JP5203117B2 - Drain discharge method and drain discharge mechanism of air compressor - Google Patents

Drain discharge method and drain discharge mechanism of air compressor Download PDF

Info

Publication number
JP5203117B2
JP5203117B2 JP2008257607A JP2008257607A JP5203117B2 JP 5203117 B2 JP5203117 B2 JP 5203117B2 JP 2008257607 A JP2008257607 A JP 2008257607A JP 2008257607 A JP2008257607 A JP 2008257607A JP 5203117 B2 JP5203117 B2 JP 5203117B2
Authority
JP
Japan
Prior art keywords
drain
drain discharge
time
temperature
discharge valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2008257607A
Other languages
Japanese (ja)
Other versions
JP2010084736A (en
Inventor
正幸 山後
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HOKUETSU INDUSTRIES CO., LTD.
Original Assignee
HOKUETSU INDUSTRIES CO., LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HOKUETSU INDUSTRIES CO., LTD. filed Critical HOKUETSU INDUSTRIES CO., LTD.
Priority to JP2008257607A priority Critical patent/JP5203117B2/en
Publication of JP2010084736A publication Critical patent/JP2010084736A/en
Application granted granted Critical
Publication of JP5203117B2 publication Critical patent/JP5203117B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は,空気圧縮機のドレン排出方法及びドレン排出機構に関し,より詳細には,圧縮機本体によって得た圧縮空気を消費側に供給する前に冷却する冷却手段を備えた空気圧縮機において,前記冷却手段による冷却の際に発生したドレンを,圧縮空気の供給系外に排出する空気圧縮機におけるドレンの排出方法及び排出装置に関する。   The present invention relates to a drain discharge method and a drain discharge mechanism of an air compressor, and more specifically, in an air compressor including a cooling means for cooling before supplying compressed air obtained by a compressor body to a consumer side. The present invention relates to a drain discharging method and a discharging device in an air compressor for discharging drain generated during cooling by the cooling means to the outside of a compressed air supply system.

空気を圧縮する圧縮機本体を備えた圧縮機では,前記圧縮機本体によって空気を圧縮する際に圧縮熱が生じ,該圧縮機本体より吐出された圧縮空気の温度が上昇しているが,圧縮空気の露点温度も高いことから冷却されると結露してドレンが発生しやすく,圧縮機本体から吐出されたままの圧縮空気を消費側へ供給すると,供給配管内で圧縮空気が冷却されてドレンが発生し,このドレンによって空圧機器が故障するおそれがあった。このことから,消費側に供給する全ての圧縮空気を予め冷却し,この冷却により圧縮空気中の水蒸気を凝結させてドレンを発生させると共に除去することで,消費側に冷却され,かつ,含有水分量の少ない圧縮空気を供給することが行われている。   In a compressor having a compressor main body that compresses air, compression heat is generated when air is compressed by the compressor main body, and the temperature of the compressed air discharged from the compressor main body rises. Since the dew point temperature of the air is high, condensation is likely to occur when it is cooled, and when compressed air that has been discharged from the compressor body is supplied to the consumer side, the compressed air is cooled in the supply pipe and drained. There was a risk that the pneumatic equipment would be damaged by this drain. Therefore, all the compressed air supplied to the consumer side is cooled in advance, and the water vapor in the compressed air is condensed by this cooling to generate and remove the drain. A small amount of compressed air is supplied.

一例として,油冷式スクリュ圧縮機1を例にとり説明すると,この油冷式スクリュ圧縮機1は,シリンダ内に2本のスクリュロータを噛み合い回転可能に配置すると共に,該シリンダ内に潤滑油を導入して圧縮作用空間の密封や冷却,潤滑を行う圧縮機本体10を備えたもので,この圧縮機本体10を駆動するエンジンやモータ等の駆動源60を備えると共に,前記圧縮機本体10より潤滑油と共に吐出された圧縮気体を導入してこの圧縮空気と潤滑油とに分離するレシーバタンク70を備えており,レシーバタンク70で潤滑油と分離された圧縮空気を,空気作業機等が接続された消費側に供給することができるよう,レシーバタンク内の圧縮空気を供給するための供給回路81が設けられている。   As an example, the oil-cooled screw compressor 1 will be described as an example. The oil-cooled screw compressor 1 is configured such that two screw rotors are engaged with each other in a cylinder so as to be rotatable, and lubricating oil is placed in the cylinder. The compressor main body 10 is provided to seal, cool, and lubricate the compression working space by being introduced. The compressor main body 10 is provided with a drive source 60 such as an engine and a motor for driving the compressor main body 10. A receiver tank 70 that introduces compressed gas discharged together with the lubricating oil and separates the compressed air and the lubricating oil is provided. The compressed air separated from the lubricating oil in the receiver tank 70 is connected to an air working machine or the like. A supply circuit 81 for supplying compressed air in the receiver tank is provided so that it can be supplied to the consumer side.

そして,この供給回路81中に,レシーバタンク70からの圧縮空気を冷却するアフタクーラ22やドライヤ23等の冷却手段を設けると共に,この冷却手段によって発生したドレンを供給系外に排出するためのドレン排出弁5を備えている(図7,図8参照)。   The supply circuit 81 is provided with cooling means such as an aftercooler 22 and a dryer 23 for cooling the compressed air from the receiver tank 70, and drain discharge for discharging the drain generated by the cooling means out of the supply system. A valve 5 is provided (see FIGS. 7 and 8).

このようなドレン排出機構としては,例えばフロート式のドレントラップを設け,ドレンが所定量溜まることによりフロートが浮上すると,ドレン排出口が開いてドレンの排出を行うという,機械的な制御方法によってドレンの排出タイミングや排出時間を制御することも行われている。   As such a drain discharge mechanism, for example, a float type drain trap is provided, and when the float rises when a predetermined amount of drain accumulates, the drain discharge port opens and drains by a mechanical control method. The discharge timing and discharge time are also controlled.

しかし,このような機械的な制御方法による場合,フロートと開閉弁のリンク機構等に経年使用によるゴミの付着や腐蝕(錆の発生)等が生じると,作動不良が発生して動作の信頼性が低下する場合がある。   However, with such a mechanical control method, if dirt or corrosion (rust generation) occurs due to aging in the link mechanism of the float and the on-off valve, malfunction will occur and operation reliability will be increased. May decrease.

そのため,このような機械的な制御に代え,ドレンの排出路に電磁弁を設け,この電磁弁の開閉を電気的に制御することによりドレンの排出制御を行うことも提案されている。   Therefore, instead of such mechanical control, it has also been proposed to provide a drain valve by providing a solenoid valve in the drain discharge path and electrically controlling the opening and closing of the solenoid valve.

このようなドレン排出方法の一例として,空気圧縮機の運転時間をカウントして積算する積算カウンタを設け,この積算カウンタによってカウントされた積算時間が設定値に達すると,ドレンの排出を行うドレン排出弁を一定時間開放するように構成したものが提案されている(特許文献1参照)。   As an example of such a drain discharge method, an integration counter that counts and accumulates the operation time of the air compressor is provided, and when the integration time counted by the integration counter reaches a set value, a drain discharge that discharges the drain is performed. A configuration in which the valve is configured to open for a certain period of time has been proposed (see Patent Document 1).

また,別の例としては,タイマにより予め設定した設定時間が経過する毎に,ドレンの排出流路に設けた制御弁を開放してドレン排出弁を開閉すると共に,ドレン排出弁の二次側に設けた圧力センサが設定圧力以上の圧力を検知したとき,タイマの経過時間にかかわらずドレン排出弁を閉じるように構成したものが提案されている(特許文献2参照)。   As another example, every time a preset time set by a timer elapses, the control valve provided in the drain discharge flow path is opened to open and close the drain discharge valve, and the secondary side of the drain discharge valve is also opened. There has been proposed a configuration in which the drain discharge valve is closed regardless of the elapsed time of the timer when the pressure sensor provided in the sensor detects a pressure equal to or higher than the set pressure (see Patent Document 2).

この発明の先行技術文献情報としては次のものがある。
特開平11−351497号公報 特開2003−97444号公報
Prior art document information of the present invention includes the following.
JP-A-11-351497 JP 2003-97444 A

以上で説明した従来技術中,特許文献1として紹介したドレン排出方法にあっては,空気圧縮機の積算運転時間をカウントして,積算時間が設定時間に達するとドレンを排出する開閉弁(電磁弁)を開放するような構成としたものであるために,フロートのような機械的な制御方法によって排出タイミングを制御する場合のように,リンク機構等の経年劣化等に伴う作動不良が生じるといった問題が解消される。   Among the conventional technologies described above, in the drain discharge method introduced as Patent Document 1, the integrated operation time of the air compressor is counted, and an on-off valve (electromagnetic valve) that discharges drain when the integrated time reaches the set time. Because the valve is configured to be open, malfunctions associated with aging of the link mechanism, etc. occur as in the case where the discharge timing is controlled by a mechanical control method such as a float. The problem is solved.

しかし,圧縮空気の冷却により生じるドレン発生量は,圧縮機本体に吸入される外気量の増加,吸入する外気温度や湿度の上昇に伴い増加し,圧縮機本体に吸入される外気量の減少,吸入する外気温度や湿度の低下に伴い減少する。   However, the amount of drain generated due to cooling of the compressed air increases with an increase in the amount of outside air sucked into the compressor body, an increase in the outside air temperature and humidity that is sucked in, and a decrease in the amount of outside air sucked into the compressor body. Decreases with decreasing outside air temperature and humidity.

前述した特許文献1に記載の構成にあっては,一定の回転速度で圧縮機本体が運転され,圧縮機本体の吸入口の開閉によって容量制御が行われる空気圧縮機にあっては,圧縮機本体に対する外気の吸入量は,空気圧縮機のフルロード運転時間に比例することから,空気圧縮機の積算運転時間をカウントして,積算運転時間が一定時間となったときにドレンを排出することで,圧縮機本体に対する吸入空気量が一定となる毎にドレンを排出して吸入空気量の変化に伴うドレン発生量の変化に対しては対応し得るものとなっている。   In the configuration described in Patent Document 1, the compressor main body is operated at a constant rotation speed, and the capacity of the compressor is controlled by opening and closing the suction port of the compressor main body. Since the amount of outside air sucked into the main body is proportional to the full load operation time of the air compressor, the accumulated operation time of the air compressor is counted, and drain is discharged when the accumulated operation time reaches a certain time. Thus, every time the intake air amount to the compressor body becomes constant, drain is discharged, and the change in the drain generation amount accompanying the change in the intake air amount can be dealt with.

しかし,圧縮機本体に対する吸入空気量が一定となる毎にドレンを排出した場合であっても,吸入空気の温度や湿度が変化すればドレン発生量は変化する。   However, even if the drain is discharged every time the amount of intake air to the compressor body becomes constant, the amount of generated drain changes if the temperature and humidity of the intake air change.

そのために,特許文献1に記載の発明にあっては,このようなドレン発生量の変化に対応し得るものとはなっておらず,予定したドレン発生量に対し,実際のドレン発生量が多い場合にはドレン排出弁の1回の開閉動作によって発生したドレンの全量を排出できず,この場合には,消費側に供給される圧縮空気中にドレンが混入することとなる。   For this reason, in the invention described in Patent Document 1, it is not possible to cope with such a change in the amount of generated drain, and the actual amount of generated drain is larger than the planned amount of generated drain. In this case, the total amount of drain generated by one opening / closing operation of the drain discharge valve cannot be discharged, and in this case, the drain is mixed into the compressed air supplied to the consumption side.

また,逆に予定したドレン発生量に対して実際のドレン発生量が少ない場合には,ドレンの排出が完了した後においても開閉弁が開放された状態に維持され,これにより圧縮空気が排出されて,レシーバタンク内の圧力低下や,このような圧力低下を補うためにフルロード運転が行われる等,不要な動力の消費が行われる。   On the other hand, if the actual drain generation amount is smaller than the planned drain generation amount, the on-off valve is maintained open even after the drain discharge is completed, so that compressed air is discharged. Thus, unnecessary power consumption is performed such as a pressure drop in the receiver tank and a full load operation to compensate for such a pressure drop.

以上のように構成された特許文献1に記載のドレン排出機構に対し,特許文献2に記載のドレン排出機構にあっては,ドレンの排出が完了して排水経路中に圧縮空気が導入されると排出経路中の圧力が上昇する点に着目し,開閉弁の二次側圧力の上昇を圧力センサによって検出して,このような圧力上昇が生じた場合にタイマの経過時間に拘わらず開閉弁を閉じることとしていることから,圧縮空気の大量放出に伴う大幅な圧力低下を解消し得るものとなっている。   In contrast to the drain discharge mechanism described in Patent Document 1 configured as described above, the drain discharge mechanism described in Patent Document 2 completes drain discharge and introduces compressed air into the drainage path. The pressure on the secondary side of the on-off valve is detected by a pressure sensor, and when such a pressure rise occurs, the on-off valve Therefore, it is possible to eliminate the significant pressure drop that accompanies the mass release of compressed air.

しかし,上記構成において,開閉弁の閉動作は,開閉弁の二次側圧力が所定圧力以上に上昇した後,すなわち圧縮空気の排出が行われて初めて行われるこから,少なからず圧縮空気の放出と,これに伴う圧力低下が生じることとなる。   However, in the above configuration, the on-off valve closing operation is performed only after the secondary pressure of the on-off valve rises above a predetermined pressure, that is, only after the compressed air is discharged. This will cause a pressure drop.

また,特許文献2に記載の構成にあっては,ドレンの発生量が予定した量よりも少ない場合には前述した機能を発揮するものの,圧力センサが開閉弁の二次側圧力の上昇を検知しない場合には,タイマによる設定時間で開閉弁が閉ざされることとなるために,予定したドレン発生量に対して実際のドレン発生量が上回っている場合には,開閉弁の1回の開閉によってドレンを全量排出することができず,このように排出されずに残ったドレンが蓄積されてやがて圧縮空気と共に消費側に導入されることとなる。   In the configuration described in Patent Document 2, the pressure sensor detects an increase in the secondary side pressure of the on-off valve, although the above-described function is exhibited when the amount of drain generated is less than the planned amount. Otherwise, the on-off valve is closed at the set time set by the timer. Therefore, if the actual drain generation amount exceeds the planned drain generation amount, the on-off valve is opened and closed once. The total amount of drain cannot be discharged, and the drain remaining without being discharged in this way is accumulated and eventually introduced into the consumer side together with the compressed air.

そこで,本発明は,上記従来技術における欠点を解消するためになされたものであり,圧縮機本体に対する外気の導入量の変化のみならず,空気圧縮機の運転環境の変化に伴うドレンの発生量変化に対応して,ドレンの効率的な排出を行うことができると共に,圧縮空気の排出に伴う圧力降下に伴って生じるエネルギー損失や,ドレンの排出不足に伴い圧縮空気と共にドレンが消費側に導入されることを好適に防止することができる空気圧縮機のドレン排出方法及びドレン排出機構を提供することを目的とする。   Therefore, the present invention has been made to eliminate the above-described drawbacks of the prior art, and not only changes in the amount of outside air introduced into the compressor body, but also the amount of drain generated due to changes in the operating environment of the air compressor. In response to changes, drains can be discharged efficiently, and energy is lost due to pressure drop due to compressed air discharge, and drains are introduced to the consumer side along with compressed air due to insufficient drainage. It is an object of the present invention to provide a drain discharge method and a drain discharge mechanism for an air compressor that can suitably prevent this.

上記目的を達成するために,本発明の空気圧縮機1のドレン排出方法は,圧縮機本体10より吐出された圧縮空気を消費側に供給する前に冷却する冷却手段22を備え,ドレン排出弁5の開閉動作を繰り返すことによって前記冷却手段22で発生したドレンを排出する空気圧縮機のドレン排出方法において,
吸入空気の温度又は温度及び湿度の変化と前記空気圧縮機1のフルロード運転における単位時間当たりのドレン発生量の変化との対応関係,及び前記ドレン排出弁5の単位時間当たりのドレン排出量を予め求めておき,
吸入空気の温度又は温度及び湿度を実測すると共に,前記空気圧縮機のフルロード運転時間を計測且つ積算し,前記対応関係に基づいて,該実測された温度又は温度及び湿度と,フルロード運転の積算時間と,前記単位時間当たりのドレン発生量及び前記単位時間当たりのドレン排出量から,前記空気圧縮機のフルロード運転の積算時間において発生するドレンの発生量と,前記ドレン排出弁5の1回の開閉動作に伴うドレン排出量とを算出し,前記ドレン発生量と前記ドレン排出量とを一致させる前記ドレン排出弁の動作パターンを求め,
得られた動作パターンに従って前記ドレン排出弁5の動作を制御することを特徴とする(請求項1)。
In order to achieve the above object, the drain discharge method of the air compressor 1 of the present invention comprises a cooling means 22 for cooling the compressed air discharged from the compressor body 10 before supplying it to the consumption side, and includes a drain discharge valve. In the drain discharge method of the air compressor for discharging the drain generated in the cooling means 22 by repeating the opening and closing operation of No. 5,
Correspondence relationship between the temperature of the intake air or the change in temperature and humidity and the change in the amount of drain generated per unit time in the full load operation of the air compressor 1, and the drain discharge amount per unit time of the drain discharge valve 5 Ask in advance,
Measure the temperature or temperature and humidity of the intake air, measure and accumulate the full load operation time of the air compressor, and based on the correspondence, the measured temperature or temperature and humidity and the full load operation From the accumulated time, the amount of drain generated per unit time, and the amount of drain discharged per unit time, the amount of drain generated during the accumulated time of the full load operation of the air compressor, and 1 of the drain discharge valve 5 Calculating the drain discharge amount associated with the opening and closing operations of the first time, and obtaining an operation pattern of the drain discharge valve for matching the drain generation amount and the drain discharge amount,
The operation of the drain discharge valve 5 is controlled according to the obtained operation pattern (Claim 1).

上記構成のドレン排出方法において,前記ドレン排出弁5の開放時間を予め設定された一定の開放時間として,前記ドレン排出弁5の各回毎の開閉動作に伴うドレン排出量を定量化すると共に,
前記対応関係に基づいて,前記実測された温度又は温度及び湿度において前記定量化されたドレン排出量に一致ないし対応するドレンを発生させるフルロード運転の積算時間を算出し,
空気圧縮機1のフルロード運転時間を計測して,その積算時間が,前記算出された積算時間となる毎に,前記ドレン排出弁5に1回の開閉動作を行わせるものとすることができる(請求項2)。
In the drain discharge method having the above-described configuration, the drain discharge amount associated with each opening / closing operation of the drain discharge valve 5 is quantified by setting the open time of the drain discharge valve 5 as a predetermined constant open time.
Based on the correspondence relationship, the accumulated time of the full load operation for generating the drain corresponding to or corresponding to the quantified drain discharge amount at the measured temperature or temperature and humidity is calculated,
The full load operation time of the air compressor 1 is measured, and the drain discharge valve 5 can be opened and closed once each time the accumulated time reaches the calculated accumulated time. (Claim 2).

また,別の方法としては,前記ドレン排出弁5の開閉動作を,前記空気圧縮機のフルロード運転が予め設定された一定時間の設定積算時間となる毎に行うと共に,
前記対応関係に基づいて,前記実測された温度又は温度及び湿度において前記設定積算時間で空気圧縮機をフルロード運転した際に発生するドレン発生量に一致ないし対応した前記ドレン排出弁5の開放時間を算出し,前記算出された開放時間で前記ドレン排出弁5を開閉制御するものとしても良い(請求項3)。
As another method, the opening and closing operation of the drain discharge valve 5 is performed every time the full load operation of the air compressor reaches a set integration time of a predetermined time,
Based on the correspondence relationship, the drain discharge valve 5 opening time corresponding to or corresponding to the amount of drain generated when the air compressor is fully loaded at the set integrated time at the measured temperature or temperature and humidity. And the drain discharge valve 5 may be controlled to open and close during the calculated opening time (Claim 3).

また,本発明の空気圧縮機1のドレン排出機構は,圧縮機本体10より吐出された圧縮空気を消費側に供給する前に冷却する冷却手段22を備え,開閉動作を繰り返すドレン排出弁5によって前記冷却手段22で発生したドレンを排出する空気圧縮機1において,
前記圧縮機本体10の吸入空気温度又は温度及び湿度を測定するセンサ(7及び/又は8)と,
前記センサ(7及び/又は8)の検知信号に従って前記ドレン排出弁5の開閉動作を制御する制御手段30を備え,
前記制御手段30が,
前記空気圧縮機1のフルロード運転時間を積算する計測部33と,
吸入空気の温度又は温度及び湿度の変化と前記空気圧縮機1のフルロード運転における単位時間当たりのドレン発生量の変化との対応関係,及び前記ドレン排出弁5の単位時間当たりのドレン排出量に基づいて予め求められた前記ドレン排出弁5の動作パターンを規定する関係式を記憶する記憶部32と,
前記センサ(7及び/又は8)によって検出された吸入空気の温度又は温度及び湿度と,前記記憶部32に記憶された前記関係式に基づいて,前記空気圧縮機1のフルロード運転の積算時間において発生するドレンの発生量と,前記ドレン排出弁5の1回の開閉動作に伴うドレン排出量とを一致させる前記ドレン排出弁の動作パターンを特定する演算処理部34と,
前記演算処理部34によって特定された動作パターンに従って前記ドレン排出弁5の動作を制御する動作制御部35を備えることを特徴とする(請求項4)。
The drain discharge mechanism of the air compressor 1 according to the present invention includes a cooling means 22 for cooling the compressed air discharged from the compressor main body 10 before supplying it to the consumer side, and the drain discharge valve 5 is repeatedly opened and closed. In the air compressor 1 for discharging the drain generated by the cooling means 22,
A sensor (7 and / or 8) for measuring the intake air temperature or temperature and humidity of the compressor body 10;
Control means 30 for controlling the opening / closing operation of the drain discharge valve 5 according to the detection signal of the sensor (7 and / or 8);
The control means 30 is
A measuring unit 33 for integrating the full load operation time of the air compressor 1;
Correspondence relationship between changes in temperature or temperature and humidity of intake air and changes in the amount of drain generated per unit time in the full load operation of the air compressor 1, and the amount of drain discharged per unit time of the drain discharge valve 5 A storage unit 32 for storing a relational expression that prescribes an operation pattern of the drain discharge valve 5 obtained in advance,
Based on the temperature or temperature and humidity of the intake air detected by the sensor (7 and / or 8) and the relational expression stored in the storage unit 32, the accumulated time of the full load operation of the air compressor 1 An operation processing unit 34 for specifying an operation pattern of the drain discharge valve that matches a generated amount of drain generated in step 1 and a drain discharge amount associated with one opening / closing operation of the drain discharge valve 5;
An operation control unit 35 that controls the operation of the drain discharge valve 5 according to the operation pattern specified by the arithmetic processing unit 34 is provided (Claim 4).

上記構成のドレン排出機構において,前記記憶部32が,一定時間に設定された前記ドレン排出弁5の開放時間を設定開放時間として記憶すると共に,前記関係式として,温度又は温度及び湿度の変化と,前記設定開放時間によって特定されるドレン排出量に対応したドレンを発生させるフルロード運転の積算時間の変化との対応関係を規定した関係式を記憶し,
前記演算処理部34が,前記センサ(7及び/又は8)によって検出された吸入空気の温度又は温度及び湿度と,前記記憶部32に記憶された前記関係式に基づいて,前記設定開放時間によって特定されるドレン排出量に一致ないし対応したドレンを発生させる前記フルロード運転の積算時間を算出すると共に,
前記演算処理部34が算出した前記フルロード運転の積算時間を前記計測部33が計測する毎に,前記動作制御部35が,前記ドレン排出弁5を開閉するものとして構成することができる(請求項5)。
In the drain discharge mechanism having the above-described configuration, the storage unit 32 stores the opening time of the drain discharge valve 5 set for a fixed time as a set opening time, and the relational expression is a change in temperature or temperature and humidity. , Storing a relational expression defining a correspondence relationship with a change in the accumulated time of full load operation for generating drain corresponding to the drain discharge amount specified by the set release time;
Based on the temperature or temperature and humidity of the intake air detected by the sensor (7 and / or 8) and the relational expression stored in the storage unit 32, the arithmetic processing unit 34 calculates the set release time. Calculating the accumulated time of the full load operation for generating a drain that matches or corresponds to the specified drain discharge amount;
The operation control unit 35 can be configured to open and close the drain discharge valve 5 each time the measurement unit 33 measures the accumulated time of the full load operation calculated by the arithmetic processing unit 34 (claim). Item 5).

また,上記ドレン排出機構の別の構成としては,前記記憶部32が,予め一定時間に設定されたフルロード運転の積算時間である設定積算時間を記憶すると共に,前記関係式として,温度又は温度及び湿度の変化と,前記設定積算時間のフルロード運転におけるドレン発生量に対応した前記ドレン排出弁5の開放時間の変化との対応関係を規定した関係式を記憶し,
前記演算処理部34が,前記センサ(7及び/又は8)によって検出された吸入空気の温度又は温度及び湿度と,前記記憶部32に記憶された前記関係式に基づいて,前記ドレン排出弁5の開放時間を算出すると共に,
前記計測部33が前記設定積算時間のフルロード運転を計測する毎に,前記動作制御部35が,前記演算処理部34が算出した開放時間に従って前記ドレン排出弁を開閉制御するように構成することができる(請求項6)。
Further, as another configuration of the drain discharge mechanism, the storage unit 32 stores a set integration time which is an integration time of a full load operation set in advance as a predetermined time, and the temperature or temperature And a relational expression defining a correspondence relationship between the change in humidity and the change in the open time of the drain discharge valve 5 corresponding to the amount of drain generated in the full load operation of the set integration time,
Based on the temperature or temperature and humidity of the intake air detected by the sensor (7 and / or 8) and the relational expression stored in the storage unit 32, the arithmetic processing unit 34 determines the drain discharge valve 5 And calculating the opening time of
The operation control unit 35 is configured to control the opening and closing of the drain discharge valve according to the opening time calculated by the arithmetic processing unit 34 every time the measurement unit 33 measures a full load operation for the set integration time. (Claim 6).

なお,前記制御装置30には更に,消費側に供給される圧縮空気の圧力を検知する圧力センサ6からの検知信号を受信して,前記圧縮機本体10の吸気口11に設けた吸入弁40の開閉動作を制御する,容量制御部31を設け,前記計測部33が前記容量制御部31による前記吸入弁40の開放信号を受信して当該空気圧縮機のフルロード運転時間を計測するように構成することもできる(請求項7)。   The control device 30 further receives a detection signal from the pressure sensor 6 for detecting the pressure of the compressed air supplied to the consumption side, and receives an intake valve 40 provided at the intake port 11 of the compressor body 10. A capacity control unit 31 is provided for controlling the opening / closing operation of the engine, and the measurement unit 33 receives the opening signal of the intake valve 40 from the capacity control unit 31 and measures the full load operation time of the air compressor. It can also be configured (claim 7).

以上説明した本発明の構成により,本発明の空気圧縮機1のドレン排出方法及びドレン排出機構によれば,以下の顕著な効果を得ることができた。   With the configuration of the present invention described above, according to the drain discharge method and drain discharge mechanism of the air compressor 1 of the present invention, the following remarkable effects can be obtained.

吸入空気の温度の変化と前記空気圧縮機1のフルロード運転における単位時間当たりのドレン発生量の変化との対応関係,及び前記ドレン排出弁1の単位時間当たりのドレン排出量を予め求めておき,この対応関係に基づく関係式等により,実測された吸入空気の温度と,フルロード運転の積算時間と,前記単位時間当たりのドレン発生量及び前記単位時間当たりのドレン排出量から,前記空気圧縮機のフルロード運転の積算時間において発生するドレンの発生量と,前記ドレン排出弁5の1回の開閉動作に伴うドレン排出量とを算出し,前記ドレン発生量と前記ドレン排出量とを一致させる,前記ドレン排出弁5の動作パターンに基づいてドレン排出弁5の各回の開閉制御を行うものとしたことから,このようにして求められるドレン発生量は,圧縮機本体1の吸入空気量の変化のみならず,吸入空気の温度の変化に基づくドレン発生量の変化をも反映させることができた。   The correspondence between the change in the temperature of the intake air and the change in the amount of drain generated per unit time in the full load operation of the air compressor 1 and the drain discharge amount per unit time of the drain discharge valve 1 are obtained in advance. From the measured intake air temperature, the accumulated time of full load operation, the amount of drain generated per unit time, and the amount of drain discharged per unit time based on a relational expression based on this correspondence, the air compression Calculate the amount of drain generated during the accumulated time of full load operation of the machine and the amount of drain discharged with one open / close operation of the drain discharge valve 5, and match the amount of drain generated and the amount of drain discharged. Since the opening / closing control of each time of the drain discharge valve 5 is performed based on the operation pattern of the drain discharge valve 5, the drain generation required in this way is performed. Is not a change in only the intake air amount of the compressor body 1, it was possible to reflect the change in the drain generation amount based on a change in the temperature of the intake air.

その結果,実際のドレン発生量と,ドレン排出弁5の1回の開閉動作によって行われるドレン排出量とが一致し,消費側に対してドレンが導入されることや,ドレンの排出時に圧縮空気が放出されることによるレシーバタンク70の圧力低下等の発生を好適に防止することができた。   As a result, the actual drain generation amount coincides with the drain discharge amount performed by one opening / closing operation of the drain discharge valve 5, so that the drain is introduced to the consumption side or the compressed air is discharged when the drain is discharged. Generation | occurrence | production of the pressure fall of the receiver tank 70, etc. by discharge | released was able to be prevented suitably.

特に,吸入空気の温度のみならず,温度,湿度の双方を共に考慮した制御を行う場合には,ドレンの発生量と排出量を極めて高い精度で一致させることができ,消費側に対するドレンの導入や,圧縮空気の不要な放出を略完全に防止することができた。   In particular, when control is performed in consideration of both the temperature and humidity as well as the temperature of the intake air, the amount of drain generated and the amount of discharge can be matched with extremely high accuracy, and the introduction of drain to the consumer side is possible. In addition, unnecessary discharge of compressed air was almost completely prevented.

このようなドレンの排出を,ドレン排出弁5の開放時間を一定時間として行うと共に,ドレン排出弁5の作動間隔を前記対応関係に基づいて可変として行うことで,又は,ドレン排出弁5の作動間隔を一定とし,ドレン排出弁5の開放時間を可変とすることにより行うことで,ドレンの発生量とドレン排出量とを一致させる制御を比較的容易に行うことができた。   Such drain discharge is performed by setting the open time of the drain discharge valve 5 to be a constant time, and by changing the operation interval of the drain discharge valve 5 based on the correspondence relationship, or by operating the drain discharge valve 5. By making the interval constant and making the opening time of the drain discharge valve 5 variable, it was possible to relatively easily perform control to match the amount of drain generated and the amount of drain discharged.

なお,前記ドレン排出機構を実現する制御装置30に,圧縮機本体10の吸入弁40の開閉制御を行う容量制御部31を設ける場合には,空気圧縮機1のフルロード運転の積時間をカウントする計測部33が,この容量制御部31の動作,例えば吸入弁40を開閉制御するための制御信号の出力時間等をカウントすることにより,容易に空気圧縮機1のフルロード運転の積算時間をカウントすることができる等の利点がある。   When the capacity control unit 31 for controlling the opening and closing of the suction valve 40 of the compressor body 10 is provided in the control device 30 that realizes the drain discharge mechanism, the product time of the full load operation of the air compressor 1 is counted. The measuring unit 33 that counts the operation of the capacity control unit 31, for example, the output time of a control signal for controlling the opening and closing of the intake valve 40, makes it possible to easily calculate the total load operation time of the air compressor 1. There are advantages such as being able to count.

次に,添付図面を参照しながら本発明の実施例を以下説明する。   Embodiments of the present invention will be described below with reference to the accompanying drawings.

〔実施例1〕
全体構造
本発明のドレン排出装置を備えた油冷式スクリュ圧縮機1の一例を,図1を参照して説明すると,この油冷式スクリュ圧縮機1は,構成機器を防音箱等の筺体3内に収容して構成したもので,この筺体3内に潤滑油と共に空気を圧縮する油冷式のスクリュ圧縮機である圧縮機本体10,この圧縮機本体10を駆動するモータ60,及び前記圧縮機本体10より潤滑油と共に吐出された圧縮空気を導入して,圧縮空気と潤滑油とに分離するレシーバタンク70を備えている。
[Example 1]
Overall Structure An example of an oil-cooled screw compressor 1 equipped with a drain discharge device according to the present invention will be described with reference to FIG. 1. This oil-cooled screw compressor 1 is composed of a housing 3 such as a soundproof box. The compressor body 10 is an oil-cooled screw compressor that compresses air together with lubricating oil in the housing 3, the motor 60 that drives the compressor body 10, and the compression A receiver tank 70 for introducing compressed air discharged together with the lubricating oil from the machine body 10 and separating the compressed air and the lubricating oil is provided.

この圧縮機本体10の吸気口11には,前記圧縮機本体10の吸気口11を開閉制御する吸入弁40と,この吸入弁40の一次側に取り付けられたエアフィルタ41が設けられていると共に,吸入弁40の閉弁受圧室とレシーバタンク70間を連通する吸入制御回路84を設け,吸入弁40に対して作動圧力としてレシーバタンク70内の圧力を導入可能と成すと共に,この吸入制御回路84中に吸入弁制御用電磁弁4を設け,この吸入弁制御用電磁弁4の開閉によって吸入弁40の動作を制御することができるように構成している。   The intake port 11 of the compressor body 10 is provided with an intake valve 40 for controlling opening and closing of the intake port 11 of the compressor body 10 and an air filter 41 attached to the primary side of the intake valve 40. , A suction control circuit 84 that communicates between the closed pressure receiving chamber of the suction valve 40 and the receiver tank 70 is provided, so that the pressure in the receiver tank 70 can be introduced into the suction valve 40 as an operating pressure. 84, the suction valve control electromagnetic valve 4 is provided, and the operation of the suction valve 40 can be controlled by opening and closing the suction valve control electromagnetic valve 4.

圧縮機本体10の吐出口12には,前述のレシーバタンク70が連通され,圧縮機本体10より潤滑油と共に吐出された圧縮空気がレシーバタンク70内に導入されるように構成されている。   The above-described receiver tank 70 is communicated with the discharge port 12 of the compressor body 10, and the compressed air discharged together with the lubricating oil from the compressor body 10 is introduced into the receiver tank 70.

このレシーバタンク70内で潤滑油より分離された圧縮空気は,該レシーバタンク70に逆止弁50を介して連通された供給回路81を介して図示せざる消費側に供給されると共に,レシーバタンク70で回収された潤滑油は,給油回路82を介して圧縮機本体10の給油口13に供給可能に構成されている。   The compressed air separated from the lubricating oil in the receiver tank 70 is supplied to a consumer side (not shown) via a supply circuit 81 communicated with the receiver tank 70 via a check valve 50, and the receiver tank 70 The lubricating oil recovered at 70 is configured to be supplied to the oil supply port 13 of the compressor body 10 via the oil supply circuit 82.

この給油回路82には,潤滑油を冷却するオイルクーラ21が設けられており,オイルクーラ21を通過して冷却された潤滑油が再度,圧縮作用空間内に導入されて,圧縮機本体10の潤滑,冷却及び圧縮作用空間の密封に使用される。   The oil supply circuit 82 is provided with an oil cooler 21 that cools the lubricating oil. The lubricating oil cooled through the oil cooler 21 is again introduced into the compression working space, and the compressor body 10 Used for sealing of lubrication, cooling and compression working space.

レシーバタンク70内の圧縮空気を消費側に供給する供給回路81中には,アフタクーラ22やドライヤ23等の圧縮空気の冷却手段を設けている。   In the supply circuit 81 for supplying the compressed air in the receiver tank 70 to the consumer side, cooling means for compressed air such as the aftercooler 22 and the dryer 23 is provided.

そして,このドライヤ23を介して前記供給回路81より分岐されたドレン排出回路83中に,電磁弁であるドレン排出弁5を設け,このドレン排出弁5の開閉によって,ドライヤ23内に溜まったドレンの排出開始,停止を制御できるように構成している。   A drain discharge valve 5 that is an electromagnetic valve is provided in a drain discharge circuit 83 branched from the supply circuit 81 through the dryer 23, and the drain accumulated in the dryer 23 by opening and closing the drain discharge valve 5. It is configured to control the start and stop of discharge.

供給回路81には,更に供給回路81内の圧力,すなわち消費側に供給される圧縮空気の圧力を検知する圧力センサ6が設けられ,図示の実施形態にあっては,この圧力センサ6を前述のアフタクーラ22と逆止弁50の間における供給回路81中に設けている。   The supply circuit 81 is further provided with a pressure sensor 6 for detecting the pressure in the supply circuit 81, that is, the pressure of the compressed air supplied to the consumption side. In the illustrated embodiment, the pressure sensor 6 is described above. Is provided in the supply circuit 81 between the aftercooler 22 and the check valve 50.

図1中,3aは,前記筺体3内に外気を導入するための吸気口であり,この吸気口3aの形成位置に温度センサである外気温センサ7を設け,筺体3内に導入される外気の温度を測定することができるよう構成されている。   In FIG. 1, reference numeral 3 a denotes an intake port for introducing outside air into the housing 3. An outside air temperature sensor 7, which is a temperature sensor, is provided at a position where the intake port 3 a is formed, and the outside air introduced into the housing 3. It is comprised so that the temperature of can be measured.

なお,この外気温センサ7は,前記吸気口3aから圧縮機本体10の吸気口11に至る空気流路のいずれの位置に設けても良い。   The outside air temperature sensor 7 may be provided at any position in the air flow path from the intake port 3a to the intake port 11 of the compressor body 10.

更に,図1中,30は制御装置であり,この制御装置30は,前述した外気温センサ7によって検出された外気温,及び圧力センサ6によって検出された圧力を受信し,予め設定されたプログラムに従って吸入弁制御用電磁弁4,及びドレン排出弁5に対して制御信号を出力する電子制御装置であり,前記各センサ6,7の検知信号に従って,吸入弁制御用電磁弁4,及びドレン排出弁5を以下のように制御することにより,容量制御及びドレン排出制御を行う。   Further, in FIG. 1, reference numeral 30 denotes a control device. The control device 30 receives the outside air temperature detected by the outside air temperature sensor 7 and the pressure detected by the pressure sensor 6 and receives a preset program. In accordance with the above, the electronic control device outputs a control signal to the suction valve control solenoid valve 4 and the drain discharge valve 5, and according to the detection signals of the sensors 6 and 7, the suction valve control solenoid valve 4 and the drain discharge By controlling the valve 5 as follows, capacity control and drain discharge control are performed.

容量制御
制御装置30は,圧力センサ6より受信した検知信号に基づいて,以下のように吸入弁制御用電磁弁4を制御することにより,空気圧縮機1の運転状態を,圧縮機本体10の吸気口11を閉じたアンロード運転と,圧縮機本体10の吸気口11を開放したフルロード運転とを切り換える容量制御を行う。
Based on the detection signal received from the pressure sensor 6, the capacity control control device 30 controls the intake valve control electromagnetic valve 4 as follows, thereby changing the operating state of the air compressor 1 to the compressor body 10. Capacity control is performed to switch between unload operation with the intake port 11 closed and full load operation with the intake port 11 of the compressor body 10 opened.

このような容量制御は,制御装置30に予め記憶されたプログラムの実行によって実現される容量制御部31(図2参照)により行われ,この容量制御部31は,圧力センサの検出値が予め設定されたアンロード開始圧力(例えば0.7MPa)に達していない状態において,制御信号の出力又は出力停止により吸入弁制御用電磁弁4を閉塞した状態とする。   Such capacity control is performed by a capacity control unit 31 (see FIG. 2) that is realized by executing a program stored in advance in the control device 30. The capacity control unit 31 sets the detection value of the pressure sensor in advance. In a state where the unload start pressure (for example, 0.7 MPa) has not been reached, the suction valve control electromagnetic valve 4 is closed by outputting a control signal or stopping the output.

これにより,吸入弁40の閉弁受圧室に対してレシーバタンク70内の圧縮空気は導入されていない状態にあり,吸入弁40が開放して圧縮機本体10はフルロード運転となる。   Thus, the compressed air in the receiver tank 70 is not introduced into the closed pressure receiving chamber of the intake valve 40, the intake valve 40 is opened, and the compressor body 10 is in full load operation.

一方,圧力センサ6の検知信号により,逆止弁50の二次側圧力がアンロード開始圧力に達したことを判断すると,制御装置30は,制御信号の出力又は出力停止によって吸入弁制御用電磁弁4を開放する。   On the other hand, when it is determined from the detection signal of the pressure sensor 6 that the secondary side pressure of the check valve 50 has reached the unload start pressure, the control device 30 outputs the control signal or stops the suction valve control electromagnetic by the output stop. The valve 4 is opened.

これにより,吸入弁40の閉弁受圧室に対してレシーバタンク70内の圧縮空気が導入されて吸入弁40が閉じ,圧縮機本体10はアンロード運転に移行して,圧力センサ6の検出値がフルロード開始圧力(例えば0.6MPa)に低下するまでは吸入弁制御用電磁弁4の開放状態を維持する。これにより吸入弁40は閉塞された状態を維持し,圧縮機本体10はアンロード運転を継続する。   Thus, the compressed air in the receiver tank 70 is introduced into the closed pressure receiving chamber of the suction valve 40, the suction valve 40 is closed, the compressor body 10 shifts to the unload operation, and the detected value of the pressure sensor 6 is detected. Until the full load starting pressure (for example, 0.6 MPa) is reduced, the open state of the intake valve control solenoid valve 4 is maintained. As a result, the suction valve 40 is kept closed, and the compressor body 10 continues the unload operation.

一方,消費側における圧縮空気の消費によりレシーバタンク70内の圧力が低下して,圧力センサ6によって検出された逆止弁の二次側圧力がフルロード開始圧力(例えば0.6MPa)以下に低下すると,制御装置30の容量制御部31は,吸入弁制御用電磁弁4を閉塞し,これにより吸入弁40は開放された状態となり,圧縮機本体10はフルロード運転に移行して,レシーバタンク70内の圧力を上昇させる。   On the other hand, the pressure in the receiver tank 70 decreases due to the consumption of compressed air on the consumption side, and the secondary pressure of the check valve detected by the pressure sensor 6 decreases below the full load start pressure (for example, 0.6 MPa). Then, the capacity control unit 31 of the control device 30 closes the intake valve control electromagnetic valve 4, whereby the intake valve 40 is opened, and the compressor body 10 shifts to the full load operation, and the receiver tank The pressure in 70 is increased.

このような動作を繰り返し,制御装置30の容量制御部31は,消費側に供給される圧縮空気の圧力が,常に一定範囲の圧力となるように容量制御を行う。   By repeating such an operation, the capacity control unit 31 of the control device 30 performs capacity control so that the pressure of the compressed air supplied to the consumption side is always within a certain range.

なお,上記の例では,吸入弁40として閉弁受圧型のものを採用し,レシーバタンク70と吸入弁40の閉弁受圧室間を連通する吸入制御回路84中に吸入弁制御用電磁弁4を設けて前記制御装置30にこの吸入弁制御用電磁弁4を制御させるものとして説明したが,例えば,吸入弁40自体を電気信号の入力によって開閉制御可能なものとする場合には,この吸入弁40を制御装置30の容量制御部31が直接開閉制御するものとして構成しても良く,容量制御を実現するための構成は,図1に示す構成に限定されない。   In the above example, the suction valve 40 is a closed pressure receiving type, and the suction valve control solenoid valve 4 is provided in the suction control circuit 84 that communicates between the receiver tank 70 and the closed pressure receiving chamber of the suction valve 40. However, for example, when the intake valve 40 itself can be controlled to open and close by the input of an electric signal, the intake valve control electromagnetic valve 4 is controlled by the control device 30. The valve 40 may be configured such that the capacity control unit 31 of the control device 30 directly controls opening and closing, and the configuration for realizing the capacity control is not limited to the configuration shown in FIG.

ドレン排出制御
前述した制御装置30は,前述の容量制御の他,ドレン排出弁5を開閉して行うドレン排出制御を可能とする構成を備えている。
Drain discharge control The control device 30 described above has a configuration that enables drain discharge control performed by opening and closing the drain discharge valve 5 in addition to the capacity control described above.

このようなドレン排出制御を可能とするために,前述の制御装置30は,図2に示すように記憶部32と,該記憶部32に予め記憶されたプログラムを実行することにより実現される,計測部33,演算処理部34,及びドレン排出弁5の動作を制御する動作制御部35を備える。   In order to enable such drain discharge control, the control device 30 described above is realized by executing a storage unit 32 and a program stored in advance in the storage unit 32 as shown in FIG. A measurement unit 33, an arithmetic processing unit 34, and an operation control unit 35 that controls the operation of the drain discharge valve 5 are provided.

このうち,前述の記憶部32は,動作プログラムの他,外気温センサ7によって検出される外気温の変化に対応して,ドレン排出弁5の動作タイミングの変化を求めるための関係式が記憶されている。   Of these, the storage unit 32 stores an operation program and a relational expression for obtaining a change in the operation timing of the drain discharge valve 5 in response to a change in the outside air temperature detected by the outside air temperature sensor 7. ing.

この関係式は,本発明によるドレン排出制御方法の対象とする空気圧縮機1において,例えば吸入空気の温度を変化させた実測を行い,前記圧縮機本体10に導入される吸入空気の温度の変化と前記空気圧縮機1の単位時間当たりのフルロード運転によって冷却手段22で発生するドレンの発生量の変化との対応関係を求め,及びドレン排出弁5の単位時間当たりのドレン排出量を実測により求め,これらの実測値に基づいて,吸入空気の温度を特定すると,ドレン発生量とドレン排出量を一致させることができる前記ドレン排出弁の動作パターンを算出することができるものを記憶する。   This relational expression is obtained by measuring, for example, the temperature of the intake air in the air compressor 1 that is the target of the drain discharge control method according to the present invention, and changing the temperature of the intake air introduced into the compressor body 10. And the change in the amount of drain generated in the cooling means 22 by the full load operation per unit time of the air compressor 1 is obtained, and the drain discharge amount per unit time of the drain discharge valve 5 is measured by actual measurement. When the temperature of the intake air is determined based on these actually measured values, the one that can calculate the operation pattern of the drain discharge valve that can match the drain generation amount and the drain discharge amount is stored.

一例として,図4に示すようにドレン排出弁5の1回の開閉動作における開放時間を予め設定された一定時間(設定開放時間)yとし,ドレン排出弁の1回の開閉動作に伴うドレン排出量を定量化すると共に,この定量化されたドレン排出量に対応するドレン発生量となるフルロード運転の積算時間毎にドレン排出弁5の開閉動作を行う本実施例にあっては,図3に示すように外気温が高くなるに従い,定量化されたドレン排出量に対応するドレン発生量となるフルロード運転の積算時間(従ってドレン排出弁5の作動間隔)は減少し,逆に外気温が低くなると積算時間(従ってドレン排出弁5の作動間隔)は増大する。   As an example, as shown in FIG. 4, the opening time in one opening / closing operation of the drain discharge valve 5 is set to a predetermined time (set opening time) y, and drain discharge accompanying one opening / closing operation of the drain discharging valve is performed. In the present embodiment in which the amount is quantified, and the drain discharge valve 5 is opened / closed for each integration time of the full load operation that becomes the drain generation amount corresponding to the quantified drain discharge amount, FIG. As shown in Fig. 4, as the outside air temperature increases, the accumulated time of the full load operation (that is, the operation interval of the drain discharge valve 5) at which the drain generation amount corresponding to the quantified drain discharge amount decreases, and conversely the outside air temperature. When the value becomes lower, the accumulated time (and hence the operation interval of the drain discharge valve 5) increases.

このような対応関係に基づいて,吸入空気の温度が特定されると,前記定量化されたドレン排出量に対応するドレン発生量を得るために必要なフルロード運転の積算時間x1,x2が得られる関係式を記憶させる。   When the temperature of the intake air is specified based on such a correspondence relationship, the accumulated times x1 and x2 of the full load operation necessary for obtaining the drain generation amount corresponding to the quantified drain discharge amount are obtained. The relational expression is memorized.

前述の計測部33は,空気圧縮機1のフルロード運転時間を積算してカウントするものであり,既知のタイマ等によって構成される。   The above-described measuring unit 33 integrates and counts the full load operation time of the air compressor 1 and is configured by a known timer or the like.

制御装置30が前述の容量制御部31を備えた本実施例にあっては,一例としてこの計測部33は,空気圧縮機1の運転中,容量制御部31によって圧縮機本体10の吸気口11が開放されたフルロード運転の状態にある時間をカウントする(吸気口11が閉じたアンロード運転状態にある時間をカウントから外す)ことによりフルロード運転の積算時間をカウントするものであり,例えば,図1に示す実施例において,吸入弁40が受圧閉弁型の吸入弁であり,かつ,吸入弁制御用電磁弁4が常時開(ノーマリオープン)型である場合には,制御装置30の容量制御部31が,吸入弁制御用電磁弁4に対して制御信号の出力(作動電圧の印加)している時間を積算してカウントすることにより,容易に空気圧縮機のフルロード運転の積算時間のカウント行うことができる。   In the present embodiment in which the control device 30 includes the capacity control unit 31 described above, for example, the measurement unit 33 is operated by the capacity control unit 31 during the operation of the air compressor 1. Is counted in the full load operation state in which the engine is opened (the time in the unload operation state in which the intake port 11 is closed is removed from the count). In the embodiment shown in FIG. 1, when the intake valve 40 is a pressure-receiving closed valve type intake valve and the intake valve control solenoid valve 4 is normally open (normally open) type, the control device 30 The capacity control unit 31 of the compressor integrates and counts the time during which the control signal is output (application of the operating voltage) to the intake valve control solenoid valve 4, so that the full load operation of the air compressor can be easily performed. During integration It can be carried out of the count.

前述の演算処理部34は,空気圧縮機1の吸気口3aに設けた外気温センサ7が検知した外気温に従い,前述の記憶部32に記憶された関係式に基づいて,前記設定開放時間yにおけるドレン排出量に対応したドレンを発生させるフルロード運転の積算時間x1,x2を算出する。   The arithmetic processing unit 34 is configured to perform the set opening time y based on the relational expression stored in the storage unit 32 according to the outside air temperature detected by the outside air temperature sensor 7 provided in the air inlet 3a of the air compressor 1. The accumulated times x1 and x2 of the full load operation for generating drain corresponding to the drain discharge amount are calculated.

前述の動作制御部35は,ドレン排出弁5の開閉動作を制御するもので,前述した計測部33によってカウントされたフルロード運転の積算時間が,演算処理部34が関係式に基づいて算出した積算時間に達すると,ドレン排出弁5を前記設定開放時間yに従って1回開閉動作させる。   The above-described operation control unit 35 controls the opening / closing operation of the drain discharge valve 5, and the total processing time of the full load operation counted by the above-described measurement unit 33 is calculated by the arithmetic processing unit 34 based on the relational expression. When the accumulated time is reached, the drain discharge valve 5 is opened and closed once according to the set opening time y.

このドレン排出弁5の1回の開閉動作の終了によって,前述の計測部33は,カウントをリセットし,再度,空気圧縮機1のフルロード運転時間の積算を開始し,各部が前述した動作を繰り返して,関係式によって特定される所定の対応関係に従った所定の動作パターン(積算時間x1,x2)で,ドレン排出弁5の開閉制御が行われ,ドレンは間欠的に排出される。   When the opening / closing operation of the drain discharge valve 5 is completed once, the above-described measuring unit 33 resets the count, and again starts to accumulate the full load operation time of the air compressor 1, and each unit performs the above-described operation. Repeatedly, the drain discharge valve 5 is controlled to open and close with a predetermined operation pattern (integrated time x1, x2) according to a predetermined correspondence specified by the relational expression, and the drain is discharged intermittently.

その結果,空気圧縮機の作動中に,何らかの原因によって外気温度が低下した場合,動作制御部35は,図4に示すように当初,計測部33がフルロード運転の積算時間x1をカウントすることにより行っていたドレン排出弁の1回の開閉動作を,延長された積算時間x2をカウントしたときに行い,ドレン排出弁5の作動間隔を可変とする。   As a result, when the outside air temperature decreases for some reason during the operation of the air compressor, the operation control unit 35 initially counts the accumulated time x1 of the full load operation as shown in FIG. The drain opening valve is opened and closed once when the extended accumulated time x2 is counted, and the operation interval of the drain discharging valve 5 is made variable.

動作及び作用
以上のように構成されたドレン排出機構を備えた空気圧縮機1を運転すると,筐体3の吸気口3aから機内に外気を取り込み,圧縮機本体10は機内の空気を吸い込んで圧縮する。
Operation and Action When the air compressor 1 having the drain discharge mechanism configured as described above is operated, outside air is taken into the machine from the intake port 3a of the housing 3, and the compressor body 10 sucks the air inside the machine and compresses it. To do.

圧縮機本体10から吐出された圧縮空気は,レシーバタンク70及びセパレータ71で含有する潤滑油を分離する。そして,冷却手段であるアフタクーラ22及びドライヤ23で冷却されて圧縮空気中の水蒸気が凝結してドレンが発生し,アフタクーラ22で発生したドレンは圧縮空気と共にドライヤ23に送られて,ドライヤ23のドレン貯留部に一時的に貯留される。   The compressed air discharged from the compressor body 10 separates the lubricating oil contained in the receiver tank 70 and the separator 71. Then, after cooling by the aftercooler 22 and the dryer 23 as cooling means, water vapor in the compressed air condenses to generate drain, and the drain generated in the aftercooler 22 is sent to the dryer 23 together with the compressed air, and the drain of the dryer 23 is drained. It is temporarily stored in the storage part.

このドライヤ23のドレン貯留部に貯留されたドレンは,制御装置30からの開閉信号に基づいて開閉制御されるドレン排出弁5を備えたドレン排出回路83を介して排出される。   The drain stored in the drain storage portion of the dryer 23 is discharged through a drain discharge circuit 83 including a drain discharge valve 5 that is controlled to open and close based on an open / close signal from the control device 30.

制御装置30の容量制御部31は,前述したように供給回路81に設けた圧力センサ6で検出した圧縮空気の圧力に基づいて吸入弁制御用電磁弁4の開閉信号を出力する。   The capacity control unit 31 of the control device 30 outputs an opening / closing signal for the electromagnetic valve 4 for intake valve control based on the pressure of the compressed air detected by the pressure sensor 6 provided in the supply circuit 81 as described above.

この吸入弁制御用電磁弁4への閉信号の出力により,計測部33は吸入弁40の開放時間,すなわち空気圧縮機1のフルロード運転時間のカウントを開始する。   In response to the output of the close signal to the intake valve control electromagnetic valve 4, the measurement unit 33 starts counting the open time of the intake valve 40, that is, the full load operation time of the air compressor 1.

ドレン排出弁の動作を制御する前述の動作制御部35は,前記計測部33によるフルロード運転時間のカウントが,前記演算処理部34によって算出された積算時間に達したらドレン排出弁5へ開信号を出力して,一定時間yでドレン排出弁5を開放した後,ドレン排出弁5を閉じる。   The operation control unit 35 that controls the operation of the drain discharge valve opens the signal to the drain discharge valve 5 when the count of the full load operation time by the measurement unit 33 reaches the accumulated time calculated by the arithmetic processing unit 34. Is output, the drain discharge valve 5 is opened at a predetermined time y, and then the drain discharge valve 5 is closed.

このとき,演算処理部34によって算出される積算時間は,吸気口近傍に設けた外気温センサ7で検出した外気温と,記憶部32に記憶された関係式に基づいて求められることから,ドレン排出弁5の1回の開閉動作から,次回の開閉動作迄の作動間隔を規定するフルロード運転の積算時間x1,x2,・・・は,図4に示すように外気温の変化に基づいて変化し,このフルロード運転によって発生するドレン発生量と,ドレン排出弁5の1回の開閉によって排出されるドレン排出量とが一致するように調整される。   At this time, the accumulated time calculated by the arithmetic processing unit 34 is obtained based on the outside air temperature detected by the outside air temperature sensor 7 provided in the vicinity of the intake port and the relational expression stored in the storage unit 32. The accumulated time x1, x2,... For defining the operation interval from one opening / closing operation of the discharge valve 5 to the next opening / closing operation is based on the change of the outside air temperature as shown in FIG. The drain generation amount generated by the full load operation and the drain discharge amount discharged by one opening / closing of the drain discharge valve 5 are adjusted to coincide with each other.

このように,タイマはフルロード運転時間を積算し,圧縮機本体に外気を吸い込まないアンロード時間を積算しないことから,圧縮機の吸入空気量に対応したドレン発生量に応じてドレン排出弁の動作間隔が決定されるのみならず,外気温度の変化に対応したドレン発生量に応じてドレン排出弁の動作間隔が決定されることになる。   In this way, the timer adds up the full load operation time and does not add up the unload time during which no outside air is sucked into the compressor body. Therefore, the drain discharge valve is set according to the amount of drain generated corresponding to the intake air amount of the compressor. Not only the operation interval is determined, but also the operation interval of the drain discharge valve is determined according to the amount of drain generated corresponding to the change in the outside air temperature.

ここで,温度のみを問題とするのは,同一温度であっても湿度の変化によってドレンの発生量は変化するが,日本国内では地域が変わっても同一温度であれば湿度は,ほぼ同程度であることによる。   Here, the only problem with temperature is that even if the temperature is the same, the amount of drain generated changes due to changes in humidity. Because it is.

その結果,ドレン排出弁5の1回の動作から次回の動作迄の間のドレン発生量と,ドレン排出弁5の1回の開閉動作によるドレン排出量とが一致し,ドレンと共に圧縮空気が機外へ放出される無駄を抑制し,また,消費側の空圧機器へドレンが混入した圧縮空気を供給されることを防止することが可能となる。   As a result, the amount of drain generated from one operation of the drain discharge valve 5 to the next operation coincides with the amount of drain discharge by one opening / closing operation of the drain discharge valve 5, and the compressed air is discharged together with the drain. It is possible to suppress waste discharged to the outside and to prevent the compressed air mixed with drain from being supplied to the pneumatic equipment on the consumption side.

しかも,制御装置30は,圧力センサ6の検知信号を受けて吸入弁制御用電磁弁4を開閉制御することにより,空気圧縮機1の運転状態をアンロード運転,又はフルロード運転に制御する容量制御装置としての機能を有するものであることから,制御装置30は,吸入弁制御用電磁弁4への開閉信号の出力により空気圧縮機1の運転状態が,アンロード運転,又はフルロード運転のいずれの状態にあるかを容易に把握することができる。   In addition, the control device 30 receives the detection signal from the pressure sensor 6 and controls the intake valve control electromagnetic valve 4 to open and close, thereby controlling the operation state of the air compressor 1 to unload operation or full load operation. Since the control device 30 has a function as a control device, the control device 30 determines whether the operation state of the air compressor 1 is an unload operation or a full load operation by outputting an opening / closing signal to the electromagnetic valve 4 for suction valve control. It can be easily grasped in which state.

そのため,制御装置30の計測部33は,吸入弁制御用電磁弁4への開信号でカウントを中断し,閉信号でカウント再開することにより,また,ドレン排出弁5への開信号でカウントをリセットすることで,フルロード運転の積算時間を容易にカウントすることが可能である。   Therefore, the measurement unit 33 of the control device 30 interrupts the count by the open signal to the intake valve control electromagnetic valve 4 and restarts the count by the close signal, and also counts by the open signal to the drain discharge valve 5. By resetting, it is possible to easily count the total time of full load operation.

なお,上記実施例においては,ドレン排出弁5の開閉動作終了後,次回開閉動作開始までのフルロード運転の時間を積算しているが,これに限定せず,ドレン排出弁5が開放しているときもフルロード運転の時間を積算してもよく,フルロード運転時間が所定の時間に達したら,ドレン排出弁5を開放するとともに,積算時間をリセットしてフルロード運転の時間を積算することができる。   In the above embodiment, the full load operation time from the end of the open / close operation of the drain discharge valve 5 to the start of the next open / close operation is integrated. However, the present invention is not limited to this, and the drain discharge valve 5 is opened. The full load operation time may be accumulated even when the vehicle is running. When the full load operation time reaches a predetermined time, the drain discharge valve 5 is opened and the accumulation time is reset to accumulate the full load operation time. be able to.

〔実施例2〕
以上で説明した実施例1に記載の構成において,制御装置30は,ドレン排出弁5の開放時間を一定時間とし,外気温の変化に従ってドレン排出弁5の動作間隔を可変とする制御を行うものとして説明したが,この構成に代え,図6に示すように制御装置30がドレン排出弁5の開閉動作を一定周期x毎に行わせるが,ドレン排出弁5の開放時間についてはこれを外気温の変化に対応してy1,y2,y3,・・・と可変とするように構成しても良い。
[Example 2]
In the configuration described in the first embodiment described above, the control device 30 performs control so that the open time of the drain discharge valve 5 is a fixed time and the operation interval of the drain discharge valve 5 is variable according to changes in the outside air temperature. However, instead of this configuration, as shown in FIG. 6, the control device 30 causes the drain discharge valve 5 to be opened and closed at regular intervals x. It may be configured to be variable as y1, y2, y3,.

すなわち,ドレン排出弁5の開放時間を長くすれば,この間に排出されるドレンの量は増加し,一方,ドレン排出弁5の開放時間を短くすれば,この間に排出されるドレンの量は減少することから,一定時間のフルロード運転によって発生するドレン発生量が,外気温の変化に応じて変化した場合,ドレン排出弁5の開放時間を変化させることでドレン発生量とドレン排出量を一致させるようにしている。   That is, if the opening time of the drain discharge valve 5 is lengthened, the amount of drained water increases during this period, while if the opening time of the drain discharge valve 5 is shortened, the amount of drainage discharged during this time decreases. Therefore, if the amount of drain generated by a full load operation for a certain time changes according to the change in the outside air temperature, the drain generation amount and the drain discharge amount are matched by changing the opening time of the drain discharge valve 5 I try to let them.

このようなドレンの排出を実施するために,本実施例にあっては制御装置30の記憶部32に予めドレン排出弁5の作動間隔を規定する,空気圧縮機1のアンロード運転の積算時間xを,設定積算時間として記憶させる。   In order to perform such drain discharge, in this embodiment, the accumulated time of unloading operation of the air compressor 1 that predefines the operation interval of the drain discharge valve 5 in the storage unit 32 of the control device 30. x is stored as the set integration time.

そして,制御装置30の記憶部32に,外気温の変化に伴うドレン排出弁5の開放時間y1,y2,y3,・・・の変化を算出するために,外気温の変化と,この外気温の変化に対応したドレン排出弁の開放時間の変化の対応関係を関係式として記憶させておく。   And in order to calculate the change of open time y1, y2, y3, ... of the drain discharge valve 5 accompanying the change of external temperature in the memory | storage part 32 of the control apparatus 30, change of external temperature and this external temperature are calculated. The correspondence relationship of the change in the opening time of the drain discharge valve corresponding to the change in is stored as a relational expression.

このように,記憶部32に記憶した関係式の相違により,演算処理部34は,外気温センサ7によって検知された外気温に基づいて,該外気温において設定積算時間のフルロード運転によって生じるドレン発生量に対応したドレン排出量を生じさせるドレン排出弁5の開放時間y1,y2,y3,・・・を算出する。   As described above, due to the difference in the relational expression stored in the storage unit 32, the arithmetic processing unit 34 is based on the outside air temperature detected by the outside air temperature sensor 7, and the drain generated by the full load operation for the set integration time at the outside air temperature. The open times y1, y2, y3,... Of the drain discharge valve 5 for generating the drain discharge amount corresponding to the generated amount are calculated.

動作制御部35は,前述の計測部33によるフルロード運転の積算カウントが,予め記憶部32に記憶された設定積算時間xとなる毎にドレン排出弁5の1回の開閉制御を行うが,この開閉に際してドレン排出弁5の開閉時間を,前記演算処理部34によって算出された開放時間y1,y2,y3,・・・開放する。   The operation control unit 35 performs one-time opening / closing control of the drain discharge valve 5 every time the total count of the full load operation by the measurement unit 33 reaches the set integration time x stored in the storage unit 32 in advance. At the time of this opening / closing, the opening / closing time of the drain discharge valve 5 is opened by the opening times y1, y2, y3,.

その後のドレン排出弁5の閉動作と共に,計測部33によるカウントがリセットされ,再度フルロード運転の積算時間のカウントが開始され,積算時間が設定時間xに達したとき,ドレン排出弁5を外気温に基づいて算出された時間開放してドレンを排出する動作を繰り返す。   With the subsequent closing operation of the drain discharge valve 5, the count by the measuring unit 33 is reset, the counting of the accumulated time of full load operation is started again, and when the accumulated time reaches the set time x, the drain discharging valve 5 is removed. The operation of releasing the drain after opening for a time calculated based on the temperature is repeated.

このようにして得られる外気温に基づく開放時間の変化は,一例として,図5に示すように,外気温が高い場合,ドレン排出弁5の開放時間は長くなり,また,外気温が低い場合には,ドレン排出弁5の開放時間は短くなる。   For example, as shown in FIG. 5, when the outside air temperature is high, the open time of the drain discharge valve 5 becomes long and the outside air temperature is low. In this case, the opening time of the drain discharge valve 5 is shortened.

一例として,開放時間y1でのドレン排出弁5の開閉動作後,何らかの原因によって外気温度が上昇した場合,制御装置は,図6に示すようにドレン排出弁5の開放時間を変化させて,ドレン排出弁5の開放時間をy2に増大する。   As an example, when the outside air temperature rises for some reason after opening / closing operation of the drain discharge valve 5 at the opening time y1, the control device changes the opening time of the drain discharge valve 5 as shown in FIG. The opening time of the discharge valve 5 is increased to y2.

また,これとは逆に,開放時間y2での開閉動作後,外気温が低下した場合には,ドレン排出弁5の開放時間をy3に減少させて,ドレン排出量を減少させることによりドレン発生量とドレン排出量を一致させる。   On the contrary, when the outside air temperature decreases after the opening / closing operation at the opening time y2, the drain generation time is reduced by decreasing the drain discharge amount by reducing the opening time of the drain discharge valve 5 to y3. Match the amount and drain discharge.

このように,外気温の低下に伴うドレンの発生量の減少に伴い,ドレン排出弁5の開放時間を短くすることにより,ドレン排出弁5が,発生したドレンを排出するために必要な時間以上開放されることがなく,ドレンの排出後に圧縮空気が排出されることを防止することができ,圧力低下に伴うフルロード運転への移行により無駄な動力が消費されることを防止することができる。   As described above, the drain discharge valve 5 is shortened for the time required to discharge the generated drain by shortening the opening time of the drain discharge valve 5 in accordance with the decrease in the amount of drain generated as the outside air temperature decreases. Compressed air can be prevented from being discharged after draining without being opened, and useless power can be prevented from being consumed due to the shift to full load operation due to pressure drop. .

一方,外気温の上昇によって発生するドレン量が増加した場合には,この増加分に対応してドレン排出弁の開放時間が増加することから,排出されずに残ったドレンが蓄積される等して,圧縮空気と共に消費側に導入されることも好適に防止することができる。   On the other hand, if the amount of drain generated due to an increase in outside air temperature increases, the open time of the drain discharge valve increases corresponding to this increase, so that the remaining drain without being discharged is accumulated. Thus, it can be suitably prevented from being introduced to the consumption side together with the compressed air.

〔実施例3〕
前述した実施例1,2において,制御装置30は吸気口3aに設けた外気温センサ7に基づいてドレン排出弁5の動作間隔x1,x2を可変とし(実施例1;図4参照),又は,ドレン排出弁5の開放時間y1,y2,y3を可変としているが(実施例2;図6参照),外気温(吸入空気の温度)の測定に代えて,吸入空気の湿度を測定して,前記同様の制御を行うように構成しても良い。この場合には,図1に示す装置構成において,外気温センサ7に代えて湿度センサを設ける。
Example 3
In the first and second embodiments described above, the control device 30 makes the operation intervals x1 and x2 of the drain discharge valve 5 variable based on the outside air temperature sensor 7 provided at the intake port 3a (the first embodiment; see FIG. 4), or Although the opening times y1, y2 and y3 of the drain discharge valve 5 are variable (Example 2; see FIG. 6), instead of measuring the outside air temperature (intake air temperature), the humidity of the intake air is measured. The same control as described above may be performed. In this case, a humidity sensor is provided in place of the outside air temperature sensor 7 in the apparatus configuration shown in FIG.

より好ましくは,図7に示すように,外気温センサ7に加え,湿度センサ8を吸入空気の流路,図示の例では吸気口3aに面して設け,前記外気温センサ7が検出した外気温度,湿度センサ8が検出した吸入空気の湿度の双方に基づいて,制御装置30がドレン排出弁5の作動間隔,又はドレン排出弁5の開放時間を可変とするように構成する。   More preferably, as shown in FIG. 7, in addition to the outside air temperature sensor 7, a humidity sensor 8 is provided facing the intake air flow path, in the illustrated example, the air inlet 3 a, and the outside air detected by the outside air temperature sensor 7 is provided. Based on both the temperature and the humidity of the intake air detected by the humidity sensor 8, the control device 30 is configured to vary the operation interval of the drain discharge valve 5 or the opening time of the drain discharge valve 5.

このようなドレン排出方法を実現するために,制御装置30の記憶手段32には,測定された外気温及び湿度において最適となるドレン排出弁5の作動間隔,又はドレン排出弁5の開放時間を算出するための関係式を記憶させる。   In order to realize such a drain discharge method, the storage means 32 of the control device 30 stores the operation interval of the drain discharge valve 5 or the opening time of the drain discharge valve 5 which is optimum at the measured outside air temperature and humidity. A relational expression for calculation is stored.

以上のように構成されたドレン排出機構にあっては,外気温の変化に伴うドレン発生量の変化のみならず,圧縮機本体に吸入する外気の湿度変化に基づくドレン発生量の変化をも考慮してドレン排出弁5の作動間隔,又はドレン排出弁5の開放時間が可変となることから,より高精度にドレン発生量に対応したドレン排出量となるようにドレン排出弁5の動作間隔,又は開放時間でドレン排出弁5を開閉制御することができ,ドレンの排出不足に伴い消費側にドレンが導入されることや,ドレン発生量に対して過剰にドレン排出弁5が開放されることによる圧縮空気の放出が好適に防止される。   In the drain discharge mechanism configured as described above, not only changes in the amount of drain generated due to changes in the outside air temperature, but also changes in the amount of drain generated based on changes in the humidity of the outside air sucked into the compressor body are considered. Since the operation interval of the drain discharge valve 5 or the opening time of the drain discharge valve 5 is variable, the operation interval of the drain discharge valve 5 so as to obtain a drain discharge amount corresponding to the drain generation amount with higher accuracy. Alternatively, the drain discharge valve 5 can be controlled to open and close during the opening time, drain is introduced to the consumption side due to insufficient drain discharge, or the drain discharge valve 5 is opened excessively with respect to the amount of drain generated. The release of compressed air due to is preferably prevented.

〔その他〕
なお,図1及び図6を参照して説明した上記実施例にあっては,いずれもアフタクーラ22の二次側にドライヤ23を設け,このドライヤ23のドレン貯留部に連通したドレン排出回路83を介してドレンを排出する構成について説明したが,図8に示すように,このドライヤ23に代え,アフタクーラ22の二次側に圧縮空気とドレンとを分離するドレンセパレータ23’を設け,このドレンセパレータ23’に設けたドレン貯留部の下端にドレン排出回路83を連通するように構成しても良い。
[Others]
In the above-described embodiments described with reference to FIGS. 1 and 6, a dryer 23 is provided on the secondary side of the aftercooler 22, and a drain discharge circuit 83 communicated with the drain storage portion of the dryer 23 is provided. The drain is discharged via the drain 23, but instead of the dryer 23, a drain separator 23 'for separating compressed air and drain is provided on the secondary side of the aftercooler 22, as shown in FIG. You may comprise so that the drain discharge circuit 83 may be connected to the lower end of the drain storage part provided in 23 '.

その他の構成については,前述した図1及び図7を参照して説明した実施例1〜3のいずれかの構成を採用することが可能である。   As for other configurations, any of the configurations of the first to third embodiments described with reference to FIGS. 1 and 7 described above can be employed.

本発明のドレン排出機構を備えた空気圧縮機の説明図。Explanatory drawing of the air compressor provided with the drain discharge mechanism of this invention. 制御装置の機能ブロック図。The functional block diagram of a control apparatus. 外気温の変化とドレン排出弁の作動間隔の変化を示す相関図。The correlation diagram which shows the change of the change of the outside temperature, and the change of the operation interval of a drain discharge valve. ドレン排出弁の動作を示すタイムチャート。The time chart which shows operation | movement of a drain discharge valve. 外気温の変化とドレン排出弁の開放時間の変化を示す相関図。The correlation diagram which shows the change of the open temperature of a drain discharge valve, and the change of external temperature. ドレン排出弁の動作を示すタイムチャート。The time chart which shows operation | movement of a drain discharge valve. 本発明の別のドレン排出機構を備えた空気圧縮機の説明図。Explanatory drawing of the air compressor provided with another drain discharge mechanism of this invention. 本発明のドレン排出機構を備えた空気圧縮機の説明図。Explanatory drawing of the air compressor provided with the drain discharge mechanism of this invention.

符号の説明Explanation of symbols

1 空気圧縮機(油冷式スクリュ圧縮機)
3 筺体
3a 吸気口
4 吸入弁制御用電磁弁
5 ドレン排出弁
6 圧力センサ
7 外気温センサ
8 湿度センサ
10 圧縮機本体
11 吸気口
12 吐出口
13 給油口
21 オイルクーラ
22 冷却手段(アフタクーラ)
23 冷却手段(ドライヤ)
23’ 捕集手段(ドレンセパレータ)
30 制御装置
31 容量制御部
32 記憶部
33 計測部
34 演算処理部
35 動作制御部
40 吸入弁
41 エアフィルタ
50 逆止弁
60 モータ
70 レシーバタンク
71 セパレータ
81 供給回路
82 給油回路
83 ドレン排出回路
84 吸入制御回路
1 Air compressor (oil-cooled screw compressor)
DESCRIPTION OF SYMBOLS 3 Housing | casing 3a Intake port 4 Solenoid valve for intake valve control 5 Drain discharge valve 6 Pressure sensor 7 Outside temperature sensor 8 Humidity sensor 10 Compressor body 11 Intake port 12 Discharge port 13 Oil supply port 21 Oil cooler 22 Cooling means (after cooler)
23 Cooling means (dryer)
23 'Collection means (drain separator)
DESCRIPTION OF SYMBOLS 30 Control apparatus 31 Capacity | capacitance control part 32 Memory | storage part 33 Measurement part 34 Operation processing part 35 Operation control part 40 Suction valve 41 Air filter 50 Check valve 60 Motor 70 Receiver tank 71 Separator 81 Supply circuit 82 Oil supply circuit 83 Drain discharge circuit 84 Suction Control circuit

Claims (7)

圧縮機本体より吐出された圧縮空気を消費側に供給する前に冷却する冷却手段を備え,ドレン排出弁の開閉動作を繰り返すことによって前記冷却手段で発生したドレンを排出する空気圧縮機のドレン排出方法において,
吸入空気の温度又は温度及び湿度の変化と前記空気圧縮機のフルロード運転における単位時間当たりのドレン発生量の変化との対応関係,及び前記ドレン排出弁の単位時間当たりのドレン排出量を予め求めておき,
吸入空気の温度又は温度及び湿度を実測すると共に,前記空気圧縮機のフルロード運転時間を計測且つ積算し,前記対応関係に基づいて,該実測された温度又は温度及び湿度と,フルロード運転の積算時間と,前記単位時間当たりのドレン発生量及び前記単位時間当たりのドレン排出量から,前記空気圧縮機のフルロード運転の積算時間において発生するドレンの発生量と,前記ドレン排出弁の1回の開閉動作に伴うドレン排出量とを算出し,前記ドレン発生量と前記ドレン排出量とを一致させる前記ドレン排出弁の動作パターンを求め,
得られた動作パターンに従って前記ドレン排出弁の動作を制御することを特徴とする空気圧縮機におけるドレン排出方法。
Drain discharge of an air compressor having cooling means for cooling before supplying compressed air discharged from the compressor body to the consuming side, and discharging drain generated by the cooling means by repeatedly opening and closing the drain discharge valve In the method,
Corresponding relationship between changes in intake air temperature or temperature and humidity and changes in drain generation per unit time in full load operation of the air compressor, and drain discharge per unit time of the drain discharge valve are obtained in advance. And
Measure the temperature or temperature and humidity of the intake air, measure and accumulate the full load operation time of the air compressor, and based on the correspondence, the measured temperature or temperature and humidity and the full load operation From the accumulated time, the amount of drain generated per unit time and the amount of drain discharged per unit time, the amount of drain generated during the accumulated time of the full load operation of the air compressor and the one time of the drain discharge valve Calculating a drain discharge amount associated with the opening / closing operation of the valve, and obtaining an operation pattern of the drain discharge valve for matching the drain generation amount and the drain discharge amount,
A drain discharge method in an air compressor, wherein the operation of the drain discharge valve is controlled according to the obtained operation pattern.
前記ドレン排出弁の開放時間を予め設定された一定の開放時間として前記ドレン排出弁の各回毎の開閉動作に伴うドレン排出量を定量化すると共に,
前記対応関係に基づいて,前記実測された温度又は温度及び湿度において前記定量化されたドレン排出量に一致するドレンを発生させるフルロード運転の積算時間を算出し,
空気圧縮機のフルロード運転時間を計測して,その積算時間が,前記算出された積算時間となる毎に,前記ドレン排出弁に1回の開閉動作を行わせることを特徴とする請求項1記載の空気圧縮機のドレン排出方法。
Quantifying the drain discharge amount associated with each opening and closing operation of the drain discharge valve, with the opening time of the drain discharge valve as a predetermined constant opening time,
Based on the correspondence, calculate an accumulated time of full load operation for generating drain that matches the quantified drain discharge at the measured temperature or temperature and humidity;
2. The full load operation time of the air compressor is measured, and the drain discharge valve is caused to perform one opening / closing operation every time the accumulated time reaches the calculated accumulated time. The air compressor drain discharge method described.
前記ドレン排出弁の開閉動作を,前記空気圧縮機のフルロード運転が予め設定された一定の設定積算時間となる毎に行うと共に,
前記対応関係に基づいて,前記実測された温度又は温度及び湿度において前記設定積算時間で空気圧縮機をフルロード運転した際に発生するドレン発生量に一致した前記ドレン排出弁の開放時間を算出し,前記算出された開放時間で前記ドレン排出弁を開閉制御することを特徴とする請求項1記載の空気圧縮機におけるドレン排出方法。
The opening and closing operation of the drain discharge valve is performed every time the full load operation of the air compressor reaches a predetermined set integration time,
Based on the correspondence relationship, the drain discharge valve opening time corresponding to the amount of drain generated when the air compressor is fully loaded at the set integration time at the measured temperature or temperature and humidity is calculated. The drain discharge method for an air compressor according to claim 1, wherein the drain discharge valve is controlled to open and close during the calculated opening time.
圧縮機本体より吐出された圧縮空気を消費側に供給する前に冷却する冷却手段を備え,開閉動作を繰り返すドレン排出弁によって前記冷却手段で発生したドレンを排出する空気圧縮機において,
前記圧縮機本体の吸入空気温度又は温度及び湿度を測定するセンサと,
前記センサの検知信号に従って前記ドレン排出弁の開閉動作を制御する制御手段を備え,
前記制御手段が,
前記空気圧縮機のフルロード運転時間を計測且つ積算する計測部と,
吸入空気の温度又は温度及び湿度の変化と前記空気圧縮機のフルロード運転における単位時間当たりのドレン発生量の変化との対応関係,及び前記ドレン排出弁の単位時間当たりのドレン排出量に基づいて予め求められた前記ドレン排出弁の動作タイミングを規定する関係式を記憶する記憶部と,
前記センサによって検出された吸入空気の温度又は温度及び湿度と,前記記憶手段に記憶された前記関係式に基づいて,前記空気圧縮機のフルロード運転の積算時間において発生するドレンの発生量と,前記ドレン排出弁の1回の開閉動作に伴うドレン排出量とを一致させる前記ドレン排出弁の動作パターンを特定する演算処理部と,
前記演算処理部によって特定された動作パターンに従って前記ドレン排出弁の動作を制御する動作制御部を備えることを特徴とする空気圧縮機におけるドレン排出機構。
An air compressor comprising cooling means for cooling before supplying compressed air discharged from a compressor body to a consumer side, and discharging drain generated by the cooling means by a drain discharge valve that repeatedly opens and closes.
A sensor for measuring the intake air temperature or temperature and humidity of the compressor body;
Control means for controlling the opening and closing operation of the drain discharge valve according to the detection signal of the sensor;
The control means is
A measuring unit for measuring and integrating the full load operation time of the air compressor;
Based on the relationship between the change in temperature or temperature and humidity of intake air and the change in the amount of drain generated per unit time in full load operation of the air compressor, and the amount of drain discharged per unit time of the drain discharge valve A storage unit for storing a relational expression that prescribes the operation timing of the drain discharge valve obtained in advance;
Based on the temperature or temperature and humidity of the intake air detected by the sensor and the relational expression stored in the storage means, the amount of drain generated during the accumulated time of full load operation of the air compressor, An arithmetic processing unit for specifying an operation pattern of the drain discharge valve that matches a drain discharge amount associated with one opening / closing operation of the drain discharge valve;
A drain discharge mechanism in an air compressor, comprising: an operation control unit that controls the operation of the drain discharge valve in accordance with an operation pattern specified by the arithmetic processing unit.
前記記憶部が,一定時間に設定された前記ドレン排出弁の開放時間を設定開放時間として記憶すると共に,前記関係式として,温度又は温度及び湿度の変化と,前記設定開放時間によって特定されるドレン排出量に対応したドレンを発生させるフルロード運転の積算時間の変化との対応関係を規定した関係式を記憶し,
前記演算処理部が,前記センサによって検出された吸入空気の温度又は温度及び湿度と,前記記憶部に記憶された前記関係式に基づいて,前記設定開放時間によって特定されるドレン排出量に一致したドレンを発生させる前記フルロード運転の積算時間を算出すると共に,
前記演算処理部が算出した前記フルロード運転の積算時間を前記計測部が計測する毎に,前記動作制御部が,前記ドレン排出弁を開閉することを特徴とする請求項4記載のドレン排出機構。
The storage unit stores the opening time of the drain discharge valve set for a fixed time as a set opening time, and as a relational expression, the drain specified by the change in temperature or temperature and humidity and the set opening time. Stores a relational expression that defines the correspondence with the change in the accumulated time of full load operation that generates drain corresponding to the discharge amount,
The arithmetic processing unit matches the drain discharge amount specified by the set open time based on the temperature or temperature and humidity of the intake air detected by the sensor and the relational expression stored in the storage unit. Calculate the accumulated time of the full load operation that generates drain,
5. The drain discharge mechanism according to claim 4, wherein the operation control unit opens and closes the drain discharge valve every time the measurement unit measures the accumulated time of the full load operation calculated by the arithmetic processing unit. .
前記記憶部が,予め一定時間に設定されたフルロード運転の積算時間である設定積算時間を記憶すると共に,前記関係式として,温度又は温度及び湿度の変化と,前記設定積算時間のフルロード運転におけるドレン発生量に一致した前記ドレン排出弁の開放時間の変化との対応関係を規定した関係式を記憶し,
前記演算処理部が,前記センサによって検出された吸入空気の温度又は温度及び湿度と,前記記憶部に記憶された前記関係式に基づいて,前記ドレン排出弁の開放時間を算出すると共に,
前記計測部が前記設定積算時間のフルロード運転を計測する毎に,前記動作制御部が,前記演算処理部が算出した開放時間に従って前記ドレン排出弁を開閉制御することを特徴とする請求項4記載のドレン排出機構。
The storage unit stores a set integration time that is an integration time of a full load operation set in advance for a fixed time, and as a relational expression, a change in temperature or temperature and humidity, and a full load operation of the set integration time. Storing a relational expression that defines the correspondence with the change in the open time of the drain discharge valve that matches the amount of drain generated in
The arithmetic processing unit calculates the opening time of the drain discharge valve based on the temperature or temperature and humidity of the intake air detected by the sensor and the relational expression stored in the storage unit;
5. The open / close control of the drain discharge valve according to the open time calculated by the arithmetic processing unit whenever the measuring unit measures a full load operation for the set integration time. The drain discharge mechanism as described.
前記制御装置が,消費側に供給される圧縮空気の圧力を検知する圧力センサからの検知信号を受信して,前記圧縮機本体の吸気口に設けた吸入弁の開閉動作を制御する,容量制御部を更に備え,
前記計測部が前記容量制御部による前記吸入弁の開放信号を受信して当該空気圧縮機のフルロード運転時間を計測することを特徴とする請求項4〜6いずれか1項記載の空気圧縮機のドレン排出機構。
The control device receives a detection signal from a pressure sensor that detects a pressure of compressed air supplied to a consumer side, and controls an opening / closing operation of an intake valve provided in an intake port of the compressor body. Further comprising
The air compressor according to any one of claims 4 to 6, wherein the measuring unit receives the opening signal of the intake valve from the capacity control unit and measures a full load operation time of the air compressor. Drain discharge mechanism.
JP2008257607A 2008-10-02 2008-10-02 Drain discharge method and drain discharge mechanism of air compressor Active JP5203117B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008257607A JP5203117B2 (en) 2008-10-02 2008-10-02 Drain discharge method and drain discharge mechanism of air compressor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008257607A JP5203117B2 (en) 2008-10-02 2008-10-02 Drain discharge method and drain discharge mechanism of air compressor

Publications (2)

Publication Number Publication Date
JP2010084736A JP2010084736A (en) 2010-04-15
JP5203117B2 true JP5203117B2 (en) 2013-06-05

Family

ID=42248930

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008257607A Active JP5203117B2 (en) 2008-10-02 2008-10-02 Drain discharge method and drain discharge mechanism of air compressor

Country Status (1)

Country Link
JP (1) JP5203117B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5655248B2 (en) * 2013-05-29 2015-01-21 株式会社フクハラ Compressed air circuit system
JP6357635B1 (en) * 2017-12-27 2018-07-18 株式会社フクハラ Drain trap
JP7072463B2 (en) * 2018-07-31 2022-05-20 コベルコ・コンプレッサ株式会社 Compressor and its operation method
JP7270567B2 (en) * 2020-03-02 2023-05-10 株式会社日立産機システム gas compressor
JP6835373B1 (en) * 2020-03-27 2021-02-24 株式会社フクハラ Drain amount measurement system generated in compressed pneumatic circuit
JP2023134306A (en) * 2022-03-14 2023-09-27 株式会社日立産機システム gas compressor

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2595685B2 (en) * 1988-09-30 1997-04-02 石川島播磨重工業株式会社 Filter life prediction method
JP2529998Y2 (en) * 1993-12-16 1997-03-26 株式会社フクハラ Drain discharge device
JP3607042B2 (en) * 1997-06-04 2005-01-05 株式会社神戸製鋼所 Compressor operation method
JP2909901B1 (en) * 1998-06-08 1999-06-23 株式会社フクハラ Automatic drain discharge device
JP3498260B2 (en) * 2000-01-06 2004-02-16 株式会社フクハラ Automatic drain discharge method and automatic drain discharge device
JP4675774B2 (en) * 2005-12-20 2011-04-27 株式会社日立産機システム air compressor

Also Published As

Publication number Publication date
JP2010084736A (en) 2010-04-15

Similar Documents

Publication Publication Date Title
JP5203117B2 (en) Drain discharge method and drain discharge mechanism of air compressor
EP3193105B1 (en) Refrigeration system with superheating, subcooling and refrigerant charge level control
US8616856B2 (en) Air compressor of water injection type
JP5836327B2 (en) Air compressor control device
TWI622704B (en) Oil-cooled screw compressor and control method thereof
KR102110915B1 (en) Air conditioner
US20030006891A1 (en) Method, computer program and device for monitoring a vacuum device
AU2019204608B2 (en) Method of pumping in a system of vacuum pumps and system of vacuum pumps
JP6412992B2 (en) Oil-cooled air compressor
US11692549B2 (en) Methods and systems for air compressor and engine driven control
CN107076489A (en) The refrigerant charging detection of ice machine
CN103486028B (en) Oil free screw compressor
JP2007170216A (en) Air compressor
JP6847216B2 (en) Refrigeration cycle equipment
JP4847766B2 (en) Method and apparatus for determining strainer clogging
US20140373559A1 (en) Refrigeration apparatus and method for detecting whether different refrigerant has been charged into the same
CN106092248B (en) Method and system for measuring volume of fluid discharged from an air conditioning service unit
JP5025381B2 (en) Drain discharge abnormality detection device and compressed air dehumidification device
JP6714572B2 (en) Compressor and operating method thereof
JP2018536138A (en) Economic device control for refrigeration systems
US20210222706A1 (en) Compressor and method of operating same
JPS5844307B2 (en) Absorption chiller bleed device
CN117267817A (en) Dehumidifier and dehumidification control method of dehumidifier
BE1013743A3 (en) METHOD FOR CONTROLLING THE WATER CYCLE OF A WATER-INJECTED COMPRESSOR INSTALLATION AND COMPRESSOR INSTALLATION WITH WATER-CONTROLLED WATER RUN

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110930

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121228

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130116

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130213

R150 Certificate of patent or registration of utility model

Ref document number: 5203117

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160222

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250