JP3715415B2 - Electricity meter - Google Patents

Electricity meter Download PDF

Info

Publication number
JP3715415B2
JP3715415B2 JP24535397A JP24535397A JP3715415B2 JP 3715415 B2 JP3715415 B2 JP 3715415B2 JP 24535397 A JP24535397 A JP 24535397A JP 24535397 A JP24535397 A JP 24535397A JP 3715415 B2 JP3715415 B2 JP 3715415B2
Authority
JP
Japan
Prior art keywords
load
power
watt
opening
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24535397A
Other languages
Japanese (ja)
Other versions
JPH1183904A (en
Inventor
哲也 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP24535397A priority Critical patent/JP3715415B2/en
Publication of JPH1183904A publication Critical patent/JPH1183904A/en
Application granted granted Critical
Publication of JP3715415B2 publication Critical patent/JP3715415B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、例えば一般家庭等のような電力需要設備の使用電力量を計量する電力量計に係り、特に、使用電力量を調整するために電力を消費する負荷への接続・切断をコントロールする電力量計に関する。
【0002】
【従来の技術】
例えば一般家庭等のような電力需要設備の使用電力量を計量する装置に電力量計がある。
図2は、従来の電力量計の構成を示すブロック図であり、以下ではこの電力量計1が一般家庭に用いられている場合を例として説明する。
【0003】
この電力量計1は、例えば電柱等のような電力供給設備2と配電線3a、3bを介して入力端子4によって接続され、また電力需要設備である一般家庭内の負荷5と配電線6a、6bを介して出力端子7によって接続されている。ここで、配電線6a、6bは、一般家庭の屋内に張り巡らされて負荷5と接続されている。
【0004】
この電力量計1は、入力端子4と出力端子7とが、内部において導体8a、8bによって接続されている。
電圧検出部9は、導体8a、8b間の電圧値を検出することで、負荷5に印加される電圧値を検出する。この電圧検出部9は、検出した電圧値を電力演算部11に出力する。
【0005】
電流検出部10は、導体8aあるいは導体8bのいずれか一方に流れる電流値を検出することで、負荷5に供給される電流値を検出する。この電圧検出部10は、検出した電流値を電力演算部11に出力する。
【0006】
電力演算部11は、電圧検出部9から入力した電圧値と、電流検出部10から入力した電流値とを乗算して電力量を求め、この求めた電力量を中央処理部12に出力する。
【0007】
中央演算部12は、電力演算部11から入力した電力量の累積値を求め、この求めた累積値を一般家庭内の負荷5による使用電力量として表示部13に出力する。
【0008】
表示部13は、中央演算部12から入力した使用電力量を表示する。
次に、この従来の電力量計1の動作について説明する。
一般家庭に電力が供給される場合には、電力供給設備2から、配電線3a、3b、電力量計1、配電線6a、6bを介して、負荷5に電力が供給される。
【0009】
すなわち、この電力量計1の内部において、電力量計1の入力端子4及び出力端子7が導体8a、8bによって接続されているため、配電線3a、3bと配電線6a、6bとが電気的に導通されており、電力供給設備2から負荷5への電力供給がなされる。
【0010】
この電力量計1の内部では、導体8a、8bに接続された電圧検出部9によって負荷5に印加される電圧値が検出され、また導体8a、8bのいずれか一方に接続された電流検出部10によって負荷5に供給される電流値が検出される。
【0011】
検出された電圧値及び電流値は、電力演算部11によって乗算されて電力量が求められ、この求められた電力量の累積量が中央演算部12によって求められ、負荷5の使用電力量として表示部13に表示される。
【0012】
【発明が解決しようとする課題】
このような従来の電力量計においては、累積量である総合的な使用電力量は表示部に表示されるため把握することができるが、現時点での使用状況を示す瞬時電力量等は把握することができない。
【0013】
一般家庭等の電力需要設備においては、契約電流を越えるとブレーカーにより電力供給が遮断されてしまうため、契約電流が増大され、電力供給側においてもピーク使用時の電力供給を補うため設備の増加等が必要となり、非経済的であるという問題がある。
【0014】
本発明は、上記に鑑みてなされたもので、電力の使用状況に応じて負荷の接続・切断をコントロールして電力を効率的及び経済的に供給できる負荷コントロール機能付きの電力量計を提供することを目的とする。
【0015】
【課題を解決するための手段】
上記目的を達成するために、請求項1の発明は、常時動作し続けなければならない負荷に、電力供給設備からの電力供給するための第1の出力端子と、電力供給設備からの電力を、開閉手段を介して負荷とは別の負荷に供給するための第2の出力端子と、負荷及び別の負荷において消費された電力量を検出する電力検出手段と、電力検出手段によって検出された電力量と基準制御値とを一定周期毎に比較し、電力量が基準制御値を越えると開閉手段を開放し、電力量が基準制御値を下回ると開閉手段を閉成する制御手段と、開閉手段が閉じている状態において、開閉手段が開放状態になるまでにどの程度余裕があるかを示す電力量を表示する余裕表示手段とを具備した電力量計である。
請求項2の発明は、請求項1記載の電力量計において、余裕表示手段は、電力供給設備から負荷及び別の負荷に流入する電流値、負荷及び別の負荷の負荷量のうちの少なくとも一つをさらに表示する電力量計である。
請求項3の発明は、請求項1又は請求項2の電力量計において、開閉手段の開閉状態を表示する開閉状態表示手段を付加した電力量計である。
【0016】
この請求項1−3の発明の電力量計においては、負荷及び別の負荷において消費された電力量を電力検出手段によって検出し、制御手段が、一定周期毎に電力検出手段によって検出される電力量と基準制御値とを比較し、電力量が基準制御値を越えた場合には開閉手段を開放して第2の出力端子に接続されている別の負荷への電力供給を停止する。また、別の負荷への電力供給停止後においても、制御手段が、一定周期毎に電力量検出手段によって検出される電力量と基準制御値とを比較し、電力量が基準制御値以下になれば開閉手段を閉じて第2の出力端子に接続されている別の負荷への電力供給を再開する。
【0017】
このように、負荷及び別の負荷によって消費される電力量に基づいて、この負荷及び別の負荷に対する電力供給を操作することにより、ピーク電力量を抑制することができ、消費される電力量の平準化を図ることができる。
【0018】
ゆえに、電力供給の効率化が可能であり、ピーク使用時の電力供給を補うための設備増加等を防ぎ経済化を図ることができる。
また、請求項の発明は、開閉手段の開閉状態を表示する開閉状態表示手段を具備した電力量計である。
したがって、請求項の発明の電力量計においては、開閉状態表示手段によって開閉手段の開閉状態を電力使用者が確認し、確認の結果、開閉手段が開放されていると認識した場合に、負荷によって消費される電力を抑制させることで、別の負荷への電力供給を早期に再開させることができるため、消費される電力量の平準化を図ることができ、負荷及び別の負荷へ安定して電力を供給することができる。
請求項の発明は、開閉手段が閉じている状態において、開閉手段が開放状態になるまでにどの程度余裕があるかを示す電力量を表示する余裕表示手段を具備した電力量計である。また、請求項2の発明は、請求項1記載の電力量計において、余裕表示手段は、電力供給設備から負荷及び別の負荷に流入する電流値、負荷及び別の負荷の負荷量のうちの少なくとも一つをさらに表示する電力量計である。
したがって、請求項1,2の発明の電力量計においては、余裕表示手段によって開閉手段が開放されるまでの余裕を電力使用者が確認し、確認の結果、開放手段が開放されやすい状態にあると判断した場合に、負荷及び別の負荷によって消費される電力を抑制させることで、別の負荷への電力供給の停止を防止して負荷及び別の負荷へ安定して電力を供給することができ、また消費される電力量の平準化を図ることができる。
次に、請求項4の発明は、請求項1乃至請求項3のいずれか1項に記載の電力量計において、基準制御値は、開閉手段が閉成状態のときは高く、開放状態のときは低く切り換えられ、開閉手段が閉成状態のときに電力量が高い基準制御値を越えると開閉手段を開放し、開閉手段が開放状態のときに電力量が低い基準制御値を下回ると開閉手段を閉成する電力量計である。
【0019】
この請求項の発明の電力量計においては、請求項1乃至請求項3の発明の電力量計と同様の作用により同様の効果を得ることができる。
また、開閉手段が開いた状態における基準制御値を、開閉手段が閉じた状態における基準制御値よりも小さくしている。すなわち、開閉手段の電力量変化による開閉動作にヒステリシス特性を持たせることにより、一旦開閉手段が開放されるとその開放状態が維持されやすくすることができ、一層ピーク電力量を抑制することができ、かつ消費される電力量の平準化を図ることができる。
【0020】
次に、請求項の発明は、請求項1乃至請求項4のいずれか1項に記載の電力量計において、制御手段において用いられる基準制御値を指定する基準制御値指定手段を付加した電力量計である。
【0021】
したがって、請求項の発明の電力量計においては、請求項1乃至請求項4と同様の作用効果に加えて、基準制御値指定手段によって基準制御値を自由に指定することができるため、負荷や別の負荷や環境が変化したり、負荷や別の負荷が変更された場合においても、適切にピーク電力量を抑制することができ、消費される電力量の平準化を図ることができる。
【0022】
次に、請求項の発明は、請求項1乃至請求項のいずれか1項に記載の電力量計において、制御手段が比較を行う一定周期の時間を指定する周期指定手段を付加した電力量計である。
【0023】
この請求項の発明の電力量においては、請求項1乃至請求項の発明の電力量計と同様の作用により同様の効果を得ることができる。
また、周期指定手段によって比較を行う周期を自由に指定することができるため、例えば負荷及び別の負荷の電力量の変化が小さい場合には周期を長くし、負荷及び別の負荷の電力量の変化が大きい場合には周期を短くすることができ、比較処理の実行回数を適切に設定することができる。
【0028】
【発明の実施の形態】
以下、本発明の実施の形態について図面を参照して詳細に説明する。
図1は、本発明の実施の形態の電力量計としての負荷コントロール機能付き電力量計の構成を示すブロック図であり、図2と同一の部分には同一の符号を付してその説明を省略し、ここでは異なる部分についてのみ詳しく説明する。
【0029】
この負荷コントロール機能付き電力量計14は、一般家庭内の負荷15と配電線6a、6bを介して出力端子16によって接続され、また負荷15とは別の一般家庭内の負荷17と配電線18a、18bを介して負荷コントロール用出力端子19によって接続されている。ここで、配電線18a、18bは、配電線6a、6bと同様に一般家庭の屋内に張り巡らされて負荷17と接続されている。
【0030】
また、この負荷コントロール機能付き電力量計14の内部においては、出力端子16と開閉器20とが、導体21a、21bによって接続され、また開閉器20と負荷コントロール用出力端子19とが、導体22a、22bによって接続されている。
【0031】
開閉器20は、中央演算部23からの指令に基づいて、導体21a、21bと導体22a、22bとの接続・切断を行い、この接続・切断動作によって、負荷17へ電力が供給されるか否かが決定される。
【0032】
中央演算部23は、電力演算部11から入力される電力量を累積して使用電力量を求め、この求めた使用電力量を表示部24に出力する。
加えて、この中央演算部23は、任意に設定された一定周期毎に、電力演算部11から入力する電力量と任意の基準制御値とを比較し、この電力量が基準制御値を越えた場合に、開閉器20に切断命令を出力し、これとは逆に、この電力量が基準制御値以下になった場合に、開閉器20に接続命令を出力する。
【0033】
ここで、基準制御値は、負荷17が接続状態の場合と切断状態の場合、すなわち開閉器20の開閉状態によって値を切り換えるとしてもよい。
この場合、開閉手段が開いた状態の基準制御値は、開閉手段が閉じた状態の基準制御値よりも小さく設定する。
【0034】
なお、この基準制御値は、中央演算部23に接続されている図示しない基準制御値指定部によって自由に指定可能となっている。
また、この中央演算部23には、電力演算部11から入力する電力量と基準制御値との比較を行う一定周期の時間を自由に指定可能とするための図示しない周期指定手段が接続されている。
【0035】
加えて、この中央演算部23は、開閉器20が開放状態になるまでにどの程度余裕があるかを示す電力量、電力供給設備2から負荷15及び別の負荷17に流入する電流値、負荷15及び別の負荷17の負荷量等を求め表示部24に出力する。
【0036】
表示部24は、中央演算部23から入力した使用電力量、開閉器20の開閉状態、中央演算部23が比較を行う一定周期、基準制御値、さらに開閉器20が開放状態になるまでにどの程度余裕があるかを示す電力量、電力供給設備2から負荷15及び別の負荷17に流入する電流値、負荷15及び別の負荷17の負荷量等を表示する。
【0037】
次に、このような構成を持つ負荷コントロール機能付き電力量計14の動作について説明する。
電力供給設備2から負荷コントロール機能付き電力量計14の入力端子4に入力された電力は、導体8a、8bを介して出力端子16に入力される。
【0038】
この出力端子16に入力された電力は、屋内に張り巡らされた配電線6a、6bを介して負荷15に供給されるため、負荷15には電力供給設備2が停止しない限り電力が供給される。ゆえに、負荷15としては、例えば冷蔵庫等のように常時動作し続けなければならない電気機器等が適している。
【0039】
また、この出力端子16に入力された電力は、開閉器20が閉じた状態の場合には、導体21a、21b、開閉器20、導体22a、22bを介して負荷コントロール用出力端子19に入力され、さらにこの負荷コントロール用出力端子19に入力された電力は、屋内に張り巡らされた配電線18a、18bを介して負荷17に供給される。
【0040】
一方、開閉器20が開放した状態の場合には、負荷17への電力の供給が停止される。
本実施の形態に係る負荷コントロール機能付き電力量計14の内部においては、負荷15及び負荷17による使用電力量を求めるために、電圧検出部9によって電圧成分が電気信号として検出され、電流検出部10によって電流成分が電流信号として検出され、この電圧値及び電流値を乗算する電力演算部11によって電力量が求められ、中央演算部23が求められた電力量を累積した使用電力量を求め、この求められた使用電力量が表示部24に表示される。
【0041】
ここで、中央演算部23においては、負荷15及び負荷17によって消費される電力量と基準制御値とが一定周期毎に比較され、この消費電力量が基準制御値を越えた場合には、開閉器20が開放され、負荷17への電力供給が停止される。
【0042】
そして、中央演算部23で扱われる基準制御値が、小さい値に切り換えられる。
続いて、中央演算部23においては、負荷15によって消費される電力量と、小さい値に切り換えられた基準制御値とが一定周期毎に比較され、この消費電力量が基準制御値以下になった場合には、開閉器20が閉じられ、負荷17への電力供給が再開される。
【0043】
そして、中央演算部23で扱われる基準制御値が元の値に切り換えられる。
以下に、本実施の形態に係る負荷コントロール機能付き電力量計14の効果について説明する。
【0044】
この負荷コントロール機能付き電力量計14においては、負荷15及び別の負荷17によって消費される電力量が、基準制御値を越えるとき、あるいは基準制御値以下になるときに、この負荷15及び別の負荷17に対する電力供給の操作がなされるため、ピーク電力量を抑制することができ、消費される電力量の平準化を図ることができる。
【0045】
ゆえに、電力供給の効率化が可能であり、ピーク使用時の電力供給を補うための設備増加等を防ぎ経済化を図ることができる。
また、開閉器20が開いた状態における基準制御値を、開閉器20が閉じた状態における基準制御値よりも小さくすることで、一端開閉器20が開放されるとその開放状態が維持されやすくすることができるため、一層ピーク電力量を抑制することができる。
【0046】
さらに、図示しない基準制御値指定部によって基準制御値を自由に指定することができるため、負荷15や別の負荷17の状態や環境が変化したり、負荷15や別の負荷17が変更された場合においても、適切にピーク電力量を抑制することができる。
【0047】
さらに、図示しない周期指定部によって比較を行う周期を自由に指定することができるため、例えば負荷15及び別の負荷17の電力量の変化が小さい場合には周期を長くし、負荷15及び別の負荷17の電力量の変化が大きい場合には周期を短くすることができ、比較処理の実行回数を適切に設定することができる。
【0048】
また、表示部24によって表示される開閉器20の開閉状態によって、電力使用者が開閉器20の開閉状態を確認することができ、この確認結果が開閉器20が開放されているというものの場合は、電力使用者が負荷15によって消費される電力を抑制させることで、別の負荷17への電力供給を早期に再開させることができ、これにより消費される電力量の平準化を図り、かつ負荷15及び別の負荷17へ安定して電力を供給することができる。
【0049】
さらに、開閉器20が開放されるまでの余裕を電力使用者が表示部24によって確認し、確認の結果、電力使用者が開放器20が開放されやすい状態にあると判断した場合に、負荷15及び別の負荷17によって消費される電力を抑制させることで、別の負荷17への電力供給の停止を防止することができ、負荷15及び別の負荷17へ安定して電力を供給することができる。
【0050】
なお、本実施の形態に係る負荷コントロール機能付き電力量計14においては、電力演算部11と中央演算部23とを別の構成としているが、この2つの構成を1つにまとめてもよい。
【0051】
【発明の効果】
以上説明したように本発明によれば、電力供給される負荷を負荷及び別の負荷の2つに分けて、双方の負荷に消費される電力量が基準制御値を越えると、別の負荷に対する電力供給を停止し、双方の負荷に消費される電力量が基準制御値を下回ると、別の負荷に対する電力供給を再開している。
【0052】
したがって、ピーク電力量を抑制することができ、消費される電力量の平準化を図ることができる。
ゆえに、電力供給の効率化が可能であり、ピーク使用時の電力供給を補うための設備増加等を防ぎ経済化を図ることができる。
【0053】
また、一旦、別の負荷に対する電力供給を停止した後は、電力量が前記基準制御値より下方の基準制御値を下回った時点で、双方の負荷に対する電力供給を再開することにより、一旦、別の負荷に対する電力供給が停止されるとその停止状態を維持しやすくすることができ、一層ピーク電力量を抑制することができる。
【図面の簡単な説明】
【図1】本発明の実施の形態の電力量計としての負荷コントロール機能付き電力量計の構成を示すブロック図。
【図2】従来の電力量計の構成を示すブロック図。
【符号の説明】
1…電力量計
2…電力供給設備
3a、3b、6a、6b、18a、18b…配電線
4…入力端子
5、15、17…負荷
7、16…出力端子
8a、8b、21a、21b、22a、22b…導体
9…電圧検出部
10…電流検出部
11…電力演算部
12、23…中央演算部
13、24…表示部
14…負荷コントロール機能付き電力量計
19…負荷コントロール用出力端子
20…開閉器
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a watt hour meter that measures the amount of power used by a power demand facility such as a general household, and in particular, controls connection / disconnection to a load that consumes power in order to adjust the amount of power used. It relates to electricity meter.
[0002]
[Prior art]
For example, a power meter is a device that measures the amount of power used by a power demand facility such as a general household.
FIG. 2 is a block diagram showing the configuration of a conventional watt-hour meter. Hereinafter, a case where the watt-hour meter 1 is used in a general household will be described as an example.
[0003]
This watt-hour meter 1 is connected to a power supply facility 2 such as a power pole by an input terminal 4 through distribution lines 3a and 3b, and a load 5 and a distribution line 6a in a general household which is a power demand facility. The output terminal 7 is connected via 6b. Here, the distribution lines 6 a and 6 b are stretched around a general household and connected to the load 5.
[0004]
In this watt-hour meter 1, an input terminal 4 and an output terminal 7 are internally connected by conductors 8a and 8b.
The voltage detector 9 detects the voltage value applied to the load 5 by detecting the voltage value between the conductors 8a and 8b. The voltage detection unit 9 outputs the detected voltage value to the power calculation unit 11.
[0005]
The current detection unit 10 detects a current value supplied to the load 5 by detecting a current value flowing through either the conductor 8a or the conductor 8b. The voltage detection unit 10 outputs the detected current value to the power calculation unit 11.
[0006]
The power calculation unit 11 multiplies the voltage value input from the voltage detection unit 9 by the current value input from the current detection unit 10 to obtain an electric energy, and outputs the obtained electric energy to the central processing unit 12.
[0007]
The central processing unit 12 calculates a cumulative value of the amount of power input from the power calculation unit 11 and outputs the calculated cumulative value to the display unit 13 as the amount of power used by the load 5 in a general household.
[0008]
The display unit 13 displays the power consumption input from the central processing unit 12.
Next, the operation of the conventional watt-hour meter 1 will be described.
When power is supplied to a general household, power is supplied from the power supply facility 2 to the load 5 through the distribution lines 3a and 3b, the watt-hour meter 1, and the distribution lines 6a and 6b.
[0009]
That is, since the input terminal 4 and the output terminal 7 of the watt-hour meter 1 are connected by the conductors 8a and 8b inside the watt-hour meter 1, the distribution lines 3a and 3b and the distribution lines 6a and 6b are electrically connected. The power is supplied from the power supply facility 2 to the load 5.
[0010]
In the watt-hour meter 1, the voltage value applied to the load 5 is detected by the voltage detector 9 connected to the conductors 8a and 8b, and the current detector connected to one of the conductors 8a and 8b. The current value supplied to the load 5 is detected by 10.
[0011]
The detected voltage value and current value are multiplied by the power calculation unit 11 to obtain the amount of power, and the accumulated amount of the obtained power amount is obtained by the central processing unit 12 and displayed as the power consumption amount of the load 5. Displayed in the section 13.
[0012]
[Problems to be solved by the invention]
In such a conventional watt-hour meter, the total amount of used electric power, which is the cumulative amount, can be grasped because it is displayed on the display unit, but the instantaneous amount of electricity indicating the current usage state is grasped. I can't.
[0013]
In power demand facilities such as ordinary households, if the contract current is exceeded, the power supply is cut off by the breaker, so the contract current is increased, and the power supply side also increases the facilities to supplement the power supply during peak use etc. Is necessary and uneconomical.
[0014]
The present invention has been made in view of the above, and provides a watt-hour meter with a load control function that can efficiently and economically supply power by controlling connection / disconnection of a load according to the use state of power. For the purpose.
[0015]
[Means for Solving the Problems]
To achieve the above object, the invention of claim 1, the load which must continue to operate at all times, a first output terminal for supplying power from the power supply facility, the power from the power supply equipment A second output terminal for supplying to a load different from the load via the opening / closing means, a power detection means for detecting the amount of power consumed in the load and another load, and detected by the power detection means comparing a power amount and the reference control value for each constant period, and a control means for opening the opening and closing means power amount exceeds the reference control value, closes the opening and closing means power amount is below the reference control value, closing In the state where the means is closed, it is a watt hour meter provided with a margin display means for displaying an amount of power indicating how much margin is available until the opening / closing means is opened .
According to a second aspect of the present invention, in the watt-hour meter according to the first aspect, the margin display means is at least one of a current value flowing from the power supply facility to the load and another load, and the load amount of the load and the other load. It is an electric energy meter which displays one further .
The invention of claim 3 is the watt-hour meter according to claim 1 or 2 , further comprising an open / close state display means for displaying an open / close state of the open / close means .
[0016]
In the watt-hour meter according to the first to third aspects of the present invention, the amount of power consumed in the load and another load is detected by the power detection unit, and the control unit detects the power detected by the power detection unit at regular intervals. The amount is compared with the reference control value, and when the amount of power exceeds the reference control value, the switching means is opened to stop the power supply to another load connected to the second output terminal. Even after the power supply to another load is stopped, the control means compares the power amount detected by the power amount detection means with a reference control value at regular intervals, and the power amount cannot be less than the reference control value. Then, the switching means is closed and the power supply to another load connected to the second output terminal is resumed.
[0017]
Thus, by operating the power supply to this load and another load based on the amount of power consumed by the load and another load, the peak power amount can be suppressed, and the amount of power consumed Leveling can be achieved.
[0018]
Therefore, the efficiency of power supply can be increased, and an increase in equipment for supplementing the power supply during peak use can be prevented, thereby achieving economic efficiency.
The invention of claim 3 is a watt hour meter provided with an open / close state display means for displaying an open / close state of the open / close means.
Therefore, in the watt-hour meter of the invention of claim 3 , when the power user confirms the open / close state of the open / close means by the open / close state display means, and it is recognized that the open / close means is open as a result of the confirmation, By suppressing the power consumed by the power supply, power supply to another load can be resumed early, so that the amount of power consumed can be leveled and stable to the load and another load. Power can be supplied.
The invention according to claim 1 is a watt hour meter including a margin display unit that displays an amount of power indicating how much margin is available before the opening / closing unit is opened in a state where the opening / closing unit is closed . According to a second aspect of the present invention, in the watt-hour meter according to the first aspect, the margin display means includes a current value flowing from the power supply facility to the load and another load, a load and a load amount of the other load. a power meter further display at least one.
Therefore, in the power meter of the invention of claim 1, the allowance up to the opening and closing means is opened by the margin display means to verify the power user, confirmation of the result, in a state where the opening means is easily opened When it is determined that the power consumed by the load and another load is suppressed, the power supply to the other load is prevented from being stopped, and the power can be stably supplied to the load and the other load. It is also possible to level the amount of power consumed.
Next, according to a fourth aspect of the present invention, in the watt hour meter according to any one of the first to third aspects, the reference control value is high when the open / close means is closed, and when the open / close means is open. Is switched to a low level, and the switching means is opened if the power amount exceeds a high reference control value when the switching means is closed, and the switching means is opened if the power amount falls below a low reference control value when the switching means is open. It is a watt-hour meter which closes.
[0019]
In the watt-hour meter of the invention of claim 4 , the same effect can be obtained by the same action as the watt-hour meter of the invention of claims 1 to 3 .
Further, the reference control value in a state where the opening / closing means is open is made smaller than the reference control value in a state where the opening / closing means is closed. That is, by providing hysteresis characteristics to the opening / closing operation due to the change in the electric energy of the opening / closing means, the opening state can be easily maintained once the opening / closing means is opened, and the peak power amount can be further suppressed. In addition, it is possible to level the power consumption.
[0020]
Next, the invention of claim 5 is the watt-hour meter according to any one of claims 1 to 4, wherein the electric power meter is provided with reference control value specifying means for specifying a reference control value used in the control means. It is a meter.
[0021]
Therefore, in the watt-hour meter of the invention of claim 5 , in addition to the same effects as those of claims 1 to 4 , the reference control value can be freely specified by the reference control value specifying means. Even when another load or environment changes, or when the load or another load is changed, the peak power amount can be appropriately suppressed, and the consumed power amount can be leveled.
[0022]
Next, the invention of claim 6 is the watt-hour meter according to any one of claims 1 to 5 , wherein the electric power meter is provided with a period specifying means for specifying a fixed period of time for the control means to compare. It is a meter.
[0023]
In the watt- hour meter of the invention of claim 6 , the same effect can be obtained by the same operation as the watt-hour meter of the invention of claims 1 to 5 .
In addition, since the period for comparison can be freely specified by the period specifying means, for example, when the change in the electric energy of the load and another load is small, the period is lengthened, and the electric energy of the load and the other load is When the change is large, the cycle can be shortened, and the number of executions of the comparison process can be set appropriately.
[0028]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is a block diagram showing a configuration of a watt-hour meter with a load control function as a watt-hour meter according to an embodiment of the present invention. The same parts as those in FIG. Omitted, here, only different parts will be described in detail.
[0029]
The watt-hour meter 14 with a load control function is connected to a load 15 in a general household by an output terminal 16 via distribution lines 6a and 6b, and a load 17 and a distribution line 18a in a general household different from the load 15 are connected. , 18b through a load control output terminal 19. Here, the distribution lines 18a and 18b are stretched around the indoors of ordinary households and connected to the load 17 like the distribution lines 6a and 6b.
[0030]
In the watt-hour meter 14 with load control function, the output terminal 16 and the switch 20 are connected by conductors 21a and 21b, and the switch 20 and the load control output terminal 19 are connected by a conductor 22a. , 22b.
[0031]
The switch 20 connects / disconnects the conductors 21a, 21b and the conductors 22a, 22b based on a command from the central processing unit 23, and whether or not electric power is supplied to the load 17 by this connection / disconnection operation. Is decided.
[0032]
The central processing unit 23 calculates the amount of power used by accumulating the amount of power input from the power calculation unit 11 and outputs the calculated amount of power used to the display unit 24.
In addition, the central processing unit 23 compares the amount of power input from the power calculation unit 11 with an arbitrary reference control value at an arbitrarily set fixed period, and the power amount exceeds the reference control value. In this case, a disconnection command is output to the switch 20, and conversely, a connection command is output to the switch 20 when the amount of power becomes equal to or less than the reference control value.
[0033]
Here, the reference control value may be switched depending on whether the load 17 is connected or disconnected, that is, depending on the open / close state of the switch 20.
In this case, the reference control value when the opening / closing means is open is set smaller than the reference control value when the opening / closing means is closed.
[0034]
The reference control value can be freely specified by a reference control value specifying unit (not shown) connected to the central processing unit 23.
The central processing unit 23 is connected to a period specifying means (not shown) for freely specifying a fixed period of time for comparing the amount of power input from the power calculating unit 11 with the reference control value. Yes.
[0035]
In addition, the central processing unit 23 includes an amount of power indicating how much time is left before the switch 20 is opened, a current value flowing from the power supply facility 2 into the load 15 and another load 17, and a load. 15 and the load amount of another load 17 are obtained and output to the display unit 24.
[0036]
The display unit 24 displays the power consumption input from the central processing unit 23, the open / closed state of the switch 20, the fixed period for which the central processing unit 23 performs comparison, the reference control value, and the switch 20 until the switch 20 is opened. The amount of power indicating whether there is a margin, the current value flowing from the power supply facility 2 into the load 15 and another load 17, the load amounts of the load 15 and another load 17, and the like are displayed.
[0037]
Next, the operation of the watt-hour meter 14 with a load control function having such a configuration will be described.
The power input from the power supply facility 2 to the input terminal 4 of the watt-hour meter 14 with a load control function is input to the output terminal 16 via the conductors 8a and 8b.
[0038]
Since the electric power input to the output terminal 16 is supplied to the load 15 via the distribution lines 6a and 6b extending indoors, the electric power is supplied to the load 15 unless the power supply facility 2 stops. . Therefore, as the load 15, for example, an electric device or the like that must continuously operate, such as a refrigerator, is suitable.
[0039]
In addition, when the switch 20 is closed, the power input to the output terminal 16 is input to the load control output terminal 19 via the conductors 21a and 21b, the switch 20, and the conductors 22a and 22b. Further, the electric power input to the load control output terminal 19 is supplied to the load 17 via the distribution lines 18a and 18b extending indoors.
[0040]
On the other hand, when the switch 20 is open, the supply of power to the load 17 is stopped.
In the watt-hour meter with load control function 14 according to the present embodiment, the voltage component is detected as an electrical signal by the voltage detection unit 9 in order to obtain the power consumption by the load 15 and the load 17, and the current detection unit 10, the current component is detected as a current signal, the power amount is calculated by the power calculation unit 11 that multiplies the voltage value and the current value, and the central calculation unit 23 determines the used power amount by accumulating the calculated power amount, The obtained power consumption is displayed on the display unit 24.
[0041]
Here, in the central processing unit 23, the amount of power consumed by the load 15 and the load 17 and the reference control value are compared at regular intervals, and when this amount of power consumption exceeds the reference control value, the power is opened and closed. The device 20 is opened and the power supply to the load 17 is stopped.
[0042]
Then, the reference control value handled by the central processing unit 23 is switched to a small value.
Subsequently, in the central processing unit 23, the amount of power consumed by the load 15 and the reference control value switched to a small value are compared at regular intervals, and this power consumption is below the reference control value. In this case, the switch 20 is closed and the power supply to the load 17 is resumed.
[0043]
Then, the reference control value handled by the central processing unit 23 is switched to the original value.
Below, the effect of the watt-hour meter 14 with a load control function which concerns on this Embodiment is demonstrated.
[0044]
In the watt-hour meter 14 with the load control function, when the amount of power consumed by the load 15 and another load 17 exceeds the reference control value or falls below the reference control value, the load 15 and the other load Since the operation of supplying power to the load 17 is performed, the peak power amount can be suppressed and the consumed power amount can be leveled.
[0045]
Therefore, the efficiency of power supply can be increased, and an increase in equipment for supplementing the power supply during peak use can be prevented, thereby achieving economic efficiency.
Further, by making the reference control value when the switch 20 is open smaller than the reference control value when the switch 20 is closed, it is easy to maintain the open state when the one-end switch 20 is opened. Therefore, the peak power amount can be further suppressed.
[0046]
Furthermore, since the reference control value can be freely specified by a reference control value specifying unit (not shown), the state or environment of the load 15 or another load 17 has changed, or the load 15 or another load 17 has been changed. Even in the case, the peak power amount can be appropriately suppressed.
[0047]
Furthermore, since the period for comparison can be freely specified by a period specifying unit (not shown), for example, when the change in the electric energy of the load 15 and another load 17 is small, the period is increased, When the change in the electric energy of the load 17 is large, the cycle can be shortened, and the number of executions of the comparison process can be set appropriately.
[0048]
Further, the power user can check the open / close state of the switch 20 according to the open / closed state of the switch 20 displayed by the display unit 24, and this check result indicates that the switch 20 is open. The power user can suppress the power consumed by the load 15 so that the power supply to another load 17 can be restarted at an early stage, thereby leveling the amount of power consumed, and the load Power can be stably supplied to 15 and another load 17.
[0049]
Further, when the electric power user confirms the margin until the switch 20 is opened by the display unit 24 and, as a result of the confirmation, the electric power user determines that the opener 20 is easily opened, the load 15 In addition, by suppressing the power consumed by another load 17, it is possible to prevent the power supply to another load 17 from being stopped, and to stably supply power to the load 15 and another load 17. it can.
[0050]
In addition, in the watt-hour meter 14 with a load control function which concerns on this Embodiment, although the electric power calculating part 11 and the central calculating part 23 are set as another structure, you may combine these two structures into one.
[0051]
【The invention's effect】
As described above, according to the present invention, when a load to be supplied with power is divided into a load and another load, and the amount of power consumed by both loads exceeds the reference control value, When the power supply is stopped and the amount of power consumed by both loads falls below the reference control value, the power supply to another load is resumed.
[0052]
Therefore, the peak power amount can be suppressed, and the consumed power amount can be leveled.
Therefore, the efficiency of power supply can be increased, and an increase in equipment for supplementing the power supply during peak use can be prevented, thereby achieving economic efficiency.
[0053]
In addition, once the power supply to another load is stopped, when the amount of power falls below the reference control value below the reference control value, the power supply to both loads is resumed. When the power supply to the load is stopped, the stopped state can be easily maintained, and the peak power amount can be further suppressed.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a configuration of a watt-hour meter with a load control function as a watt-hour meter according to an embodiment of the present invention.
FIG. 2 is a block diagram showing a configuration of a conventional watt-hour meter.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Electricity meter 2 ... Electric power supply equipment 3a, 3b, 6a, 6b, 18a, 18b ... Distribution line 4 ... Input terminal 5, 15, 17 ... Load 7, 16 ... Output terminal 8a, 8b, 21a, 21b, 22a , 22b ... conductor 9 ... voltage detector 10 ... current detector 11 ... power calculator 12, 23 ... central calculator 13, 24 ... display 14 ... watt-hour meter 19 with load control function ... load control output terminal 20 ... Switch

Claims (6)

常時動作し続けなければならない負荷に、電力供給設備からの電力供給するための第1の出力端子と、
前記電力供給設備からの電力を、開閉手段を介して前記負荷とは別の負荷に供給するための第2の出力端子と、
前記負荷及び前記別の負荷において消費された電力量を検出する電力検出手段と、
前記電力検出手段によって検出された電力量と基準制御値とを一定周期毎に比較し、前記電力量が前記基準制御値を越えると前記開閉手段を開放し、前記電力量が前記基準制御値を下回ると前記開閉手段を閉成する制御手段と、
前記開閉手段が閉じている状態において、前記開閉手段が開放状態になるまでにどの程度余裕があるかを示す電力量を表示する余裕表示手段と
を具備したことを特徴とする電力量計。
The load must continue to operate at all times, a first output terminal for supplying power from the power supply equipment,
A second output terminal for supplying power from the power supply facility to a load different from the load via an opening / closing means;
Power detection means for detecting the amount of power consumed in the load and the other load;
The power amount detected by the power detection means is compared with a reference control value at regular intervals. When the power amount exceeds the reference control value, the opening / closing means is opened, and the power amount is equal to the reference control value. Control means for closing the opening and closing means when below,
Electric power comprising: margin display means for displaying an amount of electric power indicating how much margin is available before the opening / closing means is opened when the opening / closing means is closed. Quantity meter.
請求項1記載の電力量計において、
前記余裕表示手段は、前記電力供給設備から前記負荷及び前記別の負荷に流入する電流値、前記負荷及び前記別の負荷の負荷量のうちの少なくとも一つをさらに表示することを特徴とする電力量計。
The watt-hour meter according to claim 1,
The margin display means, power, characterized by further displaying a current value flowing into the load and the another load from the power supply facility, at least one of the load of the load and the further load Quantity meter.
請求項1又は請求項2記載の電力量計において、
前記開閉手段の開閉状態を表示する開閉状態表示手段を付加したことを特徴とする電力量計。
In the electricity meter of Claim 1 or Claim 2 ,
An watt-hour meter further comprising an open / close state display means for displaying an open / close state of the open / close means .
請求項1乃至請求項3のいずれか1項に記載の電力量計において、
前記基準制御値は、前記開閉手段が閉成状態のときは高く、開放状態のときは低く切り換えられ、前記開閉手段が閉成状態のときに電力量が高い基準制御値を越えると前記開閉手段を開放し、前記開閉手段が開放状態のときに電力量が低い基準制御値を下回ると前記開閉手段を閉成することを特徴とする電力量計。
In the electricity meter of any one of Claim 1 thru | or 3,
The reference control value is switched to high when the opening / closing means is closed, and low when the opening / closing means is open, and when the power amount exceeds a high reference control value when the opening / closing means is closed, the opening / closing means The watt-hour meter is configured to close the opening / closing means when the amount of electric power falls below a low reference control value when the opening / closing means is open.
請求項1乃至請求項4のいずれか1項に記載の電力量計において、
前記制御手段において用いられる基準制御値を指定する基準制御値指定手段を付加したことを特徴とする電力量計。
The watt-hour meter according to any one of claims 1 to 4,
A watt hour meter further comprising reference control value specifying means for specifying a reference control value used in the control means.
請求項1乃至請求項5のいずれか1項に記載の電力量計において、
前記制御手段が比較を行う一定周期の時間を指定する周期指定手段を付加したことを特徴とする電力量計。
The watt-hour meter according to any one of claims 1 to 5,
A watt hour meter added with period specifying means for specifying a fixed period of time for comparison by the control means.
JP24535397A 1997-09-10 1997-09-10 Electricity meter Expired - Fee Related JP3715415B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24535397A JP3715415B2 (en) 1997-09-10 1997-09-10 Electricity meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24535397A JP3715415B2 (en) 1997-09-10 1997-09-10 Electricity meter

Publications (2)

Publication Number Publication Date
JPH1183904A JPH1183904A (en) 1999-03-26
JP3715415B2 true JP3715415B2 (en) 2005-11-09

Family

ID=17132421

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24535397A Expired - Fee Related JP3715415B2 (en) 1997-09-10 1997-09-10 Electricity meter

Country Status (1)

Country Link
JP (1) JP3715415B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030064480A (en) * 2002-01-28 2003-08-02 엘지산전 주식회사 Electronic wattmeter

Also Published As

Publication number Publication date
JPH1183904A (en) 1999-03-26

Similar Documents

Publication Publication Date Title
US11106228B2 (en) Thermal energy storage apparatus, controllers and thermal energy storage control methods
US9647493B2 (en) Control device and power distribution system
US9692257B2 (en) Control device, conversion device, control method, and electricity distribution system
US9859750B2 (en) Power distribution control apparatus, electricity storage system, and power distribution control method
KR101531625B1 (en) Charging apparatus
US9819222B2 (en) Power control apparatus and control method
US9360903B2 (en) System for controlling electric power supply to devices
US11139681B2 (en) Smart switching panel for secondary power supply
KR101264142B1 (en) New and renewable energy system for home and/or microgrid application
JP2013236522A (en) Power control device
US20160197477A1 (en) Controlling power in a micro-grid
KR20120138145A (en) Intelligent cabinet-panel having energy managing function in the smart grid environment
US20230361574A1 (en) Load control architecture of an energy control system
CN106208386B (en) A kind of intelligent switch control method suitable for family's micro-capacitance sensor
EP3032682B1 (en) Power supply system, power conversion device, and distribution board
CN211183508U (en) Power supply control device
JP3715415B2 (en) Electricity meter
JP7249561B2 (en) storage system
US10826320B2 (en) Solar power system
CN209472390U (en) A kind of commutation device smoothly switched
AU2015100624A4 (en) Domestic Electrical Demand Limiting Controller
JP2002335630A (en) Power-saving apparatus and method of operating the same
KR20150060213A (en) Smart Plug for Self Demand Response
US12021388B2 (en) Systems and methods for photovoltaic production curtailment and autonomous load breaking
Muawiya et al. Electrical grid stability enhancement using smart home frequency-response grid-friendly appliance system

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041126

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041221

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050218

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050322

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050518

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050823

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050825

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080902

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090902

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090902

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100902

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100902

Year of fee payment: 5

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100902

Year of fee payment: 5

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D03

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110902

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120902

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees