JP4115747B2 - Hybrid power generation system - Google Patents

Hybrid power generation system Download PDF

Info

Publication number
JP4115747B2
JP4115747B2 JP2002157266A JP2002157266A JP4115747B2 JP 4115747 B2 JP4115747 B2 JP 4115747B2 JP 2002157266 A JP2002157266 A JP 2002157266A JP 2002157266 A JP2002157266 A JP 2002157266A JP 4115747 B2 JP4115747 B2 JP 4115747B2
Authority
JP
Japan
Prior art keywords
power generation
generation amount
output
wind
wind turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002157266A
Other languages
Japanese (ja)
Other versions
JP2003343416A (en
Inventor
茂雄 吉田
崇 白石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Subaru Corp
Original Assignee
Fuji Jukogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Jukogyo KK filed Critical Fuji Jukogyo KK
Priority to JP2002157266A priority Critical patent/JP4115747B2/en
Publication of JP2003343416A publication Critical patent/JP2003343416A/en
Application granted granted Critical
Publication of JP4115747B2 publication Critical patent/JP4115747B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Control Of Eletrric Generators (AREA)
  • Wind Motors (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、ハイブリッド発電システムに関する。
【0002】
【従来の技術】
従来より、自然風から安定した電力を得る目的で風車が提案され、実用化されている。また、近年においては、風エネルギそのものが有する不規則性や間欠性を他の発電装置との結合によって補い、安定した出力を得るためのハイブリッド発電システムが提案されている。かかるハイブリッド発電システムにおいて風車と組み合わせて用いられる他の発電装置としては、ディーゼル発電装置が挙げられる。
【0003】
風力・ディーゼル系のハイブリッド発電システムにおいては、コスト削減のため、燃料消費率の高いディーゼル発電装置の出力をできるだけ抑え、風車の出力を増加させるのが好ましい。一方、ディーゼル発電装置は、その出力が最大出力の約50%を下回ると煤が発生して装置内に堆積し、装置の耐久性に影響を与える場合がある。従って、ディーゼル発電装置が、装置の耐久性に影響を与えない程度の最小出力(以下、「許容最小出力」という)を維持するように、風車の出力を制御する必要がある。
【0004】
【発明が解決しようとする課題】
風力・ディーゼル系のハイブリッド発電システムにおける風車の出力制御方法としては、システムの出力が所定量を超えた場合に、複数の風車のうち特定の風車の運転を停止させる方法(以下、「台数制御」という)が採用されている。しかし、この「台数制御」を採用すると、風力がわずかに大きくなってシステムの出力が所定量をわずかに超えた場合にも特定の風車の運転を完全に停止させてしまうため、ディーゼル発電装置の出力を増加させてしまうことがある。
【0005】
例えば、定格出力100kWの風車2基運転時に風車の全出力を80kW(所定量)に制限する場合には、1基を停止させ、2基目の出力が80kWを超えそうになった場合にこの2基目を停止させる必要がある。この結果、風車による全出力が零となるため、不足分の電力をディーゼル発電装置で補う必要があった。
【0006】
一方、風車の出力制御方法の他の例としては、ピッチ制御自在なブレードを備えた風車を採用し、システムの出力が所定量を超えた場合に、風車のブレードのピッチを制御して出力を制限する方法(以下、「出力制御」という)が挙げられる。この「出力制御」においては、風車による全出力を風車基数で割ったものを単基当りの出力としており、例えば、定格出力100kWの風車2基運転時に風車の全出力を80kW(所定量)に制限する場合には、風車1基当りの出力を40kWに設定している。
【0007】
ここで、一般に、地形が複雑になるほど地点毎の風速はばらつくため、各風車に全て一定の風速の風が作用することは少なく、風車の配置場所や障害物(風上側の風車の影響も含む)の状況によって各風車の出力が変動することが頻繁に起こり得る。
【0008】
前記した「出力制御」を採用すると、風車による全出力を風車基数で割ったものを単基当りの出力としているため、例えば前記した例において1基目の風車に60kW相当の風が作用し、2基目の風車に20kW相当の風が作用した場合においても、1基目の風車の出力が40kWに制限される。この結果、風車による全出力は結果的に80kWに満たないこととなり、やはり不足分をディーゼル発電装置で補う必要があった。
【0009】
本発明の課題は、風力・ディーゼル系のハイブリッド発電システムにおいて、ディーゼル発電装置の燃料消費量を抑制して、発電コストの削減を図ることである。
【0010】
【課題を解決するための手段】
以上の課題を解決するために、請求項1記載の発明は、出力変更可能な風車を複数有する風力発電装置と、ディーゼル発電装置と、前記風車の各々の出力を制御する制御装置と、前記風車の各々の発電量を検出する発電量検出手段と、前記風車の各々の潜在発電量を検出する潜在発電量検出手段と、を備えるハイブリッド発電システムにおいて、
前記制御装置は、前記風力発電装置の発電量が所定量を超過した場合に、風力総発電量低減操作を繰り返すことで、前記発電量を所定量以下に低減させる機能を有し、前記風力総発電量低減操作は、前記発電量検出手段に基づき、その時点での発電量が最大である前記風車を選択する発電量最大風車選択工程と、前記発電量最大風車選択工程により選択した前記風車の出力を低減させる発電量低減工程とを繰り返しの単位として備え、前記制御装置は、前記風力発電装置の発電量が所定量未満となった場合に、風力総発電量増加操作を繰り返すことで、前記発電量を所定以上に増加させる機能を有し、前記風力総発電量増加操作は、前記潜在発電量検出手段に基づき、その時点での潜在発電量が最大である前記風車を選択する潜在発電量最大風車選択工程と、前記潜在発電量最大風車選択工程により選択した前記風車の出力を増加させる発電量増加工程とを繰り返しの単位として備えることを特徴とする。
【0011】
請求項1記載の発明によれば、風力発電装置の発電量が所定量を超過した場合に、発電量最大の風車の出力を優先的に低減させる制御装置を備えるので、各風車に作用する風の速度が変動し、これに起因して各風車の出力(発電量)が変動した場合においても、発電量に比較的余裕のある風車の出力を優先的に低減させることができる。
【0012】
従来の風車の出力制御方法である「出力制御」においては、風車1基当りの出力が所定の値(風車による全出力を風車基数で割った値)以下に制限されていたため、風車全体でみると出力が不足する場合があり、この不足分をディーゼル発電装置で補っていた。これに対し、本発明によれば、風車1基当りの出力が所定の値(風車による全出力を風車基数で割った値)以下に制限されることはなく、発電量最大の風車から優先的に出力を低減させるので、風車全体でみると出力が不足することが少なくなる。従って、ディーゼル発電装置が補う出力を低減させることができるので、ディーゼル発電装置の燃料消費量を抑制することができる。この結果、発電コストを削減することができる。
【0013】
請求項2記載の発明は、請求項1記載のハイブリッド発電システムにおいて、前記制御装置は、前記風力総発電量低減操作又は前記風力総発電量増加操作において、前記各々の風車の前記その時点での発電量又は潜在発電量が同じである場合、所定の優先順位に基づき、前記風車を選択することを特徴とする。
【0014】
請求項2記載の発明によれば、風力発電装置の発電量が所定量未満となった場合に、潜在発電量が最大である風車の出力を優先的に増加させる制御装置を備えるので、風力発電装置の発電量を所定量まで迅速に回復させることができる。
【0015】
【発明の実施の形態】
以下、本発明の実施の形態を、図面に基づいて詳細に説明する。
【0016】
[第1の実施の形態]
本実施の形態においては、風力・ディーゼル系のハイブリッド発電システムについて説明する。図1は、本実施の形態に係るハイブリッド発電システム1の構成を示す概念図である。ハイブリッド発電システム1は、風力発電装置10と、ディーゼル発電装置20と、これら風力発電装置10およびディーゼル発電装置20を制御するハイブリッド制御装置30と、を備えている。
【0017】
風力発電装置10は、定格出力100kWの3基の風車11A、11B、11Cを備えている。各風車11A(11B、11C)は、可変速制御手段によって回転速度を変更できるロータを備えており、さらにこのロータは、ピッチ可変制御手段によってピッチ変更自在なブレードを有している。そして、ハイブリッド制御装置30によってこれら可変速制御手段およびピッチ可変制御手段を制御することによって、各風車11A(11B、11C)の出力(発電量)を、定格出力(100kW)未満の任意の出力に設定することができる。
【0018】
また、各風車11A(11B、11C)のナセルには、作用する風の速度(風速)を測定する(図示してない)風速計が設けられている。この風速計は、各風車11A(11B、11C)の潜在的な発電能力を検出する潜在発電量検出手段として機能する。風速計によって測定された各風車11A(11B、11C)に作用する風の速度信号は、ハイブリッド制御装置30に送られ、各風車11A(11B、11C)の出力制御に用いられる。
【0019】
ディーゼル発電装置20は、定格出力100kWの3台のディーゼル発電機21A、21B、21Cを備えている。各ディーゼル発電機21A(21B、21C)の許容最小出力は、50kWである。
【0020】
ハイブリッド制御装置30は、系統の電力負荷を検出する系統負荷検出手段31と、ディーゼル発電装置20による発電量(以下、「ディーゼル発電量」という)を検出するディーゼル発電量検出手段32と、風力発電装置10による発電量(以下、「風力総発電量」という)を検出する風力総発電量検出手段33と、各風車11A(11B、11C)の発電量を検出する風車発電量検出手段34と、中央自動処理手段35と、を備えている。
【0021】
中央自動処理手段35は、系統負荷検出手段31によって検出された系統の電力負荷と、ディーゼル発電量検出手段32によって検出されたディーゼル発電量と、から、風力総発電量の制御が必要か否かを判定するという機能を果たす。また、風力総発電量の制御が必要である場合に、各風車11A(11B、11C)に備えられた可変速制御手段およびピッチ可変制御手段を制御することによって、各風車11A(11B、11C)の出力(発電量)を制御し、もって風力総発電量を制御するという機能をも果たす。
【0022】
なお、作業者の手動操作によって、中央自動処理手段35と同様の処理を行うことができる。この場合には、系統負荷検出手段31によって検出された系統の電力負荷と、ディーゼル発電量検出手段32によって検出されたディーゼル発電量と、を作業者がモニタ等を介して監視し、風力総発電量の制御が必要か否かを判定する。そして、風力総発電量の制御が必要である場合に、各風車11A(11B、11C)に備えられた可変速制御手段およびピッチ可変制御手段を、作業者が通信手段等を介して制御することによって、各風車11A(11B、11C)の出力(発電量)を制御する。
【0023】
次に、本実施の形態に係るハイブリッド発電システム1の制御方法について、図2のフローチャートを用いて説明する。
【0024】
まず、ハイブリッド制御装置30の中央自動処理手段35は、系統負荷検出手段31によって検出された系統の電力負荷と、ディーゼル発電量検出手段32によって検出されたディーゼル発電量と、から、風力総発電量を制御する必要があるか否かを判定する(制御要否判定工程:S1)。風力総発電量を制御する必要がないと判定された場合には、風力発電装置10の発電量の制御は行わない。
【0025】
風力総発電量の制御が必要であると判定された場合には、風力総発電量が過剰であるか否かを判定する(過剰発電判定工程:S2)。なお、風力総発電量が過剰であるか否かの判定は、風力総発電量検出手段33によって検出された風力総発電量が所定の発電量よりも一定量大きいか否かによって行う。
【0026】
風力総発電量が過剰であると判定された場合には、風車発電量検出手段34によって検出された各風車11A、11B、11Cの発電量に基づいて、所定の評定時間内の発電量が最大の風車(以下、「発電量最大風車」という)を選択する(発電量最大風車選択工程:S3)。本実施の形態では、所定の評定時間を1秒に設定している。そして、ハイブリッド制御装置30によって風力発電装置10の可変速制御手段およびピッチ可変制御手段を制御することによって、選択した発電量最大風車の出力(発電量)を低減させる(発電量低減工程:S4)。
【0027】
ハイブリッド制御装置30の中央自動処理手段35は、風力総発電量が所定の値に達するまで、これら発電量最大風車選択工程S3および発電量低減工程S4を繰り返す。この際、風速の変動によって発電量最大風車が入れ替わることがある。この後、風力発電装置10の発電量の制御を終了する。
【0028】
一方、過剰発電量判定工程S2で風力総発電量が過剰でないと判定された場合には、風力総発電量が過小か否かを判定する(過小発電判定工程:S5)。なお、風力総発電量が過小であるか否かの判定は、風力総発電量検出手段33によって検出された風力総発電量が所定の発電量よりも一定量小さいか否かによって行う。風力総発電量が過小でないと判定された場合には、風力発電装置10の発電量の制御を終了する。
【0029】
風速の減少や系統の電力負荷の増加などに起因して各風車の出力(発電量)が減少した結果、風力総発電量が過小であると判定された場合には、潜在発電量検出手段である風速計によって検出された各風車11A、11B、11Cの風速に基づいて、潜在的な発電能力が最大の風車(以下、「潜在発電量最大風車」という)を選択する(潜在発電量最大風車選択工程:S6)。そして、ハイブリッド制御装置30によって風力発電装置10の可変速制御手段およびピッチ可変制御手段を制御することによって、選択した潜在発電量最大風車の出力(発電量)を増加させる(発電量増加工程:S7)。
【0030】
ハイブリッド制御装置30の中央自動処理手段35は、風力総発電量が所定の値に回復するまで、これら潜在発電量最大風車選択工程S6および発電量増加工程S7を繰り返す。この際、風速の変動によって潜在発電量最大風車が入れ替わることがある。この後、風力発電装置10の発電量の制御を終了する。
【0031】
次に、以上説明したハイブリッド発電システム1の制御方法において、発電量最大風車選択工程S3および発電量低減工程S4の繰り返しによる風力総発電量低減操作の具体例と、潜在発電量最大風車選択工程S6および発電量増加工程S7の繰り返しによる風力総発電量増加操作の具体例と、を説明する。
【0032】
<風力総発電量低減操作の具体例>
まず、発電量最大風車選択工程S3および発電量低減工程S4の繰り返しによる風力総発電量低減操作の具体例について説明する。図1に示したハイブリッド発電システム1において、電力需要180kWの下で、ディーゼル発電装置20の3台のディーゼル発電機のうち2台を許容最小出力の50kWで運転させるとともに、風力発電装置10の風車11Aを出力40kW、風車11Bを出力30kW、風車11Cを出力10kWで各々運転させている状態を想定する。この状態においては、ディーゼル発電装置20が100kWの出力を、風力発電装置10が80kWの出力を、各々担っている。
【0033】
この状態から風が強まって、風車11Aの出力が45kW、風車11Bの出力が35kW、風車11Cの出力が30kW(風力総発電量110kW)となったため、発電量最大風車選択工程S3および発電量低減工程S4を繰り返して過剰な風力総発電量を低減させ、風力総発電量を80kWまで回復させる手順について説明する。なお、以下の例では、各風車の出力を5kWずつ低減させることとしている。
【0034】
まず、発電量最大風車である風車11Aを選択し、この風車11Aの出力を5kW低減させ、風車11Aの出力を40kW、風車11Bの出力を35kW、風車11Cの出力を30kWとし、風力総発電量を105kWとする(第1発電量低減操作)。次いで、発電量最大風車である風車11Aを再び選択し、この風車11Aの出力を5kW低減させ、風車11Aの出力を35kW、風車11Bの出力を35kW、風車11Cの出力を30kWとし、風力総発電量を100kWとする(第2発電量低減操作)。
【0035】
ここで各風車に作用する風の速度が変動して、風車11Aの出力が30kW、風車11Bの出力が30kW、風車11Cの出力が35kWとなり、風力総発電量が95kWとなったものと仮定する。この状態においては、発電量最大風車は風車11Cであるので、風車11Cの出力を5kW低減させ、風車11Aの出力を30kW、風車11Bの出力を30kW、風車11Cの出力を30kWとし、風力総発電量を90kWとする(第3発電量低減操作)。
【0036】
第3発電量低減操作が終了した時点においては全ての風車の出力が同じであるので、出力の履歴を参照して発電量最大風車を選択する。すなわち、最新の発電量低減操作終了時点から所定の評定時間だけ前の時点で出力が最大の風車を選択する。かかる選択手法により、発電量最大風車として風車11Cを選択し、風車11Cの出力を5kW低減させ、風車11Aの出力を30kW、風車11Bの出力を30kW、風車11Cの出力を25kWとし、風力総発電量を85kWとする(第4発電量低減操作)。
【0037】
次いで、前記した出力の履歴を参照した選択手法により、発電量最大風車として風車11Aを選択し、風車11Aの出力を5kW低減させ、風車11Aの出力を25kW、風車11Bの出力を30kW、風車11Cの出力を25kWとし、風力総発電量を80kWとする(第5発電量低減操作)。以上で、発電量最大風車選択工程S3および発電量低減工程S4の繰り返しによる風力総発電量低減操作を終了する。
【0038】
<風力総発電量増加操作の具体例>
次に、潜在発電量最大風車選択工程S6および発電量増加工程S7の繰り返しによる風力総発電量増加操作の具体例について説明する。図1に示したハイブリッド発電システム1において、電力需要180kWの下で、ディーゼル発電装置20の3台のディーゼル発電機のうち2台を許容最小出力の50kWで運転させるとともに、風力発電装置10の風車11Aを出力40kW、風車11Bを出力30kW、風車11Cを出力10kWで各々運転させている状態を想定する。この状態においては、ディーゼル発電装置20が100kWの出力を、風力発電装置10が80kWの出力を、各々担っている。
【0039】
この状態から電力需要が200kWに増加したため、潜在発電量最大風車選択工程S6および発電量増加工程S7を繰り返して風力総発電量を100kWまで増加させる手順について説明する。なお、以下の例では、各風車の出力を5kWずつ増加させることとしている。
【0040】
まず、潜在発電量検出手段である風速計によって検出された各風車11A、11B、11Cの風速に基づいて、潜在発電量最大風車を選択する。潜在発電量最大風車が風車11Bであるとすると、この風車11Bを選択して出力を5kW増加させ、風車11Aの出力を40kW、風車11Bの出力を35kW、風車11Cの出力を10kWとし、風力総発電量を85kWとする(第1発電量増加操作)。
【0041】
次いで、第1発電量増加操作終了時点における潜在発電量最大風車を選択する。潜在発電量最大風車が再び風車11Bであるとすると、この風車11Bを再び選択して出力を5kW増加させ、風車11Aの出力を40kW、風車11Bの出力を40kW、風車11Cの出力を10kWとし、風力総発電量を90kWとする(第2発電量増加操作)。
【0042】
第2発電量増加操作が終了した時点において、全ての風車の潜在的な発電能力が同じであるとする。このような場合を想定して、出力を増加させる優先順位をあらかじめ決めておく。例えば、出力増加優先順位が、風車11A、風車11B、風車11Cの順で決められていたとすると、優先順位の高い風車11Aを選択して出力を5kW増加させ、風車11Aの出力を45kW、風車11Bの出力を40kW、風車11Cの出力を10kWとし、風力総発電量を95kWとする(第3発電量増加操作)。
【0043】
第3発電量増加操作が終了した時点において、風車11Bと風車11Cの潜在的な発電能力が同じであり、風車11Aの潜在的な発電能力よりも高い場合には、前記した優先順位により、風車11Bを選択して出力を5kW増加させ、風車11Aの出力を45kW、風車11Bの出力を45kW、風車11Cの出力を10kWとし、風力総発電量を100kWとする(第4発電量増加操作)。以上で、潜在発電量最大風車選択工程S6および発電量増加工程S7の繰り返しによる風力総発電量増加操作を終了する。
【0044】
なお、全ての風車の潜在的な発電能力が同じである場合には、出力の履歴を参照して潜在発電量最大風車を選択することもできる。この場合には、最新の発電量増加操作終了時点から所定の評定時間だけ前の時点で潜在的な発電能力が最大の風車を選択する。
【0045】
次に、本実施の形態に係るハイブリッド発電システム1の出力制御方法を採用した場合の制御結果と、従来の風車の出力制御方法である「台数制御」および「出力制御」を採用した場合の制御結果と、を表−1に示した。なお、表−1においては、本実施の形態に係るハイブリッド発電システム1による風車の出力制御方法を「複数機出力制御」と記載している。
【0046】
【表1】

Figure 0004115747
【0047】
表−1に示すように、「複数機出力制御」、「台数制御」および「出力制御」いずれの場合においても、定格出力100kWの風車2基と、定格出力100kWのディーゼル発電機2台と、を運転させており、ハイブリッド発電システム全体で200kWの出力を得るように、風力発電装置およびディーゼル発電装置の出力を制御するものとした。なお、各風車に風速10m/sの風が作用した場合には約81kWの出力(発電量)が得られ、風速7m/sの風が作用した場合には約28kWの出力(発電量)が得られる。
【0048】
2基の風車に作用する風の速度が同一(10m/s)であるケース1において「台数制御」を採用した場合には、風力発電装置で出力100kWを超えないように1基目の風車を停止させ、2基目の風車において風速10m/sの風の作用により81kWの出力(発電量)を得ている。このため、風力発電装置によって合計81kWの出力が得られる。この風力発電装置の出力不足を補うために、ディーゼル発電装置は119kWの出力を行っており、2台のディーゼル発電機を各々許容最小出力50kWで運転させた場合の出力100kWよりも出力が19kW過剰となる。
【0049】
また、ケース1において「出力制御」を採用した場合には、風力発電装置の風車による全出力100kWを風車基数(2基)で割った50kWを単基当りの出力に設定している。このため、風力発電装置によって合計100kWの出力を得ることができ、2台のディーゼル発電機を各々許容最小出力50kWで運転させることができる。
【0050】
また、ケース1において本発明に係る「複数機出力制御」を採用した場合には、非制御時における出力である162kW(81kW×2)から、前記したフローチャート等で説明した発電量低減操作を行うことによって、2基の風車の出力を各々50kWに設定し、風力発電装置によって合計100kWの出力を得ることができる。この場合にも、2台のディーゼル発電機を各々許容最小出力50kWで運転させることができる。
【0051】
一方、1基目の風車に風速7m/sの風が作用し、2基目の風車に10m/sの風が作用するケース2において「台数制御」を採用した場合には、風力発電装置で出力100kWを超えないように1基目の風車を停止させ、2基目の風車において風速10m/sの風の作用により81kWの出力(発電量)を得ている。よって、ケース1と同様に風力発電装置によって合計81kWの出力を得ることとなり、風力発電装置の出力不足を補うために、ディーゼル発電装置は119kWの出力を行うこととなる。この場合、2台のディーゼル発電機を各々許容最小出力50kWで運転させた場合の出力100kWよりも出力が19kW過剰となる。
【0052】
また、ケース2において「出力制御」を採用した場合には、風力発電装置の風車による全出力100kWを風車基数(2基)で割った50kWを単基当りの出力としている。しかし、このケース2においては、1基目の風車に風速7m/sの風が作用しているため、1基目の風車によっては約28kWの出力しか得ることができない。従って、風力発電装置によって合計78kWの出力しか得ることができず、この風力発電装置の出力不足を補うために、ディーゼル発電装置は122kWの出力を行うこととなる。この場合、2台のディーゼル発電機を各々許容最小出力50kWで運転させた場合の出力100kWよりも出力が22kW過剰となる。
【0053】
これに対し、ケース1において本発明に係る「複数機出力制御」を採用した場合には、非制御時における出力である162kW(81kW×2)から、前記したフローチャート等で説明した発電量低減操作を行うことによって、1基目の風車の出力を72kWに設定し、2基目の風車の出力を28kWに設定することができる。これは、発電量最大風車である1基目の風車の出力を優先的に低減させたからである。この結果、風力発電装置によって合計100kWの出力を得ることができ、2台のディーゼル発電機を各々許容最小出力50kWで運転させることができる。
【0054】
本実施の形態に係るハイブリッド発電システム1においては、風力発電装置10の発電量が所定量を超過した場合に、発電量最大の風車の出力を優先的に低減させるハイブリッド制御装置30を備えるので、各風車11A(11B、11C)に作用する風の速度が変動し、これに起因して各風車11A(11B、11C)の出力(発電量)が変動した場合においても、発電量に比較的余裕のある風車の出力を優先的に低減させることができる。
【0055】
従来の風車の出力制御方法である「出力制御」においては、風車1基当りの出力が所定の値(風車による全出力を風車基数で割った値)以下に制限されていたため、風車全体でみると出力が不足する場合があり、この不足分をディーゼル発電装置で補っていた(表−1参照)。これに対し、本実施の形態に係るハイブリッド発電システム1においては、風車1基当りの出力が所定の値(風車による全出力を風車基数で割った値)以下に制限されることはなく(表−1参照)、発電量最大の風車から優先的に出力を低減させるので、風車全体でみると出力が不足することが少なくなる。従って、ディーゼル発電装置20が補う出力を低減させることができるので、ディーゼル発電装置20の燃料消費量を抑制することができる。この結果、発電コストを削減することができる。
【0056】
また、本実施の形態に係るハイブリッド発電システム1においては、風力発電装置10の発電量が所定量未満となった場合に、潜在発電量が最大である風車の出力を優先的に増加させるハイブリッド制御装置30を備えるので、風力発電装置10の発電量を所定量まで迅速に回復させることができる。
【0057】
【発明の効果】
請求項1記載の発明によれば、風力発電装置の発電量が所定量を超過した場合に発電量最大の風車の出力を優先的に低減させる制御装置を備えるので、発電量に比較的余裕のある風車の出力を優先的に低減させることができる。従って、ディーゼル発電装置が補う出力を低減させることができるので、ディーゼル発電装置の燃料消費量を抑制することができる。この結果、発電コストを削減することができる。
【0058】
請求項2記載の発明によれば、風力発電装置の発電量が所定量未満となった場合に潜在発電量が最大である風車の出力を優先的に増加させる制御装置を備えるので、風力発電装置の発電量を所定量まで迅速に回復させることができる。
【図面の簡単な説明】
【図1】本発明の実施の形態に係るハイブリッド発電システムの構成を示す概念図である。
【図2】本発明の実施の形態に係るハイブリッド発電システムの制御方法を説明するためのフローチャートである。
【符号の説明】
1 ハイブリッド発電システム
10 風力発電装置
11A 風車
11B 風車
11C 風車
20 ディーゼル発電装置
21A ディーゼル発電機
21B ディーゼル発電機
21C ディーゼル発電機
30 ハイブリッド制御装置
31 系統負荷検出手段
32 ディーゼル発電量検出手段
33 風力総発電量検出手段
34 風車発電量検出手段
35 中央自動処理手段
S1 制御要否判定工程
S2 過剰発電判定工程
S3 発電量最大風車選択工程
S4 発電量低減工程
S5 過小発電判定工程
S6 潜在発電量最大風車選択工程
S7 発電量増加工程[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a hybrid power generation system.
[0002]
[Prior art]
Conventionally, wind turbines have been proposed and put into practical use for the purpose of obtaining stable power from natural wind. In recent years, hybrid power generation systems have been proposed in which irregularities and intermittency of wind energy itself are compensated by coupling with other power generation devices to obtain a stable output. As another power generator used in combination with a windmill in such a hybrid power generation system, a diesel power generator can be cited.
[0003]
In a wind / diesel hybrid power generation system, in order to reduce costs, it is preferable to suppress the output of a diesel generator with a high fuel consumption rate as much as possible and increase the output of the windmill. On the other hand, when the output of the diesel power generator falls below about 50% of the maximum output, soot is generated and accumulates in the apparatus, which may affect the durability of the apparatus. Therefore, it is necessary to control the output of the wind turbine so that the diesel generator maintains a minimum output that does not affect the durability of the device (hereinafter referred to as “allowable minimum output”).
[0004]
[Problems to be solved by the invention]
As a wind turbine output control method in a wind power / diesel hybrid power generation system, when the output of the system exceeds a predetermined amount, a method of stopping operation of a specific wind turbine among a plurality of wind turbines (hereinafter referred to as “unit control”). Is adopted). However, when this “unit control” is adopted, the operation of a specific wind turbine is completely stopped even when the wind power is slightly increased and the output of the system exceeds a predetermined amount. The output may be increased.
[0005]
For example, when the total output of a wind turbine is limited to 80 kW (predetermined amount) during the operation of two wind turbines with a rated output of 100 kW, this is done when one of the turbines is stopped and the output of the second turbine is likely to exceed 80 kW. It is necessary to stop the second unit. As a result, since the total output of the windmill becomes zero, it was necessary to supplement the insufficient power with a diesel power generator.
[0006]
On the other hand, as another example of the wind turbine output control method, a wind turbine equipped with pitch-controllable blades is adopted, and when the output of the system exceeds a predetermined amount, the pitch of the wind turbine blade is controlled to output the wind turbine. A limiting method (hereinafter referred to as “output control”) can be mentioned. In this “output control”, the total output of the wind turbine divided by the number of wind turbines is used as the output per unit. For example, when operating two wind turbines with a rated output of 100 kW, the total output of the wind turbine is set to 80 kW (predetermined amount). When limiting, the output per wind turbine is set to 40 kW.
[0007]
Here, since the wind speed at each point varies as the terrain becomes more complex, the wind at a constant wind speed is unlikely to act on each windmill, and the windmill location and obstacles (including the effects of windmills on the windward side) ) The output of each windmill may fluctuate frequently depending on the situation.
[0008]
When the above “output control” is adopted, since the output per unit is obtained by dividing the total output of the wind turbine by the number of wind turbines, for example, the wind equivalent to 60 kW acts on the first wind turbine in the above example, Even when wind equivalent to 20 kW acts on the second windmill, the output of the first windmill is limited to 40 kW. As a result, the total output from the windmill eventually became less than 80 kW, and it was necessary to make up for the shortage with a diesel generator.
[0009]
An object of the present invention is to reduce the power generation cost by suppressing the fuel consumption of a diesel power generation device in a wind / diesel hybrid power generation system.
[0010]
[Means for Solving the Problems]
In order to solve the above problems, the invention according to claim 1 is a wind power generator having a plurality of wind turbines whose output can be changed, a diesel power generator, and a control device for controlling the output of each of the wind turbines, A power generation amount detecting means for detecting a power generation amount of each of the windmills; a potential power generation amount detecting means for detecting a potential power generation amount of each of the windmills; In a hybrid power generation system comprising:
The control device, when the power generation amount of the wind power generator exceeds a predetermined amount, By repeating the total wind power generation amount reduction operation, the power generation amount is reduced to a predetermined amount or less. The total wind power generation amount reduction operation is based on the power generation amount detection unit, and the power generation amount at that time is A power generation amount maximum wind turbine selection step for selecting the wind turbine that is the maximum, and a power generation amount reduction step for reducing the output of the wind turbine selected in the power generation amount maximum wind turbine selection step as a repeating unit, the control device, When the power generation amount of the wind power generation device becomes less than a predetermined amount, it has a function of increasing the power generation amount to a predetermined value or more by repeating the operation of increasing the total wind power generation amount. The potential power generation maximum wind turbine selection step of selecting the wind turbine having the maximum potential power generation amount at that time based on the potential power generation amount detection means, and the wind selected by the potential power generation maximum wind turbine selection step It comprises a power generation amount increasing step for increasing the output of the units of repeated It is characterized by that.
[0011]
According to the first aspect of the present invention, since the control device that preferentially reduces the output of the wind turbine with the maximum power generation amount when the power generation amount of the wind power generation device exceeds a predetermined amount, the wind power acting on each wind turbine is provided. Even when the speed of the wind turbine fluctuates and the output (power generation amount) of each wind turbine fluctuates due to this, it is possible to preferentially reduce the output of the wind turbine having a relatively large amount of power generation.
[0012]
In “output control”, which is a conventional wind turbine output control method, the output per wind turbine is limited to a predetermined value (a value obtained by dividing the total output of the wind turbine by the number of wind turbines) or less. The output may be insufficient, and this shortage was compensated with a diesel generator. On the other hand, according to the present invention, the output per wind turbine is not limited to a predetermined value (a value obtained by dividing the total output of the wind turbine by the number of wind turbines) or less. Therefore, the output is less likely to be insufficient when viewed from the whole wind turbine. Therefore, since the output supplemented by the diesel power generation device can be reduced, the fuel consumption of the diesel power generation device can be suppressed. As a result, the power generation cost can be reduced.
[0013]
According to a second aspect of the present invention, in the hybrid power generation system according to the first aspect, the control device includes: In the operation for reducing the total wind power generation amount or the operation for increasing the total wind power generation amount, when the power generation amount or the potential power generation amount of each of the wind turbines is the same, the wind turbine is selected based on a predetermined priority order. Do It is characterized by that.
[0014]
According to the second aspect of the invention, since the wind power generator includes the control device that preferentially increases the output of the wind turbine having the largest potential power generation amount when the power generation amount of the wind power generation device is less than a predetermined amount, The power generation amount of the apparatus can be quickly recovered to a predetermined amount.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0016]
[First embodiment]
In this embodiment, a wind / diesel hybrid power generation system will be described. FIG. 1 is a conceptual diagram showing a configuration of a hybrid power generation system 1 according to the present embodiment. The hybrid power generation system 1 includes a wind power generation device 10, a diesel power generation device 20, and a hybrid control device 30 that controls the wind power generation device 10 and the diesel power generation device 20.
[0017]
The wind turbine generator 10 includes three wind turbines 11A, 11B, and 11C having a rated output of 100 kW. Each windmill 11A (11B, 11C) includes a rotor whose rotation speed can be changed by variable speed control means, and this rotor has blades whose pitch can be freely changed by variable pitch control means. And by controlling these variable speed control means and pitch variable control means by the hybrid control device 30, the output (power generation amount) of each windmill 11A (11B, 11C) is set to an arbitrary output less than the rated output (100 kW). Can be set.
[0018]
The nacelle of each windmill 11A (11B, 11C) is provided with an anemometer (not shown) that measures the speed (wind speed) of the acting wind. This anemometer functions as a potential power generation amount detecting means for detecting the potential power generation capacity of each windmill 11A (11B, 11C). The wind speed signal acting on each windmill 11A (11B, 11C) measured by the anemometer is sent to the hybrid control device 30 and used for output control of each windmill 11A (11B, 11C).
[0019]
The diesel power generator 20 includes three diesel generators 21A, 21B, and 21C having a rated output of 100 kW. The allowable minimum output of each diesel generator 21A (21B, 21C) is 50 kW.
[0020]
The hybrid control device 30 includes a system load detection unit 31 that detects a power load of the system, a diesel power generation amount detection unit 32 that detects a power generation amount (hereinafter referred to as “diesel power generation amount”) by the diesel power generation device 20, and wind power generation. Wind power generation amount detection means 33 for detecting the power generation amount by the apparatus 10 (hereinafter referred to as “wind power generation amount”), wind turbine power generation amount detection means 34 for detecting the power generation amount of each windmill 11A (11B, 11C), Central automatic processing means 35.
[0021]
The central automatic processing means 35 determines whether or not it is necessary to control the total wind power generation amount based on the power load of the system detected by the system load detection means 31 and the diesel power generation amount detected by the diesel power generation amount detection means 32. It fulfills the function of judging. Further, when it is necessary to control the total wind power generation amount, each windmill 11A (11B, 11C) is controlled by controlling the variable speed control means and the pitch variable control means provided in each windmill 11A (11B, 11C). It also functions to control the total output of wind power.
[0022]
It should be noted that the same processing as the central automatic processing means 35 can be performed by the manual operation of the operator. In this case, the operator monitors the power load of the system detected by the system load detection means 31 and the diesel power generation amount detected by the diesel power generation amount detection means 32 via a monitor or the like. Determine whether quantity control is required. When the total wind power generation amount needs to be controlled, the operator controls the variable speed control means and the pitch variable control means provided in each wind turbine 11A (11B, 11C) via the communication means or the like. To control the output (power generation amount) of each windmill 11A (11B, 11C).
[0023]
Next, the control method of the hybrid power generation system 1 according to the present embodiment will be described using the flowchart of FIG.
[0024]
First, the central automatic processing unit 35 of the hybrid control device 30 calculates the total wind power generation amount from the power load of the system detected by the system load detection unit 31 and the diesel power generation amount detected by the diesel power generation amount detection unit 32. It is determined whether or not it is necessary to control (control necessity determination step: S1). When it is determined that it is not necessary to control the total wind power generation amount, the power generation amount of the wind power generator 10 is not controlled.
[0025]
When it is determined that the total wind power generation amount needs to be controlled, it is determined whether the total wind power generation amount is excessive (excess power generation determination step: S2). Whether or not the total wind power generation amount is excessive is determined based on whether or not the total wind power generation amount detected by the total wind power generation detection means 33 is larger than the predetermined power generation amount by a certain amount.
[0026]
When it is determined that the total wind power generation amount is excessive, the power generation amount within a predetermined evaluation time is the maximum based on the power generation amounts of the windmills 11A, 11B, and 11C detected by the windmill power generation amount detection unit 34. Wind turbines (hereinafter referred to as “maximum power generation amount wind turbine”) (power generation maximum wind turbine selection step: S3). In the present embodiment, the predetermined rating time is set to 1 second. Then, the hybrid controller 30 controls the variable speed control means and the pitch variable control means of the wind power generator 10 to reduce the output (power generation amount) of the selected maximum power generation wind turbine (power generation reduction step: S4). .
[0027]
The central automatic processing means 35 of the hybrid controller 30 repeats the maximum power generation wind turbine selection step S3 and the power generation amount reduction step S4 until the total wind power generation amount reaches a predetermined value. At this time, the wind turbine with the maximum power generation amount may be changed due to the fluctuation of the wind speed. Then, control of the electric power generation amount of the wind power generator 10 is complete | finished.
[0028]
On the other hand, when it is determined in the excessive power generation amount determination step S2 that the total wind power generation amount is not excessive, it is determined whether or not the total wind power generation amount is excessive (underpower generation determination step: S5). Whether or not the total wind power generation amount is too small is determined based on whether or not the total wind power generation amount detected by the total wind power generation detection means 33 is smaller than a predetermined power generation amount. When it is determined that the total wind power generation amount is not too small, the control of the power generation amount of the wind power generator 10 is terminated.
[0029]
If it is determined that the total wind power generation is too small as a result of a decrease in the output (power generation) of each wind turbine due to a decrease in wind speed or an increase in the power load of the system, the potential power generation detection means Based on the wind speeds of the wind turbines 11A, 11B, and 11C detected by a certain anemometer, the wind turbine having the maximum potential power generation capacity (hereinafter referred to as “the maximum potential power generation wind turbine”) is selected (the maximum potential power generation wind turbine). Selection step: S6). Then, the hybrid controller 30 controls the variable speed control means and the pitch variable control means of the wind power generator 10 to increase the output (power generation amount) of the selected maximum potential power generation wind turbine (power generation increase step: S7). ).
[0030]
The central automatic processing means 35 of the hybrid controller 30 repeats these potential power generation maximum wind turbine selection step S6 and power generation amount increase step S7 until the total wind power generation amount is restored to a predetermined value. At this time, the wind turbine with the maximum potential power generation may be replaced by the fluctuation of the wind speed. Then, control of the electric power generation amount of the wind power generator 10 is complete | finished.
[0031]
Next, in the control method of the hybrid power generation system 1 described above, a specific example of the total wind power generation amount reduction operation by repeating the power generation maximum windmill selection step S3 and the power generation amount reduction step S4, and the potential power generation maximum windmill selection step S6. A specific example of the total wind power generation amount increasing operation by repeating the power generation amount increasing step S7 will be described.
[0032]
<Specific examples of total wind power generation reduction operation>
First, a specific example of the total wind power generation amount reduction operation by repeating the power generation maximum wind turbine selection step S3 and the power generation amount reduction step S4 will be described. In the hybrid power generation system 1 shown in FIG. 1, under a power demand of 180 kW, two of the three diesel generators of the diesel power generator 20 are operated at an allowable minimum output of 50 kW, and the wind turbine of the wind power generator 10 Assume that 11A is operated at an output of 40 kW, the windmill 11B is operated at an output of 30 kW, and the windmill 11C is operated at an output of 10 kW. In this state, the diesel power generator 20 is responsible for 100 kW output and the wind power generator 10 is responsible for 80 kW output.
[0033]
Since the wind increased from this state, the output of the windmill 11A was 45 kW, the output of the windmill 11B was 35 kW, and the output of the windmill 11C was 30 kW (total wind power generation 110 kW). A procedure for reducing the total wind power generation amount by repeating step S4 and recovering the total wind power generation amount to 80 kW will be described. In the following example, the output of each wind turbine is reduced by 5 kW.
[0034]
First, the wind turbine 11A that is the maximum wind power generation amount is selected, the output of the wind turbine 11A is reduced by 5 kW, the output of the wind turbine 11A is 40 kW, the output of the wind turbine 11B is 35 kW, the output of the wind turbine 11C is 30 kW, and the total wind power generation amount Is set to 105 kW (first power generation reduction operation). Next, the wind turbine 11A that is the maximum power generation amount wind turbine is selected again, the output of the wind turbine 11A is reduced by 5 kW, the output of the wind turbine 11A is 35 kW, the output of the wind turbine 11B is 35 kW, and the output of the wind turbine 11C is 30 kW. The amount is set to 100 kW (second power generation amount reduction operation).
[0035]
Here, it is assumed that the wind speed acting on each windmill fluctuates, the output of the windmill 11A is 30 kW, the output of the windmill 11B is 30 kW, the output of the windmill 11C is 35 kW, and the total wind power generation amount is 95 kW. . In this state, since the wind turbine 11C has the maximum power generation amount, the output of the wind turbine 11C is reduced by 5 kW, the output of the wind turbine 11A is 30 kW, the output of the wind turbine 11B is 30 kW, and the output of the wind turbine 11C is 30 kW. The amount is set to 90 kW (third power generation amount reducing operation).
[0036]
Since the output of all the wind turbines is the same at the time when the third power generation amount reducing operation is completed, the maximum power generation amount wind turbine is selected with reference to the output history. That is, the wind turbine with the maximum output is selected at a time point a predetermined rating time before the end of the latest power generation amount reduction operation. With this selection method, the wind turbine 11C is selected as the maximum power generation amount windmill, the output of the windmill 11C is reduced by 5 kW, the output of the windmill 11A is 30 kW, the output of the windmill 11B is 30 kW, the output of the windmill 11C is 25 kW, and the total wind power generation The amount is set to 85 kW (fourth power generation amount reduction operation).
[0037]
Next, the wind turbine 11A is selected as the maximum power generation amount windmill by the selection method referring to the output history described above, the output of the windmill 11A is reduced by 5 kW, the output of the windmill 11A is 25 kW, the output of the windmill 11B is 30 kW, and the windmill 11C. Is set to 25 kW, and the total wind power generation amount is set to 80 kW (the fifth power generation amount reduction operation). Thus, the total wind power generation amount reduction operation by repeating the maximum power generation wind turbine selection step S3 and the power generation amount reduction step S4 is completed.
[0038]
<Specific example of operation to increase total wind power generation>
Next, a specific example of the total wind power generation amount increasing operation by repeating the potential power generation maximum wind turbine selection step S6 and the power generation amount increase step S7 will be described. In the hybrid power generation system 1 shown in FIG. 1, under a power demand of 180 kW, two of the three diesel generators of the diesel power generator 20 are operated at an allowable minimum output of 50 kW, and the wind turbine of the wind power generator 10 Assume that 11A is operated at an output of 40 kW, the windmill 11B is operated at an output of 30 kW, and the windmill 11C is operated at an output of 10 kW. In this state, the diesel power generator 20 is responsible for 100 kW output and the wind power generator 10 is responsible for 80 kW output.
[0039]
Since the power demand has increased to 200 kW from this state, a procedure for increasing the total wind power generation amount to 100 kW by repeating the potential power generation maximum wind turbine selection step S6 and the power generation amount increase step S7 will be described. In the following example, the output of each wind turbine is increased by 5 kW.
[0040]
First, the maximum potential power generation amount wind turbine is selected based on the wind speed of each wind turbine 11A, 11B, 11C detected by the anemometer as the potential power generation amount detection means. If the wind turbine 11B has the maximum potential power generation amount, the wind turbine 11B is selected and the output is increased by 5 kW. The output of the wind turbine 11A is 40 kW, the output of the wind turbine 11B is 35 kW, the output of the wind turbine 11C is 10 kW, The power generation amount is set to 85 kW (first power generation amount increasing operation).
[0041]
Next, the maximum potential power generation wind turbine at the end of the first power generation amount increasing operation is selected. Assuming that the maximum potential power generation wind turbine is the wind turbine 11B again, this wind turbine 11B is selected again to increase the output by 5 kW, the output of the wind turbine 11A is 40 kW, the output of the wind turbine 11B is 40 kW, and the output of the wind turbine 11C is 10 kW. The total wind power generation amount is set to 90 kW (second power generation amount increasing operation).
[0042]
It is assumed that the potential power generation capacities of all wind turbines are the same at the time when the second power generation amount increasing operation is completed. Assuming such a case, the priority for increasing the output is determined in advance. For example, if the output increase priority is determined in the order of the windmill 11A, the windmill 11B, and the windmill 11C, the windmill 11A having a higher priority is selected and the output is increased by 5 kW, the output of the windmill 11A is 45 kW, and the windmill 11B. Is set to 40 kW, the output of the wind turbine 11 C is set to 10 kW, and the total wind power generation amount is set to 95 kW (third power generation amount increasing operation).
[0043]
When the third power generation amount increasing operation is finished, if the potential power generation capacity of the windmill 11B and the windmill 11C is the same and is higher than the potential power generation capacity of the windmill 11A, the windmill has the above priority order. 11B is selected and the output is increased by 5 kW, the output of the windmill 11A is 45 kW, the output of the windmill 11B is 45 kW, the output of the windmill 11C is 10 kW, and the total wind power generation amount is 100 kW (fourth power generation amount increasing operation). This completes the operation for increasing the total wind power generation amount by repeating the potential power generation maximum wind turbine selection step S6 and the power generation amount increase step S7.
[0044]
In addition, when the potential power generation capability of all the windmills is the same, the maximum potential power generation amount windmill can be selected with reference to the output history. In this case, a wind turbine having the maximum potential power generation capacity is selected at a time point a predetermined evaluation time before the end of the latest power generation amount increase operation.
[0045]
Next, the control result when the output control method of the hybrid power generation system 1 according to the present embodiment is adopted, and the control when the “number control” and “output control” that are the conventional wind turbine output control methods are adopted. The results are shown in Table 1. In Table 1, the wind turbine output control method by the hybrid power generation system 1 according to the present embodiment is described as “multi-machine output control”.
[0046]
[Table 1]
Figure 0004115747
[0047]
As shown in Table 1, in any case of “multi-machine output control”, “number control”, and “output control”, two wind turbines with a rated output of 100 kW, two diesel generators with a rated output of 100 kW, The output of the wind power generator and the diesel power generator is controlled so that an output of 200 kW is obtained in the entire hybrid power generation system. When a wind speed of 10 m / s acts on each windmill, an output (power generation amount) of about 81 kW is obtained, and when a wind speed of 7 m / s acts, an output (power generation amount) of about 28 kW is obtained. can get.
[0048]
When “number control” is adopted in case 1 where the wind speeds acting on the two wind turbines are the same (10 m / s), the first wind turbine is set so that the wind power generator does not exceed the output of 100 kW. The second windmill is stopped and an output (power generation amount) of 81 kW is obtained by the action of wind at a wind speed of 10 m / s. For this reason, a total output of 81 kW is obtained by the wind turbine generator. In order to make up for the shortage of output of this wind turbine generator, the diesel generator has an output of 119 kW, and the output is 19 kW more than the output of 100 kW when each of the two diesel generators is operated at an allowable minimum output of 50 kW. It becomes.
[0049]
When “output control” is adopted in case 1, 50 kW obtained by dividing the total output 100 kW by the wind turbine of the wind turbine generator by the number of wind turbines (2) is set as the output per unit. For this reason, a total output of 100 kW can be obtained by the wind turbine generator, and each of the two diesel generators can be operated at an allowable minimum output of 50 kW.
[0050]
When “multi-machine output control” according to the present invention is adopted in case 1, the power generation amount reduction operation described in the above-described flowchart is performed from 162 kW (81 kW × 2), which is the output during non-control. Thus, the output of the two wind turbines can be set to 50 kW, respectively, and a total output of 100 kW can be obtained by the wind turbine generator. In this case as well, the two diesel generators can each be operated at an allowable minimum output of 50 kW.
[0051]
On the other hand, when “number control” is adopted in case 2 where wind of 7 m / s acts on the first wind turbine and wind of 10 m / s acts on the second wind turbine, The first wind turbine is stopped so that the output does not exceed 100 kW, and an output (power generation amount) of 81 kW is obtained by the action of wind at a wind speed of 10 m / s in the second wind turbine. Therefore, the output of a total of 81 kW is obtained by the wind power generator as in the case 1, and the diesel power generator outputs 119 kW to compensate for the shortage of the output of the wind power generator. In this case, the output is 19 kW more than the output 100 kW when each of the two diesel generators is operated at the allowable minimum output 50 kW.
[0052]
Further, when “output control” is adopted in case 2, 50 kW obtained by dividing the total output 100 kW by the wind turbine of the wind turbine generator by the number of wind turbines (2) is set as the output per unit. However, in this case 2, since the wind at the wind speed of 7 m / s is acting on the first windmill, only the output of about 28 kW can be obtained depending on the first windmill. Therefore, only a total output of 78 kW can be obtained by the wind power generator, and the diesel power generator will output 122 kW in order to compensate for the shortage of output of this wind power generator. In this case, the output is 22 kW excess from the output 100 kW when each of the two diesel generators is operated at the allowable minimum output 50 kW.
[0053]
On the other hand, when “multi-machine output control” according to the present invention is adopted in case 1, the power generation amount reduction operation described in the above-described flowchart or the like from 162 kW (81 kW × 2), which is the output during non-control. , The output of the first windmill can be set to 72 kW, and the output of the second windmill can be set to 28 kW. This is because the output of the first windmill, which is the maximum power generation windmill, is preferentially reduced. As a result, a total output of 100 kW can be obtained by the wind turbine generator, and each of the two diesel generators can be operated at an allowable minimum output of 50 kW.
[0054]
The hybrid power generation system 1 according to the present embodiment includes the hybrid control device 30 that preferentially reduces the output of the wind turbine with the maximum power generation amount when the power generation amount of the wind power generation device 10 exceeds a predetermined amount. Even when the wind speed acting on each windmill 11A (11B, 11C) fluctuates and the output (power generation amount) of each windmill 11A (11B, 11C) fluctuates due to this, the power generation amount is relatively marginal. It is possible to preferentially reduce the output of a wind turbine with a gap.
[0055]
In “output control”, which is a conventional wind turbine output control method, the output per wind turbine is limited to a predetermined value (a value obtained by dividing the total output of the wind turbine by the number of wind turbines) or less. The output may be insufficient, and this shortage was compensated with a diesel generator (see Table 1). In contrast, in hybrid power generation system 1 according to the present embodiment, the output per wind turbine is not limited to a predetermined value (a value obtained by dividing the total output of the wind turbine by the number of wind turbines) or less (Table -1), since the output is reduced preferentially from the wind turbine with the maximum power generation amount, the output is less likely to be insufficient in the entire wind turbine. Therefore, since the output supplemented by the diesel power generation device 20 can be reduced, the fuel consumption of the diesel power generation device 20 can be suppressed. As a result, the power generation cost can be reduced.
[0056]
Further, in the hybrid power generation system 1 according to the present embodiment, when the power generation amount of the wind power generation apparatus 10 becomes less than a predetermined amount, the hybrid control that preferentially increases the output of the wind turbine having the maximum potential power generation amount. Since the apparatus 30 is provided, the power generation amount of the wind power generator 10 can be quickly recovered to a predetermined amount.
[0057]
【The invention's effect】
According to the first aspect of the present invention, since the control device that preferentially reduces the output of the wind turbine with the maximum power generation amount when the power generation amount of the wind turbine generator exceeds a predetermined amount, the power generation amount has a relatively large margin. The output of a certain windmill can be reduced preferentially. Therefore, since the output supplemented by the diesel power generation device can be reduced, the fuel consumption of the diesel power generation device can be suppressed. As a result, the power generation cost can be reduced.
[0058]
According to the second aspect of the present invention, the wind turbine generator includes the control device that preferentially increases the output of the wind turbine having the maximum potential power generation amount when the power generation amount of the wind turbine generator is less than a predetermined amount. It is possible to quickly recover the power generation amount to a predetermined amount.
[Brief description of the drawings]
FIG. 1 is a conceptual diagram showing a configuration of a hybrid power generation system according to an embodiment of the present invention.
FIG. 2 is a flowchart for explaining a control method of the hybrid power generation system according to the embodiment of the present invention.
[Explanation of symbols]
1 Hybrid power generation system
10 Wind power generator
11A windmill
11B windmill
11C windmill
20 Diesel generator
21A diesel generator
21B Diesel generator
21C diesel generator
30 Hybrid controller
31 System load detection means
32 Diesel power generation detection means
33 Total wind power generation detection means
34 Wind turbine power generation detection means
35 Central automatic processing means
S1 Control necessity determination process
S2 excessive power generation determination process
S3 Power generation maximum windmill selection process
S4 Power generation reduction process
S5 Underpower generation determination process
S6 Potential potential power generation maximum windmill selection process
S7 Power generation increase process

Claims (2)

出力変更可能な風車を複数有する風力発電装置と、ディーゼル発電装置と、前記風車の各々の出力を制御する制御装置と、前記風車の各々の発電量を検出する発電量検出手段と、前記風車の各々の潜在発電量を検出する潜在発電量検出手段と、を備えるハイブリッド発電システムにおいて、
前記制御装置は、
前記風力発電装置の発電量が所定量を超過した場合に、風力総発電量低減操作を繰り返すことで、前記発電量を所定量以下に低減させる機能を有し、
前記風力総発電量低減操作は、
前記発電量検出手段に基づき、その時点での発電量が最大である前記風車を選択する発電量最大風車選択工程と、
前記発電量最大風車選択工程により選択した前記風車の出力を低減させる発電量低減工程とを繰り返しの単位として備え、
前記制御装置は、
前記風力発電装置の発電量が所定量未満となった場合に、風力総発電量増加操作を繰り返すことで、前記発電量を所定以上に増加させる機能を有し、
前記風力総発電量増加操作は、
前記潜在発電量検出手段に基づき、その時点での潜在発電量が最大である前記風車を選択する潜在発電量最大風車選択工程と、
前記潜在発電量最大風車選択工程により選択した前記風車の出力を増加させる発電量増加工程とを繰り返しの単位として備えることを特徴とするハイブリッド発電システム。
A wind turbine generator having a plurality of wind turbines capable of changing output, a diesel generator, a control device for controlling the output of each of the wind turbines, a power generation detection means for detecting the power generation amount of each of the wind turbines, In a hybrid power generation system comprising a potential power generation amount detecting means for detecting each potential power generation amount ,
The controller is
When the power generation amount of the wind power generator exceeds a predetermined amount, by repeating the total wind power generation amount reduction operation, the function of reducing the power generation amount below a predetermined amount,
The total wind power generation reduction operation is:
Based on the power generation amount detection means, a power generation amount maximum windmill selection step of selecting the windmill with the maximum power generation amount at that time,
A power generation amount reduction step for reducing the output of the windmill selected in the power generation amount maximum windmill selection step is provided as a repetition unit.
The controller is
When the power generation amount of the wind turbine generator is less than a predetermined amount, by repeating the total wind power generation amount increasing operation, it has a function of increasing the power generation amount above a predetermined amount,
The total wind power generation increase operation is:
A potential power generation maximum wind turbine selection step of selecting the wind turbine having the maximum potential power generation at that time, based on the potential power generation detection means;
A hybrid power generation system comprising: a power generation amount increasing step for increasing the output of the wind turbine selected in the latent power generation amount maximum wind turbine selection step as a repeating unit .
前記制御装置は、前記風力総発電量低減操作又は前記風力総発電量増加操作において、前記各々の風車の前記その時点での発電量又は潜在発電量が同じである場合、所定の優先順位に基づき、前記風車を選択することを特徴とする請求項1記載のハイブリッド発電システム。In the operation for reducing the total wind power generation amount or the operation for increasing the total wind power generation amount, when the power generation amount or the potential power generation amount of each of the wind turbines is the same, the control device is based on a predetermined priority order. The hybrid power generation system according to claim 1 , wherein the wind turbine is selected .
JP2002157266A 2002-05-30 2002-05-30 Hybrid power generation system Expired - Fee Related JP4115747B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002157266A JP4115747B2 (en) 2002-05-30 2002-05-30 Hybrid power generation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002157266A JP4115747B2 (en) 2002-05-30 2002-05-30 Hybrid power generation system

Publications (2)

Publication Number Publication Date
JP2003343416A JP2003343416A (en) 2003-12-03
JP4115747B2 true JP4115747B2 (en) 2008-07-09

Family

ID=29773202

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002157266A Expired - Fee Related JP4115747B2 (en) 2002-05-30 2002-05-30 Hybrid power generation system

Country Status (1)

Country Link
JP (1) JP4115747B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4495001B2 (en) * 2005-02-17 2010-06-30 三菱重工業株式会社 Power generation system
JP5491730B2 (en) * 2008-12-15 2014-05-14 大阪瓦斯株式会社 Power supply system
JP4770954B2 (en) 2009-03-16 2011-09-14 Tdk株式会社 Multiple power supply integration device, multiple power supply integration system, and multiple power supply integration program
KR20130050272A (en) 2011-08-10 2013-05-15 미츠비시 쥬고교 가부시키가이샤 Wind-power-station control apparatus and wind-power-station control method
JP5272113B1 (en) * 2012-02-24 2013-08-28 三菱重工業株式会社 Wind power generation system, control device therefor, and control method therefor
EP2818696B1 (en) 2012-02-24 2020-10-07 Mitsubishi Heavy Industries, Ltd. Wind power generation system and method for controlling same
CN102926930B (en) * 2012-11-12 2014-07-09 东南大学 Independent variable pitch control method of wind power generation system
JP6031011B2 (en) * 2013-07-24 2016-11-24 日立造船株式会社 Power generation system

Also Published As

Publication number Publication date
JP2003343416A (en) 2003-12-03

Similar Documents

Publication Publication Date Title
US8185249B2 (en) Wind farm power production control system
JP3905692B2 (en) Wind power generation control method
JP5117677B2 (en) Wind farm and its control method
US8718832B2 (en) Wind farm control system, wind farm, and wind farm control method
US9124134B2 (en) Method for avoiding voltage instability in an electrical grid of an offshore wind park
JP4848478B1 (en) Output leveling method for wind power generation equipment and output leveling apparatus for wind power generation equipment
CN107810322B (en) Increase active power by wind turbine
JP5244923B2 (en) Wind power generator and output control method
MX2011000030A (en) Power curtailment of wind turbines.
EP2610487A1 (en) Wind turbine controller and method for controlling a wind turbine to provide redundancy
CN102705160B (en) Rotating speed control method and device of wind generation set
WO2012137356A1 (en) Apparatus for controlling wind power generation apparatus, wind power generation apparatus, wind farm, and method for controlling wind power generation apparatus
JP4115747B2 (en) Hybrid power generation system
EP2743501B1 (en) Control device for wind power plant and control method for wind power plant
EP2604854A2 (en) Control method of a wind turbine generator
CN110429615B (en) Automatic power balance control method and system for wind storage alternating current micro-grid
CN108518305A (en) A kind of Wind turbines control method and system
CN107346894B (en) Wind power plant generating capacity control method and wind power plant energy control platform
CN103174587A (en) Wind power generation system and control method thereof
CN112688344A (en) Wind power plant frequency control method and system for offshore wind power base delivery system
CN113517683A (en) Direct-current grid-connected double-fed wind power generation system with energy stored at rotor side and control method thereof
EP4075629B1 (en) Method and system for controlling continuous low voltage ride-through and high voltage ride-through of permanent magnet direct-driven wind turbine
CN115769454A (en) Fast frequency response of hybrid power plant
CN113193573A (en) Fan rotating speed recovery control method, controller and wind power plant
Kanabar et al. Rotor speed stability analysis of a constant speed wind turbine generator

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050510

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071120

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080116

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080401

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080416

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4115747

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120425

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130425

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130425

Year of fee payment: 5

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130425

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130425

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140425

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees