JP3663503B2 - High pressure injection ground improvement method - Google Patents

High pressure injection ground improvement method Download PDF

Info

Publication number
JP3663503B2
JP3663503B2 JP33729897A JP33729897A JP3663503B2 JP 3663503 B2 JP3663503 B2 JP 3663503B2 JP 33729897 A JP33729897 A JP 33729897A JP 33729897 A JP33729897 A JP 33729897A JP 3663503 B2 JP3663503 B2 JP 3663503B2
Authority
JP
Japan
Prior art keywords
injection
ground
material liquid
improved
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP33729897A
Other languages
Japanese (ja)
Other versions
JPH11172667A (en
Inventor
一昭 内藤
浩治 江崎
泰守 宣原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Onoda Chemico Co Ltd
Original Assignee
Onoda Chemico Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=18307312&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP3663503(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Onoda Chemico Co Ltd filed Critical Onoda Chemico Co Ltd
Priority to JP33729897A priority Critical patent/JP3663503B2/en
Publication of JPH11172667A publication Critical patent/JPH11172667A/en
Application granted granted Critical
Publication of JP3663503B2 publication Critical patent/JP3663503B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【0001】
この発明は高圧噴射地盤改良工法、詳しくは改良対象地盤中に改良体を造成するについて、当該改良対象地盤中に捨石層や硬質層などの障害物層が存在する場合の施工あるいは水中施工に適した高圧噴射地盤改良工法に関する。
【0002】
【従来の技術】
従来から注入ロッドを回転上下動させながら噴射ノズルから硬化材液を改良対象地盤中に高圧で噴射しつつ改良体を造成し、地盤を改良する高圧噴射地盤改良工法が広く行われている。
この高圧噴射地盤改良工法は、改良対象地盤の上部や地盤中に捨石層や硬質層などの障害物層が存在する際には、予め、ロータリーパーカッションドリルなどを用いて先行削孔を行い、その掘削孔に注入ロッドを建て込む方法がとられているのが通常である。
【0003】
【発明が解決しようとする課題】
しかし上記従来工法には、以下の問題がある。
すなわち、従来工法では、▲1▼先行削孔、▲2▼内管引き抜き、▲3▼注入ロッドの建て込み、▲4▼ケーシング引き抜き、▲5▼硬化材液の噴射造成の諸工程が必要となり、そのために多大の手間と時間を必要とする。
【0004】
また、改良対象予定地盤が水中にある場合の施工では、先行掘削孔の場所が水面下にあるので先行掘削孔の保護および位置確認が複雑で困難である。
【0005】
【課題を解決するための手段】
この発明は上述の問題を解決するために、以下の構成としたことである。
軸身を回転上下動させながら、該軸身の下端部に設けた硬化材噴射用モニタの噴射ノズルから硬化材液を改良対象地盤中に高圧噴射して、地盤を改良する高圧噴射地盤改良工法に用いる注入ロッドの、前記軸身の下端部に設けた硬化材液噴射用モニターに、ダウンザホールハンマーを取り付け、改良対象地盤中の軟弱土層に対して噴射ノズルから圧縮空気のみを吐出して削孔し、改良対象地盤中の捨石層、硬質層などの障害物層に接したときは、前記ダウンザホールハンマーで該障害物層を打撃削孔して所定深度まで削孔した後、注入ロッドを回転引き上げながら硬化材液噴射用モニターから硬化材液を高圧噴射して、標準的な高圧噴射工程である削孔及び硬化材液噴射造成の二工程のみの一連の手順により、改良体を造成する高圧噴射地盤改良工法としたことである。
【0006】
この発明の工法は、注入ロッドの硬化材液噴射用モニターの先端に装備したダウンザホールハンマーにより、所定深度まで打撃削孔した後、注入ロッドを回転引き上げながら噴射ノズルから硬化材液を高圧で噴射しつつ、改良予定地盤中に改良体を造成するので、従来の障害物層を含んだ地盤を高圧噴射工法で地盤改良する場合に要した▲1▼先行削孔、▲2▼内管引き抜き、▲3▼注入ロッドの建て込み、▲4▼ケーシング引き抜き、▲5▼硬化材液の噴射造成の諸工程が、標準的な高圧噴射工程である▲1▼削孔及び▲2▼硬化材液の噴射造成の二工程のみで、改良対象地盤中の改良体の造成が可能である。
【0007】
上記のように、本発明の工法は削孔および硬化材液の噴射という二工程のみからなる工法であるから、工期の短縮を図ることができ、施工手間を省くこともできるので、非常に経済的である。
また、改良対象地盤が水中にある場合の水中施工であっても、削孔および噴射造成工程を連続して行えるので、従来の工法のような先行掘削孔の保護も位置確認も不要となる。
【0008】
【発明の実施の形態】
以下、この発明の高圧噴射地盤改良工法及び装置についての一実施例を図面に基づいて説明する。
図1はこの発明の注入ロッドの主要部の拡大概略断面図であり、図2はこの発明の施工手順を示す説明図である。
図1に示すように、本願発明の工法に用いる注入ロッド1は、駆動装置(図示せず)により支持された軸身1aの内部をエア流路2aを構成する外管2と、硬化材液流路3aを構成する内管3の二重管構造に形成する。
また、該注入ロッド1の軸身1aの下端部に、硬化材液噴射用モニター4をねじ式ジョイント7により取り付ける。
【0009】
この硬化材液噴射用モニター4は、前記注入ロッド1の二重管構造の軸体1a内の硬化材液流路3aと連通する硬化材液流路4bを有し、該流路4bから供給される硬化材液Bを噴射する硬化材液噴射ノズル6を有するとともに前記軸体1aのエア流路2aに連通するエア流路4aを有する。
【0010】
上記の様に構成した硬化材液噴射用モニター4の下部に、ダウンザホールハンマー5を取り付け、硬化材液噴射用モニター4のエア流路4aからの圧縮空気Aによりダウンザホールハンマー5を作動させる。
【0011】
上記のように構成した注入ロッドを改良対象地盤の削孔予定位置にセットし、削孔していくのであるが、図2の(イ)に示すように改良対象土層Eまでの削孔の途中で改良対象地盤の表土Cの下部にある硬質層などの障害物層Dに接したときは、噴射用モニター4の先端に設けたダウンザホールハンマー5の打撃により当該硬質層などの障害物層Dを打撃し削孔する。
【0012】
次に、改良対象土層をダウンザホールハンマー5先端から硬化材液噴射用モニター4のエア流路4aからの圧縮空気Aのみを出しつつ所定深度まで注入ロッド1を貫入する(図2の(ロ))。
所定深度までの貫入が終了した後、図2の(ハ)に示すように、さらに余堀(F)をおこなう。
【0013】
所定の深度まで削孔を行った後、図2の(ハ)に示すとおり噴射用モニター4の噴射ノズル6から硬化材液Bを噴射し、図2の(ニ)に示すとおり注入ロッド1を回転引き上げながら改良体Gを造成する。
所定深度まで硬化材液Bを噴射し改良体Gの造成を終了したら、図2の(ホ)に示すとおり硬化材液Bの噴射を止め空打部分を引き抜き、障害物層Dの下部に所定の改良体Gを造成する。
【0014】
【発明の効果】
この発明の工法を実施した結果、改良対象地盤中に硬質層や捨石層などの障害物層があったとしても、該障害物層を容易に削孔することができ、従来技術と比較して非常な工期の短縮となり、多大な経済効果を得ることができた。
【0015】
また、水中施工を実施した結果でも、海底の捨石層などの障害物層を容易に削孔でき、掘削孔の保護や位置確認の必要もなく、スムーズな施工ができ、地上の施工と同様の効果を得ることができた。
【図面の簡単な説明】
【図1】この発明の注入ロッドの主要部の拡大概略断面図である。
【図2】この発明の施工手順を示す説明図である。
【符号の説明】
1 注入ロッド
2 外管
2a エア流路
3 内管
3a 硬化材液流路
4 硬化材液噴射モニター
4a エア流路
4b 硬化材液流路
5 ダウンザホールハンマー
6 噴射ノズル
7 ねじ式ジョイント
A 圧縮空気
B 硬化材液
C 改良対象地盤の表土
D 障害物層
E 改良地盤層
F 余堀
G 改良体
[0001]
The present invention is suitable for high pressure spray ground improvement method, more specifically, for constructing an improved body in the ground to be improved, for construction where there is an obstacle layer such as a rubble layer or hard layer in the ground to be improved or underwater construction. about the high-pressure injection ground improvement construction method was.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, a high pressure spray ground improvement method has been widely used in which an improved body is created while a hardening material liquid is sprayed from a spray nozzle into a ground to be improved at a high pressure while rotating an injection rod up and down to improve the ground.
This high-pressure spray ground improvement method, when there is an obstacle layer such as a rubble layer or hard layer in the upper part of the ground to be improved or in the ground, pre-drilling using a rotary percussion drill etc. in advance, Usually, an injection rod is installed in the borehole.
[0003]
[Problems to be solved by the invention]
However, the conventional method has the following problems.
Chi words, in accordance come method, ▲ 1 ▼ prior drilling, ▲ 2 ▼ pulling the inner tube, ▲ 3 ▼ injection rod like an anchor, ▲ 4 ▼ casing withdrawal, ▲ 5 ▼ various steps of the injection Construction of hardener solution This requires a lot of effort and time.
[0004]
Moreover, in the construction when the planned ground for improvement is underwater, the location of the preceding excavation hole is below the surface of the water, so that the protection and position confirmation of the preceding excavation hole are complicated and difficult.
[0005]
[Means for Solving the Problems]
The present invention has the following configuration in order to solve the above-described problems.
High-pressure spray ground improvement method to improve the ground by rotating the shaft body up and down and spraying the hardened material liquid into the ground to be improved from the spray nozzle of the hard material spray monitor provided at the lower end of the shaft body. A down-the-hole hammer is attached to the hardened material liquid injection monitor provided at the lower end of the shaft body of the injection rod used for cutting, and only the compressed air is discharged from the injection nozzle to the soft soil layer in the ground to be improved. When the drilling hole touches an obstacle layer such as a rubble layer or hard layer in the ground to be improved, the obstacle layer is blown and drilled to the predetermined depth with the down-the-hole hammer, and then the injection rod is rotated. High pressure to create an improved body by a series of steps consisting only of two steps of drilling and hardening material liquid injection formation, which is a standard high pressure injection process, by high pressure injection of the hardening material liquid from the monitor for injection of the hardening material liquid while pulling up. Injection ground It is that it was a good method.
[0006]
The construction method of the present invention is such that a down-the-hole hammer equipped at the tip of the injection rod curing agent liquid injection monitor is blown to a predetermined depth, and then the injection rod is rotated and the injection rod is injected with a high pressure from the injection nozzle. On the other hand, since the improved body is created in the ground to be improved, it was necessary to improve the ground by using the high-pressure injection method for the ground including the conventional obstacle layer. (1) Advance drilling, (2) Pull out the inner pipe, 3) Injection rod installation, (4) Casing drawing, (5) Hardening material injection process are standard high-pressure injection processes (1) Drilling and (2) Hardening material injection It is possible to create an improved body in the ground to be improved by only two steps of creation.
[0007]
As described above, since the construction method of the present invention is a construction method consisting of only two steps of drilling and injection of a hardening material liquid, the construction period can be shortened and construction labor can be saved, which is very economical. Is.
In addition, even in the case of underwater construction when the ground to be improved is underwater, the drilling and injection creation process can be performed continuously, so that it is not necessary to protect and confirm the position of the preceding excavation hole as in the conventional construction method.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of a high pressure spray ground improvement method and apparatus according to the present invention will be described with reference to the drawings.
FIG. 1 is an enlarged schematic cross-sectional view of the main part of the injection rod of the present invention, and FIG. 2 is an explanatory view showing the construction procedure of the present invention.
As shown in FIG. 1, an injection rod 1 used in the method of the present invention includes an outer tube 2 that forms an air flow path 2 a inside a shaft body 1 a supported by a drive device (not shown), and a hardening material liquid. It forms in the double tube structure of the inner tube 3 which comprises the flow path 3a.
Further, a hardening material liquid injection monitor 4 is attached to the lower end portion of the shaft body 1 a of the injection rod 1 by a screw joint 7.
[0009]
The curable material liquid injection monitor 4 has a curable material liquid flow path 4b communicating with the curable material liquid flow path 3a in the shaft body 1a of the double tube structure of the injection rod 1, and is supplied from the flow path 4b. It has the hardening material liquid injection nozzle 6 which injects the hardening material liquid B to be performed, and has an air flow path 4a communicating with the air flow path 2a of the shaft body 1a.
[0010]
The down-the-hole hammer 5 is attached to the lower part of the curing material liquid jet monitor 4 configured as described above, and the down-the-hole hammer 5 is operated by the compressed air A from the air flow path 4a of the curing material liquid jet monitor 4.
[0011]
The injection rod configured as described above is set at the planned drilling position of the ground to be improved and drilled. However, as shown in FIG. When it touches the obstacle layer D such as a hard layer below the top soil C of the ground to be improved, the obstacle layer D such as the hard layer is hit by the down-the-hole hammer 5 provided at the tip of the spray monitor 4. To drill and drill holes.
[0012]
Next, the soil rod E to be improved is penetrated through the injection rod 1 to a predetermined depth while only the compressed air A from the air flow path 4a of the hardener liquid jetting monitor 4 is discharged from the tip of the down-the-hole hammer 5 (see (b) in FIG. )).
After penetration to a predetermined depth is completed, urchin by are shown in FIG. 2 (c), further performs Yohori (F).
[0013]
After drilling to a predetermined depth, as shown in FIG. 2C, the curing material liquid B is injected from the injection nozzle 6 of the injection monitor 4, and the injection rod 1 is inserted as shown in FIG. The improved body G is created while rotating up.
When the curing material liquid B is sprayed to a predetermined depth and the formation of the improved body G is completed, the injection of the curing material liquid B is stopped as shown in FIG. The improved body G is created.
[0014]
【The invention's effect】
As a result of carrying out the construction method of the present invention, even if there is an obstacle layer such as a hard layer or a rubble layer in the ground to be improved, the obstacle layer can be easily drilled, compared with the prior art. The construction period was greatly shortened and a great economic effect was obtained.
[0015]
In addition, even underwater construction results, it is possible to easily drill holes in the bottom of the sea such as rubble layers, without needing to protect and confirm the position of the drilling holes, and to perform smooth construction, which is the same as construction on the ground. The effect was able to be acquired.
[Brief description of the drawings]
FIG. 1 is an enlarged schematic cross-sectional view of a main part of an injection rod according to the present invention.
FIG. 2 is an explanatory view showing a construction procedure of the present invention.
[Explanation of symbols]
1 injection rod 2 outer tube 2a air channel 3 inner tube 3a hardener liquid channel 4 cured material liquid jetting monitor 4a air passage 4b hardener liquid channel 5 down-the-hole hammer 6 injection nozzle 7 screw joints A compressed air B Hardening fluid C Topsoil D of improved ground D Obstacle layer E Improved ground layer F Yobori G Improved body

Claims (1)

軸身を回転上下動させながら、該軸身の下端部に設けた硬化材噴射用モニタの噴射ノズルから硬化材液を改良対象地盤中に高圧噴射して、地盤を改良する高圧噴射地盤改良工法に用いる注入ロッドの、前記軸身の下端部に設けた硬化材液噴射用モニターに、ダウンザホールハンマーを取り付け、改良対象地盤中の軟弱土層に対して噴射ノズルから圧縮空気のみを吐出して削孔し、改良対象地盤中の捨石層、硬質層などの障害物層に接したときは、前記ダウンザホールハンマーで該障害物層を打撃削孔して所定深度まで削孔した後、注入ロッドを回転引き上げながら硬化材液噴射用モニターから硬化材液を高圧噴射して、標準的な高圧噴射工程である削孔及び硬化材液噴射造成の二工程のみの一連の手順により、改良体を造成することを特徴とする高圧噴射地盤改良工法。High-pressure spray ground improvement method to improve the ground by rotating the shaft body up and down and spraying the hardened material liquid into the ground to be improved from the spray nozzle of the hard material spray monitor provided at the lower end of the shaft body. A down-the-hole hammer is attached to the hardened material liquid injection monitor provided at the lower end of the shaft body of the injection rod used for cutting, and only the compressed air is discharged from the injection nozzle to the soft soil layer in the ground to be improved. When the drilling hole touches an obstacle layer such as a rubble layer or hard layer in the ground to be improved, the obstacle layer is blown and drilled to the predetermined depth with the down-the-hole hammer, and then the injection rod is rotated. The improvement material is created by a series of steps consisting only of two steps of drilling and hardening material liquid injection, which are standard high pressure injection processes, by high pressure injection of the hardening material liquid from the monitor for injection of the hardening material liquid while pulling up. With features High-pressure injection ground improvement method that.
JP33729897A 1997-12-08 1997-12-08 High pressure injection ground improvement method Expired - Lifetime JP3663503B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33729897A JP3663503B2 (en) 1997-12-08 1997-12-08 High pressure injection ground improvement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33729897A JP3663503B2 (en) 1997-12-08 1997-12-08 High pressure injection ground improvement method

Publications (2)

Publication Number Publication Date
JPH11172667A JPH11172667A (en) 1999-06-29
JP3663503B2 true JP3663503B2 (en) 2005-06-22

Family

ID=18307312

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33729897A Expired - Lifetime JP3663503B2 (en) 1997-12-08 1997-12-08 High pressure injection ground improvement method

Country Status (1)

Country Link
JP (1) JP3663503B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3694849B2 (en) * 1998-07-28 2005-09-14 東洋建設株式会社 High-pressure jet stirring method
JP4523490B2 (en) * 2005-06-03 2010-08-11 株式会社エステック Down the hole hammer
SE534066C2 (en) * 2009-02-09 2011-04-19 Wassara Ab Device for lowering drills for use in soil reinforcement
JP6956284B2 (en) * 2017-02-07 2021-11-02 小野田ケミコ株式会社 High-pressure injection agitation device with a down-the-hole hammer and high-pressure injection agitation method using this
JP6887262B2 (en) * 2017-02-07 2021-06-16 小野田ケミコ株式会社 High-pressure injection agitation device with a down-the-hole hammer and high-pressure injection agitation method using this
CN114703840B (en) * 2022-03-23 2024-08-27 深圳市工勘岩土集团有限公司 Deep-filled stone layer down-the-hole hammer hole guiding and jet grouting integrated pile forming equipment
CN114703839B (en) * 2022-03-23 2024-08-27 深圳市工勘岩土集团有限公司 Deep-filled stone layer down-hole hammer hole guiding and jet grouting integrated pile forming construction method

Also Published As

Publication number Publication date
JPH11172667A (en) 1999-06-29

Similar Documents

Publication Publication Date Title
JP3663503B2 (en) High pressure injection ground improvement method
JP5305573B2 (en) Underground solid body forming device and underground solid body forming method
JP5250729B2 (en) Underground consolidated body construction method and underground solid body creation device for creating a solid body using the method
JPH0586614A (en) Method and apparatus for forming improved ground
JP2909014B2 (en) Method for drilling earth and sand layer and rock and apparatus for drilling earth and sand layer and rock
JPH04115014A (en) Method of improving foundation by filling hardener by use of high pressure jet water
JP3886433B2 (en) Ground hardening layer construction method and equipment
JP3944553B2 (en) Construction method of underground hardened material
JP3682194B2 (en) Curing material mixing method and curing material mixing device
JPS615115A (en) Formation of hardened stratum of ground
JP2000328560A (en) Method of creating steel pipe column row earth retaining wall
JP4942059B2 (en) Drilling direction control method
JP4349522B2 (en) Ground improvement method
JP2003003457A (en) Hardening method of sleeve pipe
JP3382873B2 (en) How to insert the tube
JPH05321511A (en) Construction method for underground vessel in weak ground
KR200325158Y1 (en) The Rapid-set Injection System by High-speed Jet Fluid
JP2526336B2 (en) Ground improvement body construction method and construction equipment used for it
JP3678935B2 (en) Consolidation pile construction method
JP2875064B2 (en) Ground reinforcement method and ground reinforcement equipment
JPH06257379A (en) Drilling method for tunnel and the like
JPH11117287A (en) Ground improved body creating method and its device
JP2000045264A (en) Construction method of hydraulic pressure proofing board
JPH11315533A (en) Soil improvement method
JP2695143B2 (en) Lining hardened layer construction method and injection equipment

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041001

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041019

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041214

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050222

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050315

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080408

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090408

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100408

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110408

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120408

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130408

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140408

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term