JP3653269B2 - Tension fixing device - Google Patents

Tension fixing device Download PDF

Info

Publication number
JP3653269B2
JP3653269B2 JP2003204912A JP2003204912A JP3653269B2 JP 3653269 B2 JP3653269 B2 JP 3653269B2 JP 2003204912 A JP2003204912 A JP 2003204912A JP 2003204912 A JP2003204912 A JP 2003204912A JP 3653269 B2 JP3653269 B2 JP 3653269B2
Authority
JP
Japan
Prior art keywords
cap
spring
fixing device
cone
tension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003204912A
Other languages
Japanese (ja)
Other versions
JP2005048406A (en
Inventor
邦彦 成沢
晴次 広瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyokuto Kogen Concrete Shinko Co Ltd
Original Assignee
Kyokuto Kogen Concrete Shinko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyokuto Kogen Concrete Shinko Co Ltd filed Critical Kyokuto Kogen Concrete Shinko Co Ltd
Priority to JP2003204912A priority Critical patent/JP3653269B2/en
Publication of JP2005048406A publication Critical patent/JP2005048406A/en
Application granted granted Critical
Publication of JP3653269B2 publication Critical patent/JP3653269B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、PC鋼より線等の緊張材の端末の定着に用いる緊張材定着装置に関し、特に隣り合う橋脚間および隣り合う橋脚とアバットとの間に張設する緊張材の端末の定着に用いる緊張材定着装置に関する。
【0002】
【従来の技術】
図5は、橋脚間緊張構造の構成を示す側面図であり、図6は、図5に示す定着装置付近の構成を示す断面図である。
橋脚10およびアバット20に橋桁30を乗せた河川用の橋や高速道路用の橋に地震等により水平力が作用すると、橋脚10の損壊のみならず、隣り合うアバット20と橋脚10との間および隣り合う橋脚10間の固有周期に違いがある場合には、隣り合うアバット20と橋脚10および隣り合う橋脚10は、異なった位相で振動することになって、橋桁30が落橋するという被害をもたらす可能性がある。
【0003】
そこで、従来、図5に示すように、隣り合うアバット20と橋脚10との間および隣り合う橋脚10間に緊張材40を張設する橋脚間緊張構造を用いることによって、隣り合うアバット20と橋脚10および隣り合う橋脚10の間隔が拡がることを防ぎ、橋桁30の落下を防止することが行われている。
【0004】
このような橋脚間緊張構造に用いられる緊張材は、図6に示すように、PC鋼より線、PC鋼線等からなるPC鋼材1と、PC鋼材1がアバット20および橋脚10に接触して傷つくことや雨水等によるPC鋼材1の腐食を防止するためのPEパイプ2とからなり、PC鋼材1がPEパイプ2に挿入された状態で張設されている。PC鋼材1は、アバット20および橋脚10に設けられた緊張材定着装置4によって両端部がそれぞれ定着され、PEパイプ2は、鋼製プレート9に取り付けられたサポートチューブ5内に設けられている雌コーン51と雄コーン52とからなるパイプ定着装置によって一端部のみが定着されている。
【0005】
緊張材定着装置4は、図6を参照すると、PC鋼材1の挿入口(先端側)に向かって漸次縮径するテーパ孔が形成された雌コーン41と、テーパ円筒形の外周形状と平行円筒形の内周形状を有する筒状体を複数分割(例えば3分割)にした分割筒状に形成された雄コーン42と、雌コーン41の後端側の開口端面に螺着されているキャップ43と、雄コーン42とキャップ43との間に介装され、雄コーン42を雌コーン41の先端側に付勢しているスプリング44と、雌コーン41およびキャップ43を覆うように支圧板8に取り付けられた防錆キャップ45とからなる。
【0006】
このような構成において、PC鋼材1の端部を緊張材定着装置4の緊張材定着装置4に取り付けるには、PC鋼材1の端部を雌コーン41の挿入口に挿入すると共に、雄コーン42に挿入し、雄コーン42をスプリング44による付勢力以上の力で押し込こんで雄コーン42を拡径させた後に、PC鋼材1を離す。すると、雄コーン42は、スプリング44によって雌コーン41に押し込められると同時に、縮径してPC鋼材1の端部を強く掴み、緊張材定着装置4にPC鋼材1の端部を定着させることができる。また、同様の動作でPEパイプ2の端部を緊張材定着装置4のサポートチューブ5に定着させることができる(例えば、特許文献1参照)。
【0007】
【特許文献1】
特開平09−1536号公報
【0008】
【発明が解決しようとする課題】
図7は、従来の緊張材定着装置の緊張材定着工程を示す図である。
しかしながら、従来技術では、PC鋼材1を緊張材定着装置4に挿入するに際し、図7(a)に示すように、PC鋼材1が雄コーン42に引っ掛かってしまう場合があり、PC鋼材1が雄コーン42に引っ掛かった状態でPC鋼材1を押し込んだ場合には、図7(b)に示すように、防錆キャップ45の底部45aが破損したり、亀裂が生じたりして防錆機能が失われ、緊張材定着装置4の腐食によってPC鋼材1が抜け落ちてしまう危険性があるという問題点があった。
【0009】
また、従来技術では、PC鋼材1を張設後、地震等によって隣り合うアバット20と橋脚10との間および隣り合う橋脚10の間の距離が短くなってしまうと、PC鋼材1によって雄コーン42が押されて定着位置がずれてしまい、PC鋼材1に必要以上の緊張力が加わってしまうという問題点があった。
【0010】
本発明は斯かる問題点を鑑みてなされたものであり、その目的とするところは、緊張材定着装置にPC鋼材を定着させる際に、PC鋼材が雄コーンに引っ掛かってしまっても、防錆キャップが破損したり、亀裂が生じたりすることがなく、さらに、地震等によって隣り合うアバット20と橋脚10との間および隣り合う橋脚10の間の距離が短くなった場合にも、PC鋼材1の定着位置がずれることがない緊張材定着装置を提供する点にある。
【0011】
【課題を解決するための手段】
本発明は上記課題を解決すべく、以下に掲げる構成とした。
請求項1記載の発明の要旨は、緊張材を橋脚もしくはアバットに定着させる緊張材定着装置であって、前記緊張材の挿入口が形成されている先端側に向かって漸次縮径するテーパ孔が形成された雌コーンと、テーパ円筒形の外周形状と平行円筒形の内周形状を有する筒状体を複数分割にした分割筒状に形成され、前記雌コーンのテーパ孔に収納されている雄コーンと、前記雌コーンの後端側の開口端面に螺着されているキャップと、前記雄コーンとキャップとの間に介装され、前記雄コーンを前記雌コーンの先端側に付勢している第1のスプリングと、前記キャップが螺着されている前記雌コーンを収納する防錆キャップと、該防錆キャップの底面と前記キャップとの間に介装され、前記キャップおよび前記雌コーンを前記第1のスプリングの付勢方向と同一方向に付勢している第2のスプリングとを具備することを特徴とする緊張材定着装置に存する。
また請求項2記載の発明の要旨は、前記キャップの前記第2のスプリングとの当接面には、前記第2のスプリングを位置決めするための凸部が形成されていることを特徴とする請求項1記載の緊張材定着装置に存する。
また請求項3記載の発明の要旨は、前記第1のスプリングの付勢力は、前記第2のスプリングの付勢力の略2倍であることを特徴とする請求項1又は2記載の緊張材定着装置に存する。
【0012】
【発明の実施の形態】
以下、本発明の実施の形態を図面に基づいて詳細に説明する。
【0013】
図1は、本発明に係る緊張材定着装置の実施の形態の構成を示す断面図であり、図2は、本発明に係る緊張材定着装置の実施の形態の構成を示す分解図である。
【0014】
本実施の形態の緊張材定着装置7は、図1および図2を参照すると、PC鋼材1の挿入口(先端側)に向かって漸次縮径するテーパ孔が形成された雌コーン41と、テーパ円筒形の外周形状と平行円筒形の内周形状を有する筒状体を複数分割(2分割等)にした分割筒状に形成された雄コーン42と、雌コーン41の後端側の開口端面に螺着され、凸部71aとPC鋼材1が貫通する開口とが形成されているキャップ71と、雄コーン42とキャップ43との間に介装され、雄コーン42を雌コーン41の先端側に付勢しているスプリング44と、雌コーン41およびキャップ71を覆うように支圧板8に取り付けられた防錆キャップ45と、防錆キャップ45の底部45aとキャップ71との間に介装され、キャップ71および雌コーン41を支圧板8に押しつける方向、すなわちスプリング44の付勢方向と同一方向に付勢している第2のスプリング72とからなる。なお、キャップ71の第2のスプリング72に当接する面側に形成されている凸部71aは、第2のスプリング72を位置決めするために設けられている。
【0015】
スプリング44の付勢力と第2のスプリング72の付勢力とは、第2のスプリング72の付勢力がスプリング44の付勢力よりも弱く設定されており、第2のスプリング72の付勢力は、スプリング44の付勢力の1/2程度であることが好ましい。
【0016】
なお、PEパイプ2は、鋼製プレート9に取り付けられたサポートチューブ5内に設けられている雌コーン51と雄コーン52とからなるパイプ定着装置によって一端部のみが定着されている。
【0017】
次に、本実施の形態の緊張材定着工程について図3を参照して詳細に説明する。
図3および図4は、本発明に係る緊張材定着装置の実施の形態の緊張材定着工程を示す図である。
【0018】
アバット20と橋脚10と間にPC鋼材1を張設する場合には、まず、アバット20に取り付けられている緊張材定着装置7にPC鋼材1の一端部を取り付ける。すなわち、図3に示すように、PC鋼材1の一端部を雌コーン41の挿入口に挿入すると共に、雄コーン42に挿入し、雄コーン42をスプリング44による付勢力以上の力で押し込こんで雄コーン42を拡径させた後に、PC鋼材1を離す。すると、雄コーン42は、スプリング44によって雌コーン41に押し込められると同時に、縮径してPC鋼材1の端部を強く掴み、緊張材定着装置7にPC鋼材1の一端部を定着させることができる。
【0019】
PC鋼材1を緊張材定着装置7に挿入するに際し、図3(a)に示すような、PC鋼材1が雌コーン41に引っ掛かった状態でPC鋼材1を押し込んだ場合にも、図3(b)に示すように、第2のスプリング72によって防錆キャップ45の底部45aに雌コーン41およびキャップ71が当接することがなく、防錆キャップ45の底部45aに急激な力が加わることがないため、防錆キャップ45の底部45aが破損したり、亀裂が生じたりすることがない。
【0020】
次に、橋脚10側にPC鋼材1の他端部を取り付ける。図4(a)に示すように、防錆キャップ45と第2のスプリング72とを取り外した状態の緊張材定着装置7にPC鋼材1を通し、図示しない緊張用ジャッキによってPC鋼材1を図4(a)に矢印で示す方向に緊張させる。緊張用ジャッキによる緊張は、キャップ71および雌コーン41を押さえた状態で行われるため、雄コーン42は、スプリング44によって雌コーン41に押し込められると同時に、縮径してPC鋼材1の端部を強く掴み、緊張させた状態でPC鋼材1を定着させることができる。
【0021】
このようにしてPC鋼材1に所定の緊張力を与えた後、図示しない緊張用ジャッキを取り外すと共に、図4(a)に示すように、PC鋼材1を切断し、図4(b)に示すように、第2のスプリング72と防錆キャップ45とを取り付ける。
【0022】
以上説明したように、本実施の形態によれば、防錆キャップ45とキャップ71(雌コーン41)との間に第2のスプリング72を介装することにより、緊張材定着装置7にPC鋼材1を定着させる際に、PC鋼材1が雄コーン42に引っ掛かってしまっても、防錆キャップ45が破損したり、亀裂が生じたりすることがないため、防錆キャップ45の防錆機能が損なわれることなく、長期間に亘って安定してPC鋼材1を定着させることができるという効果を奏する。
【0023】
さらに、本実施の形態によれば、地震等によって隣り合うアバット20と橋脚10との間および隣り合う橋脚10の間の距離が短くなった場合にも、第2のスプリング72によってPC鋼材1が雄コーン42を押し込むことがないため、定着位置がずれてしまうことがなく、長期間に亘って安定してPC鋼材1を定着させることができるという効果を奏する。
【0024】
なお、本発明が上記各実施の形態に限定されず、本発明の技術思想の範囲内において、各実施の形態は適宜変更され得ることは明らかである。また、上記構成部材の数、位置、形状等は上記実施の形態に限定されず、本発明を実施する上で好適な数、位置、形状等にすることができる。なお、各図において、同一構成要素には同一符号を付している。
【0025】
【発明の効果】
本発明の緊張材定着装置は、防錆キャップとキャップ(雌コーン)との間にスプリングを介装することにより、緊張材定着装置にPC鋼材を定着させる際に、PC鋼材が雌コーンに引っ掛かってしまっても、防錆キャップが破損したり、亀裂が生じたりすることがないため、防錆キャップの防錆機能が損なわれることなく、長期間に亘って安定してPC鋼材1を定着させることができるという効果を奏する。
【0026】
さらに、本発明の緊張材定着装置は、地震等によって隣り合うアバットと橋脚との間および隣り合う橋脚の間の距離が短くなった場合にも、第2のスプリングによってPC鋼材が雄コーンを押し込むことがないため、定着位置がずれてしまうことがなく、長期間に亘って安定してPC鋼材を定着させることができるという効果を奏する。
【図面の簡単な説明】
【図1】本発明に係る緊張材定着装置の実施の形態の構成を示す断面図である。
【図2】本発明に係る緊張材定着装置の実施の形態の構成を示す分解図である。
【図3】本発明に係る緊張材定着装置の実施の形態の緊張材定着工程を示す図である。
【図4】本発明に係る緊張材定着装置の実施の形態の緊張材定着工程を示す図である。
【図5】橋脚間緊張構造の構成を示す側面図である。
【図6】図5に示す定着装置付近の構成を示す断面図である。
【図7】従来の緊張材定着装置の緊張材定着工程を示す図である。
【符号の説明】
1 PC鋼材
2 PEパイプ
4、7 緊張材定着装置
5 サポートチューブ
8 支圧板
9 鋼製プレート
10 橋脚
20 アバット
30 橋桁
41、51 雌コーン
42、52 雄コーン
43 キャップ(従来)
44 スプリング
45 防錆キャップ
72 第2のスプリング
71 キャップ(本発明)
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tension material fixing device used for fixing a terminal of a tension material such as a PC steel strand, and particularly to fixing a tension material terminal stretched between adjacent piers and between adjacent piers and an abutment. The present invention relates to a tendon fixing device.
[0002]
[Prior art]
5 is a side view showing the configuration of the tension structure between piers, and FIG. 6 is a cross-sectional view showing the configuration in the vicinity of the fixing device shown in FIG.
When a horizontal force acts on a river bridge or a highway bridge with bridge girder 30 on pier 10 and abut 20 due to an earthquake or the like, not only the pier 10 is damaged, but also between adjacent abut 20 and pier 10 and When there is a difference in the natural period between the adjacent piers 10, the adjacent abut 20, the pier 10, and the adjacent pier 10 vibrate at different phases, causing damage that the bridge girder 30 is dropped. there is a possibility.
[0003]
Therefore, conventionally, as shown in FIG. 5, by using an abutment tension structure in which tension members 40 are stretched between adjacent abutments 20 and piers 10 and between adjacent piers 10, adjacent abutments 20 and piers are used. 10 and the gap between adjacent piers 10 are prevented from expanding and the bridge girder 30 is prevented from falling.
[0004]
As shown in FIG. 6, the tension member used in such an inter-pier tension structure includes a PC steel material 1 made of PC steel wire, a PC steel wire, and the like, and the PC steel material 1 is in contact with the abutment 20 and the pier 10. It consists of a PE pipe 2 for preventing corrosion of the PC steel material 1 due to damage or rainwater, and the PC steel material 1 is stretched in a state inserted into the PE pipe 2. Both ends of the PC steel 1 are fixed by a tension material fixing device 4 provided on the abut 20 and the pier 10, and the PE pipe 2 is a female provided in a support tube 5 attached to a steel plate 9. Only one end is fixed by a pipe fixing device including a cone 51 and a male cone 52.
[0005]
Referring to FIG. 6, the tension material fixing device 4 includes a female cone 41 in which a tapered hole gradually reducing in diameter toward the insertion port (front end side) of the PC steel material 1, a tapered cylindrical outer peripheral shape, and a parallel cylinder A male cone 42 formed into a divided cylindrical shape obtained by dividing a cylindrical body having an inner peripheral shape into a plurality of divisions (for example, three divisions), and a cap 43 screwed to an opening end surface on the rear end side of the female cone 41 And a spring 44 interposed between the male cone 42 and the cap 43 and urging the male cone 42 toward the distal end side of the female cone 41, and the support plate 8 so as to cover the female cone 41 and the cap 43. The rust prevention cap 45 is attached.
[0006]
In such a configuration, in order to attach the end portion of the PC steel material 1 to the tension material fixing device 4 of the tension material fixing device 4, the end portion of the PC steel material 1 is inserted into the insertion opening of the female cone 41 and the male cone 42. The male cone 42 is pushed in with a force greater than the urging force of the spring 44 to expand the diameter of the male cone 42, and then the PC steel material 1 is released. Then, the male cone 42 is pushed into the female cone 41 by the spring 44, and at the same time, the diameter of the male cone 42 is reduced and the end of the PC steel 1 is strongly grasped, and the end of the PC steel 1 is fixed to the tension material fixing device 4. it can. Further, the end of the PE pipe 2 can be fixed to the support tube 5 of the tension material fixing device 4 by the same operation (see, for example, Patent Document 1).
[0007]
[Patent Document 1]
Japanese Patent Laid-Open No. 09-1536
[Problems to be solved by the invention]
FIG. 7 is a diagram showing a tension material fixing step of a conventional tension material fixing device.
However, in the prior art, when the PC steel material 1 is inserted into the tension material fixing device 4, the PC steel material 1 may be caught by the male cone 42 as shown in FIG. When the PC steel material 1 is pushed in while being caught by the cone 42, as shown in FIG. 7 (b), the bottom 45a of the rust prevention cap 45 is broken or cracked, and the rust prevention function is lost. However, there is a problem in that there is a risk that the PC steel material 1 falls off due to the corrosion of the tension material fixing device 4.
[0009]
In the prior art, if the distance between the adjacent abutment 20 and the pier 10 and between the adjacent piers 10 is shortened by an earthquake or the like after the PC steel material 1 is stretched, the male cone 42 is caused by the PC steel material 1. Is pushed, the fixing position is shifted, and there is a problem that the PC steel material 1 is applied with a tension more than necessary.
[0010]
The present invention has been made in view of such problems, and the object of the present invention is to prevent rust even if the PC steel is caught on the male cone when the PC steel is fixed to the tension material fixing device. Even when the cap is not damaged or cracked, and the distance between the adjacent abut 20 and the pier 10 and between the adjacent pier 10 is shortened due to an earthquake or the like, the PC steel 1 It is in the point which provides the tension | tensile_strength fixing apparatus with which the fixing position of this does not shift | deviate.
[0011]
[Means for Solving the Problems]
In order to solve the above problems, the present invention has the following configuration.
The gist of the invention described in claim 1 is a tension material fixing device for fixing a tension material to a bridge pier or an abutment, wherein a taper hole gradually decreasing in diameter toward a distal end side where the insertion port of the tension material is formed. The male cone formed is divided into a plurality of cylindrical bodies having a tapered cylindrical outer peripheral shape and a parallel cylindrical inner peripheral shape, and is accommodated in the tapered hole of the female cone. A cone, a cap screwed to the opening end face of the rear end side of the female cone, and interposed between the male cone and the cap, urging the male cone toward the distal end side of the female cone A first spring, a rust prevention cap for housing the female cone to which the cap is screwed, and a bottom surface of the rust prevention cap and the cap, the cap and the female cone Said first spring Consists in tendon fixing apparatus characterized by comprising a second spring biases the urging direction and the same direction.
According to a second aspect of the present invention, a convex portion for positioning the second spring is formed on a contact surface of the cap with the second spring. It exists in the tension material fixing apparatus of claim | item 1.
The gist of the invention described in claim 3 is that the urging force of the first spring is approximately twice the urging force of the second spring. Exists in the device.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0013]
FIG. 1 is a cross-sectional view showing the configuration of the embodiment of the tendon fixing device according to the present invention, and FIG. 2 is an exploded view showing the configuration of the embodiment of the tendon fixing device according to the present invention.
[0014]
1 and 2, a tendon fixing device 7 according to the present embodiment includes a female cone 41 having a tapered hole that gradually decreases in diameter toward the insertion port (front end side) of the PC steel material 1, and a taper. A male cone 42 formed into a divided cylindrical shape obtained by dividing a cylindrical body having a cylindrical outer peripheral shape and a parallel cylindrical inner peripheral shape into a plurality of divisions (such as two divisions), and an opening end surface on the rear end side of the female cone 41 Are inserted between the male cone 42 and the cap 43, and the male cone 42 is connected to the distal end side of the female cone 41. Are interposed between the bottom portion 45a of the rust prevention cap 45 and the cap 71. The spring 44 is urged to the rust, the rust prevention cap 45 is attached to the bearing plate 8 so as to cover the female cone 41 and the cap 71. , Cap 71 and female cone 4 Direction of pressing to the bearing capacity plate 8, that is, the second spring 72 that urges the urging direction and the same direction of the spring 44. A convex portion 71 a formed on the side of the cap 71 that contacts the second spring 72 is provided to position the second spring 72.
[0015]
The urging force of the spring 44 and the urging force of the second spring 72 are set such that the urging force of the second spring 72 is weaker than the urging force of the spring 44. It is preferably about 1/2 of the urging force of 44.
[0016]
The PE pipe 2 is fixed only at one end by a pipe fixing device including a female cone 51 and a male cone 52 provided in a support tube 5 attached to a steel plate 9.
[0017]
Next, the tendon fixing process of the present embodiment will be described in detail with reference to FIG.
3 and 4 are diagrams showing a tension material fixing process of the embodiment of the tension material fixing device according to the present invention.
[0018]
When the PC steel material 1 is stretched between the abut 20 and the pier 10, first, one end of the PC steel material 1 is attached to the tension material fixing device 7 attached to the abut 20. That is, as shown in FIG. 3, one end of the PC steel material 1 is inserted into the insertion opening of the female cone 41 and inserted into the male cone 42, and the male cone 42 is pushed in with a force greater than the urging force of the spring 44. After expanding the diameter of the male cone 42, the PC steel material 1 is released. Then, the male cone 42 is pushed into the female cone 41 by the spring 44, and at the same time, the diameter of the male cone 42 is reduced and the end of the PC steel material 1 is strongly grasped, and the end of the PC steel material 1 is fixed to the tension material fixing device 7. it can.
[0019]
When the PC steel material 1 is inserted into the tendon fixing device 7 and the PC steel material 1 is pushed in a state where the PC steel material 1 is caught by the female cone 41 as shown in FIG. ), The second cone 72 prevents the female cone 41 and the cap 71 from coming into contact with the bottom 45a of the rust prevention cap 45, and no sudden force is applied to the bottom 45a of the rust prevention cap 45. The bottom 45a of the rust prevention cap 45 is not damaged or cracked.
[0020]
Next, the other end portion of the PC steel material 1 is attached to the pier 10 side. As shown in FIG. 4 (a), the PC steel material 1 is passed through the tension material fixing device 7 in a state where the rust prevention cap 45 and the second spring 72 are removed, and the PC steel material 1 is removed by a tension jack (not shown). Tension in the direction indicated by the arrow in (a). Since the tension by the tension jack is performed in a state where the cap 71 and the female cone 41 are pressed, the male cone 42 is pushed into the female cone 41 by the spring 44, and at the same time, the diameter of the male cone 42 is reduced and the end of the PC steel material 1 is moved. The PC steel material 1 can be fixed in a tightly gripped and tensioned state.
[0021]
After giving a predetermined tension force to the PC steel material 1 in this manner, a tension jack (not shown) is removed, and the PC steel material 1 is cut as shown in FIG. 4 (a), as shown in FIG. 4 (b). In this manner, the second spring 72 and the rust prevention cap 45 are attached.
[0022]
As described above, according to the present embodiment, the second spring 72 is interposed between the rust prevention cap 45 and the cap 71 (female cone 41), so that the tension steel fixing device 7 is provided with the PC steel material. When fixing 1, even if the PC steel material 1 is caught on the male cone 42, the rust prevention cap 45 will not be broken or cracked, so the rust prevention function of the rust prevention cap 45 is impaired. The effect is that the PC steel material 1 can be stably fixed over a long period of time.
[0023]
Furthermore, according to the present embodiment, even when the distance between the adjacent abut 20 and the pier 10 and the distance between the adjacent piers 10 are shortened due to an earthquake or the like, the PC steel material 1 is removed by the second spring 72. Since the male cone 42 is not pushed in, the fixing position is not shifted, and the PC steel material 1 can be stably fixed over a long period of time.
[0024]
Note that the present invention is not limited to the above-described embodiments, and it is obvious that the embodiments can be appropriately changed within the scope of the technical idea of the present invention. In addition, the number, position, shape, and the like of the constituent members are not limited to the above-described embodiment, and can be set to a number, position, shape, and the like that are suitable for implementing the present invention. In each figure, the same numerals are given to the same component.
[0025]
【The invention's effect】
In the tension material fixing device of the present invention, when a PC steel material is fixed to the tension material fixing device by interposing a spring between the rust prevention cap and the cap (female cone), the PC steel material is caught by the female cone. Even if the rust prevention cap is not damaged or cracked, the PC steel material 1 can be stably fixed over a long period of time without impairing the rust prevention function of the rust prevention cap. There is an effect that can be.
[0026]
Further, in the tension material fixing device of the present invention, the PC steel material pushes the male cone by the second spring even when the distance between the adjacent abutment and the pier and the distance between the adjacent piers are shortened due to an earthquake or the like. Therefore, the fixing position is not shifted, and the PC steel material can be stably fixed over a long period of time.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing a configuration of an embodiment of a tendon fixing device according to the present invention.
FIG. 2 is an exploded view showing the configuration of the embodiment of the tendon fixing device according to the present invention.
FIG. 3 is a diagram showing a tension material fixing step of the embodiment of the tension material fixing device according to the present invention.
FIG. 4 is a diagram showing a tension material fixing process of the embodiment of the tension material fixing device according to the present invention.
FIG. 5 is a side view showing a configuration of a bridge pier tension structure.
6 is a cross-sectional view showing a configuration in the vicinity of the fixing device shown in FIG.
FIG. 7 is a diagram showing a tension material fixing step of a conventional tension material fixing device.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 PC steel material 2 PE pipe 4, 7 Tensile material fixing device 5 Support tube 8 Bearing plate 9 Steel plate 10 Bridge pier 20 Abut 30 Bridge girder 41, 51 Female cone 42, 52 Male cone 43 Cap (conventional)
44 Spring 45 Anti-rust cap 72 Second spring 71 Cap (present invention)

Claims (3)

緊張材を橋脚もしくはアバットに定着させる緊張材定着装置であって、
前記緊張材の挿入口が形成されている先端側に向かって漸次縮径するテーパ孔が形成された雌コーンと、
テーパ円筒形の外周形状と平行円筒形の内周形状を有する筒状体を複数分割にした分割筒状に形成され、前記雌コーンのテーパ孔に収納されている雄コーンと、
前記雌コーンの後端側の開口端面に螺着されているキャップと、
前記雄コーンとキャップとの間に介装され、前記雄コーンを前記雌コーンの先端側に付勢している第1のスプリングと、
前記キャップが螺着されている前記雌コーンを収納する防錆キャップと、
該防錆キャップの底面と前記キャップとの間に介装され、前記キャップおよび前記雌コーンを前記第1のスプリングの付勢方向と同一方向に付勢している第2のスプリングとを具備することを特徴とする緊張材定着装置。
A tension material fixing device for fixing a tension material to a bridge pier or an abutment,
A female cone formed with a tapered hole that gradually decreases in diameter toward the tip side where the insertion port of the tendon is formed;
A male cone that is formed into a divided cylindrical shape obtained by dividing a cylindrical body having an outer peripheral shape of a tapered cylindrical shape and an inner peripheral shape of a parallel cylindrical shape, and is accommodated in a tapered hole of the female cone;
A cap screwed to the opening end face on the rear end side of the female cone;
A first spring interposed between the male cone and the cap and biasing the male cone toward the distal end of the female cone;
A rust prevention cap for housing the female cone to which the cap is screwed;
A second spring interposed between the bottom surface of the rust prevention cap and the cap and biasing the cap and the female cone in the same direction as the biasing direction of the first spring; A tendon fixing device characterized by that.
前記キャップの前記第2のスプリングとの当接面には、前記第2のスプリングを位置決めするための凸部が形成されていることを特徴とする請求項1記載の緊張材定着装置。The tension material fixing device according to claim 1, wherein a convex portion for positioning the second spring is formed on a contact surface of the cap with the second spring. 前記第2のスプリングの付勢力は、前記第1のスプリングの付勢力よりも弱いことを特徴とする請求項1又は2記載の緊張材定着装置。The tension material fixing device according to claim 1, wherein an urging force of the second spring is weaker than an urging force of the first spring.
JP2003204912A 2003-07-31 2003-07-31 Tension fixing device Expired - Fee Related JP3653269B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003204912A JP3653269B2 (en) 2003-07-31 2003-07-31 Tension fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003204912A JP3653269B2 (en) 2003-07-31 2003-07-31 Tension fixing device

Publications (2)

Publication Number Publication Date
JP2005048406A JP2005048406A (en) 2005-02-24
JP3653269B2 true JP3653269B2 (en) 2005-05-25

Family

ID=34263768

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003204912A Expired - Fee Related JP3653269B2 (en) 2003-07-31 2003-07-31 Tension fixing device

Country Status (1)

Country Link
JP (1) JP3653269B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812256A (en) * 2015-12-01 2017-06-09 衡阳市新德力预应力有限公司 A kind of compound prestress stretching end anchorage
CN105421666B (en) * 2015-12-11 2018-04-24 桂林理工大学 Pre-stressed carbon fiber plate anchor and its construction method
CN106121265A (en) * 2016-06-23 2016-11-16 山东大学 Prestressing force, mechanical anchor external application carbon fiber sheet joint reinforcement device and method
CN106567331B (en) * 2016-10-17 2018-04-17 南京大德减震科技有限公司 A kind of adjustable steel wire dragline anchorage
KR102004417B1 (en) * 2019-02-25 2019-07-26 주식회사 성지기공 Inside reinforcement device of prefabricated water tank

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH091536A (en) * 1995-06-15 1997-01-07 Tokyo Seiko Co Ltd Tendon anchoring apparatus
JP3053568B2 (en) * 1996-04-19 2000-06-19 株式会社ピー・エス Girder bridge
FR2777296B1 (en) * 1998-04-10 2000-06-16 Freyssinet Int Stup SUSPENSION DEVICE FOR A CONSTRUCTION STRUCTURE

Also Published As

Publication number Publication date
JP2005048406A (en) 2005-02-24

Similar Documents

Publication Publication Date Title
WO2006062659A3 (en) Anchor wedge configuration for tendon anchors
JP4979141B2 (en) Pipe connecting device
FR2545998A1 (en) TERMINATION STRUCTURE FOR TORON CABLE
EP2305895A3 (en) Internal anchorage for a tension member
JP3653269B2 (en) Tension fixing device
US6004165A (en) Multiple cable connector and method therefor
EP1439262A3 (en) Rope and method for detecting damage thereof
EP1131492A1 (en) System for connecting a structural cable to a building work structure
JP2001165245A (en) Wedge type rope clamping device
JP3990708B2 (en) PC steel fixing method
TWI267604B (en) Pilot-controlled electromagnetic valve system
US5596854A (en) Post-tensioning anchor head assembly
KR200392136Y1 (en) removable anchor
JP3970262B2 (en) PC steel fixing tool
JP5477792B2 (en) Fixing tool
KR100456336B1 (en) Power anchorage system by one piece wedge type
CN87105250A (en) The improvement of anchoring devices for tensile braces
EP3696446B1 (en) Wedge clamp and steel wire
KR200392134Y1 (en) removable anchor
KR200419243Y1 (en) Removal anchor
EP1172605A3 (en) Attachment for a flashlight
KR950006172A (en) Fixtures with auxiliary wedges of P.S concrete beam strand steel of post tension method and fixing method using the same
JP2004060432A (en) Anchor wedge for pc steel
RU193534U1 (en) FASTENING DEVICE FOR MULTI-ORDER CABLE
JPH07317721A (en) Fixing method for terminal of cableway cable and fixng tool for it

Legal Events

Date Code Title Description
A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20041227

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20050203

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050222

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050225

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090304

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees