JP4027193B2 - Elevator control device - Google Patents

Elevator control device Download PDF

Info

Publication number
JP4027193B2
JP4027193B2 JP2002265627A JP2002265627A JP4027193B2 JP 4027193 B2 JP4027193 B2 JP 4027193B2 JP 2002265627 A JP2002265627 A JP 2002265627A JP 2002265627 A JP2002265627 A JP 2002265627A JP 4027193 B2 JP4027193 B2 JP 4027193B2
Authority
JP
Japan
Prior art keywords
park
floor
park operation
ratio
boarding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002265627A
Other languages
Japanese (ja)
Other versions
JP2004099279A (en
Inventor
雅史 岩田
耕一 笹川
秀樹 塩崎
利昭 河原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Mitsubishi Electric Building Techno-Service Co Ltd
Original Assignee
Mitsubishi Electric Corp
Mitsubishi Electric Building Techno-Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp, Mitsubishi Electric Building Techno-Service Co Ltd filed Critical Mitsubishi Electric Corp
Priority to JP2002265627A priority Critical patent/JP4027193B2/en
Publication of JP2004099279A publication Critical patent/JP2004099279A/en
Application granted granted Critical
Publication of JP4027193B2 publication Critical patent/JP4027193B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Elevator Control (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、エレベータ制御装置、特に交通状況に応じて効率良くエレベータの運行を制御する装置に関する。
【0002】
【従来の技術】
エレベータ装置は、乗客が無い時刻に、次に乗客が発生することが期待される階床又はその近くの階床(パーク階)にエレベータかごを停止して待機するように構成することで、パーク階またはその近くの階床で呼びが発生したときに、エレベータかごを短時間で乗客の利用に供することができる。具体的なパーク制御例として、特開平10−109837号公報では、各階の乗場呼び発生確率を予測し、その値が所定範囲内にある階が複数ある場合、少なくとも半数の乗場呼びの方向がダウン方向と予測されたときに、これらの階のうち最上階を待機階とするエレベータ制御装置が提案されている。
【0003】
【発明が解決しようとする課題】
しかしながら、このエレベータ制御装置では、乗場呼びの発生頻度に基づいてパーク階を決定しているため、乗客が特定階間を往復移動する場合や、1階床づつ移動する巡回行動する場合に、パーク設定を行なわないという選択肢を含めたパーク階の制御ができないという問題がある。
【0004】
【課題を解決するための手段】
この問題を解消するために、本発明に係るエレベータ制御装置は、時間帯ごとのパーク階を設定するパーク動作設定部を備えたエレベータ制御装置において、ある乗客の出発階と直前に発生した乗客の行先階が同一である比率をあらわす非パーク動作有利率を演算する非パーク動作有利率演算部と、各階の乗車比率を演算する乗車比率演算部と、前記非パーク動作有利率と前記各階乗車比率に基づいてパーク動作を中止すべき時間帯を決定するパーク動作中止時間帯決定部を備え、その決定にもとづいて、パーク動作の中止ならびにパーク動作の設定を行なうように構成されていることを特徴とする
【0005】
【発明の実施の形態】
この発明は、概略、エレベータ装置において、過去の乗降車データに基づいてかごのパーク階(待機階)を設定しておき、乗場呼びもなく、かご内の乗客もいなくなり待機状態となったときにかごをパーク階へ回送して待機させるパーク動作モードを備えたエレベータ制御装置に関するもので、過去の乗降車データの時系列関係に基づいて、ある乗客の降車階と次の乗客の乗車階が同一であるようなパターンが頻繁に起こる時間帯にはパーク動作(待機動作)を中止するものである。
【0006】
具体的な状況を例に挙げて説明すると、例えば、比較的小規模なビルでは、乗客の発生量が比較的少ないため、ある乗客を輸送した後、次の乗客が発生するまで待機状態になることが頻繁に発生する。このような場合、本発明では、乗降車データに基づいてパーク階を設定し、待ち時間を削減する。一方、任意の2つの階床を往復するような乗客や、全ての階を順次移動していくような乗客がある場合、いずれかの階にパーク階を設定するよりも、最終停止階で待機しておいたほうが待ち時間も小さく、無駄な走行を行なうこともない。そこで、本発明は、過去の乗降車データの時系列関係に基づいて、ある乗客の降車階と次の乗客の乗車階が同一であるようなパターンが頻繁に起こる時間帯では、パーク動作つまり待機動作を中止する設定を行ない、これによりパーク動作によるサービスや効率の低下を防ぐものである。
【0007】
図1と図2はそのエレベータかごの動作例を示している。具体的に、図1は乗客が無い場合にエレベータかごが1階で待機するようにパーク制御されたエレベータ装置におけるかごの動きを示し、図2は乗客の降車階床でかごが待機するように制御(非パーク制御)されたエレベータ装置におけるかごの動きを示しており、いずれの図面においても、縦方向が階床数に対応し、横方向(右方向)が時間軸に対応している。また、▲、▼は上方向と下方向の乗場呼びの発生、▲、▼の右に付した数字は乗場呼びの発生順番、○は降車、○の右に付した数字は乗場呼びに付された数字に対応する降車番号を表している。
【0008】
図1に示すように、パーク制御されたエレベータ装置では、乗場呼び(▲1)の乗客が6階で降車(○1)した後、かごは6階から1階に移動する。その後、6階で乗場呼び(▼2)が発生すると再びかごは6階へ移動して乗客を乗せた後、再び1階に移動する。したがって、点線矢印で示すように、乗客の無い状態で、6階から1階へ、また1階から6階へと、かごは不要に運行することになる。これに対し、非パーク制御されたエレベータ装置によれば、図2に示すように、図1に点線矢印で示す無駄な移動が無くなるだけでなく、乗客の待ち時間も短縮する。そこで、本発明は、エレベータ装置をパーク制御しながら、過去の乗降車データの時系列関係に基づいて、ある乗客の降車階と次の乗客の乗車階が同一であるようなパターンが頻繁に起こる時間帯にはパーク動作を中止する。
【0009】
本発明の具体的な構成について説明する。まず、本発明の機能構成を示す図3において、1−1〜1−Mはかご装置であり、Mはかご台数を表わす(Mは、「1」以上の整数である。)。2−1〜2−Nは乗場装置であり、上下の乗場呼びボタン、かご割当部、到着告知用のランタン、かご位置表示部などを含む(Nは乗場装置の数を表わし、階床数よりも多い数となる。)。3−1から3−Mはかご制御装置であり、かごならびに乗場装置の状態の取得と制御を行なう。4はパーク動作中止時間帯設定部であり、5はパーク動作設定部である。
【0010】
このような構成において、パーク動作設定部5は、パーク動作中止時間帯設定部4から出力されるパーク動作中止設定時間帯以外の時間、パーク階の設定を行なって各かご制御部3−1〜3−Mにパーク設定結果を出力する。パーク設定結果を受けた各かご制御部3−1〜3−Mは、そのパーク設定結果に基づいて各かご装置1−1〜1−Mをパーク制御する。パーク制御パーク設定の詳細は省略し、パーク動作中止時間帯設定部4の処理について以下に詳述する。
【0011】
パーク動作中止時間帯設定部4において、乗降車時系列データ作成部41は、かご制御部3−1〜3−Mから呼びや乗客の乗降車に関するデータを取得し、乗客発生時刻、発生階、行き先階、人数に関するデータ(乗降車時系列データA(0))を図4の形式で作成する。作成された乗降車時系列データA(0)は、乗降車時系列データ蓄積部42に記憶される。乗降車時系列データ蓄積部42は、過去の乗降車時系列データA(1)〜A(P)を図5の形式で記憶する。ここで、Pは乗降車時系列データ蓄積部に記憶される乗降車時系列データの数であり、過去P日分のデータが記憶されていることを表わす。非パーク動作有利率演算部43は、乗降車時系列データ蓄積部42に蓄積された過去P日分の乗降車時系列データA(1)〜A(P)に基づき、パーク動作を行わない方がパーク動作を行うよりも有利であることを示す指標である非パーク動作有利率のデータを作成する。非パーク動作有利率は次の式(1)によって求めることが可能である。

Figure 0004027193
式(1)において、時間帯tの非パーク動作有利乗客数R(t)は、時間幅Tの大きさを持つ時間帯t〔例えば、00:00:00〜00:00:59の時間帯〕に発生した乗客のうち、ある乗客の前に発生した別の乗客の行き先階と当該ある乗客の発生階が同じであった乗客数の過去P日間分の総和を示す。時間帯tに発生した全乗客数Q(t)は、時間帯tに発生した全乗客数の過去P日間分の総和を示す。
【0012】
各時間帯ごとの非パーク動作有利率V(t)は、図6のフローチャートに基づいて演算される。このフローチャートにおいて、S601からS604では、各変数を初期化する。具体的に、S601では時間帯tを0時0分(00:00)に設定する。ここで、時間帯t=00:00は、00:00:00〜00:00:59の時間帯を意味する。S602では、変数sに時間帯tを設定する。ここで、設定された変数sは、時間帯tの中の秒単位の時刻〔例えば0時0分0秒(00:00:00)〕である。S603、S604では、それぞれ時間帯tの非パーク動作有利乗客数R(t)と時間帯tに発生した全乗客数Q(t)を「0」にリセットする。
【0013】
S605では、変数dを「1」に設定する。この変数dは、何日目の乗降車時系列データを扱うかを示している。次に、S606では、時刻sで発生している乗降車データについて、時刻sにおいて発生する乗客数データの出発階とその直前の乗客数データの行き先階が同じであれば、時刻sにおいて発生する乗客数の人数R(t)を演算する。続いて、S607では、時刻sで発生している乗降車データについて、時刻sにおいて乗降車データがあれば、その人数を加算してQ(t)を演算する。S608では、P日目までの乗降車時系列データについてR(t)、Q(t)が演算されたか否かを判断する。判断の結果、P日目までの演算が完了していない場合、S609で変数dをインクリメントし、このインクリメントされた変数dについてS606、S607でそれぞれR(t)、Q(t)を演算する。P日目まで演算が完了するとS610に進み、初期設定された時刻tに所定の時間幅Tを加えた時刻(t+T)に時刻sが到達したか否か判断する。例えば、時間幅Tは、「1分」に設定される。
【0014】
時刻sが時刻(t+T)に達していない場合、S611で時刻sに1秒(0:00:00)を加算した後、S605で変数dを「1」から「P」までインクリメントしながら、S606でR(t)を加算するとともに、S607でQ(t)を加算する。この処理は時刻sが時刻(t+T)に達するまで実行され、これにより時刻sから時刻(t+T)までの時間帯t〔例えば、Tが1分に設定されている場合には、00:00:00〜00:00:59の時間帯〕について、加算されたR(t)とQ(t)が得られる。
【0015】
S612では、時刻tから時刻(t+T)までの時間帯tの間で加算されたR(t)とQ(t)をもとに、その時間帯tの非パーク動作有利率V(t)を演算する。次に、S613では、時間帯tが、24時間を多数の時間帯tで分割したときの最後の時間帯(24:00−T)であるか否か判断する。判断の結果、時間帯tが最後の時間帯に相当しなければ、S614で時間帯tに時間幅Tを加算し、S602からS612の処理を繰り返し、24時間にわたるすべての時間帯tについてR(t)、Q(t)、V(t)を演算し、図7に示す非パーク動作有利率データを作成する。
【0016】
図3に戻り、乗車比率演算部44は、乗降車時系列データ蓄積部に蓄積された過去P日分の乗降車時系列データA(1)〜A(P)(図5参照)をもとに、図8に示すように、各階各方向ごとで発生する乗客比率のデータを作成する。各階各方向の乗車比率は次の式(1)によって計算する。
Figure 0004027193
【0017】
具体的に、式(2)における、時間帯tのFL階UPD方向の乗車比率H(FL,UPD,t)は、図9のフローチャートに基づいて演算される。このフローチャートにおいて、S901からS904では、各変数を初期化する。具体的に、S901では時間帯tを0時0分(00:00)に設定する。S902では、変数sに時間帯tを設定する。設定された変数sは、時間帯tの中の秒単位の時刻である。S903では、すべての階床FL、方向(上方向及び下方向)UPDに関して、G(FL,UPD,t)を「0」にリセットする。また、S904では、時間帯tに発生した全乗客数Q(t)を「0」にリセットする。
【0018】
S905では、変数dを「1」に設定する。次に、S906では、d日目の乗降車時系列データ(図5参照)について、時刻sにおいてFL階、UPD方向の乗客数データがあれば、その人数をG(FL,UPD,t)に加算する。続いて、S907では、d日目の乗降車時系列データについて、時刻sにおいて乗降車データがあれば、その人数をQ(t)に加算する。S908では、P日目までの乗降車時系列データについてG(FL,UPD,t)、Q(t)が演算されたか否かを判断する。判断の結果、P日目までの演算が完了していない場合、S909で変数dをインクリメントし、このインクリメントされた変数dについてS906、S907でそれぞれG(FL,UPD,t)、Q(t)を演算する。P日目まで演算が完了するとS910に進み、初期設定された時刻tに所定の時間幅Tを加えた時刻(t+T)に時刻sが到達したか否か判断する。例えば、時間幅Tは、「1分」に設定される。
【0019】
時刻sが時刻(t+T)に達していない場合、S911で時刻sに1秒(0:00:00)を加算した後、S905で変数dを「1」から「P」までインクリメントしながら、S906でG(FL,UPD,t)を加算するとともに、S907でQ(t)を加算する。この処理は時刻sが時刻(t+T)に達するまで実行され、これにより時刻sから時刻(t+T)までの時間帯t〔例えば、Tが1分に設定されている場合には、00:00:00〜00:00:59の時間帯〕について、加算されたG(FL,UPD,t)とQ(t)が得られる。
【0020】
S912では、すべての階床FL、方向UPDに関して、時間帯tにける乗車比率H(FL,UPD,t)を演算する。次に、S913では、時間帯tが、24時間を多数の時間帯tで分割したときの最後の時間帯(24:00−T)であるか否か判断する。判断の結果、時間帯tが最後の時間帯に相当しなければ、S914で時間帯tに時間幅Tを加算し、S902からS912の処理を繰り返し、24時間にわたるすべての時間帯tについてH(FL,UPD,t)を演算する。
【0021】
再び図3に戻り、パーク動作中止条件蓄積部45は、非パーク動作有利率V(t)と各階各方向の乗車比率H(FL,UPD,t)について、パーク動作を中止すべき条件を記憶している。その条件は、例えば図10に示すような表形式で作成しても良い。図10においては、「○」は、パーク設定を有効とする条件であり、「×」はパーク動作を中止する条件であることを示す。なお、図10は、非パーク動作有利率V(t)と1階上方向の乗車比率H(1,UP,t)について設定されたパーク動作中止条件のみを示すが、各階についても同様に、非パーク動作有利率V(t)と乗車比率H(FL,UPD,t)に関するパーク動作中心条件を設定することができる。また、パーク動作中止条件は事前のシミュレーションによって、パーク動作を行なった場合とパーク動作を行なわなかった場合の待ち時間などの評価値を比較することによって設定することができる。また、この中止条件はいくつかの典型的なビルの種類の乗降者データの傾向に合わせて複数パターンの中止条件を用意しても良い。例えば、乗降者データの傾向に合わせてパターンを用意する場合には、図11のように1階上方向の乗車比率H(1,UP,t)と非パーク動作有利率V(t)の相関を表わすモデルを用意し、そのモデルに最適なパーク動作中止条件を図10の表形式で用意することが可能である。また、図11では1階上方向の乗車比率H(FL,UPD,t)と非パーク動作有利率V(t)の相関を表わすモデルについて記述しているが、これは単数もしくは複数の任意の階の任意方向のH(FL,UPD,t)と非パーク動作有利率V(t)の相関を表わすモデルを用いても良い。
【0022】
再び図3に戻り、パーク動作中止時間帯決定部46は、非パーク動作有利率演算部43で演算されたある時間帯tの非パーク動作有利率V(t)と、乗車比率演算部44で演算されたその時間帯tの各階各方向の乗車比率乗車比率H(FL,UPD,t)が、パーク動作中止条件蓄積部45に蓄積されたパーク動作中止条件に当てはまるか否か判断し、それら非パーク動作有利率V(t)とこれに対応する乗車比率H(FL,UPD,t)がパーク動作中止条件に該当する場合には、その時間帯tをパーク動作中止時間帯として決定し、決定されたパーク動作中止時間帯を図12に示すパーク動作中止時間帯設定データとしてパーク動作設定部5に出力する。
【0023】
また、パーク動作中止条件蓄積部に複数のパーク動作中止条件が複数パターンある場合には、パーク動作中止時間帯決定部46で中止条件パターンを選択してから、パーク動作中止時間帯を決定する。その選択方法としては、いくつかが考えられるが、パーク動作中止条件のパターンがビルの種類ごとに決まっている場合には、ビルの種類(例えば、用途、階床数、規模など)に応じてパーク動作中止条件のパターンを選択する。また、図11に示したように、1階上方向の乗車比率H(1,UP,t)と非パーク動作有利率V(t)の相関を表わすモデルに対して、パーク動作中止条件のパターンが与えられる場合には、例えば、(3)式の値XMDを最小とするようなモデルMDに対するパーク動作中止条件を選択することが可能である。
Figure 0004027193
ここで、XMDはモデルMDと本発明の手法を適用したビルから得られた全ての時刻tにおける点(H(FL,UPD,t),V(t))の距離の総和を表わしている。これは、本発明の手法を適用したビルとモデルMDのいずれが近いかを表わしていることになる。また、fMD(・)はモデルMDにおける乗車比率と非パーク動作有利率の関係を表わす関数である。
【0024】
以上のように、エレベータ制御装置を構成することにより、乗客の特定階間の往復行動や、1階床づつ移動する巡回行動などが存在する時間帯で、ある乗客の降車階と次の乗客の乗車階が同じであって、特定の階にパーク動作を行なわない方が効率のよい乗客パターンにおいては、パーク階設定を中止することが可能となり、パーク階設定の効果を向上させることが可能となる。
【0025】
なお、上述した本発明のエレベータ制御装置は、本発明の思想内において種々改良又は変更することができる。例えば、図13のように群管理装置を備えたエレベータ制御装置では、パーク階設定を行なう群管理装置6に対してパーク動作中止時間帯を出力し、この群管理装置6でパーク動作中止制御を行なうことも可能である。
【0026】
また、本発明のさらに別の形態として、図14の構成を備えたエレベータ制御装置によって、オフラインでパーク動作中止時間帯設定を行なっても良い。この図において、乗降車データ記憶部7は、実施の形態1で説明した乗降車時系列データ作成部41、乗降車時系列データ蓄積部42と同一の乗降車時系列データ作成部71、乗降車時系列データ蓄積部72を備えており、乗降車乗降車時系列データを作成して蓄積する。オフラインパーク動作中止時間帯設定装置8は、エレベータ装置とは別に設置されているコンピュータ(例えば、パーソナルコンピュータ)などで構成されており、乗降車データ記憶部7から乗降車時系列データ(図4、図5参照)をダウンロードし、乗降車時系列データダウンロード部81に蓄積する。パーク動作中止時間帯設定蓄積部86は、図12に示すパーク動作中止時間帯設定データを蓄積し、パーク動作設定部5へアップロードする。その他、非パーク動作有利率演算部82、乗車比率演算部83、パーク動作中止条件蓄積部84、パーク動作中止時間帯決定部85はそれぞれ、図3の非パーク動作有利率演算部43、乗車比率演算部44、パーク動作中止条件蓄積部45、パーク動作中止時間帯決定部46と同一である。
【0027】
【発明の効果】
以上の説明から明らかなように、本発明に係るエレベータ制御装置によれば、乗客の特定階間の往復行動や、1階床づつ移動する巡回行動など、ある乗客の降車階と次の乗客の乗車階が同じであり、特定の階にパーク動作を行なわない方がよい乗客パターンに対してパーク階設定を中止することが可能となり、パーク階設定の効果を向上させることが可能となる。
【図面の簡単な説明】
【図1】 パーク制御を行った場合のかごの動きを示す図。
【図2】 パーク制御を行わない場合のかごの動きを示す図。
【図3】 本発明に係るエレベータ制御装置の機能構成図。
【図4】 乗降車時系列データの一例を表形式で表した図。
【図5】 乗降車時系列データ蓄積部に蓄積されている過去の乗降車時系列データの一例を表形式で表した図。
【図6】 時間帯ごとの非パーク動作有利率を演算するプロセスを示すフローチャート。
【図7】 非パーク動作有利率データの一例を表形式で表した図。
【図8】 乗客比率データの一例を表形式で表した図。
【図9】 乗車比率を演算するプロセスを示すフローチャート。
【図10】 パーク動作中止条件の一例を表形式で表した図。
【図11】 1階上方向の乗車比率と非パーク動作有利率の相関を表わすモデル1,2,3を示す図。
【図12】 パーク動作中止時間帯設定データの一例を表形式で表した図。
【図13】 群管理装置を備えたエレベータ制御装置の機能構成図。
【図14】 オフラインでパーク動作中止時間帯を設定するエレベータ制御装置の機能構成図。
【符号の説明】
1−1〜1−M:かご装置 2−1〜2−N:乗場装置 3−1〜3−M:かご装置 4:パーク動作中止時間帯設定部 5:パーク動作設定部 6:群管理装置 7:乗降車データ記憶部 41:乗降車時系列データ作成部 42:乗降車時系列データ蓄積部 43:非パーク動作有利率演算部 44:乗車比率演算部
45:パーク動作中止条件蓄積部 46:パーク動作中止時間決定部[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an elevator control device, and more particularly to a device that efficiently controls the operation of an elevator according to traffic conditions.
[0002]
[Prior art]
The elevator system is configured to stop and wait for the elevator car on the floor where the next passenger is expected to occur at the time when there is no passenger, or on the floor nearby (park floor). When a call is made on the floor or near the floor, the elevator car can be used for passengers in a short time. As a specific example of park control, Japanese Patent Laid-Open No. 10-109837 predicts the probability of occurrence of hall calls on each floor, and when there are multiple floors whose values are within a predetermined range, at least half of the hall call directions are down. An elevator control device has been proposed in which the top floor of these floors is the standby floor when predicted to be in the direction.
[0003]
[Problems to be solved by the invention]
However, in this elevator control device, the park floor is determined based on the frequency of landing calls. Therefore, when a passenger reciprocates between specific floors or travels one floor at a time, There is a problem that the park floor cannot be controlled including the option of not setting.
[0004]
[Means for Solving the Problems]
In order to solve this problem, an elevator control device according to the present invention is an elevator control device including a park operation setting unit that sets a park floor for each time zone . A non-parking operation advantage rate calculating unit that calculates a non-parking operation advantage rate that represents a ratio that the destination floors are the same, a boarding rate calculation unit that calculates a boarding ratio on each floor , the non-parking operation advantage rate and the each floor boarding ratio characterized by comprising a park operation stop time zone determination unit for determining a time zone should be discontinued park operation, based on the determination, it is configured to perform a stop and set the park operation Park operation based on And
[0005]
DETAILED DESCRIPTION OF THE INVENTION
In general, in the elevator apparatus, when a car park floor (standby floor) is set based on past boarding / alighting data, there is no landing call, no passengers in the car, and the vehicle enters a standby state. It relates to an elevator control device equipped with a park operation mode in which the car is forwarded to the park floor and waits. Based on the time series relationship of past boarding / alighting data, the boarding floor of one passenger is the same as the boarding floor of the next passenger The park operation (standby operation) is stopped in a time zone where such a pattern frequently occurs.
[0006]
For example, in a relatively small building, since the amount of passengers generated is relatively small, after a certain passenger is transported, it enters a standby state until the next passenger is generated. It happens frequently. In such a case, in the present invention, the park floor is set based on the getting-on / off data to reduce the waiting time. On the other hand, if there are passengers who make a round trip to any two floors or passengers who move sequentially through all the floors, they will wait at the final stop floor rather than setting a park floor on any floor If you keep it, the waiting time is smaller and you don't need to run. Therefore, the present invention is based on the time series relationship of past boarding / alighting data, and in a time zone where a pattern in which the boarding floor of one passenger and the boarding board of the next passenger frequently occur is a park operation, that is, standby The setting for stopping the operation is performed, thereby preventing the service and efficiency from being lowered due to the park operation.
[0007]
1 and 2 show examples of operation of the elevator car. Specifically, FIG. 1 shows the movement of a car in an elevator apparatus that is park-controlled so that the elevator car waits on the first floor when there is no passenger, and FIG. 2 shows that the car waits on the passenger's getting-off floor. The movement of the car in the elevator apparatus controlled (non-parking control) is shown. In any of the drawings, the vertical direction corresponds to the number of floors, and the horizontal direction (right direction) corresponds to the time axis. In addition, ▲ and ▼ are for upward and downward landing calls, the numbers to the right of ▲ and ▼ are the order of landing calls, ○ is getting off, the numbers to the right of ○ are for landing calls The number of getting off corresponding to the number.
[0008]
As shown in FIG. 1, in the park-controlled elevator device, after the passenger of the hall call (▲ 1) gets off (○ 1) on the sixth floor, the car moves from the sixth floor to the first floor. After that, when a hall call (▼ 2) occurs on the 6th floor, the car moves again to the 6th floor, carries passengers, and then moves to the 1st floor again. Therefore, as shown by the dotted arrows, the car operates unnecessarily from the sixth floor to the first floor and from the first floor to the sixth floor in the absence of passengers. On the other hand, according to the elevator apparatus controlled in the non-parking manner, as shown in FIG. 2, not only the useless movement indicated by the dotted arrow in FIG. 1 is eliminated, but also the waiting time of the passenger is shortened. Therefore, in the present invention, while the elevator apparatus is park-controlled, a pattern in which a certain passenger's getting-off floor and the next passenger's getting-on floor are the same frequently occurs based on the time series relationship of past getting-on / off data. Park operation is stopped during the time period.
[0009]
A specific configuration of the present invention will be described. First, in FIG. 3 showing the functional configuration of the present invention, 1-1 to 1-M are car devices, and M represents the number of cars (M is an integer equal to or greater than “1”). 2-1 to 2-N are landing devices, which include upper and lower landing call buttons, a car assignment unit, an arrival notification lantern, a car position display unit, etc. (N represents the number of landing devices, from the number of floors) Is also a large number.) Reference numerals 3-1 to 3-M denote car control devices that acquire and control the state of the car and the landing device. 4 is a park operation stop time zone setting unit, and 5 is a park operation setting unit.
[0010]
In such a configuration, the park operation setting unit 5 sets the park floor at a time other than the park operation stop setting time zone output from the park operation stop time zone setting unit 4 and sets each car control unit 3-1. The park setting result is output to 3-M. Each of the car control units 3-1 to 3-M that has received the park setting result controls the car apparatuses 1-1 to 1-M based on the park setting result. Details of the park control park setting will be omitted, and the processing of the park operation stop time zone setting unit 4 will be described in detail below.
[0011]
In the park operation stop time zone setting unit 4, the boarding / alighting time series data creation unit 41 obtains data related to calls and passengers getting on and off from the car control units 3-1 to 3 -M, and the passenger generation time, generation floor, Data related to the destination floor and the number of people (get-on / off time series data A (0)) is created in the format of FIG. The generated boarding / alighting time series data A (0) is stored in the boarding / alighting time series data storage unit 42. The boarding / alighting time series data storage unit 42 stores past boarding / alighting time series data A (1) to A (P) in the format shown in FIG. Here, P is the number of boarding / alighting time series data stored in the boarding / alighting time series data storage unit, and represents that data for the past P days is stored. The non-parking operation advantage ratio calculation unit 43 is a person who does not perform the park operation based on the previous P days of getting on / off time series data A (1) to A (P) stored in the getting on / off time series data storage unit 42. The data of the non-parking operation advantage rate, which is an index indicating that is more advantageous than performing the park operation, is created. The non-parking operation advantage can be obtained by the following equation (1).
Figure 0004027193
In the formula (1), the number of non-parking advantageous passengers R (t) in the time zone t is a time zone t having a size of the time width T [for example, a time zone of 00: 00: 00: 00 to 00:00:59 ], The sum total of the number of passengers for the past P days in which the destination floor of another passenger generated in front of a certain passenger and the generated floor of the certain passenger are the same is shown. The total number of passengers Q (t) generated in the time zone t indicates the sum of the total number of passengers generated in the time zone t for the past P days.
[0012]
The non-parking operation advantage rate V (t) for each time zone is calculated based on the flowchart of FIG. In this flowchart, each variable is initialized in steps S601 to S604. Specifically, in S601, the time zone t is set to 0:00 (00:00). Here, the time zone t = 00: 00 means a time zone from 00:00:00 to 00:00:59. In S602, a time zone t is set in the variable s. Here, the set variable s is the time in seconds in the time zone t [for example, 0: 0: 0 (00:00:00)]. In S603 and S604, the non-parking operation advantageous number of passengers R (t) in the time zone t and the total number of passengers Q (t) generated in the time zone t are reset to “0”.
[0013]
In S605, the variable d is set to “1”. This variable d indicates what day of getting on / off time series data is handled. Next, in S606, if the getting-on / off data generated at the time s is the same as the departure floor of the passenger number data generated at the time s and the destination floor of the passenger data just before it is generated at the time s. The number of passengers R (t) is calculated. Subsequently, in S607, regarding the boarding / alighting data generated at time s, if there is boarding / alighting data at time s, the number of persons is added to calculate Q (t). In S608, it is determined whether R (t) and Q (t) have been calculated for the getting-on / off time-series data up to the Pth day. As a result of the determination, if the calculation up to the Pth day is not completed, the variable d is incremented in S609, and R (t) and Q (t) are calculated for the incremented variable d in S606 and S607, respectively. When the calculation is completed up to the Pth day, the process proceeds to S610, and it is determined whether or not the time s has reached the time (t + T) obtained by adding a predetermined time width T to the initially set time t. For example, the time width T is set to “1 minute”.
[0014]
If the time s has not reached the time (t + T), after adding 1 second (0: 00: 00: 00) to the time s in S611, the variable d is incremented from “1” to “P” in S605. In step S606, R (t) is added, and in step S607, Q (t) is added. This process is executed until the time s reaches the time (t + T), whereby the time zone t from the time s to the time (t + T) [for example, when T is set to 1 minute, [00: 00: 00: 00 to 00:00:59], the added R (t) and Q (t) are obtained.
[0015]
In S612, based on R (t) and Q (t) added during time zone t from time t to time (t + T), non-parking operation advantage rate V (t for that time zone t ) Is calculated. Next, in S613, it is determined whether or not the time zone t is the last time zone (24: 00-T) when 24 hours are divided by a number of time zones t. As a result of the determination, if the time zone t does not correspond to the last time zone, the time width T is added to the time zone t in S614, and the processing from S602 to S612 is repeated, and R ( t), Q (t), and V (t) are calculated, and non-parking operation advantage ratio data shown in FIG. 7 is created.
[0016]
Returning to FIG. 3, the boarding ratio calculation unit 44 is based on the boarding / alighting time series data A (1) to A (P) for the past P days accumulated in the boarding / alighting time series data storage unit (see FIG. 5). In addition, as shown in FIG. 8, data on passenger ratio generated in each direction of each floor is created. The boarding ratio in each direction on each floor is calculated by the following equation (1).
Figure 0004027193
[0017]
Specifically, the boarding ratio H (FL, UPD, t) in the FL floor UPD direction in the time zone t in Expression (2) is calculated based on the flowchart of FIG. In this flowchart, each variable is initialized in steps S901 to S904. Specifically, in S901, the time zone t is set to 0:00 (00:00). In S902, the time zone t is set to the variable s. The set variable s is the time in seconds in the time zone t. In S903, G (FL, UPD, t) is reset to “0” for all floors FL and direction (upward and downward) UPD. In S904, the total number of passengers Q (t) generated in the time zone t is reset to “0”.
[0018]
In step S905, the variable d is set to “1”. Next, in S906, if there is passenger number data in the FL floor and UPD direction at time s for the d-day boarding / alighting time series data (see FIG. 5), the number of passengers is set to G (FL, UPD, t). to add. Subsequently, in S907, if there is boarding / alighting data at the time s with respect to the boarding / alighting time series data on the d-th day, the number of persons is added to Q (t). In S908, it is determined whether G (FL, UPD, t) and Q (t) have been calculated for the getting-on / off time-series data up to the Pth day. As a result of the determination, if the calculation up to the Pth day is not completed, the variable d is incremented in S909, and G (FL, UPD, t) and Q (t) for the incremented variable d in S906 and S907, respectively. Is calculated. When the calculation is completed up to the Pth day, the process proceeds to S910, and it is determined whether or not the time s has reached the time (t + T) obtained by adding a predetermined time width T to the initially set time t. For example, the time width T is set to “1 minute”.
[0019]
If the time s has not reached the time (t + T), 1 second (0:00: 00) is added to the time s in S911, and then the variable d is incremented from “1” to “P” in S905. In step S906, G (FL, UPD, t) is added, and in step S907, Q (t) is added. This process is executed until the time s reaches the time (t + T), whereby the time zone t from the time s to the time (t + T) [for example, when T is set to 1 minute, G (FL, UPD, t) and Q (t) are obtained for [00:00:00 to 00:00:59].
[0020]
In S912, the boarding ratio H (FL, UPD, t) in the time zone t is calculated for all floors FL and direction UPD. Next, in S913, it is determined whether or not the time zone t is the last time zone (24: 00-T) when 24 hours are divided by a number of time zones t. As a result of the determination, if the time zone t does not correspond to the last time zone, the time width T is added to the time zone t in S914, the processing of S902 to S912 is repeated, and H ( FL, UPD, t) is calculated.
[0021]
Returning to FIG. 3 again, the park operation stop condition accumulating unit 45 stores the conditions to stop the park operation for the non-park operation advantage rate V (t) and the boarding ratio H (FL, UPD, t) in each direction of each floor. is doing. The condition may be created in a table format as shown in FIG. In FIG. 10, “◯” indicates a condition for enabling the park setting, and “×” indicates a condition for stopping the park operation. FIG. 10 shows only the park operation stop conditions set for the non-parking operation advantage V (t) and the boarding ratio H (1, UP, t) in the first floor direction. Park operation center conditions regarding the non-park operation advantage V (t) and the boarding ratio H (FL, UPD, t) can be set. The park operation stop condition can be set by comparing evaluation values such as a waiting time when the park operation is performed and when the park operation is not performed, by a prior simulation. In addition, a plurality of patterns of cancellation conditions may be prepared according to the tendency of passenger data of some typical building types. For example, when a pattern is prepared in accordance with the tendency of passenger data, the correlation between the boarding ratio H (1, UP, t) in the first floor direction and the non-parking operation advantage V (t) as shown in FIG. 10 can be prepared, and the park operation stop condition optimum for the model can be prepared in the form of a table in FIG. Further, FIG. 11 describes a model representing the correlation between the boarding ratio H (FL, UPD, t) in the first floor direction and the non-parking operation advantage ratio V (t). A model representing the correlation between H (FL, UPD, t) in any direction of the floor and the non-parking operation advantage V (t) may be used.
[0022]
Returning to FIG. 3 again, the park operation stop time zone determination unit 46 calculates the non-park operation advantage rate V (t) in a certain time zone t calculated by the non-park operation advantage rate calculation unit 43 and the boarding ratio calculation unit 44. It is determined whether or not the calculated boarding ratio boarding ratio H (FL, UPD, t) in each direction of each floor in the time zone t is applicable to the park operation stop condition stored in the park operation stop condition storage unit 45, and When the non-parking operation advantage V (t) and the corresponding boarding ratio H (FL, UPD, t) correspond to the park operation stop condition, the time zone t is determined as the park operation stop time zone, The determined park operation stop time zone is output to the park operation setting unit 5 as the park operation stop time zone setting data shown in FIG.
[0023]
Further, when there are a plurality of park operation stop conditions in the park operation stop condition storage unit, the park operation stop time zone determination unit 46 selects the stop condition pattern and then determines the park operation stop time zone. There are several possible selection methods, but if the park operation stop condition pattern is determined for each type of building, it depends on the type of building (eg, usage, number of floors, scale, etc.). Select the pattern for stopping the park operation. Further, as shown in FIG. 11, the pattern of the park operation stop condition is compared with the model representing the correlation between the boarding ratio H (1, UP, t) in the first floor direction and the non-park operation advantage rate V (t). Is given, for example, it is possible to select a park operation stop condition for the model MD that minimizes the value XMD of the equation (3).
Figure 0004027193
Here, X MD represents the sum of the distance between the point at all the times t obtained from the building to which the technique of model MD and the present invention (H (FL, UPD, t ), V (t)) . This represents which one of the building and the model MD to which the method of the present invention is applied is closer. F MD (·) is a function representing the relationship between the boarding ratio and the non-parking operation advantage in the model MD.
[0024]
As described above, by configuring the elevator control device, a passenger's exit floor and the next passenger's In the passenger pattern where the boarding floor is the same and it is more efficient not to park on a specific floor, it is possible to cancel the park floor setting and improve the effect of the park floor setting Become.
[0025]
The above-described elevator control device of the present invention can be variously improved or changed within the concept of the present invention. For example, in an elevator control device having a group management device as shown in FIG. 13, a park operation stop time zone is output to the group management device 6 that performs park floor setting, and the park operation stop control is performed by this group management device 6. It is also possible to do this.
[0026]
As still another embodiment of the present invention, the park operation stop time zone may be set off-line by an elevator control device having the configuration of FIG. In this figure, a boarding / alighting data storage unit 7 includes a boarding / alighting time series data creation unit 71, a boarding / alighting time series data creation unit 41, and a boarding / alighting time series data storage unit 42 described in the first embodiment. A time-series data storage unit 72 is provided, and the time-series data for getting on and off the vehicle is created and stored. The offline park operation stop time zone setting device 8 is configured by a computer (for example, a personal computer) installed separately from the elevator device, and gets on / off time series data (FIG. 4, FIG. 4). 5) and is stored in the boarding / alighting time series data download unit 81. The park operation stop time zone setting storage unit 86 stores the park operation stop time zone setting data shown in FIG. 12 and uploads it to the park operation setting unit 5. In addition, the non-parking operation advantage calculation unit 82, the boarding ratio calculation unit 83, the park operation stop condition accumulation unit 84, and the park operation stop time zone determination unit 85 are respectively the non-parking operation advantage calculation unit 43 and the boarding ratio. The calculation unit 44, the park operation stop condition accumulation unit 45, and the park operation stop time zone determination unit 46 are the same.
[0027]
【The invention's effect】
As is clear from the above description, according to the elevator control device of the present invention, a passenger's getting-off floor and the next passenger's It is possible to cancel the setting of the park floor for a passenger pattern in which the boarding floor is the same and it is better not to perform the park operation on a specific floor, and the effect of the park floor setting can be improved.
[Brief description of the drawings]
FIG. 1 is a diagram showing the movement of a car when park control is performed.
FIG. 2 is a view showing the movement of a car when park control is not performed.
FIG. 3 is a functional configuration diagram of an elevator control device according to the present invention.
FIG. 4 is a diagram showing an example of getting-on / off time-series data in a tabular format.
FIG. 5 is a table showing an example of past boarding / alighting time series data stored in a boarding / alighting time series data storage unit.
FIG. 6 is a flowchart showing a process of calculating a non-parking operation advantage rate for each time zone.
FIG. 7 is a diagram showing an example of non-parking operation advantage rate data in a tabular format.
FIG. 8 is a diagram showing an example of passenger ratio data in a tabular format.
FIG. 9 is a flowchart showing a process for calculating a boarding ratio.
FIG. 10 is a diagram showing an example of a park operation stop condition in a table format.
FIG. 11 is a diagram showing models 1, 2, and 3 representing the correlation between the boarding ratio in the first floor direction and the non-parking operation advantage rate.
FIG. 12 is a diagram showing an example of park operation stop time zone setting data in a table format.
FIG. 13 is a functional configuration diagram of an elevator control device including a group management device.
FIG. 14 is a functional configuration diagram of an elevator control device that sets a park operation suspension time zone offline.
[Explanation of symbols]
1-1 to 1-M: car device 2-1 to 2-N: landing device 3-1 to 3-M: car device 4: park operation stop time zone setting unit 5: park operation setting unit 6: group management device 7: Boarding / alighting data storage unit 41: Boarding / alighting time series data creation unit 42: Boarding / alighting time series data storage unit 43: Non-parking operation advantage ratio calculation unit 44: Boarding ratio calculation unit 45: Park operation stop condition storage unit 46: Park operation stop time determination section

Claims (3)

時間帯ごとのパーク階を設定するパーク動作設定部を備えたエレベータ制御装置において、ある乗客の出発階と直前に発生した乗客の行先階が同一である比率をあらわす非パーク動作有利率を演算する非パーク動作有利率演算部と、各階の乗車比率を演算する乗車比率演算部と、前記非パーク動作有利率と前記各階乗車比率に基づいてパーク動作を中止すべき時間帯を決定するパーク動作中止時間帯決定部を備え、その決定にもとづいて、パーク動作の中止ならびにパーク動作の設定を行なうように構成されていることを特徴とするエレベータ制御装置。In an elevator control device having a park operation setting unit for setting a park floor for each time zone , a non-park operation advantage ratio representing a ratio in which a departure floor of a certain passenger and a destination floor of a passenger generated immediately before is the same is calculated. Non-parking operation advantage ratio calculation unit, boarding ratio calculation unit for calculating the boarding ratio of each floor, and park operation stop for determining a time zone where the park operation should be stopped based on the non-parking operation advantage ratio and each floor boarding ratio An elevator control device comprising a time zone determination unit and configured to stop the park operation and set the park operation based on the determination. 時間帯ごとのパーク階を設定するパーク動作設定部を備えたエレベータ制御装置において、ある乗客の出発階と直前に発生した乗客の行先階が同一である比率をあらわす非パーク動作有利率を演算する非パーク動作有利率演算部と、各階の乗車比率を演算する乗車比率演算部と、所定の方法によって定められたパーク動作有利率と各階の乗車比率に対してパーク動作を中止すべきか否かを示すパーク動作中止条件を蓄積するパーク動作中止条件蓄積部と、前記非パーク動作有利率と前記各階乗車比率と前記パーク動作中止条件に基づいてパーク動作を中止すべき時間帯を決定するパーク動作中止時間帯決定部を備え、その決定にもとづいて、パーク動作の中止ならびにパーク動作の設定を行なうように構成されていることを特徴とするエレベータ制御装置。In an elevator control device having a park operation setting unit for setting a park floor for each time zone, a non-park operation advantage ratio representing a ratio in which a departure floor of a certain passenger and a destination floor of a passenger generated immediately before is the same is calculated. Non-parking operation advantage calculation unit, boarding ratio calculation unit for calculating the boarding ratio of each floor, and whether or not the park operation should be stopped with respect to the park operation advantage rate determined by a predetermined method and the boarding ratio of each floor A park operation stop condition storage unit that stores the park operation stop condition shown, and a park operation stop that determines a time zone in which the park operation should be stopped based on the non-park operation advantage ratio, the respective boarding ratio, and the park operation stop condition An elevator comprising a time zone determination unit and configured to stop the park operation and set the park operation based on the determination. Motor controller. 非パーク動作有利率と各階乗車比率の相関を表す複数のモデルと、前記モデルに対して所定の方法によって定められたパーク動作中止条件を前記パーク動作中止条件蓄積部に蓄積し、当該ビルと最も近いモデルに関するパーク動作中止条件を選択し、前記非パーク動作有利率と前記各階乗車比率と選択されたパーク動作中止条件に基づいてパーク動作を中止すべき時間帯を決定するパーク動作中止時間帯決定部を備えたことを特徴とする請求項2記載のエレベータ制御装置。A plurality of models representing the correlation between the non-parking operation advantage ratio and each floor boarding ratio, and the park operation stop condition determined by a predetermined method for the model are stored in the park operation stop condition storage unit, Park operation stop time period determination for selecting a park operation stop condition for a nearby model, and determining a time period for stopping the park operation based on the non-park operation advantage ratio, the respective floor boarding ratio, and the selected park operation stop condition The elevator control device according to claim 2, further comprising a section.
JP2002265627A 2002-09-11 2002-09-11 Elevator control device Expired - Lifetime JP4027193B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002265627A JP4027193B2 (en) 2002-09-11 2002-09-11 Elevator control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002265627A JP4027193B2 (en) 2002-09-11 2002-09-11 Elevator control device

Publications (2)

Publication Number Publication Date
JP2004099279A JP2004099279A (en) 2004-04-02
JP4027193B2 true JP4027193B2 (en) 2007-12-26

Family

ID=32264719

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002265627A Expired - Lifetime JP4027193B2 (en) 2002-09-11 2002-09-11 Elevator control device

Country Status (1)

Country Link
JP (1) JP4027193B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103359562A (en) * 2012-03-29 2013-10-23 株式会社东芝 Elevator group management operation rate control device

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4879887B2 (en) * 2005-05-17 2012-02-22 三菱電機株式会社 Control parameter setting device for elevator system
CN102689824B (en) * 2011-03-25 2015-01-07 三菱电机株式会社 Parameter in elevator and recommended device of equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103359562A (en) * 2012-03-29 2013-10-23 株式会社东芝 Elevator group management operation rate control device

Also Published As

Publication number Publication date
JP2004099279A (en) 2004-04-02

Similar Documents

Publication Publication Date Title
JP6430008B2 (en) Group management elevator device and allocation method of boarding car by group management
JP3375643B2 (en) Elevator management control device
CN109693980B (en) Elevator dispatching method, device and system
JP5264717B2 (en) Elevator group management control device
JP4870863B2 (en) Elevator group optimum management method and optimum management system
JP2573715B2 (en) Elevator control device
JP6407430B2 (en) Group management elevator device and allocation method of boarding car by group management
US6315082B2 (en) Elevator group supervisory control system employing scanning for simplified performance simulation
CN112141831B (en) Group management system for elevator
CN112041255B (en) People flow prediction method and people flow prediction system
JP6542701B2 (en) Elevator apparatus and control method of elevator apparatus
CN107108149A (en) Handled by elevator control gear and call the method for input and the lift facility for performing this method
JP4879887B2 (en) Control parameter setting device for elevator system
JPWO2019087250A1 (en) Congestion avoidance driving system and method
JP4027193B2 (en) Elevator control device
CN105253726B (en) Elevator cluster management system and elevator control system
JP6536484B2 (en) Elevator system
JP4538264B2 (en) Elevator system control parameter setting device and elevator control device
JP6776174B2 (en) Elevator user movement prediction method and elevator user movement prediction device
CN105645201B (en) The group management control apparatus of elevator
JP6402074B2 (en) Group management elevator device and allocation method of boarding car by group management
JP3714343B2 (en) Elevator group management simple simulator and elevator group management device
JP7136256B1 (en) elevator controller
JP4293629B1 (en) Elevator system
KR102026698B1 (en) Group call pattern based elevator call control apparatus

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050105

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070612

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070619

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070809

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070918

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071009

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101019

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4027193

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111019

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121019

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131019

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term