JP4079477B2 - Branch pipe connection method - Google Patents

Branch pipe connection method Download PDF

Info

Publication number
JP4079477B2
JP4079477B2 JP09199597A JP9199597A JP4079477B2 JP 4079477 B2 JP4079477 B2 JP 4079477B2 JP 09199597 A JP09199597 A JP 09199597A JP 9199597 A JP9199597 A JP 9199597A JP 4079477 B2 JP4079477 B2 JP 4079477B2
Authority
JP
Japan
Prior art keywords
branch pipe
pipe
flange
existing
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP09199597A
Other languages
Japanese (ja)
Other versions
JPH10281378A (en
Inventor
健次 木谷
伸太郎 鈴木
浩輔 酒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Waterworks Technology Development Organization Co Ltd
Original Assignee
Waterworks Technology Development Organization Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Waterworks Technology Development Organization Co Ltd filed Critical Waterworks Technology Development Organization Co Ltd
Priority to JP09199597A priority Critical patent/JP4079477B2/en
Priority to EP19980100040 priority patent/EP0870969B1/en
Priority to DE1998622540 priority patent/DE69822540T2/en
Priority to US09/055,004 priority patent/US5967168A/en
Publication of JPH10281378A publication Critical patent/JPH10281378A/en
Application granted granted Critical
Publication of JP4079477B2 publication Critical patent/JP4079477B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、分岐管接続用の分岐用管部を備えた分岐管継手を既設管に連通接続し、前記分岐用管部に分岐管を接続して、その分岐管と前記既設管とを前記分岐管継手を介して連通させるまでの一連の工程を、前記既設管内の流体の流出を阻止しながら行う分岐管接続工法に関する。
【0002】
【従来の技術】
冒記分岐管接続工法によれば、分岐用管部に分岐管を接続して、その分岐管と既設管とを分岐管継手を介して連通させるまでの一連の工程を、既設管内の流体の流出を阻止しながら行うので、既設管が水道管の場合には、断水等の不便を利用者に強いることなく、分岐管を接続することができる。
そして、従来の冒記分岐管接続工法においては、例えば特開平7−113489号公報に記載されているように、分岐用管部を開閉自在な仕切り弁が備えられている分岐管継手を、既設管内の流体の流出を阻止しながら既設管に連通接続し、分岐管継手を既設管に連通接続したあとは、その仕切弁で分岐用管部を閉じて流体の流出を阻止して、その仕切弁に分岐管を接続するようにしている。
【0003】
【発明が解決しようとする課題】
上記従来技術によれば、分岐用管部を開閉自在な仕切弁が備えられている分岐管継手を使用する必要があり、分岐管の接続工費が高く付く欠点がある。
本発明は上記実情に鑑みてなされたものであって、分岐用管部と分岐管との接続方法を工夫することにより、分岐管の接続工費を安くすることができるようにすることを目的とする。
【0004】
【課題を解決するための手段】
請求項1記載の分岐管接続工法は、
分岐管を、分岐用管部側にフランジ継手で連結される接続管部に接続するように構成し、そのフランジ継手のフランジどうしの間に塞ぎ板を挟み込んで接続管部を分岐用管部側に連結して、分岐用管部からの流体の流出をその塞ぎ板で阻止し、接続管部に分岐管が接続されている状態でフランジ継手を緩めて、分岐管と分岐用管部とが連通するように塞ぎ板を引き抜き、フランジ継手を締め付けて、接続管部を分岐用管部側に連通接続する。
従って、分岐管と分岐管継手とをその間に仕切り弁を介在させることなく連通接続することができ、分岐管の接続工費を安くすることができる。
【0005】
また、流路形成部材を既設管の外周面に固定して、分岐用管部を通して既設管の管壁に貫通孔を形成するので、分岐管継手自体を、既設管内の流体の流出を阻止する作業用の密閉ケースの一部に兼用して、既設管の管壁に貫通孔を形成することができる。
請求項2記載の分岐管接続工法は、
前記フランジ継手が、前記接続管部に形成の接続管部側フランジと、前記塞ぎ部を下方に備えた塞ぎ部材に形成の塞ぎ部材側フランジと、前記分岐用管部に形成の分岐用管部側フランジとから構成されている分岐管接続工法である。
請求項3記載の分岐管接続工法は、
前記塞ぎ板が、前記接続管部側フランジと前記塞ぎ部材側フランジとの間に挟み込まれている分岐管接続工法である。
請求項4記載の分岐管接続工法は、
前記塞ぎ部材には、前記分岐用管部に嵌め込み可能な円筒状の嵌込部が形成されている分岐管接続工法である。
【0006】
請求項記載の分岐管接続工法は、
フランジ継手を緩めて塞ぎ板を引き抜く為の、その塞ぎ板を挟み込んでいるフランジどうしの締め付けボルトの緩め代が一定範囲内になるように規制されているので、締め付けボルトを緩めすぎて、フランジどうしの間から多量の流体が流れ出してしまうような事態を防止できる。
【0007】
請求項記載の分岐管接続工法は、
締め付けボルトが塞ぎ板を挟み込んでいるフランジのうちの一方のフランジに対して螺合され、その締め付けボルトを緩めるに伴ってフランジ側に接当する接当部材をその締め付けボルトに設けて、緩め代が一定範囲内になるように規制されているので、締め付けボルトの一方のフランジに対する螺進操作でフランジ継手を一定範囲内で簡便に緩めることができる。
【0008】
岐管接続工法において、前記塞ぎ板の一端部に、その塞ぎ板を前記フランジどうしの間から引き抜くための引き抜き具を係脱自在に係止する被係止部が形成し、前記塞ぎ板が、前記被係止部が前記フランジどうしの間からはみ出る状態で挟み込まれている構成にすれば、塞ぎ板の一端部に被係止部を形成して、その被係止部がフランジどうしの間からはみ出るように塞ぎ板を挟み込み、塞ぎ板を引き抜くときには、引き抜き具をその被係止部に係止して引き抜くので、引き抜き具を予め取り付てある大型の塞ぎ板をその引き抜き具がフランジどうしの間からはみ出るように挟み込む場合に比べて、塞ぎ板のフランジどうしの間からのはみ出し部分が作業の邪魔になるおそれが少ない。
【0009】
【発明の実施の形態】
図1,図2は、既設管の一例としての地中に埋設されている既設水道管Aと、消火栓Cが接続されている分岐管の一例としてのボール弁付き分岐管Bとをダクタイル鋳鉄製の分岐管継手Dを介して連通接続してある分岐管の接続構造を示し、分岐管継手Dは、既設水道管Aの外周面との間に形成した既設管下部から既設管上部に亘って既設管周方向に沿う渦巻き状の案内流路2と、案内流路2内の下部に連通するように既設水道管Aの下部管壁A1に形成した下部貫通孔1aとを介して既設水道管Aと分岐管Bとを連通接続するように構成されている。
【0010】
前記分岐管継手Dは、既設水道管Aの外周面に対して水密に固定される筒状の流路形成部材3に分岐管接続用の分岐用管部4を一体形成して構成され、既設水道管Aの上部管壁A2に設けた作業用の上部貫通孔1bを後述する塞ぎ部5で塞いで、既設水道管Aの外周面と流路形成部材3の内面との間に案内流路2を形成するように構成され、分岐用管部4が案内流路2内の上部において開口するように既設水道管径方向に向けて略垂直に設けられている。
【0011】
前記分岐管Bは、分岐用管部4にフランジ継手6で連結される接続管部としての短管Eに接続するように構成され、既設水道管Aの下部貫通孔1aから流出した水道水を既設水道管A外周面に沿ってその周方向上部に案内して分岐用管部4に流入させ、短管Eに接続した分岐管Bを介して、消火栓Cから放水できるように構成されている。
【0012】
前記流路形成部材3は、既設水道管A外周面を囲繞する筒形に形成され、既設水道管A外周面を径方向から挟み付ける状態でその既設水道管Aに固定できるよう上下二個の分割部材3a,3bに分割されているとともに、その分割部材3a,3bを既設水道管Aの周方向に沿って径方向外方に膨出させて、その内側に案内流路2を形成するように構成され、分割部材3a,3bと既設水道管Aとの間、並びに、分割部材3a,3bどうしの間には、ゴム製パッキン材3cが装着されている。
従って、この流路形成部材3が既設水道管Aの外周面を囲むように固定されるケース形成部材に構成され、分岐管継手Dがこのケース形成部材3に分岐用管部4を連通接続して構成されている。
【0013】
前記分岐用管部4内に嵌め込まれる円形の筒状体7(塞ぎ部材7、詳しくは、塞ぎ部材7の円筒状の嵌込部)の下端には、前記上部貫通孔1bを塞ぐ塞ぎ部5が一体形成され、この塞ぎ部5の中心部には、空気抜き孔5aが形成されている。
前記筒状体7には、分岐用管部4の上部に形成した上部フランジ(分岐用管部側フランジ)6aと短管Eの下部に形成した下部フランジ(接続管部側フランジ)6bとの間に挟み込んで共締め状態で固定される固定用フランジ(塞ぎ部材側フランジ)6cと、案内流路2に連通する開口7aとが形成されている。
【0014】
そして、開口7aを案内流路2側に向けた筒状体7を、固定用フランジ6cで上部フランジ6aと下部フランジ6bとの間に挟み込んで固定することにより、塞ぎ部5を上部貫通孔周縁との間に隙間fを形成する状態でその上部貫通孔1b内に入り込ませて、その上部貫通孔1bを塞ぐように構成されている。
【0015】
次に、前記分岐管継手Dを地中に埋設されている既設水道管Aに固定して、分岐管Bを短管Eを介して分岐用管部4に接続し、その分岐管Bと既設水道管Aとを分岐管継手Dを介して連通させるまでの一連の工程を、既設水道管A内の水道水の流通を遮断せずに、分岐管継手Dからの水道水の流出を阻止しながら行う分岐管接続工法を、図12〜図18を参照しながら説明する。
【0016】
消火栓Cの設置箇所にピットを掘削して既設水道管Aを露出させて、その外周面を清掃した後、パッキン材3cを装着した各分割部材3a,3bをその外周面に対して水密に連結固定して、流路形成部材3の内面と既設水道管A外周面との間に案内流路2を形成し、図12に示すように、分岐用管部4に作業用の仕切り弁Gを取付けるとともに、穿孔機Hの円筒状カッターH1が内側にセットされている作業用の第1密閉ケースJをその仕切り弁Gに固定する。
尚、分岐用管部4の上部フランジ6aのボルト孔には、筒状体7を位置決めする為のガイドピンK1を備えた止水用ボルトKが螺着されている。
【0017】
次に、図13に示すように、仕切り弁Gを開いて、分岐用管部4を通して案内流路2にカッターH1を入り込ませて、既設水道管Aの下部管壁A1に下部貫通孔1aを形成する為の作業用の上部貫通孔1bをそのカッターH1で上部管壁A2を設け、その上部貫通孔1bの切片bを保持したカッターH1を仕切り弁Gの上部に持ち上げてから、その仕切り弁Gを閉じて、その切片aをカッターH1から取り外し、次に、図14に示すように、上部貫通孔1bを通して既設水道管A内に入り込ませたカッターH1で既設水道管Aの下部管壁A1に下部貫通孔1aを形成し、その切片aを保持したカッターH1を仕切り弁Gの上部に持ち上げてから、仕切り弁Gを閉じて、穿孔機Hを第1密閉ケースJとともに仕切り弁Gから撤去する。
【0018】
次に、図15に示すように、昇降用の操作軸部材L1に連結されている短管Eと筒状体7とを内側にセットしてある第2密閉ケースLを仕切り弁Gに固定する。
前記第2密閉ケースLの内側にセットされている短管Eの下部フランジ6bには、図3に示すように、筒状体7が固定用フランジ6cで予めボルト固定され、下部フランジ6bと固定用フランジ6cは、それらのフランジ6b,6cどうしの間に分岐用管部4を塞ぐ塞ぎ板8を径方向に引き抜き可能に挟み込んで、フランジ径方向で対向する2箇所に装着した固定用の締め付けボルト・ナット9で仮固定されている。
【0019】
前記塞ぎ板8の一端部には、図4に示すように、その塞ぎ板8を下部フランジ6bと固定用フランジ6cとの間から引き抜く為の引き抜き具10が係脱自在に係止される被係止部としての二個の係止孔8aが形成され、締め付けボルト・ナット9は、塞ぎ板8をそれらの係止孔8aがフランジ6b,6cどうしの間からはみ出るように挟み込んで締め付けている。
【0020】
図6,図7は、下部フランジ6bと固定用フランジ6cとを塞ぎ板8を挟んで固定用の締め付けボルト・ナット9で固定する際の作業手順を示し、ネジ回しの先端が差し込まれる溝が形成されている平頭9cを備えた締め付けボルトとしての頭付きボルト9aを、図6に示すように、平頭9cが固定用フランジ6cの下面に接当するまでその固定用フランジ6cにねじ込み、次に、その頭付きボルト9aを予め規定されている量、例えば半回転だけ緩める側に回して、平頭9cと固定用フランジ6cの下面との間に隙間mを形成してから、図7に示すように、その頭付きボルト9aの下部フランジ6bからの突出端にナット9bをねじ込んで、下部フランジ6bと固定用フランジ6cとを締め付けて、下部フランジ6bと固定用フランジ6cとを塞ぎ板8を挟んで固定し、その固定状態で頭付きボルト9aとナット9bとが一体に回転するように互いに溶接してある。
【0021】
従って、頭付きボルト9aが、塞ぎ板8を挟み込んでいるフランジ6b,6cのうちの一方のフランジである固定用フランジ6cに対して螺合され、その頭付きボルト9aに、その頭付きボルト9aをナット9bで緩めるに伴ってフランジ9c側に接当する接当部材としての平頭9cが設けられ、頭付きボルト9aの塞ぎ板8を引き抜く為の緩め代が一定範囲内になるように規制されている。
【0022】
次に、図16に示すように、仕切り弁Gを開いて、操作軸部材L1の操作で、筒状体7の固定用フランジ6cが分岐用管部4の上部フランジ6aに接当するまで、短管Eと筒状体7とを分岐用管部4を通して下降させ、固定用フランジ6cの4箇所の連結用ボルト孔6dに止水用ボルトKのガイドピンK1を入り込ませて位置決めした後、止水用ボルトKを外しながら、図17に示すように、その止水用ボルトKに代えて挿通した連結用ボルト11を固定用フランジ6cにねじ込んで、短管Eを分岐用管部4側にフランジ継手6で連結する。
従って、この状態では、図5に示すように、分岐用管部4を通して挿入した塞ぎ部5が上部貫通孔1bに入り込んで、その上部貫通孔1bが塞がれているとともに、分岐用管部4からの水道水の流出が塞ぎ板8で阻止されている。
【0023】
次に、第2密閉ケースLの仕切り弁Gとの連結を解除して、その第2密閉ケースLを操作軸部材L1に沿って持ち上げ、操作軸部材1と短管Eとの連結を解除して、第2密閉ケースLを仕切り弁Gから撤去し、更に、仕切り弁Gを分岐用管部4から撤去して、図18に示すように、短管Eに分岐管Bを接続し、その分岐管Bに消火栓Cを接続する。
【0024】
次に、図8に示すように、下部フランジ6bと固定用フランジ6cとを塞ぎ板8を挟んで固定している頭付きボルト9aを平頭9cが固定用フランジ6cの下面に接当するまでナット9b側から回して、フランジ継手6を緩め、図9に示すように、塞ぎ板8に鋼板製の引き抜き具10を係止してその塞ぎ板8を引き抜く。
【0025】
前記引き抜き具10は、図10に示すように、塞ぎ板8の係止孔8aに係止する係止突起10aと持ち手部10bとを備え、係止孔8aに係止突起10aを係止した状態で、その持ち手部10bを掴んでフランジ径方向に引っ張ることで、塞ぎ板8を容易に引き抜けるように構成してある。
【0026】
次に、図11に示すように、頭付きボルト9aをナット9bで締め付けて、下部フランジ6bと固定用フランジ6cとを固定したあと、図1に示すように、連結用ボルト11のナット11aをねじ込んで、フランジ継手6を構成している上部フランジ6aと下部フランジ6bと固定用フランジ6cとを共締め状態で固定して、一連の工程を終了する。
【0027】
〔その他の実施例〕
1.本発明による分岐管接続工法は、既設の水道管に分岐管を接続するものに限定されず、例えば、既設の下水管に分岐管を接続するものであっても良い。
2.分岐用管部と接続管部とを直接連結するフランジ継手を設けて、そのフランジ継手のフランジどうしの間に、塞ぎ板を引き抜き可能に挟み込んでも良い。
3.二枚のフランジの双方に亘って挿通した締め付けボルトにナットをねじ込んで、それらのフランジどうしの間に塞ぎ板を挟み込むように構成し、ナットの締め付けボルトに対する螺進範囲を規制する規制部材を設けて、その締め付けボルトの緩め代が一定範囲内になるように規制しても良い。
4.引き抜き具が予め固定されている塞ぎ板をフランジどうしの間に引き抜き可能に挟み込んで実施しても良い。
5 既設管を囲む作業用の密閉ケース内で既設管の一定長さを切除し、その切除部分に分岐管継手を接続して、分岐管継手と既設管を連通接続する分岐管接続工法であっても良い。
【図面の簡単な説明】
【図1】分岐管の接続構造を示す一部断面正面図
【図2】分岐管の接続構造を示す一部断面側面図
【図3】短管と筒状体との仮固定状態を示す一部断面側面図
【図4】要部の平面図
【図5】要部の断面図
【図6】要部の断面図
【図7】要部の断面図
【図8】要部の断面図
【図9】要部の断面図
【図10】要部の斜視図
【図11】要部の断面図
【図12】分岐管接続工法の説明図
【図13】分岐管接続工法の説明図
【図14】分岐管接続工法の説明図
【図15】分岐管接続工法の説明図
【図16】分岐管接続工法の説明図
【図17】分岐管接続工法の説明図
【図18】分岐管接続工法の説明図
【符号の説明】
1a 下部貫通孔
3 ケース形成部材
4 分岐用管部
6 フランジ継手
6b,6c フランジ
8 塞ぎ板
8a 被係止部
9a 締め付けボルト
9c 接当部材
10 引き抜き具
A 既設管
A1 管壁
B 分岐管B
D 分岐管継手
E 接続管部
[0001]
BACKGROUND OF THE INVENTION
In the present invention, a branch pipe joint having a branch pipe part for connecting a branch pipe is connected in communication with an existing pipe, a branch pipe is connected to the branch pipe part, and the branch pipe and the existing pipe are connected to each other. The present invention relates to a branch pipe connection method for performing a series of steps until communication is established via a branch pipe joint while preventing outflow of fluid in the existing pipe.
[0002]
[Prior art]
According to the first branch pipe connection method, a series of steps from connecting a branch pipe to the branch pipe section and communicating the branch pipe and the existing pipe via the branch pipe joint is performed. Since it is performed while preventing the outflow, when the existing pipe is a water pipe, the branch pipe can be connected without forcing the user to inconvenience such as water outage.
Then, in the conventional冒記branch pipe connecting method, for example, as described in JP-A-7-113489, the branch pipe joint is freely partition Ri valve opening and closing the branch pipe portion is provided, After connecting and connecting the existing pipe to the existing pipe while preventing the fluid from flowing in the existing pipe, and connecting the branch pipe joint to the existing pipe, the branch pipe is closed by the gate valve to prevent the fluid from flowing out. A branch pipe is connected to the gate valve.
[0003]
[Problems to be solved by the invention]
According to the prior art, it is necessary to use a branch pipe joint is provided with a branching pipe portion openable and closable partition Ri valve, there is a high stick drawback connection construction costs of the branch pipe.
The present invention has been made in view of the above circumstances, and an object thereof is to reduce the connection cost of the branch pipe by devising a connection method between the branch pipe section and the branch pipe. To do.
[0004]
[Means for Solving the Problems]
The branch pipe connection method according to claim 1 is:
The branch pipe is configured to be connected to the connection pipe section connected to the branch pipe section by a flange joint, and a connecting plate is sandwiched between the flanges of the flange joint to connect the connection pipe section to the branch pipe section side. To prevent the fluid from flowing out from the branching pipe part with its closing plate, and loosen the flange joint while the branch pipe is connected to the connecting pipe part. Pull out the closing plate so as to communicate, tighten the flange joint, and connect the connecting pipe part to the branching pipe part side.
Thus, the branch pipe and the branch pipe joint may be connected communication without intervention of the partition Ri valve therebetween, it is possible to reduce the connection cost of construction of the branch pipe.
[0005]
In addition, since the flow path forming member is fixed to the outer peripheral surface of the existing pipe and a through hole is formed in the pipe wall of the existing pipe through the branch pipe portion, the branch pipe joint itself prevents the outflow of fluid in the existing pipe. A through hole can be formed in the pipe wall of the existing pipe, also serving as a part of the working airtight case.
The branch pipe connection method according to claim 2 is:
The flange joint is formed on the connecting pipe part, the connecting pipe part side flange, the closing member side flange formed on the closing member provided with the closing part below, and the branching pipe part formed on the branching pipe part. This is a branch pipe connection method composed of side flanges.
The branch pipe connecting method according to claim 3 is:
In the branch pipe connecting method, the closing plate is sandwiched between the connecting pipe portion side flange and the closing member side flange.
The branch pipe connection method according to claim 4 is:
It is a branch pipe connecting method in which the closing member is formed with a cylindrical fitting portion that can be fitted into the branch pipe portion.
[0006]
The branch pipe connecting method according to claim 5 is:
In order to loosen the flange joint and pull out the closing plate, the tightening bolts between the flanges that sandwich the closing plate are regulated so that the allowance is within a certain range. It is possible to prevent a situation in which a large amount of fluid flows out from between.
[0007]
The branch pipe connecting method according to claim 6 is:
A tightening bolt is screwed into one of the flanges sandwiching the closing plate, and when the tightening bolt is loosened, a contact member that comes into contact with the flange side is provided on the tightening bolt. Is regulated so as to be within a certain range, the flange joint can be easily loosened within the certain range by a screwing operation on one flange of the tightening bolt.
[0008]
In partial branch pipes splicing technique, to one end of the closing plate, the engaged portion is formed to disengageably lock the withdrawal device for withdrawing from between the flanges to each other the closing plate, the closing plate If the configuration is such that the locked portion is sandwiched between the flanges , a locked portion is formed at one end of the closing plate, and the locked portion is between the flanges. When the pulling plate is sandwiched so that it protrudes and the pulling plate is pulled out, the pulling tool is locked to the locked part and pulled out. Compared to the case of sandwiching so as to protrude from between the flanges, the protruding portion between the flanges of the closing plate is less likely to interfere with the work.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
FIGS. 1 and 2 show that an existing water pipe A buried in the ground as an example of an existing pipe and a branch pipe B with a ball valve as an example of a branch pipe to which a fire hydrant C is connected are made of ductile cast iron. 1 shows a connection structure of branch pipes that are connected in communication via a branch pipe joint D, and the branch pipe joint D extends from the existing pipe lower portion formed between the outer peripheral surface of the existing water pipe A and the existing pipe upper portion. The existing water pipe through the spiral guide channel 2 along the circumferential direction of the existing pipe and the lower through-hole 1a formed in the lower pipe wall A1 of the existing water pipe A so as to communicate with the lower part of the guide channel 2 A and the branch pipe B are connected in communication.
[0010]
The branch pipe joint D is configured by integrally forming a branch pipe portion 4 for connecting a branch pipe to a cylindrical flow path forming member 3 fixed in a watertight manner to the outer peripheral surface of the existing water pipe A. The upper through-hole 1b for operation provided in the upper pipe wall A2 of the water pipe A is closed with a closing part 5 described later, and a guide flow path is formed between the outer peripheral surface of the existing water pipe A and the inner surface of the flow path forming member 3. 2 and the branch pipe part 4 is provided substantially vertically toward the existing water pipe radial direction so as to open at the upper part in the guide flow path 2.
[0011]
The said branch pipe B is comprised so that it may connect to the short pipe E as a connection pipe part connected with the pipe part 4 for a branch by the flange joint 6, and the tap water which flowed out from the lower through-hole 1a of the existing water pipe A is used. It is configured so that water can be discharged from the fire hydrant C via the branch pipe B connected to the short pipe E by being guided to the upper part in the circumferential direction along the outer peripheral surface of the existing water pipe A and flowing into the branch pipe section 4. .
[0012]
The flow path forming member 3 is formed in a cylindrical shape surrounding the outer peripheral surface of the existing water pipe A, and two upper and lower parts are fixed so that the outer peripheral surface of the existing water pipe A can be fixed to the existing water pipe A in a state of being sandwiched from the radial direction. The divided members 3a and 3b are divided into the divided members 3a and 3b, and the divided members 3a and 3b are bulged radially outward along the circumferential direction of the existing water pipe A so as to form the guide channel 2 inside thereof. A rubber packing material 3c is mounted between the divided members 3a and 3b and the existing water pipe A and between the divided members 3a and 3b.
Accordingly, the flow path forming member 3 is configured as a case forming member fixed so as to surround the outer peripheral surface of the existing water pipe A, and the branch pipe joint D connects the branch pipe portion 4 to the case forming member 3 in communication. Configured.
[0013]
A closing portion 5 that closes the upper through hole 1b at the lower end of a circular cylindrical body 7 (the closing member 7, specifically, a cylindrical fitting portion of the closing member 7) that is fitted into the branch pipe portion 4. There is integrally formed, in the center of the closing part 5, air vent hole 5a is made form.
The cylindrical body 7 includes an upper flange (branch pipe part side flange) 6a formed on the upper part of the branch pipe part 4 and a lower flange (connection pipe part side flange) 6b formed on the lower part of the short pipe E. A fixing flange (closing member side flange) 6c sandwiched between and fixed in a co-tightened state and an opening 7a communicating with the guide channel 2 are formed.
[0014]
Then, the cylindrical body 7 with the opening 7a facing the guide channel 2 is sandwiched and fixed between the upper flange 6a and the lower flange 6b by the fixing flange 6c, so that the closing portion 5 is peripheral to the upper through-hole. In the state where a gap f is formed between the upper through hole 1b and the upper through hole 1b, the upper through hole 1b is closed.
[0015]
Next, the branch pipe joint D is fixed to the existing water pipe A buried in the ground, and the branch pipe B is connected to the branch pipe portion 4 through the short pipe E. The series of processes until the water pipe A is communicated with the branch pipe joint D is prevented from flowing out of the tap water from the branch pipe joint D without interrupting the flow of tap water in the existing water pipe A. The branch pipe connecting method that is performed will be described with reference to FIGS.
[0016]
After excavating a pit at the place where the fire hydrant C is installed to expose the existing water pipe A and cleaning the outer peripheral surface thereof, the divided members 3a and 3b fitted with the packing material 3c are connected to the outer peripheral surface in a watertight manner. fixed to the guide passage 2 is formed between the inner surface and the existing water pipe a peripheral surface of the flow path forming member 3, as shown in FIG. 12, the gate valve G for work branching pipe portion 4 At the same time, the first sealed case J for work in which the cylindrical cutter H1 of the punching machine H is set inside is fixed to the gate valve G.
A water stop bolt K having a guide pin K1 for positioning the cylindrical body 7 is screwed into the bolt hole of the upper flange 6a of the branch pipe portion 4.
[0017]
Next, as shown in FIG. 13, the gate valve G is opened, the cutter H1 is inserted into the guide channel 2 through the branching pipe part 4, and the lower through-hole 1a is formed in the lower pipe wall A1 of the existing water pipe A. The upper through-hole 1b for work to be formed is provided with an upper tube wall A2 with the cutter H1, and the cutter H1 holding the section b of the upper through-hole 1b is lifted above the gate valve G, and then the gate valve G is closed, the section a is removed from the cutter H1, and then, as shown in FIG. 14, the lower pipe wall A1 of the existing water pipe A with the cutter H1 that has entered the existing water pipe A through the upper through hole 1b. The lower through-hole 1a is formed in the upper part, and the cutter H1 holding the section a is lifted to the upper part of the gate valve G, then the gate valve G is closed, and the perforator H is removed from the gate valve G together with the first sealed case J. To do.
[0018]
Next, as shown in FIG. 15, the second closed casing L that is set to a short pipe E and the cylindrical body 7 inside which is connected to the operating shaft member L1 for elevating the partition Riben G fixed To do.
As shown in FIG. 3, a cylindrical body 7 is bolted to a lower flange 6b of a short pipe E set inside the second sealed case L in advance with a fixing flange 6c, and fixed to the lower flange 6b. The flange 6c is a fastening clamp that is fitted between two flanges 6b, 6c so that the branch plate 4 is closed between the flanges 6b and 6c so as to be able to be pulled out in the radial direction, and is mounted at two locations facing each other in the flange radial direction. It is temporarily fixed with bolts and nuts 9.
[0019]
As shown in FIG. 4, at one end of the closing plate 8, a pulling tool 10 for pulling out the closing plate 8 from between the lower flange 6b and the fixing flange 6c is detachably locked. Two locking holes 8a are formed as locking portions, and the tightening bolts and nuts 9 are clamped by sandwiching the closing plate 8 so that the locking holes 8a protrude from between the flanges 6b and 6c. .
[0020]
6 and 7 show the work procedure when the lower flange 6b and the fixing flange 6c are closed and fixed with the fixing bolts and nuts 9 with the fixing plate 8 interposed therebetween, and a groove into which the tip of the screwdriver is inserted is shown. As shown in FIG. 6, the headed bolt 9a as a fastening bolt having the formed flat head 9c is screwed into the fixing flange 6c until the flat head 9c contacts the lower surface of the fixing flange 6c. As shown in FIG. 7, the head bolt 9a is turned to a side loosened by a predetermined amount, for example, a half turn to form a gap m between the flat head 9c and the lower surface of the fixing flange 6c. Then, a nut 9b is screwed into the projecting end of the head bolt 9a from the lower flange 6b, and the lower flange 6b and the fixing flange 6c are tightened to form the lower flange 6b and the fixing flange 6c. Fixed across the closing plate 8, and head bolt 9a and a nut 9b in its fixed state are welded together so as to rotate integrally.
[0021]
Accordingly, the headed bolt 9a is screwed to the fixing flange 6c, which is one of the flanges 6b and 6c sandwiching the closing plate 8, and the headed bolt 9a is connected to the headed bolt 9a. A flat head 9c is provided as a contact member that comes into contact with the flange 9c when the nut 9b is loosened, and the loosening allowance for pulling out the closing plate 8 of the headed bolt 9a is regulated within a certain range. ing.
[0022]
Next, as shown in FIG. 16, until the gate valve G is opened and the operation shaft member L1 is operated, the fixing flange 6c of the cylindrical body 7 contacts the upper flange 6a of the branch pipe portion 4. After the short pipe E and the cylindrical body 7 are lowered through the branch pipe portion 4 and positioned by inserting the guide pins K1 of the water stop bolt K into the four connecting bolt holes 6d of the fixing flange 6c, While removing the water stop bolt K, as shown in FIG. 17, the connecting bolt 11 inserted in place of the water stop bolt K is screwed into the fixing flange 6c, and the short pipe E is connected to the branch pipe portion 4 side. Are connected by a flange joint 6.
Therefore, in this state, as shown in FIG. 5, the blocking portion 5 inserted through the branching tube portion 4 enters the upper through hole 1b, and the upper through hole 1b is blocked, and the branching tube portion Outflow of tap water from 4 is blocked by a blocking plate 8.
[0023]
Next, the connection with the gate valve G of the second sealed case L is released, the second sealed case L is lifted along the operation shaft member L1, and the connection between the operation shaft member 1 and the short pipe E is released. Then, the second sealed case L is removed from the gate valve G, and the gate valve G is further removed from the branch pipe portion 4, and the branch pipe B is connected to the short pipe E as shown in FIG. Connect a fire hydrant C to the branch pipe B.
[0024]
Next, as shown in FIG. 8, the head bolt 9a that fixes the lower flange 6b and the fixing flange 6c with the plate 8 sandwiched therebetween is tightened until the flat head 9c contacts the lower surface of the fixing flange 6c. The flange joint 6 is loosened by turning from the 9b side, and a pulling tool 10 made of a steel plate is locked to the closing plate 8 and the closing plate 8 is pulled out as shown in FIG.
[0025]
As shown in FIG. 10, the pulling tool 10 includes a locking projection 10a and a handle portion 10b that are locked in the locking hole 8a of the closing plate 8, and the locking projection 10a is locked in the locking hole 8a. In this state, the closing plate 8 is easily pulled out by grasping the handle portion 10b and pulling it in the radial direction of the flange.
[0026]
Next, as shown in FIG. 11, the head bolt 9a is tightened with a nut 9b to fix the lower flange 6b and the fixing flange 6c, and then, as shown in FIG. 1, the nut 11a of the connecting bolt 11 is The upper flange 6a, the lower flange 6b, and the fixing flange 6c constituting the flange joint 6 are fixed by being screwed together, and the series of steps is completed.
[0027]
[Other Examples]
1. The branch pipe connection method according to the present invention is not limited to connecting a branch pipe to an existing water pipe, and for example, a branch pipe may be connected to an existing sewer pipe.
2. A flange joint that directly connects the branch pipe portion and the connection pipe portion may be provided, and a closing plate may be sandwiched between the flanges of the flange joint so that they can be pulled out.
3. A nut is screwed into a tightening bolt that is inserted over both flanges, and a closing plate is sandwiched between the flanges, and a restricting member that restricts the screw advance range of the nut against the tightening bolt is provided. Thus, the tightening bolt loosening allowance may be regulated within a certain range.
4). A closing plate to which a drawing tool is fixed in advance may be sandwiched between the flanges so as to be pulled out.
5 This is a branch pipe connection method in which a fixed length of an existing pipe is cut out in a sealed case for work surrounding the existing pipe, a branch pipe joint is connected to the cut portion, and the branch pipe joint and the existing pipe are connected in communication. May be.
[Brief description of the drawings]
FIG. 1 is a partial cross-sectional front view showing a branch pipe connection structure. FIG. 2 is a partial cross-sectional side view showing a branch pipe connection structure. FIG. 3 shows a temporarily fixed state between a short pipe and a cylindrical body. Sectional sectional side view [FIG. 4] Plan view of the main part [FIG. 5] Cross section of the main part [FIG. 6] Cross section of the main part [FIG. 7] Cross section of the main part [FIG. 9 is a cross-sectional view of the main part. FIG. 10 is a perspective view of the main part. FIG. 11 is a cross-sectional view of the main part. FIG. 12 is an explanatory view of the branch pipe connection method. 14] Illustration of branch pipe connection method [FIG. 15] Illustration of branch pipe connection method [FIG. 16] Illustration of branch pipe connection method [FIG. 17] Illustration of branch pipe connection method [FIG. 18] Branch pipe connection method Explanation drawing [Explanation of symbols]
DESCRIPTION OF SYMBOLS 1a Lower through-hole 3 Case formation member 4 Branching pipe part 6 Flange joint 6b, 6c Flange 8 Closing board 8a Locking part 9a Clamping bolt 9c Contacting member 10 Extraction tool A Existing pipe A1 Pipe wall B Branch pipe B
D Branch fitting E Connection pipe

Claims (6)

既設管の外周面との間に既設管下部から既設管上部に亘って既設管周方向に沿う案内流路を形成する流路形成部材に、分岐管接続用の分岐用管部が前記案内流路内の上部において開口するように既設管径方向に向けて設けられている分岐管継手を前記既設管の外周面に固定し、
前記分岐用管部を通して、前記既設管の下部管壁に前記案内流路内の下部に連通する下部貫通孔を形成するための上部貫通孔をその既設管の上部管壁に設け、
前記下部貫通孔を形成した後の前記上部貫通孔を前記分岐用管部を通して塞ぎ、
前記分岐用管部に分岐管を接続して、その分岐管と前記既設管とを前記案内流路及び前記下部貫通孔を介して連通させるまでの一連の工程を、前記分岐管継手からの流体の流出を阻止しながら行う分岐管接続工法であって、
前記分岐管を、前記分岐用管部側にフランジ継手で連結される接続管部に接続するように構成し、
前記分岐用管部からの流体の流出を阻止する仕切り弁を前記分岐管継手に取り付けたのち、前記上部貫通孔を前記既設管に設け、
前記上部貫通孔を塞ぐ塞ぎ部が前記分岐用管部を通して挿入可能に形成され、且つ、前記分岐用管部を塞ぐ塞ぎ板がフランジどうしの間に引き抜き可能に挟み込まれている前記フランジ継手で、前記上部貫通孔を塞ぎつつ前記接続管部を前記分岐用管部側に連結したのち、前記仕切り弁を前記分岐管継手から取り外し、
次に、前記接続管部に前記分岐管が接続されている状態で、前記フランジ継手を緩めて前記塞ぎ板を引き抜き、
次に、前記フランジ継手を締め付けて、前記接続管部を前記分岐用管部側に連通接続する分岐管接続工法。
A branch pipe section for connecting a branch pipe is connected to the flow path forming member that forms a guide flow path along the existing pipe circumferential direction from the existing pipe lower portion to the existing pipe upper portion with the outer peripheral surface of the existing pipe. Fixing the branch pipe joint provided toward the existing pipe radial direction so as to open at the upper part in the road to the outer peripheral surface of the existing pipe,
An upper through hole for forming a lower through hole communicating with the lower part in the guide channel is provided in the upper pipe wall of the existing pipe through the branching pipe part,
The upper through-hole after forming the lower through-hole is closed through the branch pipe portion,
A series of steps from connecting a branch pipe to the branch pipe section and communicating the branch pipe and the existing pipe through the guide flow path and the lower through-hole is performed by a fluid from the branch pipe joint. Branch pipe connection method while preventing the outflow of
The branch pipe is configured to be connected to a connection pipe portion connected by a flange joint to the branch pipe portion side,
After attaching a gate valve for preventing the fluid from flowing out from the branch pipe part to the branch pipe joint, the upper through hole is provided in the existing pipe,
In the flange joint, a closing portion that closes the upper through-hole is formed so as to be insertable through the branching pipe portion, and a closing plate that closes the branching pipe portion is sandwiched between the flanges, After connecting the connecting pipe part to the branch pipe part side while closing the upper through hole, the partition valve is removed from the branch pipe joint,
Next, in a state where the branch pipe is connected to the connection pipe portion, loosen the flange joint, pull out the closing plate,
Next, a branch pipe connection method for tightening the flange joint and connecting the connection pipe portion to the branch pipe portion side.
前記フランジ継手が、前記接続管部に形成の接続管部側フランジと、前記塞ぎ部を下方に備えた塞ぎ部材に形成の塞ぎ部材側フランジと、前記分岐用管部に形成の分岐用管部側フランジとから構成されている請求項1記載の分岐管接続工法。  The flange joint includes a connecting pipe portion side flange formed on the connecting pipe portion, a closing member side flange formed on a closing member provided with the closing portion below, and a branch pipe portion formed on the branch pipe portion. The branch pipe connecting method according to claim 1, comprising a side flange. 前記塞ぎ板が、前記接続管部側フランジと前記塞ぎ部材側フランジとの間に挟み込まれている請求項2記載の分岐管接続工法。  The branch pipe connecting method according to claim 2, wherein the closing plate is sandwiched between the connecting pipe portion side flange and the closing member side flange. 前記塞ぎ部材には、前記分岐用管部に嵌め込み可能な円筒状の嵌込部が形成されている請求項2又は3記載の分岐管接続工法。  The branch pipe connecting method according to claim 2 or 3, wherein the plugging member is formed with a cylindrical fitting portion that can be fitted into the branch pipe portion. 前記塞ぎ板を挟み込んでいるフランジどうしの締め付けボルトの緩め代が一定範囲内になるように規制されている請求項1〜4のいずれか1項に記載の分岐管接続工法。  The branch pipe connection method according to any one of claims 1 to 4, wherein a loosening margin of a fastening bolt between flanges sandwiching the closing plate is regulated to be within a certain range. 前記締め付けボルトが、前記塞ぎ板を挟み込んでいるフランジのうちの一方のフランジに対して螺合され、
前記締め付けボルトに、その締め付けボルトを緩めるに伴って前記フランジ側に接当する接当部材を設けて、前記緩め代が一定範囲内になるように規制されている請求項5記載の分岐管接続工法。
The fastening bolt is screwed to one of the flanges sandwiching the closing plate;
6. The branch pipe connection according to claim 5, wherein a contact member that contacts the flange side as the tightening bolt is loosened is provided on the tightening bolt, and the loosening allowance is regulated within a certain range. Construction method.
JP09199597A 1997-04-10 1997-04-10 Branch pipe connection method Expired - Fee Related JP4079477B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP09199597A JP4079477B2 (en) 1997-04-10 1997-04-10 Branch pipe connection method
EP19980100040 EP0870969B1 (en) 1997-04-10 1998-01-03 Method of connecting a branch pipe
DE1998622540 DE69822540T2 (en) 1997-04-10 1998-01-03 Method for connecting a branch pipe
US09/055,004 US5967168A (en) 1997-04-10 1998-04-03 Method of connecting branch pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09199597A JP4079477B2 (en) 1997-04-10 1997-04-10 Branch pipe connection method

Publications (2)

Publication Number Publication Date
JPH10281378A JPH10281378A (en) 1998-10-23
JP4079477B2 true JP4079477B2 (en) 2008-04-23

Family

ID=14042025

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09199597A Expired - Fee Related JP4079477B2 (en) 1997-04-10 1997-04-10 Branch pipe connection method

Country Status (1)

Country Link
JP (1) JP4079477B2 (en)

Also Published As

Publication number Publication date
JPH10281378A (en) 1998-10-23

Similar Documents

Publication Publication Date Title
US6836911B2 (en) Waste and overflow system for a bathtub
US4756338A (en) Pipe repair assemblies to repair pipe when fluids therein are under high pressure
US5058620A (en) Insertion assembly for boring a hole in a pipe
US8286655B2 (en) Line stop adapter
JPH10281380A (en) Connecting structure of branch pipe
JP4353560B2 (en) Work gate valve device
US20150247578A1 (en) Gate valves for installation in pressurized pipes
US5170813A (en) Tapping bands
US5074526A (en) In-line fluid flow control valve with apparatus for and method of installation in an existing fluid conduit
US5967168A (en) Method of connecting branch pipe
JP2007177945A (en) Valve element replacing device
JP4079477B2 (en) Branch pipe connection method
JP7290464B2 (en) Fluidic device replacement method and device replacement jig
WO2007135873A1 (en) Branch tube connection device and branch tube connection method
US6227234B1 (en) Tapping sleeve with a mechanical joint adaptor
US5797423A (en) Device for cutting off a flow in a conduit for fluide
JPH054635Y2 (en)
US6360771B2 (en) Tapping sleeve with a mechanical joint adaptor
JPH10281379A (en) Branch pipe connecting construction method
JPH02599B2 (en)
JPH0729365U (en) Water tap
US5655283A (en) Corporation stop assembly
JP3090580B2 (en) Rust prevention method for branch entrance and closing device for rust prevention work
KR930011585B1 (en) Divergence pipe connector devices
JP3741695B2 (en) Pipe fitting installation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040408

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060501

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060511

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060710

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070208

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070404

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080124

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080205

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110215

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120215

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130215

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees