JP3654091B2 - Motor generator with power conversion circuit and control method thereof - Google Patents
Motor generator with power conversion circuit and control method thereof Download PDFInfo
- Publication number
- JP3654091B2 JP3654091B2 JP30524899A JP30524899A JP3654091B2 JP 3654091 B2 JP3654091 B2 JP 3654091B2 JP 30524899 A JP30524899 A JP 30524899A JP 30524899 A JP30524899 A JP 30524899A JP 3654091 B2 JP3654091 B2 JP 3654091B2
- Authority
- JP
- Japan
- Prior art keywords
- voltage
- power supply
- conversion circuit
- power
- output
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Connection Of Motors, Electrical Generators, Mechanical Devices, And The Like (AREA)
- Inverter Devices (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、内燃機関により駆動される発電機を電源として直流電圧または交流電圧を発生する電源部の出力を任意の周波数と大きさとを有する交流電圧に変換する電力変換回路付き発動発電装置及びその制御方法に関する。
【0002】
【従来の技術】
内燃機関により駆動される発電機を電源とする発動発電装置として、電源の出力を所定の周波数を有する交流出力に変換するインバータやサイクロコンバータ等の電力変換回路を備えたものが用いられている。
【0003】
この種の発動発電装置は、例えば、内燃機関により駆動される交流発電機の出力を整流する整流器と、該整流器の出力電圧を交流電圧に変換するインバータ回路と、該インバータ回路の出力から高調波成分を除去するフィルタと、インバータ回路の出力がフィルタを通して印加された負荷接続端子と、負荷接続端子間の電圧を検出する負荷電圧検出回路と、負荷接続端子を通して流れる電流を検出する負荷電流検出回路と、負荷接続端子間に所望の波形の交流電圧を得るようにインバータ回路のスイッチ素子を制御するコントローラとを備えている。
【0004】
インバータ回路としては、互いに直列に接続された上段のスイッチ素子と下段のスイッチ素子とからなるアームをスイッチ素子のブリッジ回路を構成するように複数個並列に接続した構成を有するブリッジ形の回路が用いられている。
【0005】
またコントローラは通常CPU(マイクロコンピュータ)を備えていて、基準電圧の波形をシミュレートするように該基準電圧をPWM変調した階段状波形の交流電圧をインバータ回路から出力させるように、インバータ回路のスイッチ素子を一定の周期でオンオフさせる。
【0006】
ここで基準電圧とは、負荷接続端子(発動発電装置の出力端子)間に得ようとする交流出力の基準波形を与える電圧で、所望の交流出力の波形と同一または相似の波形を有する交流電圧である。
【0007】
コントローラは、例えば、インバータ回路のスイッチ素子を所定のデューティ値でオンオフさせて該インバータ回路から基準電圧をPWM変調した波形の交流電圧を得る際のインバータ回路の各スイッチ素子のデューティ値を定めるPWM信号を発生するPWM信号発生手段と、負荷電圧検出回路により検出された電圧の瞬時値と基準電圧の瞬時値との間の偏差を零にするようにPWM信号を修正するPWM信号修正手段と、PWM信号により決まるデューティ値でインバータ回路の各スイッチ素子をオンオフさせるべく各スイッチ素子に駆動信号を与えるスイッチ素子駆動手段と、負荷電流が設定値を超えたことが検出されたときにインバータ回路への駆動信号の供給を停止してスイッチ素子を保護する過電流保護手段とにより構成される。
【0008】
PWM信号は、通常、一定の周期で第1の状態(例えば高レベルの状態)と第2の状態(例えば零レベルの状態)とを繰り返す矩形波信号からなっていて、インバータ回路のスイッチ素子をオン状態にする期間及びオフ状態にする期間それぞれ第1の状態及び第2の状態をとる。
【0009】
本明細書では、このPWM信号の周期を「PWM周期」と呼び、該PWM信号の周波数をPWM周波数と呼ぶ。また各PWM信号の1周期に対して、PWM信号が第1の状態をとる時間の割合をPWM信号のデューティ値と呼ぶ。更に各PWM周期において、スイッチ素子がオン状態になる時間が占める割合をスイッチ素子のデューティ値と呼ぶ。
【0010】
またインバータ回路の各スイッチ素子をオン状態にするタイミング(PWM周期が開始されるタイミング)をスイッチタイミングと呼ぶ。
【0011】
CPUを用いてコントローラを構成する場合、一定の周期で発生するパルスをPWM周期計数用カウンタにより計数することによって各PWM周期が検出され、各PWM周期が開始されるタイミングがスイッチタイミング(スイッチ素子がオン状態になるタイミング)となる。
【0012】
各スイッチタイミングで発生させられるPWM信号のデューティ値は、一連のスイッチタイミングと整流器の出力電圧と各スイッチタイミングにおけるPWM信号のデューティ値(スイッチ素子のデューティ値)との間の関係を与えるデューティ演算用マップ(ROMに記憶されている。)から読み出すか、または演算式を用いて演算することにより求められる。
【0013】
コントローラのCPUは、PWM周期t毎に内部割込みをかけて、その内部割込み処理でマップから読み出す等の方法により求めたデューティ値に基づいてPWM信号発生用タイマにスイッチ素子のオン時間をセットし、該タイマがセットされたオン時間の計時を行っている間PWM信号の出力ポートの電位を第1の状態(例えば高レベルの状態)にして、PWM信号を発生させる。
【0014】
スイッチ素子駆動手段は、PWM信号が第1の状態にある期間対応するスイッチ素子に駆動信号(スイッチ素子をオン状態にするための信号)を与える。
【0015】
ここで、周期tで発生するPWM信号の周波数(PWM周波数)をfp 、出力波形の周波数をfo (周期T)とすると、出力波形の1サイクルの期間(T)にn=fp /fo 回内部割込みがかけられることになる。
【0016】
図5は、基準電圧を正弦波形とする場合の内部割込みタイミング(スイッチ素子のスイッチタイミング)とPWM信号のデューティ値との関係を示したもので、同図においてaは基準電圧波形、tはPWM周期、VA は基準電圧の波高値、Vavは基準電圧の平均値、Tは基準電圧の周期(得ようとする交流電圧の周期)である。
【0017】
PWM信号のデューティ値は基準電圧の瞬時値の変化に伴って、時間t毎に変化することになり、インバータ回路からは1サイクルの基準電圧波形をn個に分割して、階段状とした波形(基準電圧をPWM変調した波形)の交流電圧が出力される。この階段状の交流電圧波形をフィルタに通すことにより、高調波成分を除去して負荷接続端子間に滑らかな正弦波形の出力電圧を得る。
【0018】
PWM信号の周波数を高くすればする程交流電圧の1サイクルの間にかかる割込みの回数が多くなって、基準電圧の波形を細かくシミュレートすることができるため、出力電圧の波形を滑らかな波形とすることができる。しかしながら、スイッチ素子のターンオン時間やターンオフ時間等、コントローラが信号を発生してからスイッチ素子が実際に動作するまでの遅延時間や、CPUの性能(内部処理時間等)を考慮してPWM信号の周波数を決定する必要があるため、PWM信号の周波数を無限に高くすることはできない。通常PWM信号の周波数は10KHz程度に設定され、このPWM信号の周波数に応じてフィルタのL(コイル)及びC(コンデンサ)の定数が決定される。
【0019】
インバータを用いた発動発電装置においては、各内部割込みがかかる毎に、負荷接続端子間の電圧波形をA/Dコンバータによりデジタル信号に変換してCPUに読み込み、読み込んだ負荷接続端子間の電圧の瞬時値を基準電圧の瞬時値に合わせるように帰還演算を行ってPWM信号のデューティ値を補正する制御を行い、これにより負荷接続端子間に印加する交流電圧の波形を基準電圧の波形に一致させる。
【0020】
【発明が解決しようとする課題】
上記の発動発電装置においては、内燃機関の起動時に先ずコントローラのマイクロコンピュータの電源電圧が確立し、その後内燃機関の回転数の上昇に伴う発電機の出力電圧の上昇に伴って、電源部の出力電圧が増大していく。
【0021】
この種の発電装置において、電源部の出力電圧が不足する状態でコントローラによる電力変換回路のスイッチ素子の制御を開始すると、負荷接続端子間に印加される交流電圧の波形が歪むのを避けられない。
【0022】
そこで、従来は、内燃機関が起動し、マイクロコンピュータの電源電圧が確立した後、機関の回転数が、発電機の出力電圧を確立させるために必要な回転数に落ち着くまでに要する時間を見込んで設定された一定時間の間、コントローラによる電力変換回路のスイッチ素子の制御を見合わせ、マイクロコンピュータの電源電圧が確立した後一定時間が経過した時に、機関の回転が安定して電源部の出力電圧が確立したと判断して、コントローラによるスイッチ素子の制御を開始するようにしていた。
【0023】
内燃機関の起動が毎回支障なく行われれば、上記の構成により、波形が歪んだ交流出力が負荷に供給されるのを防ぐことができる。
【0024】
ところが、上記の構成では、機関に何らかの異常があって機関の起動時に発電機の回転数がなかなか安定しない場合や、機関の吸気口付近に障害物があるために機関の回転が安定するまでに長い時間がかかる場合、あるいは、機関の点火プラグがかぶるなどして、機関の起動時に回転を安定させるまでに時間がかかる場合等の予期しない事態が生じたときに、コントローラがその事態を認識することができないため、電源部の出力電圧が不足する状態で電力変換回路のスイッチ素子の制御が開始されて、波形が歪んだ交流電圧が負荷に供給されることがあった。
【0025】
本発明の目的は、機関の起動時の状態がいかなる場合でも、電源部の出力電圧が不足する状態で電力変換回路のスイッチ素子の制御が開始されることがないようにして、波形が歪んだ交流電圧が負荷に供給されるのを防止した電力変換回路付き発動発電装置及びその制御方法を提供することにある。
【0026】
【課題を解決するための手段】
本発明に係わる制御方法は、内燃機関により駆動される発電機を電源とする電源部と、スイッチ素子のスイッチングにより電源部の出力電圧を交流電圧に変換する電力変換回路と、電力変換回路の出力がフィルタを通して印加される負荷接続端子と、マイクロコンピュータとを設けて、マイクロコンピュータにより、負荷接続端子間に印加する電圧を所望の波形の交流電圧とするように電力変換回路のスイッチ素子を制御する電力変換回路付き発動発電装置の制御方法である。
【0027】
本発明においては、前記の目的を達成するため、内燃機関の起動とマイクロコンピュータの電源電圧の確立とが確認された後、設定時間が経過した時に電源部の出力電圧が無負荷時に前記負荷接続端子間に得られる交流電圧の波高値を定格負荷時に該負荷接続端子間に得られる交流電圧の波高値よりも高くするために必要な値に設定された設定値以上になっているか否かを確認する電源電圧確認過程を行い、電源電圧確認過程で電源部の出力電圧が設定値以上になったことが確認された時に電力変換回路のスイッチ素子の制御を開始するようにした。
【0028】
本発明を適用する発動発電装置において、マイクロコンピュータが、電源部の出力電圧を一定の直流電圧に変換する直流電源回路により電源電圧が与えられて動作するようになっている場合には、マイクロコンピュータの電源電圧の確立が確認された後、設定時間が経過した時に電源部の出力電圧が、無負荷時に前記負荷接続端子間に得られる交流電圧の波高値を定格負荷時に該負荷接続端子間に得られる交流電圧の波高値よりも高くするために必要な値に設定された設定値以上になっているか否かを確認する電源電圧確認過程を行い、該電源電圧確認過程で電源部の出力電圧が設定値以上になったことが確認された時に電力変換回路のスイッチ素子の制御を開始するようにする。
【0029】
また本発明を適用する発動発電装置において、マイクロコンピュータが、バッテリを電源とする直流電源回路から電源電圧が与えられて動作するようになっている場合には、マイクロコンピュータの電源電圧が確立した後、内燃機関が起動したか否かを確認する機関起動確認過程と、設定された時間が経過したか否かを確認する設定時間経過確認過程と、電源部の出力電圧が無負荷時に前記負荷接続端子間に得られる交流電圧の波高値を定格負荷時に該負荷接続端子間に得られる交流電圧の波高値よりも高くするために必要な値に設定された設定値以上になったか否かを確認する電源電圧確認過程とを順に行い、電源電圧確認過程で電源部の出力電圧が設定値以上になったことが確認された時に電力変換回路のスイッチ素子の制御を開始する。
【0030】
上記のように、内燃機関の起動とマイクロコンピュータの電源電圧の確立とが確認された後、設定時間が経過した時に電源部の出力電圧が設定値以上になっているか否かを確認し、その結果、電源部の出力電圧が設定値以上になったことが確認された時にスイッチ素子の制御を開始するようにすると、何等かの原因で機関の起動がスムースに行われない事態が生じたときでも、電源部の出力電圧が確立した後に(電源部の出力電圧が負荷接続端子間に波形歪みが少ない交流電圧を得るために必要な電圧値に達した後に)電力変換回路のスイッチ素子の制御が開始されるので、機関の起動時の状態がいかなる場合でも、波形が歪んだ交流電圧が負荷に供給されるのを防止することができる。
【0031】
本発明の制御方法を実施する発動発電装置は、例えば、内燃機関により駆動される発電機を電源とする電源部と、スイッチ素子のスイッチングにより電源部の出力電圧を交流電圧に変換する電力変換回路と、電力変換回路の出力がフィルタを通して印加される負荷接続端子と、電源部の出力を一定の直流電圧に変換する直流電源回路により電源電圧が与えられて動作するマイクロコンピュータを用いて負荷接続端子間に印加する電圧を所望の波形の交流電圧とするように上記スイッチ素子を制御するコントローラとを備えることにより構成される。
【0032】
このような発動発電装置に本発明を適用する場合には、上記コントローラに、その電源電圧が確立した後設定時間が経過した時に電源部の出力電圧が設定値以上になったか否かを確認する電源電圧確認手段を設けて、該電源電圧確認手段により電源部の出力電圧が設定電圧以上になったことが確認された時に電力変換回路のスイッチ素子の制御を開始するようにする。
【0033】
また、内燃機関により駆動される発電機を電源とする電源部と、スイッチ素子のスイッチングにより前記電源部の出力電圧を交流電圧に変換する電力変換回路と、電力変換回路の出力がフィルタを通して印加される負荷接続端子と、バッテリを電源とする直流電源回路から電源電圧が与えられて動作するマイクロコンピュータを用いて負荷接続端子間に印加する電圧を所望の波形の交流電圧とするように上記スイッチ素子を制御するコントローラとを備えた電力変換回路付き発動発電装置に本発明を適用する場合には、上記コントローラに、その電源電圧が確立した後前記内燃機関の起動を確認する内燃機関起動確認手段と、内燃機関の起動が確認された後設定時間が経過した時に電源部の出力電圧が無負荷時に負荷接続端子間に得られる交流電圧の波高値を定格負荷時に該負荷接続端子間に得られる交流電圧の波高値よりも高くするために必要な値に設定された設定値以上になったか否かを確認する電源電圧確認手段とを設けて、電源電圧確認手段により電源部の出力電圧が設定電圧以上になったことが確認された時にスイッチ素子の制御を開始するようにする。
【0034】
【発明の実施の形態】
図1は、本発明が対象とする発動発電装置1の構成例を示したもので、同図において、2は3相磁石式交流発電機、3は磁石発電機2を駆動する内燃機関である。磁石式交流発電機2は、多極に構成された磁石回転子(図示せず。)と、3相結線された発電コイル2u 〜2w を有する固定子とからなっていて、図示しない磁石回転子は、内燃機関3のクランク軸に取り付けられている。
【0035】
また4はダイオードDu〜DwとDx〜Dzとを3相ブリッジ接続して構成した整流器で、整流器4の3相の交流入力端子4u〜4wにそれぞれ発電機2の3相の出力端子が接続され、整流器4の直流出力端子4a,4b間には電源コンデンサCdが接続されている。
【0036】
図示の例では、発電機2と内燃機関3と整流器4と電源コンデンサCd とにより、内燃機関により駆動される発電機を電源として直流電圧を出力する電源部が構成されている。
【0037】
5はスイッチ素子としてMOSFET Fu 及びFv とFx 及びFy とを用いたブリッジ形のインバータ回路(電力変換回路)で、このインバータ回路においては、互いに直列に接続されたMOSFET Fu 及びFX からなる第1のアームと、同じく直列に接続されたMOSFET Fv 及びFy からなる第2のアームとを並列に接続することによりHブリッジ回路を構成している。この例では、MOSFET Fu 及びFv がそれぞれ第1及び第2のアームの上段のスイッチ素子を構成し、Fx 及びFy がそれぞれ第1及び第2のアームの下段のスイッチ素子を構成している。
【0038】
MOSFET Fu ,Fv 及びFx ,Fy のドレインソース間にはそれぞれアノードがソース側に向いた寄生ダイオードDfu,Dfv及びDfx,Dfyが形成されている。インバータ回路5の対の入力端子5a及び5bは整流器4の出力端子4a及び4bに接続され、インバータ回路5の対の出力端子5u及び5vはそれぞれインダクタンスL1 及びL2 とコンデンサC1 とからなる低域通過形のフィルタ回路6を通して対の負荷接続端子7u及び7vに接続されている。負荷接続端子7u及び7vにはコンセントとプラグとからなる周知のコネクタ8を通して負荷9が接続されている。
【0039】
11はインバータ回路5から負荷に供給される電流を検出する負荷電流検出回路、12は演算増幅器OP1 と該演算増幅器の入力端子を負荷接続端子7u及び7vに接続する抵抗Ru及びRvとからなる負荷電圧検出回路で、負荷電流検出回路11の出力及び負荷電圧検出回路12の出力は、インバータ回路のスイッチ素子を制御するコントローラ13に入力されている。
【0040】
コントローラ13は、負荷電流検出回路11の出力を基準信号と比較する比較器13aと、負荷電圧検出回路12の出力をデジタル信号に変換するA/D変換器13bと、ROM,RAM(図示せず。)及びCPUを有するマイクロコンピュータ13cと、CPUが発生するPWM信号に応じてFET Fu,Fv,Fx及びFyのゲートに駆動信号Gu,Gv,Gx及びGyを与える駆動信号出力回路13dと、整流器4の出力電圧の検出値をデジタル信号に変換するA/D変換器13eとを備えている。
【0041】
整流器4の出力端子間の電圧(電源部の出力電圧)が抵抗Ra及びRbを通して演算増幅器OP2 の入力端子に印加され、該演算増幅器OP2 の出力がコントローラ13内のA/D変換器13eに入力されている。抵抗Ra及びRbと演算増幅器OP2 とにより、電源部の出力電圧を検出する電源出力検出回路14が構成されている。
【0042】
コントローラ13は、整流器4から得られる電源部の直流出力電圧のデータAN1を演算増幅器OP2 とA/D変換器13eとを通して読み込む。コントローラ13は、また、負荷電圧検出回路12とA/D変換器13bとを通して負荷接続端子7u,7v間の交流電圧の瞬時値を示す瞬時データAN0を読み込む。
【0043】
コントローラ13は、電源部の出力電圧(AN1)と、PWM周期t毎に到来するスイッチタイミングにおける基準電圧の瞬時値とにより決まるデューティ値でインバータ回路の所定のスイッチ素子をオンオフさせることにより、負荷接続端子間から基準電圧と同じ波形を有する交流電圧を出力させる。
【0044】
電源部が出力する直流電圧VD は、出力電流ID に対して例えば図3に示すV−I特性曲線のように変化する。出力電流ID が零の無負荷状態のときには、出力電圧VD がVo に等しい。出力電流ID が流れると、動作点はV−I特性に沿ってP1 からPr へと移行していき、負荷接続端子7u,7v間に得られる単相交流電圧の波高値VA を与える動作点Pr で、定格負荷に最大の負荷電流IDmaxを流すことができる。
【0045】
図3に示すようなV−I特性を有する電源部の出力をインバータ回路5に入力して、スイッチ素子をPWM制御することにより、負荷接続端子7u,7v間に波高値がVA の単相交流電圧を得ようとする場合の、各PWM周期におけるスイッチ素子のデューティ値Dを求めるため、次式に示すように、負荷接続端子間に得る交流電圧の波高値を与える電源部の出力電圧VA と、負荷接続端子間に得る交流電圧のある瞬時値を与える電源部の出力電圧VB との比で与えられる電圧補正値Kv を用いる。
【0046】
Kv =VA /VB …(1)
上記電圧補正値を用いると、各PWM周期におけるスイッチ素子のデューティ値Dは、次式により与えられる。
【0047】
D=Sin(2πnt/T)×Kv …(2)
ここで、nはPWM周期が交流電圧波形の立ち上がりの零クロス点から何番目のPWM周期であるかを示す値で、PWM周期計数用のカウンタの計数値により与えられる。またtは図5に示したPWM周期、Tは負荷接続端子間に得る交流電圧の1周期の時間である。
【0048】
CPUは、カウンタによりPWM周期が検出される毎に、カウンタの計数値nと、読み込んだ整流器の出力電圧のデータAN1と波高値を与える電源部の出力電圧VA とを用いて(1)式により演算した電圧補正値Kv と、上記(2)式とを用いてデューティ値Dを求めるか、または予めROMに記憶させたデューティ演算用マップから読み出すことによりDの値を求める。ここで用いるデューティ演算用マップは、例えば、カウンタの計数値nと整流器の出力電圧のデータAN1とデューティ値Dとの間の関係を与える3次元マップである。
【0049】
前述のように、CPU13cはクロックパルスを計数するカウンタを備えていて、該カウンタの計数値nにより、PWM周期t毎に到来するスイッチタイミングを検出する。そして、各スイッチタイミングが検出される毎に内部割込みをかけて、各スイッチタイミングにおけるスイッチ素子のデューティ値を求め、求められたデューティ値Dに基づいてCPU内のタイマにスイッチ素子のオン時間をセットする。タイマがセットされたオン時間の計時を行っていする間PWM信号を高レベルの状態にし、タイマの計時動作が終了した時にPWM信号を零レベルにする。
【0050】
駆動信号出力回路13dは、CPUが発生するPWM信号に応じて、インバータ回路のスイッチ素子Fu,Fv,Fx,Fyに駆動信号を与える。
【0051】
図1に示したインバータ回路5のスイッチ(図示の例ではFET)Fu,Fv,Fx及びFyは、例えば図2に示すようなスイッチングパターンでオンオフ制御される。図2(A),(B),(C)及び(D)はそれぞれPWM制御信号に応じてスイッチFu,Fy,Fx及びFvに与えられる駆動信号Gu,Gy,Gx及びGvを示したもので、スイッチFu,Fy,Fx及びFvはそれぞれ、駆動信号Gu,Gy,Gx及びGvがHレベルにあるときにオン状態になる。駆動信号Gu,Gy,Gx及びGvがLレベルにあるときにそれぞれスイッチFu,Fy,Fx及びFvがオフ状態に保持される。
【0052】
また図2(E)及び(F)はインバータ回路5を構成するスイッチ素子のブリッジ回路の対角位置にある対のスイッチ素子(Fu,Fy)及び(Fx,Fv)が同時にオン状態になるタイミングを示し、図2(G)及び(H)はそれぞれブリッジ回路の上辺を構成する2つのスイッチ素子(Fu,Fv)が同時にオン状態になるタイミング及び下辺を構成する2つのスイッチ素子(Fx,Fy)が同時にオン状態になるタイミングを示している。
【0053】
負荷接続端子7u,7v間には、使用者が任意の負荷を接続する可能性がある。使用者が接続する可能性がある負荷の中には、容量性の負荷もあれば誘導性の負荷もあり、また負荷接続端子を通して断続的に電流を流すように、スイッチング動作を行う負荷もある。負荷接続端子間に基準波形の交流電圧を得るようにインバータ回路のスイッチ素子を制御していても、負荷によっては、出力波形が歪んでしまい、出力電圧波形の歪み率が大きくなることがある。
【0054】
そこで図1の発動発電装置では、負荷接続端子間の電圧の瞬時値を与えるデータAN0をCPUに読み込んで、該データが基準電圧の瞬時値を与える基準データよりも小さいときにPWM信号デューティ値を大きくし、瞬時データAN0が基準データよりも大きいときにはPWM信号のデューティ値を小さくするようにデューティ値を補正して、負荷電圧検出回路12により検出された電圧の瞬時値と基準電圧の瞬時値との間の偏差を零に近付ける制御を行うようにしている。
【0055】
上記のような補正を行った後のデューティ値D´は、下記の式により与えられる。
【0056】
D´=D+G×(ANS−AN0)×Kc …(3)
ここで、ANSは基準データで、この基準データは、各スイッチタイミングにおける基準波形の瞬時値である。Gは基準データANSとAN0との差に対する補正量の割合を決めるゲインである。ゲインGは、通常は1以下の値に設定される。
【0057】
また係数Kc は、負荷接続端子間の電圧の瞬時データの補正値[G×(ANS−AN0)]をその時のデューティ値への補正値に変換するために補正値に乗じる係数で、Kv により決まる数値である。
【0058】
図1の発動発電装置においてはまた、負荷接続端子7u,7vを通して設定値を超える過電流が流れたときにインバータ回路5のスイッチ素子への駆動信号の供給を停止して、過電流を遮断するための制御を行う過電流保護手段を設けている。
【0059】
図4は、発動発電機起動時の電源部の出力電圧対出力電流特性(V−I特性)曲線を回転数N1 ,N2 ,…,N5 [rpm](N1 <N2 <N3 <N4 <N5 )をパラメータにとって示したものである。同図に示すように、機関の起動時には、機関の回転数の上昇に伴って発電機2の出力電圧が上昇していく。
【0060】
通常の場合は、機関が起動した後、ある一定時間(約1秒前後)が経過した時点で機関の回転数か設定回転数に落ち着き、発電機2から、負荷接続端子7u,7v間に波形歪みが少ない交流電圧を得るために充分な設定値以上の出力電圧を得ることができる状態になる。
【0061】
しかし何らかの原因で、機関の回転数が設定回転数に達するのが遅れると、上記一定時間が経過しても発電機の出力電圧が設定値に達することができない状態になる。
【0062】
本発明の制御方法では、コントローラ13が、内燃機関の始動が確認された後、設定時間が経過した時に、電源部の出力電圧AN1を検出し、その検出値AN1が設定値Vs に達しているか否かを確認する。その結果、電源部の出力電圧が設定値Vs に達しているときには、インバータ回路5のスイッチ素子の制御を開始して、該インバータ回路5から交流電圧を出力させる。また内燃機関の始動が確認された後、設定時間が経過した時に、電源部の出力電圧AN1が設定値Vs に達していないときには、該出力電圧AN1が設定値に達するまで待ってからインバータ回路5のスイッチ素子の制御を開始する。
【0063】
上記起動時の電源部の出力電圧の設定値Vs は、電源部の出力電圧が該設定値Vs に等しいときに負荷接続端子間に得られる無負荷交流電圧の波高値が図3に示す定格負荷時の波高値VA よりも高くなるように設定することが望ましい。
【0064】
本発明の制御方法を実施する場合に、内燃機関の起動時にコントローラ13を構成するマイクロコンピュータに実行させるプログラムのアルゴリズムの一例を示すフローチャートを図6に示した。この例では、マイクロコンピュータが、整流器4の出力電圧を入力としてマイクロコンピュータを動作させるために適した大きさ(通常は5V)の一定の直流電圧を得る直流電源回路の出力により電源電圧が与えられて動作するものとしている。
【0065】
内燃機関が起動して発電機2の出力電圧がマイクロコンピュータを動作させるための電圧を得るために必要な電圧値に達したとき(機関の起動が完了してマイクロコンピュータの電源電圧が確立されたとき)に、先ず図6のルーチンが開始され、そのステップ1において、各部の初期設定が行われる。この例では、マイクロコンピュータの電源電圧が確立されたことを以て内燃機関の起動を確認するようにしている。
【0066】
各部の初期設定を行った後、ステップ2に移行して設定時間が経過するのを待つ。設定時間が経過した後、ステップ3に移行して電源部の出力電圧AN1を読み込み、ステップ4において読み込んだ出力電圧AN1が設定値E以上であるか否かを判定する。その結果読み込んだ出力電圧AN1が設定値E以上であるときには、ステップ5に進んでコントローラ13によるスイッチ素子Fu,Fv,Fx,FyのPWM制御を開始する。
【0067】
上記設定値Eは、負荷接続端子7u,7v間に得る交流電圧の波形を、歪みが少ない波形とするために必要な電源部(整流器4)の出力電圧の最小値以上に設定する。
【0068】
ステップ4において電源部の出力電圧AN1が設定値未満であると判定された時には、該出力電圧AN1が設定値Eに達するまで待ち、出力電圧AN1が設定値Eに達したことが確認された後に、ステップ8に進んでスイッチ素子の制御を開始する。
【0069】
図6に示したアルゴリズムによる場合には、ステップ2ないし4により、設定時間が経過した時に前記電源部の出力電圧が設定値以上になっているか否かを確認する電源電圧確認手段が実現され、この確認手段により電源電圧確認過程が行われる。
【0070】
図1に示した発動発電装置において、発電機2の整流出力により充電されるバッテリが設けられていて、該バッテリを電源とする直流電源回路からマイクロコンピュータに電源電圧が与えられるようになっている場合に、機関の起動時にマイクロコンピュータに実行させるプログラムのアルゴリズムの一例を図7に示した。
【0071】
図7のアルゴリズムによる場合には、キースイッチが投入されて、図1には図示しないバッテリから直流電源回路を通してマイクロコンピュータに電源電圧が印加された後(マイクロコンピュータの電源が確立した後)、ステップ1において各部の初期設定を行い、次いでステップ2において、電源部の出力電圧AN1が第1の設定値E1 以上であるか否かを判定する。その結果電源部の出力電圧AN1が第1の設定値E1 未満である時には、内燃機関の起動が完了していないと判定して、電源部の出力電圧AN1が第1の設定値E1 以上になるのを待つ。第1の設定値E1 は、機関の起動を確認するために必要な大きさ(機関の起動が完了したときの回転数で発電が回転しているときに整流器4から得られる電圧の大きさ)に設定しておく。このステップ2により、内燃機関が起動したか否かを確認する機関起動確認手段が実現され、この手段により機関起動確認過程が行われる。
【0072】
機関の起動が完了し、ステップ2において、電源部の出力電圧AN1が第1の設定値E1 以上になったことが確認されると、次いでステップ3に進んで、設定時間が経過するのを待つ。ステップ3により、設定された時間が経過したか否かを確認する設定時間経過確認手段が実現され、この手段により設定時間経過確認過程が行われる。
【0073】
ステップ3において設定時間が経過したことが確認された後、ステップ4において電源部の出力電圧AN1が第2の設定値E2 (>E1 )以上であるか否かを判定する。その結果出力電圧AN1が第2の設定値E2 以上である時には、インバータ回路のスイッチ素子の制御を開始し、出力電圧AN1が第2の設定値E2 未満であるときには、該出力電圧AN1が第2の設定値E2 以上になってからインバータ回路のスイッチ素子の制御を開始する。図7のステップ4により、電源部の出力電圧が設定値以上になったか否かを確認する電源電圧確認手段が実現され、この手段により、電源電圧確認過程が行われる。
【0074】
第2の設定値E2 は、負荷接続端子7u,7v間に得る交流電圧の波形を、歪みが少ない波形とするために必要な電源部(整流器4)の出力電圧の最小値以上に設定する。
【0075】
上記のように、図7に示した例では、内燃機関の起動時に、マイクロコンピュータの電源電圧が確立した後、内燃機関が起動したか否かを確認する機関起動確認過程と、設定された時間が経過したか否かを確認する設定時間経過確認過程と、電源部の出力電圧が設定値以上になったか否かを確認する電源電圧確認過程とを順に行い、電源電圧確認過程で電源部の出力電圧が設定値以上になったことが確認された時に電力変換回路のスイッチ素子の制御を開始する。
【0076】
上記の例では、インバータ回路に直流電源を与えるための電源部として発電機と整流器とにより構成されるものを用いたが、バッテリや直流発電機を電源部として用いる場合にも本発明を適用することができる。
【0077】
また上記の例では、電力変換回路としてインバータ回路5を用いたが、任意の周波数を有する交流電圧を所定の周波数を有する交流電圧に変換するサイクロコンバータ等を電力変換回路として用いる場合にも本発明を適用することができる。
【0078】
【発明の効果】
以上のように、本発明によれば、内燃機関の起動とマイクロコンピュータの電源電圧の確立とが確認された後、設定時間が経過した時に電源部の出力電圧が設定値以上になっているか否かを確認し、その結果、電源部の出力電圧が設定値以上になったことが確認された時にスイッチ素子の制御を開始するようにしたので、何等かの原因で機関の起動がスムースに行われない事態が生じたときでも、電源部の出力電圧が確立した後に電力変換回路のスイッチ素子の制御を開始することができる。したがって、機関の起動時の状態がいかなる場合でも、波形が歪んだ交流電圧が負荷に供給されるのを防止することができる。
【図面の簡単な説明】
【図1】 本発明に係わる電力変換回路付き発動発電装置の構成例を示した回路図である。
【図2】 図1の発動発電装置の動作を説明するためのタイミングチャートである。
【図3】 図1に示した発動発電装置の整流器の直流電圧対出力電流特性の一例を示した線図である。
【図4】 図1の例で用いる発電機の起動時の出力電圧対出力電流特性の一例を回転数をパラメータにとって示した線図である。
【図5】 本発明が対象とする発動発電装置において、基準電圧を正弦波形とする場合の内部割込みタイミングとPWM信号のデューティとの関係を示した波形図である。
【図6】 図1の発動発電装置においてコントローラを構成するマイクロコンピュータが機関の起動時に実行するプログラムのアルゴリズムの一例を示したフローチャートである。
【図7】 図1の発動発電装置においてコントローラを構成するマイクロコンピュータが機関の起動時に実行するプログラムの他のアルゴリズムを示したフローチャートである。
【符号の説明】
1…発動発電装置、、2…3相磁石式交流発電機、3…内燃機関、4…整流器、5…インバータ回路、6…フィルタ回路、7u,7v…負荷接続端子、9…負荷、13…コントローラ。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an engine generator with a power conversion circuit that converts an output of a power supply unit that generates a DC voltage or an AC voltage into an AC voltage having an arbitrary frequency and magnitude using a generator driven by an internal combustion engine as a power source, and It relates to a control method.
[0002]
[Prior art]
2. Description of the Related Art As an engine generator that uses a generator driven by an internal combustion engine as a power source, a generator that includes a power conversion circuit such as an inverter or a cycloconverter that converts an output of the power source into an AC output having a predetermined frequency is used.
[0003]
This type of engine generator includes, for example, a rectifier that rectifies the output of an AC generator driven by an internal combustion engine, an inverter circuit that converts the output voltage of the rectifier into an AC voltage, and harmonics from the output of the inverter circuit. A filter for removing components, a load connection terminal to which the output of the inverter circuit is applied through the filter, a load voltage detection circuit for detecting a voltage between the load connection terminals, and a load current detection circuit for detecting a current flowing through the load connection terminal And a controller for controlling the switching element of the inverter circuit so as to obtain an AC voltage having a desired waveform between the load connection terminals.
[0004]
As the inverter circuit, a bridge type circuit having a configuration in which a plurality of arms composed of an upper switch element and a lower switch element connected in series with each other is connected in parallel so as to form a bridge circuit of the switch element is used. It has been.
[0005]
The controller usually includes a CPU (microcomputer) and switches the inverter circuit so that an AC voltage having a stepped waveform obtained by PWM-modulating the reference voltage is output from the inverter circuit so as to simulate the waveform of the reference voltage. The element is turned on and off at a constant cycle.
[0006]
Here, the reference voltage is a voltage that gives a reference waveform of the AC output to be obtained between the load connection terminals (output terminals of the engine generator), and an AC voltage having the same or similar waveform as the desired AC output waveform. It is.
[0007]
The controller, for example, a PWM signal that determines the duty value of each switch element of the inverter circuit when the switch element of the inverter circuit is turned on / off with a predetermined duty value to obtain an AC voltage having a waveform obtained by PWM-modulating the reference voltage from the inverter circuit PWM signal generation means for generating the PWM signal, PWM signal correction means for correcting the PWM signal so that the deviation between the instantaneous value of the voltage detected by the load voltage detection circuit and the instantaneous value of the reference voltage is zero, and PWM Switch element driving means for supplying a drive signal to each switch element to turn on and off each switch element of the inverter circuit with a duty value determined by the signal, and driving to the inverter circuit when it is detected that the load current exceeds the set value It consists of overcurrent protection means that stops the signal supply and protects the switch element
[0008]
The PWM signal is usually composed of a rectangular wave signal that repeats a first state (for example, a high level state) and a second state (for example, a zero level state) at a constant cycle. The period for the on state and the period for the off state are the first state and the second state, respectively.
[0009]
In this specification, the period of the PWM signal is referred to as “PWM period”, and the frequency of the PWM signal is referred to as PWM frequency. In addition, the ratio of the time during which the PWM signal takes the first state with respect to one period of each PWM signal is referred to as the duty value of the PWM signal. Furthermore, the ratio of the time during which the switch element is turned on in each PWM cycle is called the duty value of the switch element.
[0010]
The timing at which each switch element of the inverter circuit is turned on (the timing at which the PWM cycle is started) is referred to as switch timing.
[0011]
When a controller is configured using a CPU, each PWM cycle is detected by counting pulses generated at a constant cycle by a PWM cycle counting counter, and the timing at which each PWM cycle is started is the switch timing (the switch element is Timing to turn on).
[0012]
The duty value of the PWM signal generated at each switch timing is for duty calculation that gives the relationship between a series of switch timings, the output voltage of the rectifier, and the duty value of the PWM signal at each switch timing (duty value of the switch element) It is obtained by reading from a map (stored in the ROM) or by calculating using an arithmetic expression.
[0013]
The CPU of the controller sets an ON time of the switch element in the PWM signal generation timer based on a duty value obtained by a method such as an internal interrupt every PWM cycle t and reading from the map by the internal interrupt processing, While counting the ON time when the timer is set, the potential of the output port of the PWM signal is set to the first state (for example, a high level state) to generate the PWM signal.
[0014]
The switch element driving means gives a drive signal (a signal for turning on the switch element) to the switch element corresponding to the period in which the PWM signal is in the first state.
[0015]
Here, assuming that the frequency (PWM frequency) of the PWM signal generated in the period t is fp and the frequency of the output waveform is fo (period T), n = fp / fo times in one cycle period (T) of the output waveform. An interrupt will be applied.
[0016]
FIG. 5 shows the relationship between the internal interrupt timing (switch timing of the switch element) and the duty value of the PWM signal when the reference voltage is a sine waveform, where a is the reference voltage waveform and t is the PWM The cycle, VA is the peak value of the reference voltage, Vav is the average value of the reference voltage, and T is the cycle of the reference voltage (the cycle of the AC voltage to be obtained).
[0017]
The duty value of the PWM signal changes every time t with the change of the instantaneous value of the reference voltage, and the inverter circuit divides the reference voltage waveform of one cycle into n and forms a stepped waveform. An AC voltage (waveform obtained by PWM modulating the reference voltage) is output. By passing this stepped AC voltage waveform through a filter, harmonic components are removed, and a smooth sine waveform output voltage is obtained between the load connection terminals.
[0018]
As the frequency of the PWM signal is increased, the number of interruptions during one cycle of the AC voltage is increased, and the waveform of the reference voltage can be finely simulated. can do. However, the frequency of the PWM signal in consideration of the delay time until the switch element actually operates after the controller generates a signal, such as the turn-on time and turn-off time of the switch element, and the CPU performance (internal processing time, etc.) Therefore, the frequency of the PWM signal cannot be increased infinitely. Usually, the frequency of the PWM signal is set to about 10 KHz, and constants of L (coil) and C (capacitor) of the filter are determined according to the frequency of the PWM signal.
[0019]
In the power generator using the inverter, each time an internal interrupt is applied, the voltage waveform between the load connection terminals is converted into a digital signal by the A / D converter and read into the CPU, and the voltage between the load connection terminals is read. Feedback control is performed so that the instantaneous value matches the instantaneous value of the reference voltage, and the duty value of the PWM signal is corrected, thereby matching the waveform of the AC voltage applied between the load connection terminals with the waveform of the reference voltage. .
[0020]
[Problems to be solved by the invention]
In the engine generator described above, the power supply voltage of the microcomputer of the controller is first established when the internal combustion engine is started, and then the output of the power supply unit increases with the increase in the output voltage of the generator accompanying the increase in the rotational speed of the internal combustion engine. The voltage increases.
[0021]
In this type of power generation device, when control of the switch element of the power conversion circuit by the controller is started in a state where the output voltage of the power supply unit is insufficient, it is inevitable that the waveform of the AC voltage applied between the load connection terminals is distorted. .
[0022]
Therefore, conventionally, after the internal combustion engine is started and the microcomputer power supply voltage is established, the time required for the engine speed to settle to the speed necessary for establishing the output voltage of the generator is expected. For a set period of time, the control of the switch element of the power conversion circuit by the controller is postponed, and when a certain period of time has elapsed after the power supply voltage of the microcomputer is established, the engine rotation is stabilized and the output voltage of the power supply section It was determined that it was established, and control of the switch element by the controller was started.
[0023]
If the internal combustion engine is started without any trouble, it is possible to prevent the AC output having a distorted waveform from being supplied to the load by the above configuration.
[0024]
However, with the above configuration, when there is some abnormality in the engine and the rotation speed of the generator is not stable when the engine starts up, or when there is an obstacle near the engine intake port, the engine rotation becomes stable. The controller recognizes the situation when it takes a long time or when an unexpected situation occurs, such as when the engine ignition plug is put on and it takes time to stabilize the rotation when starting the engine. Therefore, the control of the switch element of the power conversion circuit is started in a state where the output voltage of the power supply unit is insufficient, and an alternating voltage having a distorted waveform may be supplied to the load.
[0025]
The object of the present invention is to prevent the control of the switch element of the power conversion circuit from being started in a state where the output voltage of the power supply unit is insufficient, regardless of the engine starting state, and the waveform is distorted. It is an object of the present invention to provide an engine generator with a power conversion circuit that prevents an alternating voltage from being supplied to a load and a control method thereof.
[0026]
[Means for Solving the Problems]
A control method according to the present invention includes a power source unit that uses a generator driven by an internal combustion engine as a power source, a power conversion circuit that converts an output voltage of the power source unit into an alternating voltage by switching of a switch element, and an output of the power conversion circuit Is provided with a load connection terminal applied through the filter and a microcomputer, and the microcomputer controls the switch element of the power conversion circuit so that the voltage applied between the load connection terminals is an AC voltage having a desired waveform. It is a control method of the motor generator with a power conversion circuit.
[0027]
In the present invention, in order to achieve the above object, the output voltage of the power supply unit is set when the set time has elapsed after the start of the internal combustion engine and the establishment of the power supply voltage of the microcomputer are confirmed. The peak value of the AC voltage obtained between the load connection terminals at no load was set to a value necessary to make the peak value of the AC voltage obtained between the load connection terminals at the rated load higher than the peak value of the AC voltage. A power supply voltage check process is performed to check whether or not the power supply voltage is higher than the set value. When it is confirmed that the output voltage of the power supply section is higher than the set value in the power supply voltage check process, the switch element of the power conversion circuit is controlled. To start.
[0028]
In the motor generator according to the present invention, when the microcomputer is operated by being supplied with a power supply voltage by a DC power supply circuit that converts the output voltage of the power supply unit into a constant DC voltage, the microcomputer After confirming that the power supply voltage is established, the output voltage of the power supply The peak value of the AC voltage obtained between the load connection terminals at no load is set to a value necessary for making the peak value of the AC voltage obtained between the load connection terminals at the rated load higher than the peak value of the AC voltage. A power supply voltage check process is performed to check whether or not the power supply voltage exceeds a set value. When the power supply voltage check process confirms that the output voltage of the power supply section is equal to or higher than the set value, the switch element of the power conversion circuit is checked. Start control.
[0029]
Further, in the engine power generation apparatus to which the present invention is applied, when the microcomputer is operated by being supplied with a power supply voltage from a DC power supply circuit using a battery as a power supply, after the power supply voltage of the microcomputer is established. The engine start confirmation process for confirming whether the internal combustion engine has been activated, the set time passage confirmation process for confirming whether the set time has elapsed, and the output voltage of the power supply unit The peak value of the AC voltage obtained between the load connection terminals at no load was set to a value necessary to make the peak value of the AC voltage obtained between the load connection terminals at the rated load higher than the peak value of the AC voltage. The power supply voltage confirmation process for confirming whether or not the value exceeds the set value is performed in order, and when it is confirmed that the output voltage of the power supply section exceeds the set value in the power supply voltage confirmation process, the switch element of the power conversion circuit is Start control.
[0030]
As described above, after confirming the start of the internal combustion engine and the establishment of the power supply voltage of the microcomputer, it is confirmed whether the output voltage of the power supply unit is higher than the set value when the set time has elapsed. As a result, when it is confirmed that the output voltage of the power supply unit has exceeded the set value, if the control of the switch element is started, the engine will not start smoothly for some reason. However, after the output voltage of the power supply section is established (after the output voltage of the power supply section reaches the voltage value necessary to obtain an AC voltage with less waveform distortion between the load connection terminals), the switch elements of the power conversion circuit are controlled. Therefore, it is possible to prevent an alternating voltage having a distorted waveform from being supplied to the load, regardless of the engine starting state.
[0031]
An engine generator that implements the control method of the present invention includes, for example, a power supply unit that uses a generator driven by an internal combustion engine as a power supply, and a power conversion circuit that converts an output voltage of the power supply unit into an AC voltage by switching a switch element. A load connection terminal to which the output of the power conversion circuit is applied through a filter, and a load connection terminal using a microcomputer that operates with a power supply voltage applied by a DC power supply circuit that converts the output of the power supply unit into a constant DC voltage. And a controller for controlling the switch element so that the voltage applied between them is an AC voltage having a desired waveform.
[0032]
When the present invention is applied to such a motor generator, the controller confirms whether or not the output voltage of the power supply unit has exceeded a set value when a set time has elapsed after the power supply voltage has been established. Power supply voltage confirmation means is provided, and control of the switch element of the power conversion circuit is started when it is confirmed by the power supply voltage confirmation means that the output voltage of the power supply section is equal to or higher than the set voltage.
[0033]
Further, a power source unit that uses a generator driven by the internal combustion engine as a power source, a power conversion circuit that converts the output voltage of the power source unit into an AC voltage by switching of a switch element, and an output of the power conversion circuit are applied through a filter. The switch element so that the voltage applied between the load connection terminals is a desired waveform AC voltage using a microcomputer that operates by being supplied with a power supply voltage from a DC power supply circuit that uses a battery as a power supply. When the present invention is applied to an engine generator with a power conversion circuit that includes a controller for controlling the internal combustion engine, an internal combustion engine start confirmation unit that confirms the start of the internal combustion engine after the power supply voltage is established. The output voltage of the power supply unit is set when the set time has elapsed after the start of the internal combustion engine is confirmed. The peak value of the AC voltage obtained between the load connection terminals at no load was set to a value necessary to make it higher than the peak value of the AC voltage obtained between the load connection terminals at the rated load. Power supply voltage confirmation means for confirming whether or not the set value has been exceeded is provided, and control of the switch element is started when the power supply voltage confirmation means confirms that the output voltage of the power supply section has exceeded the set voltage. Like that.
[0034]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 shows an example of the configuration of an
[0035]
Reference numeral 4 denotes a rectifier constructed by connecting diodes Du to Dw and Dx to Dz in a three-phase bridge. The three-phase AC input terminals 4u to 4w of the rectifier 4 are connected to the three-phase output terminals of the
[0036]
In the illustrated example, the
[0037]
[0038]
Parasitic diodes Dfu, Dfv, Dfx, and Dfy with anodes facing the source are formed between the drains and sources of the MOSFETs Fu, Fv, Fx, and Fy, respectively. The pair of
[0039]
11 is a load current detection circuit for detecting the current supplied from the
[0040]
The
[0041]
The voltage between the output terminals of the rectifier 4 (the output voltage of the power supply unit) is applied to the input terminal of the operational amplifier OP2 through the resistors Ra and Rb, and the output of the operational amplifier OP2 is input to the A /
[0042]
The
[0043]
The
[0044]
The DC voltage VD output from the power supply section varies with the output current ID, for example, as shown in the VI characteristic curve shown in FIG. When the output current ID is zero and there is no load, the output voltage VD is equal to Vo. When the output current ID flows, the operating point shifts from P1 to Pr along the VI characteristic, and the operating point Pr giving the peak value VA of the single-phase AC voltage obtained between the load connection terminals 7u and 7v. Thus, the maximum load current IDmax can be passed through the rated load.
[0045]
A single-phase alternating current having a peak value VA between the load connection terminals 7u and 7v is obtained by inputting the output of the power supply unit having the VI characteristic as shown in FIG. 3 to the
[0046]
Kv = VA / VB (1)
When the voltage correction value is used, the duty value D of the switch element in each PWM cycle is given by the following equation.
[0047]
D = Sin (2πnt / T) × Kv (2)
Here, n is a value indicating the number of PWM periods from the zero cross point of the rising edge of the AC voltage waveform, and is given by the count value of the counter for counting the PWM period. Further, t is the PWM cycle shown in FIG. 5, and T is the time of one cycle of the AC voltage obtained between the load connection terminals.
[0048]
Each time the PWM period is detected by the counter, the CPU uses the count value n of the counter, the read output voltage data AN1 of the rectifier, and the output voltage VA of the power supply unit that gives the peak value according to the equation (1). The duty value D is obtained using the calculated voltage correction value Kv and the above equation (2), or the value D is obtained by reading from the duty computation map stored in advance in the ROM. The duty calculation map used here is, for example, a three-dimensional map that gives the relationship between the counter value n, the output voltage data AN1 of the rectifier, and the duty value D.
[0049]
As described above, the
[0050]
The drive signal output circuit 13d gives a drive signal to the switch elements Fu, Fv, Fx, Fy of the inverter circuit according to the PWM signal generated by the CPU.
[0051]
The switches (FETs in the illustrated example) Fu, Fv, Fx and Fy of the
[0052]
2E and 2F are timings when the pair of switch elements (Fu, Fy) and (Fx, Fv) at the diagonal positions of the bridge circuit of the switch elements constituting the
[0053]
A user may connect an arbitrary load between the load connection terminals 7u and 7v. Some loads that users may connect are capacitive loads and some are inductive loads, and some loads perform switching operations so that current flows intermittently through the load connection terminals. . Even if the switching element of the inverter circuit is controlled so as to obtain an AC voltage having a reference waveform between the load connection terminals, the output waveform may be distorted depending on the load, and the distortion rate of the output voltage waveform may be increased.
[0054]
Therefore, in the motor generator of FIG. 1, the data AN0 that gives the instantaneous value of the voltage between the load connection terminals is read into the CPU, and the PWM signal duty value is set when the data is smaller than the reference data that gives the instantaneous value of the reference voltage. When the instantaneous data AN0 is larger than the reference data, the duty value is corrected so as to reduce the duty value of the PWM signal, and the instantaneous value of the voltage detected by the load
[0055]
The duty value D ′ after the above correction is given by the following equation.
[0056]
D ′ = D + G × (ANS−AN0) × Kc (3)
Here, ANS is reference data, and this reference data is an instantaneous value of the reference waveform at each switch timing. G is a gain that determines the ratio of the correction amount with respect to the difference between the reference data ANS and AN0. The gain G is normally set to a value of 1 or less.
[0057]
The coefficient Kc is a coefficient that is multiplied by the correction value in order to convert the correction value [G × (ANS−AN0)] of the instantaneous data of the voltage between the load connection terminals into the correction value to the duty value at that time, and is determined by Kv. It is a numerical value.
[0058]
In the motor generator of FIG. 1, when an overcurrent exceeding a set value flows through the load connection terminals 7u and 7v, the supply of the drive signal to the switch element of the
[0059]
FIG. 4 shows the output voltage vs. output current characteristic (VI characteristic) curve of the power supply section at the time of starting the generator, with the rotational speeds N1, N2,..., N5 [rpm] (N1 <N2 <N3 <N4 <N5) Is shown for parameters. As shown in the figure, when the engine is started, the output voltage of the
[0060]
In a normal case, after a certain period of time (about 1 second) has elapsed after the engine is started, the engine speed settles to the set speed, and a waveform is generated between the
[0061]
However, if for some reason it is delayed for the engine speed to reach the set speed, the output voltage of the generator cannot reach the set value even if the predetermined time has elapsed.
[0062]
In the control method of the present invention, the
[0063]
The set value Vs of the output voltage of the power supply unit at the time of start-up is the peak load value of the no-load AC voltage obtained between the load connection terminals when the output voltage of the power supply unit is equal to the set value Vs. It is desirable to set so as to be higher than the peak value VA at the time.
[0064]
FIG. 6 shows a flowchart showing an example of an algorithm of a program executed by the microcomputer constituting the
[0065]
When the internal combustion engine is started and the output voltage of the
[0066]
After initial setting of each part, the process proceeds to step 2 and waits for the set time to elapse. After the set time has elapsed, the process proceeds to step 3 to read the output voltage AN1 of the power supply unit, and it is determined whether or not the output voltage AN1 read in step 4 is greater than or equal to the set value E. As a result, when the read output voltage AN1 is equal to or higher than the set value E, the process proceeds to step 5 to start the PWM control of the switch elements Fu, Fv, Fx, Fy by the
[0067]
The set value E is set to be equal to or greater than the minimum value of the output voltage of the power supply unit (rectifier 4) necessary for making the waveform of the AC voltage obtained between the load connection terminals 7u and 7v less distorted.
[0068]
When it is determined in step 4 that the output voltage AN1 of the power supply unit is less than the set value, the process waits until the output voltage AN1 reaches the set value E, and after confirming that the output voltage AN1 has reached the set value E. Then, the process proceeds to step 8 to start control of the switch element.
[0069]
In the case of the algorithm shown in FIG. 6, the power supply voltage confirmation means for confirming whether or not the output voltage of the power supply unit is equal to or higher than the set value when the set time has elapsed is realized by
[0070]
In the motor generator shown in FIG. 1, a battery charged by the rectified output of the
[0071]
In the case of the algorithm of FIG. 7, after the key switch is turned on and the power supply voltage is applied to the microcomputer from the battery (not shown in FIG. 1) through the DC power supply circuit (after the power supply of the microcomputer is established), the steps are performed. In
[0072]
When the start of the engine is completed and it is confirmed in
[0073]
After confirming that the set time has elapsed in
[0074]
The second set value E2 is set to be equal to or greater than the minimum value of the output voltage of the power supply unit (rectifier 4) necessary for making the waveform of the AC voltage obtained between the load connection terminals 7u and 7v less distorted.
[0075]
As described above, in the example shown in FIG. 7, when the internal combustion engine is started, after the power supply voltage of the microcomputer is established, the engine start confirmation process for checking whether the internal combustion engine is started, and the set time A set time elapse confirmation process for confirming whether or not the power has elapsed and a power supply voltage confirmation process for confirming whether or not the output voltage of the power supply unit has exceeded the set value are performed in order. When it is confirmed that the output voltage is equal to or higher than the set value, control of the switch element of the power conversion circuit is started.
[0076]
In the above example, the power supply unit for supplying DC power to the inverter circuit is configured by a generator and a rectifier. However, the present invention is also applied to the case where a battery or a DC generator is used as the power supply unit. be able to.
[0077]
In the above example, the
[0078]
【The invention's effect】
As described above, according to the present invention, whether or not the output voltage of the power supply unit is equal to or higher than the set value when the set time has elapsed after the startup of the internal combustion engine and the establishment of the power supply voltage of the microcomputer are confirmed. As a result, when it was confirmed that the output voltage of the power supply unit exceeded the set value, the control of the switching element was started, so the engine started smoothly for some reason. Even when an unforeseen situation occurs, control of the switch element of the power conversion circuit can be started after the output voltage of the power supply unit is established. Therefore, it is possible to prevent an alternating voltage having a distorted waveform from being supplied to the load regardless of the engine starting state.
[Brief description of the drawings]
FIG. 1 is a circuit diagram showing a configuration example of a power generator with a power conversion circuit according to the present invention.
FIG. 2 is a timing chart for explaining the operation of the motor generator of FIG.
FIG. 3 is a diagram showing an example of DC voltage versus output current characteristics of the rectifier of the motor generator shown in FIG. 1;
4 is a diagram showing an example of an output voltage versus output current characteristic at the time of start-up of a generator used in the example of FIG. 1 using the rotation speed as a parameter. FIG.
FIG. 5 is a waveform diagram showing the relationship between the internal interrupt timing and the duty of the PWM signal when the reference voltage is a sine waveform in the engine generator targeted by the present invention.
6 is a flowchart showing an example of an algorithm of a program executed by a microcomputer constituting the controller in the engine generator of FIG. 1 when the engine is started.
7 is a flowchart showing another algorithm of a program executed by the microcomputer constituting the controller in the engine generator of FIG. 1 when the engine is started.
[Explanation of symbols]
DESCRIPTION OF
Claims (5)
前記内燃機関の起動と前記マイクロコンピュータの電源電圧の確立とが確認された後、設定時間が経過した時に前記電源部の出力電圧が無負荷時に前記負荷接続端子間に得られる交流電圧の波高値を定格負荷時に該負荷接続端子間に得られる交流電圧の波高値よりも高くするために必要な値に設定された設定値以上になっているか否かを確認する電源電圧確認過程を行い、
前記電源電圧確認過程で前記電源部の出力電圧が設定値以上になったことが確認された時に前記電力変換回路のスイッチ素子の制御を開始することを特徴とする電力変換回路付き発動発電装置の制御方法。A power source unit that uses a generator driven by an internal combustion engine as a power source, a power conversion circuit that converts an output voltage of the power source unit into an AC voltage by switching of a switching element, and an output of the power conversion circuit is applied through a filter A power conversion circuit comprising a load connection terminal and a microcomputer, wherein the microcomputer controls a switch element of the power conversion circuit so that a voltage applied between the load connection terminals is an AC voltage having a desired waveform. In the control method of the attached generator set,
After the start of the internal combustion engine and the establishment of the power supply voltage of the microcomputer are confirmed , the peak value of the AC voltage obtained between the load connection terminals when the output voltage of the power supply section is unloaded when a set time has elapsed A power supply voltage confirmation process is performed to confirm whether or not the value is higher than a set value set to a value necessary for making the voltage higher than the peak value of the AC voltage obtained between the load connection terminals at the rated load ,
In the power generation device with a power conversion circuit, the control of the switch element of the power conversion circuit is started when it is confirmed in the power supply voltage confirmation process that the output voltage of the power supply unit is equal to or higher than a set value. Control method.
前記マイクロコンピュータの電源電圧の確立が確認された後、設定時間が経過した時に前記電源部の出力電圧が無負荷時に前記負荷接続端子間に得られる交流電圧の波高値を定格負荷時に該負荷接続端子間に得られる交流電圧の波高値よりも高くするために必要な値に設定された設定値以上になっているか否かを確認する電源電圧確認過程を行い、
前記電源電圧確認過程で前記電源部の出力電圧が設定値以上になったことが確認された時に前記電力変換回路のスイッチ素子の制御を開始することを特徴とする電力変換回路付き発動発電装置の制御方法。A power source unit that uses a generator driven by an internal combustion engine as a power source, a power conversion circuit that converts an output voltage of the power source unit into an AC voltage by switching of a switching element, and an output of the power conversion circuit is applied through a filter A load connection terminal and a microcomputer that operates by being supplied with a power supply voltage by a DC power supply circuit that converts the output of the power supply unit into a constant DC voltage are provided between the load connection terminals by the microcomputer. In the control method of the motor generator with a power conversion circuit for controlling the switch element of the power conversion circuit so that the voltage is an AC voltage having a desired waveform,
After confirming the establishment of the power supply voltage of the microcomputer, when the set time elapses, the output voltage of the power supply unit is connected to the load voltage at the rated load when the output voltage of the power supply unit is not loaded. Perform a power supply voltage check process to check whether it is higher than the set value set to the value required to make it higher than the peak value of the AC voltage obtained between the terminals ,
In the power generation device with a power conversion circuit, the control of the switch element of the power conversion circuit is started when it is confirmed in the power supply voltage confirmation process that the output voltage of the power supply unit is equal to or higher than a set value. Control method.
前記電源電圧確認過程で前記電源部の出力電圧が設定値以上になったことが確認された時に前記電力変換回路のスイッチ素子の制御を開始することを特徴とする電力変換回路付き発動発電装置の制御方法。A power source unit that uses a generator driven by an internal combustion engine as a power source, a power conversion circuit that converts an output voltage of the power source unit into an AC voltage by switching of a switching element, and an output of the power conversion circuit is applied through a filter A load connection terminal and a microcomputer that operates by being supplied with a power supply voltage from a DC power supply circuit that uses a battery as a power supply are provided, and the voltage applied between the load connection terminals by the microcomputer is an AC voltage having a desired waveform. In the control method of the power generation device with a power conversion circuit for controlling the switch element of the power conversion circuit, an engine for confirming whether or not the internal combustion engine is started after the power supply voltage of the microcomputer is established A startup confirmation process, a set time elapse confirmation process for confirming whether a set time has elapsed, and the power supply Set to a value necessary for making the peak value of the AC voltage obtained between the load connection terminals when the load voltage is no load higher than the peak value of the AC voltage obtained between the load connection terminals at the rated load. Power supply voltage check process to check whether or not the set value is exceeded
In the power generation device with a power conversion circuit, the control of the switch element of the power conversion circuit is started when it is confirmed in the power supply voltage confirmation process that the output voltage of the power supply unit is equal to or higher than a set value. Control method.
前記コントローラは、その電源電圧が確立した後前記内燃機関の起動を確認する内燃機関起動確認手段と、前記内燃機関の起動が確認された後設定時間が経過した時に前記電源部の出力電圧が無負荷時に前記負荷接続端子間に得られる交流電圧の波高値を定格負荷時に該負荷接続端子間に得られる交流電圧の波高値よりも高くするために必要な値に設定された設定値以上になったか否かを確認する電源電圧確認手段とを備えて、前記電源電圧確認手段により前記電源部の出力電圧が前記設定電圧以上になったことが確認された時に前記電力変換回路のスイッチ素子の制御を開始することを特徴とする電力変換回路付き発動発電装置。A power source unit that uses a generator driven by an internal combustion engine as a power source, a power conversion circuit that converts an output voltage of the power source unit into an AC voltage by switching of a switching element, and an output of the power conversion circuit is applied through a filter The switch element so that the voltage applied between the load connection terminals is an AC voltage having a desired waveform using a microcomputer connected to a load connection terminal and a DC power supply circuit operating from a DC power supply circuit powered by a battery. In the generator device with a power conversion circuit comprising a controller for controlling
Wherein the controller is an internal combustion engine restart confirmation means for confirming the start of the internal combustion engine after establishing the power supply voltage, the output voltage of the power supply unit when the start of the internal combustion engine set time has elapsed after the confirmed free The peak value of the AC voltage obtained between the load connection terminals at the time of load is greater than or equal to the set value set to a value necessary for making the peak value of the AC voltage obtained between the load connection terminals at the rated load higher than that of the load connection terminal. Power supply voltage confirmation means for confirming whether the output voltage of the power supply unit is equal to or higher than the set voltage by the power supply voltage confirmation means. The power generation apparatus with a power conversion circuit, characterized in that
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30524899A JP3654091B2 (en) | 1999-10-27 | 1999-10-27 | Motor generator with power conversion circuit and control method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30524899A JP3654091B2 (en) | 1999-10-27 | 1999-10-27 | Motor generator with power conversion circuit and control method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2001128463A JP2001128463A (en) | 2001-05-11 |
JP3654091B2 true JP3654091B2 (en) | 2005-06-02 |
Family
ID=17942826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP30524899A Expired - Fee Related JP3654091B2 (en) | 1999-10-27 | 1999-10-27 | Motor generator with power conversion circuit and control method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3654091B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4433149B2 (en) | 2003-10-31 | 2010-03-17 | 国産電機株式会社 | Engine-driven inverter power generator and control method thereof |
DE102017114526A1 (en) * | 2017-06-29 | 2019-01-03 | Hanon Systems | Method for controlling power semiconductors in an inverter |
-
1999
- 1999-10-27 JP JP30524899A patent/JP3654091B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2001128463A (en) | 2001-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7256507B2 (en) | Inverter controlled generator set | |
JP3440889B2 (en) | Power supply device with power conversion circuit and control method therefor | |
US8035330B2 (en) | Apparatus and method for driving synchronous motor | |
JP3589086B2 (en) | Power supply | |
JP2004320984A (en) | Inverter controller for driving motor and air conditioner | |
JP4433149B2 (en) | Engine-driven inverter power generator and control method thereof | |
JPH11187662A (en) | Dc-to-dc converter | |
JP2005137164A5 (en) | ||
US6556457B1 (en) | Method of controlling inverter power generation apparatus | |
US6317339B1 (en) | Method of controlling electric power supply apparatus with electric power converter circuit | |
JP3848903B2 (en) | Power converter | |
JP3654091B2 (en) | Motor generator with power conversion circuit and control method thereof | |
JP3598936B2 (en) | Inverter generator | |
JP3598939B2 (en) | Inverter generator | |
JP3742929B2 (en) | Power supply | |
JPH10201248A (en) | Power supply device | |
JP3525910B2 (en) | Inverter generator and parallel operation method of inverter generator and external AC power supply | |
JP3546775B2 (en) | Inverter generator | |
JP2002078349A (en) | Inverter device | |
JP3508699B2 (en) | Control method of inverter generator | |
JP2000253665A (en) | Power supply apparatus | |
JP4077326B2 (en) | Method of processing regenerative power of inverter device and inverter device used in this method | |
JP2001309663A (en) | Inverter generating set | |
JP3580190B2 (en) | Inverter power supply and method for detecting connection of other power supply between output terminals thereof | |
JPH09289776A (en) | Inverter circuit of power supply device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050208 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050221 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090311 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090311 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100311 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110311 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110311 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120311 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130311 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130311 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140311 Year of fee payment: 9 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |