JP3616727B2 - Cast-in-place reinforced concrete pile - Google Patents

Cast-in-place reinforced concrete pile Download PDF

Info

Publication number
JP3616727B2
JP3616727B2 JP37006098A JP37006098A JP3616727B2 JP 3616727 B2 JP3616727 B2 JP 3616727B2 JP 37006098 A JP37006098 A JP 37006098A JP 37006098 A JP37006098 A JP 37006098A JP 3616727 B2 JP3616727 B2 JP 3616727B2
Authority
JP
Japan
Prior art keywords
reinforcement
spiral
cast
reinforced concrete
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP37006098A
Other languages
Japanese (ja)
Other versions
JP2000192455A (en
Inventor
健好 是永
淳 小林
努 小室
一三 川端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Neturen Co Ltd
Original Assignee
Taisei Corp
Neturen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Neturen Co Ltd filed Critical Taisei Corp
Priority to JP37006098A priority Critical patent/JP3616727B2/en
Publication of JP2000192455A publication Critical patent/JP2000192455A/en
Application granted granted Critical
Publication of JP3616727B2 publication Critical patent/JP3616727B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、建設現場に配置した鉄筋籠にコンクリートを打設して施工される場所打ち鉄筋コンクリート杭に関する。
【0002】
【背景技術】
従来より、橋梁等の土木建築物を施工するために、場所打ち鉄筋コンクリートやプレキャストコンクリートが用いられている。
プレキャストコンクリートは、工場にて規格化された製品が多量に製造できるので、品質が一定であるという利点があるものの、トラック等の輸送手段で建設現場まで搬送しなければならないため、その大きさが制限される。
【0003】
場所打ちコンクリートは、輸送制限がないため、大きな杭を建てるために利用されている。
この場所打ち鉄筋コンクリート杭は、仮想円上に並べられた複数本の縦主筋の周囲にスパイラル筋を溶接して鉄筋籠を製造し、この鉄筋籠を被設置部に予め形成された穴に立設し、この鉄筋籠の周りに型枠を配置するとともに、この型枠の内部にコンクリートを打設するものである。
【0004】
この場所打ち鉄筋コンクリート杭を用いて施工される土木建築物では、プレキャストされたコンクリート杭を用いて施工される土木建築物と同様に、地震等により杭頭部や杭中間部における脆性的な破壊の虞れがあるので、大きな地震に耐え得る十分な耐力が発揮されなければならない。
この点、プレキャストされたコンクリート杭では、降伏点強度を55kgf/mmとしたスパイラル筋を使用する等の種々の提案がされている(特公昭58−25806号公報等)。
【0005】
【発明が解決しようとする課題】
プレキャストされたコンクリート杭では、大きな耐力を確保するため、特公昭58−25806号公報で示される通り、スパイラル筋の降伏点強度を所定値とする等の改善がなされているものの、場所打ち鉄筋コンクリート杭では、具体的な改善策が検討されていないことが現状であった。
【0006】
本発明の目的は、大きな耐力を有する場所打ち鉄筋コンクリート杭を提供することにある。
【0007】
【課題を解決するための手段】
そのため、本件出願の発明者は、場所打ち鉄筋コンクリート杭において、十分な耐力を得るため、縦主筋の周囲に配置されたスパイラル筋の降伏点強度と剪断補強筋比とを所定値にすることで前記目的を達成しようとするものである。
具体的には、本発明にかかる場所打ち鉄筋コンクリート杭は、剪断補強するスパイラル筋を縦主筋の周囲に設けて鉄筋籠を成形し、この鉄筋籠を建設現場に配置し、この鉄筋籠にコンクリートを打設して施工される場所打ち鉄筋コンクリート杭であって、前記スパイラル筋は、大きな耐力を得るために、異形PC鋼棒から形成され、その降伏点強度が80kgf/mm2以上であり、剪断補強筋比が0.1〜0.5%、好ましくは、0.1〜0.3%であることを特徴とする。
【0008】
スパイラル筋を構成する異形PC鋼棒の降伏点強度が80kgf/mm未満である場合には、杭の横補強が十分に行われない。つまり、捩じり耐力、剪断耐力を十分に確保して十分な横補強するには、異形PC鋼棒の降伏点強度が80kgf/mm以上、好ましくは、1300MPa以上必要となる。
【0009】
その上、本発明において、スパイラル筋の剪断補強筋比Pw(スパイラル筋の間隔sと杭直径Dとの積からなる面積(s×D)に対する1組のスパイラル筋の断面積(aw)の比率)を0.1〜0.5%の範囲としたのは、0.1%より剪断補強筋比Pwが小さいと、十分な横補強が行えないことになり、0.5%より剪断補強筋比Pwが大きいと、スパイラル筋の高コストに伴って鉄筋コンクリート杭自体の製造コストが高いものになるからである。
【0010】
【発明の実施の形態】
以下、本発明の実施の形態を図面に基づいて詳細に説明する。
図1には本発明の一実施形態にかかる場所打ち鉄筋コンクリート杭が示されており、図1(A)は、スパイラル筋が一重のものを示し、図1(B)はスパイラル筋が二重のものを示す。
【0011】
図1(A)において、場所打ち鉄筋コンクリート杭10は、スパイラル筋1を縦主筋2の周囲に設けて形成された鉄筋籠3と、この鉄筋籠3に設けられたコンクリート部4とから構成される。
縦主筋2は、直径dの細長い鋼棒であり、直径D1の仮想円に沿って所定本数N(図ではN=20)配置されている。これらの縦主筋2の外周に沿って異形PC鋼棒から形成されたスパイラル筋1が所定巻き数n(図ではn=24)で接合されている。
コンクリート部4は、長さL及び直径Dの円柱状に形成されており、そのかぶり厚がtとされている。
【0012】
ここで、スパイラル筋1は、その降伏点強度が80kgf/mm以上であり、好ましくは、1300MPa(≒132.56kgf/mm)以上であり、より好ましくは、1325MPa(≒135.11kgf/mm)以上かつ1368MPa(≒139.49kgf/mm)以下である。ここで、スパイラル筋1を構成する異形PC鋼棒の降伏点強度を80kgf/mm以上としたのは、杭10の横補強を十分に行うためである。換言すれば、捩じり耐力、剪断耐力を十分に確保して十分な横補強するには、異形PC鋼棒の降伏点強度が80kgf/mm以上必要となる。
【0013】
さらに、スパイラル筋1の剪断補強筋比Pw、つまり、スパイラル筋1の間隔sと杭直径Dとの積からなる面積(s×D)に対する1組のスパイラル筋1の断面積(aw)の比率(Pw=aw/(s×D))は、0.1〜0.5%、好ましくは、0.1〜0.3%の範囲である。剪断補強筋比Pwが0.1%未満であると、十分な横補強が行えないことになり、0.5%を越えると、スパイラル筋1自体が高コストであるため、鉄筋コンクリート杭10自体の製造コストが高いものになる。
【0014】
図1(B)において、場所打ち鉄筋コンクリート杭20は、スパイラル筋1を縦主筋2の内周と外周とにそれぞれ設けて二重に形成された鉄筋籠23と、この鉄筋籠23に設けられたコンクリート部4とから構成される。
縦主筋2は、直径dの細長い鋼棒であり、直径D1の仮想円に沿って所定本数N(図ではN=20)配置されている。これらの縦主筋2の内周と外周とにそれぞれ沿って異形PC鋼棒から形成されたスパイラル筋1が所定巻き数n(図ではn=18)で接合されている。
これらのスパイラル筋1は同芯上に配置されており、これらの間隔はt2とされている。
【0015】
ここで、スパイラル筋1は、図1(A)の場所打ち鉄筋コンクリート杭10と同様に、その降伏点強度が80kgf/mm以上であり、好ましくは、1300MPa(≒132.56kgf/mm)以上であり、より好ましくは、1325MPa(≒135.11kgf/mm)以上かつ1368MPa(≒139.49kgf/mm)以下である。
さらに、スパイラル筋1の剪断補強筋比Pwは、図1(A)の場所打ち鉄筋コンクリート杭10と同様に、0.1〜0.3%、好ましくは、0.1〜0.5%の範囲である。
【0016】
以上の構成の場所打ち鉄筋コンクリート杭10,20を施工するには、工場あるいは建設現場でスパイラル筋1を縦主筋2に溶接等して鉄筋籠鉄筋籠3,23を成形する。この鉄筋籠3,23を建設現場に配置し、この鉄筋籠3,23の周囲に型枠を配置するとともに、この型枠内にコンクリートを打設する。
従って、本実施形態では、場所打ち鉄筋コンクリート杭10,20において、縦主筋2の周囲に配置され異形PC鋼棒から形成されたスパイラル筋1の降伏点強度を80kgf/mm以上とし、剪断補強筋比を0.1〜0.5%としたので、大きな耐力を有するという効果を奏することができる。
さらに、スパイラル筋1の降伏点強度を1300MPa以上とすることで、より大きな耐力を有することができる。
【0017】
【実施例】
次に、本実施形態の効果を確認するための実施例について説明する。
実施例1から実施例9について実験を行った。各実施例のスパイラル筋1の構成を次の表1の構成とした。なお、各実施例で使用されるスパイラル筋1は高周波熱錬株式会社製の異形PC鋼棒(商品名ウルボン)を使用し、そのシアスパン比は1.5である。また、表1において、全縦主筋比Pgとは杭全断面積Aに対する全縦主筋量agの比率(Pg=ag/A)をいう。さらに、スパイラル筋の配筋構造では、外周のみとは図1(A)に相当する場所打ち鉄筋コンクリート杭10の構造であり、内外二重とは図1(B)に相当する場所打ち鉄筋コンクリート杭20の構造である。実施例8と実施例9とは同じ試験体である。
【0018】
【表1】

Figure 0003616727
【0019】
実施例1〜4では剪断破壊に先行して曲げ降伏しないように、全縦主筋比Pgを4.57%とし、実施例5〜9では曲げ降伏後の剪断破壊を想定して剪断補強筋比に応じて縦主筋の量を変化させた。
コンクリート部4の材料特性を表2に表し、鋼材の材料特性を表3に表した。なお、表2の圧縮強度のデータにおいて、かっこ内の数値は材令による直線補間値であり、表3の降伏点のデータにおいて、*印は0.2%のオフセット値である。
【0020】
【表2】
Figure 0003616727
【0021】
【表3】
Figure 0003616727
【0022】
以上の構成の実施例1〜9を図2で示される試験機で加圧実験を行った。
図2において、試験機は、試験体である杭10,20の上下端部を基礎スタブ31と加圧スタブ32とで保持し、この加圧スタブ32に取り付けられた加圧部材33で加圧スタブ32を介して杭10,20に圧縮と引張の軸力Nを付与する構成である。この加圧部材33は、水平方向に往復動可能であり、剪断力Qを杭10,20にかけられるようになっている。また、傾斜調整のため、加圧部材32の両側に荷重Fがかけられるようになっている。
【0023】
各実施例1〜9は、その上下端部の縦主筋2を長さ40×d(dは縦主筋1の直径寸法)だけ各スタブ31,32に定着し、コンクリート部4の長さ寸法Lは1200mmであり、直径寸法Dは400mmである。また、コンクリート部4のかぶり厚tは、実施例3,7では21mmであり、他の実施例では22mmである。
さらに、加圧スタブ32の高さ寸法は750mmであり、基礎スタブ31の高さ寸法は800mmである。
【0024】
この試験機において、実施例1〜8では、軸応力5.2MPaで圧縮軸力と引張軸力との正負繰り返し載荷とし、部材角R=±1/500で1回、±1/200,±1/100及び±1/50でそれぞれ2回、±1/30で1回載荷した後、正方向にR=1/15付近まで加力した。
実施例9では、図3で示す軸力−剪断力関係に従って、杭20の剪断力に見合った軸力を作用させた。最大圧縮軸力は軸力比で0.76であり、最大引張力は杭全体縦主筋降伏点荷重の72%に相当する。水平加力サイクル数は一定軸力載荷を行った試験体と同様である。このような条件で行った実験結果を表4に示す。
【0025】
【表4】
Figure 0003616727
【0026】
表4において、Qは剪断力、Rは部材角、τは剪断応力(=Q/A,Aは杭全断面積)、−は現象なし、「リード線破断」とは歪みゲージのリード線が比較的早期に破断したことを指す。
また、図4は実施例2の剪断力−変形関係のグラフであり、図5(A)は実施例1〜4の歪みと剪断力との関係を示す包絡線のグラフであり、図5(B)は実施例5〜8の歪みと剪断力との関係を示す包絡線のグラフである。
【0027】
以上の表4、図4及び図5(A)(B)に示される通り、各実施例1〜8とも剪断ひび割れに先行して杭端部付近に曲げひび割れが発生した。
その後、部材角R=8〜15×10−3で杭端部圧縮部で圧壊が始まった。
剪断破壊先行を想定した実施例1〜4では、杭端部圧壊後、剪断補強筋(スパイラル筋)が降伏し、剪断補強筋比が小さい実施例ほど小さい変形で剪断補強筋が降伏している。
曲げ降伏先行を想定した実施例5〜8では、結果として実施例7を除き、縦主筋の降伏は確認できなかったが、主筋歪みは降伏歪み近くまで達していた。
【0028】
また、剪断補強筋は最大耐力時には降伏歪み近くに達しているものの、その後の加力で降伏現象が確認できたのは実施例8のみである。
最大耐力は、二重のスパイラル筋を有する実施例4,8を除き、剪断補強筋量が増加すると大きくなっている。実施例1〜4と実施例5〜8で同じ補強筋比の試験体毎に比較すると、実施例1〜4の方がコンクリート強度が高いこと等のため、最大耐力が若干大きい。
二重のスパイラル筋を有する実施例4,8では、内側のスパイラル筋の歪みは外側のスパイラル筋の歪みに比べて1/4〜1/3程度であり、内側のスパイラル筋の補強効果があまり期待できないことが確認できた。
【0029】
最大耐力以降の耐力低下は、剪断補強筋比が小さいもの程大きいが、剪断補強筋比Pw=0.1%の実施例1,5においても、部材角R=33×10−3で最大耐力の7割程度の耐力を保持し、さらに、部材角R=60×10−3を越える大変形域でも十分な軸力保持能力を有する。
また、剪断補強筋比Pw=0.2%,0.3%の実施例2〜4,6〜9では、部材角R=60×10−3の大変形域で最大耐力の8割以上の耐力を保持しており、異形PC鋼棒の補強効果が確認できた。
【0030】
図5(C)は実施例8,9の歪みと剪断力との関係を示す包絡線のグラフである。この図において、部材角R=20×10−3までは一定軸力載荷の実施例8に比べて実施例9の耐力が高いが、それ以降、両者の耐力変形関係は、ほぼ同じ性状となっている。また、部材角R=67×10−3の大変形域に達しても耐力の低下は少なく、十分なじん性能が確認できた。
【0031】
なお、本発明は前述の実施形態に限定されるものではなく、本発明の目的を達成できる範囲であれば次に示す変形例を含むものである。
例えば、本発明では、スパイラル筋1を縦主筋2の内周にのみ配置した構造でもよい。
【0032】
【発明の効果】
以上の通り、本発明によれば、場所打ち鉄筋コンクリート杭の耐力を大きなものにすることができる。
【図面の簡単な説明】
【図1】本発明の一実施形態にかかる場所打ち鉄筋コンクリート杭の側面と端面とを示す図であり、(A)はスパイラル筋が一重のものを示し、(B)はスパイラル筋が二重のものを示す。
【図2】実施例1〜9の実験を行うための試験機の概略構成図である。
【図3】試験機で実施例9に力を付与するための軸力−剪断力関係を示すグラフである。
【図4】実施例2の剪断力−変形関係のグラフである。
【図5】(A)は実施例1〜4の歪みと剪断力との関係を示す包絡線のグラフであり、(B)は実施例5〜8の歪みと剪断力との関係を示す包絡線のグラフであり、(C)は実施例8,9との歪みと剪断力との関係を示す包絡線のグラフである。
【符号の説明】
1 スパイラル筋
2 縦主筋
3,23 鉄筋籠
4 コンクリート部
10,20 場所打ち鉄筋コンクリート杭[0001]
BACKGROUND OF THE INVENTION
TECHNICAL FIELD The present invention relates to a cast-in-place reinforced concrete pile that is constructed by placing concrete on a reinforcing bar placed at a construction site.
[0002]
[Background]
Conventionally, cast-in-place reinforced concrete and precast concrete have been used to construct civil structures such as bridges.
Although precast concrete can be manufactured in large quantities at the factory, it has the advantage of being of constant quality, but it must be transported to the construction site by means of transportation such as trucks. Limited.
[0003]
Cast-in-place concrete is used to build large piles because there are no transport restrictions.
This cast-in-place reinforced concrete pile is manufactured by welding spiral bars around a plurality of longitudinal main bars arranged on a virtual circle to produce a reinforcing bar, and standing this reinforcing bar in a pre-formed hole in the installation site. In addition, a mold frame is disposed around the reinforcing bar rod and concrete is placed inside the mold frame.
[0004]
In civil engineering buildings constructed using cast-in-place reinforced concrete piles, brittle fractures at pile heads and intermediate piles due to earthquakes, etc., as well as civil engineering buildings constructed using precast concrete piles. Because there is a fear, sufficient proof strength to withstand a big earthquake must be demonstrated.
In this regard, various proposals have been made for precast concrete piles, such as using spiral bars with a yield strength of 55 kgf / mm 2 (Japanese Patent Publication No. 58-25806).
[0005]
[Problems to be solved by the invention]
In precast concrete piles, cast-in-place reinforced concrete piles have been improved to set the yield strength of spiral bars to a predetermined value, as shown in Japanese Patent Publication No. 58-25806, in order to ensure a large yield strength. In the current situation, no specific improvement measures have been studied.
[0006]
An object of the present invention is to provide a cast-in-place reinforced concrete pile having a high yield strength.
[0007]
[Means for Solving the Problems]
Therefore, the inventor of the present application, in the cast-in-place reinforced concrete pile, in order to obtain a sufficient proof strength, the yield point strength of the spiral bars arranged around the longitudinal main bars and the shear reinforcement ratio are set to predetermined values. It is intended to achieve the purpose.
Specifically, in the cast-in-place reinforced concrete pile according to the present invention, a spiral bar for shear reinforcement is provided around the longitudinal main bar to form a reinforcing bar rod, the reinforcing bar rod is arranged at the construction site, and concrete is applied to the reinforcing bar rod. It is a cast-in-place reinforced concrete pile that is cast and constructed, and the spiral bar is formed from a deformed PC steel bar to obtain a large yield strength , and its yield strength is 80 kgf / mm 2 or more. Shear reinforcement The muscle ratio is 0.1 to 0.5%, preferably 0.1 to 0.3%.
[0008]
When the yield point strength of the deformed PC steel bar constituting the spiral reinforcement is less than 80 kgf / mm 2 , the lateral reinforcement of the pile is not sufficiently performed. That is, in order to ensure sufficient torsional strength and shear strength and sufficient lateral reinforcement, the yield point strength of the deformed PC steel bar is required to be 80 kgf / mm 2 or more, preferably 1300 MPa or more.
[0009]
Moreover, in the present invention, the ratio of the cross-sectional area (aw) of one set of spiral bars to the shear reinforcement ratio Pw of spiral bars (the area (s × D) formed by the product of the spacing s between spiral bars and the pile diameter D). ) In the range of 0.1 to 0.5%, if the shear reinforcement ratio Pw is smaller than 0.1%, sufficient lateral reinforcement cannot be performed, and the shear reinforcement is less than 0.5%. This is because if the ratio Pw is large, the manufacturing cost of the reinforced concrete pile itself increases with the high cost of the spiral reinforcement.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 shows a cast-in-place reinforced concrete pile according to an embodiment of the present invention. FIG. 1 (A) shows a single spiral reinforcement, and FIG. 1 (B) shows a double spiral reinforcement. Show things.
[0011]
In FIG. 1 (A), a cast-in-place reinforced concrete pile 10 is composed of a reinforcing bar 3 formed by providing a spiral bar 1 around a longitudinal main bar 2 and a concrete portion 4 provided on the reinforcing bar 3. .
The longitudinal main bars 2 are elongated steel bars having a diameter d, and a predetermined number N (N = 20 in the figure) is arranged along a virtual circle having a diameter D1. A spiral bar 1 formed from a deformed PC steel bar is joined along the outer periphery of these vertical main bars 2 with a predetermined number of turns n (n = 24 in the figure).
The concrete part 4 is formed in a columnar shape having a length L and a diameter D, and its cover thickness is t.
[0012]
Here, the yield strength of the spiral muscle 1 is 80 kgf / mm 2 or more, preferably 1300 MPa (≈132.56 kgf / mm 2 ) or more, and more preferably 1325 MPa (≈135.11 kgf / mm). 2 ) and 1368 MPa (≈139.49 kgf / mm 2 ) or less. Here, the reason why the yield strength of the deformed PC steel bar constituting the spiral reinforcement 1 is set to 80 kgf / mm 2 or more is to sufficiently perform the lateral reinforcement of the pile 10. In other words, the yield point strength of the deformed PC steel bar is required to be 80 kgf / mm 2 or more in order to sufficiently secure torsional strength and shear strength and to perform sufficient lateral reinforcement.
[0013]
Furthermore, the ratio of the cross-sectional area (aw) of the set of spiral muscles 1 to the shear reinforcement ratio Pw of the spiral muscles 1, that is, the area (s × D) consisting of the product of the interval s of the spiral muscles 1 and the pile diameter D. (Pw = aw / (s × D)) is 0.1 to 0.5%, preferably 0.1 to 0.3%. If the shear reinforcement ratio Pw is less than 0.1%, sufficient lateral reinforcement cannot be performed. If the shear reinforcement ratio Pw exceeds 0.5%, the spiral reinforcement 1 itself is expensive. Manufacturing cost is high.
[0014]
In FIG. 1 (B), the cast-in-place reinforced concrete pile 20 is provided in the reinforcing bar 23 which is formed in a double manner by providing the spiral bars 1 on the inner periphery and the outer periphery of the longitudinal main bars 2 respectively. It consists of a concrete part 4.
The longitudinal main bars 2 are elongated steel bars having a diameter d, and a predetermined number N (N = 20 in the figure) is arranged along a virtual circle having a diameter D1. Spiral bars 1 formed of deformed PC steel bars are joined at a predetermined number of turns n (n = 18 in the figure) along the inner periphery and the outer periphery of these longitudinal main bars 2, respectively.
These spiral muscles 1 are arranged on the same core, and the interval between them is t2.
[0015]
Here, the spiral reinforcement 1 has a yield point strength of 80 kgf / mm 2 or more, preferably 1300 MPa (≈132.56 kgf / mm 2 ) or more, like the cast-in-place reinforced concrete pile 10 in FIG. More preferably, it is 1325 MPa (≈135.11 kgf / mm 2 ) or more and 1368 MPa (≈139.49 kgf / mm 2 ) or less.
Furthermore, the shear reinforcement ratio Pw of the spiral reinforcement 1 is in the range of 0.1 to 0.3%, preferably 0.1 to 0.5%, similarly to the cast-in-place reinforced concrete pile 10 of FIG. It is.
[0016]
In order to construct the cast-in-place reinforced concrete piles 10 and 20 having the above-described configuration, the reinforcing bar rods 3 and 23 are formed by welding the spiral bar 1 to the longitudinal main bar 2 at a factory or a construction site. The reinforcing bar rods 3 and 23 are arranged on the construction site, a mold frame is arranged around the reinforcing bar rods 3 and 23, and concrete is placed in the mold frame.
Therefore, in the present embodiment, in the cast-in-place reinforced concrete piles 10 and 20, the yield strength of the spiral reinforcement 1 formed from the deformed PC steel rod arranged around the longitudinal main reinforcement 2 is 80 kgf / mm 2 or more, and the shear reinforcement reinforcement Since the ratio is set to 0.1 to 0.5%, an effect of having a large proof stress can be achieved.
Furthermore, by setting the yield point strength of the spiral muscle 1 to 1300 MPa or more, a greater proof stress can be obtained.
[0017]
【Example】
Next, an example for confirming the effect of the present embodiment will be described.
Experiments were conducted on Example 1 to Example 9. The configuration of the spiral muscle 1 of each example is the configuration shown in Table 1 below. In addition, the spiral reinforcement 1 used in each embodiment uses a deformed PC steel bar (trade name: Urbon) manufactured by Induction Heat Smelting Co., Ltd., and its shear span ratio is 1.5. In Table 1, the total longitudinal main bar ratio Pg means the ratio of the total vertical main bar amount ag to the pile total cross-sectional area A (Pg = ag / A). Furthermore, in the spiral bar arrangement structure, only the outer periphery is the structure of a cast-in-place reinforced concrete pile 10 corresponding to FIG. 1 (A), and the inner and outer double is a cast-in-place reinforced concrete pile 20 corresponding to FIG. 1 (B). This is the structure. Example 8 and Example 9 are the same specimens.
[0018]
[Table 1]
Figure 0003616727
[0019]
In Examples 1 to 4, the total longitudinal main bar ratio Pg is 4.57% so that bending yield does not occur prior to shear failure, and in Examples 5 to 9, the shear reinforcement ratio is assumed assuming shear failure after bending yielding. The amount of longitudinal main muscle was changed accordingly.
The material properties of the concrete part 4 are shown in Table 2, and the material properties of the steel material are shown in Table 3. In the compression strength data in Table 2, the values in parentheses are linear interpolation values according to the material age, and in the yield point data in Table 3, * is an offset value of 0.2%.
[0020]
[Table 2]
Figure 0003616727
[0021]
[Table 3]
Figure 0003616727
[0022]
A pressurization experiment was conducted on Examples 1 to 9 having the above-described configuration using the testing machine shown in FIG.
In FIG. 2, the testing machine holds the upper and lower ends of the piles 10 and 20 as test bodies with a foundation stub 31 and a pressure stub 32 and pressurizes with a pressure member 33 attached to the pressure stub 32. The axial force N of compression and tension is applied to the piles 10 and 20 via the stub 32. The pressurizing member 33 can reciprocate in the horizontal direction, and a shearing force Q can be applied to the piles 10 and 20. Further, a load F is applied to both sides of the pressure member 32 for adjusting the inclination.
[0023]
In each of Examples 1 to 9, the vertical main reinforcing bars 2 at the upper and lower ends are fixed to the stubs 31 and 32 by a length of 40 × d (d is the diameter of the vertical main reinforcing bars 1), and the length L of the concrete part 4 Is 1200 mm and the diameter dimension D is 400 mm. Moreover, the cover thickness t of the concrete part 4 is 21 mm in Examples 3 and 7, and is 22 mm in other Examples.
Furthermore, the height dimension of the pressure stub 32 is 750 mm, and the height dimension of the foundation stub 31 is 800 mm.
[0024]
In this test machine, in Examples 1 to 8, the axial stress was 5.2 MPa and the positive and negative repeated loadings of the compression axial force and the tensile axial force were performed, and once at a member angle R = ± 1/500, ± 1/200, ± After loading twice each at 1/100 and ± 1/50 and once at ± 1/30, force was applied in the positive direction to around R = 1/15.
In Example 9, the axial force corresponding to the shearing force of the pile 20 was applied according to the axial force-shearing force relationship shown in FIG. The maximum compression axial force is 0.76 in terms of the axial force ratio, and the maximum tensile force corresponds to 72% of the pile main longitudinal main bar yield point load. The number of horizontal force cycles is the same as that of the specimen subjected to constant axial load. Table 4 shows the results of experiments conducted under such conditions.
[0025]
[Table 4]
Figure 0003616727
[0026]
In Table 4, Q is the shear force, R is the member angle, τ is the shear stress (= Q / A, A is the entire cross-sectional area of the pile),-is no phenomenon, and the lead wire of the strain gauge is compared with "Lead wire breakage" It means that it broke early.
4 is a graph of the shear force-deformation relationship of Example 2, and FIG. 5A is an envelope graph showing the relationship between the strain and the shear force of Examples 1 to 4, and FIG. B) is an envelope graph showing the relationship between strain and shear force in Examples 5 to 8.
[0027]
As shown in the above Table 4, FIG. 4 and FIGS. 5A and 5B, in each of Examples 1 to 8, bending cracks occurred in the vicinity of the end of the pile prior to the shear crack.
Thereafter, crushing started at the pile end compression portion at a member angle R = 8 to 15 × 10 −3 .
In Examples 1 to 4 assuming shear failure leading, after the pile end crushing, the shear reinforcement (spiral reinforcement) yields, and the smaller the shear reinforcement ratio, the smaller the shear reinforcement is yielded. .
In Examples 5 to 8 in which bending yield precedence was assumed, as a result, except for Example 7, yield of the longitudinal main bars could not be confirmed, but the main bar distortions reached nearly the yield strain.
[0028]
Moreover, although the shear reinforcement reached the yield strain near the maximum proof stress, it was only in Example 8 that the yield phenomenon could be confirmed by the subsequent applied force.
The maximum yield strength increases as the amount of shear reinforcement increases, except in Examples 4 and 8, which have double spiral bars. When Examples 1-4 and Examples 5-8 are compared for each test specimen having the same reinforcing bar ratio, Examples 1 to 4 have a slightly higher maximum proof stress because the concrete strength is higher.
In Examples 4 and 8 having double spiral muscles, the distortion of the inner spiral muscle is about 1/4 to 1/3 of the distortion of the outer spiral muscle, and the reinforcement effect of the inner spiral muscle is not so great. It was confirmed that it was not expected.
[0029]
The decrease in the yield strength after the maximum yield strength is greater as the shear reinforcement ratio is smaller, but also in Examples 1 and 5 where the shear reinforcement ratio Pw = 0.1%, the maximum yield strength is obtained at the member angle R = 33 × 10 −3. In addition, it has sufficient axial force holding ability even in a large deformation range exceeding the member angle R = 60 × 10 −3 .
Further, in Examples 2 to 4, 6 to 9 in which the shear reinforcement ratio Pw = 0.2% and 0.3%, the maximum proof stress is 80% or more in the large deformation region of the member angle R = 60 × 10 −3 . The proof strength was maintained, and the reinforcing effect of the deformed PC steel bar was confirmed.
[0030]
FIG. 5C is an envelope graph showing the relationship between strain and shear force in Examples 8 and 9. In this figure, up to a member angle R = 20 × 10 −3 , the proof stress of Example 9 is higher than that of Example 8 of constant axial load, but thereafter, the proof stress deformation relationship between them is almost the same property. ing. Moreover, even if it reached the large deformation range of member angle R = 67 * 10 < -3 >, there was little fall of proof stress and sufficient dust performance was able to be confirmed.
[0031]
In addition, this invention is not limited to the above-mentioned embodiment, If the range which can achieve the objective of this invention is included, the modification shown next is included.
For example, in the present invention, a structure in which the spiral muscle 1 is disposed only on the inner periphery of the longitudinal main muscle 2 may be used.
[0032]
【The invention's effect】
As described above, according to the present invention, the proof stress of cast-in-place reinforced concrete piles can be increased.
[Brief description of the drawings]
FIG. 1 is a diagram showing a side surface and an end surface of a cast-in-place reinforced concrete pile according to an embodiment of the present invention, wherein (A) shows a single spiral reinforcement, and (B) shows a double spiral reinforcement. Show things.
FIG. 2 is a schematic configuration diagram of a testing machine for conducting experiments of Examples 1 to 9.
FIG. 3 is a graph showing an axial force-shear force relationship for applying force to Example 9 using a test machine.
4 is a graph showing a shear force-deformation relationship of Example 2. FIG.
5A is an envelope graph showing the relationship between strain and shear force in Examples 1 to 4, and FIG. 5B is an envelope showing the relationship between strain and shear force in Examples 5 to 8. It is a graph of a line, (C) is a graph of the envelope which shows the relationship between distortion with Example 8, 9 and shear force.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Spiral reinforcement 2 Longitudinal reinforcement 3,23 Reinforcing bar 4 Concrete part 10,20 Cast-in-place concrete pile

Claims (2)

剪断補強するスパイラル筋を縦主筋の周囲に設けて鉄筋籠を成形し、この鉄筋籠を建設現場に配置し、この鉄筋籠にコンクリートを打設して施工される場所打ち鉄筋コンクリート杭であって、前記スパイラル筋は、大きな耐力を得るために、異形PC鋼棒から形成され、その降伏点強度が80kgf/mm2以上であり、剪断補強筋比が0.1〜0.5%であることを特徴とする場所打ち鉄筋コンクリート杭。 It is a cast-in-place reinforced concrete pile in which a spiral reinforcement for shear reinforcement is provided around the longitudinal main reinforcement to form a reinforcement bar, this reinforcement bar is placed on the construction site, and concrete is placed on this reinforcement bar. The spiral bar is formed from a deformed PC steel bar to obtain a high yield strength, and has a yield point strength of 80 kgf / mm 2 or more and a shear reinforcement bar ratio of 0.1 to 0.5%. Cast-in-place reinforced concrete piles. 請求項1に記載の場所打ち鉄筋コンクリート杭において、前記スパイラル筋の降伏点強度は、1300MPa以上であることを特徴とする場所打ち鉄筋コンクリート杭。2. The cast-in-place reinforced concrete pile according to claim 1, wherein the yield point strength of the spiral bar is 1300 MPa or more.
JP37006098A 1998-12-25 1998-12-25 Cast-in-place reinforced concrete pile Expired - Fee Related JP3616727B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP37006098A JP3616727B2 (en) 1998-12-25 1998-12-25 Cast-in-place reinforced concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP37006098A JP3616727B2 (en) 1998-12-25 1998-12-25 Cast-in-place reinforced concrete pile

Publications (2)

Publication Number Publication Date
JP2000192455A JP2000192455A (en) 2000-07-11
JP3616727B2 true JP3616727B2 (en) 2005-02-02

Family

ID=18495978

Family Applications (1)

Application Number Title Priority Date Filing Date
JP37006098A Expired - Fee Related JP3616727B2 (en) 1998-12-25 1998-12-25 Cast-in-place reinforced concrete pile

Country Status (1)

Country Link
JP (1) JP3616727B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101182704B1 (en) 2010-02-22 2012-09-13 (주)한울구조안전기술사사무소 Construction method of undergroud structure using PHC pile
KR101114171B1 (en) 2010-02-22 2012-02-22 김원근 Load Transfer Beam For Earth Retaining Wall Using PHC Pile And Construction Method Of The Same
KR101177426B1 (en) 2010-05-27 2012-08-27 최승희 Field infused post and constructing method thereof
JP6814610B2 (en) * 2016-11-22 2021-01-20 大成建設株式会社 Concrete pile
JP7160537B2 (en) * 2018-01-30 2022-10-25 東海旅客鉄道株式会社 reinforced concrete structure
JP6884259B2 (en) * 2020-09-15 2021-06-09 大成建設株式会社 Concrete pile

Also Published As

Publication number Publication date
JP2000192455A (en) 2000-07-11

Similar Documents

Publication Publication Date Title
Mourad et al. Repair and strengthening of reinforced concrete square columns using ferrocement jackets
CN206385460U (en) Combined floorings
Liu et al. Behavior of circular CFRP-steel composite tubed high-strength concrete columns under axial compression
Kusuma et al. Axial load behavior of concrete columns with welded wire fabric as transverse reinforcement
JP3616727B2 (en) Cast-in-place reinforced concrete pile
US20080184667A1 (en) Concrete Reinforcement Apparatus and Method
Hsu et al. Performance of hollow composite members subjected to cyclic eccentric loading
KR101209063B1 (en) Pre-stressed girder by plate and method thereof
Takiguchi An investigation into the behavior and strength of reinforced concrete columns strengthened with ferrocement jackets
JP3834637B2 (en) Permanent and emergency seismic reinforcement method for wall columns
JP2000017615A (en) Prestressed concrete bridge pier
EP2336455A1 (en) Construction systeme for strengthening an existing structure with tension sheets and a respective anchoring device and method therefore
JP2019019664A (en) High-rise building and precast pre-stressed concrete column
JP4708296B2 (en) Pile-column connection structure
Ruangrassamee et al. Seismic enhancement of reinforced-concrete columns by rebar-restraining collars
JPH0420444B2 (en)
JPH08260565A (en) Reinforced concrete wall column
JPH08326052A (en) Reinforced concrete pile
JP4708295B2 (en) Pile-column connection structure
Suzuki et al. Ultimate shear strength of component model of composite beam with perfobond shear connector
Castro et al. Structural performance of RC columns using double rigth angle anchorage hoops with high strength bars
Zhou et al. Performance of RC Precast Continuous Beams Incorporating New Strategy for Design and Allocating Connections
JP2002201636A (en) High flexural toughness and high strength pile
JP7397752B2 (en) concrete member structure
Weng et al. Experimental investigation on rectangular SRC columns with multi-spiral confinements

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040202

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040608

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040806

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041012

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041108

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071112

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081112

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091112

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101112

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101112

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111112

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111112

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121112

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121112

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131112

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees