JP3943527B2 - Concrete storage tank and its construction method - Google Patents
Concrete storage tank and its construction method Download PDFInfo
- Publication number
- JP3943527B2 JP3943527B2 JP2003176148A JP2003176148A JP3943527B2 JP 3943527 B2 JP3943527 B2 JP 3943527B2 JP 2003176148 A JP2003176148 A JP 2003176148A JP 2003176148 A JP2003176148 A JP 2003176148A JP 3943527 B2 JP3943527 B2 JP 3943527B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- storage tank
- circumferential direction
- segments
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Description
【0001】
【発明の属する技術分野】
本願に係る発明は、プレストレストコンクリートからなる軸対称シェル構造の貯槽に係り、特にプレキャストコンクリートセグメントを組立てることによって構築される貯槽及びこの貯槽の構築方向に関するものである。
【0002】
【従来の技術】
1000m3程度から数万m3の液体又は粒状体等を収容する大規模な貯槽として、プレストレストコンクリートからなるシェル構造の貯槽が広く用いられている。例えば、上下水道の貯水槽として、鉛直な軸線に関して対称な円筒シェル構造の壁体と球シェルであるドーム屋根とを備えたプレストレストコンクリートタンクが数多く構築されている。また、下水処理場における消化槽としては、上下で径が縮小された卵型の貯槽が知られている。さらに、穀物や石炭等を収容するサイロや低温常圧の液化ガスの貯蔵タンクとして、プレストレストコンクリートからなる円筒型貯槽が用いられることもある。
【0003】
上記貯槽は、一般に、現場打ちコンクリートによって構築され、先ず壁体となる部分の内型枠及び外型枠を組立て、これらの間にコンクリートを打設し、コンクリートが硬化した後に型枠を撤去する。そして、所定の高さまで壁体を立ち上げた後、支保工を組立て、これに屋根となる部分のドーム型の型枠を支持させてコンクリートを打設する。又は、プレキャストコンクリートセグメントを支保工に支持させて配置し、接合する。
【0004】
このような貯槽では、収容された貯蔵物によって内圧が作用し、軸対称シェル構造の円周方向(水平方向)に引張力が生じる。この引張力に抵抗するために、貯槽の円周方向に緊張材を配置し、張力を導入することにより、貯槽の円周方向にプレストレスを導入する。
【0005】
円周方向のプレストレスは、周方向の全域にわたってほぼ均等に導入されるのが望ましく、端部付近をラップさせた複数の緊張材を壁体内の周方向に配置し、これらに緊張力を導入するのが一般的である。
【0006】
緊張力の導入は、一般に、図10に示すように円周方向に配置された緊張材103の端部を壁体102の外側に曲げ、壁体102の外側に突出するように設けられた柱状突出部101から引き出し、該柱状突出部101の側端面101aにジャッキを装着して行なわれる。そして、緊張材に緊張力が導入された状態で、緊張材端部が定着具104によって壁体102に定着され、後打ちコンクリート105によって埋め込まれる。
なお、符号106は鉛直方向のPC鋼材、符号107は鉄筋を示すものである。
【0007】
【発明が解決しようとする課題】
しかしながら、上記のような構造のプレストレストコンクリート貯槽では、次のような問題点がある。
上記貯槽のように壁体及び屋根を現場打ちコンクリートによって構築する場合には、型枠の組立て及び脱型やコンクリートの打設及び養生等の現場における工数が増大するとともに、これらの作業を現場という環境が良好でない場所で行なうため、作業の効率化が難しい。また、壁体を構築後、屋根となる部分の型枠を組立てて支持するために大規模な支保工が必要となり、この支保工の組立て及び解体に多くの時間や費用を要してしまう。
【0008】
また、上記緊張材は、壁体となる部分の内型枠及び外型枠を組立てた後、これらの間の所定の位置に、周方向に配置される。そして、内型枠と外型枠との間にコンクリートを打設し、このコンクリートが硬化した後、緊張材の緊張及び定着が行なわれる。このように、壁体内に緊張材を配置し、壁体の周方向にプレストレスを導入するには多くの作業工程が必要となるため、工費や工期の減縮が難しい。
【0009】
さらに、プレストレスを導入するための緊張材は柱状突出部の部分でラップして配置され、それぞれが独立して柱状突出部の側面に定着される。したがって、緊張材の張力は定着具からコンクリートに伝達され、定着具付近のコンクリートには局部的に大きな応力が生じやすくなる。このため、定着具付近の補強等が必要となり、この部分の構造が複雑になるとともに、作業工数が多くなって工費もかさむことになる。
【0010】
本願発明は、上記のような事情に鑑みてなされたものであり、その目的は、軸対称シェル構造を有し、簡単な作業で壁体及び天蓋の構築及びプレストレスの導入が可能なコンクリート貯槽を提供すること及びこのようなコンクリート貯槽の構築方法を提供することである。
【0011】
【課題を解決するための手段】
上記課題を解決するために、請求項1に係る発明は、 コンクリート壁体及びコンクリート天蓋が鉛直な中心軸線に関して対称な構造の貯槽であって、 前記中心軸線から放射状に設定した鉛直面で分割され、前記コンクリート壁体となる部分と前記コンクリート天蓋となる部分とが連続したプレキャストコンクリートセグメントを周方向に配列して構成され、 前記コンクリート壁体の外周面から突出し、上下方向に連続したリブが、周方向の所定間隔毎に設けられ、 該プレキャストコンクリートセグメントの外側で周方向に配置された緊張材に引張力を導入することによって前記コンクリート壁体に周方向の圧縮力が導入されており、
前記緊張材は、前記リブを貫通し、前記コンクリート壁体の外周面と離隔して配置されているコンクリート貯槽を提供する。
【0012】
上記貯槽は、プレキャストコンクリートセグメントによって構成されており、該プレキャストコンクリートセグメントをあらかじめ工場や現場ヤード等で製作し、架設現場へと搬入して架設することができる。また、貯槽のコンクリート壁体となる部分とコンクリート天蓋となる部分とが、連続したセグメントを組立てて構築されているため、これらのセグメントを支持する支柱等のみで構築することができ、屋根材の架設に用いられる大規模な支保工の組立て及び解体が不要となる。このため、現場での作業性が向上し、省力化及び工期の短縮化を図ることができる。
また、上記緊張材はコンクリート壁体の外側に配置されているため、これを緊張及び定着する作業を簡略化することができるとともに、コンクリート壁体内に配置する場合に比べて壁体の厚さを低減することができる。そして、この緊張材によってコンクリート壁体の周方向に圧縮力が導入されているため、該コンクリート壁体に貯槽内の液体や粒体等による内圧、及び、地震による慣性力が作用した場合における周方向の引張応力に抵抗することができる。
【0013】
上記緊張材は、リブに貫通され、この部分で壁体に沿って方向が変えられ、周方向に連続するように配置される。したがって、緊張材を緊張したとき、リブから壁体の内側に向かって内圧に有効に抵抗する力が作用する。そして、緊張材はリブの部分のみにおいてコンクリート部材と接触しており、壁体の外周面とは離隔しているので、摩擦による緊張力の低下が少なく、全周にわたって大きな緊張力が導入される。また、リブによってコンクリート壁体の上下方向の剛性が増加するため、コンクリート壁体に作用する上下方向の曲げモーメントに対して、上下方向のプレストレスを導入する鋼材量を低減することができる。さらに、リブによってセグメントが十分な曲げ強度を有するため、該セグメントが輸送時に破損してしまうのを防止できる。
【0014】
請求項2に係る発明は、 請求項1に記載のコンクリート貯槽において、前記コンクリート壁体と前記コンクリート天蓋とは、なだらかな曲面で連続したものとする。
【0015】
この貯槽は、該貯槽の中心軸線に関して対称なシェル構造であり、コンクリート壁体とコンクリート天蓋とがなだらかな曲面で連続しているため、壁体と天蓋との間で断面力の伝達が円滑に生じる。このため、局部的に大きな断面力が生じることがなく、外力に対して広い範囲で抵抗し得る構造となり、構造物の信頼性が向上する。
【0016】
請求項3に係る発明は、 請求項1又は請求項2に記載のコンクリート貯槽において、緊張材の定着具が前記リブに埋め込んで固着され、 該定着具は、二つの筒状部が一体に結合されたものであり、 周方向に配置された一連の緊張材の端部が前記定着具の二つの筒状部にそれぞれ反対側から挿通され、定着されているものとする。
【0017】
上記緊張材はコンクリート壁体の周方向に配置され、緊張材の両端部を一体に定着する定着具によって定着され、環状に閉じた形状となる。また、複数の緊張材を同数の定着具を用いて環状に連結してもよい。そして、それぞれの緊張材の両端又は一方の端部から張力を導入して定着具に係止すると、張力は緊張材の端部間で定着具を介して伝達され、定着具周辺のリブへは緊張材の軸線方向の反力がほとんど伝達されない。このため、コンクリート壁体は、周方向にほぼ均一な圧縮力が導入され、該コンクリート壁体に作用する引張応力にほぼ均等に抵抗するものとなる。
【0018】
請求項4に係る発明は、 コンクリート壁体及びコンクリート天蓋が鉛直な中心軸線に関して対称なシェル構造の貯槽を形成する複数のプレキャストコンクリートセグメントであって、前記中心軸線から放射状に設定した鉛直面に沿ってセグメント間の接合面が形成され、壁体部分と天蓋部分とが連続したプレキャストコンクリートセグメントを製作し、 該プレキャストコンクリートセグメントのそれぞれには、外側へ突出し、所定位置に建て込んだときに上下方向に連続したものとなるリブを設けておき、 該プレキャストコンクリートセグメントを所定位置に建て込み、 これらのプレキャストコンクリートセグメントの外側に周方向の緊張材を配置して、該緊張材が前記リブを貫通し、壁体部分の外周面と離隔するものとし、 該緊張材に引張力を導入することによって、前記コンクリートセグメントを一体とし、壁体の周方向に圧縮応力を導入するコンクリート貯槽の構築方法を提供する。
【0019】
上記コンクリート貯槽の構築方法では、プレキャストコンクリートセグメントをあらかじめ工場等で製作し、これを現場で架設することによって、現場で型枠を組立ててコンクリートを打設する場合に比べ、作業を簡略化することができる。このため、工期を短縮したり工費を低減することができる。また、壁体部分と天蓋部分とが連続したプレキャストコンクリートセグメントを用いるため、天蓋部分を構築するための大規模な支保工の組立て及び解体が不要となる。さらに、緊張材をプレキャストコンクリートセグメントの外側に容易に配置することができ、これにともなって部材厚を低減することができる。
【0020】
また、緊張材をリブに貫通し、壁体部分の外周面と離隔するように配置することによって、緊張材を緊張したとき、壁体の外周面との摩擦によって緊張力が低下しにくく、全周にわたって大きな緊張力を導入することができる。また、リブによってセグメントの上下方向の剛性が増加するため、該セグメントに作用する上下方向の曲げモーメントに対するプレストレス量を低減することができるとともに、セグメントの輸送時等の取り扱いが容易になる。
【0021】
【発明の実施の形態】
以下、本願に係る発明の実施の形態を図に基づいて説明する。
図1は、本願発明の一実施形態である貯槽を示す概略斜視図であり、図2は、該貯槽の概略断面図及び概略平面図である。
この貯槽は、支持地盤上又は基礎杭を形成した上に設けられた円形の底版1と、この上に立ち上げられ、なだらかな曲面で連続した壁体2aと天蓋2bとからなる躯体2とで主要部が構成されている。また、躯体2の外周面には、周方向の所定間隔毎に上下方向のリブ14が設けられており、該リブ14を貫通し、躯体2の外周面と離隔して、周方向に緊張力が導入された外ケーブル4が配置されている。さらに、貯槽の頂部には換気孔3が設けられている。
【0022】
上記底版1は、鉄筋コンクリートからなるものであり、支持地盤上又は基礎杭上で躯体2および貯留物5の重量を支持するものである。
【0023】
上記躯体2は、鉛直な中心軸線に関して対称なシェル構造となっており、複数のプレキャストコンクリートセグメント(以下PCセグメントという)11を底版1上に周方向に配列して閉じた形状としたものである。
このPCセグメント11は、図3に示すように、躯体2を中心軸線から所定の中心角で鉛直に分割した形状となっており、壁体2aとなる部分と天蓋2bとなる部分とが連続したなだらかな曲面12となっており、下端部には底版1とアンカーによって結合される下端ブロック部13が形成されている。また、上下方向に連続したリブ14は、下端ブロック部13から上方に連続し、PCセグメントの幅方向(周方向)の中心線上で外側に突出するように形成されており、該リブ14には、外ケーブルを挿通するために水平方向の貫通孔14aが、上下方向に所定間隔で複数形成されている。そして、複数の外ケーブルの内、当該PCセグメントで定着されるケーブルに対しては、貫通孔に換えて定着具がリブ14内に埋め込まれている。
なお、躯体2を構成するPCセグメント11の数は、貯槽の規模等に応じて任意に設定できるものであり、一つのセグメントの重量等、輸送及び組立て時の取り扱いを考慮して分割数が決定される。
【0024】
上記PCセグメント11は、いわゆるマッチキャスト工法によって製作する。この工法は、既に製作されたPCセグメントの端面を新たなPCセグメントの型枠の端面とし、該型枠内にコンクリートを打設して硬化させ、脱型するものである。この工法では、連続して配置されるPCセグメントの接合部を高精度に製作することができ、複数のPCセグメントを周方向に配置して隣合うPCセグメントを接合したとき、PCセグメント間の密着性が極めて良好となる。
【0025】
上記外ケーブル4は、鋼より線等の高張力の鋼材を用いることができ、合成樹脂等の防食材によって被覆されている。この外ケーブル4は、躯体2を一周する長さを有しており、図4に示すように、各リブ14の貫通孔14aに挿通して周方向に配置され、周方向に隣合うリブ14の間では躯体2の外周面と離隔して配置されている。そして、張力が導入された状態で両端が一つの定着具21にくさびによって定着され、環状に閉じたものとなっている。これにより、躯体2に周方向の圧縮力が導入され、該躯体2に貯槽内の液体や粒体等による内圧が作用したり、地震による慣性力が作用した場合に、周方向に生じる引張応力に抵抗することができる。
【0026】
上記定着具21は鋳造品であり、図5に示すように、外ケーブル4が挿通される二つの筒状体21a,21bをX状に交差させて一体化した形状となっており、それぞれの筒状体に挿通された外ケーブル4をそれぞれ反対側で緊張し、定着することができるものである。この定着具21は、周方向における1つのリブ14内に埋め込まれており、リブの端部には外ケーブル4を緊張するときにジャッキを装着するための切り欠き部25が形成されている。
なお、図5中に示す符号22は鋼より線を押さえ付けるくさび、符号23はくさび22が係止される雌コーン、符号24は合成樹脂からなる鋼より線の被覆である。
【0027】
また、定着具21は、図6に示すように、上下に隣り合う外ケーブル4a,4bの定着具が、同一のリブ内に配置されることなく、周方向にずれた位置A、Bに分散して配置されるのが望ましい。さらに、3つ以上のリブに分割して定着具を配置することもできる。
なお、定着具21が埋め込まれているリブ14は、定着具21の全長に合わせて周方向の幅が、上下方向の全域にわたって大きいものとなっている。
【0028】
次に、上記貯槽の構築方法について説明する。なお、この方法は、請求項4に係る発明の一実施形態である。
まず、支持地盤上又は基礎杭を形成した上に、鉄筋コンクリートの底版1を形成する。底版1の周縁部には、周方向に所定間隔でアンカーを埋め込み、底版の上面より鉛直に突き出しておく。一方、工場や現場ヤード等であらかじめPCセグメントを製作しておき、これを構築現場に搬入する。
【0029】
上記PCセグメントは、クレーン等によって吊り上げて、底版1上に配置する。このとき、図7に示すように、PCセグメント11の下端ブロック部13にはあらかじめアンカー15が挿通される孔13a及びアンカー15を係止するためのプレート13c及びナット13dが埋め込まれる凹部13bを形成しておき、これらが底版1から突き出しているアンカー15と対応するようにPCセグメント11を配置する。設置されたPCセグメント11の内側には、図8に示すように、これらのPCセグメント11を支持するサポート16をあらかじめ設置しておき、このサポート16によって支持しながら位置調整を行なう。
【0030】
一つのPCセグメント11が設置されると、これと隣合って連続するように他のPCセグメントを配置し、位置調整を行なう。このとき、接合されるPCセグメント11の端面にはエポキシ樹脂等の合成樹脂を塗布し、PCセグメントの内側及び外側にあらかじめ水平に配置しておいた引き寄せケーブルを用いてPCセグメントを互いに圧接する。このようにして、全てのPCセグメント11を底版1の形状に沿って周方向に順次配列し、それぞれのPCセグメントを一体に接合する。また、最初と最後に配置したPCセグメント間には隙間が形成されるため、これらの間に型枠を組立て、この型枠内にコンクリートを打設することによって、躯体2を周方向に連続したものとする。
【0031】
その後、底版1と水平面13との間には、モルタル17を充填してPCセグメントを安定した状態とするとともに、一部に止水用の充填材18を充填する。PCセグメント11の下端ブロック部13に挿通されたアンカー15にはナットを締め込んで、該アンカー15を緊張し、底版1上にPCセグメント11を固定する。そして、アンカー15の頭部を埋め込むように、PCセグメント11の水平部13に形成された凹部13bにコンクリートを打設する。
【0032】
上記のように躯体2が構築された後、外ケーブル4をPCセグメント11のリブ14に設けられた貫通孔14aに順次挿通し、躯体2の外周面に沿って全周に配置するとともに、両端部は定着具21の二つの筒状体にそれぞれ挿入する。このようにして、外ケーブル4を上下方向に間隔をあけて所定の本数を配置する。
【0033】
定着具21に挿通された外ケーブル4の両端部は、該定着具が埋め込まれたリブ14の両側部に設けられた切り欠き部25からそれぞれ引き出しておき、この切り欠き部25の端面にジャッキを装着する。そして、外ケーブル4のそれぞれの端部をジャッキによって反対方向に緊張し、定着具21に係止する。これにより、張力が外ケーブル4の端部間で伝達され、躯体2の周方向にプレストレスが導入される。その後、外ケーブル4の突出部分を切断し、切り欠き部25にコンクリートを打設して端部を埋め込む。
【0034】
上記のような貯槽の構築方法では、PCセグメント11をあらかじめ工場や現場ヤード等で製作しておくことができ、このPCセグメント11が壁体2aとなる部分と天蓋2bとなる部分とが連続した形状となっている。このため、現場において複数のPCセグメントを配置し、これらを接合することによって迅速に躯体2、すなわち壁体と天蓋とを構築することができる。また、貯槽の内側に設ける支保工が簡略化され、仮設費用を低減することができる。一方、外ケーブル4が躯体2の外側に突出したリブ14を貫通して配置されており、これにより躯体2の周方向にプレストレスが導入されている。したがって、ケーブルの配置作業、グラウトの充填作業が簡略化され、現場での作業量が大幅に減少し、工期及び工費の削減を図ることができる。また、ケーブルとコンクリートの躯体との間の摩擦も極めて小さく、有効にプレストレスが導入される。
【0035】
なお、上記貯槽では、複数の外ケーブル4を同数の定着具を用いて壁体の周方向に閉じた形状としてもよい。このような場合でもそれぞれの外ケーブル4を緊張して定着具に係止すると、張力が隣合う外ケーブル4の端部間で伝達され、壁体の周方向にほぼ均一な圧縮力が導入される。
【0036】
また、本願の請求項1に係る発明の貯槽は、図1に示す貯槽の形状に限られるものではなく、用途に合わせて、図9に示すような形状のものとすることができる。すなわち、図9(a)のようにPCセグメントからなる躯体、すなわち壁体と天蓋とが連続した軸対称シェル構造であっても良いし、図9(b)、(c)のように壁体となる部分が軸対象シェルとなり、天蓋となる部分が平板状となったものとすることもできる。図9(a)、(b)に示すように、壁体部分が上方に向かって径が縮小される形状であると、PCセグメントの形状が輸送し易いものとなる。そして、上記貯槽と同様に、PCセグメントの外周面側にリブを設けることにより、PCセグメントの曲げ強度が大きくなり、輸送時等の取り扱いが容易になるともに、PCセグメントを閉じた形状に配置した後、外ケーブルを周方向に配置して、簡単かつ迅速に緊張力を導入することができる。
【0037】
【発明の効果】
以上説明したように、本願発明に係るコンクリート貯槽及びコンクリート貯槽の構築方法では、該貯槽のコンクリート壁体となる部分とコンクリート天蓋となる部分とが連続しているプレキャストコンクリートセグメントを用いることによって、現場での作業性が向上し、仮設材の低減、省力化及び工期の短縮化を図ることができる。また、コンクリート壁体の外側に緊張材を配置することによって、これを緊張及び定着する作業を簡略化することができる。そして、この緊張材によって壁体の周方向に圧縮力をほぼ均等に導入することができる。
【図面の簡単な説明】
【図1】 本願発明の一実施形態である貯槽を示す概略斜視図である。
【図2】 図1に示す貯槽の概略断面図及び概略平面図である。
【図3】 図1に示す貯槽の躯体を構成するPCセグメントを示す概略斜視図である。
【図4】 躯体の円周方向に配置される外ケーブルを示す平断面図である。
【図5】 図4に示す外ケーブルが定着具に係止されている状態を示す断面図である。
【図6】 図5に示す外ケーブルの配置及び定着具の位置を示す概略図である。
【図7】 PCセグメントと底版との結合部を示す断面図である。
【図8】 PCセグメントを底版上に配置する方法を示す概略図である。
【図9】 本願発明の他の実施形態である貯槽を示す概略断面図である。
【図10】 従来のプレストレストコンクリート貯槽における円周方向の緊張材の定着部を示す平断面図である。
【符号の説明】
1 底版
2 躯体
3 換気孔
4 外ケーブル
5 貯留物
6 地盤
11 PCセグメント
12 曲面
13 下端ブロック部
14 リブ
15 アンカー
16 サポート
21 定着具
22 くさび
23 雌コーン
24 鋼より線の被覆
25 切り欠き部[0001]
BACKGROUND OF THE INVENTION
The invention according to the present application relates to a storage tank having an axisymmetric shell structure made of prestressed concrete, and more particularly to a storage tank constructed by assembling a precast concrete segment and a construction direction of the storage tank.
[0002]
[Prior art]
Shell storage tanks made of prestressed concrete are widely used as large-scale storage tanks that store liquids or granules of about 1000 m 3 to tens of thousands m 3 . For example, many prestressed concrete tanks having a cylindrical shell-structured wall body symmetrical about a vertical axis and a dome roof that is a spherical shell are constructed as water and sewage water storage tanks. As a digestion tank in a sewage treatment plant, an egg-shaped storage tank whose diameter is reduced vertically is known. In addition, a cylindrical storage tank made of prestressed concrete may be used as a silo for storing grains, coal, or the like or a storage tank for low-temperature and normal-pressure liquefied gas.
[0003]
The storage tank is generally constructed by cast-in-place concrete. First, the inner and outer molds of the wall part are assembled, concrete is placed between them, and the mold is removed after the concrete has hardened. . And after raising a wall body to predetermined | prescribed height, a support construction is assembled, concrete is cast | placed by supporting the dome-shaped formwork of the part used as a roof to this. Alternatively, the precast concrete segments are arranged and supported by supporting works.
[0004]
In such a storage tank, an internal pressure is applied by the stored material, and a tensile force is generated in the circumferential direction (horizontal direction) of the axisymmetric shell structure. In order to resist this tensile force, a prestress is introduced in the circumferential direction of the storage tank by placing a tension material in the circumferential direction of the storage tank and introducing tension.
[0005]
Circumferential prestress is preferably introduced almost uniformly throughout the entire circumferential direction, and multiple tension members wrapped around the edges are placed in the circumferential direction in the wall, and tension is introduced into them. It is common to do.
[0006]
As shown in FIG. 10, the tension force is generally introduced in a columnar shape provided such that the end portion of the
[0007]
[Problems to be solved by the invention]
However, the prestressed concrete storage tank having the above structure has the following problems.
When building the wall and roof with on-site concrete like the above storage tank, the number of man-hours on the site such as assembling and demolding of the formwork, placing of concrete and curing is increased, and these operations are called on-site. Since it is performed in a place where the environment is not good, work efficiency is difficult. Further, after the wall body is constructed, a large-scale support work is required for assembling and supporting the formwork of the roof portion, and much time and cost are required for assembling and dismantling the support work.
[0008]
Moreover, after assembling the inner mold frame and the outer mold frame of the portion that becomes the wall body, the tension material is arranged in a circumferential direction at a predetermined position between them. Then, concrete is placed between the inner mold frame and the outer mold frame, and after the concrete is hardened, the tension material is tensioned and fixed. As described above, a lot of work steps are required to arrange the tendon material in the wall body and introduce prestress in the circumferential direction of the wall body, and therefore it is difficult to reduce the construction cost and the construction period.
[0009]
Furthermore, the tension material for introducing the prestress is arranged by being wrapped at the columnar protrusion portion, and each is independently fixed to the side surface of the columnar protrusion portion. Therefore, the tension of the tendon is transmitted from the fixing tool to the concrete, and a large stress tends to be locally generated in the concrete near the fixing tool. For this reason, reinforcement around the fixing tool or the like is necessary, the structure of this portion becomes complicated, and the number of work steps increases, which increases the work cost.
[0010]
The present invention has been made in view of the circumstances as described above, and its purpose is a concrete storage tank having an axisymmetric shell structure and capable of constructing a wall and a canopy and introducing prestress by simple operations. And a method for constructing such a concrete storage tank.
[0011]
[Means for Solving the Problems]
In order to solve the above problems, the invention according to
The tendon provides a concrete storage tank that penetrates the rib and is spaced apart from the outer peripheral surface of the concrete wall .
[0012]
The said storage tank is comprised by the precast concrete segment, this precast concrete segment can be manufactured beforehand in a factory, a site yard, etc., can be carried in to a construction site, and can be installed. In addition, since the concrete wall of the storage tank and the concrete canopy are constructed by assembling continuous segments, it can be constructed with only the pillars that support these segments. Assembling and dismantling of large-scale support used for erection is not required. For this reason, workability on site can be improved, and labor saving and shortening of the construction period can be achieved.
In addition, since the tension material is arranged outside the concrete wall body, the work of tensioning and fixing the tension material can be simplified, and the thickness of the wall body can be reduced as compared with the case where the tension material is arranged in the concrete wall body. Can be reduced. Since the compressive force is introduced in the circumferential direction of the concrete wall body by this tendon material, the internal pressure due to the liquid or granule in the storage tank and the inertial force due to the earthquake are applied to the concrete wall body. Can resist tensile stress in the direction.
[0013]
The above-mentioned tendon is penetrated by the rib, the direction is changed along the wall body at this portion, and the tension material is arranged to be continuous in the circumferential direction. Therefore, when the tension material is tensioned, a force that effectively resists internal pressure acts from the rib toward the inside of the wall body. And, since the tension material is in contact with the concrete member only at the rib portion and is separated from the outer peripheral surface of the wall body, there is little reduction in tension due to friction, and a large tension is introduced over the entire circumference. . Moreover, since the rigidity in the vertical direction of the concrete wall body is increased by the ribs, the amount of steel material that introduces prestress in the vertical direction can be reduced with respect to the bending moment in the vertical direction acting on the concrete wall body. Furthermore, since the segments have sufficient bending strength due to the ribs, the segments can be prevented from being damaged during transportation.
[0014]
The invention according to
[0015]
This storage tank has a symmetrical shell structure with respect to the central axis of the storage tank, and the concrete wall and the concrete canopy are continuous with a gentle curved surface, so that the cross-sectional force is smoothly transmitted between the wall and the canopy. Arise. For this reason, a large cross-sectional force is not locally generated, and a structure capable of resisting a wide range against an external force is obtained, and the reliability of the structure is improved.
[0016]
According to a third aspect of the present invention, in the concrete storage tank according to the first or second aspect , a tension material fixing tool is embedded and fixed in the rib, and the two cylindrical portions are integrally coupled to the fixing tool. It is assumed that the ends of a series of tension members arranged in the circumferential direction are inserted through the two cylindrical portions of the fixing tool from opposite sides and fixed.
[0017]
The tendon is arranged in the circumferential direction of the concrete wall, is fixed by a fixing tool that fixes both ends of the tendon integrally, and has an annularly closed shape. Also, a plurality of tendons may be connected in an annular shape using the same number of fixing tools. Then, when tension is introduced from both ends or one end of each tension member and locked to the fixing tool, the tension is transmitted between the ends of the tension material via the fixing tool, and to the ribs around the fixing tool. The reaction force in the axial direction of the tendon is hardly transmitted. For this reason, a substantially uniform compressive force is introduced into the concrete wall body in the circumferential direction, and the concrete wall body resists the tensile stress acting on the concrete wall body almost evenly.
[0018]
The invention according to
[0019]
In the construction method of the above concrete storage tank, the precast concrete segment is manufactured in advance in a factory etc., and this is erected at the site, so that the work is simplified compared with the case where the formwork is assembled and the concrete is placed at the site. Can do. For this reason, a construction period can be shortened or a construction cost can be reduced. Moreover, since the precast concrete segment in which the wall portion and the canopy portion are continuous is used, it is not necessary to assemble and disassemble a large-scale support for constructing the canopy portion. Further, the tendon can be easily disposed outside the precast concrete segment, and accordingly, the member thickness can be reduced.
[0020]
Further, by placing the tension material through the rib and being spaced apart from the outer peripheral surface of the wall body portion, when the tension material is tensioned, the tension force is unlikely to decrease due to friction with the outer peripheral surface of the wall body. Large tension can be introduced over the circumference. Further, since the vertical rigidity of the segment is increased by the rib, it is possible to reduce the amount of prestress with respect to the vertical bending moment acting on the segment, and the handling of the segment during transportation becomes easy.
[0021]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the invention according to the present application will be described with reference to the drawings.
FIG. 1 is a schematic perspective view showing a storage tank according to an embodiment of the present invention, and FIG. 2 is a schematic cross-sectional view and a schematic plan view of the storage tank.
This storage tank is composed of a
[0022]
The
[0023]
The
As shown in FIG. 3, the
The number of
[0024]
The
[0025]
The
[0026]
The fixing
[0027]
In addition, as shown in FIG. 6, the fixing
The
[0028]
Next, a method for constructing the storage tank will be described. This method is an embodiment of the invention according to
First, the
[0029]
The PC segment is lifted by a crane or the like and placed on the
[0030]
When one
[0031]
Thereafter, the
[0032]
After the
[0033]
Both end portions of the
[0034]
In the construction method of the storage tank as described above, the
[0035]
In the storage tank, a plurality of
[0036]
Moreover, the storage tank of the invention according to
[0037]
【The invention's effect】
As described above, in the concrete storage tank and the method for constructing the concrete storage tank according to the present invention, the precast concrete segment in which the part that becomes the concrete wall of the storage tank and the part that becomes the concrete canopy are continuous is used. This improves the workability of the machine, reduces the temporary materials, saves labor, and shortens the construction period. In addition, by placing a tension material on the outside of the concrete wall, the work of tensioning and fixing it can be simplified. And this compressive material can introduce compressive force into the circumferential direction of a wall body substantially equally.
[Brief description of the drawings]
FIG. 1 is a schematic perspective view showing a storage tank according to an embodiment of the present invention.
FIG. 2 is a schematic cross-sectional view and a schematic plan view of the storage tank shown in FIG.
3 is a schematic perspective view showing a PC segment constituting the housing of the storage tank shown in FIG. 1. FIG.
FIG. 4 is a plan sectional view showing an outer cable arranged in the circumferential direction of the housing.
5 is a cross-sectional view showing a state in which the outer cable shown in FIG. 4 is locked to a fixing tool.
6 is a schematic view showing the arrangement of the outer cable and the position of the fixing device shown in FIG. 5. FIG.
FIG. 7 is a cross-sectional view showing a connecting portion between a PC segment and a bottom plate.
FIG. 8 is a schematic view showing a method of arranging PC segments on a bottom plate.
FIG. 9 is a schematic sectional view showing a storage tank according to another embodiment of the present invention.
FIG. 10 is a plan sectional view showing a fixing portion of a tension material in a circumferential direction in a conventional prestressed concrete storage tank.
[Explanation of symbols]
DESCRIPTION OF
Claims (4)
前記中心軸線から放射状に設定した鉛直面で分割され、前記コンクリート壁体となる部分と前記コンクリート天蓋となる部分とが連続したプレキャストコンクリートセグメントを周方向に配列して構成され、
前記コンクリート壁体の外周面から突出し、上下方向に連続したリブが、周方向の所定間隔毎に設けられ、
該プレキャストコンクリートセグメントの外側で周方向に配置された緊張材に引張力を導入することによって前記コンクリート壁体に周方向の圧縮力が導入されており、
前記緊張材は、前記リブを貫通し、前記コンクリート壁体の外周面と離隔して配置されていることを特徴とするコンクリート貯槽。The concrete wall and the concrete canopy are storage tanks having a symmetrical structure with respect to the vertical central axis,
Divided by a vertical plane set radially from the central axis, configured by arranging the precast concrete segments in which the portion that becomes the concrete wall and the portion that becomes the concrete canopy are arranged in the circumferential direction,
Ribs protruding from the outer peripheral surface of the concrete wall body and continuous in the vertical direction are provided at predetermined intervals in the circumferential direction,
A compressive force in the circumferential direction is introduced into the concrete wall by introducing a tensile force to the tension material disposed in the circumferential direction outside the precast concrete segment ;
The said tension material penetrates the said rib, and is spaced apart and arrange | positioned from the outer peripheral surface of the said concrete wall body, The concrete storage tank characterized by the above-mentioned .
該定着具は、二つの筒状部が一体に結合されたものであり、
周方向に配置された一連の緊張材の端部が前記定着具の二つの筒状部にそれぞれ反対側から挿通され、定着されていることを特徴とする請求項1又は請求項2に記載のコンクリート貯槽。A tensioner fixing device is embedded and fixed in the rib,
The fixing device is one in which two cylindrical portions are integrally coupled,
Circumferential end of the set of tendons arranged in the direction are inserted from opposite sides into two cylindrical portions of the fixing device, according to claim 1 or claim 2, characterized in that it is fixed Concrete storage tank.
該プレキャストコンクリートセグメントのそれぞれには、外側へ突出し、所定位置に建て込んだときに上下方向に連続したものとなるリブを設けておき、
該プレキャストコンクリートセグメントを所定位置に建て込み、
これらのプレキャストコンクリートセグメントの外側に周方向の緊張材を配置して、該緊張材が前記リブを貫通し、壁体部分の外周面と離隔するものとし、
該緊張材に引張力を導入することによって、前記コンクリートセグメントを一体とし、壁体の周方向に圧縮応力を導入することを特徴とするコンクリート貯槽の構築方法。A plurality of precast concrete segments in which the concrete wall and the concrete canopy form a storage tank with a shell structure that is symmetric with respect to a vertical central axis, and a joint surface between the segments is formed along a vertical plane set radially from the central axis A precast concrete segment in which the wall part and the canopy part are continuous,
Each of the precast concrete segments protrudes outward and is provided with ribs that are continuous in the vertical direction when built in place.
Building the precast concrete segment in place,
Circumferential tension material is arranged outside these precast concrete segments, the tension material penetrates the rib, and is separated from the outer peripheral surface of the wall portion,
A method for constructing a concrete storage tank, wherein a tensile force is introduced into the tendon material to integrate the concrete segments and introduce a compressive stress in the circumferential direction of the wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003176148A JP3943527B2 (en) | 2003-06-20 | 2003-06-20 | Concrete storage tank and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003176148A JP3943527B2 (en) | 2003-06-20 | 2003-06-20 | Concrete storage tank and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005008240A JP2005008240A (en) | 2005-01-13 |
JP3943527B2 true JP3943527B2 (en) | 2007-07-11 |
Family
ID=34099107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003176148A Expired - Lifetime JP3943527B2 (en) | 2003-06-20 | 2003-06-20 | Concrete storage tank and its construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3943527B2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102111610B1 (en) * | 2018-08-27 | 2020-05-15 | 주식회사 티에프이앤씨 | Silo having hopper manufactured with precast segment and manufacturing method thereof |
JP7117212B2 (en) * | 2018-10-11 | 2022-08-12 | 鹿島建設株式会社 | Storage tank, construction method of storage tank |
JP2020143438A (en) * | 2019-03-04 | 2020-09-10 | 株式会社Ihi建材工業 | Cylindrical structure and pile cap segment |
JP7169930B2 (en) * | 2019-04-10 | 2022-11-11 | 鹿島建設株式会社 | Structures, construction methods of structures |
JP7408465B2 (en) * | 2020-04-01 | 2024-01-05 | 鹿島建設株式会社 | storage tank |
KR102331033B1 (en) * | 2021-08-17 | 2021-12-01 | 한국건설기술연구원 | Structure and reinforcing method of in-service liquid storage tank stiffened by prestressed ring |
-
2003
- 2003-06-20 JP JP2003176148A patent/JP3943527B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2005008240A (en) | 2005-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108699796B (en) | Base for wind turbine | |
US5826387A (en) | Pier foundation under high unit compression | |
CN108699797B (en) | Base for wind turbine | |
JP4512899B2 (en) | Construction method of large cylindrical concrete structures for LNG storage tanks. | |
CN211714003U (en) | Center cylinder, tower cylinder foundation and tower cylinder | |
US20120291394A1 (en) | Grout Template and Method of Use for Wind Turbine Foundations | |
CA3106298A1 (en) | Foundation for a windmill | |
JP3943527B2 (en) | Concrete storage tank and its construction method | |
KR20010100042A (en) | Earthquake-resistant forced constitution of bridge pier | |
JP3842581B2 (en) | Construction method of cylindrical PC container | |
JP4541573B2 (en) | Prestressed concrete storage tank and prestressed concrete storage tank construction method | |
JP2019100087A (en) | Pile head isolation structure and construction method thereof | |
US4154029A (en) | Steel concrete container and a process for erecting the same | |
JP4309835B2 (en) | Concrete storage tank and its construction method | |
JP3947622B2 (en) | Side wall of PC storage tank | |
JP2011084967A (en) | Connection structure of column of building and prefabricated pile | |
JP3044459B2 (en) | Tower structure construction method | |
JPH0434161A (en) | Centrifugally molded hollow pc concrete column and column construction method | |
KR200239887Y1 (en) | Earthquake-resistant forced constitution of bridge pier | |
JP7232661B2 (en) | Structures, construction methods of structures | |
JP7169930B2 (en) | Structures, construction methods of structures | |
JP7537982B2 (en) | Pile head seismic isolation structure and construction method thereof | |
JP2006348480A (en) | Building and building forming method | |
JP7175792B2 (en) | Structures, construction methods of structures | |
RU2782015C2 (en) | Foundation for wind power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041207 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20061102 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20061114 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070112 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070206 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070327 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070405 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 3943527 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130413 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130413 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160413 Year of fee payment: 9 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |