JP4414684B2 - Printing control apparatus, shipping slip printing control method, and control program - Google Patents
Printing control apparatus, shipping slip printing control method, and control program Download PDFInfo
- Publication number
- JP4414684B2 JP4414684B2 JP2003171997A JP2003171997A JP4414684B2 JP 4414684 B2 JP4414684 B2 JP 4414684B2 JP 2003171997 A JP2003171997 A JP 2003171997A JP 2003171997 A JP2003171997 A JP 2003171997A JP 4414684 B2 JP4414684 B2 JP 4414684B2
- Authority
- JP
- Japan
- Prior art keywords
- data
- printing
- shipping slip
- scheduled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 51
- 238000004519 manufacturing process Methods 0.000 claims description 225
- 230000008569 process Effects 0.000 claims description 34
- 238000012545 processing Methods 0.000 claims description 28
- 230000006870 function Effects 0.000 claims description 21
- 238000003860 storage Methods 0.000 claims description 13
- 238000013500 data storage Methods 0.000 claims description 11
- 238000012937 correction Methods 0.000 claims description 5
- 230000003111 delayed effect Effects 0.000 claims description 4
- 238000007726 management method Methods 0.000 description 38
- UDYLZILYVRMCJW-UHFFFAOYSA-L disodium;oxido carbonate Chemical compound [Na+].[Na+].[O-]OC([O-])=O UDYLZILYVRMCJW-UHFFFAOYSA-L 0.000 description 34
- 238000010586 diagram Methods 0.000 description 16
- 230000008859 change Effects 0.000 description 15
- 238000012423 maintenance Methods 0.000 description 8
- 238000012856 packing Methods 0.000 description 8
- 238000004891 communication Methods 0.000 description 7
- 230000001360 synchronised effect Effects 0.000 description 7
- 230000004308 accommodation Effects 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 4
- 238000006243 chemical reaction Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000013497 data interchange Methods 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、発注元及び物品ごとに異なる出荷伝票を印刷可能な印刷制御装置および出荷伝票の印刷制御方法およびプログラムに関する。
【0002】
【従来の技術】
従来、自動車部品等の部品メーカは、受注データに基づいて生産計画を作成し、その生産計画に従って部品を生産し、出荷段階で容器に部品の生産指示書に対応する出荷伝票を貼りつけて組立メーカに出荷している。
【0003】
容器はトラック等に積載され、指定時刻に指定場所に容器を台車に載せる等の荷姿で納品され、作業者によってラインサイドに移動した後、車体に組みつけられている。納品時に出荷伝票のバーコードをなぞる等して納入部品の検品が行われている。
【0004】
出荷伝票には部品の種類に応じて各種のサイズがあり、出荷伝票のフォームも共通部分以外は組立メーカ毎に異なっている。組立メーカの内示に基づいて見込生産した完成品の容器には部品メーカの自社伝票(生産指示書)が貼り付けられ又は差し込まれている。部品メーカでは、組立メーカから確定発注データを受信すると、該確定発注データに基づいて、出荷伝票の印刷を行ない、容器に貼り付けたり差し込まれている生産指示書と照合して、出荷伝票を容器に貼り付けあるいは取り付けている。出荷伝票は最新の確定発注データ又はその日の生産計画に基づいて例えば半日単位で一括して印刷するか、若しくは出荷伝票の印刷担当者が、最新の確定発注データ又は当日の生産計画データを確認しながら、その都度印刷プログラムを操作して出荷伝票印刷している。
【0005】
特開2001−22863号公報(特許文献1)には、インターネット経由でEDIデータを受信し、商取引データをデータベースに記憶してブラウザの画面に担当者が指示を入力することによって、データベースから読み出したデータと印刷プログラムを受信し、見積もり依頼書や出荷伝票を印刷するシステムが開示されている。
【0006】
また、特開2002−222382号公報(特許文献2)には、受信した標準フォーマットの帳票用EDIデータを内部的に処理する際の業務用フォーマットに変換する転換定義情報格納部を備えた電子データ・フォーマット変換システムが開示されている。
【0007】
【特許文献1】
特開2001−22863号公報
【0008】
【特許文献2】
特開2002−222382号公報
【0009】
【発明が解決しようとする課題】
出荷伝票が組立メーカ毎に微妙に異なるため、従来の印刷システムにおいては、出荷伝票印刷プログラムを組立メーカ毎に複数用意して印刷を実行しており、プログラムの数が多くなってしまい、メンテナンス工数や維持費用の増大を生じているという問題点があった。
【0010】
出荷伝票を半日単位等で一括印刷している場合、出荷伝票の印刷操作の負担は大きくないが、組立メーカ毎に出荷伝票印刷プログラムが異なるため、誤った出荷伝票印刷プログラムにより誤った出荷伝票を印刷して無駄となってしまったり、急な生産変更が生じた場合には、多数の印刷済み出荷伝票と、生産指示書及び生産された部品との照合作業が極めて困難に成るという問題点があった。
【0011】
他方、生産計画を見ながら印刷操作する場合、急な生産変更には柔軟に対応できるが、印刷担当者は、生産計画データや確定発注データと生産された部品の生産指示書を照合しながら、組立てメーカ毎の出荷伝票印刷プログラムを、その都度操作して出荷伝票を印刷しており運用負担が重いという問題があった。
【0012】
本発明は、上記の問題点を解決するためになされたもので、本発明の目的は、ロットの最初の物品の流動を検知したことを示す生産進捗情報を送信可能な端末と通信可能に構成された印刷制御装置において、発注元及び物品に応じた複数の出荷伝票フォームや物品情報と容器の種類と該容器の収容数を含むマスタを予め登録しておき、物品の発注元を特定可能な発注元情報,生産する物品を特定可能な物品情報,該物品の生産数,生産開始予定時刻及び生産終了予定時刻を含む生産計画データを更に記憶しておき、前記生産計画データと前記マスタとを参照して、出荷伝票に印刷するデータであって前記物品情報を含む出荷伝票データを作成してメモリに格納 し、前記生産計画データに含まれる前記物品の前記生産開始予定時刻及び生産終了予定時刻を用いて、前記生産開始予定時刻及び生産終了予定時刻により特定される前記物品の流動予定時刻から所定時間前に前記出荷伝票を印刷すべく印刷予定時刻を決定し、また生産計画データと前記出荷伝票データとを用いて、出荷伝票データ,発注元情報に応じた前記出荷伝票フォーム,出荷伝票印刷枚数,出荷伝票印刷予定時刻をそれぞれ指示した出荷伝票の印刷指示データを作成し、前記端末から受信した前記生産進捗情報を用いて前記印刷指示データを修正し、該作成された出荷伝票の印刷指示データに基づいて、指示された出荷伝票データ,出荷伝票フォームをメモリより読み出し、該読み出した出荷伝票データと出荷伝票フォームとのオーバレイ印刷を、指示された印刷予定時刻に指示された印刷枚数だけ行うように出荷伝票の印刷処理を制御する(印刷スケジューリングを動的に制御する)ことにより、生産者(部品メーカ等)毎に、単一の端末,単一のシステムで、複数の発注元(組立メーカ等)毎の種々の物品の出荷伝票を物品(部品等)毎の容器に応じて固有のフォーマットで印刷することができ、フォームの変更を行う場合にも1箇所のメンテナンスで対応することができるとともに、生産計画を確認しながら適時に出荷伝票を印刷する操作等も不要になり、出荷伝票印刷担当者の運用負担を大幅に軽減させることができ、さらに、急な生産変更があった場合でも、変更後の確定発注データや生産計画と同期した出荷伝票の印刷が可能となり、出荷伝票の印刷漏れや後日生産分等の不要出荷伝票の印刷をなくし、出荷伝票と物品の照合担当者の運用負担を大幅に軽減できる出荷伝票印刷環境を構築することが可能となる印刷制御装置および出荷伝票の印刷制御方法およびプログラムを提供することである。
【0013】
【課題を解決するための手段】
本発明は、ロットの最初の物品の流動を検知したことを示す生産進捗情報を送信可能な端末と通信可能に構成された印刷制御装置であって、発注元に応じた複数の出荷伝票フォームを予め記憶しておくフォーム記憶手段と、少なくとも前記物品の前記発注元を特定可能な発注元情報と、生産する前記物品を特定可能な物品情報と、該物品の生産数と、該物品の生産開始予定時刻及び生産終了予定時刻とを含む生産計画データを記憶する生産計画データ記憶手段と、物品情報と容器の種類と該容器の収容数を含むマスタを記憶するマスタ記憶手段と、前記生産計画データと前記マスタとを参照して、出荷伝票に印刷するデータであって、前記物品情報と、前記物品の前記生産数と、該物品を収容した前記容器の収容数から算出される前記出荷伝票の印刷枚数とを含む出荷伝票データを作成する第1の作成手段と、前記第1の作成手段により作成された出荷伝票データを記憶する伝票データ記憶手段と、前記生産計画データに含まれる前記物品の前記生産開始予定時刻及び生産終了予定時刻を用いて、前記生産開始予定時刻及び生産終了予定時刻により特定される前記物品の流動予定時刻から所定時間前に前記出荷伝票を印刷すべく印刷予定時刻を決定する決定手段と、前記生産計画データと前記出荷伝票データとを用いて、前記出荷伝票の印刷を指示するための印刷指示データであって、前記出荷伝票データと、前記発注元情報に応じた出荷伝票フォームと、前記出荷伝票の前記印刷予定時刻と、前記印刷枚数とをそれぞれ指示した印刷指示データを作成する第2の作成手段と、前記端末から受信した前記生産進捗情報を用いて前記印刷指示データを修正する修正手段と、前記修正手段により修正された前記印刷指示データを用いて、指示された前記出荷伝票フォームを前記フォーム記憶手段から読み出し、更に指示された前記出荷伝票データを前記伝票データ記憶手段より読み出し、該読み出した出荷伝票データと該読み出した出荷伝票フォームとのオーバレイ印刷を前記修正された印刷指示データを用いて前記印刷予定時刻に印刷を行うべく出荷伝票の印刷処理を制御する印刷制御手段とを備えることを特徴とする。
【0020】
【発明の実施の形態】
〔第1実施形態〕
図1は、本発明の第1実施形態を示す印刷システムの構成を示すシステム構成図である。
【0021】
以下、なお、説明のために、組立メーカからの依頼により、部品メーカが、生産した部品を組立メーカに出荷する際に使用する出荷伝票の印刷制御を例にして説明するが、本発明は、部品の出荷伝票の印刷制御に限られるものではなく、部品以外広く物品(どのような物品(有体物動産であって流通過程を通して取引可能なもの)であってもよい)の出荷伝票の印刷制御に適用可能である。即ち、発注元からの依頼等により、物品を出荷する際に使用する出荷伝票の印刷制御に本発明は適用可能である。
【0022】
図において、EDI(Electric Data Interchage;電子データ交換)サーバ130,業務サーバ140,帳票メンテナンスPC150は、通常部品メーカの情報システム部門にある。
【0023】
EDIサーバ130は、所定の通信回線190を介して、各組立メーカ等に設定されたEDIサーバA100,EDIサーバB110と部品注文等のデータを交換可能である。
【0024】
また、業務サーバ140内のハードディスク28(図2)には、複数の出荷伝票フォーム、発注元及び部品に応じて出荷伝票フォーム(フォームNo.)を特定するための出荷伝票マスタ、部品番号,部品名称,荷姿(部品を収容する容器の種類,容器の収容数),取引先名称,各種バーコード情報等を含む部品マスタ等のマスタ類が記憶されている。さらに、後述する出荷伝票データ(図5)や印刷指示データ(図6)も記憶される。なお、これら各種フォームやマスタ類等のデータは、業務サーバ140内のハードディスクに記憶される形態に限られるものではなく、他のサーバに記憶され、該他のサーバに記憶されたデータを、業務サーバが参照する形態であってもよい。
【0025】
また、印刷装置A160,業務PC−A170,印刷装置B175,業務PC−B180は、部品メーカのラインサイドにある。
【0026】
印刷装置A160,印刷装置B175は、出荷伝票のラベルをバーコード付きで印刷可能であり、該印刷されたバーコード付きの出荷伝票ラベルは、部品を収容する容器に貼り付けられて組立メーカに出荷される。
【0027】
図2は、図1に示した業務サーバ140のハードウェア構成を示すブロック図である。
【0028】
図に示すように、業務サーバ140は、CPU21と、RAM22と、ROM23と、ネットワークアダプタ(LANアダプタ)24と、ビデオアダプタ25と、キーボード26と、マウス27等のポインティングデバイスと、ハードディスク28と、CD−ROMドライブ29,DVD−ROMドライブ等の記録媒体ドライブとを備え、これらがシステムバス20を介して互いに接続されている。
【0029】
CPU21は、ROM23又はハードディスク28に、CD−ROMドライブ29に記憶保存されたプログラムを読み出して後述する各種制御処理を実行する。ハードディスク28は、各種フォーム情報やマスタ類等を記憶するものとする。RAM22は、CPU21が所定の処理を実行する際にデータ等を一時記憶させるためのメモリである。ネットワークアダプタ24は、通信回線100(図1)に接続するための通信インターフェースである。
【0030】
図3は、図1に示した業務PC−A170,業務PC−B180のハードウェア構成を示すブロック図である。
【0031】
図に示すように、業務PC−A170,業務PC−B180は、CPU31と、RAM32と、ROM33と、ネットワークアダプタ(LANアダプタ)34と、ビデオアダプタ35と、キーボード36と、マウス37等のポインティングデバイスと、ハードディスク38と、CD−ROMドライブ39,DVD−ROMドライブ等の記録媒体ドライブとを備え、これらがシステムバス30を介して互いに接続されている。
【0032】
CPU31は、ROM33又はハードディスク38に、CD−ROMドライブ39に記憶保存されたプログラムを読み出して各種制御処理を実行する。RAM32は、CPU31が所定の処理を実行する際にデータ等を一時記憶させるためのメモリである。ネットワークアダプタ34は、通信回線100(図1)に接続するための通信インターフェースである。また、40はモニタで、各種情報をビデオアダプタ35を介して表示する。
【0033】
以下、図4〜図7を参照して、本発明の印刷システムにおける各種処理について説明する。
【0034】
図4は、本発明の印刷システムにおける第1の制御処理手順の一例を示すフローチャートであり、出荷伝票データ作成処理に対応する。
【0035】
なお、S501〜S502は、図1に示した組立メーカのEDIサーバA100又はEDIサーバB110により実行されるステップ示し、EDIサーバA100又はEDIサーバB110内の不図示のCPUにより不図示の記録媒体に格納されたプログラムに基づいて実行される。また、S521〜S525は、図1に示した部品メーカのEDIサーバ130により実行されるステップを示し、EDIサーバ130内の不図示のCPUにより不図示の記録媒体に格納されたプログラムに基づいて実行される。さらに、S531〜S533は、不図示の生産管理サーバにより実行されるステップを示し、生産管理サーバ内の図示しないCPUにより記録媒体に格納されたプログラムに基づいて実行される。また、S541〜S546は、図1に示した業務サーバ140により実行されるステップを示し、業務サーバ140内のCPU21によりハードディスク28又はその他の記録媒体に格納されたプログラムに基づいて実行される。
【0036】
まず、ステップS501において、組立メーカのEDIサーバ(ここでは、EDIサーバA100として説明する)から送信された発注情報(EDIデータ)は、ステップS521で部品メーカのEDIサーバ130によって受信される。なお、発注情報に変更等が発生した場合には、その都度、組立メーカのEDIサーバから、更新分の発注情報が送信されるものとする。
【0037】
そして、ステップS522において、EDIサーバ130は、受信した発注情報をトランスレータによりデータ変換(トランスレート)する。次に、ステップS523において、EDIサーバ130は、データ変換した発注情報についてエラーの有無を判断し、エラーがあると判断した場合には、エラー情報をEDIサーバA100に送信する。そして、ステップS502において、EDIサーバA100がエラー情報を受信すると、処理を終了する。
【0038】
一方、ステップS523で、EDIサーバ130が、データ変換した発注情報にエラーが無いと判断した場合には、ステップS525において、発注情報(更新の場合は更新分)を不図示の生産管理サーバに転送する。この生産管理サーバは、部品メーカに設置され部品の生産量を管理するものであり、この生産管理サーバに管理されるとおりに部品生産が行われる。
【0039】
そして、この生産管理サーバは、ステップS531において、EDIサーバ130から送信された発注情報を受信し、ステップS532において、該受信した発注情報に基づいて生産計画データを作成する(なお、受信した発注情報が更新分の発注情報の場合は生産計画データの更新分を作成する)。そして、ステップS533において、生産管理サーバは、該更新した生産計画データを業務サーバ140に送信する。
【0040】
なお、生産管理サーバは、予めEDIサーバ130から内示データを受信し、内示データに基づいて生産計画データを作成し生産を行ない、完成した部品を在庫として管理し、EDIサーバ130から確定発注データを受信した場合、まず在庫分を引当して、在庫分の出荷伝票を直ちに印刷し、生産管理サーバは、未引当分(つまり確定発注データの発注数が在庫数より多い場合の差分)を元に生産計画を変更し、該更新した生産計画データを業務サーバ140に送信する形態も考えられる。この見込み生産の実施形態及び見込み生産と受注生産の混在する実施形態は、後述する第3実施形態にて詳しく説明する。
【0041】
次に、ステップS541において、業務サーバ140は、生産管理サーバより送信された生産計画データ(更新の場合は更新分)を受信し、ハードディスク28に記憶する。
【0042】
なお、上述した生産管理サーバより送信される生産計画データは、少なくとも部品の発注元を特定可能な発注元情報,生産する部品を特定可能な部品情報,該部品の生産数,更に該物品の生産時刻を含むものであり、具体的には、(生産順位No.)、ロットNo.、部品メーカ用部品番号、(取引先用部品番号)、指示数、生産開始予定時刻、(生産終了予定時刻)、生産場所、(指示情報)、(発注元)、納入場所、納入指示日、納入時刻等が含まれる。なお、カッコ書で記載した項目は必須項目でないものとするが、「発注元」の省略は、取引先毎に異なる番号を用いる場合(即ち、部品番号より発注元が確定する場合)とする。
【0043】
そして、ステップS542において、業務サーバ140は、生産計画データの発注元を判定する。生産計画データに発注元の情報が含まれない場合、生産計画データ内の部品メーカ用部品番号に基づいて、ハードディスク28に格納される部品番号マスタを照会し、発注元を判定してRAM22に記憶させる。
【0044】
次に、ステップS543において、生産計画データ内の部品番号マスタから荷姿(部品を収容する容器の種類)を判定する。
【0045】
そして、ステップS544において、業務サーバ140は、ステップS542,S543で判定された発注元,荷姿及び生産計画データに基づいて、ハードディスク28に予め記憶されている出荷伝票マスタ及び部品マスタを参照し、部品名称や取引先名称、フォームNo.、バーコード情報(2次元バーコードを含む)等を読み出し、後述する図5に示す出荷伝票データを作成し(更新の場合は更新分を作成し)、一意の名称を付して出荷伝票データファイルとしてハードディスク28に記憶させる。なお、この一意の出荷伝票データファイルの名称もRAM22のワークエリアに記憶しておく。また、ここで、業務サーバ140は、出荷伝票データのラベル数も算出してRAM22に記憶しておく。このラベル数は、指示数と各容器の収容数に基づいて算出される出荷伝票の印刷枚数のことを言う。例えば、ある部品の指示数が「100」で、1つあたりの容器の収容数が「8」であれば、「100」の部品を収容するためには、「13」個の容器が必要となるため、該容器に貼り付けるラベル数は「13」となる。なお、バーコードを部品マスタ経由で読み出さずに出荷伝票データ作成時に、部品番号を元に2次元バーコードや1次元バーコードを作成しても良い。このように構成すればバーコードのイメージデータをハードディスク等に記憶しておく必要がない。
【0046】
このように、生産計画データの発注者情報と部品番号に基づいて出荷伝票の種類(フォーム及びサイズ)を特定することによって単一の出荷伝票印刷プログラムにより各組立メーカの複数種類の出荷伝票を印刷可能にする。なお、詳細には、発注者情報及び部品番号から荷姿を決定し、該荷姿から出荷伝票サイズを決定し、出荷伝票フォームと抽出情報(出荷伝票データを作成するための情報)を決定する。なお、出荷伝票フォームは、共通データ部分,組立メーカ部分,部品メーカ部分等に分けて記憶しておき、印刷実行時に合成した上でフォームオーバレイを掛けるようにしてもよい。
【0047】
次に、ステップS545において、業務サーバ140は、生産計画データの指示数、生産開始予定時刻、及び生産終了予定時刻に基づいて、出荷伝票の印刷予定時刻を算出して、RAM22に記憶させる。なお、出荷伝票の印刷予定時刻は、好ましくは部品の流動予定時刻(生産開始予定時刻,生産終了予定時刻)から所定時間前(荷姿に応じて例えば5分〜10分前)に最新の生産計画と同期して出荷伝票を印刷することができるように決定する。また、休憩時間等ラインの休止時間に応じて出荷伝票データの印刷も休止するように、出荷伝票の印刷予定時刻を決定する。
【0048】
そして、ステップS546では、ステップS545で算出した出荷伝票の印刷予定時刻及びステップS544でRAM22のワークエリアに記憶させた一意の出荷伝票データファイルの名称と出荷伝票データファイルに基づいて、後述する図6に示すような印刷指示データを作成し追加する。
【0049】
なお、生産管理サーバより送信される生産計画データに、生産に同期した印刷を行わない旨を指定する印刷フラグを設け(生産管理サーバは、生産同期した印刷を行わない旨が設定されている場合にはこの印刷フラグを「OFF」にし、それ以外の場合は「ON」にして送信する)、この印刷フラグが「OFF」の場合には、業務サーバ140は、ステップS546で当初作成する印刷指示データ内の出荷伝票の印刷時刻(図6に示す印刷開始907)を「99:99」としておき、ステップS546の後、ユーザ(担当者)が(業務PC等からアクセスして)業務サーバ140で出荷伝票の検索を実行して、印刷対象の出荷伝票を絞り込んでから印刷指示データ内の印刷開始時刻(図6に示す印刷開始907)を担当者が指示した時刻等に変更し、あるいは印刷指示データ内の印刷開始時刻の変更は行わずに直ちに出荷伝票を印刷出力するように印刷制御する実施形態としても良い。この構成の場合、ステップS544で作成する出荷伝票データに、印刷フラグ(「未出力」/「出力済」を示す)を設けておき(デフォルトは「未出力」)、印刷時に前記印刷フラグを「出力済」にセットするようにする。また、上述の検索条件は、少なくとも発注元あるいは要元、納入日又は出荷日、出力区分(未出力/出力済)とする。検索条件として更に部品カテゴリ又は主部品番号(例えば部品番号の上5桁)、部品名称等で絞りこめるようにしても良い。この検索条件に合致した出荷伝票データの印刷指示データ中の印刷時刻が「99:99」から実際の印刷時刻に更新されて印刷が実行される。
【0050】
また、業務サーバ140において、特定の発注元あるいは要元、納入日又は出荷日、部品番号等の条件に合致した場合には、生産に同期した印刷を行わないように設定可能にし(ユーザが業務PC等から業務サーバ140にアクセスして設定可能)、該条件に合致した出荷伝票については、ステップS546で当初作成する印刷指示データ内の出荷伝票の印刷時刻(図6に示す印刷開始907)を「99:99」としておき、ステップS546の後、ユーザ(担当者)が(業務PC等からアクセスして)業務サーバ140で上述の出荷伝票の検索を実行して、印刷対象の出荷伝票を絞り込んでから印刷指示データ内の印刷開始時刻(図6に示す印刷開始907)を担当者が指示した時刻等に変更し、あるいは印刷指示データ内の印刷開始時刻の変更は行わずに直ちに出荷伝票を印刷出力するように印刷制御する実施形態としても良い。
【0051】
以下、上述した部品番号マスタの構成の一例について示す。
【0052】
部品番号マスタは、例えば、自社部品番号(一意)、発注元部品番号、発注元、親部品番号、部品名称、図面番号、設計変更番号、管理区分、登録年月日、製造開始年月日、製造終了年月日、バーコードファイル名称、削除フラグ等から構成される。なお、「発注元」とは、組立てメーカ等の部品の発注元会社のコードを示し、「親部品番号」とは、当該部品の親部品の部品番号(例えば、シート全体とシートのクッションやシートカバーは親子関係にある)を示す。また、「図面番号」とは、当該部品に対応する図面の管理番号(一意)を示しものであり、「自社部品番号」や「発注元部品番号」と同一の場合もある。さらに、「設計変更番号」とは、その部品が新設されたときの設計変更番号を示す、「管理区分」とは、部品の重要度に応じてA管理、B管理、C管理等を行う区分を示し、「登録年月日」とは、その部品が初めてマスタに登録された年月日を示し、「バーコードイメージファイル名称」とは、バーコードのイメージ情報を記憶しているファイルの名称を示す。
【0053】
図5は、本発明の印刷システムにおける出荷伝票データの構成の一例を示すデータ構成図である。
【0054】
図において、800は出荷伝票データで、発注者情報801,部品番号802,部品番号(バーコード情報)803,部品番号識別804,収容数805,収容数(バーコード情報)806,部品名称807,納入先808,指示数809,受注者名称810,受注者コード811,受注者コード(バーコード情報)812,発行番号813,発行番号(バーコード情報)814,納入指示日815,時刻816,受注側部品番号817,要元818,荷降単位819,管理担当部門820等で構成される。
【0055】
なお、発注者情報801は、注文を行う組立業者の名称を示す。部品番号802は、部品等を特定するため、発注者がそれらの部品に設定した管理番号を示し、部品番号(バーコード情報)803は、部品番号802に対応するバーコード情報を示す。部品番号識別804は、部品番号802だけでは部品を特定できない場合に使用する識別情報を示す。
【0056】
収容数805は、納入時の荷姿毎に収容する標準個数を示す。なお、標準個数に満たない場合は端数表示を明示するものとする。収容数(バーコード情報)806は、収容数805に対応するバーコード情報を示す。
【0057】
部品名称807は、部品等の名称を示す。納入先808は、部品納入先企業の事業所,工場等を示す情報や、部品納入先企業の事業所,工場等の納入場所を示す情報に対応する。
【0058】
指示数809は、発注者が受注者に提示する納入数量又は出荷数量を示す。受注者名称810は、注文を受ける企業の名称を示す。受注者コード811は、注文を受ける企業を示すコードや、注文を受ける企業の工場,事業所,事業部門等を示すコードに対応する。受注者コード(バーコード情報)812は、受注者コード811に対応するバーコード情報を示す。
【0059】
発行番号813は、納入指示単位を特定するために付番した識別番号又は出荷伝票を特定するために付番した識別番号を示し、発行番号(バーコード情報)814は、発行番号813に対応するバーコード情報を示す。
【0060】
納入指示日815は、発注者が受注者に提示する納入日付を示し、時刻816は、発注者が受注者に提示する納入時刻又は納入時刻区分を示す。受注側部品番号817は、部品等を特定するため、受注者がそれらの部品に設定した管理番号を示す。
【0061】
要元818は、当該部品を要求した組織等を示す。荷降単位819は、納入時に荷降する単位を示す。管理担当部門820は、受注者側の管理担当部門の名称を示す。
【0062】
図6は、本発明の印刷システムにおける印刷指示データの構成の一例を示すデータ構成図である。
【0063】
図において、900は印刷指示データで、ロットNo.901,フォームNo.902,ラベル数903,出荷伝票データファイル名904,開始予定905,終了予定906,印刷開始907等で構成される。
【0064】
なお、開始予定905,終了予定906は、当該部品の生産が開始,終了される予定時刻を示し、印刷開始907は、前記開始予定905,終了予定906に基づいて算出される当該出荷伝票の実際の印刷時刻を示す。
【0065】
例えば、ロットNo.「010235」の終了予定940(生産終了予定時刻)とロットNo.「010236」の開始予定950(生産開始予定時刻)に10分の差があるが、この10分間は休憩時間等で製造ラインが停止することを示している。このように実際の製造時刻に(製造ラインの停止時間をも考慮して)出荷伝票を印刷するように指示するので、従来の出荷伝票を半日単位で一括印刷する場合のように、未貼り付けの出荷伝票が手元に多数印刷されることがなく、実際に部品が生産される直前に出荷伝票が印刷されるため、生産された部品と出荷伝票との照合作業の手間を大幅に省くことができ、出荷伝票の誤貼り付け等も抑制することができる。
【0066】
また、生産計画等が変更された場合でも、従来の出荷伝票を半日単位で一括印刷する場合とは異なり、変更毎に、生産計画の変更を生産管理サーバから受信して、印刷指示データを更新するため、変更前の生産計画のまま出荷伝票を印刷してしまい多数の出荷伝票が無駄となってしまう等の事態も防止することができる。
【0067】
また、従来の生産後に生産された部品に基づいて後から出荷伝票を印刷する場合では、生産された部品を照合しながら操作するという多大な負荷を課していたが、本実施形態はこのような場合とも異なり、最新の生産計画に基づいて印刷指示データが生成されるので、ユーザによる操作等の手間を大幅に省くこともできる。
【0068】
図7は、本発明の印刷システムにおける第2の制御処理手順の一例を示すフローチャートであり、出荷伝票印刷処理に対応する。
【0069】
なお、S601〜S605は、図1に示した業務サーバ140により実行されるステップを示し、業務サーバ140内のCPU21によりハードディスク28又はその他の記録媒体に格納されたプログラムに基づいて実行される。また、S621〜S633は、図1に示した業務PC−A170又は業務PC−B180により実行されるステップを示し、業務PC−A170,業務PC−B180内のCPU31によりハードディスク38又はその他の記録媒体に格納されたプログラムに基づいて実行される。さらに、S641〜S643は、図1に示した印刷装置A160,印刷装置B175により実行されるステップを示し、印刷装置A160,印刷装置B175内の不図示のCPUにより不図示の記録媒体に格納されたプログラムに基づいて実行される。
【0070】
まず、予めその日の最初(ライン稼動前の時間)に印刷指示データと出荷伝票データ及び必要なフォームデータが、業務用サーバ140から業務PC(ここでは業務PC−A170として説明する)に送信され、業務PC−A170で受信されてハードディスク38に記憶される。これらの予備データは、後述するステップS629の例外処理で使用される。
【0071】
まず、ステップS601において、業務サーバ140から業務PC−A170に印刷指示データが送信される。そして、ステップS621において、業務PC−A170で、印刷指示データが受信されてハードディスク38に記憶される。なお、この業務サーバ140からの印刷指示データの送信は、業務サーバ140で、印刷指示データが更新される(図4のステップS546)たびに行われるものとし、業務PC−A170では、印刷指示データを受信するたびに、ハードディスク38に記憶された印刷指示データを更新するものとする。
【0072】
次に、ステップS622において、ハードディスク38に記憶されている印刷進捗情報を参照してRAM32に記憶し、この印刷進捗情報と印刷指示データとを比較して印刷進捗(印刷が予定時刻に実行されているか)を判定する。
【0073】
そして、ステップS623において、上記ステップS622でRAM32に記憶した次の印刷時刻に基づいて印刷開始時刻が到来したかを判定し、未到来であればステップS622に戻る。ただし、ステップS622で判定した進捗が予定より遅れている場合はステップS624に進むものとする。このように、流動予定時刻に対して出荷伝票の印刷の実行が遅れ気味の場合は、印刷予定時刻に追いつくまでは、印刷装置の最大速度で印刷を続行する。
【0074】
一方、ステップS623で、印刷開始時刻が到来していると判定した場合には、ステップS624において、業務サーバ140に対して印刷指示データで指定されている出荷伝票データファイルを要求する。
【0075】
そして、業務サーバ140では、ステップS602において、業務PC−A170からの出荷伝票データ要求を受信し、ステップS603において、ハードディスク28に記憶されている出荷伝票データのうち要求された出荷伝票データを読み出して業務PC−A170に送信する。
【0076】
そして、業務PC−A170では、ステップS625において、業務サーバ140から送信された出荷伝票データを受信して、ハードディスク38に記憶し、ステップS626に進む。なお、出荷伝票データ受信にタイムアウトが発生した場合も、そのままステップS627に進む。
【0077】
次に、ステップS626において、業務PC−A170では業務サーバ140に対して印刷指示データで指定されているフォームNo.のフォームデータを要求する。
【0078】
そして、業務サーバ140では、ステップS604において、業務PC−A170からのフォームデータ要求を受信し、ステップS605において、ハードディスク28に記憶されているフォームデータのうち要求されたフォームNo.のフォームデータを読み出して業務PC−A170に送信する。
【0079】
そして、業務PC−A170では、ステップS627において、業務サーバ140から送信されたフォームデータを受信して、ハードディスク38に記憶し、ステップS628に進む。なお、フォームデータ受信にタイムアウトが発生した場合も、そのままステップS628に進む。
【0080】
次に、ステップS628において、業務PC−A170は、出荷伝票データの受信とフォームデータの受信にタイムアウトが発生したか否かを判定し、タイムアウトが発生したと判定した場合には、ステップS629において、例外処理を行い、ステップS630に進む。なお、この例外処理とは、ライン稼動前の時間に受信された出荷伝票データ及び必要なフォームデータと、印刷指示データと印刷進捗情報から出荷伝票を印刷する出荷伝票データとフォームデータを特定する。つまり、印刷進捗情報の印刷済み出荷伝票に基づいて、印刷指示データから次に印刷すべき出荷伝票データを特定する。
【0081】
一方、ステップS628で、出荷伝票データの受信とフォームデータの受信にタイムアウトが発生していないと判定した場合には、そのままステップS630に進む。
【0082】
次に、ステップS630において、ステップS625,S627で受信した(又はステップS629で特定した)出荷伝票データファイルとフォームデータに基づいて、フォームオーバレイ処理を実行し、印刷データを作成する。
【0083】
次に,ステップS631において、ステップS630で作成した印刷データを業務PC−A170から印刷装置(ここでは、印刷装置A160として説明する)に送信する。
【0084】
そして、印刷装置A160では、ステップS641において、業務PC−A170から送信される印刷データを受信し、ステップS642において、出荷伝票印刷を実行して出荷伝票を出力し、ステップS643において、印刷ログを業務PC−A170に送信する。
【0085】
そして、業務PC−A170では、ステップS632において、印刷装置A160から送信された印刷ログを受信し、ステップS633において、受信した印刷ログに基づいて進捗情報を更新し、ステップS622に戻る。
【0086】
図8は、本発明の印刷システムにより印刷される出荷伝票の一例を示す模式図である。
【0087】
図8(a),(b)に示すように、出荷伝票は部品の種類や組立メーカ毎に異なっている。
【0088】
〔第2実施形態〕
上記第1実施形態では、業務サーバ140で生産管理サーバからの生産計画データを受信し、該生産計画データに基づいて出荷伝票データ,印刷指示データを生成し、該生成した印刷指示データを業務PCに送信し、業務PCで出荷伝票印刷処理を行う構成について説明したが、業務PCに業務サーバ140の機能を追加するように構成してもよい。即ち、業務PCで生産管理サーバからの生産計画データを受信し、該生産計画データに基づいて出荷伝票データ,印刷指示データを生成し、業務PCで出荷伝票印刷処理を行う構成について説明したが、業務PCで生産管理サーバからの生産計画データを受信し、該生産計画データに基づいて出荷伝票データ,印刷指示データを生成し、該生成した印刷指示データに基づいて、業務PCで出荷伝票印刷処理を行うように構成してもよい。以下、その実施形態について説明する。
【0089】
図9は、本発明の第2実施形態を示す印刷システムの構成を示すシステム構成図であり、図1と同一のものには同一の符号を付してある。
【0090】
図において、270は業務PC−Aであり、部品メーカのラインサイドにある。なお、この業務PC−A270は、図1に示した業務PC−A170の機能に図1に示した業務サーバ140の機能を追加したものである。
【0091】
この業務PC−A270内のハードディスク38(図3)には、各種フォーム情報やマスタ類や、出荷伝票データ(図5)や印刷指示データ(図6)も記憶されている。
【0092】
そして、業務PC−A270は、図4に示した業務サーバ140によるステップS541〜S546の処理を実行する。
【0093】
以下、図10のフローチャートを参照して、本発明の第2実施形態における出荷伝票印刷処理について説明する。
【0094】
図10は、本発明の印刷システムにおける第3の制御処理手順の一例を示すフローチャートであり、本発明の第2実施形態における出荷伝票印刷処理に対応する。
【0095】
なお、S721〜S729は、図8に示した業務PC−A270により実行されるステップを示し、業務PC−A270内のCPU31によりハードディスク38又はその他の記録媒体に格納されたプログラムに基づいて実行される。また、S641〜S643は、図1に示した印刷装置A160,印刷装置B175により実行されるステップを示し、図7に示したS641〜S643と同一のステップである。
【0096】
まず、ステップS721において、業務PC−A270がハードディスク38から印刷指示データを読み出しRAM32に記憶する。なお、業務PC−A270がハードディスク38に格納される印刷指示データは、図4のステップS546により常に、最新のデータに更新されているものとし、ステップS721の処理は、印刷指示データが更新されるたびに実行されるものとする。
【0097】
次に、ステップS722において、ハードディスク38に記憶されている印刷進捗情報を参照してRAM32に記憶し、この印刷進捗情報と印刷指示データとを比較して印刷進捗(印刷が予定時刻に実行されているか)を判定する。
【0098】
そして、ステップS723において、上記ステップS722でRAM32に記憶した次の印刷時刻に基づいて印刷開始時刻が到来したかを判定し、未到来であればステップS722に戻る。ただし、ステップS722で判定した進捗が予定より遅れている場合はステップS724に進むものとする。
【0099】
一方、ステップS723で、印刷開始時刻が到来していると判定した場合には、ステップS724において、ハードディスク38に記憶されている出荷伝票データのうち、印刷指示データで指定されている出荷伝票データファイルを読み出す。
【0100】
そして、ステップS725において、ハードディスク38に記憶されているフォームデータのうち、印刷指示データで指定されているフォームNo.のフォームデータを読み出す。
【0101】
次に、ステップS726において、ステップS724,S725で読み出した出荷伝票データファイルとフォームデータに基づいて、フォームオーバレイ処理を実行し、印刷データを作成する。
【0102】
次に,ステップS727において、ステップS726で作成した印刷データを業務PC−A270から印刷装置(ここでは、印刷装置A160として説明する)に送信する。
【0103】
そして、印刷装置A160では、ステップS641において、業務PC−A270から送信される印刷データを受信し、ステップS642において出荷伝票印刷を実行して出荷伝票を出力し、ステップS643において、印刷ログを業務PC−A270に送信する。
【0104】
そして、業務PC−A270では、ステップS728において、印刷装置A160から送信された印刷ログを受信し、ステップS729において、受信した印刷ログに基づいて進捗情報を更新し、ステップS722に戻る。なお、印刷指示データが更新されると再度ステップS721から処理が実行される。
【0105】
〔第3実施形態〕
部品メーカによっては、発注元から内示データを受信して生産計画を作成し、部品を見込み生産して、確定発注データを受信するとその確定発注データを在庫照会して、在庫分は引当し、不足分は生産計画を変更して新たに生産する実施形態も考えられる。この見込み生産の場合は、確定発注データの受信の前に内示データを発注元から受信し、その内示データを基に生産計画を更新し、生産指示書を発行して見込み生産を行う。この場合、完成した部品の容器にはこの生産指示書が貼り付け又は取り付けられており、生産完了後は部品メーカ内の在庫として管理される。
【0106】
内示データの受信後、確定発注データを受信すると、在庫が引き当てられ、荷姿から出荷伝票の必要枚数が集計され、出荷伝票の印刷指示データが作成され、出荷伝票が印刷される。もし、在庫数量が確定発注数に満たない場合は、不足分については図4の説明と同様に生産計画データが更新され、更新された生産計画に基づいて出荷伝票の印刷指示データが作成され、出荷伝票が印刷される。以下図11を元に図4との相違部分を中心に実際の処理を説明する。
【0107】
図4の処理が受注生産であるのに対して、図11の見込み生産の場合、全てが見込み生産の場合と、見込み生産と受注生産の混在形が考えられる。
【0108】
そこで、図11のステップS521においては、部品メーカのEDIサーバ130が受信するデータは以下の▲1▼〜▲3▼の3種類の可能性がある。
【0109】
▲1▼内示データ(見込生産分)
▲2▼確定発注データ
▲3▼発注データ(受注生産分)
この確定発注データは、部品の発注元を特定可能な発注元情報,生産する部品を特定可能な部品情報(部品メーカ用部品番号),該部品の生産数、更に、内示データの管理番号,確定発注データである旨を示す区分データが含まれており、対応する内示データと関連付けることができる。
【0110】
図11は、本発明の印刷システムにおける第4の制御処理手順の一例を示すフローチャートであり、本発明の第3実施形態における出荷伝票データ作成処理に対応する。
【0111】
なお、S501〜S502は、図1に示した組立メーカのEDIサーバA100又はEDIサーバB110により実行されるステップ示し、EDIサーバA100又はEDIサーバB110内の不図示のCPUにより不図示の記録媒体に格納されたプログラムに基づいて実行される。また、S521〜S524,S1225〜S1230は、図1に示した部品メーカのEDIサーバ130により実行されるステップを示し、EDIサーバ130内の不図示のCPUにより不図示の記録媒体に格納されたプログラムに基づいて実行される。さらに、S1231〜S1233は、不図示の生産管理サーバにより実行されるステップを示し、生産管理サーバ内の図示しないCPUにより記録媒体に格納されたプログラムに基づいて実行される。また、S1241〜S1246は、図1に示した業務サーバ140により実行されるステップを示し、業務サーバ140内のCPU21によりハードディスク28又はその他の記録媒体に格納されたプログラムに基づいて実行される。なお、図4と同一のステップの説明については省略する。
【0112】
ステップS1225において、部品メーカ側のEDIサーバ130は、組立メーカ側のEDIサーバから受信したデータが確定発注データか否かを判定し、確定発注データと判定した場合には、そのままステップS1226に進み、図1及び図9に不図示の在庫管理サーバに対して取引先部品番号又は自社部品番号をキーにして在庫照会を行ない、在庫があった場合は確定発注数分を引当処理する(在庫データの引当済み数を更新する)。この場合、下記のケース(1),(2)の2つのケースに分かれる。
【0113】
ケース(1)は「確定発注数≦在庫の引当可能数」の場合である。例えば、確定発注数が「100」で在庫の引当可能数が「150」であれば、確定発注数「100」について引当され、引き当て可能数は「50」に更新される。
【0114】
ケース(2)は「確定発注数>在庫の引当可能数」の場合である。例えば、確定発注数が「100」で在庫の引当可能数が「40」であれば、引当可能数「40」について引当され、引き当て可能数は「0」に更新される。
【0115】
次にステップS1227において、ステップS1226の処理で確定発注数に対して全て引き当てられたかを判定する。上述のケース(1)の場合、全て引当済みと判定し、ステップS1228に進み、確定発注データを業務サーバ140に送信する。
【0116】
一方、上述のケース(2)の場合、ステップS1227で、全て引当済みでないと判定し、ステップS1229に進み、確定発注データの引当済み分を業務サーバに送信した後、確定発注データを未引当分相当数に更新し、ステップ1230に進み、生産管理サーバに送信する。この未引当分相当数は、新規発注の受注生産分と同様に処理される。
【0117】
一方、ステップS1225で、確定発注データでない場合も、ステップS1230に進み、見込生産分の内示データ又は受注生産分の発注データを生産管理サーバに送信する。
【0118】
この発注データ(又は内示データ)を受信した生産管理サーバは、生産計画を更新し、生産計画データを生成し、業務サーバ140に送信する(S1231〜S1233)。
【0119】
なお、ここで生産管理サーバより送信する生産計画データには、生産に同期した印刷を行うか否かを指定する印刷フラグが設けられており、EDIサーバ130から受信したデータが上述した内示データ(見込生産分)の場合には、この印刷フラグを「OFF」にして業務サーバ140に送信するものとする。一方、受信したデータが上述した発注データ(受注生産分)の場合には、印刷フラグを「ON」にして業務サーバ140に送信するものとする。
【0120】
次に、ステップS1241において、業務サーバ140は、EDIサーバ130より送信された確定発注データ又は生産管理サーバより送信された生産計画データ(更新の場合は更新分)を受信し、ハードディスク28に記憶する。
【0121】
そして、ステップS1242において、業務サーバ140は、確定発注データ又は生産計画データの発注元を判定してRAM22に記憶させる。
【0122】
次に、ステップS1243において、確定発注データ又は生産計画データ内の部品番号マスタから荷姿(部品を収容する容器の種類)を判定する。
【0123】
そして、ステップS1244において、業務サーバ140は、ステップS1242,S1243で判定された発注元,荷姿及び生産計画データに基づいて、ハードディスク28に予め記憶されている出荷伝票マスタ及び部品マスタを参照し、図5に示した出荷伝票データを作成し(更新の場合は更新分を作成し)、一意の名称を付して出荷伝票データファイルとしてハードディスク28に記憶させる。なお、この一意の出荷伝票データファイルの名称もRAM22のワークエリアに記憶しておく。また、ここで、業務サーバ140は、出荷伝票データのラベル数も算出してRAM22に記憶しておく。
【0124】
次に、ステップS1245において、業務サーバ140は、確定発注データ又は生産計画データに基づいて、出荷伝票の印刷予定時刻を算出して、RAM22に記憶させる。
【0125】
このステップS1245の印刷予定時刻の算出について、まず、生産計画データに基づいて出荷伝票の印刷予定時刻を算出する場合を説明する。
【0126】
上述したように、生産計画データには、印刷フラグが設けられており、この印刷フラグが「ON」の場合には、生産開始予定時刻等に基づいて出荷伝票の印刷予定時刻を算出する。一方、印刷フラグが「OFF」の場合には、出荷伝票の印刷予定時刻を「99:99」とする。
【0127】
次に、確定発注データに基づいて出荷伝票の印刷予定時刻を算出する場合を説明する。確定発注データに基づいて、出荷伝票の印刷予定時刻を算出する場合には、直ちに印刷するように出荷伝票の印刷予定時刻を算出する。
【0128】
次に、ステップS1246では、ステップS1245で算出した出荷伝票の印刷予定時刻及びステップS1244でRAM22のワークエリアに記憶させた一意の出荷伝票データファイルの名称と出荷伝票データファイルに基づいて図6に示した印刷指示データを追加する。
【0129】
なお、EDIサーバ130より業務サーバ140に送信される確定発注データに、確定発注データに同期した印刷を行わない旨を指定する印刷フラグを設け(EDIサーバ130は、確定発注データに同期した印刷を行わない旨が設定されている場合にはこの印刷フラグを「OFF」にし、それ以外の場合は「ON」にして送信する)、この印刷フラグが「OFF」の場合には、業務サーバ140は、ステップS1246で当初作成する印刷指示データ内の出荷伝票の印刷時刻(図6に示す印刷開始907)を「99:99」としておき、ステップS1246の後、ユーザ(担当者)が(業務PC等からアクセスして)業務サーバ140で出荷伝票の検索を実行して、印刷対象の出荷伝票を絞り込んでから印刷指示データ内の印刷開始時刻(図6に示した印刷開始907)を担当者が指示した時刻等に変更し、あるいは印刷指示データ内の印刷開始時刻の変更は行わずに直ちに出荷伝票を印刷出力するように印刷制御する実施形態としても良い。この構成の場合、ステップS1244で作成する出荷伝票データに、印刷フラグ(「未出力」/「出力済」を示す)を設けておき(デフォルトは「未出力」)、印刷時に前記印刷フラグを「出力済」にセットするようにする。また、上述の検索条件は、少なくとも発注元あるいは要元、納入日又は出荷日、出力区分(未出力/出力済)とする。検索条件として更に部品カテゴリ又は主部品番号(例えば部品番号の上5桁)、部品名称等で絞りこめるようにしても良い。この検索条件に合致した出荷伝票データの印刷指示データ中の印刷時刻が「99:99」から実際の印刷時刻に更新されて印刷が実行される。
【0130】
また、業務サーバ140において、特定の発注元あるいは要元、納入日又は出荷日、部品番号等の条件に合致した場合には、確定発注及び生産に同期した印刷を行わないように設定可能にし(ユーザが業務PC等から業務サーバ140にアクセスして設定可能)、該条件に合致した出荷伝票については、ステップS1246で当初作成する印刷指示データ内の出荷伝票の印刷時刻(図6に示す印刷開始907)を「99:99」としておき、ステップS1246の後、ユーザ(担当者)が(業務PC等からアクセスして)業務サーバ140で上述の出荷伝票の検索を実行して、印刷対象の出荷伝票を絞り込んでから印刷指示データ内の印刷開始時刻(図6に示す印刷開始907)を担当者が指示した時刻等に変更し、あるいは印刷指示データ内の印刷開始時刻の変更は行わずに直ちに出荷伝票を印刷出力するように印刷制御する実施形態としても良い。
【0131】
なお、上述した業務サーバの処理であるS1241〜S1246を業務PCで実行させるように構成してもよい。
【0132】
以上説明したように、第3実施形態によれば、上述した第1実施形態及び第2実施形態の効果に加えて更に受注生産の部品と見込み生産の部品が混在している場合でも、見込み生産のみの場合であっても、各々に対応して適時に出荷伝票を作成することができるという効果を奏する。
【0133】
〔他の実施形態〕
上述した印刷指示データに実際の生産進捗を反映させるように構成しても良い。具体的には、ロットの最初の部品にRF−IDタグを取付けるか、又はQRコード(二次元バーコード)を出荷伝票に印刷し、チェックポイントにRF−ID端末又はQRコード読取機を設置して、ロットの最初の部品の流動を検知し、該検知結果(即ち、生産進捗情報)を業務サーバ140(又は業務PC−A270)に送信し、業務サーバ140(又は業務PC−A270)が、上述したロットの最初の部品の検知結果に基づいて、ラインの実際の流動進捗を反映させて印刷指示データを修正するように構成してもよい。
【0134】
なお、業務PCは、パーソナルコンピュータでもよいし、ハードディスク等の記憶手段、CPU、及びLANアダプタを搭載した複合機(スキャン機能、プリント機能、コピー機能等の複合機能を備えた機器)であってもよい。
【0135】
この場合、図7や図10に示したフローチャートのプログラムは、この複合機のハードディスクに記憶され、複合機のRAMに読み出されて、複合機のCPUにより実行され、複合機は業務PC−Aと印刷装置を兼ねるものとなる。
【0136】
なお、図7及び図10では、印刷データは印刷装置に通信回線経由で送信されているが、これに限らず、FAXデータ形式に変換して電話回線経由で遠隔地のFAXに送信し、遠隔地のFAXでラベル用紙に出力するように構成してもよく、離れた場所のFAXから出荷伝票を出力することが出来る。
【0137】
また、その他、印刷データを圧縮後に電子メールに添付して予め定められたアドレスに送信してもよい。さらに、印刷データをいわゆるFTPプロトコルで送信してもよい。また、印刷データは、IPv6プロトコルを用いて送信することにより、セキュリティ面でも有利になる。
【0138】
さらに、上述した図5,図6等で示した各種データの構成及びその内容はこれに限定されるものではなく、用途や目的に応じて、様々な構成や内容で構成されることは言うまでもない。
【0139】
以上、一実施形態について示したが、本発明は、例えば、システム、装置、方法、プログラムもしくは記録媒体等としての実施態様をとることが可能であり、具体的には、複数の機器から構成されるシステムに適用しても良いし、また、一つの機器からなる装置に適用しても良い。
【0140】
以上説明したように、部品メーカ毎に、単一の端末、単一のシステムで、複数の組立てメーカ毎の種々の部品の出荷伝票を部品毎の容器に応じて固有のフォーマットで印刷することができる。
【0141】
また、フォームの変更を行う場合にも1箇所のメンテナンスで対応することができる。
【0142】
さらに、確定発注データ又は生産計画を確認しながら適時に出荷伝票を印刷する操作が不要になるので、出荷伝票印刷担当者の運用負担を大幅に軽減させることができたり、出荷伝票印刷担当者を配置する必要がなくなる。
【0143】
また、急な発注変更や生産変更があった場合でも、確定発注データ又は生産計画と同期した出荷伝票の印刷が可能なので、出荷伝票の印刷漏れや後日生産分等の不要出荷伝票の印刷をなくし、出荷伝票と生産指示書の照合担当者の運用負担を大幅に軽減できる。
【0144】
さらに、印刷進捗状況や部品の実際の流動状況や休憩時刻等に基づいて印刷タイミングをきめ細かく調整することで過剰な数の出荷伝票を印刷することを防止しつつ、現場の出荷伝票プリンタで用紙切れや紙詰まり等が発生した場合にも、出荷伝票の印刷遅れを最小限に抑制することができる。
【0145】
さらに、受注生産の部品と見込み生産の部品が混在している場合でも、受注生産部品のみの場合であっても、見込み生産のみの場合であっても、各々に対応して適時に出荷伝票を印刷することができる。
【0146】
また、多様な印刷データの送信形式をサポートしているので、様々な生産現場で出荷伝票をタイムリに印刷出力することができる。
【0147】
以下、図12に示すメモリマップを参照して本発明に係る印刷システムで読み出し可能なデータ処理プログラムの構成について説明する。
【0148】
図12は、本発明に係る印刷システムで読み出し可能な各種データ処理プログラムを格納する記録媒体のメモリマップを説明する図である。
【0149】
なお、特に図示しないが、記録媒体に記憶されるプログラム群を管理する情報、例えばバージョン情報,作成者等も記憶され、かつ、プログラム読み出し側のOS等に依存する情報、例えばプログラムを識別表示するアイコン等も記憶される場合もある。
【0150】
さらに、各種プログラムに従属するデータも上記ディレクトリに管理されている。また、各種プログラムをコンピュータにインストールするためのプログラムや、インストールするプログラムが圧縮されている場合に、解凍するプログラム等も記憶される場合もある。
【0151】
本実施形態における図4,図7,図10,図11に示す機能が外部からインストールされるプログラムによって、ホストコンピュータにより遂行されていてもよい。そして、その場合、CD−ROMやフラッシュメモリやFD等の記録媒体により、あるいはネットワークを介して外部の記録媒体から、プログラムを含む情報群を出力装置に供給される場合でも本発明は適用されるものである。
【0152】
以上のように、前述した実施形態の機能を実現するソフトウエアのプログラムコードを記録した記録媒体を、システムあるいは装置に供給し、そのシステムあるいは装置のコンピュータ(またはCPUやMPU)が記録媒体に格納されたプログラムコードを読出し実行することによっても、本発明の目的が達成されることは言うまでもない。
【0153】
この場合、記録媒体から読み出されたプログラムコード自体が本発明の新規な機能を実現することになり、そのプログラムコードを記憶した記録媒体は本発明を構成することになる。
【0154】
従って、プログラムの機能を有していれば、オブジェクトコード、インタプリタにより実行されるプログラム、OSに供給するスクリプトデータ等、プログラムの形態を問わない。
【0155】
プログラムを供給するための記録媒体としては、例えばフレキシブルディスク、ハードディスク、光ディスク、光磁気ディスク、MO、CD−ROM、CD−R、CD−RW、磁気テープ、不揮発性のメモリカード、ROM、DVDなどを用いることができる。
【0156】
この場合、記録媒体から読出されたプログラムコード自体が前述した実施形態の機能を実現することになり、そのプログラムコードを記憶した記録媒体は本発明を構成することになる。
【0157】
その他、プログラムの供給方法としては、クライアントコンピュータのブラウザを用いてインターネットのホームページに接続し、該ホームページから本発明のコンピュータプログラムそのもの、もしくは、圧縮され自動インストール機能を含むファイルをハードディスク等の記録媒体にダウンロードすることによっても供給できる。また、本発明のプログラムを構成するプログラムコードを複数のファイルに分割し、それぞれのファイルを異なるホームページからダウンロードすることによっても実現可能である。つまり、本発明の機能処理をコンピュータで実現するためのプログラムファイルを複数のユーザに対してダウンロードさせるWWWサーバやftpサーバ等も本発明の請求項に含まれるものである。
【0158】
また、本発明のプログラムを暗号化してCD−ROM等の記録媒体に格納してユーザに配布し、所定の条件をクリアしたユーザに対し、インターネットを介してホームページから暗号化を解く鍵情報をダウンロードさせ、その鍵情報を使用することにより暗号化されたプログラムを実行してコンピュータにインストールさせて実現することも可能である。
【0159】
また、コンピュータが読み出したプログラムコードを実行することにより、前述した実施形態の機能が実現されるだけでなく、そのプログラムコードの指示に基づき、コンピュータ上で稼働しているOS(オペレーティングシステム)等が実際の処理の一部または全部を行い、その処理によって前述した実施形態の機能が実現される場合も含まれることは言うまでもない。
【0160】
さらに、記録媒体から読み出されたプログラムコードが、コンピュータに挿入された機能拡張ボードやコンピュータに接続された機能拡張ユニットに備わるメモリに書き込まれた後、そのプログラムコードの指示に基づき、その機能拡張ボードや機能拡張ユニットに備わるCPU等が実際の処理の一部または全部を行い、その処理によって前述した実施形態の機能が実現される場合も含まれることは言うまでもない。
【0161】
また、本発明は、複数の機器から構成されるシステムに適用しても、1つの機器からなる装置に適用してもよい。また、本発明は、システムあるいは装置にプログラムを供給することによって達成される場合にも適応できることは言うまでもない。この場合、本発明を達成するためのソフトウエアによって表されるプログラムを格納した記録媒体を該システムあるいは装置に読み出すことによって、そのシステムあるいは装置が、本発明の効果を享受することが可能となる。
【0162】
本発明は上記実施形態に限定されるものではなく、本発明の趣旨に基づき種々の変形(各実施形態の有機的な組合せを含む)が可能であり、それらを本発明の範囲から排除するものではない。
【0163】
本発明の様々な例と実施形態を示して説明したが、当業者であれば、本発明の趣旨と範囲は、本明細書内の特定の説明に限定されるのではない。
【0164】
また、上記各実施形態を組み合わせた構成も全て、本発明に含まれるものである。
【0165】
【発明の効果】
以上説明したように、本発明によれば、生産者(部品メーカ等)毎に、単一の端末,単一のシステムで、複数の発注元(組立メーカ等)毎の種々の物品の出荷伝票を物品(部品等)毎の容器に応じて固有のフォーマットで印刷することができる。
【0166】
また、フォームの変更を行う場合にも1箇所のメンテナンスで対応することができる。
【0167】
さらに、生産計画を確認しながら適時に出荷伝票を印刷する操作等も不要になり、出荷伝票印刷担当者の運用負担を大幅に軽減させることができる。
【0168】
また、急な発注変更や生産変更があった場合でも、在庫状況及び生産計画と同期した出荷伝票の印刷が可能となり、出荷伝票の印刷漏れや後日生産分等の不要出荷伝票の印刷をなくし、出荷伝票と部品の照合担当者の運用負担を大幅に軽減できる。
【0169】
さらに、物品の在庫状況や印刷進捗状況や物品の実際の流動状況や休憩時刻等に基づいて印刷タイミングをきめ細かく調整することができ、過剰な数の出荷伝票を印刷することを防止しつつ、現場の出荷伝票プリンタで用紙切れや紙詰まり等が発生した場合にも、出荷伝票の印刷遅れを最小限に抑制することができる。
【0170】
また、多様な印刷データの送信形式をサポートしているので、様々な生産現場で出荷伝票をタイムリに印刷出力することができる。
【0171】
従って、発注元ごと及び物品ごとに異なる出荷伝票の印刷を、メンテナンス負担や運用負担の重い複数の印刷システムを用いることなく単一のシステムにより行うことができ、また急な発注変更や生産計画の変更に起因する出荷伝票印刷の無駄の防止や照合時の印刷担当者の負担を軽減することができる優れた出荷伝票印刷環境を構築することが可能となる等の効果を奏する。
【0172】
さらに、受注生産の物品と見込み生産の部品が混在している場合でも、受注生産部品のみの場合であっても、見込み生産のみの場合であっても、各々に対応して適時に出荷伝票を印刷することができる。
【図面の簡単な説明】
【図1】本発明の第1実施形態を示す印刷システムの構成を示すシステム構成図である。
【図2】図1に示した業務サーバのハードウェア構成を示すブロック図である。
【図3】図1に示した業務PC−A,業務PC−Bのハードウェア構成を示すブロック図である。
【図4】本発明の印刷システムにおける第1の制御処理手順の一例を示すフローチャートである。
【図5】本発明の印刷システムにおける出荷伝票データの構成の一例を示すデータ構成図である。
【図6】本発明の印刷システムにおける印刷指示データの構成の一例を示すデータ構成図である。
【図7】本発明の印刷システムにおける第2の制御処理手順の一例を示すフローチャートである。
【図8】本発明の印刷システムにより印刷される出荷伝票の一例を示す模式図である。
【図9】本発明の第2実施形態を示す印刷システムの構成を示すシステム構成図である。
【図10】本発明の印刷システムにおける第3の制御処理手順の一例を示すフローチャートである。
【図11】本発明の印刷システムにおける第4の制御処理手順の一例を示すフローチャートである。
【図12】本発明に係る印刷システムで読み出し可能な各種データ処理プログラムを格納する記録媒体のメモリマップを説明する図である。
【符号の説明】
100,110 EDIサーバ(組立メーカ)
130 EDIサーバ(部品メーカ)
140 業務サーバ(部品メーカ)
150 帳票メンテナンスPC(部品メーカ)
160 印刷装置A(部品メーカ)
170 業務PC−A(部品メーカ)
175 印刷装置B(部品メーカ)
180 業務PC−B(部品メーカ)
190 通信回線[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a printing control apparatus and a shipping slip that can print different shipping slips for each ordering source and article. of Printing control method and program To Related.
[0002]
[Prior art]
Conventionally, parts manufacturers such as automobile parts create a production plan based on order data, produce parts according to the production plan, and attach a shipping slip corresponding to the parts production instruction to the container at the shipping stage and assemble Ships to manufacturers.
[0003]
The container is loaded on a truck or the like, delivered in a packaged state such as placing the container on a cart at a designated location at a designated time, moved to the line side by an operator, and then assembled to the vehicle body. The delivered parts are inspected by tracing the barcode on the shipping slip at the time of delivery.
[0004]
There are various sizes of shipping slips depending on the type of parts, and the form of the shipping slip is different for each assembly manufacturer except for the common part. The in-house slip (production instruction) of the parts maker is pasted or inserted into the container of the finished product that is expected to be produced based on the indication of the assembly maker. When the parts manufacturer receives the confirmed order data from the assembly manufacturer, the parts manufacturer prints the shipping slip based on the confirmed ordering data, compares it with the production instructions that are pasted or inserted into the container, and sends the shipping slip to the container. Affixed to or attached to. The shipping slip is printed in batches, for example, in half-day units based on the latest firm order data or the production plan for the day, or the person in charge of printing the shipping slip confirms the latest firm order data or the production plan data for the day. However, the shipping slip is printed by operating the printing program each time.
[0005]
In Japanese Patent Laid-Open No. 2001-22863 (Patent Document 1), EDI data is received via the Internet, commercial transaction data is stored in a database, and the person in charge inputs the instruction on the screen of the browser and reads it from the database. A system that receives data and a print program and prints a request for quotation or a shipping slip is disclosed.
[0006]
Japanese Patent Application Laid-Open No. 2002-222382 (Patent Document 2) discloses electronic data including a conversion definition information storage unit that converts received standard format form EDI data into a business format for internal processing. A format conversion system is disclosed.
[0007]
[Patent Document 1]
JP 2001-22863 A
[0008]
[Patent Document 2]
JP 2002-222382 A
[0009]
[Problems to be solved by the invention]
Since the shipping slip is slightly different for each assembly maker, the conventional printing system prepares multiple shipping slip printing programs for each assembly maker and executes printing, which increases the number of programs and maintenance man-hours. There has been a problem that the maintenance cost has increased.
[0010]
If the shipping slip is batch printed in half a day, the burden of printing the shipping slip is not great, but the shipping slip printing program differs for each assembly manufacturer. When printing is wasted or sudden production changes occur, it is extremely difficult to collate a large number of printed shipping slips with production instructions and produced parts. there were.
[0011]
On the other hand, if you print while looking at the production plan, you can flexibly respond to sudden production changes, but the person in charge of printing checks the production plan data and firm order data against the production instructions for the parts produced, The shipping slip printing program for each assembly maker is operated each time and the shipping slip is printed, resulting in a heavy operational burden.
[0012]
The present invention was made to solve the above problems, and the object of the present invention is to In a print control device configured to be communicable with a terminal capable of transmitting production progress information indicating that the flow of the first item in the lot has been detected, Multiple shipping slip forms according to the ordering source and the goods , Master information including article information, container type and number of containers accommodated Is registered in advance, ordering source information that can identify the ordering source of the article, article information that can identify the article to be produced, and the number of production of the article ,Living Product start Estimated time And scheduled production end time To further store production plan data including With reference to the production plan data and the master, Data to be printed on the delivery Including the article information Create delivery slip data, store it in memory, Using the scheduled production start time and scheduled production end time of the article included in the production plan data, the predetermined time before the scheduled flow time of the article specified by the scheduled production start time and scheduled production end time. Determine the scheduled print time to print the shipping slip, Production plan data And the shipping slip data Shipping slip data, According to the ordering source information Create print instruction data for the shipping slip that indicates the shipping slip form, the number of printed copies of the shipping slip, and the scheduled time for printing the shipping slip. Modify the print instruction data using the production progress information received from the terminal; Based on the print instruction data of the generated shipping slip, the instructed shipping slip data and the shipping slip form are read from the memory, and overlay printing between the read shipping slip data and the shipping slip form is instructed to be printed. By controlling the printing process of the shipping slip so as to perform only the number of prints specified at the time (dynamically controlling the print scheduling), each producer (part manufacturer, etc.) has a single terminal, a single The system can print various items of shipping slips for each ordering source (assembly manufacturer, etc.) in a specific format according to the container for each item (parts, etc.). It can be handled by one place of maintenance, and there is no need to print the shipping slip in a timely manner while checking the production plan. In addition, even if there is a sudden change in production, it is possible to print the final order data after the change and the shipping slip in synchronization with the production plan. Printing control device and shipping slip that can eliminate the printing of unnecessary shipping slips such as minutes, and can build a shipping slip printing environment that can greatly reduce the operational burden of the person in charge of collating the shipping slip and goods of Printing control method and program The Is to provide.
[0013]
[Means for Solving the Problems]
The present invention is a print control device configured to be able to communicate with a terminal capable of transmitting production progress information indicating that the flow of the first article in a lot has been detected, and a plurality of shipping slip forms corresponding to an ordering source are provided. Form storage means stored in advance, ordering source information that can specify at least the ordering source of the article, article information that can specify the article to be produced, the number of articles produced, and the production start of the article Production plan data storage means for storing production plan data including scheduled time and scheduled production end time, master storage means for storing master information including article information, container type and number of containers accommodated, and the production plan data Data to be printed on a shipping slip with reference to the master and the shipping information calculated from the product information, the production number of the product, and the number of containers stored in the product. First creation means for creating shipping slip data including the number of printed sheets, slip data storage means for storing the shipping slip data created by the first creation means, and the article included in the production plan data The scheduled print time to print the shipping slip a predetermined time before the scheduled flow time of the article specified by the scheduled production start time and the scheduled production end time using the scheduled production start time and scheduled production end time Print instruction data for instructing printing of the shipping slip using the determining means for determining the production plan data and the shipping slip data, and depending on the shipping slip data and the ordering source information A second creation means for creating print instruction data instructing the shipping slip form, the scheduled printing time of the shipping slip, and the number of prints, respectively, And modifying means for modifying the print instruction data by using the production progress information received from the end, with the print instruction data corrected by said correction means, said delivery instructed The form Is read out from the form storage means and further instructed to the shipping slip data Is printed out from the slip data storage means, and an overlay print of the read shipping slip data and the read shipping slip form is printed at the scheduled print time using the corrected print instruction data. And a print control means for controlling processing.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
[First Embodiment]
FIG. 1 is a system configuration diagram showing the configuration of a printing system according to the first embodiment of the present invention.
[0021]
Hereinafter, for the purpose of explanation, the print control of the shipping slip used when the parts maker ships the produced parts to the assembly maker at the request of the assembly maker will be described as an example. It is not limited to printing control of parts shipment slips, but is also used for printing control of shipping slips of articles other than parts (any kind of article (which is a tangible property movable and can be traded through the distribution process)). Applicable. That is, the present invention can be applied to print control of a shipping slip used when shipping an article by a request from an ordering source.
[0022]
In the figure, an EDI (Electronic Data Interchange)
[0023]
The
[0024]
Further, the hard disk 28 (FIG. 2) in the
[0025]
Further, the printing apparatus A160, the business PC-A170, the printing apparatus B175, and the business PC-B180 are on the line side of the parts manufacturer.
[0026]
The printing device A160 and the printing device B175 can print the label of the shipping slip with a barcode, and the printed shipping slip label with the barcode is affixed to a container containing the parts and shipped to an assembly manufacturer. Is done.
[0027]
FIG. 2 is a block diagram showing a hardware configuration of the
[0028]
As shown in the figure, the
[0029]
The
[0030]
FIG. 3 is a block diagram showing a hardware configuration of the business PC-
[0031]
As shown in the figure, the business PC-
[0032]
The
[0033]
Hereinafter, various processes in the printing system of the present invention will be described with reference to FIGS.
[0034]
FIG. 4 is a flowchart showing an example of a first control processing procedure in the printing system of the present invention, and corresponds to the shipping slip data creation processing.
[0035]
S501 to S502 show steps executed by the assembly manufacturer's EDI server A100 or EDI server B110 shown in FIG. 1, and are stored in a recording medium (not shown) by a CPU (not shown) in the EDI server A100 or EDI server B110. It is executed based on the programmed program. S521 to S525 indicate steps executed by the
[0036]
First, in step S501, the ordering information (EDI data) transmitted from the assembly manufacturer's EDI server (described here as EDI server A100) is received by the component manufacturer's
[0037]
In step S522, the
[0038]
On the other hand, if the
[0039]
In step S531, the production management server receives the ordering information transmitted from the
[0040]
Note that the production management server receives the inside data from the
[0041]
Next, in step S <b> 541, the
[0042]
The production plan data transmitted from the production management server described above includes at least ordering source information that can specify an ordering source of parts, part information that can specify a part to be produced, the number of parts produced, and the production of the article. It includes the time, and specifically, (Production rank No.), Lot No. , Part maker part number, (part number for suppliers), number of instructions, scheduled production start time, (scheduled production end time), production location, (instruction information), (ordering source), delivery location, delivery instruction date, Includes delivery time. Note that the items described in parentheses are not essential items, but the omission of “ordering party” is when a different number is used for each business partner (that is, when the ordering party is determined from the part number).
[0043]
In step S542, the
[0044]
Next, in step S543, the packing form (the type of container that accommodates the part) is determined from the part number master in the production plan data.
[0045]
In step S544, the
[0046]
In this way, by specifying the type (form and size) of the shipping slip based on the orderer information and part number in the production plan data, a single shipping slip printing program prints multiple types of shipping slips for each assembly manufacturer. enable. More specifically, the packing form is determined from the orderer information and the part number, the shipping slip size is determined from the packing form, and the shipping slip form and extraction information (information for creating shipping slip data) are determined. . The shipping slip form may be stored separately for a common data part, an assembly maker part, a parts maker part, etc., and may be combined at the time of print execution and overlaid with a form overlay.
[0047]
Next, in step S545, the
[0048]
In step S546, based on the scheduled print time of the shipping slip calculated in step S545, the name of the unique shipping slip data file stored in the work area of the
[0049]
In addition, the production plan data transmitted from the production management server is provided with a print flag for specifying that printing synchronized with production is not performed (when the production management server is set not to perform production synchronized printing). If the print flag is “OFF”, the
[0050]
Also, in the
[0051]
Hereinafter, an example of the configuration of the part number master described above will be described.
[0052]
The part number master is, for example, in-house part number (unique), ordering part number, ordering party, parent part number, part name, drawing number, design change number, management classification, registration date, production start date, Consists of production end date, barcode file name, deletion flag, etc. “Ordering party” indicates the code of the ordering company of the parts such as an assembly manufacturer, and “Parent part number” indicates the part number of the parent part of the part (for example, the entire seat and seat cushion or seat). The cover is in a parent-child relationship). The “drawing number” indicates the management number (unique) of the drawing corresponding to the part, and may be the same as the “own part number” or the “ordering part number”. Furthermore, “design change number” indicates the design change number when the part is newly established, and “management category” is a category for performing A management, B management, C management, etc. according to the importance of the part. "Registered date" indicates the date when the part was first registered in the master, and "Barcode image file name" is the name of the file that stores the barcode image information. Indicates.
[0053]
FIG. 5 is a data configuration diagram showing an example of the configuration of shipping slip data in the printing system of the present invention.
[0054]
In the figure,
[0055]
The
[0056]
The
[0057]
A
[0058]
The number of
[0059]
An
[0060]
The
[0061]
The
[0062]
FIG. 6 is a data configuration diagram showing an example of the configuration of the print instruction data in the printing system of the present invention.
[0063]
In the figure, 900 is print instruction data, and lot number. 901, Form No. 902, number of
[0064]
Note that the
[0065]
For example, lot no. The end schedule 940 (scheduled end time of production) of “010235” and the lot number. Although there is a difference of 10 minutes in the start schedule 950 (scheduled start time of production) of “010236”, this indicates that the production line is stopped during this 10 minutes due to a break time. In this way, it is instructed to print the shipping slip at the actual manufacturing time (considering the production line stop time), so it is not pasted as in the case of batch printing of the conventional shipping slip in half-day units. Many shipping slips are not printed at hand, and shipping slips are printed just before parts are actually produced. This greatly reduces the labor of collating the produced parts with the shipping slips. It is also possible to suppress erroneous pasting of shipping slips.
[0066]
Also, even if the production plan etc. is changed, unlike the case of batch printing of conventional shipping slips every half day, the change of the production plan is received from the production management server and the print instruction data is updated for each change. Therefore, it is possible to prevent a situation in which a shipping slip is printed as it is in the production plan before the change and a lot of shipping slips are wasted.
[0067]
Further, when a shipping slip is printed later based on the parts produced after the conventional production, a large load of operating while collating the produced parts has been imposed. Unlike the case, since the print instruction data is generated based on the latest production plan, it is possible to greatly save the user's operation.
[0068]
FIG. 7 is a flowchart showing an example of a second control processing procedure in the printing system of the present invention, and corresponds to the shipping slip printing process.
[0069]
S601 to S605 indicate steps executed by the
[0070]
First, print instruction data, shipping slip data, and necessary form data are transmitted in advance from the
[0071]
First, in step S601, print instruction data is transmitted from the
[0072]
Next, in step S622, the print progress information stored in the
[0073]
In step S623, it is determined whether the print start time has arrived based on the next print time stored in the
[0074]
On the other hand, if it is determined in step S623 that the print start time has arrived, in step S624, the
[0075]
In step S602, the
[0076]
In step S625, the business PC-
[0077]
Next, in step S626, the business PC-
[0078]
In step S604, the
[0079]
In step S627, the business PC-
[0080]
Next, in step S628, the business PC-
[0081]
On the other hand, if it is determined in step S628 that no timeout has occurred in receiving the shipping slip data and receiving the form data, the process directly proceeds to step S630.
[0082]
Next, in step S630, form overlay processing is executed based on the shipment slip data file received in steps S625 and S627 (or specified in step S629) and form data, and print data is created.
[0083]
Next, in step S631, the print data created in step S630 is transmitted from the business PC-
[0084]
In step S641, the printing apparatus A160 receives the print data transmitted from the business PC-
[0085]
The business PC-
[0086]
FIG. 8 is a schematic diagram showing an example of a shipping slip printed by the printing system of the present invention.
[0087]
As shown in FIGS. 8 (a) and 8 (b), the shipping slip differs depending on the type of part and the assembly manufacturer.
[0088]
[Second Embodiment]
In the first embodiment, the
[0089]
FIG. 9 is a system configuration diagram showing the configuration of the printing system showing the second embodiment of the present invention. The same components as those in FIG. 1 are denoted by the same reference numerals.
[0090]
In the figure,
[0091]
The hard disk 38 (FIG. 3) in the business PC-
[0092]
And business PC-A270 performs the process of step S541-S546 by the
[0093]
Hereinafter, the shipping slip printing process according to the second embodiment of the present invention will be described with reference to the flowchart of FIG.
[0094]
FIG. 10 is a flowchart showing an example of a third control processing procedure in the printing system of the present invention, and corresponds to the shipping slip print processing in the second embodiment of the present invention.
[0095]
S721 to S729 indicate steps executed by the business PC-
[0096]
First, in step S <b> 721, the business PC-
[0097]
Next, in step S722, the print progress information stored in the
[0098]
In step S723, it is determined whether the print start time has arrived based on the next print time stored in the
[0099]
On the other hand, if it is determined in step S723 that the print start time has arrived, the shipment slip data file specified by the print instruction data among the shipment slip data stored in the
[0100]
In step S725, among the form data stored in the
[0101]
Next, in step S726, form overlay processing is executed based on the shipment slip data file and form data read in steps S724 and S725 to create print data.
[0102]
Next, in step S727, the print data created in step S726 is transmitted from the business PC-
[0103]
In step S641, the printing apparatus A160 receives the print data transmitted from the business PC-
[0104]
The business PC-
[0105]
[Third Embodiment]
Depending on the parts maker, receiving the unlisted data from the ordering party, creating a production plan, probably producing the parts, and receiving the firm order data, the firm orders data is inquired, the stock is reserved, and the shortage An embodiment in which the production plan is changed and production is newly performed is also conceivable. In the case of this prospective production, the unofficial data is received from the ordering source before the final order data is received, the production plan is updated based on the unofficial data, and the production instruction is issued to perform the prospective production. In this case, the production instruction is pasted or attached to the container of the completed part, and is managed as inventory in the parts manufacturer after the production is completed.
[0106]
When the final order data is received after receiving the introductory data, the stock is allocated, the required number of shipping slips is totaled from the packing form, print instruction data for the shipping slip is created, and the shipping slip is printed. If the inventory quantity is less than the confirmed order quantity, the production plan data is updated for the shortage in the same manner as described in FIG. 4, and the print instruction data for the shipping slip is created based on the updated production plan. The delivery slip is printed. The actual processing will be described below with a focus on the differences from FIG. 4 based on FIG.
[0107]
While the process in FIG. 4 is a build-to-order production, in the case of the prospective production in FIG.
[0108]
Therefore, in step S521 in FIG. 11, the data received by the
[0109]
(1) Indication data (estimated production)
(2) Final order data
(3) Ordering data (for order production)
This confirmed ordering data includes ordering source information that can specify the part ordering source, part information (part number for parts manufacturer) that can specify the part to be produced, the number of parts produced, and the management number of the informed data, Classification data indicating that the data is order data is included, and can be associated with corresponding unofficial data.
[0110]
FIG. 11 is a flowchart showing an example of a fourth control processing procedure in the printing system of the present invention, and corresponds to the shipping slip data creation processing in the third embodiment of the present invention.
[0111]
S501 to S502 show steps executed by the assembly manufacturer's EDI server A100 or EDI server B110 shown in FIG. 1, and are stored in a recording medium (not shown) by a CPU (not shown) in the EDI server A100 or EDI server B110. It is executed based on the programmed program. S521 to S524, S1225 to S1230 indicate steps executed by the
[0112]
In step S1225, the
[0113]
Case (1) is a case where “the number of confirmed orders ≦ the number of available inventory”. For example, if the confirmed order number is “100” and the possible allocation quantity is “150”, the confirmed order quantity “100” is allocated, and the allocatable number is updated to “50”.
[0114]
Case (2) is a case where “the number of confirmed orders> the number of stocks that can be allocated”. For example, if the confirmed order quantity is “100” and the possible allocation quantity is “40”, the possible allocation quantity “40” is allocated, and the allocatable quantity is updated to “0”.
[0115]
Next, in step S1227, it is determined whether all confirmed orders have been allocated in the process of step S1226. In the case (1) described above, it is determined that all have been allocated, and the process advances to step S 1228 to transmit confirmed order data to the
[0116]
On the other hand, in the case (2) described above, in step S1227, it is determined that not all allocations have been made, and the process proceeds to step S1229. The number is updated to a considerable number, and the process proceeds to Step 1230 to transmit to the production management server. This unallocated portion equivalent number is processed in the same manner as the order-made production for a new order.
[0117]
On the other hand, even if it is not confirmed order data in step S1225, the process proceeds to step S1230, and the informing data for estimated production or the order data for order production is transmitted to the production management server.
[0118]
The production management server that has received this ordering data (or introductory data) updates the production plan, generates production plan data, and transmits it to the business server 140 (S1231 to S1233).
[0119]
Here, the production plan data transmitted from the production management server is provided with a print flag for designating whether or not to perform printing in synchronization with production, and the data received from the
[0120]
Next, in step S1241, the
[0121]
In step S <b> 1242, the
[0122]
Next, in step S1243, the packing form (the type of container that contains the part) is determined from the part number master in the confirmed order data or the production plan data.
[0123]
In step S1244, the
[0124]
Next, in step S <b> 1245, the
[0125]
Regarding the calculation of the scheduled print time in step S1245, the case where the planned print time of the shipping slip is calculated based on the production plan data will be described first.
[0126]
As described above, the production plan data is provided with the print flag. When this print flag is “ON”, the print scheduled time of the shipping slip is calculated based on the production start scheduled time and the like. On the other hand, when the print flag is “OFF”, the scheduled print time of the shipping slip is set to “99:99”.
[0127]
Next, the case where the scheduled print time of the shipping slip is calculated based on the confirmed order data will be described. When calculating the scheduled printing time of the shipping slip based on the confirmed order data, the scheduled printing time of the shipping slip is calculated so that printing is immediately performed.
[0128]
Next, in step S1246, based on the estimated shipping time of the shipping slip calculated in step S1245, the name of the unique shipping slip data file stored in the work area of the
[0129]
In addition, a print flag for designating that printing synchronized with the confirmed order data is not performed is provided in the confirmed order data transmitted from the
[0130]
Further, in the
[0131]
In addition, you may comprise so that S1241-S1246 which are the processes of the business server mentioned above may be performed by business PC.
[0132]
As described above, according to the third embodiment, in addition to the effects of the first embodiment and the second embodiment described above, even if there is a mixture of parts for build-to-order production and parts for production, the production is expected. Even in this case, it is possible to produce a shipping slip in a timely manner corresponding to each.
[0133]
[Other Embodiments]
You may comprise so that an actual production progress may be reflected in the printing instruction data mentioned above. Specifically, an RF-ID tag is attached to the first part of a lot, or a QR code (two-dimensional barcode) is printed on a shipping slip, and an RF-ID terminal or QR code reader is installed at a checkpoint. Then, the flow of the first part of the lot is detected, the detection result (that is, production progress information) is transmitted to the business server 140 (or business PC-A 270), and the business server 140 (or business PC-A 270) Based on the detection result of the first part of the lot described above, the print instruction data may be modified to reflect the actual flow progress of the line.
[0134]
The business PC may be a personal computer or a multi-function machine (equipment having multi-functions such as a scan function, a print function, and a copy function) equipped with storage means such as a hard disk, a CPU, and a LAN adapter. Good.
[0135]
In this case, the programs of the flowcharts shown in FIGS. 7 and 10 are stored in the hard disk of the multifunction machine, read out to the RAM of the multifunction machine, and executed by the CPU of the multifunction machine. And a printing device.
[0136]
7 and 10, the print data is transmitted to the printing apparatus via the communication line. However, the present invention is not limited to this, and the print data is converted into the FAX data format and transmitted to the remote FAX via the telephone line. You may comprise so that it may output to label paper by a local FAX, and a shipping slip can be output from the FAX of a distant place.
[0137]
In addition, the print data may be attached to an e-mail after being compressed and transmitted to a predetermined address. Further, the print data may be transmitted using a so-called FTP protocol. Also, printing data is advantageous in terms of security by transmitting it using the IPv6 protocol.
[0138]
Furthermore, the configuration and contents of various data shown in FIG. 5 and FIG. 6 are not limited to this, and it goes without saying that they are configured with various configurations and contents according to applications and purposes. .
[0139]
Although one embodiment has been described above, the present invention can take an embodiment as, for example, a system, apparatus, method, program, or recording medium, and specifically includes a plurality of devices. The present invention may be applied to a system including a single device.
[0140]
As described above, it is possible to print out shipping slips for various parts for each assembly manufacturer in a specific format according to the container for each part, using a single terminal and a single system for each part manufacturer. it can.
[0141]
In addition, even when a form is changed, it can be dealt with by a single maintenance.
[0142]
In addition, since it is not necessary to print the shipping slip in a timely manner while confirming the final order data or production plan, the operation burden on the shipping slip printing staff can be greatly reduced. There is no need to place them.
[0143]
In addition, even if there is a sudden order change or production change, it is possible to print a shipment slip that is synchronized with the firm order data or production plan. The operational burden on the person in charge of collating the shipping slip and the production instruction can be greatly reduced.
[0144]
In addition, fine adjustment of the printing timing based on the printing progress status, the actual flow status of parts, break time, etc. prevents printing of an excessive number of shipping slips, while the on-site shipping slip printer runs out of paper. Even when a paper jam or a paper jam occurs, it is possible to minimize the delay in printing the shipping slip.
[0145]
In addition, even if there are a mix of build-to-order parts and parts for prospective production, whether they are made-to-order parts only, or only for prospective production, a shipment slip will be sent in a timely manner corresponding to each. Can be printed.
[0146]
In addition, since a variety of print data transmission formats are supported, shipping slips can be printed out in a timely manner at various production sites.
[0147]
The configuration of a data processing program that can be read by the printing system according to the present invention will be described below with reference to the memory map shown in FIG.
[0148]
FIG. 12 is a diagram illustrating a memory map of a recording medium that stores various data processing programs that can be read by the printing system according to the present invention.
[0149]
Although not specifically shown, information for managing a program group stored in the recording medium, for example, version information, creator, etc. is also stored, and information depending on the OS on the program reading side, for example, a program is identified and displayed. Icons may also be stored.
[0150]
Further, data depending on various programs is also managed in the directory. In addition, a program for installing various programs in the computer, and a program for decompressing when the program to be installed is compressed may be stored.
[0151]
The functions shown in FIGS. 4, 7, 10, and 11 in this embodiment may be performed by a host computer by a program installed from the outside. In this case, the present invention is applied even when an information group including a program is supplied to the output device from a recording medium such as a CD-ROM, a flash memory, or an FD, or from an external recording medium via a network. Is.
[0152]
As described above, a recording medium recording software program codes for realizing the functions of the above-described embodiments is supplied to a system or apparatus, and a computer (or CPU or MPU) of the system or apparatus stores the recording medium in the recording medium. It goes without saying that the object of the present invention can also be achieved by reading and executing the programmed program code.
[0153]
In this case, the program code itself read from the recording medium realizes the novel function of the present invention, and the recording medium storing the program code constitutes the present invention.
[0154]
Therefore, as long as it has the function of the program, the form of the program such as an object code, a program executed by an interpreter, or script data supplied to the OS is not limited.
[0155]
As a recording medium for supplying the program, for example, a flexible disk, hard disk, optical disk, magneto-optical disk, MO, CD-ROM, CD-R, CD-RW, magnetic tape, nonvolatile memory card, ROM, DVD, etc. Can be used.
[0156]
In this case, the program code itself read from the recording medium realizes the functions of the above-described embodiment, and the recording medium storing the program code constitutes the present invention.
[0157]
As another program supply method, a browser of a client computer is used to connect to a homepage on the Internet, and the computer program itself of the present invention or a compressed file including an automatic installation function is stored on a recording medium such as a hard disk from the homepage. It can also be supplied by downloading. It can also be realized by dividing the program code constituting the program of the present invention into a plurality of files and downloading each file from a different homepage. That is, a WWW server, an ftp server, and the like that allow a plurality of users to download a program file for realizing the functional processing of the present invention on a computer are also included in the claims of the present invention.
[0158]
In addition, the program of the present invention is encrypted, stored on a recording medium such as a CD-ROM, distributed to users, and key information for decryption is downloaded from a homepage via the Internet to users who have cleared predetermined conditions. It is also possible to execute the encrypted program by using the key information and install the program on a computer.
[0159]
Further, by executing the program code read by the computer, not only the functions of the above-described embodiments are realized, but also an OS (operating system) or the like running on the computer based on the instruction of the program code. It goes without saying that a case where the function of the above-described embodiment is realized by performing part or all of the actual processing and the processing is included.
[0160]
Furthermore, after the program code read from the recording medium is written in a memory provided in a function expansion board inserted in the computer or a function expansion unit connected to the computer, the function expansion is performed based on the instruction of the program code. It goes without saying that the case where the CPU or the like provided in the board or the function expansion unit performs part or all of the actual processing and the functions of the above-described embodiments are realized by the processing.
[0161]
Further, the present invention may be applied to a system composed of a plurality of devices or an apparatus composed of a single device. Needless to say, the present invention can be applied to a case where the present invention is achieved by supplying a program to a system or apparatus. In this case, by reading a recording medium storing a program represented by software for achieving the present invention into the system or apparatus, the system or apparatus can enjoy the effects of the present invention. .
[0162]
The present invention is not limited to the above embodiments, and various modifications (including organic combinations of the embodiments) are possible based on the spirit of the present invention, and these are excluded from the scope of the present invention. is not.
[0163]
While various examples and embodiments of the present invention have been shown and described, the spirit and scope of the present invention are not limited to the specific descriptions in the present specification by those skilled in the art.
[0164]
Moreover, all the structures which combined said each embodiment are also contained in this invention.
[0165]
【The invention's effect】
As explained above, according to the present invention, ,Living For each producer (part manufacturer, etc.), a single terminal, a single system, and various items for each ordering source (assembly manufacturer, etc.) are shipped according to containers for each article (parts, etc.) Can print in a unique format.
[0166]
In addition, even when a form is changed, it can be dealt with by a single maintenance.
[0167]
Further, it is not necessary to print the shipping slip in a timely manner while checking the production plan, and the operation burden on the shipping slip printing person can be greatly reduced.
[0168]
In addition, even if there is a sudden order change or production change, it becomes possible to print shipping slips synchronized with the inventory status and production plan, eliminating the need to print out shipping slips and printing unnecessary shipping slips such as production at a later date, The operational burden on the person in charge of checking the shipping slip and parts can be greatly reduced.
[0169]
In addition, the printing timing can be finely adjusted based on the inventory status of goods, the progress of printing, the actual flow status of goods, the break time, etc., while preventing the printing of an excessive number of shipping slips. Even when the shipping slip printer is out of paper or jammed, it is possible to minimize the delay in printing the shipping slip.
[0170]
In addition, since a variety of print data transmission formats are supported, shipping slips can be printed out in a timely manner at various production sites.
[0171]
Therefore, it is possible to print shipping slips that differ for each ordering source and for each item by a single system without using multiple printing systems that have heavy maintenance and operational burdens. It is possible to prevent the waste of printing the shipping slip due to the change and to construct an excellent shipping slip printing environment that can reduce the burden on the printing staff at the time of collation.
[0172]
In addition, even if there are a mix of made-to-order products and parts for prospective production, whether they are made-to-order parts only, or only for prospective production, a shipping slip will be provided in a timely manner. Can be printed.
[Brief description of the drawings]
FIG. 1 is a system configuration diagram illustrating a configuration of a printing system according to a first embodiment of the present invention.
FIG. 2 is a block diagram showing a hardware configuration of the business server shown in FIG. 1;
FIG. 3 is a block diagram showing a hardware configuration of business PC-A and business PC-B shown in FIG. 1;
FIG. 4 is a flowchart illustrating an example of a first control processing procedure in the printing system of the present invention.
FIG. 5 is a data configuration diagram showing an example of a configuration of shipping slip data in the printing system of the present invention.
FIG. 6 is a data configuration diagram showing an example of the configuration of print instruction data in the printing system of the present invention.
FIG. 7 is a flowchart showing an example of a second control processing procedure in the printing system of the present invention.
FIG. 8 is a schematic diagram showing an example of a shipping slip printed by the printing system of the present invention.
FIG. 9 is a system configuration diagram illustrating a configuration of a printing system according to a second embodiment of the present invention.
FIG. 10 is a flowchart illustrating an example of a third control processing procedure in the printing system of the present invention.
FIG. 11 is a flowchart illustrating an example of a fourth control processing procedure in the printing system of the present invention.
FIG. 12 is a diagram illustrating a memory map of a recording medium storing various data processing programs that can be read by the printing system according to the present invention.
[Explanation of symbols]
100,110 EDI server (assembly manufacturer)
130 EDI server (parts manufacturer)
140 Business server (parts manufacturer)
150 Form maintenance PC (parts manufacturer)
160 Printer A (parts manufacturer)
170 Business PC-A (parts manufacturer)
175 Printer B (parts manufacturer)
180 Business PC-B (parts manufacturer)
190 Communication line
Claims (9)
発注元に応じた複数の出荷伝票フォームを予め記憶しておくフォーム記憶手段と、
少なくとも前記物品の前記発注元を特定可能な発注元情報と、生産する前記物品を特定可能な物品情報と、該物品の生産数と、該物品の生産開始予定時刻及び生産終了予定時刻とを含む生産計画データを記憶する生産計画データ記憶手段と、
物品情報と容器の種類と該容器の収容数を含むマスタを記憶するマスタ記憶手段と、
前記生産計画データと前記マスタとを参照して、出荷伝票に印刷するデータであって、前記物品情報と、前記物品の前記生産数と、該物品を収容した前記容器の収容数から算出される前記出荷伝票の印刷枚数とを含む出荷伝票データを作成する第1の作成手段と、
前記第1の作成手段により作成された出荷伝票データを記憶する伝票データ記憶手段と、
前記生産計画データに含まれる前記物品の前記生産開始予定時刻及び生産終了予定時刻を用いて、前記生産開始予定時刻及び生産終了予定時刻により特定される前記物品の流動予定時刻から所定時間前に前記出荷伝票を印刷すべく印刷予定時刻を決定する決定手段と、
前記生産計画データと前記出荷伝票データとを用いて、前記出荷伝票の印刷を指示するための印刷指示データであって、前記出荷伝票データと、前記発注元情報に応じた出荷伝票フォームと、前記出荷伝票の前記印刷予定時刻と、前記印刷枚数とをそれぞれ指示した印刷指示データを作成する第2の作成手段と、
前記端末から受信した前記生産進捗情報を用いて前記印刷指示データを修正する修正手段と、
前記修正手段により修正された前記印刷指示データを用いて、指示された前記出荷伝票フォームを前記フォーム記憶手段から読み出し、更に指示された前記出荷伝票データを前記伝票データ記憶手段より読み出し、該読み出した出荷伝票データと該読み出した出荷伝票フォームとのオーバレイ印刷を前記修正された印刷指示データを用いて前記印刷予定時刻に印刷を行うべく出荷伝票の印刷処理を制御する印刷制御手段と、
を備えることを特徴とする印刷制御装置。A printing control device configured to be communicable with a terminal capable of transmitting production progress information indicating that the flow of the first article of a lot has been detected,
Form storage means for storing a plurality of shipping slip forms according to the ordering source in advance;
Including at least ordering source information capable of specifying the ordering source of the article, article information capable of specifying the article to be produced, the number of productions of the article, a scheduled production start time and a scheduled production end time of the article Production plan data storage means for storing production plan data;
Master storage means for storing a master including article information, the type of container, and the number of containers accommodated,
Data to be printed on a shipping slip with reference to the production plan data and the master, and calculated from the article information, the production number of the article, and the number of containers accommodated in the article. First creation means for creating shipping slip data including the number of printed copies of the shipping slip;
Slip data storage means for storing the shipping slip data created by the first creation means;
Using the scheduled production start time and scheduled production end time of the article included in the production plan data, the predetermined time before the scheduled flow time of the article specified by the scheduled production start time and scheduled production end time. A determination means for determining a scheduled print time for printing the shipping slip;
Print instruction data for instructing printing of the shipping slip using the production plan data and the shipping slip data, the shipping slip data, a shipping slip form corresponding to the ordering source information, Second creation means for creating print instruction data instructing the scheduled printing time of the shipping slip and the number of printed sheets, respectively;
Correction means for correcting the print instruction data using the production progress information received from the terminal;
Using the print instruction data corrected by the correction means, the instructed shipping slip form is read from the form storage means, and further the instructed shipping slip data is read from the slip data storage means and read. Print control means for controlling the printing process of the shipping slip so as to print the overlay printing of the shipping slip data and the read shipping slip form at the scheduled print time using the corrected print instruction data;
A printing control apparatus comprising:
前記印刷制御装置は、
前記印刷装置から受信した印刷ログを用いて更新される印刷の実行時刻を含む進捗情報と前記印刷指示データの前記印刷予定時刻とを比較して、前記印刷装置による前記出荷伝票の印刷が前記印刷予定時刻に実行されているかを判定する判定手段を更に備え、
前記判定手段が前記出荷伝票の印刷が前記印刷予定時刻より遅れていると判定した場合は、前記印刷制御手段は前記出荷伝票の印刷の前記実行時刻が前記出荷伝票の印刷の予定時刻と一致するまで、前記印刷装置が最大速度で前記出荷伝票の印刷を続行するよう制御することを特徴とする請求項1記載の印刷制御装置。The print control device is capable of communicating with a print device that prints the shipping slip using print data received from the print control device;
The print control device includes:
The progress information including the execution time of printing updated using the print log received from the printing apparatus is compared with the scheduled printing time of the print instruction data, and the printing of the shipping slip by the printing apparatus is performed by the printing apparatus. It further comprises a determination means for determining whether it is executed at the scheduled time,
If the determination means determines that printing of the shipping slip is delayed from the scheduled printing time, the printing control means matches the execution time of printing of the shipping slip with the scheduled printing time of the shipping slip. The printing control apparatus according to claim 1, wherein the printing apparatus is controlled to continue printing the shipping slip at a maximum speed.
登録手段が、発注元に応じた複数の出荷伝票フォームを予めメモリに登録しておくフォーム登録工程と、
生産計画データ記憶手段に、前記物品の前記発注元を特定可能な発注元情報と、生産する前記物品を特定可能な物品情報と、該物品の生産数と、該物品の生産開始予定時刻及び終了予定時刻とを含む生産計画データを記憶する生産計画データ記憶工程と、
マスタ記憶手段に、物品情報と容器の種類と該容器の収容数を含むマスタを記憶するマスタ記憶工程と、
第1の作成手段が、前記生産計画データと前記マスタとを参照して、出荷伝票に印刷するデータであって、前記物品情報と、前記物品の前記生産数と、該物品を収容した前記容器の収容数から算出される前記出荷伝票の印刷枚数とを含む出荷伝票データを作成しメモリに格納する第1の作成工程と、
決定手段が、前記生産計画データに含まれる前記物品の前記生産開始予定時刻及び生産終了予定時刻を用いて、前記生産開始予定時刻及び生産終了予定時刻により特定される前記物品の流動予定時刻から所定時間前に前記出荷伝票を印刷すべく印刷予定時刻を決定する決定工程と、
第2の作成工程が、前記生産計画データと前記出荷伝票データとを用いて、前記出荷伝票の印刷を指示するための印刷指示データであって、前記出荷伝票データと、前記発注元情報に応じた出荷伝票フォームと、前記出荷伝票の印刷枚数と、前記出荷伝票の前記印刷予定時刻とをそれぞれ指示した印刷指示データを作成する第2の作成工程と、
修正手段が、前記端末から受信した前記生産進捗情報を用いて前記印刷指示データを修正する修正工程と、
印刷制御手段が、前記修正された前記印刷指示データに基づいて、指示された前記出荷伝票データと指示された前記出荷伝票フォームとを前記メモリより読み出し、該読み出した前記出荷伝票データと前記出荷伝票フォームとのオーバレイ印刷を、前記修正された前記印刷指示データを用いて指示された前記印刷予定時刻に指示された前記印刷枚数だけ行うように出荷伝票の印刷処理を制御する印刷制御工程と
を備えることを特徴とする出荷伝票の印刷制御方法。A printing control method for a shipping slip in a printing control apparatus configured to be communicable with a terminal capable of transmitting production progress information indicating that the flow of the first article of a lot has been detected,
A form registration step in which a registration means registers a plurality of shipping slip forms according to an ordering source in advance in a memory;
In the production plan data storage means, ordering source information that can identify the ordering source of the article, article information that can identify the article to be produced, the number of production of the article, the scheduled production start time and end of the article A production plan data storage process for storing production plan data including a scheduled time;
A master storage step of storing in the master storage means a master including article information, the type of container, and the number of containers accommodated;
The first creation means refers to the production plan data and the master, and is data to be printed on a shipping slip, wherein the article information, the production number of the article, and the container containing the article A first creation step of creating shipping slip data including the number of printed shipping slips calculated from the number of stored items and storing the shipping slip data in a memory;
The determining means uses the scheduled production start time and scheduled production end time of the article included in the production plan data to determine a predetermined value from the scheduled flow time of the article specified by the scheduled production start time and scheduled production end time. A determination step of determining a scheduled printing time to print the shipping slip before time;
The second creation step is print instruction data for instructing printing of the shipping slip using the production plan data and the shipping slip data, and is in accordance with the shipping slip data and the ordering source information. A second creation step of creating print instruction data instructing the shipping slip form, the number of printed copies of the shipping slip, and the scheduled printing time of the shipping slip;
A correcting step for correcting the print instruction data using the production progress information received from the terminal;
The print control means reads the instructed shipping slip data and the instructed shipping slip form from the memory based on the corrected printing instruction data, and reads the read shipping slip data and the shipping slip. A printing control step for controlling a printing process of a shipping slip so that overlay printing with a form is performed only for the number of printed sheets designated at the scheduled printing time designated using the modified printing instruction data. A shipping slip printing control method characterized by the above.
前記印刷制御装置は、
判定手段が、前記印刷装置から受信した印刷ログを用いて更新される印刷の実行時刻を含む進捗情報と前記印刷指示データの前記印刷予定時刻とを比較して前記印刷装置による前記出荷伝票の印刷が前記印刷予定時刻に実行されているかを判定する判定工程を更に備え、
前記判定工程が前記出荷伝票の印刷が前記印刷予定時刻より遅れていると判定した場合は、前記印刷制御工程は前記出荷伝票の印刷の前記実行時刻が前記出荷伝票の印刷の予定時刻と一致するまで、前記印刷装置が最大速度で前記出荷伝票の印刷を続行するよう制御することを特徴とする請求項4記載の出荷伝票の印刷制御方法。The print control device is capable of communicating with a print device that prints the shipping slip using print data received from the print control device;
The print control device includes:
The determination unit compares the progress information including the execution time of printing updated using the print log received from the printing apparatus with the scheduled printing time of the print instruction data, and prints the shipping slip by the printing apparatus. Further includes a determination step of determining whether or not is executed at the scheduled printing time,
If the determination step determines that printing of the shipping slip is delayed from the scheduled printing time, the printing control step causes the execution time of printing the shipping slip to coincide with the scheduled printing time of the shipping slip. 5. The shipping slip printing control method according to claim 4, wherein the printing apparatus is controlled to continue printing the shipping slip at a maximum speed.
前記印刷制御装置を、
発注元に応じた複数の出荷伝票フォームを予め記憶しておくフォーム記憶手段と、
少なくとも前記物品の前記発注元を特定可能な発注元情報と、生産する前記物品を特定可能な物品情報と、該物品の生産数と、該物品の生産開始予定時刻及び生産終了予定時刻とを含む生産計画データを記憶する生産計画データ記憶手段と、
物品情報と容器の種類と該容器の収容数を含むマスタを記憶するマスタ記憶工程と、
前記生産計画データと前記マスタとを参照して、出荷伝票に印刷するデータであって、前記物品情報と、前記物品の前記生産数と、該物品を収容した前記容器の収容数から算出される前記出荷伝票の印刷枚数とを含む出荷伝票データを作成する第1の作成手段と、
前記第1の作成手段により作成された出荷伝票データを記憶する伝票データ記憶手段と、
前記生産計画データに含まれる前記物品の前記生産開始予定時刻及び生産終了予定時刻を用いて、前記生産開始予定時刻及び生産終了予定時刻により特定される前記物品の流動予定時刻から所定時間前に前記出荷伝票を印刷すべく印刷予定時刻を決定する決定手段と、
前記生産計画データと前記出荷伝票データとを用いて、前記出荷伝票の印刷を指示するための印刷指示データであって、前記出荷伝票データと、前記発注元情報に応じた出荷伝票フォームと、前記出荷伝票の印刷枚数と、前記出荷伝票の前記印刷予定時刻とをそれぞれ指示した印刷指示データを作成する第2の作成手段と、
前記端末から受信した前記生産進捗情報を用いて前記印刷指示データを修正する修正手段と、
前記修正手段により修正された前記印刷指示データを用いて、指示された前記出荷伝票フォームを前記フォーム記憶手段から読み出し、更に指示された前記出荷伝票データを前記伝票データ記憶手段より読み出し、該読み出した出荷伝票フォームと該読み出した出荷伝票フォームとのオーバレイ印刷を前記修正された印刷指示データに用いて前記印刷予定時刻に印刷を行うべく出荷伝票の印刷処理を制御する印刷制御手段として機能させることを特徴とする制御プログラム。A control program for a printing control apparatus configured to be able to communicate with a terminal capable of transmitting production progress information indicating that the flow of the first article in a lot has been detected,
The printing control device;
Form storage means for storing a plurality of shipping slip forms according to the ordering source in advance;
Including at least ordering source information capable of specifying the ordering source of the article, article information capable of specifying the article to be produced, the number of productions of the article, a scheduled production start time and a scheduled production end time of the article Production plan data storage means for storing production plan data;
A master storage step for storing a master including article information, the type of container, and the number of containers accommodated;
Data to be printed on a shipping slip with reference to the production plan data and the master, and calculated from the article information, the production number of the article, and the number of containers accommodated in the article. First creation means for creating shipping slip data including the number of printed copies of the shipping slip;
Slip data storage means for storing the shipping slip data created by the first creation means;
Using the scheduled production start time and scheduled production end time of the article included in the production plan data, the predetermined time before the scheduled flow time of the article specified by the scheduled production start time and scheduled production end time. A determination means for determining a scheduled print time for printing the shipping slip;
Print instruction data for instructing printing of the shipping slip using the production plan data and the shipping slip data, the shipping slip data, a shipping slip form corresponding to the ordering source information, Second creation means for creating print instruction data instructing the number of prints of the shipping slip and the scheduled printing time of the shipping slip;
Correction means for correcting the print instruction data using the production progress information received from the terminal;
Using the print instruction data corrected by the correction means, the instructed shipping slip form is read from the form storage means, and further the instructed shipping slip data is read from the slip data storage means and read. Overlay printing of the shipping slip form and the read shipping slip form is used as the print control means for controlling the printing processing of the shipping slip so as to perform printing at the scheduled print time using the corrected print instruction data. A characteristic control program.
前記印刷制御装置から受信した印刷データを用いて前記出荷伝票の印刷を行う印刷装置から受信した印刷ログを用いて更新される印刷の実行時刻を含む進捗情報と前記印刷指示データの前記印刷予定時刻とを比較して前記印刷装置による前記出荷伝票の印刷が前記印刷予定時刻に実行されているかを判定する判定手段として更に機能させ、
前記判定手段が前記出荷伝票の印刷が前記印刷予定時刻より遅れていると判定した場合は、前記印刷制御手段を前記出荷伝票の印刷の前記実行時刻が前記出荷伝票の印刷の予定時刻と一致するまで、前記印刷装置が最大速度で前記出荷伝票の印刷を続行するよう機能させることを特徴とする請求項7記載の制御プログラム。The printing control device;
Progress information including print execution time updated using a print log received from a printing apparatus that prints the shipping slip using print data received from the print control apparatus, and the scheduled print time of the print instruction data And further functioning as a determination unit that determines whether printing of the shipping slip by the printing apparatus is executed at the scheduled printing time,
When the determination unit determines that the printing of the shipping slip is delayed from the scheduled printing time, the execution time of printing the shipping slip matches the scheduled printing time of the shipping slip. The control program according to claim 7, wherein the printing apparatus is caused to function so as to continue printing the shipping slip at a maximum speed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003171997A JP4414684B2 (en) | 2003-06-17 | 2003-06-17 | Printing control apparatus, shipping slip printing control method, and control program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003171997A JP4414684B2 (en) | 2003-06-17 | 2003-06-17 | Printing control apparatus, shipping slip printing control method, and control program |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005010914A JP2005010914A (en) | 2005-01-13 |
JP4414684B2 true JP4414684B2 (en) | 2010-02-10 |
Family
ID=34096291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003171997A Expired - Fee Related JP4414684B2 (en) | 2003-06-17 | 2003-06-17 | Printing control apparatus, shipping slip printing control method, and control program |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4414684B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5467745B2 (en) * | 2008-09-09 | 2014-04-09 | 株式会社日立システムズ | Electronic data exchange computer and electronic data exchange program |
JP5355706B2 (en) * | 2009-10-30 | 2013-11-27 | 富士通フロンテック株式会社 | Production management apparatus, production management system, production management program, and production management method |
JP5375712B2 (en) * | 2010-03-30 | 2013-12-25 | トヨタ自動車株式会社 | Production instruction system |
-
2003
- 2003-06-17 JP JP2003171997A patent/JP4414684B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2005010914A (en) | 2005-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10884675B2 (en) | Image forming apparatus and method for the same | |
US20010004734A1 (en) | Method, system and program product for managing and ordering supplies for office equipment | |
EP1407397A1 (en) | Package labeling | |
JP2001309099A (en) | Image processor and its management system | |
CN1508738A (en) | Method and system for automatically ordering consumable in information processing system | |
CN101751030A (en) | Manufacturing collaboration hub data exchange interface | |
US8402478B2 (en) | Storing medium having a device driver for controlling a plurality of types of peripheral devices | |
JP2007193537A (en) | Tag information management program, tag information management method, and tag information management device | |
JP6066358B2 (en) | Manufacturing method, image forming apparatus, setting method, and kitting system | |
US20020103725A1 (en) | Inventory and order management tool | |
WO2002005058A2 (en) | Price label communication system | |
JP4414684B2 (en) | Printing control apparatus, shipping slip printing control method, and control program | |
JP2005165722A (en) | Information medium issuing system and method, and computer-readable storage medium having program stored thereon and its program | |
CN1497423B (en) | Data processing equipment | |
JP2001209509A (en) | Printer.driver for application use | |
JP2017052296A (en) | Manufacturing method, image formation device, setting method, and kitting system | |
JP2008305374A (en) | Information processor management system, information processor management program and information processor management method | |
JP7257198B2 (en) | PRINT CONTROL DEVICE, PRINT CONTROL METHOD, AND PRINT CONTROL PROGRAM | |
JP7104594B2 (en) | Order / sales management device, order / sales management method and order / sales management program | |
JP7546006B2 (en) | Automatic printing system, automatic printing method, and automatic printing program | |
JP2009069914A (en) | Label printer management system | |
JP2019164483A (en) | Commodity inventory management device, commodity inventory management method, and commodity inventory management program | |
JP2020149114A (en) | Warehouse acquisition device, warehouse acquisition method, and warehouse acquisition program | |
EP4033428A1 (en) | System and method for managing items, containers and entities | |
JP7539284B2 (en) | Product inventory management device, product inventory management method, and product inventory management program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041227 |
|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20080403 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080617 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080818 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090825 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091023 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20091117 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20091120 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121127 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4414684 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121127 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131127 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20141127 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |