JP4966994B2 - Foundation pile and pile foundation structure - Google Patents

Foundation pile and pile foundation structure Download PDF

Info

Publication number
JP4966994B2
JP4966994B2 JP2009098158A JP2009098158A JP4966994B2 JP 4966994 B2 JP4966994 B2 JP 4966994B2 JP 2009098158 A JP2009098158 A JP 2009098158A JP 2009098158 A JP2009098158 A JP 2009098158A JP 4966994 B2 JP4966994 B2 JP 4966994B2
Authority
JP
Japan
Prior art keywords
pile
central
foundation
center
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009098158A
Other languages
Japanese (ja)
Other versions
JP2010248762A (en
Inventor
忠 青井
文男 原内
守正 坂本
秀樹 筒井
堯世 上田
Original Assignee
国土交通省四国地方整備局長
有限会社エスエス
株式会社ロイヤルコンサルタント
株式会社上田建築事務所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 国土交通省四国地方整備局長, 有限会社エスエス, 株式会社ロイヤルコンサルタント, 株式会社上田建築事務所 filed Critical 国土交通省四国地方整備局長
Priority to JP2009098158A priority Critical patent/JP4966994B2/en
Publication of JP2010248762A publication Critical patent/JP2010248762A/en
Application granted granted Critical
Publication of JP4966994B2 publication Critical patent/JP4966994B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は土木建築における各種の簡易構造物の基礎として、沼地や湿地帯などの軟弱地盤であっても重機を使用することなく設置することが可能な基礎杭及び杭基礎の構造に関するものである。   TECHNICAL FIELD The present invention relates to a foundation pile and a pile foundation structure that can be installed without using heavy machinery as a foundation for various simple structures in civil engineering architecture even in soft ground such as swamps and wetlands. .

従来、沼地や湿地帯などの軟弱地盤に木道,八ツ橋や防護柵などの各種の簡易構造物を構築するに際しては、木製や鋼製の1本杭等の伝統的な杭を打設する杭基礎が使用されている。更に、必要に応じて置換工法や締固め工法等の地盤改良を併用することも行われている。   Conventionally, when constructing various simple structures such as wooden paths, Yatsuhashi bridges, guard fences, etc. on soft ground such as swamps and wetlands, piles that are traditionally built with wooden or steel single piles The foundation is used. Furthermore, ground improvement such as a replacement method and a compaction method is also used in combination as necessary.

また、地盤改良を伴うことなく、簡便に施工できる構造物の基礎として、地中に場所打ち杭を鉛直及び斜めに打設して構築した鉛直部材と斜め部材とによる構造体の上部に水平部材を架設してトラス構造体として形成した構造物の基礎も提供されている(特許文献1)。或いは、地震によって液状化を起こすような軟弱地盤に対しても施工が容易なように、内部に引張材を有する3本以上の中空斜杭による直線多角形の錐体を地盤内で構成して斜杭の先端部で引張材を固定し、錐体の頂部をもって支持体とする基礎工法も提供されている(特許文献2)。   In addition, as a foundation for a structure that can be easily constructed without ground improvement, a horizontal member is placed on the upper part of the structure with vertical and diagonal members constructed by placing cast-in-place piles vertically and diagonally in the ground. There is also provided a foundation for a structure formed as a truss structure by laying a frame (Patent Document 1). Alternatively, a straight polygonal pyramid composed of three or more hollow diagonal piles with a tensile material inside is constructed in the ground so that it can be easily constructed even on soft ground that liquefies due to an earthquake. There is also provided a basic construction method in which a tensile material is fixed at the tip of the inclined pile and the top of the cone is used as a support (Patent Document 2).

特開平9−71950号JP-A-9-71950 特開平8−333733号JP-A-8-333733

しかしながら、従来の1本杭等の伝統的な杭では必要な支持力を得るために、杭の長さや径を大きくするか、打設する本数を増やす必要があり、施工が煩雑となって工期が長くなり、施工費用も増加してしまう。また、杭が大きくなると重機を使用して打設する必要があり、公園内の湿地帯等における作業では環境に負荷を与えることとなる。更に、鋼製の杭は杭そのものが高額である。一方、特許文献1に示すようなトラス構造体を使用する基礎は、沼地や湿地帯などの軟弱地盤の現場においてトラス構造体を構築しなければならず、施工が複雑となる。更に、特許文献2に示すような基礎工法も、構造が複雑であり、木道,八ツ橋や防護柵などの各種の簡易構造物の基礎としては適していない。   However, in order to obtain the necessary bearing capacity for traditional piles such as a conventional single pile, it is necessary to increase the length and diameter of the piles or increase the number of piles to be placed. Will increase the construction cost. Moreover, when a pile becomes large, it is necessary to drive using a heavy machine, and the work in the wetland etc. in a park will give a load to an environment. Furthermore, steel piles are expensive. On the other hand, the foundation using the truss structure as shown in Patent Document 1 has to construct the truss structure at the site of soft ground such as a swamp or a wetland, and the construction becomes complicated. Furthermore, the foundation method as shown in Patent Document 2 is also complicated in structure, and is not suitable as a foundation for various simple structures such as wooden roads, Yatsuhashi bridges, and guard fences.

そこで、発明者らは主として沼地や湿地帯などの軟弱地盤における各種の簡易構造物の基礎として、重機を使用することなく現場での施工が容易であって、自然環境に与える負荷を最小限にとどめるとともに、安定した支持力を得ることができる基礎杭及び杭基礎の構造を提供することを目的としている。   Therefore, the inventors mainly used various simple structures in soft ground such as swamps and wetlands, and they were easy to construct on site without using heavy machinery, minimizing the load on the natural environment. It aims at providing the structure of the foundation pile and pile foundation which can obtain the stable support force while remaining.

本発明はその目的を達成するために、長手方向の中間部が断面六角形状に形成された中心杭と、中心杭の相互に隣接しない中間部周面にそれぞれ固着されるとともに、中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に所定角度で斜設された3本の支持杭とからなる基礎杭を提供する。 In order to achieve the object of the present invention, the longitudinal intermediate portion is fixed to the central pile having a hexagonal cross section and the intermediate peripheral surface of the central pile that is not adjacent to each other, and separated from the central pile. The foundation pile which consists of three support piles diagonally installed at a predetermined angle in the same direction as the front-end | tip part of a center pile .

また、長手方向の中間部が断面六角形状に形成された中心杭と、上面が中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に所定角度で傾斜するように中心杭の相互に隣接しない中間部周面にそれぞれ固着された3つのガイド部材と、それぞれのガイド部材に案内されて中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に所定角度で斜設されるとともに中心杭の相互に隣接しない中間部周面に固着された3本の支持杭とからなる基礎杭を提供する。 Further, the center piles middle portion in the longitudinal direction is formed in the cross-sectional hexagonal shape, in the direction above surface away from the center stake and the central pile to be inclined at a predetermined angle to the front end portion in the same direction of the central pile Three guide members respectively fixed to the peripheral surface of the intermediate portion that are not adjacent to each other, in directions away from the central pile guided by the respective guide members, and in the same direction as the tip of the central pile at a predetermined angle Provided is a foundation pile composed of three support piles that are obliquely attached and fixed to the peripheral surface of the intermediate portion that is not adjacent to the center pile.

更に、設置地盤の鉛直方向に、長手方向の中間部が断面六角形状に形成された中心杭を打設した後、中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に向けて3本の支持杭を設置地盤に所定角度で斜設するとともに、3本の支持杭をそれぞれ中心杭の相互に隣接しない中間部周面に固着した杭基礎の構造を提供する。 Furthermore, in the vertical direction of the installation ground, after the intermediate portion in the longitudinal direction is Da設center piles formed in hexagonal cross, in a direction away from the center stake, and, toward the tip and the same direction of the central pile And providing a structure of a pile foundation in which the three support piles are obliquely installed on the installation ground at a predetermined angle, and the three support piles are fixed to the peripheral surfaces of the central piles that are not adjacent to each other.

また、設置地盤の鉛直方向に、長手方向の中間部が断面六角形状に形成された中心杭を打設した後、上面が中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に向けて所定角度で傾斜するように中心杭の相互に隣接しない中間部周面にそれぞれ固着された3つのガイド部材に案内されて、中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に向けて支持杭を所定角度で斜設するとともに、3本の支持杭をそれぞれ中心杭の相互に隣接しない中間部周面に固着した杭基礎の構造を提供する。 Further, in the vertical direction of the installation ground, after the intermediate portion in the longitudinal direction is Da設center piles formed in hexagonal cross, in the direction above surface away from the center stake, and identical to the front end portion of the center stake In the direction away from the central pile, guided by the three guide members fixed to the intermediate peripheral surfaces of the central pile that are not adjacent to each other so as to be inclined at a predetermined angle toward the direction, and the tip of the central pile Provided is a structure of a pile foundation in which support piles are obliquely inclined at a predetermined angle in the same direction as the section, and three support piles are respectively fixed to the peripheral surface of the central portion not adjacent to each other .

そして、中心杭の上端部を断面四角形状に形成した。And the upper end part of the center pile was formed in cross-sectional square shape.

また、3本の支持杭が平面視において等間隔に配置され、3本の支持杭の中心杭に対する配置角度を同一とした。Moreover, the three support piles are arrange | positioned at equal intervals in planar view, and the arrangement | positioning angle with respect to the center pile of the three support piles was made the same.

更に、中心杭の先端部方向への支持杭の配置角度を中心杭に対して略30度とした。 Furthermore, the arrangement angle of the support pile in the direction of the tip of the center pile was set to approximately 30 degrees with respect to the center pile.

上記した構成の本発明によれば、中心杭は支持地盤の深さまで打設する必要がないため、中心杭の打設が容易であり、又中心杭をガイドとして利用して支持杭を打設することができる。そのため、支持杭の打設も容易となるとともに、支持杭が中心杭を介して一体として結合されるいるため、打設に際して重機を使用することなく、人力や軽機械での打込み作業が可能で現場での施工が容易である。よって、自然環境に与える負荷を最小限にとどめるとともに、安定した支持力を得ることができる。そのため、主として沼地や湿地帯などの軟弱地盤における各種の簡易構造物の基礎として最適である。また、基礎杭の素材として間伐材を有効利用した木製の杭を使用することが可能であり、環境に配慮するとともに、現地での加工が容易といった特徴がある。   According to the present invention having the above-described configuration, it is not necessary to drive the central pile to the depth of the support ground, so it is easy to drive the central pile, and the support pile is driven using the central pile as a guide. can do. For this reason, it is easy to place support piles, and the support piles are joined together via the central pile, so that it is possible to drive in manpower and light machines without using heavy machinery. Easy construction on site. Therefore, it is possible to minimize the load applied to the natural environment and to obtain a stable support force. Therefore, it is most suitable as the basis of various simple structures mainly in soft ground such as swamps and wetlands. In addition, it is possible to use wooden piles that make effective use of thinned wood as the material for the foundation piles, which is characterized by environmental considerations and easy local processing.

本発明にかかる基礎杭の構造の実施形態を示す全体斜視図。The whole perspective view showing the embodiment of the structure of the foundation pile concerning the present invention. 本発明にかかる基礎杭の構造の実施形態を示す全体正面図。The whole front view which shows embodiment of the structure of the foundation pile concerning this invention. 本発明にかかる基礎杭の構造の実施形態を示す全体平面図。The whole top view which shows embodiment of the structure of the foundation pile concerning this invention. 中心杭の斜視図。The perspective view of a center pile. 中心杭の正面図。The front view of a center pile. 中心杭の平面図。The top view of a center pile. 中心杭の底面図。The bottom view of a center pile. 中心杭の側面図。The side view of a center pile. 図5の中央縦断面図。The center longitudinal cross-sectional view of FIG. 図5のA−A断面図。AA sectional drawing of FIG. 図5のB−B断面図。BB sectional drawing of FIG. 図6のC矢視図。C arrow line view of FIG. 図6のD矢視図。D arrow line view of FIG. ガイド部材を装着した中心杭の斜視図。The perspective view of the center pile which mounted | wore with the guide member. ガイド部材を装着した中心杭の正面図。The front view of the center pile which mounted | wore with the guide member. ガイド部材を装着した中心杭の平面図。The top view of the center pile which mounted | wore with the guide member. 図16のE矢視図。E arrow view of FIG. 図16のF矢視図。F arrow line view of FIG. (A)はガイド部材の正面図、(B)は側面図、(C)は平面図。(A) is a front view of a guide member, (B) is a side view, (C) is a plan view. 支持杭を固着した中心杭の斜視図。The perspective view of the center pile which fixed the support pile. 支持杭を固着した中心杭の正面図。The front view of the center pile which fixed the support pile. 支持杭を固着した中心杭の右側面図。The right view of the center pile which fixed the support pile. 支持杭を固着した中心杭の平面図。The top view of the center pile which fixed the support pile. 図21のG−G断面図。GG sectional drawing of FIG. 支持杭を固着した中心杭の要部右側面図。The main part right side view of the center pile which fixed the support pile. 中心杭に支持杭を固着した図16のE矢視図。The E arrow line view of FIG. 16 which fixed the support pile to the center pile. 中心杭に支持杭を固着した図16のF矢視図。The F arrow line view of FIG. 16 which fixed the support pile to the center pile. (A)は支持杭の正面図、(B)は平面図、(C)は底面図。(A) is a front view of a support pile, (B) is a top view, (C) is a bottom view. 基礎杭の使用例を示す正面図。The front view which shows the usage example of a foundation pile. 基礎杭の使用例を示す側面図。The side view which shows the usage example of a foundation pile. 基礎杭の使用例を示す平面図。The top view which shows the usage example of a foundation pile. 基礎杭を使用して構築した木道の完成図。A completed drawing of a wooden path constructed using foundation piles.

以下図面に基づいて本発明の実施形態を説明する。図1は本発明にかかる基礎杭1の実施形態を示す全体斜視図、図2は正面図、図3は平面図である。図に示すように基礎杭1は、角柱状の中心杭2と、中心杭2の周部に固着される3本の支持杭3,4,5と、支持杭3,4,5のガイド部材6,7,8とから構成されている。この基礎杭1を設置地盤に打設した杭構造は、図2に示すように、3本の支持杭3,4,5の中心杭2への固着部分から上の部分が地面GLより露出した状態で基礎として利用される。   Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is an overall perspective view showing an embodiment of a foundation pile 1 according to the present invention, FIG. 2 is a front view, and FIG. 3 is a plan view. As shown in the figure, the foundation pile 1 includes a prismatic center pile 2, three support piles 3, 4, 5 fixed to the periphery of the center pile 2, and guide members of the support piles 3, 4, 5. 6, 7, 8. As shown in FIG. 2, the pile structure in which the foundation pile 1 is driven on the installation ground is exposed from the ground GL at the upper part of the three support piles 3, 4 and 5 fixed to the central pile 2. Used as a basis in state.

先ず中心杭2の構成について、図4〜図13に基づいて説明する。図4は中心杭2の斜視図、図5は正面図、図6は平面図、図7は底面図、図8は側面図である。中心杭2は全体が角柱状であって、先端部9が先鋭に形成された杭である。そして、中心杭2の上端部10は、図5のA−A断面図である図10に示すように断面四角形状であり、又長手方向の中間部11は、図5のB−B断面図である図11に示すように断面六角形状に形成されている。   First, the structure of the center pile 2 is demonstrated based on FIGS. 4 is a perspective view of the central pile 2, FIG. 5 is a front view, FIG. 6 is a plan view, FIG. 7 is a bottom view, and FIG. 8 is a side view. The central pile 2 is a pile having a prismatic shape as a whole and having a sharpened tip 9. And the upper end part 10 of the center pile 2 is a cross-sectional square shape as shown in FIG. 10 which is AA sectional drawing of FIG. 5, and the intermediate part 11 of a longitudinal direction is BB sectional drawing of FIG. As shown in FIG. 11, it is formed in a hexagonal cross section.

よって、上端部10の周部には、正面10a,右側面10b,左側面10c,背面10dの四面が形成されている(図10参照)。また、中間部11の周部には、正面11a,背面11fと、正面11aに隣接する第1の右側面11b及び第1の左側面11dと、背面11fに隣接する第2の右側面11c及び第2の左側面11eの六面が形成されている(図11参照)。  Therefore, four surfaces including a front surface 10a, a right side surface 10b, a left side surface 10c, and a back surface 10d are formed on the periphery of the upper end portion 10 (see FIG. 10). Further, on the periphery of the intermediate portion 11, there are a front surface 11a, a back surface 11f, a first right side surface 11b and a first left side surface 11d adjacent to the front surface 11a, a second right side surface 11c adjacent to the back surface 11f, and Six surfaces of the second left side surface 11e are formed (see FIG. 11).

よって、図8に示すとおり右側面視において、第1の右側面11bと第2の右側面11cは相互に隣接することとなり、これらの第1の右側面11bと第2の右側面11cは、上端部10の右側面10bとは、異なる平面を形成している。同様に左側面視において、第1の左側面11dと第2の左側面11eは相互に隣接することとなり、これらの第1の左側面11dと第2の左側面11eは、上端部10の左側面10cとは、異なる平面を形成している。   Therefore, as shown in FIG. 8, in the right side view, the first right side surface 11b and the second right side surface 11c are adjacent to each other, and the first right side surface 11b and the second right side surface 11c are A plane different from the right side surface 10b of the upper end portion 10 is formed. Similarly, in the left side view, the first left side surface 11d and the second left side surface 11e are adjacent to each other, and the first left side surface 11d and the second left side surface 11e are the left side of the upper end portion 10. A plane different from the surface 10c is formed.

一方、中間部11の正面11aは上端部10の正面10aと、又中間部11の背面11fは上端部10の背面10dと長手方向において連接し、連続した同一平面を構成している。また、先端部9は、中間部11の正面11a,背面11f,第1の右側面11b,第2の右側面11c,第1の左側面11d,第2の左側面11eの六面と隣接する六面を有する六角錐状に形成されている。   On the other hand, the front surface 11a of the intermediate portion 11 is connected to the front surface 10a of the upper end portion 10 and the rear surface 11f of the intermediate portion 11 is connected to the rear surface 10d of the upper end portion 10 in the longitudinal direction, thereby forming a continuous and identical plane. The front end portion 9 is adjacent to the six surfaces of the intermediate portion 11 including a front surface 11a, a back surface 11f, a first right side surface 11b, a second right side surface 11c, a first left side surface 11d, and a second left side surface 11e. It has a hexagonal pyramid shape with six faces.

中心杭2の製造に際しては、先端部9を有する断面四角形状の杭の上端部10を断面四角形状に残したまま、中間部11を断面略正六角形状に切削形成すればよい。中心杭2の材料としては、間伐材等を使用した木製杭とすることが適当であるが、他の素材で形成することを排除するものではない。   When the center pile 2 is manufactured, the intermediate portion 11 may be cut and formed into a substantially regular hexagonal cross section while the upper end portion 10 of the square cross section having the tip portion 9 is left in a square cross section. The material of the central pile 2 is suitably a wooden pile using thinned wood or the like, but does not exclude the formation of other materials.

上記構成の中間部11において、相互に隣接しない中間部周面である正面11a,第2の右側面11c及び第2の左側面11eを支持杭載置面として、各面にガイド部材6,7,8をそれぞれ固着する。図14はガイド部材6,7,8を固着した中心杭2の斜視図、図15は中心杭2の正面図、図16は平面図、図17は図16のE方向(第2の右側面11c方向)からの矢視図、図18は図16のF方向(第2の左側面11e方向)からの矢視図、図19(A)はガイド部材6,7,8の正面図、図19(B)は同側面図、図19(C)は同平面図である。   In the intermediate portion 11 having the above-described configuration, the front surface 11a, the second right side surface 11c, and the second left side surface 11e, which are the circumferential surfaces of the intermediate portions that are not adjacent to each other, are used as the support pile placement surfaces, and the guide members 6, 7 , 8 are fixed. 14 is a perspective view of the central pile 2 to which the guide members 6, 7, and 8 are fixed, FIG. 15 is a front view of the central pile 2, FIG. 16 is a plan view, and FIG. 17 is an E direction (second right side surface) of FIG. 11c direction), FIG. 18 is an arrow view from the F direction (second left side surface 11e direction) in FIG. 16, and FIG. 19A is a front view of the guide members 6, 7, and 8. 19 (B) is a side view thereof, and FIG. 19 (C) is a plan view thereof.

ガイド部材6,7,8は支持杭3,4,5をガイドするための添え木であり、図19(A)に示すように正面視において平行四辺形の形状を有し、それぞれ上面6a,7a,8aが平滑面として形成された立方体からなる。このガイド部材6,7,8をそれぞれの上面6a,7a,8aが中心杭2から離反する方向で、かつ、中心杭2の先端部9と同一方向に所定角度で傾斜するように中心杭2の相互に隣接しない中間部周面である正面11a,第2の右側面11c及び第2の左側面11eの上方における所定位置にビス12で固着する。   The guide members 6, 7, and 8 are splints for guiding the support piles 3, 4, and 5, as shown in FIG. 19A, have a parallelogram shape when viewed from the front, and have upper surfaces 6a and 7a, respectively. , 8a is a cube formed as a smooth surface. The central pile 2 is configured such that the guide members 6, 7, 8 are inclined at a predetermined angle in a direction in which the upper surfaces 6 a, 7 a, 8 a are separated from the central pile 2 and in the same direction as the distal end portion 9 of the central pile 2. Are fixed at predetermined positions above the front surface 11a, the second right side surface 11c, and the second left side surface 11e, which are peripheral surfaces of the intermediate portions that are not adjacent to each other, with screws 12.

上記した構成のガイド部材6,7,8の上面6a,7a,8aに沿って支持杭3,4,5をそれぞれ中心杭2の周部(具体的には正面11a,第2の右側面11c及び第2の左側面11e)に案内して固着する。図28(A)は、支持杭3,4,5の正面図、図28(B)は同平面図、図28(C)は同底面図である。支持杭3,4,5はそれぞれ先端部3a,4a,5aが先鋭に形成され、全体が角柱状であって、中心杭2より長尺の杭である。この支持杭3,4,5が支持地盤に至ることによって一体となって必要な支持力を得るものである。支持杭3,4,5も中心杭2と同様に間伐材等を使用した木製杭とすることが適当であるが、他の素材で形成することを排除するものではない。   The support piles 3, 4 and 5 are arranged along the upper surfaces 6a, 7a and 8a of the guide members 6, 7 and 8 having the above-described configuration, respectively, around the periphery of the central pile 2 (specifically, the front surface 11a and the second right side surface 11c). And guides and adheres to the second left side surface 11e). 28A is a front view of the support piles 3, 4 and 5, FIG. 28B is a plan view thereof, and FIG. 28C is a bottom view thereof. Each of the support piles 3, 4, 5 has a sharpened tip 3 a, 4 a, 5 a, and has a prismatic shape as a whole and is longer than the center pile 2. The support piles 3, 4 and 5 reach the support ground to obtain a necessary support force as a unit. The support piles 3, 4, and 5 are suitably wooden piles using thinned wood or the like, as with the central pile 2, but this does not exclude the formation of other materials.

次に支持杭3,4,5の中心杭2への配置及び固着方法について、支持杭3を例として説明する。図20は支持杭3を中心杭2の中間部11における正面11aに固着した状態を示す斜視図、図21は同正面図、図22は同右側面図、図23は同平面図、図24は図21のG−G断面図である。中心杭2の中間部11における正面11aに固着されたガイド部材6の上面6aに支持杭3の下面を当接させた状態で、ガイド部材6の傾斜に沿って案内されて、支持杭3の先端部3aが中心杭2から離反する方向で、かつ、中心杭2の先端部9と同一方向に所定角度で傾斜するように支持杭3を配置し、コーチスクリュー13を使用して、中心杭2に固着する。このとき、支持杭3の先端部3aは中心杭2の先端部9よりも延長された位置にある。即ち、図に示すように支持杭3はガイド部材6に沿って案内されて中心杭2の周部に固着される。   Next, the arrangement and fixing method of the support piles 3, 4 and 5 to the central pile 2 will be described by taking the support pile 3 as an example. 20 is a perspective view showing a state in which the support pile 3 is fixed to the front surface 11a in the intermediate portion 11 of the central pile 2. FIG. 21 is a front view thereof, FIG. 22 is a right side view thereof, FIG. FIG. 22 is a GG sectional view of FIG. 21. In the state where the lower surface of the support pile 3 is brought into contact with the upper surface 6a of the guide member 6 fixed to the front surface 11a in the intermediate portion 11 of the central pile 2, the guide pile 6 is guided along the inclination of the support pile 3. The support pile 3 is arranged in such a direction that the tip 3a is separated from the center pile 2 and is inclined at a predetermined angle in the same direction as the tip 9 of the center pile 2, and using the coach screw 13, the center pile It adheres to 2. At this time, the tip 3 a of the support pile 3 is in a position extended from the tip 9 of the center pile 2. That is, as shown in the figure, the support pile 3 is guided along the guide member 6 and fixed to the peripheral portion of the center pile 2.

支持杭3の先端部3aが中心杭2から離反する方向で、かつ、中心杭2の先端部9と同一方向とは、図3に示すように打設した中心杭2の平面視において、中心杭2から放射状の下向きの方向を意味するものである。具体的には、中心杭の長手方向に対して45度以下、好ましくは図示例のように略30度程度の配置角度とすることが好ましい。支持杭4,5についても同様である。なお、支持杭3,4,5の中心杭2の先端部9方向への配置角度をそれぞれ異なる角度とすることも可能である。   The direction in which the tip 3a of the support pile 3 is separated from the center pile 2 and the same direction as the tip 9 of the center pile 2 is the center in the plan view of the center pile 2 placed as shown in FIG. This means a downward radial direction from the pile 2. Specifically, the arrangement angle is preferably 45 degrees or less with respect to the longitudinal direction of the central pile, and preferably about 30 degrees as shown in the illustrated example. The same applies to the support piles 4 and 5. In addition, the arrangement | positioning angle to the front-end | tip part 9 direction of the center pile 2 of the support piles 3, 4, and 5 can also be made into a respectively different angle.

次に支持杭3と同様にして、図26に示すように2本目の支持杭4を中心杭2の中間部11における第2の右側面11cに固着したガイド部材7に支持させて、支持杭4の先端部4aが中心杭2の先端部9よりも延長された位置にあるように中心杭2の周部にコーチスクリュー13で固着する。なお、図26においては既に固着した1本目の支持杭3の図示は省略してある。その結果、支持杭4は中心杭2から離反する方向で、かつ、中心杭2の先端部9と同一方向に所定角度で斜設される。   Next, in the same manner as the support pile 3, as shown in FIG. 26, the second support pile 4 is supported by the guide member 7 fixed to the second right side surface 11c in the intermediate portion 11 of the center pile 2, 4 is fixed to the peripheral portion of the central pile 2 with a coach screw 13 so that the distal end portion 4a of the central portion 4 is extended from the distal end portion 9 of the central pile 2. In addition, in FIG. 26, illustration of the 1st support pile 3 already fixed is abbreviate | omitted. As a result, the support pile 4 is obliquely installed at a predetermined angle in a direction away from the central pile 2 and in the same direction as the tip portion 9 of the central pile 2.

更に、支持杭3と同様にして、図27に示すように、3本目の支持杭5を中心杭2の中間部11における第2の左側面11eに固着したガイド部材8に支持させて、支持杭5の先端部5aが中心杭2の先端部9よりも延長された位置にあるように中心杭2の周部にコーチスクリュー13で固着する。なお、図27においては既に固着した1本目の支持杭3及び2本目の支持杭4の図示は省略してある。その結果、支持杭5は中心杭2から離反する方向で、かつ、中心杭2の先端部9と同一方向に所定角度で斜設される。なお、支持杭3,4,5を固着するコーチスクリュー13の位置は相互に高さ方向の位置を変えて干渉しないように固着するものである。   Further, in the same manner as the support pile 3, as shown in FIG. 27, the third support pile 5 is supported by the guide member 8 fixed to the second left side surface 11e in the intermediate portion 11 of the center pile 2, and supported. The pile 5 is fixed to the periphery of the central pile 2 with a coach screw 13 so that the distal end 5a of the pile 5 is located at a position extended from the distal end 9 of the central pile 2. In FIG. 27, the first support pile 3 and the second support pile 4 that are already fixed are not shown. As a result, the support pile 5 is obliquely installed at a predetermined angle in a direction away from the central pile 2 and in the same direction as the tip portion 9 of the central pile 2. The position of the coach screw 13 to which the support piles 3, 4 and 5 are fixed is fixed so as not to interfere by changing the position in the height direction.

その結果、基礎杭1において支持杭3,4,5は図3に示すように、平面視において中心杭2の周部に放射状に等間隔で配置されることとなり、中心杭2を介して一体に結合される。   As a result, as shown in FIG. 3, the support piles 3, 4, 5 in the foundation pile 1 are arranged radially at equal intervals around the center pile 2 in plan view, and are integrated via the center pile 2. Combined with

中心杭2として、図5,図6,図11に示すように上端部10の横寸法Wが120mm、縦寸法Hが105mmの断面四角形状を有し、中間部11が断面六角形状を有し、先端部9が先鋭に形成された全長Lが1000mmの杉の間伐材からなる木製杭を使用した。なお、図11に示すように中間部11における第2の右側面11cの背面11f方向への傾斜角度αを30度とした。また、中間部11における第1の右側面11b及び第1の左側面11dの正面11a方向への傾斜角度、並びに第2の左側面11eの背面11f方向への傾斜角度も30度とした。その結果、上端部10の長さL1は220mm、中間部11及び先端部9の合計長さL2は780mm、中間部11における正面11a及び背面11fの横寸法W1は60mm、第1の右側面11b,第2の右側面11c,第1の左側面11d,第2の左側面11eの平面視における横寸法W2,W3はそれぞれ30mm、第1の右側面11b,第2の右側面11c,第1の左側面11d,第2の左側面11eの平面視における縦寸法H1,H2はそれぞれ52.5mmである。   As shown in FIGS. 5, 6, and 11, the central pile 2 has a rectangular cross section with a lateral dimension W of the upper end 10 of 120 mm and a vertical dimension H of 105 mm, and the intermediate section 11 has a hexagonal cross section. A wooden pile made of thinned cedar with a total length L of 1000 mm with a sharp tip 9 was used. As shown in FIG. 11, the inclination angle α of the second right side surface 11c in the intermediate portion 11 in the direction of the back surface 11f is 30 degrees. The inclination angle of the first right side surface 11b and the first left side surface 11d in the intermediate portion 11 in the direction of the front surface 11a and the inclination angle of the second left side surface 11e in the direction of the back surface 11f were also set to 30 degrees. As a result, the length L1 of the upper end portion 10 is 220 mm, the total length L2 of the intermediate portion 11 and the tip portion 9 is 780 mm, the lateral dimension W1 of the front surface 11a and the rear surface 11f in the intermediate portion 11 is 60 mm, and the first right side surface 11b. , Second right side surface 11c, first left side surface 11d, and second left side surface 11e have horizontal dimensions W2 and W3 in plan view of 30 mm, respectively, first right side surface 11b, second right side surface 11c, and first left side surface 11e. The vertical dimensions H1 and H2 in the plan view of the left side surface 11d and the second left side surface 11e are 52.5 mm, respectively.

ガイド部材6,7,8は図19に示すように、側面視において横寸法W4が35mm、縦寸法H3が35mmの断面形状を有する全長L3が210mmで、正面視において右端部の底面に対する傾斜角度βを30度とした杉の間伐材からなる木製の添え木を使用した。なお、正面視において、左端部の上面6a,7a,8aに対する傾斜角度γも30度とした。   As shown in FIG. 19, the guide members 6, 7, and 8 have a total length L <b> 3 having a cross-sectional shape of a lateral dimension W <b> 4 of 35 mm and a longitudinal dimension H <b> 3 of 35 mm in a side view, and an inclination angle with respect to the bottom surface of the right end portion in a front view A wooden splint made of thinned cedar with a β of 30 degrees was used. In front view, the inclination angle γ with respect to the upper surfaces 6a, 7a, 8a at the left end is also set to 30 degrees.

支持杭3,4,5は図28に示すように横寸法W5が75mm、縦寸法H4が75mmの断面形状を有し、先端部が先鋭に形成された全長L4が1500mmの杉の間伐材からなる木製杭を使用した。これらの中心杭2,支持杭3,4,5,ガイド部材6,7,8の寸法は設置地盤の地質調査に基づいて支持力を計算して決定されるものであり、上記した寸法や材質に限定されるものではない。   As shown in FIG. 28, the support piles 3, 4, and 5 have a cross-sectional shape with a horizontal dimension W5 of 75 mm, a vertical dimension H4 of 75 mm, and a total length L4 with a sharp tip formed from a thinned cedar with a total length L4 of 1500 mm. Used wooden piles. The dimensions of these central piles 2, support piles 3, 4, 5, guide members 6, 7, and 8 are determined by calculating the bearing capacity based on the geological survey of the installed ground. It is not limited to.

次に、かかる基礎杭1を使用した杭基礎の構造について説明する。先ず設置地盤の地質調査を行い、基礎杭1の支持力を計算し、杭長等のサイズを決定する。そして、設置場所において中心杭2の打設位置を決定して、ガイド部材6,7,8を所定の位置に固着した図18に示す状態の中心杭2をモンケン等にて鉛直方向に所定深さまで打設する。次に図20から図23に示すようにガイド部材6に沿って案内された支持杭3を電動ハンマー等を使用して順次中心杭2の周部(具体的には正面11a)に打設し、その上端部を図24,図25に示すようにコーチスクリュー13で中心杭2の中間部11における正面11aに固着する。次に支持杭3と同様の手順でガイド部材7,8に沿って案内された支持杭4,5を電動ハンマー等を使用して順次中心杭2の周部に打設し、その上端部をコーチスクリュー13で中心杭2の中間部11における第2の右側面11c,第2の左側面11eに固着する。   Next, the structure of the pile foundation using this foundation pile 1 is demonstrated. First, a geological survey of the installed ground is performed, the bearing capacity of the foundation pile 1 is calculated, and the size of the pile length, etc. is determined. Then, the placement position of the central pile 2 is determined at the installation location, and the central pile 2 in the state shown in FIG. I will cast it. Next, as shown in FIGS. 20 to 23, the support pile 3 guided along the guide member 6 is sequentially driven on the peripheral portion (specifically, the front surface 11a) of the central pile 2 using an electric hammer or the like. As shown in FIGS. 24 and 25, the upper end portion is fixed to the front surface 11 a in the intermediate portion 11 of the center pile 2 with a coach screw 13. Next, the support piles 4 and 5 guided along the guide members 7 and 8 in the same procedure as the support pile 3 are sequentially driven around the periphery of the center pile 2 using an electric hammer or the like, and the upper end portion thereof is The coach screw 13 is fixed to the second right side surface 11c and the second left side surface 11e in the intermediate portion 11 of the center pile 2.

これにより、図1〜図3に示すように基礎杭1を設置した杭基礎が設置地盤の所定の位置に完成する。この杭基礎において、支持杭3,4,5は先端部が中心杭2から離反する方向で、かつ、中心杭の先端部9と同一方向に向けて斜設され、この3本の支持杭3,4,5によって必要な支持力が得られる。なお、中心杭2は鉛直方向に打設することが基本であるが、これに限らず設置地盤の状況によっては所定の角度で傾斜させて打設することも可能である。   Thereby, as shown in FIGS. 1-3, the pile foundation which installed the foundation pile 1 is completed in the predetermined position of an installation ground. In this pile foundation, the support piles 3, 4, 5 are obliquely arranged in the direction in which the tip ends away from the center pile 2 and in the same direction as the tip 9 of the center pile. , 4 and 5 provide the necessary supporting force. The center pile 2 is basically driven in the vertical direction. However, the center pile 2 is not limited to this, and can be driven at a predetermined angle depending on the situation of the installation ground.

図29から図32は本発明にかかる杭基礎を使用して公園内の湿地帯に木道14を構築した例を示すものである。図に示すように木道の設置場所において木道の幅方向両端部となる位置に一定間隔で基礎杭1からなる杭基礎を2列に設置し、対抗する基礎杭1の間に横桟15を適宜のボルトで固着し、横桟15を利用して長手方向に縦桟16を配置し、縦桟16を利用して踏板17を架橋して木道14とする。   FIG. 29 to FIG. 32 show an example in which the wooden path 14 is constructed in the wetland in the park using the pile foundation according to the present invention. As shown in the figure, pile foundations composed of foundation piles 1 are installed in two rows at fixed intervals at positions where both ends of the wooden road in the width direction of the installation place of the wooden road, and a horizontal beam 15 is placed between the opposing foundation piles 1. Are fixed with appropriate bolts, the vertical beam 16 is arranged in the longitudinal direction using the horizontal beam 15, and the tread 17 is bridged using the vertical beam 16 to form the wooden path 14.

本発明にかかる基礎杭及び杭基礎の構造によれば沼地や湿地帯などの軟弱地盤における各種の簡易構造物の基礎として、重機を使用することなく現場での施工が容易であって、自然環境に与える負荷を最小限にとどめるとともに、安定した支持力を得ることができる。   According to the foundation pile and the structure of the pile foundation according to the present invention, as a foundation for various simple structures in soft ground such as swamps and wetlands, construction on site is easy without using heavy machinery, and the natural environment In addition to minimizing the load applied to the vehicle, a stable supporting force can be obtained.

1…基礎杭
2…中心杭
3,4,5…支持杭
6,7,8…ガイド部材
9…先端部
10…上端部
11…中間部
11a…正面
11b…第1の右側面
11c…第2の右側面
11d…第1の左側面
11e…第2の左側面
12…ビス
13…コーチスクリュー
DESCRIPTION OF SYMBOLS 1 ... Foundation pile 2 ... Center pile 3, 4, 5 ... Support pile 6, 7, 8 ... Guide member 9 ... Tip part 10 ... Upper end part 11 ... Middle part 11a ... Front 11b ... 1st right side surface 11c ... 2nd 11d ... 1st left side 11e ... 2nd left side 12 ... Screw 13 ... Coach screw

Claims (12)

長手方向の中間部が断面六角形状に形成された中心杭と、中心杭の相互に隣接しない中間部周面にそれぞれ固着されるとともに、中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に所定角度で斜設された3本の支持杭とからなることを特徴とする基礎杭。   A central pile whose longitudinal intermediate portion is formed in a hexagonal cross section and an intermediate portion peripheral surface not adjacent to each other of the central pile are fixed to each other and in a direction away from the central pile, and the tip of the central pile A foundation pile comprising three support piles obliquely installed at a predetermined angle in the same direction. 長手方向の中間部が断面六角形状に形成された中心杭と、上面が中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に所定角度で傾斜するように中心杭の相互に隣接しない中間部周面にそれぞれ固着された3つのガイド部材と、それぞれのガイド部材に案内されて中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に所定角度で斜設されるとともに中心杭の相互に隣接しない中間部周面に固着された3本の支持杭とからなることを特徴とする基礎杭。   A center pile with a hexagonal cross-section in the middle in the longitudinal direction and a center pile that is inclined at a predetermined angle in the same direction as the tip of the center pile in a direction in which the upper surface is separated from the center pile. Three guide members fixed to non-adjacent intermediate part circumferential surfaces, and in a direction away from the central pile guided by the respective guide members, and obliquely installed at a predetermined angle in the same direction as the tip of the central pile And a support pile fixed to the peripheral surface of the intermediate portion of the central pile not adjacent to each other. 中心杭の上端部を断面四角形状に形成した請求項又は記載の基礎杭。 The foundation pile of Claim 1 or 2 which formed the upper end part of the center pile in the cross-sectional square shape. 3本の支持杭が平面視において等間隔に配置されている請求項1,2又は記載の基礎杭。 The foundation pile according to claim 1, 2 or 3, wherein the three support piles are arranged at equal intervals in a plan view. 3本の支持杭の中心杭に対する配置角度を同一とした請求項1,2,3又は記載の基礎杭。 The foundation pile of Claim 1, 2, 3 or 4 which made the arrangement angle with respect to the center pile of three support piles the same. 中心杭の先端部方向への支持杭の配置角度を中心杭に対して略30度とした請求項1,2,3,4又は5記載の基礎杭。 The foundation pile according to claim 1, 2, 3, 4 or 5 , wherein the support pile is disposed at an angle of about 30 degrees with respect to the center pile in the direction of the tip of the center pile. 設置地盤の鉛直方向に、長手方向の中間部が断面六角形状に形成された中心杭を打設した後、中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に向けて3本の支持杭を設置地盤に所定角度で斜設するとともに、3本の支持杭をそれぞれ中心杭の相互に隣接しない中間部周面に固着したことを特徴とする杭基礎の構造。   In the vertical direction of the installation ground, after placing a central pile having a hexagonal cross-section in the middle in the longitudinal direction, the direction away from the central pile and in the same direction as the tip of the central pile 3 A structure of a pile foundation characterized in that three support piles are obliquely installed at a predetermined angle on the installation ground, and three support piles are fixed to intermediate peripheral surfaces of the central pile that are not adjacent to each other. 設置地盤の鉛直方向に、長手方向の中間部が断面六角形状に形成された中心杭を打設した後、上面が中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に向けて所定角度で傾斜するように中心杭の相互に隣接しない中間部周面にそれぞれ固着された3つのガイド部材に案内されて、中心杭から離反する方向で、かつ、中心杭の先端部と同一方向に向けて支持杭を所定角度で斜設するとともに、3本の支持杭をそれぞれ中心杭の相互に隣接しない中間部周面に固着したことを特徴とする杭基礎の構造。   After placing a central pile with a hexagonal cross section in the vertical direction of the installation ground, the top surface is away from the central pile and in the same direction as the tip of the central pile In the direction away from the central pile and the same as the tip of the central pile, guided by three guide members fixed to the circumferential surfaces of the central pile that are not adjacent to each other so as to be inclined at a predetermined angle. A structure of a pile foundation characterized in that support piles are inclined at a predetermined angle in a direction and three support piles are fixed to intermediate peripheral surfaces of the central pile that are not adjacent to each other. 中心杭の上端部を断面四角形状に形成した請求項又は記載の杭基礎の構造。 The structure of the pile foundation of Claim 7 or 8 which formed the upper end part of the center pile in the cross-sectional square shape. 3本の支持杭が平面視において等間隔に配置されている請求項7,8又は記載の杭基礎の構造。 The structure of a pile foundation according to claim 7, 8 or 9 , wherein three support piles are arranged at equal intervals in a plan view. 3本の支持杭の中心杭に対する配置角度を同一とした請求項7,8,9又は10記載の杭基礎の構造。 The pile foundation structure according to claim 7, 8, 9, or 10, wherein the arrangement angles of the three support piles with respect to the central pile are the same. 中心杭の先端部方向への支持杭の配置角度を中心杭に対して略30度とした請求項7,8,9,10又は11記載の杭基礎の構造。 The structure of a pile foundation according to claim 7, 8, 9, 10 or 11 , wherein the support pile is disposed at an angle of about 30 degrees with respect to the central pile in the direction of the tip of the central pile.
JP2009098158A 2009-04-14 2009-04-14 Foundation pile and pile foundation structure Expired - Fee Related JP4966994B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009098158A JP4966994B2 (en) 2009-04-14 2009-04-14 Foundation pile and pile foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009098158A JP4966994B2 (en) 2009-04-14 2009-04-14 Foundation pile and pile foundation structure

Publications (2)

Publication Number Publication Date
JP2010248762A JP2010248762A (en) 2010-11-04
JP4966994B2 true JP4966994B2 (en) 2012-07-04

Family

ID=43311395

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009098158A Expired - Fee Related JP4966994B2 (en) 2009-04-14 2009-04-14 Foundation pile and pile foundation structure

Country Status (1)

Country Link
JP (1) JP4966994B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6081261B2 (en) * 2013-03-28 2017-02-15 東京製綱株式会社 High strength anchor
CN109826205B (en) * 2019-03-29 2024-02-09 深圳宏业基岩土科技股份有限公司 Double-row support pile structure
CN113174987B (en) * 2021-04-07 2022-06-28 武汉东研智慧设计研究院有限公司 Tree root type resistance to plucking piling bar basis

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4417955Y1 (en) * 1965-05-28 1969-08-04
JPS458588Y1 (en) * 1965-07-23 1970-04-22
GB1596160A (en) * 1976-12-15 1981-08-19 Nat Res Dev Nuclear magnetic resonance apparatus and methods
JPH03113392U (en) * 1990-03-06 1991-11-19
JP2840045B2 (en) * 1995-04-07 1998-12-24 泰三郎 小野 Freestanding foundation method on soft ground
JPH0971950A (en) * 1995-09-07 1997-03-18 Kajima Corp Foundation for structure

Also Published As

Publication number Publication date
JP2010248762A (en) 2010-11-04

Similar Documents

Publication Publication Date Title
JP5719700B2 (en) Method for laying honeycomb-shaped three-dimensional cell structure block on slope
JP5555643B2 (en) Structure and construction method of mountain retaining support
JP4966994B2 (en) Foundation pile and pile foundation structure
KR100764135B1 (en) Reinforced soil retaining wall and method for constructing therof
KR101591812B1 (en) Block-type reinforced earth retaining wall construction method and steel rod grid reinforcing material is installed
JP6325248B2 (en) Cell structure construction method and cell structure
JP5425157B2 (en) Simple foundation structure
JP6640945B1 (en) Construction method of pier structure and pier structure
JPH03158525A (en) High horizontal load bearing foundation practice using solidification method
JP2007247308A (en) Pulling-out bearing strength reinforcing for pile group comprised of inclined piles and structure constructed according to the same
CN105696603A (en) Truss supporting and steel sheet pile supporting device and method for deep excavation of trenches
KR101696854B1 (en) Various assembling construction methods of E shaped precast concrete block retainning wall
JP6441030B2 (en) How to add underground facilities
JP6308491B2 (en) Pile-type liquefaction countermeasure structure and its construction method
CN111005363A (en) Spliced snowflake type steel sheet pile capable of monitoring self deformation and construction method thereof
JP6869825B2 (en) Pier foundation structure
JP6985037B2 (en) Pier foundation structure
JP2009013616A (en) Long span structure building
JP2015229854A (en) Foundation structure
RU77878U1 (en) CONSTRUCTION UNIT FOR SAVING WALL AND SAVING WALL
KR101452454B1 (en) Truncated pyramid block for reinforcing ground and foundation construction method using the truncated pyramid blocks
JP2004225492A (en) Falling rock safety net anchor
KR100960610B1 (en) Reinforcing structure of head part in steel pipe pile for dispersing external force
KR101838219B1 (en) Variable pile for increasing horizontal force and method for constructing foundation of structure
JP3742637B2 (en) Building structure

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110824

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20111003

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111125

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120301

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120402

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150406

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees