JP3665855B2 - Pile and column joining method - Google Patents

Pile and column joining method Download PDF

Info

Publication number
JP3665855B2
JP3665855B2 JP2000117052A JP2000117052A JP3665855B2 JP 3665855 B2 JP3665855 B2 JP 3665855B2 JP 2000117052 A JP2000117052 A JP 2000117052A JP 2000117052 A JP2000117052 A JP 2000117052A JP 3665855 B2 JP3665855 B2 JP 3665855B2
Authority
JP
Japan
Prior art keywords
pile
pile head
pillar
column
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000117052A
Other languages
Japanese (ja)
Other versions
JP2001295286A (en
Inventor
吉隆 外狩
久男 高梨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2000117052A priority Critical patent/JP3665855B2/en
Publication of JP2001295286A publication Critical patent/JP2001295286A/en
Application granted granted Critical
Publication of JP3665855B2 publication Critical patent/JP3665855B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は建物の基礎に係わり、特に杭と柱の簡便かつ合理的な接合工法に関する。
【0002】
【従来の技術】
建物の基礎における杭は上部構造の荷重を支持するために柱と確実に接合されなければならない。そのため、杭と柱との接合部には大掛かりなフーチングを設けて確実強固な接合を行い、かつ隣り合うフーチング間には基礎梁を設けることが従来一般的である。
【0003】
【発明が解決しようとする課題】
上記のような従来一般の基礎の構造ではフーチングや基礎梁を設けることによる基礎工事費の増大が不可避であり、特にフーチングの施工は多数の鉄筋が縦横に錯綜するので複雑かつ面倒な作業となる。
【0004】
そのため、近年においてはフーチングや基礎梁を省略して杭と柱とを直接的に接合することも試みられつつあるが、杭と柱とを簡略にかつ確実に接合し得る有効適切な構造とその施工方法は確立されておらず未だ試行段階にある。
【0005】
上記事情に鑑み、本発明は杭と柱とを十分に簡便にかつ確実に接合し得る有効な工法を提供することを目的とする。
【0006】
【課題を解決するための手段】
本発明は、柱脚締結用のボルトを植設した杭頭接合金物を中空杭の杭頭部に固定して、柱のベースプレートを前記ボルトに締結することにより前記杭頭接合金物を介して杭頭と柱脚とを接合するとともに、ベースプレートの下方に延長させた柱脚部を杭頭部の中空部に挿入し、該中空部にコンクリートを充填して該コンクリートを介して柱脚部を杭頭部に固着せしめるようにした杭と柱の接合工法であって、前記杭頭接合金物には柱建方時に建入れ直し用のワイヤーを連結するための連結片を設けておいて、前記杭を施工した後に該杭頭接合金物を杭頭部に位置決めして固定し、柱建方に際しては、該柱のベースプレートのボルト孔に前記ボルトを挿通せしめてその位置決めとレベル調整を行い、かつ該柱の柱頭部に前記ワイヤーの一端を連結するとともに該ワイヤーの他端を他の杭の杭頭部に固定した杭頭接合金物の連結片に連結して該ワイヤーを張設することにより該柱の建入れ直しを行い、しかる後に、前記ベースプレートを前記ボルトにより前記杭頭接合金物に対して締結するとともに杭頭部にコンクリートを充填することを特徴とするものである。
【0009】
【発明の実施の形態】
図1〜図3は本発明の第1実施形態を示すものである。本第1実施形態は、従来一般の基礎におけるフーチングや基礎梁を省略して杭1と柱2とを杭頭接合金物3を介して接合するようにしたものである。
【0010】
本第1実施形態における杭1は既製の中空PC杭であって、杭頭にはPC鋼線定着用の環状のPC定着鋼板4が固着され、杭頭部の周囲には補強鋼板5が嵌着されているものである。
【0011】
本第1実施形態における柱2は円形断面の鋼管柱であって、柱脚にはベースプレート6が一体に設けられ、そのベースプレート6を上記の杭頭接合金物3を介して杭頭に締結し、かつ、ベースプレート6の下方に延長されている柱脚部7を杭1の中空部に挿入してそこにコンクリート8を打設充填することにより、柱脚部7を杭1に対して固着するようにされている。柱脚部7には定着強度増強のためのスタッド9を設けておくことが好ましい。
【0012】
本第1実施形態における杭頭接合金物3は鋼板製のもので、図3に示すように杭1の断面形状にほぼ合致する環状の本体部3aの上面に所定規格のボルト10(たとえばM20×170)が複数本(図示例では4本)植設されているものである。それらボルト10の本数と位置は、接合するべき柱2のベースプレート6に形成されているボルト孔11に対応するものとされている。各ボルト10の本体部3aに対する植設は溶接によるか、あるいは図3(c)に示すように本体部3aに設けたネジ穴にボルト10の下端部を螺着してナットにより締め付けることでも良く、その場合には(d)あるいは(e)に示すようにボルト10の中間部や頭部にスパナをかけるための平坦部や矩形頭部を設けておくと良い。また、本体部3aの周囲には4方向に突出する連結片12が設けられている。それら連結片12は、柱建方に際して各柱2を支持するワイヤー13を連結するためのもので、その先端部にはシャックル孔14が設けられている。ワイヤー13は柱2の建方時にその建入れ直しを行うためのもので、建入れすべき柱2の柱頭部にワイヤー13の一端を連結するとともにそのワイヤー13の他端を周囲に隣接している他の杭1の杭頭部に固定されている他の杭頭接合金物3における連結片12にそれぞれ連結して、それらワイヤー13を図1〜図2に示すように斜めに張設することでその柱2の建入れ直しを行って自立状態で仮支持するようになっている。
【0013】
上記杭頭接合金物3を用いて杭1と柱2を接合する場合の構造を、その施工手順とともに具体的に説明する。
【0014】
杭1を施工した後、その杭頭に杭頭接合金物3を固定する。杭頭に対する杭頭接合金物3の固定は、杭頭に固着されているPC定着鋼板4に対して本体部3aを直接的に溶接することで行う。その際、杭頭接合金物3の位置を柱2の建て込み位置に対して正確に合致させ、各連結片12の突出方向を柱2の通り芯に合致させる。
【0015】
そして、柱2のベースプレート6に形成されているボルト孔11を杭頭接合金物3の各ボルト10に挿通せしめることで、柱脚部7を杭頭部の中空部内に挿入した状態で柱2を建て込む。この際、柱2の水平方向の位置決めはボルト10により自ずと正確になされるが、柱2のレベル調整(上下方向の位置決め)はボルト10に螺着した下ナット15により行う。また、柱頭部にワイヤー13の一端を連結するとともに該ワイヤー13の他端を隣接する他の杭1の杭頭部に固定されている杭頭接合金物3の連結片12にシャックルを介して連結して張設することで該柱2の建入れ直しを行って仮支持する。
【0016】
上記のようにして柱2を建て込んで位置決めした後、ボルト10に上ナット16を螺着することでベースプレート6を杭頭接合金物3に対して締結し、杭頭部の中空部にコンクリート8を打設充填することで柱脚部7を杭頭部に対して固着せしめる。
【0017】
本第1実施形態の工法によれば、杭1と柱2とを確実強固に接合できることはもとより、その施工は極めて簡便かつ容易に行うことができる。特に、ボルト10を植設した杭頭接合金物3を介して杭1と柱2とを接合するようにしたことで、柱2の建て込みと位置決めを容易にかつ精度良く行い得ることはもとより、仮に柱2の建て込み位置に対して杭1がずれて施工されていたような場合には、杭1に対する杭頭接合金物3の固定位置を調整することでその位置ずれを容易にかつ正確に修正することができる。しかも、柱建方の際に建入れ直し用のワイヤー13を連結するための連結片12を杭頭接合金物3に設けているので、通常のようにワイヤー13を連結するための金物を別途用意してそれを取り付ける手間を無くすことができるし、杭頭接合金物3を杭頭に固定した時点で直ちにワイヤー13の張設が可能となり、この点においても施工性に優れ合理的である。勿論、杭頭接合金物3は鋼板を加工してボルト10を植設しただけの簡単な構成であるので安価に製作することができるものである。
【0018】
なお、このような杭頭接合金物3を用いることなく、各ボルト10を杭頭のPC定着鋼板4に対して直接的に溶接することも従来においては試みられているが、その場合には複数のボルト10を個々に溶接する手間が必要となるのみならず、PC定着鋼板4の上面にはPC鋼線の定着のために多数の凹凸が形成されているから、そこに各ボルト10を正確に位置決めしつつ溶接することは必ずしも容易ではないし、最適位置にボルト10を溶接できない場合もあり得る。その点、本第1実施形態のように杭1と柱2の形状および寸法に対応させて予め製作した杭頭接合金物3を用い、それをPC定着鋼板4に重ねた状態でその全体を一括して溶接して固定することにより、各ボルト10を個々に位置決めして溶接する場合に比較すれば作業性と施工精度を格段に改善することができる。
【0019】
以上で本発明の第1実施形態を説明したが、杭頭接合金物3の形状と寸法は接合対象の杭1と柱2の形状と寸法に対応して適切に設定すれば良く、たとえば図4に示すようにボルト10の植設位置を変更したり、ボルト10の本数を増減する等の変更は任意である。
【0020】
次に、図5〜図7を参照して第2実施形態を説明する。上記第1実施形態では環状の杭頭接合金物3を採用したが、本第2実施形態では短冊形状の杭頭接合金物20を複数(図示例では4つ)用いるようにしたものである。その杭頭接合金物20は短冊形状の本体部20aの基端部上面に1本のボルト21が溶接あるいは螺着されて植設され、本体部20aの先端部にシャックル孔22を有する連結片23が形成されているものである。
【0021】
この杭頭接合金物20を用いて杭1と柱2とを接合するには、杭1を施工した後、上記の各杭頭接合金物20をそれぞれ連結片23を外側に突出させた状態で本体部20aの基端部をPC定着鋼板4に対して溶接して固定する。その際、各ボルト21の位置をそれぞれベースプレート6のボルト孔11の位置に正確に合致させ、連結片23の向きを通り芯方向に合致させる。以降は第1実施形態と同様に、ベースプレート6のボルト孔11を各ボルト21に挿通せしめて柱2を建て込み、各杭頭接合金物20の連結片23にワイヤー13を連結して各柱2の建入れ直しを行うとともに仮支持し、下ナット15によりレベル調整を行った後、上ナット16により締結し、コンクリート8を打設すれば良い。
【0022】
本第2実施形態では、各杭頭接合金物20をそれぞれ杭頭に対して個々に位置決めして固定するので第1実施形態の環状の杭頭接合金物3を用いる場合に比較すると各杭頭接合金物20を杭頭に対して固定する手間が増えることにはなるが、逆に、それぞれの杭頭接合金物20を独立に所望位置に固定することができるし、その使用数は適宜増減することができるから、この杭頭接合金物20は様々な形状、寸法の杭1と柱2を接合する場合全般に広く採用することができ、したがって特定の形状、寸法の杭1と柱2を接合する専用のものとして予め製作しておく必要のある第1実施形態の杭頭接合金物3よりも汎用性に優れる利点がある。
【0023】
以上で本発明の第1および第2実施形態を説明したが、本発明は上記各実施形態に限定されず、以下に列挙するような変形、応用が可能である。
【0024】
本発明における柱はベースプレートを杭頭接合金物に対して締結するものであれば良く、その限りにおいて上記各実施形態のような円形あるいは角形の鋼管柱に限らず、H形鋼をはじめとして適宜断面形状の柱が採用可能である。
【0026】
上記実施形態では杭1として既製の中空PC杭を採用し、その杭頭のPC定着鋼板4に対して杭頭接合金物3,20を溶接して固定するようにしたが、他の構造の中空杭も採用可能であり、杭の構造に合わせて杭頭接合金物の形態や杭に対する固定の構造を変更すれば良い。たとえば鋼管杭を採用する場合にはその杭頭に杭頭接合金物を直接的に溶接すれば良い。
【0027】
杭頭接合金物は柱のベースプレートを締結するためのボルトと、建入れ直し用のワイヤーを連結するための連結片を有するものであれば良く、その限りにおいて第1実施形態の環状の杭頭接合金物3や第2実施形態の短冊状の杭頭接合金物20の他、さらに様々な形状、寸法のものが採用可能である。
【0028】
【発明の効果】
本発明によれば、柱脚締結用のボルトを植設した杭頭接合金物を杭頭部に固定し、前記ボルトに柱脚のベースプレートを締結することで杭頭と柱脚とを前記杭頭接合金物を介して接合することにより、杭と柱とを確実強固にしかも簡便に接合することができ、基礎の構造の簡略化を十分に図ることができる。
【0029】
また、前記杭として中空杭を採用するとともに、前記柱の柱脚部をベースプレートの下方に延長せしめておき、杭頭部に柱脚部を挿入してコンクリートを充填することで柱脚部を杭頭部に固着せしめることにより、杭と柱との接合強度とそれらの間の応力伝達をより高めることができる。
【0030】
さらに、杭を施工した後、柱脚締結用のボルトを植設した杭頭接合金物を杭頭部に位置決めして固定し、ベースプレートのボルト孔に前記ボルトを挿通せしめることで柱を位置決めして建て込むとともにレベル調整を行い、しかる後に前記ベースプレートを前記ボルトにより前記杭頭接合金物に対して締結して杭と柱とを接合する工法であるから、柱の建て込みと位置決め、レベル調整を容易にかつ精度良く行うことができ、仮に柱の建て込み位置に対して杭がずれて施工されていたような場合にも杭に対する杭頭接合金物の固定位置を調整することでその位置ずれを容易にかつ正確に修正することができる。
しかも、杭頭接合金物には柱建方の際に建入れ直し用のワイヤーを連結するための連結片を設けているので、通常のようにワイヤーを連結するための金物を別途用意してそれを取り付ける手間を無くすことができるし、杭頭接合金物を杭頭に固定した時点で直ちにワイヤーの張設が可能となり、この点においても施工性に優れ合理的であるし、杭頭接合金物は鋼板を加工してボルトを植設し連結片を設けただけの簡単な構成であるので安価に製作することができるものである。
【図面の簡単な説明】
【図1】 本発明の第1実施形態である杭と柱の接合工法を示す図である。
【図2】 同、接合部の分解図である。
【図3】 同、杭頭接合金物の一例を示す図である。
【図4】 同、杭頭接合金物の他の例を示す図である。
【図5】 本発明の第2実施形態である杭と柱の接合工法を示す図である。
【図6】 同、接合部の分解図である。
【図7】 同、杭頭接合金物の一例を示す図である。
【符号の説明】
1 杭
2 柱
3 杭頭接合金物
3a 本体部
4 PC定着鋼板
5 補強鋼板
6 ベースプレート
7 柱脚部
8 コンクリート
9 スタッド
10 ボルト
11 ボルト孔
12 連結片
13 ワイヤー
14 シャックル孔
15 下ナット
16 上ナット
20 杭頭接合金物
20a 本体部
21 ボルト
22 シャックル孔
23 連結片
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a building foundation, and more particularly, to a simple and rational joining method for piles and columns.
[0002]
[Prior art]
The piles at the foundation of the building must be securely joined to the columns to support the superstructure loads. For this reason, it is common in the past to provide a large footing at the joint between the pile and the column to ensure a firm joint and to provide a foundation beam between adjacent footings.
[0003]
[Problems to be solved by the invention]
In the conventional general foundation structure as described above, it is inevitable to increase the foundation construction cost by installing footings and foundation beams. In particular, the construction of footings is complicated and troublesome because many rebars are complicated vertically and horizontally. .
[0004]
For this reason, in recent years, it has been attempted to directly connect the pile and the column by omitting the footing and the foundation beam. However, an effective and appropriate structure capable of simply and reliably connecting the pile and the column and its The construction method has not been established and is still in the trial stage.
[0005]
In view of the above circumstances, an object of the present invention is to provide an effective method capable of joining a pile and a column sufficiently simply and reliably.
[0006]
[Means for Solving the Problems]
The present invention provides a pile head joint hardware having a bolt for fastening a column base fixed to a pile head of a hollow pile, and a pillar base plate is fastened to the bolt to thereby pile the pile head through the pile head joint hardware. The head and the column base are joined, and the column base portion extended below the base plate is inserted into the hollow portion of the pile head, and the hollow portion is filled with concrete and the column base portion is piled through the concrete. A method of joining a pile and a column to be fixed to the head, wherein the pile head joint hardware is provided with a connecting piece for connecting a wire for re-installation at the time of column construction, After the construction, the pile head joint hardware is positioned and fixed to the pile head, and when the column is built, the bolt is inserted into the bolt hole of the base plate of the column to perform positioning and level adjustment, and the column Connect one end of the wire to the column head of The other end of the wire is connected to a connecting piece of a pile head joint hardware fixed to the pile head of another pile, and the wire is stretched to rebuild the pillar, and then the base plate Is fastened to the pile head joint with the bolt, and the pile head is filled with concrete.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
1 to 3 show a first embodiment of the present invention. In the first embodiment, footings and foundation beams in a conventional general foundation are omitted, and the pile 1 and the column 2 are joined via the pile head joint hardware 3.
[0010]
The pile 1 in the first embodiment is a ready-made hollow PC pile, and an annular PC fixing steel plate 4 for fixing a PC steel wire is fixed to the pile head, and a reinforcing steel plate 5 is fitted around the pile head. It is what is worn.
[0011]
The column 2 in the first embodiment is a steel pipe column having a circular cross section, and a base plate 6 is integrally provided on the column base, and the base plate 6 is fastened to the pile head via the pile head joint hardware 3, In addition, the column base 7 is fixed to the pile 1 by inserting the column base 7 extending below the base plate 6 into the hollow portion of the pile 1 and casting and filling the concrete 8 there. Has been. The column base 7 is preferably provided with a stud 9 for increasing the fixing strength.
[0012]
The pile head joint metal 3 in the first embodiment is made of a steel plate, and a predetermined standard bolt 10 (for example, M20 ×) is formed on the upper surface of an annular main body 3a substantially matching the cross-sectional shape of the pile 1 as shown in FIG. 170) are planted (four in the illustrated example). The numbers and positions of the bolts 10 correspond to the bolt holes 11 formed in the base plate 6 of the pillars 2 to be joined. The bolts 10 may be implanted into the main body 3a by welding, or as shown in FIG. 3C, the lower end of the bolt 10 may be screwed into a screw hole provided in the main body 3a and tightened with a nut. In that case, as shown in (d) or (e), it is preferable to provide a flat part or a rectangular head part for applying a spanner to the intermediate part or the head part of the bolt 10. Moreover, the connection piece 12 which protrudes in four directions is provided around the main-body part 3a. These connecting pieces 12 are for connecting the wires 13 that support the pillars 2 when the pillars are erected, and a shackle hole 14 is provided at the tip thereof. The wire 13 is for re-installing the pillar 2 when it is erected, and connects one end of the wire 13 to the pillar head of the pillar 2 to be erected, and the other end of the wire 13 is adjacent to the periphery. By connecting to the connecting pieces 12 in the other pile head joint hardware 3 fixed to the pile heads of the other piles 1 and stretching the wires 13 diagonally as shown in FIGS. The pillar 2 is rebuilt and temporarily supported in a self-supporting state.
[0013]
The structure in the case of joining the pile 1 and the pillar 2 using the said pile head joint metal fitting 3 is demonstrated concretely with the construction procedure.
[0014]
After constructing the pile 1, the pile head joint 3 is fixed to the pile head. The pile head joint 3 is fixed to the pile head by directly welding the main body portion 3a to the PC fixing steel plate 4 fixed to the pile head. At that time, the position of the pile head joint 3 is accurately matched with the built-in position of the pillar 2, and the protruding direction of each connecting piece 12 is matched with the core of the pillar 2.
[0015]
And by inserting the bolt hole 11 formed in the base plate 6 of the column 2 into each bolt 10 of the pile head joint metal 3, the column 2 is inserted in the state where the column base 7 is inserted into the hollow portion of the pile head. Build. At this time, the horizontal positioning of the pillar 2 is naturally accurately performed by the bolt 10, but the level adjustment (vertical positioning) of the pillar 2 is performed by the lower nut 15 screwed to the bolt 10. In addition, one end of the wire 13 is connected to the column head and the other end of the wire 13 is connected to the connection piece 12 of the pile head joint 3 fixed to the pile head of another adjacent pile 1 through a shackle. Then, the pillar 2 is rebuilt and temporarily supported.
[0016]
After the pillar 2 is built and positioned as described above, the base plate 6 is fastened to the pile head joint 3 by screwing the upper nut 16 to the bolt 10, and the concrete 8 is placed in the hollow portion of the pile head. The column base 7 is fixed to the pile head by casting and filling.
[0017]
According to the construction method of the first embodiment, the pile 1 and the column 2 can be securely and firmly joined together, and the construction can be performed very simply and easily. In particular, since the pile 1 and the pillar 2 are joined via the pile head joint hardware 3 in which the bolts 10 are planted, the pillar 2 can be built and positioned easily and accurately, If the pile 1 is constructed with a deviation from the built-in position of the pillar 2, the positional deviation can be easily and accurately adjusted by adjusting the fixing position of the pile head joint 3 with respect to the pile 1. It can be corrected. In addition, since the connecting piece 12 for connecting the wire 13 for re-installation is provided in the pile head joint hardware 3 at the time of pillar construction, a hardware for connecting the wire 13 as usual is prepared separately. Therefore, the wire 13 can be stretched immediately when the pile head joint 3 is fixed to the pile head, which is also excellent in workability and rational. Of course, the pile head joint hardware 3 can be manufactured at low cost because it has a simple structure in which a steel plate is processed and a bolt 10 is implanted.
[0018]
In addition, although it has been attempted in the past to directly weld each bolt 10 to the PC fixing steel plate 4 of the pile head without using such a pile head joint fitting 3, Not only is it necessary to weld each bolt 10 individually, but also the upper surface of the PC fixing steel plate 4 has a large number of irregularities for fixing the PC steel wire. It is not always easy to perform welding while positioning the bolt 10, and the bolt 10 may not be welded to the optimum position. In that respect, as in the first embodiment, a pile head joint metal 3 manufactured in advance corresponding to the shape and dimensions of the pile 1 and the pillar 2 is used, and the whole is collectively collected in a state where it is overlapped on the PC fixing steel plate 4. Then, by welding and fixing, workability and construction accuracy can be remarkably improved as compared with the case where each bolt 10 is individually positioned and welded.
[0019]
Although the first embodiment of the present invention has been described above, the shape and dimensions of the pile head joint hardware 3 may be appropriately set in accordance with the shapes and dimensions of the pile 1 and the pillar 2 to be joined. For example, FIG. As shown in FIG. 4, changes such as changing the planting position of the bolt 10 or increasing or decreasing the number of the bolts 10 are arbitrary.
[0020]
Next, a second embodiment will be described with reference to FIGS. In the said 1st Embodiment, although the cyclic | annular pile head joining metal | hardware 3 was employ | adopted, in this 2nd embodiment, the strip-shaped pile head joining hardware 20 is used in multiple numbers (in the example of illustration). The pile head joint hardware 20 is planted by welding or screwing one bolt 21 on the upper surface of the base end portion of the strip-shaped main body portion 20a, and a connecting piece 23 having a shackle hole 22 at the front end portion of the main body portion 20a. Is formed.
[0021]
In order to join the pile 1 and the pillar 2 using this pile head joint hardware 20, after constructing the pile 1, the main body in the state where each of the above pile head joint hardware 20 protrudes to the outside respectively. The base end portion of the portion 20 a is welded and fixed to the PC fixing steel plate 4. At that time, the position of each bolt 21 is made to exactly match the position of the bolt hole 11 of the base plate 6 and the direction of the connecting piece 23 is made to match the core direction. Thereafter, as in the first embodiment, the bolt holes 11 of the base plate 6 are inserted into the bolts 21 to build the pillars 2, and the wires 13 are connected to the connecting pieces 23 of the pile head joints 20 to connect the pillars 2. And then temporarily supporting it, adjusting the level with the lower nut 15, fastening with the upper nut 16, and placing the concrete 8.
[0022]
In this 2nd Embodiment, since each pile head joining hardware 20 is positioned and fixed individually with respect to a pile head, each pile head joining is compared with the case where the cyclic | annular pile head joining hardware 3 of 1st Embodiment is used. Although the effort to fix the hardware 20 to the pile head will increase, conversely, each pile head joint hardware 20 can be independently fixed at a desired position, and the number of uses should be increased or decreased as appropriate. Therefore, this pile head joint hardware 20 can be widely adopted in general when joining the pile 1 and the pillar 2 of various shapes and dimensions, and thus joins the pile 1 and the pillar 2 of a specific shape and dimension. There exists an advantage which is excellent in versatility rather than the pile-head-joint metal fitting 3 of 1st Embodiment which needs to produce beforehand as an exclusive thing.
[0023]
Although the first and second embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and modifications and applications as listed below are possible.
[0024]
The column in the present invention may be any column as long as the base plate is fastened to the pile head joint hardware. Shaped columns can be used.
[0026]
In the above embodiment employs a ready-made hollow PC pile as the pile 1 has been so fixed by welding Pile Head Connection fittings 3,20 to the PC fixing steel 4 of the pile head, hollow other structures A pile can also be used, and the form of the pile head joint hardware and the structure fixed to the pile may be changed according to the structure of the pile. For example, when adopting a steel pipe pile, a pile head joint metal may be welded directly to the pile head .
[0027]
The pile head joint hardware only needs to have a bolt for fastening the base plate of the pillar and a connection piece for connecting the wire for re-installation. To that extent, the annular pile head joint hardware of the first embodiment is used . In addition to the strip-shaped pile head joint hardware 20 of the third and second embodiments, various shapes and sizes can be employed .
[0028]
【The invention's effect】
According to the present invention, the pile head joint hardware in which bolts for fastening the column base are planted is fixed to the pile head, and the base plate of the column base is fastened to the bolt so that the pile head and the column base are connected to the pile head. By joining through the joint hardware , the pile and the column can be securely and simply joined together, and the foundation structure can be sufficiently simplified.
[0029]
Moreover, while adopting a hollow pile as the said pile, the column base part of the said column is extended below the base plate, and the column base part is piled by inserting the column base part into the pile head and filling with concrete. By adhering to the head, the joint strength between the pile and the column and the stress transmission between them can be further increased.
[0030]
In addition, after the pile is constructed , the pile head joint hardware in which the bolts for fastening the column base are planted is positioned and fixed to the pile head, and the column is positioned by inserting the bolt into the bolt hole of the base plate. It is a method to build and adjust the level, and then fasten the base plate to the pile head joint with the bolt to join the pile and the column, so it is easy to build and position the column and adjust the level Even if the pile is shifted from the built-in position of the pillar, it is easy to shift the position by adjusting the fixed position of the pile head joint to the pile. And can be corrected accurately.
In addition, since the pile head joint hardware is provided with a connection piece for connecting the wire for re-installation in the case of pillar construction, a hardware for connecting the wire is prepared separately as usual. It is possible to eliminate the hassle of attaching, and when the pile head joint hardware is fixed to the pile head, it becomes possible to immediately stretch the wire. In this respect as well, it is excellent in workability, and the pile head joint hardware is a steel plate. Since this is a simple structure in which a bolt is planted and a connecting piece is provided, it can be manufactured at low cost.
[Brief description of the drawings]
FIG. 1 is a diagram showing a method of joining a pile and a pillar according to a first embodiment of the present invention.
FIG. 2 is an exploded view of the joint portion.
FIG. 3 is a view showing an example of a pile head joint hardware.
FIG. 4 is a view showing another example of the pile head joint hardware.
FIG. 5 is a diagram showing a method for joining a pile and a pillar according to a second embodiment of the present invention.
FIG. 6 is an exploded view of the joint portion.
FIG. 7 is a view showing an example of a pile head joint hardware.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Pile 2 Column 3 Pile head joint 3a Main part 4 PC fixing steel plate 5 Reinforced steel plate 6 Base plate 7 Column base 8 Concrete 9 Stud 10 Bolt 11 Bolt hole 12 Connection piece 13 Wire 14 Shackle hole 15 Lower nut 16 Upper nut 20 Pile Head joint 20a Main body 21 Bolt 22 Shackle hole 23 Connecting piece

Claims (1)

柱脚締結用のボルトを植設した杭頭接合金物を中空杭の杭頭部に固定して、柱のベースプレートを前記ボルトに締結することにより前記杭頭接合金物を介して杭頭と柱脚とを接合するとともに、ベースプレートの下方に延長させた柱脚部を杭頭部の中空部に挿入し、該中空部にコンクリートを充填して該コンクリートを介して柱脚部を杭頭部に固着せしめるようにした杭と柱の接合工法であって、The pile head joint hardware with bolts for fastening the column base is fixed to the pile head of the hollow pile, and the base plate of the pillar is fastened to the bolt to fasten the pile head and the column base via the pile head joint hardware. And the column base part extended below the base plate is inserted into the hollow part of the pile head, the concrete is filled in the hollow part, and the column base part is fixed to the pile head through the concrete. A method of joining piles and columns
前記杭頭接合金物には柱建方時に建入れ直し用のワイヤーを連結するための連結片を設けておいて、前記杭を施工した後に該杭頭接合金物を杭頭部に位置決めして固定し、  The pile head joint hardware is provided with a connecting piece for connecting a re-installation wire at the time of column construction, and after the pile is constructed, the pile head joint hardware is positioned and fixed to the pile head. ,
柱建方に際しては、該柱のベースプレートのボルト孔に前記ボルトを挿通せしめてその位置決めとレベル調整を行い、かつ該柱の柱頭部に前記ワイヤーの一端を連結するとともに該ワイヤーの他端を他の杭の杭頭部に固定した杭頭接合金物の連結片に連結して該ワイヤーを張設することにより該柱の建入れ直しを行い、  When building a pillar, the bolt is inserted into the bolt hole of the base plate of the pillar to position and adjust the level, and one end of the wire is connected to the pillar head of the pillar and the other end of the wire is connected to the other. The pillar is rebuilt by connecting the connecting piece of the pile head joint hardware fixed to the pile head of the pile of the
しかる後に、前記ベースプレートを前記ボルトにより前記杭頭接合金物に対して締結するとともに杭頭部にコンクリートを充填することを特徴とする杭と柱の接合工法。  Thereafter, the base plate is fastened to the pile head joint hardware with the bolts, and the pile head is filled with concrete.
JP2000117052A 2000-04-18 2000-04-18 Pile and column joining method Expired - Fee Related JP3665855B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000117052A JP3665855B2 (en) 2000-04-18 2000-04-18 Pile and column joining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000117052A JP3665855B2 (en) 2000-04-18 2000-04-18 Pile and column joining method

Publications (2)

Publication Number Publication Date
JP2001295286A JP2001295286A (en) 2001-10-26
JP3665855B2 true JP3665855B2 (en) 2005-06-29

Family

ID=18628426

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000117052A Expired - Fee Related JP3665855B2 (en) 2000-04-18 2000-04-18 Pile and column joining method

Country Status (1)

Country Link
JP (1) JP3665855B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7419627B2 (en) * 2019-09-18 2024-01-23 株式会社竹中工務店 Welded reinforcing bar joint structure
KR102604734B1 (en) * 2022-09-16 2023-11-22 최상호 Device for connecting composite pile and installation method thereof

Also Published As

Publication number Publication date
JP2001295286A (en) 2001-10-26

Similar Documents

Publication Publication Date Title
JPH08170340A (en) Pedestal structure and method of pedestal construction
JP5699015B2 (en) Steel pile and structure joint structure
JP5948838B2 (en) Column and beam joining method
JP2012057430A (en) Structure and method for connecting pile and steel column
JP2003055984A (en) Column base connecting structure
JP4901900B2 (en) Precast pile cap structure and joining method
JP4405639B2 (en) Pile head joint hardware
JP3665855B2 (en) Pile and column joining method
JP6768760B2 (en) Anchor frame
JP3609083B1 (en) Construction method of building foundation and joint board for building foundation construction
JP2018145699A (en) Structure and method for joining column and beam together
JP4545470B2 (en) Joint structure of steel column and steel pipe pile
JPH09291545A (en) Joining method of column and pile
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JP2012057431A (en) Structure for connecting pile and steel column
JP2004162345A (en) Joining method and joint structure for prefabricated pile and foundation
JP2011084967A (en) Connection structure of column of building and prefabricated pile
JP3084654B2 (en) Construction foundation, foundation structure using the same, and construction method thereof
JP2002194748A (en) Foundation constructing method and building foundation structure
JP2584321Y2 (en) Steel reinforced concrete column base structure
JP6127325B2 (en) Support frame for anchor ring installation of windmill tower and manufacturing method thereof
JP2017008504A (en) Connection structure of foundation pile and unit, and unit construction method using the same
JP2000257175A (en) Column base structure of steel structure and its construction method
JP3169887B2 (en) Column base structure of steel pipe column and its construction method
JPH1181461A (en) Joint metal for steel frame column base or steel pipe column base, and its fixing method

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041116

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050106

TRDD Decision of grant or rejection written
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20050106

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050222

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050317

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080415

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090415

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110415

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120415

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120415

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130415

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees