JP3880130B2 - One can two water channel hot water supply apparatus and control method thereof - Google Patents

One can two water channel hot water supply apparatus and control method thereof Download PDF

Info

Publication number
JP3880130B2
JP3880130B2 JP12636897A JP12636897A JP3880130B2 JP 3880130 B2 JP3880130 B2 JP 3880130B2 JP 12636897 A JP12636897 A JP 12636897A JP 12636897 A JP12636897 A JP 12636897A JP 3880130 B2 JP3880130 B2 JP 3880130B2
Authority
JP
Japan
Prior art keywords
hot water
combustion
piping system
water supply
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP12636897A
Other languages
Japanese (ja)
Other versions
JPH10300198A (en
Inventor
徹哉 佐藤
久恭 渡辺
寿久 斎藤
良彦 田中
Original Assignee
株式会社ガスター
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ガスター filed Critical 株式会社ガスター
Priority to JP12636897A priority Critical patent/JP3880130B2/en
Publication of JPH10300198A publication Critical patent/JPH10300198A/en
Application granted granted Critical
Publication of JP3880130B2 publication Critical patent/JP3880130B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control For Baths (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、一缶二水路式の給湯装置の制御方法に関する。
【0002】
【従来の技術】
一般に、一缶二水路式給湯装置は、一つのバーナおよび熱交換器を、給湯配管系と追焚配管系とで共用している。したがって、装置全体を小型化することができるとともに安価に製造することができる等のメリットがある。
【0003】
ところがその反面、一缶二水路式給湯装置においては、給湯配管系と追焚配管系とで一つの熱交換器を共用しているため、各種の不具合もある。例えば、追焚燃焼中には、熱交換器に設置された給湯配管系の給湯水管(受熱管)内の滞留水が高温に加熱される。このため、給湯配管系の使用時には、使用開始直後に高温の湯が給湯栓から吐出され、使用者に苦痛を与えるおそれがある。そこで、特開平6−272954号公報に記載のものにおいては、追焚終了後に追焚配管系の循環用ポンプで運転(ポストポンプ)して風呂水を所定時間循環させ、給湯水管内の滞留水の温度を低下させるようにしている。
【0004】
【発明が解決しようとする課題】
しかしながら、一缶二水路式給湯装置においては、未だ解決されていない問題がある。
例えば、給湯配管系の使用を一旦停止した直後に再度給湯配管系を使用すると、後沸き現象によって高温になった給湯水管内の湯が給湯栓から吐出されるため、使用者に苦痛を与えることがあり、このような事態は上記公報に記載のものでは解消することができない。
また、使用者が給湯栓を開いてから給湯装置が燃焼を開始し、その燃焼熱によって給水が湯になるまでの間は、設定温度より低い湯が出湯されるという、いわゆるアンダーシュートが発生するが、これを防止するために熱交換器内に所定温度範囲の温水を確保する必要がある。もし、そのような温水を確保することができなければ、アンダーシュートが発生し、使用者に不快感を与えてしまうからである。
さらに、追焚開始直後に使用者によって追焚が停止された場合にポストポンプが行われると、風呂内の冷水が循環するため、熱交換器が冷却されて結露が発生するという問題がある。さらに、追焚燃焼中に、給湯配管系を流れる水量をフローセンサが検出することができない程度に給湯栓14が誤って開かれたような場合には、バーナの燃焼量が増加しないにも拘わらず追焚用の燃焼熱が給湯側に費やされてしまうため、追焚燃焼が終了しないような事態に陥ってしまう。
【0005】
【課題を解決するための手段】
上記の問題を解決するために、請求項1の発明は、給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部と、上記燃焼部を制御するとともに、上記追焚配管系に接続された浴槽の水を循環させるポンプの運転を制御する制御部とを備えた一缶二水路式給湯装置において、上記制御部は、少なくとも燃焼停止中、またはポンプ運転を伴って燃焼を実行中のいずれか一方において、記給湯配管系の受熱管内の湯の温度が所定のポンプ運転温度より高いときには上記ポンプを運転状態にし、上記湯の温度が上記ポンプ運転温度以下であるときには上記ポンプを停止状態にすることを特徴とする。
【0006】
請求項2の発明は、給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部と、上記燃焼部を制御するとともに、上記追焚配管系に接続された浴槽の水を循環させるポンプの運転を制御する制御部とを備えた一缶二水路式給湯装置において、上記制御部は、上記燃焼部での燃焼停止中に、上記給湯配管系の受熱管内の湯の温度が所定のポンプ運転温度より高いときには上記ポンプを運転状態にし、上記湯の温度が上記ポンプ運転温度以下であるときには上記ポンプを停止状態にすることを特徴とする。
請求項3の発明は、給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部と、上記燃焼部を制御するとともに、上記追焚配管系に接続された浴槽の水を循環させるポンプの運転を制御する制御部とを備えた一缶二水路式給湯装置において、上記制御部は、上記ポンプ運転と燃焼部での燃焼を行って追焚を実行中に、上記給湯配管系の受熱管内の湯の温度が上記ポンプ運転温度に所定の時間経過しても達しないとき、またはポンプ運転温度以下に下がったときには、ポンプを停止させるとともに燃焼を停止させることを特徴とする。
請求項4の発明は、請求項1〜3のいずれかに記載の一缶二水路式給湯装置において、上記制御部は、上記ポンプ運転と燃焼を伴った追焚実行時において、給湯配管系の滞留水の沸騰を防止するために、追焚燃焼 OFF 温度およびこれより低い追焚燃焼ON温度に基づき、燃焼部での燃焼をヒステリシス制御し、上記ポンプ運転温度が上記追焚燃焼ON温度より低い温度に設定されていることを特徴とする。
【0007】
また、請求項5の発明は、給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部とを備え、上記追焚配管系には浴槽の水を循環させるポンプが設けられた一缶二水路式給湯装置において、少なくとも燃焼停止中、またはポンプ運転を伴って燃焼を実行中のいずれか一方において、上記給湯配管系の受熱管内の湯の温度が、所定のポンプ運転温度より高いときには上記ポンプを運転状態にし、上記湯の温度が上記ポンプ運転温度以下であるときには上記ポンプを停止状態にすることを特徴とする。
【0008】
請求項5の発明は、給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部とを備え、上記追焚配管系には浴槽の水を循環させるポンプが設けられた一缶二水路式給湯装置において、燃焼停止中、またはポンプ運転を伴って燃焼を実行中に、上記給湯配管系の受熱管内の湯の温度が、所定のポンプ運転温度より高いときには上記ポンプを運転状態にし、上記湯の温度が上記ポンプ運転温度以下であるときには上記ポンプを停止状態にすることを特徴とする。
請求項6の発明は、給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部とを備え、上記追焚配管系には浴槽の水を循環させるポンプが設けられた一缶二水路式給湯装置において、燃焼停止中に、上記給湯配管系の受熱管内の湯の温度が、所定のポンプ運転温度より高いときには上記ポンプを運転状態にし、上記湯の温度が上記ポンプ運転温度以下であるときには上記ポンプを停止状態にすることを特徴とする。
請求項7の発明は、給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部とを備え、上記追焚配管系には浴槽の水を循環させるポンプが設けられた一缶二水路式給湯装置において、上記ポンプ運転と燃焼部での燃焼を行って追焚を実行中に、上記給湯配管系の受熱管内の湯の温度が上記ポンプ運転温度に所定の時間経過しても達しないとき、またはポンプ運転温度以下に下がったときには、ポンプを停止させるとともに燃焼を停止させることを特徴とする。
請求項8の発明は、請求項5〜7のいずれかに記載の一缶二水路式給湯装置の制御方法において、上記ポンプ運転と燃焼を伴った追焚実行時において、給湯配管系の滞留水の沸騰を防止するために、追焚燃焼 OFF 温度およびこれより低い追焚燃焼ON温度に基づき、燃焼部での燃焼をヒステリシス制御し、上記ポンプ運転温度が上記追焚燃焼ON温度より低い温度に設定されていることを特徴とする。
【0009】
【発明の実施の形態】
以下、この発明の一実施の形態について図1〜図2を参照して説明する。
図1はこの発明に係る一缶二水路式ガス給湯装置の概略構成を示すものであり、この給湯装置は、一つの缶(図示せず)と、この缶の下部に収容されたガスバーナ(熱発生部)1と、缶の上部に収容された熱交換部2と、ガスバーナ1に燃焼空気を供給するためのファン(図示せず)とを有している。上記バーナ1にガスを供給する手段は、ガス管3と、このガス管3にそれぞれ設けられた主電磁開閉弁4および電磁比例弁5とを有している。また、バーナ1の近傍には、点火機構(図示)が配置されている。
【0010】
上記ガスバーナ1および熱交換部2は、給湯配管系10と追焚配管系20との両者に共通に用いられている。すなわち、上記熱交換部2は、多数の薄肉のフィンプレート2aを有しており、このフィンプレート2aには給湯配管系10の受熱管たる給湯水管11と、追焚配管系20の受熱管たる追焚水管21とがそれぞれ貫通状態で配置されている。
【0011】
まず、給湯配管系10について説明すると、上記受熱管11の入口端には、給湯配管系10の給水管12が接続され、出口端には給湯管13が接続されている。給湯管13の末端には給湯栓14が設けられている。また、給水管12と給湯管13との間には、2本のバイパス管15,16が受熱管11と並列に設けられている。図1において、バイパス管15と給水管12および給湯管13との接続点が符号P1,P2でそれぞれ示され、バイパス管16と給水管12および給湯管13との接続点が符号P3,P4でそれぞれ示されている。
【0012】
熱交換部2に近い方のバイパス管15には弁等が設けられておらず、給水管12内を流れ水は、接続点P1において受熱管11側とバイパス管12側とに常に一定の割合(例えば、70:30)で別れる。そして、接続点P2において再び合流する。
【0013】
一方、熱交換部2から遠い方のバイパス管16には、第1の流量制御弁GM2が設けられている。この流量制御弁GM2は、例えば次のように構成されたギアモータ駆動式のものが用いられている。すなわち、ギアモータ駆動式の流量制御弁は、管内に設けられた環状の弁座と、この弁座に対して移動可能な弁体と、この弁体に一端部が固定されたシャフトと、このシャフトの他端部に減速ギヤ列を介して接続されたモータとを有している。上記シャフトは、弁ケースに螺合されている。したがって、モータが回転すると、シャフトがその軸方向へ移動し、これによって弁体と弁座との間の開度を変えることができるようになっている。したがって、接続点P3から給湯水管11側へ流れる水量とバイパス管16側流れる水量との割合は、適宜に変えることができる。なお、流量制御弁GM2と同様に構成された流量制御弁GM1が接続点P2,P4間の給湯管13にも設けられている。
【0014】
上記給湯配管系10には、第1、第2の二つのフローセンサFL1,FL2が設けられている。第1のフローセンサFL1は、接続点P1,P3間の給水管12に配置されており、第2のフローセンサFL2は、接続点P4と給湯栓14との間の給湯管13に配置されている。
【0015】
また、給湯配管系10には、4つの温度センサTHIN、THZ、THOUT、THMIXが設けられている。温度センサTHINは、接続点P3より上流側の給水管12に配置されており、給水温度を検出する。温度センサTHZは、給湯水管11のベンド部に配置されており、給湯水管11内の水の温度を検出する。温度センサTHOUTは、給湯水管11の出口近傍の給湯管13配置されており、給湯水管11から出る湯の温度を検出する。温度センサTHMIXは、接続点P4より下流側の給湯管13に配置されており、給湯栓14から出る湯の温度を検出する。
【0016】
一方、上記追焚配管系20であるが、上記追焚水管21の入口端と浴槽6との間には復路管22が接続され、追焚水管21の出口端と浴槽6との間には往路管23が接続されている。復路管22には、ポンプ24、温度センサTHHRおよび流水スイッチFSが設けられている。温度センサTHHRは、浴槽6から復路管22に流入する湯(または水)の温度を検出する。したがって、温度センサTHHRは、浴槽6内の湯の温度を実質的に検出する。また、流水スイッチFSは、復路管22内を湯が流れているか否かを検出するためのものであり、復路管22内を湯が流れている場合にはON状態になり、流れていない場合にはOFF状態になっている。流水スイッチFSがOFF状態のときには、後述する追焚スイッチがON操作されたとしても、バーナ1を点火させないようになっている。
【0017】
上記給湯配管系10の給湯管13と追焚配管系20の復路管22との間には、浴槽6への湯張りのための注湯管30が設けられており、注湯管30と給湯管13および復路管22との接続点が符号P5,P6で示されている。注湯管30には、電磁開閉弁からなる注湯弁31が設けられている。
【0018】
上記給湯装置は、さらに、制御ユニット50とリモートコントローラ60とを備えている。制御ユニット50には、種々の検出手段からの検出信号が入力される。ここでは、温度センサTHIN、THZ、THOUT、THMIX、THHR、フローセンサFL1,FL2および流水スイッチFSの検出信号が入力されている。なお、以下においては、各検出手段の検出信号には各検出手段と同一の符号を用いるものとする。制御ユニット50は、各検出信号に基づいて、ガス供給手段の主電磁開閉弁4および電磁比例弁5、点火機構、ファン、流量制御弁GM1,GM2、ポンプ24および注湯弁31を制御する。一方、リモートコントローラ60は、運転スイッチ、風呂自動運転スイッチ、追焚スイッチ、温度設定部および表示部(いずれも図示せず)を備えており、これらのスイッチのON、OFF情報、設定温度情報を制御ユニット50に出力するととともに、これの情報を表示部に表示する。後述するように、表示部は制御ユニット50からのエラー情報も表示する。
【0019】
上記構成の給湯装置を用いて給湯、追焚および自動湯張りを行う場合において、まず給湯を行う場合には、リモートコントローラ60の運転スイッチをON状態にし、給湯栓14を開く。すると、制御ユニット50は、設定温度、給水管12に供給される水の給水量FL1、給水温度THIN、出湯温度THOUTおよび給湯量FL2に基づいて電磁比例制御弁5および流量制御弁GM1,GM2を制御する。これにより、出湯栓14から設定温度に等しい温度の湯が吐出される。
なお、電磁比例制御弁5等の制御は、従来のものと同様であり、この発明の要部でもないので、その詳細な説明は省略する。これは、次の追焚および自動湯張りについても同様である。また、給水量FL1と給湯量FL2が所定の大きさ以上の差がある場合には、配管中に水漏れがあるものとして、バーナの燃焼を停止するとともに、表示部がエラーの表示をする。
【0020】
追焚を行う場合には、リモートコントローラ60の追焚スイッチをON状態にする。すると、まずポンプ24が起動され、浴槽6内の湯が復路管22および往路管23を通って循環する。復路管22内の湯の流れを流水スイッチFSが検出すると、ガスバーナ1が点火される。これによって、浴槽6内の湯が加熱される。そして、温度センサTHHRによる検出信号が設定温度に達すると、自動的にバーナ1の燃焼が停止されるとともに、ポンプ24が停止される。
【0021】
自動湯張りを行う場合には、リモートコントローラ60の風呂自動運転スイッチをON状態にする。すると、注湯弁31が開弁され、給湯水管11において加熱された湯が注湯管30を通り、復路管22および往路管23を介して浴槽6に供給される。勿論、浴槽6に供給される湯の温度が設定温度になるように、制御ユニット50によって制御される。そして、浴槽6内に所定の量の湯が溜まると、浴槽6の水量を検出する検出手段(図示せず)の検出信号に基づいて注湯弁31が閉じられるとともに、バーナ1の燃焼が停止され、湯張りが終了する。
【0022】
湯張りの終了後は、浴槽の湯をほぼ一定の温度に維持するための保温運転が行われる。保温運転中は、所定時間毎に追焚が実行される。すなわち、湯張りの終了後、所定時間経過すると、自動的に追焚が行われる。このときの追焚は、追焚スイッチをONにしたときの追焚と同様である。そして、浴槽6の湯の温度THHRが設定温度になると追焚が停止し、再度所定時間が経過するまでバーナ1およびポンプ24が停止した待機状態になる。
【0023】
ここで、前述したように、追焚中に給湯水管11内の滞留水が高温に加熱されたり、あるいは追焚停止後または給湯停止後に熱交換部2のフィン2a等の蓄熱によって滞留水が高温に加熱されるという問題がある。また、追焚の開始直後に追焚スイッチをOFFにして、ポストポンプが行われると、浴槽内の冷水によって熱交換部2が冷水され、フィン2aおよび受熱管11,21に結露が発生することがある。このような不具合を防止するために、制御ユニット50によって次のような制御が実行されている。この制御を図2〜図4に示すフローチャートに基づいて説明する。
【0024】
プログラムのスタート後、まずステップS1において自動湯張りの保温運転中か否かが判断される。保温運転中である場合には、ステップS2において所定の待機時間が経過したか否かが判断される。所定の待機時間が経過している場合には、ステップS3においてバーナ1のフレームロッド(図示せず)がON状態であるか否かが判断される。この場合、フレームロッドがON状態であるということは、バーナ1が燃焼中であり、給湯中であることを意味する。したがって、ステップ3は、給湯中であるか否かを判断するものであると言い換えることができる。
【0025】
ステップSにおいて、保温運転中でないと判断された場合には、ステップS4において追焚SWがON操作されたか否かが判断される。ON操作されていない場合には、ステップS1に戻る。ON操作されている場合には、ステップS3が実行される。
【0026】
ステップ3において、フレームロッドがON状態であると判断された場合、つまり給湯が行われていると判断された場合には、ステップ5においてポンプ24が間欠運転される。ポンプ4の間欠運転は、浴槽6内の湯を復路管22に少量流して、その温度を温度センサTHHRによって検出させるためのものである。その後、ステップ6において、浴槽6の湯の温度THHR、給湯の設定温度および給湯量、並びに電磁比例弁5の開度に基づいて、給湯を継続しつつ、追焚が可能であるか否かが判断される。つまり、バーナ1が給湯燃焼に加えて追焚燃焼をすることができるだけの余裕があるか否かが判断される。
【0027】
追焚が可能である場合には、ステップ7において同時運転制御が行われ、給湯と追焚との両者が同時に実行される。
一方、追焚燃焼を行う余裕がない場合には、ステップS3〜S6を繰り返す。つまり、給湯が終了するまで待機することになる。そして、給湯が終了すると、フレームロッドがOFF状態になるので、ステップ3における判断が否定判断になる。
【0028】
フレームロッドがOFF状態であるときには、ステップS8においてポンプ24が起動され、ステップS9において点火機構によってバーナ1が点火される。これにより、追焚燃焼が開始され、フレームロッドがON状態になる。勿論、ステップの実行前には、流水スイッチFSがON状態になっていることが確認されるが、フローチャートを簡潔にするために、そのようなステップは省略してある。以下、同様にフローチャートに示すことなく説明することがある。
【0029】
その後、ステップS10において、給湯水管11のベンド部に設けられた温度センサTHZによる検出温度、つまり給湯水管11内の湯の温度THZが予め設定されたポンプON設定温度(ポンプ運転温度)TP0より高いか否かが判断される。なお、ポンプON設定温度TP0は、例えば60°C程度に設定されている。
【0030】
THZ<TP0である場合には、図4に示すステップS11において、ステップ10の判断が実行されてから所定の微少漏れ検出時間が経過したか否かが判断される。所定の時間が経過していない場合には、時間が経過するまでステップS9〜S11が繰り返される。通常は、バーナ1の燃焼熱によって受熱管11内の水が加熱されるので、所定の微少漏れ検出時間が経過するまでの間にTHZ≧TP0になる。その結果、ステップ13へ進む。
【0031】
しかるに、フローセンサFL1,FL2が流水量を検出することができない程度に給湯栓14が開かれている場合、あるいは給湯栓14が開かれているにも拘わらず、フローセンサFL1,FL2が故障しているため給湯配管系10を流れる水を検出することができない場合には、バーナ1の燃焼熱が給湯水管11内を流れる水によって奪われるため、温度THZの上昇速度が遅くなり、所定時間経過してもTHZ≧TP0にならない。したがって、所定時間経過した場合には、故障が発生しているものとみなされ、ステップS12において、故障処理が実行される。ここでは、故障処理として燃焼OFF、ポンプOFFおよびエラー表示が実行される。そして、プログラムを終了する。
【0032】
ステップ13においては、浴槽6の湯の温度THHRがその設定温度TB0より高いか否かが判断される。THHR<TB0である場合には、ステップ14へ進む。一方、THHR≧TB0である場合、つまり浴槽6内の湯の温度が設定温度に達した場合には、ステップS15において、追焚スイッチがOFF操作される。これにより、バーナ1の燃焼が停止され、フレームロッドがOFF状態になり、追焚が終了する。その後、ステップ14へ進む。
【0033】
ステップS14おいては、給湯水管11内を流れる水(湯)または滞留水(以下、これらを総称して滞留水という。)の温度THZがポンプON設定温度TP0より高いか否かが判断される。この場合、ステップS10においてTHZ≧TP0が判断されているので、ステップ15においてバーナ1の燃焼が停止されているか、給湯装置に故障が発生しない限りTHZ<TP0になることはない。
【0034】
THZ>TP0である場合には、ステップ16において滞留水の温度THZが予め定められた所定の第1燃焼停止温度TH0(OFF)より高いか否か、および受熱管11から吐出される湯の温度THOUTが所定の第2燃焼停止温度TH0′(OFF)より高いか否かが判断される。
【0035】
ここで、第1燃焼停止温度TH0(OFF)は、滞留水が沸騰するような事態を防止するための温度であり、例えば80°C程度に設定されている。この温度からも明らかなように、上記ポンプON設定温度よりも高く設定されている。一方、第2燃焼停止温度TH0′(OFF)は、ガスバーナ1が全開状態で追焚燃焼中に、受熱管11内を給水が微少量(フローセンサFL1,FL2で検出することができる範囲において最小の流量。例えば1l)だけ流れているものとしたときに、その給水が温度センサTHZの設置箇所から温度センサTHOUTの設置箇所まで流れる間に上昇する温度上昇分をαとしたとき、TH0(OFF)+αに設定されている。
【0036】
このように設定したのは次の理由による。すなわち、出湯管13に漏れが無い場合には、温度センサTHZと温度センサTHOUTとはほぼ同一の温度を出力する。したがって、受熱管11内の滞留水の温度が上昇すると、まずTHZ>TH0(OFF)が検出される。これにより、出湯管13に漏れが無いことが分かる。なお、THZ>TH0(OFF)であると判断されると、後述するように、ガスバーナ1の燃焼が停止される。したがって、漏れがない場合には、THOUT>TH0′(OFF)であると判断されることはない。
【0037】
一方、出湯管13に微少漏れがある場合、例えば出湯栓14を誤って微少量だけ開いてしまい、受熱管11内を1l/min以下の給水が流れているような場合には、その微少量の給水が温度センサTHZの設置箇所から温度センサTHOUTの設置箇所まで流れ間に給水の温度がβだけ上昇する。この温度上昇分βは、漏れ量が1l/minであるときの温度上昇分αより大きい。したがって、THZ>TH0(OFF)が検出される前に、THOUT>TH0′(OFF)が検出される。これにより、フローセンサFL1,FL2が検出することができない程度の漏れがあることが分かる。
なお、THOUT>TH0′(OFF)がTHZ>TH0(OFF)の前に検出された場合には、直ちにガスバーナ1の燃焼を停止させるとともに、故障を表示させるようにしてもよい。
【0038】
ステップS16においてTHZ>TH0(OFF)またはTHOUT>TH0′(OFF)であると判断された場合には、ステップ17に進み、バーナ1の燃焼が停止され、フレームロッドがOFF状態になる。そして、ステップS13に戻る。この結果、THZ≦TH0(ON)、かつTHOUT≦TH0(ON)になるまで(ステップS18参照)、燃焼OFFのままポンプ24が運転される。したがって、滞留水が沸騰するのを防止することができるのみならず、その温度THZを早急に低下させることができる。しかも、熱交換部2が有する熱(滞留水が有する熱を含む)を利用して浴槽6の湯を加熱することができる。これにより、追焚に要する時間を短縮することができる。そして、再びTHZ≦TH0(OFF)、かつTHOUT≦TH0(OFF)になると、ステップS16において否定判断されるため、ステップS18へ進む。
【0039】
ステップ18においては、温度THZが第1燃焼ON温度(追焚燃焼ON温度)TH0(ON)より低いか否かが判断されるとともに、温度THOUTが第2燃焼ON温度(追焚燃焼ON温度)TH0′(ON)より低いか否かが判断される。ここで、第1燃焼ON温度TH0(ON)は、ポンプON設定温度TP0より高いのは勿論であるが、第1燃焼停止温度TH0(OFF)より若干低い(例えば5°C程度低い)温度に設定されている。これは、ガスバーナ1の燃焼と燃焼停止とが頻繁に行われるのを防止するためであり、一種のヒステリシスを持たせるためである。TH0′(ON)も同様に、第2燃焼停止温度TH0′(OFF)より若干低い(例えば5°C程度低い)温度に設定されている。
【0040】
ステップ18において否定判断された場合、つまりTHZ≧TH0(ON)とTHOUT≧TH0′(ON)との少なくとも一方が成立する場合には、ステップ13に戻り、追焚燃焼が停止されているならば停止状態が続行し、追焚燃焼中であるならば追焚燃焼が続行される。一方、ステップ18において肯定判断された場合には、ステップS19に進む。
【0041】
ステップS19においては、追焚スイッチがOFF操作されているか否かが判断される。OFF操作されていない場合には、ステップS9に戻り、再びバーナ1に点火され、追焚が再開する。一方、追焚スイッチがOFF操作されている場合には、ステップS17へ進み、燃焼が停止され、フレームロッドがOFF状態になる。
【0042】
ステップ15において燃焼が停止された場合、およびステップ19からステップ17へ進んで燃焼が停止された場合には、バーナ1が再度燃焼することがないので、ステップS13、S14,S16,S18、S19およびS17を繰り返すうちに、ポンプ24によって浴槽6の湯が循環することにより、滞留水の温度THZが早急に冷却される。そして、THZ≦TP0になると、ステップ14において否定判断されるので、ステップ20へ進む。
【0043】
ステップ20においては、バーナ1の燃焼が停止され、フレームロッドがOFF状態になる。次に、ステップS21においてポンプ24が停止される。その後、ステップ22において保温運転中か否かが判断される。保温運転中である場合には、プログラムが最初から再度実行される。保温運転中でない場合には、プログラムを終了する。
【0044】
ここで、追焚が終了した後においては、ポンプ24によって浴槽6の湯が循環されることにより、滞留水の温度THZがポンプON設定温度TP0まで早急に冷却される。したがって、追焚燃焼の後に、給湯栓14を開いても高温の湯が出るのを防止することができる。しかも、滞留水の温度THZがポンプON設定温度より低下すると、ポンプ24が停止するので、滞留水の温度が自然冷却を除けばポンプON設定温度に維持される。したがって、給湯開始直後には、流量制御弁GM1,GM2を適宜の開度に開いて滞留水と給水とを混合することにより、アンダーシュートを防止することができるのは勿論のこと、出湯温度を設定給湯温度にすることも可能である。換言すれば、流量制御弁GM1,GM2で混合できる(設定温度にできる)上限、下限値に基づいてTP0が決定されている。
【0045】
また、仮に追焚燃焼の直後に追焚スイッチがOFFされてステップ18の判断が肯定判断になった場合には、ステップS14の判断に基づいてポンプ24が直ちに停止されるので、浴槽6内の冷水が循環されることがない。したがって、熱交換部2のフィン2a等に結露が発生するのを防止することができる。
【0046】
また、追焚燃焼中に、フローセンサFL1,FL2が流水量を検出することができない程度に給湯栓14が誤って開かれた場合には、ステップS18においてTH0′(OFF)によって燃焼が停止され、次にステップS16で燃焼が再開されるまでの間に滞留水の温度THZが、

Figure 0003880130
まで低下する。ここで、
TH0′(OFF)−TH0′(ON)=TH0(OFF)−TH0(ON)
であるから、温度THZは、温度TH0(ON)より(β−α)の分だけ下がる。この結果、滞留水の温度THZがポンプON設定温度TP0より低下するので(TH0(ON)−(β−α)<TP0<TH0(ON))、バーナ1の燃焼およびポンプ24の運転が停止される。したがって、追焚が終了することなく続行するのを防止することができる。しかも、その後にはステップS1に戻り、ステップS11,S12を経てエラー表示される。
【0047】
なお、この発明は、上記の実施の形態に限定されるものでなく、適宜変更可能である。例えば、上記の実施の形態においては、追焚燃焼開始直後に滞留水の温度がポンプON設定温度TP0より高いか否かを判断している(ステップS10)が、この判断は必ずしも必要ではない。また、ステップ20における燃焼停止は、安全性をより向上させるためのものであり、必ずしも実行させる必要はない。
【0048】
また、αの設定は1l/minとし、1l/min以上の漏れはフローセンサFL1,FL2の検知により検出しているが、最低作動流量2.5l/minをもとにして第2燃焼停止温度TH0′(OFF)を設定すれば、フローセンサFL1,FL2で検知できない上限での1l/min漏れ時におけるTH0(ON)−TP0の温度差を大きくとることができる(2.5l/min流れている時の温度差をγとすると、TH0′(OFF)=TH0(OFF)+γ)。
【0049】
また、温度THZとTHOUTのヒステリシスが同一の例で説明したが、THOUTの方を大きくしてもよい。この場合も、THOUTのヒステリシスを大きくすると、TH0(ON)−TP0の温度差を大きくとることができる。また、THOUTのヒステリシスを小さくする場合には、差分をTH0′(OFF)に上乗せを行うことにより、つまり
Figure 0003880130
を新たなTH0′(OFF)とすることにより、設定温度がTH0(ON)を上回ることを防ぐことができる。
【0050】
また、上記の実施の形態は、この発明を追焚燃焼時の制御に適用したものであるが、給湯燃焼終了時にも適用可能である。その場合にも、滞留水の温度THZがポンプON設定温度TP0より高いときにはポンプ24を運転状態にし、それより低いときにはポンプ24を停止させておけばよい。そのようにすれば、後沸き減少による再出湯時のオーバーシュートを防止することができ、高温の湯が給湯栓14から吐出させて使用者に苦痛を与えるのを防止することができる。
【0051】
【発明の効果】
以上説明したように、本願発明によれば、出湯開始時に高温の湯が出湯されて使用者に苦痛を与えるのを防止することができるのみならず、アンダーシュートが発生するのを防止することができ、しかも追焚に要する時間を短縮することができるという効果が得られる。さらに、熱交換器に結露が発生するのを防止することができるという効果が得られる。
【図面の簡単な説明】
【図1】この発明が適用された一缶二水路式給湯装置の概略構成を示す図である。
【図2】この発明に係る制御方法を説明するためのフローチャートの前半を示す図である。
【図3】同フローチャートの後半の主要部を示す図である。
【図4】同フローチャートの後半の一部を示す図である。
【符号の説明】
1 ガスバーナ(熱発生部)
2 熱交換器(熱交換部)
6 浴槽
10 給湯配管系
11 給湯配管系の受熱管
20 追焚配管系
21 追焚配管系の受熱管
24 ポンプ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for controlling a single-can two-water channel hot water supply apparatus.
[0002]
[Prior art]
In general, a single can two-water channel type hot water supply apparatus shares one burner and a heat exchanger in a hot water supply piping system and a memorial piping system. Therefore, there is an advantage that the entire apparatus can be downsized and manufactured at a low cost.
[0003]
On the other hand, in the single can two-water channel type hot water supply apparatus, since one heat exchanger is shared by the hot water supply piping system and the remedy piping system, there are various problems. For example, during additional combustion, the accumulated water in the hot water supply pipe (heat receiving pipe) of the hot water supply pipe system installed in the heat exchanger is heated to a high temperature. For this reason, when using the hot water supply piping system, hot water is discharged from the hot water tap immediately after the start of use, which may cause pain to the user. Therefore, in the one described in Japanese Patent Application Laid-Open No. Hei 6-272754, after the completion of the remedy, operation (post-pump) is performed with a circulation pump of the remedy piping system to circulate bath water for a predetermined time, and the accumulated water in the hot water supply water pipe I try to lower the temperature.
[0004]
[Problems to be solved by the invention]
However, there is a problem that has not yet been solved in the single can and two water channel type hot water supply apparatus.
For example, if the hot water supply piping system is used again immediately after the hot water supply piping system has been temporarily stopped, the hot water in the hot water supply water pipe that has become hot due to the post-boiling phenomenon is discharged from the hot water tap, which may cause pain to the user. Such a situation cannot be solved by the one described in the above publication.
In addition, a so-called undershoot occurs in which hot water lower than the set temperature is discharged until the hot water supply device starts burning after the user opens the hot water tap and the hot water becomes hot water due to the combustion heat. However, in order to prevent this, it is necessary to secure hot water in a predetermined temperature range in the heat exchanger. If such hot water cannot be secured, an undershoot will occur, causing discomfort to the user.
Furthermore, if the post pump is performed when the user stops the chasing immediately after the chasing starts, cold water in the bath circulates, causing a problem that the heat exchanger is cooled and condensation occurs. Further, during hot water combustion, if the hot water tap 14 is accidentally opened to such an extent that the flow sensor cannot detect the amount of water flowing through the hot water supply piping system, the burner combustion amount does not increase. Therefore, since the combustion heat for remedy is expended on the hot water supply side, the situation is such that the remedy combustion does not end.
[0005]
[Means for Solving the Problems]
  In order to solve the above problems, the invention of claim 1 is commonly used for a hot water supply piping system and a supplementary piping system, and is provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the supplementary piping system. The heat exchanger and the heat exchangerCombustion partWhen,While controlling the combustion section,In a single can two-water channel hot water supply apparatus comprising a control unit that controls the operation of a pump that circulates water in a bathtub connected to the additional piping system, the control unit includes:At least one of when combustion is stopped or when combustion is being performed with pump operation,When the temperature of hot water in the heat receiving pipe of the hot water supply piping system is higher than a predetermined pump operating temperature, the pump is operated, and when the temperature of the hot water is lower than the pump operating temperature, the pump is stopped. And
[0006]
  The invention of claim 2 is used in common for the hot water supply piping system and the additional piping system, and includes a heat exchange section provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and this heat exchange. One-can two-water channel hot water supply apparatus comprising: a combustion section that heats a section; and a control section that controls the combustion section and that controls the operation of a pump that circulates water in a bathtub connected to the additional piping system When the temperature of the hot water in the heat receiving pipe of the hot water supply piping system is higher than a predetermined pump operating temperature while the combustion is stopped in the combustion unit, the control unit operates the pump, and the temperature of the hot water is When the temperature is lower than the pump operating temperature, the pump is stopped.
  The invention of claim 3 is used in common for the hot water supply piping system and the additional piping system, and includes a heat exchange section provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and this heat exchange. One-can two-water channel hot water supply apparatus comprising: a combustion section that heats a section; and a control section that controls the combustion section and that controls the operation of a pump that circulates water in a bathtub connected to the additional piping system In the above, the control unit performs combustion in the pump operation and the combustion unit and performs the memorial, even if the temperature of the hot water in the heat receiving pipe of the hot water supply piping system has passed the pump operation temperature for a predetermined time. When not reaching or when the temperature falls below the pump operating temperature, the pump is stopped and the combustion is stopped.
  According to a fourth aspect of the present invention, in the single can two-channel hot water supply apparatus according to any one of the first to third aspects, the control unit is configured to perform a hot water supply piping system when performing the memorial operation with the pump operation and combustion. Remembrance combustion to prevent boiling of accumulated water OFF Based on the temperature and the additional combustion ON temperature lower than this, hysteresis is controlled in the combustion in the combustion section, and the pump operating temperature is set to a temperature lower than the additional combustion ON temperature.
[0007]
  ClaimsThe invention of 5A heat exchange section that is used in common for the hot water supply piping system and the additional piping system, and is provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and heats the heat exchange sectionCombustion partIn the one-and-two water channel hot water supply apparatus provided with a pump that circulates the water in the bathtub in the memorial piping system,At least one of when combustion is stopped or when combustion is being performed with pump operation,When the temperature of hot water in the heat receiving pipe of the hot water supply piping system is higher than a predetermined pump operating temperature, the pump is operated, and when the temperature of the hot water is lower than the pump operating temperature, the pump is stopped. Features.
[0008]
  The invention according to claim 5 is used in common for the hot water supply piping system and the additional piping system, and includes a heat exchange section provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and this heat exchange. In a one-can two-water-type hot water supply apparatus provided with a pump that circulates the water in the bathtub in the above-described piping system, the combustion is performed while the combustion is stopped or accompanied by a pump operation. When the hot water temperature in the heat receiving pipe of the hot water supply piping system is higher than a predetermined pump operating temperature, the pump is in an operating state, and when the hot water temperature is lower than the pump operating temperature, the pump is stopped. It is characterized by doing.
  The invention of claim 6 is used in common for the hot water supply piping system and the additional piping system, and includes a heat exchange section provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and this heat exchange. In the one-can two-water-type hot water supply device provided with a pump for circulating the water in the bathtub in the additional piping system, the combustion pipe in the heat receiving pipe of the hot water supply pipe system is stopped during combustion stoppage. When the temperature of hot water is higher than a predetermined pump operating temperature, the pump is operated, and when the temperature of the hot water is lower than the pump operating temperature, the pump is stopped.
  The invention of claim 7 is used in common for the hot water supply piping system and the additional piping system, and includes a heat exchange section provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and this heat exchange. A one-can two-water-type hot water supply apparatus provided with a pump for circulating water in the bathtub in the additional piping system, and performing additional pumping and combustion in the combustion section. During the dredging, if the hot water temperature in the heat receiving pipe of the hot water supply piping system does not reach the pump operating temperature even after a predetermined time has elapsed or falls below the pump operating temperature, the pump is stopped and burned It is characterized by stopping.
  The invention of claim 8 is the method for controlling a single can two-channel hot water supply apparatus according to any one of claims 5 to 7, wherein the stagnant water in the hot water supply piping system is used when performing the above-mentioned pump operation and recompensation with combustion. Commemorative combustion to prevent boiling OFF Based on the temperature and the additional combustion ON temperature lower than this, hysteresis is controlled in the combustion in the combustion section, and the pump operating temperature is set to a temperature lower than the additional combustion ON temperature.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of the present invention will be described below with reference to FIGS.
FIG. 1 shows a schematic configuration of a single can two-water channel hot water supply apparatus according to the present invention. This hot water supply apparatus includes one can (not shown) and a gas burner (heat) accommodated in a lower portion of the can. Generator 1), a heat exchanging unit 2 accommodated in the upper portion of the can, and a fan (not shown) for supplying combustion air to the gas burner 1. The means for supplying gas to the burner 1 has a gas pipe 3 and a main electromagnetic on-off valve 4 and an electromagnetic proportional valve 5 provided on the gas pipe 3 respectively. Further, an ignition mechanism (shown) is disposed in the vicinity of the burner 1.
[0010]
The gas burner 1 and the heat exchanging unit 2 are commonly used for both the hot water supply piping system 10 and the memorial piping system 20. That is, the heat exchanging section 2 has a large number of thin fin plates 2 a, and the fin plate 2 a is a hot water supply pipe 11 that is a heat receiving pipe of the hot water supply piping system 10 and a heat receiving pipe of the additional piping system 20. The remedy water pipe 21 is disposed in a penetrating state.
[0011]
First, the hot water supply pipe system 10 will be described. A water supply pipe 12 of the hot water supply pipe system 10 is connected to the inlet end of the heat receiving pipe 11, and a hot water supply pipe 13 is connected to the outlet end. A hot water tap 14 is provided at the end of the hot water supply pipe 13. Further, two bypass pipes 15 and 16 are provided in parallel with the heat receiving pipe 11 between the water supply pipe 12 and the hot water supply pipe 13. In FIG. 1, connection points between the bypass pipe 15, the water supply pipe 12, and the hot water supply pipe 13 are indicated by reference signs P <b> 1 and P <b> 2, respectively, and connection points between the bypass pipe 16, the water supply pipe 12, and the hot water supply pipe 13 are indicated by reference signs P <b> 3 and P4. Each is shown.
[0012]
The bypass pipe 15 closer to the heat exchange unit 2 is not provided with a valve or the like, and the water flowing through the water supply pipe 12 is always at a constant ratio between the heat receiving pipe 11 side and the bypass pipe 12 side at the connection point P1. (For example, 70:30). And it merges again in the connection point P2.
[0013]
  On the other hand, a first flow rate control valve GM2 is provided in the bypass pipe 16 far from the heat exchange unit 2. As the flow control valve GM2, for example, a gear motor driven type configured as follows is used. That is, a gear motor-driven flow control valve includes an annular valve seat provided in a pipe, a valve body movable with respect to the valve seat, a shaft having one end fixed to the valve body, and the shaft And a motor connected to the other end portion via a reduction gear train. The shaft is screwed into the valve case. Therefore, when the motor rotates, the shaft moves in the axial direction, thereby changing the opening between the valve body and the valve seat. Therefore, the amount of water flowing from the connection point P3 to the hot water supply pipe 11 side and the bypass pipe 16 sideWhatThe ratio with the amount of flowing water can be changed as appropriate. In addition, the flow control valve GM1 configured similarly to the flow control valve GM2 is also provided in the hot water supply pipe 13 between the connection points P2 and P4.
[0014]
The hot water supply piping system 10 is provided with first and second flow sensors FL1, FL2. The first flow sensor FL1 is disposed in the water supply pipe 12 between the connection points P1 and P3, and the second flow sensor FL2 is disposed in the hot water supply pipe 13 between the connection point P4 and the hot water tap 14. Yes.
[0015]
  The hot water supply piping system 10 includes four temperature sensors TH.IN, THZ, THOUT, THMIXIs provided. Temperature sensor THINIs arranged in the water supply pipe 12 upstream from the connection point P3, and detects the water supply temperature. Temperature sensor THZIs arranged at the bend of the hot water supply pipe 11 and detects the temperature of the water in the hot water supply pipe 11. Temperature sensor THOUTIs a hot water supply pipe 13 near the outlet of the hot water supply pipe 11.InIt is arranged to detect the temperature of hot water coming out of the hot water supply water pipe 11. Temperature sensor THMIXIs arranged in the hot water supply pipe 13 downstream from the connection point P4,Hot water tapThe temperature of the hot water coming out of 14 is detected.
[0016]
On the other hand, in the remedy piping system 20, a return pipe 22 is connected between the inlet end of the remedy water pipe 21 and the bathtub 6, and between the outlet end of the remedy water pipe 21 and the bathtub 6. An outgoing pipe 23 is connected. The return pipe 22 includes a pump 24 and a temperature sensor TH.HRAnd a running water switch FS are provided. Temperature sensor THHRDetects the temperature of hot water (or water) flowing into the return pipe 22 from the bathtub 6. Therefore, the temperature sensor THHRSubstantially detects the temperature of the hot water in the bathtub 6. The flowing water switch FS is for detecting whether or not hot water is flowing in the return pipe 22, and is turned on when hot water is flowing in the return pipe 22 and is not flowing. Is in an OFF state. When the running water switch FS is in an OFF state, the burner 1 is not ignited even if a follow-up switch described later is turned on.
[0017]
Between the hot water supply pipe 13 of the hot water supply piping system 10 and the return pipe 22 of the memorial piping system 20, a pouring pipe 30 for filling the bathtub 6 is provided. Connection points between the pipe 13 and the return pipe 22 are indicated by symbols P5 and P6. The pouring pipe 30 is provided with a pouring valve 31 composed of an electromagnetic on-off valve.
[0018]
The hot water supply apparatus further includes a control unit 50 and a remote controller 60. The control unit 50 receives detection signals from various detection means. Here, temperature sensor THIN, THZ, THOUT, THMIX, THHRThe detection signals of the flow sensors FL1, FL2 and the running water switch FS are input. In the following, the same reference numerals as those of the detection means are used for the detection signals of the detection means. Based on each detection signal, the control unit 50 controls the main electromagnetic on-off valve 4 and the electromagnetic proportional valve 5 of the gas supply means, the ignition mechanism, the fan, the flow control valve GM.1, GM2The pump 24 and the pouring valve 31 are controlled. On the other hand, the remote controller 60 includes an operation switch, a bath automatic operation switch, a memory switch, a temperature setting unit, and a display unit (none of which are shown). While outputting to the control unit 50, this information is displayed on a display part. As will be described later, the display unit also displays error information from the control unit 50.
[0019]
In the case of performing hot water supply, chasing and automatic hot water filling using the hot water supply apparatus having the above configuration, when hot water supply is performed first, the operation switch of the remote controller 60 is turned on and the hot water tap 14 is opened. Then, the control unit 50 sets the set temperature, the amount of water supplied FL1 supplied to the water supply pipe 12, and the water supply temperature TH.IN, Hot water temperature THOUTFurther, the electromagnetic proportional control valve 5 and the flow rate control valves GM1, GM2 are controlled based on the hot water supply amount FL2. Thereby, hot water having a temperature equal to the set temperature is discharged from the hot water tap 14.
The control of the electromagnetic proportional control valve 5 and the like is the same as that of the conventional one and is not a main part of the present invention, and therefore detailed description thereof is omitted. The same applies to the following memorial service and automatic hot water filling. Further, when there is a difference between the water supply amount FL1 and the hot water supply amount FL2 greater than or equal to a predetermined magnitude, it is assumed that there is water leakage in the piping, and the burner combustion is stopped and the display unit displays an error.
[0020]
When performing the tracking, the tracking switch of the remote controller 60 is turned on. Then, first, the pump 24 is activated, and the hot water in the bathtub 6 circulates through the return pipe 22 and the forward pipe 23. When the flowing water switch FS detects the flow of hot water in the return pipe 22, the gas burner 1 is ignited. Thereby, the hot water in the bathtub 6 is heated. And temperature sensor THHRWhen the detection signal by reaches the set temperature, combustion of the burner 1 is automatically stopped and the pump 24 is stopped.
[0021]
When performing automatic hot water filling, the bath automatic operation switch of the remote controller 60 is turned ON. Then, the pouring valve 31 is opened, and hot water heated in the hot water supply pipe 11 passes through the pouring pipe 30 and is supplied to the bathtub 6 through the return pipe 22 and the forward pipe 23. Of course, it is controlled by the control unit 50 so that the temperature of the hot water supplied to the bathtub 6 becomes the set temperature. When a predetermined amount of hot water accumulates in the bathtub 6, the pouring valve 31 is closed based on a detection signal from a detection means (not shown) for detecting the water amount in the bathtub 6, and combustion of the burner 1 is stopped. The hot water filling is finished.
[0022]
After completion of the hot water filling, a heat insulation operation is performed to maintain the hot water in the bathtub at a substantially constant temperature. During the heat insulation operation, the memorial service is executed every predetermined time. That is, when a predetermined time elapses after the hot water filling is completed, the memorial service is automatically performed. The memorial at this time is the same as the memorial when the memorial switch is turned on. And the temperature TH of the hot water in the bathtub 6HRWhen the temperature reaches the set temperature, the chasing is stopped and the burner 1 and the pump 24 are stopped until a predetermined time elapses again.
[0023]
Here, as described above, the staying water in the hot water supply pipe 11 is heated to a high temperature during the chasing, or the staying water becomes hot due to heat accumulation in the fins 2a of the heat exchanging unit 2 after the chasing or the hot water is stopped. There is a problem of being heated. In addition, when the post-pump is performed immediately after the start of the remedy and the post pump is performed, the heat exchange unit 2 is chilled by the cold water in the bathtub, and condensation occurs on the fins 2a and the heat receiving tubes 11 and 21. There is. In order to prevent such a problem, the control unit 50 performs the following control. This control will be described based on the flowcharts shown in FIGS.
[0024]
After the start of the program, it is first determined in step S1 whether or not the hot water filling operation is being performed. If the warming operation is being performed, it is determined in step S2 whether a predetermined standby time has elapsed. If the predetermined waiting time has elapsed, it is determined in step S3 whether or not the frame rod (not shown) of the burner 1 is in the ON state. In this case, the fact that the frame rod is in an ON state means that the burner 1 is burning and hot water is being supplied. Therefore, step 3 can be rephrased as determining whether or not hot water is being supplied.
[0025]
  Step S1If it is determined that the warming operation is not being performed, it is determined in step S4 whether or not the tracking SW has been turned ON. If the ON operation has not been performed, the process returns to step S1. If it is ON, step S3 is executed.
[0026]
If it is determined in step 3 that the frame rod is in the ON state, that is, if it is determined that hot water is being supplied, the pump 24 is intermittently operated in step 5. In intermittent operation of the pump 4, a small amount of hot water in the bathtub 6 is allowed to flow through the return pipe 22, and the temperature is measured by the temperature sensor TH.HRIt is for making it detect by. Thereafter, in step 6, the temperature TH of the hot water in the bathtub 6HRBased on the set temperature of hot water supply and the amount of hot water supply and the opening of the electromagnetic proportional valve 5, it is determined whether or not the reheating is possible while continuing the hot water supply. In other words, it is determined whether or not the burner 1 has enough room to perform additional combustion in addition to hot water combustion.
[0027]
If the chasing is possible, simultaneous operation control is performed in step 7 and both hot water supply and chasing are performed simultaneously.
On the other hand, if there is no room for additional combustion, steps S3 to S6 are repeated. That is, it waits until hot water supply is completed. When the hot water supply is completed, the frame rod is turned off, so the determination in step 3 is negative.
[0028]
  When the frame rod is in the OFF state, the pump 24 is activated in step S8, and the burner 1 is ignited by the ignition mechanism in step S9. Thereby, additional combustion is started and the frame rod is turned on. Of course, step9It is confirmed that the running water switch FS is in the ON state before the execution of, but such steps are omitted for the sake of simplicity of the flowchart. Hereinafter, the description may be similarly made without showing in the flowchart.
[0029]
Thereafter, in step S10, the temperature sensor TH provided in the bend portion of the hot water supply pipe 11 is used.Z, That is, the temperature TH of hot water in the hot water supply pipe 11ZIs preset pump ON set temperature (pump operating temperature) TP0It is determined whether it is higher. Pump ON set temperature TP0Is set to about 60 ° C., for example.
[0030]
THZ<TP0If it is, in step S11 shown in FIG. 4, it is determined whether or not a predetermined minute leak detection time has elapsed since the determination in step 10 was executed. If the predetermined time has not elapsed, steps S9 to S11 are repeated until the time elapses. Usually, since the water in the heat receiving pipe 11 is heated by the combustion heat of the burner 1, the TH is detected until a predetermined minute leak detection time elapses.Z≧ TP0become. As a result, the process proceeds to step 13.
[0031]
However, when the hot water tap 14 is opened to such an extent that the flow sensors FL1 and FL2 cannot detect the amount of flowing water, or the hot water tap 14 is opened, the flow sensors FL1 and FL2 fail. Therefore, when the water flowing through the hot water supply piping system 10 cannot be detected, the combustion heat of the burner 1 is taken away by the water flowing through the hot water supply water pipe 11, so that the temperature THZThe ascent rate ofZ≧ TP0do not become. Therefore, when a predetermined time has elapsed, it is considered that a failure has occurred, and failure processing is executed in step S12. Here, combustion OFF, pump OFF, and error display are executed as failure processing. Then, the program ends.
[0032]
In step 13, the temperature TH of the hot water in the bathtub 6HRIs the set temperature TB0It is determined whether it is higher. THHR<TB0If YES, go to step 14. On the other hand, THHR≧ TB0If this is the case, that is, if the temperature of the hot water in the bathtub 6 has reached the set temperature, the memory switch is turned OFF in step S15. Thereby, the combustion of the burner 1 is stopped, the frame rod is turned off, and the remedy is completed. Then, it progresses to step 14.
[0033]
In step S14, temperature TH of water (hot water) or stagnant water (hereinafter collectively referred to as stagnant water) flowing in hot water supply pipe 11 is determined.ZIs the pump ON set temperature TP0It is determined whether it is higher. In this case, TH in step S10Z≧ TP0Therefore, unless the combustion of the burner 1 is stopped in step 15 or a failure occurs in the water heater, THZ<TP0Never become.
[0034]
THZ> TP0If it is, in step 16, the temperature TH of the accumulated water isZIs a predetermined first combustion stop temperature TH0(OFF) or higher, and the temperature TH of the hot water discharged from the heat receiving pipe 11OUTIs the predetermined second combustion stop temperature TH0It is determined whether it is higher than ′ (OFF).
[0035]
Here, the first combustion stop temperature TH0(OFF) is a temperature for preventing a situation in which the accumulated water boils, and is set to about 80 ° C., for example. As is apparent from this temperature, it is set higher than the pump ON set temperature. On the other hand, the second combustion stop temperature TH0′ (OFF) means that during the combustion with the gas burner 1 fully open, the feed water flows through the heat receiving pipe 11 by a very small amount (a minimum flow rate within a range that can be detected by the flow sensors FL1, FL2; for example, 1 l). The water supply is the temperature sensor THZTemperature sensor TH from the installation location ofOUTWhen the temperature rise that rises while flowing to the installation location of0(OFF) + α is set.
[0036]
The reason for this setting is as follows. That is, when there is no leak in the tapping pipe 13, the temperature sensor THZAnd temperature sensor THOUTOutputs almost the same temperature. Therefore, when the temperature of the accumulated water in the heat receiving pipe 11 rises, first, THZ> TH0(OFF) is detected. Thereby, it turns out that there is no leak in the hot water discharge pipe 13. THZ> TH0If determined to be (OFF), the combustion of the gas burner 1 is stopped, as will be described later. Therefore, if there is no leakage, THOUT> TH0It is not determined to be 'OFF'.
[0037]
On the other hand, when there is a slight leak in the hot water discharge pipe 13, for example, when the hot water tap 14 is mistakenly opened by a small amount, and a water supply of 1 l / min or less flows through the heat receiving pipe 11, that small amount. Water supply temperature sensor THZTemperature sensor TH from the installation location ofOUTThe temperature of the feed water rises by β during the flow to the installation location. This temperature increase β is larger than the temperature increase α when the leakage amount is 1 l / min. Therefore, THZ> TH0Before (OFF) is detected, THOUT> TH0′ (OFF) is detected. As a result, it is understood that there is a leak that the flow sensors FL1 and FL2 cannot detect.
THOUT> TH0'(OFF) is THZ> TH0If it is detected before (OFF), the combustion of the gas burner 1 may be immediately stopped and a failure may be displayed.
[0038]
In step S16, THZ> TH0(OFF) or THOUT> TH0If it is determined that ′ (OFF), the routine proceeds to step 17 where combustion of the burner 1 is stopped and the frame rod is turned off. Then, the process returns to step S13. As a result, THZ≦ TH0(ON) and THOUT≦ TH0Until it becomes (ON) (see step S18), the pump 24 is operated with the combustion OFF. Therefore, it is possible not only to prevent the stagnant water from boiling, but also its temperature THZCan be quickly reduced. And the hot water of the bathtub 6 can be heated using the heat | fever (including the heat | fever which stagnant water has) which the heat exchange part 2 has. Thereby, the time required for memorialization can be shortened. And again THZ≦ TH0(OFF) and THOUT≦ TH0If it is (OFF), a negative determination is made in step S16, and the process proceeds to step S18.
[0039]
In step 18, the temperature THZIs the first combustion ON temperature (remembrance combustion ON temperature) TH0It is judged whether the temperature is lower than (ON) and the temperature THOUTIs the second combustion ON temperature (remembrance combustion ON temperature) TH0It is determined whether it is lower than ′ (ON). Here, the first combustion ON temperature TH0(ON) is the pump ON set temperature TP0Of course, the first combustion stop temperature TH is higher.0The temperature is set slightly lower than (OFF) (for example, about 5 ° C.). This is to prevent the gas burner 1 from being frequently burned and stopped, and to have a kind of hysteresis. TH0′ (ON) is also the second combustion stop temperature TH0It is set to a temperature slightly lower than 'OFF' (for example, about 5 ° C lower).
[0040]
If a negative determination is made in step 18, that is, THZ≧ TH0(ON) and THOUT≧ TH0If at least one of ′ (ON) is established, the process returns to step 13, and if the additional combustion is stopped, the stopped state continues, and if additional combustion is being performed, additional combustion is continued. The On the other hand, if a positive determination is made in step 18, the process proceeds to step S19.
[0041]
In step S19, it is determined whether or not the memory switch is turned off. When the OFF operation is not performed, the process returns to step S9, the burner 1 is ignited again, and the tracking is resumed. On the other hand, if the memory switch is turned off, the process proceeds to step S17, combustion is stopped, and the frame rod is turned off.
[0042]
When the combustion is stopped in step 15 and when the combustion proceeds from step 19 to step 17 and the combustion is stopped, the burner 1 does not burn again, so steps S13, S14, S16, S18, S19 and As the hot water in the bathtub 6 is circulated by the pump 24 while repeating S17, the temperature TH of the accumulated water is increased.ZIs cooled immediately. And THZ≦ TP0If so, a negative determination is made in step 14, and the routine proceeds to step 20.
[0043]
In step 20, combustion of the burner 1 is stopped and the frame rod is turned off. Next, in step S21, the pump 24 is stopped. Thereafter, in step 22, it is determined whether or not the heat retaining operation is being performed. When the heat insulation operation is being performed, the program is executed again from the beginning. If the warming operation is not in progress, the program is terminated.
[0044]
Here, after the memorial service is finished, the hot water in the bathtub 6 is circulated by the pump 24, so that the temperature TH of the accumulated water is increased.ZIs the pump ON set temperature TP0It is cooled quickly. Therefore, it is possible to prevent hot water from coming out even if the hot-water tap 14 is opened after the combusting combustion. Moreover, the temperature TH of the accumulated waterZWhen the temperature drops below the pump ON set temperature, the pump 24 stops, so that the temperature of the accumulated water is maintained at the pump ON set temperature except for natural cooling. Therefore, immediately after the start of hot water supply, the underflow can be prevented by opening the flow rate control valves GM1 and GM2 to an appropriate opening degree and mixing the stagnant water and the feed water. It is also possible to set the hot water supply temperature. In other words, TP based on the upper and lower limits that can be mixed by the flow rate control valves GM1, GM2 (can be set temperature).0Has been determined.
[0045]
Further, if the remedy switch is turned off immediately after the flaring combustion and the determination in step 18 is affirmative, the pump 24 is immediately stopped based on the determination in step S14. Cold water is not circulated. Therefore, it is possible to prevent dew condensation from occurring on the fins 2a and the like of the heat exchange unit 2.
[0046]
If the hot-water tap 14 is accidentally opened to the extent that the flow sensors FL1 and FL2 cannot detect the amount of flowing water during the additional combustion, TH is determined in step S18.0′ (OFF) stops the combustion, and then the temperature TH of the accumulated water until the combustion is restarted in step S16.ZBut,
Figure 0003880130
To fall. here,
TH0'(OFF) -TH0'(ON) = TH0(OFF) -TH0(ON)
Therefore, the temperature THZIs the temperature TH0Lower than (ON) by (β-α). As a result, the temperature TH of the accumulated waterZIs the pump ON set temperature TP0(TH0(ON)-(β-α) <TP0<TH0(ON)), the combustion of the burner 1 and the operation of the pump 24 are stopped. Therefore, it is possible to prevent the memorial service from continuing without ending. In addition, after that, the process returns to step S1, and an error is displayed through steps S11 and S12.
[0047]
  In addition, this invention is not limited to said embodiment, It can change suitably. For example, in the above embodiment, the temperature of the staying water is set to the pump ON set temperature TP immediately after the start of the additional combustion.0Although it is judged whether it is higher (step S10), this judgment is not necessarily required. Also step20The combustion stop at is for the purpose of improving safety and does not necessarily have to be executed.
[0048]
In addition, α is set to 1 l / min, and leaks of 1 l / min or more are detected by detection of the flow sensors FL1 and FL2, but the second combustion stop temperature based on the minimum operating flow rate 2.5 l / min. TH0If '(OFF) is set, TH at the time of 1 l / min leakage at the upper limit that cannot be detected by the flow sensors FL1 and FL20(ON) -TP0(If the temperature difference when flowing 2.5 l / min is γ, TH0'(OFF) = TH0(OFF) + γ).
[0049]
Also, temperature THZAnd THOUTIn the example of the same hysteresis, THOUTMay be larger. Again, THOUTWhen hysteresis is increased, TH0(ON) -TP0The temperature difference can be made large. THOUTWhen reducing the hysteresis of the0By adding '(OFF), that is,
Figure 0003880130
The new TH0By setting ′ (OFF), the set temperature becomes TH0(ON) can be prevented from exceeding.
[0050]
In the above-described embodiment, the present invention is applied to the control at the time of additional combustion, but can also be applied at the end of hot water combustion. Even in this case, the temperature TH of the accumulated waterZIs the pump ON set temperature TP0When it is higher, the pump 24 is in an operating state, and when it is lower than that, the pump 24 may be stopped. By doing so, it is possible to prevent overshoot at the time of re-watering due to a decrease in post-boiling, and it is possible to prevent hot water from being discharged from the hot-water tap 14 and causing pain to the user.
[0051]
【The invention's effect】
As explained above,This applicationAccording to the present invention, not only can hot water be poured out at the start of pouring and the user can be prevented from suffering, but also undershooting can be prevented, and in addition, it is necessary for memorialization. The effect that time can be shortened is acquired. Furthermore, the effect that it is possible to prevent the occurrence of condensation in the heat exchanger is obtained.The
[Brief description of the drawings]
FIG. 1 is a diagram showing a schematic configuration of a single can / two water channel hot water supply apparatus to which the present invention is applied.
FIG. 2 is a diagram showing the first half of a flowchart for explaining a control method according to the present invention;
FIG. 3 is a diagram showing a main part of the latter half of the flowchart.
FIG. 4 is a diagram showing a part of the latter half of the flowchart.
[Explanation of symbols]
1 Gas burner (heat generating part)
2 Heat exchanger (Heat exchange part)
6 Bathtub
10 Hot water supply piping system
11 Heat receiving pipe of hot water supply piping system
20 Memorial piping system
21 Receiving pipe of memorial piping system
24 pump

Claims (8)

給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部と、上記燃焼部を制御するとともに、上記追焚配管系に接続された浴槽の水を循環させるポンプの運転を制御する制御部とを備えた一缶二水路式給湯装置において、
上記制御部は、少なくとも燃焼停止中、またはポンプ運転を伴って燃焼を実行中のいずれか一方において、上記給湯配管系の受熱管内の湯の温度が所定のポンプ運転温度より高いときには上記ポンプを運転状態にし、上記湯の温度が上記ポンプ運転温度以下であるときには上記ポンプを停止状態にすることを特徴とする一缶二水路式給湯装置。
A heat exchange section that is used in common for the hot water supply piping system and the additional piping system, and is provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and a combustion section that heats the heat exchange section. In addition , the one-can two-water-type hot water supply apparatus including a control unit that controls the combustion unit and controls the operation of a pump that circulates water in the bathtub connected to the additional piping system.
The control unit operates the pump when the temperature of hot water in the heat receiving pipe of the hot water supply piping system is higher than a predetermined pump operating temperature at least while combustion is stopped or combustion is being performed with pump operation. When the temperature of the hot water is equal to or lower than the pump operating temperature, the pump is stopped.
給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部と、上記燃焼部を制御するとともに、上記追焚配管系に接続された浴槽の水を循環させるポンプの運転を制御する制御部とを備えた一缶二水路式給湯装置において、  A heat exchange section that is used in common for the hot water supply piping system and the additional piping system, and is provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and a combustion section that heats the heat exchange section. In addition, the one-can two-water-type hot water supply apparatus including a control unit that controls the combustion unit and controls the operation of a pump that circulates water in the bathtub connected to the additional piping system.
上記制御部は、上記燃焼部での燃焼停止中に、上記給湯配管系の受熱管内の湯の温度が所定のポンプ運転温度より高いときには上記ポンプを運転状態にし、上記湯の温度が上記ポンプ運転温度以下であるときには上記ポンプを停止状態にすることを特徴とする一缶二水路式給湯装置。  When the temperature of hot water in the heat receiving pipe of the hot water supply piping system is higher than a predetermined pump operating temperature while the combustion is stopped in the combustion unit, the control unit puts the pump into an operating state, and the hot water temperature is A can and two water channel hot water supply apparatus, wherein the pump is stopped when the temperature is lower than the temperature.
給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部と、上記燃焼部を制御するとともに、上記追焚配管系に接続された浴槽の水を循環させるポンプの運転を制御する制御部とを備えた一缶二水路式給湯装置において、A heat exchange section that is used in common for the hot water supply piping system and the additional piping system, and is provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and a combustion section that heats the heat exchange section. In addition, the one-can two-water-type hot water supply apparatus including a control unit that controls the combustion unit and controls the operation of a pump that circulates water in the bathtub connected to the additional piping system.
上記制御部は、上記ポンプ運転と燃焼部での燃焼を行って追焚を実行中に、上記給湯配管系の受熱管内の湯の温度が上記ポンプ運転温度に所定の時間経過しても達しないとき、またはポンプ運転温度以下に下がったときには、ポンプを停止させるとともに燃焼を停止させることを特徴とする一缶二水路式給湯装置。The controller does not reach the pump operating temperature even if the temperature of the hot water in the heat receiving pipe of the hot water supply piping system reaches the pump operating temperature while performing the tracking by performing combustion in the pump operation and the combustion unit. When the temperature drops below the pump operating temperature, the can is stopped by the pump and the combustion is stopped.
上記制御部は、上記ポンプ運転と燃焼を伴った追焚実行時において、給湯配管系の滞留水の沸騰を防止するために、追焚燃焼 OFF 温度およびこれより低い追焚燃焼ON温度に基づき、燃焼部での燃焼をヒステリシス制御し、上記ポンプ運転温度が上記追焚燃焼ON温度より低い温度に設定されていることを特徴とする請求項1〜3のいずれかに記載の一缶二水路式給湯装置。 The control unit, based on the combustion combustion OFF temperature and a lower combustion combustion ON temperature lower than this , in order to prevent boiling of the accumulated water in the hot water supply piping system at the time of performing the tracking with the pump operation and combustion , the combustion in the combustion section and the hysteresis control, a can two conduit-type according to claim 1, the pump operating temperature, characterized in that it is set to a temperature lower than the add焚燃sintered oN temperature Hot water supply device. 給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部とを備え、上記追焚配管系には浴槽の水を循環させるポンプが設けられた一缶二水路式給湯装置において、
少なくとも燃焼停止中、またはポンプ運転を伴って燃焼を実行中のいずれか一方において、上記給湯配管系の受熱管内の湯の温度が、所定のポンプ運転温度より高いときには上記ポンプを運転状態にし、上記湯の温度が上記ポンプ運転温度以下であるときには上記ポンプを停止状態にすることを特徴とする一缶二水路式給湯装置の制御方法。
A heat exchange section that is used in common for the hot water supply piping system and the additional piping system, and is provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and a combustion section that heats the heat exchange section. In the one-can two-water channel hot water supply apparatus provided with a pump for circulating the water of the bathtub in the memorial piping system,
At least one of when the combustion is stopped or when the combustion is performed with the pump operation, when the temperature of the hot water in the heat receiving pipe of the hot water supply piping system is higher than a predetermined pump operating temperature, the pump is operated, A control method for a single-can two-water-type hot water supply apparatus, wherein the pump is stopped when the temperature of hot water is equal to or lower than the pump operating temperature.
給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部とを備え、上記追焚配管系には浴槽の水を循環させるポンプが設けられた一缶二水路式給湯装置において、A heat exchange section that is used in common for the hot water supply piping system and the additional piping system, and is provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and a combustion section that heats the heat exchange section. In the one-can two-water channel hot water supply apparatus provided with a pump for circulating the water in the bathtub in the memorial piping system,
燃焼停止中に、上記給湯配管系の受熱管内の湯の温度が、所定のポンプ運転温度より高いときには上記ポンプを運転状態にし、上記湯の温度が上記ポンプ運転温度以下であるときには上記ポンプを停止状態にすることを特徴とする一缶二水路式給湯装置の制御方法。  While the combustion is stopped, the pump is operated when the temperature of the hot water in the heat receiving pipe of the hot water supply piping system is higher than a predetermined pump operating temperature, and the pump is stopped when the temperature of the hot water is equal to or lower than the pump operating temperature. A control method for a single-can two-water-type hot water supply device, characterized in that it is in a state.
給湯配管系と追焚配管系とに共通して用いられ、給湯配管系の受熱管と追焚配管系の受熱管とが設けられた熱交換部と、この熱交換部を加熱する燃焼部とを備え、上記追焚配管系には浴槽の水を循環させるポンプが設けられた一缶二水路式給湯装置において、A heat exchange section that is used in common for the hot water supply piping system and the additional piping system, and is provided with a heat receiving pipe for the hot water supply piping system and a heat receiving pipe for the additional piping system, and a combustion section that heats the heat exchange section. In the one-can two-water channel hot water supply apparatus provided with a pump for circulating the water in the bathtub in the memorial piping system,
上記ポンプ運転と燃焼部での燃焼を行って追焚を実行中に、上記給湯配管系の受熱管内の湯の温度が上記ポンプ運転温度に所定の時間経過しても達しないとき、またはポンプ運転温度以下に下がったときには、ポンプを停止させるとともに燃焼を停止させることを特徴とする一缶二水路式給湯装置の制御方法。When the temperature of hot water in the heat receiving pipe of the hot water supply piping system does not reach the pump operating temperature even after a predetermined time has elapsed while performing the pump operation and combustion in the combustion section, or the pump operation A control method for a single-can two-water-type hot water supply apparatus, wherein when the temperature falls below the temperature, the pump is stopped and the combustion is stopped.
上記ポンプ運転と燃焼を伴った追焚実行時において、給湯配管系の滞留水の沸騰を防止するために、追焚燃焼 OFF 温度およびこれより低い追焚燃焼ON温度に基づき、燃焼部での燃焼をヒステリシス制御し、
上記ポンプ運転温度が上記追焚燃焼ON温度より低い温度に設定されていることを特徴とする請求項5〜7のいずれかに記載の一缶二水路式給湯装置の制御方法。
Combustion in the combustion section based on the combustion combustion OFF temperature and lower combustion combustion ON temperature in order to prevent boiling of the accumulated water in the hot water supply piping system during the above-mentioned pump operation and combustion with combustion Control the hysteresis,
Control method for a can two conduit-type hot water supply apparatus according to claim 5, the pump operating temperature, characterized in that it is set to a temperature lower than the add焚燃sintered ON temperature.
JP12636897A 1997-04-30 1997-04-30 One can two water channel hot water supply apparatus and control method thereof Expired - Fee Related JP3880130B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12636897A JP3880130B2 (en) 1997-04-30 1997-04-30 One can two water channel hot water supply apparatus and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12636897A JP3880130B2 (en) 1997-04-30 1997-04-30 One can two water channel hot water supply apparatus and control method thereof

Publications (2)

Publication Number Publication Date
JPH10300198A JPH10300198A (en) 1998-11-13
JP3880130B2 true JP3880130B2 (en) 2007-02-14

Family

ID=14933461

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12636897A Expired - Fee Related JP3880130B2 (en) 1997-04-30 1997-04-30 One can two water channel hot water supply apparatus and control method thereof

Country Status (1)

Country Link
JP (1) JP3880130B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT514681A1 (en) * 2013-08-05 2015-02-15 Vaillant Group Austria Gmbh Process for stagnation detection and stagnation avoidance in heat exchangers

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7062267B2 (en) * 2017-11-27 2022-05-06 株式会社パロマ Water heater

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT514681A1 (en) * 2013-08-05 2015-02-15 Vaillant Group Austria Gmbh Process for stagnation detection and stagnation avoidance in heat exchangers
AT514681B1 (en) * 2013-08-05 2015-06-15 Vaillant Group Austria Gmbh Method for detecting and avoiding boiling in heat exchangers

Also Published As

Publication number Publication date
JPH10300198A (en) 1998-11-13

Similar Documents

Publication Publication Date Title
JP6939190B2 (en) Heating and hot water supply device
JP3880130B2 (en) One can two water channel hot water supply apparatus and control method thereof
JP2008128528A (en) Hot water supply bath device
JPH11311449A (en) Combustion equipment and non-return device thereof having overpressure prevention function
JP7153192B2 (en) Heating water heater
JP3810202B2 (en) Multi-function water heater
JP2003294305A (en) Bathtub hot-water supply device
JP3862810B2 (en) Water heater
JP3848726B2 (en) Water heater
JP3480320B2 (en) Instant hot water unit
JP3859810B2 (en) Flow rate control device and hot water supply device
JP3480245B2 (en) Water heater with solar hot water function
JP3848746B2 (en) Hot water supply device with memorial function
JP3798123B2 (en) One can two water channel type water heater
JP3872875B2 (en) One can two water channel hot water supply apparatus and control method thereof
JP3252879B2 (en) Water heater control device
JP2921177B2 (en) Water heater with bath kettle
JP2004085112A (en) Space heating apparatus
JPH1137554A (en) Combustion equipment
JP3901296B2 (en) One can two water channel type water heater
JP3859832B2 (en) One can two water channel hot water supply apparatus and control method thereof
JP3530251B2 (en) Water heater control method
JPH04222328A (en) Instantaneous supply apparatus of hot water
JPH0413689Y2 (en)
JP3152011B2 (en) Automatic hot water bath equipment

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060207

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060406

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060523

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060721

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061031

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061107

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101117

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111117

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121117

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121117

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131117

Year of fee payment: 7

R250 Receipt of annual fees