JP3525899B2 - Control method of household water softener - Google Patents
Control method of household water softenerInfo
- Publication number
- JP3525899B2 JP3525899B2 JP2001034959A JP2001034959A JP3525899B2 JP 3525899 B2 JP3525899 B2 JP 3525899B2 JP 2001034959 A JP2001034959 A JP 2001034959A JP 2001034959 A JP2001034959 A JP 2001034959A JP 3525899 B2 JP3525899 B2 JP 3525899B2
- Authority
- JP
- Japan
- Prior art keywords
- water
- raw water
- line
- flow
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Treatment Of Water By Ion Exchange (AREA)
Description
【発明の詳細な説明】
【0001】
【発明の属する技術分野】この発明は、原水を処理材を
収容した処理容器,処理水ラインを順次含む通水流路へ
流通させる通水工程を所定量実行したとき、原水を原水
ライン,ドレンラインを順次含む呼び水流路へ流通させ
る呼び水工程と、再生液を処理容器,ドレンラインを順
次含む再生流路へ流通させる再生工程と、原水を処理容
器,ドレンラインを順次含む押出し流路へ流通させる押
出し工程とを順次行い、通水工程に戻る再生制御を行う
家庭用軟水装置の制御方法に関する。
【0002】
【発明が解決しようとする課題】この種の家庭用軟水装
置においては、一般的に硬水軟化用の処理材としてイオ
ン交換樹脂が用いられる。こうした装置においては、長
時間に亘り処理容器内への通水を行わないでいると、イ
オン交換樹脂から無害の有機物が流出し、通水を再開し
たとき、処理水中に若干の臭いや色水として混入するこ
とになる。このため、苦情の原因となる可能性がある。
【0003】
【課題を解決するための手段】この発明は、前記課題を
解決すべくなされたものであって、原水を処理材を収容
した処理容器,処理水ラインを順次含む通水流路へ流通
させる通水工程を所定量実行したとき、原水を原水ライ
ン,ドレンラインを順次含む呼び水流路へ流通させる呼
び水工程と、再生液を処理容器,ドレンラインを順次含
む再生流路へ流通させる再生工程と、原水を処理容器,
ドレンラインを順次含む押出し流路へ流通させる押出し
工程とを順次行い、通水工程へ戻る制御を行う家庭用軟
水装置において、原水をその単位時間当たりの流量を前
記押出し工程時よりも増大させて処理容器,ドレンライ
ンを順次含む洗浄流路へ流通させる洗浄工程を設け、通
水流路における原水または処理容器により処理された処
理水の流れが所定時間以上無いことを検出したとき、前
記洗浄工程を行った後に通水工程へ移行することを特徴
としている。
【0004】前記手段によれば、通水流路における原水
または処理水の流れが所定時間以上無いことを検出した
とき、自動的に洗浄工程が実行され、処理容器内は急速
に洗浄され、その後、通水工程へ移行する。
【0005】
【発明の実施の形態】この発明の家庭用軟水装置の実施
の形態としては、原水を処理材を収容した処理容器,処
理水ラインを順次含む通水流路へ流通させる通水工程を
所定量実行したとき、原水を原水ライン,ドレンライン
を順次含む呼び水流路へ流通させる呼び水工程と、再生
液を処理容器,ドレンラインを順次含む再生流路へ流通
させる再生工程と、原水を処理容器,ドレンラインを順
次含む押出し流路へ流通させる押出し工程とを順次行
い、通水工程へ戻る制御を行う家庭用軟水装置におい
て、原水をその単位時間当たりの流量を前記押出し工程
時よりも増大させて処理容器,ドレンラインを順次含む
洗浄流路へ流通させる洗浄工程を設け、通水流路におけ
る原水または処理容器により処理された処理水の流れが
所定時間以上無いことを検出したとき、前記洗浄工程を
行った後に通水工程へ移行する家庭用軟水装置の制御方
法とする。
【0006】この実施の形態について、以下に詳細に説
明する。この実施の形態においては、家庭用軟水装置
は、つぎの3つの形態を含む。すなわち、原水供給ライ
ンから原水を一度原水タンクへ貯溜し、通水工程時、そ
の貯溜した原水を給水ポンプの作用で処理容器へ供給
し、押出し工程時、原水タンクの原水を自然落下により
処理容器へ供給する形態(第一の形態:給水タンク介在
形態)と、原水供給ラインから原水を一度原水タンクへ
貯溜するとともに、原水供給ラインを直接的に処理容器
と接続し、通水工程時、原水を原水供給ラインから直接
処理容器へ供給し、押出し工程時、原水タンクの原水を
自然落下により処理容器へ供給する形態(第二の形態:
直圧・タンク併存形態)と、原水タンクを設けず、通水
工程時および押出し工程時、ともに原水を原水供給ライ
ンから直接処理容器へ供給する形態(第三の形態:直圧
形態)とである。これらの形態において、原水ラインは
原水が流通するラインを意味し、また再生液ラインは再
生液が流通するラインを意味し、そして処理水ラインは
処理材にて処理された処理済原水が流通するラインを意
味し、さらにドレンラインは処理容器内の排水すべき液
体を排出するラインを意味する。
【0007】第一の形態とする場合について説明する。
この形態において、通水流路は、原水タンク,処理容
器,処理水ラインを順次含んだものである。原水タンク
は、原水を一旦貯溜するための手段であり、処理容器は
内部に処理材を収容する手段である。原水ラインは、原
水タンクの原水を処理容器へ供給する供給路である。原
水ラインの処理容器側の端部は、通常処理容器の上部に
接続されるが、処理容器内の処理材中に先端を挿入する
ように接続することもできる。処理水ラインは、処理容
器に接続され、処理容器内へ原水を流通させることによ
り生成された処理水を供給する供給路である。処理水ラ
インの処理容器への接続位置は、原水が処理材を流通し
た後処理水ラインから流出するように、原水ラインの先
端に対して処理材を挟んだ位置であって、通常は処理容
器の下部となるが、これに限定されない。この通水流路
には、原水を吸引し圧送する給水ポンプが設置される。
この設置位置は、原水タンクと処理容器との間の原水ラ
インであるか,または処理容器出口側の処理水ラインで
ある。通水工程は、給水ポンプを駆動して原水タンクの
原水を通水流路へ流通させる。この通水工程が所定量実
行されると、再生工程が実行される。この所定量とは、
通水工程の実行時間,または処理水の流量,または原水
の流量等が所定値に達することを意味する。
【0008】再生流路は、再生液ライン,処理容器,ド
レンラインを順次含んだものである。この再生流路の再
生液ラインには、必要に応じて再生液タンクが含まれ
る。この再生液タンクは、処理容器内の処理材を再生す
る再生液を貯溜する手段である。再生液ラインは、再生
液タンクの再生液を処理容器へ供給する供給路である。
ドレンラインは処理容器に接続され、再生作用を終えた
再生液を排出するための排出路である。再生液の処理容
器への流れは、再生液タンクを処理容器より上方に設け
て重力による自然落下方式により生成させるか,あるい
は原水の流れを発生させ、この流れによるジェットポン
プ作用により生成させる。ジェットポンプによる場合
は、原水と再生液とは混合された状態で処理容器へ供給
される。また、再生液の濃度を薄める必要が有る場合に
は、原水タンクから原水が自然落下により流下する原水
流下ラインを再生液ラインの処理容器手前か,もしくは
処理容器内の処理材の手前にて接続して、再生液ライン
の再生液と原水流下ラインの原水とを混合して薄めた後
に、処理容器へ供給するように構成する。再生液とし
て、適当な濃度に調整済のものが再生液タンクに貯溜さ
れる場合には、この混合のための手段は不要である。再
生工程時は、再生液または再生液と原水との混合液を再
生流路へ流通させる。
【0009】押出し流路は、原水タンク,原水流下ライ
ン,処理容器,ドレンラインを順次含み、原水タンクを
処理容器より上方へ位置させ、重力による自然落下によ
り、原水を原水タンク−原水流下ライン−処理容器−ド
レンラインと流通させる。押出し流路の原水流下ライン
は自然落下式であり、一方通水流路の原水ラインは給水
ポンプによる強制通水のため、両ラインは基本的には別
ラインとするが、一部を共用することは可能である。押
出し工程時は、原水タンクの原水を自然落下により押出
し流路へ流通させる。
【0010】洗浄流路は、原水タンク,原水ライン,処
理容器,ドレンラインを順次含んだものであり、原水タ
ンクと処理容器との間の原水ラインに給水ポンプを設け
る。洗浄流路は、通水流路の給水ポンプおよび原水ライ
ンの一部を共用することにより、洗浄流路の原水ライン
に給水ポンプを設けることもできる。また、この洗浄流
路の原水ラインは、処理水ラインの一部を共用しても良
いし、共用しなくても良い。また、洗浄流路のドレンラ
インは、押出し流路のドレンラインを共用するのが望ま
しいが、別個に設けることも可能である。洗浄工程時
は、給水ポンプを駆動して原水タンクの原水を洗浄流路
へ流通させる。この洗浄工程は押出し工程の後に設けら
れ、再生制御は、再生工程,押出し工程および洗浄工程
を含むことになる。この再生制御には、必要に応じて、
呼び水工程が含まれる。この呼び水工程は、再生工程の
前工程として設けられ、再生流路のドレンライン中の空
気を抜き、水で満たし、再生工程時の再生液の自然落下
を容易にする工程である。洗浄工程時の原水の単位時間
当たりの流量を押出し工程時のそれよりも増大させるに
は、洗浄工程時、給水ポンプを駆動することで流量を増
大でき、押出し工程時、給水ポンプを駆動せず自然落下
により原水を供給することで流量を減少できる。なお、
押出し工程時の原水の単位時間当たりの流量を減少させ
るのは、処理材による再生をゆっくりと時間をかけて行
う必要があるためである。
【0011】そして、通水流路における原水の流れ,ま
たは処理容器から流出する処理水の流れが所定時間以上
無いことが検出されると、前記洗浄工程が所定時間実行
される。この検出は、たとえば通水流路に設けたフロー
スイッチ等の水流検出手段により行われる。この水流検
出手段は、給水ポンプの制御用手段としても共用でき
る。
【0012】第二の形態とする場合は、通水流路は、原
水供給ライン,原水ライン,処理材を収容した処理容
器,処理水ラインを順次含む構成とし、再生流路は、再
生液ライン,処理容器,ドレンラインを順次含む構成と
し、押出し流路は、原水タンク,原水ライン,処理容
器,ドレンラインを順次含む構成とし、洗浄流路は、原
水供給ライン,原水ライン,処理容器,ドレンラインを
順次含む構成とする。この形態においては、原水供給ラ
インの上流側(家庭用軟水装置の装置外)にポンプ手段
を有する場合と、有しない場合とがあり、何れにしても
原水ラインの水圧は、水道圧程度の圧力となっている。
この形態において、洗浄工程時は、原水供給ラインから
直接的に水圧の高い原水を処理容器へ供給し、押出し工
程時は原水タンクから自然落下により水圧の低い原水を
供給するように構成しているので、洗浄工程時の原水の
単位時間当たりの流量は、押出し工程時のそれよりも多
くなっている。
【0013】第三の形態とする場合は、通水流路は、原
水供給ライン,原水ライン,処理材を収容した処理容
器,処理水ラインを順次含む構成とし、再生流路は、再
生液ライン,処理容器,ドレンラインを順次含む構成と
し、押出し流路は、原水供給ライン,原水ライン,処理
容器,ドレンラインを順次含む構成とし、洗浄流路は、
原水供給ライン,原水ライン,処理容器,ドレンライン
を順次含む構成とする。この形態において、洗浄流路と
押出し流路の流通抵抗を調整する。たとえば、押出し流
路の適所にオリフィス等の流通抵抗部材を介在させ、洗
浄流路には流通抵抗部材を介在させないことで、洗浄工
程時の原水の単位時間当たりの流量を押出し工程時のそ
れよりも多くする。
【0014】
【実施例】前記のようなこの発明の実施の形態は、処理
材をイオン交換樹脂とし、再生液を食塩水とした家庭用
の軟水装置において具体化される。この具体的実施例を
以下に図面に基づいて詳細に説明する。
【0015】図1〜図5は、この発明を実施した家庭用
軟水装置の構成を示す概略説明図で、それぞれ通水工
程,呼び水工程,再生工程,押出し工程,洗浄工程を示
している。符号1は、樹脂筒(筒状の樹脂製処理容器)
であって、この樹脂筒1内の下部に樹脂保持部材として
の所定量の硅石2が収容されており、この硅石2の上方
部に設置した樹脂保持部材としての金網3との間に所定
量のイオン交換樹脂(処理材)4を収容している。樹脂
筒1の上方に原水タンク5と塩水タンク(再生液タン
ク)6を並列に設け、樹脂筒1の下部に設けた原水入口
部7と原水タンク5の下部を原水ライン8で接続し、こ
の原水ライン8中に、給水ポンプ9,給水ポンプ9方向
への流れを阻止する第一逆止弁G1,フロースイッチ
(水流検出手段)10,圧力スイッチ(圧力検出手段)
11および第一弁V1を上流側から順次設けている。樹
脂筒1の上部には軟水出口部12を設け、この軟水出口
部12に軟水ライン(処理水ライン)13を接続し、途
中に第二弁V2およびアキュームレータ14を設けてい
る。そして、軟水ライン13の第二弁V2の下流側と、
原水ライン8の圧力スイッチ11と前記第一弁V1との
間を、原水ライン8から分岐するようにバイパスライン
15で接続し、その途中に第三弁V3を設けている。こ
のバイパスライン15は、樹脂筒1内のイオン交換樹脂
4の再生中における断水を回避するものである。なお、
前記アキュームレータ14は、軟水ライン13の蛇口
(図示省略)からのチョロもれ,チョロ出し等による給
水ポンプ9の発停回数を減らすものである。
【0016】さらに、塩水タンク6の下部と軟水ライン
13の軟水出口部12に近接した位置とを塩水流下ライ
ン(再生液ライン)16で接続し、この塩水流下ライン
16中に塩水タンク6方向への流れを阻止する第二逆止
弁G2および第四弁V4を上流側から順次設けている。
そして、塩水流下ライン16の第四弁V4の下流側と、
原水タンク5の下部に接続される原水流下ライン17の
下流側端部とを樹脂筒1の手前で接続している。原水流
下ライン17の途中には、原水タンク5方向への流れを
阻止する第三逆止弁G3を設けている。そして、樹脂筒
1の下部に設けた原水入口部7にドレンライン18を接
続し、その途中に第五弁V5を設けている。
【0017】前記原水タンク5には、水位制御装置19
(たとえば、ボールタップ方式)が設けてあり、この水
位制御装置19により水道水等の原水を供給する原水供
給ライン20が接続してある。塩水タンク6内にはネッ
ト21が設けてあって、このネット21上に塩22を載
置するとともに、塩水タンク6のネット21の下方部分
は、隔壁23により第一の部分6Aと第二の部分6Bと
に区画されている。この第一の部分6Aと原水タンク5
とを補水ライン24で接続し、塩水タンク6へ原水を供
給するようにしている。符号G4は、補水ライン24に
設けた原水タンク5方向への流れを阻止する第四逆止弁
である。前記隔壁23は、原水タンク5から供給される
原水と、すでに生成されている飽和塩水とが再生工程時
に塩水タンク6の下方部で混合するのを防止するための
部材である。なお、塩水流下ライン16は、第二の部分
6Bの底部に接続される。ネット21上の塩22は、原
水タンク5から供給される原水に溶解して飽和塩水を生
成する。原水タンク5および塩水タンク6は、それぞれ
原水オーバーフロー管25,塩水オーバーフロー管26
を備えている。以上の実施例の説明において、ラインと
は流路または経路を意味し、さらに具体的には管路を意
味する。
【0018】以上の構成において、各通水工程,呼び水
工程,再生工程,押出し工程,洗浄工程に対応する通水
流路,呼び水流路,再生流路,押出し流路,洗浄流路を
整理して説明する。通水流路は、原水タンク5−原水ラ
イン8−樹脂筒1−軟水(処理水)ライン13を順次含
んだものである。この通水流路には、給水ポンプ9,第
一逆止弁G1,第一弁V1,第二弁V2が含まれる。呼
び水流路は、原水タンク5−原水ライン8の一部(給水
ポンプ9を含む)−ドレンライン18を順次含んだもの
である。この呼び水流路には、第一逆止弁G1,第一弁
V1,第五弁V5が含まれる。再生流路は、濃度の濃い
塩水(再生液)とこれを薄める原水とを混合して樹脂筒
1のイオン交換樹脂4へ供給する流路であり、塩水タン
ク6−塩水流下ライン16−軟水ライン13の一部−樹
脂筒1−ドレンライン18を順次含むとともに、原水タ
ンク5−原水流下ライン17のラインを含む。この再生
流路には、第二逆止弁G2,第四弁V4,第五弁V5,
第三逆止弁G3が含まれる。押出し流路は、原水タンク
5−原水流下ライン17−樹脂筒1−ドレンライン18
を順次含む。押出し流路には、第三逆止弁G3,第五弁
V5が含まれる。洗浄流路は、原水タンク5−原水ライ
ン(原水ライン8の一部−バイパスライン15−軟水ラ
イン13の一部からなり、洗浄工程時、原水が流通する
という意味での原水ラインである)−樹脂筒1−ドレン
ライン18を順次含んだものである。このように、洗浄
流路の原水ラインは、バイパスライン15の第三弁V3
を設けた部分と軟水ライン13の第二弁V2を設けた部
分を共用しているが、これは回路構成を簡単化するため
である。この洗浄流路には、第一逆止弁G1,第三弁V
3,第二弁V2,第五弁V5が含まれる。
【0019】前記各流路に含まれる第一弁V1〜第五弁
V5は、この実施例ではカム機構(図示省略)にて開閉
制御される切換弁装置VAとして構成されるが、別個の
5つの電磁弁により構成できる。前記カム機構は、バル
ブ駆動モータ31(図6参照)により駆動され、各工程
に対応するように回転位置が制御される。この切換弁装
置VAは、各弁の開閉状態を制御することで、その異な
る開閉状態に対応して通水流路,呼び水流路,再生流
路,押出し流路および洗浄流路を形成する。また、第二
逆止弁G2〜第四逆止弁G4は、一つの逆止弁ボックス
(図示省略)内に一体的に設けている。
【0020】そして、この切換弁装置VAおよび給水ポ
ンプ9は、図6に示すように、マイクロコンピュータ等
を含む制御装置Cにより、予め記憶された処理手順にし
たがい、フロースイッチ10,圧力スイッチ11,切換
弁装置VAの切換状態(各工程位置)を検出する位置検
出手段33等からの信号を入力して制御される。フロー
スイッチ10は、所定の第一設定流量を検出したとき、
水流有信号(給水ポンプ駆動要求信号)を出力し、第一
設定流量より所定値少ない第二設定流量を検出したと
き、水流無信号(給水ポンプ停止要求信号)を出力す
る。また、圧力スイッチ11は、第一設定圧力以下の検
出により給水ポンプ駆動要求信号を出力し、第一設定圧
力よりも所定値高い第二設定圧力以上の検出により給水
ポンプ停止要求信号を出力する。制御装置Cによる制御
は、図7に示すように、初期設定制御CAと通水制御C
Bと再生制御CCと洗浄制御CDとに大別される。初期
設定制御CAは、リセットスイッチ(図示省略)を操作
する等、リセットがかけられたとき行われる制御で、洗
浄工程SJと原点だし工程SG(切換弁装置VAを原点
位置である通水工程位置とする制御)とを行う。通水制
御CBは、切換弁装置VAを通水工程位置として通水工
程を行う制御である。再生制御CCは、通水工程が所定
日数行われ、かつ現在時刻が再生時刻に等しくなったと
きにイオン交換樹脂4の再生を行う制御であり、呼び水
工程SY,再生工程SS,押出し工程SO,洗浄工程S
Jおよび原点だし工程SGを順次行う。呼び水工程SY
は、装置の構造によっては不要な場合がある。各呼び水
工程SY,再生工程SS,押出し工程SO,洗浄工程S
Jは、各工程位置の検出と工程の実行(工程の実行と
は、呼び水,再生等の動作の実行を意味する)を含む。
ここで、洗浄工程SJは、必ずしも必要としない。洗浄
制御CDは、フロースイッチ10が所定時間以上(たと
えば、24時間以上)流れを検出しない等の所定の条件
を満たしたとき、洗浄工程SJを行う制御である。洗浄
制御CDの一例は、図8に示すようなものである。
【0021】以下に、この実施例における前記各制御を
説明する。まず、通水制御CBについて説明する。図1
を参照して説明すると、初期設定制御CAにより、切換
弁装置VAは通水工程位置に制御される。この工程位置
制御は、切換弁装置VAの開閉状態を制御するカム機構
を駆動する回転軸(いずれも図示省略)を回転駆動し、
その回転位置を位置検出手段33(図6参照)により検
出することで行われる。通水工程における切換弁装置V
Aの開閉状態は、第一弁V1:開,第二弁V2:開,第
三弁V3:閉,第四弁V4:閉,第五弁V5:閉とされ
る。そして、蛇口(図示省略)を開くと、原水タンク5
内の原水は、原水ライン8を介して樹脂筒1へ流入す
る。これにより、フロースイッチ10からの水流有の信
号により、または圧力スイッチ11の所定圧力以下の検
出信号により、給水ポンプ9が駆動され、原水は樹脂筒
1の下部から上向流として通水される。この通水によ
り、原水はイオン交換樹脂4の作用によって軟水化さ
れ、軟水(処理水)として、樹脂筒1の上部に設けた軟
水出口部12から軟水ライン13を介して蛇口へ供給さ
れる。この通水工程では、第三逆止弁G3の阻止作用に
より、樹脂筒1の軟水出口部12から原水タンク5への
処理水の流れは阻止される。
【0022】つぎに、イオン交換樹脂4を再生する再生
制御CCについて説明する。この再生制御CCにおいて
は、再生工程SSに入る前に、図2の呼び水工程SYが
所定時間(たとえば、数秒〜数十秒程度)行われるので
これについて説明する。切換弁装置VAは、樹脂筒1の
上方または樹脂筒1の上部の側方に設けられるので、ド
レンライン18がストレートに下方へ向けて配管される
のではなく、樹脂筒1の下部から切換弁装置VAの第五
弁V5へと上方へ配管され、その後反転して下方へ向け
て配管される構造となっている。このため、ドレンライ
ン18に空気が流入すると、水頭圧差が取れなくなり、
再生工程SS時にドレンライン18を通って原水および
塩水がスムーズに流下しない場合がある。前記呼び水工
程SYは、こうした不具合を無くすために、再生工程S
Sで原水または塩水が流通する経路,とくにドレンライ
ン18を原水で充満させる工程である。この呼び水工程
SY時の切換弁装置VAの開閉状態は、第一弁V1:
開,第二弁V2:閉,第三弁V3:開,第四弁V4:
開,第五弁V5:開とされる。その結果、原水タンク5
内の原水が樹脂筒1へ流れることになり、フロースイッ
チ10からの水流有の信号が出力されることにより、ま
たは圧力スイッチ11の所定圧力以下の検出信号が出力
されることにより、給水ポンプ9が駆動される。原水
は、原水ライン8−ドレンライン18を流通し、この流
通路内の空気を抜き、原水で満たすとともに、原水ライ
ン8−樹脂筒1経由で、樹脂筒1から第二逆止弁G2ま
での間および樹脂筒1から第三逆止弁G3までの間の流
路を原水で満たす。この呼び水工程SYが所定時間実行
された後、塩水による再生工程SSへ移行する。
【0023】つぎに、再生工程SSについて説明する。
この工程時の切換弁装置VAの開閉状態は、図3に示す
ように、第一弁V1:閉,第二弁V2:閉,第三弁V
3:開,第四弁V4:開,第五弁V5:開とされる。そ
の結果、塩水タンク6内の飽和塩水が塩水流下ライン1
6を介して重力により流下する。一方、原水タンク5内
の原水が原水流下ライン17を介して流下し、再生工程
SS時、再生液の入口部となる軟水出口部12におい
て、飽和塩水と原水が混合する。そして、所定濃度(約
10%)の塩水となり、樹脂筒1の上部から流下してイ
オン交換樹脂4を再生する。再生後の塩水は、ドレンラ
イン18を介して系外へ排出する。この再生工程SS
時、第三弁V3が開いているので、家庭での使用者が軟
水ライン13の先に接続された蛇口(図示省略)を開く
と、水流が発生し、フロースイッチ10の作動により給
水ポンプ9が駆動される。その結果、原水タンク5−原
水ライン8の一部−バイパスライン15−軟水ライン1
3の一部を経て、原水が供給されるので、水の使用に支
障を来すことは無い。そして、この再生工程SSが所定
時間(たとえば、約15分)実行される。すなわち、所
定量の塩水を流下させてイオン交換樹脂4の再生が完了
すると、つぎの押出し工程SOへ移行する。
【0024】つぎに、押出し工程SOについて説明す
る。この工程時の切換弁装置VAの開閉状態は、図4に
示すように、第一弁V1:閉,第二弁V2:閉,第三弁
V3:開,第四弁V4:閉,第五弁V5:開とされる。
その結果、原水タンク5の原水が原水流下ライン17を
通って自然落下して樹脂筒1内へ流入し、イオン交換樹
脂4内に残留する塩分を押し出して水洗する。この水洗
後の水は、ドレンライン18を介して系外へ排出され
る。この押出し工程SOは、所定時間(たとえば、約1
20分)実行され、所定量の原水を流下させて塩分を押
し出し、再生を完了する。この再生完了後は、後述の洗
浄工程SJを経て原点だし工程SGを行う。正常時の再
生制御においては、洗浄工程SJは必ずしも必要ではな
い。
【0025】ここで、前記再生工程SS中における原水
タンク5から塩水タンク6への補水について、図3に基
づいて説明する。すなわち、再生工程SS時は、すでに
再生工程SS前に生成され,貯溜された飽和塩水が、塩
水流下ライン16を介して流下するが、この流下に伴
い、原水が補水ライン24を介して原水タンク5から塩
水タンク6の第一の部分6Aへ流入し、隔壁23の上端
部を乗り越えて第二の部分6Bへ流入する。このよう
に、飽和塩水が流下するにしたがい、飽和塩水の水位が
低下する分、原水が補給されるが、比重差により、飽和
塩水層の上方に濃度の薄い原水層が位置し、この二層状
態を比較的保持しながら、飽和塩水の流下が行われる。
この補水による塩水タンク6内の水位制御は、原水タン
ク5の水位制御装置19の作用により行われ、ネット2
1より上方の所定水位LWまで流入し、原水に塩が溶け
ることで、再生時の飽和塩水を生成し貯溜する。最終的
に飽和塩水となるのは再生制御CCの終了後、しばらく
の時間(たとえば、約12時間)の経過後となる。
【0026】つぎに、洗浄制御CDについて説明する。
図8に基づいて説明すると、ステップS1(以下Sx
は、ステップSxを意味する。)で、フロースイッチ1
0により水流が有るかどうかを判定する。ここでNOが
判定されると、ステップS2へ移行し、水流無時間のカ
ウントを開始し、ステップS3へ移行し、水流無が所定
時間(たとえば、24時間)カウントされたかどうかを
判定し、NOであればステップS1へ戻る。こうして、
水流無が所定時間連続してカウントされると、ステップ
S3から洗浄工程SJへ移行し、洗浄工程SJでは洗浄
工程位置を検出し、洗浄工程SJを,たとえば約5分間
実行する。
【0027】この洗浄工程SJの実行について説明す
る。この洗浄工程SJ時の切換弁装置VAの開閉状態
は、図5に示すように、第一弁V1:閉,第二弁V2:
開,第三弁V3:開,第四弁V4:閉,第五弁V5:開
とされる。その結果、原水タンク5の原水が原水ライン
8を流下することに伴うフロースイッチ10または圧力
スイッチ11の作動により、給水ポンプ9が駆動され
る。原水タンク5内の原水は、給水ポンプ9の吸引,吐
出作用により原水ライン8の一部−バイパスライン15
−軟水ライン13の一部−樹脂筒1−ドレンライン18
からなる洗浄流路を流通する。こうして、給水ポンプ9
の作用により樹脂筒1への単位時間当たりの供給原水量
は、押出し工程SO時と比較して多くなり(たとえば、
約15倍)、樹脂筒1内の残留水は急速に系外へ排出さ
れる。そして、洗浄工程SJが終了すると、ステップS
4へ移行し、水流無の積算時間のカウントをクリアーし
て、前記原点だし工程SGへ移行する。ここでは、通水
工程実行可能な待機工程とする。また、ステップS1で
YESが判定されると、ステップS5へ移行し、水流無
の積算時間のカウントをクリアーする。
【0028】この実施例のようなイオン交換樹脂4を用
いた軟水装置においては、長時間通水工程が行われなか
った場合、樹脂筒1内においては、イオン交換樹脂4か
ら若干の色,臭いを有する有機物が樹脂筒1内の残留水
へ溶け出してくる。また、原水タンク5内の原水が長時
間使用されないで貯溜されると、軟水装置の設置環境如
何では、雑菌の繁殖等、衛生上、好ましくない状態の発
生も考えられる。しかしながら、前記洗浄工程SJを実
行することで、樹脂筒1内の残留水を急速に排出するこ
とができるとともに、原水タンク5内の原水を系外へ急
速に排出でき、こうした問題を解決してつぎの通水工程
へ速やかに移行できる効果がある。
【0029】なお、前記実施例においては、つぎの制御
も行うことができる構成となっている。すなわち、制御
装置C(図6参照)は、電池(図示省略)を具備し、停
電時も時計機能を継続できる。また、現在時刻,再生時
刻,再生周期(再生制御を行う周期)を設定する設定手
段を備える。また、これらを設定しない場合でも、再生
時刻,再生周期のデフォルト値(初期設定値)が設定さ
れる。また、再生時刻になったとき、停電であれば、停
電復帰時に再生制御を行い、再生中に停電となれば、停
電復帰後に再生を継続する。さらに、手動再生スイッチ
(図示省略)を設け、このスイッチを操作すると、強制
的に再生制御が実行される。
【0030】つぎに、この発明の他の実施例を図9に基
づいて説明する。この実施例において、図1の第一の実
施例と異なるのは、給水ポンプ9を樹脂筒1の出口側の
軟水ライン13に設けた点であり、軟水ライン13の給
水ポンプ9の出口側から分岐して樹脂筒1の上部へ至る
原水ライン50を設け、この原水ライン50に第六弁V
6を介設し、洗浄工程SJにおける流路を、原水タンク
5−原水ライン8の一部−バイパスライン15(第三弁
V3を含む)−軟水ライン13の一部(給水ポンプ9を
含む)−原水ライン50−樹脂筒1−ドレンライン18
からなる洗浄流路としている点である。また、呼び水工
程SYにおける流路を、洗浄流路と同じとしている点で
ある。また、圧力スイッチ11およびフロースイッチ1
0を給水ポンプ9の出口側へ設けている。なお、図9に
おいて、図1〜図5と同じ構成要素には同じ符号を付し
て説明を省略する。
【0031】この実施例では、通水工程,再生工程S
S,押出し工程SOにおける切換弁装置VAの第一弁V
1〜第五弁V5の開閉状態は、図1〜図5と同様であ
り、第六弁V6は各工程で全て閉とする。また、洗浄工
程SJ時の切換弁装置VAの開閉状態は、図9に示すよ
うに、第一弁V1:閉,第二弁V2:閉,第三弁V3:
開,第四弁V4:閉,第五弁V5:開,第六弁V6:開
とされる。その結果、原水タンク5の原水が原水ライン
8を流下することに伴うフロースイッチ10または圧力
スイッチ11の作動により、給水ポンプ9が駆動され
る。原水タンク5内の原水は、給水ポンプ9の吸引,吐
出作用により原水ライン8の一部−バイパスライン15
−軟水ライン13の一部−原水ライン50−樹脂筒1−
ドレンライン18からなる洗浄流路を流通する。こうし
て、第一の実施例と同様に洗浄工程SJが実行される。
また、呼び水工程SY時の切換弁装置VAの開閉状態
は、第一弁V1:閉,第二弁V2:閉,第三弁V3:
開,第四弁V4:開,第五弁V5:開,第六弁V6:開
とされる。
【0032】なお、この発明は、前記実施例に限定され
るものではなく、発明の実施の形態の欄において説明し
たように、給水ポンプを設けず、原水供給ラインの直圧
を処理容器にかける方式の軟水装置にも適用可能であ
る。この場合、原水供給ラインの上流にポンプを設ける
等して、原水供給ラインの水圧を確保しておく必要があ
る。この実施例を図10に基づいて説明する。この実施
例において、図1の第一の実施例と異なるのは、給水ポ
ンプ9を設けることなく、通水流路における原水ライン
8を原水供給ライン20と直接接続し、洗浄工程SJに
おける流路を原水供給ライン20−原水ライン8の一部
−バイパスライン15(第三弁V3を含む)−軟水ライ
ン13の一部−樹脂筒1−ドレンライン18からなる洗
浄流路としている点である。なお、図10において、図
1と同じ構成要素には同じ符号を付して説明を省略す
る。
【0033】この実施例では、通水工程,呼び水工程S
Y,再生工程SS,押出し工程SO,洗浄工程SJにお
ける切換弁装置VAの第一弁V1〜第五弁V5の開閉状
態は、図1〜図5と同様であるので、説明を省略する。
【0034】
【発明の効果】以上のように、この発明によれば、処理
容器へ供給される単位時間当たりの原水の流量が多い洗
浄工程により、短時間で処理容器内を洗浄することがで
き、かりに処理材から色や臭いを有する物質が溶け出し
たとしても、これを処理水内へ混入させることなく速や
かに排出して、通水工程へ移行できるので、家庭用軟水
装置として頗る効果的である。DETAILED DESCRIPTION OF THE INVENTION
[0001]
TECHNICAL FIELD The present invention relates to a method for treating raw water for treating
To the water flow path that contains the accommodated treatment vessel and treated water line in sequence
When the water flow process to be distributed is executed for a predetermined amount,Raw water to raw water
Through the priming flow path, which includes a line and a drain line
Priming process,Recycle solution in processing vessel, drain line in order
A regeneration step of circulating through a regeneration channel containing
To the extrusion flow path, which includes a vessel and a drain line.
And then perform the regeneration control to return to the water flow process.
The present invention relates to a method for controlling a household water softener.
[0002]
SUMMARY OF THE INVENTION This type of water softener for domestic use
Is generally used as a treatment material for water softening.
An exchange resin is used. In such devices,
If water is not passed into the processing container for a long time,
Harmless organic matter spilled from the on-exchange resin and water flow was resumed.
Odor or color water in the treated water
And This can cause complaints.
[0003]
The present invention solves the above problems.
It was made to solve the problem, containing raw water
Includes treated vessels and treated water lines sequentiallyWater passageDistribution to
When a predetermined amount of water flow process is performed,Raw water to raw water rye
Call that flows through a priming flow path that includes
And water process,Including the processing vessel and drain line in order
A regeneration step of circulating the raw water through a regeneration channel,
Extrusion to flow through the extrusion flow path including the drain line sequentially
Process, and control the return to the water flow process.
In the water system, the raw water is adjusted for the flow rate per unit time.
Process container and drain line
A washing step to circulate through the washing flow path containing
Raw water in the water flow path or the treatment
When it detects that the flow of the water
After performing the washing process, it shifts to the water flow process
And
According to the above means, the raw water in the water passage is
Or, it has been detected that the flow of the treated water is not longer than a predetermined time.
When the cleaning process is performed automatically,
After that, the process proceeds to the water passing step.
[0005]
DETAILED DESCRIPTION OF THE INVENTIONHousehold water softenerImplementation of
The form of the treatment is as follows:
A water flow process that circulates water through a water flow path that includes
When a predetermined amount is executed,Raw water to raw water line, drain line
A priming step of circulating the priming flow path sequentially includingPlayback
Distributes the liquid to the regeneration channel, which includes the processing vessel and drain line sequentially
Regeneration process, and the raw water in the treatment vessel and drain line in order.
And the extrusion process of circulating through the extrusion flow path
Home water softener that controls the return to the water flow process
The raw water flow rate per unit time in the extrusion step
Include processing vessel and drain line sequentially
Provide a washing process to circulate to the washing channel, and
Flow of raw water or treated water treated by a treatment vessel
When it is detected that there is no predetermined time or more, the cleaning step is performed.
Move to water flow process after performingHousehold water softenerHow to control
Act.
[0006] This embodiment will be described in detail below.
I will tell. In this embodiment, a household water softener
Includes the following three forms. That is, the raw water supply line
The raw water is once stored in the raw water tank from the
Of the raw water stored in the tank to the treatment vessel by the action of the water supply pump
During the extrusion process, the raw water in the raw water tank
Form to supply to processing container (first form: water tank interposed)
Form) and raw water from the raw water supply line to the raw water tank once
Store and directly connect the raw water supply line to the treatment vessel
To feed raw water directly from the raw water supply line during the water flow process.
During the extrusion process, the raw water in the raw water tank is
Form to supply to processing vessel by natural fall (second form:
Direct pressure / tank coexistence) and water flow without raw water tank
During the process and the extrusion process, the raw water is
(3rd form: direct pressure)
Form). In these configurations, the raw water line
The line refers to the line through which raw water flows, and the regenerating solution line
Means the line through which the raw liquor flows, and the treated water line
The line through which the treated raw water treated by the treated material flows
Taste, and the drain line is the liquid to be drained in the processing vessel.
Means the line that drains the body.
The case of the first embodiment will be described.
In this mode, the water flow path is a raw water tank,
Vessel and treated water line. Raw water tank
Is a means for temporarily storing raw water.
This is a means for storing a processing material inside. Raw water line
This is a supply path for supplying raw water from the water tank to the processing container. original
The end of the water line on the processing vessel side is usually at the top of the processing vessel.
Connected, but insert the tip into the processing material in the processing container
It can also be connected as follows. The treated water line is
By connecting the raw water to the treatment vessel.
This is a supply path for supplying the generated treated water. Treated water
The location of the connection to the treatment vessel
So that it flows out of the treated water line.
This is the position where the processing material is sandwiched between the edges.
The lower part of the vessel is not limited to this. This water passage
Is provided with a water supply pump that sucks and pumps raw water.
This installation location is for the raw water tank between the raw water tank and the treatment vessel.
In or at the treated water line at the outlet of the treatment vessel
is there. In the water flow process, the feedwater pump is driven to
The raw water is circulated to the water channel. This water flow process is performed for a predetermined amount.
Once executed, a regeneration step is performed. This predetermined amount is
Execution time of water passage process, or flow rate of treated water, or raw water
Means that the flow rate reaches a predetermined value.
[0008] The regeneration flow path includes a regenerating solution line, a processing vessel, and a drain.
It includes a ren line sequentially. This regeneration channel
The raw liquid line includes a regenerating liquid tank if necessary.
You. This regenerating liquid tank regenerates the processing material in the processing container.
This is a means for storing the regenerating liquid. Regeneration liquid line
This is a supply path for supplying the regenerating liquid in the liquid tank to the processing container.
The drain line was connected to the processing vessel and finished the regeneration operation
This is a discharge path for discharging the regenerating solution. Processing volume of regenerating solution
For the flow to the vessel, set the regenerating liquid tank above the processing vessel
To generate by gravity free fall method, or
Generates a stream of raw water,
It is generated by the step action. When using a jet pump
Is supplied to the processing vessel in a state where raw water and regenerating solution are mixed
Is done. Also, when it is necessary to reduce the concentration of the regenerating solution
Is raw water from which raw water flows down from the raw water tank by natural fall
Place the downflow line before the processing vessel of the regenerating solution line, or
Connected before the processing material in the processing vessel
After mixing and regenerating the regenerated solution from
Then, it is configured to supply to the processing container. As a regenerating solution
Is adjusted to an appropriate concentration and stored in the regenerant tank.
If this is the case, no means for this mixing is necessary. Again
During the raw process, regenerate the regenerating solution or a mixture of the regenerating solution and raw water.
Distribute to the raw channel.
[0009] The extrusion channel is a raw water tank, a raw water flowing down line.
Water tank, processing vessel, drain line
It is positioned above the processing container,
Raw water, raw water tank-raw water flow down line-treatment vessel-
Distribute with Renline. Raw water flow down line of extrusion channel
Is a natural fall type, while the raw water line in the
Both lines are basically separate due to forced water flow by pump
Although it is a line, it is possible to share a part. Push
During the discharging process, the raw water in the raw water tank is extruded by gravity
Flow through the flow path.
[0010] The washing flow path includes a raw water tank, a raw water line, and a processing line.
It contains a water supply container and a drain line in order.
A feedwater pump is installed in the raw water line between the tank and the treatment vessel.
You. The washing channel is a feedwater pump and a raw water line in the water channel.
By sharing a part of the raw water, the raw water line
It is also possible to provide a water supply pump. This washing flow
The raw water line of the road may share part of the treated water line.
It does not have to be shared. In addition, drain line
In, it is desirable to share the drain line of the extrusion flow path
However, it is also possible to provide them separately. During the cleaning process
Drives the feed water pump to wash the raw water in the raw water tank
Distribute to This washing step is provided after the extrusion step.
The regeneration control includes the regeneration process, the extrusion process, and the cleaning process.
Will be included. In this playback control, if necessary,
The priming process is included. This priming process is a part of the regeneration process.
An empty space in the drain line of the regeneration channel
Vent and fill with water, natural fall of regenerated solution during regeneration process
This is a process for facilitating Unit time of raw water during cleaning process
To increase the flow rate per unit from that during the extrusion process
Increases the flow rate by driving the water supply pump during the cleaning process.
It can be large and falls naturally without driving the water supply pump during the extrusion process
By supplying raw water, the flow rate can be reduced. In addition,
Reduce the flow rate of raw water per unit time during the extrusion process
Is that the regeneration with the treated material takes place slowly and slowly.
This is because it is necessary to
[0011] Then, the flow of raw water in the water passage,
Or the flow of treated water flowing out of the treatment
If the absence is detected, the cleaning step is performed for a predetermined time.
Is done. This detection is performed, for example, by using a flow provided in the water flow path.
This is performed by a water flow detecting means such as a switch. This water flow test
The outlet means can also be used as a means for controlling the feedwater pump.
You.
In the case of the second mode, the water flow path is
Water supply line, raw water line, treatment volume containing processing materials
Vessel and treated water line, and the regeneration channel is
A configuration that includes a raw liquid line, a processing vessel, and a drain line sequentially
And the extrusion channel is a raw water tank, raw water line, treatment volume
And a drain line in order.
Water supply line, raw water line, treatment vessel, drain line
It is configured to include them sequentially. In this mode, the raw water supply line
Pump means on the upstream side (outside of the household water softener)
May or may not have
The water pressure in the raw water line is about the same as the water pressure.
In this mode, during the cleaning process, the raw water supply line
Raw water with a high water pressure is directly supplied to the treatment vessel and extruded.
At the time, raw water with low water pressure is dropped by natural fall from the raw water tank
Because it is configured to supply, raw water during the cleaning process
The flow rate per unit time is higher than that during the extrusion process.
It's getting worse.
In the case of the third mode, the water flow path is
Water supply line, raw water line, treatment volume containing processing materials
Vessel and treated water line, and the regeneration channel is
A configuration that includes a raw liquid line, a processing vessel, and a drain line sequentially
And the extrusion flow path is raw water supply line, raw water line, treatment
The container and the drain line are sequentially included.
Raw water supply line, raw water line, treatment vessel, drain line
Are sequentially included. In this embodiment, the cleaning channel and
Adjust the flow resistance of the extrusion channel. For example, extrusion flow
Wash through a flow resistance member such as an orifice etc.
By eliminating the flow resistance member in the purification channel,
The flow rate of raw water during the extrusion process during the extrusion process.
Do more than that.
[0014]
DESCRIPTION OF THE PREFERRED EMBODIMENTS The embodiment of the present invention as described above
Household material made of ion-exchange resin and saline as regenerating solution
Embodied in a water softener. This specific example
The details will be described below with reference to the drawings.
FIG. 1 to FIG. 5 show a home use according to the present invention.
FIG. 2 is a schematic explanatory view showing the configuration of a water softener,
Process, priming process, regeneration process, extrusion process, washing process
are doing. Reference numeral 1 denotes a resin tube (a cylindrical processing container made of resin).
And as a resin holding member at a lower portion in the resin cylinder 1
A predetermined amount of silica stone 2 is accommodated, and above this silica stone 2
Between the wire mesh 3 as the resin holding member installed in the part
The amount of the ion exchange resin (processing material) 4 is stored. resin
A raw water tank 5 and a salt water tank (regenerated liquid tank)
H) Raw water inlets provided in parallel at the bottom of the resin cylinder 1
Section 7 and the lower part of raw water tank 5 are connected by raw water line 8,
Feed water pump 9 and feed water pump 9 in the raw water line 8
Check valve G1 and flow switch to block the flow to
(Water flow detecting means) 10, pressure switch (pressure detecting means)
11 and the first valve V1 are provided sequentially from the upstream side. Tree
A soft water outlet 12 is provided at the upper part of the oil cylinder 1, and this soft water outlet is provided.
A soft water line (treated water line) 13 is connected to the section 12
The second valve V2 and the accumulator 14 are provided inside.
You. And the downstream side of the second valve V2 of the soft water line 13,
Between the pressure switch 11 of the raw water line 8 and the first valve V1.
A bypass line that branches from the raw water line 8
15 and a third valve V3 is provided on the way. This
Of the ion exchange resin in the resin cylinder 1
4 is to avoid water interruption during regeneration. In addition,
The accumulator 14 is a faucet for the soft water line 13.
(Not shown)
This is to reduce the number of times the water pump 9 starts and stops.
Further, a lower portion of the salt water tank 6 and a soft water line
13 and the position close to the soft water outlet 12
(Regeneration liquid line) 16 and this brine downflow line
Second check to prevent the flow in the direction of the salt water tank 6 during 16
The valve G2 and the fourth valve V4 are provided sequentially from the upstream side.
And, on the downstream side of the fourth valve V4 of the brine descending line 16,
The raw water flow down line 17 connected to the lower part of the raw water tank 5
The downstream end is connected before the resin cylinder 1. Raw water flow
In the middle of the lower line 17, the flow toward the raw water tank 5
A third check valve G3 for blocking is provided. And the resin cylinder
A drain line 18 is connected to the raw water inlet 7
A fifth valve V5 is provided on the way.
The raw water tank 5 has a water level control device 19.
(For example, ball tap method)
Raw water supply that supplies raw water such as tap water by the position control device 19
The supply line 20 is connected. In the salt water tank 6,
And a salt 22 is placed on the net 21.
And the lower part of the net 21 of the salt water tank 6
Is separated from the first portion 6A and the second portion 6B by the partition wall 23.
Is divided into This first part 6A and raw water tank 5
And water supply line 24 to supply raw water to salt water tank 6.
I am trying to pay. Symbol G4 is on the rehydration line 24.
Fourth check valve that prevents flow toward the raw water tank 5 provided
It is. The partition 23 is supplied from the raw water tank 5.
During the regeneration process, the raw water and the already generated saturated brine
To prevent mixing in the lower part of the salt water tank 6
It is a member. In addition, the salt water falling line 16 is a second part.
6B is connected to the bottom. The salt 22 on the net 21
Dissolve in raw water supplied from water tank 5 to produce saturated brine
To achieve. The raw water tank 5 and the salt water tank 6 are respectively
Raw water overflow pipe 25, salt water overflow pipe 26
It has. In the above description of the embodiment,
Means a channel or path, more specifically a conduit
To taste.
In the above configuration, each water passage process, priming water
Water flow for process, regeneration process, extrusion process, and washing process
Flow path, priming flow path, regeneration flow path, extrusion flow path, washing flow path
Organize and explain. The water flow path is raw water tank 5
In 8-resin cylinder 1-soft water (treated water) line 13
It is something. In this water passage, the water supply pump 9
One check valve G1, a first valve V1, and a second valve V2 are included. Call
The water flow path is a part of the raw water tank 5-raw water line 8 (water supply
Including the pump 9) -including the drain line 18 sequentially
It is. The priming flow path includes a first check valve G1 and a first valve
V1 and a fifth valve V5. The regeneration channel has a high concentration
Mix the salt water (regenerated liquid) and the raw water that dilutes it to make a resin cylinder
1 is a flow path for supplying to the ion exchange resin 4,
Ku 6-brine flow down line 16-part of soft water line 13-tree
Including the oil cylinder 1-drain line 18 sequentially,
Includes the line 5-raw water flow down line 17. This playback
In the flow path, the second check valve G2, the fourth valve V4, the fifth valve V5,
A third check valve G3 is included. Extrusion channel is a raw water tank
5-Raw water flow down line 17-Resin cylinder 1-Drain line 18
Are sequentially included. The third check valve G3 and the fifth valve
V5 is included. The washing channel is the raw water tank 5
(Part of raw water line 8-bypass line 15-soft water line)
It consists of a part of the in 13 and the raw water flows during the washing process
This is a raw water line in the sense of)-resin cylinder 1-drain
Lines 18 are sequentially included. Thus, cleaning
The raw water line of the flow path is the third valve V3 of the bypass line 15.
And the portion of the soft water line 13 where the second valve V2 is provided.
Although the share is shared, this is to simplify the circuit configuration
It is. The cleaning flow path includes a first check valve G1 and a third valve V
3, a second valve V2, and a fifth valve V5.
The first valve V1 to the fifth valve included in each of the flow paths
V5 is opened and closed by a cam mechanism (not shown) in this embodiment.
It is configured as a controlled switching valve device VA, but separate
It can be composed of five solenoid valves. The cam mechanism includes a valve
Each step is driven by a step drive motor 31 (see FIG. 6).
Is controlled so as to correspond to. This switching valve device
The position VA is controlled by controlling the open / close state of each valve.
Flow path, priming flow path, regeneration flow
A channel, an extrusion channel and a cleaning channel are formed. Also the second
The check valve G2 to the fourth check valve G4 are one check valve box.
(Not shown).
The switching valve device VA and the water supply port
As shown in FIG. 6, the amplifier 9 is a microcomputer or the like.
The processing procedure stored in advance is performed by the control device C including
Therefore, flow switch 10, pressure switch 11, switching
Position detection for detecting the switching state (each process position) of the valve device VA
It is controlled by inputting a signal from the output means 33 or the like. flow
When the switch 10 detects a predetermined first set flow rate,
Outputs a water flow signal (feed pump drive request signal)
When a second set flow rate smaller than the set flow rate by a predetermined value is detected.
Output a water flow no signal (feed pump stop request signal)
You. Further, the pressure switch 11 detects a pressure equal to or lower than the first set pressure.
Output the feed water pump drive request signal to output the first set pressure
Water is supplied by detecting the second set pressure or more that is higher than the force by a predetermined value.
Outputs pump stop request signal. Control by control device C
As shown in FIG. 7, the initial setting control CA and the water flow control C
B, regeneration control CC, and cleaning control CD. initial
The setting control CA operates a reset switch (not shown)
Control performed when a reset is applied.
Purification process SJ and origin setting process SG (switch valve device VA
Control to set the position of the water flow step). Water system
The control CB is used as a switching valve device VA as a water passage process position.
This is the control for performing the process. In the regeneration control CC, the water flow process is
Days and the current time equals the playback time
Control to regenerate the ion exchange resin 4
Step SY, regeneration step SS, extrusion step SO, cleaning step S
J and the origin setting step SG are sequentially performed. Priming process SY
May be unnecessary depending on the structure of the device. Each priming
Step SY, regeneration step SS, extrusion step SO, cleaning step S
J detects each process position and executes the process (execution of the process and
Means execution of operations such as priming and regeneration).
Here, the cleaning step SJ is not always necessary. Washing
The control CD determines that the flow switch 10
Predetermined conditions such as not detecting flow
Is satisfied, the cleaning process SJ is performed. Washing
An example of the control CD is as shown in FIG.
Hereinafter, each control in this embodiment will be described.
explain. First, the water flow control CB will be described. FIG.
The description will be made with reference to FIG.
The valve device VA is controlled to the water passage process position. This process position
The control is performed by a cam mechanism for controlling the open / close state of the switching valve device VA.
A rotary shaft (both not shown) is driven to rotate the
The rotational position is detected by the position detecting means 33 (see FIG. 6).
It is done by putting out. Switching valve device V in water passage process
The open / close state of A is as follows: first valve V1: open, second valve V2: open,
Three valves V3: closed, fourth valve V4: closed, fifth valve V5: closed
You. Then, when the faucet (not shown) is opened, the raw water tank 5 is opened.
The raw water inside flows into the resin cylinder 1 through the raw water line 8
You. As a result, the water flow signal from the flow switch 10 is
Signal or the pressure of the pressure switch 11
The water feed pump 9 is driven by the output signal, and the raw water is
Water is passed from the lower part of 1 as upward flow. This water flow
The raw water is softened by the action of the ion exchange resin 4.
The soft water (treated water)
Water is supplied from the water outlet 12 to the faucet via the soft water line 13.
It is. In this water passage step, the third check valve G3 is prevented from acting.
From the soft water outlet 12 of the resin cylinder 1 to the raw water tank 5
The flow of treated water is blocked.
Next, regeneration for regenerating the ion exchange resin 4
The control CC will be described. In this reproduction control CC
Before entering the regeneration step SS, the priming step SY of FIG.
Since it is performed for a predetermined time (for example, about several seconds to several tens of seconds)
This will be described. The switching valve device VA is
Since it is provided above or on the side of the upper part of the resin cylinder 1,
Len line 18 is piped straight down
Instead of the fifth part of the switching valve device VA from the lower part of the resin cylinder 1.
Piped upward to valve V5, then inverted and directed downward
It is structured to be piped. For this reason, drain
When the air flows into the pump 18, the head pressure difference cannot be obtained,
Raw water and wastewater pass through the drain line 18 during the regeneration process SS.
Brine may not flow smoothly. Primer
In order to eliminate such inconvenience, the reproduction process S
The route through which raw water or salt water circulates in S, especially drainage
This is a step of filling the container 18 with raw water. This priming process
The open / closed state of the switching valve device VA during SY is determined by the first valve V1:
Open, second valve V2: closed, third valve V3: open, fourth valve V4:
Open, fifth valve V5: Open. As a result, the raw water tank 5
The raw water in the tank flows to the resin cylinder 1 and the flow switch
When the signal indicating the presence of water flow from the switch 10 is output,
Or a detection signal below a predetermined pressure of the pressure switch 11 is output.
As a result, the water supply pump 9 is driven. Raw water
Circulates through the raw water line 8 and the drain line 18.
Vent the air in the passage, fill it with raw water, and
8-Resin cylinder 1 to second check valve G2 via resin cylinder 1
And the flow from the resin cylinder 1 to the third check valve G3
Fill the road with raw water. This priming process SY is performed for a predetermined time.
After that, the process proceeds to the regeneration step SS using salt water.
Next, the regeneration step SS will be described.
The open / closed state of the switching valve VA in this step is shown in FIG.
Thus, the first valve V1: closed, the second valve V2: closed, the third valve V
3: Open, fourth valve V4: open, fifth valve V5: open. So
As a result, the saturated salt water in the salt water tank 6 is
It flows down by gravity through 6. On the other hand, in the raw water tank 5
Raw water flows down through the raw water flow down line 17 and the regeneration process
At the time of SS, the soft water outlet 12 which is the inlet of the regenerated liquid
Then, the saturated salt water and the raw water are mixed. Then, a predetermined concentration (about
(10%) salt water that flows down from the top of
The on-exchange resin 4 is regenerated. The salt water after regeneration is drainage
It is discharged out of the system through the inlet 18. This regeneration process SS
At this time, since the third valve V3 is open, the user at home is soft.
Open the faucet (not shown) connected to the end of the water line 13
Water flow is generated, and the water is supplied by the operation of the flow switch 10.
The water pump 9 is driven. As a result, the raw water tank 5-
Part of water line 8-bypass line 15-soft water line 1
The raw water is supplied through part of 3 so that it can support the use of water.
There is no obstacle. Then, this regeneration process SS
Run for a time (eg, about 15 minutes). That is,
Regeneration of ion exchange resin 4 is completed by flowing a fixed amount of salt water
Then, the process proceeds to the next extrusion process SO.
Next, the extrusion process SO will be described.
You. FIG. 4 shows the open / closed state of the switching valve device VA in this step.
As shown, the first valve V1: closed, the second valve V2: closed, the third valve
V3: open, fourth valve V4: closed, fifth valve V5: open.
As a result, the raw water in the raw water tank 5 passes through the raw water flow down line 17.
It naturally falls through it and flows into the resin cylinder 1, where the ion-exchange tree
The salt remaining in the fat 4 is extruded and washed with water. This washing
The remaining water is discharged out of the system through the drain line 18.
You. This extrusion process SO is performed for a predetermined time (for example, about 1
20 minutes) is executed, a predetermined amount of raw water is allowed to flow down, and salt is pressed.
And complete the playback. After this regeneration is completed,
After the cleaning step SJ, the origin setting step SG is performed. Normal
In the raw control, the cleaning step SJ is not always necessary.
No.
Here, the raw water during the regeneration step SS
Refilling of water from tank 5 to salt water tank 6 is based on FIG.
A description will be given below. That is, at the time of the regeneration process SS,
The saturated brine generated and stored before the regeneration process SS
It flows down through the water flow down line 16,
Raw water is supplied from the raw water tank 5 through the
It flows into the first portion 6A of the water tank 6, and the upper end of the partition 23
And flows into the second portion 6B. like this
Then, as the saturated saline water flows down, the level of the saturated saline water
Raw water is replenished as much as it decreases, but due to the specific gravity difference, it is saturated
A low concentration raw water layer is located above the saltwater layer.
The saturated brine is allowed to flow while maintaining the state relatively.
The water level control in the salt water tank 6 by this replenishment is performed by the raw water tank.
This is performed by the operation of the water level control device 19 of the
Inflow to the predetermined water level LW above 1 and salt dissolves in raw water
This generates and stores saturated brine during regeneration. Final
Will be saturated brine for a while after the regeneration control CC ends.
(For example, about 12 hours).
Next, the cleaning control CD will be described.
Referring to FIG. 8, step S1 (hereinafter, Sx
Means step Sx. ), Flow switch 1
Based on 0, it is determined whether there is a water flow. Where NO
If it is determined, the process proceeds to step S2, and the water flow is stopped for a period of time.
Starts counting and moves to step S3, where no water flow is determined.
Time (for example, 24 hours)
If the determination is NO, the process returns to step S1. Thus,
When water flow is counted continuously for a predetermined time, step
The process proceeds from S3 to the cleaning step SJ.
The process position is detected, and the cleaning process SJ is performed, for example, for about 5 minutes.
Execute.
The execution of the cleaning step SJ will be described.
You. Opening / closing state of the switching valve device VA during the cleaning step SJ
As shown in FIG. 5, the first valve V1: closed, the second valve V2:
Open, third valve V3: open, fourth valve V4: closed, fifth valve V5: open
It is said. As a result, the raw water in the raw water tank 5 is
Flow switch 10 or pressure associated with flowing down 8
The operation of the switch 11 drives the water supply pump 9.
You. The raw water in the raw water tank 5 is sucked and discharged by the water supply pump 9.
Part of raw water line 8-bypass line 15
-Part of the soft water line 13-Resin cylinder 1-Drain line 18
Flow through a washing channel consisting of Thus, the water supply pump 9
Of raw water supplied to the resin cylinder 1 per unit time by the action of
Is larger than at the time of the extrusion process SO (for example,
(Approx. 15 times), the residual water in the resin cylinder 1 is quickly discharged out of the system.
It is. When the cleaning step SJ is completed, step S
Move to 4 and clear the count of the accumulated time without water flow
Then, the process proceeds to the origin setting step SG. Here, the water
This is a standby process that can be performed. Also, in step S1
If YES is determined, the process proceeds to step S5, where there is no water flow.
Clear the count of the integration time of.
Using the ion exchange resin 4 as in this embodiment
The water softening device was not used for a long time
The ion exchange resin 4 in the resin cylinder 1
The organic matter having a slight color and odor is the residual water in the resin cylinder 1.
Melting out to Also, if the raw water in the raw water tank 5 is long
If it is not used for a while and stored,
What is the cause of unfavorable hygiene conditions such as propagation of various bacteria?
Raw is also conceivable. However, the cleaning step SJ is performed.
By doing so, the residual water in the resin cylinder 1 can be quickly discharged.
And the raw water in the raw water tank 5 is rushed out of the system.
The water can be discharged quickly, and these problems can be solved
There is an effect that can be quickly shifted to.
In the above embodiment, the following control
It can also be performed. That is, control
The device C (see FIG. 6) includes a battery (not shown),
The clock function can be continued even when power is on. Also, the current time, during playback
Setting procedure to set the playback cycle (cycle for performing playback control)
It has a step. Also, even if you do not set these,
Default values of time and playback cycle (initial setting values) are set.
It is. Also, when the playback time comes, if there is a power outage,
Regeneration control is performed when power is restored, and if a power failure occurs during regeneration,
Regeneration is continued after power recovery. In addition, a manual regeneration switch
(Not shown), and when this switch is operated, forced
The reproduction control is executed.
Next, another embodiment of the present invention will be described with reference to FIG.
A description will be given below. In this embodiment, the first embodiment of FIG.
The difference from the embodiment is that the water supply pump 9 is connected to the outlet side of the resin cylinder 1.
The point provided in the soft water line 13 is that
Branches from the outlet side of the water pump 9 to the upper part of the resin cylinder 1
A raw water line 50 is provided, and a sixth valve V
6, the flow path in the washing step SJ is connected to the raw water tank.
5-Part of raw water line 8-Bypass line 15 (third valve
V3) (part of the soft water line 13 (feed water pump 9)
Including)-Raw water line 50-Resin cylinder 1-Drain line 18
This is a point that the cleaning channel is made of In addition, priming
In that the flow path in step SY is the same as the cleaning flow path.
is there. The pressure switch 11 and the flow switch 1
0 is provided on the outlet side of the water supply pump 9. Note that FIG.
Here, the same components as those in FIGS. 1 to 5 are denoted by the same reference numerals.
The description is omitted.
In this embodiment, the water supply step and the regeneration step S
S, first valve V of switching valve device VA in extrusion process SO
The open / close state of the first to fifth valves V5 is the same as in FIGS.
Therefore, the sixth valve V6 is closed in each step. Also, cleaning
FIG. 9 shows the open / closed state of the switching valve device VA at step SJ.
Thus, the first valve V1: closed, the second valve V2: closed, the third valve V3:
Open, fourth valve V4: closed, fifth valve V5: open, sixth valve V6: open
It is said. As a result, the raw water in the raw water tank 5 is
Flow switch 10 or pressure associated with flowing down 8
The operation of the switch 11 drives the water supply pump 9.
You. The raw water in the raw water tank 5 is sucked and discharged by the water supply pump 9.
Part of raw water line 8-bypass line 15
-Part of the soft water line 13-Raw water line 50-Resin cylinder 1-
It flows through the washing flow path composed of the drain line 18. Like this
Then, the cleaning step SJ is executed in the same manner as in the first embodiment.
In addition, the open / close state of the switching valve device VA during the priming process SY.
Is the first valve V1: closed, the second valve V2: closed, the third valve V3:
Open, fourth valve V4: open, fifth valve V5: open, sixth valve V6: open
It is said.
The present invention is not limited to the above embodiment.
It is not described in the section of the embodiment of the invention.
As shown in the figure, the direct pressure of the raw water
Can also be applied to a soft water system in which
You. In this case, install a pump upstream of the raw water supply line
It is necessary to secure the water pressure of the raw water supply line
You. This embodiment will be described with reference to FIG. This practice
In the example, the difference from the first embodiment of FIG.
Raw water line in the water flow path without providing pump 9
8 is directly connected to the raw water supply line 20 to perform the cleaning process SJ.
Flow path in the raw water supply line 20-part of the raw water line 8
-Bypass line 15 (including third valve V3)-Soft water line
Washing consisting of a part of the resin 13-the resin cylinder 1-the drain line 18
The point is that it is a purification channel. Note that in FIG.
The same components as those in 1 are denoted by the same reference numerals and description thereof is omitted.
You.
In this embodiment, the water supply step and the priming step S
Y, regeneration process SS, extrusion process SO, cleaning process SJ
Of the first valve V1 to the fifth valve V5 of the switching valve device VA
Since the state is the same as in FIGS. 1 to 5, the description is omitted.
[0034]
As described above, according to the present invention, the processing
Washing with a large flow rate of raw water per unit time supplied to the container
The cleaning process enables the processing vessel to be cleaned in a short time.
Substances with color and odor dissolve out of the treated material
Even if it does not mix this into the treated water,
Can be transferred to the water flow process for soft water for domestic use.
Very effective as a device.
【図面の簡単な説明】
【図1】この発明の一実施例における通水工程を示す家
庭用軟水装置の構成図である。
【図2】この発明の一実施例における呼び水工程を示す
家庭用軟水装置の構成図である。
【図3】この発明の一実施例における再生工程を示す家
庭用軟水装置の構成図である。
【図4】この発明の一実施例における押出し工程を示す
家庭用軟水装置の構成図である。
【図5】この発明の一実施例における洗浄工程を示す家
庭用軟水装置の構成図である。
【図6】この発明の一実施例における電気的概略構成を
示す図である。
【図7】この発明の一実施例における制御装置による制
御手順を示すフローチャート図である。
【図8】この発明の一実施例における制御装置による他
の制御手順を示すフローチャート図である。
【図9】この発明の他の実施例における洗浄工程を示す
家庭用軟水装置の構成図である。
【図10】この発明の他の実施例における通水工程を示
す家庭用軟水装置の構成図である。
【符号の説明】
1 樹脂筒
4 イオン交換樹脂
5 原水タンク
6 塩水タンク
8 原水ライン
9 給水ポンプ
10 フロースイッチ
13 軟水ライン
16 塩水流下ライン
17 原水流下ライン
18 ドレンライン
C 制御装置
V1〜V5 第一弁〜第五弁
VA 切換弁装置BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a configuration diagram of a household water softener showing a water passage step in one embodiment of the present invention. FIG. 2 is a configuration diagram of a household water softener showing a priming process in one embodiment of the present invention. FIG. 3 is a configuration diagram of a household water softener showing a regeneration step in one embodiment of the present invention. FIG. 4 is a configuration diagram of a household water softener showing an extrusion step in one embodiment of the present invention. FIG. 5 is a configuration diagram of a household water softener showing a cleaning step in one embodiment of the present invention. FIG. 6 is a diagram showing an electrical schematic configuration according to an embodiment of the present invention. FIG. 7 is a flowchart illustrating a control procedure by a control device according to an embodiment of the present invention. FIG. 8 is a flowchart illustrating another control procedure performed by the control device according to the embodiment of the present invention. FIG. 9 is a configuration diagram of a household water softener showing a cleaning step in another embodiment of the present invention. FIG. 10 is a configuration diagram of a household water softener showing a water passage step in another embodiment of the present invention. [Description of Signs] 1 Resin cylinder 4 Ion exchange resin 5 Raw water tank 6 Salt water tank 8 Raw water line 9 Feed water pump 10 Flow switch 13 Soft water line 16 Salt water falling line 17 Raw water falling line 18 Drain line C Controller V1 to V5 First valve ~ Fifth valve VA switching valve device
───────────────────────────────────────────────────── フロントページの続き (72)発明者 福岡 好之 愛媛県松山市堀江町7番地 三浦工業株 式会社 内 (56)参考文献 特開 平7−265850(JP,A) 実開 平6−19892(JP,U) (58)調査した分野(Int.Cl.7,DB名) C02F 1/42 B01J 47/00 - 49/02 ──────────────────────────────────────────────────続 き Continuation of front page (72) Inventor Yoshiyuki Fukuoka 7-7 Horie-cho, Matsuyama-shi, Ehime Miura Kogyo Co., Ltd. (56) References JP-A-7-265850 (JP, A) 19892 (JP, U) (58) Field surveyed (Int. Cl. 7 , DB name) C02F 1/42 B01J 47/00-49/02
Claims (1)
水ラインを順次含む通水流路へ流通させる通水工程を所
定量実行したとき、原水を原水ライン,ドレンラインを
順次含む呼び水流路へ流通させる呼び水工程と、再生液
を処理容器,ドレンラインを順次含む再生流路へ流通さ
せる再生工程と、原水を処理容器,ドレンラインを順次
含む押出し流路へ流通させる押出し工程とを順次行い、
通水工程へ戻る制御を行う家庭用軟水装置において、原
水をその単位時間当たりの流量を前記押出し工程時より
も増大させて処理容器,ドレンラインを順次含む洗浄流
路へ流通させる洗浄工程を設け、通水流路における原水
または処理容器により処理された処理水の流れが所定時
間以上無いことを検出したとき、前記洗浄工程を行った
後に通水工程へ移行することを特徴とする家庭用軟水装
置の制御方法。(1) Claims: (1) When a predetermined amount of a water-passing step of flowing raw water through a water supply passage including a processing vessel containing a processing material and a processing water line is executed, the raw water is converted into the raw water line. , Drain line
A priming step of circulating sequentially through a priming channel, a regeneration step of circulating a regenerating solution through a regeneration channel including a processing vessel and a drain line, and an extrusion of circulating raw water through an extrusion channel sequentially including a processing vessel and a drain line. The process is performed sequentially,
In a domestic soft water device that performs control to return to the water passing step, a washing step is provided in which the flow rate of raw water per unit time is increased from that in the extrusion step and the raw water flows through a washing flow path including a processing vessel and a drain line sequentially. When detecting that the flow of the raw water or the treated water treated by the treatment container in the water passage is not longer than a predetermined time, the water softening device is shifted to a water flowing process after performing the washing process. Control method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001034959A JP3525899B2 (en) | 2001-02-13 | 2001-02-13 | Control method of household water softener |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001034959A JP3525899B2 (en) | 2001-02-13 | 2001-02-13 | Control method of household water softener |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP13439096A Division JP3218974B2 (en) | 1996-04-30 | 1996-04-30 | Control method of water treatment equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2001246376A JP2001246376A (en) | 2001-09-11 |
JP3525899B2 true JP3525899B2 (en) | 2004-05-10 |
Family
ID=18898473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001034959A Expired - Fee Related JP3525899B2 (en) | 2001-02-13 | 2001-02-13 | Control method of household water softener |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3525899B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009178666A (en) * | 2008-01-31 | 2009-08-13 | Noritz Corp | Water treating device |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5152087B2 (en) * | 2009-04-17 | 2013-02-27 | 株式会社ノーリツ | Water softener |
JP5463877B2 (en) * | 2009-11-27 | 2014-04-09 | 株式会社ノーリツ | Water softener |
JP5772015B2 (en) * | 2011-01-28 | 2015-09-02 | 三浦工業株式会社 | Ion exchanger |
JP5375850B2 (en) * | 2011-02-10 | 2013-12-25 | 三浦工業株式会社 | Ion exchanger |
-
2001
- 2001-02-13 JP JP2001034959A patent/JP3525899B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009178666A (en) * | 2008-01-31 | 2009-08-13 | Noritz Corp | Water treating device |
Also Published As
Publication number | Publication date |
---|---|
JP2001246376A (en) | 2001-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3525899B2 (en) | Control method of household water softener | |
JP2007289959A (en) | Water softener | |
JP3218974B2 (en) | Control method of water treatment equipment | |
JP3147774B2 (en) | Water treatment device and water treatment method | |
JP4175784B2 (en) | Bathroom structure | |
JP4061716B2 (en) | Control method of water softener | |
JP3525900B2 (en) | Regeneration control method for household water softener | |
EP0565876B1 (en) | A method of regenerating water softeners and a water softener | |
JP2776279B2 (en) | Control method of water softener | |
JP2000334450A (en) | Water softening device and control method of the water softening device | |
JP2867906B2 (en) | Water softener | |
JPH09297150A (en) | Position detecting device and water treatment device | |
JP3982086B2 (en) | Control method of water softener | |
JP3149786B2 (en) | Water softener | |
JP2778462B2 (en) | Water regeneration control method | |
JP4419178B2 (en) | Control method of drainage process in water softener | |
JP3147775B2 (en) | Water treatment equipment | |
JP3218975B2 (en) | Regeneration control method for water treatment equipment | |
JP2009178664A (en) | Water softening device and hot-water supply system | |
KR100658594B1 (en) | Recycling system for water softener | |
JP4221796B2 (en) | Regeneration method of water softener | |
KR100639798B1 (en) | Recycling apparatus for water softener | |
JP3505912B2 (en) | Water treatment equipment | |
JP3058508U (en) | Water softener | |
JP2000279956A (en) | Control method of water softener |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040127 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040209 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090227 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100227 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100227 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110227 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120227 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130227 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130227 Year of fee payment: 9 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |