JP3634924B2 - Method for assembling concrete pole ring reinforcement and apparatus, jig and metal fitting used therefor - Google Patents

Method for assembling concrete pole ring reinforcement and apparatus, jig and metal fitting used therefor Download PDF

Info

Publication number
JP3634924B2
JP3634924B2 JP21169496A JP21169496A JP3634924B2 JP 3634924 B2 JP3634924 B2 JP 3634924B2 JP 21169496 A JP21169496 A JP 21169496A JP 21169496 A JP21169496 A JP 21169496A JP 3634924 B2 JP3634924 B2 JP 3634924B2
Authority
JP
Japan
Prior art keywords
ring
bar
concrete pole
spacer
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP21169496A
Other languages
Japanese (ja)
Other versions
JPH1052815A (en
Inventor
政治 山下
Original Assignee
九州高圧コンクリート工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 九州高圧コンクリート工業株式会社 filed Critical 九州高圧コンクリート工業株式会社
Priority to JP21169496A priority Critical patent/JP3634924B2/en
Publication of JPH1052815A publication Critical patent/JPH1052815A/en
Application granted granted Critical
Publication of JP3634924B2 publication Critical patent/JP3634924B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Wire Processing (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、リング筋で縦鉄筋を横拘束したコンクリートポールのリング筋の組立てにおいて、リング筋の組立方法並びにその組立方法に使用するリング筋組立装置、リング筋配置装置、スペーサー受け装置、リング筋連結金具及びリング筋集合治具に関する。
【0002】
【従来の技術】
大地震によっても破壊されない高強度を有するコンクリートポール、パイル等の長尺コンクリート製品あるいは細径であっても高強度を有する長尺コンクリート製品を得るため、縦鉄筋の横拘束筋としてリング筋が採用されつつある。
【0003】
図9はリング筋を用いたコンクリートポールの鉄筋の概略図で、ポールの上部及び下部は荷重の影響が少ないので、らせん筋が縦鉄筋及び補助縦鉄筋の外周に巻いてある。曲げモーメントが大きい部分には、リング筋で横拘束して強度を上げるため、第1のブロックのリング筋にダブルリング筋、第2及び第3のブロックのリング筋に丸状リング筋を用いて組立てている。曲げモーメントの大きさに応じてリング筋の強度、数、断面形状等を変化させて必要な強度を確保している。
【0004】
ところで、縦鉄筋をリング筋で横拘束するコンクリートポールは、最近製造されるようになったため、リング筋の組立て作業は手作業で行われているのが現状である。
【0005】
リング筋の手作業による組立て方法は、コンクリートポールにリング筋を配置するブロック毎に必要な数(通常十本を越える。)のリング筋を集合させ、リング筋の集合体の外周を固定治具で挟みボルトで固定し、縦鉄筋の所定のブロックの位置にリング筋の集合体を配置する。次いで、全ての縦鉄筋をリング筋の集合体の内部及び所定の間隔で配置される縦鉄筋を位置決めし保持するスペーサーに通した後、固定治具を外し、リング筋の集合体からリング筋を一本づつ分離して間隔揃え治具の溝に保持して所定の位置に配置する。配置が終了すると、極細鉄線で縦鉄筋とリング筋の結束を行って縦鉄筋とリング筋とを固定し、間隔揃え治具を外して、リング筋の組立てを終了する。
【0006】
【発明が解決しようとする課題】
従来のリング筋組立て作業が手作業であることから明らかなとおり、リング筋の位置決め配置及びリング筋の固定作業に時間を要するとともに、手作業によるため、リング筋の間隔精度がばらつくという欠点がある。また、テーパー状のコンクリートポールの場合、リング筋の集合体の内部及びスペーサーに縦鉄筋を通す時、縦鉄筋を軸方向にテーパー状に通すために、集合してテーパー状となっているリング筋集合体の径の小さいリング筋と縦鉄筋との摩擦が増大し、縦鉄筋が通しにくくなる。
【0007】
そこで、本発明は、コンクリートポールのリング筋の位置決め配置を自動化し、リング筋を結束作業をすることなく固定して作業時間を短縮し、リング筋間隔精度を向上させるコンクリートポールのリング筋の組立方法並びにそれに使用する装置、治具及び金具を提供するものである。
【0008】
【課題を解決するための手段】
本発明は、リング筋配置装置のリング筋保持体にリング筋を保持するとともに、スペーサー受け装置のスペーサー受台にスペーサーを保持し、縦鉄筋をスペーサー及びリング筋の内側に通した後、リング筋保持体を拡げてリング筋を所定間隔で位置決めし、位置決めしたリング筋をリング筋連結金具のクリップで挟持してコンクリートポールのリング筋を組立てる。
【0009】
コンクリートポールのリング筋組立装置は、リング筋配置装置及び複数のスペーサー受け装置が配置され、リング筋配置装置は、所定数のリング筋保持体からなっており、各リング筋保持体は連結環で互いに連結され、一対のエアシリンダの各ピストンロッドの先端には、それぞれ両端のリング筋保持体に固定され、エアシリンダの駆動により各リング筋保持体が所定間隔に移動する。
【0010】
スペーサー受け装置は、スペーサーを支持する複数のローラーが配置された昇降自在のスペーサー受台で構成される。
【0011】
リング筋連結金具は、リング筋を挟む所定数のクリップが形成された金属バンドからなる。
【0012】
リング筋集合治具は、リング筋の半円部分に接触する、位置決め切り欠きを有する位置決め板が両端の支持板に支持され、支持板の上部には、位置決めされた所定数のリング筋を保持するための保持棒を通す孔が形成されている。
【0013】
なお、本発明は、コンクリートポールのリング筋の組立てだけでなく、リング筋を利用したパイル等の長尺コンクリート製品のリング筋の組立てにも利用することができる。
【0014】
【発明の実施の形態】
図1は本発明のコンクリートポールのリング筋組立装置の一実施例の全体図で、リング筋組立装置は複数のリング筋配置装置1及び複数のスペーサー受装置2が交互に所定位置に配置され、両端には螺旋鉄筋コイル移動装置3が配置されている。
【0015】
図2はリング筋配置装置の正面図で、右半分はリング筋保持体を拡げた状態、左半分はリング筋保持体が閉じられた状態を示し、図3はリング筋保持体の概略図で、リング筋配置装置1は、リフター4上に設けられ、昇降可能となっている。リング筋配置装置1は、所定数のリング筋保持体5からなっている。
【0016】
各リング筋保持体5は、リング筋をはめ込み保持する半円弧状の溝6が形成され、上下の4隅のロッド7にその軸方向に摺動自在に支持されている。なお、リング筋保持体5及びそれに支持したリング筋の重量によりロッド7が撓むのを防止するため、リング筋保持体5の下部に車輪付脚8を設けてリング筋保持体5を支えてもよい。
【0017】
各リング筋保持体5は、楕円状の連結環9で隣接するリング筋保持体5と互いに連結されている。
【0018】
各リング筋保持体5を移動させてリング筋を所定間隔に位置決めする手段として、各リング筋保持体5の外側の中央部には一対のシリンダ10a,10bが各ピストンロッド11a,11bの作動方向が反対方向となるように固定されており、各ピストンロッド11a,11bの先端11c,11dは、それぞれ両端のリング筋保持体5a,5bに固定されており、シリンダ10a,10bを作動させ各リング筋保持体5を移動させて、図2に示す左半分のリング筋保持体が閉じられた状態から右半分のリング筋保持体を拡げた状態にして各リング筋保持体5を所定の間隔に拡げる。
【0019】
なお、各リング筋保持体5,5a,5bを移動させてリング筋を所定間隔に位置決めする手段としては、シリンダ以外の周知の移動機構で実施してもよい。
【0020】
図4はスペーサー受け装置の概略図で、スペーサー受け装置2は、スペーサーSを3点で支持するため、3個のローラー12a,12b,12cが配置されたスペーサー受台12とスペーサー受台12を昇降させるシリンダ13とからなり、各ローラー12a,12b,12cはスペーサーSの横断面の外形と一致する形状の溝が形成されている。
【0021】
図5はリング筋連結金具の斜視図で、リング筋連結金具14は、金属バンド14aを板金加工してリング筋を挟むクリップ15を形成したもので、クリップ15はリング筋に押付けるだけでリング筋を挟むことができるように、末広がりのガイド片16a,16bを形成する。
【0022】
図6はリング筋集合治具の上方から見た斜視図で、図7はリング筋集合治具の下方から見た斜視図で、リング筋配置装置のリング筋保持体にリング筋をセットするためのリング筋集合治具17は、リング筋を3点で位置決めするため、リング筋の半円部分に接触する3枚の位置決め板18a,18b,18cが両端の支持板19a,19bに支持され、位置決め板18a,18b,18cには、リング筋保持体5のピッチに合わせた位置決め用切り欠き20a,20b,20cが形成されており、支持板19a,19bの上部には、位置決めされたリング筋を保持するための保持棒21を通す孔22a,22bが形成されている。
【0023】
次に、リング筋の組立てについて説明する。
【0024】
図8は本発明のリング筋組立装置によるリング筋Rの組立て工程の説明図で、所定のリング筋Rをリング筋集合治具17の位置決め板18a,18b,18cの位置決め用切り欠き20a,20b,20cに配置した後、支持板19a,19bの孔22a,22bに保持棒21を通してリング筋Rの集合体を保持する。
【0025】
リング筋Rの集合体を保持したリング筋集合治具17をリング筋配置装置1のリング筋保持体5上に置くと、各リング筋Rはリング筋保持体5野溝に収まり、リング筋集合治具17から保持棒21を引き抜きリング筋集合治具17を持ち上げると、リング筋Rはリング筋保持体5に保持される。
【0026】
スペーサー受け装置2のスペーサー受台12にスペーサーをセットする。
【0027】
縦鉄筋をスペーサーS及びリング筋の内側に通す。シリンダ10a,10bを作動させて、ピストンロッドを移動させると、連結環9で連結されたリング筋保持体5が左右に拡がり、リング筋が所定間隔に位置決めされる。
【0028】
位置決めしたリング筋をリング筋連結金具14のクリップ15で挟持して連結する。連結箇所は断面等角度で3ヶ所が好ましい。
【0029】
リング筋配置装置1をリフター4で降下させた後、両端にらせん筋を移動させて巻く。
【0030】
【発明の効果】
(1) 縦鉄筋とリング筋及びスペーサーの摩擦が小さくなるため、縦鉄筋の通しが容易となる。
【0031】
(2) リング筋の所定間隔配置に間隔揃え治具及び手作業がなくなるので、作業時間の短縮とリング筋間隔精度が向上する。
【0032】
(3) ワンタッチ式リング筋連結金具を使用することで、結束作業がなくなるので、作業時間の短縮とリング筋配置間隔が連結金具のクリップ間隔で決まるため、リング筋間隔の変化に対する対応及び間隔精度が向上する。
【0033】
(4) スペーサー受け部に回転機能を付加しているので、鉄筋籠全体がスムースに回転することとなり、その他の作業が容易になる。
【図面の簡単な説明】
【図1】本発明のリング筋組立装置の一実施例の全体図である。
【図2】リング筋組立装置の正面図で、右半分はリング筋保持体を拡げた状態、左半分はリング筋保持体が閉じられた状態を示す正面図である。
【図3】リング筋保持体の概略図である。
【図4】スペーサー受け装置の概略図である。
【図5】リング筋連結金具の斜視図である。
【図6】リング筋集合治具の上方から見た斜視図である。
【図7】リング筋集合治具の下方から見た斜視図である。
【図8】本発明の装置によるリング筋の組立て工程の説明図である。
【図9】リング筋を用いたコンクリートポールの鉄筋の概略図である。
【符号の説明】
1 リング筋配置装置
2 スペーサー受け装置
3 螺旋鉄筋コイル移動装置
4 リフター
5,5a,5b リング筋保持体
6 溝
7 ロッド
8 車輪付脚
9 連結環
10a,10b エアシリンダ
11a,11b ピストンロッド
11c,11d ロッドの先端
12 スペーサー受台
12a,12b,12c ローラー
13 シリンダ
14 リング筋連結金具
14a 金属バンド
15 クリップ
16 ガイド片
17 リング筋集合治具
18a,18b,18c 位置決め板
19a,19b 支持板
20a,20b,20c 位置決め用切り欠き
21 保持棒
22a,22b 孔
R リング筋
S スペーサー
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method of assembling a ring bar, a ring bar assembling device, a ring bar placing device, a spacer receiving device, and a ring bar in the assembly of a ring bar of a concrete pole in which a vertical bar is laterally restrained by a ring bar. The present invention relates to a connection fitting and a ring reinforcing jig.
[0002]
[Prior art]
In order to obtain long concrete products such as concrete poles and piles that have high strength that will not be destroyed by large earthquakes or long concrete products that have high strength even with small diameters, ring bars are adopted as lateral restraint bars for the vertical bars. It is being done.
[0003]
FIG. 9 is a schematic diagram of a reinforcing bar of a concrete pole using ring bars. Since the upper part and the lower part of the pole are less affected by the load, the spiral bars are wound around the outer circumferences of the vertical bars and the auxiliary vertical bars. In order to increase the strength by laterally constraining the portion with a large bending moment with a ring reinforcement, a double ring reinforcement is used for the ring reinforcement of the first block, and a circular ring reinforcement is used for the ring reinforcement of the second and third blocks. Assembling. The required strength is ensured by changing the strength, number, cross-sectional shape, etc. of the ring streaks according to the magnitude of the bending moment.
[0004]
By the way, since the concrete pole which restrains a vertical reinforcing bar laterally with a ring reinforcement came to be manufactured recently, the assembly work of a ring reinforcement is currently performed manually.
[0005]
Assembling the ring bars manually, collect the required number (usually more than ten) of ring bars for each block where the ring bars are placed on the concrete pole, and fix the outer circumference of the ring bar assembly to the fixture. Then, the ring bars are fixed with pinching bolts, and a set of ring bars is arranged at a predetermined block position of the vertical bars. Next, after passing all the vertical reinforcing bars through the spacers that position and hold the vertical reinforcing bars arranged at predetermined intervals inside the ring reinforcing bars, the fixing jig is removed, and the ring reinforcing bars are removed from the ring reinforcing bars. They are separated one by one and are held in the grooves of the interval aligning jig and arranged at predetermined positions. When the arrangement is completed, the vertical reinforcing bar and the ring reinforcing bar are bound with the extra fine iron wire to fix the vertical reinforcing bar and the ring reinforcing bar, and the interval aligning jig is removed to finish the assembly of the ring reinforcing bar.
[0006]
[Problems to be solved by the invention]
As is apparent from the conventional ring muscle assembling work is manual work, it takes time for the positioning and positioning of the ring muscle and the fixing work of the ring muscle, and because it is by manual work, there is a disadvantage that the accuracy of the ring muscle spacing varies. . Also, in the case of tapered concrete poles, when the longitudinal bars are passed through the inside of the aggregate of ring bars and the spacer, the ring bars are gathered and tapered to pass the longitudinal bars in a taper shape in the axial direction. Friction between the ring bars having a small diameter of the aggregate and the vertical bars increases, and the vertical bars are difficult to pass.
[0007]
Therefore, the present invention automates the positioning and arrangement of the ring bars of the concrete pole, fixes the ring bars without binding, shortens the work time, and improves the accuracy of the ring bars spacing accuracy. The present invention provides a method and an apparatus, jig and metal fitting used therefor.
[0008]
[Means for Solving the Problems]
The present invention holds a ring line on a ring line holding body of a ring line arrangement device, holds a spacer on a spacer base of a spacer receiving device, passes a vertical reinforcing bar inside the spacer and the ring line, The ring body of the concrete pole is assembled by expanding the holding body and positioning the ring bars at predetermined intervals, and holding the positioned ring bars with the clip of the ring bar connecting bracket.
[0009]
A concrete pole ring rebar assembly device includes a ring rebar placement device and a plurality of spacer receiving devices, and the ring rebar placement device includes a predetermined number of ring rebar holders, and each ring rebar holder is a connecting ring. Connected to each other, the ends of the piston rods of the pair of air cylinders are fixed to the ring bar holders at both ends, respectively, and the ring bar holders move at predetermined intervals by driving the air cylinder.
[0010]
The spacer receiving device includes a vertically movable spacer receiving base on which a plurality of rollers supporting the spacer are arranged.
[0011]
The ring bar connecting metal fitting is made of a metal band on which a predetermined number of clips sandwiching the ring bar are formed.
[0012]
In the ring bar assembly jig, positioning plates with positioning notches that contact the semicircular portion of the ring bar are supported by support plates at both ends, and a predetermined number of positioned ring bars are held on the upper part of the support plate. A hole is formed through which a holding rod is inserted.
[0013]
The present invention can be used not only for assembling the ring bars of concrete poles but also for assembling ring bars of long concrete products such as piles using ring bars.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 is an overall view of an embodiment of a concrete pole ring rebar assembling apparatus according to the present invention. In the ring rebar assembling apparatus, a plurality of ring rebar arranging devices 1 and a plurality of spacer receiving devices 2 are alternately arranged at predetermined positions. Helical rebar coil moving devices 3 are arranged at both ends.
[0015]
FIG. 2 is a front view of the ring streak arrangement device, the right half shows a state in which the ring streak holding body is expanded, the left half shows a state in which the ring streak holding body is closed, and FIG. 3 is a schematic view of the ring streak holding body. The ring streak arrangement device 1 is provided on the lifter 4 and can be moved up and down. The ring streak arrangement device 1 includes a predetermined number of ring streak holders 5.
[0016]
Each ring streak holding body 5 is formed with a semicircular arc-shaped groove 6 for fitting and holding the ring streak, and is supported by the upper and lower four corner rods 7 so as to be slidable in the axial direction. In order to prevent the rod 7 from being bent due to the weight of the ring streak holding body 5 and the ring streak supported by the ring streak holding body 5, a leg 8 with a wheel is provided below the ring streak holding body 5 to support the ring streak holding body 5. Also good.
[0017]
Each ring line holding body 5 is connected to the adjacent ring line holding body 5 by an elliptical connecting ring 9.
[0018]
A pair of cylinders 10a and 10b is provided at the center of the outer side of each ring streak holding body 5 as a means for positioning the ring streaks at predetermined intervals by moving each ring streak holding body 5 and operating directions of the piston rods 11a and 11b. Are fixed so that the piston rods 11a and 11b are in opposite directions, and the tip ends 11c and 11d of the piston rods 11a and 11b are fixed to the ring bar holders 5a and 5b at both ends, respectively. The muscle holding body 5 is moved so that the left half ring muscle holding body shown in FIG. 2 is closed and the right half ring muscle holding body is expanded so that each ring muscle holding body 5 is set at a predetermined interval. spread.
[0019]
In addition, you may implement by a well-known moving mechanism other than a cylinder as a means to move each ring streak holding body 5,5a, 5b and to position a ring streak at predetermined intervals.
[0020]
FIG. 4 is a schematic diagram of the spacer receiving device. Since the spacer receiving device 2 supports the spacer S at three points, the spacer receiving device 12 including the three rollers 12a, 12b, and 12c and the spacer receiving device 12 are provided. Each roller 12a, 12b, 12c is formed with a groove having a shape that matches the outer shape of the cross section of the spacer S.
[0021]
FIG. 5 is a perspective view of a ring bar connecting metal fitting. The ring bar connecting metal fitting 14 is a metal band 14a formed by sheet-metal processing to form a clip 15 sandwiching the ring bar, and the clip 15 is simply pressed against the ring bar. The diverging guide pieces 16a and 16b are formed so that the streaks can be pinched.
[0022]
6 is a perspective view of the ring muscle assembly jig as viewed from above, and FIG. 7 is a perspective view of the ring muscle assembly jig as viewed from below, in order to set the ring muscle on the ring muscle holder of the ring muscle assembly device. In order to position the ring line at three points, the ring bar assembly jig 17 is supported by the support plates 19a and 19b at the opposite ends of the three positioning plates 18a, 18b, and 18c that are in contact with the semicircular portion of the ring bar. The positioning plates 18a, 18b, 18c are formed with positioning cutouts 20a, 20b, 20c in accordance with the pitch of the ring bar holding body 5, and the positioned ring bars are formed above the support plates 19a, 19b. Holes 22a and 22b are formed through which holding rods 21 are held.
[0023]
Next, assembly of the ring line will be described.
[0024]
FIG. 8 is an explanatory view of a process of assembling the ring reinforcement R by the ring reinforcement assembly apparatus of the present invention. A predetermined ring reinforcement R is notched 20a, 20b for positioning the positioning plates 18a, 18b, 18c of the ring reinforcement assembly jig 17. , 20c, the assembly of the ring streaks R is held through the holding rod 21 in the holes 22a, 22b of the support plates 19a, 19b.
[0025]
When the ring muscle assembly jig 17 holding the assembly of ring muscles R is placed on the ring muscle holder 5 of the ring muscle placement device 1, each ring muscle R fits into the ring muscle holder 5 groove and the ring muscle assembly healing is performed. When the holding bar 21 is pulled out from the tool 17 and the ring bar assembly jig 17 is lifted, the ring bar R is held by the ring bar holding body 5.
[0026]
A spacer is set on the spacer holder 12 of the spacer receiver 2.
[0027]
The vertical rebar is passed through the spacer S and the inside of the ring rebar. When the cylinders 10a and 10b are operated to move the piston rod, the ring streak holding body 5 connected by the connecting ring 9 spreads left and right, and the ring streak is positioned at a predetermined interval.
[0028]
The positioned ring line is clamped and connected by the clip 15 of the ring line connection fitting 14. The number of connecting points is preferably three in terms of equiangular cross section.
[0029]
After the ring streak arrangement device 1 is lowered by the lifter 4, the spiral streak is moved to both ends and wound.
[0030]
【The invention's effect】
(1) Since the friction between the vertical reinforcing bar, the ring reinforcing bar, and the spacer is reduced, the vertical reinforcing bar can be easily passed.
[0031]
(2) Since the interval aligning jig and the manual operation are eliminated in the predetermined interval arrangement of the ring lines, the working time is shortened and the ring line interval accuracy is improved.
[0032]
(3) By using the one-touch type ring bar connecting bracket, the bundling work is eliminated, so the work time is shortened and the ring bar layout interval is determined by the clip interval of the connecting bar. Will improve.
[0033]
(4) Since a rotation function is added to the spacer receiving portion, the entire rebar rod rotates smoothly, and other operations are facilitated.
[Brief description of the drawings]
FIG. 1 is an overall view of an embodiment of a ring muscle assembling apparatus of the present invention.
FIG. 2 is a front view of the ring muscle assembling apparatus, in which the right half is a state in which the ring muscle holder is expanded, and the left half is a front view showing a state in which the ring muscle holder is closed.
FIG. 3 is a schematic view of a ring muscle holder.
FIG. 4 is a schematic view of a spacer receiving device.
FIG. 5 is a perspective view of a ring bar connecting metal fitting.
FIG. 6 is a perspective view as seen from above the ring reinforcing jig.
FIG. 7 is a perspective view as seen from below the ring bar assembly jig.
FIG. 8 is an explanatory diagram of an assembly process of ring bars by the apparatus of the present invention.
FIG. 9 is a schematic view of a concrete pole rebar using ring bars.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Ring reinforcement arrangement | positioning apparatus 2 Spacer receiving apparatus 3 Spiral rebar coil moving apparatus 4 Lifter 5, 5a, 5b Ring reinforcement holding body 6 Groove 7 Rod 8 Wheeled leg 9 Connecting ring 10a, 10b Air cylinder 11a, 11b Piston rod 11c, 11d Rod end 12 Spacer cradle 12a, 12b, 12c Roller 13 Cylinder 14 Ring bar connecting bracket 14a Metal band 15 Clip 16 Guide piece 17 Ring bar assembly jigs 18a, 18b, 18c Positioning plates 19a, 19b Support plates 20a, 20b, 20c Positioning cutout 21 Holding rod 22a, 22b Hole R Ring bar S Spacer

Claims (7)

リング筋で縦鉄筋を横拘束したコンクリートポールのリング筋の組立方法において、リング筋集合治具に位置決めされたリング筋をリング筋配置装置のリング筋保持体にセットするとともに、スペーサー受け装置のスペーサー受台にスペーサーを保持し、縦鉄筋をスペーサー及びリング筋の内側に通した後、リング筋保持体を拡げてリング筋を所定間隔に位置決めし、位置決めしたリング筋をリング筋連結金具のクリップで挟持して連結することを特徴とするコンクリートポールのリング筋の組立方法。In a method for assembling a concrete pole ring bar with a vertical bar horizontally constrained by the ring bar, the ring bar positioned on the ring bar assembly jig is set on the ring bar holder of the ring bar placing device , and the spacer of the spacer receiving unit After holding the spacer on the cradle and passing the vertical reinforcing bar inside the spacer and the ring bar, expand the ring bar holder to position the ring bar at a predetermined interval, and place the ring bar with the clip of the ring bar connecting bracket. A method for assembling a ring rod of a concrete pole, characterized by sandwiching and connecting. 請求項1記載のコンクリートポールのリング筋の組立方法に使用するコンクリートポールのリング筋組立装置であって、リング筋保持体を移動させてリング筋を所定間隔に位置決めするリング筋配置装置及びスペーサー受台を備えたスペーサー受け装置が交互に間隔をおいて配置されたコンクリートポールのリング筋組立装置。A ring muscle group standing device of the concrete pole to be used in the method of assembling the ring muscles of the concrete pole of claim 1 wherein, ring muscle placement device and the spacer is positioned at a predetermined distance ring muscles move the ring muscle holder A concrete pole ring rebar assembly device in which spacer receiving devices having receiving bases are alternately arranged. リング筋配置装置が、リング筋を保持する溝が形成された所定数のリング筋保持体が互いに連結され、各リング筋保持体を移動させてリング筋を所定間隔に位置決めする手段を有することを特徴とする請求項2記載のコンクリートポールのリング筋組立装置。 The ring streak arrangement device has means for connecting a predetermined number of ring streak holding bodies in which grooves for holding the ring streak are formed to each other and moving each ring streak holding body to position the ring streak at a predetermined interval. 3. A concrete pole ring reinforcement assembly apparatus according to claim 2, wherein リング筋配置装置が昇降自在であることを特徴とする請求項2又は3記載のコンクリートポールのリング筋組立装置。The ring bar assembling device for a concrete pole according to claim 2 or 3, wherein the ring bar arranging device is freely movable up and down. 前記スペーサー受け装置、スペーサーを支持する複数のローラーが配置されたスペーサー受台とスペーサー受台の昇降装置とからなることを特徴とする請求項2、3又は4記載のコンクリートポールのリング筋組立装置。 The spacer receiving device, the ring muscle assembly of claim 2, 3 or 4 concrete pole, wherein the comprising a plurality of rollers elevator device arranged spacers cradle and the spacer receiving base for supporting the spacer apparatus. 請求項1記載のコンクリートポールのリング筋の組立方法において使用するリング筋連結金具は、リング筋を挟む所定数のクリップが間隔をおいて形成された金属バンドからなり、クリップが末広がりのガイド片を有することを特徴とするリング筋連結金具。 The ring bar connecting bracket used in the method for assembling a ring bar of a concrete pole according to claim 1 is composed of a metal band in which a predetermined number of clips sandwiching the ring bar are formed at intervals, and the clip has a guide piece having a widening end. A ring bar connecting metal fitting characterized by having. 請求項1記載のコンクリートポールのリング筋の組立方法において使用するリング筋集合治具、リング筋保持体の溝のピッチと同一ピッチでリング筋の位置決め用切り欠きを形成した位置決め板がその両端の支持板に支持され、支持板には、位置決めされたリング筋の集合体を保持するための保持棒を通す孔が形成されていることを特徴とするリング筋集合治具。 Claim 1 ring muscles set jig used in the method of assembling the ring muscles of the concrete pole described, positioning plate whose both ends forming outs positioning cutting ring muscles pitch the same pitch of the grooves of the ring muscle holder A ring bar assembly jig characterized in that a hole for passing a holding rod for holding an assembly of positioned ring bars is formed in the support plate.
JP21169496A 1996-08-09 1996-08-09 Method for assembling concrete pole ring reinforcement and apparatus, jig and metal fitting used therefor Expired - Lifetime JP3634924B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21169496A JP3634924B2 (en) 1996-08-09 1996-08-09 Method for assembling concrete pole ring reinforcement and apparatus, jig and metal fitting used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21169496A JP3634924B2 (en) 1996-08-09 1996-08-09 Method for assembling concrete pole ring reinforcement and apparatus, jig and metal fitting used therefor

Publications (2)

Publication Number Publication Date
JPH1052815A JPH1052815A (en) 1998-02-24
JP3634924B2 true JP3634924B2 (en) 2005-03-30

Family

ID=16610048

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21169496A Expired - Lifetime JP3634924B2 (en) 1996-08-09 1996-08-09 Method for assembling concrete pole ring reinforcement and apparatus, jig and metal fitting used therefor

Country Status (1)

Country Link
JP (1) JP3634924B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719419B (en) * 2021-10-09 2024-09-27 重庆大学 Steel-concrete combined structure switching section of wind generating set
CN115415795B (en) * 2022-10-12 2024-04-09 建华建材(中国)有限公司 Processing equipment and processing method for prestressed concrete support pile reinforcement cage

Also Published As

Publication number Publication date
JPH1052815A (en) 1998-02-24

Similar Documents

Publication Publication Date Title
US20110120048A1 (en) Rebar installation system and method of securing rebar
JP3634924B2 (en) Method for assembling concrete pole ring reinforcement and apparatus, jig and metal fitting used therefor
JP2014050881A (en) Reinforcement pulling-in device and reinforced cage horizontal assembling method thereof
EP0432121B1 (en) Method for producing reinforcement for concrete members, preferably concrete piles, reinforcement and a strut member incorporated therein
CN211166982U (en) Support arrangement suitable for assembly type structure
CN219074217U (en) Copper stranded wire shaping device
CN108787966B (en) Machine tool for manufacturing hollow hexagonal brick lead wire
JPH08197181A (en) Device for assembling reinforcing bar cage
CN218029097U (en) Steel reinforcement cage support bar structure
CN212769176U (en) Winding device for winding and unwinding large-section cable
JPS6163329A (en) Method and equipment for assembling reinforcement cage for concrete columnar
CN215657553U (en) Portable bar straightener
CN214078969U (en) Building circular stirrup processing device
JPH11347672A (en) Holding apparatus for assembling reinforcing bar cage
CN219058115U (en) Winding mechanism of full-automatic winding displacement machine
CN218798775U (en) Bending device for reinforcing steel bars inside bridge pier
CN220725787U (en) Reinforcing bar location structure for construction
CN220825426U (en) Reinforcement cage main reinforcement positioner
CN216949112U (en) Square column steel reinforcement cage locating rack
CN220928435U (en) A building reinforcing bar location structure for cemetery construction
CN216042779U (en) Temporary fixing device for reinforcement cage
CN213003243U (en) Reducing bar penetrating disc of reinforcement cage seam welder
CN110303288B (en) Steel reinforcement cage binding, welding and positioning device and using method thereof
CN215918969U (en) Auxiliary device is used in wire pole steel reinforcement cage processing
CN215614691U (en) Quick-correcting rebar straightening device

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040813

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040903

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041028

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041126

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041227

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090107

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100107

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110107

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110107

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120107

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130107

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term