JP4535689B2 - Fluid filtration method - Google Patents

Fluid filtration method Download PDF

Info

Publication number
JP4535689B2
JP4535689B2 JP2003122584A JP2003122584A JP4535689B2 JP 4535689 B2 JP4535689 B2 JP 4535689B2 JP 2003122584 A JP2003122584 A JP 2003122584A JP 2003122584 A JP2003122584 A JP 2003122584A JP 4535689 B2 JP4535689 B2 JP 4535689B2
Authority
JP
Japan
Prior art keywords
filter
filtration
pump
water
film
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003122584A
Other languages
Japanese (ja)
Other versions
JP2004321996A (en
Inventor
浩之 梅沢
正博 井関
元幸 対比地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP2003122584A priority Critical patent/JP4535689B2/en
Priority to US10/831,585 priority patent/US20040262209A1/en
Priority to CNB2004100766341A priority patent/CN100352535C/en
Publication of JP2004321996A publication Critical patent/JP2004321996A/en
Priority to US11/499,532 priority patent/US20060266686A1/en
Priority to US11/499,531 priority patent/US20060266685A1/en
Priority to US11/499,554 priority patent/US7381323B2/en
Application granted granted Critical
Publication of JP4535689B2 publication Critical patent/JP4535689B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は濾過装置に関し、特に、濾過水をフィルタ装置から取り出すポンプの吸引圧を好適に調節できる濾過装置に関するものである。
【0002】
【従来の技術】
現在、産業廃棄物を減らすこと、また産業廃棄物を分別し再利用することまたは産業廃棄物を自然界に放出させないことは、エコロジーの観点から重要なテーマであり、21世紀の企業課題である。この産業廃棄物の中には、被除去物が含まれた色々な流体がある。
【0003】
これらは、汚水、排水、廃液等の色々な言葉で表現されているが、以下、水や薬品等の流体中に被除去物である物質が含まれているものを排水と呼び説明する。これらの排水は、高価な濾過処理装置等で前記被除去物が取り除かれ、排水がきれいな流体となり再利用されたり、分別された被除去物または濾過できず残ったものを産業廃棄物として処理している。特に水は、濾過により環境基準を満たすきれいな状態にして川や海等の自然界に戻されたり、また再利用される。
【0004】
しかし、濾過処理等の設備費、ランニングコスト等の問題から、これらの装置を採用することが非常に難しく、環境問題にもなっている。
【0005】
このことからも判るように、排水処理の技術は、環境汚染の意味からも、またリサイクルの点からも重要な問題であり、低イニシャルコスト、低ランニングコストのシステムが早急に望まれている。
【0006】
一例として、半導体分野に於ける排水処理を以下に説明していく。一般に、金属、半導体、セラミック等の板状体を研削または研磨する際、摩擦による研磨(研削)治具等の温度上昇防止、潤滑性向上、研削屑または切削屑の板状体への付着等が考慮され、水等の流体が研磨(研削)治具や板状体にシャワーリングされている。
【0007】
具体的には、半導体材料の板状体である半導体ウェハをダイシングしたり、バックグラインドする際、純水を流す手法が取られている。ダイシング装置では、ダイシングブレードの温度上昇防止のために、またダイシング屑がウェハに付着するのを防止するために、半導体ウェハ上に純水の流れを作ったり、ブレードに純水が当たるように放水用のノズルが取り付けられ、シャワーリングされている。またバックグラインドでウェハ厚を薄くする際も、同様な理由により純水が流されている。
【0008】
前述したダイシング装置やバックグラインド装置から排出される研削屑または研磨屑が混入された排水は、濾過されてきれいな水にして自然界に戻したり、あるいは再利用され、濃縮された排水は、回収されている。
【0009】
現状の半導体製造に於いて、Siを主体とする被除去物(屑)の混入された排水の処理には、凝集沈殿法、フィルタ濾過と遠心分離機を組み合わせた方法の二通りがある。
【0010】
前者の凝集沈殿法では、凝集剤としてPAC(ポリ塩化アルミニウム)またはAl2(SO4)3(硫酸バンド)等を排水の中に混入させ、Siとの反応物を生成させ、この反応物を取り除くことで、排水の濾過をしていた。
【0011】
後者の、フィルタ濾過と遠心分離を組み合わせた方法では、排水を濾過し、濃縮された排水を遠心分離機にかけて、シリコン屑をスラッジとして回収するとともに、排水を濾過してできたきれいな水を自然界に放出したり、または再利用していた。
【0012】
例えば、図13に示すように、ダイシング時に発生する排水は、原水タンク201に集められ、ポンプ202で濾過装置203に送られる。濾過装置203には、セラミック系や有機物系のフィルタFが装着されているので、濾過された水は、配管204を介して回収水タンク205に送られ、再利用される。または自然界に放出される。
【0013】
一方、濾過装置203は、フィルタFに目詰まりが発生するため、定期的に洗浄が施される。例えば、原水タンク201側のバルブB1を閉め、バルブB3と原水タンクから洗浄水を送付するためのバルブB2が開けられ、回収水タンク205の水で、フィルタFが逆洗浄される。これにより発生した高濃度のSi屑が混入された排水は、原水タンク201に戻される。また濃縮水タンク206の濃縮水は、ポンプ208を介して遠心分離器209へ輸送され、遠心分離器209により汚泥(スラッジ)と分離液に分離される。Si屑から成る汚泥は、汚泥回収タンク210に集められ、分離液は分離液タンク211に集められる。更に分離液が集められた分離液タンク211の排水は、ポンプ212を介して原水タンク201に輸送される。
【0014】
これらの方法は、例えば、Cu、Fe、Al等の金属材料を主材料とする固形物または板状体、セラミック等の無機物から成る固形物や板状体等の研削、研磨の際に発生する屑を回収する際も採用されていた。
【0015】
一方、CMP(Chemical-Mechanical Polishing)が新たな半導体プロセス技術として登場してきた。このCMP技術がもたらすものは、▲1▼平坦なデバイス面形状の実現と、▲2▼基板とは異なる材料の埋め込み構造の実現である。
【0016】
▲1▼は、リソグラフィ技術を使った微細パターンを精度良く形成するものである。またSiウェハの貼り付け技術の併用等で、三次元ICの実現の可能性をもたらすものである。
【0017】
▲2▼は、埋め込み構造を可能とするものである。従来、ICの多層配線には、タングステン(W)埋め込み技術が採用されている。これは層間膜の溝にCVD法でWを埋め込み、表面をエッチバックして平坦化していたが、最近はCMPにより平坦化されている。この埋め込み技術の応用としては、ダマシンプロセス、素子分離があげられる。これらCMPの技術および応用は、サイエンスフォーラム発行の「CMPのサイエンス」に詳述されている。
【0018】
続いて、CMPの機構を簡単に説明する。図14に示すように、回転定盤250上の研磨布251に半導体ウェハ252を載せ、研磨材(スラリー)253を流しながら擦り合わせ、研磨加工、化学的エッチングすることにより、ウェハ252表面の凹凸を無くしている。研磨材253の中の溶剤による化学反応と、研磨布と研磨剤の中の研磨砥粒との機械的研磨作用で平坦化されている。研磨布251としては、例えば発泡ポリウレタン、不織布などが用いられ、研磨材は、シリカ、アルミナ等の研磨砥粒を、pH調整材を含んだ水に混合したもので、一般にはスラリーと呼ばれている。このスラリー253を流しながら、研磨布251にウェハ252を回転させながら一定の圧力をかけて擦り合わせるものである。尚、254は、研磨布251の研磨能力を維持するもので、常に研磨布251の表面をドレスされた状態にするドレッシング部である。また202、208、212はモーター、255〜257はベルトである。
【0019】
上述した機構は、例えば図15に示すように、システムとして構築されている。このシステムは、大きく分けると、ウェハカセットのローディング・アンローデイングステーション260、ウェハ移載機構部261、図14で説明した研磨機構部262、ウェハ洗浄機構部263およびこれらを制御するシステム制御から成る。
【0020】
まずウェハが入ったカセット264は、ウェハカセット・ローデイング・アンローディングステーション260に置かれ、カセット264内のウェハが取り出される。続いて、ウェハ移載機構部261、例えばマニプュレータ265で前記ウェハを保持し、研磨機構部262に設けられた回転定盤250の上に載置され、CMP技術を使ってウェハが平坦化される。この平坦化の作業が終わると、スラリーの洗浄を行うため、前記マニプュレータ266によりウェハがウェハ洗浄機構部263に移され、洗浄される。そして洗浄されたウェハは、ウェハカセット266に収容される。
【0021】
例えば、1回の工程で使われるスラリーの量は、約500cc〜1リットル/ウェハである。また、前記研磨機構部262、ウェハ洗浄機構部263で純水が流される。そしてこれらの排水は、ドレインで最終的には一緒になるため、約5リットル〜10リットル/ウェハの排水が1回の平坦化作業で排出される。例えば3層メタルであると、メタルの平坦化と層間絶縁膜の平坦化で約7回の平坦化作業が入り、一つのウェハが完成するまでには、5〜10リットルの七倍の排水が排出される。よって、CMP装置を使うと、純水で希釈されたスラリーがかなりの量排出されることが判る。そしてこれらの排水は、凝集沈殿法で処理されていた(特許文献1参照)。
【0022】
【特許文献1】
特開2001−157894号公報
【0023】
【発明が解決しようとする課題】
しかしながら、凝集沈殿法は、凝集剤として化学薬品が投入される。しかし完全に反応する薬品の量を特定するのは非常に難しく、どうしても薬品が多く投入され未反応の薬品が残る。逆に薬品の量が少ないと、全ての被除去物が凝集沈降されず、被除去物が分離せず残ってしまう。特に、薬品の量が多い場合は、上澄液に薬品が残る。これを再利用する場合、濾過流体に薬品が残留するため、化学反応を嫌うものには再利用できない問題があった。
【0024】
また薬品と被除去物の反応物であるフロックは、あたかも藻の如き浮遊物で生成される。このフロックを形成する条件は、pH条件が厳しく、攪拌機、pH測定装置、凝集剤注入装置およびこれらを制御する制御機器等が必要となる。またフロックを安定して沈降させるには、大きな沈殿槽が必要となる。例えば、3立方メートル(m3)/1時間の排水処理能力であれば、直径3メートル、深さ4メートル程度のタンク(約15トンの沈降タンク)が必要となり、全体のシステムにすると約11メートル×11メートル程度の敷地も必要とされる大がかりなシステムになってしまう。
【0025】
しかも沈殿槽に沈殿せず浮遊しているフロックもあり、これらはタンクから外部に流出する恐れがあり、全てを回収することは難しかった。つまり設備の大きさの点、このシステムによるイニシャルコストが高い点、水の再利用が難しい点、薬品を使う点から発生するランニングコストが高い点等の問題があった。
【0026】
一方、図13の如き、5立方メートル(m)/1時間のフィルタ濾過と遠心分離機を組み合わせた方法では、濾過装置203にフィルタF(UFモジュールと言われ、ポリスルホン系ファイバで構成されたもの、またはセラミックフィルタ)を使用するため、水の再利用が可能となる。しかし、濾過装置203には4本のフィルタFが取り付けられ、フィルタFの寿命から、約50万円/本と高価格なフィルタを、少なくとも年に1回程度、交換する必要があった。しかも濾過装置203の手前のポンプ202は、フィルタFが加圧型の濾過方法であるためフィルタの目詰まりが発生してモータの負荷が大きく、ポンプ202が高容量であった。また、フィルタFを通過する排水の内、2/3程度は、原水タンク201に戻されていた。更には被除去物が入った排水をポンプ202で輸送するため、ポンプ202の内壁が削られ、ポンプ2の寿命も非常に短かった。
【0027】
これらの点をまとめると、モータの電気代が非常にかかり、ポンプPやフィルタFの取り替え費用がかかることからランニングコストが非常に大きい問題があった。
【0028】
更に、CMPに於いては、ダイシング加工とは、比較にならない量の排水が排出される。スラリーはコロイド状に流体内に分布し、ブラウン運動によりなかなか沈降しない。しかもスラリーに混入される砥粒の粒径は10〜200nmの極めて微細なものである。従って、微細な砥粒から成るスラリーをフィルタで濾過すると、フィルタの孔に砥粒が侵入し、すぐに目詰まりを起こし、目詰まりが頻繁に発生するため、排水を大量に処理できない問題があった。
【0029】
今までの説明からも判るように、地球環境に害を与える物質を可能な限り取り除くため、または濾過流体や分離された被除去物を再利用するために、排水の濾過装置は、色々な装置を追加して大がかりなシステムとなり、結局イニシャルコスト、ランニングコストが膨大と成っている。従って今までの汚水処理装置は、到底採用できるようなシステムでなかった。
【0030】
また、自己形成膜(プレコートフィルタ)を用いて上記排水を濾過する場合、濾過を行うポンプの制御が困難である問題があった。
【0031】
【課題を解決するための手段】
本発明は上記の課題に鑑みてなされ、被除去物を含む流体が収納されるタンクと、前記タンク内に浸漬される第1のフィルタとその表面に堆積した前記被除去物から成る第2のフィルタとで形成されるフィルタ装置と、パイプを介して前記フィルタ装置と接続されたポンプとを有し、前記第2のフィルタは、前記ポンプの吸引圧により前記第1のフィルタを前記流体が通過することにより形成され、前記第2のフィルタが形成された前記フィルタ装置を、前記ポンプの吸引圧により前記流体が通過することで前記流体は濾過され、前記第2のフィルタを形成する工程では、前記流体を濾過する工程よりも前記ポンプの吸引圧が大きいことを特徴とする。
【0032】
更に本発明は、コロイド状の被除去物を含む流体が収納されるタンクと、前記タンク内に浸漬される第1のフィルタとその表面に吸着されるゲル膜より成る第2のフィルタとで形成されるフィルタ装置と、パイプを介して前記フィルタ装置と接続されたポンプとを有し、前記第2のフィルタは、前記ポンプの吸引圧により前記第1のフィルタを前記流体が通過することにより形成され、前記第2のフィルタが形成された前記フィルタ装置を、前記ポンプの吸引圧により前記流体が通過することで前記流体は濾過され、前記第2のフィルタを形成する工程では、前記流体を濾過する工程よりも前記ポンプの吸引圧が大きいことを特徴とする。
【0033】
本発明では、ポンプの吸引圧を調節することにより、自己形成膜である第2のフィルタの形成工程と、第2のフィルタを用いた濾過工程をスムーズに行うことができる。
【0034】
一般に、CMPのスラリーに混入される砥粒のように200nmクラス以下の粒体を取り除くには、この粒体よりも小さな孔のフィルタ膜を採用するのが一般的である。しかし本発明は、被除去物より成るゲル膜をフィルタとして用い、フィルタに形成される数多くの隙間を流体の通過路として活用している。また本発明はフィルタ自身が被除去物の粒体の集合体であることから、目詰まりの原因となる被除去物をフィルタから離間させることができ、濾過能力の維持が実現できるものである。更に本発明はゲル膜のフィルタが濾過を続けることで目詰まりしても、そのフィルタを再生して濾過を継続でき長時間の濾過が実現できるものである。
【0035】
【発明の実施の形態】
図1を参照して、本発明の濾過装置20の構成等を説明する。図1(A)は本発明に係る濾過装置20の概略構成図であり、図1(B)はモーターの回転数およびパイプ56内部の吸引圧の時間的変化を示す特性図である。
【0036】
図1(A)を参照して、本発明の濾過装置20は、被除去物を含む流体が収納されるタンク50と、タンク50内に浸漬される第1のフィルタとその表面に堆積した被除去物から成る第2のフィルタとで形成されるフィルタ装置53と、パイプ56を介してフィルタ装置53と接続されたポンプ57とを有し、第2のフィルタはポンプ57の吸引圧により第1のフィルタを流体が通過することにより形成され、第2のフィルタが形成されたフィルタ装置53を、ポンプ57の吸引圧により流体が通過することで前記流体は濾過され、前記第2のフィルタを形成する工程では、前記流体を濾過する工程よりもポンプ57の吸引圧が大きい構成と成っている。このような構成の濾過装置20の詳細を以下にて説明する。
【0037】
先ず、図1(A)を参照して濾過装置20の概要を説明する。符号50は原水タンクである。このタンク50の上方には、排水供給手段としてパイプ51が設けられている。このパイプ51は被除去物が混入した流体をタンク50に導入する。例えば、半導体分野で説明すると、ダイシング装置、バックグラインド装置、ミラーポリッシング装置またはCMP装置から流れ出るコロイド溶液の被除去物が混入された排水(原水)が導かれる所である。尚、この排水は、CMP装置から流れる砥粒、砥粒により研磨または研削された屑が混入された排水として説明していく。また、同図に示すように、排水受入槽17に一時的に貯留された流体が、パイプ51を介して原水タンク50に導入されても良い。
【0038】
原水タンク50に貯められた原水52の中には、第2のフィルタが形成されたフィルタ装置53が複数個設置される。このフィルタ装置53の下方には、例えばパイプに小さい孔を開けたような、また魚の水槽に使うバブリング装置の如き、散気管54が設けられ、ちょうどフィルタ装置53の表面を通過するようにその位置が調整されている。この散気管54はフィルタ装置53の底辺全体に渡って配置され、気泡をフィルタ装置53の全面に均一に供給出来るようになっている。55はエアーポンプである。エアーポンプ55と散気管54とは、パイプ状の通気管40により接続されている。
【0039】
パイプ51から供給された原水52は、原水タンク50に貯められ、フィルタ装置53により濾過される。このフィルタ装置53に取り付けられた第2のフィルタ2の表面は、気泡が通過し、気泡の上昇力や破裂により並行流を発生させ、第2のフィルタに吸着するゲル化した被除去物を動かし、フィルタ装置53の全面に均一に吸着させてその濾過能力が低下しないように維持されている。
【0040】
ポンプ57は、パイプ56を介してフィルタ装置53と連結されている。即ち、ポンプ57により発生する吸引力により、フィルタ装置53で濾過された流体は外部に放出される。また、第2のフィルタを形成する工程や、濾過液が所望の透明度を有していない場合は、フィルタ装置53から取り出された流体は、原水タンク50に戻される。即ち、本発明の濾過装置20は、濾過水を循環させる工程を有している。また、パイプ56の途中には、その内部の圧力を感知するための圧力計59が設けられている。そして、圧力計59で計測したパイプ56内部の圧力に応答して、ポンプが有するモーターの回転が制御されてその吸引圧が制御されている。また、パイプ56の途中には、濾過液が一時的に貯留される剥離用の水槽70が設けられる。
【0041】
ポンプ57としては、インバータ回路によりその回転数が制御される交流モーター、または、印加される電圧によりその回転が制御される直流モーター等を備えたもの採用することができる。このように回転数が制御可能なモーターを採用することにより、第2のフィルタを形成する工程と、濾過を行う工程とで、フィルタ装置53に印加される吸引圧を変化させることができる。特に、本発明では、第1のフィルタの表面に形成されるゲル状の膜を用いて、流体の濾過を行う。従って、回転数が制御可能なモーターを採用することにより、第1のフィルタの孔にゲルが侵入してしまい、第2のフィルタが破壊されてしまうのを防止することができる。ゲル状の第2のフィルタの詳細に関しては後述する。
【0042】
また、フィルタ装置53に加印する吸引圧の調整手段としては、上記したモーターの回転数の変化だけではなく、他の手段も採用することができる。例えば、ポンプ57を稼働するモーターの回転数は固定しておき、パイプ56の途中にリリース弁を介装することで、フィルタ装置53に加印する吸引圧を調節することもできる。具体的には、このリリース弁を開くことで吸引圧を小さくすることが可能であり、このリリース弁をしめることで吸引圧を大きくすることが可能である。更には、ポンプ55の位置を上下方向に移動させることでも、フィルタ装置53に加印する吸引圧を変化させることも可能である。
【0043】
図1(B)を参照して、フィルタ装置53に印加される吸引圧と、ポンプ55が備えるモータの回転数との関係を説明する。同図の横軸は時間の変化を示す。左側の縦軸はフィルタ装置53に加印される吸引圧を示し、ここでは負圧の増加を示している。右側の縦軸はポンプ57を作動させるモーターの回転数を示している。更に、同図で、点線は吸引圧の変化を示し、実線はモータの回転数の変化を示している。
【0044】
先ず、原水52にフィルタ装置53を浸漬して、ポンプ55を作動させることにより、第1のフィルタの表面に自己形成膜である第2のフィルタを形成する。この工程が第2のフィルタ形成工程である。この工程では、早期に第2のフィルタを形成するために、ポンプ55を動作させるモータの回転数をできるだけ早く行う。また、この工程では、取り出された濾過水は、原水タンク50に戻されても良い。
【0045】
上記工程により、フィルタ装置53の第1のフィルタの表面に徐々に自己形成膜である第2のフィルタが形成される。第2のフィルタは、流体中に含まれる被除去物からなり、第1のフィルタと比較するとその孔は微細である。従って、この第2のフィルタの形成に伴い、吸引圧は徐々に低下する。また、この吸引圧は、圧力計59によりモニタリングされている。
【0046】
吸引圧が所定の値に達した場合、第2のフィルタが形成されたと判断して、濾過工程に移行する。濾過工程でのモータの回転数は、上記工程よりも遅い回転数と成っている。このようにすることで、吸引圧を所定の値以下にすることが可能であり、過度の吸引圧が第2のフィルタに作用することによる、第2のフィルタの破壊を防止することができる。
【0047】
また、上記第2のフィルタは、濾過の進行により濾過能力が低下する。そして、濾過能力が低下した第2のフィルタは、剥離用水槽70から濾過水をフィルタ装置53に逆流させることにより剥離される。そして、その後にポンプ57を作動させることにより、フィルタ装置53に逆流した濾過水を剥離用水槽70に戻す。この時のポンプ55の吸引圧は、濾過を行う際よりも大きく設定される。
【0048】
また、濾過の作業を終了する際は、濾過装置20を停止させる前に、濾過時よりも吸引圧を小さくしてポンプを所定の時間だけ作動させる。このようにすることにより、濾過装置20が再稼働した際に、濾過装置20に与える負荷を小さくすることができる。
【0049】
図2を参照して更に具体化された濾過装置を説明する。なお、図1に示す濾過装置と同一構成要素は同一符号を付した。
【0050】
図2において、50は原水タンクである。このタンク50の上方には、排水供給手段としてパイプ51が設けられている。このパイプ51は被除去物が混入した流体をタンク50に導入する。例えば、半導体分野で説明すると、ダイシング装置、バックグラインド装置、ミラーポリッシング装置またはCMP装置から流れ出るコロイド溶液の被除去物が混入された排水(原水)が導かれる所である。尚、この排水は、CMP装置から流れる砥粒、砥粒により研磨または研削された屑が混入された排水として説明していく。
【0051】
エアポンプ55と散気管54とを接続する通気管40には、その途中に調整バルブ41および停止バルブ42が介装されている。調整バルブ41は、所望の量の気体の流れを許容するように設定されており、例えば、ニードル弁等を調整バルブとして採用することができる。停止バルブ42は、通気管40内部を流れる気体の開放および遮断を行うためのバルブである。具体的に停止バルブ42としては、例えばソレノイドを使用したバルブ等を使用することができる。このように、調整バルブ41Aと停止バルブ42とを組み合わせて用いることにより、エアーポンプ55の出力を固定したままで、停止バルブ42の開閉を行うのみで、所望の量の気体を散気管54に供給することができる。
【0052】
また、通気管40には、その途中に分岐して並列した経路が複数個設けられている。具体的には、第1の経路40A、第2の経路40Bおよび第3の経路40Cが分岐して並列している。それぞれの経路には上述した調整バルブ41および停止バルブ42が介装されている。
【0053】
第1の経路40Aには、第1の調整バルブ41Aおよび第1の停止バルブ42Aが介装されている。第1の調整バルブ41Aは、フィルタ装置53が濾過作業等を行う際に適した量の気体が通過する様に調節されている。第1の停止バルブ42Aは、フィルタ装置53で濾過する濾過工程または、ゲル状の第2のフィルタを製膜する工程等で開放される。また、第1の停止バルブ42Aが開放状態にある時は、第2の停止バルブ42Bおよび第3の停止バルブ42Cは、遮断状態になっている。このように調節された第1の調整バルブ41Aにより、濾過時に於いて、散気管54から適度な量の気体を供給することが可能となる。従って、散気管54から上昇する気泡により、原水タンク50内部の原水は攪拌され、濾過をスムーズに行うことができる。
【0054】
第2の経路40Bには、第2の調整バルブ41Bおよび第2の停止バルブ42Bが介装されている。第2の調整バルブ41Bは、上述した第1の調整バルブ41Aよりも多量の気体が通過するように設定されている。第2の停止バルブ42Bは、フィルタ装置53を構成するゲル状の第2のフィルタを、第1のフィルタから離脱させる工程(再生工程)で開放される。多量の気体が散気管から原水内部に供給されることにより、第2のフィルタの離脱を行うことができる。第2の停止バルブ42Bが開放状態の際は、第1の停止バルブ42Aおよび第3の停止バルブ42Cは、遮断状態になる。
【0055】
第3の経路40Cには、第3の調整バルブ41Cおよび第3の停止バルブ42Cが介装されている。第3の調整バルブ41Cは、上述した第1の調整バルブ41Aおよび第2の調整バルブ41Bよりも、少ない気体が流れるように設定されている。第3の停止バルブ42Cは、濾過装置20全体が運転を停止している時に開放される。第3の停止バルブ42Cが開放状態のときには、第1の停止バルブ42Aおよび第2の停止バルブ42Bは、遮断状態になっている。このように濾過装置20全体が濾過作業を停止している際に、開放状態になっていることで、散気管54の目詰まりを防止することができる。
【0056】
パイプ56は、フィルタ装置53で濾過された濾過流体が流れ、バルブV1を介して吸引を行うマグネットポンプ57に接続される。パイプ58はマグネットポンプ57からコントロールバルブCV1を介してバルブV3およびバルブV4に接続されている。またパイプ56のバルブV1の後に第1の圧力計59が設けられ、吸引圧力Pinを測定している。更にパイプ58のコントロールバルブCV1の後には流量計Fおよび第2の圧力計60が設けられ、流量計61で一定の流量になるように制御している。またエアーポンプ55からのエアー流量はコントロールバルブCV2で制御される。
【0057】
原水タンク50に貯められた原水52の中には、第2のフィルタが形成されたフィルタ装置53が複数個設置される。このフィルタ装置53の下方には、例えばパイプに小さい孔を開けたような、また魚の水槽に使うバブリング装置の如き、散気管54がフィルタ装置53の底辺全体に渡って設けられ、ちょうどフィルタ装置53の表面を通過するようにその位置が調整されている。55はエアーポンプである。空気はエアーポンプ55から供給され、エアー流量計69を介して散気管54に導かれる。また、散気管54とエアーポンプ55とを接続する通気管40には、上述した第1の経路40A、第2の経路40Bおよび第3の経路40Cが設けられている。更に、各経路に設けられた第1の停止バルブ42A、第2の停止バルブ42Bおよび第3の停止バルブ42Cは、制御部68と電気的に接続されている。
【0058】
フィルタ装置53に固定されたパイプ56は、フィルタ装置53で濾過された濾過流体が流れ、バルブV1を介して吸引を行うマグネットポンプ57に接続される。パイプ58はマグネットポンプ57から第1のコントロールバルブCV1を介してバルブV3およびバルブV4に接続されている。またパイプ56のバルブV1の後に第1の圧力計59が設けられ、吸引圧力Pinを測定している。更にパイプ58の第1のコントロールバルブCV1の後には流量計61および第2の圧力計60が設けられ、流量計61で一定の濾過流量になるように制御している。
【0059】
また、パイプ58は光センサ62に接続され、光センサ62からは分岐したパイプ63、64に導かれる。パイプ63、64には光センサ62からの検出信号で開閉が切り換えられるバルブV3、V4が挿入され、パイプ63は濾過水をタンク50に戻し、パイプ64は濾過水を外部に取り出すようになっている。光センサー62は濾過水に含まれる微粒子の濃度を監視し、微粒子が所望の混入率よりも低いことを確認して濾過を開始する。濾過が開始される時は、バルブV3が光センサー62からの検出信号で閉じられ、バルブV4が開かれて精製水が外部に取り出される。
【0060】
また、剥離用水槽70はバルブV5によりパイプ58と接続され、濾過水を貯める働きがあり、一定量を超えるとオーバーフローしてタンク50にパイプ71で戻される。その底部にはバルブV2が設けられ、パイプ56と接続されている。この剥離用水槽70はタンク50の液面より10〜20cm程度高い位置に設けられ、第2フィルタの再生工程で利用される。
【0061】
更に、タンク50にはpH調節機65、加熱冷却機66が設けられ、特にCMP排水のpHを6〜7程度に調整をしたり、ゲル化を促進するために排水の温度を調整する。タンク50から排水がオーバーフローするのを防止するために液面計67で監視し、排水の流入量を調整する。
【0062】
更に、この濾過装置の運転を制御する制御装置68が設けられ、同図で点線で示すようにコントロールバルブCV1、流量計61、69、ポンプ57、圧力計59、60、光センサ62等が各工程毎に制御される。
【0063】
上述した濾過装置では、第2のフィルタの成膜工程、濾過工程、第2のフィルタの再生工程、再濾過工程、メンテナンス工程において、制御装置68からの制御で各バルブ等を開閉し、ポンプ57等の運転を制御している。以下に各工程毎にその運転状況を説明する。なお、図3に各工程でのポンプ57,光センサ62、エアーポンプ55および各バルブの動作状態を示す。
【0064】
まず、原水タンク50にコロイド溶液の被除去物が混入された排水をパイプ51を介して入れる。このタンク50の中に第2のフィルタ2が形成されていない第1のフィルタ1のみのフィルタ装置53を所望の濾過流量を得られる枚数だけ間隔を設けて浸漬する。具体的には、10枚から40枚程度のフィルタ装置53が図示しないが支持手段に懸架される。当然フィルタ装置53の1枚の濾過面積によりこの枚数も異なるが、タンク50の大きさよりフィルタ装置53の必要な濾過面積総計は求められる。
【0065】
次に、第2のフィルタ2の成膜工程に移行する。パイプ56を介してポンプ57で微弱な吸引圧力で吸引しながらタンク50内の排水を循環させる。循環経路はフィルタ装置53、パイプ56、バルブV1、ポンプ57、パイプ58、コントロールバルブCV1、流量計61、光センサー62、バルブV3であり、排水はタンク50から吸引されまたタンク50に戻される。散気管54からはエアーポンプ55から第1の経路40Aを通り供給される空気の気泡が上昇してフィルタ装置53の表面に供給されている。即ち、第1の停止バルブ42Aを開放状態にして、第1の調整バルブ41Aにより所望の量の気体が、散気管54に供給される。このとき、他のバルブV2、V4、V5、V6、Dは閉じられている。
【0066】
排水を循環させることによりフィルタ装置53の第1のフィルタには、第2のフィルタ2が成膜され、最終的には目的のコロイド溶液の被除去物が捕獲される様になる。(この具体的な原理は後述する)すなわち、ポンプ57により第1のフィルタ1を介して排水を微弱な吸引圧力で吸引をすると、第1のフィルタ1に近づくにつれて被除去物の微粒子はゲル化して第1のフィルタ1の表面に吸着される。ゲル化した微粒子は第1のフィルタ1のフィルタ孔11より大きいものが徐々に第1のフィルタ1表面に吸着して積層され、ゲル膜より成る第2のフィルタ2を形成する。なおフィルタ孔11より径の小さいゲル化した微粒子は第1のフィルタ1を通過するが、第2のフィルタ2の成膜とともに排水中の水はこの隙間を通路として吸引されて第1のフィルタ1を通過して精製水として取り出され、排水は濾過されるようになる。
【0067】
このとき光センサー62で濾過水に含まれる微粒子の濃度を監視し、微粒子が所望の混入率よりも低いことを確認して濾過工程に移行する。
【0068】
続いて、第2のフィルタ2の成膜が完了すると、濾過工程に進む。濾過が開始されると、バルブV3が光センサー62からの検出信号で閉じられ、バルブV4が開かれて前述した循環経路は閉じられ、バルブV4から濾過水が取り出される。この工程では、流量計61で一定の濾過流量になるように制御装置68で制御され、第2のフィルタ2の目詰まりをできるだけ防いで濾過時間を長く保持できるように運転される。図9に示すように、ポンプ57の吸引圧力Pinは徐々に増加され、濾過流量を一定に保持している。なお、他の部分は成膜工程と同様の運転条件となっている。この工程に於いても、散気管54に供給される気体は、第1の経路40Aを介して供給されている。
【0069】
何らかの原因で第2のフィルタ2が破壊された場合は、光センサ62で微粒子の混入が検出されて、バルブV4が閉じられ、逆にバルブV3が開かれて濾過水はタンク50に戻される。すなわち、成膜工程に逆戻りをして第2のフィルタ2の修復を行い、正常に戻ると再び濾過工程に戻る。
【0070】
そして連続して濾過が続けられると、原水タンク50の排水中の水は濾過水としてタンク50の外に取り出されるので、排水中の被除去物の濃度は上がってくる。すなわち、コロイド溶液は濃縮されて粘度を増してくる。このために原水タンク50にはパイプ51から排水を補充して、排水の濃度の上昇を抑えて濾過の効率を上げる。しかし、フィルタ装置53の第2のフィルタ2表面にゲル膜が厚く付着して、やがて第2のフィルタ2は目詰まりを起こし、濾過が行えない状態になる。
【0071】
この第1フィルタ1の表面に第2のフィルタ2のゲル膜が厚く吸着されると、濾過流量の減少として流量計61で検知されて制御装置68により濾過工程から第2のフィルタの再生工程に移行する。
【0072】
まず、再生工程ではポンプ57を停止し、フィルタ装置53に加わる負の吸引圧力を解除する。同時に、バルブV2が開かれて剥離用水槽70に予め蓄えられた濾過水がバルブV1を介してパイプ56を逆流してフィルタ装置53の中空部5に送られる。
【0073】
従って、再生工程ではこの微弱な吸引圧力が停止されてほぼ大気圧に戻るので、フィルタ装置53の第1のフィルタ1は吸引圧力で窪んだ状態から元の状態に戻る。これにより第2のフィルタ2およびその表面に吸着されたゲル膜も同様に戻る。この結果、まずゲル膜を吸着していた吸引圧力がなくなるので、ゲル膜はフィルタ装置53への吸着力を失うと同時に外側に膨らむ力を受ける。更に、剥離用水槽70がタンク50液面より高い位置に設けられるので、剥離用水槽70からの濾過水の逆流によりその高低差による静水圧が加わり、フィルタ装置53の第1のフィルタ1および第2のフィルタ2は外側に膨らむ力が加わる。これにより、吸着したゲル膜は自重および静水圧でフィルタ装置53から離脱を始める。実験に依れば、フィルタ装置53の下端から離脱が始まり、雪崩の様に第1のフィルタ1の表面に付着した第2のフィルタ2のゲル膜が離脱し、原水タンク50の底面に沈降する。続いて前述した循環経路で排水を循環させて第2のフィルタ2の成膜を行うと良い。この再生工程で第2のフィルタ2は元の状態まで戻り、排水の濾過を行える状態まで復帰し、再び排水の濾過を行う。このときにバルブV2を閉じてバルブV5を開き、剥離用水槽70に濾過水を貯めておき、次の再生工程に備える。
【0074】
更に、この離脱を進めるために散気管54からの気泡の量を2倍程度に増加させると良い。具体的には、第2の停止バルブ42Bを開放状態にして、第1の停止バルブ42Aおよび第3の停止バルブ42Cを遮断状態にする。
【0075】
この後に、再濾過工程に入り再び排水の濾過を開始する。運転条件は濾過工程と同様である。このように第2のフィルタ2を再生させながら何度も濾過を続けると、原水タンク50の排水の被除去物の濃度が上昇し、やがて排水もかなりの粘度を有する。従って、排水の被除去物の濃度が所定の濃度を超えたら、濾過作業を停止してメンテナンス工程に移行する。
【0076】
メンテナンス工程はパイプ56、58および剥離用水槽70にある濾過水を排出するステップと、タンク50内の排水および底部に貯まったゲルを排出するステップから構成される。前のステップでは、ポンプ57およびエアーポンプ55を停止し、コントロールバルブCV1、バルブV1、V2、V5を開いて、パイプ56、58および剥離用水槽70にある濾過水をパイプ56に設けた排出用のバルブDより外部に排出する。
【0077】
また、後のステップでは凝集沈殿させるために放置してタンク50の底に濃縮スラリーを沈殿させ、このゲルの濃縮スラリーをバルブV6を開けて回収する。回収された濃縮スラリーは熱乾燥してその中に含まれる水を蒸発させて更にその量を圧縮する。これにより産業廃棄物として扱われるスラリーの量は大幅に減少できる。上澄みの排水は同様にバルブV6から排出され、続く濾過工程においてまたタンク50に戻される。
【0078】
ここで前述したフィルタ装置53、具体的には原水タンク50の中に浸漬されるフィルタ装置53について図4および図5を参照しながら説明する。
【0079】
図4(A)に示す符号30は、額縁の如き形状のフレームであるこのフレーム30の両面には第1のフィルタとなるフィルタ膜31、32が貼り合わされ固定されている。そしてフレーム30、フィルタ膜31、32で囲まれた内側の空間33には、パイプ34を吸引することにより、フィルタ膜31、32により濾過される。そしてフレーム30にシールされて取り付けられているパイプ34を介して濾過水が取り出されている。もちろんフィルタ膜31、32とフレーム30は、排水がフィルタ膜以外から前記空間33に侵入しないように完全にシールされている。
【0080】
図4(A)のフィルタ膜31、32は、薄い樹脂膜であるため、吸引されると内側に反り、破壊に至る場合もある。そのため、この空間をできるだけ小さくし、濾過能力を大きくするために、この空間33を大きく形成する必要がある。これを解決したものが、図4(B)である。図4(B)では、空間33が9個しか示されていないが、実際は数多く形成される。また実際に採用したフィルタ膜31は、約0.1mm厚さのポリオレフィン系の高分子膜であり、図4(B)に示す如く、薄いフィルタ膜が袋状に形成されており、図4(B)ではFTで示した。この袋状のフィルタFTの中に、パイプ34が一体化されたフレーム30が挿入され、前記フレーム30と前記フィルタFTが貼り合わされている。符号RGは、押さえ手段であり、フィルタFTが貼り合わされた枠を両側から押さえるものである。そして押さえ手段の開口部OPからは、フィルタFTが露出している。詳細については、図5を参照して再度説明する。
【0081】
図4(C)は、フィルタ装置53自身を円筒形にしたものである。パイプ34に取り付けられたフレームは、円筒形で、側面には開口部OP1、OP2が設けられている。開口部OP1と開口部OP2に対応する側面が取り除かれているため、開口部間には、フィルタ膜31を支持する支持手段SUSが設けられることになる。そして側面にフィルタ膜31が貼り合わされる。
【0082】
更に図5を参照して、図4(B)のフィルタ装置53を詳述する。まず図4(B)のフレーム30に相当する部分30aを図5(A)および図5(B)で説明する。部分30aは、見た限り段ボールの様な形状に成っている。0.2mm程度の薄い樹脂シートSHT1、SHT2が重なり、その間に縦方向にセクションSCが複数個設けられ、樹脂シートSHT1、SHT2,セクションSCで囲まれて空間33が設けられる。この空間33の断面は、縦3mm、横4mmから成る矩形であり、別の表現をすると、この矩形断面を持ったストローが何本も並べられ一体化されたような形状である。部分30aは、両側のフィルタ膜FTを一定の間隔で維持しているので、以下スペーサと呼ぶ。
【0083】
このスペーサ30aを構成する薄い樹脂シートSHT1,SHT2の表面には、直径1mmの孔HLがたくさん開けられ、その表面にはフィルタ膜FTが貼り合わされている。よって、フィルタ膜FTで濾過された濾過水は、孔HL、空間33を通り、最終的にはパイプ34から出ていく。
【0084】
またフィルタ膜FTは、スペーサ30aの両面SHT1、SHT2に貼り合わされている。スペーサ30aの両面SHT1,SHT2には、孔HLの形成されていない部分があり、ここに直接フィルタ膜FT1が貼り付けられると、孔HLの形成されていない部分に対応するフィルタ膜FT1は、濾過機能が無く排水が通過しないため、被除去物が捕獲されない部分が発生する。この現象を防止するため、フィルタ膜FTは、少なくとも2枚貼り合わされている。一番表側のフィルタ膜FT1は、被除去物を捕獲するフィルタ膜で、このフィルタ膜FT1からスペーサ30aの表面SHT1に向かうにつれて、フィルタ膜FT1の孔よりも大きな孔を有するフィルタ膜が設けられ、ここではフィルタ膜FT2が一枚貼り合わされている。依って、スペーサ30aの孔HLが形成されていない部分でも、間にフィルタ膜FT2が設けられているため、フィルタ膜FT1全面が濾過機能を有するようになり、フィルタ膜FT1全面に被除去物が捕獲され、第2のフィルタ膜が表裏の面SH1、SH2全面に形成されることになる。また図面の都合で、フィルタ膜SHT1、SHT2が矩形状のシートの様に表されているが、実際は図4Bに示すように袋状に形成されている。
【0085】
次に、袋状のフィルタ膜SHT1、SHT2、スペーサ30aおよび押さえ手段RGがどのように取り付けられているか、図5(A)、図5(C)および図5(D)を参照して説明する。
【0086】
図5(A)は完成図であり、図5(C)は、図5(A)のA−A線に示すように、パイプ34頭部からパイプ34の延在方向(縦方向)に切断した図を示し、図5(D)は、B−B線に示すように、フィルタ装置35を水平方向に切断した断面図である。
【0087】
図5(A)、図5(C)、図5(D)を見ると判るように、袋状のフィルタ膜FTに挿入されたスペーサ30aは、フィルタ膜FTも含めて4側辺が押さえ手段RGで挟まれている。そして袋状にとじた3側辺および残りの1側辺は、押さえ手段RGに塗布された接着剤AD1で固定される。また残りの1側辺(袋の開口部)と押さえ手段RGとの間には、空間SPが形成され、空間33に発生した濾過水は、空間SPを介してパイプ34へと吸引される。また押さえ金具RGの開口部OPには、接着剤AD2が全周に渡り設けられ、完全にシールされ、フィルタ以外から流体が侵入できない構造になっている。
【0088】
よって空間33とパイプ34は連通しており、パイプ34を吸引すると、フィルタ膜FTの孔、スペーサ30aの孔HLを介して流体が空間33に向かって通過し、空間33からパイプ34を経由して外部へ濾過水を輸送できる構造となっている。
【0089】
ここで用いるフィルタ装置53は、図5の構造を採用しており、フィルタ膜を取り付けるフレーム(押さえ金具RG)の大きさはA4サイズであり、具体的には縦:約19cm、横:約28.8cm、厚み:5〜10mmである。実際にはフィルタ装置53はフレームの両面に設けられるので、上記した2倍の面積(面積:0.109m)となる。しかし原水タンク50の大きさによりフィルタ装置の枚数や大きさは自由に選ばれ、求められる濾過量から決められる。
【0090】
次に、ゲル状の第2のフィルタを用いて原水の濾過を行う原理を説明する。先ず、以下の説明で用いる用語の定義を明確にする。
【0091】
コロイド溶液とは直径が1nm〜1μmの大きさの微粒子が媒質中に分散している状態をいう。この微粒子はブラウン運動をし、普通の濾紙は通過するが半透膜は通過しない性質がある。また凝集速度が非常に遅い性質は微粒子間に静電気反発力が働いているため、接近する機会を少なくしていると考えられている。
【0092】
ゾルはコロイド溶液とほぼ同義に使用され、ゾルはゲルと異なり液体中に分散していて流動性を示し、微粒子は活発にブラウン運動をしている。
【0093】
ゲルはコロイド粒子が独立した運動性を失って、集合して固化した状態をいう。例えば寒天やゼラチンは温水に溶かせば分散してゾルになるが、これを冷却すると流動性を失ってゲルとなる。ゲルには液体分の多いヒドロゲルとやや乾燥したキセロゲルとがある。
【0094】
ゲル化の要因としては、分散媒の水を取り除いて乾燥させたり、シリカスラリー(pH9〜10)に電解質塩を添加してpH6〜7までpH調整をしたり、冷却をして流動性を失わせる等がある。
【0095】
スラリーは粒子と液体および化学薬品を混合して、ポリッシングに使用するコロイド溶液またはゾルを言う。前述したCMPに用いる研磨剤をCMPスラリーと呼んでいる。CMPスラリーにはシリカ系研磨剤、酸化アルミニウム(アルミナ)系研磨剤、酸化セリウム(セリア)系研磨剤等が知られている。もっともよく利用されるのはシリカ系研磨剤であり、その中でもコロイダルシリカが広く用いられる。コロイダルシリカとは、7〜300nmのコロイドサイズのシリカ超微粒子が水または有機溶媒中に沈降すること無く均質に分散している分散液であり、シリカゾルとも呼ばれる。このコロイダルシリカは水の中で粒子が単分散しているので、コロイド粒子の相互の反発力で1年以上放置してもほとんど沈降することはない。
【0096】
まず本発明は被除去物がコロイド溶液あるいはゾルで流体中に含まれた状態の排水から被除去物を濾過により取り除く被除去物の除去方法を提供することにある。
【0097】
被除去物は、3nm〜2μmの粒径分布の微粒子が大量に入ったコロイド溶液(ゾル)であり、例えばCMPに用いるシリカ、アルミナあるいはセリア等の砥粒と砥粒により削られて発生する半導体材料屑、金属屑および/または絶縁膜材料屑である。本実施例ではCMPスラリーとして、キャボット社製W2000タングステン研磨用のスラリーを用いた。このスラリーはpH 2.5、砥粒分布10〜200nmのシリカを主成分としている。
【0098】
本発明の基本的な原理を図6を参照して説明する。本発明は、コロイド溶液(ゾル)の被除去物が混入された流体(排水)を、被除去物から形成したゲル膜から成るフィルタで除去するものである。
【0099】
具体的に説明すると、有機高分子の第1のフィルタ1表面に、コロイド溶液の被除去物であるCMPスラリーから形成した第2のフィルタ2となるゲル膜を形成し、このフィルタ1、2をタンク内の流体3中に浸漬し、被除去物が入った排水を濾過するものである。
【0100】
第1のフィルタ1は、ゲル膜を付着させることができれば原理的に考えて有機高分子系、セラミック系とどちらでも採用可能である。ここでは、平均孔径0.25μm、厚さ0.1mmのポリオレフィン系の高分子膜を採用した。このポリオレフィン系から成るフィルタ膜の表面写真を図2(B)に示した。
【0101】
また、第1のフィルタ1はフレーム4の両面に設けられた平膜構造を有し、流体に垂直になるように浸漬され、フレーム4の中空部5からポンプ6により吸引する様に構成され、ろ液7を取り出せる。
【0102】
次に、第2のフィルタ2は第1のフィルタ1表面全体に付着され、被除去物のゾルを吸引することでゲル化して形成されるゲル膜である。一般にゲル膜はゼリー状であるので、フィルタとしての働きは無いと考えられている。しかし、本発明ではこのゲル膜の生成条件を選択することで第2のフィルタ2の機能を持たせることができる。この生成条件は後で詳述する。
【0103】
では、上記した被除去物のコロイド溶液(ゾル)で被除去物のゲル膜である第2のフィルタ2を形成し、被除去物を取り除く濾過について図6および図7(A)を参照して説明する。
【0104】
1は第1のフィルタで、11はフィルタ孔である。またフィルタ孔11の開口部および第1のフィルタ1の表面に層状に形成されている膜は、被除去物13のゲル膜である。この被除去物13はポンプからの吸引圧力により第1のフィルタ1を介して吸引され、流体3の水分が吸い取られるために乾燥(脱水)してコロイド溶液の被除去物の微粒子がゲル化して結合し、フィルタ孔11を通過できない大きなゲル膜を第1のフィルター1表面に形成する。このゲル膜が第2のフィルタ2を形成する。
【0105】
やがて第2のフィルタ2が所定の膜厚になると第2のフィルタ2は被除去物のゲルを通過させない隙間を形成し、この第2のフィルタ2を利用してコロイド溶液の被除去物の濾過が開始される。従ってポンプ6で吸引しながら濾過を続けると、第2のフィルタ2の表面には徐々にゲル膜が積層されて厚くなり、やがて第2のフィルタ2は目詰まりして濾過を続けられなくなる。この間に被除去物のコロイド溶液はゲル化されながら、第2のフィルタ2の表面に付着してコロイド溶液の水が第1のフィルター1を通過して濾過水として取り出される。
【0106】
図7(A)において、第1のフィルタ1の片面には、被除去物が混入されたコロイド溶液の排水があり、第1のフィルタ1の反対面には、第1のフィルタ1を通過した濾過水が生成されている。矢印の方向に排水は吸引されて流れ、この吸引によりコロイド溶液中の微粒子が第1のフィルタ1に近づくにつれて静電気反発力を失いゲル化されていくつかの微粒子が結合したゲル膜が第1のフィルタ1表面に吸着されて第2のフィルタ2が形成される。この第2のフィルタ2の働きでコロイド溶液中の被除去物はゲル化されながら排水の濾過が行われる。第1のフィルタ1の反対面からは濾過水が吸引される。
【0107】
このように第2のフィルタ2を介してコロイド溶液の排水をゆっくりと吸引することで、排水中の水が濾過水として取り出せ、被除去物は乾燥してゲル化し第2のフィルタ2表面に積層されて被除去物はゲル膜として捕獲される。
【0108】
次に、第2のフィルタ2の生成条件について図8を参照して説明する。図8は第2のフィルタ2の生成条件とその後の濾過量を示している。
【0109】
本発明の方法では、まず第2のフィルタ2の生成と濾過の工程から構成されている。第2のフィルタ2の生成条件により濾過時の精製水濾過量が大きく異なり、第2のフィルタ2の精製条件を適切に選択しないと、ゲル膜の第2のフィルタ2でほとんど濾過できないことが明らかとなる。これは従来ではコロイド溶液の濾過は不可能であると言われてきた事実と一致している。
【0110】
図8(B)に示す特性は、図8(A)に示す方法で実験的に求められたものである。すなわち、円筒の容器21の底部に第1のフィルタ1を設け、キャボット社製W2000タングステン研磨用のスラリー22の原液50ccを入れて吸引圧力を変えてゲル膜の生成を行う。続いて残ったスラリー22を捨てて精製水23を100cc入れ、極めて低い吸引圧力で濾過を行うものである。これにより第2のフィルタ2となるゲル膜の濾過特性を調べることが出来る。なお、このときの第1のフィルタ1は直径47mmのものを用い、その面積は1734mmである。
【0111】
図8(B)において、ゲル膜の生成工程では、吸引圧力を−55cmHg、−30cmHg、−10cmHg、−5cmHg、−2cmHgと変えて120分間成膜を行い、ゲル膜の性質を調べた。この結果、吸引圧力を−55cmHgと強く設定すると2時間で濾過量は16ccと一番多く、順に12.5cc、7.5cc、6cc、4.5ccとなる。
【0112】
次に、精製水に入れ替えてこのゲル膜で濾過を行う。このときの吸引圧力は−10cmHg一定に設定される。吸引圧力−55cmHgで成膜されたゲル膜ではわずか0.75cc/時間しか濾過できない。吸引圧力−30cmHgで成膜されたゲル膜では約1cc/時間の濾過量である。しかし、吸引圧力−10cmHgのゲル膜では2.25cc/時間、吸引圧力−5cmHgのゲル膜では3.25cc/時間、吸引圧力−2cmHgのゲル膜では3.1cc/時間の濾過量となり、極めて弱い吸引圧力で成膜されたゲル膜は濾過工程でも安定して濾過が行える。この実験結果から、第2のフィルタ2のゲル膜の生成工程では約3cc/時間の濾過量になるように吸引圧力を設定すれば、その後の濾過工程での濾過量が一番大きくなることが明らかである。
【0113】
この理由は吸引圧力が強いと、成膜されるゲル膜が膨潤度が低く、緻密で硬くなり、ゲル膜が水分の含有が少なく収縮された状態で成膜されるので、精製水が浸透する通路がほとんど無くなるためであると考えられる。
【0114】
これに対して吸引圧力を弱くすると、成膜されるゲル膜は膨潤度が高く、密度が低く柔らかくなり、ゲル膜に水分の含有が多く膨潤された状態のまま成膜され、精製水が浸透する通路を多く確保できる。ちょうど粉雪がゆっくり降り積もる状態を考えれば容易に理解できる。本発明の特徴はこの微弱な吸引圧力で成膜された膨潤度の高いゲル膜を用いて、このゲル膜に水分が浸透する性質を利用して濾過を実現したことにある。
【0115】
図9を参照して、ゲル膜の特性を説明する。図9(A)はゲル膜中に含まれるゾル量と濾過量の関係を示す。ゾルの除去量はスラリー濃度3%の精製水からゲル膜成膜時の濾過量から第1のフィルタ1に捕捉されたゾル量を求めている。このゾル量が吸引による乾燥で第2のフィルタ2としてゲル化して付着した量と考えられる。これから明らかになることは微弱な吸引により第2のフィルタ2を成膜したときほどゾル量が少ないことが分かる。すなわち、3cc/時間の濾過量のときに消費されるゾル量は0.15ccと極めて少なく、第2のフィルタ2に含まれるゾル量が少ないほど濾過量は多くなる。これが本発明の重要なポイントを示唆するもので、出来るだけゾル量の少ない第2のフィルタ2を形成することでコロイド溶液の排水の濾過を実現可能にするものである。
【0116】
また、図9(B)では上述したゾル除去量とゲル膜の体積からその膨潤度すなわちゲル膜中のゾルの密度を示す。吸引圧力が−30mmHgのときの第2のフィルタ2の膜厚が6mm、吸引圧力が−10mmHgのときの第2のフィルタ2の膜厚が4mmである実験結果から、膨潤度は27から30に増加している。すなわち、吸引圧力が大きいほど膨潤度が低下し、第2のフィルタ2のゾル量の密度が高くなることを示している。さらに重要なことは吸引圧力が低いほど第2のフィルタ2の膜厚も薄くなり且つ膨潤度も大きくなり、図9(B)に示す吸引圧力を微弱にして形成した第2のフィルタ2の濾過時の濾過量が多く且つ長時間濾過できることを裏付けている。
【0117】
従って、本発明で主に0.15μm以下の微粒子のコロイド溶液の排水が濾過できる大きなポイントは第2のフィルタ2の成膜条件に依るところが大きいことが明確になる。
【0118】
図7(A)に示すフィルタは図6のフィルタの片側を示しており、実際にはゲル膜がどのように付着するかを説明する模式図である。
【0119】
第1のフィルタ1はコロイド溶液の排水に垂直に立って浸漬され、排水は被除去物13が分散したコロイド溶液となっている。被除去物13は小さい黒丸で示している。ポンプ6により第1のフィルタ1を介して排水を微弱な吸引圧力で吸引をすると、第1のフィルタ1に近づくにつれて被除去物の微粒子はゲル化して第1のフィルタ1の表面に吸着される。白丸で示すゲル化した微粒子14は第1のフィルタ1のフィルタ孔11より大きいものが徐々に第1のフィルタ1表面に吸着して積層され、ゲル膜より成る第2のフィルタ2を形成する。なおフィルタ孔11より径の小さいゲル化した微粒子14は第1のフィルタ1を通過するが、第2のフィルタ2を成膜する工程では濾過水は再び排水に循環されるので問題はない。そして前述したように約120分間を掛けて第2のフィルタ2が形成される。この成膜する工程では、極めて微弱な吸引圧力で吸引されているのでゲル化した微粒子14はいろいろな形状の隙間を形成しながら積層され、極めて膨潤度の低い柔らかなゲル膜の第2のフィルタ2となる。排水中の水はこの膨潤度の高いゲル膜を浸透して吸引されて第1のフィルタ1を通過して濾過水として取り出され、最終的に排水は濾過されることになる。
【0120】
すなわち、本発明では膨潤度の高いゲル膜で第2のフィルタ2を形成し、第1のフィルタ1から微弱な吸引圧力で吸引することで第1のフィルタ1に接するゲル膜に含まれる水分を脱水させてゲル膜を収縮させ、そのゲル膜に排水に接するゲル膜から水分を浸透させて補給して膨潤させることを繰り返して、第2のフィルタ2を水分のみ浸透させて濾過するのである。
【0121】
また、第1のフィルタ1には排水の底面から空気の気泡12を送り、第1のフィルタ1の表面に沿って排水に並行流を形成している。これは第2のフィルタ2が第1のフィルタ1の表面全体に均一に付着するためと第2のフィルタ2に隙間を形成して柔らかく付着するためである。具体的には1.8リットル/分のエアー流量に設定をしているが、第2のフィルタ2の膜質により選択される。
【0122】
次に濾過工程では、この第2のフィルタ2の表面に微弱な吸引圧力により白丸で示すゲル化した微粒子14が吸着されながら徐々に積層される。このときに精製水は第2のフィルタ2および更に積層される白丸で示すゲル化した微粒子14を浸透して第1のフィルタ1から濾過水として取り出される。すなわち排水に含まれる、例えばCMPの場合にはシリカ、アルミナあるいはセリア等の砥粒と砥粒により削られて発生する半導体材料屑、金属屑および/または絶縁膜材料屑等の加工屑はゲルとして第2のフィルタ2の表面に徐々に積層して捕獲され、水はゲル膜を浸透して第1のフィルタ1から濾過水として取り出せる。
【0123】
しかし、図8(B)に示すように長時間濾過を続けると、第2のフィルタ2表面には厚くゲル膜が付着されるために上述した隙間もやがて目詰まりを起こし、濾過水は取り出せなくなる。このために濾過能力を再生するにはこの積層されたゲル膜を除去することが必要になる。
【0124】
続いて、図2に示す濾過装置を用いて実際の濾過方法を具体的に説明する。
【0125】
まず原水タンク50にコロイド溶液の被除去物が混入された排水をパイプ51を介して入れる。このタンク50の中に第2のフィルタ2が形成されていない第1のフィルタ1のみのフィルタ装置53を浸漬し、パイプ56を介してポンプ57で微弱な吸引圧力で吸引しながら排水を循環させる。循環経路はフィルタ装置53、パイプ56、バルブV1、ポンプ57、パイプ58、コントロールバルブCV1、流量計61、光センサー62、バルブV3であり、排水はタンク50から吸引されまたタンク50に戻される。
【0126】
循環させることによりフィルタ装置53の第1のフィルタには、第2のフィルタ2が成膜され、最終的には目的のコロイド溶液の被除去物が捕獲される様になる。
【0127】
すなわち、ポンプ57により第1のフィルタ1を介して排水を微弱な吸引圧力で吸引をすると、第1のフィルタ1に近づくにつれて被除去物の微粒子はゲル化して第1のフィルタ1の表面に吸着される。ゲル化した微粒子は第1のフィルタ1のフィルタ孔11より大きいものが徐々に第1のフィルタ1表面に吸着して積層され、ゲル膜より成る第2のフィルタ2を形成する。なおフィルタ孔11より径の小さいゲル化した微粒子は第1のフィルタ1を通過するが、第2のフィルタ2の成膜とともに排水中の水はこの隙間を通路として吸引されて第1のフィルタ1を通過して精製水として取り出され、排水は濾過されるようになる。
【0128】
光センサー62で濾過水に含まれる微粒子の濃度を監視し、微粒子が所望の混入率よりも低いことを確認して濾過を開始する。濾過が開始される時は、バルブV3が光センサー62からの検出信号で閉じられ、バルブV4が開かれて前述した循環経路は閉じられる。従って、バルブV4から精製水が取り出される。散気管54からは常時エアーポンプ55から供給される空気の気泡がコントロールバルブCV2で調整されてフィルタ装置53の表面に供給されている。
【0129】
そして連続して濾過が続けられると、原水タンク50の排水中の水は精製水としてタンク50の外に取り出されるので、排水中の被除去物の濃度は上がってくる。すなわち、コロイド溶液は濃縮されて粘度を増してくる。このために原水タンク50にはパイプ51から排水を補充して、排水の濃度の上昇を抑えて濾過の効率を上げる。しかし、フィルタ装置53の第2のフィルタ2表面にゲル膜が厚く付着して、やがて第2のフィルタ2は目詰まりを起こし、濾過が行えない状態になる。
【0130】
フィルタ装置53の第2のフィルタ2が目詰まりを起こすと、第2のフィルタ2の濾過能力の再生を行う。すなわち、ポンプ57を停止し、フィルタ装置53に加わる負の吸引圧力を解除する。
【0131】
図10に示すその模式図を参照して、その再生工程を更に詳述する。図10(A)は濾過工程のフィルタ装置53の状態を示している。第1のフィルタ1の中空部5は微弱な吸引圧力によりは外側と比較すれば負圧となっているので、第1のフィルタ1は内側に窪んだ形状になっている。従って、その表面に吸着される第2のフィルタ2も同様に内側に窪んだ形状になっている。更に第2のフィルタ2の表面に徐々に吸着されるゲル膜も同様である。
【0132】
ところが、図10(B)を参照して、再生工程ではこの微弱な吸引圧力が停止されてほぼ大気圧に戻るので、フィルタ装置53の第1のフィルタ1は元の状態に戻る。これにより第2のフィルタ2およびその表面に吸着されたゲル膜も同様に戻る。この結果、まずゲル膜を吸着していた吸引圧力がなくなるので、ゲル膜はフィルタ装置53への吸着力を失うと同時に外側に膨らむ力を受ける。これにより、吸着したゲル膜は自重でフィルタ装置53から離脱を始める。更に、この離脱を進めるために散気管54からの気泡の量を2倍程度に増加させると良い。実験に依れば、フィルタ装置53の下端から離脱が始まり、雪崩の様に第1のフィルタ1表面の第2のフィルタ2のゲル膜が離脱し、原水タンク50の底面に沈降する。その後、第2のフィルタ2は前述した循環経路で排水を循環させて再度成膜を行うと良い。この再生工程で第2のフィルタ2は元の状態まで戻り、排水の濾過を行える状態まで復帰し、再び排水の濾過を行う。
【0133】
更に、この再生工程で中空部5に濾過水を逆流させると、第1に、第1のフィルタ1が元の状態に戻るのを助け且つ濾過水の静水圧が加わり更に外側に膨らむ力を加え、第2に、第1のフィルタ1の内側からフィルタ孔11を通して濾過水が第1のフィルタ1と第2のフィルタ2の境界にしみ出して第1のフィルタ1の表面から第2のフィルタ2のゲル膜が離脱するのを促進する。
【0134】
上述のように第2のフィルタ2を再生させながら濾過を続けると、原水タンク50の排水の被除去物の濃度が上昇し、やがて排水もかなりの粘度を有する。従って、排水の被除去物の濃度が所定の濃度を超えたら、濾過作業を停止し沈殿させるために放置する。するとタンク50の底に濃縮スラリーが貯まり、このゲルの濃縮スラリーをバルブ64を開けて回収する。回収された濃縮スラリーは圧縮または熱乾燥してその中に含まれる水を除去して更にその量を圧縮する。これにより産業廃棄物として扱われるスラリーの量は大幅に減少できる。
【0135】
図11を参照して、図2に示す濾過装置の運転状況を説明する。運転条件は前述したA4サイズのフィルタ装置53の1枚の両面(面積:0.109m)を用いたものである。初期流量は前述したように濾過効率の良い3cc/時間(0.08m/日)に設定し、再生後流量も同じに設定している。エアーブロー量は成膜および濾過時1.8L/分、再生時3L/分としている。Pinおよび再Pinは吸引圧力であり、圧力計59で測定される。Poutおよび再Poutはパイプ58の圧力であり、圧力計60で測定される。流量および再流量は流量計61で測定され、フィルタ装置53から吸引される濾過量を表している。
【0136】
図11で左側のY軸は圧力(単位:MPa)を示し、X軸に近づくほど負圧が大きくなることを示している。右側のY軸は流量(単位:cc/分)を示す。X軸は成膜からの経過時間(単位:分)を示す。
【0137】
本発明のポイントであるが、第2のフィルタ2の成膜工程、濾過工程および再生後の濾過工程において、流量および再流量は3cc/時間を維持するように制御している。このために成膜工程ではPinは−0.001MPaから−0.005MPaと極めて微弱の吸引圧力で柔らかく吸着されたゲル膜で第2のフィルタ2を形成している。
【0138】
次に、濾過工程ではPinは−0.005MPaから徐々に大きくして、一定の流量を確保しながら濾過を続ける。濾過は約1000分続けられ、やがて流量が減少し始めてときに再生工程を行う。これは第2のフィルタ2の表面にゲル膜が厚く付着して目詰まりを起こすためである。
【0139】
更に、第2のフィルタ2の再生が行われると、徐々に再Pinを大きくしながら一定の再流量で再度濾過を続ける。第2のフィルタ2の再生および再濾過は原水52が所定の濃度、具体的には濃縮度が5倍から10倍になるまで続けられる。
【0140】
また、上述した運転方法とは異なり、吸引圧力を濾過流量の多い−0.005MPaに固定して濾過を行う方法も採用できる。この場合は、第2のフィルタ2の目詰まりとともに濾過流量は徐々に減少するが、濾過時間を長く取れ且つポンプ57の制御が簡単となる利点がある。従って、第2のフィルタ2の再生は濾過流量が一定値以下に減少したときに行えば良い。
【0141】
図12(A)は、CMP用スラリーの中に含まれる砥粒の粒径分布を示すものである。この砥粒は、Si酸化物から成る層間絶縁膜をCMPするものであり、材料はSi酸化物から成り、一般にシリカと呼ばれているものである。最小粒子径は約0.076μm、最大粒子径は、0.34μmであった。この大きな粒子は、この中の粒子が複数集まって成る凝集粒子である。また平均粒径は、約0.1448μmであり、この近傍0.13〜0.15μmで分布がピークとなっている。またスラリーの調整剤としては、KOHまたはNH3が一般的に用いられる。またpHは、約10から11の間である。
【0142】
具体的に、CMP用の砥粒はシリカ系、アルミナ系、酸化セリウム系、ダイヤモンド系が主にあり、他に酸化クロム系、酸化鉄系、酸化マンガン系、BaCO4系、酸化アンチモン系、ジルコニア系、イットリア系がある。シリカ系は、半導体の層間絶縁膜、P−Si、SOI等の平坦化、Al・ガラスディスクの平坦化に使用されている。アルミナ系は、ハードディスクのポリッシング、金属全般、Si酸化膜等の平坦化に使用されている。また酸化セリウムは、ガラスのポリッシング、Si酸化物のポリッシングとして、酸化クロムは、鉄鋼の鏡面研磨に使用されている。また酸化マンガン、BaCO4は、タングステン配線のポリッシングに使用されている。
【0143】
更には、酸化物ゾルと呼ばれ、このゾルは、シリカ、アルミナ、ジルコニア等、金属酸化物または一部水酸化物から成るコロイドサイズの微粒子が水または液体中に均一に分散されているモノで、半導体デバイスの層間絶縁膜やメタルの平坦化に使用され、またアルミ・ディスク等の情報ディスクにも検討されている。
【0144】
図12(B)は、CMP排水が濾過され、砥粒が捕獲されていることを示すデータである。実験では、前述したスラリーの原液を、純水で50倍、500倍、5000倍に薄め、試験液として用意した。この3タイプの試験液は、従来例で説明したように、CMP工程に於いて、ウェハが純水で洗浄されるため、排水は、50倍〜5000倍程度になると想定し、用意された。
【0145】
この3つのタイプの試験液の光透過率を400nmの波長の光で調べると、50倍の試験液は、22.5%、500倍の試験液は、86.5%、5000倍の試験液は、98.3%である。原理的には、排水に砥粒が含まれていなければ、光は散乱されず、限りなく100%に近い数値をとるはずである。
【0146】
これら3つのタイプの試験液に前記第2のフィルタ膜13が形成されたフィルタを浸漬し濾過すると、濾過後の透過率は、3つのタイプとも99.8%となった。つまり濾過する前の光透過率よりも濾過後の光透過率の値が大きいため、砥粒は捕獲できている。尚、50倍希釈の試験液の透過率データは、その値が小さいため図面には出てこない。
【0147】
以上の結果から、本発明の濾過装置に設けたフィルタ装置53のゲル膜より成る第2のフィルタ2でCMP装置から排出されるコロイド溶液の被除去物を濾過すると、透過率で99.8%程度まで濾過できることが判った。
【0148】
また、上記説明では、ゲル状の自己形成膜である第2のフィルタを用いた流体の濾過方法に関して説明したが、自己形成膜はゲル状のもののみに限定されない。本願の構成は、他の種類の自己形成膜(プレコートフィルタ)を用いた濾過装置および濾過方法に適用することも可能である。
【0149】
【発明の効果】
本発明では、自己形成膜である第2のフィルタを用いて濾過を行う濾過装置において、吸引圧が調節可能なモータを有するポンプを用いて、フィルタ装置53からの濾過水の取り出しを行っている。従って、自己形成膜である第2のフィルタを形成する工程ではモータを高速に回転させ、形成された自己形成膜を用いた濾過工程ではモータを低速で回転させることができる。従って、第2のフィルタを形成する工程では、早期に第2のフィルタを形成することが可能となる。更に、濾過工程では、過度の吸引圧により、第2のフィルタが破壊されてしまうのを防止することができる。
【0150】
更に、第2のフィルタがゲル状の自己形成膜である場合は、濾過工程でモータを低速で回転させることにより、ゲルを所望の膨潤度に保つことができる。更に、ゲル状の第2のフィルタが、第1のフィルタの孔に侵入してしまうのを防止することができる。
【0151】
更に、CMPのスラリーに混入される砥粒のように主に0.15μmクラス以下の微粒子を取り除くには、この微粒子よりも小さな孔のフィルタ膜を採用するのが一般的である。しかし、本発明は主に0.15μm以下の小さな孔のフィルタ膜を用いることなく、コロイド溶液の被除去物をゲル膜のフィルタを成膜して濾過出来る濾過装置を実現した。
【図面の簡単な説明】
【図1】 本発明の濾過装置を説明する図である。
【図2】 本発明の具体化された濾過装置を説明する図である。
【図3】 本発明の更に具体化された濾過装置の運転状況を説明する図である。
【図4】 本発明のフィルタ装置を説明する図である。
【図5】 本発明の更に具体化されたフィルタ装置を説明する図である。
【図6】 本発明のフィルタを説明する図である。
【図7】 本発明のフィルタの動作原理を説明する図である。
【図8】 本発明の第2のフィルタの成膜条件を説明する(A)断面図および(B)特性図である。
【図9】 本発明の第2のフィルタの特性を説明する図である。
【図10】 本発明のフィルタ装置の再生を説明する図である。
【図11】 本発明の濾過装置の運転状況を説明する図である。
【図12】 本発明の濾過特性を説明する図である。
【図13】 従来の濾過システムを説明する図である。
【図14】 CMP装置を説明する図である。
【図15】 CMP装置のシステムを説明する図である。
【符号の説明】
1 第1のフィルタ
2 第2のフィルタ
4 フレーム
5 中空部
6 ポンプ
7 ろ液
11 フィルタ孔
40 通気管
50 原水タンク
52 原水
53 フィルタ装置
57 ポンプ
61 流量計
62 光センサ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a filtration device, and more particularly to a filtration device that can suitably adjust the suction pressure of a pump that takes out filtered water from the filter device.
[0002]
[Prior art]
At present, reducing industrial waste, separating and reusing industrial waste, or not releasing industrial waste to the natural world is an important theme from the viewpoint of ecology and is a corporate issue in the 21st century. Among these industrial wastes, there are various fluids containing the objects to be removed.
[0003]
These are expressed in various words such as sewage, drainage, and waste liquid. Hereinafter, a substance that is a substance to be removed in a fluid such as water or chemicals will be referred to as drainage. These wastewater is treated as industrial waste by removing the object to be removed with an expensive filtration processing device, etc., and draining the wastewater into a clean fluid and reusing it, or separating the object to be removed or unfiltered. ing. In particular, water is returned to the natural world such as rivers and seas by being filtered to be in a clean state that satisfies environmental standards, or reused.
[0004]
However, it is very difficult to adopt these apparatuses due to problems such as equipment costs such as filtration processing, running costs, and the like, which is also an environmental problem.
[0005]
As can be seen from this, the wastewater treatment technique is an important problem from the viewpoint of environmental pollution and from the viewpoint of recycling, and a system with low initial cost and low running cost is urgently desired.
[0006]
As an example, wastewater treatment in the semiconductor field will be described below. In general, when grinding or polishing a plate such as metal, semiconductor, ceramic, etc., prevention of temperature rise of a polishing (grinding) jig due to friction, improvement of lubricity, adhesion of grinding or cutting waste to the plate Therefore, a fluid such as water is showered on a polishing (grinding) jig or a plate-like body.
[0007]
Specifically, a method of flowing pure water when a semiconductor wafer, which is a plate of semiconductor material, is diced or back-ground. In the dicing machine, in order to prevent the temperature of the dicing blade from rising and to prevent dicing debris from adhering to the wafer, a flow of pure water is created on the semiconductor wafer, or the water is discharged so that the pure water hits the blade. A nozzle is installed and showered. Also, when the wafer thickness is reduced by back grinding, pure water is flowed for the same reason.
[0008]
Waste water mixed with grinding or polishing waste discharged from the dicing equipment and back grinding equipment described above is filtered to clean water and returned to nature, or reused, and concentrated waste water is recovered. Yes.
[0009]
In the current semiconductor manufacturing, there are two methods for treating wastewater mixed with removal objects (scraps) mainly composed of Si: a coagulation sedimentation method, and a combination of filter filtration and a centrifugal separator.
[0010]
In the former coagulation-precipitation method, PAC (polyaluminum chloride) or Al2 (SO4) 3 (sulfuric acid band) or the like is mixed in the waste water as a coagulant to generate a reaction product with Si and remove this reaction product. The wastewater was filtered.
[0011]
In the latter method, which combines filter filtration and centrifugation, the wastewater is filtered, the concentrated wastewater is centrifuged and the silicon waste is recovered as sludge, and the clean water produced by filtering the wastewater is returned to nature. It was released or reused.
[0012]
For example, as shown in FIG. 13, waste water generated during dicing is collected in a raw water tank 201 and sent to a filtration device 203 by a pump 202. Since the filter 203 is equipped with a ceramic or organic filter F, the filtered water is sent to the recovered water tank 205 via the pipe 204 and reused. Or released to nature.
[0013]
On the other hand, since the filter F is clogged, the filter 203 is periodically cleaned. For example, the valve B1 on the raw water tank 201 side is closed, the valve B3 and the valve B2 for sending cleaning water from the raw water tank are opened, and the filter F is back-washed with the water of the recovered water tank 205. The waste water mixed with the high-concentration Si waste generated thereby is returned to the raw water tank 201. The concentrated water in the concentrated water tank 206 is transported to the centrifuge 209 via the pump 208 and separated into sludge and sludge by the centrifuge 209. Sludge composed of Si waste is collected in the sludge collection tank 210, and the separation liquid is collected in the separation liquid tank 211. Further, the drainage of the separation liquid tank 211 in which the separation liquid is collected is transported to the raw water tank 201 via the pump 212.
[0014]
These methods occur, for example, when grinding or polishing a solid or plate-like body mainly made of a metal material such as Cu, Fe, or Al, or a solid or plate-like body made of an inorganic substance such as ceramic. It was also used when collecting waste.
[0015]
On the other hand, CMP (Chemical-Mechanical Polishing) has appeared as a new semiconductor process technology. This CMP technology provides (1) realization of a flat device surface shape and (2) realization of an embedded structure of a material different from that of the substrate.
[0016]
{Circle around (1)} is to form a fine pattern with high accuracy using a lithography technique. Further, the combined use of the Si wafer bonding technique brings about the possibility of realizing a three-dimensional IC.
[0017]
(2) enables an embedded structure. Conventionally, a tungsten (W) embedding technique has been adopted for IC multilayer wiring. In this method, W was buried in the groove of the interlayer film by the CVD method, and the surface was etched back to flatten it, but recently it has been flattened by CMP. Applications of this embedding technique include damascene process and element isolation. These CMP techniques and applications are described in detail in “CMP Science” published by Science Forum.
[0018]
Next, the CMP mechanism will be briefly described. As shown in FIG. 14, a semiconductor wafer 252 is placed on a polishing cloth 251 on a rotating platen 250, and is rubbed while flowing an abrasive (slurry) 253, polished, and chemically etched. Is lost. It is flattened by a chemical reaction by the solvent in the abrasive 253 and a mechanical polishing action between the polishing cloth and the abrasive grains in the abrasive. As the polishing cloth 251, for example, foamed polyurethane, non-woven fabric or the like is used. The polishing material is a mixture of abrasive grains such as silica and alumina in water containing a pH adjusting material, and is generally called a slurry. Yes. While flowing the slurry 253, the wafer 252 is rotated against the polishing cloth 251 and rubbed with a certain pressure. Reference numeral 254 denotes a dressing unit that maintains the polishing ability of the polishing pad 251 and always makes the surface of the polishing pad 251 dressed. Reference numerals 202, 208 and 212 denote motors, and 255 to 257 denote belts.
[0019]
The mechanism described above is constructed as a system, for example, as shown in FIG. This system roughly comprises a wafer cassette loading / unloading station 260, a wafer transfer mechanism 261, the polishing mechanism 262 described in FIG. 14, the wafer cleaning mechanism 263, and a system control for controlling them.
[0020]
First, the cassette 264 containing the wafer is placed in the wafer cassette loading / unloading station 260, and the wafer in the cassette 264 is taken out. Subsequently, the wafer is held by a wafer transfer mechanism unit 261, for example, a manipulator 265, placed on a rotating surface plate 250 provided in the polishing mechanism unit 262, and the wafer is flattened using CMP technology. . When the planarization operation is completed, the wafer is transferred to the wafer cleaning mechanism 263 by the manipulator 266 and cleaned in order to clean the slurry. The cleaned wafer is accommodated in a wafer cassette 266.
[0021]
For example, the amount of slurry used in one process is about 500 cc to 1 liter / wafer. Further, pure water is caused to flow through the polishing mechanism 262 and the wafer cleaning mechanism 263. Since these wastewaters are finally combined together at the drain, wastewater of about 5 to 10 liters / wafer is discharged in one flattening operation. For example, in the case of a three-layer metal, about seven times of flattening work is performed by the flattening of the metal and the flattening of the interlayer insulating film, and 5 to 10 liters of seven times drainage is completed until one wafer is completed. Discharged. Therefore, it can be seen that when a CMP apparatus is used, a considerable amount of slurry diluted with pure water is discharged. And these waste water was processed by the coagulation sedimentation method (refer patent document 1).
[0022]
[Patent Document 1]
JP 2001-157894 A
[0023]
[Problems to be solved by the invention]
However, in the coagulation precipitation method, a chemical is input as the coagulant. However, it is very difficult to specify the amount of a chemical that completely reacts, and a large amount of chemical is inevitably added, and an unreacted chemical remains. Conversely, if the amount of chemicals is small, all the objects to be removed are not agglomerated and settled, and the objects to be removed remain without being separated. In particular, when the amount of the chemical is large, the chemical remains in the supernatant. When this is reused, since chemicals remain in the filtered fluid, there is a problem that it cannot be reused for those who dislike chemical reactions.
[0024]
In addition, flocs, which are the reaction product of chemicals and objects to be removed, are generated as if they were floating substances such as algae. The conditions for forming this floc are severe pH conditions, and a stirrer, a pH measuring device, a flocculant injection device, a control device for controlling these, and the like are required. In addition, a large sedimentation tank is required to settle the floc stably. For example, 3 cubic meters (m Three ) / 1 hour drainage treatment capacity requires a tank with a diameter of about 3 meters and a depth of about 4 meters (about 15 tons of sedimentation tank). It becomes a large-scale system that is required.
[0025]
Moreover, there are some flocs that do not settle in the sedimentation tank and are floating, and these may flow out of the tank, and it is difficult to collect all of them. In other words, there are problems such as the size of the equipment, the high initial cost of this system, the difficulty of reusing water, and the high running cost generated from the use of chemicals.
[0026]
On the other hand, as shown in FIG. 3 ) / 1 hour filter filtration combined with a centrifuge uses a filter F (referred to as a UF module, made of polysulfone fiber, or a ceramic filter) for the filtration device 203. Reusable. However, four filters F are attached to the filtering device 203. From the life of the filter F, it has been necessary to replace a high-priced filter of about 500,000 yen / piece at least once a year. Moreover, the pump 202 in front of the filtering device 203 is clogged with a filter F because the filter F is a pressurizing type filtration method, and the load on the motor is large, and the pump 202 has a high capacity. Further, about 2/3 of the waste water passing through the filter F was returned to the raw water tank 201. Furthermore, since the waste water containing the object to be removed is transported by the pump 202, the inner wall of the pump 202 is shaved and the life of the pump 2 is very short.
[0027]
To sum up these points, the electric cost of the motor is very high, and the replacement cost of the pump P and filter F is high.
[0028]
Furthermore, in CMP, an amount of waste water that cannot be compared with dicing is discharged. The slurry is colloidally distributed in the fluid and does not settle easily due to Brownian motion. Moreover, the particle size of the abrasive grains mixed in the slurry is extremely fine, 10 to 200 nm. Therefore, when a slurry consisting of fine abrasive grains is filtered with a filter, the abrasive grains enter the pores of the filter, causing immediate clogging and frequent clogging. It was.
[0029]
As can be seen from the above description, wastewater filtration devices are used in various ways to remove as much of the substances that harm the global environment as possible, or to reuse filtration fluids and separated objects. The system becomes a large-scale system, and the initial cost and running cost are enormous. Therefore, the sewage treatment apparatus so far has not been a system that can be adopted at all.
[0030]
Moreover, when the said waste_water | drain is filtered using a self-forming film | membrane (precoat filter), there existed a problem that control of the pump which filters was difficult.
[0031]
[Means for Solving the Problems]
The present invention has been made in view of the above problems, and includes a tank that contains a fluid containing an object to be removed, a first filter that is immersed in the tank, and a second object that is deposited on the surface of the first filter. A filter device formed by a filter and a pump connected to the filter device via a pipe, and the fluid passes through the first filter by a suction pressure of the pump. In the step of forming the second filter, the fluid is filtered by passing the fluid by the suction pressure of the pump through the filter device in which the second filter is formed. The suction pressure of the pump is larger than the step of filtering the fluid.
[0032]
Furthermore, the present invention is formed by a tank in which a fluid containing a colloidal object to be removed is stored, a first filter immersed in the tank, and a second filter composed of a gel film adsorbed on the surface of the first filter. And a pump connected to the filter device via a pipe, and the second filter is formed by the fluid passing through the first filter by the suction pressure of the pump. The fluid is filtered by passing the fluid by the suction pressure of the pump through the filter device in which the second filter is formed. In the step of forming the second filter, the fluid is filtered. The suction pressure of the pump is larger than the step of performing.
[0033]
In the present invention, by adjusting the suction pressure of the pump, the formation process of the second filter which is a self-forming film and the filtration process using the second filter can be performed smoothly.
[0034]
In general, in order to remove particles having a size of 200 nm or less such as abrasive grains mixed in a CMP slurry, it is common to employ a filter film having pores smaller than the particles. However, in the present invention, a gel film made of an object to be removed is used as a filter, and many gaps formed in the filter are used as fluid passages. Further, according to the present invention, since the filter itself is an aggregate of particles of the object to be removed, the object to be removed that causes clogging can be separated from the filter, and the filtration performance can be maintained. Furthermore, even if the filter of the gel membrane is clogged due to continuous filtration, the filter can be regenerated and filtration can be continued for a long time.
[0035]
DETAILED DESCRIPTION OF THE INVENTION
With reference to FIG. 1, the structure of the filtration apparatus 20 of this invention, etc. are demonstrated. FIG. 1 (A) is a schematic configuration diagram of a filtration device 20 according to the present invention, and FIG. 1 (B) is a characteristic diagram showing temporal changes in the rotational speed of the motor and the suction pressure inside the pipe 56.
[0036]
Referring to FIG. 1A, a filtration device 20 according to the present invention includes a tank 50 in which a fluid containing an object to be removed is stored, a first filter immersed in the tank 50, and a substrate deposited on the surface thereof. It has a filter device 53 formed of a second filter made of a removed product, and a pump 57 connected to the filter device 53 via a pipe 56, and the second filter is a first filter by the suction pressure of the pump 57. When the fluid passes through the filter device 53 in which the second filter is formed, the fluid is filtered by the suction pressure of the pump 57 to form the second filter. In this step, the pump 57 has a higher suction pressure than the step of filtering the fluid. Details of the filtration device 20 having such a configuration will be described below.
[0037]
First, an outline of the filtration device 20 will be described with reference to FIG. Reference numeral 50 denotes a raw water tank. Above the tank 50, a pipe 51 is provided as drainage supply means. The pipe 51 introduces the fluid mixed with the object to be removed into the tank 50. For example, in the semiconductor field, wastewater (raw water) mixed with a removal object of a colloidal solution flowing out from a dicing apparatus, a back grinding apparatus, a mirror polishing apparatus or a CMP apparatus is introduced. This waste water will be described as waste water mixed with abrasive grains flowing from the CMP apparatus and scraps polished or ground by the abrasive grains. Moreover, as shown in the figure, the fluid temporarily stored in the drainage receiving tank 17 may be introduced into the raw water tank 50 through the pipe 51.
[0038]
In the raw water 52 stored in the raw water tank 50, a plurality of filter devices 53 in which a second filter is formed are installed. Below this filter device 53, there is provided an air diffuser tube 54, such as a bubbling device used in a fish tank, for example, with a small hole in the pipe, and its position so as to pass through the surface of the filter device 53. Has been adjusted. The air diffuser 54 is arranged over the entire bottom of the filter device 53 so that air bubbles can be uniformly supplied to the entire surface of the filter device 53. 55 is an air pump. The air pump 55 and the diffuser pipe 54 are connected by a pipe-like vent pipe 40.
[0039]
The raw water 52 supplied from the pipe 51 is stored in the raw water tank 50 and filtered by the filter device 53. Bubbles pass through the surface of the second filter 2 attached to the filter device 53 and a parallel flow is generated by the rising force or rupture of the bubbles to move the gelled object to be adsorbed on the second filter. The filter device 53 is uniformly adsorbed on the entire surface and is maintained so that its filtering ability does not decrease.
[0040]
The pump 57 is connected to the filter device 53 via a pipe 56. That is, the fluid filtered by the filter device 53 is released to the outside by the suction force generated by the pump 57. Further, when the step of forming the second filter or the filtrate does not have the desired transparency, the fluid taken out from the filter device 53 is returned to the raw water tank 50. That is, the filtration device 20 of the present invention has a step of circulating filtered water. Further, a pressure gauge 59 for sensing the pressure inside the pipe 56 is provided in the middle of the pipe 56. In response to the pressure inside the pipe 56 measured by the pressure gauge 59, the rotation of the motor of the pump is controlled to control the suction pressure. Further, in the middle of the pipe 56, a peeling water tank 70 in which the filtrate is temporarily stored is provided.
[0041]
As the pump 57, an AC motor whose rotation speed is controlled by an inverter circuit or a DC motor whose rotation is controlled by an applied voltage can be adopted. By adopting the motor capable of controlling the rotation speed in this way, the suction pressure applied to the filter device 53 can be changed between the step of forming the second filter and the step of filtering. In particular, in the present invention, the fluid is filtered using a gel-like film formed on the surface of the first filter. Therefore, by employing a motor capable of controlling the rotation speed, it is possible to prevent the gel from entering the hole of the first filter and destroying the second filter. Details of the gel-like second filter will be described later.
[0042]
Further, as a means for adjusting the suction pressure applied to the filter device 53, not only the above-described change in the rotational speed of the motor but also other means can be employed. For example, the suction pressure applied to the filter device 53 can be adjusted by fixing the rotation speed of the motor that operates the pump 57 and inserting a release valve in the middle of the pipe 56. Specifically, the suction pressure can be reduced by opening the release valve, and the suction pressure can be increased by closing the release valve. Furthermore, the suction pressure applied to the filter device 53 can be changed by moving the position of the pump 55 in the vertical direction.
[0043]
With reference to FIG. 1 (B), the relationship between the suction pressure applied to the filter device 53 and the rotational speed of the motor provided in the pump 55 will be described. The horizontal axis of FIG. The left vertical axis shows the suction pressure applied to the filter device 53, and here shows the increase in negative pressure. The vertical axis on the right side indicates the rotational speed of the motor that operates the pump 57. Furthermore, in the figure, the dotted line shows the change in the suction pressure, and the solid line shows the change in the rotational speed of the motor.
[0044]
First, the filter device 53 is immersed in the raw water 52 and the pump 55 is operated to form a second filter that is a self-forming film on the surface of the first filter. This step is the second filter forming step. In this step, in order to form the second filter at an early stage, the number of rotations of the motor that operates the pump 55 is made as fast as possible. In this step, the taken out filtered water may be returned to the raw water tank 50.
[0045]
Through the above process, a second filter which is a self-forming film is gradually formed on the surface of the first filter of the filter device 53. The second filter is made of an object to be removed contained in the fluid, and its pores are fine compared to the first filter. Accordingly, the suction pressure gradually decreases with the formation of the second filter. The suction pressure is monitored by a pressure gauge 59.
[0046]
When the suction pressure reaches a predetermined value, it is determined that the second filter is formed, and the process proceeds to the filtration step. The rotation speed of the motor in the filtration step is slower than that in the above process. By doing in this way, it is possible to make suction pressure below a predetermined value, and it can prevent destruction of the 2nd filter by excessive suction pressure acting on the 2nd filter.
[0047]
In addition, the filtration capacity of the second filter decreases as the filtration proceeds. Then, the second filter having a reduced filtration capacity is peeled off by causing the filtered water to flow backward from the peeling water tank 70 to the filter device 53. Then, by operating the pump 57 thereafter, the filtered water that has flowed back to the filter device 53 is returned to the peeling water tank 70. At this time, the suction pressure of the pump 55 is set to be larger than that at the time of filtration.
[0048]
Further, when the filtration operation is finished, before the filtration device 20 is stopped, the suction pressure is made smaller than that during filtration and the pump is operated for a predetermined time. By doing in this way, when the filtration apparatus 20 restarts, the load given to the filtration apparatus 20 can be made small.
[0049]
A more specific filter device will be described with reference to FIG. In addition, the same code | symbol was attached | subjected to the same component as the filtration apparatus shown in FIG.
[0050]
In FIG. 2, 50 is a raw water tank. Above the tank 50, a pipe 51 is provided as drainage supply means. The pipe 51 introduces the fluid mixed with the object to be removed into the tank 50. For example, in the semiconductor field, wastewater (raw water) mixed with a removal object of a colloidal solution flowing out from a dicing apparatus, a back grinding apparatus, a mirror polishing apparatus or a CMP apparatus is introduced. This waste water will be described as waste water mixed with abrasive grains flowing from the CMP apparatus and scraps polished or ground by the abrasive grains.
[0051]
An adjustment valve 41 and a stop valve 42 are provided in the middle of the ventilation pipe 40 that connects the air pump 55 and the diffusion pipe 54. The adjustment valve 41 is set to allow a desired amount of gas flow. For example, a needle valve or the like can be employed as the adjustment valve. The stop valve 42 is a valve for opening and shutting off the gas flowing inside the vent pipe 40. Specifically, as the stop valve 42, for example, a valve using a solenoid or the like can be used. In this way, by using the adjustment valve 41A and the stop valve 42 in combination, a desired amount of gas can be supplied to the diffuser tube 54 simply by opening and closing the stop valve 42 while fixing the output of the air pump 55. Can be supplied.
[0052]
In addition, the vent pipe 40 is provided with a plurality of paths that are branched in parallel along the way. Specifically, the first path 40A, the second path 40B, and the third path 40C are branched and parallel. The above-described adjustment valve 41 and stop valve 42 are interposed in each path.
[0053]
A first adjustment valve 41A and a first stop valve 42A are interposed in the first path 40A. The first adjustment valve 41A is adjusted so that an appropriate amount of gas passes when the filter device 53 performs a filtering operation or the like. The first stop valve 42A is opened in a filtration step of filtering with the filter device 53, a step of forming a gel-like second filter, or the like. Further, when the first stop valve 42A is in an open state, the second stop valve 42B and the third stop valve 42C are in a cut-off state. The first adjustment valve 41A adjusted in this way makes it possible to supply an appropriate amount of gas from the diffuser tube 54 during filtration. Therefore, the raw water inside the raw water tank 50 is agitated by the bubbles rising from the air diffuser 54, and the filtration can be performed smoothly.
[0054]
A second adjustment valve 41B and a second stop valve 42B are interposed in the second path 40B. The second adjustment valve 41B is set so that a larger amount of gas passes than the first adjustment valve 41A described above. The second stop valve 42B is opened in a step (regeneration step) of separating the gel-like second filter constituting the filter device 53 from the first filter. The second filter can be detached by supplying a large amount of gas from the air diffuser into the raw water. When the second stop valve 42B is in the open state, the first stop valve 42A and the third stop valve 42C are cut off.
[0055]
A third adjustment valve 41C and a third stop valve 42C are interposed in the third path 40C. The third adjustment valve 41C is set so that less gas flows than the first adjustment valve 41A and the second adjustment valve 41B described above. The third stop valve 42C is opened when the entire filtering device 20 is stopped. When the third stop valve 42C is in an open state, the first stop valve 42A and the second stop valve 42B are in a cutoff state. Thus, when the filtration device 20 as a whole stops the filtering operation, the diffuser tube 54 can be prevented from being clogged by being in an open state.
[0056]
The pipe 56 is connected to a magnet pump 57 through which the filtered fluid filtered by the filter device 53 flows and sucks through the valve V1. The pipe 58 is connected from the magnet pump 57 to the valve V3 and the valve V4 via the control valve CV1. A first pressure gauge 59 is provided after the valve V1 of the pipe 56 to measure the suction pressure Pin. Further, a flow meter F and a second pressure gauge 60 are provided after the control valve CV1 of the pipe 58, and a flow rate is controlled by a flow meter 61. The air flow rate from the air pump 55 is controlled by the control valve CV2.
[0057]
In the raw water 52 stored in the raw water tank 50, a plurality of filter devices 53 in which a second filter is formed are installed. Below this filter device 53, a diffuser tube 54 is provided over the entire bottom side of the filter device 53, such as a bubbling device used in a fish tank, for example, with a small hole in the pipe. The position is adjusted so as to pass through the surface. 55 is an air pump. Air is supplied from the air pump 55 and guided to the diffuser tube 54 via the air flow meter 69. Further, the above-described first path 40A, second path 40B, and third path 40C are provided in the vent pipe 40 that connects the air diffusion pipe 54 and the air pump 55. Furthermore, the first stop valve 42A, the second stop valve 42B, and the third stop valve 42C provided in each path are electrically connected to the control unit 68.
[0058]
The pipe 56 fixed to the filter device 53 is connected to a magnet pump 57 that carries the suction through the valve V1 through which the filtered fluid filtered by the filter device 53 flows. The pipe 58 is connected from the magnet pump 57 to the valve V3 and the valve V4 via the first control valve CV1. A first pressure gauge 59 is provided after the valve V1 of the pipe 56 to measure the suction pressure Pin. Further, a flow meter 61 and a second pressure gauge 60 are provided after the first control valve CV1 of the pipe 58, and the flow meter 61 controls the flow rate to be constant.
[0059]
The pipe 58 is connected to the optical sensor 62, and is guided from the optical sensor 62 to branched pipes 63 and 64. Valves V3 and V4, which are opened and closed by a detection signal from the optical sensor 62, are inserted into the pipes 63 and 64, the pipe 63 returns filtered water to the tank 50, and the pipe 64 takes out filtered water to the outside. Yes. The optical sensor 62 monitors the concentration of the fine particles contained in the filtered water, confirms that the fine particles are lower than the desired mixing rate, and starts filtration. When the filtration is started, the valve V3 is closed by a detection signal from the optical sensor 62, the valve V4 is opened, and purified water is taken out.
[0060]
Further, the peeling water tank 70 is connected to the pipe 58 by the valve V5 and has a function of storing filtered water. When the amount exceeds a certain amount, it overflows and is returned to the tank 50 by the pipe 71. A valve V <b> 2 is provided at the bottom and connected to the pipe 56. The peeling water tank 70 is provided at a position about 10 to 20 cm higher than the liquid level of the tank 50 and is used in the regeneration process of the second filter.
[0061]
Further, the tank 50 is provided with a pH adjuster 65 and a heating / cooling device 66. In particular, the pH of the CMP waste water is adjusted to about 6 to 7, and the temperature of the waste water is adjusted in order to promote gelation. In order to prevent the drainage from overflowing from the tank 50, monitoring is performed by the liquid level gauge 67 to adjust the inflow amount of the drainage.
[0062]
Further, a control device 68 for controlling the operation of the filtration device is provided. As shown by a dotted line in the figure, a control valve CV1, flow meters 61 and 69, a pump 57, pressure gauges 59 and 60, an optical sensor 62, etc. It is controlled for each process.
[0063]
In the above-described filtration device, in the second filter film forming step, the filtration step, the second filter regeneration step, the refiltration step, and the maintenance step, the valves and the like are opened and closed under the control of the control device 68, and the pump 57 Etc. are controlled. The operation status will be described below for each process. FIG. 3 shows operating states of the pump 57, the optical sensor 62, the air pump 55, and each valve in each process.
[0064]
First, the waste water mixed with the material to be removed of the colloidal solution is put into the raw water tank 50 through the pipe 51. In the tank 50, the filter device 53 of only the first filter 1 in which the second filter 2 is not formed is immersed in a number of sheets that can obtain a desired filtration flow rate. Specifically, about 10 to 40 filter devices 53 are suspended from a support means (not shown). Of course, this number varies depending on the filtration area of one filter device 53, but the total required filtration area of the filter device 53 can be obtained from the size of the tank 50.
[0065]
Next, the process proceeds to the film forming process of the second filter 2. The waste water in the tank 50 is circulated through the pipe 56 while being sucked by the pump 57 with a weak suction pressure. The circulation path is a filter device 53, a pipe 56, a valve V 1, a pump 57, a pipe 58, a control valve CV 1, a flow meter 61, an optical sensor 62, and a valve V 3, and waste water is sucked from the tank 50 and returned to the tank 50. From the air diffuser 54, air bubbles supplied from the air pump 55 through the first path 40A rise and are supplied to the surface of the filter device 53. That is, the first stop valve 42A is opened, and a desired amount of gas is supplied to the diffuser tube 54 by the first adjustment valve 41A. At this time, the other valves V2, V4, V5, V6, and D are closed.
[0066]
By circulating the waste water, the second filter 2 is formed on the first filter of the filter device 53, and finally the object to be removed of the target colloidal solution is captured. (This specific principle will be described later.) That is, when the waste water is sucked through the first filter 1 with a weak suction pressure by the pump 57, the fine particles of the object to be removed become gelled as it approaches the first filter 1. And adsorbed on the surface of the first filter 1. The gelled fine particles larger than the filter holes 11 of the first filter 1 are gradually adsorbed and stacked on the surface of the first filter 1 to form a second filter 2 made of a gel film. The gelled fine particles having a diameter smaller than that of the filter hole 11 pass through the first filter 1, but the water in the drainage is sucked through this gap as the second filter 2 is formed, and the first filter 1. And is taken out as purified water, and the wastewater is filtered.
[0067]
At this time, the concentration of the fine particles contained in the filtered water is monitored by the optical sensor 62, and it is confirmed that the fine particles are lower than the desired mixing rate, and the process proceeds to the filtration step.
[0068]
Subsequently, when the film formation of the second filter 2 is completed, the process proceeds to a filtration step. When filtration is started, the valve V3 is closed by a detection signal from the optical sensor 62, the valve V4 is opened, the above-described circulation path is closed, and filtered water is taken out from the valve V4. In this process, the control device 68 controls the flow meter 61 so as to obtain a constant filtration flow rate, and the second filter 2 is operated so as to prevent clogging as much as possible and to keep the filtration time long. As shown in FIG. 9, the suction pressure Pin of the pump 57 is gradually increased to keep the filtration flow rate constant. The other parts have the same operating conditions as in the film forming process. Also in this step, the gas supplied to the diffuser tube 54 is supplied via the first path 40A.
[0069]
When the second filter 2 is destroyed for some reason, the light sensor 62 detects the entry of fine particles, the valve V4 is closed, and conversely, the valve V3 is opened and the filtered water is returned to the tank 50. That is, the process returns to the film forming process to repair the second filter 2, and when it returns to normal, the process returns to the filtration process again.
[0070]
When the filtration is continued, the water in the waste water from the raw water tank 50 is taken out of the tank 50 as filtered water, so that the concentration of the object to be removed in the waste water increases. That is, the colloidal solution is concentrated to increase the viscosity. For this purpose, the raw water tank 50 is replenished with drainage from the pipe 51 to suppress an increase in the concentration of drainage and increase the efficiency of filtration. However, the gel film is thickly attached to the surface of the second filter 2 of the filter device 53, and eventually the second filter 2 becomes clogged and becomes unable to be filtered.
[0071]
When the gel film of the second filter 2 is adsorbed thickly on the surface of the first filter 1, it is detected by the flow meter 61 as a decrease in the filtration flow rate and is changed from the filtration step to the second filter regeneration step by the control device 68. Transition.
[0072]
First, in the regeneration process, the pump 57 is stopped and the negative suction pressure applied to the filter device 53 is released. At the same time, the valve V2 is opened and the filtered water previously stored in the peeling water tank 70 flows back through the pipe 56 through the valve V1 and is sent to the hollow portion 5 of the filter device 53.
[0073]
Therefore, in the regeneration process, the weak suction pressure is stopped and the pressure returns to almost the atmospheric pressure. Therefore, the first filter 1 of the filter device 53 returns from the depressed state to the original state. As a result, the second filter 2 and the gel film adsorbed on the surface thereof also return in the same manner. As a result, since the suction pressure that first adsorbs the gel film disappears, the gel film loses the adsorbing force to the filter device 53 and simultaneously receives a force that expands outward. Furthermore, since the separation water tank 70 is provided at a position higher than the liquid level of the tank 50, the hydrostatic pressure due to the difference in height is applied by the backflow of the filtered water from the separation water tank 70, and the first filter 1 and the first filter 1 of the filter device 53. The second filter 2 is applied with a force that expands outward. Thereby, the adsorbed gel film starts to be detached from the filter device 53 by its own weight and hydrostatic pressure. According to the experiment, the separation starts from the lower end of the filter device 53, and the gel film of the second filter 2 attached to the surface of the first filter 1 is detached like an avalanche and settles on the bottom surface of the raw water tank 50. . Subsequently, the second filter 2 may be formed by circulating the waste water through the circulation path described above. In this regeneration step, the second filter 2 returns to the original state, returns to a state where the drainage can be filtered, and again filters the drainage. At this time, the valve V2 is closed and the valve V5 is opened, and filtered water is stored in the separation water tank 70 to prepare for the next regeneration step.
[0074]
Furthermore, in order to advance this separation, it is preferable to increase the amount of bubbles from the air diffuser 54 by about twice. Specifically, the second stop valve 42B is opened, and the first stop valve 42A and the third stop valve 42C are shut off.
[0075]
Thereafter, the re-filtration process is started, and drainage filtration is started again. The operating conditions are the same as in the filtration step. If the filtration is continued many times while the second filter 2 is regenerated in this manner, the concentration of the material to be removed from the waste water in the raw water tank 50 increases, and the waste water eventually has a considerable viscosity. Therefore, when the concentration of the object to be removed from the waste water exceeds a predetermined concentration, the filtering operation is stopped and the process proceeds to the maintenance process.
[0076]
The maintenance process includes a step of discharging the filtered water in the pipes 56 and 58 and the peeling water tank 70 and a step of discharging the waste water in the tank 50 and the gel stored in the bottom. In the previous step, the pump 57 and the air pump 55 are stopped, the control valve CV1, the valves V1, V2, and V5 are opened, and the filtered water in the pipes 56 and 58 and the peeling water tank 70 is provided in the pipe 56. To the outside through the valve D.
[0077]
In the subsequent step, the concentrated slurry is allowed to settle at the bottom of the tank 50 for aggregation and precipitation, and the concentrated slurry of the gel is recovered by opening the valve V6. The recovered concentrated slurry is dried by heat to evaporate the water contained therein and further compress the amount. This can greatly reduce the amount of slurry that is treated as industrial waste. The supernatant drainage is likewise discharged from the valve V6 and returned to the tank 50 again in the subsequent filtration step.
[0078]
Here, the filter device 53 described above, specifically, the filter device 53 immersed in the raw water tank 50 will be described with reference to FIGS. 4 and 5.
[0079]
Reference numeral 30 shown in FIG. 4A is a frame having a frame-like shape, and filter films 31 and 32 serving as a first filter are bonded and fixed to both surfaces of the frame 30. Then, the inner space 33 surrounded by the frame 30 and the filter films 31 and 32 is filtered by the filter films 31 and 32 by sucking the pipe 34. Then, filtered water is taken out through a pipe 34 sealed and attached to the frame 30. Of course, the filter membranes 31 and 32 and the frame 30 are completely sealed so that drainage does not enter the space 33 from other than the filter membrane.
[0080]
Since the filter films 31 and 32 in FIG. 4A are thin resin films, if they are sucked, they may warp inward and may be destroyed. Therefore, in order to make this space as small as possible and increase the filtration capacity, it is necessary to make this space 33 large. FIG. 4B shows a solution to this. In FIG. 4B, only nine spaces 33 are shown, but many spaces 33 are actually formed. The filter membrane 31 actually employed is a polyolefin-based polymer membrane having a thickness of about 0.1 mm, and a thin filter membrane is formed in a bag shape as shown in FIG. In B), it is indicated by FT. A frame 30 in which a pipe 34 is integrated is inserted into the bag-like filter FT, and the frame 30 and the filter FT are bonded together. Reference numeral RG denotes pressing means that presses the frame on which the filter FT is bonded from both sides. The filter FT is exposed from the opening OP of the pressing means. Details will be described again with reference to FIG.
[0081]
FIG. 4C shows the filter device 53 itself having a cylindrical shape. The frame attached to the pipe 34 has a cylindrical shape, and openings OP1 and OP2 are provided on the side surfaces. Since the side surfaces corresponding to the openings OP1 and OP2 are removed, support means SUS for supporting the filter film 31 is provided between the openings. Then, the filter film 31 is bonded to the side surface.
[0082]
Further, the filter device 53 of FIG. 4B will be described in detail with reference to FIG. First, a portion 30a corresponding to the frame 30 in FIG. 4B will be described with reference to FIGS. 5A and 5B. The portion 30a is shaped like a cardboard as far as it is seen. Thin resin sheets SHT1 and SHT2 having a thickness of about 0.2 mm are overlapped, and a plurality of sections SC are provided in the vertical direction therebetween, and a space 33 is provided surrounded by the resin sheets SHT1, SHT2 and sections SC. The cross section of the space 33 is a rectangle having a length of 3 mm and a width of 4 mm. In other words, the space 33 has a shape in which many straws having the rectangular cross section are arranged and integrated. Since the portion 30a maintains the filter films FT on both sides at regular intervals, it is hereinafter referred to as a spacer.
[0083]
Many holes HL having a diameter of 1 mm are formed on the surfaces of the thin resin sheets SHT1 and SHT2 constituting the spacer 30a, and a filter film FT is bonded to the surface. Therefore, the filtered water filtered by the filter membrane FT passes through the hole HL and the space 33 and finally exits from the pipe 34.
[0084]
The filter film FT is bonded to both surfaces SHT1 and SHT2 of the spacer 30a. Both surfaces SHT1 and SHT2 of the spacer 30a have a portion where the hole HL is not formed, and when the filter film FT1 is directly attached thereto, the filter film FT1 corresponding to the portion where the hole HL is not formed is filtered. Since there is no function and drainage does not pass, there will be a part where the object to be removed is not captured. In order to prevent this phenomenon, at least two filter films FT are bonded together. The filter film FT1 on the front side is a filter film that captures an object to be removed, and a filter film having a larger hole than the hole of the filter film FT1 is provided from the filter film FT1 toward the surface SHT1 of the spacer 30a. Here, one filter film FT2 is bonded. Therefore, since the filter film FT2 is provided between the portions where the holes HL of the spacer 30a are not formed, the entire surface of the filter film FT1 has a filtering function, and an object to be removed is present on the entire surface of the filter film FT1. The second filter film is captured and formed on the entire front and back surfaces SH1 and SH2. For the convenience of the drawings, the filter films SHT1 and SHT2 are represented as rectangular sheets, but in actuality, they are formed in a bag shape as shown in FIG. 4B.
[0085]
Next, how the bag-like filter films SHT1, SHT2, the spacer 30a, and the pressing means RG are attached will be described with reference to FIGS. 5 (A), 5 (C), and 5 (D). .
[0086]
FIG. 5 (A) is a completed drawing, and FIG. 5 (C) is cut in the extending direction (longitudinal direction) of the pipe 34 from the head of the pipe 34 as shown by the AA line in FIG. 5 (A). FIG. 5D is a cross-sectional view of the filter device 35 cut in the horizontal direction as indicated by the line BB.
[0087]
As can be seen from FIGS. 5A, 5C, and 5D, the spacer 30a inserted into the bag-like filter film FT includes pressing means on the four sides including the filter film FT. It is sandwiched between RG. Then, the three side edges and the remaining one side bound in a bag shape are fixed with an adhesive AD1 applied to the pressing means RG. Further, a space SP is formed between the remaining one side (bag opening) and the pressing means RG, and the filtered water generated in the space 33 is sucked into the pipe 34 through the space SP. In addition, the adhesive AD2 is provided over the entire circumference of the opening OP of the presser fitting RG so that the adhesive AD2 is completely sealed and fluid cannot enter from other than the filter.
[0088]
Therefore, the space 33 and the pipe 34 communicate with each other. When the pipe 34 is sucked, the fluid passes through the hole of the filter film FT and the hole HL of the spacer 30a toward the space 33, and from the space 33 via the pipe 34. The structure is such that filtered water can be transported to the outside.
[0089]
The filter device 53 used here employs the structure shown in FIG. 5, and the size of the frame (holding metal fitting RG) to which the filter membrane is attached is A4 size. Specifically, the length is about 19 cm, and the width is about 28. .8 cm, thickness: 5 to 10 mm. Actually, since the filter device 53 is provided on both sides of the frame, the area twice as described above (area: 0.109 m). 2 ) However, the number and size of the filter devices are freely selected depending on the size of the raw water tank 50, and are determined from the required filtration amount.
[0090]
Next, the principle of filtering raw water using a gel-like second filter will be described. First, definitions of terms used in the following explanation are clarified.
[0091]
The colloidal solution refers to a state in which fine particles having a diameter of 1 nm to 1 μm are dispersed in a medium. These fine particles have a Brownian motion and have a property of passing through a normal filter paper but not through a semipermeable membrane. In addition, the property of very slow aggregation speed is thought to reduce the chance of approach because electrostatic repulsion is acting between the fine particles.
[0092]
The sol is used almost synonymously with the colloidal solution. Unlike the gel, the sol is dispersed in a liquid and exhibits fluidity, and the fine particles are actively performing Brownian motion.
[0093]
A gel is a state in which colloidal particles have lost their independent motility and are aggregated and solidified. For example, agar and gelatin are dispersed into a sol when dissolved in warm water, but when cooled, they lose their fluidity and become a gel. Gels include hydrogels with a high liquid content and slightly dry xerogels.
[0094]
Factors for gelation include removing the water of the dispersion medium and drying, adding electrolyte salt to silica slurry (pH 9-10) to adjust pH to pH 6-7, cooling to lose fluidity Etc.
[0095]
Slurry refers to a colloidal solution or sol used for polishing by mixing particles with liquid and chemicals. The above-mentioned abrasive used for CMP is called CMP slurry. As the CMP slurry, a silica-based abrasive, an aluminum oxide (alumina) -based abrasive, a cerium oxide (ceria) -based abrasive, and the like are known. Silica-based abrasives are most often used, and colloidal silica is widely used. Colloidal silica is a dispersion in which ultrafine silica particles having a colloidal size of 7 to 300 nm are uniformly dispersed without being precipitated in water or an organic solvent, and is also called silica sol. Since the colloidal silica has monodispersed particles in water, the colloidal silica hardly settles even when left for more than one year due to the repulsive force of the colloidal particles.
[0096]
First, the present invention provides a method for removing an object to be removed by filtering the object to be removed from waste water in a state where the object to be removed is contained in a fluid as a colloidal solution or a sol.
[0097]
An object to be removed is a colloidal solution (sol) containing a large amount of fine particles having a particle size distribution of 3 nm to 2 μm. For example, a semiconductor generated by grinding with abrasive grains such as silica, alumina or ceria used for CMP and abrasive grains. Material waste, metal waste and / or insulating film material waste. In this example, a slurry for polishing W2000 tungsten manufactured by Cabot was used as the CMP slurry. This slurry is mainly composed of silica having a pH of 2.5 and an abrasive grain distribution of 10 to 200 nm.
[0098]
The basic principle of the present invention will be described with reference to FIG. The present invention removes a fluid (drainage) mixed with an object to be removed of a colloidal solution (sol) with a filter made of a gel film formed from the object to be removed.
[0099]
More specifically, a gel film to be a second filter 2 formed from a CMP slurry that is an object to be removed of a colloidal solution is formed on the surface of the first filter 1 made of organic polymer. It is immersed in the fluid 3 in the tank, and the waste water containing the object to be removed is filtered.
[0100]
The first filter 1 can be either organic polymer type or ceramic type in principle, as long as a gel film can be attached. Here, a polyolefin polymer film having an average pore diameter of 0.25 μm and a thickness of 0.1 mm was employed. A photograph of the surface of the filter membrane made of polyolefin is shown in FIG.
[0101]
Further, the first filter 1 has a flat membrane structure provided on both surfaces of the frame 4, is immersed so as to be perpendicular to the fluid, and is configured to be sucked by the pump 6 from the hollow portion 5 of the frame 4, The filtrate 7 can be taken out.
[0102]
Next, the second filter 2 is a gel film that is attached to the entire surface of the first filter 1 and gels by sucking the sol of the object to be removed. In general, since the gel film is jelly-like, it is considered that there is no function as a filter. However, in this invention, the function of the 2nd filter 2 can be given by selecting the production | generation conditions of this gel film. This generation condition will be described in detail later.
[0103]
Now, referring to FIG. 6 and FIG. 7 (A), the second filter 2 that is the gel film of the object to be removed is formed by the above-described colloidal solution (sol) of the object to be removed, and the filtration for removing the object to be removed is described with reference to FIGS. explain.
[0104]
1 is a first filter and 11 is a filter hole. The film formed in layers on the opening of the filter hole 11 and the surface of the first filter 1 is a gel film of the object 13 to be removed. The removal object 13 is sucked through the first filter 1 by the suction pressure from the pump, and since the moisture of the fluid 3 is sucked off, it is dried (dehydrated) and the fine particles of the removal object of the colloidal solution are gelled. A large gel film that is bonded and cannot pass through the filter hole 11 is formed on the surface of the first filter 1. This gel film forms the second filter 2.
[0105]
Eventually, when the second filter 2 reaches a predetermined film thickness, the second filter 2 forms a gap that does not allow the gel of the object to be removed to pass therethrough, and this second filter 2 is used to filter the object to be removed of the colloidal solution. Is started. Therefore, if the filtration is continued while sucking with the pump 6, the gel film is gradually laminated on the surface of the second filter 2 to become thick, and the second filter 2 is eventually clogged so that the filtration cannot be continued. During this time, the colloidal solution to be removed is gelled and adheres to the surface of the second filter 2 so that the water of the colloidal solution passes through the first filter 1 and is taken out as filtered water.
[0106]
In FIG. 7A, there is a drainage of a colloidal solution mixed with an object to be removed on one side of the first filter 1, and the first filter 1 has passed through the first filter 1 on the opposite side of the first filter 1. Filtered water is generated. The drainage is sucked in the direction of the arrow and flows, and as the fine particles in the colloidal solution approach the first filter 1 due to the suction, the gel film is formed by losing the electrostatic repulsion force and gelling and combining several fine particles. The second filter 2 is formed by being adsorbed on the surface of the filter 1. By the action of the second filter 2, the object to be removed in the colloidal solution is gelled while the waste water is filtered. Filtrated water is sucked from the opposite surface of the first filter 1.
[0107]
By slowly sucking the colloidal solution drainage through the second filter 2 in this way, the water in the drainage can be taken out as filtered water, and the object to be removed is dried and gelled and laminated on the surface of the second filter 2. Then, the object to be removed is captured as a gel film.
[0108]
Next, the generation conditions for the second filter 2 will be described with reference to FIG. FIG. 8 shows the generation conditions of the second filter 2 and the subsequent filtration amount.
[0109]
In the method of the present invention, first, the second filter 2 is formed and filtered. The amount of purified water filtered during filtration varies greatly depending on the production conditions of the second filter 2, and it is apparent that the gel membrane second filter 2 can hardly be filtered unless the purification conditions of the second filter 2 are appropriately selected. It becomes. This is consistent with the fact that it has traditionally been said that filtration of colloidal solutions is impossible.
[0110]
The characteristics shown in FIG. 8B are experimentally obtained by the method shown in FIG. That is, the first filter 1 is provided at the bottom of the cylindrical container 21, and 50 cc of a stock solution of slurry 22 for polishing W2000 tungsten manufactured by Cabot Corporation is added to generate a gel film by changing the suction pressure. Subsequently, the remaining slurry 22 is discarded, 100 cc of purified water 23 is added, and filtration is performed at a very low suction pressure. Thereby, the filtration characteristic of the gel film used as the 2nd filter 2 can be investigated. At this time, the first filter 1 having a diameter of 47 mm is used, and its area is 1734 mm. 2 It is.
[0111]
In FIG. 8B, in the gel film generation step, film formation was performed for 120 minutes while changing the suction pressure to −55 cmHg, −30 cmHg, −10 cmHg, −5 cmHg, and −2 cmHg, and the properties of the gel film were examined. As a result, when the suction pressure is set as strong as -55 cmHg, the filtration amount is as large as 16 cc in 2 hours, and becomes 12.5 cc, 7.5 cc, 6 cc and 4.5 cc in order.
[0112]
Next, it replaces with purified water and performs filtration with this gel membrane. The suction pressure at this time is set to -10 cmHg constant. A gel film formed at a suction pressure of −55 cmHg can only filter 0.75 cc / hour. A gel film formed at a suction pressure of −30 cmHg has a filtration rate of about 1 cc / hour. However, the filtration amount is 2.25 cc / hour for a gel membrane with a suction pressure of −10 cmHg, 3.25 cc / hour for a gel membrane with a suction pressure of −5 cmHg, and 3.1 cc / hour for a gel membrane with a suction pressure of −2 cmHg. The gel film formed with the suction pressure can be stably filtered even in the filtration process. From this experimental result, if the suction pressure is set so that the filtration amount of about 3 cc / hour is set in the gel film generation step of the second filter 2, the filtration amount in the subsequent filtration step is the largest. it is obvious.
[0113]
The reason for this is that if the suction pressure is strong, the gel film to be formed has a low degree of swelling, becomes dense and hard, and the gel film is formed in a contracted state with little moisture content, so that purified water penetrates. This is probably because the passage is almost gone.
[0114]
On the other hand, if the suction pressure is weakened, the gel film to be formed has a high degree of swelling, a low density and is soft, and the gel film is formed with a large amount of water swelled and purified water penetrates. Many passages can be secured. It can be easily understood if you think about the situation where powder snow falls slowly. A feature of the present invention resides in that filtration is realized by using a gel film having a high degree of swelling formed with such a weak suction pressure and utilizing the property of moisture permeating into the gel film.
[0115]
The characteristics of the gel film will be described with reference to FIG. FIG. 9A shows the relationship between the amount of sol contained in the gel film and the amount of filtration. The amount of sol removed is obtained from purified water having a slurry concentration of 3% and the amount of sol trapped by the first filter 1 from the amount of filtration during gel film formation. This amount of sol is considered to be the amount of gel attached as the second filter 2 by drying by suction. It becomes clear from this that the amount of sol is smaller as the second filter 2 is formed by weak suction. That is, the amount of sol consumed when the amount of filtration is 3 cc / hour is as extremely small as 0.15 cc, and the amount of filtration increases as the amount of sol contained in the second filter 2 decreases. This suggests an important point of the present invention. By forming the second filter 2 with as little sol as possible, it is possible to filter the drainage of the colloidal solution.
[0116]
FIG. 9B shows the degree of swelling, that is, the density of the sol in the gel film, from the sol removal amount and the volume of the gel film described above. From the experimental results that the film thickness of the second filter 2 when the suction pressure is −30 mmHg is 6 mm and the film thickness of the second filter 2 when the suction pressure is −10 mmHg is 4 mm, the degree of swelling is 27 to 30 It has increased. That is, the greater the suction pressure, the lower the degree of swelling and the higher the sol amount density of the second filter 2. More importantly, the lower the suction pressure is, the thinner the film thickness of the second filter 2 is and the greater the degree of swelling is. Filtration of the second filter 2 formed with the suction pressure shown in FIG. It proves that the amount of filtration at the time is large and it can be filtered for a long time.
[0117]
Therefore, it is clear that the major point where the wastewater of the colloidal solution of fine particles of 0.15 μm or less can be filtered mainly depends on the film forming conditions of the second filter 2 in the present invention.
[0118]
The filter shown in FIG. 7A shows one side of the filter shown in FIG. 6, and is a schematic diagram for explaining how the gel film is actually attached.
[0119]
The first filter 1 is immersed vertically in the colloidal solution wastewater, and the wastewater is a colloidal solution in which the objects to be removed 13 are dispersed. The removal target 13 is indicated by a small black circle. When the drainage is sucked by the pump 6 through the first filter 1 with a weak suction pressure, the fine particles of the object to be removed are gelled and adsorbed on the surface of the first filter 1 as approaching the first filter 1. . The gelled fine particles 14 indicated by white circles are gradually adsorbed and stacked on the surface of the first filter 1 to form the second filter 2 made of a gel film, which is larger than the filter holes 11 of the first filter 1. The gelled fine particles 14 having a diameter smaller than that of the filter hole 11 pass through the first filter 1, but there is no problem because filtered water is circulated again to the drainage in the step of forming the second filter 2. As described above, the second filter 2 is formed by taking about 120 minutes. In this film forming step, the gelled fine particles 14 are stacked while forming gaps of various shapes because they are sucked with a very weak suction pressure, and the second filter is a soft gel film having a very low degree of swelling. 2. The water in the wastewater penetrates through the gel film having a high degree of swelling and is sucked and passes through the first filter 1 to be taken out as filtered water. Finally, the wastewater is filtered.
[0120]
That is, in the present invention, the second filter 2 is formed with a gel film having a high degree of swelling, and moisture contained in the gel film in contact with the first filter 1 is sucked from the first filter 1 with a weak suction pressure. The gel film is contracted by dehydration, and the gel film in contact with the drainage is infiltrated with water, replenished and swollen, and the second filter 2 is infiltrated only with water and filtered.
[0121]
In addition, air bubbles 12 are sent to the first filter 1 from the bottom surface of the drainage, and a parallel flow is formed in the drainage along the surface of the first filter 1. This is because the second filter 2 adheres uniformly to the entire surface of the first filter 1 and forms a gap in the second filter 2 so as to adhere softly. Specifically, the air flow rate is set to 1.8 liters / minute, but it is selected depending on the film quality of the second filter 2.
[0122]
Next, in the filtration step, the gelled fine particles 14 indicated by white circles are gradually stacked on the surface of the second filter 2 while being adsorbed by a weak suction pressure. At this time, the purified water penetrates through the second filter 2 and the gelled fine particles 14 indicated by the white circles to be further laminated, and is taken out from the first filter 1 as filtered water. In other words, in the case of CMP, for example, in the case of CMP, abrasives such as silica, alumina or ceria and scraps of semiconductor material generated by grinding with abrasive grains, metal scraps and / or insulating film material scraps, etc., are treated as gels. Gradually stacked on the surface of the second filter 2 and captured, and water can permeate the gel membrane and be taken out from the first filter 1 as filtered water.
[0123]
However, if filtration is continued for a long time as shown in FIG. 8 (B), the gel film is thickly attached to the surface of the second filter 2, so that the above-mentioned gap eventually becomes clogged, and filtered water cannot be taken out. . For this reason, it is necessary to remove the laminated gel film in order to regenerate the filtration capacity.
[0124]
Next, the actual filtration method will be specifically described using the filtration apparatus shown in FIG.
[0125]
First, the waste water mixed with the material to be removed of the colloidal solution is put into the raw water tank 50 through the pipe 51. The filter device 53 of only the first filter 1 in which the second filter 2 is not formed is immersed in the tank 50, and the waste water is circulated while being sucked with a weak suction pressure by the pump 57 through the pipe 56. . The circulation path is a filter device 53, a pipe 56, a valve V 1, a pump 57, a pipe 58, a control valve CV 1, a flow meter 61, an optical sensor 62, and a valve V 3, and waste water is sucked from the tank 50 and returned to the tank 50.
[0126]
By circulating, the second filter 2 is formed on the first filter of the filter device 53, and finally, the object to be removed of the target colloidal solution is captured.
[0127]
That is, when the pump 57 sucks the waste water through the first filter 1 with a weak suction pressure, the fine particles of the object to be removed are gelled and adsorbed on the surface of the first filter 1 as it approaches the first filter 1. Is done. The gelled fine particles larger than the filter holes 11 of the first filter 1 are gradually adsorbed and stacked on the surface of the first filter 1 to form a second filter 2 made of a gel film. The gelled fine particles having a diameter smaller than that of the filter hole 11 pass through the first filter 1, but the water in the drainage is sucked through this gap as the second filter 2 is formed, and the first filter 1. And is taken out as purified water, and the wastewater is filtered.
[0128]
The concentration of fine particles contained in the filtered water is monitored by the optical sensor 62, and it is confirmed that the fine particles are lower than a desired mixing rate, and filtration is started. When the filtration is started, the valve V3 is closed by a detection signal from the optical sensor 62, the valve V4 is opened, and the above-described circulation path is closed. Therefore, purified water is taken out from the valve V4. Air bubbles constantly supplied from the air pump 55 are adjusted from the air diffusion pipe 54 by the control valve CV2 and supplied to the surface of the filter device 53.
[0129]
If the filtration is continued continuously, the water in the waste water of the raw water tank 50 is taken out of the tank 50 as purified water, so that the concentration of the object to be removed in the waste water increases. That is, the colloidal solution is concentrated to increase the viscosity. For this purpose, the raw water tank 50 is replenished with drainage from the pipe 51 to suppress an increase in the concentration of drainage and increase the efficiency of filtration. However, the gel film is thickly attached to the surface of the second filter 2 of the filter device 53, and eventually the second filter 2 becomes clogged and becomes unable to be filtered.
[0130]
When the second filter 2 of the filter device 53 is clogged, the filtration capacity of the second filter 2 is regenerated. That is, the pump 57 is stopped and the negative suction pressure applied to the filter device 53 is released.
[0131]
The regeneration process will be further described in detail with reference to the schematic diagram shown in FIG. FIG. 10A shows the state of the filter device 53 in the filtration process. Since the hollow portion 5 of the first filter 1 has a negative pressure compared to the outside due to a weak suction pressure, the first filter 1 has a shape recessed inward. Accordingly, the second filter 2 adsorbed on the surface is similarly recessed inward. The same applies to the gel film that is gradually adsorbed on the surface of the second filter 2.
[0132]
However, referring to FIG. 10B, in the regeneration step, the weak suction pressure is stopped and the pressure returns to almost the atmospheric pressure, so that the first filter 1 of the filter device 53 returns to the original state. As a result, the second filter 2 and the gel film adsorbed on the surface thereof also return in the same manner. As a result, since the suction pressure that first adsorbs the gel film disappears, the gel film loses the adsorbing force to the filter device 53 and simultaneously receives a force that expands outward. Thereby, the adsorbed gel film starts to be detached from the filter device 53 by its own weight. Furthermore, in order to advance this separation, it is preferable to increase the amount of bubbles from the air diffuser 54 by about twice. According to the experiment, the separation starts from the lower end of the filter device 53, and the gel film of the second filter 2 on the surface of the first filter 1 is detached like an avalanche and settles on the bottom surface of the raw water tank 50. Thereafter, the second filter 2 may be formed again by circulating the waste water through the circulation path described above. In this regeneration step, the second filter 2 returns to the original state, returns to a state where the drainage can be filtered, and again filters the drainage.
[0133]
Furthermore, when the filtered water is caused to flow back into the hollow portion 5 in this regeneration step, firstly, the first filter 1 is helped to return to its original state, and the hydrostatic pressure of the filtered water is applied to further expand the outside. Second, filtered water oozes out from the inside of the first filter 1 through the filter hole 11 to the boundary between the first filter 1 and the second filter 2, and the second filter 2 from the surface of the first filter 1. Facilitates the release of the gel film.
[0134]
If filtration is continued while regenerating the second filter 2 as described above, the concentration of the material to be removed from the waste water in the raw water tank 50 increases, and the waste water eventually has a considerable viscosity. Therefore, when the concentration of the object to be removed from the wastewater exceeds a predetermined concentration, the filtering operation is stopped and left to settle. Then, the concentrated slurry is stored at the bottom of the tank 50, and the concentrated slurry of the gel is recovered by opening the valve 64. The recovered concentrated slurry is compressed or heat-dried to remove water contained therein and further compressed. This can greatly reduce the amount of slurry that is treated as industrial waste.
[0135]
With reference to FIG. 11, the driving | running state of the filtration apparatus shown in FIG. 2 is demonstrated. The operating condition is one side of the A4 size filter device 53 described above (area: 0.109 m). 2 ). As described above, the initial flow rate is 3 cc / hour (0.08 m) with good filtration efficiency. 3 / Day), and the flow rate after regeneration is also set to the same value. The air blow rate is 1.8 L / min during film formation and filtration, and 3 L / min during regeneration. Pin and re-Pin are suction pressures and are measured by a pressure gauge 59. Pout and re-Pout are pressures in the pipe 58 and are measured by the pressure gauge 60. The flow rate and the reflow rate are measured by the flow meter 61 and represent the filtration amount sucked from the filter device 53.
[0136]
In FIG. 11, the left Y-axis indicates pressure (unit: MPa), and the negative pressure increases as the X-axis is approached. The right Y-axis indicates the flow rate (unit: cc / min). The X axis indicates the elapsed time (unit: minutes) from the film formation.
[0137]
As a point of the present invention, the flow rate and reflow rate are controlled to be maintained at 3 cc / hour in the film forming step, the filtering step, and the filtration step after regeneration of the second filter 2. For this reason, in the film forming process, Pin forms the second filter 2 with a gel film that is softly adsorbed with a very weak suction pressure of −0.001 MPa to −0.005 MPa.
[0138]
Next, in the filtration step, Pin is gradually increased from −0.005 MPa, and filtration is continued while ensuring a constant flow rate. Filtration is continued for about 1000 minutes, and the regeneration process is performed when the flow rate begins to decrease over time. This is because the gel film is thickly attached to the surface of the second filter 2 to cause clogging.
[0139]
Further, when the second filter 2 is regenerated, filtration is continued again at a constant reflow rate while gradually increasing the re-Pin. The regeneration and refiltration of the second filter 2 is continued until the raw water 52 has a predetermined concentration, specifically, the concentration is 5 to 10 times.
[0140]
Further, unlike the operation method described above, a method of performing filtration while fixing the suction pressure to −0.005 MPa, which has a large filtration flow rate, can also be employed. In this case, the filtration flow rate gradually decreases as the second filter 2 is clogged, but there is an advantage that the filtration time can be increased and the control of the pump 57 is simplified. Therefore, the regeneration of the second filter 2 may be performed when the filtration flow rate decreases below a certain value.
[0141]
FIG. 12A shows the particle size distribution of abrasive grains contained in the CMP slurry. The abrasive grains are used for CMP of an interlayer insulating film made of Si oxide, and the material is made of Si oxide, which is generally called silica. The minimum particle size was about 0.076 μm, and the maximum particle size was 0.34 μm. These large particles are agglomerated particles made up of a plurality of particles therein. Further, the average particle diameter is about 0.1448 μm, and the distribution has a peak in the vicinity of 0.13 to 0.15 μm. As a slurry adjusting agent, KOH or NH3 is generally used. The pH is between about 10-11.
[0142]
Specifically, the abrasive grains for CMP are mainly silica-based, alumina-based, cerium oxide-based, and diamond-based. Besides, chromium oxide-based, iron oxide-based, manganese oxide-based, BaCO4-based, antimony oxide-based, zirconia-based There is a yttria system. Silica is used for planarization of semiconductor interlayer insulating films, P-Si, SOI, etc., and Al / glass disks. Alumina is used for polishing hard disks, general metals, and planarization of Si oxide films. Further, cerium oxide is used for polishing glass and Si oxide, and chromium oxide is used for mirror polishing of steel. Manganese oxide and BaCO4 are used for polishing tungsten wiring.
[0143]
Furthermore, it is called an oxide sol. This sol is a monolith in which colloidal sized particles consisting of metal oxide or partial hydroxide, such as silica, alumina, zirconia, etc., are uniformly dispersed in water or liquid. It is used for planarization of interlayer insulating films and metals of semiconductor devices, and is also being studied for information disks such as aluminum disks.
[0144]
FIG. 12B shows data indicating that the CMP waste water is filtered and abrasive grains are captured. In the experiment, the above-mentioned slurry stock solution was diluted 50 times, 500 times, and 5000 times with pure water and prepared as a test solution. As described in the prior art, these three types of test solutions were prepared assuming that the drainage was about 50 to 5000 times because the wafer was cleaned with pure water in the CMP process.
[0145]
When the light transmittance of these three types of test solutions is examined with light having a wavelength of 400 nm, the test solution of 50 times is 22.5%, the test solution of 500 times is 86.5%, and the test solution of 5000 times. Is 98.3%. In principle, if abrasive grains are not included in the drainage, light is not scattered and should take a value close to 100%.
[0146]
When the filter on which the second filter film 13 was formed was immersed in these three types of test solutions and filtered, the transmittance after filtration was 99.8%. That is, since the value of the light transmittance after filtration is larger than the light transmittance before filtration, the abrasive grains can be captured. Incidentally, the transmittance data of the 50-fold diluted test solution is not shown in the drawing because the value is small.
[0147]
From the above results, when the removal object of the colloidal solution discharged from the CMP apparatus is filtered by the second filter 2 made of the gel film of the filter apparatus 53 provided in the filtration apparatus of the present invention, the transmittance is 99.8%. It was found that it can be filtered to the extent.
[0148]
In the above description, the fluid filtering method using the second filter which is a gel-like self-forming film has been described. However, the self-forming film is not limited to a gel-like one. The configuration of the present application can also be applied to a filtration apparatus and a filtration method using another type of self-forming film (precoat filter).
[0149]
【The invention's effect】
In the present invention, in the filtration device that performs filtration using the second filter that is a self-forming film, the filtered water is taken out from the filter device 53 using a pump having a motor capable of adjusting the suction pressure. . Therefore, the motor can be rotated at a high speed in the process of forming the second filter which is a self-forming film, and the motor can be rotated at a low speed in the filtration process using the formed self-forming film. Therefore, the second filter can be formed at an early stage in the step of forming the second filter. Furthermore, in the filtration step, it is possible to prevent the second filter from being destroyed by excessive suction pressure.
[0150]
Furthermore, when the second filter is a gel-like self-forming film, the gel can be maintained at a desired degree of swelling by rotating the motor at a low speed in the filtration step. Furthermore, it is possible to prevent the gel-like second filter from entering the hole of the first filter.
[0151]
Further, in order to remove mainly fine particles of 0.15 μm class or less such as abrasive grains mixed in CMP slurry, it is general to employ a filter film having pores smaller than the fine particles. However, the present invention has realized a filtration device that can filter a material to be removed from a colloidal solution by forming a gel membrane filter without using a filter membrane having a small pore size of 0.15 μm or less.
[Brief description of the drawings]
FIG. 1 is a diagram illustrating a filtration device according to the present invention.
FIG. 2 is a diagram illustrating a filter device embodied in the present invention.
FIG. 3 is a diagram for explaining an operation state of a further specific filtering device of the present invention.
FIG. 4 is a diagram illustrating a filter device of the present invention.
FIG. 5 is a diagram for explaining a further specific filter device of the present invention.
FIG. 6 is a diagram illustrating a filter according to the present invention.
FIG. 7 is a diagram for explaining the operating principle of the filter of the present invention.
FIG. 8A is a cross-sectional view and FIG. 8B is a characteristic diagram for explaining a film forming condition of a second filter of the present invention.
FIG. 9 is a diagram illustrating characteristics of the second filter of the present invention.
FIG. 10 is a diagram illustrating regeneration of the filter device of the present invention.
FIG. 11 is a diagram for explaining the operating state of the filtration device of the present invention.
FIG. 12 is a diagram illustrating the filtration characteristics of the present invention.
FIG. 13 is a diagram illustrating a conventional filtration system.
FIG. 14 is a diagram illustrating a CMP apparatus.
FIG. 15 is a diagram illustrating a system of a CMP apparatus.
[Explanation of symbols]
1 First filter
2 Second filter
4 frames
5 Hollow part
6 Pump
7 Filtrate
11 Filter hole
40 Ventilation pipe
50 Raw water tank
52 Raw water
53 Filter device
57 pump
61 Flow meter
62 Optical sensor

Claims (4)

被除去物を含む流体が収納されるタンクと、前記タンク内に浸漬される第1のフィルタと前記第1のフィルタを吸引して前記第1のフィルタの表面に堆積した前記被除去物から成る第2のフィルタとで形成されるフィルタ装置と、前記吸引のために前記第1のフィルタに接続されたパイプを介して接続されたポンプとを有する濾過装置を用いて前記流体を濾過する流体の濾過方法であり、A tank in which a fluid containing an object to be removed is stored; a first filter immersed in the tank; and the object to be removed which is deposited on the surface of the first filter by sucking the first filter. A fluid filter that filters the fluid using a filtration device having a filter device formed with a second filter and a pump connected to the first filter for suction. Filtration method,
前記ポンプに備えられたモーターは、前記パイプの内部の圧力に応答して前記モーターの回転数が制御され、  The motor provided in the pump is controlled in rotation speed of the motor in response to the pressure inside the pipe,
前記第2のフィルタを形成する際は、前記流体を濾過する際よりも前記ポンプの吸引圧が大きく、When forming the second filter, the suction pressure of the pump is larger than when the fluid is filtered,
前記流体を濾過する際は、前記第2のフィルタを形成する際よりも前記ポンプの吸引圧を小さくした事を特徴とした流体の濾過方法。A fluid filtering method characterized in that the suction pressure of the pump is made smaller when the fluid is filtered than when the second filter is formed.
前記ポンプは、インバータ回路により回転が制御される交流モーター、または、電圧により回転が制御されるDCモーターを備えることを特徴とする請求項1記載の流体の濾過方法。2. The fluid filtering method according to claim 1, wherein the pump includes an AC motor whose rotation is controlled by an inverter circuit or a DC motor whose rotation is controlled by a voltage. 前記パイプには前記吸引圧を計測する圧力計が介装されることを特徴とする請求項2記載の流体の濾過方法。The fluid filtering method according to claim 2, wherein a pressure gauge for measuring the suction pressure is interposed in the pipe. 前記流体は、コロイド状の被除去物を含む流体である請求項1〜請求項3のいずれかに記載の流体の濾過方法。The fluid filtering method according to claim 1, wherein the fluid is a fluid containing a colloidal object to be removed.
JP2003122584A 2003-04-25 2003-04-25 Fluid filtration method Expired - Fee Related JP4535689B2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP2003122584A JP4535689B2 (en) 2003-04-25 2003-04-25 Fluid filtration method
US10/831,585 US20040262209A1 (en) 2003-04-25 2004-04-23 Filtration apparatus
CNB2004100766341A CN100352535C (en) 2003-04-25 2004-04-25 Filtration apparatus
US11/499,532 US20060266686A1 (en) 2003-04-25 2006-08-04 Filtration apparatus
US11/499,531 US20060266685A1 (en) 2003-04-25 2006-08-04 Filtration apparatus
US11/499,554 US7381323B2 (en) 2003-04-25 2006-08-04 Filtration apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003122584A JP4535689B2 (en) 2003-04-25 2003-04-25 Fluid filtration method

Publications (2)

Publication Number Publication Date
JP2004321996A JP2004321996A (en) 2004-11-18
JP4535689B2 true JP4535689B2 (en) 2010-09-01

Family

ID=33500760

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003122584A Expired - Fee Related JP4535689B2 (en) 2003-04-25 2003-04-25 Fluid filtration method

Country Status (1)

Country Link
JP (1) JP4535689B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001198404A (en) * 2000-01-17 2001-07-24 Sanyo Electric Co Ltd Method and apparatus for recovering substance to be removed in fluid
JP2002001661A (en) * 1999-05-27 2002-01-08 Sanyo Electric Co Ltd Filtration method of cmp drain
JP2002052388A (en) * 1999-05-27 2002-02-19 Sanyo Electric Co Ltd Wastewater filtering method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6290709U (en) * 1985-11-27 1987-06-10
JP4135246B2 (en) * 1998-01-28 2008-08-20 日産自動車株式会社 Filtration apparatus and treatment liquid circulating apparatus for coating process using the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002001661A (en) * 1999-05-27 2002-01-08 Sanyo Electric Co Ltd Filtration method of cmp drain
JP2002052388A (en) * 1999-05-27 2002-02-19 Sanyo Electric Co Ltd Wastewater filtering method
JP2001198404A (en) * 2000-01-17 2001-07-24 Sanyo Electric Co Ltd Method and apparatus for recovering substance to be removed in fluid

Also Published As

Publication number Publication date
JP2004321996A (en) 2004-11-18

Similar Documents

Publication Publication Date Title
JP4353665B2 (en) Filtration device
JP3634792B2 (en) Removal method of object to be removed
JP3557197B2 (en) Filtration method of colloid solution
JP3634791B2 (en) Removal method of object to be removed
US20060266686A1 (en) Filtration apparatus
US7438804B2 (en) Coagulation treatment apparatus
JP4544831B2 (en) Filtration device
JP4233485B2 (en) Flocculant manufacturing apparatus and flocculant manufacturing method
JP4726396B2 (en) Filtration device
JP4632635B2 (en) Waste processing system for semiconductor materials
JP4535689B2 (en) Fluid filtration method
JP3825648B2 (en) Fluid filtration method
JP4353972B2 (en) Method for recovering gel film generated from CMP waste water
JP4233484B2 (en) Fluid coagulation treatment apparatus and coagulation treatment method using the same
JP2004321998A (en) Filter apparatus
JP2004290814A (en) Waste water treatment apparatus and waste water treatment method using it
JP2004290813A (en) Water treatment apparatus and water treatment method using it
JP2001347456A (en) Filtering method of cmp drain

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060420

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080728

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090901

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091030

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100520

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100615

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130625

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130625

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130625

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees