JP3891340B2 - Passenger conveyor installation method - Google Patents

Passenger conveyor installation method Download PDF

Info

Publication number
JP3891340B2
JP3891340B2 JP2002049923A JP2002049923A JP3891340B2 JP 3891340 B2 JP3891340 B2 JP 3891340B2 JP 2002049923 A JP2002049923 A JP 2002049923A JP 2002049923 A JP2002049923 A JP 2002049923A JP 3891340 B2 JP3891340 B2 JP 3891340B2
Authority
JP
Japan
Prior art keywords
unit
balustrade
divided
passenger conveyor
body frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002049923A
Other languages
Japanese (ja)
Other versions
JP2003246573A (en
Inventor
忠一 斎藤
芳孝 山崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Ltd
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd, Hitachi Building Systems Co Ltd filed Critical Hitachi Ltd
Priority to JP2002049923A priority Critical patent/JP3891340B2/en
Publication of JP2003246573A publication Critical patent/JP2003246573A/en
Application granted granted Critical
Publication of JP3891340B2 publication Critical patent/JP3891340B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、エスカレーターや動く歩道のような乗客コンベアに係り、特に、その製造から設置に至る据付工法に関する。
【0002】
【従来の技術】
従来、乗客コンベアを建屋内に据付ける方法としては、特開昭62−290693号公報、特許第2505227号公報及び特開平2−123089号公報に示すように、長手方向において分割された本体枠に対して、駆動及び踏板等を組込みこの状態で現地に搬入し据付けるというもの、或いは、特許第254345号に示すように、左右上側に欄干リニューアル部を立設した上階側、並びに下階側フレームに分割してユニット化して運搬するようにしたもの、又は、特開平11−92067号公報に示すように、工場で、駆動系・踏板等の移動系・欄干等の意匠系全てを組込んだ一体品を形成し、これを、トレーラー等の大型運搬車で現地に運搬し、大型クレーン等で吊り上げ現地に据付けるものが知られている。
【0003】
【発明が解決しようとする課題】
上記前者の従来工法では、本体枠にのみ組込んだものを搬入し、その後、欄干や配線等の組込みが現地で行われる。このため、環境の悪い現地作業が多くあり、据付け作業の短縮化にはそれほどのの効果を得ることができなかった。また、特許第254345号のものも、上下端部の欄干を組込んだ分、現地での組立ての時間は短縮できるが、その他の欄干の組込み、配線等の組込み作業が現地でなされるため、前者のかかえる問題を解決するものとはいえなかった。更に、後者の一体搬入は、現地での据付け作業が無くなる点で大幅な据付け作業の短縮化を計ることができる反面、運搬に大型トレーラーが必要となり、道路運搬の面で多大の制約があり実用化に問題があった。
【0004】
本発明の目的は、運搬に大型等の運搬車を要することなく、かつ据付け作業の短縮化を計ることのできる乗客コンベアの据付工法を提供することにある。
【0005】
【課題を解決するための手段】
本発明の請求項1では、上記目的を達成するために、多数連結された踏板と、踏板を駆動させる駆動系と、側壁となる欄干と、これらを強度保持する踏板の連結方向に長い本体枠等を製造工場で製造して輸送し、据付現場に設置する乗客コンベアの据付工法において、上記据付現場以外の場所で、上記踏板と、上記駆動系と、上記欄干とを組み付けて全体ユニットを形成し、次いで、この全体ユニットに形成された上記乗客コンベアを、上記踏板と、上記駆動系と、上記欄干の組込まれた状態で、少なくても下部ユニット・上部ユニットの複数の分割ユニットに分割し、かつ、上記欄干の踏板連結方向における欄干端部と上記多数連結された連結踏板端部とは、上記本体枠の接続端部よりも後退した位置に位置するように構成し、この後、この分割ユニットを輸送手段により据付現場まで運搬し、しかる後、据付現場内に吊り上げ及び吊り降ろす揚重工程によって据付場所に設置し、その後、調整を行い据付けるようにしたものである。
【0007】
上記請求項1の構成によれば、欄干を含めた分割ユニットの本体枠の全長がコンバク化され、当然全重量が軽減されて運搬、搬入に際して小回りがきくばかりか、欄干や踏板、駆動系、配線等ほぼすべてが組込まれているため、現地での据付け作業の大幅な短縮化を図ることができる。また、欄干端部が本体枠の接続端部よりも後退しているので運搬、搬入に際してその破損を防止するという顕著な効果を達成する。
【0009】
【発明の実施の形態】
以下、本発明の乗客コンベアの据付工法の一実施形態を図に基いて説明する。
【0010】
図1は本発明の乗客コンベアの据付工法の一実施形態になる作業行程を示す流れ図、図2は図1の内容を詳細に示した説明図、図3は乗客コンベアの組立状態を示す全体斜視図、図4は図1の下部を分割した下部ユニット状態を示す側面図、図5は図1の上部を分割した上部ユニット状態を示す側面図、図6は図1の中間部を分割した中間ユニット状態を示す側面図、図7は運搬状態を示す側面図、図8は図3の要部に運搬補助具を取付けた斜視図、図9は揚重・設置工程を示す正面図である。
【0011】
図1に示すように主として3工程、すなわち、製造工程において、本体枠に対し、工場で製造された各構成部品(装置)を組付けて全体ユニットを形成し、この全体ユニットを3分割に解体して分割ユニットを形成したあと、各分割ユニットに運搬補助具の組付けと養生を行って、次に運搬工程において、据付現場への運搬を行い、その後、揚重・設置工程において、吊り上げ、吊り降ろしと接続・設置、据付現場の建屋梁に乗置した状態で各部分の必要な精度確保のための全体的な精度調整、本体枠の側部と底部を化粧する外装板の組付けなどの仕上げ・完成工程を経て乗客コンベアの据付作業を完了するものである。なお、図1の前段の部品製造、後段の運転(乗客輸送)開始については説明を省略する。
【0012】
本発明の構成は、図1の内容を詳述した図2のように、乗客コンベアの組立てに関わるほとんどの作業を工場あるいは据付現場以外の場所で実施でき組立作業が効率的環境(建築現場に比べ室温、埃塵対策が容易、運搬や足場に適した設備の用意が簡単、作業工具の用意も簡単、特に溶接管理、火花対策が容易)下で実施できる利点がある。例えば、製造工程において、本体枠を主体にした全体ユニットの形成の場合、駆動系の組付けとして、本体枠に、モータ、減速機、ブレーキ、踏板駆動歯車、踏板、駆動用チェーン、制御盤、安全装置、電気配線などの作業が行われ、意匠・構造系の組付けとして、欄干、ハンドレール、乗降床体などの作業が行われる。
具体的には、図3に示すように、乗客コンベア1は、これの全構成部品が製造されたのち、強度部材となる本体枠2(トラスフレームとも称し、踏板の連結方向である長手方向で分割してボルト接合するのが普通である)に対して上部機械室2Aの中にモータ、減速機、ブレーキ、踏板駆動歯車、駆動用チェーン、制御盤、安全装置、電線等(いずれも図示省略)を組付け、収納して想像線Aが水平あるいは傾斜30度の状態で組立てられている。また、この乗客コンベア1の長手方向には、多数の踏板3と踏板チェーン、踏板レール(いずれも詳細な図示省略)、欄干パネル5A、欄干デッキ5B、スカートガード5C等からなる欄干5、ハンドレール6が組付けられているほか、その長手方向の両端部には、乗降床体7が組付けられて各々が上部機械室2Aと下部機械室2Bの上向き開口面を塞いでいる。さらに、上記本体枠2の長手方向両端部には、建屋梁(図示省略)に乗客コンベア1を乗置するための支持台2Cが一体的に接合され、全体ユニット100が形成される。そして、この全体ユニット100は、それが完成したあとに、その長手方向が長さL1の分割本体枠101単位の下部ユニット104、長さL2の分割本体枠102単位の上部ユニット105、長さL3の分割本体枠103単位の中間部ユニット106に、それぞれの接続部T1,T2が解体されて分割される。そして、下部ユニット104は図4のように、上部ユニット105は図5のように、中間部ユニット106は図6のように独立した組立ユニットを形成する。この場合、分割本体枠101の接続端部101Aに対して欄干端部5aと連結踏板端部3Aが長さm1、分割本体枠102の接続端部102Aに対して欄干端部5bと連結踏板端部3Bが長さm2、分割本体枠103の接続端部103Aに対して欄干端部5cと連結踏板端部3Cが長さm3だけ後退した位置に設定されて、運搬時などに欄干端部5a,5b,5cと連結踏板端部3A,3B,3Cを保護するようになっている。
【0013】
さらに、上記長さm1と一方の長さm3,長さm2と他方の長さm3の長さ寸法は欄干パネル5Aのうちの中間欄干パネル5dの長さm4相当に設定されており、各々の接続端部101A,102A,103Aを接続した時に欄干パネル5Aの継目がバランス良く配置されるように意匠的配慮を加えてある。この場合、長さm1,m2,m3部分に配置される欄干パネル(図示省略)の支持台5e,5f,5gがそれぞれの分割本体枠101,102,103にあらかじめセットされていて、現地作業量の縮減に寄与する構成となっている。なお、図示には連結踏板端部3A,3B,3Cを1個のみ示してあるが、踏板3は、分割本体枠101,102,103の長手方向の往復路に連続配置されているものである。
【0014】
また、上記全体ユニット100には、図8に示すような施策が講じられている。即ち、図8に示すように、上記全体ユニット100が備える本体枠2の長手方向両端部に接合された支持台2Cに対して、これに設けたネジ穴にねじ込まれるボルト8で運搬補助具9が一体的に接合されている。また、この運搬補助具9には、後述する吊りロープ14を装着する金具9Aや穴9Bが設けられている。
【0015】
上記下部ユニット104、上部ユニット105及び中間部ユニット106は、図1、図2に示した運搬工程において、図7に下部ユニット104を代表例として示すような状態で製造工場あるいはこれに属する据付現場以外の倉庫、空地等で運搬車11に積み込まれて据付現場まで輸送される。この場合、従来の長さNの完成ユニット(図7の想像線Y)を載せる方式に比べて運搬車11の荷台(長さn)が小型対応でき、また、荷高Hも相当に低く抑えることができることから運搬路の道路幅、通行高さに余裕ができることになる。
【0016】
また、上記下部ユニット104、上部ユニット105及び中間部ユニット106は、図1、図2に区分した揚重、設置工程前あるいは設置工程と同時に各々の分割本体枠101,102及び103の接続端部101A,102A及び103Aが接続されて、例えば図3のような荷姿で、図9に示すように乗客コンベア1が設置される据付現場の建屋12の所において、揚重クレーン13に架けられた吊りロープ14を上記運搬補助具9に接合し、吊り上げ(図9のA)られ、建屋12の中で建屋梁12Aの所定位置に吊り降ろされ(図9のB)て設置される。
【0017】
最後に、精度調整、外装板の取付け、電気の接続、清掃作業の仕上げ、完成工程を経て乗客輸送を開始し、サービスに供するものである。なお、ハンドレール6は、全体ユニット100が各ユニット(下部ユニット104など)に分割される関係上、全体ユニット100から完全に取外して図6の符号6Aのように別梱包輸送して乗客コンベア1を建屋梁12Aに設置したあと取付けるか、または、図4の符号Zのように下部ユニット104に装着して輸送するものである。また、分割本体枠101,102及び103の接続端部101A,102A及び103Aより後退した欄干端部5a,5bおよび5c相当部分の欄干5、それに踏板3は、各々の分割本体枠101,102及び103を接続したあとで追加的に組付けて完成させるものである。
【0018】
上記構成は、エスカレーター式の乗客コンベアを例に説明したが、動く歩道の場合でも同様であり、分割本体枠101なども例示の3分割によらず、2分割やそれ以上の分割形態においても同様である。また、現場の近傍で分割ユニットを一体化した後、設置場所への運搬を行うようにしたが、分割ユニットのままで設置場所に運搬し、この場所で組上げるようにしてもよい。この場合、現場に大型のクレーンを必要とせず、大型のクレーンのない現場にも対応できる。
【0019】
【発明の効果】
以上説明したように本発明によれば、製造から設置に至る輸送及び搬入に適した荷姿形態となり、工期短縮、作業効率化、欄干の破損防止等の効果を備えた乗客コンベアの据付工法を提供できる。
【図面の簡単な説明】
【図1】図1は本発明の乗客コンベアの据付工法の一実施形態になる作業行程を示す流れ図である。
【図2】図1の内容を詳細に示した説明図である。
【図3】乗客コンベアの組立状態を示す全体斜視図である。
【図4】図1の下部を分割した下部ユニット状態を示す側面図である。
【図5】図1の上部を分割した上部ユニット状態を示す側面図である。
【図6】図1の中間部を分割した中間ユニット状態を示す側面図である。
【図7】運搬状態を示す側面図である。
【図8】図3の要部に運搬補助具を取付けた斜視図である。
【図9】揚重・設置工程を示す正面図である。
【符号の説明】
1 乗客コンベア
2 本体枠
2A 上部機械室
2B 上部機械室
3 踏板
3A,2B,3C 連結踏板端部
5 欄干
5a,5b,5c 欄干端部
6,6A,Z ハンドレール
7 乗降床体
9 運搬補助具
11 運搬車
12 建屋
12A 建屋梁
13 揚重クレーン
100 全体ユニット
101,102,103 分割本体枠
104 下部ユニット
105 上部ユニット
106 中間部ユニット
101A,102A,103A 接続端部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to passenger conveyors such as escalators and moving walkways, and more particularly to an installation method from manufacturing to installation.
[0002]
[Prior art]
Conventionally, as a method of installing a passenger conveyor in a building, as shown in JP-A-62-290693, JP-A-2505227, and JP-A-2-120289, a main body frame divided in the longitudinal direction is used. On the other hand, drive and tread board etc. are installed and brought into the site in this state, or as shown in Japanese Patent No. 254345, the upper floor side where the balustrade renewal part is erected on the left and right upper side, and the lower floor side As a unit divided into frames and transported, or as shown in Japanese Patent Application Laid-Open No. 11-92067, all design systems such as driving systems, moving systems such as treads and balustrades are incorporated at the factory. However, it is known to form a monolithic product, transport it to the site with a large transport vehicle such as a trailer, and lift it with a large crane and install it on the site.
[0003]
[Problems to be solved by the invention]
In the former conventional construction method, what is incorporated only in the main body frame is carried in, and then the balustrade and wiring are incorporated locally. For this reason, there are many on-site work with poor environment, and it was not possible to obtain such an effect for shortening the installation work. Also, in the case of Patent No. 254345, assembling time at the site can be shortened by incorporating the balustrades at the upper and lower ends, but assembling work for other balustrades, wiring, etc. is done locally, It could not be said that it solved the former problem. In addition, the latter integrated loading can greatly reduce the installation work in that the installation work at the site is eliminated, but on the other hand, a large trailer is required for transportation, and there are a lot of restrictions in terms of road transportation. There was a problem.
[0004]
An object of the present invention is to provide a passenger conveyor installation method that does not require a large-sized transport vehicle for transportation and that can shorten the installation work.
[0005]
[Means for Solving the Problems]
According to claim 1 of the present invention, in order to achieve the above-mentioned object, a main body frame that is long in the connecting direction of a multi-connected step board, a drive system that drives the tread board, a balustrade that serves as a side wall, and a tread that holds these strengths In a passenger conveyor installation method that is manufactured and transported at a manufacturing plant, etc., the entire unit is formed by assembling the step board, the drive system, and the balustrade at a location other than the installation site. Then, the passenger conveyor formed in the overall unit is divided into at least a plurality of divided units of a lower unit and an upper unit in a state where the step board, the drive system, and the balustrade are incorporated. and, the balustrade end and the number linked coupling step board ends in step board connecting direction of the balustrade, and configured to be located at a position recessed from the connection end of the main body frame, thereafter, this The division unit transported by transport means to the installation site, thereafter installed in the installation site by lifting the installation site within and hanging down lifting step, in which then to installing make adjustments.
[0007]
According to the configuration of claim 1 above, the total length of the main body frame of the divided unit including the balustrade is converted into a natural structure, naturally the total weight is reduced and not only a small turn is made when transporting and carrying in, the balustrade, the tread board, the drive system, Almost all of the wiring is built in, so the installation work at the site can be greatly shortened. Further, since the balustrade end portion is retracted from the connection end portion of the main body frame, a remarkable effect of preventing breakage during transportation and carrying-in is achieved.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of a passenger conveyor installation method of the present invention will be described with reference to the drawings.
[0010]
FIG. 1 is a flowchart showing an operation process according to an embodiment of the passenger conveyor installation method of the present invention, FIG. 2 is an explanatory diagram showing the details of FIG. 1, and FIG. 3 is an overall perspective view showing the assembly state of the passenger conveyor. 4 is a side view showing a lower unit state where the lower part of FIG. 1 is divided, FIG. 5 is a side view showing an upper unit state where the upper part of FIG. 1 is divided, and FIG. 6 is an intermediate part where the intermediate part of FIG. FIG. 7 is a side view showing the unit state, FIG. 7 is a side view showing the carrying state, FIG. 8 is a perspective view with the carrying aid attached to the main part of FIG. 3, and FIG. 9 is a front view showing the lifting / installation process.
[0011]
As shown in FIG. 1, in the main three steps, that is, in the manufacturing process, each component (apparatus) manufactured at the factory is assembled to the main body frame to form an entire unit, and the entire unit is disassembled into three parts. After forming the split unit, assembly and curing of the transport aids are performed on each split unit, then transported to the installation site in the transport process, and then lifted in the lifting / installation process. Suspension and connection / installation, overall accuracy adjustment to ensure the required accuracy of each part while mounted on the building beam at the installation site, assembly of exterior plates that make up the side and bottom of the body frame, etc. The passenger conveyor installation work is completed through the finishing and finishing process. In addition, description is abbreviate | omitted about the manufacture of components of the front | former stage of FIG.
[0012]
As shown in FIG. 2 which details the contents of FIG. 1, the configuration of the present invention can perform most of the work related to the assembly of passenger conveyors at a place other than the factory or the installation site, and the assembly work is an efficient environment (in the construction site). Compared to room temperature, dust countermeasures are easy, equipment suitable for transportation and scaffolding is easy to prepare, work tools are easy to prepare, especially welding management and spark countermeasures are easy). For example, in the manufacturing process, in the case of forming an entire unit mainly composed of a main body frame, as an assembly of the drive system, a motor, a speed reducer, a brake, a tread plate driving gear, a tread plate, a drive chain, a control panel, Work such as safety devices and electrical wiring is performed, and work such as railings, handrails, and landing floors are performed as assembly of the design / structure system.
Specifically, as shown in FIG. 3, the passenger conveyor 1 has a main body frame 2 (also called a truss frame, which is a strength member) after all of its components are manufactured. In the upper machine room 2A, motors, speed reducers, brakes, tread drive gears, drive chains, control panels, safety devices, electric wires, etc. (all not shown) ) Is assembled and stored, and the imaginary line A is assembled in a state of being horizontal or inclined at 30 degrees. Further, in the longitudinal direction of the passenger conveyor 1, a large number of treads 3, a tread chain, tread rails (all not shown in detail), a balustrade 5 comprising a balustrade panel 5A, a balustrade deck 5B, a skirt guard 5C, and a hand rail 6 is assembled, and at both ends in the longitudinal direction, a getting-on / off floor body 7 is assembled so as to block the upward opening surfaces of the upper machine room 2A and the lower machine room 2B, respectively. Furthermore, support units 2C for placing the passenger conveyor 1 on building beams (not shown) are integrally joined to both ends in the longitudinal direction of the main body frame 2 to form the entire unit 100. Then, after the entire unit 100 is completed, the lower unit 104 of the divided main body frame 101 unit of the length L1 in the longitudinal direction, the upper unit 105 of the divided main body frame unit 102 of the length L2, the length L3. The connecting portions T1 and T2 are disassembled and divided into the intermediate unit 106 of the divided main body frame 103 unit. The lower unit 104 forms an independent assembly unit as shown in FIG. 4, the upper unit 105 forms an independent unit as shown in FIG. 5, and the intermediate unit 106 forms an independent assembly unit as shown in FIG. In this case, the balustrade end portion 5a and the connecting tread plate end portion 3A have a length m1 with respect to the connecting end portion 101A of the divided main body frame 101, and the balustrade end portion 5b and the connecting tread plate end with respect to the connecting end portion 102A of the divided main body frame 102. The part 3B is set to a length m2, and the balustrade end part 5c and the connecting tread board end part 3C are set to a position retracted by the length m3 with respect to the connection end part 103A of the divided main body frame 103. , 5b, 5c and the connecting tread plate end portions 3A, 3B, 3C are protected.
[0013]
Further, the length m1, the length m3, the length m2, and the other length m3 are set to be equivalent to the length m4 of the middle balustrade panel 5d of the balustrade panel 5A. Design considerations are added so that the joints of the balustrade panel 5A are arranged in a well-balanced manner when the connecting ends 101A, 102A, 103A are connected. In this case, the support bases 5e, 5f, and 5g of balustrade panels (not shown) arranged in the length m1, m2, and m3 portions are set in advance on the respective divided main body frames 101, 102, and 103, and the field work amount It is the composition which contributes to the reduction of. Although only one connecting tread plate end 3A, 3B, 3C is shown in the drawing, the tread plate 3 is continuously arranged in the longitudinal reciprocating path of the divided main body frames 101, 102, 103. .
[0014]
Further, the overall unit 100 has a measure as shown in FIG. That is, as shown in FIG. 8, with respect to the support base 2C joined to both ends in the longitudinal direction of the main body frame 2 provided in the overall unit 100, the transport aid 9 is secured with the bolts 8 screwed into the screw holes provided in the support base 2C. Are integrally joined. In addition, the carrying aid 9 is provided with a metal fitting 9A and a hole 9B for mounting a hanging rope 14 described later.
[0015]
The lower unit 104, the upper unit 105, and the intermediate unit 106 are manufactured at the manufacturing plant or the installation site belonging thereto in a state where the lower unit 104 is shown as a representative example in FIG. 7 in the transportation process shown in FIGS. In other warehouses, open spaces, etc., they are loaded onto the transport vehicle 11 and transported to the installation site. In this case, the loading platform (length n) of the transport vehicle 11 can be reduced in size and the load height H can be considerably reduced as compared with the conventional method of placing a completed unit of length N (imaginary line Y in FIG. 7). As a result, the road width and traffic height of the transportation road can be afforded.
[0016]
Further, the lower unit 104, the upper unit 105, and the intermediate unit 106 are connected to the ends of the divided main body frames 101, 102, and 103 before or simultaneously with the lifting, installation process divided into FIGS. 101A, 102A, and 103A are connected, for example, in the state of packing as shown in FIG. 3, and hung on a lifting crane 13 at the installation site building 12 where the passenger conveyor 1 is installed as shown in FIG. The suspension rope 14 is joined to the transport aid 9 and lifted (A in FIG. 9), and suspended in the building 12 at a predetermined position of the building beam 12A (B in FIG. 9) and installed.
[0017]
Finally, passenger transportation is started through a precision adjustment, installation of exterior plates, connection of electricity, finishing of cleaning work, and a completion process, which are then provided for service. The handrail 6 is completely removed from the whole unit 100 and transported in a separate package as indicated by reference numeral 6A in FIG. 6 so that the whole unit 100 is divided into each unit (lower unit 104, etc.). Is mounted on the building beam 12A or attached to the lower unit 104 and transported as indicated by reference numeral Z in FIG. Also, the balustrade end portions 5a, 5b and 5c corresponding to the balustrade end portions 5a, 5b and 5c retreated from the connection end portions 101A, 102A and 103A of the divided main body frames 101, 102 and 103, and the step board 3 are divided into the respective divided main body frames 101, 102 and After connecting 103, additional assembly is completed.
[0018]
Although the above configuration has been described by taking an escalator type passenger conveyor as an example, the same applies to a moving sidewalk, and the divided main body frame 101 and the like are not divided into three illustrated examples, and the same applies to two or more divided forms. It is. Further, the division unit is integrated in the vicinity of the site, and then transported to the installation location. However, the division unit may be transported to the installation location as it is and assembled at this location. In this case, a large crane is not required at the site, and it can be applied to a site without a large crane.
[0019]
【The invention's effect】
As described above, according to the present invention, there is a packaging form suitable for transportation and carry-in from manufacturing to installation, and a passenger conveyor installation method having effects such as shortening the work period, improving work efficiency, preventing railing damage, etc. Can be provided.
[Brief description of the drawings]
FIG. 1 is a flowchart showing a work process according to an embodiment of a passenger conveyor installation method of the present invention.
FIG. 2 is an explanatory diagram showing the details of FIG. 1 in detail.
FIG. 3 is an overall perspective view showing an assembled state of a passenger conveyor.
FIG. 4 is a side view showing a lower unit state in which the lower part of FIG. 1 is divided.
FIG. 5 is a side view showing an upper unit state in which the upper part of FIG. 1 is divided.
6 is a side view showing an intermediate unit state in which the intermediate part of FIG. 1 is divided. FIG.
FIG. 7 is a side view showing a transporting state.
8 is a perspective view in which a transport aid is attached to the main part of FIG. 3. FIG.
FIG. 9 is a front view showing a lifting / installation process.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Passenger conveyor 2 Main body frame 2A Upper machine room 2B Upper machine room 3 Tread board 3A, 2B, 3C End part 5 Connection balustrade 5a, 5b, 5c Railing edge part 6, 6A, Z Handrail 7 Boarding / alighting body 9 Carrying aid DESCRIPTION OF SYMBOLS 11 Transport vehicle 12 Building 12A Building beam 13 Lifting crane 100 Whole unit 101,102,103 Divided main body frame 104 Lower unit 105 Upper unit 106 Middle unit 101A, 102A, 103A Connection end

Claims (2)

多数連結された踏板と、踏板を駆動させる駆動系と、側壁となる欄干と、これらを強度保持する踏板の連結方向に長い本体枠等を製造工場で製造して輸送し、据付現場に設置する乗客コンベアの据付工法において、
上記据付現場以外の場所で、上記踏板と、上記駆動系と、上記欄干とを組み付けて全体ユニットを形成し、次いで、この全体ユニットに形成された上記乗客コンベアを、上記踏板と、上記駆動系と、上記欄干の組込まれた状態で、少なくても下部ユニット・上部ユニットの複数の分割ユニットに分割し、かつ、上記欄干の踏板連結方向における欄干端部と上記多数連結された連結踏板端部とは、上記本体枠の接続端部よりも後退した位置に位置するように構成し、この後、この分割ユニットを輸送手段により据付現場まで運搬し、しかる後、据付現場内に吊り上げ及び吊り降ろす揚重工程によって据付場所に設置し、その後、調整を行い据付けるようにしたことを特徴とする乗客コンベアの据付工法。
A large number of treads connected to each other, a drive system that drives the treads, a balustrade that serves as a side wall, and a body frame that is long in the connecting direction of the treads that hold these strengths are manufactured and transported at the manufacturing plant and installed at the installation site. In the installation method for passenger conveyors,
At a place other than the installation site, the step board, the drive system, and the balustrade are assembled to form a whole unit, and then the passenger conveyor formed in the whole unit is replaced with the step board and the drive system. In the state where the balustrade is assembled, it is divided into at least a plurality of divided units of a lower unit and an upper unit , and a balustrade end portion in the baling plate connecting direction of the balustrade and an end portion of the connecting tread plate connected in large numbers Is configured to be located at a position retracted from the connection end of the main body frame, and thereafter, the divided unit is transported to the installation site by means of transportation, and then is lifted and suspended in the installation site. A passenger conveyor installation method, characterized in that it is installed at the installation site by a lifting process and then adjusted and installed.
請求項1において、上記本体枠の接続端部に予め欄干用の支持台をセットしたことを特徴とする乗客コンベアの据付工法。The passenger conveyor installation method according to claim 1, wherein a railing support base is set in advance at a connection end of the main body frame .
JP2002049923A 2002-02-26 2002-02-26 Passenger conveyor installation method Expired - Lifetime JP3891340B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002049923A JP3891340B2 (en) 2002-02-26 2002-02-26 Passenger conveyor installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002049923A JP3891340B2 (en) 2002-02-26 2002-02-26 Passenger conveyor installation method

Publications (2)

Publication Number Publication Date
JP2003246573A JP2003246573A (en) 2003-09-02
JP3891340B2 true JP3891340B2 (en) 2007-03-14

Family

ID=28662313

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002049923A Expired - Lifetime JP3891340B2 (en) 2002-02-26 2002-02-26 Passenger conveyor installation method

Country Status (1)

Country Link
JP (1) JP3891340B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006256802A (en) * 2005-03-17 2006-09-28 Mitsubishi Electric Corp Lifting method of passenger conveyor
JP4907202B2 (en) * 2006-03-20 2012-03-28 東芝エレベータ株式会社 Passenger conveyor manufacturing method
JP2008207913A (en) * 2007-02-26 2008-09-11 Toshiba Elevator Co Ltd Escalator container transportation tool and container transportation method

Also Published As

Publication number Publication date
JP2003246573A (en) 2003-09-02

Similar Documents

Publication Publication Date Title
KR101320972B1 (en) Truss construction for a passenger conveyor
US6685002B1 (en) Method of escalator modernization
WO2019015243A1 (en) Shaft module splicing system and splicing method therefor
KR0141461B1 (en) Method of making step and stairway, its elements
JP3891340B2 (en) Passenger conveyor installation method
JPH03138294A (en) Passenger conveyor reconstructing method
CN108217405B (en) Work platform device
US6247574B1 (en) Escalator installation method
JP3386819B2 (en) Method of installing passenger conveyor in building and method of transporting passenger conveyor
JP2000198648A (en) Passenger conveyer and its lifting method
JP2543945B2 (en) Escalator packing and shipping method
JP2683171B2 (en) Construction transport scaffolding equipment
JPH07215647A (en) Temporary stair for escalator
JP2001335255A (en) Elevator installation construction method, and elevator installation unit
JP3304637B2 (en) Step conveyor for passenger conveyor
JP3482933B2 (en) Passenger conveyor
CN207903727U (en) Passenger conveyors
CN113863684B (en) Construction method of stepped double-layer steel truss
WO2023046293A1 (en) Method for constructing an elevator arrangement and an elevator arrangement
JPH10280555A (en) Unit type elevator
JP2002356289A (en) Apparatus for construction works and installation work method for inclined elevator
JPH11335032A (en) Coupling structure for elevator guide rail and installation method therefor
CN117957182A (en) Method for constructing an elevator installation and elevator installation
JPH08326323A (en) Constructing device for multistoried building
JP2573734Y2 (en) Steel frame stairs

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040216

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060418

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060614

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061121

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061129

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3891340

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101215

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101215

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111215

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111215

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121215

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131215

Year of fee payment: 7

EXPY Cancellation because of completion of term