JP4942402B2 - Tunnel segment and manufacturing method thereof - Google Patents

Tunnel segment and manufacturing method thereof Download PDF

Info

Publication number
JP4942402B2
JP4942402B2 JP2006167559A JP2006167559A JP4942402B2 JP 4942402 B2 JP4942402 B2 JP 4942402B2 JP 2006167559 A JP2006167559 A JP 2006167559A JP 2006167559 A JP2006167559 A JP 2006167559A JP 4942402 B2 JP4942402 B2 JP 4942402B2
Authority
JP
Japan
Prior art keywords
tunnel
axial
peripheral plate
wall
segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006167559A
Other languages
Japanese (ja)
Other versions
JP2007162452A (en
Inventor
克佳 中西
秀昭 長山
伸郎 林
修 須藤
聡 和田
健 鱒渕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
JFE Metal Products and Engineering Inc
Original Assignee
JFE Steel Corp
JFE Metal Products and Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp, JFE Metal Products and Engineering Inc filed Critical JFE Steel Corp
Priority to JP2006167559A priority Critical patent/JP4942402B2/en
Publication of JP2007162452A publication Critical patent/JP2007162452A/en
Application granted granted Critical
Publication of JP4942402B2 publication Critical patent/JP4942402B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、トンネルの周方向及び軸方向に連結することにより、トンネル壁を形成するためのトンネル用セグメント及びその製造方法に関するものである。   The present invention relates to a tunnel segment for forming a tunnel wall by being connected in a circumferential direction and an axial direction of the tunnel, and a manufacturing method thereof.

従来のトンネル用セグメントとして、トンネル周方向で隣合うセグメントに対向すべくトンネル軸方向に沿った一対の軸方向壁と、トンネル周方向に沿うほぼ扇形で一対以上の周方向壁と、トンネル壁を構成するためにトンネル周方向に沿った周壁、周方向壁と同形の一対の縦リブとの壁からなる箱状を呈すると共に、周方向壁において、トンネル径方向に関して周壁が配置される部分とは反対側となる部分に、周方向壁のトンネル周方向長さの全域又はほぼ全域にわたってトンネル軸方向に突出するフランジ部を形成してダクタイル鋳鉄製のセグメントを構成したものがある(例えば、特許文献1参照)。   As a conventional tunnel segment, a pair of axial walls along the tunnel axial direction to face adjacent segments in the tunnel circumferential direction, a pair of circumferential walls substantially fan-shaped along the tunnel circumferential direction, and a tunnel wall In order to configure, the peripheral wall along the tunnel circumferential direction, presents a box shape consisting of a wall of a pair of vertical ribs of the same shape as the circumferential wall, and in the circumferential wall is a portion where the circumferential wall is arranged in the tunnel radial direction A part made of ductile cast iron is formed by forming a flange portion projecting in the tunnel axial direction over the entire or almost entire area of the tunnel circumferential length of the circumferential wall on the opposite side portion (for example, patent document) 1).

特開2003−307100号公報(第3,4頁、図1−7)Japanese Patent Laid-Open No. 2003-307100 (pages 3 and 4, FIG. 1-7)

特許文献1のトンネル用セグメントにおいては、鋼板をほぼ扇形状に切り出しして溶接するか、又はほぼ扇形状の鋳鉄を別途製作して設置することにより、セグメントの曲率を実現しているが、この方法では制作コストが嵩むばかりでなく、製作に時間がかかるという問題がある。
また、セグメント本体構造に加えて、別途、トンネル周方向及びトンネル軸方向に複数並べて互いに連結するためのセグメント継手及びリング継手を設置する必要があるため、製作コストがさらに嵩むことになる。
In the tunnel segment of Patent Document 1, the curvature of the segment is realized by cutting the steel plate into a substantially fan shape and welding it, or by separately producing and installing a substantially fan-shaped cast iron. This method not only increases the production cost, but also has a problem that production takes time.
Further, in addition to the segment body structure, it is necessary to separately install a plurality of segment joints and ring joints that are arranged in the circumferential direction of the tunnel and in the tunnel axis direction and are connected to each other.

さらに、セグメントの製作時に、コンクリートの打設荷重に耐えるため、トンネル周方向に沿った周壁を構成する背面板又はスキンプレートの面外変形を抑制する補剛材が多数必要となり、これに加えて、セグメントの施工時には、セグメントをジャッキ等で押し込むため、トンネル周方向に沿うほぼ扇形状の軸方向壁(セグメント側面)の強度が問題となる。特に、大深度対応のトンネル用セグメントの場合、セグメント1体当りの重量の増加に比例してジャッキ等の押し込み力も増加する。この押し込み力に対応するためにも補剛材を多数設置する必要があり、セグメント1体当りの重量がさらに増加し、その結果施工性が悪化するという問題がある。   Furthermore, in order to withstand the casting load of concrete during the production of the segments, a number of stiffeners that suppress the out-of-plane deformation of the back plate or skin plate that constitutes the peripheral wall along the tunnel circumferential direction are required. During the construction of the segment, since the segment is pushed in with a jack or the like, the strength of the substantially fan-shaped axial wall (segment side surface) along the circumferential direction of the tunnel becomes a problem. In particular, in the case of a tunnel segment for large depths, the pushing force of a jack or the like increases in proportion to the increase in weight per segment. In order to cope with this pushing force, it is necessary to install a large number of stiffeners, and the weight per segment further increases, resulting in a problem that workability deteriorates.

本発明は、上記の課題を解決するためになされたもので、構造が簡単で構成部材が少なく、そのため製造が容易で製造時間が短縮されてコストを低減することができ、その上施工性にすぐれたトンネル用セグメント及びその製造方法を提供することを目的としたものである。   The present invention has been made to solve the above problems, and has a simple structure and a small number of constituent members. Therefore, the manufacturing is easy, the manufacturing time is shortened, and the cost can be reduced. An object of the present invention is to provide an excellent tunnel segment and a method for manufacturing the same.

(1)本発明は、トンネルの周方向及び軸方向に複数並べて互いに連結してトンネル壁を形成するトンネル用セグメントであって、トンネルの軸方向に所定の間隔で設けられた一対の軸方向壁と、該軸方向壁に接合された内周板又は外周板と、前記軸方向壁及び内周板又は外周板の両端部に接合された周方向壁とを有し、前記一対の軸方向壁をそれぞれ複数本の鋼管を集成して形成し、これら一対の軸方向壁を形成する複数本の鋼管を端部が凹凸をなすように集成し、該凹凸部によりトンネルの周方向に連結するセグメント継手部を形成したものである。 (1) The present invention relates to a tunnel segment in which a plurality of tunnels are arranged in the circumferential direction and the axial direction and connected to each other to form a tunnel wall, and a pair of axial walls provided at predetermined intervals in the axial direction of the tunnel An inner peripheral plate or outer peripheral plate joined to the axial wall, and a circumferential wall joined to both ends of the axial wall and the inner peripheral plate or outer peripheral plate, and the pair of axial walls Are formed by assembling a plurality of steel pipes, and a plurality of the steel pipes forming the pair of axial walls are assembled so that the end portions thereof are uneven, and the segments are connected in the circumferential direction of the tunnel by the uneven portions. A joint portion is formed.

(2)また、本願発明は、トンネルの周方向及び軸方向に複数並べて互いに連結してトンネル壁を形成するトンネル用セグメントであって、トンネルの軸方向に所定の間隔で設けられた一対の軸方向壁と、該軸方向壁に接合された内周板又は外周板と、前記軸方向壁及び内周板又は外周板の両端部に接合された周方向壁とを有し、前記一対の軸方向壁をそれぞれ複数本の鋼管を集成して形成し、これら一対の軸方向壁を形成する複数本の鋼管を側壁が凹凸をなすように集成し、該凹凸部によりトンネルの軸方向に連結するリング継手部を形成したものである。 (2) Further , the present invention is a tunnel segment in which a plurality of tunnels are arranged in the circumferential direction and the axial direction and connected to each other to form a tunnel wall, and a pair of shafts provided at predetermined intervals in the axial direction of the tunnel A pair of shafts having a directional wall, an inner peripheral plate or an outer peripheral plate joined to the axial wall, and a circumferential wall joined to both ends of the axial wall and the inner peripheral plate or the outer peripheral plate. The direction wall is formed by assembling a plurality of steel pipes, and the plurality of steel pipes forming the pair of axial walls are assembled so that the side walls are uneven, and the uneven portions are connected in the axial direction of the tunnel. A ring joint portion is formed .

)上記(1)又は(2)の一対の軸方向壁を形成する鋼管を、トンネルの軸方向に配設した1本又は複数本の短管で連結した。
)上記(1)又は(2)の一対の軸方向壁を形成する鋼管の両端部を、トンネルの軸方向に配設した短管で連結した。
(5)また、本発明は、トンネルの周方向及び軸方向に複数並べて互いに連結してトンネル壁を形成するトンネル用セグメントであって、
トンネルの軸方向に所定の間隔で設けられた一対の軸方向壁と、該軸方向壁に接合された内周板又は外周板と、前記軸方向壁及び内周板又は外周板の両端部に接合された周方向壁とを有し、
前記一対の軸方向壁を鋼管で形成し、該一対の軸方向壁を形成する鋼管の両端部を、トンネルの軸方向に配設した短管で連結したものである。
( 3 ) The steel pipe which forms a pair of axial wall of said (1) or (2) was connected with the 1 or several short pipe arrange | positioned in the axial direction of the tunnel.
( 4 ) Both ends of the steel pipe forming the pair of axial walls of (1) or (2 ) above were connected by a short pipe disposed in the axial direction of the tunnel.
(5) Further , the present invention is a tunnel segment that forms a tunnel wall by connecting a plurality in the circumferential direction and the axial direction of the tunnel and connecting each other.
A pair of axial walls provided at predetermined intervals in the axial direction of the tunnel, an inner peripheral plate or an outer peripheral plate joined to the axial wall, and both ends of the axial wall and the inner peripheral plate or the outer peripheral plate A joined circumferential wall,
The pair of axial walls are formed of steel pipes, and both ends of the steel pipes forming the pair of axial walls are connected by a short pipe disposed in the axial direction of the tunnel.

(6)また、本発明は、トンネルの周方向及び軸方向に複数並べて互いに連結してトンネル壁を形成するトンネル用セグメントであって、
トンネルの軸方向に所定の間隔で設けられた一対の軸方向壁と、該軸方向壁に接合された内周板又は外周板と、前記軸方向壁及び内周板又は外周板の両端部に接合された周方向壁とを有し、
前記一対の軸方向壁を鋼管で形成し、前記軸方向壁を構成する鋼管を、複数枚の鋼板の端縁部を溶接接合し、又はL字状若しくはコ字状の鋼材を溶接接合して構成したものである。
(7)上記(5)又は(6)の一対の軸方向壁を、それぞれ1本の鋼管で形成した。
(8)上記(5)又は(6)の一対の軸方向壁を、それぞれ複数本の鋼管を集成して形成した。
(6) Further , the present invention is a tunnel segment that forms a tunnel wall by connecting a plurality in the circumferential direction and the axial direction of the tunnel and connecting each other.
A pair of axial walls provided at predetermined intervals in the axial direction of the tunnel, an inner peripheral plate or an outer peripheral plate joined to the axial wall, and both ends of the axial wall and the inner peripheral plate or the outer peripheral plate A joined circumferential wall,
The pair of axial walls are formed of steel pipes, the steel pipes constituting the axial walls are welded to the edge portions of a plurality of steel plates, or L-shaped or U-shaped steel materials are welded. It is composed.
(7) Each of the pair of axial walls of (5) or (6) is formed of one steel pipe.
(8) The pair of axial walls of (5) or (6) is formed by assembling a plurality of steel pipes.

)上記(1)〜()のいずれかの一対の軸方向壁と、内周板又は外周板と、周方向壁とによって形成された箱状部にコンクリートを打設した。
10)上記()の内周板又は外周板の前記箱状部に対応するコンクリート打設面にすべり止めを設けた。
11)上記()の内周板又は外周板の前記箱状部に対応する領域、前記一対の鋼管、短管及び周方向壁の箱状部内壁の全部又は一部にすべり止めを設けた。
( 9 ) Concrete was placed on a box-shaped portion formed by the pair of axial walls according to any one of (1) to ( 8 ) above, an inner peripheral plate or an outer peripheral plate, and a circumferential wall.
( 10 ) A slip stopper was provided on the concrete placing surface corresponding to the box-shaped portion of the inner peripheral plate or outer peripheral plate of ( 9 ).
( 11 ) Anti-skid is provided on all or part of the inner wall of the inner peripheral plate or outer peripheral plate of ( 9 ) above, the pair of steel pipes, the short pipe, and the inner wall of the box-shaped part of the circumferential wall. It was.

12)上記()〜(11)の箱状部に、縦鉄筋及び網鉄筋の両者又はいずれか一方を配筋した。
13)上記(1)〜(12)の一対の軸方向壁の下面及び上面若しくはいずれか一方、又は対向する壁面の下部及び上部若しくはいずれか一方に、内周板及び又は外周板を接合した。
( 12 ) Both or any one of the vertical reinforcing bar and the net reinforcing bar was arranged in the box-shaped part of ( 9 ) to ( 11 ).
( 13 ) The inner peripheral plate and / or the outer peripheral plate are joined to the lower surface and / or upper surface of the pair of axial walls of (1) to ( 12 ), or the lower portion and / or upper portion of the opposing wall surface. .

(14)上記(1)〜(13)のいずれかの鋼管に、多角形鋼管を用いた。
(15)上記(1)〜(14)の一対の軸方向壁を構成する鋼管を、トンネル周方向に沿ってほぼ円弧状に形成した。
(14) A polygonal steel pipe was used as the steel pipe of any one of (1) to (13) above.
(15) The steel pipe which comprises a pair of axial wall of said (1)-(14) was formed in the substantially circular arc shape along the tunnel circumferential direction.

16)また、本発明に係るトンネルセグメントは、複数本の鋼管をトンネルの軸方向に並べて接合し、これら複数本の鋼管の両端部に周方向壁を接合したものである。
17)上記(1)〜(16)の鋼管内にコンクリートを充填した。
18)上記()又は(17)のコンクリートに、最大骨材寸法20mm、スランプフロー60cm±10cm、空気量2%±1%の高流動コンクリートを使用した。
19)上記(17)のコンクリートを充填した鋼管の両端部に拘束板又は継手板を接合した。
( 16 ) In the tunnel segment according to the present invention, a plurality of steel pipes are aligned and joined in the axial direction of the tunnel, and circumferential walls are joined to both ends of the plurality of steel pipes.
( 17 ) Concrete was filled into the steel pipes of the above (1) to ( 16 ).
( 18 ) High-fluidity concrete having a maximum aggregate size of 20 mm, a slump flow of 60 cm ± 10 cm, and an air amount of 2% ± 1% was used as the concrete of ( 9 ) or ( 17 ).
( 19 ) Restraint plates or joint plates were joined to both ends of the steel pipe filled with the concrete of ( 17 ) above.

20)上記(1)〜(5)又は(9)〜(19)の軸方向壁を構成する鋼管を、複数枚の鋼板の端縁部を溶接接合し、又はL字状若しくはコ字状の鋼材を溶接接合して構成した。 ( 20 ) The steel pipe constituting the axial wall of the above (1) to (5) or (9) to (19) is welded to the edge portions of a plurality of steel plates, or L-shaped or U-shaped. These steel materials were constructed by welding.

21)また、本発明に係るトンネル用セグメントの製造方法は、鋼管内にコンクリートを充填し、該コンクリートの硬化後に前記鋼管の両端部に拘束板を接合して一対の軸方向壁を形成し、該一対の軸方向壁を所定の間隔で配設して内周板又は外周板を接合し、前記一対の軸方向壁及び内周板又は外周板の両端部に周方向壁を接合したものである。 ( 21 ) Further, in the method for manufacturing a tunnel segment according to the present invention, a steel pipe is filled with concrete, and after the concrete is hardened, a restraint plate is joined to both ends of the steel pipe to form a pair of axial walls. The pair of axial walls are disposed at a predetermined interval to join inner peripheral plates or outer peripheral plates, and the circumferential walls are joined to both ends of the pair of axial walls and inner peripheral plates or outer peripheral plates. It is.

22)また、本発明に係るトンネル用セグメントの製造方法は、トンネルの軸方向に所定の間隔で設けられた一対の鋼管により軸方向壁を形成し、該一対の軸方向壁を所定の間隔で配設して内周板又は外周板を接合し、前記軸方向壁を形成する鋼管内にコンクリートを充填して前記一対の軸方向壁及び内周板又は外周板の両端部に周方向壁を接合したものである。 ( 22 ) Further, in the method for manufacturing a tunnel segment according to the present invention, an axial wall is formed by a pair of steel pipes provided at a predetermined interval in the axial direction of the tunnel, and the pair of axial walls are separated by a predetermined interval. The steel pipe forming the axial wall is filled with concrete by arranging the inner peripheral board or the outer peripheral board, and the circumferential walls at both ends of the pair of axial walls and the inner or outer peripheral board. Are joined.

23)上記(21)又は(22)のトンネル用セグメントの製造方法において、一対の軸方向壁を所定の間隔で配設し、該軸方向壁の長手方向に所定の間隔で複数の補助部材を配設してその両端部を前記軸方向壁にそれぞれ接合し、ついで円周板又は外周板を接合するようにした。
24)上記(21)〜(23)のいずれかの軸方向壁を、それぞれ複数本の鋼管を集成して形成した。
25)上記(21)〜(24)のいずれかの軸方向壁と、内周板又は外周板、周方向壁とによって形成された箱状部内にコンクリートを打設した。
( 23 ) In the method for manufacturing a tunnel segment according to ( 21 ) or ( 22 ), the pair of axial walls are disposed at a predetermined interval, and a plurality of auxiliary members are disposed at a predetermined interval in the longitudinal direction of the axial wall. And both ends thereof are joined to the axial wall, respectively, and then a circumferential plate or an outer peripheral plate is joined.
( 24 ) The axial wall of any one of ( 21 ) to ( 23 ) above was formed by assembling a plurality of steel pipes.
( 25 ) Concrete was placed in a box-shaped portion formed by the axial wall of any one of the above ( 21 ) to ( 24 ), an inner peripheral plate, an outer peripheral plate, or a circumferential wall.

26)本発明に係るトンネル用セグメントの製造方法は、トンネルの周方向に沿ってほぼ円弧状に成形され、内部にコンクリートが充填された複数本の鋼管をトンネルの軸方向に並べて接合し、これら複数本の鋼管の両端部に周方向壁を接合したものである。
27)また、トンネルの周方向に沿ってほぼ円弧状に成形された複数本の鋼管をトンネルの軸方向に並べて接合し、これら複数本の鋼管内にコンクリートを充填してその両端部に周方向壁を接合したものである。
( 26 ) The method for manufacturing a tunnel segment according to the present invention is formed in a substantially arc shape along the circumferential direction of the tunnel, and a plurality of steel pipes filled with concrete are aligned and joined in the axial direction of the tunnel, A circumferential wall is joined to both ends of the plurality of steel pipes.
( 27 ) Further, a plurality of steel pipes formed in a substantially arc shape along the circumferential direction of the tunnel are aligned and joined in the axial direction of the tunnel, and the concrete is filled in the plurality of steel pipes and the both ends thereof are surrounded. Directional walls are joined.

本発明によれば、構造が簡単で構成部材が少ないので、製造が容易で製造時間が短縮され、コストを低減することができその上施工性にすぐれたトンネル用セグメント及びその製造方法を得ることができる。   According to the present invention, since the structure is simple and the number of constituent members is small, it is easy to manufacture, the manufacturing time is shortened, the cost can be reduced, and the tunnel segment excellent in workability and the manufacturing method thereof are obtained. Can do.

[実施の形態1]
図1は本発明の実施の形態1に係るトンネル用セグメントの斜視図、図2は図1のA−A断面図、図3(a)は図1のB−B断面図である。
本実施の形態に係るトンネル用セグメント(以下、単にセグメントという)は、図4に示すように、地盤中に掘削されたトンネル内に複数のセグメントSをリング状に接合してトンネル周壁を形成し、この周壁リングをトンネルの軸方向に順次接合してトンネルの周壁を形成するためのものである。
[Embodiment 1]
1 is a perspective view of a tunnel segment according to Embodiment 1 of the present invention, FIG. 2 is a cross-sectional view taken along line AA in FIG. 1, and FIG. 3A is a cross-sectional view taken along line BB in FIG.
As shown in FIG. 4, the tunnel segment according to the present embodiment (hereinafter simply referred to as a segment) is formed by joining a plurality of segments S in a ring shape in a tunnel excavated in the ground to form a tunnel peripheral wall. The peripheral wall ring is sequentially joined in the axial direction of the tunnel to form the peripheral wall of the tunnel.

図1〜図3において、1a,1bはセグメントSのトンネルの軸方向壁W1,W2を形成する第1,第2の角形鋼管(以下、単に鋼管という)である。この鋼管1a,1b(以下、単に1と記すことがある)はトンネルの周方向に沿って半径r(図4参照)でほぼ円弧状に曲げ加工して成形され、内部にはコンクリート20が充填されている。なお、鋼管1a,1bは一般に市販のものを使用できるが、大きさや板厚などに制限があるため軸方向壁W1,W2に適用できない場合がある。このような場合は、4枚の鋼板の端縁部を溶接接合し、あるいは鋼板をL字状やコ字状に曲げ加工した鋼材を溶接接合し、さらには市販のアングルやチャンネル等の鋼材を溶接接合するなどして、鋼管状の軸方向壁W1,W2を構成してもよく、また、多角形状の軸方向壁W1,W2を構成する場合は、複数枚の鋼板の端縁部を溶接接合してもよい。(他の実施の形態においても同様である)。 1 to 3, reference numerals 1a and 1b denote first and second square steel pipes (hereinafter simply referred to as steel pipes) forming the axial walls W 1 and W 2 of the tunnel of the segment S. These steel pipes 1a and 1b (hereinafter simply referred to as “1”) are formed by bending into a substantially arc shape with a radius r (see FIG. 4) along the circumferential direction of the tunnel, and the inside is filled with concrete 20 Has been. Incidentally, the steel pipe 1a, although 1b can be generally used those commercially available, may not be applicable in the axial direction a wall W 1, W 2 because of limitations such as the size and thickness. In such a case, the edge portions of the four steel plates are welded or joined, or steel materials that are bent into L-shapes or U-shapes are welded, and further commercially available steel materials such as angles and channels are used. The steel tubular axial walls W 1 and W 2 may be formed by welding or the like, and when the polygonal axial walls W 1 and W 2 are formed, the ends of a plurality of steel plates The edges may be welded together. (The same applies to other embodiments).

この鋼管1a,1bはトンネルの軸方向に所定の間隔Gで配設され、その下面にはトンネルの内周壁を形成する円弧状の背面板又はスキンプレート2a(以下、両者を合せて内周板という)が溶接接合されて一体化されている。なお、図3(b)に示すように、間隔Gで配設された鋼管1a,1bの対向する壁面の下部に、突合せ溶接により内周板2aを取付けてもよい(他の実施の形態においても同様である)。また、内周板2aの上面の両鋼管1a,1bの間隔Gに対応する領域、したがってコンクリートの打設面には、長手方向に所定の間隔で複数列のスタッドの如きずれ止め3が設けられている。   These steel pipes 1a and 1b are arranged at a predetermined interval G in the axial direction of the tunnel, and an arcuate back plate or skin plate 2a (hereinafter referred to as an inner peripheral plate combining both) is formed on the lower surface of the steel pipes 1a and 1b. Are integrated by welding. In addition, as shown in FIG.3 (b), you may attach the inner peripheral board 2a by butt welding to the lower part of the wall surface which the steel pipes 1a and 1b arrange | positioned by the space | interval G oppose (in other embodiment). Is the same). In addition, the region corresponding to the gap G between the steel pipes 1a and 1b on the upper surface of the inner peripheral plate 2a, that is, the concrete placement surface, is provided with a plurality of rows of stoppers 3 such as studs at predetermined intervals in the longitudinal direction. ing.

4は鋼管1a,1bの両端部に溶接接合されて、鋼管1a,1b内に充填されたコンクリート20を拘束する拘束板であり、両端部を拘束することにより鋼管1a,1bとこれに充填されたコンクリート20が一体化され、鋼管1a,1bの曲げ耐力及び曲げ剛性を向上することができる。なお、この拘束板4は省略してもよく、あるいは後述の継手板5で拘束板4を兼用してもよい(他の実施の形態においても同様である)。   Reference numeral 4 denotes a restraint plate that is welded to both ends of the steel pipes 1a and 1b and restrains the concrete 20 filled in the steel pipes 1a and 1b. The concrete 20 is integrated, and the bending strength and bending rigidity of the steel pipes 1a and 1b can be improved. The restraint plate 4 may be omitted, or the later-described joint plate 5 may also be used as the restraint plate 4 (the same applies to other embodiments).

5は鋼管1a,1bの両端部において、内周板2a及び拘束板4に接合された周方向壁を形成する継手板で、これら鋼管1a,1b、内周板2a及び継手板5により、上部が開口された箱状部6が形成される。
7aは箱状部6の長手方向に配筋された複数本の縦鉄筋である(図1には縦鉄筋7aは省略してある)。そして、ずれ止め3が設けられ縦鉄筋7aが配筋された箱状部6にはコンクリート20が打設されている。なお、図示してないが、コンクリート20のひび割れ等を防止するために、縦鉄筋7aに代えて、又は縦鉄筋7aと合わせて網鉄筋を配筋してもよい。
5 is a joint plate that forms a circumferential wall joined to the inner peripheral plate 2a and the constraining plate 4 at both ends of the steel pipes 1a and 1b. The steel pipes 1a and 1b, the inner peripheral plate 2a and the joint plate 5 A box-like portion 6 having an opening is formed.
Reference numeral 7a denotes a plurality of vertical reinforcing bars arranged in the longitudinal direction of the box-shaped portion 6 (the vertical reinforcing bars 7a are omitted in FIG. 1). The concrete 20 is placed in the box-like portion 6 provided with the stopper 3 and the vertical reinforcing bars 7a. Although not shown, in order to prevent cracking of the concrete 20 or the like, a rebar may be arranged instead of the vertical rebar 7a or in combination with the vertical rebar 7a.

上記の説明では、内周板2aの箱状部6に対応した領域、すなわちコンクリート打設面にずれ止め3を設けた場合を示したが、さらに、箱状部6を囲む両鋼管1a,1b及び両端部に設けた継手板5の壁面の全部又は一部、さらには後述の短管10の側壁にもすべり止めを設けてもよく、これにより、箱状部6とコンクリート20をより強固に一体化することができる。   In the above description, the region corresponding to the box-shaped portion 6 of the inner peripheral plate 2a, that is, the case where the displacement stopper 3 is provided on the concrete placing surface is shown. Further, both steel pipes 1a, 1b surrounding the box-shaped portion 6 are shown. Further, all or a part of the wall surface of the joint plate 5 provided at both ends, and further, a slip stopper may be provided on the side wall of the short pipe 10 to be described later, so that the box-like part 6 and the concrete 20 are made stronger. Can be integrated.

次に、上記のように構成したセグメントSの製造手順の一例について説明する。
先ず、トンネルの周方向に沿ってほぼ円弧状に曲げ形成された鋼管1a,1b内にコンクリート20を充填し、コンクリート20が硬化したのち鋼管1a,1bの両端部に拘束板4を溶接接合して、コンクリート20を管軸方向に拘束する。
Next, an example of a manufacturing procedure for the segment S configured as described above will be described.
First, concrete 20 is filled in steel pipes 1a and 1b which are bent in a substantially arc shape along the circumferential direction of the tunnel, and after the concrete 20 is hardened, the restraint plates 4 are welded to both ends of the steel pipes 1a and 1b. The concrete 20 is restrained in the pipe axis direction.

次に、図5に示すように、両鋼管1a,1bを所定の間隔Gで配置し、両者の間の長手方向に所定の間隔で、両鋼管1a,1bの間隔Gと等しい長さの平鋼板、棒材、アングル等からなる複数の補助部材9を配設し、その両端部を鋼管1a,1bに溶接接合し、両鋼管1a,1bを所定の間隔Gに保持する。ついで、両鋼管1a,1bの間のコンクリート20の打設面に複数のずれ止め3が設けられた内周板2aを、鋼管1a,1bの下面に溶接し、両鋼管1a,1bの両端部に設けた拘束板4と内周板2aの端部に継手板5を溶接接合する。これにより箱状部6が形成される。なお、他の手段により両鋼管1a,1bの間隔Gが保持できる場合や、製造上必要がないと判断された場合は、補助部材9を省略してもよい。また、箱状部6にコンクリート20を打設する際、補助部材9を取り除いてもよく、そのまま埋め込んでもよい。   Next, as shown in FIG. 5, the steel pipes 1a and 1b are arranged at a predetermined interval G, and a flat plate having a length equal to the interval G between the steel pipes 1a and 1b is arranged at a predetermined interval in the longitudinal direction between the two. A plurality of auxiliary members 9 made of steel plates, rods, angles, and the like are disposed, and both ends thereof are welded to the steel pipes 1a and 1b, and both the steel pipes 1a and 1b are held at a predetermined gap G. Next, an inner peripheral plate 2a having a plurality of stoppers 3 provided on the casting surface of the concrete 20 between the steel pipes 1a and 1b is welded to the lower surfaces of the steel pipes 1a and 1b, and both end portions of the both steel pipes 1a and 1b are welded. The joint plate 5 is welded and joined to the end portions of the restraint plate 4 and the inner peripheral plate 2a. Thereby, the box-shaped part 6 is formed. In addition, when the space | interval G of both the steel pipes 1a and 1b can be hold | maintained by another means, or when it is judged that it is not required on manufacture, you may abbreviate | omit the auxiliary member 9. Moreover, when placing concrete 20 in the box-shaped part 6, you may remove the auxiliary member 9, and you may embed as it is.

このようにして形成された箱状部6の長手方向に複数本の縦鉄筋7aを配筋し、箱状部6にコンクリート20を打設すれば、セグメントSが完成する。この場合、縦鉄筋7aに代えて又は縦鉄筋7aと合わせて網鉄筋を配筋してもよく、あるいは縦鉄筋7a、網鉄筋と直交して所定の間隔で横鉄筋を配筋してもよい。なお、両鋼管1a,1bの間に設けた補助部材9は、そのまま残置すればセグメントSの補強、コンクリート20の付着力の増大等に寄与するが、取外してもよい。   If a plurality of vertical reinforcing bars 7a are arranged in the longitudinal direction of the box-shaped part 6 formed in this way, and the concrete 20 is placed on the box-shaped part 6, the segment S is completed. In this case, instead of the vertical reinforcing bar 7a or in conjunction with the vertical reinforcing bar 7a, the rebar may be arranged, or the vertical reinforcing bar 7a and the horizontal reinforcing bar may be arranged at a predetermined interval. . The auxiliary member 9 provided between the steel pipes 1a and 1b contributes to reinforcing the segment S and increasing the adhesion force of the concrete 20 if left as it is, but may be removed.

ところで、鋼管1a,1b及び箱状部6に充填するコンクリート20は、セグメントSの曲げ耐力や曲げ剛性を確保するために、隅々まで確実に充填されることが必要である。そこで、本実施の形態においては、最大骨材寸法:20mm、スランプフロー:60cm±10cm、空気量:2%±1%の高流動コンクリート(以下、単にコンクリートと記すことがある)を使用した。これにより、鋼管1a,1b及び箱状部6の隅々まで確実にコンクリート20を充填することができた(他の実施の形態においても同様である)。   By the way, the concrete 20 filled in the steel pipes 1a and 1b and the box-shaped part 6 needs to be filled to every corner in order to ensure the bending strength and bending rigidity of the segment S. Therefore, in the present embodiment, high-fluidity concrete (hereinafter sometimes simply referred to as concrete) having a maximum aggregate size: 20 mm, slump flow: 60 cm ± 10 cm, and air amount: 2% ± 1% was used. Thereby, the concrete 20 was able to be reliably filled to every corner of the steel pipes 1a and 1b and the box-shaped part 6 (the same applies to other embodiments).

図6は本実施の形態のトンネル用セグメントの他の例を示す斜視図である。
図1の場合は、鋼管1a,1bを凸状に折曲げてセグメントSを構成した場合を示したが、本例の鋼管1a,1bを凹状に折曲げ、その凸面(外周壁)に背面板又はスキンプレート2b(以下外周板という)を接合してセグメントSを構成したものである。なお、図示してないが、鋼管1a,1bの内周壁に内周板2aを設けると共に、外周壁に外周板2bを設けて箱状部6の内外周面を閉塞してもよい(他の実施の形態においても同様である)。
本例の各部の構成及び製造手順は図1のセグメントの場合とほぼ同様である。なお、本例は以下に説明する他の実施の形態においても同様である。
FIG. 6 is a perspective view showing another example of the tunnel segment of the present embodiment.
In the case of FIG. 1, the case where the steel pipes 1a and 1b are bent into a convex shape and the segment S is configured is shown. However, the steel pipes 1a and 1b of this example are bent into a concave shape and the back plate is formed on the convex surface (outer peripheral wall). Or the segment S is comprised by joining the skin plate 2b (henceforth an outer peripheral board). Although not shown, the inner peripheral plate 2a may be provided on the inner peripheral walls of the steel pipes 1a and 1b, and the outer peripheral plate 2b may be provided on the outer peripheral wall to close the inner and outer peripheral surfaces of the box-shaped portion 6 (others). The same applies to the embodiment).
The configuration and manufacturing procedure of each part in this example are almost the same as those in the segment of FIG. This example is the same in other embodiments described below.

図7は本実施の形態の他の例を示す斜視図である。本例が図1〜図3及び図6のセグメントSと異なるのは、鋼管1a,1bにコンクリート20を充填しない点にある。このため、鋼管1a,1bの両端部に拘束板4を設けず継手板5を鋼管1a,1b及び内周板2aに直接接合し、箱状部6に打設したコンクリート20により、鋼管1a,1b、ずれ止め3を有する内周板2a及び縦鉄筋7aや網鉄筋(図示せず)を一体化したものである。   FIG. 7 is a perspective view showing another example of the present embodiment. This example is different from the segment S of FIGS. 1 to 3 and 6 in that the steel pipes 1a and 1b are not filled with the concrete 20. For this reason, the steel plate 1a, 1b is not provided with the restraint plate 4, but the joint plate 5 is directly joined to the steel pipes 1a, 1b and the inner peripheral plate 2a, and the concrete pipe 20 is placed on the box-like part 6 to thereby make the steel pipes 1a, 1b, 1b, an inner peripheral plate 2a having a displacement stopper 3, a vertical reinforcing bar 7a, and a rebar (not shown) are integrated.

図8は本実施の形態のさらに他の例の要部を示すもので、本例は円弧状に曲げ成形した同じ長さの鋼管1a,1bを、周方向にずらせて端面を凹凸状に配置したものである。このように構成することにより、トンネルの周方向にセグメントSをリング状に連結する際に、隣接するセグメントSと接合するセグメント継手部15を形成することができる。なお、本例は他の実施の形態にも適用することができる。   FIG. 8 shows the main part of still another example of the present embodiment. In this example, the steel pipes 1a and 1b having the same length bent into an arc shape are shifted in the circumferential direction and the end faces are arranged in an uneven shape. It is a thing. By comprising in this way, the segment joint part 15 joined to the adjacent segment S can be formed when connecting the segment S in the ring shape in the circumferential direction of a tunnel. This example can also be applied to other embodiments.

次に、本実施の形態に係るセグメントSの載荷試験の一例について説明する。
実験供試体(以下、単に供試体と記す)を構成する鋼材は、鋼管がSTKR400、その他の鋼材がSS400材で、その機械的性質を表1に示す。また、鋼管等に充填するコンクリートには、最大骨材寸法20mm、スランプフロー60cm、空気量1.8%の高流動コンクリートを使用した。その硬化コンクリートの力学的特性を表2に示す。
Next, an example of the loading test of the segment S according to the present embodiment will be described.
Steel materials constituting the experimental specimen (hereinafter simply referred to as specimen) are STKR400 for steel pipes and SS400 for other steel materials. Table 1 shows the mechanical properties. Further, as the concrete to be filled in the steel pipe or the like, high fluidity concrete having a maximum aggregate size of 20 mm, a slump flow of 60 cm, and an air amount of 1.8% was used. Table 2 shows the mechanical properties of the hardened concrete.

Figure 0004942402
Figure 0004942402

Figure 0004942402
Figure 0004942402

供試体は、実際のセグメントの寸法を、2m(幅)×0.45m(桁高)×4m(周方向長さ)を想定し、試験設備との関係で約2分の1の縮尺とし、幅0.89m、桁高0.2m、周方向長さ3.5mで、曲率のない平板状とした。
試験にあたっては、鋼管のみにコンクリートを充填したセグメント(供試体NO.1)と、鋼管と箱状部にコンクリートを充填したセグメント(供試体NO.2)との2体について行った。
The specimen is assumed to have an actual segment size of 2 m (width) x 0.45 m (digit height) x 4 m (circumferential length), and the scale is about one-half in relation to the test equipment, A flat plate having a width of 0.89 m, a digit height of 0.2 m, a circumferential length of 3.5 m, and no curvature.
In the test, the test was carried out for two segments: a segment in which only a steel pipe was filled with concrete (sample No. 1), and a segment in which the steel pipe and a box-shaped portion were filled with concrete (sample No. 2).

図9に供試体NO.2の断面を示す。鋼管1a,1bに充填したコンクリート20が硬化したのち、鋼管1a,1bを所定の間隔Gで配置し、補助部材9(図には、アングルを用いた場合を示してある)により固定した。そして、鋼管1a,1bの両端部に継手板5を接合すると共に、一方の面に内周板2aを接合して箱状部6を形成し、内周板2aの反対側に網鉄筋7bを配筋し、その内側に複数本の横鉄筋8を配筋して、箱状部6にコンクリート20を打設した。なお、供試体NO.1は鋼管1a,1bのみにコンクリート20を充填したもので、箱状部6にはコンクリート20が打設されていない点以外は、供試体NO.2とほぼ同様の構造である。   In FIG. 2 shows a cross section. After the concrete 20 filled in the steel pipes 1a and 1b was hardened, the steel pipes 1a and 1b were arranged at a predetermined interval G and fixed by an auxiliary member 9 (in the figure, an angle is shown). And while joining the joint plate 5 to the both ends of the steel pipes 1a and 1b, the inner peripheral plate 2a is joined to one surface to form the box-shaped portion 6, and the rebar 7b is formed on the opposite side of the inner peripheral plate 2a. Arrangement was made, a plurality of horizontal reinforcing bars 8 were arranged inside, and concrete 20 was placed in the box-shaped portion 6. Specimen NO. No. 1 is a steel tube 1a, 1b filled with concrete 20, and the test piece NO. 2 is almost the same structure.

このように構成した供試体NO.1とNO.2を、それぞれ下面の両端部近傍を全幅方向に支持し、上面の全幅方向の2点をそれぞれP/2で圧下してその中央部のたわみδ(mm)を測定した。
試験結果を図10に示す。
The specimen NO. 1 and NO. 2 was supported in the full width direction in the vicinity of both end portions of the lower surface, and two points in the full width direction of the upper surface were crushed by P / 2, respectively, and the deflection δ (mm) of the central portion was measured.
The test results are shown in FIG.

鋼管1a,1bのみにコンクリート20を充填した供試体NO.1においては、図にAで示すように、荷重Pを加えると徐々にたわみδが増加し、荷重Pが500KNを超えるとたわみ量が増加するが、鋼管1a,1bのひずみ硬化領域に入ったため試験を終了した。   Specimen NO. 1 in which concrete 20 is filled only in the steel pipes 1a and 1b In FIG. 1, as shown by A in the figure, when load P is applied, deflection δ gradually increases, and when load P exceeds 500 KN, the amount of deflection increases, but because the steel tube 1a, 1b has entered the strain hardening region. The test was terminated.

この供試体NO.1の荷重−たわみ曲線Aは、その理論計算値aより相当上回っており、また、鋼管1a,1bと箱状部6にコンクリート20を充填した供試体NO.2の理論計算値bより若干下回ってはいるが近似しているので、供試体NO.1は十分耐荷性能を有することがわかった。   This specimen NO. The load-deflection curve A of FIG. 1 is considerably higher than the theoretical calculation value a, and the specimen No. 1 in which the steel pipes 1a and 1b and the box-shaped part 6 are filled with concrete 20 is used. 2 is slightly lower than the theoretical calculation value b of FIG. 1 was found to have sufficient load bearing performance.

また、供試耐NO.2においては、図にBで示すように、荷重Pを加えると徐々にたわみδが増加し、荷重Pが600KNを超えるとたわみ量が増加して、その後荷重Pが650KN付近でほぼ一定になりたわみ量は増加したが、鋼管1a,1bのひずみ硬化領域に入ったため試験を終了した。   In addition, test resistance NO. In FIG. 2, as shown by B in the figure, when the load P is applied, the deflection δ gradually increases, and when the load P exceeds 600 KN, the amount of deflection increases, and then the load P becomes substantially constant around 650 KN. Although the amount of deflection increased, the test was terminated because it entered the strain hardening region of the steel pipes 1a and 1b.

このように、本実施の形態に係るセグメントSを試験値と理論計算値とを比較することにより、剛性、耐荷力が明確になり、トンネルの周方向及び軸方向の壁として十分使用しうることが明らかになった。なお、上記の載荷試験では、曲率のない平板状のセグメントSについて試験を行ったが、本実施の形態のようにほぼ円弧状のセグメントSにおいても、ほぼ同様な傾向が得られることは明らかである。   Thus, by comparing the segment S according to the present embodiment with the test value and the theoretical calculation value, the rigidity and the load bearing capacity are clarified and can be sufficiently used as the circumferential wall and the axial wall of the tunnel. Became clear. In the above loading test, the flat segment S having no curvature was tested. However, it is obvious that the same tendency can be obtained in the substantially arc segment S as in the present embodiment. is there.

本実施の形態によれば、セグメントSのトンネルの軸方向壁W1,W2を鋼管1a,1bで構成したことにより、この鋼管1a,1bを座屈を生じることなくトンネルの周方向に沿った円弧状に曲げ成形することができるので、製造が容易である。また、これにより、トンネルの周方向の壁を構成する内周板2a又は外周板2bに補剛材を設ける必要がなく、コンクリート20を打設時の荷重に耐えうる剛性を確保することができる。
さらに、鋼管1a,1bの両端部に拘束板4を接合することにより、鋼管1a,1bとその内部に充填したコンクリート20との間に、周方向のせん断力に対するずれ止めが不要になる。
According to the present embodiment, since the axial walls W 1 and W 2 of the tunnel of the segment S are constituted by the steel pipes 1a and 1b, the steel pipes 1a and 1b are aligned along the circumferential direction of the tunnel without causing buckling. Since it can be bent and formed into a circular arc shape, it is easy to manufacture. Further, it is not necessary to provide a stiffener on the inner peripheral plate 2a or the outer peripheral plate 2b constituting the circumferential wall of the tunnel, and it is possible to ensure rigidity capable of withstanding the load when the concrete 20 is placed. .
Furthermore, by joining the restraint plates 4 to both ends of the steel pipes 1a and 1b, it is not necessary to prevent the circumferential shearing force between the steel pipes 1a and 1b and the concrete 20 filled therein.

また、トンネルの軸方向壁W1,W2をコンクリート20を充填した鋼管1a,1bで構成することにより、セグメントSの側面の支圧強度が向上し、施工時のジャッキの大きな押込み力に耐えることができる。また、施工後、セグメントSに発生する曲げ力に対して鋼管1a,1bのフランジ(上下面)が抵抗するため、縦鉄筋7aの量を減らすことができる。
これらにより、セグメントSの製造コストが低減され、製造時間が短縮されるばかりでなく、施工性を向上することができる。
In addition, by configuring the axial walls W 1 and W 2 of the tunnel with steel pipes 1 a and 1 b filled with concrete 20, the bearing strength of the side surface of the segment S is improved and it can withstand a large pushing force of the jack during construction. be able to. Moreover, since the flanges (upper and lower surfaces) of the steel pipes 1a and 1b resist the bending force generated in the segment S after construction, the amount of the vertical reinforcing bars 7a can be reduced.
As a result, the manufacturing cost of the segment S is reduced, and not only the manufacturing time is shortened, but also the workability can be improved.

[実施の形態2]
図11は本発明の実施の形態2に係るセグメントの斜視図である。なお、実施の形態1と同じ部分にはこれと同じ符号を付し、説明の一部を省略する。
本実施の形態は、実施の形態1と同様の軸方向壁W1,W2を構成する鋼管1a,1bの間に長手方向に所定の間隔で軸方向に配設した複数の短管10を溶接接合し、これらの下面に内周板2a(この内周板2aにはずれ止め3が設けられていない)を溶接により接合したものである。
[Embodiment 2]
FIG. 11 is a perspective view of a segment according to Embodiment 2 of the present invention. The same parts as those in the first embodiment are denoted by the same reference numerals, and a part of the description is omitted.
In the present embodiment, a plurality of short tubes 10 disposed in the axial direction at predetermined intervals in the longitudinal direction between the steel tubes 1a and 1b constituting the axial walls W 1 and W 2 as in the first embodiment. The inner peripheral plate 2a (the inner peripheral plate 2a is not provided with the stopper 3) is joined by welding to the lower surfaces thereof.

本実施の形態に係るセグメントSの製造にあたっては、内部にコンクリート20が充填されて両端部に拘束板4が接合された円弧状の鋼管1a,1bを所定の間隔Gで配置する。そして、例えば鋼管1a,1bと同じ外形の鋼管を、両鋼管1a,1bの間隔Gに対応した長さに切断した複数の短管10を両鋼管1a,1bの間に長手方向に所定の間隔で配置し、その両端部を鋼管1a,1bに溶接接合する。なお、本実施の形態においては、実施の形態1で説明した組立時の補助部材は不要である。   In manufacturing the segment S according to the present embodiment, arc-shaped steel pipes 1a and 1b, in which concrete 20 is filled and the restraint plates 4 are joined to both ends, are arranged at a predetermined interval G. For example, a plurality of short pipes 10 obtained by cutting a steel pipe having the same outer shape as the steel pipes 1a and 1b to a length corresponding to the gap G between both the steel pipes 1a and 1b are arranged at predetermined intervals in the longitudinal direction between the both steel pipes 1a and 1b. And both ends thereof are welded to the steel pipes 1a and 1b. In the present embodiment, the auxiliary member at the time of assembly described in the first embodiment is not necessary.

ついで、両鋼管1a,1bと短管10の下面に内周板2aを溶接接合して一体化したものである。この場合、短管10にもコンクリート20を充填してもよい。なお、図11のセグメントSにおいて、両端部に設けた短管10の一方を鋼管1a,1bの端部より内側に位置させ、他方を鋼管1a,1bの端部より外側に突出させれば、セグメント継手部を構成することができる。   Next, the inner peripheral plate 2a is welded and integrated with the lower surfaces of both the steel pipes 1a and 1b and the short pipe 10. In this case, the short pipe 10 may be filled with the concrete 20. In addition, in the segment S of FIG. 11, if one of the short pipes 10 provided at both ends is positioned inside the ends of the steel pipes 1a and 1b, and the other protrudes outside the ends of the steel pipes 1a and 1b, A segment joint portion can be formed.

図12は本実施の形態の他の例を示すもので、本例においては、図11のセグメントSにおいて、鋼管1a,1bにはコンクリート20を充填せず、一方、内周板2aにずれ止め3を設けると共に鋼管1a,1bの両端部に継手板5を接合して形成した箱状部6にコンクリート20を打設したものである。なお、鋼管1a,1bの両端部に継手板5を設けた場合を示したが、継手板5に代えて短管10を接合してもよい。   FIG. 12 shows another example of the present embodiment. In this example, in the segment S of FIG. 11, the steel pipes 1a and 1b are not filled with the concrete 20, while the inner peripheral plate 2a is prevented from slipping. 3 and concrete 20 is placed in a box-like portion 6 formed by joining a joint plate 5 to both ends of the steel pipes 1a and 1b. In addition, although the case where the joint board 5 was provided in the both ends of the steel pipes 1a and 1b was shown, it replaces with the joint board 5 and you may join the short pipe 10. FIG.

また、図示してないが、例えば、図11,図12のセグメントSにおいて、鋼管1a,1bの両端部のみに短管10を接合し、両短管10の間に複数本の横鉄筋8、さらに必要に応じて縦鉄筋7aや網鉄筋を配筋してもよく、あるいは、図12のセグメントSにおいて、両鋼管1a,1bの長手方向の中心部近傍に1本の短管10を接合し、この短管10と両端部の継手板5との間に横鉄筋8を配筋するなど、要は両鋼管1a,1bの間の軸方向に1本又は複数本の短管10を接合すればよい。   Although not shown, for example, in the segment S of FIGS. 11 and 12, the short pipe 10 is joined only to both ends of the steel pipes 1 a and 1 b, and a plurality of horizontal reinforcing bars 8 are interposed between the short pipes 10. Further, if necessary, vertical reinforcing bars 7a and rebars may be arranged, or in the segment S in FIG. 12, one short pipe 10 is joined in the vicinity of the center portion in the longitudinal direction of both steel pipes 1a and 1b. In short, one or a plurality of short pipes 10 are joined in the axial direction between the steel pipes 1a and 1b, such as arranging a horizontal reinforcing bar 8 between the short pipe 10 and the joint plates 5 at both ends. That's fine.

本実施の形態においても実施の形態1の場合とほぼ同様の効果を得ることができるが、さらに、図11のセグメントSにおいては、箱状部6にずれ止め3を設けてコンクリート20を打設することがなく、図12の例においては鋼管1a,1b内にコンクリート20を充填したり、拘束板4を設けたりする必要がないので、セグメントSを軽量化することができると共に、コストを低減することができる。また、軸方向壁W1,W2を構成する鋼管1a,1bどうしをより強固に接合することができるので、施工時に大きなジャッキの押込み力に抵抗することができる。 In the present embodiment, substantially the same effect as in the case of the first embodiment can be obtained. In addition, in the segment S of FIG. In the example of FIG. 12, it is not necessary to fill the steel pipes 1a and 1b with the concrete 20 or to provide the restraining plate 4, so that the segment S can be reduced in weight and the cost can be reduced. can do. Moreover, since the steel pipes 1a and 1b constituting the axial walls W 1 and W 2 can be joined more firmly, it is possible to resist a large jack pushing force during construction.

[実施の形態3]
図13は本発明の実施の形態3に係るセグメントの斜視図、図14は図13のC−C断面図、図15は図13のD−D断面図である。なお、実施の形態1と同じ部分にはこれと同じ符号を付し、説明の一部を省略する。
[Embodiment 3]
13 is a perspective view of a segment according to Embodiment 3 of the present invention, FIG. 14 is a cross-sectional view taken along the line CC in FIG. 13, and FIG. 15 is a cross-sectional view taken along the line DD in FIG. The same parts as those in the first embodiment are denoted by the same reference numerals, and a part of the description is omitted.

本実施の形態は、トンネルの周方向に沿ってほぼ円弧状に曲げ成形され、それぞれコンクリート20が充填された複数本(図には、4本の場合が示してある)の鋼管1a,1b,1c,1dを横方向に並べて配置し、隣接する鋼管1a〜1dどうしを溶接により一体に接合すると共に、これら一体に接合された鋼管1a〜1dの両端部に、拘束板を兼ねた継手板5を接合したものである、なお、鋼管1a〜1dの数は4本に限定するものではなく、適宜数で構成することができる。   In the present embodiment, a plurality of steel pipes 1a, 1b, which are bent into a substantially arc shape along the circumferential direction of the tunnel and each filled with concrete 20 (four cases are shown in the figure), 1c and 1d are arranged side by side, adjacent steel pipes 1a to 1d are joined together by welding, and joint plates 5 that serve as restraint plates at both ends of the integrally joined steel pipes 1a to 1d Note that the number of the steel pipes 1a to 1d is not limited to four, and can be appropriately configured.

本実施の形態においても、実施の形態1の場合とほぼ同様の効果を得ることができるが、さらに、本実施の形態においては、コンクリート20を充填した複数本の鋼管1a〜1dを横方向に並べて接合し、両端部に継手板5を接合するだけなので、構成部材が少なく製造が容易でコストを低減することができる。また、施工時に大きなジャッキの押込み力に抵抗することができる。   In the present embodiment, substantially the same effect as in the first embodiment can be obtained, but in the present embodiment, a plurality of steel pipes 1a to 1d filled with concrete 20 are laterally arranged. Since only the joint plates 5 are joined side by side and the joint plates 5 are joined to both ends, the number of constituent members is small and the manufacturing is easy and the cost can be reduced. Moreover, it can resist the pushing force of a large jack at the time of construction.

[実施の形態4]
図16は本発明の実施の形態4に係るセグメントの斜視図、図17は図16のE−E断面図、図18は図16のF−F断面図、図19は図16のセグメントを構成する軸方向壁W1,W2の先端部の説明図である。なお、実施の形態1と同一又は相当部分にはこれと同じ符号を付し、説明の一部を省略する。
[Embodiment 4]
16 is a perspective view of a segment according to Embodiment 4 of the present invention, FIG. 17 is a cross-sectional view taken along line EE in FIG. 16, FIG. 18 is a cross-sectional view taken along line FF in FIG. it is an explanatory view of the tip of the axial wall W 1, W 2 to. In addition, the same code | symbol as this is attached | subjected to the same part as Embodiment 1, or an equivalent part, and a part of description is abbreviate | omitted.

図16〜図19において、W1,W2はセグメントSの軸方向壁で、一方の軸方向壁W1は、トンネルの周方向に沿ってほぼ円弧状に曲げ成形され、内部にコンクリート20が充填されて両端部に拘束板4が接合された比較的細く同じ長さの複数本(図には4本の場合が示してある)の角形の鋼管(例えば、一辺の幅が150mm)1a,1b,1c,1d(以下、単に1と記すことがある)を有し、このうち3本の鋼管1a〜1cを上下方向に積層し、その中央部の鋼管1bを鋼管1a〜1cの端面から前後方向にずらせて(図には、後方にずらせた場合が示してある)溶接接合すると共に、鋼管1dの端面を鋼管1a,1cの端面と整合させ、かつ鋼管1bの外側にこれに沿って溶接接合し、端面及び外側面を凹凸状に形成して溶接により一体に接合して構成したものである。 16 to 19, W 1 and W 2 are the axial walls of the segment S, and one axial wall W 1 is bent into a substantially arc shape along the circumferential direction of the tunnel, and the concrete 20 is formed inside. A plurality of square steel pipes (for example, the width of one side is 150 mm) 1a, which is filled and has a relatively thin and the same length, and the restraint plates 4 are joined to both ends (for example, four cases are shown in the figure). 1b, 1c, 1d (hereinafter may be simply referred to as 1), of which three steel pipes 1a to 1c are stacked in the vertical direction, and the steel pipe 1b at the center is formed from the end faces of the steel pipes 1a to 1c. Welding is performed by shifting in the front-rear direction (shown in the figure is a case of shifting backward), and the end face of the steel pipe 1d is aligned with the end faces of the steel pipes 1a and 1c, and along the outside of the steel pipe 1b. Weld and join, form end face and outer face in irregular shape, and weld It is constructed by joining together.

また、他方の軸方向壁W2は、軸方向壁W1を構成する鋼管1a〜1dと同じ構造で、内部にコンクリート20が充填され、両端部に拘束板4が接合された複数本(図には5本の場合が示してある)の鋼管1e,1f,1g,1h,1iを有し、そのうち3本の鋼管1e〜1gを上下方向に積層し、かつ、中央の鋼管1fを軸方向壁W1の鋼管1dと反対方向にずらせて(したがって、手前側に突出させて)配置して端面を凹凸状に形成し、これらを溶接により接合する。
そして、鋼管1hを鋼管1eの外側に沿って、また鋼管1iを鋼管1gの外側に沿って配設し、それぞれ溶接接合して一体に構成したものである。なお、このとき、外側面が凹凸状に形成されて鋼管1hと1iとの間には空間部が形成される。
The other axial wall W 2 has the same structure as the steel pipes 1 a to 1 d constituting the axial wall W 1, and is filled with concrete 20 inside and a plurality of pipes (see FIG. 5 shows a steel pipe 1e, 1f, 1g, 1h, 1i, of which three steel pipes 1e-1g are laminated in the vertical direction, and the central steel pipe 1f is axially arranged. The wall W 1 is displaced in the opposite direction to the steel pipe 1d (and thus protrudes to the front side) to form an end face in an uneven shape, and these are joined by welding.
The steel pipe 1h is arranged along the outside of the steel pipe 1e, and the steel pipe 1i is arranged along the outside of the steel pipe 1g, and each is integrally formed by welding. At this time, the outer surface is formed in an uneven shape, and a space is formed between the steel pipes 1h and 1i.

次に、上記のような複数本の鋼管からなる軸方向壁W1,W2を備えたセグメントSの製造手順の一例について説明する。
先ず、軸方向壁W1,W2を所定の間隔Gで配置して補助部材9(図示せず)で固定し、その下面に、コンクリート打設面にずれ止め3を有する内周板2aを溶接接合し、軸方向壁W1,W2の両端部に継手板5をそれぞれ溶接接合する。これにより、両軸方向壁W1,W2、内周板2a及び継手板5に囲まれた箱状部6が形成される。
ついで、箱状部6の軸方向壁W1,W2の間に、長手方向に所定の間隔で複数本の横鉄筋8を配筋し、また、長手方向に複数本の縦鉄筋7aあるいは網鉄筋を配筋する。そして、箱状部6にコンクリート20を打設すれば、セグメントの製造は完了する。
Next, an example of the manufacturing procedure of the segment S provided with the axial walls W 1 and W 2 made of a plurality of steel pipes as described above will be described.
First, axial walls W 1 and W 2 are arranged at a predetermined interval G and fixed by an auxiliary member 9 (not shown), and an inner peripheral plate 2a having a stopper 3 on a concrete placing surface is provided on the lower surface thereof. The joint plates 5 are welded and joined to both end portions of the axial walls W 1 and W 2 by welding. As a result, a box-shaped portion 6 surrounded by the two axial walls W 1 and W 2 , the inner peripheral plate 2 a and the joint plate 5 is formed.
Next, a plurality of horizontal reinforcing bars 8 are arranged at predetermined intervals in the longitudinal direction between the axial walls W 1 and W 2 of the box-shaped portion 6, and a plurality of vertical reinforcing bars 7 a or meshes in the longitudinal direction. Reinforce reinforcing bars. And if the concrete 20 is cast in the box-shaped part 6, manufacture of a segment will be completed.

このように構成したセグメントSにおいては、第1,第2の軸方向壁W1,W2を構成する鋼管1a〜1d、1e〜1iの一部(例えば、1bと1f)を長手方向において互いに反対方向にずらせて両端部に凹凸部を形成したので、これにより、トンネルの周方向に隣接するセグメントSを連結するためのセグメント継手部15が形成される。
また、一方の軸方向壁W1を構成する鋼管1a〜1dの外側壁の一部(例えば1d)を外方に突出させ、他方の軸方向壁W2を構成する鋼管1e〜1iの外側壁の一部に空間部を設けて互いに対応する凹凸部を形成したので、これらにより、トンネルの軸方向に隣接するセグメントSを連結するためのリング継手部16を形成することができる。
In the segment S configured as described above, a part (for example, 1b and 1f) of the steel pipes 1a to 1d and 1e to 1i constituting the first and second axial walls W 1 and W 2 are mutually connected in the longitudinal direction. Since the concavo-convex portions are formed at both ends by shifting in the opposite direction, the segment joint portion 15 for connecting the segments S adjacent in the circumferential direction of the tunnel is thereby formed.
A part of the outer wall of the steel pipe 1a~1d constituting the one axial wall W 1 (for example 1d) protruding outward, the outer wall of the steel pipe 1e~1i constituting the other axial wall W 2 Since the concave and convex portions corresponding to each other are formed by providing a space in a part of the ring portion, it is possible to form the ring joint portion 16 for connecting the segments S adjacent in the axial direction of the tunnel.

図20,図21は本実施の形態の他の例を示すもので、図20のセグメントSは、図16のセグメントSにおいて、軸方向壁W1,W2を形成する鋼管1どうしをより強固に接合し、また、施工時にさらに大きなジャッキの押込み力に抵抗するために、両軸方向壁W1,W2の間に、長手方向に所定の間隔で短管10を溶接接合したものであり、その他の構成は図16の場合と同様である。
また、図21のセグメントSは、両軸方向壁W1,W2を構成する複数の鋼管1の両端部を揃えて、同一平面上に位置させたもので、その他の構成は図16の場合と同様である。
20 and 21 show another example of the present embodiment, and the segment S in FIG. 20 is stronger than the steel pipe 1 that forms the axial walls W 1 and W 2 in the segment S in FIG. In addition, the short pipe 10 is welded and joined at predetermined intervals in the longitudinal direction between the two axial walls W 1 and W 2 in order to resist the pushing force of a larger jack during construction. Other configurations are the same as those in FIG.
Further, the segment S in FIG. 21 is obtained by aligning both ends of the plurality of steel pipes 1 constituting both the axial walls W 1 and W 2 and positioning them on the same plane. It is the same.

上記の説明では、軸方向壁W1,W2を4本及び5本の鋼管1を組合せて構成した場合を示したが、本実施の形態はこれに限定するものではなく、鋼管1の数及び組合わせは適宜選択することができる。また、セグメント継手部15及びリング継手部16を形成するための鋼管1の配置も図示のものに限定するものではなく、適宜変更し又は一部を省略することができる。 In the above description, the case where the axial walls W 1 and W 2 are configured by combining four and five steel pipes 1 is shown, but the present embodiment is not limited to this, and the number of the steel pipes 1 is not limited thereto. The combination can be selected as appropriate. Further, the arrangement of the steel pipes 1 for forming the segment joint portion 15 and the ring joint portion 16 is not limited to that shown in the drawing, and can be appropriately changed or partially omitted.

本実施の形態の効果は、実施の形態1の場合とほぼ同様であるが、軸方向壁W1,W2を比較的細い鋼管1を集成して構成したので、鋼管1の曲げ成形が容易であり、また、セグメント継手部15及びリング継手部16を容易に形成することができる。 The effect of the present embodiment is almost the same as that of the first embodiment. However, since the axial walls W 1 and W 2 are formed by assembling relatively thin steel pipes 1, bending of the steel pipe 1 is easy. In addition, the segment joint portion 15 and the ring joint portion 16 can be easily formed.

[実施の形態5]
図22は本発明の実施の形態5に係るセグメントの斜視図である。なお、実施の形態4と同じ部分にはこれと同じ符号を付し、説明の一部を省略する。
本実施の形態は実施の形態4の鋼管1と同様にトンネルの周方向に沿ってほぼ円弧状に成形し、内部にコンクリート20が充填されて両端部に拘束板4が接合された複数(図には3本の場合が示してある)の鋼管1a,1b,1cを上下方向に積層し、溶接接合により一体化して軸方向壁W1を構成し、同様に鋼管1d,1e,1fにより軸方向壁W2を構成したもので、その他の構成は図16の場合と同様である。なお、図には箱状部6に縦鉄筋7aと横鉄筋8が記載されていないが、これは必要に応じて設けてもよい。
[Embodiment 5]
FIG. 22 is a perspective view of a segment according to Embodiment 5 of the present invention. The same parts as those in the fourth embodiment are denoted by the same reference numerals, and a part of the description is omitted.
In the present embodiment, like the steel pipe 1 of the fourth embodiment, a plurality of arcuately shaped arcs are formed along the circumferential direction of the tunnel, the concrete 20 is filled therein, and the restraint plates 4 are joined to both ends (see FIG. steel pipe 1a of there is shown the case of three) in, 1b, 1c and the vertically stacked, constitute the axial wall W 1 are integrated by welding, similarly the steel pipe 1d, 1e, shaft by 1f The directional wall W 2 is configured, and other configurations are the same as those in FIG. In addition, although the vertical reinforcement 7a and the horizontal reinforcement 8 are not described in the figure at the box-shaped part 6, you may provide this as needed.

上記の説明では、それぞれ3本の鋼管1で軸方向壁W1,W2を構成した場合を示したが、これに限定するものではなく、2本あるいは4本以上あってもよい。
本実施の形態の効果は、実施の形態4の場合とほぼ同様であるが、さらに、少数の鋼管1を単純に接合して軸方向壁W1,W2を構成したので、製造が容易でコストを低減することができる。
In the above description, the case where the axial walls W 1 and W 2 are each constituted by three steel pipes 1 is shown, but the present invention is not limited to this, and there may be two or four or more.
The effect of the present embodiment is almost the same as in the case of the fourth embodiment. Furthermore, since a small number of steel pipes 1 are simply joined to form the axial walls W 1 and W 2 , manufacturing is easy. Cost can be reduced.

上記の各実施の形態においては、断面四角形の角形鋼管により軸方向壁W1,W2を構成した場合を示したが、本発明はこれに限定するものではなく、断面三角形以上の多角形鋼管でもよく、さらには断面円形の丸形鋼管であってもよい。 In each of the above-described embodiments, the case where the axial walls W 1 and W 2 are configured by square steel pipes having a square cross section has been shown, but the present invention is not limited to this, and a polygonal steel pipe having a cross section of triangles or more. Alternatively, it may be a round steel pipe having a circular cross section.

また、上記の実施の形態1,2,4,5においては、あらかじめ内部にコンクリート20が充填された鋼管1により軸方向壁W1,W2を構成した場合を示したが、鋼管1によって構成した軸方向壁W1,W2に内周板2aを接合したのち、例えば、箱状部6にコンクリート20を打設する際に、鋼管1内にコンクリート20を充填してもよい。なお、実施の形態3の場合は、複数本の鋼管1を横方向に接合したのち鋼管1内にコンクリート20を充填してもよい。 In the embodiment 1, 2, 4, 5 of the above embodiment has shown the case where the axial wall W 1, W 2 by the steel tube 1 in which concrete 20 is filled therein in advance, constituted by a steel pipe 1 After joining the inner peripheral plate 2a to the axial walls W 1 and W 2 , the concrete pipe 20 may be filled into the steel pipe 1 when, for example, the concrete 20 is placed in the box-like portion 6. In the case of the third embodiment, the steel pipe 1 may be filled with concrete 20 after joining a plurality of steel pipes 1 in the lateral direction.

また、実施の形態1,2,4,5においては、一対の軸方向壁W1,W2の下面に内周板2aを接合した場合を示したが、軸方向壁W1,W2の上面若しくは下面又は両者に内周板2a、外周板2bを接合して箱状部6を形成してもよい。なお、軸方向壁W1,W2の下面と上面に内周板2a、外周板2bを接合した場合は、一方の継手板5を接合する前に箱状部6にコンクリート20を充填する。 In the first , second , fourth, and fifth embodiments, the case where the inner peripheral plate 2a is joined to the lower surfaces of the pair of axial walls W 1 and W 2 has been described. The box-shaped portion 6 may be formed by joining the inner peripheral plate 2a and the outer peripheral plate 2b to the upper surface, the lower surface, or both. In addition, when the inner peripheral board 2a and the outer peripheral board 2b are joined to the lower surface and the upper surface of the axial walls W1 and W2, the concrete portion 20 is filled in the box-shaped portion 6 before the one joint plate 5 is joined.

[実施の形態6]
図23は本発明の実施の形態6に係るセグメントの軸方向壁を構成する鋼管の説明図である。
実施の形態1〜5においては、セグメントSの軸方向壁W1,W2を構成する鋼管1を、曲げ加工して円弧状に形成した場合を示したが、本実施の形態は、鋼管1を、複数本の短管10a,10b,10c(図には3本の場合を示してある)を溶接接合して、円弧状に近似した形状に形成したものである。
本実施の形態による鋼管1によっても、本実施の形態1〜5とほぼ同様のセグメントSを構成することができ、ほぼ同様の効果を得ることができる。
[Embodiment 6]
FIG. 23 is an explanatory view of a steel pipe constituting the axial wall of the segment according to the sixth embodiment of the present invention.
In the first to fifth embodiments, the steel tube 1 that constitutes the axial wall W 1, W 2 segment S, although the case of forming the bending to arcuate, in this embodiment, the steel pipe 1 Are formed by welding a plurality of short tubes 10a, 10b, and 10c (three cases are shown in the drawing) to approximate a circular arc shape.
Also with the steel pipe 1 according to the present embodiment, it is possible to form a segment S that is substantially the same as in the first to fifth embodiments, and to obtain substantially the same effect.

上記の実施の形態1〜6においては、断面円形のトンネルの周壁を構成するセグメントSについて説明したが、これら各実施の形態に係るセグメントSは、断面楕円形状のトンネルの内壁を構成するセグメントSにも実施することができる。この場合は、セグメントSのトンネルの周方向への設置場所に応じて、円弧状の曲げ半径rを変えればよい。   In the first to sixth embodiments described above, the segment S constituting the peripheral wall of the tunnel having a circular cross section has been described. However, the segment S according to each of these embodiments is the segment S constituting the inner wall of the tunnel having an elliptical cross section. Can also be implemented. In this case, the arc-shaped bending radius r may be changed according to the installation location of the segment S in the circumferential direction of the tunnel.

[実施の形態7]
図24は本発明の実施の形態7に係るセグメントによりトンネルの周壁を構成した説明図、図25は図24のセグメントの説明図である。
実施の形態1〜6では、地盤に掘削された断面円形のトンネルの内周に、複数の円弧状のセグメントSをリング状に接合してトンネルの周壁を構成する場合について説明したが、本実施の形態は、断面が長方形(四角形)のトンネルの周壁を構成するセグメントに関するものである。
[Embodiment 7]
FIG. 24 is an explanatory diagram in which the peripheral wall of the tunnel is configured by segments according to Embodiment 7 of the present invention, and FIG. 25 is an explanatory diagram of the segment of FIG.
In the first to sixth embodiments, the case where a plurality of arc-shaped segments S are joined in a ring shape on the inner periphery of a tunnel having a circular cross section excavated in the ground to form a peripheral wall of the tunnel is described. The embodiment relates to a segment constituting a peripheral wall of a tunnel having a rectangular (quadrangle) cross section.

本実施の形態に係るセグメントは、例えば、水平部が長く鉛直部が短いL字状の第1のセグメントS1と、水平部と鉛直部の長さがほぼ等しいL字状の第2のセグメントS2とからなり、これら第1,第2のセグメントS1,S2を交互に接合して断面長方形のトンネルの周壁と構成したものである。なお、トンネルの断面が大きい場合には、これら第1,第2のセグメントS1,S2の間に、平板状のセグメントを接合する。 The segment according to the present embodiment includes, for example, an L-shaped first segment S 1 having a long horizontal portion and a short vertical portion, and an L-shaped second segment having substantially the same length between the horizontal portion and the vertical portion. It consists S 2 Prefecture, these first, which is constituted with the peripheral wall of the rectangular section of the tunnel by joining the second segment S 1, S 2 alternately. When the tunnel has a large cross section, a flat segment is joined between the first and second segments S 1 and S 2 .

第1のセグメントS1は、例えば図25に示すように、長方形のトンネルの水平方向の軸方向壁W3,W4を構成する直線状の鋼管1c,1dと、トンネルの鉛直方向の軸方向壁W5,W6を構成する鋼管1c,1dより短い直線状の鋼管1e,1fとに、それぞれ内周板2aを接合して水平セグメントSFと鉛直セグメントSPの外殻を形成し、水平セグメントSFの端部にこれと直交して鉛直セグメントSPを溶接接合してL字状の外殻を形成する。ついで、鋼管1c〜1f内にコンクリート20を充填し、硬化したのち端部に拘束板4及び継手板5を接合し、これによって形成された箱状部6にコンクリート20を打設して、第1のセグメントS1を構成する。
第2のセグメントS2も上記に準じて構成する。なお、上記の製造手段はその一例を示すもので、本実施の形態においても実施の形態1〜5の構成、製造手段を適宜採用することができる。
For example, as shown in FIG. 25, the first segment S 1 includes straight steel pipes 1c and 1d constituting the horizontal axial walls W 3 and W 4 of the rectangular tunnel, and the vertical axial direction of the tunnel. The inner peripheral plate 2a is joined to the straight steel pipes 1e and 1f that are shorter than the steel pipes 1c and 1d constituting the walls W 5 and W 6 to form the outer shells of the horizontal segment SF and the vertical segment SP. A vertical segment SP is welded and joined to the end of the SF at right angles to form an L-shaped outer shell. Next, the concrete 20 is filled into the steel pipes 1c to 1f, and after hardening, the constraining plate 4 and the joint plate 5 are joined to the ends, and the concrete 20 is placed in the box-like portion 6 formed thereby, One segment S 1 is formed.
The second segment S 2 is also configured according to the above. In addition, said manufacturing means shows the example, The structure and manufacturing means of Embodiment 1-5 can be employ | adopted suitably also in this Embodiment.

図26は本実施の形態の他の例の説明図である。図24の例では、L字状に構成した第1,第2のセグメントS1,S2を接合して断面長方形のトンネルの周壁を構成した場合を示したが、本例は、軸方向壁W3,W4を直線状の鋼管1c,1dで構成した平面状のセグメントS3(例えば、図25の水平セグメントSF)を接合して断面長方形のトンネルの周壁を構成したものである。
本実施の形態においても、実施の形態1〜5に準じた効果を得ることができる。
FIG. 26 is an explanatory diagram of another example of the present embodiment. In the example of FIG. 24, the first and second segments S 1 and S 2 configured in an L shape are joined to form a peripheral wall of a tunnel having a rectangular cross section. A flat segment S 3 (for example, horizontal segment SF in FIG. 25) in which W 3 and W 4 are formed by straight steel pipes 1c and 1d is joined to form a peripheral wall of a tunnel having a rectangular cross section.
Also in this embodiment, it is possible to obtain the effects according to the first to fifth embodiments.

図27,図28は軸方向壁W1,W2を構成する鋼管1の他の例を示すもので、図27は多角形鋼管1(図には四角形の場合が示してある)の内壁面、特に両端部近傍の内壁面に、複数のずれ止め3を設けたものである。
また、図28は内周面にリブ3aが設けられたリブ付き鋼管1を用いたもので、いずれの場合にも鋼管1内に充填したコンクリート20を一体化して拘束することができる。
27 and 28 show another example of the steel pipe 1 constituting the axial walls W 1 and W 2 , and FIG. 27 shows the inner wall surface of the polygonal steel pipe 1 (in the figure, a square case is shown). In particular, a plurality of detents 3 are provided on the inner wall surface near both ends.
Moreover, FIG. 28 uses the steel pipe 1 with the rib provided with the rib 3a on the inner peripheral surface. In any case, the concrete 20 filled in the steel pipe 1 can be integrated and restrained.

次に、本発明の実施の形態1に係るセグメントSの実施例について説明する。
先ず、断面正方形で一辺の幅450mm、板厚12mm、長さ4mの角形鋼管1a,1bを、トンネルの周方向に沿って半径r(図4参照)を6.5mとして曲げ成形し、ほぼ円弧状に形成した。ついで、この鋼管1a,1b内に最大骨材寸法20mm、スランプフロー60cm、空気量1.8%の高流動コンクリート20を充填し、コンクリート20が硬化したのち、その両端部に鋼管1a,1bの断面形状と同じ大きさで板厚12mmの拘束板4を溶接により接合し、一対の軸方向壁W1,W2を製作した。
Next, an example of the segment S according to Embodiment 1 of the present invention will be described.
First, square steel pipes 1a and 1b having a square cross section and a side width of 450 mm, a plate thickness of 12 mm, and a length of 4 m are bent and formed along the circumferential direction of the tunnel with a radius r (see FIG. 4) of 6.5 m. It was formed in an arc shape. Next, the steel pipes 1a and 1b are filled with high-fluidity concrete 20 having a maximum aggregate size of 20 mm, a slump flow of 60 cm, and an air amount of 1.8%. After the concrete 20 is hardened, the both ends of the steel pipes 1a and 1b A constraining plate 4 having the same size as the cross-sectional shape and a plate thickness of 12 mm was joined by welding to produce a pair of axial walls W 1 and W 2 .

次に、この軸方向壁W1,W2を1.1m隔てて配置して長さ1.1m、幅0.1m、板厚12mmの4枚の補助部材9を長手方向に沿ってほぼ等間隔で配置し、鋼管1a,1bに接合した。ついで、長さ4m、幅2m、板厚12mmで、中央部の幅1.1mの領域のコンクリート打設面に長手方向のほぼ全域にわたって多数のずれ止め3が設けられた内周板2aを軸方向壁W1,W2の下面に溶接により接合し、次に、軸方向壁W1,W2及び内周板2aの両端部に、高さ450mm、幅1.1m、板厚12mmの周方向壁である継手板5をそれぞれ溶接により接合した。 Next, the axial walls W 1 and W 2 are arranged with a distance of 1.1 m, and four auxiliary members 9 having a length of 1.1 m, a width of 0.1 m, and a plate thickness of 12 mm are substantially equal along the longitudinal direction. They were arranged at intervals and joined to the steel pipes 1a and 1b. Next, an inner peripheral plate 2a having a length of 4 m, a width of 2 m, and a plate thickness of 12 mm and having a large number of detents 3 provided on the concrete placement surface in the region of the center portion having a width of 1.1 m in the longitudinal direction is pivoted. Joined to the lower surfaces of the directional walls W 1 , W 2 by welding, and then, at both ends of the axial walls W 1 , W 2 and the inner peripheral plate 2a, a circumference having a height of 450 mm, a width of 1.1 m, and a thickness of 12 mm. The joint plates 5 which are directional walls were joined by welding.

そして、幅方向壁W1,W2と、内周板2aと、継手板5とによって形成された箱状部6内の幅方向(両軸方向壁W1,W2の間)に、長手方向にほぼ等間隔で20本の横鉄筋8を配筋すると共に、長手方向(継手板5の間)に5本の縦鉄筋7aを配筋した。最後に箱状部6内に、両軸方向壁W1,W2の上面とほぼ同じ平面になるまで前記の高流動コンクリート20を打設し、セグメントSを製造した。 And, in the width direction (between both axial walls W 1 and W 2 ) in the box-shaped portion 6 formed by the width direction walls W 1 and W 2 , the inner peripheral plate 2 a and the joint plate 5, it is long Twenty horizontal reinforcing bars 8 were arranged at approximately equal intervals in the direction, and five vertical reinforcing bars 7a were arranged in the longitudinal direction (between the joint plates 5). Finally, the high-fluidity concrete 20 was placed in the box-like portion 6 until it became substantially the same plane as the upper surfaces of the two axial walls W 1 and W 2 , and the segment S was manufactured.

本発明の実施の形態1に係るセグメントの斜視図である。It is a perspective view of the segment which concerns on Embodiment 1 of this invention. 図1のA−A断面図である。It is AA sectional drawing of FIG. 図1のB−B断面図である。It is BB sectional drawing of FIG. 図1のセグメントをトンネルの周方向に連結した状態を示す説明図である。It is explanatory drawing which shows the state which connected the segment of FIG. 1 in the circumferential direction of the tunnel. 実施の形態1のセグメントの製造手順の説明図である。FIG. 6 is an explanatory diagram of a manufacturing procedure for a segment according to the first embodiment. 実施の形態1の他の例の斜視図である。6 is a perspective view of another example of the first embodiment. FIG. 実施の形態1の他の例の斜視図である。6 is a perspective view of another example of the first embodiment. FIG. 実施の形態1のさらに他の例のセグメントの要部の説明図である。FIG. 12 is an explanatory diagram of a main part of a segment of still another example of the first embodiment. 実施の形態1に係るセグメントの載荷試験の供試体の説明図である。6 is an explanatory diagram of a specimen for a segment loading test according to Embodiment 1. FIG. 載荷試験の結果を示す線図である。It is a diagram which shows the result of a loading test. 本発明の実施の形態2に係るセグメントの斜視図である。It is a perspective view of the segment which concerns on Embodiment 2 of this invention. 実施の形態2の他の例の斜視図である。10 is a perspective view of another example of the second embodiment. FIG. 本発明の実施の形態3に係るセグメントの斜視図である。It is a perspective view of the segment which concerns on Embodiment 3 of this invention. 図13のC−C断面図である。It is CC sectional drawing of FIG. 図13のD−D断面図である。It is DD sectional drawing of FIG. 本発明の実施の形態4に係るセグメントの斜視図である。It is a perspective view of the segment which concerns on Embodiment 4 of this invention. 図16のE−E断面図である。It is EE sectional drawing of FIG. 図16のF−F断面図である。It is FF sectional drawing of FIG. 図16の要部の説明図である。It is explanatory drawing of the principal part of FIG. 実施の形態4の他の例の斜視図である。FIG. 20 is a perspective view of another example of the fourth embodiment. 実施の形態4の他の例の斜視図である。FIG. 20 is a perspective view of another example of the fourth embodiment. 本発明の実施の形態5に係るセグメントの斜視図である。It is a perspective view of the segment which concerns on Embodiment 5 of this invention. 実施の形態6に係るセグメントの鋼管の説明図である。It is explanatory drawing of the steel pipe of the segment which concerns on Embodiment 6. FIG. 実施の形態7に係るセグメントを断面長方形のトンネルの周方向に連結した状態を示す説明図である。It is explanatory drawing which shows the state which connected the segment which concerns on Embodiment 7 to the circumferential direction of the tunnel of a cross-sectional rectangle. 図24の第1のセグメントの説明図である。It is explanatory drawing of the 1st segment of FIG. 実施の形態7の他の例の説明図である。FIG. 38 is an explanatory diagram of another example of the seventh embodiment. 本発明に係るセグメントを構成する鋼管の他の例を示す断面図である。It is sectional drawing which shows the other example of the steel pipe which comprises the segment which concerns on this invention. 本発明に係るセグメントを構成する鋼管さらに他の例を示す断面図である。It is sectional drawing which shows the steel pipe which comprises the segment which concerns on this invention, and another example.

符号の説明Explanation of symbols

S、S1,S2 セグメント、W1,W2 トンネル軸方向壁、1 鋼管、2a 内周板、2b 外周板、3 ずれ止め、4 拘束板、5 継手板(トンネル周方向壁)、6 箱状部、7a 縦鉄筋、7b 網鉄筋、8 横鉄筋、10 短管、15 セグメント継手部、16 リング継手部、20 コンクリート。
S, S 1 , S 2 segment, W 1 , W 2 tunnel axial wall, 1 steel pipe, 2a inner peripheral plate, 2b outer peripheral plate, 3 slip stopper, 4 restraint plate, 5 joint plate (tunnel circumferential wall), 6 Box-shaped part, 7a Vertical reinforcing bar, 7b Reinforcing bar, 8 Horizontal reinforcing bar, 10 Short pipe, 15 Segment joint part, 16 Ring joint part, 20 Concrete.

Claims (27)

トンネルの周方向及び軸方向に複数並べて互いに連結してトンネル壁を形成するトンネル用セグメントであって、
トンネルの軸方向に所定の間隔で設けられた一対の軸方向壁と、該軸方向壁に接合された内周板又は外周板と、前記軸方向壁及び内周板又は外周板の両端部に接合された周方向壁とを有し、
前記一対の軸方向壁をそれぞれ複数本の鋼管を集成して形成し、これら一対の軸方向壁を形成する複数本の鋼管を端部が凹凸をなすように集成し、該凹凸部によりトンネルの周方向に連結するセグメント継手部を形成したことを特徴とするトンネル用セグメント。
A tunnel segment that forms a tunnel wall by connecting a plurality in the circumferential direction and axial direction of the tunnel,
A pair of axial walls provided at predetermined intervals in the axial direction of the tunnel, an inner peripheral plate or an outer peripheral plate joined to the axial wall, and both ends of the axial wall and the inner peripheral plate or the outer peripheral plate A joined circumferential wall,
Each of the pair of axial walls is formed by assembling a plurality of steel pipes, and the plurality of steel pipes forming the pair of axial walls are assembled so that ends thereof are uneven, and the uneven portions are used to form a tunnel. A segment for a tunnel, characterized in that a segment joint portion connected in the circumferential direction is formed.
トンネルの周方向及び軸方向に複数並べて互いに連結してトンネル壁を形成するトンネル用セグメントであって、
トンネルの軸方向に所定の間隔で設けられた一対の軸方向壁と、該軸方向壁に接合された内周板又は外周板と、前記軸方向壁及び内周板又は外周板の両端部に接合された周方向壁とを有し、
前記一対の軸方向壁をそれぞれ複数本の鋼管を集成して形成し、これら一対の軸方向壁を形成する複数本の鋼管を側壁が凹凸をなすように集成し、該凹凸部によりトンネルの軸方向に連結するリング継手部を形成したことを特徴とするトンネル用セグメント。
A tunnel segment that forms a tunnel wall by connecting a plurality in the circumferential direction and axial direction of the tunnel,
A pair of axial walls provided at predetermined intervals in the axial direction of the tunnel, an inner peripheral plate or an outer peripheral plate joined to the axial wall, and both ends of the axial wall and the inner peripheral plate or the outer peripheral plate A joined circumferential wall,
Each of the pair of axial walls is formed by assembling a plurality of steel pipes, and the plurality of steel pipes forming the pair of axial walls are assembled so that the side walls are uneven. A segment for a tunnel, characterized in that a ring joint portion connected in a direction is formed.
前記一対の軸方向壁を形成する鋼管を、トンネルの軸方向に配設した1本又は複数本の短管で連結したことを特徴とする請求項1又は2に記載のトンネル用セグメント。 The tunnel segment according to claim 1 or 2 , wherein the steel pipes forming the pair of axial walls are connected by one or a plurality of short pipes arranged in the axial direction of the tunnel. 前記一対の軸方向壁を形成する鋼管の両端部を、トンネルの軸方向に配設した短管で連結したことを特徴とする請求項1又は2に記載のトンネル用セグメント。 The tunnel segment according to claim 1 or 2 , wherein both ends of the steel pipe forming the pair of axial walls are connected by a short pipe arranged in the axial direction of the tunnel. トンネルの周方向及び軸方向に複数並べて互いに連結してトンネル壁を形成するトンネル用セグメントであって、
トンネルの軸方向に所定の間隔で設けられた一対の軸方向壁と、該軸方向壁に接合された内周板又は外周板と、前記軸方向壁及び内周板又は外周板の両端部に接合された周方向壁とを有し、
前記一対の軸方向壁を鋼管で形成し、該一対の軸方向壁を形成する鋼管の両端部を、トンネルの軸方向に配設した短管で連結したことを特徴とするトンネル用セグメント。
A tunnel segment that forms a tunnel wall by connecting a plurality in the circumferential direction and axial direction of the tunnel,
A pair of axial walls provided at predetermined intervals in the axial direction of the tunnel, an inner peripheral plate or an outer peripheral plate joined to the axial wall, and both ends of the axial wall and the inner peripheral plate or the outer peripheral plate A joined circumferential wall,
A tunnel segment , wherein the pair of axial walls are formed of a steel pipe, and both ends of the steel pipe forming the pair of axial walls are connected by a short pipe disposed in the axial direction of the tunnel.
トンネルの周方向及び軸方向に複数並べて互いに連結してトンネル壁を形成するトンネル用セグメントであって、
トンネルの軸方向に所定の間隔で設けられた一対の軸方向壁と、該軸方向壁に接合された内周板又は外周板と、前記軸方向壁及び内周板又は外周板の両端部に接合された周方向壁とを有し、
前記一対の軸方向壁を鋼管で形成し、前記軸方向壁を構成する鋼管を、複数枚の鋼板の端縁部を溶接接合し、又はL字状若しくはコ字状の鋼材を溶接接合して構成したことを特徴とするトンネル用セグメント。
A tunnel segment that forms a tunnel wall by connecting a plurality in the circumferential direction and axial direction of the tunnel,
A pair of axial walls provided at predetermined intervals in the axial direction of the tunnel, an inner peripheral plate or an outer peripheral plate joined to the axial wall, and both ends of the axial wall and the inner peripheral plate or the outer peripheral plate A joined circumferential wall,
The pair of axial walls are formed of steel pipes, the steel pipes constituting the axial walls are welded to the edge portions of a plurality of steel plates, or L-shaped or U-shaped steel materials are welded. A tunnel segment , characterized by comprising.
前記一対の軸方向壁を、それぞれ1本の鋼管で形成したことを特徴とする請求項5又は6に記載のトンネル用セグメント。 The tunnel segment according to claim 5 or 6, wherein each of the pair of axial walls is formed by one steel pipe . 前記一対の軸方向壁を、それぞれ複数本の鋼管を集成して形成したことを特徴とする請求項5又は6に記載のトンネル用セグメント。 The tunnel segment according to claim 5 or 6, wherein the pair of axial walls are formed by assembling a plurality of steel pipes . 前記一対の軸方向壁と、内周板又は外周板と、周方向壁とによって形成された箱状部にコンクリートを打設したことを特徴とする請求項1〜のいずれか一項に記載のトンネル用セグメント。 The concrete is placed in a box-shaped portion formed by the pair of axial walls, an inner peripheral plate or an outer peripheral plate, and a peripheral wall, according to any one of claims 1 to 8. Tunnel segment. 前記内周板又は外周板の前記箱状部に対応するコンクリート打設面にすべり止めを設けたことを特徴とする請求項9に記載のトンネル用セグメント。 The tunnel segment according to claim 9, wherein a slip stopper is provided on a concrete placing surface corresponding to the box-shaped portion of the inner peripheral plate or the outer peripheral plate. 前記内周板又は外周板の前記箱状部に対応する領域、前記一対の鋼管、短管及び周方向壁の箱状部内壁の全部又は一部にすべり止めを設けたこと特徴とする請求項9に記載のトンネル用セグメント。 The region corresponding to the box-shaped portion of the inner peripheral plate or the outer peripheral plate, the pair of steel pipes, the short tube, and all or a part of the inner wall of the box-shaped portion of the circumferential wall are provided with a slip stopper. The tunnel segment according to 9 . 前記箱状部に、縦鉄筋及び網鉄筋の両者又はいずれか一方を配筋したことを特徴とする請求項9〜11のいずれか一項に記載のトンネル用セグメント。 The tunnel segment according to any one of claims 9 to 11 , wherein the box-shaped portion is provided with either or both of vertical reinforcing bars and mesh reinforcing bars. 前記所定の間隔で設けられた一対の軸方向壁の下面及び上面若しくはいずれか一方、又は対向する壁面の下部及び上部若しくはいずれか一方に、内周板及び又は外周板を接合したことを特徴とする請求項1〜12のいずれか一項に記載のトンネル用セグメント。 An inner peripheral plate and / or an outer peripheral plate are joined to a lower surface and / or an upper surface of a pair of axial walls provided at the predetermined interval, or a lower portion and / or an upper surface of an opposing wall surface. The tunnel segment according to any one of claims 1 to 12 . 前記鋼管に多角形鋼管を用いたことを特徴とする請求項1〜13のいずれか一項に記載のトンネル用セグメント。 The tunnel segment according to any one of claims 1 to 13, wherein a polygonal steel pipe is used for the steel pipe. 前記一対の軸方向壁を構成する鋼管を、トンネル周方向に沿ってほぼ円弧状に形成したことを特徴とする請求項1〜14のいずれか一項に記載のトンネル用セグメント。 The tunnel segment according to any one of claims 1 to 14, wherein the steel pipes constituting the pair of axial walls are formed in a substantially arc shape along a circumferential direction of the tunnel. トンネルの周方向及び軸方向に複数並べて互いに連結してトンネル壁を形成するトンネル用セグメントであって、
複数本の鋼管をトンネルの軸方向に並べて接合し、これら複数本の鋼管の両端部に周方向壁を接合したことを特徴とするトンネル用セグメント。
A tunnel segment that forms a tunnel wall by connecting a plurality in the circumferential direction and axial direction of the tunnel,
A segment for tunnel characterized by joining a plurality of steel pipes side by side in the axial direction of the tunnel and joining circumferential walls to both ends of the plurality of steel pipes .
前記鋼管内にコンクリートを充填したことを特徴とする請求項1〜16のいずれか一項に記載のトンネル用セグメント。 The tunnel segment according to any one of claims 1 to 16 , wherein the steel pipe is filled with concrete. 前記コンクリートに、最大骨材寸法20mm、スランプフロー60cm±10cm、空気量2%±1%の高流動コンクリートを使用したことを特徴とする請求項又は17に記載のトンネル用セグメント。 Tunnel segment according to claim 9 or 17, in the concrete, the maximum aggregate size 20 mm, slump flow 60cm ± 10 cm, characterized by using the air volume 2% ± 1% of the high fluidity concrete. 前記コンクリートを充填した鋼管の両端部に拘束板又は継手板を接合したことを特徴とする請求項17記載のトンネル用セグメント。 18. The tunnel segment according to claim 17 , wherein a constraining plate or a joint plate is joined to both ends of the steel pipe filled with concrete. 前記軸方向壁を構成する鋼管を、複数枚の鋼板の端縁部を溶接接合し、又はL字状若しくはコ字状の鋼材を溶接接合して構成したことを特徴とする請求項1〜5又は9〜19のいずれか一項に記載のトンネル用セグメント。 Claim 1-5, characterized in that the steel pipe constituting the said axial wall, and welding the end edges of a plurality of steel plates, or the L-shaped or U-shaped steel constructed by welding Or the segment for tunnels as described in any one of 9-19 . 鋼管内にコンクリートを充填し、該コンクリートの硬化後に前記鋼管の両端部に拘束板を接合して一対の軸方向壁を形成し、該一対の軸方向壁を所定の間隔で配設して内周板又は外周板を接合し、前記一対の軸方向壁及び内周板又は外周板の両端部に周方向壁を接合したことを特徴とするトンネル用セグメントの製造方法。   Concrete is filled in the steel pipe, and after the concrete is hardened, a restraint plate is joined to both ends of the steel pipe to form a pair of axial walls, and the pair of axial walls are arranged at predetermined intervals. A method for manufacturing a segment for a tunnel, comprising joining a peripheral plate or an outer peripheral plate and joining the circumferential wall to both ends of the pair of axial walls and the inner peripheral plate or the outer peripheral plate. トンネルの軸方向に所定の間隔で設けられた一対の鋼管により軸方向壁を形成し、該一対の軸方向壁を所定の間隔で配設して内周板又は外周板を接合し、前記軸方向壁を形成する鋼管内にコンクリートを充填して前記一対の軸方向壁及び内周板又は外周板の両端部に周方向壁を接合したことを特徴とするトンネル用セグメントの製造方法。   An axial wall is formed by a pair of steel pipes provided at a predetermined interval in the axial direction of the tunnel, and the inner peripheral plate or the outer peripheral plate is joined by arranging the pair of axial walls at a predetermined interval. A method for manufacturing a tunnel segment, characterized in that concrete is filled in a steel pipe forming a directional wall, and the circumferential wall is joined to both ends of the pair of axial walls and the inner peripheral plate or outer peripheral plate. 前記一対の軸方向壁を所定の間隔で配設し、該軸方向壁の長手方向に所定の間隔で複数の補助部材を配設してその両端部を前記軸方向壁にそれぞれ接合し、ついで内周板又は外周板を接合することを特徴とする請求項21又は22に記載のトンネル用セグメントの製造方法。 The pair of axial walls are arranged at predetermined intervals, a plurality of auxiliary members are arranged at predetermined intervals in the longitudinal direction of the axial walls, and both ends thereof are joined to the axial walls, respectively. The manufacturing method of the segment for tunnels of Claim 21 or 22 which joins an inner peripheral board or an outer peripheral board. 前記一対の軸方向壁を、それぞれ複数本の鋼管を集成して形成したことを特徴とする請求項21〜23のいずれか一項に記載のトンネル用セグメントの製造方法。 24. The method for manufacturing a tunnel segment according to any one of claims 21 to 23 , wherein the pair of axial walls are formed by assembling a plurality of steel pipes. 前記一対の軸方向壁と、内周板又は外周板と、周方向壁とによって形成された箱状部内にコンクリートを打設したことを特徴とする請求項21〜24のいずれか一項に記載のトンネル用セグメントの製造方法。 25. Concrete is placed in a box-shaped portion formed by the pair of axial walls, an inner peripheral plate or an outer peripheral plate, and a peripheral wall, according to any one of claims 21 to 24. Method for manufacturing tunnel segments. トンネルの周方向に沿ってほぼ円弧状に成形され、内部にコンクリートが充填された複数本の鋼管をトンネルの軸方向に並べて接合し、これら複数本の鋼管の両端部に周方向壁を接合したことを特徴とするトンネル用セグメントの製造方法。   A plurality of steel pipes, which are formed in a substantially arc shape along the circumferential direction of the tunnel and filled with concrete inside, are joined side by side in the axial direction of the tunnel, and circumferential walls are joined to both ends of the plurality of steel pipes. A method for producing a segment for a tunnel. トンネルの周方向に沿ってほぼ円弧状に形成された複数本の鋼管をトンネルの軸方向に並べて接合し、これら複数本の鋼管内にコンクリートを充填してその両端部に周方向壁を接合したことを特徴とするトンネル用セグメントの製造方法。   A plurality of steel pipes formed in a substantially arc shape along the circumferential direction of the tunnel were joined side by side in the axial direction of the tunnel, and the concrete was filled in the plurality of steel pipes, and circumferential walls were joined to both ends thereof. A method for producing a segment for a tunnel.
JP2006167559A 2005-11-21 2006-06-16 Tunnel segment and manufacturing method thereof Active JP4942402B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006167559A JP4942402B2 (en) 2005-11-21 2006-06-16 Tunnel segment and manufacturing method thereof

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2005335612 2005-11-21
JP2005335612 2005-11-21
JP2006167559A JP4942402B2 (en) 2005-11-21 2006-06-16 Tunnel segment and manufacturing method thereof

Publications (2)

Publication Number Publication Date
JP2007162452A JP2007162452A (en) 2007-06-28
JP4942402B2 true JP4942402B2 (en) 2012-05-30

Family

ID=38245675

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006167559A Active JP4942402B2 (en) 2005-11-21 2006-06-16 Tunnel segment and manufacturing method thereof

Country Status (1)

Country Link
JP (1) JP4942402B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5314903B2 (en) * 2008-02-25 2013-10-16 清水建設株式会社 segment
JP5333375B2 (en) * 2009-07-30 2013-11-06 新日鐵住金株式会社 Segment and manufacturing method thereof
JP5521221B2 (en) * 2009-07-30 2014-06-11 新日鐵住金株式会社 Segments and their manufacturing methods
JP5527087B2 (en) * 2009-07-30 2014-06-18 新日鐵住金株式会社 Segments and their manufacturing methods
JP2013083120A (en) * 2011-10-12 2013-05-09 Nippon Steel & Sumitomo Metal Composite segment

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3074402B2 (en) * 1991-08-21 2000-08-07 帝国繊維株式会社 Simple protective structure
JPH094390A (en) * 1995-06-22 1997-01-07 Takenaka Doboku Co Ltd Joint for composite segment receiving negative bending moment
JP2001058308A (en) * 1999-06-17 2001-03-06 Teihyu Corp Manufacture of steel segment and steel segment
JP2002273712A (en) * 2001-03-16 2002-09-25 Nippon Steel Corp Open sandwiching method
JP2003307100A (en) * 2002-04-15 2003-10-31 Kubota Corp Segment for tunnel
JP2005120632A (en) * 2003-10-15 2005-05-12 Kubota Corp Tunnel segment
JP4418269B2 (en) * 2004-03-18 2010-02-17 新日本製鐵株式会社 Primary lining body of concrete-filled steel segment and tunnel
JP2006016900A (en) * 2004-07-02 2006-01-19 Nippon Concrete Ind Co Ltd Tunnel constructing segment

Also Published As

Publication number Publication date
JP2007162452A (en) 2007-06-28

Similar Documents

Publication Publication Date Title
JP4942402B2 (en) Tunnel segment and manufacturing method thereof
JP4413167B2 (en) Reinforced structure of steel reinforced concrete structure and its construction method
JP2011157755A (en) Steel segment and composite segment
JP2003041708A (en) Member for structure
JP5131839B2 (en) Concrete pile with outer shell steel pipe and manufacturing method thereof
KR101636473B1 (en) Reformed concrete filled tube column structure
JP2017120018A (en) Pile
JP5418838B2 (en) Steel pipe sheet pile wall
JP2011069057A (en) Prefabricated concrete pile
JP6638900B2 (en) Design method of joint structure between columns and joint structure between columns
JP2013159970A (en) Unequal thickness steel pipe and structure employing unequal thickness steel pipe
JP7219529B2 (en) Combination structure of steel materials, shoring structure and construction method
JP2009102981A (en) Prestressed concrete structure
KR20160134123A (en) Reinforce concrete column structure
JP2017066607A (en) Joining structure of column
JP5043351B2 (en) Joint structure of steel column and ready-made pile
JP2022012839A (en) Outer shell steel pipe concrete pile
JP4953654B2 (en) Water stop structure of tunnel segment
JP7204032B1 (en) Steel-concrete composite structure and construction method for steel-concrete composite structure
JP2019060168A (en) Steel segment and shield tunnel
JP2007046346A (en) Steel segment and steel segment producing method
JP2019044407A (en) Compound segment
JP7314367B1 (en) Expanding bottom member, steel tower foundation structure, and construction method of steel tower foundation
CN216381418U (en) Reinforcing structure for junction of main line and branch line of underground excavated tunnel
KR101794073B1 (en) Reinforced concrete column structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090317

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100901

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110517

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110719

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120221

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120228

R150 Certificate of patent or registration of utility model

Ref document number: 4942402

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150309

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250