JP4365514B2 - Drain material and vertical drain method - Google Patents
Drain material and vertical drain method Download PDFInfo
- Publication number
- JP4365514B2 JP4365514B2 JP2000216225A JP2000216225A JP4365514B2 JP 4365514 B2 JP4365514 B2 JP 4365514B2 JP 2000216225 A JP2000216225 A JP 2000216225A JP 2000216225 A JP2000216225 A JP 2000216225A JP 4365514 B2 JP4365514 B2 JP 4365514B2
- Authority
- JP
- Japan
- Prior art keywords
- wood
- drain
- drain material
- vertical
- drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、間隙水を排水するためのドレーン材、及びこれを用いたバーチカルドレーン工法に関する。
【0002】
【従来の技術】
トンネルやダム或いは宅地造成等の建築工事で発生した伐採木材を有効利用する方法として、伐採木材を粉砕チップ化して用いる方法が提案されている。例えば、特開平11−29383号公報に示されるように、木材チップを堆肥材として利用する方法や、木材チップを法面緑化材の保水層に利用する方法、などが知られている。
しかしながら、上記利用方法だけでは、大量に発生する伐採木材を処分しきれないこともあり、上記利用方法以外の利用方法が要望されている。
【0003】
また、従来より、軟弱地盤対策工法として、バーチカルドレーン工法が一般に知られている。バーチカルドレーン工法とは、間隙水を通す排水路(排水柱)を軟弱地盤中に形成し、排水距離を短縮することによって、圧密沈下及び強度増加を促進させる工法である。上記排水路を構成するドレーン材には、主に砂やカードボードが用いられている。
【0004】
【発明が解決しようとする課題】
ところが、上記従来のバーチカルドレーン工法は、次に示すような問題点を有している。
例えば、ドレーン材として砂を用いる場合には、砂採取により環境破壊を引き起こす懸念がある。また、近年、良質な砂の入手が困難になりつつある。
また、ドレーン材として化学繊維等を用いる場合には、ドレーン材が半永久的に地盤中に残り、環境に悪影響を与える虞がある。このようなことから、環境保全に優れたドレーン材が求められている。
【0005】
本発明は、上記実情に鑑みなされたもので、伐採木材の有効利用が可能であり、環境保全に優れたドレーン材及びバーチカルドレーン工法を提供することを目的とする。
【0006】
【課題を解決するための手段】
以上の課題を解決するため、請求項1記載の発明は、ドレーン材を用いて地盤中に間隙水の排水路を形成することで、圧密沈下を促進するバーチカルドレーン工法において、前記間隙水を排水するための排水材として用いられるバーチカルドレーン材であって、木材を粉砕してなる木材チップを主成分として含有することを特徴とする。
【0007】
請求項1記載の発明によれば、木材チップを主成分として含有するので、木材チップの間に形成される空隙を通して間隙水を排水することができる。
また、しかる後、木材チップは腐食して土と同化するので、環境に悪影響を及ぼすことがなく、環境保全に優れたドレーン材を実現できる。
【0008】
ここで、木材チップの原料となる木材としては、例えば、後述する伐採木材、建築現場等で発生する廃棄木材、製材工場で発生する残材などが挙げられるが、これら以外の木材であってもよい。また、木材の部位は、特に限定されるものではなく、幹、根、枝葉、表皮など、如何なる部位としてもよい。従って、これまで廃棄物として処理されてきた上記木材を有効に利用することができる。
また、「木材チップを主成分として含有する」には、請求項2記載の発明のように、木材チップのみでドレーン材を構成する場合と、木材チップとその他の材料とを混合してドレーン材を構成する場合と、が含まれることを意味している。前記その他の材料としては、例えば、公知のドレーン材や、各種添加剤などが挙げられるが、それらは、砂や砕石など、天然材であることが望ましい。そうすることで、環境との親和性をより一層高めることが可能である。
また、木材チップは、大きさや形状の揃った均一な木材チップであっても、大きさや形状の異なるチップが混在した木材チップであってもよい。また、木材チップの形状は、特に限定されるものではなく、針状、板状、粒状など、如何なる形状としてもよい。なお、木材チップの大きさや形状を変えることで、木材チップの間に形成される空隙の大きさを変えることができ、それに応じて、ドレーン材としての透水性能を変化させることができる。
【0009】
そして、請求項1記載の発明は、バーチカルドレーン材が前記木材チップのみで構成されていることを特徴とする。
【0010】
従って、請求項1記載の発明によれば、木材チップのみでバーチカルドレーン材を構成するようにしたので、排水機能が高く、該排水機能を果たした後は腐食して土と同化するバーチカルドレーン材を実現できる。
【0011】
請求項2記載の発明は、請求項1に記載のドレーン材において、前記木材に、伐採木材を使用したことを特徴とする。
【0012】
請求項2記載の発明によれば、木材チップの原料となる木材に、伐採木材を使用するようにしたので、伐採木材を有効な資源として再利用することができる。
【0013】
ここで、伐採木材には、例えば、トンネルやダム或いは宅地造成等の建築工事で発生する伐採木材、植林地の間引き作業で生じる間伐材などが含まれる。
例えば、建築工事で発生する伐採木材をドレーン材として再利用する場合には、現場から発生する廃棄物の量を少なくすることができ、廃棄物の処理費用やドレーン材の材料費を縮減することができる。また、ドレーン材の確保に伴う環境破壊を回避することもできる。
一方、例えば、植林地の間引き作業で生じる間伐材をドレーン材として再利用する場合には、植林地に放置されている間伐材を減らすことができ、結果として、植林環境を改善することができる。
【0014】
請求項3記載の発明は、ドレーン材を用いて地盤中に間隙水の排水路を形成することで、圧密沈下を促進するバーチカルドレーン工法であって、前記ドレーン材として、請求項1または2に記載のバーチカルドレーン材を使用したことを特徴とする。
【0015】
請求項3記載の発明によれば、請求項1または2に記載のバーチカルドレーン材を用いて地盤中に間隙水の排水路を形成することにより圧密沈下を促進するようにしたので、これまで廃棄されてきた伐採木材等の木材の有効利用が可能であって、環境保全に優れたバーチカルドレーン工法を実現することができる。
【0016】
【発明の実施の形態】
以下、図を参照して本発明の実施の形態を詳細に説明する。
【0017】
本実施の形態のドレーン材Sは、例えば、トンネルやダム或いは宅地造成等の建築工事で発生した伐採木材(根や枝葉を含む)を粉砕してなる木材チップのみで構成されたドレーン材である。伐採木材の破砕には、公知の木材破砕装置が用いられる。
【0018】
なお、木材チップの原料となる木材には、例えば、植林地の間引き作業で生じた間伐材や、建築現場等で発生した廃棄木材、或いは製材工場で発生した残材などの木材を使用することも可能である。また、木材チップは、大きさや形状の揃った均一な木材チップであっても、大きさや形状の異なるチップが混在した木材チップであってもよい。また、木材チップの形状は、特に限定されるものではなく、針状、板状、粒状など、如何なる形状としてもよい。例えば、木材チップの大きさや形状を変えることで、木材チップの間に形成される空隙の大きさを変えることができ、それに応じて、ドレーン材としての透水性能を変化させることができる。そのため、地盤の状態に合わせて、木材チップの大きさや形状を選択することが望ましい。
また、この実施の形態では、木材チップのみでドレーン材Sを構成するようにしたが、例えば、木材チップとその他の材料(例えば、砂や砕石、各種添加剤など)とを混合してドレーン材Sを構成することも可能である。その場合、前記その他の材料には、砂等の天然材を用いることが望ましく、そうすることで、環境との親和性を向上させることができる。
【0019】
次に、上記ドレーン材Sを用いたバーチカルドレーン工法の一例について説明する。
【0020】
先ず、図1に示すように、ドレーン材Sによる排水柱1,…(鉛直方向の排水路)の形成に先だって、軟弱地盤4の地表面にサンドマット2(水平方向の排水路)を形成する。即ち、地表面に排水性の良い砂を敷き均して、所定厚さのサンドマット2を形成し、後述する盛土3と軟弱地盤4との境界面における排水路を確保する。
【0021】
次に、軟弱地盤4中に排水柱1,…(ドレーン)を所定間隔をもって形成する。排水柱1,…の施工方法としては、バイブロハンマ式、オーガ式、袋詰め式など、砂をドレーン材とした場合の公知の施工方法を適用することができる。
例えば、バイブロハンマ式の場合には、バイブロハンマの振動を利用してケーシングを所定深さまで打ち込み、バケット等で上記ドレーン材S(木材チップ)をケーシングの中に投入する。上記ドレーン材Sの投入が完了したら、ケーシングの上部から上記ドレーン材Sに向けて圧縮空気を送りながらケーシングを引き抜く。これにより、ドレーン材Sよりなる排水柱1を軟弱地盤4中に形成することができる。
ここで、例えば、ケーシングの引き抜きを円滑にするため、ケーシング内に複数種類のドレーン材を投入するようにしてもよい。例えば、木材チップよりなる上記ドレーン材Sを投入した後に、砂や砕石よりなるドレーン材を投入することで、上から木材チップに対して荷重を付与することができ、これにより、ケーシングの引き抜きを円滑にすることができる。また、木材チップの充填密度を高めることも可能である。
【0022】
上記のようにして、排水柱1,…の形成が完了したら、サンドマット2の上に盛土3を造成する。これにより、軟弱地盤4に対して所望の荷重を付与することができ、軟弱地盤4の圧密を促進することが可能となる。つまり、間隙水の早期排水が可能となる。
【0023】
以上のように、この実施の形態によれば、木材チップのみでドレーン材Sを構成したので、ドレーン材Sは、排水機能を果たした後、腐食して土と同化することとなる。従って、環境に悪影響を及ぼすことがない。
また、木材チップの原料となる木材に、建築工事で発生した伐採木材を用いるようにしたので、伐採木材を有効な資源として再利用することができる。その結果、現場から発生する廃棄物の量を少なくすることができ、廃棄物の処理費用やドレーン材の材料費を縮減することができる。また、ドレーン材の確保に伴う環境破壊を回避することもできる。
【0024】
なお、以上の実施の形態においては、木材チップよりなるドレーン材Sで軟弱地盤4中に排水柱1,…を形成するようにしたが、例えば、木材チップよりなるドレーン材Sで、前述したサンドマット2の代わりとなる排水層を形成するようにしたり、木材チップよりなるドレーン材Sに現地発生土や種子或いは添加剤などを混合して緑化基盤材を製造し、これを前述した盛土3の法面に敷き均すことで法面緑化材の保水層を形成したりすることも可能である。
また、例えば、木材チップよりなるドレーン材Sを地下水位の高い孔内に投入する場合には、木材チップは比重が軽いため浮力が働き、十分に孔内に充填されないことが懸念される。このような場合には、木材チップよりなるドレーン材Sと、木材チップより比重の大きい砂や砕石等の材料とを、適当な分量で交互に投入することで、砂や砕石等で木材チップを押さえ付けることができ、上記懸念を解消することができる。
また、本発明に係るバーチカルドレーン工法は、この実施の形態で示したバーチカルドレーン工法に限られるものではなく、種々のバリエーションが有り得る。例えば、この実施の形態で示した、排水柱1,…の施工手順や、軟弱地盤4に対する載荷重方法などは一例であって、適宜に変更可能である。
【0025】
【発明の効果】
本発明によれば、これまで廃棄されてきた伐採木材等の木材の有効利用が可能となる。
また、環境に悪影響を及ぼすことがなく、環境保全に優れたドレーン材及びバーチカルドレーン工法を実現できる。
【図面の簡単な説明】
【図1】本発明を適用した一例としてのバーチカルドレーン工法を説明する図である。
【符号の説明】
1 排水柱(排水路)
2 サンドマット
3 盛土
4 軟弱地盤[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a drain material for draining pore water, and a vertical drain method using the drain material.
[0002]
[Prior art]
As a method for effectively using felled timber generated in construction work such as tunnels, dams, or residential land development, a method of using felled timber in crushed chips has been proposed. For example, as disclosed in Japanese Patent Application Laid-Open No. 11-29383, a method of using a wood chip as a compost material, a method of using a wood chip as a water retention layer of a slope greening material, and the like are known.
However, there are cases where a large amount of felled timber cannot be disposed of only with the above usage method, and there is a demand for a usage method other than the above usage method.
[0003]
Conventionally, a vertical drain construction method is generally known as a soft ground countermeasure construction method. The vertical drain method is a method of promoting consolidation settlement and increasing strength by forming a drainage channel (drainage column) through pore water in soft ground and shortening the drainage distance. Sand or cardboard is mainly used as the drain material constituting the drainage channel.
[0004]
[Problems to be solved by the invention]
However, the conventional vertical drain method has the following problems.
For example, when sand is used as the drain material, there is a concern of causing environmental destruction by sand collection. In recent years, it has become difficult to obtain good quality sand.
In addition, when chemical fiber or the like is used as the drain material, the drain material may remain in the ground semipermanently, which may adversely affect the environment. For these reasons, a drain material excellent in environmental conservation is demanded.
[0005]
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a drain material and a vertical drain method capable of effectively using felled timber and excellent in environmental conservation.
[0006]
[Means for Solving the Problems]
In order to solve the above problems, the invention described in claim 1 is directed to draining the interstitial water in a vertical drain method that promotes consolidation settlement by forming an interstitial water drainage channel in the ground using a drain material. It is a vertical drain material used as a drainage material, and contains a wood chip formed by pulverizing wood as a main component.
[0007]
According to the first aspect of the invention, since the wood chip is contained as a main component, the pore water can be drained through the gap formed between the wood chips.
In addition, since the wood chip is corroded and assimilated with the soil after that, it is possible to realize a drain material excellent in environmental conservation without adversely affecting the environment.
[0008]
Here, examples of the wood used as a raw material for the wood chip include, for example, logging wood described later, waste wood generated at a construction site, and remaining wood generated at a lumber mill. Good. The part of the wood is not particularly limited, and may be any part such as a trunk, a root, a branch leaf, and an epidermis. Therefore, the wood that has been treated as waste can be used effectively.
In addition, the term “containing wood chips as a main component” includes a case in which the drain material is composed of only wood chips as in the invention described in claim 2, and a mixture of wood chips and other materials. Is included, and is meant to be included. Examples of the other materials include known drain materials and various additives, and these are preferably natural materials such as sand and crushed stone. By doing so, it is possible to further increase the affinity with the environment.
The wood chip may be a uniform wood chip having a uniform size and shape, or a wood chip in which chips of different sizes and shapes are mixed. Further, the shape of the wood chip is not particularly limited, and may be any shape such as a needle shape, a plate shape, or a granular shape. In addition, by changing the size and shape of the wood chip, the size of the gap formed between the wood chips can be changed, and the water permeability as a drain material can be changed accordingly.
[0009]
The invention according to claim 1 is characterized in that the vertical drain material is composed only of the wood chips.
[0010]
Therefore, according to the first aspect of the present invention, the vertical drain material is composed of only wood chips, so that the drainage function is high, and after performing the drainage function, the vertical drain material corrodes and assimilates with the soil. Can be realized.
[0011]
The invention according to claim 2 is characterized in that in the drain material according to claim 1, felled wood is used as the wood.
[0012]
According to the invention described in claim 2, since the felled wood is used for the wood that is the raw material of the wood chip, the felled wood can be reused as an effective resource.
[0013]
Here, the felled timber includes, for example, felled timber generated in construction work such as tunnels, dams, or residential land creation, and thinned wood generated in the thinning operation of plantations.
For example, when reclaiming felled timber generated in construction work as drain material, the amount of waste generated from the site can be reduced, and waste processing costs and material costs for drain materials can be reduced. Can do. In addition, it is possible to avoid environmental destruction associated with securing the drain material.
On the other hand, for example, when the thinning material generated in the thinning operation of the plantation is reused as a drain material, the thinning material left in the plantation can be reduced, and as a result, the afforestation environment can be improved. .
[0014]
The invention according to claim 3 is a vertical drain method for promoting consolidation settlement by forming a drainage channel of pore water in the ground using a drain material, and the drain material is as claimed in claim 1 or 2. The vertical drain material described is used.
[0015]
According to the third aspect of the present invention, the vertical drainage material according to the first or second aspect is used to promote the consolidation settlement by forming the drainage channel of the pore water in the ground. It is possible to effectively use timber such as felled timber that has been used, and to realize a vertical drain method excellent in environmental conservation.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0017]
The drain material S of the present embodiment is, for example, a drain material composed only of wood chips formed by pulverizing felled wood (including roots and branches and leaves) generated in construction work such as tunnels, dams, or residential land development. . A known wood crushing apparatus is used for crushing felled wood.
[0018]
The wood used as the raw material for wood chips should be, for example, thinned wood produced by thinning operations in plantations, waste wood produced at construction sites, or residual wood produced at a sawmill. Is also possible. The wood chip may be a uniform wood chip having a uniform size and shape, or a wood chip in which chips of different sizes and shapes are mixed. Further, the shape of the wood chip is not particularly limited, and may be any shape such as a needle shape, a plate shape, or a granular shape. For example, by changing the size and shape of the wood chips, the size of the gap formed between the wood chips can be changed, and the water permeability as a drain material can be changed accordingly. Therefore, it is desirable to select the size and shape of the wood chip according to the ground condition.
In this embodiment, the drain material S is composed of only wood chips. For example, the drain material S is mixed with wood chips and other materials (for example, sand, crushed stone, various additives). S can also be configured. In that case, it is desirable to use natural materials such as sand for the other materials, and by doing so, affinity with the environment can be improved.
[0019]
Next, an example of the vertical drain method using the drain material S will be described.
[0020]
First, as shown in FIG. 1, prior to the formation of drainage columns 1,... (Vertical drainage channels) by the drain material S, a sand mat 2 (horizontal drainage channel) is formed on the ground surface of the soft ground 4. . That is, sand with good drainage is spread on the ground surface to form a sand mat 2 having a predetermined thickness, and a drainage channel at the boundary surface between the embankment 3 and the soft ground 4 described later is secured.
[0021]
Next, drain columns 1,... (Drains) are formed in the soft ground 4 with a predetermined interval. As a construction method for the drainage pillars 1,..., A publicly known construction method using sand as a drain material, such as a vibratory hammer type, an auger type, a bagging type, or the like, can be applied.
For example, in the case of the vibratory hammer type, the casing is driven to a predetermined depth using the vibration of the vibratory hammer, and the drain material S (wood chips) is put into the casing with a bucket or the like. When the introduction of the drain material S is completed, the casing is pulled out while sending compressed air from the upper part of the casing toward the drain material S. Thereby, the drainage column 1 made of the drain material S can be formed in the soft ground 4.
Here, for example, in order to smoothly pull out the casing, a plurality of types of drain materials may be introduced into the casing. For example, after the drain material S made of wood chips is introduced, a drain material made of sand or crushed stone can be introduced, so that a load can be applied to the wood chips from above, whereby the casing can be pulled out. It can be smooth. It is also possible to increase the packing density of the wood chips.
[0022]
When the formation of the drainage pillars 1,... Is completed as described above, the embankment 3 is created on the sand mat 2. As a result, a desired load can be applied to the soft ground 4 and the consolidation of the soft ground 4 can be promoted. That is, it becomes possible to drain pore water at an early stage.
[0023]
As described above, according to this embodiment, since the drain material S is composed of only wood chips, the drain material S corrodes and assimilates with the soil after performing the drainage function. Therefore, it does not adversely affect the environment.
Moreover, since the felled timber generated in the construction work is used as the raw material for the wood chip, the felled timber can be reused as an effective resource. As a result, the amount of waste generated from the site can be reduced, and waste processing costs and drain material costs can be reduced. In addition, it is possible to avoid environmental destruction associated with securing the drain material.
[0024]
In the above embodiment, the drain pillars 1 are formed in the soft ground 4 with the drain material S made of wood chips. For example, the above-described sand material is made of the drain material S made of wood chips. A drainage layer can be formed in place of the mat 2, or a greening base material is produced by mixing the drainage material S made of wood chips with locally generated soil, seeds or additives, and this is used for the above-described embankment 3 It is also possible to form a water retention layer of slope greening material by spreading on the slope.
Further, for example, when the drain material S made of wood chips is put into a hole having a high groundwater level, the wood chip has a low specific gravity, so that buoyancy works and there is a concern that the hole is not sufficiently filled in the hole. In such a case, draining material S made of wood chips and materials such as sand and crushed stone having a higher specific gravity than wood chips are alternately put in appropriate amounts, so that the wood chips are made of sand or crushed stone. It can be pressed down and the above concerns can be resolved.
Further, the vertical drain method according to the present invention is not limited to the vertical drain method shown in this embodiment, and there may be various variations. For example, the construction procedure of the drainage pillars 1... Shown in this embodiment, the loading method on the soft ground 4 and the like are examples, and can be changed as appropriate.
[0025]
【The invention's effect】
According to the present invention, it is possible to effectively use wood such as felled wood that has been discarded so far.
In addition, it is possible to realize a drain material and a vertical drain method excellent in environmental conservation without adversely affecting the environment.
[Brief description of the drawings]
FIG. 1 is a diagram illustrating a vertical drain method as an example to which the present invention is applied.
[Explanation of symbols]
1 Drainage column (drainage channel)
2 Sandmat 3 Filling 4 Soft ground
Claims (3)
木材を粉砕してなる木材チップのみで構成されていることを特徴とするバーチカルドレーン材。In the vertical drain construction method that promotes consolidation settlement by forming a drainage channel of pore water in the ground using a drain material, a vertical drain material used as a drainage material for draining the pore water,
A vertical drain material comprising only wood chips obtained by pulverizing wood.
前記ドレーン材として、請求項1または2に記載のバーチカルドレーン材を使用したことを特徴とするバーチカルドレーン工法。It is a vertical drain method that promotes consolidation settlement by forming pore water drainage channels in the ground using drain materials,
A vertical drain construction method using the vertical drain material according to claim 1 or 2 as the drain material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000216225A JP4365514B2 (en) | 2000-07-17 | 2000-07-17 | Drain material and vertical drain method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000216225A JP4365514B2 (en) | 2000-07-17 | 2000-07-17 | Drain material and vertical drain method |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2002030647A JP2002030647A (en) | 2002-01-31 |
JP2002030647A5 JP2002030647A5 (en) | 2007-08-23 |
JP4365514B2 true JP4365514B2 (en) | 2009-11-18 |
Family
ID=18711520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000216225A Expired - Fee Related JP4365514B2 (en) | 2000-07-17 | 2000-07-17 | Drain material and vertical drain method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4365514B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6773409B2 (en) * | 2015-12-01 | 2020-10-21 | 五洋建設株式会社 | Desalination and improvement methods for cohesive soil |
CN113445395B (en) * | 2021-05-20 | 2022-04-26 | 中铁三局集团广东建设工程有限公司 | Construction method for improving strength of high liquid limit soil roadbed |
-
2000
- 2000-07-17 JP JP2000216225A patent/JP4365514B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2002030647A (en) | 2002-01-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7850402B1 (en) | Cement-treated soil blocks with vegetative faces | |
KR20110070025A (en) | Ecological slope construction method and block for ecological slope | |
US8596928B1 (en) | Cement-treated soil blocks with vegetative faces | |
JP4365514B2 (en) | Drain material and vertical drain method | |
KR20010104773A (en) | VCPS : Process for Treating Weak Soil with Vibrated Crushed Stone Compaction Pile Reinforced with Sand | |
JP2743055B2 (en) | Liquefaction prevention method for sand ground | |
CN209508919U (en) | A kind of riverbank appearance silt system | |
KR20080014176A (en) | Environmental affinity reinforcement soil retaining wall using a earth pressure reduction type environmental affinity block, and the construction method of this | |
JP3939305B2 (en) | Slope greening method | |
JP5916432B2 (en) | Consolidation ground improvement method | |
JP3107132B2 (en) | Greening concrete and its forming method | |
CN205954647U (en) | Miniature stake professional equipment of real airborne water high frequency compaction | |
JPH1181293A (en) | Soft ground improving method | |
CN205917649U (en) | River bank slope protection structure | |
JP3498012B2 (en) | Civil engineering materials using tree-generated materials such as felled timber | |
JP3124144U (en) | Outdoor ground and court structure | |
JP5902337B2 (en) | Method for producing foamed hydrothermal solidified product using incinerated ash as the main raw material | |
KR100699410B1 (en) | Vertical drain method using wasted glass | |
FI126288B (en) | Procedure for building a sealing layer for a side tip | |
JP3588798B2 (en) | Construction method of wood chip pavement | |
JP2023102855A (en) | pile material | |
Clar et al. | Rethinking bioretention design concepts | |
SU1689513A1 (en) | Method for preparation of foundation base | |
JPH06116938A (en) | Construction method for strip footing | |
JP3409184B2 (en) | Outdoor ground and court structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070705 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070705 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090806 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090818 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090821 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120828 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150828 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |