JP4152305B2 - Operation control system - Google Patents
Operation control system Download PDFInfo
- Publication number
- JP4152305B2 JP4152305B2 JP2003390368A JP2003390368A JP4152305B2 JP 4152305 B2 JP4152305 B2 JP 4152305B2 JP 2003390368 A JP2003390368 A JP 2003390368A JP 2003390368 A JP2003390368 A JP 2003390368A JP 4152305 B2 JP4152305 B2 JP 4152305B2
- Authority
- JP
- Japan
- Prior art keywords
- data
- demand
- heat
- power
- timing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/14—Combined heat and power generation [CHP]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
- Y02P80/15—On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply
Landscapes
- Air Conditioning Control Device (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Steam Or Hot-Water Central Heating Systems (AREA)
- Heat-Pump Type And Storage Water Heaters (AREA)
Description
本発明は、電力及び熱を発生する熱電併給装置の運転を制御する運転制御システムに関する。 The present invention relates to an operation control system that controls the operation of a cogeneration device that generates electric power and heat.
熱電併給装置のように、電力と熱とを併せて供給することのできる装置では、電力需要と熱需要という二つの要因によって、装置の運転スケジュールが決定されることになる。ここで、突然の停電などによって熱電併給装置の運転が停止された場合、停電後の電源復帰時にどのような運転をすればよいのかの制御情報を熱電併給装置が持ち合わせていない場合には、需要家の電力需要及び熱需要に応じた適切な運転ができないという問題が生じる。そのような問題点を解決するために、運転開始時間、運転終了時間、運転モード、現在時間、タイマー設定などの情報を不揮発性メモリ(EEPROM)に予め記憶しておき、停電などの電源供給遮断からの復帰時に、停電前の運転状態を再現することができるようなシステムが提案されている(例えば、特許文献1を参照)。 In an apparatus that can supply both electric power and heat, such as a combined heat and power supply apparatus, the operation schedule of the apparatus is determined by two factors, namely, electric power demand and heat demand. Here, if the operation of the cogeneration device is stopped due to a sudden power failure, etc., if the cogeneration device does not have control information on what operation should be performed when the power is restored after the power failure, There arises a problem that proper operation according to the electric power demand and heat demand of the house cannot be performed. In order to solve such problems, information such as operation start time, operation end time, operation mode, current time, timer setting, etc. is stored in advance in a nonvolatile memory (EEPROM) to shut off power supply such as power failure There has been proposed a system that can reproduce the operation state before a power failure when returning from (see, for example, Patent Document 1).
また、熱電併給装置の運転スケジュールを需要家の過去の電力需要及び熱需要に対して忠実に作成するためには、膨大な量の過去の電力需要量データと熱需要量データとを読み出し可能に保存しておくため、大容量のメモリが必要になってくる。 Also, in order to create the operation schedule of the combined heat and power unit faithfully with respect to the customer's past power demand and heat demand, a huge amount of past power demand data and heat demand data can be read. In order to save it, a large amount of memory is required.
ここで、膨大な量の過去の電力需要量データと熱需要量データとを読み出し可能に保存しておくためのメモリとして揮発性メモリを採用した場合、安価ではあるが、電源の供給が停止すると記憶内容が消去されてしまうため、再始動時に過去の電力需要量データと熱需要量データとに基づく最適な運転スケジュールの作成が行えないという問題がある。他方で、メモリとして不揮発性メモリを採用した場合、電源の供給が停止しても記憶内容が消去されることはないが、揮発性メモリに比べて高価であるため、上述のような大容量のデータを保存するためのメモリとしては経済性に問題がある。 Here, when a volatile memory is adopted as a memory for storing a huge amount of past power demand data and heat demand data in a readable manner, it is inexpensive, but power supply is stopped. Since the stored contents are erased, there is a problem that it is not possible to create an optimal operation schedule based on past power demand data and heat demand data at the time of restart. On the other hand, when a non-volatile memory is adopted as the memory, the stored contents are not erased even if the supply of power is stopped, but it is more expensive than a volatile memory, so it has a large capacity as described above. There is a problem in economy as a memory for storing data.
また、特許文献1に記載のシステムでは、現在の様々な運転条件を不揮発性メモリに記憶して停電の発生に備えることが行われているものの、このシステムでは電源復帰時には停電時の運転条件と同様の運転が行われてしまうという問題が発生する。つまり、いつ電源が復帰したとしても、停電時と同様の運転が行われてしまうため、電源復帰時点での需要家の電力需要及び熱需要に対して適切な運転が行われないという問題が発生する。
Further, in the system described in
本発明は上記の問題点に鑑みてなされたものであり、その目的は、停電後の電源復帰時に、その時点での需要家の電力需要及び熱需要に対して適切な熱電併給装置の運転制御を行うことができる安価なシステムを提供する点にある。 The present invention has been made in view of the above-described problems, and its purpose is to control the operation of a combined heat and power supply apparatus that is appropriate for the power demand and heat demand of the customer at that time when the power is restored after a power failure. It is in the point of providing an inexpensive system that can perform the above.
上記課題を解決するための本発明に係る運転制御システムの第1特徴構成は、電力及び熱を発生する熱電併給装置の運転を制御する運転制御システムであって、需要家の電力需要量データ及び熱需要量データを所定のタイミング毎に収集する需要量情報収集手段と、前記需要量情報収集手段によって収集された前記所定のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、前記熱電併給装置に指示する運転制御情報を作成する運転制御手段と、前記需要量情報収集手段によって収集された前記所定のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、前記需要家の電力需要特性及び熱需要特性を代表する電力需要代表データ及び熱需要代表データを作成して、不揮発性メモリに記憶する代表データ作成手段とを備え、前記運転制御手段は、停電後の電源復帰時に、前記不揮発性メモリに記憶されている前記電力需要代表データ及び前記熱需要代表データを参照して、前記運転制御情報を作成し、前記代表データ作成手段は、前記需要量情報収集手段によって収集された第1のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、単位期間毎に存在する同じ時間属性の電力需要量データを互いに平均化する処理と、第1のタイミング毎に収集された前記電力需要量データを所定の期間毎に平均化して前記第1のタイミングよりも間隔の長い第2のタイミング毎のデータへの変換処理とを行って、前記電力需要代表データを前記第2のタイミング毎のデータで作成し、前記単位期間毎に存在する同じ時間属性の熱需要量データを互いに平均化する処理と、前記第1のタイミング毎に収集された前記熱需要量データを所定の期間毎に平均化して前記第1のタイミングよりも間隔の長い前記第2のタイミング毎のデータへの変換処理とを行って、前記熱需要代表データを前記第2のタイミング毎のデータで作成する点にある。 A first characteristic configuration of an operation control system according to the present invention for solving the above-described problem is an operation control system for controlling the operation of a combined heat and power generation device that generates electric power and heat, and includes electric power demand data of a consumer and Referring to the demand amount information collecting means for collecting the heat demand amount data at every predetermined timing, the power demand amount data and the heat demand amount data at the predetermined timing collected by the demand amount information collecting means , Referring to the operation control means for creating operation control information instructing the cogeneration device, the power demand data and the heat demand data for each predetermined timing collected by the demand information collection means Representative data stored in the nonvolatile memory by creating power demand representative data and heat demand representative data representing the power demand characteristics and heat demand characteristics of the consumer. The operation control means refers to the power demand representative data and the heat demand representative data stored in the nonvolatile memory at the time of power recovery after a power failure, and obtains the operation control information. The representative data creating means refers to the power demand amount data and the heat demand amount data at each first timing collected by the demand amount information collecting means, and is the same time existing for each unit period. A process of averaging the power demand data of the attributes with each other, and a second that has a longer interval than the first timing by averaging the power demand data collected at each first timing for each predetermined period The power demand representative data is created with the data for each second timing by performing conversion processing to data for each timing, and the heat demand of the same time attribute existing for each unit period A process for averaging the quantity data to each other, and the heat demand data collected at each of the first timings are averaged for each predetermined period, and each second timing having a longer interval than the first timing. The data is converted into data, and the heat demand representative data is created with the data for each second timing.
上記第1特徴構成により、熱電併給装置に突然の停電が発生した場合であっても、運転制御手段は、停電後の電源復帰時に需要家の電力需要特性及び熱需要特性を代表する電力需要代表データ及び熱需要代表データを参照して、電源復帰時点での需要家の電力需要及び熱需要に対して適切な熱電併給装置の運転制御情報を作成することができる。 According to the first feature configuration, even when a sudden power failure occurs in the combined heat and power supply device, the operation control means is a power demand representative that represents the power demand characteristics and heat demand characteristics of the consumer when the power is restored after the power failure. With reference to the data and the heat demand representative data, it is possible to create operation control information of the combined heat and power supply apparatus that is appropriate for the power demand and heat demand of the consumer at the time of power recovery.
また、電力需要代表データが単位期間毎に存在する同じ時間属性の電力需要量データを互いに平均化して作成され、前記熱需要代表データが単位期間毎に存在する同じ時間属性の熱需要量データを互いに平均化して作成されるので、需要家の過去の平均的な電力需要及び熱需要を表す代表データを作成することができる。その結果、運転制御手段がこの電力需要代表データ及び熱需要代表データを参照して運転制御情報を作成した場合、需要家の実際の電力需要及び熱需要と、熱電併給装置から出力される電力供給量及び熱供給量とに大きな隔たりが生じないことが確保される。 Further, power demand representative data is created by averaging the same time attribute power demand data that exists for each unit period, and the heat demand representative data is the same time attribute heat demand data that exists for each unit period. Since they are created by averaging each other, representative data representing the past average power demand and heat demand of the consumer can be created. As a result, when the operation control means creates the operation control information with reference to the power demand representative data and the heat demand representative data, the actual power demand and heat demand of the consumer and the power supply output from the cogeneration device It is ensured that there is no significant gap between the quantity and the heat supply.
更に、例えば1時間毎の電力需要量データ及び熱需要量データを2時間という期間毎に平均化処理することで得られた2時間毎の電力需要量データ及び熱需要量データを用いて電力需要代表データ及び熱需要代表データが作成された場合には、電力需要代表データ及び熱需要代表データとして記憶する必要のあるデータ数が半減するので、それらを記憶しておくための高価な不揮発性メモリに関して必要なコストを低くすることができる。 Further, for example, the power demand using the power demand data and the heat demand data every two hours obtained by averaging the power demand data and the heat demand data every hour for every two hours. When representative data and heat demand representative data are created, the number of data required to be stored as power demand representative data and heat demand representative data is halved. Therefore, an expensive nonvolatile memory for storing them. The necessary cost can be reduced.
上記課題を解決するための本発明に係る運転制御システムの第2特徴構成は、電力及び熱を発生する熱電併給装置の運転を制御する運転制御システムであって、需要家の電力需要量データ及び熱需要量データを所定のタイミング毎に収集する需要量情報収集手段と、前記需要量情報収集手段によって収集された前記所定のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、前記熱電併給装置に指示する運転制御情報を作成する運転制御手段と、前記需要量情報収集手段によって収集された前記所定のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、前記需要家の電力需要特性及び熱需要特性を代表する電力需要代表データ及び熱需要代表データを作成して、不揮発性メモリに記憶する代表データ作成手段とを備え、前記運転制御手段は、停電後の電源復帰時に、前記不揮発性メモリに記憶されている前記電力需要代表データ及び前記熱需要代表データを参照して、前記運転制御情報を作成し、前記代表データ作成手段は、前記需要量情報収集手段によって収集された第1のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、第1の時間属性群及び第2の時間属性群で規定される前記電力需要量データに対して、前記第1の時間属性群の属性毎に設定された重み付け係数を乗算した後に、乗算後の電力需要量データを前記第2の時間属性群の属性毎に互いに平均化する処理と、前記第1のタイミング毎に収集された前記電力需要量データを所定の期間毎に平均化して前記第1のタイミングよりも間隔の長い第2のタイミング毎のデータへの変換処理とを行って、前記電力需要代表データを前記第2のタイミング毎のデータで作成し、前記第1の時間属性群及び前記第2の時間属性群で規定される前記熱需要量データに対して、前記第1の時間属性群の属性毎に設定された重み付け係数を乗算した後に、乗算後の熱需要量データを前記第2の時間属性群の属性毎に互いに平均化する処理と、前記第1のタイミング毎に収集された前記熱需要量データを所定の期間毎に平均化して前記第1のタイミングよりも間隔の長い第2のタイミング毎のデータへの変換処理とを行って、前記熱需要代表データを前記第2のタイミング毎のデータで作成する点にある。 A second characteristic configuration of an operation control system according to the present invention for solving the above-described problem is an operation control system for controlling the operation of a combined heat and power generation device that generates electric power and heat. Referring to the demand amount information collecting means for collecting the heat demand amount data at every predetermined timing, the power demand amount data and the heat demand amount data at the predetermined timing collected by the demand amount information collecting means , Referring to the operation control means for creating operation control information instructing the cogeneration device, the power demand data and the heat demand data for each predetermined timing collected by the demand information collection means Representative data stored in the nonvolatile memory by creating power demand representative data and heat demand representative data representing the power demand characteristics and heat demand characteristics of the consumer. The operation control means refers to the power demand representative data and the heat demand representative data stored in the nonvolatile memory at the time of power recovery after a power failure, and obtains the operation control information. The representative data creating means refers to the power demand amount data and the heat demand amount data for each first timing collected by the demand amount information collecting means, and refers to the first time attribute group and the first time attribute group. After multiplying the power demand data defined by the time attribute group of 2 by a weighting coefficient set for each attribute of the first time attribute group, the power demand data after multiplication is the second A process for averaging each attribute of the time attribute group, and the power demand data collected at each of the first timings are averaged for each predetermined period, and a time interval longer than the first timing is obtained. The power demand representative data is created with the data for each second timing, and is defined by the first time attribute group and the second time attribute group. After multiplying the heat demand data by the weighting coefficient set for each attribute of the first time attribute group, the heat demand data after multiplication is obtained for each attribute of the second time attribute group. A process of averaging each other, and the heat demand data collected at each first timing are averaged at a predetermined period to obtain data at a second timing having a longer interval than the first timing. Conversion processing is performed, and the heat demand representative data is created with data at each second timing.
上記第2特徴構成により、熱電併給装置に突然の停電が発生した場合であっても、運転制御手段は、停電後の電源復帰時に需要家の電力需要特性及び熱需要特性を代表する電力需要代表データ及び熱需要代表データを参照して、電源復帰時点での需要家の電力需要及び熱需要に対して適切な熱電併給装置の運転制御情報を作成することができる。 According to the second feature configuration, even when a sudden power failure occurs in the combined heat and power supply device, the operation control means is a power demand representative that represents the power demand characteristics and heat demand characteristics of the consumer when the power is restored after the power failure. With reference to the data and the heat demand representative data, it is possible to create operation control information of the combined heat and power supply apparatus that is appropriate for the power demand and heat demand of the consumer at the time of power recovery.
また、複数種の時間属性の内で優先したい属性が存在する場合には、需要家の電力需要特性や熱需要特性におけるその優先したい属性の影響が大きくなるように、属性毎に乗算される重み付け係数を、その優先したい属性に関して大きくすることができる。例えば、月曜日から日曜日の曜日という時間属性と、0時から24時の時刻という時間属性を有する過去の電力需要量データ及び熱需要量データを参照して電力需要代表データ及び熱需要代表データを作成する際に月曜日という時間属性を優先する場合、月曜日に収集された0時から24時までの過去の電力需要量データ及び熱需要量データに対しての重み付け係数を大きくし、火曜日から日曜日に収集された0時から24時までの過去の電力需要量データ及び熱需要量データに対しての重み付け係数を小さく設定した上で、月曜日から日曜日までに収集された0時から24時までの電力需要量データ及び熱需要量データの同じ時刻のデータを平均化処理することで、月曜日の電力需要特性が強調された電力需要代表データを作成することができる。 In addition, when there is an attribute that you want to prioritize among multiple types of time attributes, weighting that is multiplied for each attribute so that the influence of the attribute you want to prioritize on the power demand characteristics and heat demand characteristics of the consumer will increase. The coefficient can be increased with respect to its preferred attributes. For example, power demand representative data and heat demand representative data are created by referring to past power demand data and heat demand data having a time attribute from Monday to Sunday and a time attribute from midnight to 24:00. When priority is given to the time attribute of Monday, the weighting coefficient for past power demand data and heat demand data collected from 0:00 to 24:00 on Monday is increased and collected from Tuesday to Sunday. Electricity demand from 0:00 to 24:00 collected from Monday to Sunday with a small weighting factor for the past electricity demand data and heat demand data from 0:00 to 24:00 It is possible to create power demand representative data that emphasizes the power demand characteristics of Monday by averaging the data at the same time of the quantity data and heat demand data. Kill.
更に、例えば1時間毎の電力需要量データ及び熱需要量データを2時間という期間毎に平均化処理することで得られた2時間毎の電力需要量データ及び熱需要量データを用いて電力需要代表データ及び熱需要代表データが作成された場合には、電力需要代表データ及び熱需要代表データとして記憶する必要のあるデータ数が半減するので、それらを記憶しておくための高価な不揮発性メモリに関して必要なコストを低くすることができる。 Further, for example, the power demand using the power demand data and the heat demand data every two hours obtained by averaging the power demand data and the heat demand data every hour for every two hours. When representative data and heat demand representative data are created, the number of data required to be stored as power demand representative data and heat demand representative data is halved. Therefore, an expensive nonvolatile memory for storing them. The necessary cost can be reduced.
本発明に係る運転制御システムの第3特徴構成は、上記第1又は第2の特徴構成に加えて、前記運転制御手段は、停電後の電源復帰時に、前記不揮発性メモリに記憶されている前記第2のタイミング毎の前記電力需要代表データ及び前記熱需要代表データに対してデータ補間処理を行うことにより導出される、前記需要家の電力需要特性及び熱需要特性を代表する前記第1のタイミング毎の電力需要代表データ及び熱需要代表データを参照して、前記運転制御情報を作成する点にある。 According to a third characteristic configuration of the operation control system according to the present invention, in addition to the first or second characteristic configuration, the operation control means is stored in the nonvolatile memory when the power is restored after a power failure. The first timing representing power demand characteristics and heat demand characteristics of the consumer, which is derived by performing data interpolation processing on the power demand representative data and heat demand representative data at each second timing. The operation control information is created with reference to each power demand representative data and heat demand representative data.
上記第3特徴構成により、例えば、1時間毎の電力需要量データ及び熱需要量データを上述のように2時間毎の電力需要量データ及び熱需要量データに変換したことで得られた2時間毎の電力需要代表データ及び熱需要代表データを参照する運転制御手段が、運転制御情報を作成するためには1時間毎の電力需要代表データ及び熱需要代表データを必要とする場合、2時間毎のデータを1時間毎のデータに変換するデータ補間処理を行うことで、運転制御手段は1時間毎の電力需要代表データ及び熱需要代表データを得ることができる。 By the third feature configuration, for example, 2 hours obtained by converting hourly power demand data and heat demand data into power demand data and heat demand data every two hours as described above When the operation control means referring to the power demand representative data and the heat demand representative data for each hour requires the hourly power demand representative data and the heat demand representative data to create the operation control information, every two hours By performing a data interpolation process for converting the data into hourly data, the operation control means can obtain hourly power demand representative data and heat demand representative data.
以下に図面を参照して本発明に係る運転制御システム10について説明する。
図1に例示する運転制御システム10は、需要家20に対して供給する電力及び熱を発生する熱電併給装置21の運転を制御するシステムである。ここで運転制御システム10は、需要家20の電力需要量データ及び熱需要量データを所定のタイミング毎に収集する需要量情報収集手段1と、需要量情報収集手段1によって収集された所定のタイミング毎の電力需要量データ及び熱需要量データを参照して、熱電併給装置21に指示する運転制御情報を作成する運転制御手段2と、需要量情報収集手段1によって収集された所定のタイミング毎の電力需要量データ及び熱需要量データを参照して、需要家20の電力需要特性及び熱需要特性を代表する電力需要代表データ及び熱需要代表データを作成して、不揮発性メモリ5に記憶する代表データ作成手段とを備えて構成され、運転制御手段2は、停電後の電源復帰時に、不揮発性メモリ5に記憶されている電力需要代表データ及び熱需要代表データを参照して、運転制御情報を作成するように動作する。
Hereinafter, an
The
需要量情報収集手段1は、需要家20の電力需要量データと熱需要量データとを所定のタイミング毎に収集し、揮発性メモリ3に記憶しておく機能を実現する。例えば、1時間毎に単位時間当たりの電力需要量データと熱需要量データとを収集して、その1時間毎のデータが揮発性メモリ3に蓄積される。尚、給湯熱需要量データ及び暖房熱需要量データというように上記熱需要量データを更に細かく収集して、揮発性メモリ3に記憶させることもできる。ここで、需要量情報収集手段1によって収集された電力需要量データ及び熱需要量データの格納場所として揮発性メモリ3を採用したのは、データの収集が進むにつれて電力需要量データ及び熱需要量データが膨大な量になるために安価な記憶装置が求められているからである。
The demand amount
運転制御手段2は、後述するように熱電併給装置21の運転を制御する機能を実現し、その際、運転制御手段2は需要量情報収集手段1によって収集された需要家20自身の過去の電力需要量データ及び熱需要量データを参照して運転制御情報を作成する。
The operation control means 2 realizes a function of controlling the operation of the combined heat and
代表データ作成手段は、後述するように需要家20の電力需要特性及び熱需要特性を代表する電力需要代表データ及び熱需要代表データを作成する機能を実現し、その際、代表データ作成手段は需要量情報収集手段1によって収集され、揮発性メモリ3に記憶されている需要家20自身の過去の電力需要量データ及び熱需要量データを参照して電力需要代表データ及び熱需要代表データの作成を行う。
The representative data creating means realizes a function of creating power demand representative data and heat demand representative data representing the power demand characteristics and heat demand characteristics of the
次に、運転制御手段2による熱電併給装置21の運転の制御について説明を行う。
運転制御手段2は、実際の使用状況に基づいて、1日分の過去需要量データを曜日と対応付ける状態で更新して記憶するデータ更新処理を行い、日付が変わるごとに、記憶されている1日分の過去需要量データから、その日1日分の予測需要量データを求める予測負荷演算処理を行うように構成されている。
そして、運転制御手段2は、その日1日分の予測需要量データを求めた状態で、単位時間である1時間が経過するごとに、予測需要量データから、熱電併給装置21を運転させるか否かの基準となる省エネ度基準値を求める省エネ度基準値演算処理を行うとともに、その省エネ度基準値演算処理にて求められた省エネ度基準値よりも現時点での実省エネ度が上回っているか否かによって、熱電併給装置21の運転の可否を判別する運転可否判別処理を行うように構成されている。
Next, control of the operation of the
The operation control means 2 performs a data update process for updating and storing the past demand data for one day in a state in which it is associated with the day of the week based on the actual usage situation, and is stored every time the date changes. It is configured to perform predicted load calculation processing for obtaining predicted demand data for one day from the past demand data for the day.
Then, the
このようにして、運転制御手段2は、運転可否判別処理において、熱電併給装置21の運転が可と判別されると、その時点から1時間先までの単位時間を熱電併給装置21を運転させる運転用時間帯として設定して、その運転用時間帯に熱電併給装置21を運転させ、熱電併給装置21の運転が不可と判別されると、熱電併給装置21の運転を停止させるように構成されている。
In this way, when it is determined that the operation of the combined heat and
そして、運転制御手段2は、運転用時間帯において、貯湯タンク22内の貯湯量が満杯になると、熱電併給装置21の運転を停止させるように構成されている。
ちなみに、貯湯タンク22内の貯湯量については、図示はしないが、貯湯タンク22内に設けられる複数のサーミスタの検出情報に基づいて検出するように構成されている。
Then, the operation control means 2 is configured to stop the operation of the combined heat and
Incidentally, although not shown, the amount of hot water stored in the hot
前記データ更新処理について説明を加えると、1日のうちのどの時間帯にどれだけの電力負荷、熱負荷としての給湯熱負荷と暖房熱負荷があったかの1日分の過去需要量データを曜日と対応付ける状態で更新して記憶するように構成されている。 When the description of the data update processing is added, the past demand data for one day indicating how much power load, hot water supply heat load as heat load and heating heat load were present in which time zone of the day and day of week. It is configured to be updated and stored in the associated state.
まず、過去需要量データについて説明すると、過去需要量データは、電力需要量データ、給湯熱需要量データ、暖房熱需要量データの3種類の需要量データからなり、図2に示すように、1日分の過去需要量データが日曜日から土曜日までの曜日ごとに区分けした状態で記憶するように構成されている。
そして、1日分の過去需要量データは、24時間のうち1時間を単位時間として、単位時間当たりの電力需要量データの24個、単位時間当たりの給湯熱需要量データの24個、および、単位時間当たりの暖房熱需要量データの24個から構成されている。
First, the past demand data will be described. The past demand data consists of three types of demand data, namely, power demand data, hot water heat demand data, and heating heat demand data. As shown in FIG. The past demand data for the day is stored in a state of being divided for each day of the week from Sunday to Saturday.
The past demand data for one day includes 24 pieces of power demand data per unit time, 24 pieces of hot water supply heat demand data per unit time, with 1 hour of 24 hours as a unit time, and It consists of 24 pieces of heating heat demand data per unit time.
上述のような過去需要量データを更新する構成について説明を加えると、実際の使用状況から、単位時間当たりの電力負荷、給湯熱負荷、および、暖房熱負荷の夫々を、需要量情報収集手段1にて計測収集し、その収集した需要量データを記憶する状態で1日分の実需要量データを曜日と対応付けて記憶させる。
そして、1日分の実需要量データが1週間分記憶されると、曜日ごとに、過去需要量データと実需要量データとを所定の割合で足し合わせることにより、新しい過去需要量データを求めて、その求めた新しい過去需要量データを記憶して、過去需要量データを更新するように構成されている。
When the configuration for updating the past demand amount data as described above is added, the demand amount
When the actual demand data for one day is stored for one week, new past demand data is obtained by adding the past demand data and the actual demand data at a predetermined ratio for each day of the week. Thus, the obtained past demand data is stored, and the past demand data is updated.
日曜日を例に挙げて具体的に説明すると、図2に示すように、過去需要量データのうち日曜日に対応する過去需要量データD1mと、実需要量データのうち日曜日に対応する実需要量データA1とから、下記の〔数1〕により、日曜日に対応する新しい過去需要量データD1(m+1)が求められ、その求められた過去需要量データD1(m+1)を記憶する。
なお、下記の〔数1〕において、D1mを、日曜日に対応する過去需要量データとし、A1を、日曜日に対応する実需要量データとし、Kは、0.75の定数であり、D1(m+1)を、新しい過去需要量データとする。
Specifically, taking Sunday as an example, as shown in FIG. 2, the past demand data D1m corresponding to Sunday among the past demand data and the actual demand data corresponding to Sunday among the actual demand data. From A1, new past demand data D1 (m + 1) corresponding to Sunday is obtained by the following [Equation 1], and the obtained past demand data D1 (m + 1) is stored.
In the following [Equation 1], D1m is past demand data corresponding to Sunday, A1 is actual demand data corresponding to Sunday, K is a constant of 0.75, and D1 (m + 1) ) As new past demand data.
〔数1〕
D1(m+1)=(D1m×K)+{A1×(1−K)}
[Equation 1]
D1 (m + 1) = (D1m × K) + {A1 × (1-K)}
前記予測負荷演算処理について説明を加えると、日付が変わるごとに実行され、その日のどの時間帯にどれだけの電力負荷、給湯熱負荷、暖房熱負荷が予測されているかの1日分の予測需要量データを求めるように構成されている。
すなわち、曜日ごとの7つの過去需要量データのうち、その日の曜日に対応する過去需要量データと前日の実需要量データとを所定の割合で足し合わせることにより、どの時間帯にどれだけの電力負荷、給湯熱負荷、暖房熱負荷が予測されているかのその日1日分の予測需要量データを求めるように構成されている。
When the predicted load calculation process is described, it is executed every time the date changes, and the predicted demand for one day of how much power load, hot water heat load, and heating heat load is predicted in which time zone of the day. It is configured to determine quantity data.
That is, out of the seven past demand data for each day of the week, by adding the past demand data corresponding to the day of the day and the actual demand data of the previous day at a predetermined ratio, how much power is consumed in which time zone Whether the load, hot water supply heat load, or heating heat load is predicted, the predicted demand data for one day is calculated.
月曜日1日分の予測需要量データを求める場合を例に挙げて具体的に説明すると、図2に示すように、曜日ごとの7つの過去需要量データD1m〜D7mと曜日ごとの7つの実需要量データA1〜A7とが記憶されているので、月曜日に対応する過去需要量データD2mと、前日の日曜日に対応する実需要量データA1とから、下記の〔数2〕により、月曜日の1日分の予測需要量データBを求める。
そして、1日分の予測需要量データBは、図3に示すように、1日分の予測電力需要量データ、1日分の予測給湯熱需要量データ、1日分の予測暖房熱需要量データからなり、図3の(イ)は、1日分の予測電力負荷を示しており、図3の(ロ)は、1日分の予測給湯熱負荷を示しており、図3の(ハ)は、1日分の予測暖房熱負荷を示している。
なお、下記の〔数2〕において、D2mを、月曜日に対応する過去需要量データとし、A1を、日曜日に対応する実需要量データとし、Qは、0.25の定数であり、Bは、予測需要量データとする。
More specifically, taking as an example the case of obtaining the forecast demand data for one day on Monday, as shown in FIG. 2, seven past demand data D1m to D7m for each day of the week and seven actual demands for each day of the week are shown. Since the quantity data A1 to A7 are stored, from the past demand data D2m corresponding to Monday and the actual demand data A1 corresponding to Sunday of the previous day, one day of Monday is calculated by the following [Equation 2]. The demand demand data B for the minute is obtained.
As shown in FIG. 3, the predicted daily demand data B for one day is predicted power demand data for one day, predicted hot water demand data for one day, predicted heating heat demand for one day. 3, (b) in FIG. 3 shows the predicted power load for one day, (b) in FIG. 3 shows the predicted hot water supply heat load for one day, and (c) in FIG. ) Shows the predicted heating heat load for one day.
In the following [Equation 2], D2m is past demand data corresponding to Monday, A1 is actual demand data corresponding to Sunday, Q is a constant of 0.25, and B is Predicted demand data.
〔数2〕
B=(D2m×Q)+{A1×(1−Q)}
[Equation 2]
B = (D2m × Q) + {A1 × (1-Q)}
前記省エネ度基準値演算処理について説明を加えると、単位時間である1時間が経過するごとに実行され、予測給湯熱需要量データを用いて、現時点から基準値用時間先までの間に必要となる貯湯必要量を賄えるように熱電併給装置21を運転させた場合に、熱電併給装置21を運転させることによって省エネルギー化を実現できる省エネ度基準値を求めるように構成されている。
When the energy saving standard value calculation process is described, it is executed every
例えば、単位時間を1時間とし、基準値用時間を12時間として説明を加えると、まず、予測需要量データによる予測電力負荷、予測給湯熱負荷、および、予測暖房熱負荷から、下記の〔数3〕により、図4に示すように、熱電併給装置21を運転させた場合の予測省エネ度を1時間ごとに12時間先までの12個分を求めるとともに、熱電併給装置21を運転させた場合に貯湯タンク22に貯湯することができる予測貯湯量を1時間ごとに12時間先までの12個分を求める。
For example, assuming that the unit time is 1 hour and the reference value time is 12 hours, first, from the predicted power load, predicted hot water supply heat load, and predicted heating heat load based on the predicted demand data, 3], as shown in FIG. 4, when the predicted energy-saving degree when operating the combined heat and
〔数3〕
省エネ度P={(EK1+EK2+EK3)/熱電併給装置21の必要エネルギー}×100
[Equation 3]
Energy saving level P = {(EK1 + EK2 + EK3) / required energy of cogeneration apparatus 21} × 100
ただし、EK1は、有効発電出力E1を変数とする関数であり、EK2は、E2を変数とする関数であり、EK3は、E3を変数とする関数であり、
EK1=有効発電出力E1の発電所一次エネルギー換算値
=f1(有効発電出力E1,発電所での必要エネルギー)
EK2=暖房熱出力E2の従来給湯器でのエネルギー換算値
=f2(暖房熱出力E2,バーナ効率(暖房時))
EK3=有効貯湯熱出力E3の従来給湯器でのエネルギー換算値
=f3(有効貯湯熱出力E3,バーナ効率(給湯時))
熱電併給装置21の必要エネルギー:5.5kW
(熱電併給装置21を1時間稼動させたときに必要な都市ガス使用量を0.433m3とする)
単位電力発電必要エネルギー:2.8kW
バーナ効率(暖房時):0.8
バーナ効率(給湯時):0.9
However, EK1 is a function with the effective power generation output E1 as a variable, EK2 is a function with E2 as a variable, EK3 is a function with E3 as a variable,
EK1 = Effective power generation output E1 power plant primary energy conversion value = f1 (Effective power generation output E1, required energy at the power plant)
EK2 = energy conversion value in the conventional water heater of heating heat output E2 = f2 (heating heat output E2, burner efficiency (during heating))
EK3 = Effective hot water storage heat output E3 energy conversion value in conventional water heater = f3 (Effective hot water storage heat output E3, burner efficiency (during hot water supply))
Necessary energy of the combined heat and power unit 21: 5.5 kW
(The amount of city gas required when the
Unit power generation required energy: 2.8kW
Burner efficiency (heating): 0.8
Burner efficiency (with hot water supply): 0.9
また、有効発電出力E1、暖房熱出力E2、有効貯湯熱出力E3の夫々は、下記の〔数4〕〜〔数6〕により求められる。 Moreover, each of the effective power generation output E1, the heating heat output E2, and the effective hot water storage heat output E3 is obtained by the following [Equation 4] to [Equation 6].
〔数4〕
E1=需要家20の電力負荷での消費電力=熱電併給装置21の発電電力−(電気ヒータの消費電力+各種補機の消費電力)
[Equation 4]
E1 = Power consumption at the power load of the
ここで、電気ヒータは熱電併給装置21の余剰電力により貯湯タンク22内の水を加熱するために使用される機器であり、各種補機は熱電併給装置21で補助的に用いられる冷却水循環ポンプや湯水循環ポンプなどの装置や機械である。
Here, the electric heater is a device used to heat the water in the hot
〔数5〕
E2=需要家20の温水暖房機器での消費熱量
[Equation 5]
E2 = Amount of heat consumed by the hot water heater of
〔数6〕
E3=(熱電併給装置21にて発生する熱量+電気ヒータの回収熱量−暖房熱出力E2)−放熱ロス
[Equation 6]
E3 = (amount of heat generated in the combined heat and
ただし、電気ヒータの回収熱量=電気ヒータの消費電力×ヒータの熱効率とする。 However, the amount of heat recovered by the electric heater = power consumption of the electric heater × heat efficiency of the heater.
そして、図4に示すように、1時間ごとの予測省エネ度および予測貯湯量を12個分求めた状態において、まず、予測給湯熱需要量データから12時間先までに必要とされている予測必要貯湯量を求め、その予測必要貯湯量から現時点での貯湯タンク22内の貯湯量を引いて、12時間先までの間に必要となる必要貯湯量を求める。
例えば、予測給湯熱需要量データから12時間後に9.8kWの給湯熱負荷が予測されていて、現時点での貯湯タンク22内の貯湯量が2.5kWである場合には、12時間先までの間に必要となる必要貯湯量は7.3kWとなる。
And in the state which calculated | required the prediction energy saving degree and prediction hot water storage amount for every 12 hours as shown in FIG. 4, first, the prediction necessity required from the predicted hot water supply heat demand data to 12 hours ahead is required. The hot water storage amount is obtained, and the hot water storage amount in the hot
For example, when a hot water supply heat load of 9.8 kW is predicted 12 hours later from the predicted hot water supply heat demand data, and the hot water storage amount in the hot
そして、単位時間の予測貯湯量を足し合わせる状態で、その足し合わせた予測貯湯量が必要貯湯量に達するまで、12個分の単位時間のうち、予測省エネ度の数値が高いものから選択していくようにしている。 And in the state where the predicted hot water storage amount of the unit time is added, until the total predicted hot water storage amount reaches the required hot water storage amount, select from among the unit time for 12 units that has the highest predicted energy saving level I am going to go.
説明を加えると、例えば、上述の如く、必要貯湯量が7.3kWである場合には、図4に示すように、まず、予測省エネ度の一番高い7時間先から8時間先までの単位時間を選択し、その単位時間における予測貯湯量を足し合わせる。
次に予測省エネ度の高い6時間先から7時間先までの単位時間を選択し、その単位時間における予測貯湯量を足し合わせて、そのときの足し合わせた予測貯湯量が1.1kWとなる。
また次に予測省エネ度の高い5時間先から6時間先までの単位時間を選択し、その単位時間における予測貯湯量を足し合わせて、そのときの足し合わせた予測貯湯量が4.0kWとなる。
For example, as described above, when the required hot water storage amount is 7.3 kW, as shown in FIG. 4, first, the unit from 7 hours to 8 hours ahead, which has the highest predicted energy saving degree, is used. Select the time, and add the predicted hot water storage amount per unit time.
Next, a unit time from 6 hours ahead to 7 hours ahead with a high predicted energy saving degree is selected, and the predicted hot water storage amount in the unit time is added, and the predicted hot water storage amount at that time is 1.1 kW.
Moreover, the unit time from 5 hours ahead to 6 hours ahead with the highest predicted energy saving degree is selected, and the predicted hot water storage amount in the unit time is added, and the predicted hot water storage amount at that time is 4.0 kW. .
このようにして、予測省エネ度の数値が高いものからの単位時間の選択と予測貯湯量の足し合わせを繰り返していくと、図4に示すように、8時間先から9時間先までの単位時間を選択したときに、足し合わせた予測貯湯量が7.3kWに達する。
そうすると、8時間先から9時間先までの単位時間の省エネ度を省エネ度基準値として設定し、図4に示すものでは、省エネ度基準値が106となる。
In this way, when the selection of the unit time from the one with the high predicted energy saving value and the addition of the predicted hot water storage amount are repeated, the unit time from 8 hours ahead to 9 hours ahead as shown in FIG. When is selected, the combined predicted hot water storage amount reaches 7.3 kW.
If it does so, the energy-saving degree of the unit time from 8 hours ahead to 9 hours ahead will be set as an energy-saving degree reference value, and in the thing shown in FIG.
前記運転可否判別処理について説明を加えると、単位時間である1時間が経過するごとに実行され、現時点での電力負荷、予測給湯熱負荷、および、現時点での暖房熱負荷から、上記の〔数3〕により、現省エネ度を求める。
そして、その現省エネ度が省エネ度基準値よりも上回ると、熱電併給装置21の運転が可と判別し、現省エネ度が省エネ度基準値以下であると、熱電併給装置21の運転が不可と判別するようにしている。
When the operation determination process is further described, it is executed every
If the current energy saving level exceeds the energy saving level reference value, it is determined that the operation of the combined heat and
以上のように、運転制御手段2が揮発性メモリ3に記憶されている過去の電力需要量データ及び熱需要量データを参照して、熱電併給装置21の将来の運転制御情報を作成する方法について説明した。ここで、需要家20側で突然の停電などが発生した場合、電源からの電力供給の停止に伴って揮発性メモリ3の記憶内容は消えてしまうため、運転制御手段2は停電後の電源復帰時に熱電併給装置21に与える運転制御情報を作成できないという問題が起こりうるのだが、本発明に係る運転制御システム10では、代表データ作成手段が、需要家20の電力需要特性及び熱需要特性を代表する電力需要代表データ及び熱需要代表データを予め作成し、電源からの電力供給が停止した場合であっても記憶内容が保持される不揮発性メモリ5に記憶しておくので、運転制御手段2は停電後の電源復帰時に上記電力需要代表データ及び上記熱需要代表データを上述の過去需要量データと同様に参照して、熱電併給装置21の運転制御情報を作成することができる。
As described above, the operation control means 2 refers to the past power demand data and heat demand data stored in the
以下には代表データ作成手段が作成する電力需要代表データ及び熱需要代表データについて説明する。但し、電力需要代表データ及び熱需要代表データの作成方法は同様であるため、熱需要代表データの作成に関する記載を省略することもある。 The power demand representative data and heat demand representative data created by the representative data creation means will be described below. However, since the method for creating the power demand representative data and the heat demand representative data is the same, the description regarding the creation of the heat demand representative data may be omitted.
図5に例示するのは、1週間の各曜日毎(時間属性の一例)に作成された1時間毎(時間属性の一例)の電力需要代表データである。代表データ作成手段は、揮発性メモリ3に記憶されている過去の電力需要量データ及び熱需要量データを参照して、上記電力需要代表データ及び熱需要代表データを作成する。上記電力需要代表データ及び熱需要代表データを作成する際、過去の電力需要量データ及び熱需要量データが有する時間属性に関する情報が利用される。
FIG. 5 illustrates power demand representative data for every hour (an example of a time attribute) created for each day of the week (an example of a time attribute). The representative data creating means creates the power demand representative data and the heat demand representative data with reference to the past power demand data and heat demand data stored in the
例えば、揮発性メモリ3に記憶されている過去の電力需要量データ及び熱需要量データには、需要量情報収集手段1によってデータ収集が行われた月、日、曜日、時刻などの情報が併せて含まれている。従って、図5に例示した各曜日毎の1時間毎の電力需要代表データを作成する場合、代表データ作成手段は、揮発性メモリ3に記憶されている過去の電力需要量データを曜日毎及び1時間毎に分け、例えば、月曜日の1時間毎の電力需要量データを全て集めて、同じ時刻に収集された電力需要量データを互いに平均化する。その結果、需要家20にとっての月曜日の電力需要特性を代表する電力需要代表データが1時間毎の電力需要量値の形式で作成される。そして、このような平均化処理を各曜日毎に行うことで、図5に示したように需要家20にとっての各曜日の電力需要特性を代表する電力需要代表データがそれぞれ作成されることになる。
For example, past power demand amount data and heat demand amount data stored in the
代表データ作成手段によって以上のように作成された電力需要代表データ及び熱需要代表データは不揮発性メモリ5に記憶されることになる。尚、代表データの作成は、図5に例示したような1週間毎の代表データを1週間に1回作成し、7日分の代表データを不揮発性メモリ5に記憶しておく場合や、当日の曜日属性に合致する代表データを1日に1回作成して不揮発性メモリ5に記憶しておく場合(例えば、熱電併給装置21の起動時に作成する場合)や、当日の曜日属性に合致する代表データを1日に複数回作成し、その都度、不揮発性メモリ5に記憶しておく場合(例えば、熱電併給装置21の起動時とその3時間毎に作成する場合)などの様々な設定が可能である。また、不揮発性メモリ5に記憶されている過去に作成された代表データと、揮発性メモリ3に記憶されている各需要量データとを参照して新たな代表データを作成することもできる。
The power demand representative data and the heat demand representative data created as described above by the representative data creation means are stored in the
そして、この電力需要代表データは図2に例示した過去需要量データとして利用することもできるので、熱電併給装置21に突然の停電が発生した後の電源復帰時に運転制御手段2が不揮発性メモリ5にアクセスして、所望の上記電力需要代表データ及び上記熱需要代表データを上述の予測需要量データとして参照して、熱電併給装置21の運転制御情報を作成することができる。
And this electric power demand representative data can also be used as the past demand amount data illustrated in FIG. 2, so that the operation control means 2 is the
以上のように、時間属性の内の、月曜から日曜までの各曜日属性を含んだ曜日属性群と、0時から24時までの各時刻属性を含んだ時刻属性群という2つの属性に基づいて電力需要代表データ及び熱需要代表データを作成する例について説明したが、どの時間属性を利用して電力需要代表データ及び熱需要代表データを作成するかについては任意に設定可能である。 As described above, based on two attributes of the time attribute, the day of the week attribute group including each day of the week attribute from Monday to Sunday and the time attribute group including each time attribute from 0:00 to 24:00. Although the example which produces electric power demand representative data and heat demand representative data was demonstrated, it can be arbitrarily set about which electric power demand representative data and heat demand representative data are produced using which time attribute.
例えば、曜日に関する属性を利用せずに、時刻に関する属性のみを利用して1日の0時から24時までの1時間毎の需要量値を含む電力需要代表データ及び熱需要代表データを作成することもできる。この場合、揮発性メモリ3に記憶されている全ての電力需要量データ及び熱需要量データのそれぞれに関して、同じ時刻に収集された(同じ時間属性を有する)電力需要量データ及び熱需要量データを平均化処理することで、曜日属性とは無関係な0時から24時までの1時間毎の需要量値を含む電力需要代表データ及び熱需要代表データを作成することができる。従って、運転制御手段2が熱電併給装置21の運転制御情報を作成するために、不揮発性メモリ5に記憶されているこの電力需要代表データ及び熱需要代表データをどの曜日に使用したとしても、需要家20の実際の電力需要及び熱需要と、熱電併給装置21から出力される電力供給量及び熱供給量とに大きな隔たりが生じないことが確保される。
For example, power demand representative data and heat demand representative data including hourly demand amount values from midnight to 24:00 are created using only the time-related attributes without using the day-related attributes. You can also. In this case, the power demand data and the heat demand data collected at the same time (having the same time attribute) are collected for all the power demand data and the heat demand data stored in the
また、曜日に関する属性を無視して1日間の0時から24時までの需要量値を有する電力需要代表データ及び熱需要代表データを作成する例について説明したが、これとは逆の考え方で、特定の曜日の属性が強調された1日間の0時から24時までの需要量値を有する電力需要代表データ及び熱需要代表データを作成することもできる。 In addition, the example of creating the power demand representative data and the heat demand representative data having the demand amount values from 0:00 to 24:00 for one day ignoring the attributes related to the day of the week has been explained, It is also possible to create power demand representative data and heat demand representative data having demand amount values from 0 o'clock to 24 o'clock for one day in which attributes of specific days are emphasized.
例えば、月曜日から日曜日の曜日という時間属性と、0時から24時の時刻という時間属性を有する過去の電力需要量データ及び熱需要量データを参照して電力需要代表データ及び熱需要代表データを作成する際に月曜日という時間属性を優先する場合、月曜日に収集された0時から24時までの過去の電力需要量データ及び熱需要量データに対して乗算する重み付け係数を4に設定し、火曜日から日曜日に収集された0時から24時までの過去の電力需要量データ及び熱需要量データに対して乗算する重み付け係数を0.5に設定した上で、月曜日から日曜日までに収集された0時から24時までの電力需要量データ及び熱需要量データの同じ時刻のデータを平均化処理(尚、上述の重み付け係数を4/7と0.5/7に設定して乗算後、0時から24時までの電力需要量データ及び熱需要量データの同じ時刻のデータを加算処理しても同様である)することで、月曜日の電力需要特性が強調された1日間の電力需要代表データを作成することができる。 For example, power demand representative data and heat demand representative data are created by referring to past power demand data and heat demand data having a time attribute from Monday to Sunday and a time attribute from midnight to 24:00. When giving priority to the time attribute of Monday, set the weighting coefficient to multiply the past power demand data and heat demand data collected from 0:00 to 24:00 on Monday to 4 0:00 collected from Monday to Sunday after setting the weighting coefficient to multiply the past power demand data and heat demand data collected from 0:00 to 24:00 on Sunday. The data at the same time of the power demand data and the heat demand data from 14:00 to 24:00 is averaged (after the multiplication by setting the above-mentioned weighting coefficients to 4/7 and 0.5 / 7, 1 day power demand representative data in which the power demand characteristics of Monday are emphasized by adding the data at the same time of the power demand data and the heat demand data from 24:00 to 24:00. Can be created.
つまり、第1の時間属性群(上述の月曜から日曜までの各曜日属性に該当)及び第2の時間属性群(上述の0時から24時までの各時刻属性に該当)で規定される電力需要量データに対して、第1の時間属性群の属性毎(曜日毎)に設定された重み付け係数を乗算した後に、乗算後の電力需要量データを第2の時間属性群の属性毎(時刻毎)に互いに平均化して電力需要代表データを作成し、第1の時間属性群上述の月曜から日曜までの各曜日属性に該当)及び第2の時間属性群(上述の0時から24時までの各時刻属性に該当)で規定される熱需要量データに対して、第1の時間属性群の属性毎(曜日毎)に設定された重み付け係数を乗算した後に、乗算後の熱需要量データを第2の時間属性群の属性毎(時刻毎)に互いに平均化して熱需要代表データを作成することで、優先したい属性の影響が大きく含まれた電力需要代表データ及び熱需要代表データを作成することができる。 That is, the power defined by the first time attribute group (corresponding to the above-mentioned day-of-week attributes from Monday to Sunday) and the second time attribute group (corresponding to the above-mentioned respective time attributes from midnight to 24:00). After multiplying the demand data by the weighting coefficient set for each attribute of the first time attribute group (every day of the week), the multiplied power demand data is obtained for each attribute of the second time attribute group (time Power demand representative data is averaged with each other), and the first time attribute group corresponds to the above-mentioned Monday-Sunday attribute) and the second time attribute group (from 0:00 to 24:00) After multiplying the heat demand data defined by the time attribute of each time) by the weighting coefficient set for each attribute (each day of the week) of the first time attribute group, the heat demand data after multiplication Is averaged for each attribute (time) of the second time attribute group Representative data by creating a can create an attribute of impact is large include electricity demand representative data and heat demand representative data were to be prioritized.
<別実施形態>
<1>
図5に示した電力需要代表データは1時間毎の電力需要値を有するデータであったが、不揮発性メモリ5に記憶される情報量を削減するような対策を講じることも出来る。例えば、電力需要量データは需要量情報収集手段1によって1時間毎に収集されたデータであるが、この1時間毎のデータを2時間毎のデータに変換した上で、2時間毎の電力需要値を有する電力需要代表データを作成し、不揮発性メモリ5に記憶させることもできる。
<Another embodiment>
<1>
The power demand representative data shown in FIG. 5 is data having a power demand value for every hour, but measures such as reducing the amount of information stored in the
具体的には、図6に示すように、図5(a)に示した1時間というタイミング毎の電力需要代表データを2時間というタイミング毎に平均化処理して2時間毎の電力需要代表データを作成し、それを不揮発性メモリ5に記憶しておくこともできる。この場合には、電力需要代表データとして記憶する必要のあるデータ数が半減するので、それらを記憶しておくための高価な不揮発性メモリ5に関して必要なコストを低くすることができる。
Specifically, as shown in FIG. 6, the power demand representative data at every timing of 1 hour shown in FIG. 5A is averaged at every timing of 2 hours to represent power demand representative data every 2 hours. Can be created and stored in the
尚、上述の実施形態で説明したように、運転制御手段2は、その日1日分の予測需要量データを求めた状態で、単位時間である1時間が経過するごとに、予測需要量データから、熱電併給装置21を運転させるか否かの基準となる省エネ度基準値を求める省エネ度基準値演算処理を行うとともに、その省エネ度基準値演算処理にて求められた省エネ度基準値よりも現時点での実省エネ度が上回っているか否かによって、熱電併給装置21の運転の可否を判別する運転可否判別処理を行うように構成されている。
As described in the above-described embodiment, the
従って、不揮発性メモリ5に記憶されている2時間毎の電力需要代表データ及び熱需要量データをデータ補間処理によって1時間毎の電力需要代表データ及び熱需要量データに変換した上で、そのデータを上述の予測需要量データとして利用する必要がある。データ補間処理としては、通常用いられている様々な手法を用いることができるのだが、例えば図7(a)及び図7(b)に例示するような手法がある。
Therefore, after the power demand representative data and heat demand data stored every two hours stored in the
図7(a)に例示するデータ補間処理は、隣接する1つのデータをそのまま利用するデータ補間であり、具体的には、1時のデータを用いて2時のデータを補間している。また、図7(b)に例示するデータ補間処理は、隣接する2つのデータの平均値を利用するデータ補間であり、例えば、1時及び3時のデータの平均値を用いて2時のデータを補間するような処理を行っている。 The data interpolation processing illustrated in FIG. 7A is data interpolation that uses one adjacent data as it is, and specifically interpolates 2 o'clock data using 1 o'clock data. In addition, the data interpolation processing illustrated in FIG. 7B is data interpolation using an average value of two adjacent data. For example, the data at 2 o'clock is obtained by using the average value of the data at 1 o'clock and 3 o'clock. Is interpolated.
<2>
上述の実施形態及び別実施形態では、代表データが記憶される不揮発性メモリが運転制御システム10の内部に設置されているように説明したが、その設置場所は特に限定されない。例えば、運転制御システム10と通信回線を介して接続され、代表データ作成手段4及び運転制御手段2との間でデータ通信を行うことができるのであれば、この不揮発性メモリ5が遠隔地に設置された所定のシステム内部に設置されていてもよい。
<2>
In the above-described embodiment and another embodiment, it has been described that the nonvolatile memory in which the representative data is stored is installed in the
1 需要量情報収集手段
2 運転制御手段
3 揮発性メモリ
4 代表データ作成手段
5 不揮発性メモリ
10 運転制御システム
20 需要家
21 熱電併給装置
22 貯湯タンク
DESCRIPTION OF
Claims (3)
需要家の電力需要量データ及び熱需要量データを所定のタイミング毎に収集する需要量情報収集手段と、
前記需要量情報収集手段によって収集された前記所定のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、前記熱電併給装置に指示する運転制御情報を作成する運転制御手段と、
前記需要量情報収集手段によって収集された前記所定のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、前記需要家の電力需要特性及び熱需要特性を代表する電力需要代表データ及び熱需要代表データを作成して、不揮発性メモリに記憶する代表データ作成手段とを備え、
前記運転制御手段は、停電後の電源復帰時に、前記不揮発性メモリに記憶されている前記電力需要代表データ及び前記熱需要代表データを参照して、前記運転制御情報を作成し、
前記代表データ作成手段は、前記需要量情報収集手段によって収集された第1のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、
単位期間毎に存在する同じ時間属性の電力需要量データを互いに平均化する処理と、第1のタイミング毎に収集された前記電力需要量データを所定の期間毎に平均化して前記第1のタイミングよりも間隔の長い第2のタイミング毎のデータへの変換処理とを行って、前記電力需要代表データを前記第2のタイミング毎のデータで作成し、
前記単位期間毎に存在する同じ時間属性の熱需要量データを互いに平均化する処理と、前記第1のタイミング毎に収集された前記熱需要量データを所定の期間毎に平均化して前記第1のタイミングよりも間隔の長い前記第2のタイミング毎のデータへの変換処理とを行って、前記熱需要代表データを前記第2のタイミング毎のデータで作成する運転制御システム。 An operation control system for controlling the operation of a cogeneration device that generates electric power and heat,
Demand information collecting means for collecting power demand data and heat demand data of consumers at a predetermined timing;
Operation control means for creating operation control information for instructing the combined heat and power supply device with reference to the power demand amount data and the heat demand amount data collected at the predetermined timing collected by the demand amount information collecting means,
Electric power demand representative data representing the electric power demand characteristic and the thermal demand characteristic of the consumer with reference to the electric power demand quantity data and the thermal demand quantity data for each predetermined timing collected by the demand quantity information collecting means. And representative data creation means for creating heat demand representative data and storing it in a nonvolatile memory,
The operation control means creates the operation control information by referring to the power demand representative data and the heat demand representative data stored in the nonvolatile memory when the power is restored after a power failure.
The representative data creating means refers to the power demand data and the heat demand data for each first timing collected by the demand information collecting means,
Processing for averaging power demand amount data having the same time attribute existing for each unit period, and the first timing by averaging the power demand amount data collected at each first timing for each predetermined period Conversion processing to data at each second timing with a longer interval, and creating the power demand representative data with data at each second timing,
The process of averaging the heat demand data having the same time attribute existing for each unit period, and the heat demand data collected at each of the first timings are averaged for each predetermined period and the first The operation control system which performs the conversion process to the data for every said 2nd timing whose interval is longer than this timing, and produces the said heat demand representative data with the data for every said 2nd timing.
需要家の電力需要量データ及び熱需要量データを所定のタイミング毎に収集する需要量情報収集手段と、
前記需要量情報収集手段によって収集された前記所定のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、前記熱電併給装置に指示する運転制御情報を作成する運転制御手段と、
前記需要量情報収集手段によって収集された前記所定のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、前記需要家の電力需要特性及び熱需要特性を代表する電力需要代表データ及び熱需要代表データを作成して、不揮発性メモリに記憶する代表データ作成手段とを備え、
前記運転制御手段は、停電後の電源復帰時に、前記不揮発性メモリに記憶されている前記電力需要代表データ及び前記熱需要代表データを参照して、前記運転制御情報を作成し、
前記代表データ作成手段は、前記需要量情報収集手段によって収集された第1のタイミング毎の前記電力需要量データ及び前記熱需要量データを参照して、
第1の時間属性群及び第2の時間属性群で規定される前記電力需要量データに対して、前記第1の時間属性群の属性毎に設定された重み付け係数を乗算した後に、乗算後の電力需要量データを前記第2の時間属性群の属性毎に互いに平均化する処理と、前記第1のタイミング毎に収集された前記電力需要量データを所定の期間毎に平均化して前記第1のタイミングよりも間隔の長い第2のタイミング毎のデータへの変換処理とを行って、前記電力需要代表データを前記第2のタイミング毎のデータで作成し、
前記第1の時間属性群及び前記第2の時間属性群で規定される前記熱需要量データに対して、前記第1の時間属性群の属性毎に設定された重み付け係数を乗算した後に、乗算後の熱需要量データを前記第2の時間属性群の属性毎に互いに平均化する処理と、前記第1のタイミング毎に収集された前記熱需要量データを所定の期間毎に平均化して前記第1のタイミングよりも間隔の長い第2のタイミング毎のデータへの変換処理とを行って、前記熱需要代表データを前記第2のタイミング毎のデータで作成する運転制御システム。 An operation control system for controlling the operation of a cogeneration device that generates electric power and heat,
Demand information collecting means for collecting power demand data and heat demand data of consumers at a predetermined timing;
Operation control means for creating operation control information for instructing the combined heat and power supply device with reference to the power demand amount data and the heat demand amount data collected at the predetermined timing collected by the demand amount information collecting means,
Electric power demand representative data representing the electric power demand characteristic and the thermal demand characteristic of the consumer with reference to the electric power demand quantity data and the thermal demand quantity data for each predetermined timing collected by the demand quantity information collecting means. And representative data creation means for creating heat demand representative data and storing it in a nonvolatile memory,
The operation control means creates the operation control information by referring to the power demand representative data and the heat demand representative data stored in the nonvolatile memory when the power is restored after a power failure.
The representative data creating means refers to the power demand data and the heat demand data for each first timing collected by the demand information collecting means,
After multiplying the power demand data defined by the first time attribute group and the second time attribute group by a weighting coefficient set for each attribute of the first time attribute group, A process of averaging power demand data for each attribute of the second time attribute group, and averaging the power demand data collected at each first timing for each predetermined period The data is converted into data for each second timing having a longer interval than the timing, and the power demand representative data is created with the data for each second timing,
Multiplication after multiplying the heat demand data defined by the first time attribute group and the second time attribute group by a weighting coefficient set for each attribute of the first time attribute group A process of averaging the subsequent heat demand data for each attribute of the second time attribute group, and averaging the heat demand data collected at each first timing for each predetermined period The operation control system which performs the conversion process to the data for every 2nd timing longer than a 1st timing, and produces the said heat demand representative data by the data for every said 2nd timing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003390368A JP4152305B2 (en) | 2003-02-26 | 2003-11-20 | Operation control system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003049850A JP4010964B2 (en) | 2003-02-26 | 2003-02-26 | Operation control system |
JP2003390368A JP4152305B2 (en) | 2003-02-26 | 2003-11-20 | Operation control system |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003049850A Division JP4010964B2 (en) | 2003-02-26 | 2003-02-26 | Operation control system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004257723A JP2004257723A (en) | 2004-09-16 |
JP4152305B2 true JP4152305B2 (en) | 2008-09-17 |
Family
ID=33115456
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003049850A Expired - Fee Related JP4010964B2 (en) | 2003-02-26 | 2003-02-26 | Operation control system |
JP2003390368A Expired - Fee Related JP4152305B2 (en) | 2003-02-26 | 2003-11-20 | Operation control system |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003049850A Expired - Fee Related JP4010964B2 (en) | 2003-02-26 | 2003-02-26 | Operation control system |
Country Status (1)
Country | Link |
---|---|
JP (2) | JP4010964B2 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4649182B2 (en) * | 2004-11-30 | 2011-03-09 | 大阪瓦斯株式会社 | Energy load data creation device and cogeneration system for energy generator |
JP4614793B2 (en) * | 2005-03-02 | 2011-01-19 | 大阪瓦斯株式会社 | Energy load data creation device and cogeneration system |
JP4554414B2 (en) * | 2005-03-28 | 2010-09-29 | 株式会社ノーリツ | Cogeneration system |
JP2007247963A (en) * | 2006-03-15 | 2007-09-27 | Nippon Oil Corp | Cogeneration system |
JP2007280650A (en) * | 2006-04-03 | 2007-10-25 | Ebara Ballard Corp | Operation method of fuel cell system, and fuel cell system |
JP2009204195A (en) * | 2008-02-26 | 2009-09-10 | Mitsubishi Heavy Ind Ltd | Air conditioning system and power consumption estimating device for building air-conditioning equipment |
JP2009204221A (en) * | 2008-02-27 | 2009-09-10 | Mitsubishi Heavy Ind Ltd | Air conditioning system and power consumption estimating device for building air-conditioning equipment |
-
2003
- 2003-02-26 JP JP2003049850A patent/JP4010964B2/en not_active Expired - Fee Related
- 2003-11-20 JP JP2003390368A patent/JP4152305B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2004260946A (en) | 2004-09-16 |
JP4010964B2 (en) | 2007-11-21 |
JP2004257723A (en) | 2004-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011007736A1 (en) | Demand-prediction device, program, and recording medium | |
JP4164347B2 (en) | Cogeneration system control device and control method thereof | |
JP4229865B2 (en) | Energy supply system | |
JP4152305B2 (en) | Operation control system | |
JP3823105B2 (en) | Energy supply evaluation system | |
JP4378120B2 (en) | Operation control system for home cogeneration system | |
JP2007252085A (en) | Power generation system | |
JP2006244062A (en) | Energy load data creation device and cogeneration system | |
JP2016114271A (en) | Cogeneration system | |
JP4516862B2 (en) | Energy supply system | |
JP4426860B2 (en) | Cogeneration system operation control system | |
JP2005287132A (en) | Cogeneration system | |
JP4148419B2 (en) | Cogeneration system and control method | |
JP2005009846A (en) | Cogeneration system | |
JP4378121B2 (en) | Operation control system for home cogeneration system | |
JP5295694B2 (en) | Fuel cell system and operation method thereof | |
JP4163977B2 (en) | Heat source system | |
JP4176028B2 (en) | Energy system | |
JP6479212B2 (en) | Water heater control system, control method and program | |
JP4222923B2 (en) | Energy saving information provision system | |
JP3970239B2 (en) | Cogeneration system energy saving degree calculation method | |
JP4229866B2 (en) | Energy supply system | |
JP4994108B2 (en) | Thermal storage control device | |
JP2004263622A (en) | Cogeneration system | |
JP4614809B2 (en) | Energy supply system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060203 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080612 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080619 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080701 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4152305 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110711 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110711 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140711 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees |