JP4816960B2 - Pile head chiseling basket - Google Patents

Pile head chiseling basket Download PDF

Info

Publication number
JP4816960B2
JP4816960B2 JP2007130520A JP2007130520A JP4816960B2 JP 4816960 B2 JP4816960 B2 JP 4816960B2 JP 2007130520 A JP2007130520 A JP 2007130520A JP 2007130520 A JP2007130520 A JP 2007130520A JP 4816960 B2 JP4816960 B2 JP 4816960B2
Authority
JP
Japan
Prior art keywords
pile
basket
pile head
work
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007130520A
Other languages
Japanese (ja)
Other versions
JP2008285856A (en
Inventor
佳澄 山下
守 熊本
晃治 渡辺
勝啓 阪下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toray Engineering Co Ltd
Original Assignee
Toyo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Construction Co Ltd filed Critical Toyo Construction Co Ltd
Priority to JP2007130520A priority Critical patent/JP4816960B2/en
Publication of JP2008285856A publication Critical patent/JP2008285856A/en
Application granted granted Critical
Publication of JP4816960B2 publication Critical patent/JP4816960B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、杭頭部ハツリ作業時の足場を構成するバスケットに関するものである。   The present invention relates to a basket that forms a scaffold during pile head chipping work.

図4及び図5に示される桟橋1は、杭2を支持体として備える港湾構造物である。具体的には、杭頭部3と、隣り合う鋼管杭2の杭頭部3同士を連結する梁部4と、これら梁部4及び杭頭部3を上方から覆う床版部5とからなる上部工10が、各杭2によって支持された構造を有している。杭2は、円筒状の鋼管により形成され、桟橋1の長手方向及び幅方向に等間隔に複数立設されている。また、杭頭部3は、各杭2の上端に、コンクリートによって所定厚の多角柱状に形成され、梁部4も、コンクリートによって略四角柱状に形成されている。そして、各杭頭部3及び各梁部4の上面に、コンクリートからなる板状の床版部5が形成され、床版部5の上面にはコンクリート舗装6が施されている(例えば、特許文献1参照。)。   The pier 1 shown in FIG.4 and FIG.5 is a harbor structure provided with the pile 2 as a support body. Specifically, it consists of a pile head 3, a beam portion 4 that connects the pile heads 3 of adjacent steel pipe piles 2, and a floor slab portion 5 that covers the beam portion 4 and the pile head 3 from above. The superstructure 10 has a structure supported by each pile 2. The pile 2 is formed of a cylindrical steel pipe, and a plurality of the piles 2 are erected at equal intervals in the longitudinal direction and the width direction of the pier 1. Moreover, the pile head 3 is formed in the polygonal column shape of predetermined thickness by the concrete at the upper end of each pile 2, and the beam part 4 is also formed in the substantially square pillar shape by concrete. And the plate-shaped floor slab part 5 which consists of concrete is formed in the upper surface of each pile head 3 and each beam part 4, and the concrete pavement 6 is given to the upper surface of the floor slab part 5 (for example, patent) Reference 1).

特開2006−169769号公報(〔0015〕、図1、図2)Japanese Patent Laying-Open No. 2006-169769 ([0015], FIGS. 1 and 2)

さて、桟橋1の老朽化や劣化が進んだ場合には、諸条件を勘案した上で、全体を解体し、新たな桟橋1を建設する場合と、杭2を残して上部工10のみを撤去し、既存の杭2上に、新たな上部工10を構築する場合とがある。そして、いずれの場合においても、杭頭部3のハツリが必要な場合には、ハツリ作業を円滑に行うために、足場を設置することが必要である。従って、作業効率を高めるためには、足場の設置作業及び撤去作業が円滑に行われることが望ましい。
本発明は、上記課題に鑑みてなされたものであり、その目的とするところは、上部工の撤去作業における杭頭部のハツリ作業を円滑に行うと共に、ハツリ作業用足場の設置及び撤去作業を、より簡単に行うことを可能とすることにある。
Now, when the pier 1 is aged and deteriorated, after considering the conditions, the whole is dismantled and a new pier 1 is constructed, and only the superstructure 10 is removed leaving the pile 2 In some cases, a new superstructure 10 is constructed on the existing pile 2. And in any case, when the pile head 3 needs to be broken, it is necessary to install a scaffold in order to carry out the peeling work smoothly. Therefore, in order to improve work efficiency, it is desirable that the scaffold installation work and removal work be performed smoothly.
The present invention has been made in view of the above-mentioned problems, and the object of the present invention is to smoothly carry out the chipping work of the pile head in the removal work of the superstructure, and to install and remove the work platform for the cutting work. Is to make it easier to do.

(発明の態様)
以下の発明の態様は、本発明の構成を例示するものであり、本発明の多様な構成の理解を容易にするために、項別けして説明するものである。各項は、本発明の技術的範囲を限定するものではなく、発明を実施するための最良の形態を参酌しつつ、各項の構成要素の一部を置換し、削除し、又は、更に他の構成要素を付加したものについても、本願発明の技術的範囲に含まれ得るものである。
(Aspect of the Invention)
The following aspects of the present invention exemplify the configuration of the present invention, and will be described separately for easy understanding of various configurations of the present invention. Each section does not limit the technical scope of the present invention, and some of the components of each section are replaced, deleted, or further while referring to the best mode for carrying out the invention. Those to which the above components are added can also be included in the technical scope of the present invention.

(1)杭を挿通するための開口が形成された床板と、該床板の下面から前記開口に沿って下方へと延びる筒状の杭バンドと、前記床板の外周に沿って上方へと延びる柵と、該柵に載置される足場とを備える杭頭部ハツリ作業用バスケットであって、前記床板と、前記杭バンドと、前記柵とが、前記床板の開口の中心を通る縦断面によって二分割され、かつ、二分割された一方の柵と他方の柵との上端部同士が、ピボットによって軸着されている杭頭部ハツリ作業用バスケット(請求項1)。   (1) A floor board in which an opening for inserting a pile is formed, a cylindrical pile band extending downward from the lower surface of the floor board along the opening, and a fence extending upward along the outer periphery of the floor board And a pile head chipping work basket comprising a scaffold placed on the fence, wherein the floor board, the pile band, and the fence are separated by a longitudinal section passing through the center of the opening of the floor board. A pile head chipping work basket in which the upper ends of one of the divided and divided two fences are pivotally attached by a pivot (claim 1).

本項に記載の杭頭部ハツリ作業用バスケットは、床板の開口に杭を挿通した状態で、床板の下面から下方へと伸びる杭バンドによって杭をクランプすることで、床板を杭の円筒壁面に固定するものである。又、床板の外周に沿って上方へと延びる柵が設けられ、該柵に足場を載置することで、杭頭部の周囲の適切な高さに、ハツリ作業を円滑に行うための足場を設置することが可能となる。   The pile head chiseling basket described in this section is a state where the pile is inserted into the opening of the floor board, and the pile is clamped by a pile band extending downward from the lower surface of the floor board, so that the floor board is attached to the cylindrical wall surface of the pile. It is to be fixed. In addition, a fence extending upward along the outer periphery of the floor board is provided, and by placing the scaffold on the fence, a scaffold for smoothly carrying out the chiseling work at an appropriate height around the pile head. It becomes possible to install.

しかも、床板と杭バンドと柵とが、床板の開口の中心を通る縦断面によって二分割され、かつ、二分割された一方の柵と他方の柵との上端部同士が、ピボットによって軸着されていることから、杭頭部に対する足場の設置作業の際には、二分割された杭頭部ハツリ作業用バスケットをクレーンによって吊り下げ、ピボットを中心として下方を開いた状態で杭頭部に被せた後、二分割されたバスケットの一方と他方とを閉じることにより、床板の下面から下方へと伸びる杭バンドによって杭をクランプすることができる。このように、杭を杭バンドでクランプすることによって、杭頭部ハツリ作業用バスケットを杭に固定することから、足場の設置に伴って杭を傷めることがない。しかも、杭頭部は、杭頭部ハツリ作業用バスケットに抱え込まれた状態となり、作業者は、バスケット内で円滑に杭頭部のハツリ作業を行うことができる。又、杭頭部から足場を撤去する際にも、二分割された杭頭部ハツリ作業用バスケットの下方を、ピボットを中心として開いた状態で、クレーンによって吊り上げることにより、撤去作業を完了することができる。   In addition, the floor board, the pile band, and the fence are divided into two by a longitudinal section passing through the center of the opening of the floor board, and the upper ends of the two divided fences and the other fence are pivotally attached by a pivot. Therefore, when installing the scaffolding to the pile head, hang the two-piece pile head chiseling basket with a crane and cover the pile head with the lower part open around the pivot. After that, by closing one and the other of the two divided baskets, the pile can be clamped by a pile band extending downward from the lower surface of the floor board. In this way, by clamping the pile with a pile band, the pile head chipping basket is fixed to the pile, so that the pile is not damaged with the installation of the scaffold. Moreover, the pile head is in a state of being held in the pile head chipping basket, and the operator can perform the chiseling work of the pile head smoothly in the basket. Also, when removing the scaffold from the pile head, the removal work is completed by lifting the bottom of the two-piece pile head chiseling basket with the crane open with the pivot at the center. Can do.

(2)前記ピボット及び前記二分割された一方の柵と他方の柵とに、夫々、ワイヤーを掛ける釣金具が設けられている杭頭部ハツリ作業用バスケット(請求項2)。
本項に記載の杭頭部ハツリ作業用バスケットは、ピボット及び二分割された一方の柵と他方の柵とに、夫々、ワイヤーを掛ける釣金具が設けられていることから、ピボットに設けられた釣金具に親巻きクレーンのワイヤーを掛け、二分割された各部分の柵に子巻きクレーンのワイヤーを掛けることで、杭頭部ハツリ作業用バスケットを吊り下げた状態で、ピボットを中心として、二分割された一方及び他方の開閉を行うことが可能である。
なお、ピボット及び二分割された一方の柵と他方の柵とに直接ワイヤーを掛けることとすれば、釣金具は不要となる。この場合には、ピボット及び柵自体が、ワイヤー掛け部となる。
(2) A pile head chiseling basket in which a fishing rod for hanging a wire is provided on the pivot and the one of the two divided fences and the other fence, respectively (Claim 2).
The pile head chiseling basket described in this section is provided on the pivot because the fishing rod for hanging the wire is provided on each of the pivot and one of the two divided fences and the other fence. By hanging the wire of the main winding crane on the fishing rod and hanging the wire of the child winding crane on the fence of each divided part, the pile head chiseling basket is suspended, It is possible to open and close one of the divided parts and the other.
In addition, if it is supposed that a wire is directly hung on one of the pivots and one of the two fences and the other, the fishing rod becomes unnecessary. In this case, the pivot and the fence itself become the wire hanging portion.

(3)前記二分割された一方及び他方の各床板上面を囲む周壁が設けられている杭頭部ハツリ作業用バスケット(請求項3)。
本項に記載の杭頭部ハツリ作業用バスケットは、二分割された一方及び他方の各床板上面を囲む周壁によって、各床板が無蓋箱状をなすことから、ハツリ作業によって杭頭部から落下するコンクリートガラを、床板上に受止め、かつ、床板からの落下を防ぐことができる。しかも、ハツリ作業の終了後、杭頭部から当該バスケットを撤去する際に、二分割されたバスケットの下方をピボットを中心として開いた状態においても、周壁によって床板上のコンクリートガラが落下することを防ぐことができる。すなわち、杭頭部ハツリ作業用バスケットは、ハツリ作業の足場としてのみならず、コンクリートガラの回収、運搬手段としても機能するものである。
(3) A pile head chiseling basket provided with a peripheral wall surrounding the upper surface of each of the two divided floor plates.
The pile head chipping basket described in this section is dropped from the pile head by the chiseling work because each floor board forms an open box shape by the peripheral wall surrounding the upper surface of each of the one and the other divided floor boards. The concrete glass can be received on the floor board and can be prevented from falling off the floor board. Moreover, when the basket is removed from the pile head after the chiseling operation is finished, even if the lower part of the divided basket is opened around the pivot, the concrete wall on the floor board is dropped by the peripheral wall. Can be prevented. That is, the pile head chipping work basket functions not only as a scaffold for the chipping work but also as a means for collecting and transporting the concrete chips.

(4)前記二分割された一方及び他方の各床板と柵とが、適宜分離可能である杭頭部ハツリ作業用バスケット(請求項4)。
本項に記載の杭頭部ハツリ作業用バスケットは、二分割された一方及び他方の各床板を、各柵から取外し、異なる杭径用の開口が形成された床板を柵に取り付けることで、杭頭部ハツリ作業用バスケットに汎用性を持たせるものである。
(4) A pile head chipping work basket in which the one and the other divided floor plates and the fence can be appropriately separated (claim 4).
The basket for chiseling of the pile head described in this section removes one and the other divided floor boards from each fence, and attaches a floor board with openings for different pile diameters to the pile. It is intended to give versatility to the head chiseling basket.

(5)前記ピボットは、前記床板の開口の中心を通る杆材により構成され、杭天端に載置された状態で、該杭頭部ハツリ作業用バスケット及びコンクリートガラの重量を受けることが可能な強度を有する杭頭部ハツリ作業用バスケット。
本項に記載の杭頭部ハツリ作業用バスケットは、ピボットを杭天端に載置した状態で、床板の下面から下方へと伸びる杭バンドによって杭をクランプすることにより杭に設置し、ハツリ作業中の、杭頭部ハツリ作業用バスケット及び発生するコンクリートガラの重量を、前記ピボットにより受けるものである。
(5) The pivot is made of a saddle that passes through the center of the opening of the floor board, and is strong enough to receive the weight of the pile head chipping work basket and the concrete glass when placed on the top of the pile. Pile head chipping basket with
The pile head chipping basket described in this section is installed on the pile by clamping the pile with a pile band that extends downward from the bottom surface of the floorboard with the pivot placed on the top of the pile. The weight of the pile head chipping work basket and the generated concrete glass is received by the pivot.

(6)上記(5)項において、前記杭バンドは、二分割された一方及び他方の各床板と柵の開放を阻止し得るだけの拘束力を発揮するものである杭頭部ハツリ作業用バスケット。
本項に記載の杭頭部ハツリ作業用バスケットは、ピボットが杭頭部ハツリ作業用バスケット及びコンクリートガラの重量を受けることが可能な強度を有し、ピボットが杭天端に載置されることから、必ずしも、杭バンドによって杭をクランプすることのみにより、杭頭部ハツリ作業用バスケットを杭に固定する必要は無くなる。そこで、杭バンドを、二分割された一方及び他方の各床板と柵の開放を阻止し得るだけの拘束力を発揮するものとして、簡略化したものである。
(6) In the above paragraph (5), the pile band is a chiseling basket for chiseling the pile head that exhibits a binding force that can prevent the one and other floor plates and the other of the two divided floor plates from being opened. .
The pile head chipping basket described in this section has a strength that allows the pivot to receive the weight of the pile head chipping work basket and the concrete glass, and the pivot is placed on the top of the pile. It is not always necessary to fix the pile head chipping basket to the pile only by clamping the pile with the pile band. Therefore, the pile band is simplified as one that exhibits a binding force that can prevent the opening of the one and the other divided floor plates and the fence.

本発明はこのように構成したので、上部工の撤去作業における杭頭部のハツリ作業を円滑に行うことが可能となる。又、ハツリ作業用足場の設置及び撤去作業を、より簡単にすることが可能となる。   Since this invention was comprised in this way, it becomes possible to perform the chiseling work of the pile head in the removal work of a superstructure smoothly. In addition, it is possible to more easily install and remove the chipping work scaffold.

以下、本発明を実施するための最良の形態を添付図面に基づいて説明する。
本発明の実施の形態に係る杭頭部ハツリ作業用バスケット12は、図1、図2に示されるように、杭2を挿通するための開口15が形成された床板14と、床板14の下面から開口15に沿って下方へと延びる筒状の杭バンド16と、床板14の外周に沿って上方へと延びる柵18と、柵18に載置される足場20とを備えるものである。そして、床板14と、杭バンド16と、柵18とが、床板14の開口15の中心を通る縦断面によって、各々、床板14A、14B、杭バンド16A、16B、柵18A,18Bに二分割されている。更に、二分割された一方の柵18Aと他方の柵18Bとの上端部同士が、ピボット22によって軸着されている。又、ピボット22と、一方の柵18Aと、他方の柵18Bとに、夫々、ワイヤー42、44を掛ける釣金具24、26が設けられている。
The best mode for carrying out the present invention will be described below with reference to the accompanying drawings.
As shown in FIGS. 1 and 2, the pile head chipping basket 12 according to the embodiment of the present invention includes a floor plate 14 in which an opening 15 for inserting the pile 2 is formed, and a lower surface of the floor plate 14. A cylindrical pile band 16 extending downward along the opening 15, a fence 18 extending upward along the outer periphery of the floor board 14, and a scaffold 20 placed on the fence 18. And the floor board 14, the pile band 16, and the fence 18 are each divided | segmented into the floor boards 14A and 14B, the pile bands 16A and 16B, and the fences 18A and 18B by the longitudinal cross section which passes along the center of the opening 15 of the floor board 14. ing. Furthermore, the upper ends of the two fences 18 </ b> A and the other fence 18 </ b> B are pivotally attached by a pivot 22. Further, fishing rods 24 and 26 for hanging wires 42 and 44 are provided on the pivot 22, one rail 18 </ b> A, and the other rail 18 </ b> B, respectively.

床板14は、矩形の鋼板に開口15を形成するための切欠きが設けられたものである。そして、図2(e)および(g)に示されるように、開口15の直径が異なる床板14が、適宜選択されて、杭頭部ハツリ作業用バスケット12が組み立てられる。開口15の直径は、ハツリ作業を行う杭2の直径に合わせて決定されるものであり、予め直径の異なる開口15を有する複数種類の床板14を用意し、適宜、柵18に固定することとしてもよい。なお、床板14と柵18とは、溶接、ボルト等により固定される。   The floor plate 14 is a rectangular steel plate provided with a notch for forming the opening 15. Then, as shown in FIGS. 2 (e) and 2 (g), floor boards 14 having different diameters of the openings 15 are appropriately selected, and the pile head chipping basket 12 is assembled. The diameter of the opening 15 is determined in accordance with the diameter of the pile 2 that performs the chiseling operation. A plurality of types of floor boards 14 having the openings 15 having different diameters are prepared in advance, and appropriately fixed to the fence 18. Also good. The floor plate 14 and the fence 18 are fixed by welding, bolts, or the like.

又、杭バンド16は、円筒状の鋼管を軸方向に二分割することにより構成されている。そして、床板14の下面に対し、開口15に沿って杭バンド16の上端部が固定され、下端部が床板14に固定された補強ステー28に支えられている。更に、二分割された杭バンド16A、16Bの向かい合う端部に沿って、杭バンド16A、16B同士をボルト固定するためのフランジ30(図1(a)、図2(d))が設けられている。   Moreover, the pile band 16 is comprised by dividing a cylindrical steel pipe into two in the axial direction. And the upper end part of the pile band 16 is fixed to the lower surface of the floor board 14 along the opening 15, and the lower end part is supported by the reinforcing stay 28 fixed to the floor board 14. Furthermore, the flange 30 (FIG. 1 (a), FIG.2 (d)) for bolt-fixing pile band 16A, 16B is provided along the edge part which the two divided pile bands 16A, 16B face each other. Yes.

又、柵18は、図1(a)、(b)、図2(a)、(b)に示されるように、角棒やL型鋼等の棒材19からなる柱19a及び横梁19bにより構成されている。そして、二分割された柵の18A、18Bは、各々の向かい合う端部に沿って、互いにボルト固定することが可能である。
なお、図1には、横梁19bが上下二段に設けられた例が示されており、図2には、横梁19bが上下三段に設けられた例が示されているが、柱19aの高さや横梁19bの段数は、ハツリ作業を行う杭2及び杭頭部3の寸法に応じ、適宜決定されるものである。
Further, as shown in FIGS. 1 (a), 1 (b), 2 (a) and 2 (b), the fence 18 is constituted by a column 19a and a horizontal beam 19b made of a bar 19 such as a square bar or L-shaped steel. Has been. The two divided fences 18A and 18B can be bolted to each other along the opposing ends.
FIG. 1 shows an example in which the horizontal beam 19b is provided in two upper and lower stages, and FIG. 2 shows an example in which the horizontal beam 19b is provided in three upper and lower stages. The height and the number of steps of the cross beam 19b are appropriately determined according to the dimensions of the pile 2 and the pile head 3 that perform the chiseling operation.

足場20は、図2(f)に示されるように、角棒やL型鋼等の棒材を交差させて構成されたフレーム32に、メッシュプレートやパンチングメタル等のシート材34を張ったものであり、中央に、杭2を挿通させるための開口36が形成されている。図示の開口36は角形であるが、ハツリ作業によって杭頭部3から落下するコンクリートガラが床板14に落下するように、開口36の形状及び開口面積が決定されるものである。又、シート材34は、柵18の横梁の更に内側に収まるような外形を有しており、フレーム32は、柵18の横梁18bで囲まれる範囲からはみ出すような長さに形成されている。
そして、足場20は、フレーム32を柵18の横梁19b上に載置され、固定されることにより、図2(b)、(d)に示されるように、杭頭部ハツリ作業用バスケット12上に設置される。なお、柵18の横梁19bは、数段設けられていることから、杭頭部3の位置や、ハツリ作業の進行具合に応じて、足場20を載置する横梁19bの位置を変えることで、常にハツリ作業がし易い高さに、足場20を設置することが可能である。
As shown in FIG. 2 (f), the scaffold 20 is formed by stretching a sheet material 34 such as a mesh plate or punching metal on a frame 32 formed by intersecting bars such as square bars and L-shaped steel. There is an opening 36 through which the pile 2 is inserted. Although the illustrated opening 36 is rectangular, the shape and the opening area of the opening 36 are determined so that the concrete glass falling from the pile head 3 by the chipping work falls on the floor plate 14. The sheet material 34 has an outer shape that fits further inside the horizontal beam of the fence 18, and the frame 32 is formed to have a length that protrudes from a range surrounded by the horizontal beam 18 b of the fence 18.
The scaffold 20 is placed on the cross beam 19b of the fence 18 and fixed, so that the scaffold 20 is placed on the pile head chipping work basket 12 as shown in FIGS. 2 (b) and 2 (d). Installed. In addition, since the horizontal beam 19b of the fence 18 is provided in several stages, by changing the position of the horizontal beam 19b on which the scaffold 20 is placed according to the position of the pile head 3 and the progress of the chiseling work, It is possible to install the scaffolding 20 at a height at which it is always easy to perform a chiseling operation.

更に、図1(a)、(b)、図2(b)、(c)に示されるように、二分割された一方及び他方の各床板14A、14Bの上面を囲むようにして、鋼板からなる周壁38が設けられている。この周壁38は、開口15を避けるようにして、各床板14A、14Bに切れ目無く設けられることにより、各床板14A、14Bは、無蓋箱状をなしている。   Further, as shown in FIGS. 1 (a), (b), 2 (b), and (c), a peripheral wall made of a steel plate so as to surround the upper surface of each of the two divided floor plates 14A and 14B. 38 is provided. The peripheral wall 38 is provided in each floor plate 14A, 14B without a break so as to avoid the opening 15, so that each floor plate 14A, 14B has an open box shape.

以上のような構造を有する杭頭部ハツリ作業用バスケット12を用い、桟橋1の杭頭部3に対するハツリ作業を実施する際には、桟橋1の上部工10を構成する床版部5及び梁部4が除去され、図3に実線で示されるように、杭2及び杭頭部3のみが水面に突出した状態において、1本の杭2に杭頭部ハツリ作業用バスケット12を設置する。図1に示される例では、杭頭部ハツリ作業用バスケット12の一部が水没した状態となることから、二分割された一方12A及び他方12Bの固定作業(杭バンド16A、16B同士をボルト固定する作業)は、潜水作業となる。
作業者は、杭頭部ハツリ作業用バスケット12内で足場20に乗り、杭頭部3のハツリ作業を行う。この際、杭頭部3から落下するコンクリートガラは、床板14上に落下して溜まる。そして、ハツリ作業の終了後、その杭2から当該バスケット12を撤去し、陸上のガラ置き場へと移動させて、コンクリートガラをガラ置き場へと卸す。そして、当該バスケット12を次の杭2へと移動させて、その杭2に当該バスケット12を設置し、杭頭部3のハツリ作業を行う、といった作業を繰り返す。この際、杭2に設置された当該バスケット12への、作業者の連絡通路として、例えば、浮き足場40を用いることが可能である。
When carrying out the chiseling work on the pile head 3 of the pier 1 using the pile head chiseling basket 12 having the structure as described above, the floor slab portion 5 and the beam constituting the superstructure 10 of the pier 1 The part 4 is removed, and as shown by a solid line in FIG. 3, the pile head chipping work basket 12 is installed in one pile 2 in a state where only the pile 2 and the pile head 3 protrude from the water surface. In the example shown in FIG. 1, since a part of the pile head chipping work basket 12 is submerged, fixing work of the one divided 12A and the other 12B (pile bands 16A and 16B are bolted together) Work) is a diving work.
The operator rides on the scaffold 20 in the pile head chipping basket 12 and performs the chipping work of the pile head 3. At this time, the concrete glass falling from the pile head 3 falls and accumulates on the floor board 14. Then, after the chipping work is finished, the basket 12 is removed from the pile 2 and moved to a land storage place, and the concrete waste is wholesaled to the place. Then, the operation of moving the basket 12 to the next pile 2, installing the basket 12 on the pile 2, and performing the chiseling work of the pile head 3 is repeated. At this time, for example, a floating scaffold 40 can be used as the worker's communication path to the basket 12 installed in the pile 2.

上記構成をなす、本発明の実施の形態により得られる作用効果は、以下の通りである。
本発明の実施の形態に係る、杭頭部ハツリ作業用バスケット12は、床板14の開口15に杭2を挿通した状態で、床板14の下面から下方へと伸びる杭バンド16によって杭2をクランプすることで、床板14を杭2の円筒壁面に固定するものである。又、床板14の外周に沿って上方へと延びる柵18が設けられ、柵18に足場20(図2(f))を固定することで、杭頭部3の周囲の適切な高さに、ハツリ作業を円滑に行うための足場20を設置することが可能となる。又、足場20は、ハツリ作業に支障を来たすような場合には、柵18から足場20を撤去する(すなわち選択的に使用する)ことにより、作業性を向上させることもできる。
The effects obtained by the embodiment of the present invention having the above-described configuration are as follows.
The pile head chipping basket 12 according to the embodiment of the present invention clamps the pile 2 by a pile band 16 extending downward from the lower surface of the floor plate 14 with the pile 2 inserted through the opening 15 of the floor plate 14. By doing so, the floor board 14 is fixed to the cylindrical wall surface of the pile 2. Moreover, the fence 18 extended upwards along the outer periphery of the floor board 14 is provided, By fixing the scaffold 20 (FIG.2 (f)) to the fence 18, the appropriate height around the pile head 3 is obtained. It is possible to install the scaffold 20 for smoothly performing the chiseling work. Moreover, when the scaffold 20 interferes with the chipping work, the workability can be improved by removing the scaffold 20 from the fence 18 (that is, selectively used).

しかも、杭頭部ハツリ作業用バスケット12は、床板14と杭バンド16と柵18とが、床板14の開口15の中心を通る縦断面によって二分割され、かつ、二分割された一方の柵18Aと他方の柵18Bとの上端部同士が、ピボット22によって軸着されていることから、杭頭部3に対する足場20の設置作業の際には、図1(a)に示されるように、この二分割された杭頭部ハツリ作業用バスケット12をクレーンによって吊り下げ、ピボット22を中心として下方を開いた状態で杭頭部3に被せた後、図1(b)に示されるように、二分割されたバスケットの一方12Aと他方12Bとを閉じることにより、杭バンド16A、16Bによって杭2をクランプすることができる。
このように、杭2を杭バンド16A、16Bでクランプすることによって、杭頭部ハツリ作業用バスケット12を杭2に固定することから、足場の設置に伴って杭2を傷めることがない。しかも、杭頭部3は、杭頭部ハツリ作業用バスケット12に抱え込まれた状態となり、作業者は、バスケット12内で円滑に杭頭部3のハツリ作業を行うことができる。又、杭頭部3から足場を撤去する際にも、二分割された杭頭部ハツリ作業用バスケット12A、12Bの下方を、ピボット22を中心として開いた状態で、クレーンによって吊り上げることにより、撤去作業を完了することができる。
In addition, the pile head chipping work basket 12 includes a floor plate 14, a pile band 16, and a fence 18 divided into two by a longitudinal section passing through the center of the opening 15 of the floor board 14, and one fence 18A divided into two. 1 and the other fence 18B are pivotally attached to each other by the pivot 22, so that when the scaffold 20 is installed on the pile head 3, as shown in FIG. After the pile head chipping work basket 12 divided into two parts is suspended by a crane and covered on the pile head 3 in a state where the lower part is opened with the pivot 22 as the center, as shown in FIG. The pile 2 can be clamped by the pile bands 16A and 16B by closing one of the divided baskets 12A and the other 12B.
Thus, by clamping the pile 2 with the pile bands 16 </ b> A and 16 </ b> B, the pile head chipping basket 12 is fixed to the pile 2, so that the pile 2 is not damaged with the installation of the scaffold. Moreover, the pile head 3 is in a state of being held in the pile head chipping basket 12, and the operator can perform the chipping work of the pile head 3 smoothly in the basket 12. Also, when removing the scaffold from the pile head 3, it is removed by lifting the bottom of the two divided pile head chiseling baskets 12 </ b> A and 12 </ b> B with the crane 22 opened around the pivot 22. Work can be completed.

又、杭頭部ハツリ作業用バスケット12は、ピボット22及び二分割された一方の柵18Aと他方の柵18Bとに、夫々、ワイヤー42、44を掛ける釣金具24、26が設けられている。そして、ピボット22に設けられた釣金具24に親巻きクレーンのワイヤー42を掛け、二分割された各部分の柵18A、18Bの釣金具26に子巻きクレーンのワイヤー44を掛けることで、杭頭部ハツリ作業用バスケット12を吊り下げた状態で、ピボット22を中心として、二分割された一方12A及び他方12Bの開閉を行うことが可能である。   Further, the pile head chipping work basket 12 is provided with fishing rods 24 and 26 for hanging wires 42 and 44 on the pivot 22 and one of the two fences 18A and the other fence 18B, respectively. Then, the main winding crane wire 42 is hung on the fishing bracket 24 provided on the pivot 22, and the child winding crane wire 44 is hung on the fishing rod 26 of each of the divided rails 18 </ b> A and 18 </ b> B, thereby the pile head. It is possible to open and close one of the two divided parts 12A and the other 12B around the pivot 22 in a state in which the partial chipping work basket 12 is suspended.

又、杭頭部ハツリ作業用バスケット12は、二分割された一方12A及び他方12Bの各床板14A、14Bの上面を囲む周壁38によって、各床板14A、14Bが無蓋箱状をなしている。よって、ハツリ作業によって杭頭部3から落下するコンクリートガラを、床板14A、14B上に可能な限り受止め、床板14A、14Bからのコンクリートガラ落下を防ぐことができ、水中におけるコンクリートガラの回収作業が大幅に軽減されることとなる。しかも、ハツリ作業の終了後、杭頭部3から杭頭部ハツリ作業用バスケット12を撤去する際に、図1(a)に示されるように、二分割されたバスケット12A、12Bの下方を、ピボット22を中心として開いた状態でも、周壁38によって床板14A、14B上のコンクリートガラが落下することを防ぐことができる。すなわち、杭頭部ハツリ作業用バスケット12は、ハツリ作業の足場としてのみならず、コンクリートガラの回収、運搬手段としても機能するものである。   Further, in the pile head chipping work basket 12, each floor plate 14A, 14B has an open box shape by a peripheral wall 38 surrounding the top surface of each floor plate 14A, 14B of one divided 12A and the other 12B. Therefore, the concrete glass falling from the pile head 3 by the chiseling work is received as much as possible on the floor boards 14A and 14B, and the concrete glass fall from the floor boards 14A and 14B can be prevented, and the concrete glass collection work in water Will be greatly reduced. Moreover, when the pile head chipping work basket 12 is removed from the pile head 3 after completion of the chipping work, as shown in FIG. 1 (a), below the two divided baskets 12A and 12B, Even when the pivot 22 is open as a center, the peripheral wall 38 can prevent the concrete glass on the floor plates 14A and 14B from falling. That is, the pile head chipping work basket 12 functions not only as a scaffold for the chipping work but also as a means for collecting and transporting the concrete chips.

なお、本発明の実施の形態では、ピボット22を、床板14の開口15の中心を通る杆材により構成し、かつ、このピボット22を、杭2の天端に載置させた状態で、杭頭部ハツリ作業用バスケット12及び杭頭部3から落下するコンクリートガラの重量を受けることが可能な強度を有するものとして構成してもよい。
この場合には、ピボット22を杭2の天端に載置した状態で、床板14の下面から下方へと伸びる杭バンド16によって杭2をクランプすることにより、ハツリ作業中の、杭頭部ハツリ作業用バスケット12及び発生するコンクリートガラの重量を、ピボット22により受けるようにして、杭2に設置される。
In the embodiment of the present invention, the pivot 22 is constituted by a saddle that passes through the center of the opening 15 of the floor plate 14 and the pivot 22 is placed on the top end of the pile 2. You may comprise as what has the intensity | strength which can receive the weight of the concrete glass falling from the basket 12 for head chipping | working work, and the pile head 3.
In this case, with the pivot 22 placed on the top of the pile 2, the pile 2 is clamped by the pile band 16 extending downward from the lower surface of the floor plate 14, so The weight of the working basket 12 and the generated concrete glass is received by the pivot 22 and installed in the pile 2.

その具体的使用例は、以下の通りである。例えば、杭頭部3に杭頭部ハツリ作業用バスケット12を設置する前に、杭頭部3から杭2の天端を露出させるハツリ作業を行い、露出された杭2の天端に、直接ピボット22を載置する。そして、釣金具24、26からワイヤー42、44を外した状態で、杭バンド16によって杭2をクランプする作業を行うことにより、設置作業の際の、クレーン作業の短縮を図ることができる。同様に、杭頭部ハツリ作業用バスケット12の撤去作業の際にも、杭バンド16のクランプ解除を行った後に、釣金具24、26にワイヤー42、44を掛けることで、クレーン作業の短縮を図ることができる。
更には、杭2の天端に、H型鋼その他補強材等、スペーサを載置し(必要に応じて杭2の天端にボルト等の固定具を用いて固定し)、かかるスペーサ上にピボット22を載置することとすれば、ハツリ作業用バスケット12を、杭2の天端に対し比較的上方へと設置することが可能である。このとき、杭バンド16が水面上に位置することとなり、杭バンド16による杭2のクランプ作業及びクランプ解除作業に、潜水作業が不要となる。よって、ハツリ作業用バスケット12の着脱作業が容易となり、なおかつ、クレーン作業の時間も短縮することが可能となる。
The specific usage example is as follows. For example, before installing the pile head chipping work basket 12 on the pile head 3, the chipping work for exposing the top edge of the pile 2 from the pile head 3 is performed, and the exposed top edge of the pile 2 is directly The pivot 22 is placed. And the crane work in the case of an installation work can be shortened by performing the operation | work which clamps the pile 2 with the pile band 16 in the state which removed the wires 42 and 44 from the fishing rods 24 and 26. FIG. Similarly, when the pile head chipping basket 12 is removed, the crane band can be shortened by hooking the wires 42 and 44 to the fishing rods 24 and 26 after releasing the clamp of the pile band 16. Can be planned.
Furthermore, a spacer such as an H-shaped steel or other reinforcing material is placed on the top end of the pile 2 (fixed to the top end of the pile 2 using a fixing tool such as a bolt if necessary) and pivoted on the spacer. If 22 is mounted, it is possible to install the chiseling basket 12 relatively upward with respect to the top end of the pile 2. At this time, the pile band 16 is positioned on the water surface, and the diving work becomes unnecessary for the clamp work and the clamp release work of the pile 2 by the pile band 16. Therefore, the work for attaching and detaching the chiseling basket 12 is facilitated, and the crane work time can be shortened.

又、ピボット22が、杭頭部ハツリ作業用バスケット12及びコンクリートガラの重量を受けることが可能な強度を有し、このピボット22が杭2の天端に載置されることから、必ずしも、杭バンド16によって杭をクランプすることのみにより、杭頭部ハツリ作業用バスケットを杭2に固定する必要が無くなる。
そこで、杭バンド16を、二分割された一方12A及び他方12Bの各床板14A、14Bと柵18A、18Bの開放を阻止し得るだけの拘束力を発揮するものとして、簡略化することとしてもよい。この場合には、床板14の開口15の直径が、必ずしも杭2の直径とほぼ一致している必要は無く、杭2に対し若干大径であってもよい。
In addition, the pivot 22 has a strength capable of receiving the weight of the pile head chipping work basket 12 and the concrete glass, and the pivot 22 is placed on the top end of the pile 2. Only by clamping the pile with the band 16, it is not necessary to fix the pile head chipping basket to the pile 2.
Therefore, the pile band 16 may be simplified as the pile band 16 exhibiting a binding force that can prevent the floor plates 14A and 14B and the fences 18A and 18B of the one divided 12A and the other 12B from being opened. . In this case, the diameter of the opening 15 of the floor board 14 is not necessarily substantially equal to the diameter of the pile 2 and may be slightly larger than the pile 2.

又、杭頭部ハツリ作業用バスケット12は、二分割された一方12A及び他方12Bの各床板14A、14Bを、各柵18A、18Bから取外し、異なる杭径用の開口が形成された床板14A、14Bを柵18A、18Bに取り付けることで、杭頭部ハツリ作業用バスケットに汎用性を持たせることが可能となる。
なお、本発明の実施の形態では、杭頭部ハツリ作業用バスケット12を、桟橋1の杭頭部3のハツリ作業に用いる場合を例示して説明したが、他の構造物に係る杭頭部のハツリ作業にも利用可能であることは理解されるであろう。
In addition, the pile head chipping basket 12 is divided into two floor plates 14A and 14B of one divided 12A and the other 12B from the rails 18A and 18B, and a floor plate 14A in which openings for different pile diameters are formed. By attaching 14B to the fences 18A and 18B, the pile head chipping work basket can be provided with versatility.
In the embodiment of the present invention, the case where the pile head chipping work basket 12 is used for the chipping work of the pile head 3 of the pier 1 has been described as an example. However, the pile head according to another structure is described. It will be understood that the present invention can also be used for the chiseling operation.

本発明の実施の形態に係る杭頭部ハツリ作業用バスケットを、杭と共に示す側面図であり、(a)は設置作業中又は撤去作業中の状態を、(b)は設置完了状態を示すものである。It is a side view which shows the pile head chipping work basket which concerns on embodiment of this invention with a pile, (a) shows the state in installation work or removal work, (b) shows an installation completion state It is. 本発明の実施の形態に係る杭頭部ハツリ作業用バスケットを示す図であり、(a)は平面図、(b)は側面図、(c)はA−A断面図、(d)はB−B断面図、(e)はC−C断面図、(f)は足場の平面図、(g)は床板の別例に係るC−C断面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure which shows the pile head chipping | basket work basket which concerns on embodiment of this invention, (a) is a top view, (b) is a side view, (c) is AA sectional drawing, (d) is B -B sectional drawing, (e) is CC sectional drawing, (f) is a top view of a scaffold, (g) is CC sectional drawing concerning another example of a floor board. 本発明の実施の形態に係る杭頭部ハツリ作業用バスケットを、桟橋の杭頭部のハツリ作業に使用した様子を示す平面図である。It is a top view which shows a mode that the basket for pile head chipping | working work which concerns on embodiment of this invention was used for the chipping work of the pile head of a pier. 桟橋の一般的な構造を示す斜視図である。It is a perspective view which shows the general structure of a pier. 桟橋の一般的な構造を示す縦断面図である。It is a longitudinal cross-sectional view which shows the general structure of a jetty.

符号の説明Explanation of symbols

2:杭、3:杭頭部、4:梁部、12、12A、12B:杭頭部ハツリ作業用バスケット、 14、14A、14B:床板、15:開口、 16、16A、16B:杭バンド、 18、18A、18B:柵、19a:柱、19b:横梁、20:足場、22:ピボット、 24、26:釣金具、38:周壁   2: Pile, 3: Pile head, 4: Beam part, 12, 12A, 12B: Pile head chiseling basket, 14, 14A, 14B: Floor board, 15: Opening, 16, 16A, 16B: Pile band, 18, 18A, 18B: fence, 19a: pillar, 19b: cross beam, 20: scaffolding, 22: pivot, 24, 26: fishing bracket, 38: peripheral wall

Claims (4)

杭を挿通するための開口が形成された床板と、該床板の下面から前記開口に沿って下方へと延びる筒状の杭バンドと、前記床板の外周に沿って上方へと延びる柵と、該柵に載置される足場とを備える杭頭部ハツリ作業用バスケットであって、前記床板と、前記杭バンドと、前記柵とが、前記床板の開口の中心を通る縦断面によって二分割され、かつ、二分割された一方の柵と他方の柵との上端部同士が、ピボットによって軸着されていることを特徴とする杭頭部ハツリ作業用バスケット。 A floor board in which an opening for inserting a pile is formed; a cylindrical pile band extending downward from the lower surface of the floor board along the opening; a fence extending upward along the outer periphery of the floor board; A pile head chiseling basket comprising a scaffold placed on a fence, wherein the floor board, the pile band, and the fence are divided into two by a longitudinal section passing through the center of the opening of the floor board, A pile head chiseling basket characterized in that upper ends of one of the two divided fences and the other fence are pivotally attached to each other by a pivot. 前記ピボット及び前記二分割された一方の柵と他方の柵とに、夫々、ワイヤーを掛ける釣金具が設けられていることを特徴とする請求項1記載の杭頭部ハツリ作業用バスケット。 2. The pile head chiseling basket according to claim 1, wherein a fishing rod for hanging a wire is provided on each of the pivot and the one of the two divided fences and the other of the fences. 前記二分割された一方及び他方の各床板上面を囲む周壁が設けられていることを特徴とする請求項1又は2記載の杭頭部ハツリ作業用バスケット。 3. A pile head chiseling basket according to claim 1 or 2, wherein a peripheral wall surrounding the upper surface of each of the two divided one and the other floor boards is provided. 前記二分割された一方及び他方の各床板と柵とが、適宜分離可能であることを特徴とする請求項1から3のいずれか1項記載の杭頭部ハツリ作業用バスケット。 The pile head chipping work basket according to any one of claims 1 to 3, wherein the one and the other floor plates and the fence divided into two are separable as appropriate.
JP2007130520A 2007-05-16 2007-05-16 Pile head chiseling basket Active JP4816960B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007130520A JP4816960B2 (en) 2007-05-16 2007-05-16 Pile head chiseling basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007130520A JP4816960B2 (en) 2007-05-16 2007-05-16 Pile head chiseling basket

Publications (2)

Publication Number Publication Date
JP2008285856A JP2008285856A (en) 2008-11-27
JP4816960B2 true JP4816960B2 (en) 2011-11-16

Family

ID=40145852

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007130520A Active JP4816960B2 (en) 2007-05-16 2007-05-16 Pile head chiseling basket

Country Status (1)

Country Link
JP (1) JP4816960B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988230B (en) * 2017-05-04 2022-11-29 贵州桥梁建设集团有限责任公司 Hanging basket structure used in reinforced concrete arch bridge construction process

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59327Y2 (en) * 1981-04-08 1984-01-07 東日本鉄工株式会社 Suspended scaffolding for bridge piers
JPS60135313U (en) * 1984-02-21 1985-09-09 東亜建設工業株式会社 Scaffolding for high place girder
JPH0169816U (en) * 1987-10-28 1989-05-09
JPH0310254A (en) * 1989-06-08 1991-01-17 Dainippon Ink & Chem Inc Electrophotographic sensitive body
JP2948433B2 (en) * 1993-03-11 1999-09-13 三菱重工業株式会社 Dismantling method of steel freestanding chimney
JPH09256339A (en) * 1996-03-27 1997-09-30 Kajima Corp Execution method and applied form of steel pipe pile head concrete structure
JP4101672B2 (en) * 2003-02-12 2008-06-18 株式会社高知丸高 Telescopic beam for pier construction and pier construction method using this telescopic beam

Also Published As

Publication number Publication date
JP2008285856A (en) 2008-11-27

Similar Documents

Publication Publication Date Title
CN101476410B (en) Mounting and demounting method for roof plate formwork support platform of concrete silo
KR101614253B1 (en) Cantilever construction method of temporary bridge
JP4181617B1 (en) Vibration compaction device and method for constructing cast-in-place concrete pile
CN110258539B (en) Underwater cast-in-situ bored pile and construction method thereof
JP2010007365A (en) Form timbering apparatus and form apparatus
CN211369536U (en) Cast-in-place box girder template system
CN102505640A (en) Method for constructing pier column
JP4816960B2 (en) Pile head chiseling basket
JP4748417B2 (en) Cylindrical storage tank side plate replacement repair method
JP2009108611A (en) Reinforcement erecting tool and reinforcement erecting method
KR102012367B1 (en) Bridge using temporary bridge and construction method
CN210658333U (en) Drilling bored concrete pile in water
JP5693869B2 (en) Bridge girder construction method
JP4071249B2 (en) Thread hanging jig
JP2001115422A (en) Dismantling method of supporting for form fixed to concrete slab
JP4630500B2 (en) Floating girder for underwater / water structure support
CN209741897U (en) Quick-release supporting structure for foundation cup opening template
JP4932051B1 (en) Submerged rubble foundation weight
JP2002146760A (en) Floating type form supporting and construction method for water-surface building
JP4423793B2 (en) Containment method of hatch for reactor containment vessel
CN111764289A (en) Novel cast-in-place suspension bracket with overhanging light structure and use method thereof
JP4926851B2 (en) Repair method of elevated floor slab
CN212294380U (en) Novel cast-in-place outrigger of light structure
JP7339477B2 (en) Concrete column formwork construction device and concrete column formwork construction method using the same
JP2019214891A (en) Gabion and installation method of gabion

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090330

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101201

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110810

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110816

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140909

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4816960

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250