JP5007310B2 - Power consumption estimation device and power consumption estimation method - Google Patents
Power consumption estimation device and power consumption estimation method Download PDFInfo
- Publication number
- JP5007310B2 JP5007310B2 JP2009013032A JP2009013032A JP5007310B2 JP 5007310 B2 JP5007310 B2 JP 5007310B2 JP 2009013032 A JP2009013032 A JP 2009013032A JP 2009013032 A JP2009013032 A JP 2009013032A JP 5007310 B2 JP5007310 B2 JP 5007310B2
- Authority
- JP
- Japan
- Prior art keywords
- power consumption
- load device
- load
- operation determination
- new
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Description
本発明は、負荷機器の電力消費量を推定する電力消費量推定装置および電力消費量推定方法に関する。 The present invention relates to a power consumption estimation device and a power consumption estimation method for estimating the power consumption of a load device.
家庭における消費エネルギーの低減を図るためには、電力消費量を例とした場合、まず電力消費量の構成を把握することが重要である。電力消費量の構成を把握するとは、負荷機器毎または類似する負荷機器群毎の電力消費量を明らかにすることである。なお、類似する負荷機器群とは例えば、複数の照明器具のことである。 In order to reduce energy consumption at home, when taking power consumption as an example, it is important to first understand the configuration of power consumption. To grasp the configuration of the power consumption is to clarify the power consumption for each load device or each similar load device group. In addition, the similar load apparatus group is a some lighting fixture, for example.
電力消費量の構成を把握するためには、通常、電力消費量を測定するための測定器を負荷機器毎に設置する必要がある。しかし、負荷機器に測定器を設置するスペースがない場合や、美観や安全上の問題から負荷機器に測定器を設置できない場合が多い。 In order to grasp the configuration of the power consumption, it is usually necessary to install a measuring instrument for measuring the power consumption for each load device. However, there are many cases where there is no space for installing the measuring device in the load device, or the measuring device cannot be installed in the load device due to aesthetic or safety issues.
このような場合、負荷機器の給電線に測定器を設置することが考えられるが、例えば照明器具においては、給電線が照明器具の支持体を兼ねている場合があり、給電線に測定器を設置することは難しい。また、埋め込み照明やシーリング照明においては、給電線が露出しておらず、測定器を固定する場所を見出すことでさえも極めて難しい。つまり、給電線に測定器を設置することは事実上困難である場合が多い。 In such a case, it is conceivable to install a measuring instrument on the power supply line of the load device. For example, in a lighting fixture, the power feeding line may also serve as a support for the lighting fixture. It is difficult to install. In embedded illumination and ceiling illumination, the feeder line is not exposed, and it is extremely difficult to find a place to fix the measuring instrument. In other words, it is often difficult to install a measuring instrument on the feeder line.
そこで、それぞれの負荷機器やそれぞれの負荷機器の給電線に測定器を設置するのではなく、電力系統の給電点付近の一箇所に測定器を設置することにより、負荷機器毎の稼働状況を推定するための技術が例えば、非特許文献1に開示されている。 Therefore, rather than installing a measuring instrument on each load device or the power supply line of each load device, the operating status of each load device is estimated by installing a measuring device at one location near the power supply point of the power system. For example, Non-Patent Document 1 discloses a technique for achieving this.
非特許文献1に開示されている技術では、測定器によって測定された消費電流に含まれる高調波成分の分布を求め、求めた高調波成分の分布と負荷機器毎に予め求めておいた高調波成分の分布とを照合することにより、負荷機器毎の稼働状況を推定する。なお、高調波とは、負荷機器の種類や運転状態に応じた固有のひずみのことをいう。 In the technique disclosed in Non-Patent Document 1, the distribution of harmonic components included in the current consumption measured by the measuring device is obtained, and the obtained harmonic component distribution and the harmonics obtained in advance for each load device. The operation status for each load device is estimated by collating with the component distribution. In addition, a harmonic means the distortion intrinsic | native according to the kind and operation state of a load apparatus.
上述した非特許文献1に開示されている技術では、負荷機器の種類や運転状態によって消費電流に含まれる高調波成分の分布が異なることを利用し、負荷機器毎の稼働状況を推定している。 In the technique disclosed in Non-Patent Document 1 described above, the operating state of each load device is estimated using the fact that the distribution of harmonic components contained in the current consumption differs depending on the type and operating state of the load device. .
ここで、以前はエアコン等の一部の大型家電にしか搭載されていなかったインバータが、最近では小型の家電にも広く搭載されるようになってきている。そのため、類似の高調波成分の分布を持つ負荷機器が増えてきている。 Here, inverters that were previously installed only in some large home appliances such as air conditioners are now widely used in small home appliances. For this reason, an increasing number of load devices have similar harmonic component distributions.
また、高調波に対する規制の強化から、1機種の負荷機器から発生する高調波の絶対量や基本波に対する高調波の占める割合が以前よりも減少してきている。 In addition, due to stricter regulations on harmonics, the absolute amount of harmonics generated from one type of load equipment and the proportion of harmonics with respect to the fundamental wave have been reduced.
このような状況から、非特許文献1に開示されている技術を利用しても負荷機器毎の稼働状況を推定するための特徴を抽出することが難しく、負荷機器毎の稼働状態を推定することができないという問題点がある。 From such a situation, it is difficult to extract a feature for estimating the operation status of each load device even if the technology disclosed in Non-Patent Document 1 is used, and the operation status of each load device is estimated. There is a problem that can not be.
本発明は、電力消費量を測定するための測定器を負荷機器毎に設置することなく、負荷機器毎の電力消費量を容易に推定することができる電力消費量推定装置および電力消費量推定方法を提供することを目的とする。 The present invention relates to a power consumption estimation device and a power consumption estimation method capable of easily estimating a power consumption for each load device without installing a measuring device for measuring the power consumption for each load device. The purpose is to provide.
上記目的を達成するために本発明は、
電力系統から電力供給される負荷機器の電力消費量を推定する電力消費量推定装置であって、
前記電力系統の総電力消費量を逐次計測して出力する電力消費量計測部と、
前記負荷機器の稼働状態に応じた値を示す稼働状態信号を受け付け、該受け付けた稼働状態信号が示す値に基づき、前記負荷機器が稼働状態にある稼働負荷機器かどうかを判定する稼働判定を行い、該稼働判定の結果を出力する稼働判定部と、
前記稼働判定部にて前記負荷機器が前記稼働負荷機器であると判定された場合、当該稼働負荷機器が新たに稼働状態へ変化した新規稼働負荷機器かどうかを判定する新規稼働判定を行い、該新規稼働判定の結果を出力する新規稼働判定部と、
前記新規稼働判定部から出力された新規稼働判定の結果を受け付けると、前記電力消費量計測部から出力された総電力消費量に基づき、前記変化の前後の前記総電力消費量の変動量を抽出し、該抽出された変動量を出力する電力消費量変動抽出部と、
前記負荷機器の電力消費量を推定するための推定電力消費量を前記負荷機器に割り当てる負荷別電力消費量割当部と、を有し、
前記負荷別電力消費量割当部は、前記電力消費量変動抽出部から出力された前記変動量と、前記稼働判定部から出力された稼働判定の結果と、前記新規稼働判定部から出力された新規稼働判定の結果と、を受け付けると、前記新規稼働負荷機器の前記推定電力消費量として前記変動量を割り当て、前記新規稼働負荷機器以外の稼働負荷機器の前記推定電力消費量として当該稼働負荷機器に前回割り当てた前記推定電力消費量を割り当てる。
In order to achieve the above object, the present invention provides:
A power consumption estimation device that estimates the power consumption of a load device that is powered from an electric power system,
A power consumption measuring unit that sequentially measures and outputs the total power consumption of the power system;
An operation state signal indicating a value corresponding to an operation state of the load device is received, and an operation determination is performed to determine whether the load device is an operation load device in an operation state based on the value indicated by the received operation state signal. An operation determination unit for outputting the operation determination result;
When the operation determination unit determines that the load device is the operation load device, the operation determination unit performs a new operation determination to determine whether the operation load device is a new operation load device newly changed to an operation state, A new operation determination unit that outputs a result of the new operation determination;
When the result of the new operation determination output from the new operation determination unit is received, the fluctuation amount of the total power consumption before and after the change is extracted based on the total power consumption output from the power consumption measurement unit. A power consumption fluctuation extracting unit that outputs the extracted fluctuation quantity;
A load-specific power consumption allocation unit that allocates the estimated power consumption for estimating the power consumption of the load device to the load device, and
The load-specific power consumption allocation unit includes the fluctuation amount output from the power consumption fluctuation extraction unit, the operation determination result output from the operation determination unit, and the new operation output from the new operation determination unit. When the result of the operation determination is received, the fluctuation amount is assigned as the estimated power consumption of the new active load device, and the estimated load of the operating load device other than the new active load device is assigned to the active load device. The estimated power consumption allocated last time is allocated.
また、電力系統から電力供給される負荷機器の電力消費量を推定する電力消費量推定装置における電力消費量推定方法であって、
前記電力系統の総電力消費量を逐次計測する処理と、
前記負荷機器の稼働状態に応じた値を示す稼働状態信号を受け付け、該受け付けた稼働状態信号が示す値に基づき、前記負荷機器が稼働状態にある稼働負荷機器かどうかを判定する稼働判定処理と、
前記負荷機器が前記稼働負荷機器であると判定された場合、当該稼働負荷機器が新たに稼働状態へ変化した新規稼働負荷機器かどうかを判定する新規稼働判定処理と、
前記計測された総電力消費量に基づき、前記変化の前後の前記総電力消費量の変動量を抽出する処理と、
前記稼働負荷機器が前記新規稼働負荷機器である場合、当該稼働負荷機器に対して、該稼働負荷機器の電力消費量を推定するための推定電力消費量として前記変動量を割り当てる割当処理と、
前記稼働負荷機器が前記新規稼働負荷機器でない場合、当該稼働負荷機器に対して、該稼働負荷機器の前記推定電力消費量として当該稼働負荷機器に前回割り当てた前記推定電力消費量を割り当てる処理と、を有する。
Also, a power consumption estimation method in a power consumption estimation device that estimates the power consumption of a load device that is supplied with power from the power system,
A process of sequentially measuring the total power consumption of the power system;
An operation determination process for receiving an operation state signal indicating a value corresponding to an operation state of the load device, and determining whether the load device is an operation load device in an operation state based on the value indicated by the received operation state signal; ,
When it is determined that the load device is the operation load device, a new operation determination process for determining whether the operation load device is a new operation load device newly changed to an operation state;
Based on the measured total power consumption, a process of extracting a fluctuation amount of the total power consumption before and after the change;
When the working load device is the new working load device, an allocation process for assigning the fluctuation amount to the working load device as an estimated power consumption for estimating the power consumption of the working load device;
When the working load device is not the new working load device, a process of assigning the estimated power consumption previously assigned to the working load device as the estimated power consumption of the working load device to the working load device; Have
本発明によれば、電力消費量推定装置は、稼働状態信号が示す値に基づき、負荷機器が稼働状態にある稼働負荷機器かどうかを判定し、さらに、その稼働負荷機器が新たに稼働状態へ変化した新規稼働負荷機器かどうかを判定する。そして、新規稼働負荷機器の推定電力消費量として総電力消費量の変動量を割り当て、新規稼働負荷機器以外の稼働負荷機器の推定電力消費量としてその稼働負荷機器に前回割り当てた推定電力消費量を割り当てる。 According to the present invention, the power consumption estimation device determines whether or not the load device is an operation load device in an operation state based on a value indicated by the operation state signal, and the operation load device newly enters an operation state. Judge whether it is a new operating load device that has changed. Then, the fluctuation amount of the total power consumption is assigned as the estimated power consumption of the new active load device, and the estimated power consumption previously assigned to the active load device is assigned as the estimated power consumption of the active load devices other than the new active load device. assign.
そのため、電力消費量を測定するための測定器を負荷機器毎に設置することなく、負荷機器毎の電力消費量を容易に推定することができる。 Therefore, the power consumption for each load device can be easily estimated without installing a measuring instrument for measuring the power consumption for each load device.
以下に、本発明の実施の形態について図面を参照して説明する。 Embodiments of the present invention will be described below with reference to the drawings.
図1は、本発明の電力消費量推定装置を用いた電力消費量推定システムの実施の一形態を示す図である。 FIG. 1 is a diagram showing an embodiment of a power consumption estimation system using the power consumption estimation apparatus of the present invention.
本実施形態の電力消費量推定装置3は図1に示すように、電力系統1からの電力を負荷機器5−1〜5−nへ供給するための配電設備2と接続されており、また、負荷稼働監視部6−1〜6−nと通信線4を介して接続されている。
As shown in FIG. 1, the power
また、負荷稼働監視部6−1〜6−nのそれぞれは、負荷機器5−1~5−nのそれぞれの近傍に設けられている。なお、負荷稼働監視部6−1〜6−nのそれぞれは、負荷機器5−1〜5−nのそれぞれに直接取り付けられていてもよい。 In addition, each of the load operation monitoring units 6-1 to 6-n is provided in the vicinity of each of the load devices 5-1 to 5-n. Each of the load operation monitoring units 6-1 to 6-n may be directly attached to each of the load devices 5-1 to 5-n.
負荷機器5−1〜5−nは例えば、照明器具や冷蔵庫、電子レンジ等の電気機器であり、それぞれの近傍にある負荷稼働監視部6−1〜6−nによってその稼働状態が監視される。 The load devices 5-1 to 5-n are, for example, electric devices such as lighting fixtures, refrigerators, and microwave ovens, and their operation states are monitored by the load operation monitoring units 6-1 to 6-n in the vicinity thereof. .
負荷稼働監視部6−1〜6−nは例えば、照度センサや漏洩磁場センサ、振動センサ、音響センサ等のセンサ類である。センサ類は、電力消費量を測定する測定器に比べて簡易かつ小型であるため、設置する上での困難性が小さい。なお、漏洩磁場センサとは、負荷機器5−1〜5−nから漏洩する電磁波の量を検出するためのセンサである。負荷稼働監視部6−1〜6−nは、それぞれの近傍にある負荷機器5−1〜5−nの稼働状態を監視する。稼働状態を監視するとは、監視する負荷機器5−1〜5−nが例えば、照明器具の場合には照度値を検出することであり、電気毛布やテレビ、計算機、電子レンジの場合にはそれらから漏洩する電磁波の量を検出することであり、冷蔵庫やガス給湯器の場合には振動値や気圧の変化値である音圧値を検出することである。このとき、複数の種類の値を検出し、例えばそれらの論理和をとることも可能である。これによって後述する電力消費量推定装置3による判定の精度を高めることも可能である。また、負荷稼働監視部6−1〜6−nは、負荷機器5−1〜5−nの稼働状態を監視することによって検出され、稼働状態に応じた値を示す稼働状態信号を通信線4を介して電力消費量推定装置3へ送信する。なお、稼働状態信号は、負荷稼働監視部6−1〜6−nが例えば、照度センサである場合には照度値を示す信号であり、漏洩磁場センサである場合には電磁波の量を示す信号であり、振動センサの場合には振動の振幅や加速度を示す信号であり、音響センサの場合には音圧値を示す信号である。また、負荷稼働監視部6−1〜6−nは、稼働状態信号を常時送信し続けるのではなく、所定の時間間隔で電力消費量推定装置3へ送信する。
The load operation monitoring units 6-1 to 6-n are sensors such as an illuminance sensor, a leakage magnetic field sensor, a vibration sensor, and an acoustic sensor, for example. Sensors are simpler and smaller than a measuring instrument that measures power consumption, so that the difficulty in installation is small. The leakage magnetic field sensor is a sensor for detecting the amount of electromagnetic waves leaking from the load devices 5-1 to 5-n. The load operation monitoring units 6-1 to 6-n monitor the operation states of the load devices 5-1 to 5-n in the vicinity thereof. Monitoring the operating state means that the load devices 5-1 to 5-n to be monitored detect, for example, illuminance values in the case of lighting fixtures, and those in the case of electric blankets, televisions, calculators, and microwave ovens. In other words, in the case of a refrigerator or a gas water heater, a sound pressure value that is a vibration value or a change value of atmospheric pressure is detected. At this time, it is also possible to detect a plurality of types of values and take the logical sum of them, for example. Thereby, it is also possible to improve the accuracy of determination by the power
図2は、図1に示した電力消費量推定装置3の構成の一例を示すブロック図である。
FIG. 2 is a block diagram showing an example of the configuration of the power
図1に示した電力消費量推定装置3は図2に示すように、電力消費量計測部31と、電力消費量変動抽出部32と、負荷別電力消費量割当部33と、負荷稼働判定部34と、データ格納部35と、を備えている。また、負荷稼働判定部34は、稼働判定部34−1と、新規稼働判定部34−2と、を備えている。
As shown in FIG. 2, the power
電力消費量計測部31は、電力系統1の総電力消費量を逐次計測する。そして、計測した総電力消費量を示す総電力消費量情報106をデータ格納部35に記憶させる。
The power
負荷稼働判定部34の稼働判定部34−1は、負荷稼働監視部6−1〜6−nのそれぞれから送信される稼働状態信号101を受信する。そして、受信した稼働状態信号101が示す値と、負荷機器5−1〜5−n毎に予め決められ、負荷機器5−1〜5−nが稼働状態にあるか停止状態にあるかを判定するための閾値と、を比較する。以降、この閾値を稼働判定閾値という。稼働判定部34−1は、この比較により、負荷機器5−1〜5−nのそれぞれが稼働状態にある稼働負荷機器であるかどうかを判定する。以降、この判定のことを稼働判定という。また、負荷稼働判定部34は、負荷機器5−1〜5−n毎の稼働判定の結果を示す稼働判定結果情報103を負荷別電力消費量割当部33へ出力するとともにデータ格納部35に記憶させる。なお、稼働判定は、稼働状態信号101が示す値の時間変化率と予め決められた時間変化率の閾値とを比較することによって行ってもよい。また、稼働状態信号101が示す値及びその時間変化率と、予め決められたそれぞれの閾値とを比較することによって行ってもよい。
The operation determination unit 34-1 of the load operation determination unit 34 receives the operation state signal 101 transmitted from each of the load operation monitoring units 6-1 to 6-n. Then, it is determined in advance for each of the values indicated by the received operation state signal 101 and the load devices 5-1 to 5-n, and it is determined whether the load devices 5-1 to 5-n are in an operation state or a stop state. Is compared with a threshold value. Hereinafter, this threshold is referred to as an operation determination threshold. Based on this comparison, the operation determination unit 34-1 determines whether each of the load devices 5-1 to 5-n is an operation load device in an operation state. Hereinafter, this determination is referred to as operation determination. In addition, the load operation determination unit 34 outputs operation determination result information 103 indicating the operation determination result for each of the load devices 5-1 to 5 -n to the load-specific power
負荷稼働判定部34の新規稼働判定部34−2は、稼働判定部34−1による稼働判定の結果、負荷機器5−1〜5−nが稼働負荷機器である場合、その稼働負荷機器が新たに停止状態から稼働状態へ変化した新規稼働負荷機器であるかどうかを判定する。以降、この判定のことを新規稼働判定という。なお、新規稼働判定を行う際、新規稼働判定部34−2は、稼働負荷機器の前回の稼働判定の結果を示す前回の稼働判定結果情報102をデータ格納部35から取得する。そして、取得した前回の稼働判定結果情報102が示す稼働判定の結果が停止状態である場合、その稼働負荷機器が新規稼働負荷機器であると判定する。また、新規稼働判定部34−2は、負荷機器5−1〜5−n毎の新規稼働判定の結果を示す新規稼働判定結果情報108を電力消費量変動抽出部32及び負荷別電力消費量割当部33へ出力する。
The new operation determination unit 34-2 of the load operation determination unit 34, when the load device 5-1 to 5-n is an operation load device as a result of the operation determination by the operation determination unit 34-1, the new operation load device is new. It is determined whether the device is a new working load device that has changed from a stopped state to an operating state. Hereinafter, this determination is referred to as new operation determination. When performing a new operation determination, the new operation determination unit 34-2 acquires the previous operation determination result information 102 indicating the result of the previous operation determination of the active load device from the
電力消費量変動抽出部32は、負荷稼働判定部34から出力された新規稼働判定結果情報108を受け付ける。そして、新規稼働負荷機器が停止状態から稼働状態へ変化した時刻を含む総電力消費量を示す変化前後の総電力消費量情報104をデータ格納部35から取得する。そして、電力消費量変動抽出部32は、取得した変化前後の総電力消費量情報104からその変化前後の総電力消費量の変動量を抽出する。そして、抽出した総電力消費量の変動量を示す変動量情報107を負荷別電力消費量割当部33へ出力する。
The power consumption
負荷別電力消費量割当部33は、負荷稼働判定部34から出力された稼働判定結果情報103及び新規稼働判定結果情報108と、電力消費量変動抽出部32から出力された変動量情報107と、を受け付ける。そして、受け付けた変動量情報107が示す変動量を新規稼働負荷機器の電力消費量とみなして割り当てる。また、負荷別電力消費量割当部33は、新規稼働負荷機器以外の稼働負荷機器に対しては、その稼働負荷機器の稼働状態に変化がなかったものとみなし、その稼働負荷機器に前回割り当てた電力消費量と同じ電力消費量を割り当てる。以降、新規稼働負荷機器及び新規稼働負荷機器以外の稼働負荷機器のそれぞれに割り当てられる電力消費量のことを推定電力消費量という。また、負荷別電力消費量割当部33は、推定電力消費量を示す推定電力消費量情報105をデータ格納部35に記憶させる。なお、負荷別電力消費量割当部33は、複数の新規稼働負荷機器が存在する場合、データ格納部35に記憶されている過去の推定電力消費量情報、または予め決められた割合に基づいて変動量を按分する。そして、按分された変動量を複数の新規稼働負荷機器のそれぞれの推定電力消費量として割り当てる。
The load-specific power
データ格納部35は、電力消費量計測部31が計測した総電力消費量を示す総電力消費量情報106と、負荷別電力消費量割当部33が割り当てた推定電力消費量を示す推定電力消費量情報105と、負荷稼働判定部34が行った稼働判定の結果を示す稼働判定結果情報103と、を記憶する。
The
以下に、上記のように構成された電力消費量推定装置3内の信号の変化について説明する。
Below, the change of the signal in the power
図3は、図1及び図2に示した電力消費量推定装置3内の信号の変化の一例を示すタイムチャートであり、(a)は稼働状態信号101の変化の一例を示すタイムチャート、(b)は稼働判定結果情報103の変化の一例を示すタイムチャート、(c)は総電力消費量情報106の変化の一例を示すタイムチャート、(d)は推定電力消費量情報105の変化の一例を示すタイムチャートである。なお、ここでは電力消費量推定装置3が、負荷機器5−1の稼働状態を示す稼働状態信号101を負荷稼働監視部6−1から受信した場合を一例として説明する。
FIG. 3 is a time chart showing an example of a change in the signal in the power
時刻T1において負荷稼働判定部34は、負荷稼働監視部6−1から受信した稼働状態信号101が示す値と、図3(a)に示すような稼働判定閾値と、を比較する。 At time T1, the load operation determination unit 34 compares the value indicated by the operation state signal 101 received from the load operation monitoring unit 6-1 with the operation determination threshold value as illustrated in FIG.
次に、負荷稼働判定部34の稼働判定部34−1は、負荷機器5−1が稼働負荷機器かどうかを判定する稼働判定を行う。例えば図3(a)に示すように時刻T1において、稼働状態信号101が示す値が稼働判定閾値よりも大きな場合、稼働判定部34−1は、負荷機器5−1が稼働負荷機器であると判定する。 Next, the operation determination unit 34-1 of the load operation determination unit 34 performs operation determination to determine whether the load device 5-1 is an operation load device. For example, as illustrated in FIG. 3A, when the value indicated by the operation state signal 101 is greater than the operation determination threshold at time T1, the operation determination unit 34-1 indicates that the load device 5-1 is an operation load device. judge.
そして、稼働判定部34−1は、図3(b)に示すような稼働判定結果情報103を負荷別電力消費量割当部33へ出力するとともにデータ格納部35に記憶させる。なお、図3(b)に示すように稼働判定結果情報103は、負荷機器5−1が時刻T1において稼働状態にあることが判別できる情報である。
Then, the operation determination unit 34-1 outputs the operation determination result information 103 as illustrated in FIG. 3B to the load-specific power
負荷稼働判定部34の新規稼働判定部34−2は、負荷機器5−1が時刻T1において稼働負荷機器と判定された場合、負荷機器5−1が時刻T1において新たに停止状態から稼働状態へ変化した新規稼働負荷機器かどうかを判定する新規稼働判定を行う。ここでは、負荷機器5−1が新規稼働負荷機器であると判定されるものとする。 When the load device 5-1 is determined to be an operation load device at time T1, the new operation determination unit 34-2 of the load operation determination unit 34 newly changes the load device 5-1 from the stop state to the operation state at time T1. A new operation determination is performed to determine whether the device has a new operating load that has changed. Here, it is assumed that the load device 5-1 is determined to be a new operation load device.
そして、新規稼働判定部34−2は、負荷機器5−1が新規稼働負荷機器である旨を含む新規稼働判定結果情報108を電力消費量変動抽出部32及び負荷別電力消費量割当部33へ出力する。
Then, the new operation determination unit 34-2 sends the new operation determination result information 108 including that the load device 5-1 is a new operation load device to the power consumption
電力消費量変動抽出部32は、図3(c)に示すような時刻T1を含む変化前後の総電力消費量情報104をデータ格納部35から取得する。そして、取得した変化前後の総電力消費量情報104から時刻T1の前後の総電力消費量の変動量201を抽出する。
The power consumption amount
負荷別電力消費量割当部33は、電力消費量変動抽出部32が抽出した総電力消費量の変動量201を負荷機器5−1の推定電力消費量として割り当てる。そして、負荷別電力消費量割当部33は、図3(d)に示すように時刻T1から時刻T2までの間、負荷機器5−1の推定電力消費量として変動量201を割り当て続ける。なお、時刻T2は、負荷稼働判定部34による稼働判定において負荷機器5−1が稼働負荷機器でないと判定される時刻である。
The load-specific power
なお、図3を用いて説明した上記の各処理は、電力消費量推定装置3内の各部間において時刻を同期させながら行われる。
Note that each of the processes described with reference to FIG. 3 is performed while synchronizing the time between the units in the power
また、電力消費量推定装置3内の稼働状態信号101や総電力消費量情報106等は、リアルタイム値を示す信号または情報でもよいし、バッチ処理された値を示す信号または情報でもよい。なお、リアルタイム値とは、出力時間間隔内における平均値等の統計処理値や出力する時点での瞬時値のことである。また、バッチ処理とは、前回の出力以降に検出または計測された値を過去に遡って所定の間隔毎に出力する処理のことである。
Further, the operation state signal 101 and the total power consumption information 106 in the power
以下に、上記のように構成された電力消費量推定装置3において負荷機器5−1〜5−n毎の電力消費量を推定する動作について説明する。
Below, the operation | movement which estimates the power consumption for every load apparatus 5-1 to 5-n in the power
図4は、図1及び図2に示した電力消費量推定装置3において負荷機器5−1〜5−n毎の電力消費量を推定する動作を説明するためのフローチャートである。なお、ここでは負荷機器5−1の稼働状態を示す稼働状態信号101が負荷稼働監視部6−1から送信された場合を一例として説明する。
FIG. 4 is a flowchart for explaining the operation of estimating the power consumption for each of the load devices 5-1 to 5-n in the power
本動作の前提として電力消費量計測部31は、電力系統1の総電力消費量を逐次計測し、計測した総電力消費量を示す総電力消費量情報106をデータ格納部35に記憶させている。
As a premise of this operation, the power
まず、負荷稼働判定部34の稼働判定部34−1は、負荷稼働監視部6−1から送信された稼働状態信号101を受信する。 First, the operation determination unit 34-1 of the load operation determination unit 34 receives the operation state signal 101 transmitted from the load operation monitoring unit 6-1.
次に、稼働判定部34−1は、受信した稼働状態信号101が示す値と、予め決められた稼働判定閾値と、を比較して負荷機器5−1が稼働負荷機器かどうかを判定する稼働判定を行う(ステップS1)。 Next, the operation determination unit 34-1 compares the value indicated by the received operation state signal 101 with a predetermined operation determination threshold value to determine whether or not the load device 5-1 is an operation load device. A determination is made (step S1).
そして、稼働判定部34−1は、負荷機器5−1の稼働判定の結果を示す稼働判定結果情報103を負荷別電力消費量割当部33へ出力するとともにデータ格納部35に記憶させる。
Then, the operation determination unit 34-1 outputs the operation determination result information 103 indicating the operation determination result of the load device 5-1, to the load-specific power
ステップS1における稼働判定の結果、負荷機器5−1が稼働負荷機器である場合、負荷稼働判定部34の新規稼働判定部34−2は、データ格納部35に記憶されている負荷機器5−1の前回の稼働判定結果情報102を取得する。
As a result of the operation determination in step S <b> 1, when the load device 5-1 is an operation load device, the new operation determination unit 34-2 of the load operation determination unit 34 loads the load device 5-1 stored in the
そして、新規稼働判定部34−2は、取得した前回の稼働判定結果情報102から、負荷機器5−1が新規稼働負荷機器であるかどうかを判定する新規稼働判定を行う(ステップS2)。 Then, the new operation determination unit 34-2 performs new operation determination from the acquired previous operation determination result information 102 to determine whether or not the load device 5-1 is a new operation load device (step S2).
そして、新規稼働判定部34−2は、負荷機器5−1の新規稼働判定の結果を示す新規稼働判定結果情報108を電力消費量変動抽出部32及び負荷別電力消費量割当部33へ出力する。
Then, the new operation determination unit 34-2 outputs new operation determination result information 108 indicating the result of the new operation determination of the load device 5-1, to the power consumption
ステップS2における新規稼働判定の結果、負荷機器5−1が新規稼働負荷機器である場合、新規稼働判定部34−2から出力された新規稼働判定結果情報108を受け付けた電力消費量変動抽出部32は、負荷機器5−1が停止状態から稼働状態へ変化した時刻を含む変化前後の総電力消費量情報104をデータ格納部35から取得する。
As a result of the new operation determination in step S2, if the load device 5-1 is a new operation load device, the power consumption
次に、電力消費量変動抽出部32は、取得した変化前後の総電力消費量情報104から負荷機器5−1が停止状態から稼働状態に変化した前後の総電力消費量の変動量を抽出する(ステップS3)。
Next, the power consumption
そして、電力消費量変動抽出部32は、抽出した変動量を示す変動量情報107を負荷別電力消費量割当部33へ出力する。
Then, the power consumption
電力消費量変動抽出部32から出力された変動量情報107と、負荷稼働判定部34から出力された稼働判定結果情報103及び新規稼働判定結果情報108と、を受け付けた負荷別電力消費量割当部33は、受け付けた変動量情報107が示す総電力消費量の変動量を推定電力消費量として負荷機器5−1に割り当てる(ステップS4)。
Load-specific power consumption allocation unit that has received the fluctuation amount information 107 output from the power consumption
一方、ステップS2における新規稼働判定の結果、負荷機器5−1が新規稼働負荷機器でない場合には、負荷別電力消費量割当部33は、前回負荷機器5−1に割り当てた推定電力消費量を推定電力消費量として負荷機器5−1に割り当てる(ステップS5)。
On the other hand, if the load device 5-1 is not a new operation load device as a result of the new operation determination in step S2, the load-specific power
ここで、ステップS1における稼働判定の結果、負荷機器5−1が稼働負荷機器でない場合には、負荷別電力消費量割当部33は、推定電力消費量として0を負荷機器5−1に割り当てる(ステップS6)。これは、負荷機器5−1が稼働状態から停止状態へ変化した場合も同様である。
Here, if the load device 5-1 is not an active load device as a result of the operation determination in step S1, the load-specific power
そして、負荷別電力消費量割当部33は、上述したステップS4〜S6のいずれかにおいて負荷機器5−1に割り当てた推定電力消費量をデータ格納部35に記憶させる(ステップS7)。
Then, the power
ここで、例えば、負荷稼働判定部34が複数の負荷稼働監視部6−1,6−2から稼働状態信号101を受信した場合を考える。このとき、上述したステップS1において負荷機器5−1,5−2がともに稼働負荷機器であると判定され、かつ上述したステップS2において負荷機器5−2だけが新規稼働負荷機器と判定された場合、負荷機器5−1には前回割り当てられた推定電力消費量が推定電力消費量として割り当てられ、負荷機器5−2には総電力消費量の変動量が推定電力消費量として割り当てられる。この場合、負荷機器5−1,5−2に割り当てられた推定電力消費量の合計と計測された総電力消費量とが必ずしも一致しない場合がある。しかし、総電力消費量には稼働状態が監視されていない負荷機器による変動も含まれるため、これらが一致しなくても問題はない。但し、稼働状態が監視されている負荷機器と、稼働状態が監視されていない負荷機器と間で電力消費量が変動する時刻が重なると推定の精度が落ちる。これを避けるため、できるだけ多くの負荷機器の稼働状態を監視するようにする。 Here, for example, consider a case where the load operation determination unit 34 receives the operation state signal 101 from the plurality of load operation monitoring units 6-1 and 6-2. At this time, when it is determined that both the load devices 5-1 and 5-2 are active load devices in the above-described step S1, and only the load device 5-2 is determined as a new active load device in the above-described step S2. The estimated power consumption assigned last time is assigned as the estimated power consumption to the load device 5-1, and the fluctuation amount of the total power consumption is assigned as the estimated power consumption to the load device 5-2. In this case, the total estimated power consumption allocated to the load devices 5-1 and 5-2 may not always match the measured total power consumption. However, since the total power consumption includes fluctuations caused by load devices whose operating states are not monitored, there is no problem even if they do not match. However, if the time when the power consumption fluctuates between the load device whose operating state is monitored and the load device whose operating state is not monitored, the accuracy of estimation decreases. To avoid this, monitor the operating status of as many load devices as possible.
また、本実施形態においては、新規稼働負荷機器以外の稼働負荷機器には前回割り当てられた推定電力消費量が推定電力消費量として割り当てられ続ける。つまり、稼働状態に変化のない負荷機器の電力消費量は一定であるとみなされる。そのため、ある負荷機器が、「停止状態から稼働状態へ変化」したときの総電力消費量の変動量と推定電力消費量との差と、「稼働状態から停止状態へ変化」したときの総電力消費量の変動量と推定電力消費量との差と、が必ずしも一致しない場合がある。この場合は、どちらか一方のみを有効とすればよい。 In the present embodiment, the estimated power consumption allocated last time is continuously allocated as the estimated power consumption to the operating load devices other than the new operating load device. In other words, the power consumption of the load device that does not change in the operating state is considered to be constant. Therefore, the difference between the amount of fluctuation in the total power consumption when the load device “changes from the stopped state to the operating state” and the estimated power consumption, and the total power when the load device changes “from the operating state to the stopped state” The difference between the consumption fluctuation amount and the estimated power consumption may not always match. In this case, only one of them needs to be valid.
このように本実施形態においては、電力消費量推定装置3は、稼働状態信号101が示す値に基づき、負荷機器5−1〜5−nが稼働状態にある稼働負荷機器かどうかを判定し、さらに、その稼働負荷機器が新たに稼働状態へ変化した新規稼働負荷機器かどうかを判定する。そして、新規稼働負荷機器の推定電力消費量として総電力消費量の変動量を割り当て、新規稼働負荷機器以外の稼働負荷機器の推定電力消費量としてその稼働負荷機器に前回割り当てた推定電力消費量を割り当てる。
Thus, in this embodiment, the power
そのため、電力消費量を測定するための測定器を負荷機器5−1〜5−n毎に設置することなく、負荷機器5−1〜5−n毎の電力消費量を容易に推定することができる。 Therefore, it is possible to easily estimate the power consumption for each of the load devices 5-1 to 5-n without installing a measuring device for measuring the power consumption for each of the load devices 5-1 to 5-n. it can.
また、センサ類である負荷稼働監視部6−1〜6−nは、測定器に比べて安価であるため、負荷機器5−1〜5−n毎の電力消費量を低コストで推定することができる。 Moreover, since the load operation monitoring units 6-1 to 6-n, which are sensors, are less expensive than measuring instruments, the power consumption for each of the load devices 5-1 to 5-n should be estimated at a low cost. Can do.
また、センサ類である負荷稼働監視部6−1〜6−nは、測定器に比べて耐候性に優れており、さらに電池による駆動も可能なため、屋外に設置されている負荷機器5−1〜5−nに設置することも可能である。従って、様々な種類の負荷機器の電力消費量を推定することができる。 In addition, the load operation monitoring units 6-1 to 6-n, which are sensors, are superior in weather resistance as compared to the measuring instrument and can be driven by a battery. It is also possible to install 1 to 5-n. Therefore, the power consumption of various types of load devices can be estimated.
なお、本実施形態においては、負荷機器5−1〜5−nへ推定電力消費量の割り当てを行う度に、総電力消費量の変動量を抽出している。しかし、必ずしもこのようにする必要はなく、例えば、負荷機器毎の電力消費量や、過去に抽出したある負荷機器の電力消費量の変動量を記憶しておき、必要に応じてそれらを利用するようにしてもよい。 In this embodiment, every time the estimated power consumption is assigned to the load devices 5-1 to 5-n, the fluctuation amount of the total power consumption is extracted. However, it is not always necessary to do this. For example, the power consumption of each load device and the fluctuation amount of the power consumption of a certain load device extracted in the past are stored and used as necessary. You may do it.
また、本実施形態においては、総電力消費量の計測を行う電力消費量計測部31を電力消費量推定装置3内に設けているが、電力消費量計測部31を例えば、分電盤の近くに設置し、他の各部は別の場所に設置するようにしてもよい。
Moreover, in this embodiment, although the power
また、本実施形態においては、負荷稼働判定部34を電力消費量推定装置3内に設けているが、負荷稼働監視部6−1〜6−n内に負荷稼働判定部34を設けることも可能である。この場合には、負荷機器5−1〜5−nの稼働状態が変化した場合のみ稼働状態信号を電力消費量推定装置へ送信するようにしてもよい。
Moreover, in this embodiment, although the load operation determination part 34 is provided in the power
また、本実施形態においては、電力消費量推定装置3と負荷稼働監視部6−1〜6−nとは有線の通信線4を介して接続されていたが、無線によって接続されていてもよい。また、電力消費量推定装置3と負荷稼働監視部6−1〜6−nとの間に専用の通信媒体を設けずに、例えば電力消費量推定装置3と負荷稼働監視部6−1〜6−nとの間の通信媒体として配電設備2を利用する電力線搬送の形態であってもよい。
In the present embodiment, the power
また、本実施形態においては、電力消費量を推定する場合を一例として説明したが、電力消費量ではなくガスの消費量や水道の消費量を推定する場合にも本発明を適用することができる。例えばガスの消費量を推定する場合、電力消費量計測部31の代わりにガス流量計またはガスメータ取り付け型のメータ読み取り装置を用い、負荷稼働監視部6−1〜6−nとして、振動センサや音響センサを用いればよい。また、水道の消費量を推定する場合も同様に、電力消費量計測部31の代わりに水流量計または水道メータ取り付け型のメータ読み取り装置を用い、負荷稼働監視部6−1〜6−nとして、振動センサや音響センサを用いればよい。
Moreover, in this embodiment, although the case where the power consumption was estimated was demonstrated as an example, this invention is applicable also when estimating not the power consumption but the consumption of gas and the consumption of water supply. . For example, when estimating the gas consumption, a gas flow meter or a gas meter-attached type meter reader is used instead of the power
1 電力系統
2 配電設備
3 電力消費量推定装置
4 通信線
5−1〜5−n 負荷機器
6−1〜6−n 負荷稼働監視部
31 電力消費量計測部
32 電力消費量変動抽出部
33 負荷別電力消費量割当部
34 負荷稼働判定部
34−1 稼働判定部
34−2 新規稼働判定部
35 データ格納部
101 稼働状態信号
102 前回の稼働判定結果情報
103 稼働判定結果情報
104 変化前後の総電力消費量情報
105 推定電力消費量情報
106 総電力消費量情報
107 変動量情報
108 新規稼働判定結果情報
DESCRIPTION OF SYMBOLS 1
Claims (10)
前記電力系統の総電力消費量を逐次計測して出力する電力消費量計測部と、
前記負荷機器の稼働状態に応じた値を示す稼働状態信号を受け付け、該受け付けた稼働状態信号が示す値に基づき、前記負荷機器が稼働状態にある稼働負荷機器かどうかを判定する稼働判定を行い、該稼働判定の結果を出力する稼働判定部と、
前記稼働判定部にて前記負荷機器が前記稼働負荷機器であると判定された場合、当該稼働負荷機器が新たに稼働状態へ変化した新規稼働負荷機器かどうかを判定する新規稼働判定を行い、該新規稼働判定の結果を出力する新規稼働判定部と、
前記新規稼働判定部から出力された新規稼働判定の結果を受け付けると、前記新規稼働判定部にて前記稼働負荷機器が前記新規稼働負荷機器であると判定された場合、前記電力消費量計測部から出力された総電力消費量に基づき、前記変化の前後の前記総電力消費量の変動量を抽出し、該抽出された変動量を出力する電力消費量変動抽出部と、
前記負荷機器の電力消費量を推定するための推定電力消費量を前記負荷機器に割り当てる負荷別電力消費量割当部と、を有し、
前記負荷別電力消費量割当部は、前記電力消費量変動抽出部から出力された前記変動量と、前記稼働判定部から出力された稼働判定の結果と、前記新規稼働判定部から出力された新規稼働判定の結果と、を受け付けると、前記新規稼働負荷機器の前記推定電力消費量として前記変動量を割り当て、前記新規稼働負荷機器以外の稼働負荷機器の前記推定電力消費量として当該稼働負荷機器に前回割り当てた前記推定電力消費量を割り当てる電力消費量推定装置。 A power consumption estimation device that estimates the power consumption of a load device that is powered from an electric power system,
A power consumption measuring unit that sequentially measures and outputs the total power consumption of the power system;
An operation state signal indicating a value corresponding to an operation state of the load device is received, and an operation determination is performed to determine whether the load device is an operation load device in an operation state based on the value indicated by the received operation state signal. An operation determination unit for outputting the operation determination result;
When the operation determination unit determines that the load device is the operation load device, the operation determination unit performs a new operation determination to determine whether the operation load device is a new operation load device newly changed to an operation state, A new operation determination unit that outputs a result of the new operation determination;
When receiving the result of the new operation determination output from the new operation determination unit, when the operation load device is determined to be the new operation load device by the new operation determination unit, from the power consumption measurement unit Based on the output total power consumption, a fluctuation amount of the total power consumption before and after the change is extracted, and a power consumption fluctuation extraction unit that outputs the extracted fluctuation amount;
A load-specific power consumption allocation unit that allocates the estimated power consumption for estimating the power consumption of the load device to the load device, and
The load-specific power consumption allocation unit includes the fluctuation amount output from the power consumption fluctuation extraction unit, the operation determination result output from the operation determination unit, and the new operation output from the new operation determination unit. When the result of the operation determination is received, the fluctuation amount is assigned as the estimated power consumption of the new active load device, and the estimated load of the operating load device other than the new active load device is assigned to the active load device. A power consumption estimation device that allocates the estimated power consumption allocated last time.
前記負荷別電力消費量割当部は、前記新規稼働負荷機器が複数存在する場合、予め決められた割合に応じて前記変動量を按分し、それぞれの前記新規稼働負荷機器の推定電力消費量として前記按分された変動量を割り当てる電力消費量推定装置。 The power consumption estimation apparatus according to claim 1,
When there are a plurality of the new operating load devices, the load-specific power consumption allocation unit apportions the fluctuation amount according to a predetermined ratio, and the estimated power consumption amount of each of the new operating load devices is A power consumption estimation device for allocating apportioned variation.
データ格納部を有し、
前記電力消費量計測部は、前記計測された総電力消費量を前記データ格納部に記憶させ、
前記稼働判定部は、前記稼働判定の結果を前記データ格納部に記憶させ、
前記負荷別電力消費量割当部は、前記負荷機器に割り当てられた前記推定電力消費量を前記データ格納部に記憶させる電力消費量推定装置。 In the power consumption estimation apparatus according to claim 1 or 2,
A data storage unit,
The power consumption measuring unit stores the measured total power consumption in the data storage unit,
The operation determination unit stores the result of the operation determination in the data storage unit,
The load-specific power consumption allocation unit is a power consumption estimation apparatus that stores the estimated power consumption allocated to the load device in the data storage unit.
前記新規稼働判定部は、前記データ格納部に記憶された前記稼働判定の結果に基づき、前記稼働負荷機器が前記新規稼働負荷機器かどうかを判定する電力消費量推定装置。 In the power consumption estimation apparatus according to claim 3,
The new operation determination unit is a power consumption estimation device that determines whether the operation load device is the new operation load device based on the operation determination result stored in the data storage unit.
前記稼働判定部は、前記稼働状態信号が示す値と所定の閾値とを比較することにより、前記負荷機器が前記稼働負荷機器かどうかを判定する電力消費量推定装置。 The power consumption estimation apparatus according to any one of claims 1 to 4,
The operation determination unit is a power consumption estimation device that determines whether or not the load device is the operation load device by comparing a value indicated by the operation state signal with a predetermined threshold.
前記電力系統の総電力消費量を逐次計測する処理と、
前記負荷機器の稼働状態に応じた値を示す稼働状態信号を受け付け、該受け付けた稼働状態信号が示す値に基づき、前記負荷機器が稼働状態にある稼働負荷機器かどうかを判定する稼働判定処理と、
前記負荷機器が前記稼働負荷機器であると判定された場合、当該稼働負荷機器が新たに稼働状態へ変化した新規稼働負荷機器かどうかを判定する新規稼働判定処理と、
前記計測された総電力消費量に基づき、前記変化の前後の前記総電力消費量の変動量を抽出する処理と、
前記稼働負荷機器が前記新規稼働負荷機器である場合、当該稼働負荷機器に対して、該稼働負荷機器の電力消費量を推定するための推定電力消費量として前記変動量を割り当てる割当処理と、
前記稼働負荷機器が前記新規稼働負荷機器でない場合、当該稼働負荷機器に対して、該稼働負荷機器の前記推定電力消費量として当該稼働負荷機器に前回割り当てた前記推定電力消費量を割り当てる処理と、を有する電力消費量推定方法。 A power consumption estimation method in a power consumption estimation device for estimating a power consumption of a load device supplied with power from a power system,
A process of sequentially measuring the total power consumption of the power system;
An operation determination process for receiving an operation state signal indicating a value corresponding to an operation state of the load device, and determining whether the load device is an operation load device in an operation state based on the value indicated by the received operation state signal; ,
When it is determined that the load device is the operation load device, a new operation determination process for determining whether the operation load device is a new operation load device newly changed to an operation state;
Based on the measured total power consumption, a process of extracting a fluctuation amount of the total power consumption before and after the change;
When the working load device is the new working load device, an allocation process for assigning the fluctuation amount to the working load device as an estimated power consumption for estimating the power consumption of the working load device;
When the working load device is not the new working load device, a process of assigning the estimated power consumption previously assigned to the working load device as the estimated power consumption of the working load device to the working load device; A method for estimating power consumption.
前記割当処理は、前記新規稼働負荷機器が複数存在する場合、予め決められた割合に応じて前記変動量を按分し、それぞれの前記新規稼働負荷機器の推定電力消費量として前記按分された変動量を割り当てる電力消費量推定方法。 The power consumption estimation method according to claim 6,
In the allocation process, when there are a plurality of the new operating load devices, the variation amount is apportioned according to a predetermined ratio, and the apportioned variation amount is estimated as the estimated power consumption of each new operating load device. Power consumption estimation method to allocate.
前記計測された総電力消費量と、前記稼働判定処理の結果と、前記負荷機器に割り当てられた推定電力消費量と、を記憶する処理をさらに有する電力消費量推定方法。 In the power consumption estimation method according to claim 6 or 7,
The power consumption estimation method which further has a process which memorize | stores the said measured total power consumption, the result of the said operation determination process, and the estimated power consumption allocated to the said load apparatus.
前記新規稼働判定処理は、前記記憶された稼働判定処理の結果に基づき、前記稼働負荷機器が前記新規稼働負荷機器かどうかを判定する電力消費量推定方法。 The power consumption estimation method according to claim 8,
The new operation determination process is a power consumption estimation method for determining whether the operation load device is the new operation load device based on the stored operation determination process result.
前記稼働判定処理は、前記稼働状態信号が示す値と所定の閾値とを比較することにより、前記負荷機器が前記稼働負荷機器かどうかを判定する電力消費量推定方法。 The power consumption estimation method according to any one of claims 6 to 9,
The operation determination process is a power consumption amount estimation method for determining whether or not the load device is the operation load device by comparing a value indicated by the operation state signal with a predetermined threshold.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009013032A JP5007310B2 (en) | 2009-01-23 | 2009-01-23 | Power consumption estimation device and power consumption estimation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009013032A JP5007310B2 (en) | 2009-01-23 | 2009-01-23 | Power consumption estimation device and power consumption estimation method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2010169567A JP2010169567A (en) | 2010-08-05 |
JP5007310B2 true JP5007310B2 (en) | 2012-08-22 |
Family
ID=42701851
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009013032A Expired - Fee Related JP5007310B2 (en) | 2009-01-23 | 2009-01-23 | Power consumption estimation device and power consumption estimation method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5007310B2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10114051B2 (en) | 2014-03-31 | 2018-10-30 | Nec Corporation | Monitoring device, monitoring system, monitoring method, and non-transitory storage medium |
WO2015151558A1 (en) | 2014-03-31 | 2015-10-08 | 日本電気株式会社 | Monitoring device, monitoring system, monitoring method, and program |
US10324117B2 (en) * | 2014-04-28 | 2019-06-18 | Landis+Gyr Innovations, Inc. | Monitoring power consumption by electrical devices using monitored operational parameters |
US9705327B2 (en) * | 2015-07-14 | 2017-07-11 | Restore Nv | Self-learning, real-time, data-driven power metering system |
JP6488958B2 (en) * | 2015-09-17 | 2019-03-27 | 住友電気工業株式会社 | Power consumption management device, power consumption management method, and power consumption management program |
CN109444585B (en) * | 2018-11-09 | 2021-03-16 | 重庆仕益产品质量检测有限责任公司 | Quality detection method and device for electric blanket |
-
2009
- 2009-01-23 JP JP2009013032A patent/JP5007310B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2010169567A (en) | 2010-08-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5007310B2 (en) | Power consumption estimation device and power consumption estimation method | |
JP6232021B2 (en) | Power consumption prediction method according to consumption characteristics, power consumption prediction model generation method, power consumption prediction device | |
US10324117B2 (en) | Monitoring power consumption by electrical devices using monitored operational parameters | |
EP2619879B1 (en) | Disaggregation apparatus for identifying an appliance in an electrical network | |
US20130159756A1 (en) | Methods And Systems For Blind Analysis of Resource Consumption | |
JP5520807B2 (en) | Residential electrical equipment maintenance management device and residential electrical equipment maintenance system | |
JP2017505890A (en) | Power consumption evaluation of HVAC system | |
JP5627504B2 (en) | Air conditioning equipment maintenance system and data analysis device | |
JP2012205385A (en) | Reserve power calculation device and method, and computer program | |
JP2017201298A (en) | Energy demand-amount estimation method, estimation device and estimation program | |
Barsim et al. | Unsupervised adaptive event detection for building-level energy disaggregation | |
WO2021178784A1 (en) | System and method for detecting arc in an electrical meter | |
KR101190994B1 (en) | Ubiquitous building energy management system based on intelligent power devices | |
JP2006349519A (en) | Demand factor analyzing system and demand factor analysis method | |
US9927783B2 (en) | Analog signal processing using a correlator digital filter | |
JP5819115B2 (en) | Sensor network system | |
JP6381498B2 (en) | Weighing meter state change detection device and program | |
JP2009258063A (en) | Damage monitoring system and measuring device | |
JP2014199621A (en) | Sensor normality determination method, normality determination program and system | |
JP2007034669A (en) | Power consumption monitoring system, and method and program therefor | |
JP2010213469A (en) | Electric equipment discriminator, electric equipment discriminating method, and electric equipment discriminating program | |
US9678120B2 (en) | Electrical load identification using system line voltage | |
EP3376165B1 (en) | Power monitor | |
WO2014024559A1 (en) | Vibration detecting apparatus | |
JP6434860B2 (en) | AC adapter deterioration degree determination device and system thereof. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20101217 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20110615 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20120510 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20120522 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20120528 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150601 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |