照)。
特許第3733646号公報
Conventionally, as this kind of gas shut-off device, as shown in FIG. 7, when the control unit 10 receives a cylinder replacement signal from the cylinder reset means 14 when the cylinder is replaced, the shut-off valve 1 is closed and opened. The outputs from the valve closed state detection unit 5 and the valve open state detection unit 6 detect that both are normal, and an inspection end signal is input to the control unit 10 within a predetermined time. Whether the shutoff valve 1 is normal or abnormal is determined depending on whether or not it is, and the center can be notified by communication or the like, so that the inspection work can be automatically performed (see, for example, Patent Document 1).
Japanese Patent No. 3733646

しかしながら、前記従来の構成では、自動的に点検作業を行うことにより定期検査のために改めて係員を各家庭に派遣する必要性がなく、省力化が可能になるが、定期的な点検や調査がなされない可能性があるという課題があった。   However, in the above-described conventional configuration, it is not necessary to send a staff member to each household again for periodic inspection by automatically performing inspection work, and it is possible to save labor. There was a problem that it might not be done.

本発明は、前記従来の課題を解決するもので、所定の点検時期になると外部に通信し、現場で初期化を行わないと繰り返し外部に通信する構成としたガス遮断装置を提供することを目的とする。   The present invention solves the above-described conventional problems, and an object thereof is to provide a gas shut-off device configured to communicate with the outside when a predetermined inspection time comes and to repeatedly communicate with the outside unless initialization is performed on site. And

前記従来の課題を解決するために、本発明のガス遮断装置は、ガス供給管に接続され、ガスの供給や遮断を行う遮断手段と、遮断手段を制御する制御手段と、外部との通信が可能な外部通信手段と、点検間隔を自動でカウントする点検間隔カウント手段と、作業者の点検実施後の所定操作により点検済情報を出力する点検済情報出力手段とを備え、制御手段は、点検済情報出力手段からの出力前に点検間隔カウント手段が所定値に達すると、外部通信手段に出力して外部に通信するとともに第2点検間隔カウント手段を初期化し、第2点検間隔カウント手段が第2所定値に達すると、第2点検間隔カウント手段を初期化し、外部に通信し、以降、点検済情報出力手段からの出力があるまで、第2点検間隔カウント手段が第2所定値に達する度に第2点検間隔カウント手段の初期化及び外部通信する構成としたものである。   In order to solve the above-described conventional problems, the gas shutoff device according to the present invention is connected to a gas supply pipe, and includes a shutoff means for supplying and shutting off gas, a control means for controlling the shutoff means, and communication with the outside. A possible external communication means, an inspection interval counting means for automatically counting the inspection interval, and an inspected information output means for outputting inspected information by a predetermined operation after the operator performs the inspection. When the inspection interval counting means reaches a predetermined value before output from the completed information output means, the second inspection interval counting means is output to the external communication means and communicated to the outside and the second inspection interval counting means is initialized. 2 When the predetermined value is reached, the second inspection interval counting means is initialized, communicated to the outside, and thereafter the second inspection interval counting means reaches the second predetermined value until there is an output from the inspected information output means. It is obtained by a configuration that initializes and external communication of the second inspection interval counting means.

本発明のガス遮断装置によれば、定期的な点検を確実に実施することができ、たとえ実施されない場合でも、繰り返し外部通信され、点検忘れ等を防止することができ、安全性を向上することができる。   According to the gas shut-off device of the present invention, periodic inspection can be surely carried out, and even when not carried out, external communication is repeatedly performed, forgetting to check can be prevented, and safety is improved. Can do.

第1の発明は、ガス供給管に接続され、ガスの供給や遮断を行う遮断手段と、遮断手段
を制御する制御手段と、外部との通信が可能な外部通信手段と、点検間隔を自動でカウントする点検間隔カウント手段と、作業者の点検実施後の所定操作により点検済情報を出力する点検済情報出力手段とを備え、制御手段は、点検済情報出力手段からの出力により、点検間隔カウント手段のカウント値を初期化するとともに、点検済情報出力手段からの出力前に点検間隔カウント手段のカウント値が所定値に達すると、外部通信手段に出力して外部に通信する構成にしたものである。これにより、定期的な点検を確実に実施することができ、安全性を向上することができる。
According to a first aspect of the present invention, there is provided a shut-off means connected to the gas supply pipe for supplying and shutting off the gas, a control means for controlling the shut-off means, an external communication means capable of communicating with the outside, and an inspection interval automatically. An inspection interval counting means for counting, and an inspected information output means for outputting inspected information by a predetermined operation after the operator performs the inspection, and the control means counts the inspection interval by the output from the inspected information output means. In addition to initializing the count value of the means, when the count value of the inspection interval count means reaches a predetermined value before output from the inspected information output means, it is configured to output to the external communication means and communicate with the outside is there. Thereby, a regular check can be implemented reliably and safety can be improved.

第2の発明は、特に、第1の発明の制御手段を、点検間隔カウント手段のカウント値が所定値に達すると、第2点検間隔カウント手段を初期化し、第2点検間隔カウント手段にカウント開始出力を行い、第2点検間隔カウント手段のカウント値が第2所定値に達するまでに点検済情報出力手段からの出力があると、点検間隔カウント手段のカウント値の初期化、及び第2点検間隔カウント手段のカウント値の初期化、第2点検間隔カウント手段にカウント出力を行うとともに、第2点検間隔カウント手段のカウント値が第2所定値に達すると、第2点検間隔カウント手段のカウント値の初期化及び外部通信手段に出力して外部に通信し、以降、点検済情報出力手段からの出力があるまで、第2点検間隔カウント手段のカウント値が第2所定値に達する度に第2点検間隔カウント手段のカウント値の初期化及び外部通信手段に出力して外部に通信する構成にしたものである。これにより、定期的な点検を確実に実施することができ、たとえ実施されない場合でも、繰り返し外部通信され、点検忘れ等を防止することができ、安全性を向上することができる。   In particular, the second invention initializes the second inspection interval counting means when the count value of the inspection interval counting means reaches a predetermined value, and starts counting to the second inspection interval counting means. If there is an output from the inspected information output means until the count value of the second inspection interval count means reaches the second predetermined value, the count value of the inspection interval count means is initialized, and the second inspection interval The count value of the count means is initialized, the count value is output to the second check interval count means, and when the count value of the second check interval count means reaches the second predetermined value, the count value of the second check interval count means is set. Initialization and output to external communication means to communicate with the outside, and thereafter the count value of the second inspection interval count means is a second predetermined value until there is an output from the inspected information output means Each time it reaches output to initialize and external communication means a count value of the second inspection interval counting means is obtained by a configuration in which a communication to the outside. Accordingly, periodic inspection can be performed reliably, and even if not performed, external communication is repeatedly performed, forgetting to check can be prevented, and safety can be improved.

第3の発明は、特に、第1の発明の制御手段を、点検間隔カウント手段のカウント値が所定値に達する前に、通信手段を備えた宅内表示装置との通信が可能な宅内通信手段に点検時期を出力して、宅内表示装置に通信する構成にしたものである。これにより、事業者による点検が近づいていることを顧客に知らせることで、顧客の保安意識を高めることができる。   In particular, the third aspect of the invention relates to the in-home communication means capable of communicating with the in-home display device provided with the communication means before the count value of the inspection interval count means reaches a predetermined value. The inspection time is output and communicated to the home display device. Thereby, a customer's safety consciousness can be raised by notifying a customer that the inspection by a business operator is approaching.

第4の発明は、特に、第1の発明の制御手段を、点検間隔カウント手段のカウント値が所定値に達すると、宅内表示装置に事業者への連絡を促す表示を行うように宅内通信手段に出力する構成にしたものである。これにより、事業者による点検が必要なことを使用者に知らせることで、顧客の保安意識を高め、また点検がなされない場合も、事業者に連絡することで点検を実施することができ、安全性を向上することができる。   According to a fourth aspect of the present invention, in particular, the control means of the first aspect of the invention is configured so that when the count value of the inspection interval count means reaches a predetermined value, the in-home communication means performs a display prompting the in-home display device to contact the operator. Is configured to output to. As a result, by informing the user that inspection by the operator is necessary, the customer's safety awareness is raised, and even if no inspection is performed, the operator can be inspected by contacting the operator, Can be improved.

第5の発明は、特に、第1の発明の制御手段を、宅内表示装置での所定操作による出力が宅内通信手段に入力された場合に、少なくとも点検間隔カウント手段あるいは第2点検間隔カウント手段のカウント値を初期化し、外部通信手段に出力して外部に通信する構成にしたものである。これにより、事業者による点検が実施されたことを、顧客が確認したことで、確実に点検が実施された記録として残すことができ、また顧客の安心感を高めることができる。   The fifth aspect of the invention is that the control means of the first aspect of the invention is characterized in that at least the inspection interval counting means or the second inspection interval counting means when the output by a predetermined operation on the in-home display device is input to the in-home communication means. The count value is initialized, output to an external communication means, and communicated to the outside. Thereby, when the customer confirms that the inspection by the operator has been carried out, it can be left as a record that the inspection has been carried out reliably, and the customer's sense of security can be enhanced.

第6の発明は、第1から第5のいずれか1つの発明に記載のガス遮断装置の全てもしくは一部として、コンピュータを機能させるプログラムである。そして、プログラムであるので汎用コンピュータやサーバーを用いて本発明のプログラムの少なくとも一部を容易に実現できる。また記録媒体に記録したり通信回線を用いてプログラムを配信したりすることでプログラムの配布やインストール作業が簡単にできる。   A sixth invention is a program for causing a computer to function as all or part of the gas shut-off device according to any one of the first to fifth inventions. And since it is a program, at least one part of the program of this invention is easily realizable using a general purpose computer or a server. Also, program distribution and installation can be simplified by recording on a recording medium or distributing a program using a communication line.

本発明は、第1の発明から第5の発明の要部を実施の形態とすることにより本発明の目的を達成できるので、各請求項に対応する実施の形態の詳細を、以下に図面を参照しながら説明し、本発明を実施するための最良の形態の説明とする。なお、本実施の形態によって本発明が限定されるものではない。また、各実施の形態の説明において、同一構成並び
に同一作用効果を奏するところには、同一符号を付して重複した説明を行わないものとする。
Since the present invention can achieve the object of the present invention by making the main part of the first to fifth inventions into an embodiment, details of the embodiment corresponding to each claim will be described below with reference to the drawings. The description will be given with reference to the best mode for carrying out the present invention. Note that the present invention is not limited to the present embodiment. Further, in the description of each embodiment, the same configuration and the same function and effect are given the same reference numerals, and redundant description will not be given.

(実施の形態1)
図1は、本発明の実施の形態1におけるガス遮断装置のブロック図である。
(Embodiment 1)
FIG. 1 is a block diagram of a gas cutoff device according to Embodiment 1 of the present invention.

図1において、20はガス遮断装置であり、ガス供給管21の途中に設けられ、その下流側の配管には各顧客宅内に設置された1台以上のガス器具が接続されている。   In FIG. 1, reference numeral 20 denotes a gas shut-off device, which is provided in the middle of a gas supply pipe 21, and one or more gas appliances installed in each customer's house are connected to the downstream piping.

ガス遮断装置20は、流量計測手段2、遮断手段22、制御手段23、点検済情報出力手段24、外部通信手段25、宅内通信手段26、点検間隔カウント手段27、第2点検間隔カウント手段28を有して構成される。   The gas shut-off device 20 includes a flow rate measuring means 2, a shut-off means 22, a control means 23, an inspected information output means 24, an external communication means 25, an in-home communication means 26, an inspecting interval counting means 27, and a second inspecting interval counting means 28. It is configured.

流量計測手段2は、ガス供給管21の経路中に接続され、ガス供給管21内のガス流量を計測するものである。   The flow rate measuring means 2 is connected in the path of the gas supply pipe 21 and measures the gas flow rate in the gas supply pipe 21.

遮断手段22は、ガス供給管21の経路中に接続され、制御手段23からの指示に基づいてガス供給管21を閉塞してガスの供給を遮断するものである。   The shut-off means 22 is connected in the path of the gas supply pipe 21 and closes the gas supply pipe 21 based on an instruction from the control means 23 to shut off the gas supply.

制御手段23は、ガス遮断装置20内の各部の動作制御の他、各種警告や遮断などの保安処理等をおこなうものである。マイクロコンピュータおよびその周辺回路からなる制御手段23は、所定の動作プログラムを実行して対応する処理をおこなうことにより、各機能が実現される。   The control means 23 performs a security process such as various warnings and shut-offs in addition to operation control of each part in the gas shut-off device 20. The control means 23 composed of a microcomputer and its peripheral circuits implements each function by executing a predetermined operation program and performing corresponding processing.

外部通信手段25は、有線または無線による通信機能を有し、例えば公衆回線を介して管理センター(図示せず)と接続される。この外部通信手段25は、各種情報及びコマンドや信号を管理センターとの間で授受するものである。   The external communication means 25 has a wired or wireless communication function, and is connected to a management center (not shown) via a public line, for example. The external communication means 25 exchanges various information, commands and signals with the management center.

管理センターは、コンピュータ等を有して構成され、管理部の機能を実現するもので、コンピュータ等を構成するプロセッサ及び動作プログラムを含み、プロセッサにおいて所定の動作プログラムを実行して対応する処理をおこなうことにより、各機能が実現される。   The management center is configured to include a computer and the like, and realizes the function of the management unit. The management center includes a processor and an operation program that configure the computer and the like, and performs a corresponding process by executing a predetermined operation program in the processor. Thus, each function is realized.

宅内通信手段26は、宅内表示装置29と各種情報通信し、宅内表示装置29に各種表示を行うとともに、宅内表示装置29で操作された情報を入力する。   The in-home communication means 26 communicates various information with the in-home display device 29, performs various displays on the in-home display device 29, and inputs information operated on the in-home display device 29.

点検間隔カウント手段27は、所定の点検期間をカウントするものである。以上のように構成されたガス遮断装置について、以下点検期間到達時の処理に関して、その動作について説明する。   The inspection interval counting unit 27 counts a predetermined inspection period. The operation of the gas shut-off device configured as described above will be described below with respect to processing when the inspection period is reached.

図2は本発明の実施の形態1におけるガス遮断装置の点検期間到達時の処理を示すフローチャートである。   FIG. 2 is a flowchart showing a process when the inspection period of the gas cutoff device in Embodiment 1 of the present invention is reached.

図2において、制御手段23はステップ(以下、Sと表示する)1で、点検済情報出力手段24から点検済出力があったかどうか判定し、点検済出力がなければS3へ進む。S1で点検済出力があった場合は、点検間隔カウント手段27の点検間隔カウンタを初期化する(S2)。S3では点検間隔カウント手段27の点検間隔カウンタが所定値に達したかどうか判定し、所定値に達した場合は、外部通信手段25に出力して外部に通信する(S4)。   In FIG. 2, the control means 23 determines whether or not there is an inspected output from the inspected information output means 24 in step (hereinafter referred to as S) 1, and proceeds to S3 if there is no inspected output. If there is an inspected output in S1, the inspection interval counter of the inspection interval counting means 27 is initialized (S2). In S3, it is determined whether or not the inspection interval counter of the inspection interval counting means 27 has reached a predetermined value, and when it reaches the predetermined value, it is output to the external communication means 25 and communicated outside (S4).

以上のように、本実施の形態においては、所定の期間が経過するまでに点検がなされない場合には、外部に通信することにより、定期的な点検を確実に実施することができ、安全性を向上することができる。   As described above, in the present embodiment, when the inspection is not performed until the predetermined period elapses, the periodic inspection can be surely performed by communicating with the outside, and the safety is ensured. Can be improved.

(実施の形態2)
図3は、本発明の実施の形態2におけるガス遮断装置の点検期間到達以降の処理を示すフローチャートである。実施の形態1における図1に示す制御手段23とプログラムのみが異なるだけで、ガス遮断装置のブロック図は図1と同一である。すなわち、制御手段23は図3に示すS5からS16の制御フローを実行するプログラムを格納したものである。
(Embodiment 2)
FIG. 3 is a flowchart showing processing after the inspection period of the gas cutoff device according to Embodiment 2 of the present invention is reached. The block diagram of the gas shut-off device is the same as that of FIG. 1, except that the control unit 23 shown in FIG. That is, the control means 23 stores a program for executing the control flow from S5 to S16 shown in FIG.

図3において、制御手段23は、点検済情報出力手段24から点検済出力があったかどうか判定し(S5)、点検済出力がなければS9へ進む。S5で点検済出力があった場合は、点検間隔カウント手段27の点検間隔カウンタを初期化し(S6)、S7では第2点検間隔カウント手段28の第2点検間隔カウンタを初期化し、第2点検間隔カウント手段28のカウントを停止し(S8)、処理を抜ける。S9では、第2点検間隔カウント手段28のカウントが停止しているかどうか判定し、カウントが停止している場合にはS10へ進み、カウントが停止していない場合にはS14へ進む。S10では点検間隔カウント手段27の点検間隔カウンタが所定値に達したかどうか判定し、所定値に達した場合は、第2点検間隔カウント手段28の第2点検間隔カウンタを初期化し(S11)、第2点検間隔カウント手段28のカウントを開始し(S12)、外部通信手段25に出力して外部に通信する(S13)。S14では、第2点検間隔カウント手段28の第2点検間隔カウンタが第2所定値に達したかどうか判定し、第2所定値に達した場合は、第2点検間隔カウント手段28の第2点検間隔カウンタを初期化し(S15)、外部通信手段25に出力して外部に通信する(S16)。   In FIG. 3, the control means 23 determines whether or not there is an inspected output from the inspected information output means 24 (S5), and if there is no inspected output, the process proceeds to S9. If there is an inspected output in S5, the inspection interval counter of the inspection interval counting means 27 is initialized (S6). In S7, the second inspection interval counter of the second inspection interval counting means 28 is initialized. The count of the counting means 28 is stopped (S8), and the process is exited. In S9, it is determined whether the count of the second inspection interval counting means 28 is stopped. If the count is stopped, the process proceeds to S10, and if the count is not stopped, the process proceeds to S14. In S10, it is determined whether the inspection interval counter of the inspection interval counting means 27 has reached a predetermined value. If the predetermined value is reached, the second inspection interval counter of the second inspection interval counting means 28 is initialized (S11), The second inspection interval counting means 28 starts counting (S12), and is output to the external communication means 25 to communicate with the outside (S13). In S14, it is determined whether or not the second inspection interval counter of the second inspection interval counting means 28 has reached the second predetermined value. If the second inspection value has reached the second predetermined value, the second inspection interval counting means 28 performs the second inspection. The interval counter is initialized (S15) and output to the external communication means 25 to communicate with the outside (S16).

以上のように、本実施の形態においては、所定の期間が経過するまでに点検がなされない場合には、外部に通信することにより、定期的な点検を確実に実施することができ、たとえ実施されない場合でも、繰り返し外部通信され、点検忘れ等を防止することができ、安全性を向上することができる。   As described above, in the present embodiment, when the inspection is not performed until the predetermined period elapses, the periodic inspection can be surely performed by communicating with the outside. Even when not performed, external communication is repeatedly performed, so that forgetting to check can be prevented, and safety can be improved.

(実施の形態3)
図4は、本発明の実施の形態3におけるガス遮断装置の点検時期表示処理を示すフローチャートである。実施の形態1における図1に示す制御手段23とプログラムのみが異なるだけで、ガス遮断装置のブロック図は図1と同一である。すなわち、制御手段23は図4に示すS17からS22の制御フローを実行するプログラムを格納したものである。
(Embodiment 3)
FIG. 4 is a flowchart showing an inspection time display process of the gas cutoff device according to Embodiment 3 of the present invention. The block diagram of the gas shut-off device is the same as that of FIG. 1, except that the control unit 23 shown in FIG. That is, the control means 23 stores a program for executing the control flow from S17 to S22 shown in FIG.

図4において、制御手段23は、点検済情報出力手段24から点検済出力があったかどうか判定し(S17)、点検済出力がなければS19へ進む。S17で点検済出力があった場合は、宅内通信手段26に出力し、宅内表示装置29の点検時期表示をクリアする(S18)。S19では宅内表示装置29に点検時期が未表示かどうか判定し、点検時期未表示の場合は、点検間隔カウント手段27の点検間隔カウンタが第3所定値に達したかどうか判定し(S20)、第3所定値に達した場合は、点検間隔カウント手段27の点検間隔カウンタ値と現在の日付情報から点検時期を算出し(S21)、宅内表示装置29に点検時期表示を行うように宅内通信手段26に出力する(S22)。   In FIG. 4, the control means 23 determines whether or not there is an inspected output from the inspected information output means 24 (S17), and if there is no inspected output, the process proceeds to S19. If there is an inspected output in S17, it is output to the in-home communication means 26 and the inspection time display on the in-home display device 29 is cleared (S18). In S19, it is determined whether the inspection time is not displayed on the home display device 29. If the inspection time is not displayed, it is determined whether the inspection interval counter of the inspection interval counting means 27 has reached the third predetermined value (S20). When the third predetermined value is reached, the inspection time is calculated from the inspection interval counter value of the inspection interval counting means 27 and the current date information (S21), and the in-home communication means is configured to display the inspection time on the in-home display device 29. 26 (S22).

以上のように、本実施の形態においては、事業者による点検が近づいていることを顧客に知らせることで、顧客の保安意識を高めることができる。   As described above, in this embodiment, the customer's safety awareness can be enhanced by notifying the customer that the inspection by the operator is approaching.

(実施の形態4)
図5は、本発明の実施の形態4におけるガス遮断装置の事業者連絡表示処理を示すフローチャートである。実施の形態1における図1に示す制御手段23とプログラムのみが異なるだけで、ガス遮断装置のブロック図は図1と同一である。すなわち、制御手段23は図5に示すS23からS30の制御フローを実行するプログラムを格納したものである。
(Embodiment 4)
FIG. 5 is a flowchart showing the operator contact display process of the gas cutoff device according to Embodiment 4 of the present invention. The block diagram of the gas shut-off device is the same as that of FIG. 1, except that the control unit 23 shown in FIG. That is, the control means 23 stores a program for executing the control flow from S23 to S30 shown in FIG.

図5において、制御手段23は、点検済情報出力手段24から点検済出力があったかどうか判定し(S23)、点検済出力がなければS25へ進む。S23で点検済出力があった場合は、宅内通信手段26に出力し、宅内表示装置29の点検時期表示または事業者連絡表示をクリアする(S24)。S25では宅内表示装置29に点検時期が未表示かどうか判定し、点検時期未表示の場合はS26へ進み、点検時期表示の場合はS29へ進む。S26では、点検間隔カウント手段27の点検間隔カウンタが第3所定値に達したかどうか判定し、第3所定値に達した場合は、点検間隔カウント手段27の点検間隔カウンタ値と現在の日付情報から点検時期を算出し(S27)、宅内表示装置29に点検時期表示を行うように宅内通信手段26に出力する(S28)。S29では、点検間隔カウント手段27の点検間隔カウンタが所定値に達したかどうか判定し、所定値に達した場合は、宅内表示装置29に事業者連絡表示を行うように宅内通信手段26に出力する(S30)。   In FIG. 5, the control means 23 determines whether or not there is an inspected output from the inspected information output means 24 (S23), and if there is no inspected output, the process proceeds to S25. If there is an inspected output in S23, it is output to the in-home communication means 26, and the inspection time display or the operator contact display on the in-home display device 29 is cleared (S24). In S25, it is determined whether the inspection time is not displayed on the home display device 29. If the inspection time is not displayed, the process proceeds to S26, and if the inspection time is displayed, the process proceeds to S29. In S26, it is determined whether or not the inspection interval counter of the inspection interval counting means 27 has reached the third predetermined value. If the inspection interval counter has reached the third predetermined value, the inspection interval counter value of the inspection interval counting means 27 and the current date information are determined. Then, the inspection time is calculated (S27), and is output to the home communication means 26 so that the inspection time is displayed on the home display device 29 (S28). In S29, it is determined whether or not the inspection interval counter of the inspection interval counting means 27 has reached a predetermined value. If the predetermined value has been reached, the information is output to the in-home communication means 26 so as to display the operator communication on the in-home display device 29. (S30).

以上のように、本実施の形態においては、事業者による点検が必要なことを使用者に知らせることで、顧客の保安意識を高め、また点検がなされない場合も、事業者に連絡することで点検を実施することができ、安全性を向上することができる。   As described above, in this embodiment, by notifying the user that the inspection by the operator is necessary, the security awareness of the customer is raised, and even when the inspection is not performed, the operator is contacted. Inspection can be performed and safety can be improved.

(実施の形態5)
図6は、本発明の実施の形態5におけるガス遮断装置の点検間隔カウンタの宅内初期化処理を示すフローチャートである。実施の形態1における図1に示す制御手段23とプログラムのみが異なるだけで、ガス遮断装置のブロック図は図1と同一である。すなわち、制御手段23は図6に示すS31からS35の制御フローを実行するプログラムを格納したものである。
(Embodiment 5)
FIG. 6 is a flowchart showing the in-house initialization process of the inspection interval counter of the gas cutoff device according to Embodiment 5 of the present invention. The block diagram of the gas shut-off device is the same as that of FIG. 1, except that the control unit 23 shown in FIG. That is, the control means 23 stores a program for executing the control flow from S31 to S35 shown in FIG.

図6において、制御手段23は、宅内表示装置29からの初期化出力があったかどうか判定し(S31)、初期化出力があった場合は、S32で点検間隔カウント手段27の点検間隔カウンタを初期化し、S33で第2点検間隔カウント手段28の第2点検間隔カウンタを初期化し、S34で第2点検間隔カウント手段28のカウントを停止し、外部通信手段25に出力して外部に通信する(S35)。   In FIG. 6, the control means 23 determines whether or not there is an initialization output from the home display device 29 (S31). If there is an initialization output, the inspection interval counter of the inspection interval counting means 27 is initialized in S32. In step S33, the second inspection interval counter of the second inspection interval counting unit 28 is initialized. In step S34, the counting of the second inspection interval counting unit 28 is stopped and output to the external communication unit 25 to communicate with the outside (S35). .

以上のように、本実施の形態においては、事業者による点検が実施されたことを、顧客が確認したことで、確実に点検が実施された記録として残すことができ、また顧客の安心感を高めることができる。   As described above, in this embodiment, the customer confirms that the inspection by the operator has been carried out, so that it can be kept as a record of the inspection being carried out reliably, and the customer's sense of security can be maintained. Can be increased.

なお、上記各実施の形態においては制御手段に格納してあるプログラムでマイクロコンピュータを機能させて制御フローを実行しているが、プログラムに代えハードを以って実行することも可能である。   In each of the above embodiments, the control flow is executed by causing the microcomputer to function with the program stored in the control means, but it is also possible to execute it with hardware instead of the program.

以上のように、本発明にかかるガス遮断装置は、点検時期に達すると外部通信することにより点検を確実に実施することができ、また、未実施の場合でも、繰り返し外部通信し点検忘れを防止することができることから、電気機器等に対しても適用できる。   As described above, the gas shutoff device according to the present invention can reliably perform inspection by external communication when the inspection time is reached, and even if it has not been performed, external communication is repeatedly performed to prevent forgetting the inspection. Therefore, the present invention can also be applied to electric devices and the like.

本発明の実施の形態1〜5におけるガス遮断装置のブロック図The block diagram of the gas interruption | blocking apparatus in Embodiment 1-5 of this invention 本発明の実施の形態1におけるガス遮断装置の点検期間到達時の処理を示すフローチャートThe flowchart which shows the process at the time of the inspection period arrival of the gas cutoff device in Embodiment 1 of this invention 本発明の実施の形態2におけるガス遮断装置の点検期間到達以降の処理を示すフローチャートThe flowchart which shows the process after the inspection period arrival of the gas cutoff device in Embodiment 2 of this invention 本発明の実施の形態3におけるガス遮断装置の点検時期表示処理を示すフローチャートThe flowchart which shows the inspection time display process of the gas cutoff device in Embodiment 3 of this invention 本発明の実施の形態4におけるガス遮断装置の事業者連絡表示処理を示すフローチャートThe flowchart which shows the provider communication display process of the gas cutoff device in Embodiment 4 of this invention 本発明の実施の形態5におけるガス遮断装置の点検間隔カウンタの宅内初期化処理を示すフローチャートThe flowchart which shows the in-home initialization process of the inspection space | interval counter of the gas cutoff device in Embodiment 5 of this invention 従来のガス遮断装置のブロック図Block diagram of a conventional gas shut-off device

2 流量計測手段
20 ガス遮断装置
21 ガス供給管
22 遮断手段
23 制御手段
24 点検済情報出力手段
25 外部通信手段
26 宅内通信手段
27 点検間隔カウント手段
28 第2点検間隔カウント手段
29 宅内表示装置
2 Flow measurement means 20 Gas shut-off device 21 Gas supply pipe 22 Shut-off means 23 Control means 24 Inspected information output means 25 External communication means 26 In-home communication means 27 Inspection interval count means 28 Second inspection interval count means 29 In-house display device

Claims (4)

ガス供給管に接続されガスの供給や遮断を行う遮断手段と、前記遮断手段を制御する制御手段と、外部との通信が可能な外部通信手段と、点検間隔を自動でカウントする点検間隔カウント手段と、作業者の点検実施後の所定操作により点検済情報を出力する点検済情報出力手段とを備え、
前記制御手段は、前記点検済情報出力手段からの出力により、前記点検間隔カウント手段のカウント値を初期化するとともに、前記点検済情報出力手段からの出力前に前記点検間隔カウント手段のカウント値が所定値に達すると、前記外部通信手段に出力して外部に通信し、
前記点検間隔カウント手段のカウント値が所定値に達すると、第2点検間隔カウント手段を初期化し、前記第2点検間隔カウント手段にカウント開始出力を行い、前記第2点検間隔カウント手段のカウント値が第2所定値に達するまでに前記点検済情報出力手段からの出力があると、前記点検間隔カウント手段のカウント値の初期化、及び前記第2点検間隔カウント手段のカウント値の初期化、前記第2点検間隔カウント手段にカウント停止出力を行うとともに、前記第2点検間隔カウント手段のカウント値が第2所定値に達すると、前記第2点検間隔カウント手段のカウント値の初期化及び前記外部通信手段に出力して外部に通信し、以降、前記点検済情報出力手段からの出力があるまで、前記第2点検間隔カウント手段のカウント値が第2所定値に達する度に前記第2点検間隔カウント手段のカウント値の初期化及び前記外部通信手段に出力して外部に通信することを特徴とするガス遮断装置。
A shutoff means connected to the gas supply pipe for supplying and shutting off the gas, a control means for controlling the shutoff means, an external communication means capable of communicating with the outside, and an inspection interval counting means for automatically counting the inspection interval And an inspected information output means for outputting inspected information by a predetermined operation after the operator performs the inspection,
The control means initializes the count value of the inspection interval count means by the output from the inspection completed information output means, and the count value of the inspection interval count means is output before the output from the inspection completed information output means. When reaching a predetermined value, output to the external communication means to communicate outside ,
When the count value of the inspection interval count means reaches a predetermined value, the second inspection interval count means is initialized, a count start output is performed to the second inspection interval count means, and the count value of the second inspection interval count means is If there is an output from the inspected information output means before reaching the second predetermined value, the count value of the inspection interval count means is initialized, and the count value of the second inspection interval count means is initialized, (2) A count stop output is made to the inspection interval count means, and when the count value of the second inspection interval count means reaches a second predetermined value, the count value of the second inspection interval count means is initialized and the external communication means Until the output from the inspected information output means, the count value of the second inspection interval counting means is Gas cutoff apparatus characterized by communicating to the outside and outputs the initialization and the external communication means a count value of the second inspection interval counting means every time reaching a predetermined value.
前記制御手段は、前記点検間隔カウント手段のカウント値が所定値に達する前に、通信手段を備えた宅内表示装置との通信が可能な宅内通信手段に点検時期を出力して、宅内表示装置に通信することを特徴とする、請求項に記載のガス遮断装置。 The control means outputs an inspection time to the in-home communication means capable of communicating with the in-home display device provided with the communication means before the count value of the inspection interval count means reaches a predetermined value, to the in-home display device. characterized by communicating, gas cutoff apparatus according to claim 1. 前記制御手段は、前記点検間隔カウント手段のカウント値が所定値に達すると、前記宅内表示装置に事業者への連絡を促す表示を行うように前記宅内通信手段に出力することを特徴とする、請求項に記載のガス遮断装置。 When the count value of the inspection interval count means reaches a predetermined value, the control means outputs to the in-home communication means so as to display on the in-home display device so as to contact a business operator, The gas shut-off device according to claim 2 . 前記制御手段は、前記宅内表示装置での所定操作による出力が前記宅内通信手段に入力された場合に、少なくとも前記点検間隔カウント手段あるいは第2点検間隔カウント手段のカウント値を初期化し、前記外部通信手段に出力して外部に通信することを特徴とする、請求項2または3に記載のガス遮断装置。 The control means initializes at least a count value of the inspection interval count means or the second inspection interval count means when an output by a predetermined operation on the in-home display device is input to the in-home communication means, and the external communication The gas shut-off device according to claim 2 or 3 , wherein the gas shut-off device outputs to the means and communicates with the outside.
JP2009015206A 2009-01-27 2009-01-27 Gas shut-off device Expired - Fee Related JP5225875B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009015206A JP5225875B2 (en) 2009-01-27 2009-01-27 Gas shut-off device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009015206A JP5225875B2 (en) 2009-01-27 2009-01-27 Gas shut-off device

Publications (2)

Publication Number Publication Date
JP2010175267A JP2010175267A (en) 2010-08-12
JP5225875B2 true JP5225875B2 (en) 2013-07-03

Family

ID=42706399

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009015206A Expired - Fee Related JP5225875B2 (en) 2009-01-27 2009-01-27 Gas shut-off device

Country Status (1)

Country Link
JP (1) JP5225875B2 (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3193531B2 (en) * 1993-07-08 2001-07-30 東洋機械金属株式会社 Molding machine with periodic inspection instruction function
JP3315208B2 (en) * 1993-07-09 2002-08-19 株式会社日立ビルシステム Elevator control device
JP3531042B2 (en) * 1994-10-24 2004-05-24 松下電器産業株式会社 Gas shut-off device
JP3733646B2 (en) * 1996-06-27 2006-01-11 松下電器産業株式会社 Gas shut-off device
JP3849205B2 (en) * 1997-02-26 2006-11-22 松下電器産業株式会社 Gas appliance monitoring device
JP2003072909A (en) * 2001-09-07 2003-03-12 Nippon Yusoki Co Ltd Maintenance control system
JP2003341971A (en) * 2002-05-24 2003-12-03 Toshiba Elevator Co Ltd Conveyor device
JP4140480B2 (en) * 2003-08-06 2008-08-27 松下電器産業株式会社 Gas shut-off device

Also Published As

Publication number Publication date
JP2010175267A (en) 2010-08-12

Similar Documents

Publication Publication Date Title
US20170100617A1 (en) Devices, methods and systems for monitoring water-based fire sprinkler systems
EA200702117A1 (en) SAFETY LOCK VALVE CONTROLLER WITH BUILT-IN TROUBLE INDICATOR
US20160224033A1 (en) Computer monitoring system, apparatus and method for controlling appliance operation
KR102057439B1 (en) Internet of things gas platform system performing remote-monitoring and remote-controlling and method thereof
JP5225875B2 (en) Gas shut-off device
JP5347789B2 (en) Gas shut-off device
JP2008051648A (en) Gas meter
JP2009174895A (en) Gas meter system
JP6174911B2 (en) Gas shut-off device
JP2009177298A (en) Gas meter system
JP6757886B2 (en) Mobile terminal
JP5691017B2 (en) Alarm compatible system meter
JP5802071B2 (en) Gas meter and connection determination method thereof
JP2009115589A (en) Gas meter
JP2009204353A (en) Gas shut-off device
JP4794831B2 (en) Gas meter
JP2009251978A (en) Security alarm management system
JP2006017508A (en) Gas meter
JP2008275430A (en) Gas meter
JP4659401B2 (en) Gas meter
WO2023157788A1 (en) Gas meter and gas shutoff restoration assessment system
JP4722267B2 (en) Gas shut-off device
JP4251187B2 (en) Gas security device
JP2008014960A (en) Gas meter
JP4659400B2 (en) Gas meter

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120106

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121120

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121127

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130212

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130313

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160322

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees