JP4563792B2 - Control system for game machine production line - Google Patents

Control system for game machine production line Download PDF

Info

Publication number
JP4563792B2
JP4563792B2 JP2004369746A JP2004369746A JP4563792B2 JP 4563792 B2 JP4563792 B2 JP 4563792B2 JP 2004369746 A JP2004369746 A JP 2004369746A JP 2004369746 A JP2004369746 A JP 2004369746A JP 4563792 B2 JP4563792 B2 JP 4563792B2
Authority
JP
Japan
Prior art keywords
work
standby
area
line
target product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004369746A
Other languages
Japanese (ja)
Other versions
JP2006174948A (en
Inventor
康弘 遠山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Newgin Co Ltd
Original Assignee
Newgin Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Newgin Co Ltd filed Critical Newgin Co Ltd
Priority to JP2004369746A priority Critical patent/JP4563792B2/en
Publication of JP2006174948A publication Critical patent/JP2006174948A/en
Application granted granted Critical
Publication of JP4563792B2 publication Critical patent/JP4563792B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pinball Game Machines (AREA)
  • Control Of Conveyors (AREA)
  • Branching, Merging, And Special Transfer Between Conveyors (AREA)

Description

本発明は、遊技機製造ラインの制御システムに関し、更に詳しくは、上流側に位置する供給ラインから複数設けた搬送ラインへ作業対象品を供給し、各搬送ラインにより所定の作業エリアに作業対象品を搬送して各種作業を行なうよう構成された遊技機製造ラインの制御システムに関するものである。   The present invention relates to a control system for a gaming machine production line, and more particularly, supplies work target products from a supply line located upstream to a plurality of transport lines, and each work line supplies a work target product to a predetermined work area. The present invention relates to a control system for a gaming machine manufacturing line configured to carry various operations by transporting the game.

従来より、遊技機の生産効率の向上を図るため、工場に設けられた遊技機製造ラインに対し種々の改良がなされている。例えば、特許文献1に記載された遊技機製造ラインでは、各種の加工や点検作業が行なわれる作業対象品(例えば遊技盤等)を所定方向に搬送する搬送ラインを複数列配置すると共に、各搬送ライン毎に作業エリアを設け、各搬送ラインにおける作業対象品の搬送状況に偏りが生じた場合に、搬送量の多い搬送ラインから搬送量の少ない搬送ラインへ作業対象品を移し替えるよう構成されている。すなわち、各搬送ラインにおける作業対象品の搬送量を平均化することで、前記作業エリアへ搬送される作業対象品の偏りをなくし、生産効率の向上に寄与するようになっている。
特開平10−109747号公報
Conventionally, in order to improve the production efficiency of gaming machines, various improvements have been made to the gaming machine production line provided in the factory. For example, in the gaming machine manufacturing line described in Patent Document 1, a plurality of transfer lines for transferring work target items (for example, game boards, etc.) in which various kinds of processing and inspection work are performed in a predetermined direction are arranged, and each transfer is performed. A work area is provided for each line, and when there is a bias in the transfer status of work target items on each transfer line, the work target item is transferred from a transfer line with a large transfer amount to a transfer line with a low transfer amount. Yes. That is, by averaging the transport amount of the work target product in each transport line, it is possible to eliminate the bias of the work target product transported to the work area and contribute to the improvement of production efficiency.
JP-A-10-109747

ところで、前記作業エリアによっては、完成した遊技機の動作チェック等のように比較的時間を要する作業が行なわれる。このような検査工程では、搬送ラインで搬送された作業対象品を作業エリアで一定時間停止させて作業を行なう必要があるため、生産性が低下する要因となる欠点を内在している。このような場合には、同じ作業を行なう作業エリアを備えた搬送ラインを複数設置し、一度に多くの作業対象品に対して同じ作業を行ない得るよう構成することで生産性低下を防止することが考えられる。ここで、複数の搬送ラインを設けた場合に、その前工程の供給ラインから搬送された作業対象品を各搬送ラインへ分配する必要があり、分配が適正に行なわれないと、生産効率の低下に繋がる虞がある。しかしながら、前記供給ラインからの作業対象品を各搬送ラインへ効率的に分配供給可能とする方法に関しては提案されていないのが現状であった。
そこで、本発明は、作業対象品を供給ラインから複数の搬送ラインに効率的に分配供給し、生産効率の向上を図り得る遊技機製造ラインの制御システムを提供することを目的とする。
By the way, depending on the work area, a relatively time-consuming work such as an operation check of a completed gaming machine is performed. In such an inspection process, it is necessary to stop work for a certain period of time in the work area for the work item conveyed by the transfer line, and therefore has a drawback that causes a reduction in productivity. In such a case, it is possible to prevent a decrease in productivity by installing a plurality of transfer lines having work areas for performing the same work, and configured to perform the same work on many work items at once. Can be considered. Here, when a plurality of transfer lines are provided, it is necessary to distribute the work object transferred from the supply line in the previous process to each transfer line, and if the distribution is not performed properly, the production efficiency decreases. It may lead to However, there has been no proposal regarding a method for efficiently distributing and supplying the work target product from the supply line to each conveyance line.
Accordingly, an object of the present invention is to provide a control system for a gaming machine manufacturing line that can efficiently distribute and supply work target products from a supply line to a plurality of transfer lines to improve production efficiency.

前記課題を克服し、所期の目的を達成するため、本発明に係る遊技機製造ラインの制御システムは、
遊技機として完成されるべき作業対象品(X)に対し所要の作業を行なう作業エリア(SA)と、前記作業エリア(SA)へ向けて作業対象品(X)を搬送する複数の搬送ライン(10,11)と、前記複数の搬送ライン(10,11)へ作業対象品(X)を供給する供給ライン(30)と備えた遊技機製造ラインにおいて、
前記供給ラインに接続(30)に接続し、該供給ライン(30)から供給される任意の作業対象品(X)の搬送および搬送停止を行ない得る搬送手段(13,16)を複数連設して構成され、複数の搬送手段(13,16)により複数の作業対象品(X)を待機可能に設定された待機エリア(TA1〜TA6)を設けたメインライン(ML1,ML2)と、
前記メインライン(ML1,ML2)において前記搬送手段(13,16)から対応的に分岐し、前記作業エリア(SA)が適所に設けられた複数のサブライン(SL1〜SL6)と、
前記夫々の搬送手段(13,16)を個別に作動制御し、該搬送手段(13,16)での作業対象品(X)の搬送および搬送停止を個別に制御可能な制御手段(50)と、
作業者による前記各作業エリア(SA)に対応するスイッチ(25)のON−OFF操作に基づいて各作業エリア(SA)の稼働の有無を識別する識別手段(54)と、
前記各待機エリア(TA1〜TA6)における作業対象品(X)の待機数を記憶する記憶手段(54)とを備え、
前記制御手段(50)は、
前記識別手段(54)の識別情報に基づいて各搬送ライン(10,11)における作業エリア(SA)の稼働数を比較し、作業エリア(SA)の稼働数の比率に応じて前記複数のメインライン(ML1,ML2)への作業対象品(X)の供給数を調整するよう前記供給ライン(30)を制御すると共に、稼働している作業エリア(SA)のサブライン(SL1〜SL6)に対応する待機エリア(TA1〜TA6)の夫々に、前記記憶手段(54)が記憶する該待機エリア(TA1〜TA6)における作業対象品(X)の待機数が均等になるよう前記各メインライン(ML1,ML2)の搬送手段(13,16)を制御する一方、
所定条件の成立により各搬送ライン(10,11)における所定の待機エリア(TA1〜TA6)における作業対象品(X)の待機数を比較して、待機数の少ない待機エリア(TA1〜TA6)の属する搬送ライン(10,11)のメインライン(ML1,ML2)へ優先的に作業対象品(X)を供給するよう前記供給ライン(30)を制御し、
何れかの待機エリア(TA1〜TA6)に待機させた作業対象品(X)を下流側の待機エリア(TA1〜TA6)または対応するサブライン(SL1〜SL6)へ送出した際には、該作業対象品(X)を送出した待機エリア(TA1〜TA6)に対応する前記記憶手段(52)が記憶する待機数を1減算し、該上流側の待機エリア(TA1〜TA6)から搬送されてきた作業対象品(X)を補充すべき搬送手段(13,16)の検出手段が検出した際には、該作業対象品(X)が補充された待機エリア(TA1〜TA6)に対応する前記記憶手段(54)の待機数を1加算するよう制御ことを特徴とする。
In order to overcome the above-mentioned problems and achieve the intended purpose, a control system for a gaming machine production line according to the present invention includes:
A work area (SA) for performing the required work on the work target product (X) to be completed as a gaming machine, and a plurality of transfer lines (S) for transporting the work target product (X) toward the work area (SA) ( 10, 11) and a supply line (30) for supplying the work target product (X) to the plurality of transfer lines (10, 11),
Connected to the supply line (30), a plurality of transfer means (13, 16) that can carry and stop the transfer of any work object (X) supplied from the supply line (30). A main line (ML1, ML2) provided with standby areas (TA1 to TA6) configured to be able to wait for a plurality of work objects (X) by a plurality of conveying means (13, 16), and
A plurality of sublines (SL1 to SL6) in which the main area (ML1, ML2) branches correspondingly from the transfer means (13, 16), and the work area (SA) is provided at appropriate positions,
Control means (50) capable of individually controlling operation of the respective conveying means (13, 16), and individually controlling the conveyance and conveyance stop of the work object (X) in the conveying means (13, 16). ,
Identification means (54) for identifying the presence or absence of operation of each work area (SA) based on an ON-OFF operation of a switch (25) corresponding to each work area (SA) by an operator,
Storage means (54) for storing the number of standby of the work object (X) in each of the standby areas (TA1 to TA6),
The control means (50)
Based on the identification information of the identification means (54), the operation number of the work area (SA) in each transfer line (10, 11) is compared, the plurality of main areas according to the ratio of the operation number of the work area (SA) Controls the supply line (30) to adjust the number of work items (X) supplied to the lines (ML1, ML2) and supports sublines (SL1 to SL6) in the working area (SA) In each of the waiting areas (TA1 to TA6), the main lines (ML1) are arranged so that the number of waiting for the work target item (X) in the waiting areas (TA1 to TA6) stored in the storage means (54) is equalized. , ML2) while controlling the transport means (13, 16),
By comparing the number of standbys of the work target product (X) in the predetermined standby areas (TA1 to TA6) in each transfer line (10, 11) due to the establishment of the predetermined conditions, the standby areas (TA1 to TA6) with a low standby number Control the supply line (30) to supply the work target product (X) preferentially to the main lines (ML1, ML2) of the transfer line (10, 11) to which it belongs,
When the work target product (X) that has been waiting in any of the standby areas (TA1 to TA6) is sent to the downstream standby area (TA1 to TA6) or the corresponding subline (SL1 to SL6), the work target Work that has been transported from the upstream standby area (TA1 to TA6) by subtracting 1 from the standby number stored in the storage means (52) corresponding to the standby area (TA1 to TA6) from which the product (X) was sent When the detection means of the transport means (13, 16) to which the target product (X) is to be replenished, the storage means corresponding to the standby areas (TA1 to TA6) in which the work target product (X) is replenished Control is performed to add 1 to the number of waiting in (54).

また、前記制御手段(50)は、何れかの待機エリア(TA1〜TA6)から作業対象品(X)が下流側の待機エリア(TA1〜TA6)または対応するサブライン(SL1〜SL6)へ送出された際に、前記記憶手段(54)が記憶する作業対象品(X)を補充すべき待機エリア(TA1〜TA6)における作業対象品(X)の待機数と、その1つ上流側に位置する待機エリア(TA1〜TA6)における作業対象品(X)の待機数とを比較して、
上流側に位置する待機エリア(TA1〜TA6)における作業対象品(X)の待機数の方が少数の場合には、作業対象品(X)を補充すべき待機エリア(TA1〜TA6)に対する該作業対象品(X)の補充を一時的に停止し、該上流側に位置する待機エリア(TA1〜TA6)における作業対象品(X)の待機数が同数となった後に、作業対象品(X)を補充すべき待機エリア(TA1〜TA6)に対して上流側の待機エリア(TA1〜TA6)から作業対象品(X)を補充するよう前記各搬送手段(13,16)を作動制御することで、常には各待機エリア(TA1〜TA6)に作業対象品(X)を待機させるようにすることもできる。
Further, the control means (50) sends the work item (X) from any of the standby areas (TA1 to TA6) to the downstream standby area (TA1 to TA6) or the corresponding subline (SL1 to SL6). The number of standbys of the work target product (X) in the standby areas (TA1 to TA6) to be replenished with the work target product (X) stored in the storage means (54) and one upstream thereof Compared with the number of standby for work item (X) in the waiting area (TA1 to TA6),
When the number of standbys for the work target item (X) in the standby area (TA1 to TA6) located on the upstream side is smaller, the work target item (X) with respect to the standby area (TA1 to TA6) to be replenished After the replenishment of the work target product (X) is temporarily stopped and the standby number of the work target product (X) in the standby area (TA1 to TA6) located on the upstream side becomes equal, the work target product (X ) To control the respective transport means (13, 16) so as to replenish the work item (X) from the upstream standby area (TA1 to TA6) with respect to the standby area (TA1 to TA6). Thus, the work target item (X) can always be made to wait in each waiting area (TA1 to TA6) .

また、前記メインライン(ML1,ML2)と各サブライン(SL1〜SL6)との分岐位置に設けられる搬送手段(13,16)は、メインライン(ML1,ML2)の下流側へ向けて作業対象品(X)を搬送する第1位置、および対応するサブライン(SL1〜SL6)へ向けて作業対象品(X)を搬送し得る第2位置に変更可能に構成されると共に、常には前記第1位置に位置決めされるよう構成されるようになっている。Further, the conveying means (13, 16) provided at the branch position between the main line (ML1, ML2) and each subline (SL1-SL6) is an object to be worked toward the downstream side of the main line (ML1, ML2). The first position for transporting (X) and the second position capable of transporting the work item (X) toward the corresponding sub-lines (SL1 to SL6) are configured to be changeable, and always the first position. It is comprised so that it may be positioned by.

に、前記サブライン(SL1〜SL6)の夫々は、前記メインライン(ML1,ML2)と作業エリア(SA)との間に個別に作動および作動停止可能な第2の搬送手段(20)を備え、該第2の搬送手段(20)に作業対象品(X)を待機させ得るよう構成されるようにしてもよい。
更にまた、前記サブライン(SL1〜SL6)の夫々は、前記メインライン(ML1,ML2)と作業エリア(SA)との間に設けられて前記搬送手段(13,16)に接続する第2の搬送手段(20)と、前記作業エリア(SA)に設けられて第2の搬送手段(20)に接続する第3の搬送手段(23)と、第3の搬送手段(23)に接続して作業エリア(SA)からの作業完了品(Y)を搬出ライン(40)へ移動するリフト手段(27)とを一列に連設して構成されるようにしてもよい。
更にまた、前記搬送手段(13,16,20,23)の夫々は、作業対象品(X)の上側を支持する支持手段を備えるようにしてもよい。
Further, the said respective sub-line (SL1 to SL6) comprises a second conveying means (20) can be stopped individually actuated and actuated between the main line (ML1, ML2) and the work area (SA) The second transfer means (20) may be configured to allow the work target item (X) to wait.
Furthermore, each of the sub-lines (SL1 to SL6) is provided between the main line (ML1, ML2) and the work area (SA) and is connected to the transfer means (13, 16). Means (20), a third conveying means (23) provided in the work area (SA) and connected to the second conveying means (20), and connected to the third conveying means (23) for work The lift means (27) for moving the work completion product (Y) from the area (SA) to the carry-out line (40) may be arranged in a row.
Furthermore, each of the conveying means (13, 16, 20, 23) may be provided with a supporting means for supporting the upper side of the work target item (X).

本発明の請求項1に係る遊技機製造ラインの制御システムによれば、複数設けた搬送ライン(メインライン)に対する作業対象品の供給数を、各搬送ライン(メインライン)における作業エリアの稼働数の比率に応じて調整することで、各搬送ライン(メインライン)への作業対象品の供給効率を向上することができる。   According to the control system for a gaming machine manufacturing line according to claim 1 of the present invention, the number of work target items supplied to a plurality of transfer lines (main lines) is set to the number of working areas in each transfer line (main line). By adjusting according to the ratio, it is possible to improve the supply efficiency of the work target product to each conveyance line (main line).

そして、請求項2に係る遊技機製造ラインの制御システムによれば、各搬送ラインのメインラインにおける各サブラインとの分岐位置に作業対象品を待機させ得る待機エリアを設けたことで、何れかの作業エリアにおいて作業対象品に対する作業が完了した場合には、当該作業エリアの属するサブラインに対して待機エリアに待機させた作業対象品を速やかに送出すことができるから、生産効率の向上を図り得る。また、稼働している作業エリアを識別し、稼働している作業エリアに対応する待機エリアの夫々に作業対象品を待機させるよう各搬送手段を作動することで、生産ペースに合わせて稼働させる作業エリアを決定することができる。   According to the control system for a gaming machine production line according to claim 2, by providing a standby area in which a work target product can be made to wait at a branch position with each sub-line in the main line of each transfer line, When the work on the work target product is completed in the work area, the work target product waiting in the standby area can be promptly sent to the subline to which the work area belongs, so that the production efficiency can be improved. . Also, work that is operated at the production pace by identifying the work area that is in operation and operating each transport means to wait for the work target product in each of the standby areas corresponding to the work area that is in operation. The area can be determined.

更に、請求項3に係る遊技機製造ラインの制御システムによれば、所定条件の成立により各搬送ラインにおける所定の待機エリアにおける作業対象品の待機数を比較して、待機数の少ない待機エリアの属する搬送ラインのメインラインへ優先的に作業対象品を供給することで、作業能力の差に応じて各搬送ライン(メインライン)へ作業対象品を供給できるから、生産効率の向上を図り得る利点がある。   Furthermore, according to the control system for a gaming machine production line according to claim 3, the standby number of work items in a predetermined standby area in each transfer line is compared by the establishment of a predetermined condition, and By supplying work target products with priority to the main line of the transfer line to which they belong, it is possible to supply work target products to each transfer line (main line) according to the difference in work capacity. There is.

更にまた、請求項4に係る遊技機製造ラインの制御システムによれば、何れかの待機エリアに待機させた作業対象品を対応するメインラインの下流側または対応するサブラインへ送出した際に、該待機エリアに対して、上流側に位置する待機エリアから作業対象品を補充するようにしたから、供給ラインから供給される作業対象品を下流側に位置する作業エリアに対しても滞りなく補充でき、生産効率の向上を図り得る。   Furthermore, according to the control system for a gaming machine manufacturing line according to claim 4, when the work target product waiting in any one of the waiting areas is sent to the downstream side of the corresponding main line or the corresponding subline, Since the work object is replenished from the standby area located upstream from the standby area, the work object supplied from the supply line can be replenished to the work area located downstream as well. The production efficiency can be improved.

次に、本発明に係る遊技機製造ラインの制御システムにつき、好適な実施例を挙げて、添付図面を参照して以下に説明する。なお、実施例では、パチンコ機を製造する製造ラインにおいて、装飾部材や電子部品等の各種部材を取付けたパチンコ機(以下、作業対象品という)に対し、所定の作業エリアにおいて作業者が各種部材の取付状態や動作状態等を検査する検査ラインの制御システムを例にして説明する。   Next, a control system for a gaming machine production line according to the present invention will be described below with reference to the accompanying drawings by way of preferred embodiments. In the embodiment, in a production line for manufacturing a pachinko machine, an operator uses various members in a predetermined work area with respect to a pachinko machine (hereinafter referred to as a work target product) to which various members such as decorative members and electronic parts are attached. An inspection line control system for inspecting the mounting state, operating state, and the like will be described as an example.

図1は、実施例に係る遊技機製造ラインの検査ラインKLを概略で示す説明図である。前記検査ラインKLは、作業対象品Xを所定方向へ搬送する第1搬送ライン10および第2搬送ライン11の2つのラインからなり、前工程において各種部材を取付けた作業対象品Xを、供給ライン30を介してこれら第1および第2搬送ライン10,11に供給するようになっている。ここで、前記第1搬送ライン10および第2搬送ライン11は基本的に同一構成であって、直線的に延在するメインラインMLと、該メインラインMLにおける作業対象品Xの搬送方向に離間する複数箇所からメインラインMLに対して直交する方向へ分岐する複数のサブラインSLとからなり、各サブラインSLに、所定の検査作業を行ない得る作業エリアSAを1箇所設けるよう構成されている。なお、以下の説明においては、必要に応じて第1搬送ライン10のメインラインMLを第1メインラインML1と指称し、第2搬送ライン11のメインラインMLを第2メインラインML2と指称すると共に、第1メインラインML1から分岐するサブラインSLを、その上流側から順に第1〜第3サブラインSL1〜SL3と指称し、第2メインラインML2から分岐するサブラインSLを、その上流側から順に第4〜第6サブラインSL4〜SL6と指称する。   FIG. 1 is an explanatory diagram schematically showing an inspection line KL of the gaming machine manufacturing line according to the embodiment. The inspection line KL is composed of two lines, a first transfer line 10 and a second transfer line 11 for transferring the work target product X in a predetermined direction, and the work target product X to which various members are attached in the previous process is supplied to the supply line. The first and second transport lines 10 and 11 are supplied via the 30. Here, the first transport line 10 and the second transport line 11 have basically the same configuration, and are separated in the transport direction of the work target product X in the main line ML and the main line ML extending linearly. And a plurality of sublines SL that branch in a direction orthogonal to the main line ML, and each subline SL is configured to have one work area SA that can perform a predetermined inspection work. In the following description, the main line ML of the first transport line 10 is referred to as a first main line ML1 and the main line ML of the second transport line 11 is referred to as a second main line ML2 as necessary. The sub lines SL branched from the first main line ML1 are referred to as first to third sub lines SL1 to SL3 in order from the upstream side, and the sub lines SL branched from the second main line ML2 are fourth from the upstream side. To sixth sublines SL4 to SL6.

また、第1メインラインML1および第2メインラインML2は略平行に延在するよう設置されると共に、前記第1〜第3サブラインSL1〜SL3と第4〜第6サブラインSL4〜SL6の夫々は、対応のメインラインML1,ML2から反対方向へ分岐するよう設けられており、第1〜第3サブラインSL1〜SL3および第4〜第6サブラインSL4〜SL6の夫々が相互に干渉しないよう構成してある。すなわち、図1において、第1〜第3サブラインSL1〜SL3は第1メインラインML1から上方へ向けて延在すると共に、第4〜第6サブラインSL4〜SL6は第2メインラインML2から下方へ向けて延在している。   The first main line ML1 and the second main line ML2 are installed so as to extend substantially in parallel, and the first to third sublines SL1 to SL3 and the fourth to sixth sublines SL4 to SL6 are respectively It is provided so as to branch in the opposite direction from the corresponding main lines ML1, ML2, and is configured so that the first to third sublines SL1 to SL3 and the fourth to sixth sublines SL4 to SL6 do not interfere with each other. . That is, in FIG. 1, the first to third sublines SL1 to SL3 extend upward from the first main line ML1, and the fourth to sixth sublines SL4 to SL6 downward from the second main line ML2. It is extended.

なお、前記第1および第2搬送ライン10,11(各メインラインMLおよびサブラインSL)の下方位置には、作業エリアSAでの検査作業が完了したパチンコ機(以下、作業完了品Y(図6〜図9参照)という)を搬出する搬出ライン40(図2参照)が設けられて、検査ラインKLおよび搬出ライン40の上下2段構造となっている。このように、検査ラインKLおよび搬出ライン40の上下2段構造とすることで、製造ライン全体の幅方向への大型化を防止している。なお、上段に位置する前記第1および第2搬送ライン10,11は、概ね作業者の腰高さ位置となるよう設定されて、前記作業エリアSAにおいて作業者が立ち姿勢で容易に作業を行ない得るようになっている。   A pachinko machine (hereinafter referred to as a work-completed product Y (FIG. 6) in which inspection work in the work area SA has been completed is located below the first and second transfer lines 10 and 11 (main lines ML and sub-lines SL). (Refer to FIG. 9)) and a carry-out line 40 (see FIG. 2) for carrying out) are provided, and the inspection line KL and the carry-out line 40 have a two-stage structure. Thus, the inspection line KL and the carry-out line 40 have a two-stage structure that prevents the entire manufacturing line from being enlarged in the width direction. Note that the first and second transfer lines 10 and 11 positioned in the upper stage are set so as to be substantially at the waist height position of the worker, and the worker can easily work in a standing posture in the work area SA. It is like that.

(メインラインについて)
前記各メインラインMLは、任意の作業対象品Xの搬送および搬送停止を行ない得る第1の回転式搬送装置(搬送手段)13および第1の搬送装置(搬送手段)16を複数連設して構成され、制御手段50(図2参照)の制御に基づいてこれら各搬送装置13,16を作動させることで、作業対象品Xを所定の搬送方向(図1における左方向)へ搬送し得るようになっている。ここで、前記第1の回転式搬送装置13および第1の搬送装置16は、夫々が独立した小型のローラーコンベヤタイプのものであって、前記制御手段50により個別に作動および作動停止され、必要に応じて各搬送装置13,16を作動することで作業対象品Xを搬送し得るようになっている。そして、前記各搬送装置13,16は、その作動停止時に1つの作業対象品Xを停止状態で保持し得る大きさに設定してある。なお、前記第1の回転式搬送装置13および第1の搬送装置16の夫々は、作業対象品Xの上側を支持する支持手段(図示せず)を備えており、各搬送装置13,16で搬送される作業対象品Xの転倒を防止するよう構成されている。
(Main line)
Each main line ML includes a plurality of first rotary transfer devices (transfer means) 13 and first transfer devices (transfer means) 16 that can transfer and stop transfer of an arbitrary work target product X. It is configured, and by operating each of the conveying devices 13 and 16 based on the control of the control means 50 (see FIG. 2), the work target product X can be conveyed in a predetermined conveying direction (left direction in FIG. 1). It has become. Here, each of the first rotary transfer device 13 and the first transfer device 16 is an independent small roller conveyor type, and is individually activated and deactivated by the control means 50 and necessary. Accordingly, the work product X can be transported by operating the transport devices 13 and 16 according to the above. And each said conveying apparatus 13 and 16 is set to the magnitude | size which can hold | maintain one work object X in the stop state at the time of the operation stop. Each of the first rotary transfer device 13 and the first transfer device 16 includes support means (not shown) that supports the upper side of the work target item X. It is configured to prevent the work target product X being conveyed from falling.

また、前記第1の回転式搬送装置13は、各メインラインMLに3基設けられて、各第1の回転式搬送装置13に対応して前記サブラインSLの夫々が分岐している。ここで、前記第1の回転式搬送装置13の夫々は、前記制御手段50の制御により、対応するメインラインMLの下流側へ向けて作業対象品Xを搬送可能な第1位置(図3(a)参照)、および該第1位置から略90°回転して各第1の回転式搬送装置13に対応するサブラインSLの夫々へ向けて作業対象品Xを搬送可能な第2位置(図3(b)参照)に変更し得るよう構成されており、該第1の回転式搬送装置13を回転させることで作業対象品Xの搬送方向を適宜変更可能となっている。なお、前記第1の回転式搬送装置13は、常には前記第1位置に位置決めされて、各メインラインMLの下流側へ向けて作業対象品Xを搬送(補充)可能で、かつ上流側から搬送される作業対象品Xを受入れ得るよう保持されている。また、前記第1の回転式搬送装置13により作業対象品Xを90°回転させることで、作業エリアSAでは作業者側に作業対象品Xの正面側が向く姿勢で到来し、作業場で作業者が容易に作業を行ない得るようになっている。   Three first rotary transfer devices 13 are provided in each main line ML, and each of the sub-lines SL is branched corresponding to each first rotary transfer device 13. Here, each of the first rotary transfer devices 13 is controlled by the control means 50 to a first position where the work target product X can be transferred toward the downstream side of the corresponding main line ML (FIG. 3 ( a)), and a second position (FIG. 3) at which the work target product X can be transported toward each of the sub-lines SL corresponding to the first rotary transport devices 13 by rotating approximately 90 ° from the first position. (see (b)), and the conveyance direction of the work target product X can be appropriately changed by rotating the first rotary conveyance device 13. The first rotary transport device 13 is always positioned at the first position, can transport (replenish) the work target product X toward the downstream side of each main line ML, and from the upstream side. It is held so as to be able to accept the work object X to be conveyed. Further, by rotating the work target product X by 90 ° by the first rotary transfer device 13, the work area SA arrives in a posture in which the front side of the work target product X is directed to the worker side. You can work easily.

前記各メインラインMLは、前記第1の回転式搬送装置13の上流側に2基の第1の搬送装置16,16が位置するよう構成されて、1基の第1の回転式搬送装置13およびその上流側に位置する2基の第1の搬送装置16,16により、最大で3つの作業対象品Xを待機可能な待機エリアTA(図1参照)を設定してある。なお、以下の説明においては、必要に応じて前記第1〜第6サブラインSL1〜SL6の夫々に対応する待機エリアTAを、第1〜第6の待機エリアTA1〜TA6という。   Each main line ML is configured such that two first transfer devices 16, 16 are positioned upstream of the first rotary transfer device 13, and one first rotary transfer device 13. In addition, a standby area TA (see FIG. 1) in which a maximum of three work target items X can be waited is set by the two first transfer devices 16 and 16 located upstream thereof. In the following description, the standby areas TA corresponding to the first to sixth sublines SL1 to SL6 are referred to as first to sixth standby areas TA1 to TA6 as necessary.

このように、前記第1〜第6サブラインSL1〜SL6の夫々に対応して第1〜第6待機エリアTA1〜TA6を設けることで、各サブラインSL1〜SL6には対応する第1〜第6待機エリアTA1〜TA6に待機させた作業対象品Xが送出され、必要に応じて各メインラインMLにおける上流側の待機エリアTAから下流側の待機エリアTAへ作業対象品Xを補充するようになっている。なお、以下の説明においては、図3に示すように、各待機エリアTAにおける第1の回転式搬送装置13を第1待機位置と、該第1の回転式搬送装置13より1つ上流側に位置する第1の搬送装置16を第2待機位置と、該第2待機位置より1つ上流側に位置する第1の搬送装置16を第3待機位置と夫々指称する。ここで、実施例では、前記待機エリアTA内では第1待機位置、第2待機位置、第3待機位置の順に優先的に作業対象品Xを待機させるよう前記制御手段50が各搬送装置13,16を作動制御している。   Thus, by providing the first to sixth standby areas TA1 to TA6 corresponding to the first to sixth sublines SL1 to SL6, the first to sixth standbys corresponding to the sublines SL1 to SL6 are provided. The work target product X waiting in the areas TA1 to TA6 is sent out, and the work target product X is replenished from the upstream standby area TA to the downstream standby area TA in each main line ML as necessary. Yes. In the following description, as shown in FIG. 3, the first rotary transport device 13 in each standby area TA is placed upstream of the first standby position and the first rotary transport device 13. The first transport device 16 that is positioned is referred to as a second standby position, and the first transport device 16 that is positioned one upstream from the second standby position is referred to as a third standby position. Here, in the embodiment, in the standby area TA, the control means 50 causes each of the transfer devices 13, the control means 50 to preferentially wait for the work target product X in the order of the first standby position, the second standby position, and the third standby position. 16 is controlled.

また、図2に示すように、前記第1〜第3待機位置に対応する各搬送装置13,16,16の夫々には、前記作業対象品Xを検出する第1検出センサ14、第2検出センサ17および第3検出センサ18が対応して設けられている。ここで、前記各検出センサ14,17,18による検出結果は前記制御手段50の記憶手段52へ出力されて、該検出センサ14,17,18の検出結果に基づいて記憶手段52が各待機エリアTAにおける作業対象品Xの待機数(以下、単に待機エリアTAの待機数という)を個別に記憶し得るよう構成されている。そして、前記記憶手段52が記憶する作業対象品Xの待機数に基づいて、前記制御手段50が第1の回転式搬送装置13および第1の搬送装置16の夫々を個別に作動および作動停止するようになっている。   Further, as shown in FIG. 2, each of the transfer devices 13, 16, 16 corresponding to the first to third standby positions has a first detection sensor 14 for detecting the work target product X, a second detection, and the like. A sensor 17 and a third detection sensor 18 are provided correspondingly. Here, the detection results of the detection sensors 14, 17, and 18 are output to the storage means 52 of the control means 50, and the storage means 52 is connected to each standby area based on the detection results of the detection sensors 14, 17, and 18. The waiting number of the work target product X in the TA (hereinafter simply referred to as the waiting number of the waiting area TA) can be individually stored. Based on the standby number of the work target product X stored in the storage unit 52, the control unit 50 individually activates and deactivates the first rotary conveyance device 13 and the first conveyance device 16. It is like that.

すなわち、何れかの第1の回転式搬送装置13(すなわち第1待機位置)から下流側の待機エリアTAあるいは対応するサブラインSLへ向けて作業対象品Xが送出されると、当該第1の回転式搬送装置13の属する待機エリアTAにおける第2待機位置の作業対象品Xが第1待機位置へ搬送され、第3待機位置の作業対象品Xが第2待機位置へ搬送される。このように、メインラインMLとサブラインSLとの分岐位置に、作業対象品Xを待機させる待機エリアTAを夫々設けることで、何れかのサブラインSLの作業エリアSAにおいて作業対象品Xに対する作業が完了した場合に、当該サブラインSLに対して速やかに次の作業対象品Xを送出し得るようになっている。   That is, when the work target product X is sent from any of the first rotary transfer devices 13 (that is, the first standby position) toward the downstream standby area TA or the corresponding subline SL, the first rotation is performed. The work target product X at the second standby position in the standby area TA to which the type transport device 13 belongs is transported to the first standby position, and the work target product X at the third standby position is transported to the second standby position. Thus, by providing the standby areas TA for waiting for the work target product X at the branch positions between the main line ML and the subline SL, the work on the work target product X is completed in the work area SA of any subline SL. In this case, the next work target product X can be quickly sent to the subline SL.

ここで、前記記憶手段52は、前記第1の回転式搬送装置13から下流側の待機エリアTAまたは対応するサブラインSLへ作業対象品Xを送出した際に、この作業対象品Xを送出した待機エリアTAに対応する作業対象品Xの待機数を1減算するよう設定される。具体的には、第1待機エリアTA1における第1の回転式搬送装置13の第1検出センサ14が作業対象品Xを検出しなくなると、第1待機エリアTA1の待機数が1減算され、同様に第2〜第6待機エリアTA2〜TA6における第1の回転式搬送装置13の第1検出センサ14が作業対象品Xを検出しなくなると、対応する第2〜第6待機エリアTA2〜TA6の待機数が1減算されるようになっている。   Here, the storage means 52, when the work target product X is sent from the first rotary transfer device 13 to the downstream standby area TA or the corresponding subline SL, the standby for sending the work target product X. It is set so that the waiting number of the work target product X corresponding to the area TA is decremented by one. Specifically, when the first detection sensor 14 of the first rotary transport device 13 in the first standby area TA1 does not detect the work target product X, the standby number in the first standby area TA1 is decremented by 1, and similarly When the first detection sensor 14 of the first rotary transfer device 13 in the second to sixth standby areas TA2 to TA6 no longer detects the work target product X, the corresponding second to sixth standby areas TA2 to TA6 The waiting number is decremented by one.

また、上流側から下流側の待機エリアTAへ作業対象品Xが補充(搬送)されたときには、上流側の待機エリアTAから搬送されてきた作業対象品Xが補充されるべき搬送装置13,16の第1〜第3検出センサ14,17,18が該作業対象品Xを検出することで、この作業対象品Xが補充された下流側の待機エリアTAの待機数が1加算されるよう設定される。具体的には、待機エリアTAに作業対象品Xが待機していない状態(すなわち待機数「0」の状態)では、前記第1待機位置に対応する第1の回転式搬送装置13の第1検出センサ14が作業対象品Xを検出することで待機数が1加算され、待機エリアTAに作業対象品Xを1つ待機させている状態(すなわち待機数「1」の状態)では、前記第2待機位置に対応する第1の搬送装置16の第2検出センサ17が作業対象品Xを検出することで待機数が1加算され、待機エリアTAに作業対象品Xを2つ待機させている状態(すなわち待機数「2」の状態)では、前記第3待機位置に対応する第1の搬送装置16の第3検出センサ18が作業対象品Xを検出することで待機数が1加算される。   Further, when the work target product X is replenished (conveyed) from the upstream side to the downstream standby area TA, the transport devices 13 and 16 to which the work target product X transported from the upstream standby area TA is to be replenished. The first to third detection sensors 14, 17, 18 detect the work target product X so that the number of standby in the downstream standby area TA to which the work target product X is replenished is incremented by one. Is done. Specifically, in a state where the work target item X is not waiting in the standby area TA (that is, a state where the standby number is “0”), the first rotary transport device 13 corresponding to the first standby position has the first. When the detection sensor 14 detects the work target product X, the waiting number is incremented by 1, and in the state where one work target product X is waiting in the standby area TA (that is, the state where the standby number is “1”), When the second detection sensor 17 of the first transfer device 16 corresponding to the 2 standby position detects the work target product X, the standby number is incremented by 1, and two work target products X are kept waiting in the standby area TA. In the state (that is, the state where the standby number is “2”), the standby number is incremented by 1 when the third detection sensor 18 of the first transport device 16 corresponding to the third standby position detects the work target product X. .

また、上流側に位置する待機エリアTAから下流側に位置する待機エリアTAへの作業対象品Xの補充(搬送)に関しては、前記制御手段50は、前記記憶手段52が記憶している隣接し合う待機エリアTAの作業対象品Xの待機数を比較して、上流側に位置する待機エリアTAの待機数の方が少数の場合には下流側に位置する待機エリアTAへの作業対象品Xの補充(搬送)を停止し、当該上流側に位置する待機エリアTAの作業対象品Xの待機数が同数以上となった後に、下流側の待機エリアTAへ作業対象品Xを補充(搬送)するよう前記第1の回転式搬送装置13および第1の搬送装置16の夫々を作動制御するよう構成してある。   In addition, regarding the replenishment (conveyance) of the work target item X from the standby area TA located on the upstream side to the standby area TA located on the downstream side, the control means 50 is adjacent to the storage means 52 stored therein. When the number of standbys of the work target product X in the matching standby area TA is compared, and the standby number of the standby area TA located on the upstream side is smaller, the work target product X to the standby area TA located on the downstream side Is replenished (conveyed), and after the standby number of work target products X in the standby area TA located on the upstream side becomes equal to or more than the same number, the work target products X are replenished (transferred) to the downstream standby area TA. Thus, each of the first rotary transfer device 13 and the first transfer device 16 is controlled to be operated.

但し、前記制御手段50は、上流側の待機エリアTAと下流側の待機エリアTAの待機数を比較するに際し、比較対象となる上流側および下流側の待機エリアTA内における作業対象品Xの移動が夫々停止した後に、その待機数の比較を行なうよう設定される。すなわち、待機数の加算・減算が完了して各待機エリアTAの待機数が確定した後に、上流側と下流側に隣接する待機エリアTAの待機数を比較して上流側から下流側へ作業対象品Xを搬送することで、下流側の待機エリアTAへ作業対象品Xが過剰に供給されたり、上流側の待機エリアTAにおける作業対象品Xの不足を防止し得るようになっている。   However, when comparing the number of standbys in the upstream standby area TA and the downstream standby area TA, the control means 50 moves the work target item X in the upstream and downstream standby areas TA to be compared. Is set to compare the number of standbys after each stop. That is, after the addition / subtraction of the waiting number is completed and the waiting number of each waiting area TA is determined, the waiting number of the waiting area TA adjacent to the upstream side and the downstream side is compared, and the work object is moved from the upstream side to the downstream side. By conveying the product X, the work target product X is excessively supplied to the downstream standby area TA, and the shortage of the work target product X in the upstream standby area TA can be prevented.

ここで、図4〜図9に示す具体例を挙げて説明する。図4に示すように、第1待機エリアTA1に2つの作業対象品Xが待機(待機数「2」)し、第2待機エリアTA2に2つの作業対象品Xが待機(待機数「2」)すると共に、第3待機エリアTA3に3つの作業対象品Xが待機(待機数「3」)している状態では、第2待機エリアTA2の待機数は第3待機エリアTA3の待機数より少数であるため、第2待機エリアTA2から第3待機エリアTA3への作業対象品Xの補充は一時的に停止される。一方、第1待機エリアTA1の待機数は「2」であり、第2待機エリアTA2の待機数は「2」であるため、該第1待機エリアTA1から第2待機エリアTA2における第3待機位置へ作業対象品Xが補充(搬送)される(図5参照)。このとき、第1待機エリアTA1における第1の回転式搬送装置13の第1検出センサ14が作業対象品Xを検出しなくなるから、該第1待機エリアTA1の待機数が1減算されて待機数は「1」となる。但し、この時点では第2待機エリアTA2の待機数は加算されずに待機数は「2」のままである。なお、第1待機エリアTA1における第2待機位置にある作業対象品Xは第1待機位置へ搬送される。但し、この場合は同じ待機エリアTA(第1待機エリアTA1)内での作業対象品Xの移動のため、該第1待機エリアTA1の待機数は増減しない。   Here, a specific example shown in FIGS. 4 to 9 will be described. As shown in FIG. 4, two work target items X stand by in the first standby area TA1 (standby number “2”), and two work target items X stand by in the second standby area TA2 (standby number “2”). In addition, in the state where the three work target items X are waiting in the third waiting area TA3 (the number of waiting is “3”), the number of waiting in the second waiting area TA2 is smaller than the number of waiting in the third waiting area TA3. Therefore, the replenishment of the work target item X from the second standby area TA2 to the third standby area TA3 is temporarily stopped. On the other hand, since the number of standbys in the first standby area TA1 is “2” and the number of standbys in the second standby area TA2 is “2”, the third standby position in the second standby area TA2 from the first standby area TA1. The work target product X is replenished (conveyed) (see FIG. 5). At this time, since the first detection sensor 14 of the first rotary transfer device 13 in the first standby area TA1 does not detect the work target product X, the number of standby in the first standby area TA1 is decremented by one. Becomes “1”. However, at this time, the waiting number in the second waiting area TA2 is not added and the waiting number remains “2”. Note that the work target item X at the second standby position in the first standby area TA1 is transported to the first standby position. However, in this case, the number of standby in the first standby area TA1 does not increase or decrease because the work target item X moves within the same standby area TA (first standby area TA1).

更に、第2サブラインSL2の作業エリアSAでの作業が終了すると、第2待機エリアTA2から第2サブラインSL2へ向けて作業対象品Xが搬送される。このとき、第2待機エリアTA2における第1の回転式搬送装置13の第1検出センサ14が作業対象品Xを検出しなくなるから、該第2待機エリアTA2の待機数が1減算されて待機数は「1」となる(図6参照)。その後、図7に示すように、第2待機エリアTA2における第2待機位置にある作業対象品Xが第1待機位置へ搬送される。ここで、第2待機エリアTA2の待機数は「1」となっているが、前記第1待機エリアTA1から搬送された作業対象品Xは、第3待機位置まで到来して前記第3検出センサ18が作業対象品Xを検出することで、該第2待機エリアTA2の待機数が1加算されて「2」となる。なお、第2待機エリアTA2では第2待機位置から作業対象品Xが移動しているため、第1待機エリアTA1から第3待機位置へ到来した作業対象品Xは第2待機位置へ移動する。但し、この場合は同じ待機エリアTA(第2待機エリアTA2)内での作業対象品Xの移動のため、該第2待機エリアTA2の待機数は増減しない。   Furthermore, when the work in the work area SA of the second subline SL2 is completed, the work target product X is transported from the second standby area TA2 toward the second subline SL2. At this time, since the first detection sensor 14 of the first rotary transfer device 13 in the second standby area TA2 does not detect the work target product X, the standby number in the second standby area TA2 is decremented by 1, and the standby number. Becomes “1” (see FIG. 6). Thereafter, as shown in FIG. 7, the work target item X at the second standby position in the second standby area TA2 is conveyed to the first standby position. Here, the number of standby in the second standby area TA2 is “1”, but the work target item X transported from the first standby area TA1 arrives at the third standby position and the third detection sensor. When 18 detects the work target product X, the waiting number in the second waiting area TA2 is incremented by 1, and becomes “2”. In addition, since the work target product X has moved from the second standby position in the second standby area TA2, the work target product X that has arrived at the third standby position from the first standby area TA1 moves to the second standby position. However, in this case, because the work target item X moves within the same waiting area TA (second waiting area TA2), the number of waiting in the second waiting area TA2 does not increase or decrease.

更に、第3サブラインSL3の作業エリアSAでの作業が終了すると、第3待機エリアTA3から第3サブラインSL3へ向けて作業対象品Xが搬送される。このとき、第3待機エリアTA3における第1の回転式搬送装置13の第1検出センサ14が作業対象品Xを検出しなくなるから、該第3待機エリアTA3の待機数が1減算されて待機数は「2」となる。その後、図8に示すように、第3待機エリアTA3における第2待機位置にある作業対象品Xが第1待機位置へ搬送され、第3待機位置にある作業対象品Xが第2待機位置へ搬送される。但し、この場合は同じ待機エリアTA(第3待機エリアTA3)内での作業対象品Xの移動のため、該第3待機エリアTA3の待機数は増減しない。   Furthermore, when the work in the work area SA of the third subline SL3 is completed, the work target product X is transported from the third standby area TA3 toward the third subline SL3. At this time, since the first detection sensor 14 of the first rotary transfer device 13 in the third standby area TA3 does not detect the work target product X, the number of standby in the third standby area TA3 is decremented by one. Becomes “2”. After that, as shown in FIG. 8, the work target item X in the second standby position in the third standby area TA3 is conveyed to the first standby position, and the work target item X in the third standby position is moved to the second standby position. Be transported. However, in this case, the number of standby in the third standby area TA3 does not increase or decrease because the work target item X moves within the same standby area TA (third standby area TA3).

このとき、第2および第3待機エリアTA2,TA3の待機数は何れも「2」となるが、第2および第3待機エリアTA2,TA3内で作業対象品Xが移動しているため、各待機エリアTAの待機数の比較は行なわれない。従って、図8に示すように、前記第2待機エリアTA2の第1および第2待機位置に到来した作業対象品Xはそのまま待機し、第2サブラインSL2の作業エリアSAでの作業が終了した場合には、該第2サブラインSL2へ向けて第1待機位置の作業対象品Xが搬送される。また、前記第2サブラインSL2へ向けて作業対象品Xを搬送する前に、第3待機エリアTA3の第1および第2待機位置の夫々に作業対象品Xが到来すると(図9参照)、第2待機エリアTA2と第3待機エリアTA3の待機数が比較され、両待機エリアTA2,TA3の待機数は同数(待機数は何れも「2」)であるため、第2待機エリアTA2から第3待機エリアTA3の第2待機位置へ作業対象品Xが補充(搬送)される。このとき、前述したと同様に、第2待機エリアTA2における第1の回転式搬送装置13の第1検出センサ14が作業対象品Xを検出しなくなったときに、該第2待機エリアTA2の待機数が1減算されて待機数は「1」となるが、この時点では第3待機エリアTA3の待機数は加算されずに待機数は「2」のままである。このように、前述した条件に基づいて各待機エリアTAの待機数を増減し、かつ各待機エリアTA内の作業対象品Xの移動が停止した後に待機エリアTAの待機数を比較することで、各待機エリアTA内に略均等に作業対象品Xを待機させることができる。なお、前記第1待機エリアTA1に対しては、前記供給ライン30から作業対象品Xが順次供給される。   At this time, the number of waiting in each of the second and third waiting areas TA2, TA3 is “2”, but the work target product X is moving in the second and third waiting areas TA2, TA3. The number of waiting in the waiting area TA is not compared. Therefore, as shown in FIG. 8, when the work target product X that has arrived at the first and second standby positions in the second standby area TA2 waits as it is and the work in the work area SA of the second subline SL2 is completed. The work target product X at the first standby position is transported toward the second subline SL2. In addition, when the work target product X arrives at each of the first and second standby positions in the third standby area TA3 before the work target product X is transported toward the second subline SL2 (see FIG. 9), Since the standby numbers of the two standby areas TA2 and TA3 are compared, and the standby numbers of both standby areas TA2 and TA3 are the same (both standby numbers are “2”), the second standby area TA2 to the third standby area TA3 The work target product X is replenished (conveyed) to the second standby position in the standby area TA3. At this time, as described above, when the first detection sensor 14 of the first rotary transport device 13 in the second standby area TA2 no longer detects the work target product X, the standby in the second standby area TA2 is performed. The number is decremented by 1 and the waiting number becomes “1”. At this time, the waiting number in the third waiting area TA3 is not added and the waiting number remains “2”. In this way, by increasing / decreasing the standby number of each standby area TA based on the above-described conditions, and comparing the standby number of the standby area TA after the movement of the work target product X in each standby area TA is stopped, The work target product X can be made to wait substantially evenly in each standby area TA. Note that the work target item X is sequentially supplied from the supply line 30 to the first standby area TA1.

(サブラインについて)
図1に示すように、前記サブラインSLの夫々は、前記第1の回転式搬送装置13に接続する第2の搬送装置20と、該第2の搬送装置20に接続し、前記作業エリアSAが設けられる第3の搬送装置23と、該第3の搬送装置23に接続し、作業エリアSAからの作業完了品Yを前記搬出ライン40へ移動するリフト手段27とを一列に連設して構成されている。すなわち、実施例では前記第3の搬送装置23の近傍に作業者が位置して、該第3の搬送装置23に停止した作業対象品Xに対して所定の検査作業を行なうようになっている。
(About sublines)
As shown in FIG. 1, each of the sub-lines SL is connected to the second transfer device 20 connected to the first rotary transfer device 13 and the second transfer device 20, and the work area SA is A third conveying device 23 provided and a lift means 27 connected to the third conveying device 23 and moving work completion products Y from the work area SA to the carry-out line 40 are arranged in a row. Has been. In other words, in the embodiment, an operator is positioned in the vicinity of the third transfer device 23, and a predetermined inspection work is performed on the work target product X stopped at the third transfer device 23. .

前記第2および第3の搬送装置20,23は、前記第1の搬送装置16と同様に、夫々が独立した小型のローラーコンベヤタイプのものであって前記制御手段50により個別に作動および作動停止が制御され、各搬送装置20,23の作動により第1の回転式搬送装置13からリフト手段27へ向けて作業対象品Xまたは作業完了品Yを搬送するよう構成される。また、前記第2および第3の搬送装置20,23の夫々は、その作動停止時に1つの作業対象品Xまたは作業完了品Yを停止状態で保持し得る大きさに設定してある。すなわち、前記第1の回転式搬送装置13から対応するサブラインSL1〜SL6へ送出された作業対象品Xを前記第2の搬送装置20に一時的に待機させ、作業エリアSAでの作業が完了した後に、作業完了品Yとしてリフト手段27へ搬送すると共に、第2の搬送装置20から第3の搬送装置23(作業エリアSA)へ作業対象品Xを搬送して、次の作業対象品Xに対して検査作業を行なうようになっている。なお、前記第2および第3の搬送装置20,23の夫々は、作業対象品Xの上側を支持する支持手段(図示せず)を備えており、各搬送装置20,23で搬送される作業対象品Xの転倒を防止するよう構成されている。   The second and third conveying devices 20 and 23 are small roller conveyor types that are independent from each other, and are individually activated and deactivated by the control means 50, similar to the first conveying device 16. Are controlled, and the work target product X or the work completed product Y is transported from the first rotary transport device 13 toward the lift means 27 by the operation of the transport devices 20 and 23. Each of the second and third transfer devices 20 and 23 is set to a size that can hold one work target product X or work completed product Y in a stopped state when the operation is stopped. That is, the work target product X sent from the first rotary transfer device 13 to the corresponding sublines SL1 to SL6 is caused to temporarily stand by the second transfer device 20, and the work in the work area SA is completed. Later, the work completion product Y is transported to the lift means 27 and the work target product X is transported from the second transport device 20 to the third transport device 23 (work area SA) to be the next work target product X. In contrast, inspection work is performed. Each of the second and third transfer devices 20 and 23 is provided with a support means (not shown) for supporting the upper side of the work target product X, and work carried by each of the transfer devices 20 and 23. It is configured to prevent the target product X from falling.

また、前記第2の搬送装置20および第3の搬送装置23の夫々には、作業対象品Xまたは作業完了品Yを検出する第4検出センサ21および第5検出センサ24が設けられており、第3の搬送装置23に設けた第5検出センサ24が作業完了品Yを検出しなくなると、第2の搬送装置20の作業対象品Xを第3の搬送装置23(作業エリアSA)へ搬送するよう前記制御手段50が第2の搬送装置20を作動制御している。同様に、前記第2の搬送装置20に設けた第4検出センサ21が作業対象品Xを検出しなくなると、対応する第1の回転式搬送装置13を第2位置に回転させて、該第1の回転式搬送装置13から第2の搬送装置20へ作業対象品Xを搬送するようになっている。   Each of the second transport device 20 and the third transport device 23 is provided with a fourth detection sensor 21 and a fifth detection sensor 24 for detecting the work target product X or the work completion product Y, When the fifth detection sensor 24 provided in the third transport device 23 no longer detects the work completion product Y, the work target product X of the second transport device 20 is transported to the third transport device 23 (work area SA). Thus, the control means 50 controls the operation of the second transport device 20. Similarly, when the fourth detection sensor 21 provided in the second transport device 20 no longer detects the work target product X, the corresponding first rotary transport device 13 is rotated to the second position, and the second The work target product X is transported from one rotary transport device 13 to the second transport device 20.

なお、前記各作業エリアSAの近傍には、前記制御手段50に設けた識別手段54に接続するスイッチ25(図2参照)が設けられており、該スイッチ25のON−OFFにより対応する作業エリアSA(サブラインSL)の稼働の有無を識別手段54が識別するようになっている。すなわち、検査作業を開始するに際して、作業者が作業エリアSAに対応するスイッチ25をONにすると、前記識別手段54が対応の作業エリアSA(サブラインSL)が稼働しているものと認識し、該スイッチ25をOFFにすると、識別手段54が対応する作業エリアSA(サブラインSL)が稼働していないものとして認識するようになっている。なお、実施例では、第2搬送ライン11における第6サブラインSL6に設けた作業エリアSAのスイッチ25がOFFになっており、第1搬送ライン10では第1〜第3サブラインSL1〜SL3に設けた3箇所の作業エリアSAが稼働し、第2搬送ライン11では第4および第5サブラインSL4,SL5に設けた2箇所の作業エリアSAが稼働している。   In addition, a switch 25 (see FIG. 2) connected to the identification means 54 provided in the control means 50 is provided in the vicinity of each work area SA. The identification means 54 identifies whether or not the SA (subline SL) is operating. That is, when starting the inspection work, when the operator turns on the switch 25 corresponding to the work area SA, the identification means 54 recognizes that the corresponding work area SA (subline SL) is in operation, When the switch 25 is turned off, the identification means 54 recognizes that the corresponding work area SA (subline SL) is not operating. In the embodiment, the switch 25 of the work area SA provided in the sixth subline SL6 in the second transport line 11 is OFF, and the first transport line 10 is provided in the first to third sublines SL1 to SL3. Three work areas SA are operating, and two work areas SA provided on the fourth and fifth sublines SL4 and SL5 are operating in the second transport line 11.

ここで、前記制御手段50は、前記識別手段54の識別情報に基づいて、稼働している作業エリアSA(サブラインSL)に対応する待機エリアTAに作業対象品Xを待機させると共に、稼働していない作業エリアSA(サブラインSL)に対応する待機エリアTAには作業対象品Xを待機させないよう前記第1の回転式搬送装置13および第1の搬送装置16の夫々を作動制御している。具体的には、実施例では稼働していない作業エリアSAを設けた第6サブラインSL6に対応する第6待機エリアTA6を除く第1〜第5待機エリアTA1〜TA5の夫々に、作業対象品Xを待機させるよう前記制御手段50が各搬送装置13,16を作動制御している(図1参照)。このように、稼働している作業エリアSAに対応する第1〜第5待機エリアTA1〜TA5に作業対象品Xを待機させることで、生産計画に合わせて稼働させる作業エリアSAを決定し得るようになっている。   Here, based on the identification information of the identification means 54, the control means 50 waits for the work item X in the standby area TA corresponding to the working area SA (subline SL) that is in operation and is in operation. The operation of each of the first rotary transfer device 13 and the first transfer device 16 is controlled so that the work target product X does not wait in the waiting area TA corresponding to the non-working area SA (subline SL). Specifically, the work target product X is placed in each of the first to fifth standby areas TA1 to TA5 excluding the sixth standby area TA6 corresponding to the sixth subline SL6 provided with the work area SA that is not operating in the embodiment. The control means 50 controls the operation of each of the transfer devices 13 and 16 so as to wait (see FIG. 1). Thus, the work area SA to be operated can be determined according to the production plan by causing the work target product X to stand by in the first to fifth standby areas TA1 to TA5 corresponding to the work area SA that is operating. It has become.

また、前記リフト手段27は、前記作業エリアSA(第3の搬送装置23)からの作業完了品Yを受入れ可能な受入れ位置、および該受入れ位置から下降移動し、前記搬出ライン40へ作業完了品Yを受渡し可能な受渡し位置に昇降移動可能に構成され、常には受入位置に位置決めされて作業完了品Yを受入れ得るよう位置決めされている。そして、前記リフト手段27に設けた第6検出センサ28が作業完了品Yを検出することで、該リフト手段27を前記受渡し位置へ移動させるよう前記制御手段50が作動制御している。なお、リフト手段27には、小型のローラーコンベヤタイプの搬送装置が組み込まれており、前記受渡し位置へ移動した後に作業完了品Yをリフト手段27から搬出ライン40へ搬送し得るようになっている。このように、リフト手段27により作業完了品Yを搬出ライン40へ搬送するよう構成することで、作業者が作業終了後に作業完了品Yを搬出ライン40へ移動させる手間が省け、作業効率の向上が図られる。   Further, the lift means 27 moves to a receiving position where the work completion product Y from the work area SA (third transfer device 23) can be received, and moves downward from the receiving position, and then completes the work completion product to the carry-out line 40. It is configured to be movable up and down to a delivery position where Y can be delivered, and is always positioned to the delivery position so as to accept the work completion product Y. Then, when the sixth detection sensor 28 provided in the lift means 27 detects the work completion product Y, the control means 50 controls the operation so that the lift means 27 is moved to the delivery position. The lift means 27 incorporates a small roller conveyor type transport device so that the work completion product Y can be transported from the lift means 27 to the carry-out line 40 after moving to the delivery position. . In this way, by configuring the lift means 27 to transport the work completion product Y to the carry-out line 40, it is possible to save the operator from having to move the work completion product Y to the carry-out line 40 after the work is completed, thereby improving work efficiency. Is planned.

(供給ラインについて)
前記第1および第2搬送ライン10,11へ向けて作業対象品Xを供給する前記供給ライン30は、前記第1搬送ライン10(第1メインラインML1)に接続する供給コンベヤ32と、該供給コンベヤ32の下流端から第2搬送ライン11側へ延在するよう分岐し、前記第2搬送ライン11(第2メインラインML2)に接続する接続コンベヤ34とからなり、第1搬送ライン10に対しては作業対象品Xを供給コンベヤ32から供給し、第2搬送ライン11に対しては供給コンベヤ32からの作業対象品Xを、接続コンベヤ34を介して供給するようになっている。前記供給コンベヤ32と接続コンベヤ34との分岐位置には、第1メインラインML1へ向けて作業対象品Xを搬送可能な第3位置、および該第3位置から略90°回転して接続コンベヤ34へ向けて作業対象品Xを搬送可能な第4位置に変更し得る第2の回転式搬送装置36が設けられており、必要に応じて第1搬送ライン10(第1メインラインML1)または第2搬送ライン11(第2メインラインML2)に作業対象品Xを搬送し得るよう構成されている。
(About supply line)
The supply line 30 for supplying the work target product X toward the first and second transfer lines 10 and 11 includes a supply conveyor 32 connected to the first transfer line 10 (first main line ML1), and the supply The conveyor 32 is branched from the downstream end of the conveyor 32 so as to extend to the second conveyance line 11 side, and is connected to the second conveyance line 11 (second main line ML2). The work target product X is supplied from the supply conveyor 32, and the work target product X from the supply conveyor 32 is supplied to the second transport line 11 via the connection conveyor 34. A branch position between the supply conveyor 32 and the connection conveyor 34 is a third position where the workpiece X can be conveyed toward the first main line ML1, and the connection conveyor 34 after being rotated approximately 90 ° from the third position. A second rotary transport device 36 that can change the work target product X to a fourth position where the work target product X can be transported is provided, and the first transport line 10 (first main line ML1) or the second transport device 36 is provided as necessary. The work target product X can be transported to the second transport line 11 (second main line ML2).

なお、前記供給コンベヤ32および接続コンベヤ34の夫々は、前述と同様にローラーコンベヤタイプのものであって、前記制御手段50により作動および作動停止を制御されている。ここで、前記制御手段50は、前記第2の回転式搬送装置36に設けた第7検出センサ37が作業対象品Xを検出している間は、前記供給コンベヤ32を停止させるよう制御している。そして、第2の回転式搬送装置36から前記第1搬送ライン10(第1メインラインML1)または第2搬送ライン11(第2メインラインML2)へ向けて作業対象品Xが搬送されて、前記第7検出センサ37が作業対象品Xを検出しなくなると、供給コンベヤ32を作動させて第2の回転式搬送装置36へ作業対象品Xを移動するようになっている。   Each of the supply conveyor 32 and the connection conveyor 34 is of the roller conveyor type as described above, and its operation and operation stop are controlled by the control means 50. Here, the control means 50 controls the supply conveyor 32 to stop while the seventh detection sensor 37 provided in the second rotary transfer device 36 detects the work target product X. Yes. Then, the work target product X is transported from the second rotary transport device 36 toward the first transport line 10 (first main line ML1) or the second transport line 11 (second main line ML2). When the seventh detection sensor 37 no longer detects the work target product X, the supply conveyor 32 is operated to move the work target product X to the second rotary transfer device 36.

具体的には、前記制御手段50は、前記識別手段54が識別する第1および第2搬送ライン10,11における作業エリアSAの稼働数を比較して、作業エリアSAの稼働数の比率に応じて前記第1および第2メインラインML1,ML2への作業対象品Xの供給数を調整している。すなわち、実施例では、前述したように第1搬送ライン10では3箇所の作業エリアSAが稼働し、第2搬送ライン11では2箇所の作業エリアSAが稼働していることから、常にはその稼働数の比率(すなわち3対2)となるよう第1搬送ライン10および第2搬送ライン11への作業対象品Xの供給数が調整される。なお、供給順序としては、第1搬送ライン10(第1メインラインML1)へ3つの作業対象品Xを供給した後に、第2搬送ライン11(第2メインラインML2)へ2つの作業対象品Xを供給するのを繰返し、全体として両メインラインML1,ML2への作業対象品Xの供給が偏らないよう制御される。   Specifically, the control means 50 compares the number of working areas SA in the first and second transport lines 10 and 11 identified by the identifying means 54 and responds to the ratio of the number of working areas SA. The number of work target articles X supplied to the first and second main lines ML1 and ML2 is adjusted. That is, in the embodiment, as described above, three work areas SA are operating in the first transfer line 10, and two work areas SA are operating in the second transfer line 11, so that the operation is always performed. The supply number of the work target product X to the first transfer line 10 and the second transfer line 11 is adjusted so that the ratio of the numbers (ie, 3 to 2) is obtained. As for the supply order, after supplying the three work target products X to the first transfer line 10 (first main line ML1), the two work target products X to the second transfer line 11 (second main line ML2). As a whole, the supply of the work target product X to both the main lines ML1 and ML2 is controlled so as not to be biased.

また、所定条件が成立した場合には、前記制御手段50は、前記記憶手段52が記憶している前記第1搬送ライン10の最下流側で稼働している作業エリアSAに対応する第1の特定の待機エリアTA(実施例では第3待機エリアTA3)の待機数と、前記第2搬送ライン11の最下流側で稼働している作業エリアSAに対応する第2の特定の待機エリアTA(実施例では第5待機エリアTA5)の待機数とを比較し、待機数の少ない特定の待機エリアTA3,TA5が属するメインラインML1,ML2の何れかへ作業対象品Xを優先的に供給し得るよう供給ライン30を作動制御している。ここで、前記「所定条件」としては、一定時間が経過した地点、あるいは何れかの特定の待機エリアTA3,TA5の待機数が最大数(すなわち待機数「3」)になった時点、その他任意の条件に設定することができ、設定した条件の成立毎に両特定の待機エリアTA3,TA5の待機数を比較して、各搬送ライン10,11(メインラインML1,ML2)への作業対象品Xの供給数を調整するようになっている。   In addition, when a predetermined condition is satisfied, the control unit 50 includes a first area corresponding to the work area SA operating on the most downstream side of the first transfer line 10 stored in the storage unit 52. The number of standbys in a specific standby area TA (third standby area TA3 in the embodiment) and the second specific standby area TA (corresponding to the work area SA operating on the most downstream side of the second transfer line 11) In the embodiment, the number of standbys in the fifth standby area TA5) is compared, and the work target product X can be preferentially supplied to any of the main lines ML1 and ML2 to which the specific standby areas TA3 and TA5 having a small number of standbys belong. The supply line 30 is controlled to operate. Here, the “predetermined condition” includes a point where a certain time has elapsed, or a point in time when the number of waiting in any specific waiting area TA3, TA5 reaches the maximum number (that is, the waiting number “3”), or any other arbitrary Each time the set condition is satisfied, the number of standbys in both specific standby areas TA3 and TA5 is compared, and the work target product for each of the transfer lines 10 and 11 (main lines ML1 and ML2) The supply number of X is adjusted.

(搬出ラインについて)
前記搬出ライン40は、前記検査ラインKLと基本的に同一構成であるから、同一の機能を有する部材には同一の符号を付して説明する。前記搬出ライン40は、前記各メインラインMLの下方に設けられて、作業完了品Yを図示しない出荷工程へ搬送する2つの第1の回収ライン42,42と、前記各サブラインSLの下方に設けられて第1回収ライン42,42に合流する第2回収ライン44とから構成される(図2参照)。ここで、前記第1回収ライン42の夫々は、前記第1の回転式搬送装置13および第1の搬送装置16を連設して構成され、前記第2回収ライン44との合流位置に第1の回転式搬送装置13を配置してある。
(About the unloading line)
Since the carry-out line 40 has basically the same configuration as that of the inspection line KL, members having the same functions are described with the same reference numerals. The carry-out line 40 is provided below the main lines ML, and is provided below the two first collection lines 42 and 42 for conveying the work completion product Y to a shipping process (not shown) and the sub-lines SL. And a second recovery line 44 joined to the first recovery lines 42 and 42 (see FIG. 2). Here, each of the first recovery lines 42 is configured by connecting the first rotary transfer device 13 and the first transfer device 16, and the first recovery line 42 is first connected to the second recovery line 44. The rotary conveyance device 13 is arranged.

すなわち、前記第1回収ライン42における第1の回転式搬送装置13を前記第1位置に位置決めすることで、該第1回収ライン42に沿って作業完了品Yを搬送し得ると共に、該第1の回転式搬送装置13を第2位置に回転させることで、対応する第2回収ライン44で搬送される作業完了品Yを第1回収ライン42に受入れ得るようになっている。なお、前記第2回収ライン44における前記リフト手段27と第1回収ライン42の第1の回転式搬送装置13との間は、2つの第2の搬送装置20で接続してある。   That is, by positioning the first rotary transport device 13 in the first recovery line 42 at the first position, the work completion product Y can be transported along the first recovery line 42, and the first By rotating the rotary transport device 13 to the second position, the work completion product Y transported by the corresponding second recovery line 44 can be received in the first recovery line 42. Note that two second transfer devices 20 are connected between the lift means 27 in the second recovery line 44 and the first rotary transfer device 13 in the first recovery line 42.

ここで、前記第1回収ライン42には、前記各メインラインMLの待機エリアTAにおける第3待機位置と上下に対応する位置に、作業完了品Yを検出する第8検出センサ45が設けられると共に、前記第2回収ライン44には、前記各サブラインSLにおける第3の搬送装置23と上下に対応する位置に、作業完了品Yを検出する第9検出センサ46が夫々設けられている。そして、前記第8検出センサ45および第9検出センサ46の何れか先に作業完了品Yを検出した検出センサ45,46に対応する回収ライン42,44から作業完了品Yを優先的に搬出するよう前記第1の回転式搬送装置13を回転させるようになっている。   Here, the first recovery line 42 is provided with an eighth detection sensor 45 for detecting the work completed product Y at a position corresponding to the top and bottom of the third standby position in the standby area TA of each main line ML. The second recovery line 44 is provided with a ninth detection sensor 46 for detecting the work completion product Y at a position corresponding to the third transport device 23 in the sub-line SL and above and below. Then, the work completion product Y is preferentially carried out from the collection lines 42 and 44 corresponding to the detection sensors 45 and 46 that have detected the work completion product Y before any of the eighth detection sensor 45 and the ninth detection sensor 46. The first rotary transfer device 13 is rotated as described above.

具体的には、前記第2回収ライン44の第9検出センサ46より先に第1回収ラインの第8検出センサ45が作業完了品Yを検出した場合には、第2回収ライン44の各第2の搬送装置20を停止させると共に、前記第1の回転式搬送装置13を第1位置に位置決めして第1回収ライン42の作業完了品Yを前記出荷工程へ搬送する。一方、前記第1回収ライン42の第8検出センサ45より先に第2回収ライン44の第9検出センサ46が作業完了品Yを検出した場合には、第1回収ライン42の各第1の搬送装置16を停止させて第1回収ライン42での搬送を停止すると共に、前記第1の回転式搬送装置13を第2位置に回転させて第2回収ライン44の作業完了品Yを第1の回転式搬送装置13に受入れ、受入れ後に当該第1の回転式搬送装置13第1位置に回転して第1回収ライン42での搬送を再開して、前記出荷工程へ搬送するようになっている。   Specifically, when the eighth detection sensor 45 of the first collection line detects the work completion product Y before the ninth detection sensor 46 of the second collection line 44, each of the second collection lines 44 The second transfer device 20 is stopped, and the first rotary transfer device 13 is positioned at the first position to transfer the work completion product Y on the first recovery line 42 to the shipping process. On the other hand, when the ninth detection sensor 46 of the second recovery line 44 detects the work completion product Y before the eighth detection sensor 45 of the first recovery line 42, each first The transport device 16 is stopped to stop the transport on the first recovery line 42, and the first rotary transport device 13 is rotated to the second position so that the work completion product Y on the second recovery line 44 is the first. The first rotary transfer device 13 is rotated to the first position after the receipt, and the transfer in the first recovery line 42 is resumed and transferred to the shipping process. Yes.

次に、前述した供給ラインKLおよび各搬送ライン10,11の制御態様の一例につき、図10〜図12を用いて説明する。   Next, an example of the control mode of the supply line KL and the transport lines 10 and 11 will be described with reference to FIGS.

(供給ラインから各搬送ラインへの作業対象品の供給について)
前工程において各種部品の組付けが完了した作業対象品Xは、図10に示す作業対象品供給処理に基づいて、供給ライン30を作動して順次検査ラインKLへ向けて搬送される。先ず、前記供給コンベヤ32の下流側に位置する第2の回転式搬送装置36に設けた第7検出センサ37が作業対象品Xを検出したか否かを判定する(ステップS101)。このとき、第7検出センサ37が作業対象品Xを検出していないときは、そのまま作業対象品供給処理が終了する。第7検出センサ37が作業対象品Xを検出すると、ステップS102へ進んで予め定めた時間等の所定条件が成立したか否かを判定して、所定条件が成立していないとき場合にはステップS103へ進み、所定条件が成立している場合にはステップS106へ進む。すなわち、作業対象品供給処理では、常にはステップS103以降の処理がなされ、所定条件が成立する毎にステップS106以降の処理がなされるようになっている。
(About supply of work items from the supply line to each transfer line)
The work target product X for which the assembly of various parts has been completed in the previous process is sequentially transported toward the inspection line KL by operating the supply line 30 based on the work target product supply process shown in FIG. First, it is determined whether or not the seventh detection sensor 37 provided in the second rotary transfer device 36 located on the downstream side of the supply conveyor 32 has detected the work target product X (step S101). At this time, when the seventh detection sensor 37 does not detect the work target product X, the work target product supply process is finished as it is. When the seventh detection sensor 37 detects the work target product X, the process proceeds to step S102 to determine whether or not a predetermined condition such as a predetermined time is satisfied. If the predetermined condition is not satisfied, the step is performed. The process proceeds to S103, and if the predetermined condition is satisfied, the process proceeds to Step S106. That is, in the work object supply process, the process after step S103 is always performed, and the process after step S106 is performed every time a predetermined condition is satisfied.

ステップS103に進むと、前記識別手段54が識別した前記第1搬送ライン10における作業エリアSAの稼働数を取得すると共に、前記第2搬送ライン11における作業エリアSAの稼働数を取得し(ステップS104)、各搬送ライン10,11における作業エリアSAの稼働数の比率に応じて前記第1メインラインML1および第2メインラインML2へ作業対象品Xを供給する(ステップS105)。具体的には、前述のように第1搬送ライン10では3つの作業エリアSAが稼働しているのに対し、前記第2搬送ライン11では2つの作業エリアSAが稼働しているから、前記第1搬送ライン10(第1メインラインML1)への作業対象品Xの供給数と第2搬送ライン11(第2メインラインML2)への作業対象品Xの供給数との比率が、3:2となるよう供給ライン30が作動する。   In step S103, the operating number of the work area SA in the first transfer line 10 identified by the identification unit 54 is acquired, and the operating number of the work area SA in the second transfer line 11 is acquired (step S104). ), The work target product X is supplied to the first main line ML1 and the second main line ML2 according to the ratio of the number of working areas SA in each of the transfer lines 10 and 11 (step S105). Specifically, as described above, three work areas SA are operating in the first transfer line 10, whereas two work areas SA are operating in the second transfer line 11. The ratio between the supply number of the work target product X to the first transfer line 10 (first main line ML1) and the supply number of the work target product X to the second transfer line 11 (second main line ML2) is 3: 2. Then, the supply line 30 is activated.

このように、第1および第2搬送ライン10,11における作業エリアSAの稼働数の比率に応じて各搬送ライン10,11(各メインラインML1,ML2)への作業対象品Xの供給数を調整することで、稼働している各作業エリアSAへの作業対象品Xの供給割合を均一にし得るから、各搬送ライン10,11への作業対象品Xの供給効率を向上し得る利点がある。また、第1メインラインML1へ3つの作業対象品Xを供給した後に、第2メインラインML2へ2つの作業対象品Xを供給するよう設定されているから、全体として両メインラインML1,ML2への作業対象品Xの供給が偏ることはなく、生産効率の低下を招来することはない。   Thus, the supply number of the work target product X to each of the transfer lines 10 and 11 (each of the main lines ML1 and ML2) is set in accordance with the ratio of the number of working areas SA in the first and second transfer lines 10 and 11. By adjusting, the supply ratio of the work target product X to each operating work area SA can be made uniform, so that there is an advantage that the supply efficiency of the work target product X to each of the transfer lines 10 and 11 can be improved. . In addition, since it is set to supply the two work target products X to the second main line ML2 after supplying the three work target products X to the first main line ML1, as a whole, to both the main lines ML1 and ML2. The supply of the work target product X is not biased, and the production efficiency is not lowered.

また、前記ステップS102からステップS106へ進んだ場合には、前記記憶手段52が記憶している第1搬送ライン10(第1メインラインML1)における第3待機エリアTA3(第1の特定の待機エリア)の待機数、および第2搬送ライン11(第2メインラインML2)における第5待機エリアTA5(第2の特定の待機エリア)の待機数を取得する(ステップS106,ステップS107)。そして、取得した第3待機エリアTA3の待機数と、第5待機エリアTA5の待機数とを比較し(ステップS108)、両待機エリアTA3,TA5の待機数が同数以上の場合には前記ステップS103に進んで各搬送ライン10,11における作業エリアSAの稼働数の比率に応じて作業対象品Xを供給する。   When the process proceeds from step S102 to step S106, the third standby area TA3 (first specific standby area) in the first transport line 10 (first main line ML1) stored in the storage unit 52 is stored. ) And the standby number of the fifth standby area TA5 (second specific standby area) in the second transport line 11 (second main line ML2) (step S106, step S107). Then, the acquired number of standbys in the third standby area TA3 and the number of standbys in the fifth standby area TA5 are compared (step S108). If the number of standbys in both the standby areas TA3 and TA5 is equal to or greater than the same, the step S103 is performed. Then, the work target product X is supplied in accordance with the ratio of the number of working areas SA in each of the transfer lines 10 and 11.

一方、前記ステップS108において、第3および第5待機エリアTA3,TA5の待機数が同数でないと判定された場合にはステップS109に進み、第3待機エリアTA3の待機数が第5待機エリアTA5の待機数より少数か否かを判定する。そして、第3待機エリアTA3の待機数の方が少数の場合には前記第1搬送ライン10(第1メインラインML1)へ向けて作業対象品Xを供給し(ステップS110)、第3待機エリアTA3の待機数の方が多数の場合には第2搬送ライン11(第2メインラインML2)へ向けて作業対象品Xを供給する(ステップS111)。   On the other hand, if it is determined in step S108 that the number of standbys in the third and fifth standby areas TA3 and TA5 is not the same, the process proceeds to step S109, and the number of standbys in the third standby area TA3 is equal to that in the fifth standby area TA5. It is determined whether the number is smaller than the number of waiting. When the number of standby in the third standby area TA3 is smaller, the work target product X is supplied toward the first transfer line 10 (first main line ML1) (step S110), and the third standby area When the number of standbys of TA3 is larger, the work target product X is supplied toward the second transfer line 11 (second main line ML2) (step S111).

このように、待機数の少ない待機エリアTA3,TA5の属する搬送ラインへ優先的に作業対象品Xを供給することで、作業者の作業能力の差に応じて各搬送ライン10,11(メインラインML1,ML2)へ作業対象品Xを供給できるから、生産効率の向上が図られる。また、一定時間の経過等の予め定めた所定条件が成立する毎に、前記第3および第5待機エリアTA3,TA5の待機数を比較して、作業対象品Xを優先的に供給する搬送ライン10,11(メインラインML1,ML2)を見直すようにしてあるから、両搬送ライン10,11の各待機エリアTAの待機数を常に略均等に保つことが可能である。殊に、実施例に示す検査作業のように、作業者の熟練度等により作業速度が異なる場合であっても、その作業速度に合わせて各作業エリアSAに対して作業対象品Xを供給し得るようになるから、作業効率を大きく改善し得る利点がある。   In this way, the work target product X is preferentially supplied to the transport lines to which the standby areas TA3 and TA5 with a small number of standbys belong, so that the transport lines 10 and 11 (main line Since the work target product X can be supplied to ML1, ML2), the production efficiency can be improved. Further, every time a predetermined condition such as the passage of a predetermined time is satisfied, the number of waiting in the third and fifth waiting areas TA3 and TA5 is compared, and the conveying line that preferentially supplies the work target product X. 10, 11 (main lines ML1, ML2) are reviewed, so that the number of waiting in each waiting area TA of both conveying lines 10, 11 can always be kept substantially equal. In particular, even when the work speed varies depending on the skill level of the operator, such as the inspection work shown in the embodiment, the work target product X is supplied to each work area SA according to the work speed. Thus, there is an advantage that the working efficiency can be greatly improved.

(各搬送ラインにおける作業対象品の搬送について)
次に、前記供給ライン30から各搬送ライン(メインライン)に供給された作業対象品Xの作業エリアSAへの搬送について説明する。なお、前記第1搬送ライン10および第2搬送ライン11において、夫々に設けた作業エリアSAへの作業対象品Xの搬送制御に関しては同一であり、また前記制御手段50は、前記待機エリアTAの夫々を1つの単位として、各待機エリアTAに対して同じ作業対象品搬送処理(図11参照)を行なっている。
(About the transfer of work target items in each transfer line)
Next, the conveyance of the work target product X supplied from the supply line 30 to each conveyance line (main line) to the work area SA will be described. In addition, in the said 1st conveyance line 10 and the 2nd conveyance line 11, it is the same regarding the conveyance control of the work target product X to the work area SA provided in each, and the said control means 50 is the said waiting area TA. With each unit as one unit, the same work object transport process (see FIG. 11) is performed for each standby area TA.

図11に示すように、先ず待機エリアTAにおける第1待機位置(第1の回転式搬送装置13)に作業対象品Xがあるか否かを判定する(ステップS201)。すなわち、第1の回転式搬送装置13に設けた第1検出センサ14が作業対象品Xを検出している場合にはステップS202に進み、該第1検出センサ14が作業対象品Xを検出していない場合には後述するステップS207に進む。前記ステップS202に進むと、前記待機エリアTAに対応するサブラインSLにおける第2の搬送装置20に作業対象品Xがあるか否かを判定する。すなわち、前記第2の搬送装置20に設けた第4検出センサ21が作業対象品Xを検出していない場合にはステップS203に進み、第4検出センサ21が作業対象品Xを検出している場合には後述するステップS212に進む。換言すると、作業エリアSAでの作業が終了して第2の搬送装置20から作業対象品Xが搬送された場合にステップS203に進み、作業エリアSAにおいて作業が行なわれている最中で第2の搬送装置20に作業対象品Xが待機している場合にステップS212に進む。   As shown in FIG. 11, first, it is determined whether or not there is a work target product X at the first standby position (first rotary transfer device 13) in the standby area TA (step S201). That is, when the first detection sensor 14 provided in the first rotary conveyance device 13 detects the work target product X, the process proceeds to step S202, and the first detection sensor 14 detects the work target product X. If not, the process proceeds to step S207 described later. In step S202, it is determined whether or not the work target product X exists in the second transport device 20 in the subline SL corresponding to the standby area TA. That is, when the fourth detection sensor 21 provided in the second transfer device 20 does not detect the work target product X, the process proceeds to step S203, and the fourth detection sensor 21 detects the work target product X. In this case, the process proceeds to step S212 described later. In other words, when the work in the work area SA is completed and the work target product X is transferred from the second transfer device 20, the process proceeds to step S203, and the second operation is being performed in the work area SA. When the work target product X is waiting on the transfer device 20, the process proceeds to step S212.

ステップS203に進むと、対応する第1の回転式搬送装置13を第2位置へ回転させて、該第1の回転式搬送装置13(第1待機位置)から第2の搬送装置20へ作業対象品Xを搬送する(ステップS204)。そして、この待機エリアTAに関して前記記憶手段52が記憶している作業対象品Xの待機数を1減算した後に(ステップS205)、ステップS206へ進んで前記第1の回転式搬送装置13を第1位置へ回転させ、その後ステップS207へ進む。すなわち、前記第1待機位置に作業対象品Xが待機していない場合にステップS207に進む。このように、前記第1の回転式搬送装置13を第1位置および第2位置に回転可能に構成したことで、各メインラインMLに沿って搬送される作業対象品Xを自動的に対応するサブラインSLへ向けて送出すことができる。すなわち、作業対象品Xを、各サブラインSLに設けた作業エリアSAへ効率的に供給し得る利点がある。   In step S203, the corresponding first rotary transfer device 13 is rotated to the second position, and the work object is transferred from the first rotary transfer device 13 (first standby position) to the second transfer device 20. The product X is transported (step S204). Then, after subtracting 1 from the standby number of the work target product X stored in the storage means 52 with respect to the standby area TA (step S205), the process proceeds to step S206 and the first rotary transfer device 13 is moved to the first. The position is rotated, and then the process proceeds to step S207. That is, when the work target item X is not waiting at the first standby position, the process proceeds to step S207. As described above, since the first rotary transfer device 13 is configured to be rotatable to the first position and the second position, the work target product X transferred along each main line ML is automatically handled. It can be sent toward the subline SL. That is, there is an advantage that the work target product X can be efficiently supplied to the work area SA provided in each subline SL.

また、サブラインSLの夫々に、個別に作動および作動停止可能な第2の搬送装置20を設け、前記第1の回転式搬送装置13からの作業対象品Xを第2の搬送装置20に一旦待機させるようにしたことで、対応する作業エリアSAに対して確実に作業対象品Xを供給でき、生産性をより一層向上し得る。殊に、実施例のように第1の回転式搬送装置13を第1位置および第2位置に回転させる構成では、待機エリアTAの作業対象品XをサブラインSLへ送出すに際して、前述のように第1の回転式搬送装置13を第1位置から第2位置へ変位する動作を要するため、サブラインSLに対して作業対象品Xを速やかに供給し得ない。このような場合であっても、前記第2の搬送装置20を設けることで、作業エリアSAに対して第2の搬送装置20に待機させた作業対象品Xを速やかに供給し得ると共に、更にその後に第2の搬送装置20へ作業対象品Xを供給して待機させることで、生産効率の向上を図り得る。   In addition, a second transport device 20 that can be individually activated and deactivated is provided in each of the sublines SL, and the work target product X from the first rotary transport device 13 is once on standby in the second transport device 20. By doing so, the work target product X can be reliably supplied to the corresponding work area SA, and the productivity can be further improved. In particular, in the configuration in which the first rotary transport device 13 is rotated to the first position and the second position as in the embodiment, when the work target product X in the standby area TA is sent to the subline SL, as described above. Since the operation | movement which displaces the 1st rotary conveying apparatus 13 from a 1st position to a 2nd position is required, the work target product X cannot be rapidly supplied with respect to the subline SL. Even in such a case, by providing the second transfer device 20, the work target product X that is made to wait in the second transfer device 20 can be quickly supplied to the work area SA, and further, After that, the work target product X is supplied to the second transfer device 20 to be put on standby, so that the production efficiency can be improved.

ステップS207に進むと、前記第2待機位置に作業対象品Xがあるか否かを判定する。具体的には、第2待機位置に対応する第1の搬送装置16に設けた第2検出センサ17が作業対象品Xを検出している場合には、ステップS208へ進んで該第1の搬送装置16を作動して第2待機位置の作業対象品Xを第1待機位置(第1の回転式搬送装置13)へ搬送してステップS209に進む。なお、前記第2検出センサ17が作業対象品Xを検出していない場合には、ステップS209に進む。ステップS209では、前記第3待機位置に作業対象品Xがあるか否かを判定する。すなわち、第3待機位置に対応する第1の搬送装置16に設けた第3検出センサ18が作業対象品Xを検出している場合には、該第1の搬送装置16を作動して第3待機位置の作業対象品Xを第2待機位置へ搬送し(ステップS210)、該第3検出センサ18が作業対象品Xを検出していない場合には、ステップS211に進んで作業対象品補充処理(図12参照)が行なわれる。   In step S207, it is determined whether there is a work target item X at the second standby position. Specifically, when the second detection sensor 17 provided in the first transport device 16 corresponding to the second standby position detects the work target product X, the process proceeds to step S208 and the first transport is performed. The apparatus 16 is operated to transport the work target item X at the second standby position to the first standby position (first rotary transport device 13), and the process proceeds to step S209. If the second detection sensor 17 has not detected the work target product X, the process proceeds to step S209. In step S209, it is determined whether or not there is a work target item X at the third standby position. That is, when the third detection sensor 18 provided in the first transport device 16 corresponding to the third standby position detects the work target product X, the first transport device 16 is operated to perform the third operation. The work target product X at the standby position is conveyed to the second standby position (step S210), and when the third detection sensor 18 has not detected the work target product X, the process proceeds to step S211 and the work target product replenishment process is performed. (See FIG. 12).

一方、前記ステップS202において第2の搬送装置20に作業対象品Xがあると判定されてステップS212へ進むと、前記第2待機位置に作業対象品Xがあるか否かが判定される。すなわち、第2待機位置に対応する第1の搬送装置16に設けた第2検出センサ17が作業対象品Xを検出している場合にはステップS213に進んで第3待機位置に作業対象品Xがあるか否かを判定する。なお、前記ステップS212において、第2待機位置に作業対象品Xがない(第2検出センサ17が作業対象品Xを検出していない)場合には、前記ステップS209に進んで第3待機位置に作業対象品Xがあるか否かを判定して、前述と同様に該第3待機位置に作業対象品Xがある場合には第3待機位置の作業対象品Xを第2待機位置へ搬送し(ステップS210)、該第3待機位置に作業対象品Xがない場合には、ステップS211に進んで作業対象品補充処理(図12参照)が行なわれるようになっている。また、ステップS213では、第3待機位置に作業対象品Xがある(すなわち、対応する第1の搬送装置16に設けた第3検出センサ18が作業対象品Xを検出している)場合には、作業対象品搬送処理が終了し、該第3検出センサ18が作業対象品Xを検出していない場合にはステップS210に進んで作業対象品補充処理(図12参照)が行なわれる。   On the other hand, when it is determined in step S202 that the work object X is present in the second transport device 20, and the process proceeds to step S212, it is determined whether or not the work object X is present in the second standby position. That is, when the second detection sensor 17 provided in the first transfer device 16 corresponding to the second standby position detects the work target item X, the process proceeds to step S213 and the work target item X is set to the third standby position. It is determined whether or not there is. In step S212, if there is no work target product X at the second standby position (the second detection sensor 17 has not detected the work target product X), the process proceeds to step S209 to reach the third standby position. It is determined whether or not there is a work target product X, and if there is a work target product X at the third standby position as described above, the work target product X at the third standby position is transported to the second standby position. (Step S210) When there is no work target product X at the third standby position, the process proceeds to Step S211 to perform work target product replenishment processing (see FIG. 12). In step S213, when there is a work target item X at the third standby position (that is, the third detection sensor 18 provided in the corresponding first transport device 16 detects the work target item X). When the work target product transport process is completed and the third detection sensor 18 has not detected the work target product X, the process proceeds to step S210, and the work target product replenishment process (see FIG. 12) is performed.

このように、各メインラインMLにおけるサブラインSLとの分岐位置に作業対象品Xを待機させる待機エリアTAを設けたことで、何れかのサブラインSLにおける作業エリアSAにおいて作業対象品Xに対する作業が完了した場合には、当該作業エリアSA(サブラインSL)に対して速やかに次の作業対象品Xを送出すことができるから、製造ラインの生産効率の向上を図り得る。また、待機エリアTA内において下流側に位置する待機位置へ優先的に作業対象品Xを待機させるようにしたことで、作業対象品Xを対応のサブラインSLまたは下流側の待機エリアTAに対して速やかに送出し得るから、下流側の待機エリアTAへの、あるいは全ての待機エリアTAから対応のサブラインSLへの作業対象品Xの供給効率を向上することができる。   Thus, by providing the standby area TA for waiting for the work target product X at the branch position of each main line ML with respect to the sub line SL, the work for the work target product X is completed in the work area SA in any of the sub lines SL. In this case, since the next work target product X can be sent out quickly to the work area SA (subline SL), the production efficiency of the production line can be improved. In addition, since the work target product X is preferentially placed on standby at a standby position located downstream in the standby area TA, the work target product X is placed on the corresponding subline SL or the downstream standby area TA. Since it can be sent out promptly, the supply efficiency of the work target product X to the standby area TA on the downstream side or from all the standby areas TA to the corresponding subline SL can be improved.

更に、各待機エリアTAに最大で3つの作業対象品Xを待機させ得るよう構成したから、下流側の待機エリアTAに対して作業対象品Xを補充した場合であっても、上流側の待機エリアTAに作業対象品Xを残すことができ、対応の作業エリアSAに作業対象品Xを供給する必要が生じた場合であっても速やかに対応することが可能となる。更にまた、各待機エリアTAに複数の作業対象品Xを待機させることで、供給ライン30から供給される作業対象品Xを各待機エリアTAに順次ストックすることができ、該供給ライン30からの作業対象品Xの供給をスムーズに行ない得る。すなわち、供給ライン30を極力停止させなくて済むから、前工程での作業に悪影響を及ぼすことはない。   In addition, since each of the standby areas TA is configured to be able to wait for up to three work target products X, even if the work target product X is replenished to the downstream standby area TA, the upstream standby The work target product X can be left in the area TA, and even when it is necessary to supply the work target product X to the corresponding work area SA, it is possible to respond quickly. Furthermore, by making a plurality of work target articles X stand by in each standby area TA, the work target articles X supplied from the supply line 30 can be sequentially stocked in each standby area TA. The supply of the work target product X can be performed smoothly. That is, since it is not necessary to stop the supply line 30 as much as possible, the work in the previous process is not adversely affected.

(上流側の待機エリアからの作業対象品の補充について)
図12に示すように、前記作業対象品補充処理では、前記記憶手段52が記憶している作業対象品Xを補充すべき待機エリアTA(以下、受入れ側の待機エリアTAという)と、その1つ上流に位置する待機エリアTA(以下、送出し側の待機エリアTAという)の待機数を比較する(ステップS301)。ここで、送出し側の待機エリアTAの待機数の方が少数の場合には、該送出し側の待機エリアTAの待機数が同数になるまで受入れ側の待機エリアTAへの作業対象品Xの補充(搬送)を一時的に停止する(ステップS302、ステップS303)。送出し側と受入れ側の待機エリアTAの待機数が同数になると、ステップS304に進んで、送出し側の待機エリアTAにおける第1の回転式搬送装置13が第1位置にあるかを判定し、この第1の回転式搬送装置13が第1位置に変位した後に、該第1の回転式搬送装置13から作業対象品Xを受入れ側の待機エリアTAへ搬送する(ステップS305)。そして、送出し側の待機エリアTAから作業対象品Xを搬送すると、前記記憶手段52が記憶する送出し側の待機エリアTAの待機数を1減算する(ステップS306)。なお、ステップS301において、送出し側の待機エリアTAの待機数が受入れ側の待機エリアTAの待機数と同数以上と判定された場合には、ステップS304に直接進むようになっている。
(Replenishment of work items from the upstream standby area)
As shown in FIG. 12, in the work object replenishment process, a standby area TA (hereinafter referred to as a reception-side standby area TA) to be replenished with the work object X stored in the storage means 52, The waiting numbers in the waiting area TA located upstream (hereinafter referred to as sending-side waiting area TA) are compared (step S301). Here, when the waiting number in the waiting area TA on the sending side is smaller, the work target product X in the waiting area TA on the receiving side until the waiting number in the waiting area TA on the sending side becomes the same number. Is temporarily stopped (step S302, step S303). When the number of waiting in the waiting area TA on the sending side and the receiving side becomes the same, the process proceeds to step S304 to determine whether or not the first rotary transfer device 13 in the waiting area TA on the sending side is in the first position. After the first rotary transport device 13 is displaced to the first position, the work target product X is transported from the first rotary transport device 13 to the standby area TA on the receiving side (step S305). When the work object X is conveyed from the waiting area TA on the sending side, 1 is subtracted from the waiting number in the waiting area TA on the sending side stored in the storage means 52 (step S306). If it is determined in step S301 that the number of standbys in the waiting area TA on the sending side is equal to or greater than the number of standbys in the waiting area TA on the receiving side, the process proceeds directly to step S304.

このように、送出し側と受入れ側に隣接する待機エリアTAの待機数を比較して作業対象品Xを搬送することで、受入れ側の待機エリアTAへの作業対象品Xの供給過剰、および送出し側の待機エリアTAでの作業対象品Xの不足を防止することができる。すなわち、各待機エリアTAに対応する作業エリアSAに均一に作業対象品Xを供給できるから、作業エリアSAでの作業負担にバラツキが生ずるのを防止し得る利点がある。   In this way, by comparing the number of standbys in the waiting area TA adjacent to the sending side and the receiving side and transporting the work target product X, an excessive supply of the work target product X to the receiving side standby area TA, and It is possible to prevent a shortage of work target items X in the waiting area TA on the sending side. That is, since the work target product X can be uniformly supplied to the work area SA corresponding to each standby area TA, there is an advantage that it is possible to prevent the work load in the work area SA from being varied.

次いで、ステップS307に進むと、前記受入れ側の待機エリアTAの待機数が「0」か否かを判定し、「0」の場合には作業対象品Xを第1の回転式搬送装置13(第1待機位置)に補充するよう各搬送装置13,16を作動制御する(ステップS308)。また、受入れ側の待機エリアTAの待機数が「0」でない場合には、ステップS309に進んで待機数が「1」か否かを判定し、待機数が「1」の場合には作業対象品Xを第2待機位置に補充すると共に、待機数が「1」でない場合(すなわち、待機数が「2」の場合)には作業対象品Xを第3待機位置に補充するよう各搬送装置13,16を作動制御する(ステップS310,ステップS311)。そして、補充される待機位置の検出センサ14,17,18が作業対象品Xを検出すると、前記記憶手段52が記憶する受入れ側の待機エリアTAの待機数が1加算されて(ステップS312)、待機数が上限に達すると、作業対象品補充処理が終了する。なお、各メインラインML1,ML2において最上流側に位置する第1待機エリアTA1および第4待機エリアTA4への作業対象品Xの補充に関しては、前記供給ライン30から供給される作業対象品Xを前記ステップS307〜ステップS312の処理に基づいて第1〜第3待機位置の何れかに補充される。   Next, in step S307, it is determined whether or not the number of waiting in the waiting area TA on the receiving side is “0”. If “0”, the work object X is transferred to the first rotary transfer device 13 ( The transport devices 13 and 16 are controlled to be replenished to the first standby position (step S308). If the number of waiting in the waiting area TA on the receiving side is not “0”, the process proceeds to step S309 to determine whether or not the number of waiting is “1”. Each transport device replenishes the product X to the second standby position and replenishes the work target product X to the third standby position when the standby number is not “1” (that is, when the standby number is “2”). 13 and 16 are controlled (steps S310 and S311). When the detection sensors 14, 17, and 18 for the standby position to be replenished detect the work target product X, 1 is added to the standby number in the standby area TA on the receiving side stored in the storage means 52 (step S312). When the waiting number reaches the upper limit, the work target product replenishment process ends. In addition, regarding the replenishment of the work target product X to the first standby area TA1 and the fourth standby area TA4 located on the most upstream side in each main line ML1, ML2, the work target product X supplied from the supply line 30 is used. Based on the processing from step S307 to step S312, one of the first to third standby positions is replenished.

このように、何れかの待機エリアTAに待機させた作業対象品XをメインラインMLの下流側または対応するサブラインSLへ送出して、第1〜第3待機位置の何れかに「空き」が生じた際に、該待機エリアTAの上流側に位置する待機エリアTAから作業対象品Xを補充するようにしたから、下流側に位置する作業エリアSAに対してスムーズに作業対象品Xを補充し得る。すなわち、メインラインMLに対して複数の作業エリアSAを設けた場合であっても、各作業エリアSAに対して滞りなく作業対象品Xを搬送することができるから、作業効率を向上し得る。従って、各作業エリアSAに作業能力が異なる作業者を配置した場合であっても、その作業能力に合わせて各作業エリアSAに対して作業対象品Xを供給し得るようになるから、作業効率が大幅に改善される。また、作業エリアSAを複数設けるに際し、メインラインMLを不必要に増加させる必要がないから、製造ラインの大型化を招来することもなく、スペース的な問題を解消し得る利点がある。   In this way, the work target product X that has been waiting in any one of the waiting areas TA is sent to the downstream side of the main line ML or the corresponding subline SL, and “free” is present in any of the first to third waiting positions. When this occurs, the work target product X is replenished from the standby area TA located upstream of the standby area TA, so the work target product X is smoothly replenished to the work area SA located downstream. Can do. That is, even when a plurality of work areas SA are provided for the main line ML, the work target product X can be transported to each work area SA without any delay, so that work efficiency can be improved. Accordingly, even when workers having different work capabilities are arranged in each work area SA, the work target product X can be supplied to each work area SA in accordance with the work ability. Is greatly improved. In addition, when providing a plurality of work areas SA, there is no need to unnecessarily increase the main line ML, so that there is an advantage that the problem of space can be solved without increasing the size of the production line.

更に、実施例のように、前記各待機エリアTAから下流側の待機エリアTAまたは対応するサブラインSLへ向けて作業対象品Xを送出した際に限り、記憶手段52の記憶数を1減算すると共に、上流側の待機エリアTAからの作業対象品Xを、補充すべき搬送装置13,16の検出センサ14,17,18が検出した際に記憶手段52の記憶数を1加算するようにしたことで、各待機エリアTAの作業対象品Xの待機数を正確に管理し得る。すなわち、同じ待機エリアTA内での作業対象品Xの移動によっては作業対象品Xの待機数を増減しないから、各待機エリアTAの待機数を正確に把握でき、下流側の待機エリアTAへの作業対象品Xの供給過剰、および上流側の待機エリアTAでの作業対象品Xの不足を防止して、各作業エリアSAに対して均一に作業対象品Xを供給し得る利点がある。また、検出センサ14,17,18が検出した際に記憶手段52の記憶数を1加算することで、各待機エリアTAへ作業対象品Xを補充するに際し、作業対象品Xを補充すべき待機位置を容易に特定することが可能となる。   Further, as in the embodiment, only when the work target product X is sent from each of the standby areas TA to the downstream standby area TA or the corresponding subline SL, the number stored in the storage means 52 is decremented by one. When the detection sensors 14, 17, and 18 of the transfer devices 13 and 16 to be replenished detect the work target item X from the upstream standby area TA, the storage number of the storage means 52 is incremented by one. Thus, the standby number of the work target product X in each standby area TA can be accurately managed. That is, since the number of standbys of the work target product X is not increased or decreased depending on the movement of the work target product X in the same standby area TA, the standby number of each standby area TA can be accurately grasped, and There is an advantage that the supply of the work target product X can be uniformly supplied to each work area SA by preventing an excessive supply of the work target product X and a shortage of the work target product X in the upstream standby area TA. Further, when the detection sensors 14, 17, and 18 detect, the storage number of the storage means 52 is incremented by 1, so that when the work target product X is replenished to each standby area TA, the work target product X should be replenished. The position can be easily specified.

(作業完了品の搬出について)
なお、前記作業エリアSAでの作業が完了した作業完了品Yは、前記第3の搬送装置23により前記リフト手段27へ搬送されると共に、該リフト手段27により搬出ライン40へ搬送されて出荷工程へと運ばれる。このように、作業完了品Yをリフト手段27により搬出ライン40へ搬送することにより、作業終了後に作業者が搬出ライン40や出荷工程へ作業完了品Yを移動させる手間が省けるから、作業効率の向上が図られる。
(About unloading completed products)
The work completion product Y that has completed the work in the work area SA is transported to the lift means 27 by the third transport device 23 and also transported to the unloading line 40 by the lift means 27 to be shipped. Carried to. In this way, since the work completion product Y is transported to the carry-out line 40 by the lift means 27, it is possible for the worker to save the work of moving the work completion product Y to the carry-out line 40 or the shipping process after the work is completed. Improvement is achieved.

また、前記搬出ライン40により作業完了品Yを搬送するに際し、該搬出ライン40における第1回収ライン42と第2回収ライン44との合流位置で、該第1回収ライン42に搬送される作業完了品Yと第2回収ライン44に搬送される作業完了品Yとが接触等する虞がある。そこで、実施例では、第1回収ライン42に第8検出センサ45を設けると共に、第2回収ライン44に第9検出センサ46を設け、これら検出センサ45,46の何れか先に作業完了品Yを検出した回収ライン42,44の作業完了品Yを先に搬送するようにしたから、作業完了品Yをスムーズに搬送することが可能である。   Further, when the work completion product Y is transported by the unloading line 40, the work being transported to the first recovery line 42 is completed at the joining position of the first recovery line 42 and the second recovery line 44 in the unloading line 40. There is a possibility that the product Y and the work completion product Y conveyed to the second collection line 44 may come into contact with each other. Therefore, in the embodiment, the eighth detection sensor 45 is provided in the first recovery line 42, and the ninth detection sensor 46 is provided in the second recovery line 44. Since the work completion products Y of the collection lines 42 and 44 that have detected the above are transported first, the work completion products Y can be transported smoothly.

〔変更例〕
なお、本発明に係る遊技機製造ラインの制御システムとしては、実施例のものに限られるものではなく、種々の変更が可能である。例えば、実施例では、2つのメインラインを設けたが、1または3以上のメインラインを設けるようにしてもよく、またメインラインから分岐するサブラインの数も実施例のように3つに限られるものでなく、1つのメインラインから2以上のサブラインを分岐させることが可能である。また、実施例では各待機エリアに3つの作業対象品を待機させ得るよう構成したが、これに限らず、1つまたは2、あるいは4以上の作業対象品を待機させるようにしてもよい。
[Example of change]
The control system for the gaming machine production line according to the present invention is not limited to the embodiment, and various modifications can be made. For example, in the embodiment, two main lines are provided, but one or more main lines may be provided, and the number of sub-lines branching from the main line is limited to three as in the embodiment. Instead of this, it is possible to branch two or more sublines from one main line. In the embodiment, each work area is configured to be able to wait for three work objects. However, the present invention is not limited to this, and one, two, or four or more work objects may be made to wait.

更に、前記メインラインを構成する搬送手段としては、実施例に示す搬送装置に限らず、任意の作業対象品の搬送および搬送停止を行ない得るものであれば、従来公知の各種搬送手段を採用し得る。ここで、実施例では、前記メインラインにおけるサブラインとの分岐位置に回転式搬送装置を設けて、該回転式搬送装置を第1位置と第2位置とに回転するよう構成したがメインラインの下流および対応するサブラインへ作業対象品を送出し得る構成であれば任意の構成・手段を採用可能である。例えばメインラインにおけるサブラインとの分岐位置に作業対象品をサブラインへ向けて押出すプッシャ等の押出し手段を配設するようにしても、実施例と同様に作用効果を得ることができる。更にまた、実施例では、サブラインにおける前記メインラインと作業エリアとの間に、個別に作動および作動停止可能な第2の搬送手段を設ける構成を例示したが、該第2の搬送手段を設けることなく作業エリアをメインラインに隣接して設ける構成とすることもできる。   Further, the conveying means constituting the main line is not limited to the conveying apparatus shown in the embodiment, and various conventionally known conveying means may be adopted as long as it can carry and stop any work target product. obtain. Here, in the embodiment, a rotary transport device is provided at a branch position of the main line with the sub-line, and the rotary transport device is rotated to the first position and the second position. Any configuration / means can be adopted as long as the configuration allows the work target product to be sent to the corresponding subline. For example, even if an extrusion means such as a pusher that pushes the work target product toward the subline is arranged at a branch position with the subline in the main line, the operational effect can be obtained as in the embodiment. Furthermore, in the embodiment, the configuration in which the second conveying means that can be individually activated and deactivated is provided between the main line and the work area in the sub-line. However, the second conveying means is provided. Alternatively, the work area may be provided adjacent to the main line.

また、搬送ライン(メインラインおよびサブライン)の制御態様に関しては、実施例のものに限定されるものではなく、何れかの待機エリアに待機させた作業対象品を下流側の待機エリアまたは対応するサブラインへ送出した際に、この作業対象品を送出した待機エリアに対して、上流側の待機エリアから作業対象品を補充するよう前記各搬送手段を作動制御して、常には各待機エリアに作業対象品を待機させるようにすれば、任意に変更することができる。同様に、何れかの待機エリアから作業対象品が下流側の待機エリアまたは対応するサブラインへ送出された際に、前記記憶手段が記憶する作業対象品を補充すべき待機エリアにおける作業対象品の待機数と、その1つ上流側に位置する待機エリアにおける作業対象品の待機数とを比較し、上流側に位置する待機エリアにおける作業対象品の待機数の方が少数の場合には作業対象品の補充を一時的に停止し、当該上流側に位置する待機エリアにおける作業対象品の待機数が同数となった後に、作業対象品を補充すべき待機エリアへ作業対象品を補充するよう前記各搬送手段を作動制御するようすれば、実施例とは異なる制御態様を採用することが可能である。   In addition, the control mode of the transfer line (main line and subline) is not limited to that of the embodiment, and the work target product that has been waiting in any one of the waiting areas can be a downstream waiting area or a corresponding subline. When the work object is sent to the work area, the respective transport means are controlled to replenish the work object from the upstream standby area with respect to the work area, and the work object is always placed in the work area. If the product is made to wait, it can be changed arbitrarily. Similarly, when a work target product is sent from any one of the standby areas to a downstream standby area or a corresponding subline, the work target product in the standby area to be replenished with the work target product stored in the storage means is stored. If the number of waiting for work items in the standby area located upstream is smaller, the number of work items in the waiting area located one upstream is compared. Is temporarily stopped, and after the number of standby work items in the standby area located on the upstream side becomes the same number, the respective work items are replenished to the standby area where the work target product should be supplied. If the operation of the conveying means is controlled, it is possible to adopt a control mode different from the embodiment.

そして、複数設けた搬送ライン(メインライン)へ作業対象品を供給する供給ラインの制御態様に関しても実施例のものに限定されず、所要に応じて変更することができる。すなわち、識別手段の識別情報に基づいて各搬送ラインにおける作業エリアの稼働数を比較して、作業エリアの稼働数の比率に応じて各メインラインへの作業対象品の供給数を調整するようにすればよい。同様に、前記記憶手段が記憶する各待機エリアにおける作業対象品の待機数が均等になるよう各メインラインの搬送手段を制御すると共に、所定条件の成立により各搬送ラインにおける所定の待機エリアにおける作業対象品の待機数を比較して、待機数の少ない待機エリアの属する搬送ラインのメインラインへ優先的に作業対象品を供給することで、実施例と同様の作用効果を得ることができる。   The control mode of the supply line that supplies the work target product to a plurality of transport lines (main lines) is not limited to that of the embodiment, and can be changed as required. That is, based on the identification information of the identification means, the number of working areas in each transfer line is compared, and the number of work items supplied to each main line is adjusted according to the ratio of the number of working areas. do it. Similarly, the transport means of each main line is controlled so that the number of standby work items in each standby area stored in the storage means is equalized, and work in a predetermined standby area in each transport line is established when a predetermined condition is satisfied. By comparing the number of standbys of the target product and supplying the work target product preferentially to the main line of the transfer line to which the standby area with a small number of standbys belongs, the same effect as the embodiment can be obtained.

また、作業対象品としては、実施例のような各種部材が取付けられて作動検査前のパチンコ機に限定されるものではなく、例えば遊技盤やその他遊技機製造に係る部材であれば、何れのものであっても採用することができる。更に、遊技機としてはパチンコ機に限定されるものではなく、スロットマシン機やアレンジボール機、その他各種遊技機に関して本発明を採用することができる。なお、本発明は、作業エリアにおいて作業対象品に対して検査作業を行なう場合に限らず、遊技機製造ラインで行なわれる各種作業を行なう場合であっても適用することが可能であり、殊に作業者の作業能力の差により各作業エリアへの作業対象品の供給数が変化する作業に対して好適に適用し得るものである。   In addition, the work target product is not limited to the pachinko machine before the operation inspection by attaching various members as in the embodiment, for example, as long as it is a member related to the manufacture of a game board or other game machines Even if it is a thing, it is employable. Furthermore, the gaming machine is not limited to a pachinko machine, and the present invention can be applied to slot machine machines, arrange ball machines, and other various gaming machines. The present invention is not limited to the case where the inspection work is performed on the work target item in the work area, and can be applied to the case where various work performed in the gaming machine manufacturing line is performed. The present invention can be suitably applied to a work in which the number of work target articles supplied to each work area changes due to the difference in work ability of the worker.

本発明の実施例に係る遊技機製造ラインの検査ラインを概略で示す平面図である。It is a top view which shows roughly the inspection line of the game machine manufacturing line which concerns on the Example of this invention. 実施例に係る遊技機製造ラインの制御システムの制御体系を示すブロック図である。It is a block diagram which shows the control system of the control system of the game machine manufacturing line which concerns on an Example. 実施例に係るメインラインにおける第1の回転式搬送装置を示す拡大図であって、(a)は第1位置にある状態を示し、(b)は第2位置に回転した状態を示す。It is an enlarged view which shows the 1st rotation type conveying apparatus in the main line which concerns on an Example, (a) shows the state in a 1st position, (b) shows the state rotated to the 2nd position. 実施例に係る第1搬送ラインにおける作業対象品の搬送態様を概略で示す説明図である。It is explanatory drawing which shows roughly the conveyance aspect of the work target goods in the 1st conveyance line which concerns on an Example. 実施例に係る第1搬送ラインにおける作業対象品の搬送態様を概略で示す説明図であって、第1待機エリアから第2待機エリアへ作業対象品を補充(搬送)する状態を示す。It is explanatory drawing which shows schematically the conveyance aspect of the work target article in the 1st conveyance line which concerns on an Example, Comprising: The state which replenishes (conveys) a work target article from a 1st standby area to a 2nd standby area is shown. 実施例に係る第1搬送ラインにおける作業対象品の搬送態様を概略で示す説明図であって、図5に示した状態において、第2サブラインの作業エリアでの作業が終了した状態を示す。It is explanatory drawing which shows schematically the conveyance aspect of the work target article in the 1st conveyance line which concerns on an Example, Comprising: In the state shown in FIG. 5, the state in which the work in the work area of a 2nd subline was complete | finished is shown. 実施例に係る第1搬送ラインにおける作業対象品の搬送態様を概略で示す説明図であって、図6に示した状態において、第1待機エリアから第2待機エリアに作業対象品が搬送されて、第2待機エリア内で作業対象品が移動する状態を示す。It is explanatory drawing which shows schematically the conveyance aspect of the work target article in the 1st conveyance line which concerns on an Example, Comprising: In the state shown in FIG. 6, a work target article is conveyed from the 1st standby area to the 2nd standby area. The state which a work target article moves within the second standby area is shown. 実施例に係る第1搬送ラインにおける作業対象品の搬送態様を概略で示す説明図であって、図7に示した状態において、第3サブラインの作業エリアでの作業が終了し、第3エリア内で作業対象品が移動する状態を示す。FIG. 8 is an explanatory diagram schematically showing a transfer mode of a work target product in the first transfer line according to the embodiment, and in the state shown in FIG. 7, the work in the work area of the third subline is completed, Shows the state in which the work item is moving. 実施例に係る第1搬送ラインにおける作業対象品の搬送態様を概略で示す説明図であって、図8に示した状態において、第3待機エリア内での作業対象品の移動が終了した状態を示す。It is explanatory drawing which shows roughly the conveyance aspect of the work target article in the 1st conveyance line which concerns on an Example, Comprising: In the state shown in FIG. 8, the state which the movement of the work target article in the 3rd standby area was complete | finished. Show. 実施例に係る遊技機製造ラインの制御システムの作業対象品供給処理を示すフローチャート図である。It is a flowchart figure which shows the work object supply process of the control system of the game machine manufacturing line which concerns on an Example. 実施例に係る遊技機製造ラインの制御システムの作業対象品搬送処理を示すフローチャート図である。It is a flowchart figure which shows the work object conveyance process of the control system of the game machine manufacturing line which concerns on an Example. 実施例に係る遊技機製造ラインの制御システムの作業対象品補充処理を示すフローチャート図である。It is a flowchart figure which shows the work object replenishment process of the control system of the game machine manufacturing line which concerns on an Example.

符号の説明Explanation of symbols

10 第1搬送ライン(搬送ライン)
11 第2搬送ライン(搬送ライン)
13 第1の回転式搬送装置(搬送手段)
16 第1の搬送装置(搬送手段)
20 第2の搬送装置(第2の搬送手段)
23 第3の搬送装置(第3の搬送手段)
25 スイッチ
27 リフト手段
30 供給ライン
50 制御手段
52 記憶手段
54 識別手段
ML1 第1メインライン(メインライン)
ML2 第2メインライン(メインライン)
SA 作業エリア
SL1 第1サブライン(サブライン)
SL2 第2サブライン(サブライン)
SL3 第3サブライン(サブライン)
SL4 第4サブライン(サブライン)
SL5 第5サブライン(サブライン)
SL6 第6サブライン(サブライン)
TA1 第1待機エリア(待機エリア)
TA2 第2待機エリア(待機エリア)
TA3 第3待機エリア(待機エリア、所定の待機エリア)
TA4 第4待機エリア(待機エリア)
TA5 第5待機エリア(待機エリア、所定の待機エリア)
TA6 第6待機エリア(待機エリア)
X 作業対象品
Y 作業完了品
10 First transfer line (transfer line)
11 Second transfer line (transfer line)
13 First rotary transport device (transport means)
16 1st conveying apparatus (conveying means)
20 Second transport device (second transport means)
23 Third transfer device (third transfer means)
25 Switch 27 Lifting means 30 Supply line 50 Control means 52 Storage means 54 Identification means ML1 First main line (main line)
ML2 2nd main line (main line)
SA work area SL1 1st subline (subline)
SL2 Second subline (subline)
SL3 3rd subline (subline)
SL4 4th subline (subline)
SL5 5th subline (subline)
SL6 6th subline (subline)
TA1 1st waiting area (standby area)
TA2 Second standby area (standby area)
TA3 3rd standby area (standby area, predetermined standby area)
TA4 4th waiting area (waiting area)
TA5 5th standby area (standby area, predetermined standby area)
TA6 6th waiting area (standby area)
X Work target product Y Work completed product

Claims (6)

遊技機として完成されるべき作業対象品に対し所要の作業を行なう作業エリアと、前記作業エリアへ向けて作業対象品を搬送する複数の搬送ラインと、前記複数の搬送ラインへ作業対象品を供給する供給ラインと備えた遊技機製造ラインにおいて、
前記供給ラインに接続し、該供給ラインから供給される任意の作業対象品の搬送および搬送停止を行ない得る搬送手段を複数連設して構成され、複数の搬送手段により複数の作業対象品を待機可能に設定された待機エリアを設けたメインラインと、
前記メインラインにおいて前記搬送手段から対応的に分岐し、前記作業エリアが適所に設けられた複数のサブラインと、
前記夫々の搬送手段を個別に作動制御し、該搬送手段での作業対象品の搬送および搬送停止を個別に制御可能な制御手段と、
作業者による前記各作業エリアに対応するスイッチのON−OFF操作に基づいて各作業エリアの稼働の有無を識別する識別手段と、
前記各待機エリアにおける作業対象品の待機数を記憶する記憶手段とを備え、
前記制御手段は、
前記識別手段の識別情報に基づいて各搬送ラインにおける作業エリアの稼働数を比較し、作業エリアの稼働数の比率に応じて前記複数のメインラインへの作業対象品の供給数を調整するよう前記供給ラインを制御すると共に、稼働している作業エリアのサブラインに対応する待機エリアの夫々に、前記記憶手段が記憶する該待機エリアにおける作業対象品の待機数が均等になるよう前記各メインラインの搬送手段を制御する一方、
所定条件の成立により各搬送ラインにおける所定の待機エリアにおける作業対象品の待機数を比較して、待機数の少ない待機エリアの属する搬送ラインのメインラインへ優先的に作業対象品を供給するよう前記供給ラインを制御し、
何れかの待機エリアに待機させた作業対象品を下流側の待機エリアまたは対応するサブラインへ送出した際には、該作業対象品を送出した待機エリアに対応する前記記憶手段が記憶する待機数を1減算し、該上流側の待機エリアから搬送されてきた作業対象品を補充すべき搬送手段の検出手段が検出した際には、該作業対象品が補充された待機エリアに対応する前記記憶手段の待機数を1加算するよう制御する
ことを特徴とする遊技機製造ラインの制御システム。
A work area for performing required work on a work target product to be completed as a gaming machine, a plurality of transfer lines for transporting the work target product toward the work area, and supplying the work target product to the plurality of transfer lines In the game machine production line equipped with the supply line
A plurality of conveying means connected to the supply line and capable of carrying and stopping any work object supplied from the supply line are arranged in series, and a plurality of work objects are waited by the plurality of conveying means. A main line with a standby area set as possible,
A plurality of sub-lines branching correspondingly from the conveying means in the main line, the work area being provided in place;
Control means capable of individually controlling the operation of each of the conveying means, and capable of individually controlling the conveyance and the conveyance stop of the work object in the conveying means;
Identification means for identifying whether or not each work area is in operation based on an ON / OFF operation of a switch corresponding to each work area by an operator ;
Storage means for storing the number of standby of work items in each of the standby areas,
The control means includes
Based on the identification information of the identification means, the number of working areas in each transfer line is compared, and the number of work items to be supplied to the plurality of main lines is adjusted according to the ratio of the number of working areas. In addition to controlling the supply line, each of the main lines is arranged so that the number of standby work items in the standby area stored in the storage means is equalized in each of the standby areas corresponding to the sub-lines of the working area. While controlling the transport means,
Comparing the number of standbys of work target products in a predetermined standby area in each transfer line by the establishment of a predetermined condition, and supplying the work target products preferentially to the main line of the transfer line to which the standby area with a low standby number belongs Control the supply line,
When a work target product that has been waiting in any one of the standby areas is sent to a downstream standby area or a corresponding subline, the number of standbys stored in the storage unit corresponding to the standby area that has sent the work target product is stored. When the detection means of the transport means to subtract 1 and replenish the work object conveyed from the upstream standby area detects the storage means corresponding to the standby area where the work object is replenished A control system for a gaming machine manufacturing line, characterized in that control is performed to add 1 to the number of standbys.
前記制御手段は、
何れかの待機エリアから作業対象品が下流側の待機エリアまたは対応するサブラインへ送出された際に、前記記憶手段が記憶する作業対象品を補充すべき待機エリアにおける作業対象品の待機数と、その1つ上流側に位置する待機エリアにおける作業対象品の待機数とを比較して、
上流側に位置する待機エリアにおける作業対象品の待機数の方が少数の場合には、作業対象品を補充すべき待機エリアに対する該作業対象品の補充を一時的に停止し、該上流側に位置する待機エリアにおける作業対象品の待機数が同数となった後に、作業対象品を補充すべき待機エリアに対して上流側の待機エリアから作業対象品を補充するよう前記各搬送手段を作動制御することで、常には各待機エリアに作業対象品を待機させるようにした請求項1記載の遊技機製造ラインの制御システム。
The control means includes
When a work target product is sent from any standby area to a downstream standby area or a corresponding subline, the number of standby work target products in the standby area to be replenished with the work target product stored in the storage means; Compare the number of waiting for work items in the waiting area located upstream one of them,
When the standby number of work target items in the standby area located upstream is smaller, the supply of the work target product to the standby area to which the work target product should be supplied is temporarily stopped, and the upstream After the standby number of work objects in the standby area to be positioned becomes the same number, the respective transport means are controlled to replenish the work objects from the upstream standby area with respect to the standby area to which the work objects are to be replenished. The game machine production line control system according to claim 1 , wherein the work target product is always placed on standby in each standby area .
前記メインラインと各サブラインとの分岐位置に設けられる搬送手段は、メインラインの下流側へ向けて作業対象品を搬送する第1位置、および対応するサブラインへ向けて作業対象品を搬送し得る第2位置に変更可能に構成されると共に、常には前記第1位置に位置決めされるよう構成される請求項1または2記載の遊技機製造ラインの制御システム。 The conveying means provided at a branch position between the main line and each sub line may be a first position that conveys the work object toward the downstream side of the main line, and a first position that can convey the work object toward the corresponding sub line. The control system for a gaming machine manufacturing line according to claim 1 or 2, wherein the control system is configured to be changeable to two positions and is always positioned at the first position . 前記サブラインの夫々は、前記メインラインと作業エリアとの間に個別に作動および作動停止可能な第2の搬送手段を備え、該第2の搬送手段に作業対象品を待機させ得るよう構成されている請求項1〜3の何れか一項に記載の遊技機製造ラインの制御システム。 Each of the sub-lines includes a second transport unit that can be individually activated and deactivated between the main line and a work area, and is configured to allow the second transport unit to wait for an object to be worked. gaming machine production line control system according to any one of claim 1 to 3 are. 前記サブラインの夫々は、前記メインラインと作業エリアとの間に設けられて前記搬送手段に接続する第2の搬送手段と、前記作業エリアに設けられて第2の搬送手段に接続する第3の搬送手段と、第3の搬送手段に接続して作業エリアからの作業完了品を搬出ラインへ移動するリフト手段とを一列に連設して構成されている請求項1〜4の何れか一項に記載の遊技機製造ラインの制御システム。Each of the sub-lines is provided between the main line and the work area and connected to the transfer means, and a third transfer means provided in the work area and connected to the second transfer means. 5. The apparatus according to claim 1, wherein the transfer means and the lift means connected to the third transfer means and moving work completion products from the work area to the carry-out line are connected in a row. The control system of the gaming machine production line described in 1. 前記搬送手段の夫々は、作業対象品の上側を支持する支持手段を備えている請求項1〜5の何れか一項に記載の遊技機製造ラインの制御システム。Each of the said conveying means is a control system of the game machine manufacturing line as described in any one of Claims 1-5 provided with the support means which supports the upper side of a work target product.
JP2004369746A 2004-12-21 2004-12-21 Control system for game machine production line Expired - Fee Related JP4563792B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004369746A JP4563792B2 (en) 2004-12-21 2004-12-21 Control system for game machine production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004369746A JP4563792B2 (en) 2004-12-21 2004-12-21 Control system for game machine production line

Publications (2)

Publication Number Publication Date
JP2006174948A JP2006174948A (en) 2006-07-06
JP4563792B2 true JP4563792B2 (en) 2010-10-13

Family

ID=36729591

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004369746A Expired - Fee Related JP4563792B2 (en) 2004-12-21 2004-12-21 Control system for game machine production line

Country Status (1)

Country Link
JP (1) JP4563792B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008184288A (en) * 2007-01-30 2008-08-14 Hokuei Kako Kk Manufacturing device and method of resin container
CN106429364B (en) * 2016-07-12 2019-05-10 广东丽柏特科技有限公司 A kind of sanitary ceramics semi-finished product detection line
EP3418834B1 (en) * 2017-06-21 2021-08-18 EWAB Engineering AB Conveyor system method of operating a conveyor system and flow devices for use in such conveyor system
JP2020015602A (en) * 2018-07-27 2020-01-30 日立グローバルライフソリューションズ株式会社 Conveyance device and control program of conveyance device
CN109109437B (en) * 2018-09-11 2024-09-17 龙督实业集团有限公司 Production equipment for aluminum buckle plate bonded non-woven fabric
CN112132479B (en) * 2020-09-29 2024-02-27 深圳市今天国际物流技术股份有限公司 Distributed coordinated conveyor line task grouping and sorting method and system
CN115339715B (en) * 2022-05-24 2023-06-23 济南永信新材料科技有限公司 Water thorn non-woven fabrics yardage roll package system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003038741A (en) * 2001-07-27 2003-02-12 Soei Koki Kk Game machine transporter
JP2003039283A (en) * 2001-07-24 2003-02-12 Honda Motor Co Ltd Work transfer method
JP2003104534A (en) * 2001-09-27 2003-04-09 Watanabe Kikai Seisakusho:Kk Unit conveyer and conveyance device
JP2003245831A (en) * 2002-02-22 2003-09-02 Sansei R & D:Kk Control of game machine assembling robot

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05132133A (en) * 1991-11-11 1993-05-28 Murata Mach Ltd Confluence control device
JP3182707B2 (en) * 1992-09-30 2001-07-03 株式会社平和 Game board manufacturing equipment
JP2809330B2 (en) * 1994-06-23 1998-10-08 本田技研工業株式会社 Work transfer device
JP3054374B2 (en) * 1997-02-06 2000-06-19 株式会社ファブリカトヤマ Work transfer device
JPH11193115A (en) * 1997-12-26 1999-07-21 Kito Corp Conveying route recognizing method for distributed conveying system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003039283A (en) * 2001-07-24 2003-02-12 Honda Motor Co Ltd Work transfer method
JP2003038741A (en) * 2001-07-27 2003-02-12 Soei Koki Kk Game machine transporter
JP2003104534A (en) * 2001-09-27 2003-04-09 Watanabe Kikai Seisakusho:Kk Unit conveyer and conveyance device
JP2003245831A (en) * 2002-02-22 2003-09-02 Sansei R & D:Kk Control of game machine assembling robot

Also Published As

Publication number Publication date
JP2006174948A (en) 2006-07-06

Similar Documents

Publication Publication Date Title
JP6229729B2 (en) Storehouse
JP6123577B2 (en) Automatic picking equipment
JP6040893B2 (en) Sequential transport system
JP4563792B2 (en) Control system for game machine production line
JP2017128405A (en) Article storage facility
JP6183278B2 (en) Picking equipment
JP6245341B2 (en) Picking equipment
JP4521262B2 (en) Control system for game machine production line
KR20140144426A (en) device for rivetting
JP2001253530A (en) Carrier conveyor
CN109110366B (en) Automatic inventory method for warehouse system
JP2009220986A (en) Load storing method for automatic warehouse
CN110803435A (en) Intelligent furniture finished product carrying system
JP5130789B2 (en) Board processing system
JP3793897B1 (en) Amusement machine production line
JP6372177B2 (en) Transport system
JP5874579B2 (en) Article conveying equipment and picking equipment equipped with the same
CN211618927U (en) Intelligent furniture finished product carrying system
JP4264831B2 (en) Transport equipment
JP7302586B2 (en) Goods storage facility
JP2005225582A (en) Object treating facility
JP5159251B2 (en) Picking equipment
JP3480556B2 (en) Transfer equipment
JP2000095327A (en) Carrying equipment
JP4378633B2 (en) Amusement machine production line

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070524

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100119

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100319

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100518

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100707

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100727

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100729

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130806

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4563792

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees