JP3751095B2 - Lining pipe construction method in pipe - Google Patents
Lining pipe construction method in pipe Download PDFInfo
- Publication number
- JP3751095B2 JP3751095B2 JP32859896A JP32859896A JP3751095B2 JP 3751095 B2 JP3751095 B2 JP 3751095B2 JP 32859896 A JP32859896 A JP 32859896A JP 32859896 A JP32859896 A JP 32859896A JP 3751095 B2 JP3751095 B2 JP 3751095B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- joining
- long profile
- profile
- long
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Description
【0001】
【発明の属する技術分野】
本発明は、管渠内のライニング管施工方法であって、特に、作業員が入ることのできない小口径の管渠内で有効なライニング管施工方法に関するものである。
【0002】
【従来の技術】
一般に、両側縁部に接合部を有する長尺の帯状に形成された長尺プロファイルを、管渠内に連続的に供給するとともに、この管渠内で長尺プロファイルを螺旋状に捲回しながら、この長尺プロファイルの相接する接合部相互を接合させて管渠内にライニング管を形成して行く施工方法が知られている。
【0003】
従来より、このライニング管の施工方法において、長尺プロファイルを螺旋状に捲回しながら相接する接合部相互を接合させる製管作業を、製管装置によって行うことが提案されている(例えば、特開平5−169539号公報参照)。
【0004】
【発明が解決しようとする課題】
しかし、小口径の管渠においては、作業員が管渠内に入れないため、長尺プロファイルの供給や接合などの製管作業が上手く行われているか否かを確認することが困難となる。したがって、施工のやり直しをしなければならないような不良箇所が有るような場合であっても、それを把握することができないまま、施工完了してしまうこととなり、施工精度が悪くなってしまう。
【0005】
また、施工作業の最中に、ちょっとした製管装置の調整をするだけで、施工不良の発生を回避して良好な施工ができるような場合であっても、製管装置による製管状態が把握できないので、このような施工途中での調整が行えず、施工不良を起こしてしまうこととなる。
【0006】
本発明は、係る実情に鑑みてなされたものであって、施工精度を把握することができるとともに、施工途中での不良発生を回避して確実な施工を行うことができる管渠内のライニング管施工方法を提供することを目的としている。
【0007】
【課題を解決するための手段】
上記課題を解決するための本発明の管渠内のライニング管施工方法は、一側縁部に接合リブを有し、他側縁部に接合溝を有する長尺の帯状に形成され、長手方向に沿って複数のリブが突設された長尺プロファイルを、管渠内に連続的に供給するとともに、この管渠内では、長尺プロファイルの内周面に沿う内面ローラと長尺プロファイルのリブ間に嵌まり込む鍔部が形成された外面ローラとの間で長尺プロファイルを挟持しながら、これら内面ローラと外面ローラとからなる嵌合ローラが管渠の内面を周回移動することで、長尺プロファイルを螺旋状に捲回し、外面ローラに設けられたシリンダによって鍔部の間隔を変更することで、接合リブと接合溝との接合位置を調整しながら、この長尺プロファイルの相接する接合リブと接合溝とを接合させて管渠内にライニング管を形成して行く施工方法であって、管渠内に設けたカメラによって製管状態を常時監視し、長尺プロファイルの接合リブと接合溝とが接合されずに施工不良を生じているような場合には、カメラのモニターの映像を見ながら、製管装置の外面ローラのシリンダを、地上に設けた油圧ユニットから遠隔操作して所定の接合位置に調整することで、施工不良を回避して、再度、長尺プロファイルの接合リブと接合溝とが接合する良好な施工状態へと戻し、供給装置および送り出し装置による長尺プロファイルの供給状態が悪化して管渠内でねじれなどを生じているような場合には、カメラのモニターの映像を見ながら、供給装置および送り出し装置による長尺プロファイルの供給状態を調整するものである。
【0008】
【発明の実施の形態】
以下、本発明の実施の形態を図面を参照して説明する。
【0009】
図1は、管渠1内のライニング管20の施工方法の全体構成の概略を示し、図2は同施工に使用される長尺プロファイル2を示し、図3および図4は同施工に使用される製管装置3を示している。
【0010】
すなわち、この施工方法は、長尺プロファイル2によって管渠1内にライニング管20を施工して行く施工方法であって、管渠1内に設けたカメラ4によって、製管装置3による製管状態を常時監視するものである。
【0011】
長尺プロファイル2は、長尺の帯状に形成され、その外面には、長手方向に沿って複数のリブ21が突設されている。また、長尺プロファイル2の一側縁部には、長手方向に沿って、上記リブ21よりも突設高さが低くなされた接合リブ22が突設されている。一方、長尺プロファイル2の他側縁部のリブ21の内面には、長手方向に沿って、上記接合リブ22が接合される接合溝23が形成されている。そして、図2(b)に示すように、長尺プロファイル2を螺旋状に捲回しながら、接合リブ22を接合溝23に接合することで、ライニング管20が形成できるようになされている。この長尺プロファイル2は、地上に設置した供給装置5からマンホール11内へと繰り出されて管渠1内へと供給される。また、管渠1内には、長尺プロファイル2の供給状態を安定させるための送り出し装置6が設けられ、長尺プロファイル2を管渠1内の奥深くへ供給して長距離のライニング管20を施工することができるようになされている。この送り出し装置6は、地上に設置した油圧駆動ユニット61によって地上から操作できるようになされている。
【0012】
製管装置3は、環状の案内フレーム30に所定間隔で所定の角度をもって配置した複数の案内ローラ31と、油圧モータ32の駆動力によって回動しながら管渠1の内面を周回移動する一対の嵌合ローラ33と、ドライブホイール34とを具備している。この嵌合ローラ33は、長プロファイル2の内周面に沿う内面ローラ33aと、長尺プロファイル2のリブ22間に嵌まり込む鍔部331が形成された外面ローラ33bとによって形成されている。そして、この内面ローラ33aと外面ローラ33bとの間で長尺プロファイル2を挟持しながら、嵌合ローラ33が管渠1の内面を周回移動することで、長尺プロファイル2が螺旋状に捲回されながら、この長尺プロファイル2の接合リブ22と接合溝23とが接合されてライニング管20が形成されるようになされている。また、嵌合ローラ33は、外面ローラ33bの鍔部331が、長尺プロファイル2のリブ21および接合リブ22の間に嵌まり込んだ状態で回動するようになされているため、リブ21および接合リブ22と鍔部331との間には、若干の間隙が設けられている。したがって、鍔部331の位置がしっかりと位置決めされている場合には、図4(a)に示すように、接合リブ22と接合溝23との接合が上手く行われるようになされているが、鍔部331の位置がしっかりと位置決めされていない場合には、図4(b)に示すように、接合リブ22と接合溝23との接合が行われないこととなる。そのため、外面ローラ33bには、シリンダ332が設けられ、このシリンダ332によって鍔部331の間隔を変更することで、接合リブ22と接合溝23との接合位置の調整ができるようになされている。
【0013】
カメラ4は、管渠1内の調査に汎用される自走式のものが使用される。このカメラ4は、管渠1内を、製管装置3と同調して移動しながら、長尺プロファイル2の供給状態や、この長尺プロファイル2の接合リブ22と接合溝23との接合位置の撮影を行って、地上のモニター41に写すようになされている。
【0014】
そして、この施工方法では、カメラ4から得られるモニター41の映像によって、製管装置3による製管状態を常時監視しながら、管渠1内にライニング管20の形成が行われる。
【0015】
したがって、作業員が入れない小口径の管渠1内の場合であっても、管渠1内に形成されるライニング管20の状態をモニター41の映像から把握することができる。そのため、長尺プロファイル2の接合リブ22と接合溝23とが接合されずに施工不良を生じたような場合には、すぐに把握することができるので、施工不良を防止して施工精度の向上を図ることができる。
【0016】
また、このように長尺プロファイル2の接合リブ22と接合溝23とが接合されずに施工不良を生じているような場合には、カメラ4のモニター41の映像を見ながら、製管装置3の外面ローラ33bのシリンダ332を、地上に設けた油圧ユニット35から遠隔操作して所定の接合位置に調整することで、施工不良を回避して、再度、長尺プロファイル2の接合リブ22と接合溝23とが接合する良好な施工状態へと戻すことができる。
【0017】
さらに、供給装置5および送り出し装置6による長尺プロファイル2の供給状態が悪化して管渠1内でねじれなどを生じているような場合にも、カメラ4のモニター41の映像を見ながら、供給装置5および送り出し装置6による長尺プロファイル2の供給状態を調整し、安定した施工作業を行うことができる。
【0018】
なお、本実施の形態では、長尺プロファイル2の接合リブ22と接合溝23との接合状態と、長尺プロファイル2の供給状態とを監視するため、カメラ4のモニター41の映像が二つ必要となるが、マンホール11から管渠1内が見通せたり、管渠1内が比較的短くて長尺プロファイル2のねじれが心配無いような場合には、長尺プロファイル2の接合リブ22と接合溝23との接合状態を監視する映像だけであっても良い。
【0019】
また、このカメラ4によって映像を撮る位置としては、製管作業に悪影響を与えることなく所望の映像を撮れる位置であれば特に限定されるものではなく、製管装置3の前方、あるいは後方などであっても良い。
【0020】
さらに、本実施の形態では、カメラ4として、管渠1内の調査に汎用される自走式のものを使用しているが、このように、製管装置3と別に設けた自走式のカメラ4に限定されるものではなく、図5に示すように、製管装置3に、市販のCCDカメラ40を固定したものであっても良い。また、この場合、CCDカメラ40の代わりに、市販の管渠調査用カメラ(図示省略)を固定しても良い。
【0021】
さらに、本実施の形態では、円筒状の管渠1について述べているが、この管渠1の形状としては、特に円筒状のものに限定されるものではなく、図6に示すように、ボックス型(図6(a)および(b)参照)や馬蹄形(図6(c)および(d)参照)の管渠1などであっても良い。また、製管装置3についても、これら管渠1の形状に合わせたボックス形(図6(b)参照)や馬蹄形(図6(d)参照)の製管装置3であっても良いし、図6(a)および(c)に示すように、これら管渠1の形状に関係無く、通常の円形となされた製管装置3をボックス形や馬蹄形の管渠1に使用するものであっても良い。
【0022】
さらに、本実施の形態では、接合リブ22と接合溝23とを接合するようになされた長尺プロファイル2について述べているが、この長尺プロファイル2としては、図7に示すように、両端部に嵌合リブ24が形成されたプロファイル本体2aと、このプロファイル本体2aを接続するコネクタ2bとからなるものであっても良い。この場合、プロファイル本体2aの嵌合リブ24を横並びに突き合わせた状態で螺旋状に捲回し、この嵌合リブ24を跨ぐようにして、この嵌合リブ24にコネクタ2bを嵌合することで、ライニング管20を形成するようになされている。また、この際、カメラ4のモニター41の映像を見ながら、製管装置3の外面ローラ33bのシリンダ332を、地上に設けた油圧ユニット35から遠隔操作することで、隣接するプロファイル本体2aの嵌合リブ24の突き合わせ状態を調整することができる。また、コネクタ2bの嵌合位置を固定しているような場合には、カメラ4のモニター41の映像を見ながら嵌合ローラ34自体を左右に平行移動させることで、嵌合リブ24とコネクタ2bとの相対位置の調整を行うこともできる。
【0023】
【発明の効果】
以上述べたように、本発明によると、管渠内に設けたカメラによって製管状態を常時監視するので、作業員が入れない小口径の長距離曲線管渠などにライニング管を施工する場合であっても、カメラのモニターを見ながら施工状態を把握して施工精度の向上を図ることができる。
【0024】
また、管渠内に設けたカメラによって製管状態を常時監視し、長尺プロファイルの接合リブと接合溝とが接合されずに施工不良を生じているような場合には、カメラのモニターの映像を見ながら、製管装置の外面ローラのシリンダを、地上に設けた油圧ユニットから遠隔操作して所定の接合位置に調整することで、施工不良を回避して、再度、長尺プロファイルの接合リブと接合溝とが接合する良好な施工状態へと戻し、供給装置および送り出し装置による長尺プロファイルの供給状態が悪化して管渠内でねじれなどを生じているような場合には、カメラのモニターの映像を見ながら、供給装置および送り出し装置による長尺プロファイルの供給状態を調整することで、施工不良の発生を回避して確実な施工を行うことができる。
【図面の簡単な説明】
【図1】管渠内のライニング管の施工状態を示す断面図である。
【図2】(a)および(b)は、ライニング管の施工に使用される長尺プロファイルを示す部分斜視図および長尺プロファイルの接合状態を示す断面図である。
【図3】ライニング管の施工に使用される製管装置の全体構成の概略を示す正面図である。
【図4】(a)および(b)は、製管装置による長尺プロファイルの良好な接合状態および不良な接合状態を示す断面図である。
【図5】CCDカメラを取り付けた製管装置を示す正面図である。
【図6】(a)ないし(d)は、各種形状の管渠内に各種製管装置を装着した状態を示す断面図である。
【図7】(a)および(b)は、他の実施の形態の長尺プロファイルの接合状態を示す断面図および部分斜視図である。
【符号の説明】
1 管渠
2 長尺プロファイル
20 ライニング管
22 接合リブ(接合部)
23 接合溝(接合部)
3 製管装置
4 カメラ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a lining pipe construction method in a pipe tub, and more particularly to a lining pipe construction method effective in a small diameter pipe tub that an operator cannot enter.
[0002]
[Prior art]
In general, a long profile formed in the shape of a long band having joints on both side edges is continuously supplied into the tube, and while the long profile is spirally wound in the tube, There has been known a construction method in which the joining portions of the long profiles which are in contact with each other are joined to form a lining pipe in the pipe rod.
[0003]
Conventionally, in this lining pipe construction method, it has been proposed that a pipe making apparatus is used to perform a pipe making operation for joining joints that are in contact with each other while spirally winding a long profile (for example, a special technique) (See Kaihei 5-169539).
[0004]
[Problems to be solved by the invention]
However, in a small-diameter pipe rod, since an operator cannot enter the pipe rod, it is difficult to confirm whether or not a pipe-forming operation such as supply of a long profile or joining is performed well. Therefore, even if there is a defective part that needs to be redone, the construction will be completed without being able to grasp it, and the construction accuracy will deteriorate.
[0005]
In addition, during the construction work, even with a slight adjustment of the pipe making equipment, it is possible to grasp the pipe making state by the pipe making equipment even if it is possible to avoid the construction failure and perform good construction. Since this is not possible, such adjustment during construction cannot be performed, resulting in construction failure.
[0006]
The present invention has been made in view of the actual situation, and it is possible to grasp the construction accuracy and to avoid the occurrence of defects during construction and to perform reliable construction in a lining pipe in a pipe. The purpose is to provide a construction method.
[0007]
[Means for Solving the Problems]
The lining pipe construction method in the pipe rod of the present invention for solving the above-mentioned problem is formed in a long strip shape having a joining rib on one side edge and a joining groove on the other side edge , and in the longitudinal direction. A long profile having a plurality of ribs projecting along the inner surface of the long profile is continuously supplied into the pipe rod. While the long profile is sandwiched between the outer surface roller formed with the flange portion fitted between the ribs, the fitting roller composed of the inner surface roller and the outer surface roller moves around the inner surface of the tube rod, The long profile is wound spirally, and the long profile is brought into contact while adjusting the joining position of the joining rib and the joining groove by changing the interval between the flanges by the cylinder provided on the outer roller. contacting a bonding rib and bonding channel This is a construction method in which the lining pipe is formed in the pipe rod, and the pipe forming state is constantly monitored by a camera provided in the pipe rod, so that the joining rib and the joining groove of the long profile are not joined. If there is a construction failure, the cylinder of the outer roller of the pipe making device should be remotely controlled from the hydraulic unit on the ground and adjusted to the specified joint position while viewing the camera monitor image. Thus, the construction failure is avoided and the long profile joining rib and the joining groove are returned to a good construction state again, and the supply state of the long profile by the feeding device and the feeding device deteriorates. In the case where a twist or the like occurs in the camera, the supply state of the long profile by the supply device and the delivery device is adjusted while viewing the image on the camera monitor.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0009]
FIG. 1 shows an outline of the overall configuration of the construction method of the
[0010]
That is, this construction method is a construction method in which the
[0011]
The
[0012]
The
[0013]
As the camera 4, a self-propelled camera that is widely used for investigation in the tube 1 is used. While this camera 4 moves in the pipe rod 1 in synchronism with the
[0014]
In this construction method, the
[0015]
Therefore, even in the case of the small-diameter pipe rod 1 where a worker cannot enter, the state of the lining
[0016]
In addition, when the joining
[0017]
Further, even when the supply state of the
[0018]
In the present embodiment, two images of the
[0019]
Also, the position where the camera 4 can take an image is not particularly limited as long as a desired image can be taken without adversely affecting the pipe making work. There may be.
[0020]
Furthermore, in this embodiment, as the camera 4, a self-propelled type that is widely used for investigation in the tube 1 is used, but as described above, a self-propelled type provided separately from the
[0021]
Furthermore, in the present embodiment, the cylindrical tube rod 1 is described, but the shape of the tube rod 1 is not particularly limited to a cylindrical shape, and as shown in FIG. It may be a type (see FIGS. 6A and 6B), a horseshoe-shaped tube hook 1 (see FIGS. 6C and 6D), or the like. Also, the
[0022]
Further, in the present embodiment, the
[0023]
【The invention's effect】
As described above, according to the present invention, since the pipe forming state is constantly monitored by the camera provided in the pipe rod, when the lining pipe is constructed on a small-diameter long-distance curved pipe rod that a worker cannot enter. Even if it is, it is possible to improve the construction accuracy by grasping the construction state while looking at the camera monitor.
[0024]
In addition, when the pipe-making state is constantly monitored by the camera provided in the tube , and the construction ribs are not joined with the joining ribs and joining grooves of the long profile, the camera monitor image The cylinder of the outer surface roller of the pipe making device is remotely operated from the hydraulic unit provided on the ground and adjusted to a predetermined joining position to avoid construction failure, and again, the long profile joining rib If the long profile supplied by the feeding device and feeding device deteriorates and twists occur in the tube, the camera monitor By adjusting the supply state of the long profile by the supply device and the delivery device while watching the image, it is possible to avoid the occurrence of construction defects and perform reliable construction.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing a construction state of a lining pipe in a pipe rod.
FIGS. 2A and 2B are a partial perspective view showing a long profile used for construction of a lining pipe and a cross-sectional view showing a joining state of the long profile.
FIG. 3 is a front view showing an outline of the overall configuration of a pipe making apparatus used for construction of a lining pipe.
FIGS. 4A and 4B are cross-sectional views showing a good bonding state and a poor bonding state of a long profile by a pipe making apparatus.
FIG. 5 is a front view showing a pipe making apparatus to which a CCD camera is attached.
FIGS. 6A to 6D are cross-sectional views showing a state in which various pipe making apparatuses are mounted in various shapes of pipe rods.
FIGS. 7A and 7B are a cross-sectional view and a partial perspective view showing a joined state of a long profile according to another embodiment, respectively.
[Explanation of symbols]
1
23 Joining groove (joining part)
3 Pipe making equipment 4 Camera
Claims (1)
管渠内に設けたカメラによって製管状態を常時監視し、
長尺プロファイルの接合リブと接合溝とが接合されずに施工不良を生じているような場合には、カメラのモニターの映像を見ながら、製管装置の外面ローラのシリンダを、地上に設けた油圧ユニットから遠隔操作して所定の接合位置に調整することで、施工不良を回避して、再度、長尺プロファイルの接合リブと接合溝とが接合する良好な施工状態へと戻し、
供給装置および送り出し装置による長尺プロファイルの供給状態が悪化して管渠内でねじれなどを生じているような場合には、カメラのモニターの映像を見ながら、供給装置および送り出し装置による長尺プロファイルの供給状態を調整することを特徴とする管渠内のライニング管施工方法。A long profile formed in the shape of a long band having a joining rib on one side edge and a joining groove on the other side edge and having a plurality of ribs projecting along the longitudinal direction While being continuously supplied, in this pipe rod , a long length is formed between an inner roller along the inner peripheral surface of the long profile and an outer roller formed with a flange that fits between ribs of the long profile. While holding the profile, the fitting roller composed of these inner surface roller and outer surface roller moves around the inner surface of the tube so that the long profile is wound in a spiral shape, and the cylinder provided on the outer roller rolls the flange portion by changing the distance, while adjusting the position of junction between the bonding rib and bonding channel, to form a lining pipe and a phase contact bonding ribs and joining the groove of the elongated profile is joined to the tube culvert A construction method to go,
The pipe-making state is constantly monitored by a camera installed in the tube,
If the long profile joining ribs and joining grooves are not joined, and there is a construction failure, the outer roller cylinder of the pipe making equipment was installed on the ground while watching the camera monitor image. By operating remotely from the hydraulic unit and adjusting to the predetermined joining position, avoiding construction failure, return to a good construction state where the joining rib and joining groove of the long profile are joined again,
When the supply status of the long profile by the supply device and the delivery device deteriorates and twists occur in the tube, the long profile by the supply device and the delivery device is viewed while watching the image of the camera monitor. The lining pipe construction method in a pipe tub characterized by adjusting the supply state of the pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP32859896A JP3751095B2 (en) | 1996-12-09 | 1996-12-09 | Lining pipe construction method in pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP32859896A JP3751095B2 (en) | 1996-12-09 | 1996-12-09 | Lining pipe construction method in pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10166445A JPH10166445A (en) | 1998-06-23 |
JP3751095B2 true JP3751095B2 (en) | 2006-03-01 |
Family
ID=18212074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP32859896A Expired - Lifetime JP3751095B2 (en) | 1996-12-09 | 1996-12-09 | Lining pipe construction method in pipe |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3751095B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012000976A (en) * | 2010-05-19 | 2012-01-05 | Sekisui Chem Co Ltd | Method of applying lining |
-
1996
- 1996-12-09 JP JP32859896A patent/JP3751095B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH10166445A (en) | 1998-06-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2692540C2 (en) | Internal welding machine with laser measuring system for pipelines | |
CN107775144A (en) | Pipeline detours welding tractor and its method automatically | |
JP3751095B2 (en) | Lining pipe construction method in pipe | |
US4957586A (en) | Apparatus for producing a wound plastic tube | |
CN207735742U (en) | Pipeline detours welding tractor automatically | |
JPH08323471A (en) | Automatic circumferential welding equipment | |
JP3226091B2 (en) | Automatic pipe welding equipment | |
EP0031836A1 (en) | Welding plastic tube lining | |
JP5778050B2 (en) | Pipe making equipment | |
US5108283A (en) | Apparatus for winding pipes | |
KR100490228B1 (en) | Welding robots for inside junction of steel pipe | |
JP3901776B2 (en) | Lining pipe manufacturing apparatus and shield secondary lining method | |
JP2012000976A (en) | Method of applying lining | |
JP5329370B2 (en) | Spiral winding pipe making equipment | |
JP5778051B2 (en) | Pipe making equipment | |
JP6395161B2 (en) | Pipeline inspection device and inspection method | |
JP3763921B2 (en) | Lining pipe manufacturing apparatus and lining pipe construction method using the same | |
JP3853056B2 (en) | Pipe circumference automatic welding equipment | |
JP5926661B2 (en) | Pipe making equipment | |
JPH10249585A (en) | Inner face welder for tube body joint part | |
JPH0767616B2 (en) | Automatic welding device for piping and welding method thereof | |
JP5824409B2 (en) | Rehabilitation pipe manufacturing method | |
JP3635441B2 (en) | Shield tunnel waterproof sheet joining method, waterproof sheet cutting device and marking device | |
JPS6313900Y2 (en) | ||
JPS6313901Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050525 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050607 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050804 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050830 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20051017 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20051108 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20051206 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081216 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091216 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091216 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101216 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101216 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111216 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111216 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121216 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131216 Year of fee payment: 8 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |