JP3781468B2 - Inter-group resource usage control device - Google Patents

Inter-group resource usage control device Download PDF

Info

Publication number
JP3781468B2
JP3781468B2 JP01982196A JP1982196A JP3781468B2 JP 3781468 B2 JP3781468 B2 JP 3781468B2 JP 01982196 A JP01982196 A JP 01982196A JP 1982196 A JP1982196 A JP 1982196A JP 3781468 B2 JP3781468 B2 JP 3781468B2
Authority
JP
Japan
Prior art keywords
group
work
inter
control device
resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP01982196A
Other languages
Japanese (ja)
Other versions
JPH08292930A (en
Inventor
好房 外川
知治 苅谷
梨絵 飯本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP01982196A priority Critical patent/JP3781468B2/en
Publication of JPH08292930A publication Critical patent/JPH08292930A/en
Priority to US09/225,208 priority patent/US7478050B1/en
Application granted granted Critical
Publication of JP3781468B2 publication Critical patent/JP3781468B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明はオブジェクト指向によりリソースを利用した分散型オブジェクト指向環境やネットワーク環境におけるグループウェアにおいて用いることができるグループ間資源利用制御装置に関する。近年のコンピュータシステムの高性能化、高速化に伴い、オブジェクト指向や分散型を意識したネットワーク環境の展開が必要不可欠となってきているが、ネットワークを意識しないで使用することができる環境が要求されている。また、複数のグループが同一のネットワークに存在し、オブジェクト(プログラム)の使用に対するセキュリティオブジェクトデータ保護のためのセキュリティの重要性が増大している。このため、オブジェクトに対する管理機構が提供されている。
【0002】
しかし、グループ単位で使用する場合には、グループ内でのみ共通して使用することにより、各グループ単位ごとのウインドウ環境を持つようになり、他のグループが参照することが不可能となるため、資源の有効利用の面で問題が生じる。また、逆に複数のグループで共有する環境を持つと、自己のグループ以外の資源を相互に利用することができるが、安易にどのグループもその資源を利用することにより、資源の保証が出来なくなるという問題がある。さらに同一の名前のオブジェクトが存在した場合には、グループ単位の管理が曖昧となり、あるグループで作成したオブジェクトを別のグループが破壊してしまう可能性もある。このように、グループ単位でオブジェクト、データ及びウインドウを使用する場合のセキュリティの重要性が増大し、上述の問題を回避する必要がある。
【0003】
【従来の技術】
従来のグループウェアには、各グループ単位の独立な作業を中心にしたものと、ネットワークにおける共有作業を中心にしたものとがあるが、この区分は曖昧であった。また、従来、各グループ単位で作成したオブジェクト等を、複数のグループ間において相互に使用して作業することは、通常ではできなかった。これを実現するために、例えば作業者の1人が複数のグループに重畳して所属することにより、その作業者がそれぞれのグループにおけるオブジェクト等にアクセスし、又はグループ間でオブジェクト等の受渡しを行い、使用を可能にしていた。
【0004】
さらに、従来の技術では、グループ間資源利用に対する環境を利用して視覚的やり取りや聴覚的やり取りによる作業環境はなく、他のグループと会話しながら、グループ間の資源を利用するものは存在していなかった。そのためセキュリティによる強化とグループ作業における作業者のやり取りを実時間で行いながら、グループ資源を管理していく手段は存在しなかった。又、あるグループが他の資源を利用する時は、担当者を探して呼び出して、データを渡して処理してもらうという非常に作業効率の悪い作業を行っていた。このため、緊急な作業に対しても対応することができず、例えば商談が他社に取られたという問題があった。
【0005】
さらに、リアルタイムでお互いに視覚的な手段であるテレビ等でやり取りしながら資源を管理することはなく、やむおえない場合は、1つ1つ電子メイル等で大量のデータを送り作業をするか、MO等の別の媒体に記録して送ってから結果を受け取るといった作業を余儀無くされていた。そのために、作業者がいてもその者が他の作業をしていた場合、自分の作業を中断して行うなどの問題も多く、この作業が遅れたためにに商談が壊れたという問題が生じていた。
【0006】
【発明が解決しようとする課題】
一般に、グループ間の資源のセキュリティを厳格にすると、複数グループ間での資源の共有ができず、作業効率が低下するという問題が発生する。この問題に対処するため、グループ構成の変更やグループ間の作業メンバの移動により、作業メンバが各時点で必要とする資源の制約を一時的に解消するのは、資源の管理等が曖昧となる。このため、グループ構成の変更やグループ間の作業メンバの移動をできるだけ少なくしようとすると、固定されたグループ単位でしか作業が行えないという問題が発生する。
【0007】
一方、資源の共有化や作業の効率を優先すると、資源のセキュリティ対応が困難になるという問題が発生する。また、これらの調整は作業の管理者等の人手により行わなければならないため、その調整作業が非常に煩雑であるという問題がある。グループによる作業の効率化を図るためには、グループ単位での資源の管理、作業メンバの移動、グループ構成の変更に柔軟に対応し、又、作業手順や作業状況によりグループ間での作業の受渡しを自動的に行うことが望まれる。従って、各グループはグループ単位として資源の管理についての独立性を保持しつつ、グループの作業手順い従って作業に対応するウインドウ等の資源の属性を、現グループから次に作業が予定される別のグループへと変更させて該当する資源を受渡していくことが必要である。
【0008】
従って、本発明の第1の態様は、ネットワークにおいてグループ単位で作業を行う場合に、資源に対するセキュリティを確保しつつ、作業の効率化を図ることを可能にすることを目的とする。即ち、本発明は、各グループ毎の作業内容オブジェクト作業手順を定義する作業定義体に基づき、ウインドウ、オブジェクト(プログラム)、データの属性として、各グループの作業工程毎の使用権利を動的に付与して資源に対するセキュリティを確保しつつ、
1)他グループの専有するウインドウ等を使用する必要がある場合には、使用許可を得て、そのウインドウ等を使用して作業を行い、
2)他グループに自グループのデータと作業手続きを渡してその作業処理を依頼し、
3)作業終了、作業メンバの移動、グループ構成の変更により各グループのウインドウ等の専有属性を変更、再配置する、
ことを可能にしてグループによる作業の効率化を推進することを目的とする。
【0009】
さらに、一般に、グループ間の資源のセキュリティを厳格にすると、複数グループ間での資源の共有が困難となり、作業効率が低下するという問題が生じていた。この効率の悪さを無くそうとすると、作業者は思うように離席することができず、結局自分の時間を持つことができないといった問題が生じていた。即ち、作業効率の悪さを解消するために作業者を拘束することは行き過ぎであり、作業者は使用許可を貰うと作業許可を貰う人を不必要に拘束してしまう問題が生じていた。
【0010】
従って、本発明の第2の態様では、グループ間の資源管理機構に対して相手がどこにいても、ポケットベル、移動電話等を介して相手先を自動呼び出し可能な手段を付加し、相手からグループ間資源管理機構に対して、資源の一時許可及び許可する上での制限事項を与えることにより作業を実行するようにし、そこ結果作業者による作業の弊害を防止し、強力なセキュリティと実時間での作業を行うことをを目的とする。
【0011】
【課題を解決するための手段】
図1は本発明の第1の基本構成図である。図1に示すような各手段を備える。図1において、1は作業手順記憶処理手段、2は作業監視手段、3はグループ作業スケジュール管理手段、4はグループ再配置処理手段、5はリソース管理手段、6は特殊緊急用グループ、7a,7b,7cはそれぞれ作業を行うグループA,グループB,グループCを表す。ここで、グループとはグループ属性によって定義づけられた1又は複数の作業者(作業メンバ)の集合であるが、物理的には使用する作業者が誰であるかにによって特徴づけられた端末群やワークステーション群を意味すると考えてよい。
【0012】
作業手順記憶処理手段1は、各グループの作業手続きとして、作業期間、作業メンバ、作業工程、作業に使用するウインドウ、オブジェクト、データ等の使用権利情報等を定義した作業定義体11を登録、更新、記憶する手段である。特にこの作業定義体11には、グループ間の作業におけるウインドウ等のグループ間の使用権を切り換えるための情報が定義されている。
【0013】
作業監視手段2は、作業手順記憶処理手段1、グループ作業スケジュール管理手段3、グループ再配置処理手段4、リソース管理手段5との通知の受渡しを制御することにより、各作業グループ7(グループ7a,7b,7c)のウインドウ等の使用権利を管理する手段である。また、作業監視手段2は、各作業グループ7の作業状況をモニタリングし、グループ管理テーブル21に基づいて各グループ間でのウインドウ等の使用権利属性の一時的変更、他グループへの作業依頼、作業時間及び作業メンバの変更等の通知を制御する手段である。
【0014】
グループ作業スケジュール管理手段3は、作業開始時に作業監視手段2から作業定義体11を得て、各グループの作業に使用する資源(ウインドウ、プログラム、データ)の使用条件を返す手段である。また、作業定義体11を基に作成した各グループの作業スケジュール情報に従って各グループの作業進行を管理し、作業状況ステータス(作業時間超過)等を作業監視手段2へ通知する手段である。
【0015】
グループ再配置手段4は、作業監視手段2から作業開始/終了時期、グループ名、各グループの作業名、作業メンバ等の情報を得て、現在行われている作業グループ名、作業名、作業メンバ等を返す手段である。また、グループ再配置処理手段4は、作業監視手段2からの通知を受けて作業メンバテーブル41の作業メンバ等を変更し、グループ単位での作業終了又は作業切り換え等の通知を受けて、作業の進行状況に合わせてウインドウ等の使用権利を、次の作業のために必要なグループに再配置する手段である。
【0016】
リソース管理手段5は、作業監視手段2からの通知を基にウインドウ等の資源の使用権利の情報を管理するリソース管理テーブル51と、ウインドウ、プログラム、データ本体を記憶し、これらの登録や削除をそれぞれ行うウインドウ記憶管理手段52、プログラム記憶管理手段53、データ記憶管理手段54を備える。ウインドウ記憶管理手段52、プログラム記憶管理手段53、データ記憶管理手段54は、それぞれ、ウインドウ、プログラム、データ本体を記憶するウインドウ記憶部521 、プログラム記憶部531 、データ記憶部541 を持つ。
【0017】
特殊緊急用グループ6は、各グループ毎に使用権利を持つ全てのウインドウ、プログラム、データに自由にアクセスすることが許可され、作業監視手段2からの通知により、各グループ間での作業等の受渡し等に対して不都合が生じた場合等の緊急時に、その復旧処理等を行うことが出来るようにしたグループである。本発明の第1の態様によれば、例えばネットワーク上で複数のグループが存在する場合、各グループの作業は独立して行われ、グループは自己のグループ内のウインドウにはアクセスできるが、他のグループに属するウインドウにアクセスすることができないように管理される。これにより各グループは外部の環境に左右されずにグループ単位で独立して作業を行うことができる。また、他グループのウインドウを誤って開けようとした場合に、そのウインドウはロックされた状態となっているため、誤操作によるデータ等の破壊を防ぐことができる。
【0018】
あるグループが他グループのウインドウに対してアクセスを要求する場合、そのグループは作業監視手段2に使用要求を通知する。作業監視手段2は、予め定めた作業定義体11の作業内容及び作業手順に基づいてその使用権利要求が正当又は合理的であれば、リソース管理手段5に対してウインドウの使用権利の属性の変更を依頼して、そのグループが、他グループのウインドウのうち許可されたウインドウにのみ一時的にアクセスすることができるようにする。これにより作業の効率化を図ることができる。
【0019】
さらにグループ内での現作業を終了又は切り換えて新たな作業に移行した場合にも、作業監視手段2により新たな作業の内容に基づいてウインドウ等も自動的に切り換えられるため、各グループの作業メンバは自己の所定の作業を遂行していくことでグループ全体の作業を遂行していくことができる。
また、緊急時には全グループのウインドウ、オブジェクト、データ等をアクセスすることのできる特殊緊急用グループ6があるため、緊急の作業が発生した場合、作業手順に定められた作業の正当性が確認することができない場合等に、特殊緊急用グループ6によって対処することができる。
【0020】
以上、資源の代表的なものとして、主にウインドウを例に説明したが、プログラム(オブジェクト)、データに対しても同様である。
次に本発明の第2の態様において、図23は本発明の第2のシステム構成例である。本構成例では図22に示す第1のシステム構成例に比べて電話機、テレビカメラ、ディスプレイ、等が追加されている。
【0021】
図24は本発明の第2の基本構成図である。図1に示す第1の基本構成と比べて明らかなように、本例では、利用確認用タイマ監視手段21、プログラム及びコマンド記憶部531a、モニタ監視フレーム情報管理手段55、連絡管理手段56、テレビカメラ等の入力手段と位置決め手段8、音声入力と音声伝達手段9、利用確認依頼手段10a、利用確認通知手段10b、等が追加される。
【0022】
以下に各々の構成要素について説明する。本発明では、グループ作業スケジュール管理手段3、作業手順記憶手段1、記憶手段5に登録しておき、グループ資源利用装置を有効に利用して開発等を進めて行くための作業定義体を持ち、資源を監視する作業監視手段2、そして、作業監視手段2が管理するためのグループ管理テーブル21、利用者の作業状況を確認して作業状況を時間管理するために使用する利用確認用タイマ監視手段22、グループが作業定義体により、変更される状態が発生した時点で作業を変更することを可能とした部分、利用者が不在で外部に連絡し、確認をとる必要が発生した時に電話、ポケットベル、携帯コンピュータ等に依頼を発し、依頼相手にデータ等を使用することを確認取る為の依頼手段として、利用確認依頼手段10a、そして、その通知を受けるための手段として利用確認通知手段10bを持つ。
【0023】
さらに、テレビカメラ等の入出力機器による依頼者及び、依頼元と視覚的に資源利用の確認をとることを可能とするために、その位置に移動するための入力手段及び位置決め手段8、音声による使用許可を行い使用可能かどうかを選択したり、音声で相手に伝達し、使用可能になったことを伝えたりすること等を可能にするための音声入力伝達手段9、そしてリソースを共通に管理するためのリソース管理手段5で構成されている。
【0024】
リソース管理手段5は、リソース管理テーブル51、ウインドウ記憶管理手段52、ウインドウ記憶部521、プログラム又はコマンドを操作するためのオブジェクト、コマンドを格納してあるプログラム及びコマンド記憶部531aと、それを操作する記憶管理手段53a、使用者自身を写したりするための位置や音声等のやり取りを行うメッセージを格納している情報記憶部551とそれを管理している管理手段55、不在で他の場所にいっている時の連絡を行うための情報を格納している移動電話等の不在者連絡情報を記憶しておく連絡情報記憶部561とそれを管理している連絡管理手段56、データを記憶しておくデータ記憶部541、そして,その管理を行うデータ記憶管理手段54で構成されている。
【0025】
ウインドウ記憶部521は、ウインドウ情報、ウインドウ起動ファイルを持つことにより、ウインドウを使用することが可能となる。又,該当するウインドウやOSにあった操作ができるように情報を持てっており、必要な環境に合わせて環境を使用する構成である。プログラム及びコマンド記憶部531a、各グループの監視モニタ情報記憶部551、移動電話等の不在時の連絡情報記憶部56、データ記憶部541はそれぞれ、格納して管理するのに必要な情報を格納している。
【0026】
作業監視手段2が持つテーブルは、グループ管理テーブル21、作業メンバテーブル41、作業メンバの緊急情報使用状況テーブル、グループの緊急情報使用状況テーブルを持っている。このテーブルを持つことにより、使用状況に対して、時間による制限、使用期間、使用者確認により、使用しているメンバ及びグループを把握することにより、セキュリティの効果を上げることを可能とした構成である。
【0027】
又、使用者は使用するときにIDやパスワードを設けることにより、違う人が、違うセンサを装備した装置で入っても、簡単に依頼者の許可や依頼したりグループ間資利用装置で管理している資源を取り出したり、加工したりすることを防ぐ構成をしている。以上の動作を行うために、どのようなメンバがどのような期間どういうリソースを使用するかを明確にし、システム操作の運営におけるスケジュールを行い不本意な使用をさけるためのセキュリティを強化するための定義体(各グループ作業定義体、統合グループ作業定義体)を持ち動作を運営し、スケジュールの延長や変更はこの定義体を変更することにより行うことを可能とした構成である。
【0028】
本発明の第2の態様によれば、例えばネットワーク上で複数のグループが存在する場合、各グループの作業は独立して行われ、グループは自己のグループ内のウインドウ、オブジェクト又はコマンドには基本的にアクセスできるが、他のグループに属するウインドウにアクセスすることができないように管理される。これにより各グループは外部の環境に左右されずにグループ単位で独立して作業を行うことができる。
【0029】
また、他のグループのウインドウやコマンドを誤って開けようとした場合に、そのウインドウやコマンドはロックされた状態となっているため、誤動作によるデータ等の破壊やセキュリティの高いコマンドを安易に使用したりすることを防ぐことができる。あるグループが他のグループのウインドウに対してアクセスを要求する場合、そのグループは作業監視手段に使用要求を通知する。
【0030】
作業監視手段2は予め定めた作業定義体11の作業内容及び作業手段に対してウインドウ、オブジェクト、コマンドの使用権利の属性の変更を依頼して、そのグループが他のグループのウインドウ、コマンド、オブジェクトのうち許可されたウインドウにのみ一時的アクセスができるようにする。
但し、この場合、依頼を受けたグループの中で、許可を許すメンバを指定する場合と、グループ全員の合意により使用を認める場合等の複数の指定が依頼先のグループの定義体で定義しているのでこの定義体を元にリソース管理に反映させ、この条件にあったメンバの使用合意が必要となる。又、依頼先のメンバが不在の場合、定義体で記載された情報がリソース管理の移動電話等の不在時の連絡情報記憶部に記憶されているのでその情報から不在者の居場所に該当する電話等に作業監視手段がダイヤルを取り出し、利用者確認手段10a,10bにその情報と許可情報を送り、その手段が電話等を通して通知し、使用許可を貰うことにより、より安全に情報使用の許可を厳密に行い、保留時間を削減することができ、作業の効率化を図ることができる。
【0031】
さらに、パスワード等のセキュリティ強化を図ることにより、うその許可を防止することにより、より安全に作業を勧めることを可能にする。さらに、グループ内で現作業を終了または切り換えて新たな作業に移行した場合にも、作業監視手段2により、新しい作業の内容に基づきウインドウ等も自動的に切り換えられるため、各グループの作業メンバは自己の所定の作業を追考していくことで、グループ全体の作業を追考していくことができる。
【0032】
又、緊急時には、全グループのウインドウ、オブジェクト、コマンド、データ等をアクセスすることのできる特殊緊急用グループ6があるため、緊急の作業が発生した場合、作業手順に定めた作業の正当性が確認することができない場合等に、特殊緊急用グループ6によって対処することができる。またこのグループは、緊急用であり特権が高いのでパスワード等によるセキュリティにより、使用者を制限することにより、セキュリティを強化することが可能となる。このセキュリティとは別に各コマンド等に対して付加することにより、各グループで資源を安易に使用することを防止し、セキュリティの強化を図っている。又、ビデオカメラ等の視覚入力装置とセンサにより、依頼相手や、依頼先のメンバの確認ができ、確認の上で許可を認める操作を行うことを可能にすることにより、セキュリティの強化を更に強化することが可能となる。
【0033】
以上、資源の代表的なものとして、ウインドウを中心に例を説明したが、プログラム(オブジェクト)、コマント、データ(音声、動画、静止画等も含む)に対しても同様である。
【0034】
【発明の実施の形態】
以下、本発明の第1の態様についての実施形態について図を用いて説明する。図2及び図3は、グループ間のウインドウ使用権利の関係を示す図である。
ネットワーク上でグループAとグループBが並行している場合を例に説明する。グループA及びグループBの作業は独立して行われているので、図2(A)に示すように、グループBは自己のグループ内のウインドウにはアクセスできるが、グループAに属するウインドウにはアクセスすることはできない。これにより各グループは、外部の環境に左右されずにグループ単位で独立して作業を行うことができる。また、他グループのウインドウを誤って開けようとしても、そのウインドウはロックされた状態であるため、誤操作によるデータ等の破壊を防ぐことができる。
【0035】
しかし、状況によって他グループのウインドウへアクセスする必要が生じることがある。このような場合には、誤操作でのアクセスと異なり、他グループのデータ等を破壊する危険性は少ない。かえって資源の有効利用と作業効率の向上を図る上で必要である。
従って、他グループBがグループAの専有するウインドウに対してアクセスする必要がある場合、グループBは作業監視手段2に使用要求を通知する。作業監視手段2は予め定めた作業定義体11の作業内容及び作業手順に基づいて作成したグループ管理テーブル21を参照し、グループBの使用権利の属性の変更を依頼する。使用許諾がされれば、グループBは図2(B)に示すように、グループAのウインドウ(wa1,wa3)を一時的にアクセスすることができる。
【0036】
また、図3(A)に示すように、グループを階層的に構成することもでき、グループAとグループBを含んだグループCがある場合には、グループCは自グループ内のグループAとグループBに属するウインドウにアクセスすることができる。しかし、グループA又はグループBは、使用許可なく自分以外のグループCに属するウインドウにアクセスすることができない。また、グループCは他グループであるグループDに属するウインドウにアクセスすることができないが、前述した手順により作業監視手段2に使用要求を通知して許可されれば、グループDのウインドウにアクセスすることができる。
【0037】
さらに、グループ内で現作業を終了又は切り換えて新たな作業に移行した場合にも、作業監視手段2により新たな作業の内容に基づいてウインドウ等も自動的に切り換えられるため、各グループの作業メンバは自己の所定の作業を遂行していくことでグループ全体の作業を実行していくことができる。
また、緊急時又は作業手順に定められた作業の正当性を確認する必要があるような場合等のために、図3(B)に示すように、全グループのウインドウ、プログラム、データ等をアクセスすることができる特殊緊急用グループ6が設けられている。これは全グループを包括するグループであり、一般には使用されないが、作業状況及び資源の状況をモニタリングするなどの特殊な場合に用いられる。これにより資源を保全することもできる。
【0038】
以上、ウインドウを例としたが、プログラム(オブジェクト)、データに対しても同様である。
図4及び図5はグループBが持つデータをグループAが処理する場合の例を示す図である。例えばグループBの持つデータを、グループAの環境で処理して結果をグループBが受け取る場合、図4(A)に示すように、グループBは作業手続きにより作業監視手段2を介してデータ属性(即ち、データの使用権利)をグループAへ渡す。グループAはグループBの該当データにアクセスし、グループA内のウインドウを使用して処理を行い、その処理結果をグループBに渡す。なお、グループAがグループBのデータにアクセスする際には、作業監視手段2は、グループ管理テーブル21によりグループAがそのデータを使用することが正当かどうかを調べ、認められる場合にのみアクセスを許可する。ここでは、グループAは事前にグループBのデータ使用許可を得ているので、グループBの持つデータへのアクセスが許可されている。
【0039】
図4(B)の例では、グループBのデータ属性(データの使用権利)をグループAに渡すのではなく、作業手続きに従ってグループBそのものを、グループAに渡す。グループAは受け取ったグループBのデータについてグループA内のウインドウを使用して処理を行い、その処理結果をグループBに返却する。
図5(A)の例ではグループBは作業手続きにより作業監視手段2を介してデータ属性(データの使用権利)をグループAに渡す。グループAはグループBの該当データにアクセスし、グループA内の環境で処理を行い、その処理結果をグループAのデータとして保持する。その後、グループAは作業手続きにより作業監視手段2を介してグループBに対してグループAのデータへのアクセスを許諾する。グループBは必要なときにグループAのデータにアクセスし、処理結果を参照することができる。
【0040】
図5(B)の例では、グループBは作業手続きにより作業監視手段2を介してグループBのデータをグループAに渡す。グループAはグループBのデータを受け取り、グループAの環境で処理し、その処理結果をグループAのデータとして保持する。グループAは作業手続きにより作業監視手段2を介してグループBに対してグループAのデータへのアクセスを認める。グループBは必要なときにグループAのデータにアクセスし、処理結果を参照することができる。
【0041】
図6及び図7は、グループBがグループAにオブジェクト自体又はその使用許可を渡して処理をグループAに依頼し、その処理結果をグループBが貰う、又は参照する場合の例を示す図である。図6(A)の例では、グループBは、作業手続きにより作業監視手段2を介してグループAにオブジェクトの使用許可を与える。グループAはグループBからのオブジェクト使用権利を受け取った後、グループBの該当オブジェクトを起動し、グループBのウインドウで処理を行い、その処理結果をグループBに通知する。
【0042】
図6(B)の例ではグループBはグループBのプログラム(オブジェクト)を作業監視手段2を介してグループAに渡す。グループAはグループBからオブジェクトを受け取った後、グループAのウインドウ上でグループBから得たプログラムによる処理を行い、その処理結果をグループBに通知する。
図7(A)の例ではグループBは作業手続きにより作業監視手段2を介してグループAにオブジェクトの使用許可を与える。グループAはグループBからのオブジェクト使用許可を受け取った後、グループBの該当オブジェクトを起動し、グループA内の環境で処理を行い、その処理結果をグループAのデータとして保持する。グループAは作業手続きにより作業監視手段2を介して、グループBに対しグループAのデータへのアクセスを認める。グループBはグループAのデータにアクセスすることにより処理結果を参照することができる。
【0043】
図7(B)の例では、グループBは作業手続きにより作業監視手段2を介してグループAにグループBのプログラム(オブジェクト)を渡す。グループAは、グループBのオブジェクトを受け取った後、そのオブジェクトを起動してグループA内の環境で処理を行い、その処理結果をグループAのデータとして保持する。グループAは作業手続きにより作業監視手段2を介してグループBに対してグループAのデータへのアクセスを認める。グループBはグループAのデータにアクセスすることにより処理結果を参照することができる。
【0044】
次に各手段の処理動作について以下に説明する。
作業手順記憶処理手段1は各グループ毎の作業の工程情報を定義した依頼定義体を入力し、これらのグループごとの依頼定義体の作業工程の情報をもとに、現作業時間を参照しながら、作業工程お時間軸に合わせてグループごとのリソースのマージを行い、作業定義体11を作成し登録する。
【0045】
図8は依頼定義体の構成例を示す図である。依頼定義体は、作業定義体11の元となる基礎情報を定義したものであり、グループ単位の作業を構成する作業工程の内容が指定される。即ち、依頼定義体には、図8に示すように、一連の作業の開始時期を定める全作業開始時期(stdate)、一連の作業の終了時期を定める全作業終了(spdate)、グループ名(グループA)、作業名(作業A1,作業A2,...,作業An)、関連付けられた作業を示す作業連結状態、各作業の作業者名(作業者1、作業者2、・・・、作業者n)、各作業の開始日付(stdate−A1)、終了日付(spdate−A1)、使用ウインドウ、使用ウインドウ内の使用オブジェクト、使用データ等の資源(リソース)情報が定義されている。
【0046】
図9は作業定義体11の構成例を示す図である。図8に示すようなグループごとの依頼定義体から、図9に示すような作業定義体11が作成される。この作業定義体11では、各グループA,B,...に与えられた作業名、各グループの作業を行う作業者名、全作業開始時期、全作業終了時期、各グループごとの作業工程、及びその各作業工程ごとの使用する資源情報、各作業の終了条件等に関する情報が定義されている。
【0047】
図9において、「for(time N week)」の部分は、期間の長さの指定であるが、「for(startDate to:stopDate)」というような開始日と終了日の指定も可能である。また、グループの作業が単一である場合には、グループ名(作業名)の記載における作業名を省略してもよい。作業工程中の「status:all」は、作業が全部終了した場合に「all」というステータス情報を返すことを示している。これ以外に「status:one(どれか1つの作業が終了した)」、「status:date〔グループ名(作業名)〕(データ格納完了を確認後動作する)」というようなステータス情報を記述することも可能である。
【0048】
図10は作業監視手段2の制御フローチャートである。図10のステップS11の処理において、作業監視手段2は、作業手順記憶処理手段1から作業定義体11の受渡しがあるまで待機し、通知があったならば、作業手順記憶処理手段1から作業定義体11を得る。ステップS12では、作業手順記憶処理手段1から得た作業定義体11をグループ作業スケジュール管理手段3へ渡し、ステップS13によりグループ作業スケジュール管理手段3から各リソース(ウインドウ、プログラム(オブジェクト)、データ)の使用条件を得る。
【0049】
ステップS14では、リソース管理手段5に対し、ステップS13の処理により得た各リソースの使用条件を渡して使用権利の登録を依頼する。ステップS15では、グループ再配置処理手段4へ、作業開始/終了時期、各グループの作業名、作業メンバ等の情報を渡す。そして、ステップS16ではグループ再配置処理手段4から、各グループの現作業名と作業メンバを得る。ステップS17ではステップS16の処理で得た情報をグループ管理テーブル21に登録して、各グループの作業環境を整える。
【0050】
ステップS18では、各グループの作業をモニタリングし、各グループからの依頼等に対してグループ管理テーブル21を参照しながら、各グループと通知の受渡し等を行う。例えば、グループBからグループAへのデータ使用許諾の通知を仲介する処理などを行う。ステップS19ではステップS18の処理で各グループの作業をモニタリングした結果、グループ作業スケジュール管理手段3、グループ再配置処理手段4、リソース管理手段5の各手段の処理等が必要であれば、各手段に処理を依頼し、また各手段からの通知を他の手段やグループへ仲介する。
【0051】
ステップS20では、各手段またはグループからの作業工程、作業メンバ等の変更要求に従い、グループ管理テーブル21の内容を書き換える。例えば、ステップS19の処理で、作業時間や作業メンバの変更等が必要になった場合には、グループ管理テーブル21を書き換える。ステップS21では全作業が終了したかどうかを判断し、全作業が終了していれば、ステップS11の処理へ戻り、終了していなければステップS18以降の処理を全作業が終了するまで繰り返す。
【0052】
図11では、グループ作業スケジュール管理手段3の制御フローチャートである。
グループ作業スケジュール管理手段3は、まずステップS31において、作業監視手段2からの通知を待って、作業定義体11を得る(図10:ステップS12)。ステップS32ではステップS31の処理で得た作業定義体11中のリソースの指定を拾い、各リソースの使用条件等を作業監視手段2へ渡す。
【0053】
ステップS33では作業監視手段2から作業状況等の通知を受けて、その作業状況に応じて作業定義体(作業工程)11に従って処理を進め、作業の切り換えなどの処理結果を作業監視手段2へ渡す。ステップS34では、作業監視手段2から現作業が終了したことを示す作業状況(作業終了)の通知があったかどうかを判断する。現作業が終了した通知があったならば、ステップS39の処理へ進み、作業終了の通知がなければステップS35の処理を行う。
【0054】
ステップS35では現作業の作業時間を越えたかどうかを判断する。作業時間を超過した場合にはステップS36の処理へ進み、作業時間を超過していない場合にはステップS33の処理へ戻る。ステップS36では、作業状況のステータス(作業時間超過)を作業監視手段2へ通知し、作業を打ち切るか作業時間を延長するかの指示を待つ。ステップS37では作業監視手段2を介してグループから作業時間の延長依頼があったかどうかを判断する。延長依頼があれば、ステップS38の処理を行い、延長依頼がなければステップS39の処理へ進む。作業時間の延長依頼があれば、ステップS38により作業時間を変更し、変更した結果を作業監視手段2へ渡す。
【0055】
ステップS39では全作業が終了したかどうかを判断する。全作業が終了した場合には、ステップS31の処理へ戻り、作業監視手段2から新しい作業定義体11が通知されるのを待つ。未処理の作業工程があればステップS33の処理へ戻り、同様に処理を繰り返す。
図12は、グループ再配置処理手段4の制御フローチャートである。まず、グループ再配置処理手段4は図12のステップS51において、作業監視手段2からの通知を待って、作業開始時期、作業終了時期、グループ名、各グループの作業名、作業メンバ等の情報を得る。また、ステップS52では作業定義体11に定義された作業全体の全作業開始時期及び全作業終了時期を設定する。
【0056】
ステップS53では作業監視手段2に現作業といて開始するグループ名、作業名、作業メンバを通知する。ステップS54では作業監視手段2から作業メンバ変更の通知の受取があるかどうかを判断する。通知の受け取りがなければステップS56の処理を行う。通知があればステップS55により作業メンバテーブル41の作業メンバを変更し、関連するリソースの使用権利を再配置する。
【0057】
ステップS56では、全作業終了時期になったかどうかを判断する。全作業終了時期が経過していれば、ステップS57の処理を行い、全作業終了時期でなければステップS60へ進む。ステップS57では作業監視手段2への全作業終了時期であることを通知し、作業監視手段2からの通知を待つ。作業監視手段2から通知があったならば、ステップS58により全作業終了時期の変更通知であるかどうかを判断する。変更通知でなければ、現在の作業工程に関する情報を廃棄し、ステップS51の処理へ戻る。変更通知であれば、ステップS59の処理により全作業終了時期を変更する。
【0058】
ステップ60では作業監視手段2から作業切り換え通知または現作業終了通知の受け取りがあったかどうかを判断する。作業切り換え通知または現作業終了通知の受け取りがあれば、ステップS61の処理へ進み、作業切り換え通知又は現作業終了通知の受け取りがなければ、ステップS54の処理へ戻る。
ステップS61では次の作業へ進み、ステップS62では全作業が終了したかどうかを判断する。全作業終了であれば、ステップS51の処理へ戻り、作業監視手段2からの通知を待つ。全作業終了でなけば次の作業の処理のためにステップS53の処理へ戻る。
【0059】
図13は、作業監視手段2が管理するグループ管理テーブル21の構成例を示す図である。グループ管理テーブル21には図13に示すように、ウインドウ、オブジェクト、データファイルの各資源ごとに、資源名(ウインドウ名、オブジェクト名、データファイル名)と、その各資源を使用するグループ数と、グループ数分のグループ名(作業名)および資源の使用状況を示すフラグの組みが登録される。
【0060】
このフラグは次のようなステータスを定義している。
0:この資源は未使用である。
1:この資源は現在使用中である。
3:現在使用中であり、データファイルはアップデータされている。
4:この資源は他のグループへ依頼中/貸出し中である。
【0061】
5:この資源は他のグループのものであるが使用可能である。
図14はグループ再配置処理手段4で作業メンバを管理するための作業メンバを管理するための作業メンバテーブル41の構成例を示す図である。作業メンバテーブル41には図14に示すように、各グループの作業ごとに作業メンバ数とその作業者名が登録されている。
【0062】
図15はリソース管理手段5で管理するリソース管理テーブル51の構成例を示す図である。リソース管理手段5は、図15(A)に示すように各グループの作業ごとに使用するウインドウ名、オブジェクト名、データ名及びその作業状況(使用条件)などの情報をリソース管理テーブル51により管理する。また、ウインドウ情報としてウインドウの環境(サイズ、メニュー等)、ウインドウの起動ファイル等を登録して管理する。オブジェクト情報としては、オブジェクトの起動形式、及オブジェクト起動ファイル等を登録して管理する。データ属性情報としてはデータ形式、データファイル等の情報を登録して管理する。
【0063】
リソース管理テーブル51における作業状況は、図15(B)に示すように、ウインドウの状況、オブジェクトの使用状態、データの格納終了状態の情報であり、図15(C)及び(D)に示すようなフラグが設定される。ウインドウの状況及びオブジェクトの使用状況フラグは、値により「0:未使用、1:使用中、2:他グループの使用を認めない独占使用、3:使用中かつ他グループに一部使用を認めている」の状態を示し、データ格納終了状態フラグは、値により「0:未格納、1:作業によるデータ加工が完全に終了した、2:途中結果の格納は完了している、4:依頼を受けたデータ、5:依頼を受けたデータの格納を完了している、6:依頼を受けた部分のデータを処理中である」の状態を示す。
【0064】
図16はウインドウの切り換え処理の制御フローチャートである。ウインドウの切り換え時の処理を図16に従って説明する。ステップS91において、各グループが作業中であるとする。ステップS92では、作業監視手段2は、グループから各ウインドウの作業終了通知を受けたとき、又はリソースのファイルに所定のデータが加工され格納されたときに、作業手順記憶処理手段1の作業定義体11を見て、グループ作業スケジュール管理手段3に次の作業の処理を依頼する。
【0065】
ステップS93ではグループ作業スケジュール管理手段3は、作業定義体11をみて処理を進める。ステップS94では、グループ作業スケジュール管理手段3は、作業内容によるウインドウ等の切り換えが発生した場合、作業監視手段2へその切り換えを通知する。ステップS95では作業監視手段2は、作業切り換えの通知を受けてリソース管理手段5に、使用できるグループのウインドウ等の情報の設定を依頼する。ステップS96では作業監視手段2は、各グループに対し各グループの使用できるウインドウを通知する。これにより、ステップS97では各グループはウインドウ制御によりそのグループで使用できるウインドウのみ表示する。
【0066】
図17及び図18は各グループ間のウインドウ移動例を示す図である。図17に示すグループBに属していたウインドウは、グループBもしくはグループAからの依頼によりグループAに属するウインドウとしてグループAに移動する。また、作業終了又は作業切り換えの通知等の場合には、例えば図18に示すようにリソースの再配置が行われる。
【0067】
図19はウインドウのロックの例を示す図である。図19(A)に示すように同一のグループ内において現作業終了又は作業の切り換えがあった場合には、作業監視手段2によりウインドウの使用権利が確認され、グループAでは次に行う作業に指定されているウインドウだけがアクセス可能になり、他のウインドウはロックされる。
【0068】
複数のグループ間では現在作業終了又は作業切り換えの通知により、作業監視手段2によりウインドウの使用権利が確認される。ここで、図19(B)の例の場合、グループAのウインドウW32は、次の作業においてはグループBに使用権利が移り、グループBのウインドウW34はグループAに使用権利が移るため、グループAで使用可能であるのはウインドウW31,w34となり、グループBで使用可能であるのはウインドウW32,W33となっている。
【0069】
ウインドウは基本的にグループで作業が変わることにより画面から消える。但し、他のグループのウインドウの状況(ステータス)を得て、他のウインドウを一時的に借りたいというような要求を出して作業することが可能になっている。図19(C)は、グループBが他グループの割り当て情報を見ることにより、自グループ以外のウインドウ、例えばウインドウW42を使用するための要求を出してウインドウW42を使用する例を示している。自グループ内に他グループの割り当て情報があり、次の作業においても他グループの割り当て情報へのアクセス権利を持つ場合は、その該当するウインドウの使用権利はそのまま引き継がれる。
【0070】
図20及び図21はグループBからグループAに処理を依頼して、その処理結果を受ける場合の処理動作フローチャートである。2つのグループA及びグループBの間で、グループBがグループAに対してデータを受け渡し、グループAの環境でデータを使用して処理するようグループAに作業を依頼し、グループAはその作業を実行したとする。グループBがグループAからその結果を受ける場合、以下のように動作する。
【0071】
図20のステップS71の処理において、作業監視手段2は、グループBからのグループAに対する処理結果のデータの使用依頼を受ける。ステップS72では、作業監視手段2はグループ管理テーブル21の該当するウインドウへ依頼グループ名(作業名)を設定し、フラグを「4」(他のグループへ依頼中)にする(図13参照)。ステップS73では作業監視手段2はリソース管理手段5に対し、グループAの資源の使用を他グループに一部認めているかどうか確認する。ステップS74では、リソース管理手段5は、リソース管理テーブル51のグループ名(作業名)、作業状況中のウインドウの状況等を検索して、他グループが使用可能であるかどうかを見る。そして、ステップS75において、リソース管理手段5は、作業監視手段2へ「使用可能」又は「使用不可」を通知する。
【0072】
「使用可能」である場合には、ステップS76以降の処理を行い、「使用不可」である場合は、図21のステップS81以降の処理を行う。
ステップS76では作業監視手段2は、グループBへ「使用通知」を通知する。ステップS77ではグループBはグループAのウインドウ又はデータ等の資源を一時的に使用し、動作して処理結果をグループBへ持ってくる。その後、ステップS78で、グループBから作業終了の通知を受けたならば、作業監視手段2は、ステップS79によりグループ管理テーブル21中の該当ウインドウのグループBのグループ名(作業名)をクリアし、フラグを「0」にする。
【0073】
ステップS80では、グループBは作業を続行する。グループBが処理結果を受け取るためのグループAの資源の使用が許可されていない場合、図21のステップS81へ進む。ここで、作業監視手段2は、グループAに使用許諾の要求を通知し、グループAからの使用許諾があればリソース管理手段5に通知してグループBの使用を可能にする。
【0074】
ステップS82では、グループBは、該当ウインドウを一時的に使用し、動作し、処理結果をグループBに持ってくる。ステップS83で、グループBから作業終了の通知を受けたならば作業監視手段2は、ステップS84により、グループ管理テーブル21中の該当ウインドウのグループBのグループBのグループ名(作業名)をクリアし、フラグを「0」にする。
【0075】
ステップS85では作業監視手段2、グループAに対し、ウインドウ等の資源の一部使用許諾を継続する禁止するかを聞く。ステップS86では、作業監視手段2は、グループAからの使用状況の通知を受けて、必要があればリソース管理手段5へ通知し、リソース管理テーブル51のフラグ等の変更を依頼する。ステップS87ではグループA及びグループBはそのまま作業を続行する。
【0076】
図22は本発明の実施例におけるシステム構成を示す図である。ここで、システムは、サーバ100、複数のパソコン等の端末101〜104、リソース本体等を記憶するリソース記憶部(ファイル記憶装置)110からなり、これらはネットワーク120で接続されている。作業監視手段2、作業手順記憶処理手段1、グループ作業スケジュール管理手段3、グループ再配置処理手段4、及びリソース管理手段5は、例えばサーバ100にて実現される。各グループの作業者は、サーバ100又はパソコン等の端末101〜104から作業者の識別情報を入力し、そのグループに割り当てられているウインドウ等の資源を使用して作業を実施する。
【0077】
サーバ100は、グループを単位としてウインドウ等の資源の使用者を管理し、各グループは自分に使用権を与えられたもののみを使用するセキュリティ手段を持つ。各グループは、グループ間でやり取りが必要になった場合、ウインドウ、オブジェクト、データ等の使用権を通知又はメッセージとして転送することにより作業を行う。この通知のやり取りを各グループの作業状況と作業手順によって自動的に行うことにより、グループ間の独立した環境で、かつ各グループが協力して処理を遂行することが可能になる。
【0078】
図23及び図24については上述したのでここでは説明を省略する。
図25、図26はリソース管理テーブルの説明図である。リソース管理手段5のリソース管理テーブル51は、(A)に示すように、グループ名、該当メンバ数、メンバ名、ウインドウ名、コマンド又はオブジェクト名、データ名、監視テレビと音声名、連絡名、作業状況で構成される。(B)に示すように、作業状況は、ウインドウの状況、オブジェクト又はコマンド使用状態、データ格納収納状態、連絡状態、監視カメラ操作状態、監視カメラ入力状態、音声の入出力状態で構成され、この状態を元に作業監視手段2が各グループの作業とのやりとりを行い資源の管理を行う。
【0079】
(C)はウインドウ、オブジェクト又はコマンドの使用状態のフラグ説明図である。0−5までは前述の第1の基本構成でも使用されるフラグである。6−10は第2の基本構成の特有のフラグである。即ち、6は他の使用の連絡確認中、7は使用確認の連絡確認中、8は全員の合意による使用、9は特定メンバ以外の使用禁止のため使用確認の連絡確認中、10は個人への使用確認連絡中、である。
【0080】
(D)はデータの格納状態を示すフラグ説明図である。3−5が第2の基本構成の特有のフラグである。3はデータの格納禁止、読み出しのみ、4はデータの格納禁止、グループ全員の合意があれば読み出し可能、5はデータの格納禁止、個人の使用許可があった場合読み出しのみ可能、である。
図26の(A)は連絡状態のフラグ説明図である。0は未使用、1は連絡検索中、2は全員連絡確認中、3は連絡通知完了、4は全員の連絡完了通知、1Xは携帯電話、2Xはポケットベル、3Xはパソコン通信、4はその他の通信、である。(B)は監視カメラ操作状態を示すフラグ説明図である。0は未使用、1はカメラ監視位置の変更開始、2は移動中、3は設定終了、1Xはカメラの位置右移動、2Xは左移動、3Xは上移動、4Xは下移動、である。(C)は監視カメラの入力状態を示すフラグ説明図である。0は未使用、1は識別カードからのセンサ情報による位置が不一致である、2はカメラ位置による入力可能状態で入力していない、3はカメラ入力中、である。(D)は音声からの入出力状態のフラグ説明図である。0は未使用、1は音声メッセージによる出力依頼、2は音声メッセージ登録依頼、3は音声メッセージ通知先指定中、4は音声による声紋確認中、である。
【0081】
図27はウインドウ記憶部の格納内容の説明図である。ウインドウ情報として、OS名、CPU名、ウインドウの環境(サイズ、メニュー等)がある。ウインドウ起動ファイル(OS,CPU)を格納する。図28はプログラム及びコマンド記憶部の格納内容の説明図である。オブジェクト及びコマンド情報として、OS名、CPU名、オブジェクトの起動形式等)がある。オブジェクト起動ファイル(OS,CPU)を格納する。図29は各グループの監視モニタ情報記憶部の格納内容の説明図である。監視テレビ及び音声等の情報として、メンバ名、場所、位置(向き、角度等)、種別(音声等)、がある。監視テレビ及び音声等の動作ファイルを格納する。図30は移動電話等の不在時の連絡情報記憶部の格納内容の説明図である。連絡情報として、メンバ名、場所、ダイヤル、メッセージコード情報、等がある。連絡動作ファイルを格納する。図31はデータ記憶部の格納内容の説明図である。データ属性情報として、データ形式(リードオンリ、フォーマット、種別(動画、音声等)、属性、等がある。データファイルを格納する。
【0082】
図32はグループ管理テーブルの内容の説明図である。(A)は前述の図13(A)と同等のものである。(B)は前述の図13(B)にフラグが追加されたものである。5は現在使用中のデータ/オブジェクト/コマンド/ウインドウから新しいファイル生成、7は現在使用中のデータ/オブジェクト/コマンド/ウインドウの追加差分として関連追加、8は他グループへグループの許諾依頼中、9は他グループのウインドウ/データ/オブジェクト/コマンドの使用許諾、18は同、他グループの個人宛依頼中(特定個人の権限でのみ使用可能)、28は他グループの全員承諾依頼中、38は同、他グループの複数メンバ依頼中(特定メンバの権限のみ使用可能)、である。
【0083】
図33は作業メンバテーブルの内容説明図である。各グループ名(作業名)毎に、数とメンバ名を格納する。図34は作業メンバの緊急情報使用状況テーブルの内容説明図である。使用状況テーブルは、(A)に示すようにメンバ名又はグループ名毎に、一時使用の数、タグ、ウインドウ名、期間、等を格納する。(B)はタグの詳細である。タグ1はウインドウ名、2はオブジェクト名又はコマンド名、3はデータ名、である。(C)は期間の例であり、使用可能期間を示す。
【0084】
図35はグループの緊急情報使用状況テーブルの内容説明図である。使用状況テーブルは、(A)に示すように、各グループ名(作業名)毎の一時使用の数、タグ、ウインドウ名、期間、等が格納される。(B)はタグの詳細である。(C)は期間の一例である。
図36は作業定義体の第2の構成例である。図9に示す第1の構成例と比べて、「作業者連絡先情報」、「呼び出し」、「呼び出し可能人数」、「呼び出し可能作業者」「監視」、等が作業定義体に追加されている。
【0085】
図37は総合グループ作業定義体の構成例である。図示のように、この作業定義体では、メンバとして各グループを規定し、各グループ毎の工程の定義、各工程1及び2が定義されている。
図38はリソース管理手段内において、ウインドウ、オブジェクト又はコマンド等を代表名で行う場合の構造の説明図である。代表名にはタグ毎に例えばウインドウ名を規定する。図39はカメラ等の位置を決定するための装置の構成例である。パソコン内には通知して位置を分析し位置決めする手段や音声伝達手段等が設けられる。作業者の所在を認識するために、例えば、作業者aの頭上には本人を識別するための適当な発振器bを装着し、ここからの識別カードIDの内容をセンサcが受信しパソコンに供給する。同時にマイクロホンeからの音声とカメラの位置をパソコンに入力し、パソコンはカメラの位置を分析してスピーカdから作業者aに指示する。
【0086】
図40は作業定義体を受けてリソースの共有を行う作業のフローチャートである。まず、システムを初期化し、動作開始状態にする(S101) 、次に作業手順記憶手段に各グループの作業定義体を入力する(S102)。次に各グループの作業定義体から統合グループの作業作業定義体を作成する(103) 。次に両方の定義体を作業監視手段に渡す(S104)。次に作業監視手段は作業定義体を元にリソース管理手段の各テーブルに使用可能なコマンド、相手連絡先を登録する(s105)。次にグループスケジュールを、動作状況を管理するための管理手段に作業定義体を渡す(S106)。この際にスケジュール管理による割り込み情報や作業監視手段時のスケジュール管理のやりとりにより作業を進めていく。
【0087】
次にグループ再配置処理手段に定義体を送り、メンバ等の登録を行い、変更通知依頼を作業監視手段からグループ変更通知を送り、メンバの再編成を行い、グループ再配置手段から作業監視手段に通知する(S107)。次に作業が終了か、次の作業があるかを判定する(S108)。終了及び依頼がある場合はステップS102に戻る。その他の場合は、作業監視手段とやり取りしながら各グループで作業を行う(S109)。次に連絡処理を行う(S110)。そしてカメラ等の入力処理と位置設定処理を行う(S111)。
【0088】
図41は作業手順記憶手段の動作フローチャートである。まず、各グループ作業定義体の入力を待つ(S112)。次に各グループ定義体を入力し、統合グループ定義体を作成する(S113)。そして、出来た2つの作業定義体を作業監視手段に受け渡す(S114)。
図42はグループ作業スケジュール管理手段の動作フローチャートである。まず、作業監視手段から作業定義体を貰う(S121)。作業監視手段とのやり取りでグループ作業スケジュールを行う(S122)。作業の遅れ等が発生した時はその修正をし、変更定義体を作業監視手段に渡す(S123)。そして作業定義体の作業完了かを判定する(S124)。
【0089】
図43はグループ再配置処理手段の動作フローチャートである。まず、作業監視手段から作業定義体を貰う(S131)。作業監視手段とのやり取りでメンバの変更に対して変更処理を行う(S132)。次に作業の遅れ等が発生した時は、その修正をし、変更定義体を作業監視手段より受け取り、メンバの再配置を行う(S133)。そして作業定義体の作業完了かを判定する(S134)。
【0090】
図44は利用者確認依頼手段の動作フローチャートである。まず、作業監視手段からの呼び出し依頼を待つ(S141)。次に作業監視手段から受けた連絡方法( ポケットベル、携帯電話等) を選択し、該当する手段を選択する(S142)。次にメッセージを送り相手の確認を依頼し、作業監視手段に依頼したことを通知する(S143)。そして呼び出しをし、呼び出し出来たときは呼び出し完了を作業監視手段に通知する(S144)。
【0091】
図45は利用者確認依頼手段の動作フローチャートである。まず、作業監視手段からの呼び出し依頼を待つ(S151)。次に作業監視手段から呼び出し依頼した通知を待つ(S152)。どの機器からの通知か確認し、受信通知情報により処理を振り分ける(S153)。次に音声で受けて音声認識で変換し使用可能か否かを判断し、作業監視手段に通知する(S154)。そしてテキスト等のメッセージを受け、使用可能か否か調べ、その結果を作業監視手段に通知する(S155)。
【0092】
図46はテレビカメラ等の位置決め手段の動作フローチャートである。まず、使用メンバの通知を作業監視手段から受ける(S161)。メンバの所持している発信カード等から本人の情報を入手する(S162)。この時、カードの位置からカメラ等の入力位置を把握し、そこで2次元バーコード等で読み取ることもでき、メンバであることを認識する。次に顔の位置を設定する(S163)。この時、設定完了までの状態を作業監視手順を経由してリソース管理のステータス領域に状況を格納し、相手の所在を認識する(S163)。そして、センサに合わせて位置を追尾していく(S164)。この時、作業終了か、一時休憩の時は追尾を止め、開始するときは作業監視手段に通知する。なお、追尾を開始したら、発信カードを認識して自動的に追尾する(S164)。
【0093】
図47はテレビカメラ等の入出力手段の動作フローチャートである。まず、使用メンバの通知を作業監視手段から受ける(S171)。次にカメラを追尾しながら距離を図り、焦点を合わせ必要な相手同士でやり取りできるようにする(S172)。次に操作指示に従い、指示依頼のメンバと会話し、確認後、期間等を指定し作業監視手段に許可情報等を送る(S173)。この時、認識コードとパスワードにより本人である認識も行い、本人と判明した時動作する。この時カメラは常に写っている。そして、使用確認が終了したかを判定する(S174)。なお、指示の方法はモード設定により、指の指示で行ったり、音声で行うこともできる。音声での回答は、音声による判断を認識し、その結果を作業監視手段に送り、その情報をリソース管理手段に送る。この場合、音声認識は判断と期間の通知のみなのでDP法、パワースペクトル解析を利用して特徴点で判断してもよい。
【0094】
図48はリソース管理手段と各手段の動作フローチャートである。まず、作業監視手段から作業手続きによるグループ使用状況を貰う(S181)。次にリソース管理テーブルにグループ使用、確認メンバ、グループ、使用権情報、監視テレビ、カメラ等の登録を行い、移動電話等の不在通知に電話番号等を登録する(S182)。次に作業監視手段からの要求を待つ(S183)。次に使用可能なグループのリソース( ウインドウ、オブジェクト、コマンド等) の確認を行い、使用可能なときグループに使用権を委ね作業を実行する(S184)。次に他のグループの資源を使用したいので、その資源の許可をどうとるか確認し、確認した結果により、確認相手の状況をモニタ監視フレーム、移動電話等を確認する(S185)。次に作業監視手段に、取れる確認の依頼を全て確認するように通知し、情報を作業監視機能に渡す(S186)。渡したのち確認中である情報を作業状況に格納する。そして許可通知を受け、使用可能情報を得たら作業状況に使用可能のフラグを設定する(S187)。
【0095】
図49は各グループからの処理フローチャートである。まず作業監視機能に使用要求を出し、使用開始する(S191) 。次に作業監視機能に使用したい環境を呼び出す(S192)。呼び出す時にパスワード、ビデオ監視機能等の操作により使用開始にすることが可能となる。次に各自のグループの環境のリソースを呼び出し処理し、他グループへのリソースを使用したい場合は使用確認通知を作業監視手段に依頼する(S193)。この時、時間か期限指定を行うことができる。次に確認待ちで待つか、又はその間は別の作業を行う(S194)。次に使用可能か否かの通知を貰う(S195)。次に可能な時はその資源を使用して作業を行う(S196)。次に依頼可能な時は作業依頼をする(S197)。次に作業完了待ちする(S198)。S195で貰えないときは別の方法をとる(S199)。そして全作業完了か, 休憩かを判定する(S200)。
【0096】
図50は特殊緊急用グループの処理フローチャートである。まず特殊緊急用であることと、特殊緊急グループ権利を施行するためのパスワード等と使用する通知を作業監視手段に繋げる(S201)。次に特権グループとして、スケジュールやメンバの許諾に関係なくリソースを自由に使用する(S202)。次に使用完了したか否かを判定する(S203)。そして完了していれば終了する。
【0097】
図51から図54は作業監視手段の動作フローチャートである。図51において、まず、作業手順記憶手段(入力手段)から作業定義体情報を貰う(S211)。次に作業監視手段はグループ管理テーブルに登録し、作業定義体を複写してグループ作業スケジュール管理手段に渡す(S212)。次にグループ再配置処理手段に定義体のメンバを送り、再配置処理をする(S213)。次に作業メンバの緊急情報使用状況テーブル、グループの緊急情報使用状況テーブルに、メンバ、グループメンバ名を登録する(S214)。次にリソースに作業定義体情報を用いて登録する(S215)。この時登録する内容は確認先情報やグループでの合意情報等を格納する。さらに作業時に作成、変更、削除されるリソースの場合、各グループから登録依頼があった時登録情報と共に他グループに対する情報を貰い、この情報を元にスケジュール再配置処理に送り、リソースの追加を含めて定義体を修正する(S216)。そしてリソース管理へ使用できるグループと許可するメンバ等の情報及びリソースを格納する(S217)。
【0098】
図52において、グループ作業スケジュール管理手段から、スケジュールの状況通知を受け、各グループに状況を通知し、作業状況が遅れているときは再スケジュール要求を出す(S218)。次に各グループの作業定義体の修正した情報を貰う(S219)。次にグループ再配置手段によりメンバ訂正を行い、作業メンバの緊急情報使用状況テーブル、グループの緊急情報使用状況テーブルのメンバグループメンバ名を訂正する(S220)。次にステップS218が予定通り終了すると次の作業に移行する(S211)。まず、グループ再配置処理手段によりメンバを新メンバに変更する(S222)。次にリソースのメンバや作業メンバの緊急情報使用状況テーブルの再設定、グループの緊急情報使用状況テーブルの変更やテーブル内の状態をクリアする(S223)。さらに各グループの資源利用として、自グループで使用可能な時は自己の環境を開く(S224)。この時、確認用のカード番号やパスワードにより使用可能にする。そして自資源を利用する(S225)。
【0099】
図53において、特殊緊急用グループについて、全グループで使用可能であり、使用の時に確認用のカード番号やパスワードにより使用可能にする(S226)。そして全資源を利用する(S227)。次に他のグループに使用権利を要求した時、リソース管理手段にリソース管理を依頼する(S228)。次に利用確認手段、カメラ等を通して依頼確認するか通知を受ける(S229)。次に電話等やポケットベル等を使用して、利用確認依頼手段と通知手段により使用確認情報を入手する(S230)。次に許可等を入手後、リソース管理手段に通知する(S231)。使用許可可能か通知を貰い各グループに通知する(S232)。次に通知を得て使用可能な場合、メンバ、グループの緊急使用状況テーブルに登録する(S233)。そして該当グループは使用する(S234)。
【0100】
図54において、テレビカメラ音声等による依頼確認について、まず各グループがカメラ等を経由して確認をとる(S235)。次に使用許可を依頼先グループから音声を音声入力伝達手段にてテキストにし通知するかテキストで通知する(S236)。次にリソース使用が可能な時、パスワード等の情報を受けて依頼元グループに通知する(S37) 。次に依頼元は許可を得て使用する(S238)。
【0101】
さらに相手に依頼通知を出す(S239)。次に依頼先グループに確認をとり、YES のときリソースのフラグを依頼先の使用を一時的に可能にする(S240)。次に処理完了通知を受け、依頼グループに通知する(S241)。そして使用許諾が下りない時は依頼元に通知して終了する(S242)。
なお、その他の実施態様として、
・同一グループでも、メンバーを限定して使用することでもよい。但し、定義体での開発メンバの環境を限定することができる。又、リソース管理以外のローカルなファイルを各自で管理していてもよい。このファイルの情報交換は、各保持者がやり取りして送ってもよいが、本発明を使用した場合は、管理の条件に沿って、許可を与えたり許可を貰いグループ間の作業を推進する必要がある。
【0102】
又、使用許可に対しては相手の確認を行い、且つパスワード等による確認を終了後、目的とする相手の許可による使用を得た時点で使用の強化を受ける。又この時の許可理由をメッセージでやり取りすることにより行ってもよい。又、音声や画像による手話や手でのメッセージ等で伝達してやり取りしてもよい。カメラ等の映像を通して、文字メッセージでやり取りしてもよい。
【0103】
さらに、本発明の第2の態様では、作業手順記憶手段(入力手段)、作業監視手段、グループ作業スケジュール管理手段、グループ再配置処理手段、利用確認依頼手段、利用確認通知手段を作業監視手段の中に組み込んで動作させてもよいし分けてもよい、又、テレビカメラ等の入力手段と位置決め手段を各グループのパソコン等に接続してもよいし、作業監視手段から別信号により行ってもよい。又、監視情報を各グループが視覚的に認識して判断する場合は、リソースの管理手段の中で相手の位置がどうなっているかをリソース管理手段から把握しなくてもよい。
【0104】
【発明の効果】
本発明の第1の態様によれば、各グループ内の資源(リソース)は、原則として1つのグループでの使用のみが許可され独占的な使用が保証されているため、他のグループの誤った操作によるデータ、ウインドウ等の環境の破壊が防止される。また、グループ間のデータ等のやり取りにおいては、作業監視手段への通知を介することで、リソースのセキュリティを保持したまま、自グループ内での作業できない環境を別のグループへ依頼することが可能となる。このようにグループ作業における作業内容に従ったリソースの使用権利の管理を、予め作業手順の定義内に含めて管理することにより、並行して行われる各グループの作業の監視を容易にし、リソースの有効利用と複数グループでの作業効率を向上させることができるという効果を奏する。特にネットワーク環境におけるグループウェア等におけるリソースの利用効率の向上及び作業効率の向上に寄与するところが大きい。
【0105】
さらに、本発明の第2の態様によれば、グループ間のデータ等のやり取りにおいて、作業監視手段への通知を解することで、リソースのセキュリティを保持したまま、自グループ内で作業できない環境を別のグループに依頼する等が可能となる。更に、許可相手が不在の場合において、不在をセンサ等で確認し、確認後、不在と判断した場合は不在時の連絡として携帯電話やポケットベルに通知し、使用許可の返事を貰うことが可能となるため、相手作業者が使用環境に存在しなくても対応ができるようになる。また、データ等の使用許可に対して、許可が全員か、数人か、依頼グループの該当者の内1人でよいかが判断でき、最低限の人間に対して許可をとることが可能となる。このように、グループ作業における作業内容に従ったリソースの使用権利の管理を予め作業手順の定義内に含めて管理し、並行して行われるグループの作業の監視を容易にし、リソースの有効利用と複数グループでの作業効率、連絡効率を向上させることができるという効果がある。特にネットワーク環境におけるグループウェア等に於けるリソースの利用効率、伝達効率の向上及び作業効率、監視効率、管理効率の向上に寄与するところが大きい。
【図面の簡単な説明】
【図1】本発明の第1の基本構成図である。
【図2】グループ間ウインドウ使用権利の関係説明図(その1)である。
【図3】グループ間ウインドウ使用権利の関係説明図(その2)である。
【図4】実施形態におけるグループ間の作業処理の例の説明図(その1)である。
【図5】実施形態におけるグループ間の作業処理の例の説明図(その2)である。
【図6】実施形態におけるグループ間の作業処理の例の説明図(その3)である。
【図7】実施形態におけるグループ間の作業処理の例の説明図(その4)である。
【図8】依頼定義体の一例構成図である。
【図9】作業定義体の第1の構成図である。
【図10】作業監視手段の制御フローチャートである。
【図11】グループ作業スケジュール管理手段の制御フローチャートである。
【図12】グループ再配置処理手段の制御フローチャートである。
【図13】グループ管理テーブルの一例構成図である。
【図14】作業メンバテーブルの一例構成図である。
【図15】リソース管理テーブルの一例構成図である。
【図16】ウインドウの切り換え制御フローチャートである。
【図17】グループ間のウインドウ移動の一例説明図である。
【図18】グループ間のウインドウ移動の他の例説明図である。
【図19】ウインドウのロックの一例説明図である。
【図20】グループ間で処理を依頼しその処理結果を受ける場合の処理動作フローチャート(その1)である。
【図21】グループ間で処理を依頼しその処理結果を受ける場合の処理動作フローチャート(その2)である。
【図22】本発明の第1のシステム構成例である。
【図23】本発明の第2のシステム構成例である。
【図24】本発明の第2の基本構成図である。
【図25】リソース管理テーブルの構成図(その1)である。
【図26】リソース管理テーブルの構成図(その2)である。
【図27】ウインドウ記憶部の構成図である。
【図28】プログラム及びコマンド記憶部の構成図である。
【図29】各グループの監視モニタ情報記憶部の構成図である。
【図30】移動電話等の不在時の連絡情報記憶部の構成図である。
【図31】データ記憶部の構成図である。
【図32】グループ管理テーブルの構成図である。
【図33】作業メンバテーブルの構成図である。
【図34】作業メンバの緊急情報使用状況テーブルの構成図である。
【図35】グループの緊急情報使用状況テーブルの構成図である。
【図36】作業定義体の第2の構成図である。
【図37】総合グループ作業定義体の構成図である。
【図38】リソース管理手段にてウインドウ、オブジェクト又はコマンド等を代表名で行う場合の一例構成図である。
【図39】作業者所在認識装置認識カード等の発信情報をセンスしカメラ等の位置決めを行う手段の一例構成図である。
【図40】定義体を貰いリソースを共有する作業の全体の動作フローチャートである。
【図41】作業手順記憶手段の動作フローチャートである。
【図42】グループ作業スケジュール管理手段の動作フローチャートである。
【図43】グループ再配置処理手段の動作フローチャートである。
【図44】利用者確認依頼手段の動作フローチャートである。
【図45】利用者確認依頼手段の動作フローチャートである。
【図46】テレビカメラ等の位置決め手段の動作フローチャートである。
【図47】 テレビカメラ等の入出力手段の動作フローチャートである。
【図48】リソース管理手段と各管理手段の動作フローチャートである。
【図49】各グループからの処理フローチャートである。
【図50】特殊緊急用グループの処理フローチャートである。
【図51】作業監視手段の動作フローチャート(その1)である。
【図52】作業監視手段の動作フローチャート(その2)である。
【図53】作業監視手段の動作フローチャート(その3)である。
【図54】作業監視手段の動作フローチャート(その3)である。
【符号の説明】
1…作業手順記憶処理手段
2…作業監視手段
3…グループ作業スケジュール管理手段
4…グループ再配置処理手段
5…リソース管理手段
6…特殊緊急用グループ
7…グループ
8…テレビカメラ等の入力手段と位置決め手段
9…音声入力と音声伝達手段
10a…利用確認依頼手段
10b…利用確認通知手段
11…作業定義体
21…グループ管理テーブル
41…作業メンバテーブル
51…リソース管理テーブル
52…ウインドウ記憶管理手段
53…プログラム記憶管理手段
54…データ記憶管理手段
55…モニタ監視フレーム情報管理手段
56…移動電話等の不在時の連絡管理手段
521…ウインドウ記憶部
531…プログラム記憶部
541…データ記憶部
551…各グループの監視モニタ情報記憶部
561…移動電話等の不在時の連絡情報記憶部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an inter-group resource usage control apparatus that can be used in groupware in a distributed object-oriented environment or network environment that uses resources by object orientation. With the recent increase in performance and speed of computer systems, it has become essential to develop network environments that are conscious of object orientation and distributed types. However, an environment that can be used without being aware of the network is required. ing. In addition, a plurality of groups exist in the same network, and the importance of security for protecting security object data against the use of objects (programs) is increasing. For this reason, a management mechanism for objects is provided.
[0002]
However, when using it in group units, it becomes possible to have a window environment for each group unit by using it in common only within the group, and it becomes impossible for other groups to refer to it. Problems arise in terms of effective use of resources. Conversely, if you have an environment that is shared by multiple groups, you can use resources other than your own group, but you can't guarantee resources by using any resource easily. There is a problem. Furthermore, if there is an object with the same name, management in units of groups becomes ambiguous, and another group may destroy an object created in one group. Thus, the importance of security when using objects, data, and windows in units of groups increases, and it is necessary to avoid the above problems.
[0003]
[Prior art]
There are two types of conventional groupware, centering on independent work for each group, and centering on shared work in the network, but this classification is ambiguous. Conventionally, it has not been possible to work by using objects created in units of groups, among a plurality of groups. In order to realize this, for example, when one of the workers belongs to a plurality of groups, the worker accesses an object in each group, or delivers an object between the groups. Made it possible to use.
[0004]
Furthermore, in the conventional technology, there is no working environment for visual and auditory exchanges using the environment for resource utilization between groups, and there are those that use resources between groups while talking with other groups. There wasn't. Therefore, there was no means to manage group resources while strengthening by security and exchanging workers in group work in real time. In addition, when a group uses other resources, a work in which the work efficiency is extremely low is performed such that a person in charge is searched and called, and data is passed for processing. For this reason, it was impossible to cope with urgent work, for example, there was a problem that business negotiations were taken by other companies.
[0005]
In addition, resources are not managed while interacting with each other in real time on a television or the like, and if it is unavoidable, send a large amount of data one by one by e-mail etc. The work of recording and sending to another medium such as MO and receiving the result was forced. Therefore, even if there is a worker, if the worker is doing other work, there are many problems such as interrupting his work and doing so, causing problems that business negotiations were broken because this work was delayed. It was.
[0006]
[Problems to be solved by the invention]
In general, when security of resources between groups is strict, resources cannot be shared among a plurality of groups, resulting in a problem that work efficiency decreases. To deal with this problem, the resource management that the working members need to be temporarily removed by changing the group configuration or moving the working members between the groups temporarily causes the management of resources to be ambiguous. . For this reason, if the change in the group configuration or the movement of the working members between the groups is reduced as much as possible, there arises a problem that the work can be performed only in a fixed group unit.
[0007]
On the other hand, when resource sharing and work efficiency are prioritized, there arises a problem that it becomes difficult to deal with resource security. Further, since these adjustments must be performed manually by a manager of the work, there is a problem that the adjustment work is very complicated. In order to improve the efficiency of work by group, it is flexible to manage resources in groups, move work members, change the group configuration, and deliver work between groups according to work procedures and work status Is desired to be performed automatically. Therefore, each group maintains independence of resource management as a group unit, and the attributes of resources such as windows corresponding to the work procedure according to the work procedure of the group are changed from the current group to the next scheduled work. It is necessary to change to a group and deliver the corresponding resource.
[0008]
Therefore, a first aspect of the present invention aims to make it possible to improve work efficiency while ensuring security for resources when working in groups in a network. That is, the present invention dynamically assigns usage rights for each work process of each group as attributes of windows, objects (programs), and data based on a work definition body that defines work procedures for each group. While ensuring security for resources,
1) If it is necessary to use a window dedicated to another group, obtain permission to use it and work using that window.
2) Hand over the data and work procedure of your group to other groups and request the work process.
3) Change or rearrange exclusive attributes such as windows of each group by the end of work, movement of work members, change of group configuration,
The purpose is to promote the efficiency of work by the group.
[0009]
Furthermore, generally, when the security of resources between groups is made strict, it is difficult to share resources among a plurality of groups, resulting in a problem that work efficiency is lowered. In order to eliminate this inefficiency, there was a problem that workers could not leave their seats as expected and eventually could not have their own time. That is, it is too much to restrain the worker in order to eliminate the poor work efficiency, and there has been a problem that the worker unnecessarily restrains the person who asks for the work permission when asked for the use permission.
[0010]
Therefore, in the second aspect of the present invention, a means for automatically calling a partner via a pager, a mobile phone or the like is added to the resource management mechanism between groups wherever the partner is located. The inter-resource management mechanism is allowed to perform work by granting temporary permission of resources and restrictions on permission, thereby preventing adverse effects of work by workers, with strong security and real time. The purpose is to perform the work.
[0011]
[Means for Solving the Problems]
FIG. 1 is a first basic configuration diagram of the present invention. Each means as shown in FIG. 1 is provided. In FIG. 1, 1 is work procedure storage processing means, 2 is work monitoring means, 3 is group work schedule management means, 4 is group relocation processing means, 5 is resource management means, 6 is a special emergency group, 7a, 7b , 7c represent group A, group B, and group C that perform work, respectively. Here, a group is a set of one or a plurality of workers (work members) defined by group attributes, but a terminal group characterized by who physically uses the workers. It may be considered to mean a group of workstations.
[0012]
The work procedure storage processing means 1 registers and updates a work definition body 11 that defines work period, work member, work process, window used for work, object, data usage rights information, etc. as work procedures of each group. Means for storing. In particular, the work definition body 11 defines information for switching usage rights between groups such as windows in work between groups.
[0013]
The work monitoring means 2 controls the delivery of notifications to the work procedure storage processing means 1, the group work schedule management means 3, the group rearrangement processing means 4, and the resource management means 5, thereby allowing each work group 7 (group 7a, 7b, 7c) means for managing the right to use the window. Further, the work monitoring means 2 monitors the work status of each work group 7, temporarily changes usage rights attributes such as windows between groups based on the group management table 21, requests work to other groups, works It is a means for controlling notification of changes in time and working members.
[0014]
The group work schedule management means 3 is a means for obtaining the work definition body 11 from the work monitoring means 2 at the start of work and returning the use conditions of resources (windows, programs, data) used for the work of each group. Further, it is means for managing the work progress of each group in accordance with the work schedule information of each group created based on the work definition body 11 and notifying the work monitoring means 2 of the work status status (work time exceeded).
[0015]
The group rearrangement means 4 obtains information such as the work start / end time, group name, work name of each group, work member, etc. from the work monitoring means 2, and performs the current work group name, work name, work member. It is a means to return etc. Further, the group rearrangement processing unit 4 changes the work member of the work member table 41 in response to the notification from the work monitoring unit 2, and receives the notification of the end of work or the switching of work in units of groups, This is a means for rearranging the right to use a window or the like to a group necessary for the next operation in accordance with the progress status.
[0016]
The resource management means 5 stores a resource management table 51 for managing information on the right to use resources such as windows based on the notification from the work monitoring means 2, and a window, program, and data body, and registers and deletes these. A window storage management unit 52, a program storage management unit 53, and a data storage management unit 54 are provided. The window storage management unit 52, the program storage management unit 53, and the data storage management unit 54 have a window storage unit 521, a program storage unit 531, and a data storage unit 541 that store windows, programs, and data bodies, respectively.
[0017]
The special emergency group 6 is allowed to freely access all windows, programs, and data that each group has the right to use, and delivery of work between the groups by notification from the work monitoring means 2 This is a group that can perform recovery processing in an emergency such as when inconvenience occurs. According to the first aspect of the present invention, for example, when there are a plurality of groups on the network, the work of each group is performed independently, and the group can access the windows in its own group. It is managed so that windows belonging to the group cannot be accessed. As a result, each group can work independently in units of groups without being influenced by the external environment. In addition, when an attempt is made to open a window of another group by mistake, the window is locked, so that destruction of data or the like due to an erroneous operation can be prevented.
[0018]
When a group requests access to a window of another group, the group notifies the work monitoring unit 2 of a use request. The work monitoring means 2 changes the attribute of the window use right to the resource management means 5 if the use right request is valid or reasonable based on the work content and work procedure of the predetermined work definition body 11. To allow the group to temporarily access only authorized windows of other groups. As a result, work efficiency can be improved.
[0019]
Further, even when the current work in the group is completed or switched to a new work, the window etc. are automatically switched by the work monitoring means 2 based on the contents of the new work. Can perform the work of the entire group by performing their own predetermined work.
In addition, since there is a special emergency group 6 that can access windows, objects, data, etc. of all groups in an emergency, the validity of the work specified in the work procedure should be confirmed when an emergency work occurs. The special emergency group 6 can cope with such a situation when it cannot be performed.
[0020]
As described above, the window has been mainly described as an example of a representative resource, but the same applies to programs (objects) and data.
Next, in the second aspect of the present invention, FIG. 23 shows a second system configuration example of the present invention. In this configuration example, a telephone, a television camera, a display, and the like are added as compared to the first system configuration example shown in FIG.
[0021]
FIG. 24 is a second basic configuration diagram of the present invention. As is clear from the first basic configuration shown in FIG. 1, in this example, the usage confirmation timer monitoring means 21, the program and command storage unit 531a, the monitor monitoring frame information management means 55, the contact management means 56, and the television are displayed. Input means such as a camera and positioning means 8, voice input and voice transmission means 9, usage confirmation requesting means 10a, usage confirmation notifying means 10b, etc. are added.
[0022]
Each component will be described below. In the present invention, a work definition body is registered in the group work schedule management unit 3, the work procedure storage unit 1, and the storage unit 5, and the group resource utilization device is effectively used to proceed with development and the like. Work monitoring means 2 for monitoring resources, a group management table 21 for management by the work monitoring means 2, and a usage confirmation timer monitoring means for checking the work status of the user and managing the work status for time. 22. The part where the group can be changed when the status is changed by the work definition body. The user can contact the outside in the absence of the phone, and when there is a need to check the phone, pocket The request confirmation means 10a is used as a request means for issuing a request to a bell, a portable computer, etc. and confirming that the data is used by the other party. With the use confirmation notification means 10b as because of means.
[0023]
Further, in order to make it possible to visually confirm the resource use with the requester and the requester by the input / output device such as the TV camera, the input means and the positioning means 8 for moving to that position, by voice Voice input transmission means 9 for enabling permission to use, selecting whether it can be used, transmitting to the other party by voice, telling that it is available, etc., and managing resources in common It comprises resource management means 5 for doing this.
[0024]
The resource management means 5 is a resource management table 51, a window storage management means 52, a window storage section 521, an object for operating a program or a command, a program storing a command and a command storage section 531a, and operating it. The storage management means 53a, the information storage unit 551 storing a message for exchanging the position and voice for copying the user himself, and the management means 55 for managing the information storage section 53a are present in the absence and other places. A contact information storage unit 561 for storing absentee contact information such as a mobile phone that stores information for making contact information, a contact management means 56 that manages the information, and data. It comprises a data storage unit 541 and data storage management means 54 for managing it.
[0025]
The window storage unit 521 can use a window by having window information and a window activation file. In addition, the information is stored so that an operation suitable for the corresponding window or OS can be performed, and the environment is used according to the necessary environment. The program and command storage unit 531a, the monitoring monitor information storage unit 551 of each group, the contact information storage unit 56 when there is no mobile phone, and the data storage unit 541 each store information necessary for storage and management. ing.
[0026]
The table possessed by the work monitoring means 2 has a group management table 21, a work member table 41, a work member emergency information use situation table, and a group emergency information use situation table. By having this table, it is possible to improve the security effect by grasping the members and groups that are used by using time restrictions, usage period, and user confirmation for the usage status. is there.
[0027]
In addition, by providing an ID and password when using, even if a different person enters with a device equipped with a different sensor, the requester can easily accept or request it and manage it with an inter-group capital utilization device. It has a structure that prevents taking out and processing resources. Definitions for strengthening security for clarifying which members use what resources for what period and performing schedules in the operation of system operations to avoid unintentional use It has a configuration (each group work definition body, integrated group work definition body) and operates, and the schedule can be extended or changed by changing this definition body.
[0028]
According to the second aspect of the present invention, for example, when there are a plurality of groups on the network, the work of each group is performed independently, and the group is basically the window, object or command in its own group. Are managed so that windows belonging to other groups cannot be accessed. As a result, each group can work independently in units of groups without being influenced by the external environment.
[0029]
In addition, if you try to open another group's window or command by mistake, the window or command is locked. Can be prevented. When a group requests access to a window of another group, the group notifies the work monitoring means of a use request.
[0030]
The work monitoring means 2 requests the work contents of the predetermined work definition body 11 and the work means to change the attribute of the right to use the window, object, and command, and the group is a window, command, object of another group. Allow temporary access only to the authorized windows.
However, in this case, in the requested group, multiple designations such as specifying a member who is allowed permission and permitting use with the agreement of all the members are defined in the definition group of the requested group. Therefore, it is necessary to reflect this definition in the resource management based on this definition and to agree on the use of members that meet this condition. Also, when the requested member is absent, the information described in the definition body is stored in the contact information storage unit when the absence is present, such as a mobile phone for resource management, so the telephone corresponding to the location of the absentee from that information The work monitoring means takes out the dial, sends the information and permission information to the user confirmation means 10a, 10b, and the means notifies through the telephone etc. and asks for permission to use the information more safely. Strictly, the holding time can be reduced, and the work efficiency can be improved.
[0031]
Furthermore, it is possible to recommend work more safely by preventing security of lies by strengthening security such as passwords. Furthermore, even when the current work is finished or switched to a new work within the group, the work monitoring means 2 automatically switches the window and the like based on the contents of the new work. By reviewing your own work, you can review the work of the entire group.
[0032]
In the event of an emergency, there is a special emergency group 6 that can access windows, objects, commands, data, etc. of all groups, so if an emergency operation occurs, the correctness of the operation specified in the work procedure is confirmed. When it is not possible to do so, the special emergency group 6 can deal with it. Further, since this group is for emergency use and has high privileges, security can be strengthened by restricting users by security using a password or the like. In addition to this security, it is added to each command and the like to prevent easy use of resources in each group and to strengthen security. In addition, by using visual input devices such as video cameras and sensors, it is possible to confirm the request partner and the member of the request destination, and it is possible to perform operations that permit permission after confirmation, further strengthening security It becomes possible to do.
[0033]
As described above, examples have been described centering on windows as typical resources, but the same applies to programs (objects), commands, and data (including audio, moving images, still images, and the like).
[0034]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the first aspect of the present invention will be described below with reference to the drawings. 2 and 3 are diagrams showing the relationship of window usage rights between groups.
A case where group A and group B are parallel on the network will be described as an example. Since the operations of group A and group B are performed independently, as shown in FIG. 2A, group B can access windows in its own group, but it can access windows belonging to group A. I can't do it. Thereby, each group can work independently in units of groups without being influenced by the external environment. Even if another group's window is opened by mistake, the window is in a locked state, so that destruction of data or the like due to an erroneous operation can be prevented.
[0035]
However, it may be necessary to access windows of other groups depending on the situation. In such a case, unlike access by an erroneous operation, there is little risk of destroying data of other groups. On the contrary, it is necessary for effective utilization of resources and improvement of work efficiency.
Therefore, when the other group B needs to access the window dedicated to the group A, the group B notifies the work monitoring means 2 of the use request. The work monitoring means 2 refers to the group management table 21 created based on the work content and work procedure of the work definition body 11 determined in advance, and requests the change of the attribute of the right of use of the group B. If the license is granted, group B can temporarily access the windows (wa1, wa3) of group A as shown in FIG.
[0036]
Further, as shown in FIG. 3A, the group can be hierarchically arranged. When there is a group C including the group A and the group B, the group C has the group A and the group in its own group. A window belonging to B can be accessed. However, the group A or the group B cannot access the windows belonging to the group C other than itself without using permission. In addition, the group C cannot access the window belonging to the group D which is another group. However, if the use request is notified to the work monitoring means 2 by the procedure described above and the permission is granted, the window of the group D can be accessed. Can do.
[0037]
Further, even when the current work is finished or switched to a new work within the group, the work monitoring means 2 can automatically switch windows and the like based on the contents of the new work. Can perform the work of the entire group by performing their own predetermined work.
In case of emergency or when it is necessary to confirm the validity of the work specified in the work procedure, as shown in FIG. 3B, all groups of windows, programs, data, etc. are accessed. There is a special emergency group 6 that can be used. This is a group that includes all groups, and is not generally used, but is used in special cases such as monitoring work status and resource status. This also preserves resources.
[0038]
The window has been described above as an example, but the same applies to programs (objects) and data.
4 and 5 are diagrams illustrating an example in which group A processes data held by group B. FIG. For example, when the data of group B is processed in the environment of group A and the result is received by group B, as shown in FIG. 4 (A), group B uses the data attribute ( That is, the right to use data) is passed to group A. Group A accesses the corresponding data of group B, performs processing using the window in group A, and passes the processing result to group B. When the group A accesses the data of the group B, the work monitoring means 2 checks whether or not the group A uses the data by the group management table 21 and accesses the data only when it is permitted. to approve. Here, since the group A has already obtained the data usage permission of the group B, access to the data held by the group B is permitted.
[0039]
In the example of FIG. 4B, the data attribute (data use right) of the group B is not transferred to the group A, but the group B itself is transferred to the group A according to the work procedure. Group A processes the received data of group B using the window in group A, and returns the processing result to group B.
In the example of FIG. 5A, the group B passes the data attribute (data use right) to the group A through the work monitoring means 2 according to the work procedure. Group A accesses the corresponding data of group B, performs processing in the environment within group A, and holds the processing result as data of group A. Thereafter, the group A grants the group B access to the data of the group A through the work monitoring means 2 according to the work procedure. Group B can access the data of Group A when necessary and refer to the processing results.
[0040]
In the example of FIG. 5B, the group B passes the data of the group B to the group A through the work monitoring means 2 according to the work procedure. Group A receives the data of group B, processes it in the environment of group A, and holds the processing result as data of group A. Group A grants group B access to group A data via work monitoring means 2 according to the work procedure. Group B can access the data of Group A when necessary and refer to the processing results.
[0041]
6 and 7 are diagrams illustrating an example in which the group B passes the object itself or the use permission thereof to the group A and requests the group A to perform processing, and the group B receives or refers to the processing result. . In the example of FIG. 6A, the group B grants the object use permission to the group A through the work monitoring means 2 by the work procedure. After receiving the object use right from group B, group A activates the corresponding object of group B, performs processing in the window of group B, and notifies group B of the processing result.
[0042]
In the example of FIG. 6B, the group B passes the program (object) of the group B to the group A via the work monitoring unit 2. After receiving the object from group B, group A performs processing by the program obtained from group B on the window of group A, and notifies group B of the processing result.
In the example of FIG. 7A, the group B gives the object use permission to the group A through the work monitoring means 2 by the work procedure. After receiving the object use permission from group B, group A activates the corresponding object of group B, performs processing in the environment within group A, and holds the processing result as data of group A. Group A grants group B access to group A data via work monitoring means 2 according to the work procedure. The group B can refer to the processing result by accessing the data of the group A.
[0043]
In the example of FIG. 7B, the group B passes the program (object) of the group B to the group A via the work monitoring means 2 according to the work procedure. After receiving the group B object, the group A activates the object to perform processing in the environment within the group A, and holds the processing result as group A data. Group A grants group B access to group A data via work monitoring means 2 according to the work procedure. The group B can refer to the processing result by accessing the data of the group A.
[0044]
Next, the processing operation of each means will be described below.
The work procedure storage processing means 1 inputs a request definition body defining the work process information for each group, and refers to the current work time based on the work process information of the request definition body for each group. Then, the resources for each group are merged according to the work process time axis, and the work definition body 11 is created and registered.
[0045]
FIG. 8 is a diagram illustrating a configuration example of a request definition body. The request definition body defines basic information on which the work definition body 11 is based, and specifies the contents of the work process constituting the work in group units. That is, as shown in FIG. 8, the request definition body includes a total work start time (state) that determines the start time of a series of work, an all work end (spdate) that determines the end time of a series of work, and a group name (group A), work name (work A1, work A2,..., Work An), work connection state indicating associated work, worker name of each work (worker 1, worker 2,..., Work N), resource start information (stdate-A1), end date (spdate-A1), use window, use object in the use window, resource data such as use data are defined.
[0046]
FIG. 9 is a diagram illustrating a configuration example of the work definition body 11. A work definition body 11 as shown in FIG. 9 is created from the request definition body for each group as shown in FIG. In this work definition body 11, each group A, B,. . . The work name given to each person, the name of the worker performing the work of each group, the start time of all work, the end time of all work, the work process for each group, the resource information used for each work process, the end of each work Information about conditions etc. is defined.
[0047]
In FIG. 9, “for (time N week)” is a designation of the length of the period, but a start date and an end date such as “for (startDate to: stopDate)” can also be designated. In addition, when the work of a group is single, the work name in the description of the group name (work name) may be omitted. “Status: all” in the work process indicates that status information “all” is returned when all work is completed. In addition to this, status information such as “status: one (one of the work has been completed)” and “status: date [group name (work name)] (operates after confirming completion of data storage)” is described. It is also possible.
[0048]
FIG. 10 is a control flowchart of the work monitoring means 2. In the processing of step S11 in FIG. 10, the work monitoring means 2 waits until the work definition storage unit 1 delivers the work definition body 11, and if there is a notification, the work definition storage processing means 1 sends the work definition. A body 11 is obtained. In step S12, the work definition body 11 obtained from the work procedure storage processing means 1 is transferred to the group work schedule management means 3, and in step S13, each resource (window, program (object), data) is transferred from the group work schedule management means 3. Get usage conditions.
[0049]
In step S14, the resource management means 5 is requested to register the usage right by passing the usage conditions of each resource obtained by the processing in step S13. In step S15, information such as work start / end time, work name of each group, work members, etc. is passed to the group rearrangement processing means 4. In step S16, the current work name and work member of each group are obtained from the group rearrangement processing means 4. In step S17, the information obtained in the process of step S16 is registered in the group management table 21, and the working environment of each group is prepared.
[0050]
In step S18, the operation of each group is monitored, and notifications and the like are delivered to each group while referring to the group management table 21 for requests from each group. For example, processing for mediating notification of data usage permission from group B to group A is performed. In step S19, if the group work schedule management means 3, the group rearrangement processing means 4 and the resource management means 5 need to be processed as a result of monitoring the work of each group in the process of step S18, Request processing, and mediate notification from each means to other means and groups.
[0051]
In step S20, the contents of the group management table 21 are rewritten in accordance with a change request for work steps, work members, etc. from each means or group. For example, when it is necessary to change the working time or working member in the process of step S19, the group management table 21 is rewritten. In step S21, it is determined whether or not all work has been completed. If all work has been completed, the process returns to step S11. If not, the process from step S18 is repeated until all work is completed.
[0052]
FIG. 11 is a control flowchart of the group work schedule management means 3.
First, in step S31, the group work schedule management unit 3 waits for a notification from the work monitoring unit 2 and obtains a work definition body 11 (FIG. 10: step S12). In step S32, the designation of the resource in the work definition body 11 obtained in the process of step S31 is picked up, and the usage condition of each resource is passed to the work monitoring means 2.
[0053]
In step S33, the work monitoring means 2 is notified of the work status and the like, the process proceeds according to the work definition body (work process) 11 in accordance with the work status, and the processing result such as work switching is passed to the work monitoring means 2. . In step S34, it is determined whether the work monitoring means 2 has notified the work status (work completion) indicating that the current work has been completed. If there is a notification of completion of the current work, the process proceeds to step S39, and if there is no notification of work completion, the process of step S35 is performed.
[0054]
In step S35, it is determined whether or not the working time of the current work has been exceeded. If the work time has been exceeded, the process proceeds to step S36. If the work time has not been exceeded, the process returns to step S33. In step S36, the status of the work status (work time exceeded) is notified to the work monitoring means 2, and an instruction to abort the work or to extend the work time is awaited. In step S37, it is determined whether a work time extension request is received from the group via the work monitoring means 2. If there is an extension request, the process of step S38 is performed, and if there is no extension request, the process proceeds to step S39. If there is a request to extend the work time, the work time is changed in step S38, and the changed result is passed to the work monitoring means 2.
[0055]
In step S39, it is determined whether all work has been completed. When all the work is completed, the process returns to the process of step S31 and waits for a new work definition body 11 to be notified from the work monitoring means 2. If there is an unprocessed work process, the process returns to step S33, and the process is repeated in the same manner.
FIG. 12 is a control flowchart of the group rearrangement processing unit 4. First, in step S51 of FIG. 12, the group rearrangement processing unit 4 waits for a notification from the work monitoring unit 2, and obtains information such as the work start time, work end time, group name, work name of each group, work members, and the like. obtain. In step S52, all work start times and all work end times of the whole work defined in the work definition body 11 are set.
[0056]
In step S53, the work monitoring means 2 is notified of the group name, work name, and work member to be started as the current work. In step S54, it is determined whether or not a work member change notification is received from the work monitoring means 2. If no notification is received, the process of step S56 is performed. If there is a notification, the work member in the work member table 41 is changed in step S55, and the right to use the related resource is rearranged.
[0057]
In step S56, it is determined whether or not the end time of all work has come. If the all work end time has elapsed, the process of step S57 is performed. If it is not the all work end time, the process proceeds to step S60. In step S57, the work monitoring means 2 is notified that it is the end time of all work, and a notification from the work monitoring means 2 is awaited. If there is a notification from the work monitoring means 2, it is determined in step S58 whether it is a change notification of all work end times. If it is not a change notification, the information regarding the current work process is discarded, and the process returns to step S51. If it is a change notification, the entire work end time is changed by the process of step S59.
[0058]
In step 60, it is determined whether or not a work switching notice or a current work end notice has been received from the work monitoring means 2. If a work change notification or a current work end notice is received, the process proceeds to step S61. If a work change notice or a current work end notice is not received, the process returns to step S54.
In step S61, the process proceeds to the next work, and in step S62, it is determined whether or not all work has been completed. If all the work is completed, the process returns to step S51 and waits for notification from the work monitoring means 2. If all the operations are not completed, the process returns to step S53 for the next operation.
[0059]
FIG. 13 is a diagram illustrating a configuration example of the group management table 21 managed by the work monitoring unit 2. As shown in FIG. 13, the group management table 21 includes a resource name (window name, object name, data file name) for each resource of the window, object, and data file, the number of groups using each resource, Group names (work names) corresponding to the number of groups and flag combinations indicating the resource usage status are registered.
[0060]
This flag defines the following status:
0: This resource is unused.
1: This resource is currently in use.
3: Currently in use, data file is updated.
4: This resource is being requested / rented to another group.
[0061]
5: This resource is available from another group.
FIG. 14 is a diagram showing a configuration example of a work member table 41 for managing work members for managing work members by the group rearrangement processing means 4. In the work member table 41, as shown in FIG. 14, the number of work members and the names of the workers are registered for each work of each group.
[0062]
FIG. 15 is a diagram showing a configuration example of the resource management table 51 managed by the resource management means 5. As shown in FIG. 15A, the resource management means 5 manages information such as a window name, an object name, a data name, and a work status (use condition) used for each group work by a resource management table 51. . In addition, a window environment (size, menu, etc.), a window startup file, and the like are registered and managed as window information. As object information, an object activation format and an object activation file are registered and managed. As data attribute information, information such as data format and data file is registered and managed.
[0063]
As shown in FIG. 15B, the work status in the resource management table 51 is information on the window status, object usage status, and data storage end status, as shown in FIGS. 15C and 15D. The correct flag is set. The window status and object usage status flags are “0: Not used, 1: In use, 2: Exclusive use that does not allow other groups to be used, 3: Used, and some groups are allowed to use partly. The data storage end status flag is “0: not stored, 1: data processing by the work has been completely completed, 2: storage of intermediate results has been completed, 4: request is received. The received data, 5: storage of the requested data has been completed, and 6: the requested data is being processed.
[0064]
FIG. 16 is a control flowchart of the window switching process. Processing at the time of switching windows will be described with reference to FIG. In step S91, it is assumed that each group is working. In step S92, the work monitoring means 2 receives the work end notification of each window from the group, or when predetermined data is processed and stored in the resource file, the work definition body of the work procedure storage processing means 1 11, the group work schedule management means 3 is requested to process the next work.
[0065]
In step S <b> 93, the group work schedule management unit 3 proceeds with the process while looking at the work definition body 11. In step S94, the group work schedule management means 3 notifies the work monitoring means 2 of the switching when the window or the like is switched according to the work content. In step S95, the work monitoring means 2 receives a notice of work switching and requests the resource management means 5 to set information such as a window of a group that can be used. In step S96, the work monitoring unit 2 notifies each group of windows that can be used by each group. Thus, in step S97, each group displays only the windows that can be used in that group by window control.
[0066]
17 and 18 are diagrams showing examples of window movement between groups. A window belonging to group B shown in FIG. 17 moves to group A as a window belonging to group A in response to a request from group B or group A. In the case of notification of work completion or work switching, for example, resource rearrangement is performed as shown in FIG.
[0067]
FIG. 19 shows an example of window locking. As shown in FIG. 19A, when the current work is finished or the work is switched in the same group, the right to use the window is confirmed by the work monitoring means 2, and the next work is designated in the group A. Only the windows that have been opened are accessible, and the other windows are locked.
[0068]
The right to use the window is confirmed by the work monitoring means 2 in accordance with the notification of the current work end or work switching among a plurality of groups. In the case of the example of FIG. 19B, the right of use of the window W32 of the group A is transferred to the group B in the next operation, and the right of use of the window W34 of the group B is transferred to the group A. Can be used in windows W31 and w34, and in group B, windows W32 and W33 can be used.
[0069]
The window basically disappears from the screen as work changes in groups. However, it is possible to obtain a status (status) of the window of another group and issue a request to rent another window temporarily. FIG. 19C shows an example in which the group B uses the window W42 by issuing a request for using a window other than its own group, for example, the window W42 by looking at the allocation information of the other group. If there is other group assignment information in the own group and the user has the right to access the other group assignment information in the next operation, the right to use the corresponding window is inherited as it is.
[0070]
20 and 21 are processing operation flowcharts when a process is requested from group B to group A and the processing result is received. Between the two groups A and B, the group B delivers data to the group A and requests the group A to process the data using the data in the group A environment. Suppose that it is executed. When group B receives the result from group A, it operates as follows.
[0071]
In the process of step S <b> 71 of FIG. 20, the work monitoring unit 2 receives a use request for processing result data for group A from group B. In step S72, the work monitoring means 2 sets the requested group name (work name) in the corresponding window of the group management table 21, and sets the flag to “4” (in request to another group) (see FIG. 13). In step S73, the work monitoring means 2 confirms with the resource management means 5 whether or not a part of the use of the resources of the group A is permitted to other groups. In step S74, the resource management means 5 searches the group name (work name) in the resource management table 51, the status of the window in the work status, and the like to see whether another group is available. In step S75, the resource management unit 5 notifies the work monitoring unit 2 of “usable” or “unusable”.
[0072]
If it is “usable”, the processing after step S76 is performed, and if it is “unusable”, the processing after step S81 in FIG. 21 is performed.
In step S76, the work monitoring unit 2 notifies the group B of “use notification”. In step S77, group B temporarily uses resources such as group A's window or data and operates to bring the processing result to group B. After that, when a work end notification is received from group B in step S78, the work monitoring means 2 clears the group name (work name) of group B of the corresponding window in the group management table 21 in step S79. Set the flag to “0”.
[0073]
In step S80, group B continues the work. If group B is not permitted to use the resource of group A for receiving the processing result, the process proceeds to step S81 in FIG. Here, the work monitoring unit 2 notifies the group A of a request for use permission, and if there is a use permission from the group A, notifies the resource management unit 5 to enable use of the group B.
[0074]
In step S82, the group B operates by temporarily using the corresponding window, and brings the processing result to the group B. If the work monitoring means 2 receives a work end notification from the group B in step S83, the work monitoring means 2 clears the group name (work name) of the group B of the group B in the group management table 21 in step S84. The flag is set to “0”.
[0075]
In step S85, it asks the work monitoring means 2 and group A whether to prohibit the partial use permission of resources such as windows. In step S86, the work monitoring unit 2 receives the usage status notification from the group A, notifies the resource management unit 5 if necessary, and requests to change the flag or the like of the resource management table 51. In step S87, group A and group B continue their work.
[0076]
FIG. 22 is a diagram showing a system configuration in the embodiment of the present invention. Here, the system includes a server 100, terminals 101 to 104 such as a plurality of personal computers, and a resource storage unit (file storage device) 110 that stores a resource main body and the like, and these are connected by a network 120. The work monitoring unit 2, the work procedure storage processing unit 1, the group work schedule management unit 3, the group rearrangement processing unit 4, and the resource management unit 5 are realized by the server 100, for example. Workers in each group input worker identification information from the terminals 100 to 104 such as the server 100 or a personal computer, and perform work using resources such as windows assigned to the group.
[0077]
The server 100 manages users of resources such as windows in units of groups, and each group has security means that uses only those that have been given the right to use. Each group performs work by transferring usage rights of windows, objects, data, and the like as notifications or messages when exchange between groups becomes necessary. By automatically exchanging this notification according to the work status and work procedure of each group, it becomes possible for each group to perform processing in an independent environment between the groups.
[0078]
Since FIG. 23 and FIG. 24 have been described above, description thereof is omitted here.
25 and 26 are explanatory diagrams of the resource management table. The resource management table 51 of the resource management means 5 includes a group name, the number of corresponding members, a member name, a window name, a command or object name, a data name, a monitoring TV and voice name, a contact name, an operation, as shown in FIG. Consists of situations. As shown in (B), the work status is composed of a window status, an object or command usage status, a data storage and storage status, a contact status, a surveillance camera operation status, a surveillance camera input status, and an audio input / output status. Based on the status, the work monitoring means 2 communicates with the work of each group and manages resources.
[0079]
(C) is a flag explanatory diagram of the usage state of a window, an object, or a command. Flags 0 to 5 are also used in the first basic configuration described above. 6-10 is a flag specific to the second basic configuration. In other words, 6 is confirming contact for other uses, 7 is confirming contact for confirmation of use, 8 is used by the consent of all members, 9 is confirming contact for confirmation of use because of prohibition of use by non-specific members, 10 is for individuals The confirmation of use is in progress.
[0080]
(D) is an explanatory diagram of a flag indicating a data storage state. 3-5 is a flag specific to the second basic configuration. 3 is forbidden to store data, only for reading, 4 is forbidden to store data, can be read if there is an agreement among all the groups, and 5 is forbidden to store data, and can only be read if there is permission for personal use.
(A) of FIG. 26 is an explanatory diagram of a flag in a contact state. 0 is unused, 1 is searching for contact, 2 is checking contact, 3 is contact notification complete, 4 is contact notification for all, 1X is mobile phone, 2X is pager, 3X is PC communication, 4 is other Communication. (B) is a flag explanatory view showing a surveillance camera operation state. 0 is not used, 1 is a camera monitoring position change start, 2 is moving, 3 is set, 1X is a camera position moved right, 2X is moved left, 3X is moved up, and 4X is moved down. (C) is a flag explanatory view showing the input state of the surveillance camera. 0 is not used, 1 is a position mismatched by the sensor information from the identification card, 2 is an input enabled state according to the camera position, and 3 is camera input. (D) is an explanatory diagram of an input / output flag from a voice. 0 is unused, 1 is a voice message output request, 2 is a voice message registration request, 3 is a voice message notification destination designation, and 4 is a voice print confirmation.
[0081]
FIG. 27 is an explanatory diagram of the contents stored in the window storage unit. Window information includes the OS name, CPU name, and window environment (size, menu, etc.). A window start file (OS, CPU) is stored. FIG. 28 is an explanatory diagram of the contents stored in the program and command storage unit. The object and command information includes an OS name, a CPU name, an object activation format, and the like. An object activation file (OS, CPU) is stored. FIG. 29 is an explanatory diagram of the contents stored in the monitoring monitor information storage unit of each group. Information such as the monitoring television and voice includes member name, location, position (direction, angle, etc.), and type (voice, etc.). Stores operation files such as surveillance TV and audio. FIG. 30 is an explanatory diagram of the contents stored in the contact information storage unit when a mobile phone or the like is absent. The contact information includes member name, location, dial, message code information, and the like. Stores contact action files. FIG. 31 is an explanatory diagram of the contents stored in the data storage unit. The data attribute information includes a data format (read only, format, type (moving image, audio, etc.), attribute, etc. A data file is stored.
[0082]
FIG. 32 is an explanatory diagram of the contents of the group management table. (A) is equivalent to FIG. 13 (A) described above. (B) is obtained by adding a flag to FIG. 13 (B). 5 is a new file generation from the currently used data / object / command / window, 7 is a related addition as an additional difference of the currently used data / object / command / window, 8 is a group permission request to another group, 9 Is a window / data / object / command permission for another group, 18 is a request to an individual of another group (can be used only with the authority of a specific individual), 28 is a request for consent from all other groups, 38 is the same , Requesting multiple members of other groups (only the authority of a specific member can be used).
[0083]
FIG. 33 is a diagram for explaining the contents of the work member table. The number and member name are stored for each group name (work name). FIG. 34 is an explanatory diagram of the contents of the emergency information usage status table of the working member. The usage status table stores the number of temporary uses, tags, window names, periods, etc. for each member name or group name as shown in FIG. (B) shows details of the tag. Tag 1 is a window name, 2 is an object name or command name, and 3 is a data name. (C) is an example of a period and shows a usable period.
[0084]
FIG. 35 is an explanatory diagram of the contents of the group emergency information usage situation table. As shown in (A), the usage status table stores the number of temporary uses, tags, window names, periods, etc. for each group name (work name). (B) shows details of the tag. (C) is an example of a period.
FIG. 36 shows a second configuration example of the work definition body. Compared to the first configuration example shown in FIG. 9, “worker contact information”, “calling”, “callable number of people”, “callable workers”, “monitoring”, and the like are added to the work definition body. Yes.
[0085]
FIG. 37 is a configuration example of a general group work definition body. As shown in the figure, in this work definition body, each group is defined as a member, and a process definition for each group and each process 1 and 2 are defined.
FIG. 38 is an explanatory diagram of a structure when a window, object, command, or the like is performed with a representative name in the resource management means. For the representative name, for example, a window name is defined for each tag. FIG. 39 is a configuration example of an apparatus for determining the position of a camera or the like. In the personal computer, there are provided means for notifying, analyzing the position, positioning, voice transmission means, and the like. In order to recognize the location of the worker, for example, an appropriate oscillator b for identifying the person is mounted on the head of the worker a, and the content of the identification card ID is received by the sensor c and supplied to the personal computer. To do. At the same time, the sound from the microphone e and the position of the camera are input to the personal computer. The personal computer analyzes the position of the camera and instructs the operator a from the speaker d.
[0086]
FIG. 40 is a flowchart of work for receiving resources and sharing resources. First, the system is initialized to an operation start state (S101), and then the work definition body of each group is input to the work procedure storage means (S102). Next, a work work definition body of the integrated group is created from the work definition body of each group (103). Next, both definition bodies are transferred to the work monitoring means (S104). Next, the work monitoring means registers available commands and partner contacts in each table of the resource management means based on the work definition (s105). Next, the work definition is passed to the management means for managing the operation status of the group schedule (S106). At this time, the work is advanced by exchanging the interrupt information by the schedule management and the schedule management at the time of the work monitoring means.
[0087]
Next, the definition body is sent to the group rearrangement processing means, the members are registered, the change notification request is sent from the work monitoring means, the group change notice is sent, the members are reorganized, and the group rearrangement means is sent to the work monitoring means. Notification is made (S107). Next, it is determined whether the work is finished or there is a next work (S108). If there is an end or request, the process returns to step S102. In other cases, the work is performed in each group while exchanging with the work monitoring means (S109). Next, contact processing is performed (S110). Then, input processing and position setting processing of the camera or the like are performed (S111).
[0088]
FIG. 41 is an operation flowchart of the work procedure storage means. First, it waits for the input of each group work definition body (S112). Next, each group definition body is input to create an integrated group definition body (S113). Then, the two created work definition bodies are transferred to the work monitoring means (S114).
FIG. 42 is an operation flowchart of the group work schedule management means. First, a work definition body is obtained from the work monitoring means (S121). A group work schedule is performed by exchanging with the work monitoring means (S122). When a work delay or the like occurs, the work is corrected and the change definition is passed to the work monitoring means (S123). Then, it is determined whether the work of the work definition body is completed (S124).
[0089]
FIG. 43 is an operation flowchart of the group rearrangement processing means. First, a work definition body is obtained from the work monitoring means (S131). A change process is performed in response to the change of the member by exchanging with the work monitoring means (S132). Next, when a work delay or the like occurs, the work is corrected, the change definition body is received from the work monitoring means, and the members are rearranged (S133). Then, it is determined whether the work of the work definition body is completed (S134).
[0090]
FIG. 44 is an operation flowchart of the user confirmation request means. First, it waits for a call request from the work monitoring means (S141). Next, the contact method (pager, mobile phone, etc.) received from the work monitoring means is selected, and the corresponding means is selected (S142). Next, a message is sent to request confirmation of the other party, and the work monitoring means is notified of the request (S143). Then, a call is made, and when the call can be made, the completion of the call is notified to the work monitoring means (S144).
[0091]
FIG. 45 is an operation flowchart of the user confirmation request means. First, it waits for a call request from the work monitoring means (S151). Next, it waits for a notification requested by the work monitoring means (S152). The device from which the notification is sent is confirmed, and the process is distributed according to the reception notification information (S153). Next, it is determined whether or not it can be used after being received by voice and converted by voice recognition, and the work monitoring means is notified (S154). Then, a message such as a text is received, it is checked whether it can be used, and the result is notified to the work monitoring means (S155).
[0092]
FIG. 46 is an operation flowchart of positioning means such as a television camera. First, the notification of the member in use is received from the work monitoring means (S161). The person's information is obtained from the calling card possessed by the member (S162). At this time, the input position of the camera or the like is grasped from the position of the card, and can be read there with a two-dimensional barcode or the like, so that the member is recognized. Next, the face position is set (S163). At this time, the state until the setting is completed is stored in the status area of the resource management via the work monitoring procedure, and the location of the other party is recognized (S163). Then, the position is tracked according to the sensor (S164). At this time, tracking is stopped at the end of the work or at a temporary break, and the work monitoring means is notified at the start. When tracking is started, the calling card is recognized and automatically tracked (S164).
[0093]
FIG. 47 is an operation flowchart of input / output means such as a television camera. First, the notification of the member in use is received from the work monitoring means (S171). Next, the camera tracks the distance and focuses so that the necessary parties can communicate with each other (S172). Next, in accordance with the operation instruction, a conversation is made with the member who requested the instruction, and after confirmation, a period and the like are designated and permission information and the like are sent to the work monitoring means (S173). At this time, the identity is also recognized by the recognition code and the password, and the operation is performed when the identity is identified. At this time, the camera is always visible. Then, it is determined whether the use confirmation has been completed (S174). Note that the instruction method can be performed by a finger instruction or by voice depending on the mode setting. The answer by voice recognizes the judgment by voice, sends the result to the work monitoring means, and sends the information to the resource management means. In this case, since speech recognition is only judgment and notification of the period, the DP method and power spectrum analysis may be used to judge by feature points.
[0094]
FIG. 48 is a flowchart of the operation of the resource management means and each means. First, the group usage status according to the work procedure is obtained from the work monitoring means (S181). Next, the group use, confirmation member, group, usage right information, surveillance TV, camera, etc. are registered in the resource management table, and the telephone number etc. is registered in the absence notification of the mobile phone etc. (S182). Next, it waits for a request from the work monitoring means (S183). Next, the group resources (window, object, command, etc.) that can be used are checked, and when available, the use right is entrusted to the group and the work is executed (S184). Next, since it is desired to use the resource of another group, it is confirmed how to permit the resource, and based on the result of confirmation, the status of the confirmation partner is confirmed by a monitor monitoring frame, a mobile phone, or the like (S185). Next, the work monitoring means is notified to confirm all the confirmation requests that can be taken, and the information is passed to the work monitoring function (S186). The information that is being confirmed after passing is stored in the work status. When a permission notice is received and usable information is obtained, a usable flag is set in the work status (S187).
[0095]
FIG. 49 is a process flowchart from each group. First, a use request is issued to the work monitoring function and the use is started (S191). Next, the environment to be used for the work monitoring function is called (S192). When calling, it is possible to start use by operating a password, a video monitoring function, or the like. Next, the resource of the environment of each group is called and processed, and if the resource to other groups is to be used, a usage confirmation notification is requested to the work monitoring means (S193). At this time, the time or deadline can be specified. Next, the process waits for confirmation, or performs another work during that time (S194). Next, a notification as to whether or not it can be used is received (S195). When possible, work is performed using the resource (S196). When the next request is possible, a work request is made (S197). Next, the work is waited for (S198). If you cannot get it in S195, take another method (S199). Then, it is determined whether all work is completed or a break (S200).
[0096]
FIG. 50 is a processing flowchart of the special emergency group. First, it is connected to the work monitoring means that it is for special emergency use, a password for enforcing the special emergency group right, and the like to be used (S201). Next, the resource is freely used as a privileged group regardless of the schedule or permission of members (S202). Next, it is determined whether or not the use is completed (S203). If it is completed, the process ends.
[0097]
51 to 54 are operation flowcharts of the work monitoring means. In FIG. 51, first, work definition information is obtained from work procedure storage means (input means) (S211). Next, the work monitoring means registers in the group management table, copies the work definition, and passes it to the group work schedule management means (S212). Next, the members of the definition body are sent to the group rearrangement processing means, and rearrangement processing is performed (S213). Next, the member and group member names are registered in the emergency information usage status table of the working member and the emergency information usage status table of the group (S214). Next, it registers with the resource using the work definition information (S215). The contents to be registered at this time store confirmation destination information, group agreement information, and the like. Furthermore, in the case of resources that are created, changed, or deleted at the time of work, when registration requests are received from each group, information on other groups is received together with registration information, and this information is sent to schedule relocation processing, including resource addition. The definition body is corrected (S216). Then, information and resources such as groups that can be used for resource management and permitted members are stored (S217).
[0098]
52, a schedule status notification is received from the group work schedule management means, the status is notified to each group, and if the work status is delayed, a reschedule request is issued (S218). Next, the corrected information of the work definition body of each group is obtained (S219). Next, member correction is performed by the group rearrangement means, and the member group member names in the emergency information usage status table of the working member and the emergency information usage status table of the group are corrected (S220). Next, when step S218 is completed as scheduled, the process proceeds to the next operation (S211). First, the member is changed to a new member by the group rearrangement processing means (S222). Next, the emergency information usage status table of the resource member and the working member is reset, the group emergency information usage status table is changed, and the status in the table is cleared (S223). Furthermore, when each group can use the resource as its resource use, its own environment is opened (S224). At this time, the card can be used with a confirmation card number or password. Then, own resources are used (S225).
[0099]
In FIG. 53, the special emergency group can be used in all groups, and can be used with a confirmation card number or password when used (S226). All resources are used (S227). Next, when a usage right is requested to another group, the resource management means is requested to perform resource management (S228). Next, a request confirmation or notification is received through the usage confirmation means, camera, etc. (S229). Next, using a telephone or a pager, the usage confirmation information is obtained by the usage confirmation requesting means and the notification means (S230). Next, after obtaining permission or the like, the resource management means is notified (S231). Each group is notified of whether it can be used or not (S232). Next, when it can be used upon receiving a notification, it is registered in the member / group emergency use situation table (S233). The corresponding group is used (S234).
[0100]
In FIG. 54, regarding the request confirmation by the TV camera sound or the like, first, each group confirms via the camera or the like (S235). Next, the use permission is notified from the request destination group in the form of voice as voice by the voice input transmission means or in text (S236). Next, when the resource can be used, information such as a password is received and notified to the requesting group (S37). Next, the requester obtains permission and uses it (S238).
[0101]
Further, a request notification is issued to the other party (S239). Next, the request destination group is checked, and if YES, the resource flag is temporarily enabled to use the request destination (S240). Next, the processing completion notification is received and notified to the request group (S241). If the license is not granted, the request is notified and the process ends (S242).
As other embodiments,
-The same group may be used with limited members. However, the environment of development members in the definition body can be limited. In addition, local files other than resource management may be managed by themselves. Information exchange of this file may be exchanged and sent by each holder, but when using the present invention, it is necessary to give permission or ask permission to promote work between groups according to the management conditions There is.
[0102]
In addition, for the use permission, the other party is confirmed, and after the confirmation by the password or the like is finished, the use is strengthened when the use by the target other party's permission is obtained. Also, the permission reason at this time may be exchanged by a message. Further, it may be communicated by sign language by voice or image or a message by hand. It may be exchanged by a text message through video from a camera or the like.
[0103]
Furthermore, in the second aspect of the present invention, work procedure storage means (input means), work monitoring means, group work schedule management means, group relocation processing means, usage confirmation requesting means, and usage confirmation notifying means are provided in the work monitoring means. It may be incorporated and operated separately, or input means such as a TV camera and positioning means may be connected to each group of personal computers, etc., or may be performed by a separate signal from the work monitoring means Good. When each group visually recognizes and determines the monitoring information, it is not necessary to grasp from the resource management means what the position of the other party is in the resource management means.
[0104]
【The invention's effect】
According to the first aspect of the present invention, the resources in each group are in principle permitted to be used only in one group and guaranteed to be used exclusively. The destruction of environment such as data and windows due to operation is prevented. In addition, when exchanging data etc. between groups, it is possible to request another group for an environment where work cannot be performed within the own group while maintaining resource security through notification to the work monitoring means. Become. In this way, management of resource usage rights according to the work contents in group work is included in the work procedure definition in advance, thereby facilitating monitoring of work of each group performed in parallel, and There is an effect that it is possible to improve effective use and work efficiency in a plurality of groups. In particular, it greatly contributes to improvement of resource utilization efficiency and work efficiency in groupware in a network environment.
[0105]
Furthermore, according to the second aspect of the present invention, in the exchange of data and the like between groups, an environment in which work cannot be performed within the own group while retaining the security of the resource by solving the notification to the work monitoring means. It is possible to request another group. Furthermore, when there is no permitting party, you can check the absence with a sensor, etc., and if it is determined that you are absent, you can notify your mobile phone or pager as a notification of your absence and ask for a reply of permission to use. Therefore, it is possible to cope with the other worker even if it is not present in the usage environment. In addition, it is possible to determine whether the permission for using data, etc. is all or several, or one of the appropriate persons in the request group, and it is possible to obtain permission for the minimum number of persons. . In this way, management of the right to use resources according to the work contents in group work is included in the work procedure definition in advance, facilitating monitoring of group work performed in parallel, and effective use of resources. There is an effect that work efficiency and contact efficiency in a plurality of groups can be improved. In particular, it greatly contributes to improving resource utilization efficiency, transmission efficiency, work efficiency, monitoring efficiency, and management efficiency in groupware in a network environment.
[Brief description of the drawings]
FIG. 1 is a first basic configuration diagram of the present invention.
FIG. 2 is an explanatory diagram (part 1) illustrating the relationship between window usage rights between groups.
FIG. 3 is an explanatory diagram (part 2) illustrating the relationship between window usage rights between groups.
FIG. 4 is an explanatory diagram (part 1) of an example of inter-group work processing in the embodiment.
FIG. 5 is an explanatory diagram (part 2) of an example of work processing between groups in the embodiment;
FIG. 6 is an explanatory diagram (part 3) of an example of work processing between groups in the embodiment;
FIG. 7 is an explanatory diagram (part 4) of an example of work processing between groups in the embodiment;
FIG. 8 is an example configuration diagram of a request definition body.
FIG. 9 is a first configuration diagram of a work definition body;
FIG. 10 is a control flowchart of work monitoring means.
FIG. 11 is a control flowchart of the group work schedule management means.
FIG. 12 is a control flowchart of group rearrangement processing means.
FIG. 13 is a structural diagram of an example of a group management table.
FIG. 14 is a configuration diagram of an example of a work member table.
FIG. 15 is an example configuration diagram of a resource management table.
FIG. 16 is a flowchart of window switching control.
FIG. 17 is an explanatory diagram illustrating an example of window movement between groups.
FIG. 18 is an explanatory diagram of another example of window movement between groups.
FIG. 19 is an explanatory diagram illustrating an example of window locking;
FIG. 20 is a processing operation flowchart (part 1) in a case where processing is requested between groups and the processing result is received;
FIG. 21 is a processing operation flowchart (part 2) in a case where processing is requested between groups and the processing result is received;
FIG. 22 is a first system configuration example according to the present invention.
FIG. 23 is a second system configuration example according to the present invention.
FIG. 24 is a second basic configuration diagram of the present invention.
FIG. 25 is a configuration diagram (part 1) of a resource management table;
FIG. 26 is a configuration diagram (part 2) of the resource management table;
FIG. 27 is a configuration diagram of a window storage unit.
FIG. 28 is a configuration diagram of a program and command storage unit.
FIG. 29 is a configuration diagram of a monitoring monitor information storage unit of each group.
FIG. 30 is a configuration diagram of a contact information storage unit when a mobile phone or the like is absent.
FIG. 31 is a configuration diagram of a data storage unit.
FIG. 32 is a configuration diagram of a group management table.
FIG. 33 is a configuration diagram of a work member table.
FIG. 34 is a configuration diagram of an emergency information usage situation table of working members.
FIG. 35 is a configuration diagram of a group emergency information usage situation table.
FIG. 36 is a second configuration diagram of the work definition body;
FIG. 37 is a block diagram of a general group work definition body.
FIG. 38 is a block diagram showing an example of a case where a resource management unit performs a window, an object, a command, or the like with a representative name.
FIG. 39 is a configuration diagram of an example of a unit that senses transmission information such as a worker location recognition device recognition card and positions a camera or the like.
FIG. 40 is an overall operation flowchart of a task of scoping a definition body and sharing resources.
FIG. 41 is an operation flowchart of the work procedure storage means.
FIG. 42 is an operation flowchart of group work schedule management means.
FIG. 43 is an operation flowchart of the group rearrangement processing unit.
FIG. 44 is an operation flowchart of a user confirmation requesting unit.
FIG. 45 is an operation flowchart of the user confirmation requesting unit.
FIG. 46 is an operation flowchart of positioning means such as a television camera.
FIG. 47 is an operation flowchart of input / output means such as a television camera.
FIG. 48 is an operation flowchart of the resource management means and each management means.
FIG. 49 is a processing flowchart from each group.
FIG. 50 is a processing flowchart of a special emergency group.
FIG. 51 is an operation flowchart (part 1) of the work monitoring unit.
FIG. 52 is an operation flowchart (part 2) of the work monitoring unit.
FIG. 53 is an operation flowchart (No. 3) of the work monitoring unit.
FIG. 54 is an operation flowchart (No. 3) of the work monitoring unit.
[Explanation of symbols]
1 ... Work procedure storage processing means
2. Work monitoring means
3 ... Group work schedule management means
4 Group relocation processing means
5 ... Resource management means
6 ... Special emergency group
7 ... Group
8 ... Input means and positioning means such as a TV camera
9 ... Voice input and voice transmission means
10a: Usage confirmation request means
10b: Usage confirmation notification means
11 ... Work definition body
21 ... Group management table
41 ... Work member table
51 ... Resource management table
52. Window storage management means
53. Program storage management means
54. Data storage management means
55. Monitor monitoring frame information management means
56. Contact management means when mobile phone etc. is absent
521 ... Window storage unit
531: Program storage unit
541 ... Data storage unit
551 ... Monitoring monitor information storage unit of each group
561: Contact information storage unit when mobile phone is absent

Claims (15)

ウインドウ、オブジェクト又はデータを含む、各グループ毎に与えられた作業者の作業に使用する資源を計算機により管理するシステムにおけるグループ間資源利用制御装置において、
前記資源に対する前記グループ単位の使用権利情報を管理するリソース管理手段と、
各グループの前記作業を監視し、前記リソース管理手段により各前記グループが必要とする前記資源に前記使用権利情報に基づいて使用許可を設定し、使用許可が与えられていない前記グループからの前記資源に対するアクセスを禁止する作業監視手段と、
前記使用権利情報に記録された作業時間に基づいて、前記各グループの作業進行を管理するグループ作業スケジュール管理手段と、
を備えたことを特徴とするグループ間資源利用制御装置。
In the inter-group resource use control device in the system that manages the resources used for the work of the workers given for each group , including windows, objects or data, by the computer
And resource management means for managing the use rights information of the group unit to said resource,
Monitoring the work of each group, the resource from the group that is not set the permission to use based on the rights information to the resource each said group is required, given the use permission by the resource management unit Work monitoring means forbidding access to
Group work schedule management means for managing the work progress of each group based on the work time recorded in the usage right information ;
An inter-group resource use control device comprising:
請求項1に記載のグループ間資源利用制御装置において、
前記各グループに与える作業の前記作業時間、前記作業者、作業工程、及び作業に使用する前記ウインドウ、前記オブジェクト又は前記データに関する前記資源の前記使用権利を前記使用権利情報は記録し、
予め前記使用権利情報を定義した作業定義体を管理する作業手順記憶処理手段を備え、
前記作業監視手段、前記グループ作業スケジュール管理手段及び前記リソース管理手段は、前記作業手順記憶処理手段から得た前記作業定義体又はその一部の情報に基づいて、前記グループ間の作業における前記ウインドウを含む前記資源のグループ間の前記使用権利情報を切り換える制御を行うようにしたことを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1,
The usage right information records the usage time of the resource relating to the work time, the worker, the work process, and the window, the object, or the data used for the work.
Comprising a working procedure storage processing means for managing the advance the rights information work definition body defining a
The work monitoring means, said group work schedule management means and the resource management means, based on the work definition body or part of the information that was obtained from the work procedure storage processing unit, the window in the work between the groups between the groups is characterized in that to perform the control for switching the rights information between groups of resources including the utilizer device.
請求項1に記載のグループ間資源利用制御装置において、
前記各グループにおける前記作業の作業名及び作業情報を管理し、前記作業の進行状況に合わせて前記グループに属する前記作業を変更し、前記グループに与えられた前記資源を再配置するグループ再配置処理手段を備え、
前記作業監視手段は、前記グループ再配置処理手段から得た情報によりグループ情報を管理するようにしたことを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1,
It manages the work name and worker information of the work in each group, regroup and change the worker belonging to the group in accordance with the progress of the work, to relocate the resource given to the group A placement processing means,
The inter-group resource usage control apparatus, wherein the work monitoring means manages group information based on information obtained from the group rearrangement processing means.
請求項1に記載のグループ間資源利用制御装置において、
全ての前記グループの前記資源にアクセスすることができる特殊緊急用グループを有し、
前記作業監視手段は、前記特殊緊急用グループからの資源の要求に対し、全ての前記資源に対するアクセスを許可するようにしたことを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1,
Has a special emergency group that can access the resources of all of the groups,
The work monitoring means, said special to request resources from the emergency group, all groups between utilizer device being characterized in that so as to allow access to the resource.
請求項1に記載のグループ間資源利用制御装置において、
前記作業監視手段は、第1の前記グループからの依頼によって、第2のグループの前記資源を前記第1のグループが利用可能にすることを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1,
The inter-group resource usage control device, wherein the work monitoring means makes the first group available to the resource of the second group in response to a request from the first group .
請求項1に記載のグループ間資源利用制御装置において、
前記各グループの資源を一時的に使用可能にし、若しくは条件付きで使用可能にするために電話機とのやり取りをし、前記グループの前記資源の使用要求が発生した時に前記資源を前記作業に利用する前記作業者の居場所を検索して呼び出し、電話機による音声通知機能を利用して、前記作業者に前記資源の利用許可を行う利用確認依頼手段及び利用確認通知手段からなる利用確認手段を備えることを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1,
The permit temporary use of resources in each group, or to interact with the phone in order to enable conditionally utilize the resources when the use request is generated of the resources of the group to the working And a usage confirmation means comprising a usage confirmation requesting means and a usage confirmation notifying means for permitting the worker to use the resource by using a voice notification function by searching for and calling the worker's whereabouts and using a telephone. An inter-group resource utilization control device.
請求項6に記載のグループ間資源利用制御装置において、
前記利用確認手段は、前記資源の使用要求が発生した時に、前記居場所を検索して呼び出し、メッセージ機能を利用して前記資源の利用許可を行うためのポケットベル(登録商標)とのやり取りをする手段をさらに備えることを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 6,
The use confirmation means when the use request of the resource occurs, the call by searching the whereabouts, the interaction with pager for utilizing the message function performs use permission of the resource (R) An inter-group resource usage control device further comprising means.
請求項6に記載のグループ間資源利用制御装置において、
前記利用確認手段は、前記資源の使用要求が発生した時に前記居場所を検索し呼び出し、ノートブック、電子手帳、パソコン、ワークステーションのワイドエリアネットワーク、パソコン通信、無線、その他携帯装置を利用して前記資源の利用許可を行うために、ノートブック、電子手帳、パソコン、ワークステーションとのやり取りをする手段をさらに備えることを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 6,
The use confirmation means, the search and call the place when the use request is generated resources, notebook, electronic notebooks, personal computers, workstations wide area network, personal computer communication, radio, said using other portable devices An inter-group resource usage control apparatus further comprising means for exchanging with a notebook, an electronic notebook, a personal computer, and a workstation in order to permit use of resources.
請求項6に記載のグループ間資源利用制御装置において、
前記利用確認手段は、前記作業者の確認にテレビカメラ等の視聴覚入出力装置、マイクロホンを用いることを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 6,
The inter-group resource usage control device, wherein the usage confirmation means uses an audio-visual input / output device such as a television camera and a microphone for confirmation of the worker .
請求項6に記載のグループ間資源利用制御装置において、
前記利用確認手段は、前記作業者の居場所の確認に前記作業者に装着された発振器を検知するセンサをさらに備えることを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 6,
The inter-group resource usage control device , wherein the usage confirmation unit further includes a sensor for detecting an oscillator attached to the worker for confirming the location of the worker .
請求項に記載のグループ間資源利用制御装置において、
前記作業監視手段は、作業状況をマークしていくことによりスケジュールを把握し、他のグループとの作業変更を行う手段をさらに含むことを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1 ,
The inter-group resource usage control device further includes means for grasping a schedule by marking a work situation and changing a work with another group.
請求項に記載のグループ間資源利用制御装置において、
前記作業監視手段は、作業場所、作業時間を限定することにより、指定システム以外からのアクセスを禁止してセキュリティを強化する手段をさらに含むことを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1 ,
The inter-group resource usage control device further includes means for restricting access from other than a designated system and strengthening security by limiting a work place and a work time.
請求項に記載のグループ間資源利用制御装置において、
前記作業監視手段は、コマンド、オブジェクト、ウインドウ、又はデータの使用可否について、グループ全員の許可を得るか、若しくは一部の許可を得るかを指示する手段をさらに含むことを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1 ,
The work monitoring means further includes means for instructing whether or not to obtain permission of all the groups or a part of permission for use of commands, objects, windows, or data. Usage control device.
請求項に記載のグループ間資源利用制御装置において、
前記作業監視手段は、オブジェクト、ウインドウ、又はデータ名を使用可能とするために、これらに所属名を付加する手段をさらに含むことを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1 ,
The inter-group resource utilization control device, wherein the work monitoring means further includes means for adding an affiliation name to an object, a window, or a data name so as to be usable.
請求項に記載のグループ間資源利用制御装置において、
前記作業監視手段は、コマンドの集合、オブジェクトの集合、データの集合、ウインドウの集合、及びその複合した集合を1つの代表名として資源を管理し、前記資源を利用するときは、前記代表名に関係する資源の処理を集合内で同一に扱う手段をさらに含むことを特徴とするグループ間資源利用制御装置。
In the inter-group resource usage control device according to claim 1 ,
The work monitoring means manages a resource using a set of commands, a set of objects, a set of data, a set of windows, and a combined set of them as one representative name. An inter-group resource usage control device further comprising means for handling the processing of related resources identically in a set.
JP01982196A 1995-02-23 1996-02-06 Inter-group resource usage control device Expired - Fee Related JP3781468B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP01982196A JP3781468B2 (en) 1995-02-23 1996-02-06 Inter-group resource usage control device
US09/225,208 US7478050B1 (en) 1995-02-23 1999-01-04 System for managing resources used among groups

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP7-34813 1995-02-23
JP3481395 1995-02-23
JP01982196A JP3781468B2 (en) 1995-02-23 1996-02-06 Inter-group resource usage control device

Publications (2)

Publication Number Publication Date
JPH08292930A JPH08292930A (en) 1996-11-05
JP3781468B2 true JP3781468B2 (en) 2006-05-31

Family

ID=26356678

Family Applications (1)

Application Number Title Priority Date Filing Date
JP01982196A Expired - Fee Related JP3781468B2 (en) 1995-02-23 1996-02-06 Inter-group resource usage control device

Country Status (1)

Country Link
JP (1) JP3781468B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5030528B2 (en) * 2006-10-25 2012-09-19 中国電力株式会社 Operation and maintenance management device
JP4655059B2 (en) * 2007-03-19 2011-03-23 コニカミノルタホールディングス株式会社 Camera server system and program

Also Published As

Publication number Publication date
JPH08292930A (en) 1996-11-05

Similar Documents

Publication Publication Date Title
US5812865A (en) Specifying and establishing communication data paths between particular media devices in multiple media device computing systems based on context of a user or users
US5544321A (en) System for granting ownership of device by user based on requested level of ownership, present state of the device, and the context of the device
US5493692A (en) Selective delivery of electronic messages in a multiple computer system based on context and environment of a user
US20200007322A1 (en) Automated task management on a blockchain based on predictive and analytical analysis
US20020187750A1 (en) Method and apparatus for service management, delegation and personalization
US9165289B2 (en) Electronic meeting management for mobile wireless devices with post meeting processing
US9213805B2 (en) Approach for managing access to data on client devices
US6189032B1 (en) Client-server system for controlling access rights to certain services by a user of a client terminal
JP4441249B2 (en) Apparatus for using context property metadata in a network computing environment
US20030130953A1 (en) Systems and methods for monitoring the presence of assets within a system and enforcing policies governing assets
WO1998000790A1 (en) Device and method of controlling intergroup resource utilization
WO2011007554A1 (en) Access control device, access control method, program, storage medium, and integrated circuit
US10540510B2 (en) Approach for managing access to data on client devices
US8495753B2 (en) Electronic meeting management system for mobile wireless devices
US8732792B2 (en) Approach for managing access to data on client devices
TW200838257A (en) Provisioning of digital identity representations
TW200842648A (en) Provisioning of digital identity representations
WO2018219007A1 (en) User login method, electronic device and storage medium in data query system
US20070275754A1 (en) Portable Personal Server Device With Biometric User Authentication
US9479507B2 (en) Single-point-of-access cyber system
JP3781468B2 (en) Inter-group resource usage control device
US20120102540A1 (en) Single-Point-Of-Access Cyber System
JPH1185705A (en) Access right acquirement/decision method, access right acquirement/decision device, electronic camera device with access right acquirement/decision function and portable telephone set
WO2004109573A1 (en) Workflow management device
EP3742318B1 (en) Method and device for the storing, inspection control and retrieval of data from a permanently immutable, distributed and decentralized storage

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20020903

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060104

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060307

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100317

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100317

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110317

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110317

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120317

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130317

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130317

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140317

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees