JP4317393B2 - Water heater and method of assembling the water heater - Google Patents

Water heater and method of assembling the water heater Download PDF

Info

Publication number
JP4317393B2
JP4317393B2 JP2003198828A JP2003198828A JP4317393B2 JP 4317393 B2 JP4317393 B2 JP 4317393B2 JP 2003198828 A JP2003198828 A JP 2003198828A JP 2003198828 A JP2003198828 A JP 2003198828A JP 4317393 B2 JP4317393 B2 JP 4317393B2
Authority
JP
Japan
Prior art keywords
back cover
bottom plate
hot water
burner
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003198828A
Other languages
Japanese (ja)
Other versions
JP2005037018A (en
Inventor
洋 神谷
悟 中川
Original Assignee
パロマ工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パロマ工業株式会社 filed Critical パロマ工業株式会社
Priority to JP2003198828A priority Critical patent/JP4317393B2/en
Publication of JP2005037018A publication Critical patent/JP2005037018A/en
Application granted granted Critical
Publication of JP4317393B2 publication Critical patent/JP4317393B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Housings, Intake/Discharge, And Installation Of Fluid Heaters (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、給湯機及び給湯機の組立方法に関し、詳細には、バーナの燃焼気体から熱を回収して通水を過熱して湯を供給する給湯機及び給湯機の組立方法に関するものである。
【0002】
【従来の技術】
従来、給湯機は前面が開口する箱状の筐体を有し、その筐体内に、熱源機としてのバーナ、バーナに空気を供給する送風機、水を加熱する熱交換器、熱交換器に供給するガスの量を調整する燃料供給装置及び温水を外部の放熱器等に循環させる循環ポンプ等の各装置を備えたものが知られている(例えば、特許文献1参照)。このような給湯機では、筐体の前面の開口部には前面パネルが着脱可能となっており、前面パネルを取り外すことにより、筐体の内部に組み付けられた装置のメンテナンス作業及び交換作業等が可能となっていた。
【0003】
【特許文献1】
特開平9−126479号公報
【0004】
【発明が解決しようとする課題】
しかしながら、特許文献1に記載の給湯機の組み立て時には、上述の各装置が筐体の内側に各々組み付けられるため、各装置の筐体内における組み付けの位置決めが難しく、自動組立作業等の合理化が図りにくいという問題点があった。また、給湯機を組み立てた状態において、各装置が筐体内にて互いに重なり合った状態で組み付けられているため、前面パネルの外された筐体の前面からの各構成装置の交換作業、及び検査等が難しく、作業時間がかかるという問題点があった。
【0005】
本発明は、上述の課題を解決するためになされたものであり、給湯機を構成する各装置の組み付けを簡素化し、組み立てが容易な給湯機及び給湯機の組立方法を提供することを目的とする。
【0006】
【課題を解決するための手段】
上記目的を達成するために、請求項1に記載の給湯機は、筐体内に、バーナと、当該バーナに空気を送風する送風ファンと、前記バーナの上方に設けられ、前記バーナの燃焼気体から熱を回収して水を加熱する熱交換器と、当該熱交換器に供給する水の量を調整する水量調整器と、前記バーナに供給する燃料の量を調整する燃料調整器とを備えた給湯機であって、前記筐体は、設置時における前面及び底面が開放された略直方体形状のバックカバーと、前記バックカバーの底面に脱着可能に固定される底板と、当該バックカバーの前面に脱着可能に固定されるフロントカバーとから構成され、前記バックカバーには、前記バーナと、前記送風ファンと、前記熱交換器とが固定され、前記底板には、前記水量調整器と、前記燃料調整器と、水が供給される給水接続口と、ガス燃料が供給されるガス接続口と、前記熱交換器によって加熱された湯が排出される給湯接続口とが固定され、前記固定された状態で、前記バックカバーに前記底板が組み付けられることを特徴とする。
【0007】
この構成の給湯機の組立時では、設置時における前面及び底面が開放されたバックカバーには、バーナと、送風ファンと、熱交換器とが固定され、底板には、水量調整器と、燃料調整器と、給水接続口と、ガス接続口と、給湯接続口とが固定され、その後、バックカバーに底板を組み付けるため、底板に固定される各装置の取付作業においては、筐体の他の壁面が邪魔にならずに行えるため、給湯機の組み立てを容易にすることができる。また、バックカバーに底板を固定する前段階において、底板に固定された装置は外部に露出された状態となり、底板に固定された水量調整器及び燃料調整器の検査がしやすく、装置の交換作業等が行い易い。
【0008】
また、請求項2に記載の給湯機は、請求項1に記載の発明の構成に加え、前記バックカバーの背面の底面側の端部に設けられ、前記バックカバーの背面から前記フロントカバーに向かって前記背面に対して略直角方向に張り出した第1のフランジと、当該第1のフランジに設けられた第1の固定穴と、前記第1のフランジと当接する前記底板に設けられ、前記第1の固定穴に対向する第1の取付穴と、前記バックカバーの両側面の端部と当接する前記底板の両端部に各々設けられ、前記バックカバーの上部に向かって前記底板に対して略直角方向に各々張り出した第2のフランジと、当該第2のフランジに各々設けられた第2の固定穴と、前記第2のフランジと当接する前記バックカバーの両端部近傍に各々設けられ、前記第2の固定穴に各々対向する第2の取付穴とを備えている。
【0009】
この構成の給湯機では、請求項1に記載の発明の作用に加え、バックカバーへの底板の取付作業において、各装置を組み付けたバックカバーの背面側を床面等に載置した場合、第1のフランジに設けられた第1の固定穴と底板に設けられた第1の取付穴、及び第2のフランジに設けられた第2の固定穴とバックカバーに設けられた第2の取付穴は各々床面側に隠れることがないので、取付作業中にバックカバー及び底板を置き換えることなく、バックカバーに底板を迅速に固定することができる。
【0010】
また、請求項3に記載の給湯機は、請求項1に記載の発明の構成に加え、前記バックカバーの背面及び側面の底面側端部に各々設けられ、前記バックカバーの内側に向かって前記背面及び前記側面に対して略直角方向に各々張り出した3つの第3のフランジと、当該第3のフランジに各々設けられた第3の固定穴と、前記第3のフランジと当接する前記底板に各々設けられ、前記第3の固定穴に各々対向する第3の取付穴とを備えている。
【0011】
この構成の給湯機では、請求項1に記載の発明の作用に加え、各装置を組み付けたバックカバーの背面側を床面等に載置した場合、底板側からバックカバーに向かって一方向に第3のフランジに設けられた第3の固定穴と、底板に設けられた第3の取付穴とを固定具で固定できるので、組み立て作業を迅速に行うことができる。
【0012】
また、請求項4に記載の給湯機の組立方法は、設置時における前面及び底面が開放された略直方体形状のバックカバーと、当該バックカバーの底面に固定された底板と、前記バックカバーの前面に固定されたフロントカバーとから構成された筐体内に、空気と燃料との混合気体を燃焼するバーナと、当該バーナに空気を送風する送風ファンと、前記バーナの上方に設けられ、前記バーナの燃焼気体から熱を回収して水を加熱する熱交換器と、当該熱交換器に供給する水の量を調整する水量調整器と、前記バーナに供給する燃料の量を調整する燃料調整器とを組み付ける給湯機の組立方法であって、前記バックカバーに、前記バーナと、前記送風ファンと、前記熱交換器とを固定する工程と、前記底板に、前記水量調整器と、前記燃料調整器とを固定する工程と、前記底板を前記バックカバーの底面側から固定する工程とを包含することを特徴とする。
【0013】
この構成の給湯機の組立方法では、バックカバーに、バーナと、送風ファンと、熱交換器とを固定し、底板に、水量調整器と、燃料調整器とを固定した後に、底板を前記バックカバーの底面側から固定する。したがって、筐体内に組み付ける装置の多くを底板に直接組み付けるため、水量調整器及び燃料調整器等の装置の底板への固定は容易であり、しかも、それらは外部に露出された状態であるので、固定された各装置の検査が行い易い。
【0014】
【発明の実施の形態】
以下、本発明の一実施の形態について、図面に基づいて説明する。本発明の一実施の形態では、供給された水道水を加熱して外部に湯を供給する給湯機能と、湯を外部の室内及び床下に設置された放熱器(図示外)に供給し、室内や床を暖房する暖房機能とを併せもつ給湯暖房機1を本発明の一実施の形態として詳細に説明する。まず、給湯暖房機1の外観について、図1乃至図4を参照して説明する。図1は、給湯暖房機1の正面図であり、図2は、給湯暖房機1の側面図であり、図3は、給湯暖房機1の底面図であり、図4は、バックカバー3と底板5との固定方法を示す斜視図である。図1,図2及び図3に示すように、給湯暖房機1は略直方体形状の筐体2を備えており、筐体2は横幅:451mm、高さ600mm、奥行き:240mmの略直方体形状の箱である。さらに、筐体2は、図2又は図4に示すように、平面視略長方形状の一枚の平板を平面視略コの字型形状に折り曲げ、左側壁3a,右側壁3b及び背面壁3cが各々形成された周壁部13の上端部側に平面視略長方形の天板8が上方から覆設されて構成されるバックカバー3と、バックカバー3の開放された底面側に固定される底板5と、バックカバー3の背面壁3cと対向する前面側に固定されるフロントカバー4とにより構成されている。
【0015】
まず、給湯暖房機1のフロントカバー4について、図1及び図2を参照して説明する。図1及び図2に示すように、給湯暖房機1の前面側には正面視略長方形状のフロントカバー4が、バックカバー3の開放された前面側に固定されている。フロントカバー4の上部の略中央には、正面視略円形状の排気口7が形成されている。そして、その排気口7の外周枠には、中央が排気口7と同形状に貫通する略円柱形状の排気アダプタ6がフロントカバー4から水平方向に凸設されている(図2参照)。そして、排気口7には外部から異物が侵入することを防止するスリット穴状のカバー7aが嵌め込まれている。
【0016】
また、図1に示すように、フロントカバー4の下部には、開口部を塞ぐ横長の正面視略長方形状のケーブル接続扉10が右側寄りに設けられており、その上部はビス10a、10bによって、フロントカバー4に固定されている。このケーブル接続扉10の裏面側には、後述するコントローラ60(図9参照)が設けられており、コントローラ60の点検、又は給湯暖房機1の試運転時によるコントローラ60の操作等の場合において、ケーブル接続扉10をフロントカバー4から外して作業が行えるようになっている。また、フロントカバー4の上部の左側の角部近傍にも、開口部を塞ぐ正面視略長方形状の注入扉9がビス9aによって固定されている。この注入扉9は、後述する膨張タンク50(図8参照)に水、不凍液等を直接注入する時にフロントカバー4から取り外され、注入作業が行えるようになっている。さらに、図1及び図2に示すように、フロントカバー4の外周縁部には、後述するバックカバー3のフランジ2a,2b及び2c(図4参照)と、底板5のフランジ5c(図4参照)とに当接して固定される突出部4aが設けられている。
【0017】
次に、給湯暖房機1の取付板11,12について、図1又は図2を参照して説明する。図1又は図2に示すように、給湯暖房機1の背面側(図2参照)の上端部には、給湯暖房機1を壁等に固定する正面視略長方形状の取付板11が設けられ、取付板11には複数の略円形状の取付穴11aと、複数の略楕円形状の取付穴11bとが設けられている。取付板11に設けられた取付穴11a及び取付穴11bにビス等を貫通して壁に固定することにより、給湯暖房機1が壁に取り付けられるようになっている。さらに、給湯暖房機1の背面の下端にも同様に、取付板11と同形状の取付板12が設けられている。そして、取付板12にも略円形状の複数の取付穴12aと複数の略楕円形状の取付穴12bとが設けられており、取付板12の取付穴12a及び12bにもビスを貫通して、給湯暖房機1を壁面に強固に固定することができるようになっている。
【0018】
次に、給湯暖房機1の底板5について、図1,図2及び図3を参照して説明する。図3に示すように、給湯暖房機1の底板5には、給湯暖房機1にケーブルが接続される3つのケーブル接続口15a,15b及び15cが設けられ、ケーブル接続口15aは、給湯暖房機1のフロントカバー4側の底板5の端部と、底板5の右端部とに挟まれる底板5の角部近傍に設けられ、残り2つのケーブル接続口15b,15cは、フロントカバー4側の底板5の端部の略中央近傍に、フロントカバー4の面に対して略並列に設けられている。さらに、底板5の背面側端部と右側端部とに挟まれる角部近傍には、給湯暖房機1によって加熱された湯が外部に供給される給湯接続口17が設けられ、給湯接続口17には凍結予防のために給湯暖房機1内の水抜きを行う水抜き栓28が設けられている。また、ケーブル接続口15aと給湯接続口17とに挟まれる位置には、給湯暖房機1内に設けられた後述する膨張タンク50(図8参照)からオーバーフローした湯が外部に排出されるオーバーフロー排出口18が設けられている。
【0019】
さらに、給湯接続口17とケーブル接続口15b,15cとの間には、給湯暖房機1に水が供給される給水接続口16が設けられ、その給水接続口16には、供給された水の中に含まれる異物等をろ過するストレーナ26が設けられている。また、ケーブル接続口15b,15cの図3の左側の近傍には、給湯暖房機1にガスを供給するガス接続口27が設けられている。さらにガス接続口27と底板5の左端部との間には、給湯暖房機1内から外部(主に、床暖用の配管)に低温の湯が供給される6つの低温往き接続口25が、フロントカバー4に対して平行に2列(一列に3つの低温往き接続口25)になって設けられている。また、底板5の左端部の略中央から、底板5の背面側端部の略中央に向かって設けられており、底板5の左端部には、給湯暖房機1で加熱された湯が外部に接続された暖房用の高温放熱器(図示外)に供給される暖房往き接続口23と、高温放熱器で放熱された湯が給湯暖房機1に戻される暖房戻り接続口22とが一対となって設けられ、さらにその隣には給湯暖房機1で加熱された湯が外部に繋がれた風呂(図示外)に供給される風呂往き接続口21と、風呂から湯が循環して給湯暖房機1に戻される風呂戻り接続口20とが一対になって設けられている。
【0020】
次に、バックカバー3を構成する天板8と周壁部13との固定方法について、図4を参照して説明する。図4に示すように、左側壁3aの上部の端部と、右側壁3bの上部の端部とに当接する天板8の両端部は、左側壁3a及び右側壁3bの方向に略直角に各々折り曲げられて、フランジ55,56となっている。背面壁3cの上部に当接する天板8の端部も同様に、背面壁3cに向かって略直角に折り曲げられたフランジ57が設けられている。尚、天板8の両端部に設けられたフランジ55,56の内側面は、左側壁3a,右側壁3bの外側面に当接しており、またフランジ57の内側面も同様に背面壁3cの外側面に当接している。そして、天板8のフランジ55,56及び57に各々設けられた3つの固定穴(図示外)は、左側壁3a,右側壁3b及び背面壁3cの端部に各々設けられた3つの取付穴(図示外)に各々対向するようになっており、ビス39によって固定穴と取付穴とを各々固定することにより、周壁部13の上部に天板8が固定される。尚、天板8は周壁部13の上部の端部に当接されるようになっているが、フランジ55,56,57を周壁部13の上部端部の内側面に各々当接して固定するようにしてもよく、どれか1つ又は2つを内側面に当接するようにしてもよい。また、フランジ55〜57の固定穴及び左側壁3a,右側壁3b及び背面壁3cの取付穴の個数は上記に限らず自由に変更してもよい。
【0021】
また、フロントカバー4が固定されるバックカバー3の開放された前面側の外周枠を形成する天板8の前面側端部と、左側壁3aの前面側端部と、右側壁3bの前面側端部には、フロントカバー4が固定されるフランジ2a,2b及び2cが設けられている。尚、フランジ2aの長手方向に垂直な両端部近傍には、フロントカバー4が当接して固定される固定穴14が各々設けられている。
【0022】
そして、図4に示すように、後述する底板5のフランジ5aと当接する左側壁3aの端部近傍には3つの取付穴33が設けられ、底板5のフランジ5bと当接する右側壁3bの端部近傍には3つの取付穴34が各々設けられている。尚、取付穴33,34は、底板5のフランジ5a,5bに設けられた3つの固定穴37,38と各々対向するようになっている。尚、取付穴33,34の数は上記に限らず、自由に変更してもよい。
【0023】
次に、バックカバー3に固定されるフランジ30について、図4を参照して説明する。図4に示すように、フランジ30は長手方向に直交する断面視が略L字型の形状をなすアングル部材であり、フランジ30の直角部を形成する側をバックカバー3の内側に向け、フランジ30の略L字型を構成する2片のうちの1片をバックカバー3の背面壁3cの端部に沿って当接して固定されている。したがって、フランジ30の1片が、背面壁3cの端部からフロントカバー4が固定されるバックカバー3の前面側に向かって略直角方向に向かって凸設されている。そして、フランジ30の底板5が当接する側の該一片には、4つの固定穴31が設けられている。尚、図4に示すフランジ30が、「第1のフランジ」に相当する。
【0024】
尚、本実施の形態のフランジ30は、バックカバー3の周壁部13とは別の部材であるが、周壁部13にフランジ30の形状を有する同一平板として一体成形し、背面壁3cの端部より延設するフランジ30をフロントカバー4が固定される側に向かって略直角方向に折り曲げてもよい。
【0025】
次に、底板5について、図4を参照して説明する。図4に示すように、平面視略長方形状の底板5は、バックカバー3の開放される底面側から固定されるようになっている。そして、バックカバー3の左側壁3aと当接する底板5の端部は、バックカバー3の固定側に向かって略直角方向に折り曲げられて、フランジ5aが形成されている。そしてフランジ5aの内側面は、バックカバー3の左側壁3a端部の外側面に当接するようになっている。また、バックカバー3の右側壁3bと当接する底板5の端部も同様に、バックカバー3の固定側に向かって略直角方向に折り曲げられて、フランジ5bが形成されている。そして、フランジ5bの内側面は、バックカバー3の右側壁3b端部の外側面に当接するようになっている。さらに、フランジ5a及びフランジ5bには、バックカバー3の開放される底面側端部に固定される3つの固定穴37,38が各々設けられている。固定穴37,38は上述したバックカバー3の左側壁3aと、右側壁3bとに設けられた取付穴33,34に各々対向する位置に設けられている。さらに、バックカバー3に設けられたフランジ30に当接して固定される底板5の端部近傍には、4つの取付穴36がフランジ30の4つの固定穴31に各々対向する位置に設けられている。尚、固定穴37と取付穴33、固定穴38と取付穴34は、図2に示すように、ビス40で固定されるようになっている。
【0026】
また、底板5のフロントカバー4が固定される端部がバックカバー3の内側とは反対側に向かって底板5に対して略直角方向に折り曲げられることにより、フランジ5cが形成されている。そして、フランジ5cの両端部近傍には、フロントカバー4の突出部4aが当接してフランジ5cに固定される固定穴19が設けられている。尚、図4に示すフランジ5b及び5cが、「第2のフランジ」に相当する。
【0027】
また、底板5には、図4に示すように、ケーブル接続口15a,15b,15cが固定される固定穴15a1,15b1,15c1と、給湯接続口17が固定される固定穴17aと,オーバーフロー排出口18が固定される固定穴18aと、給水接続口16が固定される固定穴16aと、ガス接続口27が固定される固定穴27aと、6つの低温往き接続口25が各々固定される6つの固定穴25aと、暖房往き接続口23が固定されるための固定穴23aと、暖房戻り接続口22が固定される固定穴22aと、風呂往き接続口21が固定される固定穴21aと、風呂戻り接続口20が固定される固定穴20aとが、上述した図3の底板5に固定された各装置の固定場所に各々対応する底板5の各位置に各固定穴が設けられている。
【0028】
次に、底板5に組み付けられる給湯暖房機1を構成する各装置の構成について、図5を参照して説明する。図5は、底板5に各装置を組み付けた状態を示す底板5の正面図である。尚、前記各装置は、底板5のバックカバー3に固定される側の表面側(図5の底板5の上面側)に組み付けられている。底板5の裏面側に固定されたガス接続口27の上方には、ガス接続口27から供給されるガスを後述する給湯用熱交換器45に供給する量を調整する給湯用ガス開閉器54と、さらにその上方には後述する暖房用熱交換器46(図6参照)に供給するガスの量を調整する暖房用ガス開閉器35とが設けられている。そして、暖房用ガス開閉器35の下方であって、給湯用ガス開閉器54に隣接する風呂循環ポンプ32が底板5に組み付けられている。風呂循環ポンプ32は、図示外の風呂に加圧して湯を循環させる装置である。また、暖房用ガス開閉器35の下方には、後述するジョイント部95,96が設けられている。尚、図5に示す給湯用ガス開閉器54と、暖房用ガス開閉器35とが「燃料調整器」に相当する。
【0029】
また、図5に示すように、底板5の裏面側に固定された6つの低温往き接続口25の上方には、暖房用熱交換器46によって加熱された湯の熱を回収して、図示外の風呂と給湯暖房機1とを循環する湯を再度加熱して追い炊きする風呂用熱交換器51が設けられ、その風呂用熱交換器51の上方には、後述する膨張タンク50から供給される湯を加圧して暖房用熱交換器46に供給する暖房循環ポンプ59が設けられている。尚、暖房循環ポンプ59には、膨張タンク50から供給される湯が供給される入水口59aが設けられている。また、風呂用熱交換器51の下方であって、さらに底板5の端部近傍には、後述するコントローラ60(図9参照)の指示により、風呂熱交換器への温水の供給路を開閉する風呂熱動弁24が設けられている。
【0030】
さらに、図5に示すように、底板5の裏面側に固定された給水接続口16の上方には、後述する給湯用熱交換器45(図6参照)と、暖房用熱交換器46とに供給される水量を調整する水量調整器61が設けられ、水量調整器61には給湯用給水管75が接続され、その接続された一端部とは反対側の他端部は、右側壁3bの近傍に設けられたジョイント部92に接続されている。
【0031】
次に、バックカバー3に組み付けられる各装置の構成について、図6及び図7を参照して説明する。図6は、バックカバー3に膨張タンク50以外の各装置を組み付けた状態を示すバックカバー3の正面図であり、図7は、図6のバックカバー3に膨張タンク50を組み付けた状態を示すバックカバー3の正面図である。まず、バックカバー3内部の上部には、後述する給湯用バーナ43と、暖房用バーナ49との燃焼により排出される排気ガスが給湯暖房機1内全体に漏れないようにする正面視略逆三角形状の排気カバー48がバックカバーの天板8側の端部近傍に複数のビスにより固定されている。そして、排気カバー48の略中央部には正面視略円形状の排気口62が設けられ、その排気口62の外周枠には、中央が排気口62と同形状に貫通する正面視略ドーナツ形状の排気アダプタ63が排気カバー48から水平方向に凸設されている。そして、排気口62の内側には、異物が侵入することを防止するスリット穴状のカバー62aが嵌め込まれている。また、排気アダプタ63は、上述したフロントカバー4に設けられた排気アダプタ6の裏面側に嵌合するようになっている。
【0032】
さらに、図6に示すように、バックカバー3の天板8と底板5が固定される底面側とに挟まれる略中央付近には、供給される空気とガスの混合気体を燃焼する給湯用バーナ43が設けられ、さらにその給湯用バーナ43の左側壁3a側には、暖房用バーナ49が給湯用バーナ43と並列して設けられている。尚、給湯用バーナ43のバックカバー3の背面壁3c側には、イグナイタ110(図9参照)が設けられ、後述するコントローラ60の制御指示により給湯用バーナ43に点火動作を行う。また、暖房用バーナ49にも同様に、図示外のイグナイタが設けられており、後述するコントローラ60の制御指示により暖房用バーナ49に点火動作を行う。
【0033】
また、給湯用バーナ43の上方には、給湯用熱交換器45が設けられており、給湯用バーナ43の燃焼気体による熱を回収して、給湯用熱交換器45内を通過する給湯伝熱管71内の水が加熱されるようになっている。そして、給湯用熱交換器45の左側壁3a側には、暖房用熱交換器46が給湯用熱交換器45に並列して設けられ、上述した暖房用バーナ49の上方に位置するように設けられている。尚、この暖房用熱交換器46も同様に、暖房用バーナ49の燃焼気体による熱を回収して、暖房用熱交換器46内の暖房伝熱管(図示外)内を通過する水が加熱されるようになっている。この給湯暖房機1は上述の通り、給湯機能と暖房機能とを併せもつため、給湯用熱交換器45と暖房用熱交換器46とが別々に設けられ、給湯用熱交換器45で加熱された湯は、給湯接続口17と、図示外の風呂に供給され、暖房用熱交換器46で加熱された湯は、図示外の放熱器に供給されるようになっている。また、給湯用熱交換器45の右側壁3b側の下部に設けられたジョイント部93にはバイパス管72が接続され、図5に示す給水接続口16から供給される水がバイパス管72を通過し、給湯用熱交換器45で加熱された湯に混合されるようになっている。また、給湯用熱交換器45には、給水接続口16から供給される水を給湯用熱交換器45に供給する給湯用給水管53(図9参照)が接続されている。
【0034】
さらに、図6に示すように、給湯用熱交換器45の下方には、正面視略円形状の給湯用ファン41が固定されており、給湯用ファン41の駆動により外部より吸引された空気は給湯用バーナ43に供給され、給湯用バーナ43の燃焼に利用されるようになっている。また、暖房用熱交換器46の下方には、暖房用ファン42が固定されており、暖房用ファン42の駆動により外部より吸引された空気は暖房用バーナ49に供給され、暖房用バーナ49の燃焼に利用されるようになっている。
【0035】
次に、膨張タンク50について、図7を参照して説明する。膨張タンク50は、給湯暖房機1において、図示外の放熱機及び給湯暖房機1の配管内を循環する湯の膨張収縮を吸収するために設けられ、給湯暖房機1内の水量が所要水量に保持されるための調整を行う。上述のように各装置を組み付けた図6のバックカバー3において、給湯用熱交換器45及び暖房用熱交換器46と、フロントカバー4が固定されるバックカバー3の開放される前面との間には、内部が空洞になった膨張タンク50が設けられている。そして、バックカバー3の左側壁3a側の膨張タンク50の一端部からは、2本のアーム状の突出部50a,50bが水平方向に凸設されており、突出部50a,50bの先端近傍から下方に向かって図示外の軸部が凸設されている。そして、バックカバー3の暖房用熱交換器46側の左側壁3aには、突出部50a,50bの軸部が挿入可能な受け穴(図示外)を有する軸受け部52a,52bが、バックカバー3の内側に向かって凸設されている。そして、突出部50a,50bの軸部が、軸受け部52a,52bの受け穴(図示外)に挿入されることにより、膨張タンク50はバックカバー3の暖房用熱交換器46側の左側壁3aに軸支されている。尚、膨張タンク50は、バックカバー3の左側壁3aに軸支されているので、膨張タンク50を図7の左側手前に開くことができる。
【0036】
また、膨張タンク50の下部には、図示外の外部の放熱器から戻ってくる湯を膨張タンク50に供給するジャバラ状のタンク戻り管44が接続され、さらにそのタンク戻り管44の近傍には、膨張タンク50内の湯を底板5に組み付けられた暖房循環ポンプ59に供給するためのジャバラ状のタンク往き管47が膨張タンク50に接続されている。尚、タンク往き管47とタンク戻り管44のジャバラは収縮又は伸長可能であるので、膨張タンク50がバックカバー3内側面の軸支部分において回動しても、膨張タンク50からタンク往き管47とタンク戻り管44とが抜けたりすることがない。さらに膨張タンク50の右側壁3b側の端部には、膨張タンク50内に湯がオーバーフローした際に、外部に排出される排出口58が設けられており、排出口58にはオーバーフロー排出管79が接続され、下方に向かって延設されている。
【0037】
さらに、図7に示すように、バックカバー3の左側壁3a側の膨張タンク50の前面側の角部近傍には膨張タンク50の内部に貫通する貫通部(図示外)が設けられ、その貫通部にはジョイント部78がビス78a,78bにより固定され、脱着可能となっている。さらに、ジョイント部78には注水接続管77が接続され、注水接続管77には自動注水弁74が設けられ、自動注水弁74には注水管76が接続されている。注水管76には、給湯用熱交換器45で加熱された湯が通過し、後述するコントローラ60の指示による自動注水弁74の開閉動作により、膨張タンク50に供給される湯の量が調整される。尚、膨張タンク50内には、膨張タンク50内の水位を検出する炭素電極センサ97が設けられており、炭素電極センサ97の検出値がコントローラに送信され、膨張タンク50内の水位が予め定められた水位より低い場合は、自動注水弁74を開放して、膨張タンク50に湯が供給されるように制御される。
【0038】
尚、バックカバー3に底板5を固定する前段階において、底板5の表面側に組み付けられた各装置は外部に露出された状態(図5参照)となっており、水量調整器61の水洩れ検査、給湯用ガス開閉器54及び暖房用ガス開閉器35のガス洩れ検査が行い易い。また、検査に不合格の装置を脱着して交換する際も簡単に行うことができる。そして、各検査が合格した時点で、各装置が組み付けられたバックカバー3の背面壁3cを床面側に載置し、開放された底面側に向かって、各装置が組み付けられた底板5を装着する。そして、バックカバー3に組み付けられた各装置と、バックカバー3の底面側から装着された底板5に組み付けられた各装置を互いに接続し、水又はガスの通過する複数の配管を各装置間において互いに接続する。そして、バックカバー3の下端部に設けられたフランジ30の4つの固定穴31と底板5の取付穴36とを、底板5側からビスで固定する。さらに底板5の両端部に設けられたフランジ5a,5bに設けられた固定穴37,38と、バックカバー3の下端部に設けられた取付穴33,34とをビス40(図2参照)でバックカバー3の左側壁3a及び右側壁3bの外側面から各々固定する。よって、各取付穴及び各固定穴は、床面側に隠れることがないので、バックカバー3及び底板5を置き換えることなく、バックカバー3に底板5を固定することができ、図8に示すように、給湯暖房機1の組み立てが完了する。
【0039】
次に、各装置が組み付けられたバックカバー3に、各装置が組み付けられた底板5を固定した給湯暖房機1の構成について、図8又は図9を参照して説明する。図8は、フロントカバー4を外した状態を示す給湯暖房機1の正面図であり、図9は、給湯暖房機1の縦断面図である。図8に示すように、各装置が組み付けられたバックカバー3(図7参照)の開放される底面側に、各装置が組み付けられた底板5が固定されている。尚、バックカバー3への底板5の固定方法は、上述した通りである。図8に示すように、給湯用熱交換器45(図6参照)に接続された給湯用給水管53の一端部とは反対側の他端部側はジョイント部92に接続されている。そして、図8又は図9に示すように、給湯用熱交換器45で加熱された湯が通過する給湯用給湯管73はジョイント部93に接続され、ジョイント部93にはバイパス管72の一端側が接続され、該一端側と反対側の他端側は水量調整器61に接続されている。また、図9に示すように、ジョイント部93には給湯用接続管90が接続され、そのジョイント部93と接続する一端側と反対側の端部はジョイント部95に接続されている。尚、給湯用接続管90を通過した湯は、ジョイント部95を通過して、給湯接続口17から外部に供給されるようになっている。
【0040】
また、図8に示すように、膨張タンク50の近傍に設けられた自動注水弁74に接続された注水管76の一端部側と反対側の他端部側は給湯接続口17の上方に設けられたジョイント部105に接続されている。注水管76には、給湯接続口17に供給される湯の一部が分岐し、ジョイント部105から供給され、膨張タンク50に向かって供給されるようになっている。
【0041】
さらに、暖房循環ポンプ59と暖房用熱交換器46(図6参照)との間には熱交換器往き管88が接続されている。また、熱交換器往き管88の長手方向の略中央には分岐口88aが設けられ、分岐口88aには暖房低温往き管91が接続され、底板5に固定された低温往き接続口25に低温の湯を供給するために、その分岐口88aと接続した一端側と反対側の他端部は、ジョイント部99に接続されている。こうして、暖房循環ポンプ59から加圧された湯は、熱交換器往き管88と、熱交換器往き管88の分岐口88aから分岐した暖房低温往き管91とに分岐してそれぞれに供給されることになる。
【0042】
さらに、膨張タンク50の下部に接続されたジャバラ状のタンク往き管47の一端側と反対側の他端側は暖房循環ポンプ59の入水口59a(図5参照)に接続されている。
【0043】
そして、図8に示す暖房戻り接続口22には図示外の暖房戻り配管が接続され、暖房戻り配管の暖房戻り接続口22と接続する一端側とは反対側の他端部側は上述のタンク戻り管44に接続されている。したがって、外部の暖房用の放熱器(図示外)で熱が回収された湯は、暖房戻り接続口22に戻り、暖房戻り配管(図示外)、タンク戻り管44の順に通過して膨張タンク50に供給されるようになっている。
【0044】
また、図8に示すように、ジョイント部92の下方に設けられたジョイント部94と、風呂循環ポンプ32の上方に設けられたジョイント部95とにはポンプ往き管89が接続されている。ポンプ往き管89内はジョイント部94からジョイント部95に向かって湯が流れ、風呂循環ポンプ32に供給されるようになっている。そして、風呂循環ポンプ32の上方のジョイント部95に隣接して設けられたジョイント部96と風呂用熱交換器51とには、風呂用熱交換器往き管98が接続されている。風呂用熱交換器往き管98内は、風呂循環ポンプ32によって、ジョイント部96から風呂用熱交換器51に向かって湯が流れるようになっている。
【0045】
さらに、図9に示すように、フロントカバー4の内側の面の下部に、給湯暖房機1内に組み付けられた各装置の制御を行うコントローラ60が固定されている。コントローラ60は、図示外のリモコンの指示により各装置の運転制御及び各配管に設けられた弁の開閉制御を行っている。
【0046】
尚、各装置を組み付けたバックカバー3に、各装置を組み付けた底板5を固定した後は、図4に示すバックカバー3の天板8の端部に設けられたフランジ2aと、左側壁3aの端部に設けられたフランジ2bと、右側壁3bの端部に設けられたフランジ2cと、底板5の端部に設けられたフランジ5cとに、フロントカバー4の外周枠に設けられた突出部4aを当接させ、フランジ2aと固定5cとに設けられた取付穴に固定されることにより、底板5が固定されたバックカバー3の開放される前面側にフロントカバー4が固定され、図1又は図2に示す略直方体状の給湯暖房機1が組み立てられるようになっている。
【0047】
次に、バックカバー3と底板5との固定方法の変形例について、図10を参照して説明する。図10は、バックカバー3と底板5との固定方法の変形例を示す斜視図である。図10に示すように、バックカバー3の背面壁3cの下端部には、背面壁3cと一体成形されたフランジ300が延設され、フランジ300はフロントカバー4が固定される側に向かって、背面壁3cに対して略直角方向に折り曲げられている。そしてフランジ300には、底板5を固定するための4つの固定穴310が等間隔に設けられている。また、バックカバー3の左側壁3aの下端部には、左側壁3aと一体成形されたフランジ372が延設され、フランジ372は右側壁3b側に向かって、左側壁3aに対して略直角方向に折り曲げられている。そしてフランジ372には、底板5を固定するための3つの固定穴373が等間隔に設けられている。さらに、バックカバー3の右側壁3bの下端部には、右側壁3bと一体成形されたフランジ382が延設され、フランジ382は左側壁3a側に向かって、右側壁3bに対して略直角方向に折り曲げられている。そしてフランジ382には、底板5を固定するための3つの固定穴383が等間隔に設けられている。
【0048】
また、図10に示すように、フランジ300が当接する底板5の端部(フロントカバー4の固定側端部)には、4つの固定穴310に各々対向する4つの取付穴360が設けられている。そして、フランジ372が当接する底板5の左端部には、3つの固定穴373に対向する3つの取付穴370が設けられている。さらに、フランジ382が当接する底板5の右端部には、3つの固定穴383に対向する3つの取付穴380が設けられている。尚、図10に示すフランジ300,372,382が、「第3のフランジ」に相当する。
【0049】
そして、バックカバー3の背面壁3cを床面側に載置し、バックカバー3のフランジ300,372及び382の外側面に、底板5の各端部を当接させる。この時に、固定穴310と取付穴360、固定穴373と取付穴370、固定穴383と取付穴380とが対向するので、底板5側からバックカバー3側に向かって一方向に、各々の固定穴と取付穴とをビス等で固定することができる。したがって、バックカバー3と底板5との固定が容易となり、効率的に固定作業を行うことができる。
【0050】
以上説明したように、本実施の形態の給湯暖房機1は、前面及び底面が開放された略直方体状のバックカバー3には、給湯用バーナ43と、暖房用バーナ49と、給湯用熱交換器45と、暖房用熱交換器46と、給湯用ファン41と、暖房用ファン42と、膨張タンク50とが組み付けられ、底板5には、給湯用ガス開閉器54と、暖房用ガス開閉器35と、風呂循環ポンプ32と、暖房循環ポンプ59とが組み付けられる。したがって、底板5への各装置の組み付け時に、筐体2の他の壁面が邪魔になることもなくその作業が容易である。しかも、バックカバー3に固定される前段階の底板5に組み付けられた各装置は外部に露出された状態となり、水量調整器61の水洩れ検査、給湯用ガス開閉器54及び暖房用ガス開閉器35のガス洩れ検査、又は各装置の交換作業を容易に行うことができる。さらに、各検査が合格した時点で、各装置が組み付けられたバックカバー3の背面壁3cを床面側に載置し、開放された底面側に向かって、各装置が組み付けられた底板5を装着し、バックカバー3の下端部に設けられたフランジ30の4つの固定穴31と底板5の取付穴36とを、底板5側からビスで固定する。そして、底板5の両端部に設けられたフランジ5a,5bに設けられた固定穴37,38と、バックカバー3の下端部に設けられた取付穴33,34とをビスでバックカバー3の左側壁3a及び右側壁3bの外側面から各々固定する。よって、各取付穴及び各固定穴は、床面側に隠れることがないので、バックカバー3及び底板5を置き換えることなく、バックカバー3に底板5を固定することができるので、給湯暖房機1の組み立てが容易に行うことができる。
【0051】
尚、本発明の給湯機及び給湯機の組立方法では、上記の実施の形態に限定されることなく、各種の変更が可能である。上記実施の形態では、給湯機能と暖房機能とを併せもつ給湯暖房機1を一実施の形態として説明したが、給湯機能のみを備えた給湯機、又は暖房機能のみを備えた温水暖房装置等においても適用可能である。
【0052】
【発明の効果】
以上説明したように、請求項1に係る発明の給湯機によれば、筐体はバックカバーと、底板と、フロントカバーとによって構成され、給湯機内に固定される装置全てがバックカバーに固定されるのではなく、バックカバーには送風ファンと、バーナと、熱交換器とが固定され、底板には水量調整器と、燃料調整器と、給水接続口と、ガス接続口と、給湯接続口とが固定され、その後にバックカバーに底板が組み付けられるので、給湯機を組み立て易く、作業時間を短縮することができる。また、バックカバーに底板を固定する前段階において、底板に固定された水量調整器及び燃料調整器等が外部に露出され、水量調整器及び燃料調整器等の検査や装置の取り替え作業等を容易に行うことができる。
【0053】
請求項2に係る発明の給湯機では、請求項1に記載の発明の効果に加え、バックカバーに底板を組み付ける際に、バックカバーの背面側を床面等に載置し、バックカバーの開放される底面側から底板を当接すれば、第1のフランジに設けられた第1の固定穴と底板に設けられた第1の取付穴、及び第2のフランジに設けられた第2の固定穴とバックカバーに設けられた第2の取付穴が下に隠れることがなく、バックカバー及び底板を置き換えずに、一度に第1の固定穴と第1の取付穴及び第2の固定穴と第2の取付穴とを固定できる。したがって、作業の迅速化を図ることができ、作業時間を短縮することができる。
【0054】
請求項3に係る発明の給湯機では、請求項1に記載の発明の効果に加え、バックカバーに底板を組み付ける際に、バックカバーの背面を床面等に載置し、バックカバーの開放される底面側に向かって底板を当接すれば、第3のフランジの第3の固定穴と底板の第3の取付穴とを底板側からバックカバー側に向かって、一方向に固定できるので、給湯機の組立作業を迅速に行うことができ、作業時間を短縮することができる。
【0055】
請求項4に係る発明の給湯機の組立方法では、バックカバーの内側に、バーナと、送風ファンと、熱交換器とを固定し、次に底板の筐体内側の表面側に、水量調整器と、燃料調整器とを固定した後に、底板をバックカバーの底面側から固定するので、全ての装置をバックカバーに一度に固定する必要がなく、バックカバーと底板とに分けて固定することができる。したがって、バックカバーに底板が固定される前段階において、底板に固定された水量調整器及び燃料調整器等は外部に露出された状態であるので、水量調整器及び燃料調整器等の検査がしやすく、作業時間の短縮を図ることができる。
【図面の簡単な説明】
【図1】図1は、給湯暖房機1の正面図である。
【図2】図2は、給湯暖房機1の側面図である。
【図3】図3は、給湯暖房機1の底面図である。
【図4】図4は、バックカバー3と底板5との固定方法を示す斜視図である。
【図5】図5は、底板5に各装置を組み付けた状態を示す底板5の正面図である。
【図6】図6は、バックカバー3に膨張タンク50以外の各装置を組み付けた状態を示すバックカバー3の正面図である。
【図7】図7は、図6のバックカバー3に膨張タンク50を組み付けた状態を示すバックカバー3の正面図である。
【図8】図8は、フロントカバー4を外した状態を示す給湯暖房機1の正面図である。
【図9】図9は、給湯暖房機1の縦断面図である。
【図10】図10は、バックカバー3と底板5との固定方法の変形例を示す斜視図である。
【符号の説明】
1 給湯暖房機
2 筐体
3 バックカバー
4 フロントカバー
5 底板
16 給水接続口
17 給湯接続口
18 オーバーフロー排出口
61 水量調整器
32 風呂循環ポンプ
35 暖房用ガス開閉器
41 給湯ファン
42 暖房ファン
43 給湯用バーナ
45 給湯用熱交換器
46 暖房用熱交換器
49 暖房用バーナ
50 膨張タンク
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a water heater and a method for assembling a water heater, and more particularly, to a water heater for recovering heat from combustion gas of a burner to overheat water and supplying hot water, and a method for assembling the water heater. .
[0002]
[Prior art]
Conventionally, a water heater has a box-shaped housing with an open front, and a burner as a heat source device, a blower for supplying air to the burner, a heat exchanger for heating water, and a heat exchanger are provided in the housing. A fuel supply device that adjusts the amount of gas to be used and a device that includes each device such as a circulation pump that circulates hot water to an external radiator or the like are known (see, for example, Patent Document 1). In such a water heater, the front panel can be attached to and detached from the opening on the front surface of the housing, and by removing the front panel, maintenance work and replacement work of the device assembled inside the housing can be performed. It was possible.
[0003]
[Patent Document 1]
JP-A-9-126479
[0004]
[Problems to be solved by the invention]
However, at the time of assembling the water heater described in Patent Document 1, each of the above-described devices is assembled inside the housing, so that it is difficult to position the assembly of each device in the housing, and it is difficult to rationalize automatic assembly work and the like. There was a problem. In addition, in the state where the water heater is assembled, since the devices are assembled in a state of overlapping each other in the housing, replacement work of each component device from the front surface of the housing from which the front panel has been removed, inspection, etc. However, it was difficult and took a long time.
[0005]
SUMMARY OF THE INVENTION The present invention has been made to solve the above-described problems, and it is an object of the present invention to provide a hot water heater and a hot water heater assembling method that simplify the assembly of each device constituting the hot water heater and can be easily assembled. To do.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, a water heater according to claim 1 is provided in a casing with a burner, a blower fan for blowing air to the burner, and above the burner, and from the combustion gas of the burner. A heat exchanger that recovers heat and heats the water, a water amount regulator that adjusts the amount of water supplied to the heat exchanger, and a fuel regulator that adjusts the amount of fuel supplied to the burner In the water heater, the housing has a substantially rectangular parallelepiped back cover whose front and bottom surfaces are open at the time of installation, a bottom plate detachably fixed to the bottom surface of the back cover, and a front surface of the back cover. The burner, the blower fan, and the heat exchanger are fixed to the back cover, and the water amount adjuster and the fuel are fixed to the bottom plate. The regulator and the water A water supply connection port to be supplied, a gas connection port to which gas fuel is supplied, and a hot water supply connection port from which hot water heated by the heat exchanger is discharged are fixed, and in the fixed state, the back cover The bottom plate is assembled to the base plate.
[0007]
At the time of assembling the water heater having this configuration, the burner, the blower fan, and the heat exchanger are fixed to the back cover whose front and bottom surfaces are open at the time of installation, and the water amount adjuster, the fuel are fixed to the bottom plate. The regulator, water supply connection port, gas connection port and hot water supply connection port are fixed, and then the bottom plate is assembled to the back cover. Since it can do without obstructing a wall surface, assembly of a water heater can be made easy. In addition, in the previous stage of fixing the bottom plate to the back cover, the device fixed to the bottom plate is exposed to the outside, and it is easy to inspect the water amount regulator and the fuel regulator fixed to the bottom plate, and the device replacement work Etc. are easy to do.
[0008]
In addition to the configuration of the invention described in claim 1, the water heater according to claim 2 is provided at an end portion on the bottom surface side of the back surface of the back cover, and extends from the back surface of the back cover toward the front cover. A first flange projecting in a direction substantially perpendicular to the back surface, a first fixing hole provided in the first flange, and the bottom plate abutting on the first flange, A first mounting hole that faces one fixing hole, and both ends of the bottom plate that are in contact with the ends of both side surfaces of the back cover, and is substantially facing the bottom plate toward the top of the back cover. A second flange each projecting in a right angle direction, a second fixing hole provided in each of the second flanges, and provided in the vicinity of both ends of the back cover in contact with the second flange, Each in the second fixing hole And a second mounting hole opposite.
[0009]
In the water heater having this configuration, in addition to the operation of the invention according to claim 1, in the mounting operation of the bottom plate to the back cover, when the back side of the back cover assembled with each device is placed on the floor surface or the like, The first fixing hole provided in the first flange and the first mounting hole provided in the bottom plate, and the second fixing hole provided in the second flange and the second mounting hole provided in the back cover Since they are not hidden on the floor surface side, the bottom plate can be quickly fixed to the back cover without replacing the back cover and the bottom plate during the mounting operation.
[0010]
Further, in addition to the configuration of the invention according to claim 1, the water heater according to claim 3 is provided at each of the back surface side and the bottom surface side end of the side surface of the back cover, and the inside toward the back cover. Three third flanges each projecting in a direction substantially perpendicular to the back surface and the side surface, a third fixing hole provided in each of the third flanges, and the bottom plate in contact with the third flange And third mounting holes that are respectively provided and that face the third fixing holes.
[0011]
In the water heater of this configuration, in addition to the operation of the invention according to claim 1, when the back side of the back cover assembled with each device is placed on the floor surface or the like, it is unidirectional from the bottom plate side toward the back cover. Since the third fixing hole provided in the third flange and the third mounting hole provided in the bottom plate can be fixed by the fixing tool, the assembling work can be performed quickly.
[0012]
The method for assembling the hot water supply apparatus according to claim 4 includes a substantially rectangular parallelepiped back cover whose front and bottom surfaces are open at the time of installation, a bottom plate fixed to the bottom surface of the back cover, and a front surface of the back cover. A burner that burns a mixed gas of air and fuel, a blower fan that blows air to the burner, and an upper part of the burner. A heat exchanger that recovers heat from the combustion gas and heats the water, a water amount regulator that adjusts the amount of water supplied to the heat exchanger, and a fuel regulator that adjusts the amount of fuel supplied to the burner; A method of assembling a water heater, wherein the step of fixing the burner, the blower fan, and the heat exchanger to the back cover, the water amount adjuster, and the fuel adjuster to the bottom plate When And fixing, characterized in that it comprises a step of fixing the bottom plate from the bottom side of the back cover.
[0013]
In the assembling method of the water heater having this configuration, the burner, the blower fan, and the heat exchanger are fixed to the back cover, and the water amount adjuster and the fuel adjuster are fixed to the bottom plate. Secure from the bottom side of the cover. Therefore, since most of the devices to be assembled in the housing are directly assembled to the bottom plate, it is easy to fix the devices such as the water amount regulator and the fuel regulator to the bottom plate, and since they are exposed to the outside, It is easy to inspect each fixed device.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In one embodiment of the present invention, a hot water supply function for heating supplied tap water and supplying hot water to the outside, and supplying hot water to an external room and a radiator (not shown) installed under the floor, A hot water heater 1 having both a heating function for heating a floor and a floor will be described in detail as an embodiment of the present invention. First, the external appearance of the hot water heater 1 will be described with reference to FIGS. 1 to 4. FIG. 1 is a front view of a hot water heater 1, FIG. 2 is a side view of the hot water heater 1, FIG. 3 is a bottom view of the hot water heater 1, and FIG. It is a perspective view which shows the fixing method with the baseplate 5. FIG. As shown in FIGS. 1, 2 and 3, the hot water heater 1 includes a substantially rectangular parallelepiped casing 2, and the casing 2 has a substantially rectangular parallelepiped shape with a width of 451 mm, a height of 600 mm, and a depth of 240 mm. It is a box. Further, as shown in FIG. 2 or FIG. 4, the housing 2 is formed by bending a single flat plate having a substantially rectangular shape in plan view into a substantially U-shaped shape in plan view, and left side wall 3a, right side wall 3b and back wall 3c. And a bottom plate fixed to the open bottom side of the back cover 3. 5 and a front cover 4 fixed to the front side facing the back wall 3c of the back cover 3.
[0015]
First, the front cover 4 of the hot water heater 1 will be described with reference to FIGS. 1 and 2. As shown in FIGS. 1 and 2, a front cover 4 having a substantially rectangular shape in front view is fixed to the front side of the hot water heater 1 on the front side where the back cover 3 is opened. An exhaust port 7 having a substantially circular shape in front view is formed in the approximate center of the upper portion of the front cover 4. A substantially columnar exhaust adapter 6 whose center is penetrated in the same shape as the exhaust port 7 is projected from the front cover 4 in the horizontal direction on the outer peripheral frame of the exhaust port 7 (see FIG. 2). The exhaust port 7 is fitted with a slit hole-like cover 7a that prevents foreign matter from entering from the outside.
[0016]
As shown in FIG. 1, a cable connection door 10 having a substantially rectangular shape in a front view for obstructing the opening is provided on the lower side of the front cover 4 on the right side, and the upper portion thereof is formed by screws 10a and 10b. The front cover 4 is fixed. A controller 60 (see FIG. 9), which will be described later, is provided on the back surface side of the cable connection door 10. The connection door 10 can be removed from the front cover 4 to perform the work. An injection door 9 having a substantially rectangular shape in front view that closes the opening is also fixed by a screw 9a in the vicinity of the left corner of the upper portion of the front cover 4. The injection door 9 is removed from the front cover 4 when water, antifreeze, etc. are directly injected into an expansion tank 50 (see FIG. 8), which will be described later, so that an injection operation can be performed. Further, as shown in FIGS. 1 and 2, flanges 2 a, 2 b and 2 c (see FIG. 4) of the back cover 3, which will be described later, and a flange 5 c of the bottom plate 5 (see FIG. 4) ) And a protruding portion 4a that is fixed in contact therewith.
[0017]
Next, the mounting plates 11 and 12 of the hot water heater 1 will be described with reference to FIG. 1 or FIG. As shown in FIG. 1 or FIG. 2, a mounting plate 11 having a substantially rectangular shape in front view for fixing the hot water heater 1 to a wall or the like is provided at the upper end of the hot water heater 1 on the back side (see FIG. 2). The mounting plate 11 is provided with a plurality of substantially circular mounting holes 11a and a plurality of substantially elliptical mounting holes 11b. The hot water heater 1 is attached to the wall by passing screws or the like through the attachment holes 11a and 11b provided in the attachment plate 11 and fixing them to the wall. Further, a mounting plate 12 having the same shape as the mounting plate 11 is also provided at the lower end of the back surface of the hot water heater 1. The mounting plate 12 is also provided with a plurality of substantially circular mounting holes 12a and a plurality of substantially elliptical mounting holes 12b. The mounting holes 12a and 12b of the mounting plate 12 pass through screws, The hot water heater 1 can be firmly fixed to the wall surface.
[0018]
Next, the bottom plate 5 of the hot water heater 1 will be described with reference to FIGS. 1, 2, and 3. As shown in FIG. 3, the bottom plate 5 of the hot water heater 1 is provided with three cable connection ports 15a, 15b and 15c to which cables are connected to the hot water heater 1. The cable connection port 15a is connected to the hot water heater. 1 is provided near the corner of the bottom plate 5 sandwiched between the end portion of the bottom plate 5 on the front cover 4 side and the right end portion of the bottom plate 5, and the remaining two cable connection ports 15 b and 15 c are provided on the bottom plate on the front cover 4 side. 5 is provided substantially in parallel with the surface of the front cover 4 in the vicinity of the center of the end portion of the front cover 4. Further, a hot water supply connection port 17 through which hot water heated by the hot water heater 1 is supplied to the outside is provided in the vicinity of the corner between the back side end and the right end of the bottom plate 5. Is provided with a drain plug 28 for draining water in the hot water heater 1 to prevent freezing. Further, at a position sandwiched between the cable connection port 15a and the hot water supply connection port 17, an overflow discharge in which hot water overflowed from an expansion tank 50 (see FIG. 8), which will be described later, provided in the hot water heater 1 is discharged to the outside. An outlet 18 is provided.
[0019]
Further, a water supply connection port 16 through which water is supplied to the hot water heater 1 is provided between the hot water supply connection port 17 and the cable connection ports 15b and 15c. A strainer 26 is provided for filtering foreign substances contained therein. Further, a gas connection port 27 for supplying gas to the hot water heater 1 is provided in the vicinity of the cable connection ports 15b and 15c on the left side in FIG. Further, between the gas connection port 27 and the left end portion of the bottom plate 5, there are six low temperature forward connection ports 25 through which low temperature hot water is supplied from the hot water heater 1 to the outside (mainly pipes for warming the floor). The front cover 4 is provided in two rows in parallel (three low-temperature forward connection ports 25 in one row). Moreover, it is provided from the approximate center of the left end portion of the bottom plate 5 toward the approximate center of the back side end portion of the bottom plate 5, and hot water heated by the hot water heater 1 is externally provided at the left end portion of the bottom plate 5. A pair of a heating connection port 23 supplied to a connected high-temperature radiator for heating (not shown) and a heating return connection port 22 through which hot water radiated by the high-temperature radiator is returned to the hot water heater 1 are paired. Next to it, a hot water heater 1 is connected to a bath connection port 21 to which a hot water heated by the hot water heater 1 is connected to the outside (not shown), and hot water circulates from the bath. A pair of bath return connection ports 20 returned to 1 are provided.
[0020]
Next, a method of fixing the top plate 8 and the peripheral wall portion 13 constituting the back cover 3 will be described with reference to FIG. As shown in FIG. 4, both end portions of the top plate 8 contacting the upper end portion of the left side wall 3a and the upper end portion of the right side wall 3b are substantially perpendicular to the direction of the left side wall 3a and the right side wall 3b. Each is bent to form flanges 55 and 56. Similarly, the end portion of the top plate 8 that contacts the upper portion of the back wall 3c is provided with a flange 57 that is bent substantially at a right angle toward the back wall 3c. The inner surfaces of the flanges 55 and 56 provided at both ends of the top plate 8 are in contact with the outer surfaces of the left side wall 3a and the right side wall 3b, and the inner side surface of the flange 57 is similarly formed on the rear wall 3c. It is in contact with the outer surface. The three fixing holes (not shown) provided in the flanges 55, 56 and 57 of the top plate 8 are three attachment holes provided in the end portions of the left side wall 3a, the right side wall 3b and the back wall 3c, respectively. The top plate 8 is fixed to the upper portion of the peripheral wall portion 13 by fixing the fixing hole and the mounting hole with screws 39, respectively. The top plate 8 is in contact with the upper end portion of the peripheral wall portion 13, but the flanges 55, 56, 57 are in contact with and fixed to the inner surface of the upper end portion of the peripheral wall portion 13. Any one or two of them may be in contact with the inner surface. Further, the number of fixing holes of the flanges 55 to 57 and the mounting holes of the left side wall 3a, the right side wall 3b, and the back wall 3c are not limited to the above and may be freely changed.
[0021]
Further, the front side end of the top plate 8 that forms the outer peripheral frame of the open front side of the back cover 3 to which the front cover 4 is fixed, the front side end of the left side wall 3a, and the front side of the right side wall 3b. At the end, flanges 2a, 2b and 2c to which the front cover 4 is fixed are provided. In the vicinity of both ends perpendicular to the longitudinal direction of the flange 2a, there are provided fixing holes 14 to which the front cover 4 is abutted and fixed.
[0022]
As shown in FIG. 4, three attachment holes 33 are provided in the vicinity of the end of the left side wall 3 a that comes into contact with a flange 5 a of the bottom plate 5 described later, and the end of the right side wall 3 b that comes into contact with the flange 5 b of the bottom plate 5. Three attachment holes 34 are provided in the vicinity of the portion. The attachment holes 33 and 34 are respectively opposed to the three fixing holes 37 and 38 provided in the flanges 5a and 5b of the bottom plate 5. The number of mounting holes 33 and 34 is not limited to the above, and may be changed freely.
[0023]
Next, the flange 30 fixed to the back cover 3 will be described with reference to FIG. As shown in FIG. 4, the flange 30 is an angle member having a substantially L-shaped cross-sectional view perpendicular to the longitudinal direction, and the flange 30 is formed so that the side forming the right angle portion faces the inside of the back cover 3. One of two pieces constituting a substantially L-shape of 30 is abutted and fixed along the end of the back wall 3c of the back cover 3. Therefore, one piece of the flange 30 is provided so as to protrude from the end of the back wall 3c toward the front surface side of the back cover 3 to which the front cover 4 is fixed in a substantially perpendicular direction. Then, four fixing holes 31 are provided in the one piece of the flange 30 on the side where the bottom plate 5 abuts. The flange 30 shown in FIG. 4 corresponds to a “first flange”.
[0024]
The flange 30 of the present embodiment is a member different from the peripheral wall portion 13 of the back cover 3, but is integrally formed on the peripheral wall portion 13 as the same flat plate having the shape of the flange 30, and the end portion of the back wall 3 c. The extending flange 30 may be bent in a substantially right angle direction toward the side to which the front cover 4 is fixed.
[0025]
Next, the bottom plate 5 will be described with reference to FIG. As shown in FIG. 4, the bottom plate 5 having a substantially rectangular shape in plan view is fixed from the bottom surface side of the back cover 3 to be opened. And the edge part of the baseplate 5 contact | abutted with the left side wall 3a of the back cover 3 is bent in the substantially right angle direction toward the fixed side of the back cover 3, and the flange 5a is formed. The inner surface of the flange 5 a comes into contact with the outer surface of the end of the left side wall 3 a of the back cover 3. Similarly, the end of the bottom plate 5 that contacts the right side wall 3b of the back cover 3 is also bent in a substantially right angle direction toward the fixed side of the back cover 3 to form a flange 5b. The inner surface of the flange 5b comes into contact with the outer surface of the end portion of the right side wall 3b of the back cover 3. Further, the flange 5a and the flange 5b are respectively provided with three fixing holes 37 and 38 that are fixed to the open bottom side end of the back cover 3. The fixing holes 37 and 38 are provided at positions facing the mounting holes 33 and 34 provided in the left side wall 3a and the right side wall 3b of the back cover 3 described above. Further, in the vicinity of the end of the bottom plate 5 fixed in contact with the flange 30 provided on the back cover 3, four mounting holes 36 are provided at positions facing the four fixing holes 31 of the flange 30. Yes. The fixing hole 37 and the mounting hole 33, and the fixing hole 38 and the mounting hole 34 are fixed with screws 40 as shown in FIG.
[0026]
Further, the end of the bottom plate 5 to which the front cover 4 is fixed is bent in a direction substantially perpendicular to the bottom plate 5 toward the side opposite to the inner side of the back cover 3, thereby forming a flange 5c. And the fixing hole 19 which the protrusion part 4a of the front cover 4 contact | abuts and is fixed to the flange 5c is provided in the both ends vicinity of the flange 5c. Note that the flanges 5b and 5c shown in FIG. 4 correspond to the “second flange”.
[0027]
Further, as shown in FIG. 4, the bottom plate 5 has fixing holes 15a1, 15b1, 15c1 to which the cable connection ports 15a, 15b, and 15c are fixed, a fixing hole 17a to which the hot water supply connection port 17 is fixed, and an overflow discharge. A fixing hole 18a to which the outlet 18 is fixed, a fixing hole 16a to which the water supply connection port 16 is fixed, a fixing hole 27a to which the gas connection port 27 is fixed, and six low-temperature forward connection ports 25 are fixed 6 respectively. One fixing hole 25a, a fixing hole 23a for fixing the heating return connection port 23, a fixing hole 22a for fixing the heating return connection port 22, and a fixing hole 21a for fixing the bathing connection port 21; Each fixing hole is provided at each position of the bottom plate 5 corresponding to the fixing place of each device fixed to the bottom plate 5 of FIG. 3 described above with the fixing hole 20a to which the bath return connection port 20 is fixed.
[0028]
Next, the structure of each apparatus which comprises the hot water heater 1 assembled | attached to the baseplate 5 is demonstrated with reference to FIG. FIG. 5 is a front view of the bottom plate 5 showing a state in which each device is assembled to the bottom plate 5. Each device is assembled on the surface side of the bottom plate 5 that is fixed to the back cover 3 (upper surface side of the bottom plate 5 in FIG. 5). Above the gas connection port 27 fixed to the back side of the bottom plate 5, a hot water supply gas switch 54 for adjusting the amount of gas supplied from the gas connection port 27 to be supplied to a hot water supply heat exchanger 45, which will be described later, Further, a heating gas switch 35 for adjusting the amount of gas supplied to a heating heat exchanger 46 (see FIG. 6), which will be described later, is provided thereabove. A bath circulation pump 32 that is located below the heating gas switch 35 and adjacent to the hot water supply gas switch 54 is assembled to the bottom plate 5. The bath circulation pump 32 is a device that circulates hot water by pressurizing a bath (not shown). Also, below the heating gas switch 35, joint portions 95 and 96 described later are provided. The hot water supply gas switch 54 and the heating gas switch 35 shown in FIG. 5 correspond to a “fuel regulator”.
[0029]
Further, as shown in FIG. 5, the heat of hot water heated by the heating heat exchanger 46 is recovered above the six low-temperature forward connection ports 25 fixed to the back surface side of the bottom plate 5, and is not shown in the figure. A bath heat exchanger 51 for reheating and reheating the hot water circulating through the bath and the hot water heater 1 is provided above the bath heat exchanger 51 and supplied from an expansion tank 50 described later. There is provided a heating circulation pump 59 that pressurizes hot water and supplies it to the heating heat exchanger 46. The heating circulation pump 59 is provided with a water inlet 59a to which hot water supplied from the expansion tank 50 is supplied. Further, below the bath heat exchanger 51 and in the vicinity of the end of the bottom plate 5, a hot water supply path to the bath heat exchanger is opened and closed in accordance with an instruction from a controller 60 (see FIG. 9) described later. A bath heat valve 24 is provided.
[0030]
Furthermore, as shown in FIG. 5, above the water supply connection port 16 fixed to the back surface side of the bottom plate 5, a hot water supply heat exchanger 45 (see FIG. 6), which will be described later, and a heating heat exchanger 46 are provided. A water amount adjuster 61 for adjusting the amount of water to be supplied is provided, and a water supply pipe 75 for hot water supply is connected to the water amount adjuster 61, and the other end opposite to the connected one end is connected to the right side wall 3b. It is connected to a joint portion 92 provided in the vicinity.
[0031]
Next, the structure of each apparatus assembled | attached to the back cover 3 is demonstrated with reference to FIG.6 and FIG.7. 6 is a front view of the back cover 3 showing a state where each device other than the expansion tank 50 is assembled to the back cover 3, and FIG. 7 shows a state where the expansion tank 50 is assembled to the back cover 3 of FIG. 2 is a front view of a back cover 3. FIG. First, in the upper part inside the back cover 3, a substantially inverted triangle in front view is provided so that exhaust gas discharged by combustion of a hot water supply burner 43 and a heating burner 49 described later does not leak into the entire hot water heater 1. An exhaust cover 48 having a shape is fixed by a plurality of screws in the vicinity of the end portion of the back cover on the top plate 8 side. An exhaust port 62 having a substantially circular shape when viewed from the front is provided at a substantially central portion of the exhaust cover 48, and a substantially donut shape when viewed from the front with the center penetrating in the same shape as the exhaust port 62 is formed in the outer peripheral frame of the exhaust port 62. The exhaust adapter 63 protrudes from the exhaust cover 48 in the horizontal direction. A slit hole-like cover 62 a that prevents foreign matter from entering is fitted inside the exhaust port 62. Further, the exhaust adapter 63 is adapted to be fitted to the back side of the exhaust adapter 6 provided on the front cover 4 described above.
[0032]
Further, as shown in FIG. 6, a hot water supply burner for burning a mixed gas of supplied air and gas is provided in the vicinity of the center between the top plate 8 of the back cover 3 and the bottom surface side to which the bottom plate 5 is fixed. 43, and a heating burner 49 is provided in parallel with the hot water supply burner 43 on the left wall 3a side of the hot water supply burner 43. An igniter 110 (see FIG. 9) is provided on the back wall 3c side of the back cover 3 of the hot water supply burner 43, and an ignition operation is performed on the hot water supply burner 43 according to a control instruction of the controller 60 described later. Similarly, the heating burner 49 is provided with an igniter (not shown), and the heating burner 49 is ignited by a control instruction from the controller 60 described later.
[0033]
Further, a hot water supply heat exchanger 45 is provided above the hot water supply burner 43, and recovers heat from the combustion gas of the hot water supply burner 43 and passes through the hot water supply heat exchanger 45. The water in 71 is heated. A heating heat exchanger 46 is provided on the left wall 3a side of the hot water supply heat exchanger 45 in parallel with the hot water supply heat exchanger 45 so as to be positioned above the heating burner 49 described above. It has been. Similarly, the heating heat exchanger 46 collects heat from the combustion gas of the heating burner 49, and the water passing through the heating heat transfer pipe (not shown) in the heating heat exchanger 46 is heated. It has become so. Since the hot water heater 1 has both a hot water supply function and a heating function as described above, the hot water supply heat exchanger 45 and the heating heat exchanger 46 are separately provided and heated by the hot water supply heat exchanger 45. The hot water is supplied to the hot water supply connection port 17 and a bath (not shown), and the hot water heated by the heating heat exchanger 46 is supplied to a radiator (not shown). Further, a bypass pipe 72 is connected to the joint portion 93 provided on the lower side of the right side wall 3b side of the hot water supply heat exchanger 45, and water supplied from the water supply connection port 16 shown in FIG. The hot water heated by the hot water supply heat exchanger 45 is mixed. The hot water supply heat exchanger 45 is connected to a hot water supply pipe 53 (see FIG. 9) for supplying water supplied from the water supply connection port 16 to the hot water supply heat exchanger 45.
[0034]
Furthermore, as shown in FIG. 6, a hot water supply fan 41 having a substantially circular shape in front view is fixed below the hot water supply heat exchanger 45, and the air sucked from the outside by driving the hot water supply fan 41 is It is supplied to the hot water supply burner 43 and used for combustion of the hot water supply burner 43. A heating fan 42 is fixed below the heating heat exchanger 46, and air sucked from the outside by driving the heating fan 42 is supplied to the heating burner 49. It has come to be used for combustion.
[0035]
Next, the expansion tank 50 will be described with reference to FIG. The expansion tank 50 is provided in the hot water heater 1 to absorb expansion and contraction of hot water circulating in the pipe of the radiator and the hot water heater 1 (not shown), and the amount of water in the hot water heater 1 becomes the required amount of water. Make adjustments to be retained. In the back cover 3 of FIG. 6 in which the respective devices are assembled as described above, between the hot water supply heat exchanger 45 and the heating heat exchanger 46 and the open front surface of the back cover 3 to which the front cover 4 is fixed. Is provided with an expansion tank 50 having a hollow inside. And from one end part of the expansion tank 50 by the side of the left side wall 3a of the back cover 3, the two arm-shaped protrusion parts 50a and 50b are protrudingly provided in the horizontal direction, and from the front-end | tip vicinity of protrusion part 50a, 50b. A shaft portion (not shown) protrudes downward. And the bearing part 52a, 52b which has a receiving hole (not shown) in which the axial part of protrusion part 50a, 50b can be inserted in the left side wall 3a by the side of the heat exchanger 46 for heating of the back cover 3 is the back cover 3. It protrudes toward the inside. The shaft portions of the protruding portions 50a and 50b are inserted into the receiving holes (not shown) of the bearing portions 52a and 52b, so that the expansion tank 50 has the left side wall 3a of the back cover 3 on the heating heat exchanger 46 side. Is pivotally supported. Since the expansion tank 50 is pivotally supported by the left side wall 3a of the back cover 3, the expansion tank 50 can be opened to the left side in FIG.
[0036]
A bellows-shaped tank return pipe 44 for supplying hot water returning from an external radiator (not shown) to the expansion tank 50 is connected to the lower part of the expansion tank 50, and in the vicinity of the tank return pipe 44. A bellows-shaped tank outlet pipe 47 for supplying hot water in the expansion tank 50 to the heating circulation pump 59 assembled to the bottom plate 5 is connected to the expansion tank 50. Since the bellows of the tank going-out pipe 47 and the tank returning pipe 44 can be contracted or extended, even if the expansion tank 50 rotates at the pivotal support portion on the inner side surface of the back cover 3, the tank going-out pipe 47 is extended from the expansion tank 50. And the tank return pipe 44 will not come off. Further, a discharge port 58 is provided at the end of the expansion tank 50 on the right side wall 3b side so that when hot water overflows into the expansion tank 50, the discharge port 58 is discharged to the outside. Are connected and extended downward.
[0037]
Further, as shown in FIG. 7, a through portion (not shown) that penetrates the inside of the expansion tank 50 is provided in the vicinity of the front corner of the expansion tank 50 on the left side wall 3 a side of the back cover 3. A joint portion 78 is fixed to the portion by screws 78a and 78b, and is removable. Further, a water injection connecting pipe 77 is connected to the joint portion 78, an automatic water injection valve 74 is provided in the water injection connecting pipe 77, and a water injection pipe 76 is connected to the automatic water injection valve 74. Hot water heated by the hot water supply heat exchanger 45 passes through the water injection pipe 76, and the amount of hot water supplied to the expansion tank 50 is adjusted by opening and closing operation of the automatic water injection valve 74 according to an instruction from the controller 60 described later. The A carbon electrode sensor 97 for detecting the water level in the expansion tank 50 is provided in the expansion tank 50, and the detection value of the carbon electrode sensor 97 is transmitted to the controller, so that the water level in the expansion tank 50 is determined in advance. If the water level is lower, the automatic water injection valve 74 is opened, and hot water is supplied to the expansion tank 50.
[0038]
In addition, before fixing the bottom plate 5 to the back cover 3, each device assembled on the surface side of the bottom plate 5 is exposed to the outside (see FIG. 5), and the water amount regulator 61 leaks water. It is easy to inspect the gas leakage of the gas switch 54 for hot water supply and the gas switch 35 for heating. Further, it can be easily performed when a device that fails the inspection is detached and replaced. And when each inspection passes, the back wall 3c of the back cover 3 to which each device is assembled is placed on the floor surface side, and the bottom plate 5 to which each device is assembled is directed toward the opened bottom surface side. Installing. And each apparatus assembled | attached to the back cover 3 and each apparatus assembled | attached to the baseplate 5 mounted | worn from the bottom face side of the back cover 3 are mutually connected, and several piping through which water or gas passes is connected between each apparatus. Connect to each other. Then, the four fixing holes 31 of the flange 30 provided at the lower end of the back cover 3 and the mounting holes 36 of the bottom plate 5 are fixed with screws from the bottom plate 5 side. Furthermore, fixing holes 37 and 38 provided in the flanges 5a and 5b provided at both ends of the bottom plate 5 and mounting holes 33 and 34 provided in the lower end of the back cover 3 are connected with screws 40 (see FIG. 2). The back cover 3 is fixed from the outer side surfaces of the left side wall 3a and the right side wall 3b. Therefore, since each mounting hole and each fixing hole are not hidden on the floor surface side, the bottom plate 5 can be fixed to the back cover 3 without replacing the back cover 3 and the bottom plate 5, as shown in FIG. Then, the assembly of the hot water heater 1 is completed.
[0039]
Next, the configuration of the hot water heater 1 in which the bottom plate 5 to which each device is assembled is fixed to the back cover 3 to which each device is assembled will be described with reference to FIG. 8 or FIG. FIG. 8 is a front view of the hot water heater 1 showing a state where the front cover 4 is removed, and FIG. 9 is a longitudinal sectional view of the hot water heater 1. As shown in FIG. 8, a bottom plate 5 to which each device is assembled is fixed to the open bottom side of a back cover 3 (see FIG. 7) to which each device is assembled. The method for fixing the bottom plate 5 to the back cover 3 is as described above. As shown in FIG. 8, the other end of the hot water supply water supply pipe 53 connected to the hot water supply heat exchanger 45 (see FIG. 6) is connected to a joint portion 92 on the side opposite to the one end. As shown in FIG. 8 or FIG. 9, a hot water supply hot water supply pipe 73 through which hot water heated by the hot water supply heat exchanger 45 passes is connected to a joint part 93, and one end side of the bypass pipe 72 is connected to the joint part 93. The other end side opposite to the one end side is connected to the water amount adjuster 61. Further, as shown in FIG. 9, a hot water supply connecting pipe 90 is connected to the joint portion 93, and an end portion opposite to one end side connected to the joint portion 93 is connected to the joint portion 95. The hot water that has passed through the hot water supply connection pipe 90 passes through the joint portion 95 and is supplied to the outside from the hot water supply connection port 17.
[0040]
Further, as shown in FIG. 8, the other end side opposite to the one end side of the water injection pipe 76 connected to the automatic water injection valve 74 provided in the vicinity of the expansion tank 50 is provided above the hot water supply connection port 17. Connected to the joint portion 105. A part of the hot water supplied to the hot water supply connection port 17 is branched into the water supply pipe 76, supplied from the joint portion 105, and supplied toward the expansion tank 50.
[0041]
Further, a heat exchanger forward pipe 88 is connected between the heating circulation pump 59 and the heating heat exchanger 46 (see FIG. 6). In addition, a branch port 88 a is provided at substantially the center in the longitudinal direction of the heat exchanger forward pipe 88, a heating / low temperature forward pipe 91 is connected to the branch outlet 88 a, and a low temperature is connected to the low temperature forward connection port 25 fixed to the bottom plate 5. In order to supply the hot water, the other end portion opposite to the one end side connected to the branch port 88 a is connected to the joint portion 99. Thus, the hot water pressurized from the heating circulation pump 59 is branched into the heat exchanger forward pipe 88 and the heating low temperature forward pipe 91 branched from the branch port 88a of the heat exchanger forward pipe 88 and supplied to each. It will be.
[0042]
Furthermore, the other end of the bellows-shaped tank outlet pipe 47 connected to the lower part of the expansion tank 50 is connected to a water inlet 59a (see FIG. 5) of the heating circulation pump 59.
[0043]
A heating return pipe (not shown) is connected to the heating return connection port 22 shown in FIG. 8, and the other end side of the heating return pipe opposite to the one end side connected to the heating return connection port 22 is the tank described above. Connected to the return pipe 44. Accordingly, the hot water whose heat has been recovered by an external heating radiator (not shown) returns to the heating return connection port 22 and passes in the order of the heating return pipe (not shown) and the tank return pipe 44 in this order. To be supplied.
[0044]
As shown in FIG. 8, a pump forward pipe 89 is connected to a joint portion 94 provided below the joint portion 92 and a joint portion 95 provided above the bath circulation pump 32. Hot water flows from the joint portion 94 toward the joint portion 95 in the pump outgoing pipe 89 and is supplied to the bath circulation pump 32. A bath heat exchanger forward tube 98 is connected to the joint portion 96 provided adjacent to the joint portion 95 above the bath circulation pump 32 and the bath heat exchanger 51. In the bath heat exchanger forward pipe 98, hot water flows from the joint portion 96 toward the bath heat exchanger 51 by the bath circulation pump 32.
[0045]
Furthermore, as shown in FIG. 9, a controller 60 that controls each device assembled in the hot water heater 1 is fixed to the lower part of the inner surface of the front cover 4. The controller 60 performs operation control of each device and opening / closing control of valves provided in each pipe according to instructions from a remote controller (not shown).
[0046]
In addition, after fixing the baseplate 5 which each apparatus was assembled | attached to the back cover 3 which each apparatus was assembled | attached, the flange 2a provided in the edge part of the top plate 8 of the back cover 3 shown in FIG. 4, and the left side wall 3a Projection provided on the outer peripheral frame of the front cover 4 on the flange 2b provided on the end of the front cover 4, the flange 2c provided on the end of the right side wall 3b, and the flange 5c provided on the end of the bottom plate 5 The front cover 4 is fixed to the open front side of the back cover 3 to which the bottom plate 5 is fixed by bringing the portion 4a into contact and fixing to the mounting holes provided in the flange 2a and the fixing 5c. A hot water heater 1 having a substantially rectangular parallelepiped shape shown in FIG. 1 or FIG. 2 is assembled.
[0047]
Next, a modification of the method for fixing the back cover 3 and the bottom plate 5 will be described with reference to FIG. FIG. 10 is a perspective view showing a modification of the method for fixing the back cover 3 and the bottom plate 5. As shown in FIG. 10, a flange 300 integrally formed with the back wall 3 c is extended at the lower end portion of the back wall 3 c of the back cover 3, and the flange 300 is directed toward the side on which the front cover 4 is fixed. It is bent in a direction substantially perpendicular to the back wall 3c. The flange 300 is provided with four fixing holes 310 for fixing the bottom plate 5 at equal intervals. Further, a flange 372 integrally formed with the left side wall 3a is extended at the lower end portion of the left side wall 3a of the back cover 3, and the flange 372 is substantially perpendicular to the left side wall 3a toward the right side wall 3b. Is bent. The flange 372 is provided with three fixing holes 373 for fixing the bottom plate 5 at equal intervals. Further, a flange 382 integrally formed with the right side wall 3b is extended at the lower end of the right side wall 3b of the back cover 3, and the flange 382 is substantially perpendicular to the right side wall 3b toward the left side wall 3a. Is bent. The flange 382 is provided with three fixing holes 383 for fixing the bottom plate 5 at equal intervals.
[0048]
Also, as shown in FIG. 10, four attachment holes 360 respectively facing the four fixing holes 310 are provided at the end of the bottom plate 5 (the fixed side end of the front cover 4) with which the flange 300 abuts. Yes. Then, three attachment holes 370 facing the three fixing holes 373 are provided at the left end portion of the bottom plate 5 with which the flange 372 contacts. Furthermore, three attachment holes 380 that are opposed to the three fixing holes 383 are provided at the right end of the bottom plate 5 with which the flange 382 abuts. Note that the flanges 300, 372, and 382 shown in FIG. 10 correspond to the “third flange”.
[0049]
Then, the back wall 3 c of the back cover 3 is placed on the floor surface side, and each end of the bottom plate 5 is brought into contact with the outer surface of the flanges 300, 372 and 382 of the back cover 3. At this time, the fixing hole 310 and the mounting hole 360, the fixing hole 373 and the mounting hole 370, and the fixing hole 383 and the mounting hole 380 are opposed to each other, so that each fixing is performed in one direction from the bottom plate 5 side to the back cover 3 side. The hole and the mounting hole can be fixed with a screw or the like. Therefore, the back cover 3 and the bottom plate 5 can be easily fixed, and the fixing operation can be performed efficiently.
[0050]
As described above, the hot water heater 1 according to the present embodiment has the substantially rectangular parallelepiped back cover 3 whose front and bottom surfaces are open, the hot water supply burner 43, the heating burner 49, and the hot water supply heat exchange. 45, a heating heat exchanger 46, a hot water supply fan 41, a heating fan 42, and an expansion tank 50 are assembled, and the bottom plate 5 has a hot water supply gas switch 54, and a heating gas switch. 35, a bath circulation pump 32, and a heating circulation pump 59 are assembled. Therefore, when assembling each device to the bottom plate 5, the other wall surface of the housing 2 does not get in the way, and the operation is easy. In addition, each device assembled to the bottom plate 5 of the previous stage fixed to the back cover 3 is exposed to the outside, so that the water amount regulator 61 is inspected for water leakage, the hot water supply gas switch 54 and the heating gas switch. It is possible to easily perform 35 gas leakage inspections or replacement of each device. Furthermore, when each inspection passes, the back wall 3c of the back cover 3 to which each device is assembled is placed on the floor surface side, and the bottom plate 5 to which each device is assembled is directed toward the opened bottom surface side. The four fixing holes 31 of the flange 30 provided at the lower end of the back cover 3 and the mounting holes 36 of the bottom plate 5 are fixed with screws from the bottom plate 5 side. The fixing holes 37, 38 provided in the flanges 5a, 5b provided at both ends of the bottom plate 5 and the mounting holes 33, 34 provided in the lower end of the back cover 3 are screwed to the left side of the back cover 3. It fixes from the outer surface of the wall 3a and the right side wall 3b, respectively. Therefore, since each mounting hole and each fixing hole are not hidden on the floor surface side, the bottom plate 5 can be fixed to the back cover 3 without replacing the back cover 3 and the bottom plate 5. Can be easily assembled.
[0051]
In addition, in the hot water heater and the hot water heater assembling method of the present invention, various modifications are possible without being limited to the above embodiment. In the above embodiment, the hot water heater 1 having both a hot water supply function and a heating function has been described as an embodiment. However, in a hot water heater having only a hot water supply function, a hot water heating apparatus having only a heating function, or the like. Is also applicable.
[0052]
【The invention's effect】
As described above, according to the water heater of the invention according to claim 1, the casing is constituted by the back cover, the bottom plate, and the front cover, and all the devices fixed in the water heater are fixed to the back cover. Instead, the blower fan, the burner, and the heat exchanger are fixed to the back cover, and the water amount adjuster, the fuel adjuster, the water supply connection port, the gas connection port, and the hot water supply connection port are fixed to the bottom plate. Is fixed, and then the bottom plate is assembled to the back cover, so that the water heater can be easily assembled and the working time can be shortened. In addition, before the bottom plate is fixed to the back cover, the water amount adjuster and the fuel adjuster fixed to the bottom plate are exposed to the outside so that the water amount adjuster and the fuel adjuster can be easily inspected and replaced. Can be done.
[0053]
In the water heater of the invention according to claim 2, in addition to the effect of the invention according to claim 1, when the bottom plate is assembled to the back cover, the back side of the back cover is placed on the floor surface or the like to open the back cover. If the bottom plate abuts from the bottom surface side, the first fixing hole provided in the first flange, the first mounting hole provided in the bottom plate, and the second fixing hole provided in the second flange And the second mounting hole provided in the back cover is not hidden underneath, and the first fixing hole, the first mounting hole, the second fixing hole and the second fixing hole are not hidden at the same time without replacing the back cover and the bottom plate. 2 mounting holes can be fixed. Therefore, the work can be speeded up, and the work time can be shortened.
[0054]
In the water heater of the invention according to claim 3, in addition to the effect of the invention of claim 1, when the bottom plate is assembled to the back cover, the back surface of the back cover is placed on the floor surface or the like so that the back cover is opened. If the bottom plate abuts toward the bottom surface side, the third fixing hole of the third flange and the third mounting hole of the bottom plate can be fixed in one direction from the bottom plate side to the back cover side. The assembly work of the machine can be performed quickly, and the working time can be shortened.
[0055]
In the method for assembling the water heater of the invention according to claim 4, the burner, the blower fan, and the heat exchanger are fixed to the inside of the back cover, and then the water amount adjuster is provided on the surface side inside the casing of the bottom plate. And after fixing the fuel regulator, the bottom plate is fixed from the bottom side of the back cover, so it is not necessary to fix all the devices to the back cover at once, and the back cover and the bottom plate can be fixed separately. it can. Therefore, before the bottom plate is fixed to the back cover, the water amount adjuster and the fuel adjuster fixed to the bottom plate are exposed to the outside. Therefore, the water amount adjuster and the fuel adjuster are inspected. It is easy and the working time can be shortened.
[Brief description of the drawings]
FIG. 1 is a front view of a hot water heater 1;
FIG. 2 is a side view of the hot water heater 1.
FIG. 3 is a bottom view of the hot water heater 1.
FIG. 4 is a perspective view showing a method of fixing the back cover 3 and the bottom plate 5;
FIG. 5 is a front view of the bottom plate 5 showing a state in which each device is assembled to the bottom plate 5;
6 is a front view of the back cover 3 showing a state in which devices other than the expansion tank 50 are assembled to the back cover 3. FIG.
7 is a front view of the back cover 3 showing a state in which the expansion tank 50 is assembled to the back cover 3 of FIG. 6. FIG.
FIG. 8 is a front view of the hot water heater 1 with the front cover 4 removed.
FIG. 9 is a longitudinal sectional view of a hot water heater 1.
FIG. 10 is a perspective view showing a modification of the method for fixing the back cover 3 and the bottom plate 5;
[Explanation of symbols]
1 Hot water heater
2 Case
3 Back cover
4 Front cover
5 Bottom plate
16 Water supply connection port
17 Hot water connection port
18 Overflow outlet
61 Water regulator
32 Bath circulation pump
35 Gas switch for heating
41 Hot water fan
42 Heating fan
43 Hot water burner
45 Heat exchanger for hot water supply
46 Heat exchanger for heating
49 Burner for heating
50 Expansion tank

Claims (4)

筐体内に、バーナと、当該バーナに空気を送風する送風ファンと、前記バーナの上方に設けられ、前記バーナの燃焼気体から熱を回収して水を加熱する熱交換器と、当該熱交換器に供給する水の量を調整する水量調整器と、前記バーナに供給する燃料の量を調整する燃料調整器とを備えた給湯機であって、
前記筐体は、設置時における前面及び底面が開放された略直方体形状のバックカバーと、
前記バックカバーの底面に脱着可能に固定される底板と、
当該バックカバーの前面に脱着可能に固定されるフロントカバーと
から構成され、
前記バックカバーには、前記バーナと、前記送風ファンと、前記熱交換器とが固定され、
前記底板には、前記水量調整器と、前記燃料調整器と、水が供給される給水接続口と、ガス燃料が供給されるガス接続口と、前記熱交換器によって加熱された湯が排出される給湯接続口とが固定され、
前記固定された状態で、前記バックカバーに前記底板が組み付けられることを特徴とする給湯機。
In the housing, a burner, a blower fan that blows air to the burner, a heat exchanger that is provided above the burner, recovers heat from the combustion gas of the burner, and heats the water, and the heat exchanger A water heater comprising: a water regulator for adjusting the amount of water supplied to the fuel; and a fuel regulator for adjusting the amount of fuel supplied to the burner,
The casing is a substantially rectangular parallelepiped back cover whose front and bottom surfaces are open during installation;
A bottom plate removably fixed to the bottom surface of the back cover;
A front cover that is detachably fixed to the front surface of the back cover,
The burner, the blower fan, and the heat exchanger are fixed to the back cover,
The bottom plate is discharged with the water amount regulator, the fuel regulator, a water supply connection port to which water is supplied, a gas connection port to which gas fuel is supplied, and hot water heated by the heat exchanger. The hot water connection port is fixed,
The water heater according to claim 1, wherein the bottom plate is assembled to the back cover in the fixed state.
前記バックカバーの背面の底面側の端部に設けられ、前記バックカバーの背面から前記フロントカバーに向かって前記背面に対して略直角方向に張り出した第1のフランジと、
当該第1のフランジに設けられた第1の固定穴と、
前記第1のフランジと当接する前記底板に設けられ、前記第1の固定穴に対向する第1の取付穴と、
前記バックカバーの両側面の端部と当接する前記底板の両端部に各々設けられ、前記バックカバーの上部に向かって前記底板に対して略直角方向に各々張り出した第2のフランジと、
当該第2のフランジに各々設けられた第2の固定穴と、
前記第2のフランジと当接する前記バックカバーの両端部近傍に各々設けられ、前記第2の固定穴に各々対向する第2の取付穴と
を備えたことを特徴とする請求項1に記載の給湯機。
A first flange provided at an end portion of the back surface of the back cover on the bottom surface side and projecting from the back surface of the back cover toward the front cover in a direction substantially perpendicular to the back surface;
A first fixing hole provided in the first flange;
A first mounting hole provided in the bottom plate that contacts the first flange and facing the first fixing hole;
Second flanges respectively provided at both end portions of the bottom plate contacting the end portions of both side surfaces of the back cover and projecting in a direction substantially perpendicular to the bottom plate toward the upper portion of the back cover;
A second fixing hole provided in each of the second flanges;
The second mounting hole provided in the vicinity of both ends of the back cover in contact with the second flange and facing the second fixing hole, respectively. Water heater.
前記バックカバーの背面及び側面の底面側端部に各々設けられ、前記バックカバーの内側に向かって前記背面及び前記側面に対して略直角方向に各々張り出した3つの第3のフランジと、
当該第3のフランジに各々設けられた第3の固定穴と、
前記第3のフランジと当接する前記底板に各々設けられ、前記第3の固定穴に各々対向する第3の取付穴と
を備えたことを特徴とする請求項1に記載の給湯機。
Three third flanges respectively provided at the bottom side end portions of the back surface and side surface of the back cover and projecting in the direction substantially perpendicular to the back surface and the side surface toward the inside of the back cover;
A third fixing hole provided in each of the third flanges;
2. The water heater according to claim 1, further comprising a third attachment hole that is provided in each of the bottom plates in contact with the third flange and faces each of the third fixing holes.
設置時における前面及び底面が開放された略直方体形状のバックカバーと、当該バックカバーの底面に固定された底板と、前記バックカバーの前面に固定されたフロントカバーとから構成された筐体内に、空気と燃料との混合気体を燃焼するバーナと、当該バーナに空気を送風する送風ファンと、前記バーナの上方に設けられ、前記バーナの燃焼気体から熱を回収して水を加熱する熱交換器と、当該熱交換器に供給する水の量を調整する水量調整器と、前記バーナに供給する燃料の量を調整する燃料調整器とを組み付ける給湯機の組立方法であって、
前記バックカバーに、前記バーナと、前記送風ファンと、前記熱交換器とを固定する工程と、
前記底板に、前記水量調整器と、前記燃料調整器とを固定する工程と、
前記底板を前記バックカバーの底面側から固定する工程と
を包含することを特徴とする給湯機の組立方法。
In a housing composed of a substantially rectangular parallelepiped back cover whose front and bottom surfaces are open at the time of installation, a bottom plate fixed to the bottom surface of the back cover, and a front cover fixed to the front surface of the back cover, A burner that burns a mixed gas of air and fuel, a blower fan that blows air to the burner, and a heat exchanger that is provided above the burner and recovers heat from the combustion gas of the burner to heat water And a water heater assembling method for assembling a water regulator for adjusting the amount of water supplied to the heat exchanger and a fuel regulator for adjusting the amount of fuel supplied to the burner,
Fixing the burner, the blower fan, and the heat exchanger to the back cover;
Fixing the water amount regulator and the fuel regulator to the bottom plate;
And a step of fixing the bottom plate from the bottom surface side of the back cover.
JP2003198828A 2003-07-18 2003-07-18 Water heater and method of assembling the water heater Expired - Fee Related JP4317393B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003198828A JP4317393B2 (en) 2003-07-18 2003-07-18 Water heater and method of assembling the water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003198828A JP4317393B2 (en) 2003-07-18 2003-07-18 Water heater and method of assembling the water heater

Publications (2)

Publication Number Publication Date
JP2005037018A JP2005037018A (en) 2005-02-10
JP4317393B2 true JP4317393B2 (en) 2009-08-19

Family

ID=34208456

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003198828A Expired - Fee Related JP4317393B2 (en) 2003-07-18 2003-07-18 Water heater and method of assembling the water heater

Country Status (1)

Country Link
JP (1) JP4317393B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4887326B2 (en) * 2008-04-25 2012-02-29 アイシン精機株式会社 Fuel cell system
JP2016133283A (en) * 2015-01-21 2016-07-25 株式会社ノーリツ Heat source machine
JP7093536B2 (en) * 2017-10-02 2022-06-30 株式会社パロマ Water heater

Also Published As

Publication number Publication date
JP2005037018A (en) 2005-02-10

Similar Documents

Publication Publication Date Title
JP4317393B2 (en) Water heater and method of assembling the water heater
JP6488883B2 (en) Heat source machine
US5778829A (en) Gas boiler
US5596953A (en) Gas boiler
JP4933132B2 (en) Combustion equipment
JP2005037019A (en) Hot water supply and heating apparatus
JP6280450B2 (en) Combustion device
JPH10325612A (en) Combustion device
JP7093538B2 (en) Dishwasher booster
KR20110137120A (en) Apparatus of process control block for boiler
JPH02263046A (en) Hot water supply and space heating device
JP4021631B2 (en) Stove with a built-in hot water heat exchanger
JP3619639B2 (en) Combustion equipment
NZ564344A (en) Mounting structure of exhaust pipe with drain pipe
JP7361545B2 (en) water heater
KR20060127829A (en) Micro Rapid Electric Boiler
US6276307B1 (en) Heating apparatus, housing and stand
JPS596358Y2 (en) hot air heater
JP3796440B2 (en) Hot water circulation heater
JP2024153416A (en) Water heater
JP2007093095A (en) Frame body mounting structure for stove
JPH10122667A (en) Mounting structure of board unit of hot water supply heater
JP3540421B2 (en) Hot water heating system
KR100281069B1 (en) gas furnace
JPS602516Y2 (en) Water heater

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060628

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20080212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080911

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080916

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090428

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090522

R150 Certificate of patent or registration of utility model

Ref document number: 4317393

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120529

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120529

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120529

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120529

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150529

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees