JP3448503B2 - Mounting structure of boom hoisting cylinder for construction equipment - Google Patents

Mounting structure of boom hoisting cylinder for construction equipment

Info

Publication number
JP3448503B2
JP3448503B2 JP06156699A JP6156699A JP3448503B2 JP 3448503 B2 JP3448503 B2 JP 3448503B2 JP 06156699 A JP06156699 A JP 06156699A JP 6156699 A JP6156699 A JP 6156699A JP 3448503 B2 JP3448503 B2 JP 3448503B2
Authority
JP
Japan
Prior art keywords
boom
mounting
hydraulic cylinder
raising
lowering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP06156699A
Other languages
Japanese (ja)
Other versions
JP2000255999A (en
Inventor
健太郎 白石
貴之 小俣
弘 谷川
法輔 星野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP06156699A priority Critical patent/JP3448503B2/en
Publication of JP2000255999A publication Critical patent/JP2000255999A/en
Application granted granted Critical
Publication of JP3448503B2 publication Critical patent/JP3448503B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明は、建設機械である高
所作業車のブームの起伏用シリンダーを修理・交換のメ
ンテ作業時の際、作業性よくシリンダー取付けピンを抜
き差し可能とした建設機械のブーム起伏シリンダーの取
付け構造に関するものである。 【0002】 【従来の技術】従来の高所作業車の構成を図2により説
明すると、高所作業車は、走行装置の上に装架された上
部旋回台2に伸縮ブームの先端に設けられたゴンドラ等
の作業装置(フロントアタッチメント)を有しており、
この上部旋回台2の上面の一側がわには、エンジン9や
図示されてはいない非常用の発電機などが載置されてお
り、他側がわには、燃料タンク10、作動油タンク11
や図示されていない各種の制御操作装置等が載置されて
いる。 【0003】これら載置されたエンジンや非常用の発電
機と、燃料タンクおよび作動油タンクとの間には、一対
のブーム取付けフレーム7、7が間隔をおいて取付けら
れている。更に、このブーム取付けフレーム7、7間に
は、間隔をおいて一対のブーム起伏用油圧シリンダー取
付けフレーム13、13を取付けたブーム起伏用油圧シ
リンダー取付ブロック12が、ボルト15によって上部
旋回台2の上面に取付けられている。 【0004】そして、基端部が前記ブーム起伏用油圧シ
リンダー取付けフレーム13に装着されたブーム起伏用
油圧シリンダー5の先端部とブーム取付けフレーム7に
装着された伸縮ブーム4のブラケット6とを連結し、こ
のブーム起伏用油圧シリンダー4の伸縮により伸縮ブー
ム4を起伏可能とし、その先端に装着されたゴンドラ3
と云われる作業床の上に作業員が乗って高所での種々の
作業が行われている。 【0005】このような高所作業車の上部旋回台上に、
新規に伸縮ブームを取付けるには、先ず、上部旋回台2
に間隔をおいて取付けられているブーム取付けフレーム
7、7間に、予め地上で、ブーム起伏用油圧シリンダー
取付けブロック12上に間隔をおいて立設されたブーム
起伏用油圧シリンダー取付けフレーム13、13に組立
てられたブーム起伏用油圧シリンダー5と該取付けブロ
ック12とを、クレーンで吊下げて上部旋回台2に設置
し、取付けボルト15で取付ける。 【0006】その後、クレーンで伸縮ブーム4を吊下げ
てブーム取付けフレーム7に装着し、伸縮ブーム4のブ
ラケット6とブーム起伏用油圧シリンダー5とを連結
し、最後に、ブーム取付けフレーム7、7を上部旋回台
2に間隔をおいて取付け、その一側がわに、エンジン9
や図示されていない非常用の発電機などを設置し、他側
がわに、燃料タンク10、作動油タンク11や図示され
ていない各種の制御操作装置等を載置する。そして、こ
のように上部旋回台2に設置された各種の制御操作装
置、燃料用タンク10、作動油タンク11、エンジン9
や非常用の発電機などの周囲および上部は、保護や美観
のために建屋カバーで覆われている。 【0007】ここで、ブーム起伏用油圧シリンダー5を
上述のブーム起伏用油圧シリンダー取付けブロック12
を使用しないで取付ける場合には、ブーム取付けフレー
ム7、7と同様に一対のブーム起伏用油圧シリンダー取
付けフレーム13、13を上部旋回台2に溶接によって
直接取付け、この取付けフレーム13、13間にクレー
ンによってブーム起伏用油圧シリンダー5を吊下げ、上
部旋回台2に取付けたブーム起伏用油圧シリンダー取付
けフレーム13とブーム取付けフレーム7との間隔が挿
入するピンの長さに比して余裕があるときには、横方向
からこの両者のピン孔にピンを挿通して両者を組立てて
いる。 【0008】 【発明が解決しようとする課題】上記したように、従
来、ブーム起伏用油圧シリンダーを上部旋回台に取付け
るのに、ブーム起伏用油圧シリンダー取付けフレームを
取付けたブーム起伏用油圧シリンダー取付けブロックを
用いて上部旋回台にボルトで取付ける方法、また、該取
付けブロックを用いずに上部旋回台にブーム起伏用油圧
シリンダー取付けフレームを溶接などで直接取付け、こ
れにブーム起伏用油圧シリンダーを取付ける方法が採用
されている。しかしながら、ブーム起伏用油圧シリンダ
ー取付けブロックを用いて上部旋回台にボルトで取付け
る方法では、上部旋回台にボルト孔の機械加工が必要で
あり、上部旋回台の正確な位置にボルト孔をあけること
が難しく、また、その分コスト高になる。 【0009】また、上部旋回台にブーム起伏用油圧シリ
ンダー取付けフレーム13を溶接などで直接取付ける方
法では、上部旋回台2に取付けたブーム起伏用油圧シリ
ンダー取付けフレーム13とブーム取付けフレーム7と
の間隔が挿入するピンの長さに比して余裕がない場合に
は、ブーム起伏用油圧シリンダー5の基端部側のピン孔
と、ブーム起伏用油圧シリンダー取付けフレーム13の
ボス14に設けたピン孔とにピンを挿入して両者を組立
てるのに困難をきわめている。 【0010】近年、作業の大型化に伴って作業車両も大
型化すると共に、長時間作業をするために燃料タンクの
大型化や、作業の大型化に伴って伸縮ブームも大型化し
ており、それに見合って伸縮用や起伏用の油圧シリンダ
ーも大型化しており、作動油タンクの大型化が要請され
ている。このため、それぞれのタンクも大型化されてお
り、この大型化に伴ってタンク間の間隔lも狭まってき
ている。 【0011】更に、ブーム起伏用油圧シリンダー取付け
フレームに大型化したブーム起伏用油圧シリンダーを取
付けるためのピンも、その径は太くそして長くと大型化
している。一方、これらを載置する上部旋回台2の幅は
法規による規制の略限度一杯にあり、これ以上車幅方向
に拡幅することは困難である。大型化する以前には、ブ
ーム起伏用油圧シリンダーを同取付けフレームに取付け
るにしても、そのための作業スペースに余裕があった
が、大型化に伴いそのようなスペースを確保するのも難
しく、したがって、このように限られたフレーム間での
ピンの抜き差しと云った作業は非常に困難である。 【0012】一方、高所作業車の長年の使用による摩耗
や破損のために、各部材や部品の随時の修理や交換作
業、および定期的な点検作業があり、これらの作業の際
には、一度、部材や部品を取り外してから修理や交換、
点検をし、その後、再び組立てなければならない。特
に、この大型化したブーム起伏用油圧シリンダーを、修
理や交換、点検等のメンテ作業の際に、同取付けフレー
ムから取り外すには、取付け時の逆に、ブーム取付けフ
レームの外側に設置されたタンク類を一度全部外して作
業スペースを作ってからでなければ作業ができず、再度
取付けるにも、狭いフレーム間でのピンの抜き差しと云
った作業は非常に困難であった。部材の大型化に伴って
大型化したピンは、ブーム起伏用油圧シリンダーの基端
部と同取付けフレームの両者のピン孔に、そのピン孔軸
と同方向である横方向から挿入しなければならず、この
ための作業スペースを確保する必要があった。 【0013】また、従来、修理・補修用の工具類のユー
ティリティスペースとして、決まったスペースが無く、
旋回台上の適当な個所に散在して置かれていたので、工
具類を十分管理することができず不便を来していた。こ
のため、これらの工具類を集中して管理収納する必要性
があった。 【0014】そこで、本発明は、上述した課題によりな
されたもので、メンテ作業時での狭いフレーム間でのピ
ンの抜き差しと云った作業を容易にするために、タンク
側のブーム取付けフレームにピン抜き差し用のメンテ作
業用孔を設けると共に、同時に、燃料タンクと作動用タ
ンクとの間にピン抜き差しメンテ作業用の間隙Lを確保
し、メンテ作業時以外には、この間隙L部分のスペース
を工具類のユーティリティスペースとすることを目的と
するものである。 【0015】 【課題を解決するための手段】上記の目的を達成するた
め、請求項1の発明は、建設機械の上部旋回体に設けら
れた一対のブーム取付けフレーム間に設けられたブーム
起伏用油圧シリンダー取付けフレームに、取付けピンで
ブーム起伏用油圧シリンダーを取付けるようにした建設
機械のブーム起伏シリンダーの取付け構造において、燃
料タンクと作動油タンクとが載置される側のブーム取付
けフレームに、取付けピンを抜き差しするためのメンテ
作業孔を設け、前記燃料タンクと作動油タンクとの間に
メンテ作業用のスペースを形成すると共に前記メンテ作
業用のスペースをメンテ作業以外の時には、工具類等の
ユーティリティスペースとし使用するために、前記作業
用スペースに開閉可能なカバーを設けたことを特徴とす
るものである。 【0016】 【発明の実施の形態】以下、図面により本発明の高所作
業車の構成を図面によって説明すると、図1は、本発明
のブーム起伏シリンダーの取付け構造を装備した高所作
業車の伸縮ブームを縮めてゴンドラを地上に降ろした側
面図で、図3は、本発明の高所作業車の各部材の配置を
示す平面図で、図4は、本発明の高所作業車の各部材の
配置を示す側面図である。 【0017】2は、高所作業車の走行装置1の上に装架
された上部旋回台であり、この上部旋回台2上に、一対
のブーム取付けフレーム7、7が間隔をおいて取付けら
れている。この取付けられた一対のブーム取付けフレー
ム7、7のうちの一方のブーム取付けフレーム7には、
メンテ作業用孔20が形成されている。そして、この上
部旋回台2上に取付けられたブーム取付けフレーム7、
7の間には、一対のブーム起伏用油圧シリンダー取付け
フレーム13、13が間隔をおいて上部旋回台2上に溶
接され取付けられている。 【0018】この上部旋回台2に取付けられたブーム起
伏用油圧シリンダー取付けフレーム13、13のボス1
7、17に設けたピン孔と、クレーンによって吊下げら
れたブーム起伏用油圧シリンダー5の基端部側のピン孔
とを位置合わせし、これらのピン孔にブーム取付けフレ
ーム7に形成されたメンテ作業用孔20を通して取付け
ピン18が横方向から挿通され、その先端に抜止めピン
19が装着されて取付けピン18のブーム起伏用油圧シ
リンダー取付けフレーム13からの脱落を防止し、ブー
ム起伏用油圧シリンダー5がブーム起伏用油圧シリンダ
ー取付けフレーム13、13に装着される。 【0019】また、クレーンによって吊下げられる図示
されていない伸縮ブーム4の基端部に設けられたピン孔
と、ブーム取付けフレーム7、7のボス8、8に設けら
れたピン孔とを位置合わせし、これらのピン孔に取付け
ピンが挿通されて、伸縮ブーム4が取付けフレーム7に
装着される。そして、この伸縮ブーム4のブラケット6
に、上部旋回台2に取付けられたブーム起伏用油圧シリ
ンダー取付けフレーム13、13に装着されたブーム起
伏用油圧シリンダー5の先端部が装着される。 【0020】そして更に、メンテ作業用孔20が形成さ
れたブーム取付けフレーム7の外側には、図示されてい
ない各種の制御操作装置や、燃料用タンク10と作動油
タンク11とが間隔Lを隔てて上部旋回台2に設置され
る。また、他方のブーム取付けフレーム7の外側には、
エンジン9や図示されていない非常用の発電機などが設
置される。このように燃料用タンク10と作動油タンク
11とが間隔Lをおいて設置されているので、工具類を
収納する工具ユーティリティースペースとしてこのスペ
ースを利用することができる。また、この上部旋回台2
に設置された各種の制御操作装置、燃料用タンク10、
作動油タンク11、エンジン9や非常用の発電機などの
周囲および上部には、保護や美観のために建屋カバーで
覆われている。 【0021】そして、燃料タンク10、作動油タンク1
1等が載置されている側の側面は、開閉可能な開閉カバ
ー21設けられており、この開閉カバー21の開閉によ
り燃料タンク10、作動油タンク11等の点検や、後述
する工具類等のユーティリティスペースからの工具類等
の取り出しが行われるようになっている。 【0022】このようにして上部旋回台2に設置された
伸縮ブーム4は、図示されていないブーム伸縮用油圧シ
リンダーによって長さ方向に伸縮されると共に、ブーム
起伏用油圧シリンダー5の伸縮によって上部旋回台2に
対して起伏可能となっており、この起伏可能の伸縮ブー
ム4の先端に、ゴンドラ3と云われる作業床が装着され
ている。その上に作業員が乗り、地上での上部旋回台2
上に設置された制御装置の操作、またはゴンドラ3に設
けられた操作装置からの該制御装置の遠隔操作によりゴ
ンドラ3を所要位置にして高所での種々の作業を行なう
ことができる。 【0023】次に、随時のブーム起伏用油圧シリンダー
5の修理や交換作業、および定期的な点検作業について
説明すると、先ず、伸縮ブーム4をクレーンで吊上げ
て、適当な支持台に伸縮ブーム4を支承しておくと共
に、ブーム起伏用油圧シリンダー取付けフレーム13に
ブーム起伏用油圧シリンダー5の基端部を装着した取付
けピン18の先端に装着された抜止めピン19を取外し
ておく。 【0024】次に、燃料用タンク10と作動油タンク1
1との間隔Lに設けられた工具ユーティリティースペー
スに収納されている各種の工具を取り除き、この工具類
のない工具ユーティリティースペースを作業スペースと
し、この作業スペースを利用し、ブーム取付けフレーム
7に形成されたメンテ作業用孔20を通して取付けピン
18を横方向に抜き取り、ブーム起伏用油圧シリンダー
取付けフレーム13とブーム起伏用油圧シリンダー5の
基端部とを取り外す。 【0025】そして、ブーム起伏用油圧シリンダー5を
クレーンで吊上げながら伸縮ブーム4のブラケット6と
ブーム起伏用油圧シリンダー5の先端部との連結を外
し、ブーム起伏用油圧シリンダー5を他の場所に移送し
て、ブーム起伏用油圧シリンダー5の修理や交換、また
は定期的な点検をした後、再び高所作業車の所に移送の
後クレーンで吊上げ、ブーム起伏用油圧シリンダー5の
基端部側のピン孔とを位置合わせの後、これらのピン孔
にブーム取付けフレーム7に形成されたメンテ作業用孔
20を通して取付けピン18が横方向から挿通し、その
先端に抜止めピン19が装着されて取付けピン18のブ
ーム起伏用油圧シリンダー取付けフレーム13からの脱
落を防止され、ブーム起伏用油圧シリンダー5がブーム
起伏用油圧シリンダー取付けフレーム13、13に装着
される。そして、伸縮ブーム4のブラケット6にブーム
起伏用油圧シリンダー5の先端部が装着される。そして
再び、工具ユーティリティースペースに工具類を収納し
た後、再び、高所作業車として種々の作業を行なうこと
ができる。 【0026】 【発明の効果】以上説明したように、本発明の建設機械
のブーム起伏シリンダーの取付け構造は、燃料タンクと
作動油タンクとが載置された側のブーム取付けフレーム
にメンテ作業用の孔を設けたので、伸縮ブーム起伏用油
圧シリンダーの交換や修理の際の取付けピンの抜き差し
をピン孔の軸方向である横方向から容易に行うこと、シ
リンダーのボトム側の取付けピン孔の位置を合致させて
シリンダーをセッティングして、横の方からフレームの
孔を通してピンを取付けること、伸縮ブーム起伏用油圧
シリンダーの交換・修理や点検の際の取付けピンの抜き
差しを容易に行うことができると共に、上部旋回体上に
燃料タンクと作動油タンクとの間隔を拡げて載置したの
で、伸縮ブーム起伏用油圧シリンダーの交換・修理や点
検の際の取付けピンの抜き差し時の作業スペースとして
利用することができると共に、メンテ作業以外には、従
来、上部旋回体上に散在して置かれていた工具類等をこ
のスペースに集中して保管管理するためのユーティリテ
ィスペースとして利用することができる、と云う効果を
奏する
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cylinder for improving the workability of a cylinder for raising and lowering a boom of an aerial work vehicle, which is a construction machine, when repairing or replacing the cylinder. The present invention relates to a mounting structure of a boom hoist cylinder of a construction machine that allows a mounting pin to be inserted and removed. 2. Description of the Related Art The construction of a conventional aerial work vehicle will be described with reference to FIG. 2. The aerial work vehicle is provided at an end of a telescopic boom on an upper swivel 2 mounted on a traveling device. It has a working device (front attachment) such as a gondola,
An engine 9 and an emergency generator (not shown) are mounted on one side of the upper surface of the upper swivel 2, and a fuel tank 10 and a hydraulic oil tank 11 are mounted on the other side.
And various control operation devices (not shown) are mounted. [0003] A pair of boom mounting frames 7 are mounted at intervals between the mounted engine or emergency generator and the fuel tank and hydraulic oil tank. Further, between the boom mounting frames 7, 7, a pair of boom raising and lowering hydraulic cylinder mounting frames 13, 13 is mounted at a distance, and a boom raising and lowering hydraulic cylinder mounting block 12 is mounted on the upper swivel 2 by bolts 15. Mounted on top. A base end of the hydraulic cylinder 5 for boom raising and lowering mounted on the boom mounting hydraulic cylinder mounting frame 13 is connected to a bracket 6 of the telescopic boom 4 mounted on the boom mounting frame 7. The telescopic boom 4 can be raised and lowered by expansion and contraction of the hydraulic cylinder 4 for raising and lowering the boom.
Various types of work are performed at high altitudes by workers on work floors. [0005] On the upper swivel of such an aerial work vehicle,
To install a new telescopic boom, first use the upper swivel 2
The boom mounting hydraulic cylinder mounting frames 13, 13, which are previously set up on the boom lifting hydraulic cylinder mounting block 12 at intervals on the ground between the boom mounting frames 7, 7 mounted at intervals. The hydraulic cylinder 5 for raising and lowering the boom and the mounting block 12 assembled in this manner are suspended by a crane, installed on the upper swivel 2, and mounted with mounting bolts 15. Thereafter, the telescopic boom 4 is hung by a crane and mounted on the boom mounting frame 7, the bracket 6 of the telescopic boom 4 is connected to the hydraulic cylinder 5 for raising and lowering the boom, and finally, the boom mounting frames 7, 7 are connected. Attach it to the upper swivel 2 at an interval.
An emergency power generator (not shown) is installed, and the fuel tank 10, the hydraulic oil tank 11, various control operation devices (not shown), and the like are placed on the other side. The various control operation devices, the fuel tank 10, the hydraulic oil tank 11, the engine 9
And emergency generators are covered with building covers for protection and aesthetics. Here, the hydraulic cylinder 5 for raising and lowering the boom is connected to the hydraulic cylinder mounting block 12 for raising and lowering the boom.
When mounting without using the boom mounting frame 7, a pair of hydraulic cylinder mounting frames 13, 13 for raising and lowering the boom are directly mounted on the upper revolving base 2 by welding, and a crane is mounted between the mounting frames 13, 13. When the hydraulic cylinder 5 for boom raising and lowering is suspended, and the space between the hydraulic cylinder mounting frame 13 for boom raising and lowering mounted on the upper swivel 2 and the boom mounting frame 7 has a margin compared to the length of the inserted pin, The pins are inserted into the two pin holes from the lateral direction to assemble them. As described above, conventionally, a boom-lift hydraulic cylinder mounting block having a boom-lift hydraulic cylinder mounting frame mounted thereon for mounting the boom-lift hydraulic cylinder on the upper swivel. A method of attaching bolts to the upper revolving base using a bolt, or a method of directly mounting a hydraulic cylinder mounting frame for boom undulation to the upper revolving base without welding using the mounting block, and attaching the hydraulic cylinder for boom undulation to this Has been adopted. However, the method of mounting bolts on the upper swivel using the hydraulic cylinder mounting block for boom hoisting requires machining of the bolt holes in the upper swivel, and it is necessary to drill the bolt holes in the correct position of the upper swivel. Difficult and costly. In the method of directly mounting the boom raising hydraulic cylinder mounting frame 13 on the upper turning table by welding or the like, the distance between the boom raising hydraulic cylinder mounting frame 13 mounted on the upper turning table 2 and the boom mounting frame 7 is increased. If there is no room for the length of the pin to be inserted, a pin hole on the base end side of the hydraulic cylinder 5 for boom raising and lowering, and a pin hole provided on the boss 14 of the hydraulic cylinder mounting frame 13 for boom raising and lowering are provided. It is extremely difficult to assemble the two by inserting the pins into the pins. [0010] In recent years, work vehicles have become larger as work has become larger, and fuel tanks have become larger in order to work for a long time, and the telescopic boom has also become larger as work has become larger. Correspondingly, hydraulic cylinders for expansion and contraction and ups and downs have also been increased in size, and a larger hydraulic oil tank is required. For this reason, each tank is also enlarged, and the interval l between the tanks is becoming narrower with the enlargement. Further, the diameter of a pin for mounting a large-sized hydraulic cylinder for raising and lowering a boom on a frame for mounting the hydraulic cylinder for raising and lowering a boom is large and long. On the other hand, the width of the upper swivel 2 on which these are placed is almost the limit of the regulation by the law, and it is difficult to further increase the width in the vehicle width direction. Before the enlargement, even if the hydraulic cylinder for raising and lowering the boom was attached to the same mounting frame, there was room for the work space for that, but it was difficult to secure such a space with the enlargement, and therefore, It is very difficult to insert and remove pins between limited frames. On the other hand, due to wear and breakage due to long-term use of the aerial work vehicle, there are occasional repairs and replacements of members and parts, and periodic inspections. Once you remove components and parts, repair or replace,
Inspect and then reassemble. In particular, in order to remove this enlarged boom lifting hydraulic cylinder from the mounting frame during maintenance work such as repair, replacement, inspection, etc., the tank installed outside the boom mounting frame must be installed The work can only be performed after removing all the parts once to create a work space, and it is very difficult to re-install the work, such as removing and inserting pins between narrow frames. Pins that have become larger due to the increase in the size of the members must be inserted into the pin holes of both the base end of the hydraulic cylinder for raising and lowering the boom and the mounting frame from the lateral direction that is the same direction as the axis of the pin holes. Therefore, it was necessary to secure a work space for this. Conventionally, there is no fixed space as a utility space for tools for repair and repair.
Since the tools were scattered at appropriate places on the swivel table, the tools could not be managed sufficiently, causing inconvenience. For this reason, it is necessary to centrally manage and store these tools. In view of the above, the present invention has been made in view of the above-mentioned problem. In order to facilitate the work of removing and inserting pins between narrow frames during maintenance work, a pin is attached to the boom mounting frame on the tank side. A maintenance work hole for insertion and removal is provided, and at the same time, a gap L for pin removal and maintenance is secured between the fuel tank and the operation tank. It is intended to be a kind of utility space. [0015] In order to achieve the above object, an invention according to claim 1 is provided in an upper rotating body of a construction machine.
Boom provided between a pair of mounted boom mounting frames
Use the mounting pins on the hydraulic cylinder mounting frame
Construction to install hydraulic cylinders for boom hoisting
The mounting structure of the machine boom
Boom mounting on the side where the fuel tank and hydraulic oil tank are placed
Maintenance frame for inserting and removing mounting pins from the mounting frame.
Provide a working hole, between the fuel tank and the hydraulic oil tank
A space for maintenance work is formed and the maintenance work is performed.
When the industrial space is not used for maintenance work,
Said work to use as utility space
That can be opened and closed in the space for
Things . DESCRIPTION OF THE PREFERRED EMBODIMENTS The construction of an aerial work vehicle according to the present invention will be described below with reference to the drawings. FIG. 1 shows an aerial work vehicle equipped with a mounting structure for a boom hoist cylinder according to the present invention. FIG. 3 is a plan view showing the arrangement of each member of the aerial work vehicle of the present invention, and FIG. 4 is a plan view showing the arrangement of each member of the aerial work vehicle of the present invention. It is a side view which shows arrangement | positioning of a member. Reference numeral 2 denotes an upper swivel mounted on the traveling device 1 of the aerial work vehicle. A pair of boom mounting frames 7, 7 are mounted on the upper swivel 2 at an interval. ing. One of the mounted boom mounting frames 7, 7 has a boom mounting frame 7,
A maintenance work hole 20 is formed. Then, the boom mounting frame 7 mounted on the upper swivel 2,
7, a pair of hydraulic cylinder mounting frames 13, 13 for raising and lowering the boom are welded and mounted on the upper swivel 2 at an interval. The boss 1 of the hydraulic cylinder mounting frames 13, 13 attached to the upper swivel 2 for raising and lowering the boom.
The pin holes provided in the boom mounting frame 7 are aligned with the pin holes provided in the boom mounting frame 7 by aligning the pin holes provided in the boom lifting hydraulic cylinder 5 suspended by the crane with the pin holes provided in the boom mounting frame 7. A mounting pin 18 is inserted from the lateral direction through a working hole 20, and a retaining pin 19 is attached to the tip of the mounting pin 18 to prevent the mounting pin 18 from dropping out of the boom-raising hydraulic cylinder mounting frame 13. 5 is mounted on the hydraulic cylinder mounting frames 13, 13 for raising and lowering the boom. The pin holes provided at the base end of the telescopic boom 4 (not shown) suspended by the crane are aligned with the pin holes provided at the bosses 8 of the boom mounting frames 7,7. Then, mounting pins are inserted into these pin holes, and the telescopic boom 4 is mounted on the mounting frame 7. And the bracket 6 of the telescopic boom 4
Then, the tip of a hydraulic cylinder 5 for boom raising and lowering mounted on the boom raising and lowering hydraulic cylinder mounting frames 13 and 13 mounted on the upper swivel 2 is mounted. Further, outside the boom mounting frame 7 in which the maintenance work hole 20 is formed, various control and operating devices (not shown) and the fuel tank 10 and the hydraulic oil tank 11 are separated by a distance L. On the upper swivel 2. Also, on the outside of the other boom mounting frame 7,
An engine 9 and an emergency generator (not shown) are installed. As described above, since the fuel tank 10 and the hydraulic oil tank 11 are provided with the space L therebetween, this space can be used as a tool utility space for storing tools. Also, this upper swivel 2
Various control operation devices installed in the fuel tank 10,
The surroundings and upper parts of the hydraulic oil tank 11, the engine 9, the emergency generator, and the like are covered with a building cover for protection and aesthetics. The fuel tank 10 and the hydraulic oil tank 1
An openable / closable cover 21 is provided on the side surface on which 1 and the like are placed. The open / close of the openable / closable cover 21 allows inspection of the fuel tank 10, the hydraulic oil tank 11, etc. Tools and the like are taken out from the utility space. The telescopic boom 4 installed on the upper swivel 2 in this manner is extended and contracted in the length direction by a boom extending and retracting hydraulic cylinder (not shown), and the upper and lower extensible hydraulic cylinder 5 is extended and retracted. A work floor called a gondola 3 is attached to the tip of the telescopic boom 4 that can be raised and lowered with respect to the table 2. A worker rides on top of it, and the upper turntable 2 on the ground
Various operations can be performed at high altitudes by setting the gondola 3 to a required position by operating the control device provided above or remotely controlling the control device from the operation device provided on the gondola 3. Next, the repair and replacement work of the hydraulic cylinder 5 for raising and lowering the boom and the periodic inspection work will be described. First, the telescopic boom 4 is lifted by a crane, and the telescopic boom 4 is mounted on a suitable support base. At the same time, the retaining pin 19 attached to the tip of the mounting pin 18 on which the base end of the hydraulic cylinder 5 for boom undulation is mounted on the frame 13 for mounting the hydraulic cylinder for boom undulation is removed. Next, the fuel tank 10 and the hydraulic oil tank 1
Various tools stored in the tool utility space provided at an interval L with respect to 1 are removed, the tool utility space without these tools is used as a working space, and the working space is used to form the boom mounting frame 7. The mounting pin 18 is pulled out laterally through the maintenance work hole 20 and the boom-lift hydraulic cylinder mounting frame 13 and the base end of the boom-lift hydraulic cylinder 5 are removed. Then, while lifting the hydraulic cylinder 5 for raising and lowering the boom with a crane, the bracket 6 of the telescopic boom 4 is disconnected from the tip of the hydraulic cylinder 5 for raising and lowering the boom, and the hydraulic cylinder 5 for raising and lowering the boom is transferred to another place. Then, after repairing or replacing the hydraulic cylinder 5 for raising or lowering the boom, or performing a regular inspection, the hydraulic cylinder 5 is transferred again to an aerial work vehicle and then lifted by a crane. After the positioning with the pin holes, the mounting pins 18 are inserted from the lateral direction through the maintenance operation holes 20 formed in the boom mounting frame 7 into these pin holes, and the retaining pins 19 are attached to the ends thereof to mount. The pin 18 is prevented from falling off from the mounting frame 13 for the boom-lifting hydraulic cylinder, and the boom-lifting hydraulic cylinder 5 is connected to the boom-lifting hydraulic cylinder. It is attached to the mounting frame 13, 13. Then, the front end of the hydraulic cylinder 5 for boom raising and lowering is mounted on the bracket 6 of the telescopic boom 4. After the tools are stored in the tool utility space again, various operations can be performed again as the aerial work vehicle. As described above, the construction machine of the present invention
The mounting structure of the boom hoist cylinder is
Boom mounting frame on the side where the hydraulic oil tank is placed
A hole for maintenance work is provided in the
Insertion and removal of mounting pins when replacing or repairing pressure cylinders
Is easily performed from the lateral direction, which is the axial direction of the pin hole.
Align the mounting pin holes on the bottom side of the
Set the cylinder, and from the side of the frame
Installing pins through holes, hydraulic for raising and lowering the telescopic boom
Removing the mounting pin when replacing, repairing, or inspecting the cylinder
Insertion can be performed easily, and
The space between the fuel tank and the hydraulic oil tank was widened.
Replacement and repair of hydraulic cylinders for raising and lowering the telescopic boom
As a work space when inserting and removing mounting pins during inspection
Not only for maintenance work but also for
Tools that were scattered on the revolving superstructure
Utility for centralized storage and management of space
Can be used as a storage space.
Play .

【図面の簡単な説明】 【図1】高所作業車の伸縮ブームを縮めてゴンドラを地
上に降ろした側面図で、 【図2】従来の高所作業車の各部材の配置を示す平面図
で、 【図3】本発明の高所作業車の各部材の配置を示す平面
図で、 【図4】本発明の高所作業車の各部材の配置を示す側面
図である。 【符号の説明】 1 走行装置、 2 上部旋回台、 3 ゴンドラ、
4 伸縮ブーム、5 ブーム起伏用油圧シリンダー、
6 ブラケット、7 ブーム取付けフレーム、 8 ボ
ス、 9 エンジン、10 燃料タンク、 11 作動
油タンク、12 ブーム起伏用油圧シリンダー取付けブ
ロック、13 ブーム起伏用油圧シリンダー取付けフレ
ーム、 14 ボス、15 ボルト、 16 ブーム起
伏用油圧シリンダーの基端部、 17 ボス、18 取
付けピン、 19 抜止めピン、 20 メンテ作業用
孔、21 開閉カバー。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a side view in which a telescopic boom of an aerial work vehicle is contracted and a gondola is lowered on the ground; FIG. 2 is a plan view showing an arrangement of members of a conventional aerial work vehicle; FIG. 3 is a plan view showing an arrangement of each member of the aerial work vehicle of the present invention. FIG. 4 is a side view showing an arrangement of each member of the aerial work vehicle of the present invention. [Description of Signs] 1 traveling device, 2 upper swivel, 3 gondola,
4 Telescopic boom, 5 hydraulic cylinder for raising and lowering the boom,
6 Bracket, 7 Boom Mounting Frame, 8 Boss, 9 Engine, 10 Fuel Tank, 11 Hydraulic Oil Tank, 12 Hydraulic Cylinder Mounting Block for Boom Raising, 13 Hydraulic Cylinder Mounting Frame for Boom Raising, 14 Boss, 15 Bolt, 16 Boom Raising Base part of hydraulic cylinder for use, 17 boss, 18 mounting pin, 19 retaining pin, 20 maintenance work hole, 21 opening / closing cover.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 星野 法輔 茨城県土浦市神立町650番地 日立建機 株式会社 土浦工場内 (56)参考文献 特開 平4−34126(JP,A) 特開 平10−18347(JP,A) 実開 昭59−83889(JP,U) (58)調査した分野(Int.Cl.7,DB名) B66F 9/22 B66C 23/44,23/64,23/82 E02F 9/00,9/14 ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Hosuke Hoshino 650, Kunitachi-cho, Tsuchiura-shi, Ibaraki Hitachi Construction Machinery Co., Ltd. Tsuchiura Plant (56) References JP-A-4-34126 (JP, A) 10-18347 (JP, A) Japanese Utility Model Showa 59-83889 (JP, U) (58) Field surveyed (Int. Cl. 7 , DB name) B66F 9/22 B66C 23 / 44,23 / 64,23 / 82 E02F 9/00, 9/14

Claims (1)

(57)【特許請求の範囲】 【請求項1】建設機械の上部旋回体に設けられた一対の
ブーム取付けフレーム間に設けられたブーム起伏用油圧
シリンダー取付けフレームに、取付けピンでブーム起伏
用油圧シリンダーを取付けるようにした建設機械のブー
ム起伏シリンダーの取付け構造において、燃料タンクと
作動油タンクとが載置される側のブーム取付けフレーム
に、取付けピンを抜き差しするためのメンテ作業孔を設
け、前記燃料タンクと作動油タンクとの間にメンテ作業
用のスペースを形成すると共に前記メンテ作業用のスペ
ースをメンテ作業以外の時には、工具類等のユーティリ
ティスペースとし使用するために、前記作業用スペース
に開閉可能なカバーを設けたことを特徴とする建設機械
のブーム起伏シリンダーの取付け構造
(57) [Claims 1] A pair of upper revolving superstructures of a construction machine
Boom raising / lowering hydraulic pressure installed between boom mounting frames
Boom up / down with mounting pin on cylinder mounting frame
Of a construction machine with a hydraulic cylinder
The mounting structure of the cylinder
Boom mounting frame on the side where the hydraulic oil tank is placed
Maintenance holes for inserting and removing mounting pins.
Maintenance work between the fuel tank and the hydraulic oil tank.
And a space for the maintenance work.
Tools other than maintenance work.
Working space for use as a safety space
Construction machine characterized by having a cover that can be opened and closed
Boom hoist cylinder mounting structure .
JP06156699A 1999-03-09 1999-03-09 Mounting structure of boom hoisting cylinder for construction equipment Expired - Lifetime JP3448503B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06156699A JP3448503B2 (en) 1999-03-09 1999-03-09 Mounting structure of boom hoisting cylinder for construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06156699A JP3448503B2 (en) 1999-03-09 1999-03-09 Mounting structure of boom hoisting cylinder for construction equipment

Publications (2)

Publication Number Publication Date
JP2000255999A JP2000255999A (en) 2000-09-19
JP3448503B2 true JP3448503B2 (en) 2003-09-22

Family

ID=13174810

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06156699A Expired - Lifetime JP3448503B2 (en) 1999-03-09 1999-03-09 Mounting structure of boom hoisting cylinder for construction equipment

Country Status (1)

Country Link
JP (1) JP3448503B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4583315B2 (en) * 2006-02-03 2010-11-17 株式会社クボタ Swivel work machine
JP5284676B2 (en) * 2008-04-23 2013-09-11 株式会社タダノ Working vehicle storage device
CN113321140B (en) * 2021-06-30 2023-07-14 湖南三一中型起重机械有限公司 Hydraulic oil tank installation positioning structure and engineering crane

Also Published As

Publication number Publication date
JP2000255999A (en) 2000-09-19

Similar Documents

Publication Publication Date Title
JP2004512244A (en) How to put a crane on a windmill
US20170073200A1 (en) Cylinder Retraction System, Boom Device and Crawler Crane
JP3448503B2 (en) Mounting structure of boom hoisting cylinder for construction equipment
KR20140139256A (en) pipe layer adjustable boom length
KR20000029375A (en) Crawler crane
CN114540565A (en) Method for replacing transmission gear box on top of blast furnace
JP2000211888A (en) Coupling pin mounting/removing device of construction machine
JP5445403B2 (en) Counterweight desorption device for work machines
CN214944078U (en) Drill rod power tong davit
JPH10195927A (en) Fixing device telescopic cylinder for raising/lowering counterweight
JP4650904B2 (en) Reel unit mounting device and reel unit mounting method
CN210307639U (en) Be applied to high pedestal jib crane rack case bolt dismounting device
CN204997613U (en) Spacer dismounting device
WO1997003013A1 (en) Device for mounting and dismounting counterweight
JP3925767B2 (en) Hydraulic crane
CN216971707U (en) Suspension arm tool
JP3782324B2 (en) Earth drill
CN217708537U (en) Hoisting device for large member narrow inner cavity lining plate
CN218440271U (en) Tool capable of conveniently replacing Yankee cylinder bearing
CN212559354U (en) Integral maintenance device for large stone crushing equipment
JPH053568Y2 (en)
CN213087928U (en) Geological exploration drilling tower
RU6190U1 (en) REPAIR DRILLING MACHINE
JPS5929030Y2 (en) Boom rest of traveling crane
JP2017197316A (en) Assembling method of construction machine

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070704

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080704

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080704

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090704

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090704

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100704

Year of fee payment: 7