JP4327559B2 - Fuel filling method - Google Patents
Fuel filling method Download PDFInfo
- Publication number
- JP4327559B2 JP4327559B2 JP2003373089A JP2003373089A JP4327559B2 JP 4327559 B2 JP4327559 B2 JP 4327559B2 JP 2003373089 A JP2003373089 A JP 2003373089A JP 2003373089 A JP2003373089 A JP 2003373089A JP 4327559 B2 JP4327559 B2 JP 4327559B2
- Authority
- JP
- Japan
- Prior art keywords
- filling
- pressure
- time
- hydrogen gas
- fuel tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000446 fuel Substances 0.000 title claims description 55
- 238000000034 method Methods 0.000 title claims description 55
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 claims description 149
- 239000002828 fuel tank Substances 0.000 claims description 98
- 239000001257 hydrogen Substances 0.000 description 11
- 229910052739 hydrogen Inorganic materials 0.000 description 11
- 230000000694 effects Effects 0.000 description 9
- 239000007789 gas Substances 0.000 description 6
- 230000001105 regulatory effect Effects 0.000 description 5
- 238000005259 measurement Methods 0.000 description 4
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005429 filling process Methods 0.000 description 1
- 239000003502 gasoline Substances 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 239000003507 refrigerant Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 239000013585 weight reducing agent Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/30—Hydrogen technology
- Y02E60/32—Hydrogen storage
Landscapes
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
- Cooling, Air Intake And Gas Exhaust, And Fuel Tank Arrangements In Propulsion Units (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Description
本発明は、水素ガスを燃料とする水素ガス自動車の燃料タンクに、水素ガスを充てんする燃料充てん方法に関する。 The present invention relates to a fuel filling method for filling hydrogen gas into a fuel tank of a hydrogen gas vehicle using hydrogen gas as fuel.
次世代の自動車として、水素ガスを燃料として用いる水素自動車の開発が進められている。水素自動車は、炭酸ガス、NOx、SOx等の排出量が少ないという特長がある。
水素自動車は、燃料補給時には通常のガソリン自動車と同様に、水素ガスを充てんする燃料充てん装置(ディスペンサー)を備えた供給基地まで走行し、この燃料充てん装置で水素ガスを補給する。
水素自動車に搭載された燃料タンクとしては、通常、軽量化のためにFRP容器が使用されている。FRP容器は、耐久性を考慮して使用温度の上限値が規定されている。
Development of a hydrogen vehicle using hydrogen gas as a fuel is in progress as a next-generation vehicle. Hydrogen automobiles are characterized by low emissions of carbon dioxide, NOx, SOx, and the like.
The hydrogen vehicle travels to a supply base equipped with a fuel filling device (dispenser) for filling hydrogen gas, and replenishes the hydrogen gas with this fuel filling device in the same manner as a normal gasoline vehicle.
As a fuel tank mounted on a hydrogen vehicle, an FRP container is usually used for weight reduction. In the FRP container, the upper limit of the use temperature is defined in consideration of durability.
水素ガスは、一般のガスと異なり、断熱膨張させると、ジュールトムソン効果により温度が上昇する性質を有するガスである。そのため、水素ガスは、弁などの機器などを通過する際に温度が上昇しやすい。
水素ガスを燃料タンクに充てんする際には、ジュールトムソン効果による温度上昇に加え、充てんに伴う断熱圧縮による温度上昇も起きることから、ガス温度が高くなりやすい。
特に、FRPからなる燃料タンクを用いる場合には、使用温度に上限があるため、水素ガスの充てんを行うに際しては厳重な温度管理が要求される。
Unlike general gases, hydrogen gas is a gas that has the property of increasing in temperature due to the Joule-Thompson effect when adiabatically expanded. Therefore, the temperature of hydrogen gas tends to rise when it passes through devices such as valves.
When hydrogen gas is filled into the fuel tank, the temperature rises due to adiabatic compression accompanying filling in addition to the temperature rise due to the Joule-Thompson effect, so the gas temperature tends to increase.
In particular, when a fuel tank made of FRP is used, since there is an upper limit to the operating temperature, strict temperature control is required when charging hydrogen gas.
そのため、水素自動車では、水素ガスの供給流量が過剰となるのを防ぎ、燃料タンクの温度を設計温度以下に抑えることを目的として、充てん終了までの時間(充てん時間)を定めて充てんを行う方法がとられることがある。
燃料タンク容量や、燃料タンク内の水素ガス残留量が異なる場合には、水素ガス供給流量が一定である場合でも充てん時の燃料タンク内の温度が異なるため、水素自動車の大きさ(燃料タンクの大きさ)などに応じて充てん時間を設定することが行われている。
また、燃料タンク内の圧力が充てん終了圧力に達した後、所定時間放置して燃料タンク温度を低下させ、温度低下に伴う圧力低下に応じた量の水素ガスを再充てんする方法がとられることもある。
なお、本出願人が知る範囲で、本出願人によって既になされた特許出願等において開示された文献公知発明のうち、本出願に関連するものはない。
For this reason, in hydrogen automobiles, a method of filling with a predetermined time (filling time) until the end of filling in order to prevent the hydrogen gas supply flow rate from becoming excessive and to keep the fuel tank temperature below the design temperature. May be taken.
When the fuel tank capacity and the amount of hydrogen gas remaining in the fuel tank are different, the temperature of the fuel tank at the time of filling differs even when the hydrogen gas supply flow rate is constant. The filling time is set according to the size).
In addition, after the pressure in the fuel tank reaches the filling end pressure, the fuel tank temperature is lowered for a predetermined period of time, and a method of refilling with hydrogen gas corresponding to the pressure drop accompanying the temperature drop is taken. There is also.
In addition, as far as the applicant knows, none of the literature known inventions disclosed in patent applications already made by the applicant is related to the application.
しかしながら、上記燃料充てん方法では、水素自動車の大きさ(燃料タンクの大きさ)などに応じて充てん時間を設定することが必要となるため、操作が煩雑となり、充てん作業の効率低下を招いていた。また、水素ガスの再充てんを行う方法においても、操作が煩雑であるため充てん効率が低下する問題があった。
本発明は、上記事情を考慮してなされたもので、燃料タンク内の温度を低く抑えることができ、かつ効率よく燃料充てんを行うことができる方法を提供することを目的とする。
However, in the above fuel filling method, it is necessary to set the filling time according to the size of the hydrogen vehicle (the size of the fuel tank), etc., so that the operation becomes complicated and the efficiency of filling work is reduced. . Further, in the method of refilling with hydrogen gas, there is a problem that the filling efficiency is lowered because the operation is complicated.
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method capable of keeping the temperature in the fuel tank low and performing fuel filling efficiently.
かかる課題を解決するため、
請求項1にかかる発明は、水素ガスを燃料とする水素ガス自動車(12)の燃料タンク(13)に、水素ガスを充てんする燃料充てん方法であって、
充てん開始から終了までの総充てん時間である充てん終了時(G)と、燃料タンクの充てん終了圧力(F)とを設定しておき、次に示す工程を含むことを特徴とする燃料充てん方法である。
(1)水素ガスを、予め設定した仮充てん流量(A)で基準時(B)から所定時間経過時(D)まで燃料タンクに供給し、基準時(B)から所定時間経過時(D)までの圧力上昇率である基準圧力上昇率(H)を以下の通りに算出する。
所定時間経過時(D)における燃料タンク内の水素ガス圧力(E)と基準時(B)における燃料タンク内の水素ガス圧力(C)との圧力差を、所定時間経過時(D)から基準時(B)を差し引いた時間で除す。
(2)この所定時間経過時(D)から充てん終了時(G)までの間に、燃料タンク内の圧力を充てん終了圧力(F)まで上昇させるための必要圧力上昇率(J)を算出する。
(3)この必要圧力上昇率(J)に対する比率が、前記基準圧力上昇率(H)に対する仮充てん流量(A)の比率に等しくなる必要充てん流量(K)を算出する。
(4)水素ガスを、この必要充てん流量(K)で、水素ガス圧力が充てん終了圧力(F)に達するまで燃料タンクに充てんする。
請求項2にかかる発明は、前記基準時(B)は、充てん開始から一定時間経過した時点であることを特徴とする請求項1に記載の燃料充てん方法である。 To solve this problem,
The invention according to
A fuel filling method characterized in that a filling end time (G) which is a total filling time from the start to the end of filling and a filling end pressure (F) of the fuel tank are set and the following steps are included. is there.
(1) Hydrogen gas is supplied to the fuel tank at a preset temporary filling flow rate (A) from a reference time (B) until a predetermined time has elapsed (D), and when a predetermined time has elapsed from the reference time (B) (D) The reference pressure increase rate (H) that is the pressure increase rate until is calculated as follows.
The pressure difference between the hydrogen gas pressure (E) in the fuel tank at the elapse of a predetermined time (D) and the hydrogen gas pressure (C) in the fuel tank at the reference time (B) is referred to from the time (D) at the elapse of the predetermined time. Divide the time by subtracting time (B).
(2) Calculate the necessary pressure increase rate (J) for increasing the pressure in the fuel tank to the filling end pressure (F) from the time (D) until the end of filling (G). .
(3) A required filling flow rate (K) in which the ratio to the required pressure increase rate (J) is equal to the ratio of the temporary charging flow rate (A) to the reference pressure increase rate (H) is calculated.
(4) Fill the fuel tank with hydrogen gas at the required filling flow rate (K) until the hydrogen gas pressure reaches the filling end pressure (F).
The invention according to
請求項3にかかる発明は、水素ガスを燃料とする水素ガス自動車(12)の燃料タンク(13)に、水素ガスを充てんする燃料充てん方法であって、The invention according to
充てん開始から終了までの総充てん時間である充てん終了時(G)と、燃料タンクの充てん終了圧力(F)とを設定しておき、次に示す工程を含むとともに、下記工程(4)〜(6)を1回または2回以上含むことを特徴とする燃料充てん方法である。 The filling end time (G), which is the total filling time from the start to the end of filling, and the filling end pressure (F) of the fuel tank are set, and the following steps (4) to ( 6) is a fuel filling method characterized by including one or more times.
(1)水素ガスを、予め設定した仮充てん流量(A)で基準時(B)から所定時間経過時(D)まで燃料タンクに供給し、基準時(B)から所定時間経過時(D)までの圧力上昇率である基準圧力上昇率(H)を以下の通りに算出する。(1) Hydrogen gas is supplied to the fuel tank at a preset temporary filling flow rate (A) from a reference time (B) until a predetermined time has elapsed (D), and when a predetermined time has elapsed from the reference time (B) (D) The reference pressure increase rate (H) that is the pressure increase rate until is calculated as follows.
所定時間経過時(D)における燃料タンク内の水素ガス圧力(E)と基準時(B)における燃料タンク内の水素ガス圧力(C)との圧力差を、所定時間経過時(D)から基準時(B)を差し引いた時間で除す。 The pressure difference between the hydrogen gas pressure (E) in the fuel tank at the elapse of a predetermined time (D) and the hydrogen gas pressure (C) in the fuel tank at the reference time (B) is referred to from the time (D) at the elapse of the predetermined time. Divide the time by subtracting time (B).
(2)この所定時間経過時(D)から充てん終了時(G)までの間に、燃料タンク内の圧力を充てん終了圧力(F)まで上昇させるための必要圧力上昇率(J)を算出する。(2) Calculate the necessary pressure increase rate (J) for increasing the pressure in the fuel tank to the filling end pressure (F) from the time (D) until the end of filling (G). .
(3)この必要圧力上昇率(J)に対する比率が、前記基準圧力上昇率(H)に対する仮充てん流量(A)の比率に等しくなる必要充てん流量(K)を算出する。(3) A required filling flow rate (K) in which the ratio to the required pressure increase rate (J) is equal to the ratio of the temporary charging flow rate (A) to the reference pressure increase rate (H) is calculated.
(4)水素ガスを前記必要充てん流量(K)で所定時間経過時(D)と同一時刻である第2基準時(B’)から第2所定時間経過時(D’)まで燃料タンクに供給し、第2基準時(B’)から第2所定時間経過時(D’)までの圧力上昇率である第2基準圧力上昇率(H’)を以下の通りに算出する。(4) Hydrogen gas is supplied to the fuel tank from the second reference time (B ′), which is the same time as when the predetermined time has elapsed (D), until the second predetermined time has elapsed (D ′), at the required filling flow rate (K). Then, the second reference pressure increase rate (H ′), which is the pressure increase rate from the second reference time (B ′) to the second predetermined time (D ′), is calculated as follows.
第2所定時間経過時(D’)における燃料タンク内の水素ガス圧力(E’)と第2基準時(B’)における燃料タンク内の水素ガス圧力(E)との圧力差を、第2所定時間経過時(D’)から第2基準時(B’)を差し引いた時間で除す。 The pressure difference between the hydrogen gas pressure (E ′) in the fuel tank at the second predetermined time (D ′) and the hydrogen gas pressure (E) in the fuel tank at the second reference time (B ′) Divide by the time obtained by subtracting the second reference time (B ′) from the time (D ′) when the predetermined time has elapsed.
(5)第2所定時間経過時(D’)から充てん終了時(G)までの間に、燃料タンク内の圧力を充てん終了圧力(F)まで上昇させるための第2必要圧力上昇率(J’)を算出する。(5) Second required pressure increase rate (J) for increasing the pressure in the fuel tank to the filling end pressure (F) from the time when the second predetermined time elapses (D ′) to the time when filling ends (G) ') Is calculated.
(6)この第2必要圧力上昇率(J’)に対する比率が、第2基準圧力上昇率(H’)に対する前記必要充てん流量(K)の比率に等しくなる第2必要充てん流量(K’)を算出する。(6) Second required filling flow rate (K ′) in which the ratio to the second required pressure increase rate (J ′) is equal to the ratio of the required filling flow rate (K) to the second reference pressure increase rate (H ′). Is calculated.
(7)水素ガスを、この第2必要充てん流量(K’)で、水素ガス圧力が充てん終了圧力(F)に達するまで燃料タンクに充てんする。(7) The fuel tank is filled with hydrogen gas at the second required filling flow rate (K ′) until the hydrogen gas pressure reaches the filling end pressure (F).
請求項4にかかる発明は、請求項1に記載の燃料充てん方法において、前記工程(4)に代えて、次に示す工程(8)を含むことを特徴とする燃料充てん方法である。The invention according to
(8)この必要充てん流量(K)が、予め設定した設定範囲の下限値以上である場合に、水素ガスを、この必要充てん流量(K)で、水素ガス圧力が充てん終了圧力(F)に達するまで燃料タンクに充てんし、(8) When the required filling flow rate (K) is equal to or greater than the lower limit value of the preset setting range, the hydrogen gas is changed to the filling end pressure (F) at the necessary filling flow rate (K). Fill the fuel tank until it reaches,
前記必要充てん流量(K)が前記下限値未満である場合に、水素ガスを、この下限値以上の充てん流量で、水素ガス圧力が充てん終了圧力(F)に達するまで燃料タンクに充てんする。 When the required filling flow rate (K) is less than the lower limit value, hydrogen gas is filled into the fuel tank at a filling flow rate equal to or higher than the lower limit value until the hydrogen gas pressure reaches the filling end pressure (F).
請求項5にかかる発明は、水素ガスを燃料とする水素ガス自動車(12)の燃料タンク(13)に、水素ガスを充てんする燃料充てん方法であって、次に示す工程を含むことを特徴とする燃料充てん方法である。 The invention according to
(1)基準時(tn)において、燃料タンクの実際の圧力(Pn)と、充てんの際に温度変化がないと仮定して算出された燃料タンクの仮想圧力(Pn’)との圧力差(ΔPn)を算出する。(1) The pressure difference between the actual fuel tank pressure (Pn) at the reference time (tn) and the virtual fuel tank pressure (Pn ′) calculated on the assumption that there is no temperature change during filling ( ΔPn) is calculated.
(2)基準時(tn)から所定時間経過した時点(tn+1)において、燃料タンクの実際の圧力(Pn+1)と、充てんの際に温度変化がないと仮定して算出された燃料タンクの仮想圧力(Pn+1’)との圧力差(ΔPn+1)を算出する。(2) The actual pressure (Pn + 1) of the fuel tank at the time (tn + 1) when a predetermined time has elapsed from the reference time (tn), and the virtual pressure of the fuel tank calculated on the assumption that there is no temperature change during filling The pressure difference (ΔPn + 1) from (Pn + 1 ′) is calculated.
(3)所定時間経過時(tn+1)における圧力差(ΔPn+1)が、基準時(tn)における圧力差(ΔPn)よりも小さい場合には水素ガス供給流量を維持または高め、(3) When the pressure difference (ΔPn + 1) at the elapse of a predetermined time (tn + 1) is smaller than the pressure difference (ΔPn) at the reference time (tn), the hydrogen gas supply flow rate is maintained or increased,
かつ所定時間経過時(tn+1)における圧力差(ΔPn+1)が、基準時(tn)における圧力差(ΔPn)に比べ同等または大きい場合には水素ガス供給流量を小さくする。When the pressure difference (ΔPn + 1) at the elapse of a predetermined time (tn + 1) is equal to or larger than the pressure difference (ΔPn) at the reference time (tn), the hydrogen gas supply flow rate is reduced.
本発明の燃料充てん方法では、仮充てん流量で水素ガスを供給したときの圧力上昇率に基づいて必要充てん流量を算出し、この必要充てん流量で充てん終了まで充てんを行うので、水素ガス供給流量を、充てん時間に応じた最適値である必要充てん流量に修正することができ、充てん効率を高めることができる。
また、仮充てん流量が大きすぎる場合には供給流量を低い値に修正することができるため、燃料タンク内の温度が高くなりすぎるのを防ぎ、安全性を高めることができる。
In the fuel filling method of the present invention, the required filling flow rate is calculated based on the pressure increase rate when hydrogen gas is supplied at the temporary filling flow rate, and the filling is performed until the filling is completed at this necessary filling flow rate. The required filling flow rate that is the optimum value according to the filling time can be corrected, and the filling efficiency can be increased.
Moreover, since the supply flow rate can be corrected to a low value when the temporary filling flow rate is too large, the temperature in the fuel tank can be prevented from becoming too high, and the safety can be improved.
基準時を、充てん開始から一定時間経過した時点とすることによって、非定常状態となる可能性がある充てん最初期を測定対象から外すことができる。
従って、水素ガス供給流量を精度よく最適化することができる。
By setting the reference time as a time when a certain time has elapsed from the start of filling, the initial filling stage that may be in an unsteady state can be excluded from the measurement target.
Therefore, the hydrogen gas supply flow rate can be optimized with high accuracy.
本発明の燃料充てん方法では、基準時における実圧力と仮想圧力との圧力差と、所定時間経過時における圧力差とを比較し、所定時間経過時の圧力差が基準時の圧力差よりも小さい場合には水素ガス供給流量を維持または高めるので、充てん効率を高めることができる。
また、所定時間経過時の圧力差が基準時の圧力差に比べ同等または大きい場合には水素ガス供給流量を小さくするので、過剰な温度上昇を防ぐことができる。
従って、安全性を犠牲にすることなく、充てん効率を高めることができる。
また、温度上昇要因の作用が大きい場合にはこれを抑制し、燃料タンクの温度を低く維持することができる。
従って、充てん終了後における温度低下に起因する燃料タンクの圧力低下を最小限に抑え、再充てんを不要とすることができる。このため、充てん作業を容易にし、充てん効率を高めることができる。
In the fuel filling method of the present invention, the pressure difference between the actual pressure and the virtual pressure at the reference time is compared with the pressure difference at the predetermined time, and the pressure difference at the predetermined time is smaller than the pressure difference at the reference time. In this case, since the hydrogen gas supply flow rate is maintained or increased, the charging efficiency can be increased.
In addition, when the pressure difference when the predetermined time elapses is equal to or larger than the pressure difference at the reference time, the hydrogen gas supply flow rate is reduced, so that an excessive temperature rise can be prevented.
Therefore, filling efficiency can be increased without sacrificing safety.
Further, when the effect of the temperature rise factor is large, this can be suppressed and the temperature of the fuel tank can be kept low.
Therefore, the pressure drop of the fuel tank due to the temperature drop after the completion of filling can be minimized, and refilling can be made unnecessary. For this reason, filling work can be facilitated and filling efficiency can be increased.
図2は、本発明の燃料充てん方法の第1の例を実施可能な燃料充てん装置を示すものである。
ここに示す燃料充てん装置1は、水素ガス貯留タンク2からの水素ガスを供給する供給経路3と、水素ガスの流量を検出し積算する積算流量計F1と、水素ガスの流量を調整する流量調整弁V1と、水素ガスの供給量を制御する制御手段5と、供給経路3に設けられた遮断弁V2と、水素ガスを冷却する熱交換器4とを備えている。
供給経路3には、流量調整弁V1の一次側(水素ガス流れ方向の上流側)および二次側(水素ガス流れ方向の下流側)に、それぞれ水素ガス温度を検出する第1および第2温度計6、7が設けられている。
供給経路3には、熱交換器4の二次側に、充てんされる水素ガスの温度を検出する充てんガス温度計8(温度検出手段)と、充てんされる水素ガスの圧力を検出する圧力計9(圧力検出手段)とが設けられている。
FIG. 2 shows a fuel filling apparatus capable of implementing the first example of the fuel filling method of the present invention.
The
The
In the
熱交換器4は、水素ガスを流通させる水素ガス流通管4aを備え、水素ガス流通管4a内の水素ガスを冷媒によって冷却することができるようになっている。
制御手段5は、流量計F1の検出値に基づいて流量調整弁V1の開度を調節することによって、水素ガス供給流量を制御することができるようになっている。
The
The control means 5 can control the hydrogen gas supply flow rate by adjusting the opening degree of the flow rate adjusting valve V1 based on the detected value of the flow meter F1.
供給経路3の端部には、水素ガスを水素自動車12に供給するフレキシブルホースなどの連絡管11の一端が接続されている。
連絡管11の他端は、水素自動車12の供給経路14に、カプラー(図示略)を介して接続することができるようになっている。
符号V3は、水素自動車12の供給経路14に設けられた逆止弁であり、燃料タンク13内の燃料が外部に漏出するのを防ぐようになっている。
One end of a connecting
The other end of the
Reference sign V3 is a check valve provided in the
以下、本発明の燃料充てん方法の第1の例を説明する。
図2に示すように、燃料充てんのため燃料充てん装置1を訪れた水素自動車12に、連絡管11を接続した後、遮断弁V2を開き、貯留タンク2からの水素ガスを供給経路3に導入する。水素ガスの供給流量は、流量調整弁V1によって適切な値に調整することができる。
水素ガスは、熱交換器4を経て、連絡管11、供給経路14を通して燃料タンク13に充てんされる。
Hereinafter, a first example of the fuel filling method of the present invention will be described.
As shown in FIG. 2, after connecting the connecting
The hydrogen gas passes through the
以下、水素ガスを燃料タンク13に充てんする操作の一例について詳しく説明する。
この燃料充てん方法では、以下に示す操作に先だって、充てん開始から終了までの総充てん時間である充てん終了時G(min)と、燃料タンクの充てん終了圧力F(MPa)とを設定しておく。この例では、充てん終了圧力F=35(MPa)、充てん終了時G=10(min)とする。
以下に示す操作では、圧力計9によって検出された燃料タンク13の水素ガス圧力や、流量計F1で検出された水素ガス流量に基づいて、制御手段5により流量調整弁V1の開度を調整することによって、水素ガスの流量制御が行われる。制御方法としては、PID制御を採用するのが好適である。
Hereinafter, an example of the operation of filling the
In this fuel filling method, prior to the operation shown below, a filling end time G (min), which is a total filling time from the filling start to the end, and a fuel tank filling end pressure F (MPa) are set. In this example, the filling end pressure F = 35 (MPa), and the filling end pressure G = 10 (min).
In the operation described below, the opening degree of the flow rate adjusting valve V1 is adjusted by the control means 5 based on the hydrogen gas pressure in the
(1)基準圧力上昇率の算出
図1に示すように、流量計F1の検出値に基づいて流量調整弁V1の開度を調整することによって、水素ガスを、予め設定した仮充てん流量A(g/min)で燃料タンクに供給する。この例では、A=450(g/min)とする。
次いで、制御手段5において、基準時B(充てん開始からB秒経過した時点)から所定時間経過時D(充てん開始からD秒経過した時点)までの圧力上昇率である基準圧力上昇率H(MPa/min)を算出する。
充てん最初期には、外乱により非定常状態となり測定値が乱れることがあるため、この最初期を測定対象から外すことが好ましい。このため、基準時B(sec)は、充てん開始から一定時間(例えば1秒以上)経過した時点であることが好ましい。
(1) Calculation of reference pressure increase rate As shown in FIG. 1, by adjusting the opening degree of the flow rate adjusting valve V1 based on the detected value of the flow meter F1, hydrogen gas is preliminarily charged with a preliminarily charged flow rate A ( g / min) to the fuel tank. In this example, A = 450 (g / min).
Next, in the control means 5, a reference pressure increase rate H (MPa) which is a pressure increase rate from a reference time B (when B seconds have elapsed from the start of filling) to a time D (when D seconds have elapsed from the start of filling) has elapsed. / Min).
In the initial stage of filling, the measurement value may be disturbed due to a disturbance due to disturbance, so it is preferable to remove this initial stage from the measurement target. For this reason, it is preferable that the reference time B (sec) is a time when a certain time (for example, 1 second or more) has elapsed since the start of filling.
基準圧力上昇率H(MPa/min)は次の式に従って算出することができる。
H=(E−C)/((D−B)/60)
この式において、基準圧力C(MPa)は、基準時B(sec)における燃料タンク13内の水素ガス圧力である。調整時圧力E(MPa)は、所定時間経過時D(sec)における燃料タンク13内の水素ガス圧力である。
基準圧力Cおよび調整時圧力Eは、圧力計9によって検出することができる。
この例では、基準時B=10(sec)、所定時間経過時D=40(sec)、基準圧力C=5(MPa)、調整時圧力E=6.3(MPa)とする。基準圧力上昇率Hは、2.6(MPa/min)となる。
The reference pressure increase rate H (MPa / min) can be calculated according to the following equation.
H = (E−C) / ((D−B) / 60)
In this equation, the reference pressure C (MPa) is the hydrogen gas pressure in the
The reference pressure C and the adjustment pressure E can be detected by the
In this example, reference time B = 10 (sec), elapse of a predetermined time D = 40 (sec), reference pressure C = 5 (MPa), and adjustment pressure E = 6.3 (MPa). The reference pressure increase rate H is 2.6 (MPa / min).
(2)必要圧力上昇率の算出
所定時間経過時D(sec)から充てん終了時G(min)までの間に、燃料タンク13内の水素ガス圧力を充てん終了圧力F(MPa)まで上昇させるのに必要な水素ガスの圧力上昇率である必要圧力上昇率J(MPa/min)を、次のようにして算出する。
まず、所定時間経過時D(sec)における調整時圧力E(MPa)から充てん終了圧力F(MPa)までの必要昇圧幅I(MPa)を求める。
I=F−E
次いで、次の式に従って、充てん終了時G(min)に必要昇圧幅I(MPa)を得るために必要な圧力上昇率である必要圧力上昇率J(MPa/min)を算出する。
J=I/(G×60−D)/60
この例では、必要圧力上昇率J=3.1(MPa/min)となる。
(2) Calculation of required pressure increase rate The hydrogen gas pressure in the
First, a required pressure increase width I (MPa) from an adjustment pressure E (MPa) to a filling end pressure F (MPa) at a predetermined time D (sec) is obtained.
I = FE
Next, a required pressure increase rate J (MPa / min), which is a pressure increase rate necessary to obtain the required pressure increase width I (MPa) at the end of filling G (min), is calculated according to the following equation.
J = I / (G × 60−D) / 60
In this example, the required pressure increase rate J = 3.1 (MPa / min).
(3)必要充てん流量の算出
この工程では、上記必要圧力上昇率J(MPa/min)を得るために必要な水素ガスの供給流量である必要充てん流量K(g/min)を、次の関係式を利用して算出する。
H:A=J:K
この関係式は、基準圧力上昇率Hと仮充てん流量Aとの比率が、必要圧力上昇率Jと必要充てん流量Kとの比率に等しいことを意味する。
この関係式が成立するという仮定に基づいて、必要充てん流量K(g/min)を、次の式に従って算出する。
K=A×J/H
必要充てん流量Kは、必要圧力上昇率Jに対する比率が、基準圧力上昇率Hに対する仮充てん流量Aの比率に等しい値となる。この例では、必要充てん流量K=532.2(g/min)となる。
(3) Calculation of required filling flow rate In this step, the required filling flow rate K (g / min), which is the supply flow rate of hydrogen gas necessary for obtaining the required pressure increase rate J (MPa / min), is expressed as follows. Calculate using the formula.
H: A = J: K
This relational expression means that the ratio between the reference pressure increase rate H and the temporary filling flow rate A is equal to the ratio between the required pressure increase rate J and the required filling flow rate K.
Based on the assumption that this relational expression holds, the required filling flow rate K (g / min) is calculated according to the following formula.
K = A × J / H
The required filling flow rate K is a value in which the ratio to the required pressure increase rate J is equal to the ratio of the temporary filling flow rate A to the reference pressure increase rate H. In this example, the required filling flow rate K = 532.2 (g / min).
(4)必要充てん流量での充てん
水素ガスを、上記必要充てん流量K(g/min)で、水素ガス圧力が充てん終了圧力F(MPa)に達するまで燃料タンク13に充てんする。
(4) Charging at the required filling flow rate Hydrogen gas is filled into the
この燃料充てん方法では、仮充てん流量Aで水素ガスを供給したときの圧力上昇率Hに基づいて必要充てん流量Kを算出し、この必要充てん流量K(g/min)で充てん終了まで充てんを行う。
この方法では、水素ガス供給流量を、充てん時間に応じた最適値である必要充てん流量K(g/min)に修正することができるため、充てん効率を高めることができる。
また、仮充てん流量Aが大きすぎる場合には供給流量を低い値に修正することができるため、燃料タンク13内の温度が高くなりすぎるのを防ぎ、安全性を高めることができる。
In this fuel filling method, the necessary filling flow rate K is calculated based on the pressure increase rate H when hydrogen gas is supplied at the temporary filling flow rate A, and filling is performed until the filling is completed at this necessary filling flow rate K (g / min). .
In this method, since the hydrogen gas supply flow rate can be corrected to the required filling flow rate K (g / min) that is an optimum value according to the filling time, the filling efficiency can be increased.
Moreover, since the supply flow rate can be corrected to a low value when the temporary filling flow rate A is too large, it is possible to prevent the temperature in the
また、基準時Bを、充てん開始から一定時間経過した時点とすることによって、非定常状態となる可能性がある充てん最初期を測定対象から外すことができる。
従って、水素ガス供給流量を精度よく最適化することができる。
In addition, by setting the reference time B as a time when a certain time has elapsed from the start of filling, the initial filling stage that may be in an unsteady state can be excluded from the measurement target.
Therefore, the hydrogen gas supply flow rate can be optimized with high accuracy.
次に、図3を参照して、本発明の燃料充てん方法の第2の例を説明する。
この方法では、上記工程(3)の次に、以下の工程(4)〜(7)を実施する。
(4)水素ガスを、必要充てん流量Kで燃料タンク13に供給し、第2基準時B’から第2所定時間経過時D’までの圧力上昇率である第2基準圧力上昇率H’を算出する。
第2基準圧力上昇率H’は、上記工程(1)と同様にして算出することができる。
図3に示す例では、図1に示す例における所定時間経過時Dを第2基準時B’とする。
Next, a second example of the fuel filling method of the present invention will be described with reference to FIG.
In this method , the following steps (4) to (7) are performed after the step (3).
( 4 ) Hydrogen gas is supplied to the
The second reference pressure increase rate H ′ can be calculated in the same manner as in the above step (1).
In the example shown in FIG. 3, the time D when the predetermined time elapses in the example shown in FIG. 1 is set as the second reference time B ′.
(5)第2所定時間経過時D’から充てん終了時Gまでの間に、燃料タンク内の水素ガス圧力を充てん終了圧力Fまで上昇させるのに必要な水素ガスの圧力上昇率である第2必要圧力上昇率J’を算出する。
第2必要圧力上昇率J’は、上記工程(2)と同様にして算出することができる。
( 5 ) The second increase rate of the hydrogen gas required to increase the hydrogen gas pressure in the fuel tank to the filling end pressure F between the second predetermined time D 'and the filling end time G. The required pressure increase rate J ′ is calculated.
The second necessary pressure increase rate J ′ can be calculated in the same manner as in the above step (2).
(6)この第2必要圧力上昇率J’に対する比率が、第2基準圧力上昇率H’に対する上記必要充てん流量Kの比率に等しくなる第2必要充てん流量K’を算出する。
第2必要充てん流量K’は、上記工程(3)と同様にして算出することができる。
( 6 ) The second required filling flow rate K ′ is calculated such that the ratio to the second required pressure increase rate J ′ is equal to the ratio of the required filling flow rate K to the second reference pressure increase rate H ′.
The second necessary filling flow rate K ′ can be calculated in the same manner as in the step (3).
上記工程(6)に続いて、工程(7)として、水素ガスを上記第2必要充てん流量K’で、水素ガス圧力が充てん終了圧力F(MPa)に達するまで燃料タンク13に充てんする操作を行う。
なお、この例の方法では、工程(4)〜(6)を2回以上行うこともできる。
Subsequent to the step ( 6 ), as the step (7), an operation of filling the
In the method of this example, steps (4) to (6) can be performed twice or more.
この方法によれば、工程(5)〜(7)を含むので、水素ガスの供給過程において、水素ガス供給流量の修正を複数回行うことになる。
このため、外気温の変化などの想定外の要因により、必要充てん流量Kが過小または過大となった場合でも、これを最適な値である第2必要充てん流量K’に修正することができる。
従って、水素ガス供給流量を精度よく最適な値に設定し、充てん効率を高めるとともに、燃料タンク13内の温度が高くなりすぎるのを確実に防ぎ、安全性を高めることができる。
According to this method, since steps (5) to (7) are included, the hydrogen gas supply flow rate is corrected a plurality of times in the hydrogen gas supply process.
For this reason, even when the required filling flow rate K becomes excessively low or excessive due to an unexpected factor such as a change in the outside air temperature, it can be corrected to the second required charging flow rate K ′ which is an optimum value.
Accordingly, the hydrogen gas supply flow rate can be accurately set to an optimal value, the charging efficiency can be increased, the temperature in the
次に、本発明の燃料充てん方法の第3の例を説明する。
上記方法では、必要充てん流量Kは、燃料タンク13の内圧が、充てん終了時Gに充てん終了圧力Fに達することを想定して設定される。
このため、所定時間経過時Dにおける調整時圧力Eが高い値である場合には、必要昇圧幅Iが小さくなり、必要充てん流量Kは非常に低い値、すなわち必要以上に安全性の高い値となることがある。このような場合には、充てん流量を必要充てん流量Kよりも高い値に設定することも可能である。
すなわち、本発明では、工程(4)に代えて、次に示す工程(8)を行うことができる。
(8)必要充てん流量Kが、予め設定した設定範囲の下限値以上である場合には、水素ガスを、この必要充てん流量Kで充てん終了圧力Fに達するまで燃料タンク13に充てんする。
必要充てん流量Kが前記下限値未満である場合には、水素ガスを、この下限値以上の充てん流量で充てん終了圧力Fに達するまで燃料タンク13に充てんする。
必要充てん流量Kが前記下限値未満である場合の充てん流量は、仮充てん流量A以上に設定するのが好ましい。
Next, a third example of the fuel filling method of the present invention will be described.
In the above method, the necessary filling flow rate K is set on the assumption that the internal pressure of the
For this reason, when the adjustment pressure E at a predetermined time D is a high value, the required pressure increase width I becomes small, and the required filling flow rate K is a very low value, that is, a value that is safer than necessary. May be. In such a case, the filling flow rate can be set to a value higher than the necessary filling flow rate K.
That is, in this invention, it can replace with process (4) and can perform the following process (8).
(8) When the required filling flow rate K is equal to or higher than the lower limit value of the preset setting range, the
When the necessary filling flow rate K is less than the lower limit value, hydrogen gas is filled into the
When the required filling flow rate K is less than the lower limit value, the filling flow rate is preferably set to be equal to or higher than the temporary filling flow rate A.
以下、図1および図4を参照して具体例を示す。
図1に示すように、必要充てん流量Kが仮充てん流量A以上の範囲にある場合には、水素ガスを、必要充てん流量Kで充てん終了圧力Fに達するまで燃料タンク13に充てんする。
図4に示すように、必要充てん流量Kが仮充てん流量A未満である場合には、水素ガスを、仮充てん流量Aで充てん終了圧力Fに達するまで燃料タンク13に充てんする。
この方法によれば、必要充てん流量Kが仮充てん流量A未満である場合に、充てん効率が低下するのを防ぐことができる。
Hereinafter, a specific example is shown with reference to FIG. 1 and FIG.
As shown in FIG. 1, when the required filling flow rate K is in the range of the temporary filling flow rate A or more, hydrogen gas is filled in the
As shown in FIG. 4, when the required filling flow rate K is less than the temporary filling flow rate A, hydrogen gas is filled into the
According to this method, when the necessary filling flow rate K is less than the temporary filling flow rate A, it is possible to prevent the filling efficiency from being lowered.
この方法では、水素ガス温度が過度に高くなるのを防ぐため、前記設定範囲には上限値を設定するのが好ましい。
すなわち、必要充てん流量Kが前記上限値を越えた場合には、水素ガスを、この上限値以下の充てん流量で、充てん終了圧力Fまで燃料タンク13に充てんすることができる。
この方法によれば、燃料タンク13内の温度が過度に上昇するのを防ぎ、安全性を高めることができる。
In this method, in order to prevent the hydrogen gas temperature from becoming excessively high, it is preferable to set an upper limit value in the setting range.
That is, when the required filling flow rate K exceeds the upper limit value, hydrogen gas can be filled in the
According to this method, it is possible to prevent the temperature in the
次に、本発明の燃料充てん方法の第4の例を説明する。
図5に示すように、燃料充てん装置1を用いて、燃料タンク13内の圧力Pが調整時圧力PAに達するまで水素ガスを燃料タンク13に充填する(ステップS1)。
圧力PAは、充てん終了圧力に近い値に設定するのが好ましい。例えば、充てん終了圧力が35MPaであるときには、調整時圧力PAを30MPaとすることができる。
燃料タンク13内の圧力Pは、逆止弁V3があるため直接測定はできないが、水素ガス供給開始当初において積算流量計F1で検出された水素ガス供給流量と、圧力計9で検出された水素ガス圧力とに基づいて算出することができる。
以下、圧力計9による検出値から得られた燃料タンク13内の実際の圧力を、実圧力ということがある。
Next, a fourth example of the fuel filling method of the present invention will be described.
As shown in FIG. 5, using the
The pressure P A is preferably set to a value close to the filling completion pressure. For example, when the filling completion pressure is 35MPa, the adjustment time of the pressure P A may be 30 MPa.
Although the pressure P in the
Hereinafter, the actual pressure in the
(1)基準時における実圧力と仮想圧力との差を算出
図5および図6(a)に示すように、実圧力Pが調整時圧力PA(例えば30MPa)に達した時間t(充てん開始からの経過時間)を基準時であるtnとし、このときの実圧力Pを実圧力Pnとする(ステップS2)。
この時点で、制御手段5により流量調整弁V1の開度を0%にする(ステップS3)。
なお、流量調整弁V1の開度は、最大であるときを100%とし、閉状態を0%とする。
(1) the difference between the actual pressure and the virtual pressure as shown in the calculation diagram 5 and FIGS. 6 (a) at the reference time, the actual pressure P is adjusted at the pressure P A (e.g. 30 MPa) reached the time t (filling start the elapsed time) from the t n is the time reference, to the actual pressure P at this time the actual pressure P n (step S2).
At this time, the opening degree of the flow rate adjusting valve V1 is set to 0% by the control means 5 (step S3).
The opening of the flow rate adjusting valve V1 is 100% when it is the maximum, and 0% when it is closed.
この燃料充てん方法では、制御手段5において、燃料タンク13内の温度変化を考慮せず、積算流量計F1によって算出された水素ガス流量の積算値と燃料タンク13の容量のみに基づいて、時間tnにおける燃料タンク13の圧力である仮想圧力Pn’を算出する。燃料タンク13の容量は、水素ガス供給流量と、燃料タンク13の圧力変化とに基づいて定めることができる。例えば、上述の第1の例に示すように、仮充てん流量A、基準圧力C、および調整時圧力Eに基づいて定めることができる。
仮想圧力Pn’は、水素ガス流量の積算値(実際に充てんされた水素ガス量)とタンク容量のみに基づいて算出されたものであるため、充てんされた水素ガス量に比例する値となる。
この仮想圧力Pn’は、充てんの際に温度変化がないと仮定した場合の圧力に相当し、通常は、実圧力Pnよりも低い値となる。
これに対し、実圧力Pは、ガス充てんに伴う圧力上昇およびジュールトムソン効果による温度上昇のため、通常、充てんされた水素ガス量に比例する値にはならない。
次の式に基づいて、実圧力Pnと仮想圧力Pn’との差である圧力差ΔP(ΔPn)を算出する。
ΔPn=Pn−Pn’
この圧力差ΔPnは、充てん時の温度上昇が大きいほど大きな値となる。
In this fuel filling method, the control means 5 does not consider the temperature change in the
The virtual pressure P n ′ is calculated based only on the integrated value of the hydrogen gas flow rate (actually filled hydrogen gas amount) and the tank capacity, and is therefore a value proportional to the filled hydrogen gas amount. .
This virtual pressure P n ′ corresponds to a pressure when it is assumed that there is no temperature change during filling, and is usually a value lower than the actual pressure P n .
On the other hand, the actual pressure P does not normally have a value proportional to the amount of hydrogen gas charged because of the pressure increase associated with gas filling and the temperature rise due to the Joule-Thompson effect.
Based on the following equation, a pressure difference ΔP (ΔP n ) that is a difference between the actual pressure P n and the virtual pressure P n ′ is calculated.
ΔP n = P n −P n ′
This pressure difference ΔP n becomes larger as the temperature rise during filling is larger.
(2)所定時間経過時における実圧力と仮想圧力との差を算出
次いで、時間tnから所定時間(例えば1分間)経過した時点である時間tn+1において実圧力Pを測定し、これを実圧力Pn+1とする(ステップS4)。
このときの仮想圧力をPn+1’とする。
次いで、次の式に基づいて、実圧力Pn+1と仮想圧力Pn+1’との差である圧力差ΔP(ΔPn+1)を算出する(ステップS5)。
ΔPn+1=Pn+1−Pn+1’
(2) calculating a difference between the actual pressure and the virtual pressure when a predetermined time has elapsed then measured the actual pressure P at time t n + 1 is the time at which a predetermined time has elapsed from the time t n (for example, one minute), this actual The pressure is set to P n + 1 (step S4).
The virtual pressure at this time is defined as P n + 1 ′.
Next, a pressure difference ΔP (ΔP n + 1 ), which is a difference between the actual pressure P n + 1 and the virtual pressure P n + 1 ′, is calculated based on the following equation (step S5).
ΔP n + 1 = P n + 1 −P n + 1 ′
(3)基準時と所定時間経過時との圧力差を比較
この燃料充てん方法では、圧力差ΔPnと圧力差ΔPn+1とを比較し、次の式(a)が成立する場合には、流量調整弁V1の開度を大きくする(ステップS6、S7)。
ΔPn>ΔPn+1 ・・・(a)
流量調整弁V1の開度を大きくする際には、時間tnにおける流量調整弁V1の開度に対し、流量調整弁V1の開度を所定値(例えば1%)大きくする方法をとることができる。
流量調整弁V1の開度を大きくすることによって、水素ガス供給流量が増加し、充てん効率が高められる。
(3) Comparing the pressure difference between the reference time and the lapse of a predetermined time In this fuel filling method, the pressure difference ΔP n is compared with the pressure difference ΔP n + 1, and if the following equation (a) is satisfied, the flow rate The opening degree of the regulating valve V1 is increased (steps S6 and S7).
ΔP n > ΔP n + 1 (a)
When increasing the degree of opening of the flow regulating valve V1, compared opening of flow control valve V1 at time t n, take the way to the opening of flow control valve V1 larger predetermined value (e.g. 1%) it can.
By increasing the opening degree of the flow rate adjusting valve V1, the hydrogen gas supply flow rate is increased and the charging efficiency is increased.
燃料タンク13では、充てんによる圧力上昇やジュールトムソン効果などが温度上昇要因として作用する一方、外気等への放熱が温度低下要因として作用する。
式(a)が成立することは、時間tn〜tn+1において、温度低下要因の作用が温度上昇要因の作用を上回ったため、実圧力Pが仮想圧力に近づいたことを意味する。
式(a)が成立する場合には、温度上昇要因の作用が小さいため、流量調整弁V1の開度を大きくしても、過剰な温度上昇が起こりにくい。
In the
The establishment of the expression (a) means that the actual pressure P has approached the virtual pressure because the action of the temperature lowering factor exceeds the action of the temperature increasing factor at the time t n to t n + 1 .
When equation (a) is satisfied, the effect of the temperature rise factor is small, and therefore, even if the opening degree of the flow rate adjustment valve V1 is increased, an excessive temperature rise is unlikely to occur.
次いで、図5および図6(b)に示すように、流量調整弁V1の開度を大きくした時点tn+1を基準時として、上述の操作を繰り返す。
すなわち、基準時から所定時間(例えば1分間)経過した時点での実圧力と、このときの仮想圧力との圧力差ΔPを算出し、基準時のΔPと比較する。所定時間経過時の圧力差ΔPが、基準時の圧力差ΔPより小さい場合には、流量調整弁V1の開度を大きくする。
所定時間経過時の圧力差ΔPが基準時の圧力差ΔPより小さい場合には、流量調整弁V1の開度を変化させず、一定に維持することもできる。
Next, as shown in FIG. 5 and FIG. 6B, the above-described operation is repeated with the time point t n + 1 when the opening degree of the flow rate adjustment valve V1 is increased as a reference time.
That is, a pressure difference ΔP between the actual pressure when a predetermined time (for example, 1 minute) has elapsed from the reference time and the virtual pressure at this time is calculated and compared with ΔP at the reference time. When the pressure difference ΔP when the predetermined time has elapsed is smaller than the reference pressure difference ΔP, the opening degree of the flow rate adjustment valve V1 is increased.
When the pressure difference ΔP when the predetermined time elapses is smaller than the reference pressure difference ΔP, the opening degree of the flow regulating valve V1 can be kept constant without being changed.
一方、図5および図6(c)に示すように、式(a)が成立しない場合、すなわち所定時間経過時の圧力差ΔPn+1が、基準時の圧力差ΔPnに比べ、同等または大きい場合には、時間tn〜tn+1において、温度上昇要因の作用が温度低下要因の作用に対し同等または上回ったと考えられる。
このため、式(a)が成立しない場合には、流量調整弁V1の開度を小さくする。図示例では、流量調整弁V1の開度を0%にする(ステップS3)。
流量調整弁V1の開度を小さくする際には、時間tn(基準時)における流量調整弁V1の開度に比べ、流量調整弁V1の開度を所定値(例えば1%)小さくする方法をとることもできる。この場合には、図5に破線で示すように、式(a)が成立しない場合にステップS4に戻る方法をとることができる。
On the other hand, as shown in FIGS. 5 and 6C, when the formula (a) is not satisfied, that is, when the pressure difference ΔP n + 1 when the predetermined time elapses is equal to or larger than the pressure difference ΔP n at the reference time It is considered that the action of the temperature increase factor is equal to or exceeds the action of the temperature decrease factor at the time t n to t n + 1 .
For this reason, when Formula (a) is not materialized, the opening degree of the flow regulating valve V1 is made small. In the illustrated example, the opening degree of the flow rate adjustment valve V1 is set to 0% (step S3).
When reducing the opening degree of the flow rate adjustment valve V1, a method of reducing the opening degree of the flow rate adjustment valve V1 by a predetermined value (for example, 1%) compared to the opening degree of the flow rate adjustment valve V1 at time t n (reference time). You can also take In this case, as shown by a broken line in FIG. 5, when formula (a) is not satisfied, a method of returning to step S4 can be taken.
流量調整弁V1の開度を小さくすることによって、水素ガス供給流量を減少させ、温度上昇要因(充てんによる圧力上昇やジュールトムソン効果)の作用を抑え、過剰な温度上昇を防ぐことができる。 By reducing the opening degree of the flow rate adjusting valve V1, the hydrogen gas supply flow rate can be reduced, the effects of temperature rise factors (pressure rise due to filling and Joule-Thompson effect) can be suppressed, and excessive temperature rise can be prevented.
次いで、流量調整弁V1の開度を小さくした時点tn+1を基準時として、上述の操作を繰り返す。すなわち、基準時から所定時間(例えば1分間)経過した時点での実圧力と、このときの仮想圧力との圧力差ΔPを算出し、これを基準時の圧力差ΔPと比較する。 Next, the above-described operation is repeated with time t n + 1 when the opening of the flow rate adjustment valve V1 is reduced as a reference time. That is, the pressure difference ΔP between the actual pressure when a predetermined time (for example, 1 minute) has elapsed from the reference time and the virtual pressure at this time is calculated and compared with the pressure difference ΔP at the reference time.
この燃料充てん方法では、基準時tnにおける実圧力Pnと仮想圧力Pn’との圧力差ΔPnと、所定時間経過時tn+1における圧力差ΔPn+1とを比較し、圧力差ΔPn+1が圧力差ΔPnよりも小さい場合には水素ガス供給流量を維持または高めるので、充てん効率を高めることができる。
また、圧力差ΔPn+1が圧力差ΔPnに比べ同等または大きい場合には水素ガス供給流量を小さくするので、過剰な温度上昇を防ぐことができる。
従って、安全性を犠牲にすることなく、充てん効率を高めることができる。
また、温度上昇要因の作用が大きい場合にはこれを抑制し、燃料タンク13の温度を低く維持することができる。
このため、充てん終了後における温度低下に起因する燃料タンク13の圧力低下を最小限に抑え、再充てんを不要とすることができる。従って、充てん作業を容易にし、充てん効率を高めることができる。
In this fuel filling process, the reference time t actual pressure in the n P n and the pressure difference [Delta] P n of the virtual pressure P n ', compared with the pressure difference [Delta] P n + 1 in the predetermined time when t n + 1, the pressure difference [Delta] P n + 1 since the hydrogen gas supply flow rate maintained or increased if smaller than the pressure difference [Delta] P n, it is possible to increase the charging efficiency.
Further, when the pressure difference ΔP n + 1 is equal to or larger than the pressure difference ΔP n , the hydrogen gas supply flow rate is reduced, so that excessive temperature rise can be prevented.
Therefore, filling efficiency can be increased without sacrificing safety.
Further, when the effect of the temperature rise factor is large, this can be suppressed and the temperature of the
For this reason, the pressure drop of the
なお、本発明では、所定時間経過時の圧力差ΔPが基準時の圧力差ΔPと同等である場合には、流量調整弁V1の開度を変化させず、一定に維持することもできる。
この場合には、所定時間経過時における圧力差ΔPが、基準時における圧力差ΔPよりも小さい場合に、水素ガス供給流量を高め、かつ所定時間経過時における圧力差が、基準時における圧力差に比べ大きい場合には水素ガス供給流量を小さくする方法をとることができる。
In the present invention, when the pressure difference ΔP when the predetermined time has elapsed is equal to the pressure difference ΔP at the reference time, the opening degree of the flow regulating valve V1 can be kept constant without being changed.
In this case, when the pressure difference ΔP when the predetermined time elapses is smaller than the pressure difference ΔP at the reference time, the hydrogen gas supply flow rate is increased, and the pressure difference when the predetermined time elapses becomes the pressure difference at the reference time. When the comparison is larger, a method of reducing the hydrogen gas supply flow rate can be taken.
1・・・燃料充てん装置、
5・・・制御手段、
9・・・圧力計、
12・・・水素自動車、
13・・・燃料タンク、
V1・・・流量調整弁、
F1・・・積算流量計、
G・・・充てん終了時、
F・・・充てん終了圧力、
A・・・仮充てん流量、
B・・・基準時、
D・・・所定時間経過時、
K・・・必要充てん流量、
B’・・・第2基準時、
D’・・・第2所定時間経過時、
K’・・・第2必要充てん流量、
tn・・・基準時、
tn+1・・・所定時間経過時、
Pn・・・基準時における実際の圧力、
Pn’・・・基準時における仮想圧力、
ΔPn・・・基準時における実際の圧力と仮想圧力との圧力差、
Pn+1・・・所定時間経過時における実際の圧力、
Pn+1’・・・所定時間経過時における仮想圧力、
ΔPn+1・・・所定時間経過時における実際の圧力と仮想圧力との圧力差
1 ... Fuel filling device,
5 ... Control means,
9 ... Pressure gauge,
12 ... Hydrogen car,
13 ... Fuel tank,
V1 ... Flow control valve,
F1 ... Integral flow meter,
G: At the end of filling,
F: Filling end pressure,
A: Temporary filling flow rate,
B ... Reference time,
D: When a predetermined time has elapsed,
K: Necessary filling flow rate,
B ′ ・ ・ ・ Second reference time,
D ′ ・ ・ ・ When the second predetermined time has elapsed,
K ′ ・ ・ ・ Second required filling flow rate,
t n ... reference time,
t n + 1 ... when a predetermined time has elapsed,
Pn : actual pressure at the reference time,
P n '・ ・ ・ virtual pressure at reference time,
ΔP n : Pressure difference between the actual pressure and the virtual pressure at the reference time,
P n + 1 ... the actual pressure when a predetermined time has elapsed,
P n + 1 '・ ・ ・ virtual pressure when a predetermined time has elapsed,
ΔP n + 1 ... Pressure difference between actual pressure and virtual pressure when a predetermined time has elapsed
Claims (5)
充てん開始から終了までの総充てん時間である充てん終了時(G)と、燃料タンクの充てん終了圧力(F)とを設定しておき、次に示す工程を含むことを特徴とする燃料充てん方法。
(1)水素ガスを、予め設定した仮充てん流量(A)で基準時(B)から所定時間経過時(D)まで燃料タンクに供給し、基準時(B)から所定時間経過時(D)までの圧力上昇率である基準圧力上昇率(H)を以下の通りに算出する。
所定時間経過時(D)における燃料タンク内の水素ガス圧力(E)と基準時(B)における燃料タンク内の水素ガス圧力(C)との圧力差を、所定時間経過時(D)から基準時(B)を差し引いた時間で除す。
(2)この所定時間経過時(D)から充てん終了時(G)までの間に、燃料タンク内の圧力を充てん終了圧力(F)まで上昇させるための必要圧力上昇率(J)を算出する。
(3)この必要圧力上昇率(J)に対する比率が、前記基準圧力上昇率(H)に対する仮充てん流量(A)の比率に等しくなる必要充てん流量(K)を算出する。
(4)水素ガスを、この必要充てん流量(K)で、水素ガス圧力が充てん終了圧力(F)に達するまで燃料タンクに充てんする。 A fuel filling method for filling a fuel tank (13) of a hydrogen gas vehicle (12) using hydrogen gas as a fuel, with hydrogen gas,
A fuel filling method characterized in that a filling end time (G) which is a total filling time from the start to the end of filling and a filling end pressure (F) of a fuel tank are set, and the following steps are included.
(1) Hydrogen gas is supplied to the fuel tank at a preset temporary filling flow rate (A) from a reference time (B) until a predetermined time has elapsed (D), and when a predetermined time has elapsed from the reference time (B) (D) The reference pressure increase rate (H) that is the pressure increase rate until is calculated as follows.
The pressure difference between the hydrogen gas pressure (E) in the fuel tank at the elapse of a predetermined time (D) and the hydrogen gas pressure (C) in the fuel tank at the reference time (B) is referred to from the time (D) at the elapse of the predetermined time. Divide the time by subtracting time (B).
(2) Calculate the necessary pressure increase rate (J) for increasing the pressure in the fuel tank to the filling end pressure (F) from the time (D) until the end of filling (G). .
(3) A required filling flow rate (K) in which the ratio to the required pressure increase rate (J) is equal to the ratio of the temporary charging flow rate (A) to the reference pressure increase rate (H) is calculated.
(4) Fill the fuel tank with hydrogen gas at the required filling flow rate (K) until the hydrogen gas pressure reaches the filling end pressure (F).
充てん開始から終了までの総充てん時間である充てん終了時(G)と、燃料タンクの充てん終了圧力(F)とを設定しておき、次に示す工程を含むことを特徴とする燃料充てん方法。 A fuel filling method characterized in that a filling end time (G) which is a total filling time from the start to the end of filling and a filling end pressure (F) of a fuel tank are set, and the following steps are included.
(1)水素ガスを、予め設定した仮充てん流量(A)で基準時(B)から所定時間経過時(D)まで燃料タンクに供給し、基準時(B)から所定時間経過時(D)までの圧力上昇率である基準圧力上昇率(H)を以下の通りに算出する。(1) Hydrogen gas is supplied to the fuel tank at a preset temporary filling flow rate (A) from a reference time (B) until a predetermined time has elapsed (D), and when a predetermined time has elapsed from the reference time (B) (D) The reference pressure increase rate (H) that is the pressure increase rate until is calculated as follows.
所定時間経過時(D)における燃料タンク内の水素ガス圧力(E)と基準時(B)における燃料タンク内の水素ガス圧力(C)との圧力差を、所定時間経過時(D)から基準時(B)を差し引いた時間で除す。 The pressure difference between the hydrogen gas pressure (E) in the fuel tank at the elapse of a predetermined time (D) and the hydrogen gas pressure (C) in the fuel tank at the reference time (B) is referred to from the time (D) at the elapse of the predetermined time. Divide the time by subtracting time (B).
(2)この所定時間経過時(D)から充てん終了時(G)までの間に、燃料タンク内の圧力を充てん終了圧力(F)まで上昇させるための必要圧力上昇率(J)を算出する。(2) Calculate the necessary pressure increase rate (J) for increasing the pressure in the fuel tank to the filling end pressure (F) from the time (D) until the end of filling (G). .
(3)この必要圧力上昇率(J)に対する比率が、前記基準圧力上昇率(H)に対する仮充てん流量(A)の比率に等しくなる必要充てん流量(K)を算出する。(3) A required filling flow rate (K) in which the ratio to the required pressure increase rate (J) is equal to the ratio of the temporary charging flow rate (A) to the reference pressure increase rate (H) is calculated.
(4)水素ガスを前記必要充てん流量(K)で所定時間経過時(D)と同一時刻である第2基準時(B’)から第2所定時間経過時(D’)まで燃料タンクに供給し、第2基準時(B’)から第2所定時間経過時(D’)までの圧力上昇率である第2基準圧力上昇率(H’)を以下の通りに算出する。(4) Hydrogen gas is supplied to the fuel tank from the second reference time (B ′), which is the same time as when the predetermined time has elapsed (D), until the second predetermined time has elapsed (D ′), at the required filling flow rate (K). Then, the second reference pressure increase rate (H ′), which is the pressure increase rate from the second reference time (B ′) to the second predetermined time (D ′), is calculated as follows.
第2所定時間経過時(D’)における燃料タンク内の水素ガス圧力(E’)と第2基準時(B’)における燃料タンク内の水素ガス圧力(E)との圧力差を、第2所定時間経過時(D’)から第2基準時(B’)を差し引いた時間で除す。 The pressure difference between the hydrogen gas pressure (E ′) in the fuel tank at the second predetermined time (D ′) and the hydrogen gas pressure (E) in the fuel tank at the second reference time (B ′) Divide by the time obtained by subtracting the second reference time (B ′) from the time (D ′) when the predetermined time has elapsed.
(5)第2所定時間経過時(D’)から充てん終了時(G)までの間に、燃料タンク内の圧力を充てん終了圧力(F)まで上昇させるための第2必要圧力上昇率(J’)を算出する。(5) Second required pressure increase rate (J) for increasing the pressure in the fuel tank to the filling end pressure (F) from the time when the second predetermined time elapses (D ′) to the time when filling ends (G) ') Is calculated.
(6)この第2必要圧力上昇率(J’)に対する比率が、第2基準圧力上昇率(H’)に対する前記必要充てん流量(K)の比率に等しくなる第2必要充てん流量(K’)を算出する。(6) Second required filling flow rate (K ′) in which the ratio to the second required pressure increase rate (J ′) is equal to the ratio of the required filling flow rate (K) to the second reference pressure increase rate (H ′). Is calculated.
(7)水素ガスを、この第2必要充てん流量(K’)で、水素ガス圧力が充てん終了圧力(F)に達するまで燃料タンクに充てんする。(7) The fuel tank is filled with hydrogen gas at the second required filling flow rate (K ′) until the hydrogen gas pressure reaches the filling end pressure (F).
(8)この必要充てん流量(K)が、予め設定した設定範囲の下限値以上である場合に、水素ガスを、この必要充てん流量(K)で、水素ガス圧力が充てん終了圧力(F)に達するまで燃料タンクに充てんし、(8) When the required filling flow rate (K) is equal to or greater than the lower limit value of the preset setting range, the hydrogen gas is changed to the filling end pressure (F) at the necessary filling flow rate (K). Fill the fuel tank until it reaches,
前記必要充てん流量(K)が前記下限値未満である場合に、水素ガスを、この下限値以上の充てん流量で、水素ガス圧力が充てん終了圧力(F)に達するまで燃料タンクに充てんする。 When the required filling flow rate (K) is less than the lower limit value, hydrogen gas is filled into the fuel tank at a filling flow rate equal to or higher than the lower limit value until the hydrogen gas pressure reaches the filling end pressure (F).
(1)基準時(tn)において、燃料タンクの実際の圧力(Pn)と、充てんの際に温度変化がないと仮定して算出された燃料タンクの仮想圧力(Pn’)との圧力差(ΔPn)を算出する。(1) The pressure difference between the actual fuel tank pressure (Pn) at the reference time (tn) and the virtual fuel tank pressure (Pn ′) calculated on the assumption that there is no temperature change during filling ( ΔPn) is calculated.
(2)基準時(tn)から所定時間経過した時点(tn+1)において、燃料タンクの実際の圧力(Pn+1)と、充てんの際に温度変化がないと仮定して算出された燃料タンクの仮想圧力(Pn+1’)との圧力差(ΔPn+1)を算出する。(2) The actual pressure (Pn + 1) of the fuel tank at the time (tn + 1) after a predetermined time has elapsed from the reference time (tn) and the virtual pressure of the fuel tank calculated on the assumption that there is no temperature change during filling The pressure difference (ΔPn + 1) from (Pn + 1 ′) is calculated.
(3)所定時間経過時(tn+1)における圧力差(ΔPn+1)が、基準時(tn)における圧力差(ΔPn)よりも小さい場合には水素ガス供給流量を維持または高め、(3) When the pressure difference (ΔPn + 1) at the elapse of a predetermined time (tn + 1) is smaller than the pressure difference (ΔPn) at the reference time (tn), the hydrogen gas supply flow rate is maintained or increased,
かつ所定時間経過時(tn+1)における圧力差(ΔPn+1)が、基準時(tn)における圧力差(ΔPn)に比べ同等または大きい場合には水素ガス供給流量を小さくする。When the pressure difference (ΔPn + 1) at the elapse of a predetermined time (tn + 1) is equal to or larger than the pressure difference (ΔPn) at the reference time (tn), the hydrogen gas supply flow rate is reduced.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003373089A JP4327559B2 (en) | 2003-08-15 | 2003-10-31 | Fuel filling method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003293885 | 2003-08-15 | ||
JP2003373089A JP4327559B2 (en) | 2003-08-15 | 2003-10-31 | Fuel filling method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005098474A JP2005098474A (en) | 2005-04-14 |
JP4327559B2 true JP4327559B2 (en) | 2009-09-09 |
Family
ID=34466908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003373089A Expired - Fee Related JP4327559B2 (en) | 2003-08-15 | 2003-10-31 | Fuel filling method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4327559B2 (en) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006029424A (en) * | 2004-07-15 | 2006-02-02 | Toho Gas Co Ltd | Gas supply device and gas supply method |
US7757726B2 (en) * | 2005-05-06 | 2010-07-20 | Kiyoshi Handa | System for enhancing the efficiency of high pressure storage tanks for compressed natural gas or hydrogen |
FR2920858B1 (en) * | 2007-09-10 | 2009-11-27 | Air Liquide | METHOD OF FILLING A GAS CONTAINER UNDER PRESSURE |
US7621302B2 (en) | 2007-09-28 | 2009-11-24 | Airgas, Inc. | Coriolis dosing system for filling gas cylinders |
JP5461791B2 (en) * | 2008-06-18 | 2014-04-02 | トキコテクノ株式会社 | Gas filling method and gas filling apparatus |
JP5572370B2 (en) * | 2009-12-01 | 2014-08-13 | 岩谷産業株式会社 | Filling control equipment for high-pressure hydrogen test facilities and high-pressure hydrogen filling facilities |
US8927171B2 (en) * | 2010-09-14 | 2015-01-06 | GM Global Technology Operations LLC | Method for preventing pressure in vessels from dropping below minimum allowable pressure |
JP6215090B2 (en) * | 2014-03-05 | 2017-10-18 | 大陽日酸株式会社 | Hydrogen gas filling control device, hydrogen gas filling method, and computer program |
JP2015183727A (en) * | 2014-03-20 | 2015-10-22 | 日立オートモティブシステムズメジャメント株式会社 | Gas filling device |
CN108779895B (en) * | 2016-03-15 | 2020-11-13 | 本田技研工业株式会社 | Gas filling method |
JP6721626B2 (en) * | 2018-03-30 | 2020-07-15 | 本田技研工業株式会社 | Gas filling method |
JP7096062B2 (en) * | 2018-04-27 | 2022-07-05 | トキコシステムソリューションズ株式会社 | Gas filling device |
CN110848566B (en) * | 2019-12-13 | 2024-04-05 | 上海机动车检测认证技术研究中心有限公司 | Hydrogenation device and hydrogenation method |
JP7464080B2 (en) * | 2022-06-10 | 2024-04-09 | トヨタ自動車株式会社 | Gas Charging System |
CN115596988B (en) * | 2022-12-13 | 2023-04-21 | 四川凯德源科技有限公司 | LNG gas station accuse system |
-
2003
- 2003-10-31 JP JP2003373089A patent/JP4327559B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2005098474A (en) | 2005-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4327559B2 (en) | Fuel filling method | |
US11193632B2 (en) | Gas filling method | |
JP2005083567A (en) | Fuel filling device and method | |
US6619336B2 (en) | System and method for dispensing pressurized gas | |
US10443784B2 (en) | System for controlling gas supply unit | |
JP2013508641A (en) | Method of operation and control of gas filling | |
CN104110578A (en) | Method and system for temperature-controlled gas dispensing | |
US20140174593A1 (en) | Method for Filling a Tank with Pressurized Gas | |
JP2011163534A (en) | Vehicle | |
CN101488577B (en) | Gas supply system | |
US20180275697A1 (en) | Method For Controlling A Conditioning Unit And Consumption Measuring Device Having Such A Conditioning Unit | |
JP2004116619A (en) | Fuel filling apparatus and method | |
US11092290B2 (en) | Method for measuring fluid level in liquid hydrogen tank and liquid hydrogen storage system | |
JP2018507995A (en) | Filling tank with pressurized gas | |
JP6179273B2 (en) | Fuel gas filling device | |
JP2011112213A (en) | Gas station and gas filling system | |
JP2021113616A (en) | Station and method for filling one or more tanks | |
TWI636616B (en) | Gas filling apparatus and method | |
JP2015169262A (en) | Fuel gas charging system, control device, fuel gas charging method, control method and computer program | |
JP5461791B2 (en) | Gas filling method and gas filling apparatus | |
JP2011099468A (en) | Gas filling device and method of filling gas | |
JP6695194B2 (en) | Fuel gas filling system and fuel gas filling method | |
EP4206518A1 (en) | Gas filling method | |
JP5299855B2 (en) | vehicle | |
CN113357532A (en) | Filling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060907 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080423 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080708 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080908 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090519 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090611 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120619 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4327559 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120619 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120619 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130619 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130619 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130619 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |