JP3865930B2 - Pile hanging jig - Google Patents
Pile hanging jig Download PDFInfo
- Publication number
- JP3865930B2 JP3865930B2 JP12912498A JP12912498A JP3865930B2 JP 3865930 B2 JP3865930 B2 JP 3865930B2 JP 12912498 A JP12912498 A JP 12912498A JP 12912498 A JP12912498 A JP 12912498A JP 3865930 B2 JP3865930 B2 JP 3865930B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- ready
- holder
- cap body
- drive unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Description
【0001】
【発明の属する技術分野】
本発明は、杭の沈設工法に用いられる杭吊込み用治具に関する。
【0002】
【従来の技術】
地中に既製杭を建込む方法の従来の技術として、予めアースオーガにより地盤に掘削した竪穴内に、下端に膨張袋体を有するとともに肉厚部に上記袋体にセメントミルク等の薬液を供給するための流通路を有する中空杭を杭頭が地表より所定深さ埋沈するよう建込み、その後前記袋体にセメントミルク等の薬液を供給してこれを膨張させ、地中に拡大球根を造成するようになされるものがある。
【0003】
【発明が解決しようとする課題】
しかるに上記従来の技術では、杭頭部に薬液供給用の配管を設置し、地上から杭下端の膨張袋体に薬液を供給することになるが、この配管を現場で設置する作業が面倒であるばかるでなく、杭を地表より適宜深さに沈下させるときに前記配管が邪魔になって通称「ヤットコ」といわれる杭吊下げ用治具を用いての沈設作業ができず、回収不能なワイヤ等を使用して作業するほかはなかった。
【0004】
【課題を解決するための手段】
本発明は、既製杭の建込み作業時における薬液供給用配管の設置作業を不要とし、かつ特別な資材を使用することなく杭の沈設を行うことができるようにすることを課題としてなされたものである。
【0005】
上記課題を解決する手段として本発明は、既製杭の上端に既製杭の上端に嵌合して接続自在とされた杭キャップ本体と、この杭キャップ本体内に上下方向摺動自在に設けられ既製杭の上端面に液密に圧着し得るホルダとからなり、前記杭キャップ本体はその上端にオーガ駆動部に連結可能で軸方向に液体供給路を有する連結用ロッドを備え、前記ホルダは前記連結用ロッドの液体供給路に連通する縦通路を有するとともに前記既製杭に縦設された流通路に連通する周方向に長い孔を含む分配路を有することを特徴とする。
【0006】
上記既製杭は一般に中空杭を用いる場合が多く、この場合における前記流通路は中空杭の肉厚部に形成されている。
【0007】
【発明の実施の形態】
以下、本発明を図面に示す実施の形態を参照して説明する。
図1は本発明による杭吊込み用治具の一実施の形態の正面図を、図2は同平面図を示し、図3は図1の縦断面を、図4は図3のA−A相当の断面を示している。
【0008】
上記杭吊込み用治具1は、既製杭Pの上端に嵌合して接続自在な断面下向きコ字状を有する円筒状の杭キャップ本体2と、この杭キャップ本体2の内部に上下摺動自在に設けられ既製杭Pの上端に液密に圧着し得るホルダ3とからなっている。
【0009】
前記杭キャップ本体2の上面部2aの中央位置には、図5で示す掘削機のオーガ駆動部25に所要長さのロッド26を介して連結するための多角形断面を有する連結用ロッド4が突設されており、この連結用ロッド4の軸心にはセメントミルク等の薬液供給源からの薬液供給路に前記駆動部およびロッド内を通じて連通する液体供給路5が形成されているとともに、外周部にはロッド26との連結用の凹溝6,6が形成されている。
【0010】
前記連結用ロッド4の内端位置には円筒状のガイド筒7が固設垂下されている。また上記ガイド筒7の下端位置に相当する位置の杭キャップ本体2の周壁部2bには所要数の泥排除用窓孔8,8が開口されている。
【0011】
上記杭キャップ本体2の周壁部2bの下端の少くとも直径線上2箇所に、下端が開放され上端が水平方向に屈曲された切欠部9が形成されており、上記水平方向に屈曲された屈曲部9aの下縁の入口端には突部9bが突設されている。
【0012】
一方、既製杭Pの上端近くの外周には、前記切欠部9と対応して係止金具10が突設されており、この係止金具10は前記切欠部9を通過し得るとともに該切欠部9の屈曲部9aの垂直な奥端9cと前記突部9bとの間に納まり得る寸法とされている。なお上記切欠部9、係止金具10は、既製杭Pの直径に応じ等角配置の3箇所あるいは4箇所に設けることもある。
【0013】
前記ホルダ3は、中空円盤状を有し、その上面中央位置には前記杭キャップ本体2のガイド筒7の外周にシール材11を介して摺動自在に嵌合する筒状の摺動部12が垂直に突設され、前記ガイド筒7、摺動部12の各内部で縦通路を構成してその下端が通孔13を通じてホルダ3の内部の分配路14と連通されている。
【0014】
上記ホルダ3の下面板3aには、既製杭Pの肉厚部に縦設されている流通路15に連通する周方向に長い複数の長孔16が形成されている。この長孔16は分配路14の一部を構成し、前記既製杭Pに対し杭キャップ本体2を位置合わせすることなく任意の位置で嵌合させても分配路14と流通路15とが連通するよう図4にみられるように3箇所に形成されている。
【0015】
また前記ホルダ3の上下に貫通して複数(図では3本)の泥抜き管17,17,17が補強用のリブ18,18,18により取付けられ、既製杭Pの中空部と杭キャップ本体2の泥排出孔8,8とを連通している。
【0016】
前記ホルダ3の前記泥排出孔8,8…と対応する位置の上部には、該泥排出孔8,8…内に臨むようにストッパ19,19が設けられ、このストッパ19が泥排出孔8の上端または下端に当接することによりホルダ3の上下方向のストロークが規制されるようになっている。
【0017】
また上記ホルダ3の上面と杭キャップ本体2の上面部2aの下面との間には、前記ガイド筒12の外周に外嵌するようにコイルバネ20が嵌挿され、このバネ20の付勢力によりホルダ3を常時下方へ向け付勢し、ホルダ3の下面に付設された円環状のゴム等の弾性材からなるパッキン材21が既製杭Pの上端面に常時液密に圧着しておかれるように構成されている。なお上記パッキン材21にもホルダ3の下面の長孔16と整合する長孔22が形成されている。図3において23は上記パッキン材21の内周を押えるリング状の保護材である。
【0018】
前記既製杭Pの下端には従来と同様に膨張袋体24(図5示)を有し、この袋体24の内部と前記流通路15の下端とが連通状態とされている。
【0019】
次に上記実施の形態の作用を図5(A)〜(H)を参照して説明する。なお図5において符号25は掘削機のオーガ駆動部を、26は駆動部25の出力軸に連結された前述のロッドを示し、27はセメントミルク等の薬液供給管を示している。また28は地中に掘削された竪穴を、29は竪穴28の下端に予め拡大掘りされた大径の球根形成部を示している。
【0020】
まずアースオーガにより掘削された竪穴28内に中空の既製杭Pをワイヤ等により吊持して挿入し、作業しやすい高さだけ地上に突出させておく(図5(A))。このとき既製杭Pの下端は竪穴28の下端の球根形成部29には到達していない。
【0021】
この状態において掘削機の駆動部25に連結されたロッド26の下端に杭キャップ本体2の連結用ロッド4を連結し、この杭キャップ本体2の中心と既製杭Pの中心とが略一致するように位置決めする(図5(B))。
【0022】
次いで駆動部25を下降させ、杭キャップ本体2を既製杭Pの上端に被せる。このとき杭キャップ本体2の切欠部9と係止金具10とが一致するよう駆動部25を若干駆動して位置合わせする。
【0023】
こうしたのち駆動部25を下降させ、係止金具10に切欠部9が嵌合したときさらに駆動部25を寸動回転させて係止金具10が切欠部9の屈曲部9a内に進入するようにして杭キャップ本体2を若干引上げれば、係止金具10は突部9bに係合する(図5(C))。
【0024】
この状態で既製杭Pを吊持していたワイヤを外し、既製杭Pの重量を杭吊込み用治具1に預ける。
【0025】
これと同時に杭キャップ本体2内のホルダ3の下面のパッキン21が既製杭Pの上端面にバネ20の作用により圧接し、両者間の液密状態が維持される。
【0026】
こうして駆動部25を下降させ(図5(D))、既製杭Pを所定深さまで下降させる(図5(E))。
【0027】
次いで図示しない薬液供給ポンプを始動すれば、薬液は外部の薬液供給源から薬液供給管27を通じ駆動部25、ロッド26、連結用ロッド4、ガイド筒7、摺動部12の各内部を通ってホルダ3の分配路14内へ供給され、その長孔16,21を通じて既製杭Pの流通路15を通じ膨張袋体24内へ注入され、該袋体24が次第に膨張し(図5(F))、袋体24が図5(G)のように膨張しきったところで薬液の注入を停止する。
【0028】
薬液の注入が完了したら駆動部25を若干下降させて係止金具10から突部9bを外し、次いで前記とは逆方向に寸動回転させて係止金具10を切欠部9の屈曲部9aから外し、駆動部25を上昇させて杭吊込み用治具1を上方へ引上げて回収する(図5(H))。
【0029】
【発明の効果】
以上説明したように本発明によれば、下端に膨張袋体を有する既製杭であっても竪穴内の所定の深度まで確実に下降(沈設)することができ、同時に膨張袋体に薬液を供給して膨張させることができる。膨張袋体を有しない既製杭の場合であっても同様である。
【0030】
また本発明による治具は所定の作業を終了したのち容易に回収することができるので繰返し使用することができ、きわめて経済的である。さらに別途薬液供給管に関する配管作業が不要であるため作業性がよく、しかも外部配管がないので杭が沈設不能に陥った際に回転沈設を可能とすることができる。
【図面の簡単な説明】
【図1】本発明による杭吊込み用治具の一実施形態を示す正面図。
【図2】同、平面図。
【図3】図1の縦断面図。
【図4】図3のA−A相当の断面図。
【図5】(A)〜(H)は作業工程例を示す説明図。
【符号の説明】
1 杭吊込み用治具
2 杭キャップ本体
3 ホルダ
4 連結用ロッド
7 ガイド筒
8 泥排除用窓孔
9 切欠部
10 係止金具
12 摺動部
14 分配路
15 流通路
16 長孔
17 泥抜き管
18 リブ
19 ストッパ
20 バネ
21 パッキン材
22 長孔
24 袋体
25 駆動部
26 ロッド[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a pile hanging jig used in a pile setting method.
[0002]
[Prior art]
As a conventional technique for building ready-made piles in the ground, an inflatable bag body is provided at the lower end in a pothole previously drilled in the ground with an earth auger, and chemical liquid such as cement milk is supplied to the bag body at the thick part A hollow pile with a flow passage for laying is built so that the pile head is submerged to a predetermined depth from the ground surface, and then a chemical solution such as cement milk is supplied to the bag body to expand it, and an enlarged bulb is placed in the ground. There is something that is made to build.
[0003]
[Problems to be solved by the invention]
However, in the above-mentioned conventional technology, a pipe for supplying a chemical solution is installed at the head of the pile, and the chemical solution is supplied from the ground to the expansion bag body at the lower end of the pile. However, the work of installing this pipe in the field is troublesome. It is not ridiculous, and when the pile is submerged to the appropriate depth from the ground surface, the piping becomes in the way and it is impossible to set up using a jig for hanging the pile, which is commonly called “Yatco”, and it is an unrecoverable wire There was no other way to work with them.
[0004]
[Means for Solving the Problems]
An object of the present invention is to eliminate the need to install chemical supply pipes during the construction work of ready-made piles, and to allow piles to be laid without using special materials. It is.
[0005]
As a means for solving the above-mentioned problems, the present invention provides a pile cap body which is fitted to the upper end of the ready-made pile and can be freely connected to the upper end of the ready-made pile, and is provided in the pile cap body so as to be slidable in the vertical direction. The pile cap body is provided with a connecting rod that can be connected to an auger drive unit at its upper end and has a liquid supply path in the axial direction, and the holder is connected to the upper end surface of the pile. It has a distribution path containing a long hole in the peripheral direction which has a longitudinal passage connected to the liquid supply path of the rod for use, and communicates with a flow passage installed in the ready-made pile.
[0006]
The above-mentioned ready-made pile is generally a hollow pile in many cases, and the flow path in this case is formed in the thick part of the hollow pile.
[0007]
DETAILED DESCRIPTION OF THE INVENTION
The present invention will be described below with reference to embodiments shown in the drawings.
1 is a front view of an embodiment of a jig for hanging a pile according to the present invention, FIG. 2 is a plan view thereof, FIG. 3 is a longitudinal section of FIG. 1, and FIG. A considerable cross section is shown.
[0008]
The
[0009]
At the center position of the
[0010]
A
[0011]
At least two places on the diameter line of the lower end of the
[0012]
On the other hand, on the outer periphery near the upper end of the ready-made pile P, a
[0013]
The
[0014]
The
[0015]
Further, a plurality (three in the figure) of
[0016]
On the upper part of the
[0017]
A
[0018]
An inflatable bag body 24 (shown in FIG. 5) is provided at the lower end of the ready-made pile P as in the prior art, and the inside of the
[0019]
Next, the operation of the above embodiment will be described with reference to FIGS. In FIG. 5,
[0020]
First, a hollow ready-made pile P is suspended and inserted into a
[0021]
In this state, the connecting rod 4 of the
[0022]
Next, the
[0023]
After that, the
[0024]
In this state, the wire that has suspended the ready-made pile P is removed, and the weight of the ready-made pile P is deposited in the
[0025]
At the same time, the packing 21 on the lower surface of the
[0026]
Thus, the
[0027]
Next, when a chemical solution supply pump (not shown) is started, the chemical solution passes from the external chemical solution supply source through the chemical
[0028]
When the injection of the chemical solution is completed, the
[0029]
【The invention's effect】
As described above, according to the present invention, even a ready-made pile having an inflatable bag body at the lower end can be surely lowered (sedged) to a predetermined depth in the pothole, and at the same time, a chemical solution is supplied to the inflatable bag body. And can be inflated. The same applies to the case of a ready-made pile that does not have an inflatable bag.
[0030]
Further, the jig according to the present invention can be easily collected after a predetermined work is completed, so that it can be used repeatedly and is extremely economical. In addition, since a separate piping work for the chemical solution supply pipe is not required, the workability is good, and since there is no external pipe, it is possible to rotate and set when the piles cannot be set.
[Brief description of the drawings]
FIG. 1 is a front view showing an embodiment of a pile hanging jig according to the present invention.
FIG. 2 is a plan view of the same.
FIG. 3 is a longitudinal sectional view of FIG.
4 is a cross-sectional view corresponding to AA in FIG. 3;
FIGS. 5A to 5H are explanatory diagrams showing examples of work processes. FIGS.
[Explanation of symbols]
DESCRIPTION OF
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP12912498A JP3865930B2 (en) | 1998-05-12 | 1998-05-12 | Pile hanging jig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP12912498A JP3865930B2 (en) | 1998-05-12 | 1998-05-12 | Pile hanging jig |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH11323931A JPH11323931A (en) | 1999-11-26 |
JP3865930B2 true JP3865930B2 (en) | 2007-01-10 |
Family
ID=15001687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP12912498A Expired - Fee Related JP3865930B2 (en) | 1998-05-12 | 1998-05-12 | Pile hanging jig |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3865930B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5230553B2 (en) * | 2009-07-14 | 2013-07-10 | 株式会社トーヨーアサノ | Yatco lots and Yatcos, methods for reducing the strength of Yatco pillars using these, and methods for burying ready-made piles |
JP7025758B2 (en) * | 2018-06-21 | 2022-02-25 | 株式会社ワイビーエム | Steel pipe pile rotary press-fitting device |
-
1998
- 1998-05-12 JP JP12912498A patent/JP3865930B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH11323931A (en) | 1999-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4474243A (en) | Method and apparatus for running and cementing pipe | |
US5318132A (en) | Retrievable whipstock/packer assembly and method of use | |
US2162108A (en) | Method for forming concrete | |
JP6537785B2 (en) | Control method of groundwater movement in steel pipes | |
JP3865930B2 (en) | Pile hanging jig | |
CN112854194B (en) | Device for retreating type grouting and using method | |
KR100733146B1 (en) | Pipe pulling-out device for processing equipment of underground water hole | |
US3738115A (en) | Method and apparatus for plastic hydraulic material | |
JP3158116B2 (en) | Through-hole forming device in earth retaining wall construction work | |
JP4281650B2 (en) | Foundation pile, its construction method and slime processing equipment used for its construction | |
JP3158011B2 (en) | Slurry pushing-out device in earth retaining wall construction work | |
WO1982001211A1 (en) | Method and apparatus for running and cementing pipe | |
JPH01131715A (en) | Ground improving work by horizontal injection of chemical grout | |
JP4468138B2 (en) | Ground vibration isolation structure and ground vibration isolation method | |
JPH0476110A (en) | Installation method for medical fluid injection strainer pipe and strainer pipe therefor | |
CN215860015U (en) | Drilling device | |
JPH07216862A (en) | Preventer device | |
JPH11166232A (en) | Pile hanging jig | |
KR100940387B1 (en) | Grouting apparatus for deep well of ground water | |
JP2001173085A (en) | Pipeline regenerating construction method | |
JP2006063526A (en) | Expansive foot protection method using friction pile | |
JPS60119818A (en) | Construction work of custom-made pile | |
JPS6242982Y2 (en) | ||
RU32178U1 (en) | Waterjet Cutter | |
JP2789107B2 (en) | Rubber sleeve structure of injection outer tube for ground improvement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20040220 |
|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20040224 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041124 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060831 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060905 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061004 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091013 Year of fee payment: 3 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101013 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101013 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111013 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111013 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121013 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121013 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131013 Year of fee payment: 7 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |