JP3690496B2 - Foundation structure of building and construction method of foundation - Google Patents

Foundation structure of building and construction method of foundation Download PDF

Info

Publication number
JP3690496B2
JP3690496B2 JP2000337304A JP2000337304A JP3690496B2 JP 3690496 B2 JP3690496 B2 JP 3690496B2 JP 2000337304 A JP2000337304 A JP 2000337304A JP 2000337304 A JP2000337304 A JP 2000337304A JP 3690496 B2 JP3690496 B2 JP 3690496B2
Authority
JP
Japan
Prior art keywords
steel pipe
column
pile
building
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000337304A
Other languages
Japanese (ja)
Other versions
JP2002138496A (en
Inventor
佐藤  一郎
吉隆 外狩
和彦 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2000337304A priority Critical patent/JP3690496B2/en
Publication of JP2002138496A publication Critical patent/JP2002138496A/en
Application granted granted Critical
Publication of JP3690496B2 publication Critical patent/JP3690496B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、主に単層(平屋建て)ないし2〜3階建て程度の低層建築物の基礎構造および基礎の施工方法に関する。
【0002】
【従来の技術】
建築物の基礎構造として、杭の上端部にフーチングを介して柱を接合して立設し、それら柱間に梁を架設し、かつ杭の上端部同士をつなぎ梁により連結するものが一般的であるが、より簡略で合理的な構造として、杭と柱とを直接的に接合してつなぎ梁およびフーチングを省略することが近年こころみられるようになった。この場合、柱としては主に鉄骨製のものが用いられていた。
【0003】
【発明が解決しようとする課題】
上述した杭と柱とを直接的に接合する建築物の基礎構造は、施工性に優れておりコストも安価であるといった特徴を持っているが、柱がRC構造のものへの適用は行われていなかった。柱がRC構造の場合の上述した合理的な建築物の基礎構造の適用が求められていた。
【0004】
【課題を解決するための手段】
請求項1の発明は、地中に鋼管杭を打ち込み、打ち込んだ鋼管杭の頭部に同軸状となるよう一体的に設けた鋼管の内部に柱の下端面の位置が鋼管杭と鋼管との接合面からずれるように柱用の鉄筋を配設し、次いで柱の下端面の位置が鋼管杭と鋼管との接合面からずれるように鋼管内にコンクリートを打設して鋼管杭の上部に一体的に接合された柱脚部を有する柱を立設することを特徴としている。
【0005】
請求項2の発明は、地中に打ち込んだ鋼管杭の頭部に同軸状となるように鋼管が一体的に設けられ、柱の下端面の位置が鋼管杭と鋼管との接合面からずらされるように、鋼管の内部に柱用の鉄筋が組み込まれた状態でコンクリートが打設されて、前記鋼管杭の頭部の上部と一体的に接合された柱脚部を有する柱が立設されてなることを特徴としている。
【0006】
請求項3の発明は、請求項2記載の建築物の基礎構造において、前記鋼管の内周面にはスパイラル状のリブが形成されていることを特徴としている。
【0007】
請求項4の発明は、請求項2また3記載の建築物の基礎構造において、前記鋼管の内側には該鋼管の円周面に沿って割裂防止筋が配設されていることを特徴としている。
【0008】
【発明の実施の形態】
図1は本発明に係る建築物の実施形態を示す。図中、符号1は杭、3は柱である。図1から明らかなように、本実施形態の建築物では各杭1がそれぞれ独立に設けられていて、従来一般には各杭同士を連結するように設けられるつなぎ梁が省略されている。また、各杭1の上端部に各柱3が直接的に接合されており、従来一般には設けられるフーチングが省略されたものとなっている。
【0009】
図2〜図3は要部の詳細を示すものである。図2に示すように杭1として中空鋼管杭2の上部には該中空鋼管杭2と同軸状に中空鋼管杭2と同径の筒体5が溶接等の適宜固定手段で一体的に設けられている。
【0010】
また、ここでは筒体5として、例えば内周面にスパイラル状のリブ6が形成された、いわゆるスパイラル鋼管が用いられているが、必ずしもスパイラル鋼管に限られるものでなく、単なる鋼管であってもよい。さらには、杭1として用いた前記中空鋼管杭2の上部を利用してもよい。
【0011】
筒体5の内部には、柱用の鉄筋9が配設されている。柱用の鉄筋9は、主筋とそのまわりのフープ筋からなっているが、図2ではフープ筋が省略されている。柱用の鉄筋9は筒体5の上部開口部7から上方へ突出して、所定高さまで伸びている。
【0012】
前記筒体5の内側には、割裂防止筋10が筒体5の円周面に沿って配設されている。さらに、これら筒体5内に柱用の鉄筋9および割裂防止筋10が配設された状態で、筒体5内下部に図示しないコンクリート止めを設けてコンクリート8が打設されることにより、柱脚部4を杭1の頭部と一体的に接合された前記柱3が立設されている。
【0013】
次に本発明の施工方法を示す。まず、地中に杭1を構成する中空鋼管杭2を打ち込む。次いで、中空鋼管杭2の上端部に筒体5を中空鋼管杭2と同軸状に接合する。また、筒体5は、中空鋼管杭2を打ち込む前に予め同中空鋼管杭2に接合しても良い。筒体5の内周部に沿って割裂防止筋10を配設した上で、柱用の鉄筋9の下端部を筒体5の中空部に配置し、コンクリート8を打設して、筒体5と柱用の鉄筋を固定する。この後、図示せぬ柱用の他の鉄筋及び型枠を組み立てコンクリートを打設する。
【0014】
上述の構成によれば、杭1と同径の筒体5を中空鋼管杭2と同軸状に接合し、筒体内の中空部に筒体5の略下半部まで至るようにコンクリート8を打設しているから、つまり中空鋼管杭2と筒体5との接合面11を一致しないようにずらしているから、杭1と筒体5の接合部に生じやすい応力集中を回避して十分な接合強度を確保することができる。
【0015】
また、筒体5の上端部に柱用の鉄筋9の下端部を配置するとともにコンクリート8を筒体5内に打設充填し、筒体5を介して杭1と柱3を直接的に接合しているから、杭1と柱3の十分な接合強度を確保することができる。
【0016】
また、筒体5の内周面にスパイラル状のリブ6を形成しているため、該筒体5自体の強度が高まるのは勿論、その他筒体5と杭1、および柱3内にそれぞれ打設されるコンクリート8の定着強度を高めることができ、これにより杭1と柱3との接合強度を高めることができる。
【0017】
さらに、筒体5の内周部に割裂防止筋10を配置しているから、柱3から伝わる建築物の鉛直荷重により作用される筒体5の圧縮歪等の変形を防ぐことができる。
【0018】
また、図3において柱3は角形となっているが、形状は角形および円形のいずれもが採用可能である。
【0019】
【発明の効果】
請求項1の建築物の基礎の施工方法によれば、地中に鋼管杭を打ち込み、打ち込んだ鋼管杭の頭部に同軸状となるよう一体的に設けた鋼管の内部に柱用の鉄筋を配設し、次いで鋼管内にコンクリートを打設して鋼管杭の上部に一体的に接合された柱脚部を有する柱を接合するものであるから、いずれも簡略かつ合理的な構造で施工性に優れているため工費削減、工期短縮に大きく寄与するものであり、きわめて有効である。また、柱の下端面の位置が鋼管杭と鋼管との接合面からずれるように柱用の鉄筋を配設するとともに柱のコンクリートを打設するものであるから、鋼管杭と鋼管との接合部に生じやすい応力集中を回避して十分な接合強度を確保することができる。
【0020】
請求項2の建築物の基礎構造によれば、地中に打ち込んだ鋼管杭の頭部に同軸状となるように鋼管が一体的に設けられ、柱の下端面の位置が鋼管杭と鋼管との接合面からずらされるように、鋼管の内部に柱用の鉄筋が組み込まれた状態でコンクリートが打設されて、前記鋼管杭頭部の上部に一体的に接合された柱脚部を有する柱を構築されてなるから、鋼管杭と鋼管との接合部に生じやすい応力集中を回避して鋼管杭と柱との間に十分なる接合強度を確保できるため、柱にRC構造のものを用いた場合についても鋼管杭と柱とを直接的に接合する建築物の基礎構造の適用が可能となった。
【0021】
請求項3の建築物の基礎構造によれば、前記鋼管の内周面にはスパイラル状のリブが形成されていることから、鋼管自体の強度が高まるほか前記鋼管とコンクリートの充分なる定着強度が高まり、簡略な構造でRC構造の柱と鋼管杭との応力伝達はスムーズに行われる。
【0022】
請求項4の建築物の基礎構造によれば、前記鋼管の内側には該鋼管の円周面に沿って割裂防止筋が配筋されることから、建築物の柱等より鉛直荷重がかかることにより作用する該鋼管への圧縮歪等の変位を最小限にとどめ、鋼管の早期劣化を抑制することができる。
【図面の簡単な説明】
【図1】 本発明に係る建築物の基礎構造を有する建築物の実施形態を示す概略構成図である。
【図2】 本発明に係る建築物の基礎構造の実施形態を示す図である。
【図3】 本発明に係る建築物の基礎構造の実施形態を示す断面図である。
【符号の説明】
1 杭
2 中空鋼管杭
3 柱
4 柱脚部
5 筒体
6 リブ
7 上部開口部
8 コンクリート
9 柱用の鉄筋
10 割裂防止筋
11 接合面
[0001]
BACKGROUND OF THE INVENTION
The present invention mainly relates to a basic structure of a single-layer (one-story building) or a low-rise building having about two to three floors and a construction method of the foundation.
[0002]
[Prior art]
As a basic structure of a building, it is common to connect a pillar to the upper end of a pile via a footing, build a beam between the pillars, and connect the upper end of the pile to each other by a beam However, in recent years, as a simpler and more rational structure, it has become an effort to join the piles and columns directly and omit the connecting beams and footings. In this case, steel columns were mainly used.
[0003]
[Problems to be solved by the invention]
The basic structure of a building that directly joins the above-mentioned piles and pillars is characterized by excellent workability and low cost. However, it is applied to pillars with RC structures. It wasn't. The application of the above-mentioned rational building foundation structure in the case where the column is an RC structure has been demanded.
[0004]
[Means for Solving the Problems]
In the invention of claim 1, the steel pipe pile is driven into the ground, and the position of the lower end surface of the column is formed between the steel pipe pile and the steel pipe inside the steel pipe integrally provided so as to be coaxial with the head of the driven steel pipe pile . Placing the reinforcing bars for the pillars so that they deviate from the joint surface , and then place concrete in the steel pipe so that the position of the lower end of the pillar deviates from the joint surface between the steel pipe pile and the steel pipe, and integrate it with the upper part of the steel pipe pile It is characterized in that a column having column bases joined together is erected.
[0005]
In the invention of claim 2, the steel pipe is integrally provided so as to be coaxial with the head of the steel pipe pile driven into the ground, and the position of the lower end surface of the column is shifted from the joint surface between the steel pipe pile and the steel pipe. as concrete in a state in which reinforcing bars are embedded in the internal pillar of the steel pipe is pouring, posts having a columnar leg portion top and integrally joined in a head of the steel pipe pile is erected It is characterized by.
[0006]
According to a third aspect of the present invention, there is provided the building basic structure according to the second aspect, wherein spiral ribs are formed on the inner peripheral surface of the steel pipe .
[0007]
A fourth aspect of the present invention, the basic structure of claim 2 or 3 buildings according to the inside of the steel pipe is characterized in that splitting prevent muscle along the circumferential surface of the steel pipe is arranged .
[0008]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 shows an embodiment of a building according to the present invention. In the figure, reference numeral 1 is a pile, and 3 is a pillar. As is clear from FIG. 1, each pile 1 is provided independently in the building of this embodiment, and conventionally, a connecting beam provided so as to connect the piles is omitted. Moreover, each pillar 3 is directly joined to the upper end part of each pile 1, The footing generally provided conventionally is abbreviate | omitted.
[0009]
2 to 3 show details of main parts. As shown in FIG. 2, a cylindrical body 5 having the same diameter as that of the hollow steel pipe pile 2 is integrally provided on the upper portion of the hollow steel pipe pile 2 as a pile 1 by an appropriate fixing means such as welding. ing.
[0010]
Further, here, for example, a so-called spiral steel pipe in which spiral ribs 6 are formed on the inner peripheral surface is used as the cylindrical body 5, but it is not necessarily limited to the spiral steel pipe, and may be a simple steel pipe. Good. Furthermore, you may utilize the upper part of the said hollow steel pipe pile 2 used as the pile 1. FIG.
[0011]
A column reinforcing bar 9 is disposed inside the cylinder 5. The column reinforcing bars 9 are composed of main bars and hoop bars around the main bars, but the hoop bars are omitted in FIG. The column reinforcing bars 9 protrude upward from the upper opening 7 of the cylinder 5 and extend to a predetermined height.
[0012]
Inside the cylinder 5, splitting prevention muscles 10 are arranged along the circumferential surface of the cylinder 5. Furthermore, in the state in which the reinforcing bars 9 and the splitting reinforcing bars 10 for the pillars are disposed in the cylinders 5, the concrete stoppers (not shown) are provided in the lower part in the cylinders 5 and the concrete 8 is driven, whereby the columns The column 3 in which the leg 4 is integrally joined to the head of the pile 1 is erected.
[0013]
Next, the construction method of the present invention is shown. First, a hollow steel pipe pile 2 constituting the pile 1 is driven into the ground. Next, the cylindrical body 5 is joined to the hollow steel pipe pile 2 coaxially with the upper end portion of the hollow steel pipe pile 2. Further, the cylindrical body 5 may be joined to the hollow steel pipe pile 2 in advance before the hollow steel pipe pile 2 is driven. After disposing the splitting reinforcing bars 10 along the inner peripheral part of the cylinder 5, the lower end of the column reinforcing bars 9 is arranged in the hollow part of the cylinder 5, and the concrete 8 is placed, and the cylinder 5 and rebar for the column are fixed. Thereafter, other reinforcing bars and molds for pillars (not shown) are assembled and concrete is placed.
[0014]
According to the above-described configuration, the cylinder 5 having the same diameter as the pile 1 is joined coaxially with the hollow steel pipe pile 2, and the concrete 8 is driven into the hollow portion of the cylinder so as to reach the substantially lower half of the cylinder 5. Since it has installed, that is, since the joining surface 11 of the hollow steel pipe pile 2 and the cylinder 5 is shifted so as not to coincide, it is sufficient to avoid stress concentration that tends to occur at the joint between the pile 1 and the cylinder 5. Bonding strength can be ensured.
[0015]
Further, the lower end portion of the column reinforcing bar 9 is disposed at the upper end portion of the cylindrical body 5 and the concrete 8 is cast and filled in the cylindrical body 5, and the pile 1 and the column 3 are directly joined via the cylindrical body 5. Therefore, sufficient joint strength between the pile 1 and the pillar 3 can be ensured.
[0016]
Further, since the spiral rib 6 is formed on the inner peripheral surface of the cylindrical body 5, not only the strength of the cylindrical body 5 itself is increased, but also the cylindrical body 5, the pile 1 and the pillar 3 are respectively struck. The fixing strength of the concrete 8 to be installed can be increased, whereby the bonding strength between the pile 1 and the column 3 can be increased.
[0017]
Furthermore, since the splitting prevention muscles 10 are arranged on the inner peripheral portion of the cylinder 5, it is possible to prevent deformation such as compressive strain of the cylinder 5 that is acted on by the vertical load of the building transmitted from the pillar 3.
[0018]
Further, in FIG. 3, the pillar 3 has a square shape, but any of a square shape and a circular shape can be adopted.
[0019]
【The invention's effect】
According to the construction method for a foundation of a building of claim 1, a steel pipe pile is driven into the ground, and a reinforcing bar for a column is provided inside the steel pipe integrally provided so as to be coaxial with the head of the driven steel pipe pile. Since the concrete is placed in the steel pipe and then the concrete is placed in the steel pipe pile to join the pillars with the column base part integrally joined to the upper part of the steel pipe pile , both work with a simple and rational structure. It is extremely effective because it greatly contributes to reducing the construction cost and shortening the construction period. Also, because the column rebar is placed so that the position of the lower end surface of the column deviates from the joint surface between the steel pipe pile and the steel pipe, and the concrete of the column is placed, the joint between the steel pipe pile and the steel pipe It is possible to avoid a stress concentration that is likely to occur in the film and to secure a sufficient bonding strength.
[0020]
According to the basic structure of the building of claim 2, the steel pipe is integrally provided so as to be coaxial with the head of the steel pipe pile driven into the ground, and the position of the lower end surface of the column is the steel pipe pile and the steel pipe. as offset from the joint surface of the concrete is pouring in a state in which reinforcing bars are embedded for pillars in the interior of the steel pipe, having a pedestal portion integrally joined to an upper portion of the steel pipe pile head Since the column is constructed, it is possible to avoid the stress concentration that tends to occur at the joint between the steel pipe pile and the steel pipe, and to ensure sufficient joint strength between the steel pipe pile and the column. It was also possible to apply building foundations that directly connect steel pipe piles and columns.
[0021]
According to the substructure of the building according to claim 3, since the an inner peripheral surface of the steel pipe is formed form the spiral ribs, sufficient Naru fixing strength of other said steel pipe and concrete strength of the steel pipe itself increases the The stress transmission between the RC structure column and the steel pipe pile is smoothly performed with a simple structure.
[0022]
According to the substructure of the building according to claim 4, inside the steel pipe from the splitting prevent muscle along the circumferential surface of the steel pipe is Haisuji, it takes a vertical load than the pillar or the like of a building minimizing displacement such as a compression strain to the steel pipe acting, it is possible to suppress premature deterioration of the steel pipe.
[Brief description of the drawings]
FIG. 1 is a schematic configuration diagram showing an embodiment of a building having a building foundation structure according to the present invention.
FIG. 2 is a diagram showing an embodiment of a building foundation structure according to the present invention.
FIG. 3 is a cross-sectional view showing an embodiment of a building foundation structure according to the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Pile 2 Hollow steel pipe pile 3 Column 4 Column base part 5 Tubular body 6 Rib 7 Upper opening part 8 Concrete 9 Reinforcing bar 10 Splitting prevention bar 11 Joint surface

Claims (4)

地中に鋼管杭を打ち込み、打ち込んだ鋼管杭の頭部に同軸状となるよう一体的に設けた鋼管の内部に柱の下端面の位置が鋼管杭と鋼管との接合面からずれるように柱用の鉄筋を配設し、次いで柱の下端面の位置が鋼管杭と鋼管との接合面からずれるように鋼管内にコンクリートを打設して鋼管杭の上部に一体的に接合された柱脚部を有する柱を立設することを特徴とする建築物の基礎の施工方法。The steel pipe pile is driven into the ground, and the column is placed inside the steel pipe that is integrally provided so as to be coaxial with the head of the driven steel pipe pile so that the position of the lower end surface of the column is displaced from the joint surface between the steel pipe pile and the steel pipe. The column base is placed on the top of the steel pipe pile by placing concrete in the steel pipe so that the position of the bottom end of the column is shifted from the joint surface between the steel pipe pile and the steel pipe. The construction method of the foundation of the building characterized by erecting the pillar which has a part. 地中に打ち込んだ鋼管杭の頭部に同軸状となるように鋼管が一体的に設けられ、柱の下端面の位置が鋼管杭と鋼管との接合面からずらされるように、鋼管の内部に柱用の鉄筋が組み込まれた状態でコンクリートが打設されて、前記杭頭部の上部と一体的に接合された柱脚部を有する柱が立設されてなることを特徴とする建築物の基礎構造。 Steel pipe is provided integrally so as to be coaxial to the head of the implanted's steel pipe pile into the ground, so that the position of the lower end surface of the column is displaced from the junction surface of the steel pipe pile and the steel pipe, the interior of the steel pipe The building is characterized in that concrete is cast in a state in which a reinforcing bar for a column is incorporated in the column, and a column having a column base part integrally joined to the upper part of the pile head is erected. Foundation structure. 請求項2記載の建築物の基礎構造において、前記鋼管の内周面にはスパイラル状のリブが形成されていることを特徴とする建築物の基礎構造。The building foundation structure according to claim 2, wherein spiral ribs are formed on an inner peripheral surface of the steel pipe . 請求項2また3記載の建築物の基礎構造において、前記鋼管の内側には該鋼管の円周面に沿って割裂防止筋が配設されていることを特徴とする建築物の基礎構造。In basic structure according to claim 2 or 3 buildings according, substructure of a building that the inside of the steel pipe is characterized in that splitting prevent muscle along the circumferential surface of the steel pipe is disposed.
JP2000337304A 2000-11-06 2000-11-06 Foundation structure of building and construction method of foundation Expired - Lifetime JP3690496B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000337304A JP3690496B2 (en) 2000-11-06 2000-11-06 Foundation structure of building and construction method of foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000337304A JP3690496B2 (en) 2000-11-06 2000-11-06 Foundation structure of building and construction method of foundation

Publications (2)

Publication Number Publication Date
JP2002138496A JP2002138496A (en) 2002-05-14
JP3690496B2 true JP3690496B2 (en) 2005-08-31

Family

ID=18812715

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000337304A Expired - Lifetime JP3690496B2 (en) 2000-11-06 2000-11-06 Foundation structure of building and construction method of foundation

Country Status (1)

Country Link
JP (1) JP3690496B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2920289C (en) * 2013-09-25 2018-05-01 Nippon Steel & Sumitomo Metal Corporation Composite structure
CN111705789A (en) * 2020-06-29 2020-09-25 江西省地质工程(集团)公司 Long spiral pile hollow section treatment construction method

Also Published As

Publication number Publication date
JP2002138496A (en) 2002-05-14

Similar Documents

Publication Publication Date Title
JP2008075425A (en) Joining structure of pile and column
JP2006104883A (en) Base-isolated building
JP7381781B2 (en) pile foundation structure
JPH11100854A (en) Building and foundation structure therefor
JP3690496B2 (en) Foundation structure of building and construction method of foundation
JPH1121908A (en) Method of temporary coffering construction and temporary coffering structure
JPH09209451A (en) Joint construction of up and down columns with beam and joint method
JP5456627B2 (en) Connection structure and method of connection between pile and steel column
JP2002188154A (en) Foundation structure for building and execution method for foundation
JP4550534B2 (en) Building basic structure
JP2009019362A (en) Structure for joining pile and column
JPH0586630A (en) Construction for jointing steel pipe pile filled with concrete and steel pipe column filled up with concrete
JP2002030672A (en) Structure of joining foundation pile to pier base and method of constructing the structure
JP7200048B2 (en) pile foundation structure
JP4612422B2 (en) Construction method of structure and foundation structure used for it
JP2000282563A (en) Steel encased reinforced concrete structure with thickened steel-pipe used and its execution method
JP2002194748A (en) Foundation constructing method and building foundation structure
JP2769937B2 (en) Steel tube concrete column in underground reverse driving method
JP5319445B2 (en) Building construction method
JPH06248614A (en) High bridge pier and construction thereof
JP2002138495A (en) Junction structure between column base and pile
JPH02164934A (en) Foundation construction method
JP2001248167A (en) Structure of building foundation
JP2000273880A (en) Pile head connecting method
JP2618841B2 (en) Composite timber column method

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050301

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050421

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050524

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050607

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3690496

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080624

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090624

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100624

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110624

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110624

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120624

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120624

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130624

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130624

Year of fee payment: 8

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140624

Year of fee payment: 9

EXPY Cancellation because of completion of term