JP3437053B2 - Fiber optic cable - Google Patents

Fiber optic cable

Info

Publication number
JP3437053B2
JP3437053B2 JP11393497A JP11393497A JP3437053B2 JP 3437053 B2 JP3437053 B2 JP 3437053B2 JP 11393497 A JP11393497 A JP 11393497A JP 11393497 A JP11393497 A JP 11393497A JP 3437053 B2 JP3437053 B2 JP 3437053B2
Authority
JP
Japan
Prior art keywords
cable
optical fiber
laying
fiber cable
duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP11393497A
Other languages
Japanese (ja)
Other versions
JPH10301001A (en
Inventor
秀行 岩田
勝 岡田
茂 冨田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Telegraph and Telephone Corp
Original Assignee
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp filed Critical Nippon Telegraph and Telephone Corp
Priority to JP11393497A priority Critical patent/JP3437053B2/en
Publication of JPH10301001A publication Critical patent/JPH10301001A/en
Application granted granted Critical
Publication of JP3437053B2 publication Critical patent/JP3437053B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Light Guides In General And Applications Therefor (AREA)

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明は、地下に布設されて
いる管路設備の有効利用を図るため、一地下管路あたり
の光ファイバケーブルの収容数を増加させた光ファイバ
ケーブルに関する。 【0002】 【従来の技術】ルート間の通信量が増加し通信回線量が
不足した場合、光ファイバケーブルを増設する必要性が
生まれる。この場合、新たな地下管路を埋設するか、既
存の地下管路を有効利用する方法が考えられる。地下管
路の新設は交通事情等の理由で迅速に対応できない面が
あり新地下設備の構築には多大な費用がかかる故に、既
存設備の有効利用を図ることが優先される。よってこの
既存設備の有効利用を図る場合は、通信用ケーブルが既
に布設されている地下管路の空きスペースに光ファイバ
ケーブルを新たに後布設する方法がとられることが一般
的であった。 【0003】図12にルート間の通信量が増加し通信回
線量が不足した場合にケーブルを後布設する従来の方法
を示す。図示の如く地下管路11の内部には、既設のケ
ーブル12のほかに中空の後布設用ケーブルダクト13
が布設する。そこで、この中を貫通するように牽引ひも
15を布設し、この一端にこれから後布設しようとする
後布設ケーブル14を牽引用端末16を介して接続す
る。この後布設ケーブル14は一組のローラ17’で挟
持されこれらのローラは回転可能で長手方向にこのケー
ブル14を移動できる。同様に牽引ひも15の他端を牽
引用ローラ17で挟持して、矢印方向の回転駆動により
上記牽引ひも15をたぐって後布設ケーブル14を後布
設用ケーブルダクト13の中に引き込むことで後布設が
可能であった。 【0004】ここで、図13に従来の光ケーブルの後布
設方法に関する作業順序の概要をフローチャートS10
で示す。まず、地下管路11の空きスペースに後布設用
ケーブルダクト13を布設し(S11)、この後布設用
ケーブルダクト13内に牽引ひも15を布設する(S1
2)。次にこの牽引ひも15を後布設用ケーブル14の
牽引端末16に接続し(S13)、牽引機17によりこ
の牽引ひも15を牽引し後布設用ケーブル14を前記ケ
ーブルダクト内に布設する(S14)。その後この牽引
ひも15を撤去して一連の後布設作業を終了する(S1
5)。 【0005】図14には、従来の光ファイバケーブル及
び後布設用ダクト13を用いた「多条布設」時の地下管
路11の断面の一例を示している。一般にこの多条布設
は収容体12の外径が地下管路11の外径に対して小さ
く、図示のようにその収容体12と地下管路11との間
に十分な空きスペースがある場合にのみ採用される布設
方法である。 【0006】また、従来、光ファイバ通信線路の需要に
対し光ファイバケーブルを効率良く布設する必要がある
場合、一方法として両端の光ファイバテープにコネクタ
を付けた両端コネクタ付き光ファイバケーブルを用いる
ことで接続時間を削除することができるが、その管路の
長さを精度良く測定する方法が無い故に、片側がコネク
タ付きでもう一方は、当該管路の長さに合わせた後、切
断し融着する方法を用いていた。 【0007】 【発明が解決しようとする課題】このように従来の後布
設方法は、あらかじめ地下管路11内に収容されたケー
ブルが在り、さらに新たな光ファイバケーブル14を増
設する場合は、後布設用光ファイバケーブル14の牽引
時に地下管路11内に混入した土砂や腐植生成物等の障
害物による余分な張力がこの後布設用光ファイバケーブ
ル14に加わり、無理な牽引によって切断等の不測の事
態を招くこともあり、後布設作業には難しさを伴なうの
で慎重さが必要である。その後、牽引ひも15を後布設
用ケーブルダクト13内に引き込み、この牽引ひも15
と後布設用光ファイバケーブル14とを接続した後、牽
引ひも15を牽引機17で牽引してこの後布設用ケーブ
ルダクト13内に後布設用光ファイバケーブル14を布
設するという工程を採っていた。 【0008】また、線路設計時に両端コネクタ付き光フ
ァイバケーブルを布設しようとする管路の長さを精度良
く簡単に求める手段および、効率的布設作業を実現する
方法が求められている。 【0009】そこで本発明は、通信需要の増加が予想さ
れるルートに光ファイバケーブルを新たに布設する場
合、あらかじめ牽引ひもを内蔵した後布設用ケーブルダ
クトと光ファイバケーブル及び抗張力体を内包したケー
ブルを布設しておき、管路内への引き込みに伴う稼働の
省力化ならびに管路内の土砂等の障害による切断事故等
の予期せぬ故障事故を未然に防ぐ事をその主な目的とす
るものである。 【0010】 【課題を解決するための手段】上記問題を解決し目的を
達成するため本発明は次のような手段を講じている。ま
ず、光ファイバケーブルには、同一の被覆内にこの被覆
の内径より小さい外径の収容光ファイバケーブルと、光
ファイバケーブル全体の牽引のための抗張力体と、内部
に後布設用の光ファイバケーブル牽引ひもを収容して成
複数の後布設用ケーブルダクトとを収容して成り、前
記光ファイバケーブルの被覆内面と、この被覆内に収容
された光ファイバケーブルの被覆表面と、新たに光ファ
イバケーブルを後布設するためのダクトの外面と、前記
抗張力体の表面とには、互いに接する凹凸形状が形成さ
れているかまたはゴム系の材質のテープが採用される
ファイバケーブルを提供し、そして、光ファイバケーブ
ル牽引ひもの一端に新たな光ケーブルの端部を締結し、
他端を牽引してその後布設用ケーブルダクト内に引き入
れることによって後布設作業の軽減を図る。 【0011】また、本発明の布設する両端コネクタ付き
光ファイバケーブルの牽引ひもが収容された後布設用の
ケーブルダクトと光ファイバケーブルの収容体の集合体
を予め布設する際にその長さを記しておく。後布設の際
にはこの記された長さに基づいて両端コネクタ付き光フ
ァイバケーブルの長さを決めることで、余長の少ない後
布設を図る。 【0012】 【発明の実施の形態】以下、本発明の実施形態について
関連する図面を参照しながら複数の実施例を挙げて詳し
く説明する。 [実施例1]図1には本発明の光ファイバケーブル20
の概略図を示し、図2にはこのケーブルを用いた後布設
作業の手順をフローチャートで示している。 【0013】図1に示す如く、地下管路内に布設された
光ファイバケーブル20の被覆中には既に布設された光
ファイバケーブル21の他に、三本の後布設用ケーブル
ダクト22が中央に貫通する抗張力体23の回りに設け
られている。この後布設用ケーブルダクト22のそれぞ
れの内部にはあらかじめ一本の牽引ひも15が収容され
ている。後布設作業においては、この牽引ひも15の一
端は新たな後布設用光ファイバケーブル14に牽引端末
16を介して接続される。よってこの牽引ひも15は牽
引機17等により牽引駆動することで、この後布設用光
ファイバケーブル14をケーブルダクト22内に引き入
れて布設することができる。また、新たな通信需要が発
生した時点では、他の2つの空きケーブルダクト22の
何れかにも上述同様な後布設作業を繰り返し行い、さら
に光ファイバケーブルを増設して多条布設を行うことが
できる。 【0014】すなわち、図2のフローチャートS20に
よれば、まず所望により後布設用ケーブルダクト22を
布設する(S21)。前述のような後布設の為の構造的
特徴を有する本発明の光ファイバケーブル20を用い
て、牽引ひも15を後布設用ケーブル14の牽引端末1
6に締結するなどして接続する(S22)。そして、こ
の牽引ひも15の他端を牽引機17により牽引してその
後布設用ケーブル14をダクト22内に引き込んで布設
する(S23)。その後この牽引ひも15を撤去して一
連の後布設作業を終了する(S24)。 【0015】(作用効果1)このように、本発明の光フ
ァイバケーブルには、後布設用のケーブルダクト22及
び後布設用光ケーブル14の牽引ひも15があらかじめ
各後布設用ケーブルダクト22内に設けられている故
に、後布設作業にはその為のケーブルダクトやその中へ
の牽引ひもの布設作業が不要となり、作業工程を軽減で
きる。また、後布設用ケーブルダクト22が最適な設計
で被覆内に設けられるため、従来よりも後布設用光ケー
ブル14の外径を大きくでき、その結果、一管路の収容
心数を増やすことができる。 【0016】[実施例2]従来は、製造時に光ファイバ
の一端だけにコネクタを付けて布設現場に運搬して管路
内に敷設し、その後、その管路長に合わせて光ファイバ
ケーブルを切断して他端にコネクタを装着して他のケー
ブルと接続する作業を実施しているのが現状であった
が、この方法では布設現場での作業に長時間を要し、光
ファイバとコネクタ接続を現場で行うために接続部の通
信品質が必ずしも一定ではない。そこで本発明では、光
ファイバケーブルにその管路長が解る手段を設けてい
る。例えば上述同様に、牽引ひも15が収容された後布
設用のケーブルダクト22と、光ファイバケーブル20
の収容体21の集合体を予め布設し、その際にそのダク
トの長さをあらかじめ測定して記しておけば、後布設し
ようとする両端コネクタ付き光ファイバケーブルの長さ
をその後布設作業以前に決めることができる。よって、
後布設用ケーブルダクト22に決定した長さの両端コネ
クタ付き光ファイバケーブル31の牽引端末16に対し
牽引ひも15を接続した後、この牽引ひも15を牽引機
17で牽引することで、ほぼ長さの一致する必要最小限
度の長さの後布設用光ファイバケーブルを布設すること
ができる。 【0017】詳しくは、図3に本発明に係わる後布設用
両端コネクタ付きのケーブル19の構造を示している。
具体的には、例えばケーブル19の被覆面上に図示しな
い「ケーブル長」をプリントしておく。そして、そのデ
ータを基に新たに後布設しようとする光ファイバケーブ
ルの必要となる長さを推定し、あらかじめ製造時にその
両端に光ファイバテープ28でつながれた光コネクタ1
8を付けておく。なお、新たな需要が発生した場合に
は、他の後布設用ケーブルダクト22に同様な方法で両
端コネクタ付き光ファイバケーブルを繰り返し布設す
る。 【0018】また図4には、本発明のケーブル20に図
3に示す後布設用両端コネクタ付き光ファイバケーブル
を布設する手順をフローチャートS30で示している。
まず、前述の後布設用の構造的特徴を有する本発明のケ
ーブル20を布設した際にそのケーブル長を測定してお
き所定の箇所に記しておく(S31)。そのケーブル長
に基づいて、後布設しようとする両端コネクタ付きの光
ファイバケーブル19の長さを決定する(S32)。あ
らかじめ布設されていたケーブル内に備えられた牽引ひ
も15を後布設用のケーブルの端末に接続し(S3
3)、牽引機17でこの牽引ひも15を引き出して新し
いこのケーブル19をダクト22内に布設する(S3
4)。その後、この牽引ひも15を撤去して一連の後布
設作業を終了する(S35)。 【0019】(作用効果2)後布設に必要な光ファイバ
ケーブルの長さは少なくとも既設のケーブルの長さ又は
それ以上であるので、管路長が分かる手段としてこのケ
ーブル長を記しておけば、後布設のための計測または、
この結果に従ったコネクタ取付け工程を現場作業から削
減できる。よって、図4に示す如き作業手順に従えば、
ケーブル布設現場での作業時間の短縮が実現すると共
に、通信品質の低下防止が図れる。また、この得られた
長さに関するデータから、両端コネクタ付き光ファイバ
ケーブルの長さを余長を少なく布設することができる。 【0020】[実施例3]図5に示す断面図は本発明の
一実施例である光ファイバケーブルの断面であり、図6
にはこの長手方向の構造が示されている。図示のよう
に、一束の光ファイバケーブル21が収容された収容体
が1つと、後布設しようとする光ファイバケーブル( 不
図示) のための牽引ひも15を収容した三本の後布設用
ケーブルダクト22を、光ファイバケーブル20全体の
牽引のための抗張力体23の周囲に図6に示す如く長手
方向に「直線状」に並設し、その周辺には例えばポリ塩
化ビニルから成るシースを設けて1つの光ファイバケー
ブル20を構成する。 【0021】(作用効果3)この光ファイバケーブルに
あらかじめ設けられた、後布設用のケーブルダクト22
及び牽引ひも15により、後布設作業でのケーブルダク
トやその中への牽引ひもの布設が不要となるので作業工
程を軽減できる。また、複数の後布設用ケーブルダクト
22が最適に設けられる故に、従来に比較して後布設用
光ケーブルの外径を大きくでき、よって一管路の収容心
数を増やすことができる。 【0022】[実施例4]図7には、前述の収容体とし
ての光ファイバケーブル21の断面図が示されている。
図示したように中心には例えば金属鋼線や繊維強化プラ
スチックロッドから成る抗張力体26を設けている。例
えばポリエチレンなどのプラスチック材を用いて成る長
尺の丸棒状のものであり、この周面には「螺旋状」もし
くはS形状とZ形状の複合された撚り、即ち「SZ撚
り」の溝27が設けられてあり、この溝27に沿って複
数の光ファイバ(不図示)が収容されている。また、こ
の収容体の被覆層の内周には光ファイバテープ28とい
う所定の押さえテープが巻き合わせられて光ファイバの
ための押さえ巻き層が形成されている。そしてその周上
にはポリ塩化ビニルから成るシース29が設けられてい
る。 【0023】(作用効果4)上記の抗張力体26に金属
鋼線や繊維強化プラスチックロッドを採用することで長
手方向の張力に強く且つ屈曲性に富む光ファイバケーブ
ルとなる。また、例えば「SZ撚り」の溝を設けること
で、複数の光ファイバがこの溝に沿って収容され易く、
また、光ファイバテープ28による押さえにより光ファ
イバが安定的に収容される。 【0024】[実施例5]図8には、本発明の一実施例
であるケーブルのいわゆる「SZ形」を成す収納構造を
示している。すなわち、本発明の光ファイバケーブル2
0においては、光ファイバが収容された収容体21と三
本の後布設する光ファイバケーブル( 不図示) の牽引ひ
も( 不図示) を収容した後布設用ケーブルダクト22を
光ファイバケーブル20の全体の牽引のための抗張力体
23の周上に、適当な間隔周期で図示の如く長手方向に
「SZ形」に撚り合わせ、各ケーブルダクト22及び収
容体内周面には、前述同様に例えばポリ塩化ビニルから
成るシース25が設けられている。 【0025】(作用効果5)このように、光ファイバが
収容された収容体21と光ファイバケーブルを牽引する
ための牽引ひも15を収容したダクト22を適当な数の
組合せで、中心に配した抗張力体23に対し適当な間隔
で長手方向に「S撚り」と「Z撚り」とを交互に繰り返
し撚り合わせ、その周上にシースを設けた光ファイバケ
ーブルにより、従来に比較して後布設用光ケーブルの外
径を大きくでき、よって一管路の収容心数を増加できる
と共に安定的な収納が可能となる。 【0026】[実施例6]図9に示す本発明の一実施例
である光ファイバケーブル20は次のように構成されて
いる。すなわち、光ファイバが収容された収容体21
と、三本の後布設する光ファイバケーブル牽引ひもを収
容した後布設用ケーブルダクト22とを光ファイバケー
ブル20の牽引のための抗張力体23の周囲に適当な間
隔周期で長手方向に「螺旋状」に撚り合わせ、ケーブル
ダクト22及び収容体21の回りに例えばポリ塩化ビニ
ルから成るシースが設けられている。 【0027】(作用効果6)このように、光ファイバが
収容された収容体21と、牽引ひも15を収容したダク
ト22を適当な数の組合せで、抗張力体23の周囲に所
定の間隔ピッチで長手方向に「螺旋状」に撚り合わせる
と共に、その周辺にシースを設けたことで、前述同様
に、従来に比較して後布設用光ケーブルの外径を大きく
でき、よって一管路の収容心数を増加できると共に安定
的な収納ができる。 【0028】[実施例7]図10には、本発明の一実施
例であるケーブルの断面構造を示す。この構造的な特徴
は、図5に例示した収容体21の表面と、ケーブルダク
ト22の外面と、中央の抗張力体23の表面と、ケーブ
ル20の被覆内面とにそれぞれ後述する高摩擦材から成
る高摩擦材テープ30を巻回している点にある。 【0029】例えば中心に金属鋼線や繊維強化プラスチ
ックロッドから成る抗張力体23を設け、この周囲には
例えばポリエチレンなどのプラスチックを採用した後布
設用ケーブル後布設用ケーブルダクト22を設ける。ま
た、牽引のため例えば金属鋼線や繊維強化プラスチック
ロッドから成る抗張力体23の周上をポリエチレンなど
のプラスチックで覆ったロッド状の抗張力体23を中心
にしてある適当な間隔で撚り合わせ、その周辺にポリ塩
化ビニルから成るシースを配する。さらに、この光ファ
イバケーブル20を構成する収容体21、後布設用ケー
ブルダクト22および抗張力体23の各々の周面上に、
例えばゴム系素材から成る高摩擦テープ30を巻回して
いる。 【0030】(作用効果7)このような高い摩擦力を発
揮する素材によって表面を被覆することで、隣接する部
材が互いに摺動でき難くなり、被覆内において位置的に
安定する。また、収容体21、後布設用ケーブルダクト
22および抗張力体23の各々のロッドの周面に巻かれ
た高摩擦テープ30により、各ロッドの温度変化に起因
する収縮を抑制することができる。 【0031】(その他の変形実施例)なお、上述のよう
な高摩擦力の維持にはそれぞれに適する素材を採用して
もよいし、図11に示すような表面に周期的な突起物
(凸部)を設けてもよい。すなわち図11(a)に示す
ような矩形が規則的に配列され、図11(b)に示すよ
うな断面形状の突起物を多数有する高摩擦テープ30に
よって巻回してもよい。これにより、隣接する凹凸部が
互いに噛み合って摺動でき難い高い摩擦力を生じて、収
容された各ケーブルやケーブルダクトが位置的に安定す
る。 【0032】また、後布設用ケーブルダクト22は例え
ばポリエチレン等のプラスチック材から成る。また、牽
引ひも15は例えば金属鋼線や高強度の高分子繊維から
成ってもよい。さらに、抗張力体23は例えば金属鋼線
や繊維強化プラスチックロッドの周上にポリエチレン等
のプラスチック材で覆ったものである。なお、これらの
部位の材質は上記の材料に必ずしも限定さるものではな
く、適宜に他の材質を採用してもよい。このほかにも、
本発明の要旨を著しく逸脱しない範囲で種々の変形実施
も可能である。 【0033】 【発明の効果】以上説明したように、本発明の光ファイ
バケーブルにあたっては、ケーブル内の後布設用ケーブ
ルダクト及び既設の後布設用ケーブルの牽引ひもを用い
ることで、後布設の作業効率を改善できる。また、後布
設用のケーブルダクトを効率良く事前に設けることがで
きるため、後布設用光ケーブルの外径または収容体の外
径を大きくし、その結果、後布設用光ケーブルの収容心
数を大幅に増やし、一管路当たりの収容心数を容易に向
上させることが可能となる。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a technique for reducing the number of optical fiber cables accommodated in one underground pipeline in order to effectively use pipeline facilities laid underground. Increased optical fiber
About the cable. 2. Description of the Related Art When the amount of communication between routes increases and the amount of communication lines becomes insufficient, it becomes necessary to add an optical fiber cable. In this case, a method of burying a new underground pipe or effectively using an existing underground pipe can be considered. The construction of new underground pipelines cannot be promptly responded to due to traffic conditions, etc., and construction of new underground facilities requires a great deal of cost. Therefore, it is important to make effective use of existing facilities. Therefore, in order to effectively use the existing equipment, a method of newly laying an optical fiber cable in a vacant space of an underground conduit in which a communication cable has already been laid has generally been adopted. FIG. 12 shows a conventional method of laying a cable after a route when the amount of communication between routes increases and the amount of communication lines becomes insufficient. As shown in the drawing, in addition to the existing cable 12, a cable duct 13 for laying a hollow cable is provided inside the underground conduit 11.
Is laid. Therefore, a traction string 15 is laid so as to penetrate through the inside, and a rear laying cable 14 to be laid later is connected to one end of the traction string 15 via a towing terminal 16. Thereafter, the laid cable 14 is pinched by a set of rollers 17 ', which are rotatable and can move the cable 14 in the longitudinal direction. Similarly, the other end of the pulling string 15 is pinched by the pulling roller 17 and the rear cable 14 is pulled into the rear cable cable duct 13 by traversing the pulling string 15 by rotating in the direction of the arrow. Was possible. FIG. 13 is a flow chart S10 showing an outline of an operation sequence relating to a conventional method of laying an optical cable.
Indicated by First, a cable duct 13 for laying is laid in an empty space of the underground conduit 11 (S11), and a traction string 15 is laid in the cable duct 13 for laying (S1).
2). Next, the towing string 15 is connected to the towing terminal 16 of the rear laying cable 14 (S13), and the towing string 15 is towed by the traction machine 17 to lay the rear laying cable 14 in the cable duct (S14). . Thereafter, the towing string 15 is removed, and a series of post-laying work is completed (S1).
5). FIG. 14 shows an example of a cross section of the underground conduit 11 at the time of “multiple installation” using a conventional optical fiber cable and a rear installation duct 13. Generally, this multi-laying is performed when the outer diameter of the container 12 is smaller than the outer diameter of the underground conduit 11 and there is a sufficient free space between the container 12 and the underground conduit 11 as shown in the figure. This is the only laying method used. Conventionally, when it is necessary to efficiently lay an optical fiber cable in response to the demand for an optical fiber communication line, one method is to use an optical fiber cable with connectors at both ends, which is provided with optical fiber tapes at both ends. However, since there is no method for accurately measuring the length of the pipeline, there is no connector on one side, and the other is cut and fused after adjusting to the length of the pipeline. The method of wearing was used. [0007] As described above, in the conventional post-laying method, there is a cable housed in the underground conduit 11 in advance, and when a new optical fiber cable 14 is to be added, the post-laying method is required. When the installation optical fiber cable 14 is towed, extra tension due to obstacles such as earth and sand and humus products mixed in the underground conduit 11 is applied to the installation optical fiber cable 14 after that, and unforeseen pulling or cutting due to excessive pulling. In some cases, caution is required because the post-laying work is difficult. Thereafter, the traction string 15 is pulled into the cable duct 13 for rear installation, and the traction string 15
And the rear-laying optical fiber cable 14 is connected, and then the pulling string 15 is pulled by the pulling machine 17 to lay the rear-laying optical fiber cable 14 in the rear-laying cable duct 13. . In addition, there is a need for a means for accurately and easily determining the length of a conduit in which an optical fiber cable with connectors at both ends is to be laid when designing a line, and a method for realizing an efficient laying operation. Accordingly, the present invention provides a cable duct in which a traction string is incorporated in advance, a cable duct for laying, an optical fiber cable, and a strength member are included when a new optical fiber cable is laid on a route where communication demand is expected to increase. Its main purpose is to save labor in operation due to drawing into the pipeline and to prevent unexpected failure accidents such as cutting accidents due to obstacles such as earth and sand in the pipeline. It is. [0010] In order to solve the above problems and achieve the object, the present invention takes the following measures. First, the optical fiber cable has a housing fiber optic cable having an outer diameter smaller than the inner diameter of the coating within the same coating, a tensile strength member for pulling the entire optical fiber cable, and an internal
The optical fiber cable pulling string for rear installation is accommodated in
Made to accommodate a plurality of after laying cable duct that, before
The inner surface of the sheath of the optical fiber cable and housed in this sheath
And the new optical fiber
The outer surface of the duct for laying the cable
The surface of the strength member has uneven shapes that are in contact with each other.
Providing a fiber optic cable that is taped or made of rubber-based material , and fastening the end of a new fiber optic cable to one end of the fiber optic cable traction string;
By pulling the other end and then pulling it into the cable duct for laying, it is possible to reduce the laying work. In addition, when the assembly of the cable duct for installation and the optical fiber cable housing after the tow of the optical fiber cable with the connector at both ends to be installed according to the present invention is housed, the length thereof is described. Keep it. At the time of post-laying, the length of the optical fiber cable with connectors on both ends is determined on the basis of the stated length, so that post-laying with a small extra length is achieved. Preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings by way of examples. FIG. 1 shows an optical fiber cable 20 according to the present invention.
FIG. 2 is a flowchart showing a procedure of a post-laying operation using the cable. As shown in FIG. 1, during the coating of the optical fiber cable 20 laid in the underground conduit, in addition to the already laid optical fiber cable 21, three cable laying cable ducts 22 are provided at the center. It is provided around the penetrating strength member 23. After that, one traction cord 15 is housed in advance in each of the cable ducts 22 for installation. In the post-laying operation, one end of the pulling string 15 is connected to a new rear-laying optical fiber cable 14 via the pulling terminal 16. Accordingly, the towing cord 15 is driven by the towing machine 17 or the like, so that the optical fiber cable 14 for installation can be pulled into the cable duct 22 and installed thereafter. When a new communication demand is generated, the same post-laying operation as described above may be repeatedly performed on one of the other two empty cable ducts 22 and the optical fiber cable may be added to perform the multi-laying. it can. That is, according to the flowchart S20 in FIG. 2, first, the rear laying cable duct 22 is laid if desired (S21). By using the optical fiber cable 20 of the present invention having the above-described structural features for rear laying, the traction string 15 is connected to the traction terminal 1 of the rear laying cable 14.
6 (S22). Then, the other end of the towing cord 15 is towed by the towing machine 17, and then the installation cable 14 is drawn into the duct 22 and installed (S23). Thereafter, the towing cord 15 is removed, and a series of post-laying work is completed (S24). (Function and Effect 1) As described above, in the optical fiber cable of the present invention, the cable duct 22 for laying the rear cable and the pulling string 15 for the optical cable 14 for laying the rear fiber are previously provided in each cable duct 22 for laying the rear fiber. For this reason, the cable laying work for laying the cable duct and the work of laying the pulling string therethrough are not required, and the work process can be reduced. In addition, since the rear-laying cable duct 22 is provided in the covering with an optimal design, the outer diameter of the rear-laying optical cable 14 can be made larger than before, and as a result, the number of cores accommodated in one conduit can be increased. . [Embodiment 2] Conventionally, at the time of manufacture, a connector is attached to only one end of an optical fiber, transported to a laying site, laid in a pipeline, and thereafter, the optical fiber cable is cut according to the length of the pipeline. The current situation is to attach a connector to the other end and connect it to another cable, but this method requires a long time at the installation site and requires a long time to connect the optical fiber and the connector. Is performed on site, the communication quality of the connection unit is not always constant. Therefore, in the present invention, the optical fiber cable is provided with means for determining the length of the conduit. For example, as described above, the cable duct 22 for laying after the traction string 15 is accommodated therein and the optical fiber cable 20
If the length of the duct is measured and recorded in advance at that time, the length of the optical fiber cable with the connector at both ends to be laid later is determined before the laying operation. You can decide. Therefore,
After the towing string 15 is connected to the towing terminal 16 of the optical fiber cable 31 with the both ends connector of the length determined in the cable duct 22 for rear installation, the towing string 15 is towed by the towing machine 17 so that the length is almost equal to the length. Can be laid after the minimum necessary length. More specifically, FIG. 3 shows a structure of a cable 19 having a connector for both-end laying according to the present invention.
Specifically, for example, a “cable length” (not shown) is printed on the covering surface of the cable 19. Then, based on the data, the required length of the optical fiber cable to be newly laid later is estimated, and the optical connector 1 previously connected to both ends with optical fiber tapes 28 at the time of manufacture.
8 is attached. When a new demand arises, optical fiber cables with connectors at both ends are repeatedly laid in the other rear laying cable duct 22 in the same manner. FIG. 4 is a flowchart S30 illustrating a procedure for laying the optical fiber cable with the rear-end double-ended connector shown in FIG. 3 on the cable 20 of the present invention.
First, when the cable 20 of the present invention having the above-described structural feature for laying is laid, the length of the cable is measured and recorded at a predetermined location (S31). Based on the cable length, the length of the optical fiber cable 19 with connectors on both ends to be installed later is determined (S32). The traction string 15 provided in the cable laid beforehand is connected to the terminal of the cable for laying back (S3).
3) Pull out the towing cord 15 with the towing machine 17 and lay a new cable 19 in the duct 22 (S3).
4). Thereafter, the towing cord 15 is removed, and a series of post-laying work is completed (S35). (Effect 2) Since the length of the optical fiber cable required for the post-laying is at least the length of the existing cable or longer, if this cable length is described as a means for determining the length of the pipeline, Measurement for post-laying or
The connector mounting process according to this result can be reduced from on-site work. Therefore, according to the work procedure shown in FIG.
The working time at the cable laying site can be reduced, and the communication quality can be prevented from lowering. Further, from the obtained data on the length, the length of the optical fiber cable with connectors at both ends can be laid with a small excess length. Embodiment 3 FIG. 5 is a sectional view of an optical fiber cable according to an embodiment of the present invention.
Shows this longitudinal structure. As shown in the drawing, there is a single housing in which a bundle of optical fiber cables 21 is housed, and three rear laying cables housing traction strings 15 for an optical fiber cable (not shown) to be laid later. As shown in FIG. 6, the duct 22 is arranged in a "straight line" in the longitudinal direction around a strength member 23 for pulling the entire optical fiber cable 20, and a sheath made of, for example, polyvinyl chloride is provided around the duct 22. To constitute one optical fiber cable 20. (Effect 3) A cable duct 22 for back-laying, which is provided in advance on this optical fiber cable.
The towing string 15 eliminates the need to lay the cable duct and the towing string in the cable duct in the post-laying work, so that the work process can be reduced. Further, since the plurality of rear-laying cable ducts 22 are optimally provided, the outer diameter of the rear-laying optical cable can be increased as compared with the conventional case, and therefore, the number of cores accommodated in one conduit can be increased. [Embodiment 4] FIG. 7 is a sectional view of an optical fiber cable 21 as the above-mentioned container.
As shown in the figure, a tensile member 26 made of, for example, a metal steel wire or a fiber reinforced plastic rod is provided at the center. For example, it is a long round bar-shaped one made of a plastic material such as polyethylene, and has a “helical” or S-shaped and Z-shaped composite twist, that is, an “SZ twist” groove 27 on its peripheral surface. A plurality of optical fibers (not shown) are accommodated along the groove 27. Further, a predetermined holding tape called an optical fiber tape 28 is wound around the inner periphery of the coating layer of the container to form a holding roll layer for the optical fiber. A sheath 29 made of polyvinyl chloride is provided on the periphery. (Effect 4) By using a metal steel wire or a fiber reinforced plastic rod for the tensile member 26, an optical fiber cable which is strong in longitudinal tension and highly flexible can be obtained. Further, for example, by providing a groove of “SZ twist”, a plurality of optical fibers are easily accommodated along this groove,
Further, the optical fiber is stably accommodated by the holding by the optical fiber tape 28. [Embodiment 5] FIG. 8 shows a so-called "SZ type" housing structure of a cable according to an embodiment of the present invention. That is, the optical fiber cable 2 of the present invention
At 0, the cable duct 22 for laying the optical fiber cable 20 after accommodating the accommodating body 21 accommodating the optical fiber and the traction string (not shown) of the three optical fiber cables (not shown) to be laid later are housed. As shown in the figure, the cable ducts 22 and the inner surface of the housing are twisted into the "SZ shape" at appropriate intervals on the periphery of the tensile strength member 23 for pulling the cable. A sheath 25 made of vinyl is provided. (Function / Effect 5) As described above, the accommodation body 21 accommodating the optical fiber and the duct 22 accommodating the pull cord 15 for pulling the optical fiber cable are arranged at the center in an appropriate number of combinations. "S twist" and "Z twist" are alternately and repeatedly twisted in the longitudinal direction at appropriate intervals with respect to the tensile strength member 23, and an optical fiber cable provided with a sheath on the periphery thereof is used for post-laying as compared with the related art. The outer diameter of the optical cable can be increased, so that the number of cores accommodated in one conduit can be increased and stable accommodation is possible. [Embodiment 6] An optical fiber cable 20 according to an embodiment of the present invention shown in FIG. 9 is configured as follows. That is, the container 21 in which the optical fiber is stored
And a cable duct 22 for laying the fiber optic cable to be laid after three laying laces are helically wound around the strength member 23 for pulling the optical fiber cable 20 at an appropriate interval period. And a sheath made of, for example, polyvinyl chloride is provided around the cable duct 22 and the housing 21. (Function and Effect 6) As described above, the housing 21 accommodating the optical fibers and the ducts 22 accommodating the traction cords 15 are formed in a suitable number of combinations around the strength member 23 at a predetermined pitch. As described above, the outer diameter of the post-laying optical cable can be increased as compared with the conventional case, and thus the number of cores accommodated in one pipeline can be increased by twisting in a "helical shape" in the longitudinal direction and providing a sheath around the periphery. And can be stably stored. Embodiment 7 FIG. 10 shows a cross-sectional structure of a cable according to an embodiment of the present invention. This structural feature is that the surface of the container 21 illustrated in FIG. 5, the outer surface of the cable duct 22, the surface of the central tensile strength member 23, and the inner surface of the coating of the cable 20 are made of a high friction material, which will be described later. The point is that the high friction material tape 30 is wound. For example, a tensile member 23 made of a metal steel wire or a fiber reinforced plastic rod is provided at the center, and a cable duct 22 for laying a cable after laying a plastic made of, for example, polyethylene is provided around the strength member 23. Further, for pulling, for example, a rod-shaped strength member 23 in which the circumference of a strength member 23 made of a metal steel wire or a fiber-reinforced plastic rod is covered with plastic such as polyethylene is twisted at an appropriate interval around the center. A sheath made of polyvinyl chloride. Further, on the peripheral surface of each of the container 21, the cable laying cable 22 for the rear laying, and the strength member 23 which constitute the optical fiber cable 20,
For example, a high friction tape 30 made of a rubber material is wound. (Function and Effect 7) By coating the surface with such a material exhibiting a high frictional force, it becomes difficult for adjacent members to slide with each other, and the position is stabilized in the coating. In addition, the high friction tape 30 wrapped around the peripheral surfaces of the rods of the housing 21, the cable laying cable 22, and the tensile strength member 23 can suppress the shrinkage due to the temperature change of each rod. (Other Modified Embodiments) In order to maintain the high frictional force as described above, a material suitable for each may be adopted, or a periodic projection (convex) may be formed on the surface as shown in FIG. Part) may be provided. That is, rectangles as shown in FIG. 11A may be regularly arranged, and may be wound by a high friction tape 30 having a large number of projections having a sectional shape as shown in FIG. 11B. As a result, a high frictional force is generated that makes it difficult for the adjacent concave and convex portions to engage with each other and to slide, and the accommodated cables and cable ducts are positionally stabilized. The cable laying cable 22 is made of a plastic material such as polyethylene. Further, the traction string 15 may be made of, for example, a metal steel wire or a high-strength polymer fiber. Further, the strength member 23 is, for example, a metal steel wire or a fiber reinforced plastic rod covered with a plastic material such as polyethylene on the periphery. In addition, the material of these parts is not necessarily limited to the above materials, and other materials may be appropriately used. In addition,
Various modifications may be made without departing from the spirit of the present invention. As described above, the optical fiber of the present invention is
When the cable is used, the work efficiency of the rear laying can be improved by using the cable duct for the rear laying in the cable and the pulling string of the existing rear laying cable. In addition, since the cable duct for rear installation can be efficiently provided in advance, the outer diameter of the optical cable for rear installation or the outer diameter of the container is increased, and as a result, the number of optical fibers accommodated in the rear installation cable is significantly increased. It is possible to easily increase the number of accommodated cores per pipeline.

【図面の簡単な説明】 【図1】本発明の光ファイバケーブルの多条布設方法を
示す概略図。 【図2】本発明の光ファイバケーブルの多条布設方法の
手順を示すフローチャート。 【図3】本発明に係わる両端コネクタ付きの光ファイバ
ケーブルを示す概略図。 【図4】図3の両端コネクタ付き光ファイバケーブルの
多条布設方法の手順を示すフローチャート。 【図5】本発明に係わる光ファイバケーブルの断面構造
を示す横断面図。 【図6】本発明の光ファイバケーブルの長手方向の構造
を部分的に示す透視図。 【図7】本発明の光ファイバケーブルに収容されている
光ケーブルの断面構造を示す横断面図。 【図8】本発明の光ファイバケーブルの「SZ形」を成
す長手方向の構造を部分的に示す透視図。 【図9】本発明の光ファイバケーブルの「螺旋状」を成
す長手方向の構造を部分的に示す透視図。 【図10】収容体表面とケーブルダクト外面と抗張力体
表面とケーブル被覆の内面に高摩擦材を付与した本発明
の光ファイバケーブルの断面構造を示す横断面図。 【図11】高摩擦力を付与した高摩擦力テープの表面形
状を示し、(a)は高摩擦力テープの平面図、(b)は
線分A−A’に沿った高摩擦力テープの縦断面図。 【図12】従来の光ファイバケーブルの多条布設方法を
示す概略図。 【図13】従来の光ファイバケーブルの多条布設方法の
手順を示すフローチャート。 【図14】従来の光ファイバケーブルの多条布設のため
のケーブル断面構造を示す横断面図。 【符号の説明】 14…後布設用光ファイバケーブル、 15…牽引ひも、 16…牽引端末、 17…牽引機、 18…光コネクタ、 19…両端コネクタ付きケーブル、 20…光ファイバケーブル(被覆)、 21…収容光ファイバケーブル、 22…後布設用ケーブルダクト、 23…光ファイバケーブルの抗張力体、 25…収容光ファイバケーブルの抗張力体、 27…押さえ巻き層の溝、 28…光ファイバテープ、 29…収容光ファイバケーブルの被覆(シース)、 30…高摩擦材テープ、 31…突起物、 32…高摩擦力テープ素材。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a schematic view showing a method for laying multiple optical fiber cables according to the present invention. FIG. 2 is a flowchart showing a procedure of a method for laying multiple optical fiber cables according to the present invention. FIG. 3 is a schematic view showing an optical fiber cable with connectors at both ends according to the present invention. FIG. 4 is a flowchart showing a procedure of a method for laying multiple optical fiber cables with connectors at both ends in FIG. 3; FIG. 5 is a transverse sectional view showing a sectional structure of the optical fiber cable according to the present invention. FIG. 6 is a perspective view partially showing a longitudinal structure of the optical fiber cable of the present invention. FIG. 7 is a cross-sectional view showing a cross-sectional structure of an optical cable housed in the optical fiber cable of the present invention. FIG. 8 is a perspective view partially showing a longitudinal structure forming an “SZ type” of the optical fiber cable of the present invention. FIG. 9 is a perspective view partially illustrating a “spiral” longitudinal structure of the optical fiber cable of the present invention. FIG. 10 is a cross-sectional view showing the cross-sectional structure of the optical fiber cable of the present invention in which a high friction material is applied to the surface of the housing, the outer surface of the cable duct, the surface of the strength member, and the inner surface of the cable coating. 11A and 11B show a surface shape of a high frictional force tape to which a high frictional force is applied, wherein FIG. 11A is a plan view of the high frictional force tape, and FIG. 11B is a view of the high frictional force tape along a line AA ′. Longitudinal section. FIG. 12 is a schematic view showing a conventional method of laying multiple optical fiber cables. FIG. 13 is a flowchart showing the procedure of a conventional method for laying multiple optical fiber cables. FIG. 14 is a cross-sectional view showing a conventional cable cross-section structure for laying multiple optical fiber cables. [Description of Signs] 14: Optical fiber cable for rear installation, 15: Tow cord, 16: Towing terminal, 17: Towing machine, 18: Optical connector, 19: Cable with both ends connector, 20: Optical fiber cable (coating), DESCRIPTION OF SYMBOLS 21 ... accommodation optical fiber cable, 22 ... rear cable laying duct, 23 ... strength member of optical fiber cable, 25 ... strength member of accommodation fiber optic cable, 27 ... groove of holding down layer, 28 ... optical fiber tape, 29 ... Coating (sheath) of the accommodated optical fiber cable, 30: high friction material tape, 31: protrusion, 32: high friction force tape material.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平8−220390(JP,A) 特開 平7−302516(JP,A) 特開 平2−95115(JP,A) 実開 昭60−88308(JP,U) 実開 平6−64216(JP,U) 実開 平5−38716(JP,U) (58)調査した分野(Int.Cl.7,DB名) G02B 6/44 G02B 6/46 ────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-8-220390 (JP, A) JP-A-7-302516 (JP, A) JP-A-2-95115 (JP, A) 88308 (JP, U) Japanese Utility Model Hei 6-64216 (JP, U) Japanese Utility Model Utility Model 5-38716 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) G02B 6/44 G02B 6 / 46

Claims (1)

(57)【特許請求の範囲】 【請求項1】 同一の被覆内にこの被覆の内径より小さ
い外径の収容光ファイバケーブルと、光ファイバケーブ
ル全体の牽引のための抗張力体と、内部に後布設用の光
ファイバケーブル牽引ひもを収容して成る複数の後布設
用ケーブルダクトとを収容して成り、 前記光ファイバケーブルの被覆内面と、この被覆内に収
容された光ファイバケーブルの被覆表面と、新たに光フ
ァイバケーブルを後布設するためのダクトの外面と、前
記抗張力体の表面とには、互いに接する凹凸形状が形成
されているかまたはゴム系の材質のテープが採用される
ことを特徴とする光ファイバケーブル。
(57) [Claim 1] A housed optical fiber cable having an outer diameter smaller than the inner diameter of the coating within the same coating, a tensile strength member for pulling the entire optical fiber cable, and a rear inside thereof. Light for installation
Made to accommodate a plurality of after laying cable ducts formed by accommodating the fiber cable pull cord, the covering the inner surface of the optical fiber cable, yield in the coating
And the new optical fiber
The outer surface of the duct for installing the fiber cable
The surface of the strength member has irregular shapes that are in contact with each other.
An optical fiber cable characterized in that a tape made of a rubber material is used .
JP11393497A 1997-05-01 1997-05-01 Fiber optic cable Expired - Fee Related JP3437053B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11393497A JP3437053B2 (en) 1997-05-01 1997-05-01 Fiber optic cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11393497A JP3437053B2 (en) 1997-05-01 1997-05-01 Fiber optic cable

Publications (2)

Publication Number Publication Date
JPH10301001A JPH10301001A (en) 1998-11-13
JP3437053B2 true JP3437053B2 (en) 2003-08-18

Family

ID=14624868

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11393497A Expired - Fee Related JP3437053B2 (en) 1997-05-01 1997-05-01 Fiber optic cable

Country Status (1)

Country Link
JP (1) JP3437053B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009134059A (en) * 2007-11-30 2009-06-18 Sumitomo Electric Ind Ltd Optical fiber installation conduit member and optical fiber installation method
JP5745966B2 (en) * 2011-08-03 2015-07-08 株式会社フジクラ Optical fiber cable and optical fiber reconnection method
CN105954853B (en) * 2016-07-21 2022-03-01 南京华信藤仓光通信有限公司 Self-laying optical cable and laying method

Also Published As

Publication number Publication date
JPH10301001A (en) 1998-11-13

Similar Documents

Publication Publication Date Title
US4565351A (en) Method for installing cable using an inner duct
AP1290A (en) Multiple channel duct assembly for cables.
US5027864A (en) Tubular apparatus for transmission cable
CA2023060C (en) Internally spiraled inner duct and method of installation
JPH02210307A (en) Insertion of optical fiber
US4741593A (en) Multiple channel duct manifold system for fiber optic cables
US20060215979A1 (en) Method of dividing a conduit using an innerduct structure
JPH02265109A (en) Insertion methods for compound cable and optical fiber
JP2002098866A (en) Self-supporting optical fiber cable having supporting part
JP3437053B2 (en) Fiber optic cable
AU581243B2 (en) Method for installing cable using an inner duct
CN210572932U (en) Self-supporting composite optical cable
JPS6361207A (en) Formation of optical fiber cable line
JP3989207B2 (en) Cable protection tube with tow line, multi-strip line system, and tow line wiring method
JPS5943888B2 (en) Cable installation method
CN215680227U (en) Special-shaped structure conductor for power cable
KR100429505B1 (en) Optical fiber cable with optical fiber bundle
JPH11234834A (en) Inner pipe coupling tool of piping jig and piping method using the same
JP2004191506A (en) Optical cable
JP3038389B2 (en) How to handle extra cable length
JP4273477B2 (en) Drop cable coil and drop cable pulling method
KR20080060009A (en) A multi purpose fiber-optic cable
JPH08186922A (en) Flexible tube for protecting cable and manufacture thereof
JPH0862463A (en) Pipe for laying optical fiber cable
JP2000291828A (en) Pipeline structure

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090606

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090606

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100606

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100606

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110606

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120606

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130606

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees