JP4331016B2 - 地盤の透水異方性実測に基づいて遮水壁の深度を求める方法 - Google Patents
地盤の透水異方性実測に基づいて遮水壁の深度を求める方法 Download PDFInfo
- Publication number
- JP4331016B2 JP4331016B2 JP2004041180A JP2004041180A JP4331016B2 JP 4331016 B2 JP4331016 B2 JP 4331016B2 JP 2004041180 A JP2004041180 A JP 2004041180A JP 2004041180 A JP2004041180 A JP 2004041180A JP 4331016 B2 JP4331016 B2 JP 4331016B2
- Authority
- JP
- Japan
- Prior art keywords
- depth
- ground
- hydraulic conductivity
- impermeable wall
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Description
掘削する地盤領域の原位置地盤における透水係数を実測し、遮水壁の深度に対する周辺水位低下量予測値及び揚水量予測値を前記透水係数に基づいて算出し、周辺水位低下量予測値及び揚水量予測値が目標値以下となる遮水壁の深度を求める方法において、
掘削する地盤領域の原位置地盤における水平方向の透水係数及び鉛直方向の透水係数をそれぞれ実測し、遮水壁の深度に対する周辺水位低下量予測値及び揚水量予測値を前記水平方向の透水係数及び鉛直方向の透水係数に基づいて算出し、周辺水位低下量予測値及び揚水量予測値が目標値以下で、且つ次の施工費用検討式
先ずステップAで、水平方向の透水係数及び鉛直方向の透水係数を実測する。水平方向の透水係数の実測は、既往の実用されている各種の方法を実施して行うことができる。鉛直方向の透水係数の実測を「特開2003−321827号公報」に開示した発明の方法で実施する場合の概略的な手順を図2に示す。この発明の方法で鉛直方向の透水係数を実測するには、地盤の硬さを表すN値が10〜20である細砂層であることが望ましい(図3参照)。
先ず地盤にボーリング孔7を削孔し(図2A)、該ボーリング孔7にケーシングパイプ1を建込み(図2B)、内壁面にパッカー4を設けた中空管2を圧入する(図2C)。前記パッカー4を膨張させた後に、定常法に則り揚水ポンプ6で地下水を一定の揚水量で揚水し(図2D)、中空管2の上下に設置した圧力センサ3、3で水圧を計測し、前記揚水量および上下の圧力センサ3が計測した水圧に基づいて、鉛直方向の透水係数を求める。その後、前記中空管2を引き抜いて裸孔5を形成し(図2E)、ピエゾメータ法により水平方向の透水係数を求めることもできる(図2F)。
次にステップCで、遮水壁の深度を仮設定する。ステップBと同様、地盤の構成、自然地下水位及び掘削する地盤領域の平面積の関係から仮設定することができる。
なお、施工費用を算出するために必要となる各種パラメータは既に設定及び算出されている。
図6に示すグラフは、前記[数1]で算出した施工費用を基準コストで割った施工費用比と、前記施工費用の算出において代入した遮水壁の長さLとの関係を、従来の方法による場合(▲−▲線)と本発明の方法による場合(●−●線)とを比較させて示している。なお、基準コストは、従来の方法にて遮水壁長さLmax(本実施例では53m)とした場合の施工費用を採用した。
遮水壁の深度はステップD2及びステップD3で41m以上とされているので、41m以上ある最少施工費用比が選択される。図6では、本発明の方法を示す●−●線は遮水壁の深度が41m以上となるにつれ施工費用比が増しているので、この場合41mが最少施工費用比となる。したがって、遮水壁の深度は41mと決定される。従来の方法を示す▲−▲線の場合、41m以上で漸増し45mを超えると漸減しているので、結局遮水壁の深度が47m以上であって最少施工費用比となる遮水壁の深度は53mとなる。
このように本発明による方法を実施した場合、従来の方法と比べて遮水壁の深度は(53m−41m)=12mも短縮される。よって工期及び工費さらには施工に伴う産業廃棄物が大幅に削減できる。本実施例で示した図6は、施工費用比として表しているが、施工費用として表しても良いことは言うまでもない。
Claims (1)
- 掘削する地盤領域の原位置地盤における透水係数を実測し、遮水壁の深度に対する周辺水位低下量予測値及び揚水量予測値を前記透水係数に基づいて算出し、周辺水位低下量予測値及び揚水量予測値が目標値以下となる遮水壁の深度を求める方法において、
掘削する地盤領域の原位置地盤における水平方向の透水係数及び鉛直方向の透水係数をそれぞれ実測し、遮水壁の深度に対する周辺水位低下量予測値及び揚水量予測値を前記水平方向の透水係数及び鉛直方向の透水係数に基づいて算出し、周辺水位低下量予測値及び揚水量予測値が目標値以下で、且つ次の施工費用検討式
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004041180A JP4331016B2 (ja) | 2004-02-18 | 2004-02-18 | 地盤の透水異方性実測に基づいて遮水壁の深度を求める方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004041180A JP4331016B2 (ja) | 2004-02-18 | 2004-02-18 | 地盤の透水異方性実測に基づいて遮水壁の深度を求める方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005232737A JP2005232737A (ja) | 2005-09-02 |
JP4331016B2 true JP4331016B2 (ja) | 2009-09-16 |
Family
ID=35015978
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2004041180A Expired - Fee Related JP4331016B2 (ja) | 2004-02-18 | 2004-02-18 | 地盤の透水異方性実測に基づいて遮水壁の深度を求める方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4331016B2 (ja) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104615820A (zh) * | 2015-01-29 | 2015-05-13 | 南京南瑞集团公司 | 土石坝渗流量监测及计算的流场分析法 |
JP6961525B2 (ja) * | 2018-03-29 | 2021-11-05 | 鹿島建設株式会社 | 地盤の透水性を評価する方法 |
KR102008715B1 (ko) * | 2019-04-22 | 2019-10-21 | 주식회사 지오그린21 | 회복시험 결과 해석 방법 및 그 시스템 |
-
2004
- 2004-02-18 JP JP2004041180A patent/JP4331016B2/ja not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2005232737A (ja) | 2005-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wu et al. | Semi-analytical solution to pumping test data with barrier, wellbore storage, and partial penetration effects | |
JP2005258569A (ja) | Rc製地中内中空構造物の強度評価方法 | |
Parsa-Pajouh et al. | Analyzing consolidation data to predict smear zone characteristics induced by vertical drain installation for soft soil improvement | |
Maher et al. | General deformation behavior of deep excavation support systems: A review | |
Lam et al. | Field trial of a membraneless vacuum preloading system for soft soil improvement | |
Bergado et al. | Vacuum-PVD improvement: a case study of the second improvement of soft Bangkok clay on the subsiding ground | |
Paik et al. | Calculation of the axial bearing capacity of tapered bored piles | |
KR101987247B1 (ko) | 지하수위 변동에 따른 지반침하량 평가 방법 및 그 시스템 | |
JP4771173B2 (ja) | 掘削地盤におけるリバウンド量の推定方法および地盤掘削方法 | |
JP4331016B2 (ja) | 地盤の透水異方性実測に基づいて遮水壁の深度を求める方法 | |
CN112177061B (zh) | 复杂地质构造下的微观水平变形监测系统与方法 | |
Pellet et al. | The effect of water seepage forces on the face stability of an experimental microtunnel | |
Arulrajah et al. | Instrumentation at Changi land reclamation project, Singapore | |
JP3690467B2 (ja) | 地盤定数の推定方法 | |
Tschuchnigg et al. | Study of a complex deep foundation system using 3D finite element analysis | |
JP6365979B2 (ja) | 地盤の液状化防止方法 | |
Fantaziu et al. | Study Achievement of Deep Excavations from the Point of View of Their Effects on Surrounding Existing Buildings | |
Chu et al. | Prefabricated vertical drains | |
Lin et al. | Time‐dependent displacement of diaphragm wall induced by soil creep | |
Ganesharatnam et al. | Large-diameter piles in chalk–part 2, design and construction | |
Fellenius et al. | Combination of O-cell test and conventional head-down test | |
Mokwa et al. | A case study on construction dewatering-induced settlement damage: Could This Have Been Avoided? | |
CN115795978B (zh) | 考虑多种影响因子的基坑开挖导致既有隧道上浮的预测方法 | |
Halcomb et al. | Surcharge embankment on marine clayey silt case study and lessons learned | |
Szepesházi et al. | Numerical back-analysis of a monitored deep excavation in Budapest considering time dependency of wall deformations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20061227 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20081119 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20081209 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090205 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090609 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090617 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4331016 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120626 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120626 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130626 Year of fee payment: 4 |
|
LAPS | Cancellation because of no payment of annual fees |