JP3812457B2 - Power contract change method and power contract change system - Google Patents

Power contract change method and power contract change system Download PDF

Info

Publication number
JP3812457B2
JP3812457B2 JP2002039819A JP2002039819A JP3812457B2 JP 3812457 B2 JP3812457 B2 JP 3812457B2 JP 2002039819 A JP2002039819 A JP 2002039819A JP 2002039819 A JP2002039819 A JP 2002039819A JP 3812457 B2 JP3812457 B2 JP 3812457B2
Authority
JP
Japan
Prior art keywords
power
contract
information
storage means
contractor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002039819A
Other languages
Japanese (ja)
Other versions
JP2003244844A (en
Inventor
正樹 福本
孝一 ▲高▼橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2002039819A priority Critical patent/JP3812457B2/en
Publication of JP2003244844A publication Critical patent/JP2003244844A/en
Application granted granted Critical
Publication of JP3812457B2 publication Critical patent/JP3812457B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、電力供給者と電力需要者との契約の変更を行う方法及びシステムに関するものである。
【0002】
【従来の技術】
従来、電力会社などの電力供給者と電力需要者との契約は、電力量(VA)によって決定されており(実際には電圧V(ボルト)電流A(アンペア)換算/例:100V30A)、その契約に応じて、需要者の電力使用場所単位でその契約電力に応じたブレーカ(配線用遮断器)などの電力遮断機を設置して、契約電力以上の電力が供給できないよう制限していた。
【0003】
現状の電力契約は一般に契約電力が大きいほど、基本料金や電力単価(1KW当たりの電力使用量)が高くなる様に設定されており、電力需要者はなるべく少ない電力量で契約を行う事が多い。
【0004】
【発明が解決しようとする課題】
上記従来の構成では、電力需要者は契約電力を超えて電化製品を使用している事は、電力遮断機が電力を遮断する事で始めて知る事ができる。また、契約電力を変更するとなると、電力会社へその旨を申込み、その後、電力会社の担当者が変更される電力に応じた電力遮断機を設置しなおすという工事を必要とする。
【0005】
このため、従来では、予期しない電力供給の遮断が何回か続き、その時点で、電力需要者は契約電力が慢性的に不足していることを認識して初めて、契約変更を行い、その後、契約変更のための工事がされて初めて契約電力が変更される。
【0006】
電化製品には、電力の供給を受けて動作する時計機構や、パーソナルコンピュータのように所定手順以外での電力切断ではデータ破壊の可能性の伴うものなどがあり、電力切断における過剰電力の通知はこれらの電化製品に関しては致命的な障害を引き起こす事があった。
【0007】
また、電力切断による契約電力料の不足を実感してから、契約変更工事までの間、我慢しながら従来の契約電力での使用を続けなければならないという事態になっていた。
【0008】
本発明は、上記従来の課題に鑑み、電力の停止を伴わず、かつ、工事を行うことなく契約電力の変更を行う事ができる契約電力変更方法及びシステムを提供することを目的とする。
【0009】
【課題を解決するための手段】
消費電力を検出する検出装置と、検出装置と通信を行うサーバとからなり、
検出装置は、消費される電力の量を検出する検出手段と、契約電力の情報を記憶する記憶手段と、検出手段によって検出された電力量が、記憶手段に記憶されている契約電力の量を上回ったときに、サーバへ通知を行う通知手段と、サーバより契約電力情報を受信すると、記憶手段の契約電力の情報を更新する更新手段とを有し、サーバは、更新後の契約電力の量を記憶する契約電力記憶手段と、検出装置より契約電力を上回った旨の通知があると検出装置に対し、契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する送信手段とを有する事を特徴とするものである。
【0010】
【発明の実施の形態】
以下、本発明の実施の形態の電力契約変更システムについて説明を行う。
(システム構成)
図1は、本発明である電力契約変更システムを使用した電力供給システムのシステム図である。
【0011】
図1において、1は電力需要者の家屋である。一般に一般家庭との契約は家屋単位で行われる。本実施の形態でも、電力需要者の契約の単位として家屋を設定した例を示している。(なお、本実施の形態では、以降、電力会社と契約を行い、電力の供給を受けている電力需要者を「契約者」、これから契約を行う電力需要者を「契約希望者」と称する。)この家屋1内には、テレビ101、電子レンジ102、電灯103、パーソナルコンピュータ104、冷蔵庫105の電化製品が設置されている。また、この一般家屋には消費電力情報LAN106が設置されており、各電化製品には、それぞれ該当電化製品の消費電力を検出する消費電力検出手段111、消費電力検出手段112、消費電力検出手段113消費電力検出手段114、消費電力検出手段115がこの消費電力情報LAN106に接続されている。
【0012】
なお、パーソナルコンピュータ104は、図2のブロック図に示されるように、キーボード121及びマウス122からの入力を受け付ける入力制御手段120、パーソナルコンピュータ104での送受信メールを蓄積するメール情報蓄積手段123、ネットワーク3との通信を行うための通信制御手段124、ディスプレイ125に表示させる表示制御手段126、通信制御手段124を制御してメールの送受信を行いその際送信若しくは受信した電子メール情報をメール情報蓄積手段123に蓄積するメール送受信手段127、入力制御手段120が受け付けた入力内容を表示制御手段に表示させる等によりメール文書の作成を行う文書作成手段128、入力制御手段120に文書閲覧指示の入力受付が行われた際、メール情報蓄積手段123から目的の文書を抽出し、表示制御手段126を制御してディスプレイ125に抽出した文書を表示させる文書閲覧手段129とを備えている。また、このパーソナルコンピュータ104は電源ユニット130によって家庭用交流電源を電圧及び直流電圧変換を行われた電力を用いて駆動されている。この電源ユニット130は、消費電力検出手段114に接続され、消費電力検出手段114はパーソナルコンピュータ104の消費電力を検出している。
【0013】
また、消費電力検出手段111〜115は、図3のブロック図に示されるように、電力製品の電力供給コンセントを接続する電化製品接続部151、電力供給ラインとの接続を行う電源供給ライン152を持ち、電化製品接続部151と電力供給ライン接続部152との間の電力の導通・遮蔽を行うための電力遮蔽スイッチ153、消費電力情報LAN106を使った通信を行うための通信制御部154、対象となる電化製品の消費電力を測定し通信制御部154へ伝える電力測定部155、通信制御部154にて受信された信号に応じて電力遮蔽スイッチ153の開閉制御を行う電力遮蔽部156とにより構成されている。
【0014】
2は、家屋1に設置され、家屋1内の各電化製品により消費される電力の管理を行う消費電力管理装置である。この消費電力管理装置2は、消費電力情報LAN106を介した通信を行う通信制御手段201、各消費電力検出手段111〜115が検出した消費電力情報を受信する消費電力情報受信手段202、消費電力情報受信手段202が受信した消費電力情報を基に、各電化製品の消費電力を加算する消費電力加算手段203、ネットワーク3を介して後述する電力会社サーバ4との通信を行うための通信制御手段204、契約電力を記憶している契約電力記憶手段205、消費電力加算手段203の加算結果が契約電力記憶手段205に記憶されている契約電力量を超えていたときにネットワーク3を通じて電力会社サーバ4へ過剰電力通知を送信する過剰電力通知送信手段206、電力会社サーバ4から送られてくる契約電力情報を受信する契約電力情報受信手段207、契約電力情報受信手段207が受信した契約電力情報を基に契約電力記憶手段205が記憶している契約電力情報を更新する契約電力情報更新手段208とを備えている。
【0015】
4は、電力会社サーバであり、契約者の情報を記憶する契約者記憶手段401、ネットワーク3との通信を行う通信制御手段402、パーソナルコンピュータ104もしくは電力会社サーバ4の管理コンピュータ5との通信に基づき、契約者記憶手段401に契約者情報を登録する契約者登録手段403、通信制御手段402が受信した過剰電力通知を過剰電力情報記憶手段404に記憶させる過剰電流通知受信手段405、過剰電力情報記憶手段404に記憶されている情報から過剰電力供給している契約者の情報を抽出し過剰電力利用契約者情報記憶手段406に記憶する過剰電力利用者抽出手段407、過剰電力利用契約者記憶手段406に記憶されている情報を基に契約更新を促す入力フォームを入力フォーム記憶手段408より抽出し該当する契約者へ通知メールを送信する契約更新通知手段409、契約者からの契約更新通知を通信制御手段402を通じて受信する契約更新受信手段410、契約更新受信手段410が受信した通知を基に契約者記憶手段401の契約内容を更新すると共に消費電力管理装置2へ契約電力情報を送信する契約内容更新手段411、契約内容更新手段411によって更新された契約内容を該当契約者へメール通知する契約内容更新通知手段412とを備えている。
【0016】
以上のように構成された、電力契約供給システムについて、以下、その動作の説明を行う。
【0017】
(新規契約処理)
まず、電力会社との新規契約について説明する。
【0018】
この契約手順は、
1.契約希望者が契約書類を郵送や電力会社の営業所へ赴くなど、非オンライン手段により電力会社へ届け、その書類を基に電力会社の担当者が管理コンピュータ5を使って電力会社サーバ4へその情報を登録する。
2.契約希望者が所有するパーソナルコンピュータ104を使ってネットワーク経由で電力会社に契約情報を送り、電力会社サーバ4はその情報を登録する。
と、いう2種類の方法が考えられる。
【0019】
それぞれについてその手順を説明する。
【0020】
まず、上記1について図4のフローチャートを用いて説明する。なお、書類は契約希望者から何らかの非オンライン手段によって電力会社へ送られた後であるものとする。また、電力会社サーバ4では、契約者登録手段403がこの契約者の新規登録に関する処理を行っている。
【0021】
まず、電力会社の担当者は、管理コンピュータ5を起動し、契約者情報の登録画面を選択すると、図5の画面501に示されるように、契約者情報の入力画面が表示される(ステップ1001)。
【0022】
ここで、入力する項目は、
(1)契約者の「氏名」
(2)契約者の「住所」
(3)契約者の「電話番号」
(4)当初の契約電力(画面501では「契約電力」と、表示)
(5)本発明の特徴である契約の自動更新契約を行うか否かの選択(画面501では「自動更新契約」の可否をY/Nで入力するようになっている)
(6)自動更新による契約変更後の契約電力
(7)メールアドレス
である。
【0023】
電力会社の担当者は、これらの項目を電力需要者より送られてきた契約書類を基に入力する(ステップ1002)。
【0024】
この情報入力が完了すると、電力会社の担当者は画面501に設けられた「契約送信」ボタンを選択して、契約情報の送信指示を行う(ステップ1003)。
【0025】
その情報を受けた管理コンピュータ5は電力会社サーバ4へ入力された契約者情報を送信する(ステップ1004)。
【0026】
この情報を受けた電力会社サーバ4は(ステップ1005)、この契約者情報に対し、他の顧客とは重ならない一意の顧客番号を付与する。今回の場合、「012−333−4567」という番号が付されたものとする(ステップ1006)。
【0027】
その後、受信した契約情報と顧客番号を対応付けて契約者記憶手段401に記憶する(ステップ1007)。この様にして記憶された内容は図6の契約者情報テーブル601に示されるように、契約者番号6001・氏名6002・住所6003・電話番号6004・e-mail6005・当初の契約電力6006(テーブル601では単に「契約電力」と標記)・自動契約変更の可否6007(テーブル601では単に「自動契約変更」と標記)・自動変更後の契約電力6008(テーブル601では単に「自動変更後電力」と標記)という、上記した内容のほかに、変更フラグ6009が設けられている。この項目は、既に自動契約変更が行われたか否かをチェックする欄で、何らかの情報が付されていれば既に自動契約変更処理が行われた後である事を示す。新規契約の場合は、変更は行われないので、この欄は空白状態で登録されている。なお、ここに「基本増額」の情報が付された場合は、その後の集金処理では、基本料金を増額した契約に基づく集金処理が行われ、「単位増額」の情報が付された場合には、単位料金が増額された契約に基づく集金処理が行われる事となる。
【0028】
この記憶処理が完了すると、電力管理サーバ4は、契約者情報記憶手段401に記憶させた契約内容の情報を管理用コンピュータ5へ送信する(ステップ1008)。
【0029】
この情報を受信した管理用コンピュータ5は(ステップ1009)、この契約内容の表示を行う(ステップ1010)。この表示内容は、画面503に示されるように電力会社の担当者が入力された情報に契約者番号が付された情報が表示される事となる。
【0030】
次に、上記2の契約手順について図7及び図8のフローチャートを用いて説明する。なお、電子メールのやり取りは、メールを管理するメールサーバを経由して行われるのが一般的であるが、本実施の形態では、その説明を省略している。
【0031】
まず、契約希望者は、パーソナルコンピュータ104のキーボード121やマウス122を操作する事により、電力会社へ契約要求の指示を行う。
【0032】
この入力を受けたメール送受信手段127は、通信制御手段124を制御してネットワーク3を介して電力会社サーバ4へこの要求情報を送信する(ステップ1101)。この情報を受けた電力会社サーバ4は(ステップ1102)、入力フォーム記憶手段408から、新規契約用の入力フォームを抽出し(ステップ1103)、パーソナルコンピュータ104へ電子メールとして送信する(ステップ1104)。
【0033】
この電子メールを通信制御手段124により受信したパーソナルコンピュータ104は(ステップ1105)、メール送受信手段127によってメール蓄積手段123に蓄積する(ステップ1106)。
【0034】
その後、契約希望者が、このパーソナルコンピュータ104のキーボード121やマウス122などを使って、受信メールの閲覧を指示すると(ステップ1107、それを受けた入力制御手段120が文書閲覧手段129を起動する。文書閲覧手段129は、メール情報蓄積手段123から受信した電子メールを取り出し、表示制御手段126を制御して、ディスプレイ125に受信した電子メールの内容を表示させる。
【0035】
図9の画面901がその画面である。この画面でも分かるように、入力項目は、
(1)契約者の「氏名」
(2)契約者の「住所」
(3)契約者の「電話番号」
(4)当初の契約電力(画面901では「契約電力」と、表示)
(5)本発明の特徴である契約の自動更新契約を行うか否かの選択(画面901では「自動更新契約」の可否をY/Nで入力するようになっている)
(6)自動更新による契約変更後の契約電力
(7)メールアドレス
である。契約希望者は、キーボード121及びマウス122を使ってこの表示内容の所定枠に所定事項を入力する操作を行う。
この操作を入力制御手段120が受けると、この操作情報を文書作成手段128へ伝え、この操作情報に応じて電子メールへの情報の入力が行われる(ステップ1109)。
【0036】
この操作が完了すると、マウス122を使って契約希望者は画面901上の「送信」ボタン902を押す操作、即ち送信指示の操作を行う(ステップ1110)。この操作を入力制御手段120が検出すると、メール送受信手段127は、通信制御手段124を制御して、この所定事項が入力された電子メールを電力会社サーバ4へ送信する(ステップ1111)。
【0037】
この情報を受けた電力会社サーバ4は(ステップ1112)、この契約者情報に対し、他の顧客とは重ならない一意の顧客番号を付与する。今回の場合、「012−333−4567」という番号が付されたものとする(ステップ1113)。
【0038】
その後、受信した契約情報と顧客番号を対応付けて契約者記憶手段401に記憶する(ステップ1114)。この様にして記憶された内容は図6の契約者情報テーブル601に示されるように、契約者番号6001・氏名6002・住所6003・電話番号6004・e-mail6005・当初の契約電力6006(テーブル601では単に「契約電力」と標記)・自動契約変更の可否6007(テーブル601では単に「自動契約変更」と標記)・自動変更後の契約電力6008(テーブル601では単に「自動変更後電力」と標記)という、上記した内容のほかに、変更フラグ6009が設けられている。この項目は、既に自動契約変更が行われたか否かをチェックする欄で、何らかの情報が付されていれば既に自動契約変更処理が行われた後である事を示す。新規契約の場合は、変更は行われないので、この欄は空白状態で登録されている。
【0039】
この記憶処理が完了すると、電力管理サーバ4は、契約者情報記憶手段401に記憶させた契約内容の情報をパーソナルコンピュータへ電子メールとして送信する(ステップ1115)。
【0040】
この電子メールを通信制御手段124により受信したパーソナルコンピュータ104は(ステップ1116)、メール送受信手段127によってメール蓄積手段123に蓄積する(ステップ1117)。
【0041】
その後、契約希望者が、このパーソナルコンピュータ104のキーボード121やマウス122などを使って、受信メールの閲覧を指示すると(ステップ1118、それを受けた入力制御手段120が文書閲覧手段129を起動する。文書閲覧手段129は、メール情報蓄積手段123から受信した電子メールを取り出し、表示制御手段126を制御して、ディスプレイ125に受信した電子メールの内容を表示させる(1119)。
【0042】
図9の画面903はその画面を示した図面である。この表示内容は、画面903に示されるように電力会社の担当者が入力された情報に契約者番号が付された情報が表示される事となる。
【0043】
上記の1または2の新規契約手順にて契約が完了すると、契約者記憶手段401から該当契約希望者の契約電力情報6006を抽出し、消費電力管理装置2へ送信が行われる。
【0044】
この情報を受信した消費電力管理装置2は、この情報を契約電力記憶手段205に記憶する。
【0045】
これにより、新規契約の手続が完了する。
【0046】
なお、上記手順での契約が完了するまでは、消費電力管理装置2は、消費電力検出手段111〜115に対し電力遮蔽を指示する情報を送信しておき、その情報を受けた消費電力検出手段111〜115の通信制御部154は、電力遮蔽部156による制御によって電力遮蔽スイッチ153を遮蔽状態とさせておき、電力会社サーバ4から契約電力情報が送られてきたときにこの遮蔽を解除するように消費電力検出手段111〜115に通知し、これを受けた消費電力検出手段111〜115が電力遮蔽部156の制御により、電力遮蔽スイッチを通電状態に切替るようにすれば、電力会社サーバ4からの通信のみで電力開通処理を行う事ができるようになり、電力会社の担当者が、契約希望者のところへ赴いて工事するための手間、時間がなくす事ができるようになる。
(過剰電力情報蓄積処理)
上記システム構成でも説明したとおり、この消費電力管理装置2は、契約者の消費電力が契約電力を超えていた場合(過剰消費電力)、電力会社へその旨を通知するための装置である。
【0047】
以下、この消費電力管理装置2が過剰消費電力を検出した場合の処理について、図10に示されるフローチャートを基に説明を行う。
【0048】
まず、消費電力管理装置2は、消費電力情報受信手段202の処理によって消費電力情報LAN106を経由して消費電力検出手段111〜115から各電化製品が消費している消費電力情報を取得する(ステップ1201,1202)。この際のそれぞれの消費電力検出手段111〜115から消費電力管理装置2が消費電力を取得する手順は以下のとおりである。
【0049】
以下、その手順について図11のフローチャートを用いて説明する。なお、このフローチャートでは便宜上消費電力検出手段111との通信を説明しているが他の消費電力検出手段112〜115との通信も同様の手順で行われる。
【0050】
消費電力手段155は、電力測定部155により、電化製品が消費している電力を検出している(ステップ1301)。また、通信制御部154は、消費電力管理装置2から消費電力情報を要求する信号が受信されているかチェックしている(ステップ1302、ステップ1303)。この時受信が行われていなければ、ステップ1301へ戻り、消費電力検出処理を継続する。即ち、消費電力管理装置からの信号が無ければ、消費電力を継続して検出している事となる。
【0051】
この状況で消費電力管理装置2の消費電力情報受信手段202が消費電力情報を要求する信号を要求すると(ステップ1304)、その信号を消費電力検出手段111の通信制御部154が受信し、ステップ1301で検出した消費電力情報を消費電力管理装置2へ送信する(ステップ1305)。この情報を受信した消費電力管理装置2は(ステップ1306)、この情報を契約電力記憶手段404に記憶する(ステップ1307)。
【0052】
以上の手順によって各消費電力検出手段111〜115が検出した消費電力情報の取得が終了すると、消費電力管理装置2の消費電力加算手段203は、契約電力記憶手段404に記憶されている消費電力情報から全家電製品の消費電力を算出する(ステップ1203)。
【0053】
その後、消費電力通知送信手段206は、この算出された消費電力と契約電力記憶手段205に記憶されている契約電力情報とを比較し、(ステップ1204)、消費電力加算手段203が算出した消費電力が契約電力記憶手段205に記憶されている契約電力情報より大きい時には(ステップ1205)、1時間以内に過剰電力情報が送信されていないかを確認し(ステップ1206)、送信されていなければ、消費電力情報加算手段203で算出された消費電力の総和の情報を通信制御手段204を制御してネットワーク3経由で電力会社サーバ4に送る(ステップ1207)。
【0054】
この情報を、通信制御手段402を介して受信した電力会社サーバ4の過剰電力通知受信手段405は(ステップ1208)、過剰電力情報記憶手段404へその情報に、送信してきた消費電力管理装置2が設置されている契約者の契約者番号及び受信した日時情報を加えて記憶させる(ステップ1209)。この様にして、各契約者の家屋に設置された消費電力管理装置2より、過剰電力情報が送られてくるので、過剰電力情報記憶手段404には、図12のテーブル図のように、過剰電力情報を受信した日時701、受信日時契約者番号702、電力量703とが関連付けられた状態で蓄積されていく事となる。
【0055】
なお、ステップ1205で契約電力記憶手段205に記憶されている契約電力情報が、消費電力加算手段で算出された消費電力の総和より大きい場合は過剰電力情報を送信する必要が無いので、ステップ1201へ戻る。
【0056】
また、ステップ1206で1時間以内に過剰電力情報が送信済みの場合にもステップ1201へ戻るが、これは、短時間で何度も検出が行われているので、過剰電力が一度検出されると、短時間に何度も同じような情報を電力会社サーバ4に送られてしまうのを防止するためである。
【0057】
この様にして、各契約者の家屋で消費される過剰電力の情報が電力会社サーバ4の過剰電力情報記憶手段404に蓄積されていく事となる。
(契約変更処理)
上記した「過剰電力情報蓄積処理」にて蓄積された過剰電力情報を使って、契約更新処理を行う。この処理は、1日1回もしくは、週に1回程度の頻度で行われる。
【0058】
この処理について図13に示すフローチャートを用いて説明する。
【0059】
まず、電力会社サーバ4の過剰電力利用者抽出手段407は、過剰電力情報404に蓄積された情報を抽出する。(ステップ1401)
ここでは、図12のテーブルに示される、受信日時情報701、契約者番号702、電力量の3つの情報が抽出される。
【0060】
次に該当契約者のリストを抽出する(ステップ1402)。このリストは、過剰電力情報記憶手段404から抽出した情報から重複する契約者番号の情報を削除し、その後、該当する契約者番号の契約者情報を契約者記憶手段401から抽出する。上記したように契約者記憶手段401には図6のテーブルに示される契約者情報が記憶されているので、この情報と、重複する契約者番号を除いた過剰電力情報記憶手段404の情報とを照合し、該当契約者の情報を抽出するものである。過剰電力情報記憶手段404には図12のテーブルに示されるように、契約者番号「012−333−4567」、「014−345−3258」の2つの契約者番号があるので、その契約者情報に対応した契約者情報契約者記憶手段401から抽出する。本実施の形態では図6の契約者情報テーブルに示される情報から抽出されるので、その抽出された情報は、図14のテーブルに示される、「富士通太郎」「鳥崎三郎」に関する契約者情報が抽出される事となる。この様にして抽出された契約者情報は過剰電力契約者情報記憶手段405に記憶される。即ち図14のテーブルで示される情報が過剰電力契約者情報記憶手段405に記憶される事となる。
【0061】
次に、過剰契約者情報記憶手段405に記憶されている契約者情報から実際に契約の自動切り替えを行うべき契約者の情報を抽出する(ステップ1403)。
【0062】
この手順について図15のフローチャートを用いて説明する。
【0063】
まず、過剰電力利用契約者情報405に記憶されている契約者の情報を抽出する(ステップ1501)。この後、抽出した契約者情報の自動契約更新情報を参照し、該当する契約者が自動契約更新の契約者であるものを抽出する。(ステップ1502)図14のテーブルに示される契約者情報では、2つの契約者情報とも該当しているので、双方が抽出される。
【0064】
更に、この契約者のうち自動切替を未だ行っていない利用者を抽出すると共に、既に自動切替後となっている契約者に対して警告の通知を行う(ステップ1503)。この処理について図16のフローチャートを用いて説明を行う。
【0065】
まず、契約者情報から既に自動契約切替後かをチェックする(ステップ1601)。これは、契約者情報の変更フラグを確認する事で行われる。本実施の形態の場合、契約者情報に付された変更フラグに何も付されていないものが自動契約切替前のものである。
【0066】
ここで、自動契約前であれば、抽出した契約者全員についてこのチェックが完了したかを確認し、完了していなければ、ステップ1601へ戻り、完了していればもとの処理へ戻る(ステップ1602)。
【0067】
また、ステップ16011において自動契約切替後即ち変更フラグに何らかの情報が付されているものは、ステップ1603移行の処理を行う。本実施の形態の場合、図14に示される「鳥崎三郎」の契約者情報には、変更フラグに「基本増額」の情報があるため、この処理に該当する。以下、「鳥崎三郎」の契約情報を基に説明する。
【0068】
ステップ1603では、まず、契約者情報に含まれるE−mail情報である「saburo@+*+.ne.jp」を抽出し、このアドレスへ契約オーバーである旨の電子メールを送信する(ステップ1603)。この情報は、ネットワーク3を経由して、該当契約者のパーソナルコンピュータ104が受信する。
【0069】
その後、利用者がパーソナルコンピュータ104に対し、該メールの表示指示を行うと(ステップ1605)、パーソナルコンピュータ104のディスプレイに該メールが表示される(ステップ1606)。
【0070】
また、電力会社サーバ4は、ステップ1603による送信処理の後、該当する契約者情報、即ち「鳥崎三郎」の契約者情報を過剰電力利用情報記憶手段406から削除し(ステップ1607)、ステップ1602へ進む。
【0071】
この様に処理する事で、自動契約切替前の該当契約者のみの情報が過剰電力利用情報記憶手段406へ記憶され,かつ、自動切換え後であっても更に過剰電力消費を続ける契約者に対しては、警告や契約切替の手続を促す連絡を自動的に行う事ができるようになる。
【0072】
本実施の形態の場合、ステップ1403の処理によって、過剰電力利用契約者情報記憶手段405から「鳥崎三郎」の契約者情報が削除されたため、該記憶手段に記憶されている契約者情報は、図17に示されるように、「富士通太郎」の情報のみが蓄積されていることになる。
【0073】
この状態で電力会社サーバ4は、次に過剰電力利用契約者情報記憶手段405に記憶されている契約者情報を基に自動契約切替を促すメールを送信する(ステップ1404)。この処理について図18に示されるフローチャートを基に説明する。なお、この処理は電力会社サーバ4の契約更新通知手段410が行っている。
【0074】
まず過剰電力利用契約者情報記憶手段406より契約者情報を抽出し、その情報に含まれるE−Mailアドレスを抽出する。また、入力フォーム記憶手段408から入力フォームを抽出する。この入力フォームは図19に示されるように現状の契約をオーバーして電力を使用していること及び、自動切替を行う旨の通知、自動切替後の料金の増額を基本料金を増額させる契約とするのか、単位料金を増額させるのかを選択するための入力枠を設けたものである。
【0075】
この抽出された入力フォームの電子メールを抽出したE−Mailアドレス宛に送信する(ステップ1701)。この電子メールを受けた該当契約者のパーソナルコンピュータ104のメール送受信手段127は、メール情報蓄積手段123に該メールを蓄積する(ステップ1702)。その後、契約者が、パーソナルコンピュータ104のキーボード121またはマウス122を操作して、該メールの表示指示を行うと(ステップ1703)、この情報を受けた入力制御手段120は文書閲覧手段129を起動する。文書閲覧手段129は、メール情報蓄積手段123から該メール情報を抽出し、表示制御手段126を制御してディスプレイ125に表示を行わせる。この様な手順により、図19に示される旨のメールがディスプレイ125に表示される事となる(ステップ1704)。ここで、契約者が更に、キーボード121やマウス122を操作して、単位料金・基本料金いずれを増額するかを指定する入力(図19では、()内に該当数字を入れる)を行うと、この操作を受けた入力制御手段120は文書作成手段128を制御し、当該捜査に応じた情報を、表示されているメールの情報に入力する(ステップ1705)。ここで、契約者が、キーボード121もしくはマウス122を操作して送信の指示を行うと、表示されているメール情報を電力会社サーバ4へ送り返す(ステップ1706)。電力会社サーバ4はネットワーク3を介してこの情報を受信する(ステップ1707)。
【0076】
以上のようにして、契約を行う旨の確認及び、増額される電力料金の選択処理が行われたメールを受信すると、電力会社サーバ4は、受信したメールの情報に従って契約変更の処理が行われる。この処理について図20のフローチャートを基に説明する。なお、この処理は電力会社サーバ4の契約内容更新手段411が行う。
【0077】
まず、受信した電子メールの内容で、基本料金を増額すると選択されているかチェックする(ステップ1801)。ここで、基本料金増額のチェックがなされていれば、契約者記憶手段401に記憶されている該当契約者の変更フラグに「基本増額」を付し、ステップ1804へ移行する。また、ステップ1801で、基本料金増額のチェックがなされていない場合、ステップ単位料金増額を示す情報を更新し、かつ、該当契約者情報の変更フラグに「単位増額」を付し、ステップ1804へ移行する。
【0078】
その後、契約者側に対する契約変更処理が行われる(ステップ1805)。この処理について図21のフローチャートを参照して説明する。
【0079】
まず、電力会社サーバ4は、自動切替後の契約電力情報を該当契約者の契約電力管理装置へ送信する(ステップ1901)。「富士通太郎」の場合、自動変更契約後の契約電力は「50」であるので「契約電力=50」の情報が送られることとなる。
【0080】
この情報を受けた消費電力管理装置2の契約電力情報更新手段208は(ステップ1902)、契約電力情報記憶手段205の契約電力情報を、受信した情報を基に変更する。「富士通太郎」の場合、「50」に変更される。この変更によって、移行、過剰電力情報は「50」VAまで送られないことになる。
【0081】
この変更が完了すると契約電力情報更新手段208は、通信制御手段204を制御し、電力会社サーバ4へこの変更が完了した旨の情報を送信する(ステップ1904)。
【0082】
この情報を電力会社サーバ4が受信すると(ステップ1905)、次に契約者のパーソナルコンピュータ104宛に自動変更が完了した旨の通知を送信する(ステップ1906)。この通知の手順は上記してきたように、入力フォーム記憶手段408から該当するフォームを抽出し、該当契約者情報に含まれるE−Mail情報へ電子メールを送信する事で行われる。本実施の形態の場合,図22に示されるように、完了を示すメッセージと自動契約後の契約変更点を付したメールが該当契約者へ送られることとなる。
【0083】
この電子メールを受けた該当契約者のパーソナルコンピュータ104のメール送受信手段127は、メール情報蓄積手段123に該メールを蓄積する(ステップ1907)。その後、契約者が、パーソナルコンピュータ104のキーボード121またはマウス122を操作して、該メールの表示指示を行うと(ステップ1908)、この情報を受けた入力制御手段120は文書閲覧手段129を起動する。文書閲覧手段129は、メール情報蓄積手段123から該メール情報を抽出し、表示制御手段126を制御してディスプレイ125に表示を行わせる。この様な手順により、図22に示される旨のメールがディスプレイ125に表示される事となる(ステップ1909)。
【0084】
また、電力会社サーバ4では、ステップ1906による送信処理の後、過剰電力情報記憶手段404、過剰電力利用契約者情報406に記憶されている該当契約者の情報を全て消去する(ステップ1804)。
【0085】
以上のステップにより自動契約更新処理が完了することとなる。
【0086】
この実施の形態によれば、契約当初に自動更新契約を行っておけば、電力会社サーバ4が自動的に更新処理を行うため、電力会社では、何の手間も無く契約の切替を行う事ができる。
【0087】
また、従来のように電力遮断機を用いず、過剰電力による電力消費はとりあえず認めた上で、自動的に契約変更処理を行うため、自動切替前であれば、過剰電力消費状態の契約者への過剰電力による電力の遮断が行われる事も無く、かつ、契約切替の間に電力の遮断もない。
【0088】
ただ、電力遮断機は、契約電力の制限の意味もあるが、過剰電力による電線の発熱に伴う火事などの防止の役目も担っている。このため、契約を行った際に、該当契約者の家屋1に自動契約後の契約電力用の電力遮断機を設置しておくようにすれば、安全を確保しつつ、自動切替を行う事が可能となる。
【0089】
加えて、本実施の形態では、自動切替の前に、契約者へ該通知を行う事により、今後契約が切替ることを認識させるようにしている。これは、一般に電力料金の契約電力が上がると、電力の単位料金や基本料金が増額されるため、予め契約者に通知する事で、その旨を契約者に認識させる事ができるためである。
【0090】
さらに、この時、契約者に自動契約切替後の料金の支払い(基本料金の増額・単位料金の増額)を選択させるようにしている。これにより、契約者が望む料金体系での契約にて自動切替が行われる事となる。
【0091】
また、自動切替後に、さらにその契約電力をも上回る電力の消費を行う契約者へは、その警告を行うようにしているので、危険である事、契約を更新しなければならない事を認識させることができるようになる。
【0092】
また、本実施の形態では、契約電力を超えた事を家屋に設置した消費電力管理装置2が検出していたが、消費電力管理装置2が定期的に伝よく情報を電力会社サーバ4へ送り、電力会社サーバー4が、送った情報を基にその契約者が契約電力以上の電力を消費しているかを判定するようにすれば、契約者の家屋1に設置する冗費電力管理装置2の構成を簡易化させることができる。消費者電力管理装置2は、契約者毎に設置を行うため、その数は大量である。この消費電力管理装置の構成を簡易化し、安価に製造できるようにすれば、電力会社の設置コストを下げる事ができる。
【0093】
逆に本実施の形態で、示すように消費電力管理装置が契約電力以上の電力を検出したときのみその情報を伝えるようにする事で、電力会社サーバ4へ送られてくる情報を少なくする事が出来、かつ、大量の契約者毎の過剰電力判定を行う必要がなくなるので、電力会社サーバ4の不可を小さくする事が出来る。という効果が生じる。
【0094】
更に、本実施の形態のように各電化製品毎に消費電力検出手段を有し、その消費電力情報を消費電力管理手段2により管理するようにする事で、どの電化製品が消費電力が大きいかなどの、判定が可能となる。
【0095】
また、本発明の場合、本実施の形態のように電化製品毎に消費電力検出手段を有し、その消費電力情報を消費電力管理手段2により各消費電力量を加算することにより家屋1で消費される電力の総和を求めているが、家屋1への電源基幹線上に消費電力検出手段を設置し、総合消費電力を検出するようにしても良い。
【0096】
【発明の効果】
本発明は、消費電力を検出する検出装置と、検出装置と通信を行うサーバとからなり、検出装置は、消費される電力の量を検出する検出手段と、契約電力の情報を記憶する記憶手段と、検出手段によって検出された電力量が、記憶手段に記憶されている契約電力の量を上回ったときに、サーバへ通知を行う通知手段と、サーバより契約電力情報を受信すると、記憶手段の契約電力の情報を更新する更新手段とを有し、サーバは、更新後の契約電力の量を記憶する契約電力記憶手段と、検出装置より契約電力を上回った旨の通知があると検出装置に対し、契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する送信手段とを有する事を特徴とするものであり、この構成により、従来のように電力遮断機を用いず、過剰電力による電力消費はとりあえず認めた上で、自動的に契約変更処理を行うため、自動切替前であれば、過剰電力消費状態の契約者への過剰電力による電力の遮断が行われる事も無く、かつ、契約切替の間に電力の遮断もなくなる。
【0097】
(付記)
(付記1) 契約電力の情報を記憶する記憶手段を有する消費電力検出装置と、更新後の契約電力の量を記憶する契約電力記憶手段を有するサーバとからなるシステムにおける電力契約変更方法であって、
前記消費電力検出装置は、消費される電力の量を検出し、この検出された電力の量が、前記記憶手段に記憶されている契約電力の量を上回ったときに、前記サーバへ通知を行い、
前記サーバは、この通知を受け取ると前記消費電力検出装置に対し、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信を行い、
前記消費電力検出装置は、この契約電力情報を受信すると、前記記憶手段の契約電力の情報を更新する
事を特徴とする電力契約変更方法。
【0098】
(付記2) 前記サーバは、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する際に、この契約を行っている契約者宛に、契約を変更する事を示す情報を送信する
事を特徴とする付記1に記載の電力契約変更方法。
【0099】
(付記3) 前記サーバは、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する際に、この契約を行っている契約者の端末に対し、変更する契約の種別を選択を促す通知を行い、その後、該端末より送られてくる契約の種別情報を基に契約の変更を行う事を特徴とする付記1に記載の電力契約変更方法。
【0100】
(付記4) 消費電力を検出する検出装置と、前記検出装置と通信を行うサーバとからなり、
前記検出装置は、
消費される電力の量を検出する検出手段と、
契約電力の情報を記憶する記憶手段と、
前記検出手段によって検出された電力量が、前記記憶手段に記憶されている契約電力の量を上回ったときに、前記サーバへ通知を行う通知手段と、
前記サーバより契約電力情報を受信すると、前記記憶手段の契約電力の情報を更新する更新手段と、
を有し、
前記サーバは、
更新後の契約電力の量を記憶する契約電力記憶手段と、
前記検出装置より契約電力を上回った旨の通知があると前記検出装置に対し、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する送信手段と
を有する事を特徴とする電力契約変更システム。
【0101】
(付記5) 前記サーバは、
前記送信手段が前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する際に、この契約を行っている契約者宛に、変更する契約の種別の選択を促す通知を行い、その後、該端末より送られてくる契約の種別情報を基に契約の変更を行う契約変更手段と
を有する事を特徴とする付記4に記載の電力契約変更システム。
【0102】
(付記6) 更新後の契約電力の量を記憶する契約電力記憶手段する電力契約変更装置が行う自動契約変更方法において、
前記電力レイ約変更装置が、
消費電力が予め設定された電力より上回った旨の通知があると、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する事を特徴とする電力契約変更方法。
【0103】
(付記7)
更新後の契約電力の量を記憶する契約電力記憶手段と、
消費電力が予め設定された電力より上回った旨の通知があると、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する契約変更部と、
を有する事を特徴とする電力契約変更装置。
【0104】
(付記8)消費される電力の量を検出する検出手段と、
契約電力の情報を記憶する記憶手段と、
前記検出手段によって検出された電力量が、前記記憶手段に記憶されている契約電力の量を上回ったときに、前記サーバへ通知を行う通知手段と、
前記サーバより契約電力情報を受信すると、前記記憶手段の契約電力の情報を更新する更新手段と、
を有する事を特徴とする消費電力検出装置。
【0105】
(付記9)消費される電力の量を検出する検出手段と、契約電力の情報を記憶する記憶手段とを有する消費電力検出装置が行う自動契約変更方法において、
前記消費電力検出装置が、
前記検出手段によって検出された電力量が、前記記憶手段に記憶されている契約電力の量を上回ったときに、サーバへ通知を行い、
その後、サーバより契約電力情報を受信すると、前記記憶手段の契約電力の情報を更新する
事を特徴とする消費電力検出装置。
【図面の簡単な説明】
【図1】本発明の実施の形態における電力契約変更システムのブロック図
【図2】本発明の実施の形態におけるパーソナルコンピュータ104のブロック図
【図3】本発明の実施の形態における消費電力検出手段111〜115のブロック図
【図4】本発明の実施の形態において管理コンピュータ5を使用して新規契約登録を行う処理手順を示したフローチャート
【図5】本発明の実施の形態において管理コンピュータ5に表示される契約者情報の入力画面を示した図
【図6】契約者記憶手段401に記憶されている契約者情報を示したテーブル図
【図7】本発明の実施の形態においてパーソナルコンピュータ104を使用して新規契約登録を行う処理手順を示したフローチャート
【図8】本発明の実施の形態においてパーソナルコンピュータ104を使用して新規契約登録を行う処理手順を示したフローチャート
【図9】本発明の実施の形態においてパーソナルコンピュータ104に表示される契約者情報の入力画面を示した図
【図10】本発明の実施の形態における消費電力管理装置2が過剰消費電力を検出した場合の処理を示すフローチャート
【図11】本発明の実施の形態における消費電力検出手段111〜115から消費電力管理装置2が消費電力を取得する手順を示すフローチャート
【図12】本発明の実施の形態における過剰電力情報記憶手段に記憶されている過剰電力情報を示すテーブル図
【図13】本発明の実施の形態における契約更新処理を示すフローチャート
【図14】本発明の実施の形態における契約更新処理にて過剰電力契約者情報記憶手段405に記憶される契約者情報のテーブル図
【図15】本発明の実施の形態において、実際に契約の自動切り替えを行うべき契約者の情報の抽出処理を示すフローチャート
【図16】本発明の実施の形態において、契約者のうち自動切替を行うべき利用者を抽出及び、自動切替後の契約者に契約者への警告通知処理を示すフローチャート
【図17】本発明の実施の形態において、ステップ1403の処理後の過剰電力契約者情報記憶手段405に記憶される契約者情報のテーブル図
【図18】本発明の実施の形態において、自動契約切替を促すメールの送信処理を示すフローチャート
【図19】本発明の実施の形態において、自動契約切替を促すメールの送信処理の際に該当契約者へ送信されるメールの内容を示す図
【図20】本実施の形態において、契約者からのメールに基づき行われる契約変更の処理を示したフローチャート
【図21】本実施の形態における、契約者側に対する契約変更処理を示すフローチャート
【図22】本実施の形態において、自動契約切替が行われた後に契約者に通知されるメールの内容を示した図
【符号の説明】
1 電力需要者の家屋
2 消費電力管理装置
3 ネットワーク
4 電力会社サーバ
101 テレビ
102 電子レンジ
103 電灯
104 パーソナルコンピュータ
105 冷蔵庫
106 消費電力情報LAN
111 消費電力検出手段
112 消費電力検出手段
113 消費電力検出手段
114 消費電力検出手段
115 消費電力検出手段
201 通信制御手段
202 消費電力情報受信手段
203 消費電力加算手段
204 通信制御手段
205 契約電力記憶手段
206 過剰電力通知送信手段
207 契約電力情報受信手段
208 契約電力情報更新手段
401 契約者記憶手段
402 通信制御手段
403 契約者登録手段
404 過剰電力情報記憶手段
405 過剰電流通知受信手段405
406 過剰電力利用契約者情報記憶手段
407 過剰電力利用者抽出手段
408 入力フォーム記憶手段
409 契約更新通知手段
410 契約更新受信手段
411 契約内容更新手段
412 契約内容更新通知手段
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method and system for changing a contract between a power supplier and a power consumer.
[0002]
[Prior art]
Conventionally, a contract between a power supplier such as a power company and a power consumer is determined by the amount of power (VA) (actually, voltage V (volt) current A (ampere) conversion / example: 100V30A), Depending on the contract, a power breaker such as a breaker (wiring circuit breaker) corresponding to the contract power is installed in each unit of power usage of the consumer to limit the power supply beyond the contract power.
[0003]
Current power contracts are generally set so that the higher the contracted power, the higher the basic charge and the unit price of electricity (the amount of power used per 1 kW), and power consumers often make contracts with as little power as possible. .
[0004]
[Problems to be solved by the invention]
In the above-described conventional configuration, the power consumer can use the electrical appliance beyond the contracted power, and can know only when the power breaker cuts off the power. In addition, when contract power is changed, it is necessary to apply to the power company, and then a person in charge of the power company re-installs a power breaker corresponding to the changed power.
[0005]
For this reason, traditionally, unexpected power supply interruptions have continued several times, at which point power consumers have made a contract change only after recognizing that the contract power is chronically insufficient, The contract power is changed only after the construction for the contract is changed.
[0006]
There are electrical appliances such as a clock mechanism that operates with the supply of power, and personal computers such as those that have the possibility of data destruction if the power is turned off except for a predetermined procedure. These appliances could cause fatal failures.
[0007]
In addition, it has been necessary to continue using the conventional contract power while being patient until the contract change work after realizing the shortage of the contract power charge due to the power cut.
[0008]
In view of the above-described conventional problems, an object of the present invention is to provide a contract power changing method and system capable of changing contract power without stopping power and without performing construction.
[0009]
[Means for Solving the Problems]
It consists of a detection device that detects power consumption and a server that communicates with the detection device.
The detection device includes a detection unit that detects the amount of power consumed, a storage unit that stores information on the contract power, and an amount of power detected by the detection unit is calculated from the amount of contract power stored in the storage unit. A notification means for notifying the server when it exceeds, and an update means for updating the contract power information in the storage means when the contract power information is received from the server. Contract power storage means that stores the contract power information indicating that the contract power exceeds the contract power from the detection device, the contract power information indicating the amount of the contract power after update stored in the contract power storage means. And transmitting means for transmitting.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
The power contract change system according to the embodiment of the present invention will be described below.
(System configuration)
FIG. 1 is a system diagram of a power supply system using a power contract change system according to the present invention.
[0011]
In FIG. 1, reference numeral 1 denotes a power consumer's house. In general, contracts with general households are made in units of houses. Also in the present embodiment, an example is shown in which a house is set as a unit of a contract for a power consumer. (In the present embodiment, hereinafter, a power consumer who makes a contract with an electric power company and receives power supply is referred to as a “contractor”, and a power consumer who will make a contract in the future is referred to as a “contract applicant”. In this house 1, electrical appliances such as a television 101, a microwave oven 102, an electric lamp 103, a personal computer 104, and a refrigerator 105 are installed. Further, a power consumption information LAN 106 is installed in this general house, and each electric appliance has a power consumption detecting means 111, a power consumption detecting means 112, and a power consumption detecting means 113 for detecting the power consumption of the corresponding electric appliance. A power consumption detection unit 114 and a power consumption detection unit 115 are connected to the power consumption information LAN 106.
[0012]
As shown in the block diagram of FIG. 2, the personal computer 104 includes an input control unit 120 that receives input from the keyboard 121 and the mouse 122, a mail information storage unit 123 that stores transmission / reception mails in the personal computer 104, and a network. 3, a communication control means 124 for performing communication with the communication device 3, a display control means 126 for displaying on the display 125, and a communication control means 124 for sending and receiving mails, and sending or receiving e-mail information at that time as mail information storage means 123, the mail transmission / reception means 127 stored in 123, the input content received by the input control means 120 is displayed on the display control means, the document creation means 128 for creating a mail document, and the input control means 120 accepts input of a document browsing instruction. When done, mail information storage means The target document is extracted from the 23, and a document reading unit 129 for displaying the document extracted in the display 125 by controlling the display control unit 126. In addition, the personal computer 104 is driven by a power source unit 130 by using a household AC power source that has been subjected to voltage and DC voltage conversion. The power supply unit 130 is connected to the power consumption detection unit 114, and the power consumption detection unit 114 detects the power consumption of the personal computer 104.
[0013]
In addition, as shown in the block diagram of FIG. 3, the power consumption detection units 111 to 115 include an electric appliance connection unit 151 that connects an electric power supply outlet of the electric power product, and a power supply line 152 that connects the electric power supply line. A power control switch 153 for conducting and shielding power between the electrical appliance connection unit 151 and the power supply line connection unit 152; a communication control unit 154 for performing communication using the power consumption information LAN 106; A power measuring unit 155 that measures the power consumption of the electrical appliance to be transmitted and transmits it to the communication control unit 154, and a power shielding unit 156 that controls the opening / closing of the power shielding switch 153 according to the signal received by the communication control unit 154 Has been.
[0014]
Reference numeral 2 denotes a power consumption management device that is installed in the house 1 and manages the power consumed by each electrical appliance in the house 1. The power consumption management apparatus 2 includes a communication control unit 201 that performs communication via the power consumption information LAN 106, a power consumption information reception unit 202 that receives power consumption information detected by each of the power consumption detection units 111 to 115, and power consumption information. Based on the power consumption information received by the receiving means 202, the power consumption adding means 203 for adding the power consumption of each electrical appliance, and the communication control means 204 for performing communication with the power company server 4 described later via the network 3. When the addition result of the contract power storage unit 205 storing the contract power and the power consumption adding unit 203 exceeds the contract power amount stored in the contract power storage unit 205, the power is supplied to the power company server 4 through the network 3. The excessive power notification transmission means 206 for transmitting the excessive power notification, and the contract power information transmitted from the power company server 4 are received. About power information receiving unit 207, and a contract power information updating means 208 based on contract power information contracted power information receiving unit 207 has received the contract power storage unit 205 updates the contract power information stored.
[0015]
Reference numeral 4 denotes an electric power company server for communication with contractor storage means 401 for storing contractor information, communication control means 402 for communication with the network 3, the personal computer 104 or the management computer 5 of the electric power company server 4. Based on this, the contractor registration unit 403 for registering the contractor information in the contractor storage unit 401, the excess power notification reception unit 405 for storing the excess power notification received by the communication control unit 402 in the excess power information storage unit 404, the excess power information An excess power user extracting unit 407 for extracting information on a contractor supplying excess power from the information stored in the storage unit 404 and storing it in the excess power use contractor information storage unit 406, and an excess power use contractor storage unit Based on the information stored in 406, an input form for prompting contract renewal is extracted from the input form storage means 408. Based on the notification received by the contract update notifying unit 409 for transmitting a notification mail to the corresponding contractor, the contract update receiving unit 410 for receiving the contract update notification from the contractor through the communication control unit 402, and the notification received by the contract update receiving unit 410. Contract contents updating means 411 for updating the contract contents in the contractor storage means 401 and transmitting the contract power information to the power consumption management device 2, and a contract for notifying the contract contents updated by the contract contents updating means 411 to the corresponding contractor by e-mail Content update notification means 412.
[0016]
The operation of the power contract supply system configured as described above will be described below.
[0017]
(New contract processing)
First, a new contract with an electric power company will be described.
[0018]
The contract procedure
1. The contract applicant delivers the contract documents to the power company by non-on-line means such as mailing or going to the sales office of the power company, and based on the documents, the person in charge of the power company uses the management computer 5 to send it to the power company server 4 Register information.
2. Using the personal computer 104 owned by the contract applicant, the contract information is sent to the power company via the network, and the power company server 4 registers the information.
Two types of methods are possible.
[0019]
The procedure will be described for each.
[0020]
First, the above 1 will be described with reference to the flowchart of FIG. It is assumed that the documents have been sent from the contract applicant to the electric power company by some non-online means. In the electric power company server 4, the contractor registration means 403 performs processing related to the new registration of the contractor.
[0021]
First, when the person in charge of the power company starts up the management computer 5 and selects the contractor information registration screen, the contractor information input screen is displayed as shown in the screen 501 of FIG. 5 (step 1001). ).
[0022]
Here, the items to be entered are
(1) “Name” of the contractor
(2) Contractor's “address”
(3) Contractor's "phone number"
(4) Initial contract power (displayed as “contract power” on screen 501)
(5) Selection of whether or not to perform an automatic renewal contract of the contract, which is a feature of the present invention (in the screen 501, whether or not “automatic renewal contract” is permitted is input in Y / N)
(6) Contract power after contract change by automatic renewal
(7) Email address
It is.
[0023]
The person in charge of the electric power company inputs these items based on the contract document sent from the electric power consumer (step 1002).
[0024]
When this information input is completed, the person in charge of the electric power company selects the “contract transmission” button provided on the screen 501 to instruct the transmission of contract information (step 1003).
[0025]
The management computer 5 receiving the information transmits the contractor information input to the electric power company server 4 (step 1004).
[0026]
Receiving this information (step 1005), the electric power company server 4 assigns a unique customer number that does not overlap with other customers to this contractor information. In this case, it is assumed that the number “012-333-4567” is assigned (step 1006).
[0027]
Thereafter, the received contract information is associated with the customer number and stored in the contractor storage unit 401 (step 1007). As shown in the contractor information table 601 of FIG. 6, the contents stored in this way are the contractor number 6001, name 6002, address 6003, telephone number 6004, e-mail 6005, initial contract power 6006 (table 601 Is simply indicated as “contract power”) • Automatic contract change permission / inhibition 6007 (simply indicated as “automatic contract change” in table 601) • Contract power 6008 after automatic change (in table 601 simply indicated as “power after automatic change”) In addition to the above-described content, a change flag 6009 is provided. This item is a column for checking whether or not the automatic contract change has already been performed. If any information is added, this item indicates that the automatic contract change process has already been performed. In the case of a new contract, no change is made, so this field is registered blank. If the “Basic increase” information is added here, the subsequent collection process will be based on a contract with an increased basic charge, and if “Unit increase” information is added. The collection process based on the contract with the increased unit fee will be performed.
[0028]
When this storage processing is completed, the power management server 4 transmits the contract content information stored in the contractor information storage unit 401 to the management computer 5 (step 1008).
[0029]
The management computer 5 that has received this information (step 1009) displays the contents of the contract (step 1010). As this display content is displayed on the screen 503, information in which the contractor number is added to the information input by the person in charge of the electric power company is displayed.
[0030]
Next, the second contract procedure will be described with reference to the flowcharts of FIGS. Note that the exchange of electronic mail is generally performed via a mail server that manages mail, but the description thereof is omitted in the present embodiment.
[0031]
First, the contract applicant operates the keyboard 121 and mouse 122 of the personal computer 104 to instruct a contract request to the electric power company.
[0032]
Upon receiving this input, the mail transmission / reception means 127 controls the communication control means 124 to transmit this request information to the power company server 4 via the network 3 (step 1101). Receiving this information (step 1102), the electric power company server 4 extracts an input form for a new contract from the input form storage means 408 (step 1103), and transmits it as an e-mail to the personal computer 104 (step 1104).
[0033]
The personal computer 104 that has received the electronic mail by the communication control means 124 (step 1105) stores it in the mail storage means 123 by the mail transmission / reception means 127 (step 1106).
[0034]
Thereafter, when the contract applicant uses the keyboard 121 or mouse 122 of the personal computer 104 to instruct to browse the received mail (step 1107, the input control means 120 that receives it activates the document browsing means 129). The document browsing unit 129 takes out the received e-mail from the mail information storage unit 123 and controls the display control unit 126 to display the content of the received e-mail on the display 125.
[0035]
The screen 901 in FIG. 9 is the screen. As you can see on this screen,
(1) “Name” of the contractor
(2) Contractor's “address”
(3) Contractor's "phone number"
(4) Initial contract power (displayed as “contract power” on screen 901)
(5) Selection of whether or not to perform an automatic renewal contract of the contract, which is a feature of the present invention (in the screen 901, whether or not “automatic renewal contract” is permitted is input in Y / N)
(6) Contract power after contract change by automatic renewal
(7) Email address
It is. The contract applicant uses the keyboard 121 and the mouse 122 to perform an operation of inputting a predetermined item in a predetermined frame of the display content.
When this operation is received by the input control means 120, the operation information is transmitted to the document creation means 128, and information is input to the electronic mail according to the operation information (step 1109).
[0036]
When this operation is completed, the contract applicant using the mouse 122 performs an operation of pressing a “send” button 902 on the screen 901, that is, an operation of a transmission instruction (step 1110). When the input control unit 120 detects this operation, the mail transmission / reception unit 127 controls the communication control unit 124 to transmit an e-mail in which this predetermined item is input to the power company server 4 (step 1111).
[0037]
Receiving this information (step 1112), the electric power company server 4 assigns a unique customer number that does not overlap with other customers to this contractor information. In this case, it is assumed that the number “012-333-4567” is given (step 1113).
[0038]
Thereafter, the received contract information is associated with the customer number and stored in the contractor storage unit 401 (step 1114). As shown in the contractor information table 601 of FIG. 6, the contents stored in this way are the contractor number 6001, name 6002, address 6003, telephone number 6004, e-mail 6005, initial contract power 6006 (table 601 Is simply indicated as “contract power”) • Automatic contract change permission / inhibition 6007 (simply indicated as “automatic contract change” in table 601) • Contract power 6008 after automatic change (in table 601 simply indicated as “power after automatic change”) In addition to the above-described content, a change flag 6009 is provided. This item is a column for checking whether or not the automatic contract change has already been performed. If any information is added, this item indicates that the automatic contract change process has already been performed. In the case of a new contract, no change is made, so this field is registered blank.
[0039]
When this storage process is completed, the power management server 4 transmits the contract content information stored in the contractor information storage unit 401 to the personal computer as an e-mail (step 1115).
[0040]
The personal computer 104 that has received the electronic mail by the communication control means 124 (step 1116) stores it in the mail storage means 123 by the mail transmission / reception means 127 (step 1117).
[0041]
Thereafter, when the contract applicant uses the keyboard 121 and mouse 122 of the personal computer 104 to instruct to browse the received mail (step 1118, the input control means 120 that receives it activates the document browsing means 129). The document browsing unit 129 takes out the received e-mail from the mail information storage unit 123 and controls the display control unit 126 to display the content of the received e-mail on the display 125 (1119).
[0042]
A screen 903 in FIG. 9 is a diagram showing the screen. As this display content is displayed on the screen 903, information in which the contractor number is added to the information input by the person in charge of the electric power company is displayed.
[0043]
When the contract is completed by the above-described 1 or 2 new contract procedure, the contract power information 6006 of the contract applicant is extracted from the contractor storage unit 401 and transmitted to the power consumption management apparatus 2.
[0044]
The power consumption management device 2 that has received this information stores this information in the contract power storage unit 205.
[0045]
This completes the new contract procedure.
[0046]
Until the contract in the above procedure is completed, the power consumption management device 2 transmits information for instructing power shielding to the power consumption detection means 111 to 115, and the power consumption detection means that receives the information. The communication control units 154 of 111 to 115 keep the power shielding switch 153 in a shielded state under the control of the power shielding unit 156, and release the shielding when contract power information is sent from the power company server 4. If the power consumption detecting means 111 to 115 that has received the notification switch the power shielding switch to the energized state under the control of the power shielding unit 156, the power company server 4 It is now possible to carry out the power activation process only by communication from the power station, and the time and effort required for the person in charge of the power company to go to the contract applicant and perform the construction work. Camphor so that it is possible.
(Excessive power information storage process)
As described in the above system configuration, the power consumption management device 2 is a device for notifying the power company when the power consumption of the contractor exceeds the contract power (excess power consumption).
[0047]
Hereinafter, processing when the power consumption management device 2 detects excessive power consumption will be described based on the flowchart shown in FIG.
[0048]
First, the power consumption management device 2 acquires the power consumption information consumed by each electrical appliance from the power consumption detection means 111 to 115 via the power consumption information LAN 106 by the processing of the power consumption information receiving means 202 (step) 1201, 1202). The procedure for the power consumption management device 2 to acquire power consumption from the respective power consumption detection means 111 to 115 at this time is as follows.
[0049]
The procedure will be described below with reference to the flowchart of FIG. In this flowchart, communication with the power consumption detection unit 111 is described for convenience, but communication with the other power consumption detection units 112 to 115 is performed in the same procedure.
[0050]
In the power consumption unit 155, the power measuring unit 155 detects the power consumed by the electrical appliance (step 1301). Further, the communication control unit 154 checks whether a signal requesting power consumption information is received from the power consumption management apparatus 2 (steps 1302 and 1303). If reception has not been performed at this time, the process returns to step 1301 to continue the power consumption detection process. That is, if there is no signal from the power consumption management device, the power consumption is continuously detected.
[0051]
In this situation, when the power consumption information receiving unit 202 of the power consumption management apparatus 2 requests a signal requesting power consumption information (step 1304), the communication control unit 154 of the power consumption detection unit 111 receives the signal, and step 1301 The power consumption information detected in step 1 is transmitted to the power consumption management apparatus 2 (step 1305). The power consumption management apparatus 2 that has received this information (step 1306) stores this information in the contract power storage means 404 (step 1307).
[0052]
When the acquisition of the power consumption information detected by each of the power consumption detection units 111 to 115 is completed according to the above procedure, the power consumption addition unit 203 of the power consumption management device 2 stores the power consumption information stored in the contract power storage unit 404. To calculate the power consumption of all household electrical appliances (step 1203).
[0053]
After that, the power consumption notification transmission unit 206 compares the calculated power consumption with the contract power information stored in the contract power storage unit 205 (step 1204), and the power consumption calculated by the power consumption addition unit 203 Is larger than the contract power information stored in the contract power storage means 205 (step 1205), it is confirmed whether excess power information has been transmitted within one hour (step 1206). Information on the total power consumption calculated by the power information adding means 203 is sent to the power company server 4 via the network 3 by controlling the communication control means 204 (step 1207).
[0054]
The excess power notification receiving means 405 of the power company server 4 that has received this information via the communication control means 402 (step 1208), the excess power information storage means 404 sends the information to the power consumption management device 2 that has transmitted it. The contractor number of the installed contractor and the received date / time information are added and stored (step 1209). In this way, excess power information is sent from the power consumption management device 2 installed in each contractor's house, so the excess power information storage means 404 stores excess power as shown in the table of FIG. The date and time 701 when the power information is received, the reception date and time contractor number 702, and the power amount 703 are stored in an associated state.
[0055]
If the contract power information stored in the contract power storage unit 205 in step 1205 is larger than the total power consumption calculated by the power consumption addition unit, it is not necessary to transmit excess power information, so go to step 1201. Return.
[0056]
Also, if excess power information has already been transmitted within one hour in step 1206, the process returns to step 1201, but this is detected many times in a short time, so once excess power is detected. This is to prevent the same information from being sent to the power company server 4 many times in a short time.
[0057]
In this way, information on excess power consumed in each contractor's house is accumulated in the excess power information storage unit 404 of the power company server 4.
(Contract change processing)
The contract update process is performed using the excess power information accumulated in the “excess power information accumulation process” described above. This process is performed once a day or once a week.
[0058]
This process will be described with reference to the flowchart shown in FIG.
[0059]
First, the excess power user extraction unit 407 of the power company server 4 extracts information stored in the excess power information 404. (Step 1401)
Here, the three pieces of information of the reception date / time information 701, the contractor number 702, and the electric energy shown in the table of FIG. 12 are extracted.
[0060]
Next, a list of applicable contractors is extracted (step 1402). In this list, the duplicated contractor number information is deleted from the information extracted from the excess power information storage unit 404, and then the contractor information of the corresponding contractor number is extracted from the contractor storage unit 401. As described above, since the contractor information shown in the table of FIG. 6 is stored in the contractor storage unit 401, this information and the information of the excess power information storage unit 404 excluding duplicate contractor numbers are used. Collation is performed, and information on the contractor is extracted. As shown in the table of FIG. 12, the excess power information storage unit 404 has two contractor numbers “012-333-4567” and “014-345-3258”. Is extracted from the contractor information contractor storage unit 401 corresponding to. In the present embodiment, since the information is extracted from the information shown in the contractor information table of FIG. 6, the extracted information is the contractor information related to “Fujitsu Taro” and “Saburo Torizaki” shown in the table of FIG. It will be extracted. The contractor information extracted in this way is stored in the excess power contractor information storage unit 405. That is, the information shown in the table of FIG. 14 is stored in the excess power contractor information storage unit 405.
[0061]
Next, the contractor information to be actually switched automatically is extracted from the contractor information stored in the excess contractor information storage unit 405 (step 1403).
[0062]
This procedure will be described with reference to the flowchart of FIG.
[0063]
First, the contractor information stored in the excess power usage contractor information 405 is extracted (step 1501). Thereafter, the automatic contract update information of the extracted contractor information is referred to, and the corresponding contractor is extracted as the contractor of the automatic contract update. (Step 1502) In the contractor information shown in the table of FIG. 14, since both pieces of contractor information correspond, both are extracted.
[0064]
Further, among the contractors, users who have not yet switched automatically are extracted, and a warning is notified to the contractors who have already switched automatically (step 1503). This process will be described with reference to the flowchart of FIG.
[0065]
First, it is checked from the contractor information whether the automatic contract has already been switched (step 1601). This is done by checking the change flag of the contractor information. In the case of the present embodiment, nothing before the change flag attached to the contractor information is before the automatic contract switching.
[0066]
Here, if it is before the automatic contract, it is confirmed whether or not this check has been completed for all the extracted contractors, and if not completed, the process returns to step 1601, and if completed, the process returns to the original process (step 1602).
[0067]
In step 16011, after automatic contract switching, that is, in the case where some information is added to the change flag, the processing of step 1603 is performed. In the case of the present embodiment, the contractor information of “Saburo Torizaki” shown in FIG. 14 corresponds to this processing because there is information of “basic increase” in the change flag. The following explanation is based on the contract information of “Saburo Torizaki”.
[0068]
In step 1603, first, “saburo@++*.ne.jp” which is E-mail information included in the contractor information is extracted, and an e-mail indicating that the contract is over is transmitted to this address (step 1603). ). This information is received by the personal computer 104 of the contractor via the network 3.
[0069]
Thereafter, when the user instructs the personal computer 104 to display the mail (step 1605), the mail is displayed on the display of the personal computer 104 (step 1606).
[0070]
In addition, after the transmission process in step 1603, the power company server 4 deletes the corresponding contractor information, that is, the contractor information of “Saburo Torizaki” from the excess power usage information storage unit 406 (step 1607), and goes to step 1602 move on.
[0071]
By processing in this way, information on only the corresponding contractor before the automatic contract switching is stored in the excess power usage information storage means 406, and for the contractor who continues to consume excessive power even after the automatic switching. In this way, it is possible to automatically make a warning or prompt a contract switching procedure.
[0072]
In the case of the present embodiment, the contractor information stored in the storage means is stored in the storage means because the contractor information of “Saburo Torizaki” is deleted from the excess power use contractor information storage means 405 by the processing in step 1403. As shown in FIG. 17, only the information of “Fujitsu Taro” is accumulated.
[0073]
In this state, the electric power company server 4 then transmits an email for prompting automatic contract switching based on the contractor information stored in the excess power use contractor information storage unit 405 (step 1404). This process will be described based on the flowchart shown in FIG. This process is performed by the contract update notification means 410 of the power company server 4.
[0074]
First, the contractor information is extracted from the excess power use contractor information storage unit 406, and the E-Mail address included in the information is extracted. Further, the input form is extracted from the input form storage unit 408. As shown in FIG. 19, this input form uses the power exceeding the current contract, notifies that automatic switching is performed, and contracts that increase the basic charge by increasing the charge after automatic switching. An input frame is provided for selecting whether to increase the unit fee or not.
[0075]
The e-mail of the extracted input form is transmitted to the extracted E-Mail address (step 1701). The mail transmission / reception means 127 of the personal computer 104 of the corresponding contractor who has received this electronic mail stores the mail in the mail information storage means 123 (step 1702). Thereafter, when the contractor operates the keyboard 121 or the mouse 122 of the personal computer 104 to give an instruction to display the mail (step 1703), the input control means 120 that receives this information activates the document browsing means 129. . The document browsing unit 129 extracts the mail information from the mail information storage unit 123 and controls the display control unit 126 to display on the display 125. By such a procedure, the mail to the effect shown in FIG. 19 is displayed on the display 125 (step 1704). Here, when the contractor further operates the keyboard 121 and the mouse 122 to input whether to increase the unit charge or the basic charge (in FIG. 19, enter the number in parentheses), Upon receiving this operation, the input control means 120 controls the document creation means 128 and inputs information corresponding to the investigation into the displayed mail information (step 1705). Here, when the contractor operates the keyboard 121 or mouse 122 to instruct transmission, the displayed mail information is sent back to the power company server 4 (step 1706). The power company server 4 receives this information via the network 3 (step 1707).
[0076]
As described above, when the e-mail for confirming that the contract is to be made and the process for selecting the increased power charge has been performed, the power company server 4 performs the process for changing the contract in accordance with the received e-mail information. . This process will be described with reference to the flowchart of FIG. This process is performed by the contract content update unit 411 of the power company server 4.
[0077]
First, it is checked in the content of the received e-mail whether it is selected to increase the basic fee (step 1801). If the basic charge increase is checked, “basic increase” is added to the change flag of the corresponding contractor stored in the contractor storage unit 401, and the process proceeds to step 1804. If the basic charge increase is not checked in step 1801, the information indicating the step unit charge increase is updated, and the “unit increase” is added to the change flag of the corresponding contractor information, and the process proceeds to step 1804. To do.
[0078]
Thereafter, contract change processing for the contractor is performed (step 1805). This process will be described with reference to the flowchart of FIG.
[0079]
First, the power company server 4 transmits the contract power information after automatic switching to the contract power management apparatus of the contractor (step 1901). In the case of “Fujitsu Taro”, the contract power after the automatic change contract is “50”, so the information “contract power = 50” is sent.
[0080]
Receiving this information, the contract power information update unit 208 of the power consumption management apparatus 2 (step 1902) changes the contract power information in the contract power information storage unit 205 based on the received information. In the case of “Fujitsu Taro”, it is changed to “50”. Due to this change, the transition and excess power information will not be sent up to “50” VA.
[0081]
When this change is completed, the contract power information update unit 208 controls the communication control unit 204 to transmit information indicating that this change is completed to the power company server 4 (step 1904).
[0082]
When this information is received by the power company server 4 (step 1905), a notification that the automatic change is completed is transmitted to the contractor's personal computer 104 (step 1906). As described above, the notification procedure is performed by extracting a corresponding form from the input form storage unit 408 and transmitting an e-mail to the E-Mail information included in the corresponding contractor information. In the case of the present embodiment, as shown in FIG. 22, a message indicating completion and a mail with a contract change point after the automatic contract are sent to the contractor.
[0083]
The mail transmission / reception means 127 of the personal computer 104 of the corresponding contractor who has received the electronic mail stores the mail in the mail information storage means 123 (step 1907). Thereafter, when the contractor operates the keyboard 121 or the mouse 122 of the personal computer 104 to give an instruction to display the mail (step 1908), the input control means 120 that receives this information activates the document browsing means 129. . The document browsing unit 129 extracts the mail information from the mail information storage unit 123 and controls the display control unit 126 to display on the display 125. By such a procedure, a mail to the effect shown in FIG. 22 is displayed on the display 125 (step 1909).
[0084]
In addition, the power company server 4 erases all the information on the contractors stored in the excess power information storage unit 404 and the excess power usage contractor information 406 after the transmission processing in step 1906 (step 1804).
[0085]
The automatic contract update process is completed by the above steps.
[0086]
According to this embodiment, if the automatic renewal contract is made at the beginning of the contract, the power company server 4 automatically performs the renewal process. Therefore, the power company can switch the contract without any trouble. it can.
[0087]
In addition, since the contract change process is performed automatically after allowing power consumption due to excess power for the time being without using a power breaker as in the past, it is necessary for contractors who are in an excessive power consumption state before automatic switching. There is no interruption of power due to excessive power, and there is no interruption of power during contract switching.
[0088]
However, the power breaker also has the meaning of limiting contract power, but it also plays a role in preventing fires caused by overheating of the wires due to excess power. For this reason, when a contract is made, if a power breaker for contract power after automatic contract is installed in the contractor's house 1, automatic switching can be performed while ensuring safety. It becomes possible.
[0089]
In addition, in this embodiment, before the automatic switching, the contractor is notified so that the contract will be switched in the future. This is because, in general, when the contract power of the power charge increases, the unit charge or basic charge of the power is increased, so that the contractor can be recognized by notifying the contractor in advance.
[0090]
Further, at this time, the contractor is allowed to select the payment of the charge after the automatic contract switching (increase in basic charge / increase in unit charge). As a result, automatic switching is performed in a contract with a fee structure desired by the contractor.
[0091]
Also, after the automatic switchover, the contractor who consumes more power than the contracted power will be warned so that it is dangerous and the contract must be renewed. Will be able to.
[0092]
In this embodiment, the power consumption management device 2 installed in the house detects that the contracted power has been exceeded. However, the power consumption management device 2 periodically transmits information to the power company server 4. If the power company server 4 determines whether the contractor is consuming more power than the contract power based on the information sent, the redundant power management apparatus 2 installed in the contractor's house 1 The configuration can be simplified. Since the consumer power management apparatus 2 is installed for each contractor, the number thereof is large. If the configuration of the power consumption management device is simplified and can be manufactured at low cost, the installation cost of the power company can be reduced.
[0093]
On the contrary, in the present embodiment, as shown in the figure, by transmitting the information only when the power consumption management device detects the power exceeding the contract power, the information sent to the power company server 4 can be reduced. In addition, since it is not necessary to perform excessive power determination for each large number of contractors, it is possible to reduce the impossibility of the power company server 4. This produces the effect.
[0094]
Further, as in the present embodiment, each electrical appliance has a power consumption detection means, and the power consumption information is managed by the power consumption management means 2 so that which electrical appliance has the higher power consumption. Etc. can be determined.
[0095]
Further, in the case of the present invention, as in the present embodiment, each appliance has a power consumption detection means, and the power consumption information is consumed by the house 1 by adding the power consumption information by the power consumption management means 2. Although the sum total of the electric power to be obtained is obtained, the power consumption detection means may be installed on the power supply trunk line to the house 1 to detect the total power consumption.
[0096]
【The invention's effect】
The present invention includes a detection device that detects power consumption and a server that communicates with the detection device. The detection device detects detection of the amount of power consumed, and storage means that stores contract power information. And a notification means for notifying the server when the amount of power detected by the detection means exceeds the amount of contract power stored in the storage means, and receiving the contract power information from the server, An update unit that updates the information on the contract power, and the server notifies the detection device that the contract power storage unit stores the amount of the contract power after the update, and the detection device indicates that the contract power is exceeded. On the other hand, it has a transmission means for transmitting the contract power information indicating the amount of the contract power after the update stored in the contract power storage means. Without using machine The contract change process is performed automatically after allowing power consumption due to excess power for the time being. Therefore, before automatic switching, there is no interruption of power due to excess power to subscribers in an excessive power consumption state. And there is no power interruption during contract switching.
[0097]
(Appendix)
(Supplementary note 1) A power contract change method in a system comprising a power consumption detection device having storage means for storing information on contract power and a server having contract power storage means for storing the amount of contract power after update. ,
The power consumption detection device detects the amount of power consumed, and notifies the server when the amount of detected power exceeds the amount of contract power stored in the storage means. ,
Upon receiving this notification, the server transmits contract power information indicating the amount of contract power after update stored in the contract power storage unit to the power consumption detection device,
When receiving the contract power information, the power consumption detection device updates the contract power information in the storage means.
Power contract change method characterized by things.
[0098]
(Supplementary Note 2) When the server transmits contract power information indicating the amount of contract power after update stored in the contract power storage unit, the server changes the contract to the contractor who has made the contract. Send information indicating what to do
The method of changing a power contract according to appendix 1, characterized by:
[0099]
(Additional remark 3) When the said server transmits the contract electric power information which shows the amount of the contract electric power after the update memorize | stored in the said contract electric power memory | storage means, it changes with respect to the terminal of the contractor who has performed this contract The power contract change method according to appendix 1, wherein notification for prompting selection of a type of contract to be performed is performed, and thereafter the contract is changed based on contract type information transmitted from the terminal.
[0100]
(Additional remark 4) It consists of the detection apparatus which detects power consumption, and the server which communicates with the said detection apparatus,
The detection device includes:
Detection means for detecting the amount of power consumed;
Storage means for storing contract power information;
Notification means for notifying the server when the amount of power detected by the detection means exceeds the amount of contract power stored in the storage means;
When contract power information is received from the server, update means for updating the contract power information in the storage means;
Have
The server
Contract power storage means for storing the amount of contract power after the update,
A transmission means for transmitting contract power information indicating the amount of the updated contract power stored in the contract power storage means to the detection apparatus when there is a notification that the detection power exceeds the detection power from the detection apparatus;
Power contract change system characterized by having
[0101]
(Supplementary Note 5) The server
When the transmission means transmits contract power information indicating the amount of contract power after update stored in the contract power storage means, the contract type to be changed is selected for the contractor who has made the contract. A contract change means for making a change to the contract based on the contract type information sent from the terminal.
The power contract change system according to supplementary note 4, characterized by comprising:
[0102]
(Supplementary Note 6) In the automatic contract change method performed by the power contract change device that stores contract power storage means for storing the amount of contract power after update
The power ray approximately changing device is
A power contract characterized by transmitting contract power information indicating the amount of contract power after update stored in the contract power storage means when there is a notification that power consumption exceeds preset power. Modification method.
[0103]
(Appendix 7)
Contract power storage means for storing the amount of contract power after the update,
When there is a notification that the power consumption exceeds the preset power, the contract change unit that transmits the contract power information indicating the amount of the contract power after update stored in the contract power storage unit,
A power contract change device characterized by having
[0104]
(Supplementary Note 8) Detection means for detecting the amount of power consumed,
Storage means for storing contract power information;
Notification means for notifying the server when the amount of power detected by the detection means exceeds the amount of contract power stored in the storage means;
When contract power information is received from the server, update means for updating the contract power information in the storage means;
A power consumption detection device characterized by comprising:
[0105]
(Additional remark 9) In the automatic contract change method which the power consumption detection apparatus which has a detection means to detect the amount of power consumed, and a storage means to memorize contract power information performs
The power consumption detection device is
When the amount of power detected by the detection means exceeds the amount of contract power stored in the storage means, a notification is given to the server,
Thereafter, when the contract power information is received from the server, the contract power information in the storage means is updated.
Power consumption detection device characterized by things.
[Brief description of the drawings]
FIG. 1 is a block diagram of a power contract change system according to an embodiment of the present invention.
FIG. 2 is a block diagram of the personal computer 104 in the embodiment of the present invention.
FIG. 3 is a block diagram of power consumption detection means 111 to 115 in the embodiment of the present invention.
FIG. 4 is a flowchart showing a processing procedure for registering a new contract using the management computer 5 in the embodiment of the present invention.
FIG. 5 is a diagram showing a contractor information input screen displayed on the management computer 5 in the embodiment of the present invention;
FIG. 6 is a table showing contractor information stored in the contractor storage unit 401.
FIG. 7 is a flowchart showing a processing procedure for registering a new contract using the personal computer 104 in the embodiment of the present invention.
FIG. 8 is a flowchart showing a processing procedure for registering a new contract using the personal computer 104 in the embodiment of the present invention.
FIG. 9 is a diagram showing a contractor information input screen displayed on the personal computer 104 in the embodiment of the present invention;
FIG. 10 is a flowchart showing processing when the power consumption management device 2 according to the embodiment of the present invention detects excessive power consumption.
FIG. 11 is a flowchart showing a procedure for the power consumption management device 2 to acquire power consumption from the power consumption detection means 111 to 115 in the embodiment of the present invention.
FIG. 12 is a table showing excess power information stored in excess power information storage means in the embodiment of the present invention.
FIG. 13 is a flowchart showing contract update processing according to the embodiment of the present invention.
FIG. 14 is a table of contractor information stored in excess power contractor information storage means 405 in contract update processing according to the embodiment of the present invention.
FIG. 15 is a flowchart showing a process of extracting information on a contractor who should actually perform automatic contract switching in the embodiment of the present invention.
FIG. 16 is a flowchart showing a process for extracting a user to be automatically switched from contractors and notifying a contractor of a warning after automatic switching in the embodiment of the present invention.
FIG. 17 is a table of contractor information stored in the excess power contractor information storage unit 405 after the processing of step 1403 in the embodiment of the present invention.
FIG. 18 is a flowchart showing mail transmission processing for prompting automatic contract switching in the embodiment of the present invention;
FIG. 19 is a diagram showing the contents of an email sent to the contractor during the email sending process for prompting automatic contract switching in the embodiment of the present invention;
FIG. 20 is a flowchart showing contract change processing performed based on an email from a contractor in the present embodiment;
FIG. 21 is a flowchart showing contract change processing for the contractor in the present embodiment;
FIG. 22 is a diagram showing the contents of an email notified to a contractor after automatic contract switching is performed in the present embodiment
[Explanation of symbols]
1 Houses of electricity consumers
2 Power consumption management device
3 network
4 Electric power company servers
101 TV
102 microwave oven
103 electric light
104 Personal computer
105 refrigerator
106 Power consumption information LAN
111 Power consumption detection means
112 Power consumption detection means
113 Power consumption detection means
114 Power consumption detection means
115 Power consumption detection means
201 Communication control means
202 Power consumption information receiving means
203 Power consumption addition means
204 Communication control means
205 Contract power storage means
206 Excess power notification transmission means
207 Contract power information receiving means
208 Contract power information update means
401 Contractor storage means
402 Communication control means
403 Contractor registration means
404 Excess power information storage means
405 Excess current notification receiving means 405
406 Excess power usage contractor information storage means
407 Excess power user extraction means
408 Input form storage means
409 Contract update notification means
410 Contract update receiving means
411 Contract content update means
412 Contract content update notification means

Claims (5)

契約電力の情報を記憶する記憶手段を有する消費電力管理装置と、更新後の契約電力の量を記憶する契約電力記憶手段を有するサーバとからなるシステムにおける電力契約変更方法であって、
前記消費電力管理装置は、消費される電力の量が前記記憶手段に記憶されている契約電力の量を上回ったときに、前記サーバへ通知を行い、
前記サーバは、この通知を受け取ると前記消費電力管理装置に対し、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報送信を行い、
前記消費電力管理装置は、この契約電力情報を受信すると、前記記憶手段の契約電力の情報を更新する事を特徴とする電力契約変更方法。
A power contract change method in a system comprising a power consumption management device having storage means for storing contract power information and a server having contract power storage means for storing the amount of contract power after update,
The power management device, when the amount of consumed Ru power exceeds the amount of contract power, which is stored in the storage means, and notifies to the server,
The server, to said power management unit to receive this notification, performs transmission of the contract power information indicating the amount of contract demand after updating stored in the contracted power storage means,
When the contract power information is received, the power consumption management apparatus updates the contract power information in the storage means.
前記サーバは、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する際に、この契約を行っている契約者宛に、契約を変更する事を示す情報を送信する事を特徴とする請求項1に記載の電力契約変更方法。  When the server transmits contract power information indicating the amount of updated contract power stored in the contract power storage unit, the server indicates that the contract is changed to the contractor who has made the contract. Information is transmitted, The power contract change method of Claim 1 characterized by the above-mentioned. 前記サーバは、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する際に、この契約を行っている契約者の端末に対し、変更する契約の種別を選択を促す通知を行い、その後、該端末より送られてくる契約の種別情報を基に契約の変更を行う事を特徴とする請求項1に記載の電力契約変更方法。  When the server transmits the contract power information indicating the amount of the contract power after update stored in the contract power storage unit, the type of contract to be changed to the terminal of the contractor making the contract 2. The method of changing a power contract according to claim 1, wherein a notification for prompting selection is made, and thereafter the contract is changed based on the contract type information sent from the terminal. 消費電力を検出する検出装置と、契約電力の情報を記憶する記憶手段を有する消費電力管理装置と、前記消費電力管理装置と通信を行うサーバとからなり、
前記検出装置は、
消費される電力の量を検出し、前記消費電力管理装置へ送信する検出手段
を有し、
前記消費電力管理装置は、
契約電力の情報を記憶する記憶手段と、
前記検出手段によって送信された電力量の情報を受信した際、受信した電力量が、前記記憶手段に記憶されている契約電力の量を上回ったときに、前記サーバへ通知を行う通知手段と、
前記サーバより契約電力情報を受信すると、前記記憶手段の契約電力の情報を更新する更新手段と、
を有し、
前記サーバは、
更新後の契約電力の量を記憶する契約電力記憶手段と、
前記消費電力管理装置より契約電力を上回った旨の通知があると前記検出装置に対し、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する送信手段と
を有する事を特徴とする電力契約変更システム。
A detection device for detecting power consumption, a power consumption management device having storage means for storing contract power information, and a server for communicating with the power consumption management device,
The detection device includes:
Detection means for detecting the amount of power consumed and transmitting it to the power consumption management device
Have
The power consumption management device includes:
Storage means for storing contract power information;
A notification unit for notifying the server when the received power amount exceeds the amount of contract power stored in the storage unit when the information on the power amount transmitted by the detection unit is received ;
When contract power information is received from the server, update means for updating the contract power information in the storage means;
Have
The server
Contract power storage means for storing the amount of contract power after the update,
Transmitting means for transmitting contract power information indicating the amount of updated contract power stored in the contract power storage means to the detecting device when there is a notification from the power consumption management apparatus that the contract power has been exceeded. A power contract change system characterized by having
契約電力の情報を記憶する記憶手段を有する消費電力管理装置と、前記消費電力管理装置と通信を行うサーバとからなり、
前記消費電力管理装置は、
契約電力の情報を記憶する記憶手段と、
消費される電力の量が、前記記憶手段に記憶されている契約電力の量を上回ったときに、前記サーバへ通知を行う通知手段と、
前記サーバより契約電力情報を受信すると、前記記憶手段の契約電力の情報を更新する更新手段と、
を有し、
前記サーバは、
更新後の契約電力の量を記憶する契約電力記憶手段と、
前記消費電力管理装置より契約電力を上回った旨の通知があると前記検出装置に対し、前記契約電力記憶手段に記憶されている更新後の契約電力の量を示す契約電力情報を送信する送信手段と
を有する事を特徴とする電力契約変更システム。
A power consumption management device having storage means for storing contract power information, and a server communicating with the power consumption management device,
The power consumption management device includes:
Storage means for storing contract power information;
When the amount of power consumed, exceeds the amount of contract power stored in said storage means, and notification means for performing notification to the server,
When contract power information is received from the server, update means for updating the contract power information in the storage means;
Have
The server
Contract power storage means for storing the amount of contract power after the update,
Transmitting means for transmitting contract power information indicating the amount of updated contract power stored in the contract power storage means to the detecting device when there is a notification from the power consumption management apparatus that the contract power has been exceeded. And a power contract change system characterized by comprising:
JP2002039819A 2002-02-18 2002-02-18 Power contract change method and power contract change system Expired - Fee Related JP3812457B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002039819A JP3812457B2 (en) 2002-02-18 2002-02-18 Power contract change method and power contract change system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002039819A JP3812457B2 (en) 2002-02-18 2002-02-18 Power contract change method and power contract change system

Publications (2)

Publication Number Publication Date
JP2003244844A JP2003244844A (en) 2003-08-29
JP3812457B2 true JP3812457B2 (en) 2006-08-23

Family

ID=27780729

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002039819A Expired - Fee Related JP3812457B2 (en) 2002-02-18 2002-02-18 Power contract change method and power contract change system

Country Status (1)

Country Link
JP (1) JP3812457B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4771689B2 (en) * 2004-12-20 2011-09-14 中国電力株式会社 Energy charge determination system
JP4562559B2 (en) * 2005-03-22 2010-10-13 中国電力株式会社 Discontinued power usage survey automatic distribution system and method
JP4809029B2 (en) * 2005-09-27 2011-11-02 株式会社山武 Calorimeter

Also Published As

Publication number Publication date
JP2003244844A (en) 2003-08-29

Similar Documents

Publication Publication Date Title
US8116996B2 (en) System and method utilizing virtual switching for upgrading multifunction devices
CN101005392B (en) Method and system for mapping chat session invitation
JP5324386B2 (en) Home confirmation system and home confirmation method
US8855831B2 (en) Energy control apparatus and method
US20150229130A1 (en) Energy management apparatus, energy management system, and method of controlling energy management system
JP2008021284A (en) Consulting system for electric utility rate based on remote measurement data and method therefor
CN111476516A (en) Takeout distribution method, takeout distribution device, electronic equipment and storage medium
CN102542429A (en) Logistics distribution service system, logistics distribution terminal device and logistics distribution method
JP2010182072A (en) Behavior discrimination system and behavior discrimination method
JP3812457B2 (en) Power contract change method and power contract change system
CN108492086A (en) Books print distribution method, device, terminal and computer readable storage medium
CN205427589U (en) Intelligent house control system based on believe platform a little
CN205263880U (en) Select room system
CN113395193B (en) Equipment control method and device, computer equipment and storage medium
CN105809548A (en) Method and system for controlling settlement of self-service card
CN102970207A (en) Instant communication method, client device and instant communication system
JP2006313031A (en) Information distribution system
CN108449225A (en) The system and method for determining and repairing network connectivity problem
CN104092710A (en) Click stream data online analyzing method and related device and system
JP2002300668A (en) System, device and method for remotely managing house facility unit and storage medium
CN109978529B (en) Offline payment method
JP6214801B1 (en) Information providing system, server, and information providing method
CN111903011B (en) Smart electrical receptacle/outlet apparatus, systems, and related methods
CN111882757A (en) Self-service electricity selling terminal, system and self-service electricity selling method thereof
WO2020078085A1 (en) Electric quantity distribution method and apparatus

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060208

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060214

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060414

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060509

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060522

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3812457

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100609

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110609

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120609

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120609

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130609

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140609

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees