JP3424677B2 - Data processing device and data processing method - Google Patents

Data processing device and data processing method

Info

Publication number
JP3424677B2
JP3424677B2 JP2001217445A JP2001217445A JP3424677B2 JP 3424677 B2 JP3424677 B2 JP 3424677B2 JP 2001217445 A JP2001217445 A JP 2001217445A JP 2001217445 A JP2001217445 A JP 2001217445A JP 3424677 B2 JP3424677 B2 JP 3424677B2
Authority
JP
Japan
Prior art keywords
processing
data processing
requesting device
result
request
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2001217445A
Other languages
Japanese (ja)
Other versions
JP2002135356A (en
Inventor
克幸 板倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Casio Computer Co Ltd
Original Assignee
Casio Computer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Casio Computer Co Ltd filed Critical Casio Computer Co Ltd
Priority to JP2001217445A priority Critical patent/JP3424677B2/en
Publication of JP2002135356A publication Critical patent/JP2002135356A/en
Application granted granted Critical
Publication of JP3424677B2 publication Critical patent/JP3424677B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Cash Registers Or Receiving Machines (AREA)
  • Computer And Data Communications (AREA)
  • Communication Control (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、他のデータ処理装置
との通信接続により所定のデータ処理を実行するデータ
処理装置、データ処理方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a data processing device and a data processing method for executing predetermined data processing by communication connection with another data processing device.

【0002】[0002]

【従来の技術】一般に、大規模なPOSシステムにおい
て、本店等に設置されているホストコンピュータと、各
支店等に設置されているマスタ装置(電子式キャッシュ
レジスタ)とは公衆回線を介して接続され、また、各支
店等にはマスタ装置の他に複数台のスレーブ装置(電子
式キャッシュレジスタ)が設置されており、マスタ装置
とスレーブ装置とは専用回線を介して接続されている。
ここで、ホストコンピュータがマスタ装置に対し、例え
ばPLU(プライス・ルック・アップ)ファイルの集計
命令を伝送すると、マスタ装置は各スレーブ装置からP
LUファイルの内容を吸い上げて集計処理を行い、その
集計結果をホストコンピュータへ伝送する。
2. Description of the Related Art Generally, in a large-scale POS system, a host computer installed at a head office or the like and a master device (electronic cash register) installed at each branch or the like are connected via a public line. In addition, in addition to the master device, a plurality of slave devices (electronic cash registers) are installed in each branch or the like, and the master device and the slave devices are connected via a dedicated line.
Here, when the host computer transmits, for example, a PLU (price look-up) file totaling command to the master device, the master device receives P from each slave device.
The contents of the LU file are sucked up, the totalization processing is performed, and the totalization result is transmitted to the host computer.

【0003】[0003]

【発明が解決しようとする課題】ところで、公衆回線を
使用する課金方式は、距離別時間差法であり、距離に応
じた単位時間が経過する毎に、電話料金を更新するよう
にしている。したがって、ホストコンピュータがマスタ
装置を呼び出して例えば、PLU集計のバッチ処理に起
動をかけた場合、そのバッチ処理に時間がかかると、電
話料金が膨大なものとなる。この発明の課題は、ホスト
コンピュータ等の要求装置が、マスタ装置等のデータ処
理装置と通信接続を行なってその処理結果のみを必要と
するバッチ処理等のデータ処理を要求した場合に、その
データ処理に要する時間を考慮した通信接続の切断、そ
して再接続によってその処理結果を送信するようにする
ことである。
By the way, a billing method using a public line is a time difference method according to distance, and a telephone charge is updated every time a unit time corresponding to the distance elapses. Therefore, if the host computer calls the master device and activates batch processing of PLU aggregation, for example, if the batch processing takes time, the telephone charge becomes enormous. An object of the present invention is to perform data processing when a requesting device such as a host computer makes a communication connection with a data processing device such as a master device and requests data processing such as batch processing that requires only the processing result. The processing result is transmitted by disconnecting and reconnecting the communication connection in consideration of the time required for.

【0004】[0004]

【課題を解決するための手段】本発明は、所定の要求装
置との通信接続を行い、その要求装置からの処理要求に
よりデータ処理を実行するデータ処理装置であって、上
記要求装置からの処理要求が、その処理結果の返送を必
要とする処理要求である場合に、その処理要求に対応す
るデータ処理で処理結果を得るのに時間を要することを
当該要求装置に対して送信する第1送信手段と、上記処
理要求に対するデータ処理の実行でその処理結果が得ら
れた際は、そのデータ処理の実行の間に通信接続が一旦
切断された上記要求装置に対して、上記処理結果が得ら
れたことの応答を行い、上記要求装置との再度の通信接
続後に、上記処理結果を当該要求装置に対して送信する
第2送信手段と、を具備したことを特徴とする。
SUMMARY OF THE INVENTION The present invention is a data processing device for performing communication connection with a predetermined requesting device and executing data processing according to a processing request from the requesting device. When the request is a processing request that requires the return of the processing result, the first transmission that transmits to the requesting device that it takes time to obtain the processing result in the data processing corresponding to the processing request. Means, and when the processing result is obtained by executing the data processing in response to the processing request, the processing result is obtained for the requesting device whose communication connection is temporarily disconnected during the execution of the data processing. A second transmitting means for transmitting a response to the request and transmitting the processing result to the requesting device after the communication connection with the requesting device is made again.

【0005】[0005]

【実施例】図1〜図10を参照して一実施例を説明す
る。図2はPOSシステムの全体を示したシステム構成
図である。このPOSシステムは各支店の売上データ等
を各支店毎に集計し、この集計データを本店に伝送する
集計システムで、本店にはホストコンピュータHost
が設置され、また各支店には複数台の電子式キャッシュ
レジスタ(ECR)がPOSターミナルとして設置され
ており、その1台のPOSターミナルがマスタ装置Po
s1、その他のPOSターミナルがスレーブ装置Pos
2、Pos3……として機能する。ここで、ホストコン
ピュータHost側のモデムM1とホストコンピュータ
Host側のモデムM2とは公衆回線ONLを介して接
続され、またマスタ装置Pos1とスレーブ装置Pos
2、Pos3……とは構内専用回線INLを介して接続
されている。このようなPOSシステムにおいて、ホス
トコンピュータHostがマスタ装置Pos1を呼び出
して例えば、PLU集計のバッチ処理に起動をかける
と、マスタ装置Pos1はスレーブ装置Pos2、Po
s3……からデータを吸い上げて集計処理を行う。ここ
で、ホストコンピュータHostはあまりにも集計処理
に時間がかかる様であれば、課金方法によっては回線の
接続状態を切断したのち、集計処理が終るまで接続し、
その後、回線を接続させて集計データをホストコンピュ
ータHostへ送信させる動作を開始させる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT An embodiment will be described with reference to FIGS. FIG. 2 is a system configuration diagram showing the entire POS system. This POS system is a totaling system that aggregates sales data of each branch for each branch and transmits this aggregated data to the head office.
, And each branch has a plurality of electronic cash registers (ECRs) as POS terminals, one of which is a master device Po.
s1 and other POS terminals are slave devices Pos
2. Functions as Pos3 .... Here, the modem M1 on the host computer Host side and the modem M2 on the host computer Host side are connected via the public line ONL, and the master device Pos1 and the slave device Pos are connected.
2, Pos3 ... Are connected via a private line INL. In such a POS system, when the host computer Host calls the master device Pos1 and activates, for example, batch processing of PLU aggregation, the master device Pos1 will be slave devices Pos2, Pos.
Sampling data from s3 ... Here, if the host computer Host takes too much time for the counting process, depending on the charging method, after disconnecting the connection state of the line, the host computer is connected until the counting process is completed.
After that, the line is connected to start the operation of transmitting the aggregated data to the host computer Host.

【0006】図2はホストコンピュータHostのブロ
ック構成図である。ホストコンピュータHostはCP
U1を中核としてROM2、入力部3、表示部4、外部
機器インターフェイス部5、ファイル・ディスク装置
6、RAM7、モデムM1を有し、CPU1はROM2
等に格納されている各種プログラムにしたがってホスト
コンピュータHostの全体動作を制御する。ここで、
CPU1は集計コマンドをマスタ装置Pos1に送信
し、PLU集計等のバッチ処理をマスタ装置Pos1へ
指示したり、マスタ装置Pos1との間において、回線
接続状態の制御を行う。なお、RAM7には後述する課
金テーブル17−1が設けられている。
FIG. 2 is a block diagram of the host computer Host. Host computer Host is CP
With U1 as a core, it has a ROM 2, an input unit 3, a display unit 4, an external device interface unit 5, a file / disk device 6, a RAM 7, and a modem M1, and the CPU 1 has a ROM 2
The overall operation of the host computer Host is controlled according to various programs stored in the host computer. here,
The CPU 1 sends a totaling command to the master device Pos 1, instructs the master device Pos 1 to perform batch processing such as PLU totalization, and controls the line connection state with the master device Pos 1. The RAM 7 is provided with a billing table 17-1 described later.

【0007】図3はマスタ装置Pos1のブロック構成
図である。マスタ装置Pos1はCPU11を中核とし
てROM12、入力部13、表示部14、インライン制
御部15、プリンタ16、ドロア17、RAM18、モ
デムM2を有し、CPU11はROM12等に格納され
ている各種プログラムにしたがってこのマスタ装置Po
s1の全体動作を制御する。ここで、CPU11はホス
トコンピュータHostから集計コマンドが送信されて
来ると、スレーブ装置Pos2……を呼び出してデータ
集計を行い、その集計結果をホストコンピュータHos
tへ伝送する。その際、CPU11はRAM18内の時
間算出ファイル18−1を参照し、集計結果を伝送する
までの所要時間を求め、この所要時間をホストコンピュ
ータHostへ伝送する。なお、RAM18には時間算
出ファイル18−1の他に結果ファイル18−2が設け
られている。
FIG. 3 is a block diagram of the master device Pos1. The master device Pos1 includes a ROM 12, a input unit 13, a display unit 14, an in-line control unit 15, a printer 16, a drawer 17, a RAM 18, and a modem M2 with the CPU 11 as a core, and the CPU 11 follows various programs stored in the ROM 12 or the like. This master device Po
Controls the overall operation of s1. Here, when a totaling command is transmitted from the host computer Host, the CPU 11 calls the slave devices Pos2 ... And performs data totalization, and the totalization result is sent to the host computer Host.
transmit to t. At that time, the CPU 11 refers to the time calculation file 18-1 in the RAM 18 to obtain the required time until the totalized result is transmitted, and transmits this required time to the host computer Host. The RAM 18 is provided with a result file 18-2 in addition to the time calculation file 18-1.

【0008】図4は課金テーブル7−1の構成を示し、
この課金テーブル7−1は距離別時間差法にしたがった
テーブル構成で、「地域」、「フラグ」、「スター
ト」、「エンド」、「料金」の項目を有している。ここ
で、「フラグ」はレコードの続きを意味するもので、フ
ラグ「1」はレコードスタート、「2」〜「99」はレ
コードの続き番号、「0」はレコードの最後を示してい
る。このテーブル内容にしたがった課金方法において、
「市内」を例に挙げると最初の3分で10円、その後、
1分毎に5円課金されることを示している。
FIG. 4 shows the structure of the charging table 7-1.
The billing table 7-1 has a table structure according to the time difference method according to distance, and has items of "region", "flag", "start", "end", and "charge". Here, the "flag" means the continuation of the record, the flag "1" indicates the record start, "2" to "99" indicate the continuation number of the record, and "0" indicates the end of the record. In the billing method according to the contents of this table,
Taking "city" as an example, 10 yen for the first 3 minutes, then
It shows that 5 yen is charged every minute.

【0009】図5は時間算出ファイル18−1の構成を
示し、この時間算出ファイル18−1にはバッチ処理の
種別を示す「種別」、1レコードの伝送に必要な伝送時
間を示す「係数」、マスタ装置Pos1に接続されてい
るスレーブ装置の全台数を示す「台数」、処理対象ファ
イルの全レコード本数を示す「本数」の各項目を有して
いる。なお、システム内にスレーブ装置が増設される
と、自動的に時間算出ファイル18−1内の台数も更新
される。また、ファイルサイズが変更されると、それに
伴って「本数」も自動的に更新される。
FIG. 5 shows the structure of the time calculation file 18-1. In the time calculation file 18-1, "type" indicating the type of batch processing, and "coefficient" indicating the transmission time required to transmit one record. It has items of “number” indicating the total number of slave devices connected to the master device Pos1 and “number” indicating the total number of records of the processing target file. When a slave device is added to the system, the number in the time calculation file 18-1 is automatically updated. Also, when the file size is changed, the “number” is automatically updated accordingly.

【0010】図6は結果ファイル18−2の構成を示
し、ホストコンピュータHostから伝送されて来た
「コマンド」、コマンドと共に伝送されて来た処理識別
用の固有の「IDNo」、処理開始時刻を示す「スタート
タイム」、処理終了時刻を示す「エンドタイム」、処理
を正常に終了することができたか否かを示す「結果」の
各項目を有している。例えば、結果ファイル18−2の
1レコード目は日付データの集計処理を実行した場合に
おいて、その処理固有のIDNoは「5412」で、「0
時12分」〜「0時14分」の間で集計処理が行われ、
その処理結果は「正常」であったことを示している。
FIG. 6 shows the structure of the result file 18-2. The "command" transmitted from the host computer Host, the unique "IDNo" for processing identification transmitted together with the command, and the processing start time are shown. It has respective items of “start time”, “end time” indicating processing end time, and “result” indicating whether or not the processing can be normally ended. For example, in the first record of the result file 18-2, when the date data totaling process is executed, the ID No. peculiar to the process is “5412” and “0”.
Aggregation processing is performed between "12:" and "0:14",
The processing result indicates that it was “normal”.

【0011】次に、本実施例の動作を説明する。図7は
ホストコンピュータHostとマスタ装置Pos1との
間においてデータの送受信動作を示したフローチャート
である。先ず、ホストコンピュータHostはマスタ装
置Pos1を呼び出して公衆回線を接続させ(ステップ
A1)、コマンドと共にIDNoを送信する(ステップA
2)。例えば、コマンド=日付データ集計、IDNo=5
412を送信する。すると、マスタ装置Pos1ではこ
れを受信し(ステップB1)、このコマンドに基づいて
時間算出ファイル18−1を参照し、所要時間の算出を
行う(ステップB2)。例えば、日付データ集計におい
て、係数は「0.1」、台数は「8」、本数は「10
0」である為、0.1×8×100=1分20秒が算出
される。このようにして算出された所要時間はホストコ
ンピュータHostへ送信される(ステップB3)。そ
の後、マスタ装置Pos1ではコマンドに応じたバッチ
処理(例えば日付データの集計処理)を各スレーブ装置
に対して実行し(ステップB4)、その結果をコマン
ド、IDNoと共に、結果ファイル18−2に書き込む
(ステップB5)。そして、ホストコンピュータHos
tからの受信待ち状態となる。この場合、マスタ装置P
os1は他の処理を実行しながら受信待ちとなる。
Next, the operation of this embodiment will be described. FIG. 7 is a flowchart showing a data transmission / reception operation between the host computer Host and the master device Pos1. First, the host computer Host calls the master device Pos1 to connect the public line (step A1), and transmits an IDNo together with a command (step A).
2). For example, command = total date data, ID No = 5
412 is transmitted. Then, the master device Pos1 receives this (step B1), refers to the time calculation file 18-1 based on this command, and calculates the required time (step B2). For example, in the date data tabulation, the coefficient is “0.1”, the number is “8”, and the number is “10”.
Since it is “0”, 0.1 × 8 × 100 = 1 minute 20 seconds is calculated. The required time thus calculated is transmitted to the host computer Host (step B3). After that, the master device Pos1 executes a batch process (for example, an aggregate process of date data) according to the command for each slave device (step B4), and writes the result together with the command and the IDNo in the result file 18-2 ( Step B5). And the host computer Hos
It will be in a waiting state from t. In this case, the master device P
Os1 waits for reception while executing other processing.

【0012】他方、ホストコンピュータHostはマス
タ装置Pos1から伝送されて来る所要時間を受信する
と(ステップA3)、この所要時間に基づいて回線接続
を続行させるか否かの判定を行う(ステップA4)。図
8はこの場合の判定処理を示したフローチャートであ
る。先ず、課金テーブル7−1を参照し、回線接続を直
ちに切った時と回線接続をそのまま続行させた時の料金
を算出する(ステップA4−1)。これによって求めら
れた両方の料金を比較し、回線接続を直ちに切った方が
料金的に得かどうかをチェックする(ステップA4−
2)。例えば、図9の例(1)の場合には、所要時間が
4分であれば、そのまま回線接続を続行させていた方が
得であることが分るが、例(2)の場合には直ちに回線
接続を切った方が得であることが分る。
On the other hand, when the host computer Host receives the required time transmitted from the master device Pos1 (step A3), it determines whether or not to continue the line connection based on this required time (step A4). FIG. 8 is a flowchart showing the determination process in this case. First, referring to the charging table 7-1, the charges when the line connection is immediately disconnected and when the line connection is continued as it is are calculated (step A4-1). Both charges obtained by this are compared, and it is checked whether it is advantageous to cut the line connection immediately (step A4-).
2). For example, in the case of the example (1) of FIG. 9, if the required time is 4 minutes, it can be seen that it is better to continue the line connection as it is, but in the case of the example (2). It turns out that it is better to disconnect the line immediately.

【0013】ここで、例えば市内に回線接続した状態に
おいて、所要時間が1分20秒であれば、当然、回線接
続状態をそのまま続行させた方が料金的に得であるの
で、すてA4−3に進み、マスタ装置Pos1での処理
終了まで回線接続のまま待機する。なお、この場合、回
線を接続している状態において他の処理を実行していて
もよい。一方、回線接続を切った方が得であれば、マス
タ装置Pos1に対する回線接続を切り(ステップA4
−4)、マスタ装置Pos1での処理終了まで待機する
(ステップA4−5)。この間においてもホストコンピ
ュータHostは他の処理を実行してもよい。その後、
所要時間経過後、ホストコンピュータHostは再度マ
スタ装置Pos1に対して回線接続を行う(ステップA
4−6)。
Here, for example, if the required time is 1 minute and 20 seconds in a state where the line is connected to the city, it is naturally advantageous to continue the line connected state as it is. -3, and waits for line connection until the master device Pos1 completes the process. In this case, other processing may be executed while the line is connected. On the other hand, if it is better to disconnect the line connection, disconnect the line connection to the master device Pos1 (step A4).
-4), and waits until the processing by the master device Pos1 is completed (step A4-5). During this period, the host computer Host may execute other processing. afterwards,
After the lapse of the required time, the host computer Host connects again to the master device Pos1 (step A).
4-6).

【0014】この状態において、図7のステップA5に
進み、マスタ装置Pos1に対して先に送信したコマン
ドおよびIDNoで結果ファイル18−2を検索すべきこ
とを指示し、その結果、マスタ装置Pos1から"正常
終了"を示すデータが送られて来た場合にはステップA
6に進み、マスタ装置Pos1から送信されて来る集計
結果のデータを吸い上げる処理を行う。
In this state, the process proceeds to step A5 in FIG. 7 and the master device Pos1 is instructed to search the result file 18-2 with the previously transmitted command and ID No. When the data indicating "normal end" is sent, step A
In step 6, the process of sucking up the data of the counting result transmitted from the master device Pos1 is performed.

【0015】図10はホストコンピュータHostとマ
スタ装置Pos1との間におけるデータの送受信状態を
具体的に示したもので、ホストコンピュータHostか
らコマンド"PLU集計"、IDNo"4321"をマスタ装
置Pos1に送信すると、マスタ装置Pos1は時間算
出ファイル18−1を検索し、所要時間(0.01×8
×18000=24分)を求め、これをホストコンピュ
ータHostに送信すると共に、PLU集計処理を行
う。そして、その処理結果を結果ファイル18−2に書
き込む。一方、ホストコンピュータHostはマスタ装
置Pos1から送信されて来た所要時間に基づいて課金
テーブル7−1を参照し、回線を切った場合が良いかを
判断する。この場合、回線を切った方が良いので、30
分経過後、再び回線接続を行う。次に、結果ファイル1
8−2を検索すべきことを指示し、その結果、正常終了
であれば、マスタ装置Pos1からデータを吸い上げ
る。
FIG. 10 specifically shows a data transmission / reception state between the host computer Host and the master device Pos1, and the command "PLU tabulation" and the ID No "4321" are transmitted from the host computer Host to the master device Pos1. Then, the master device Pos1 searches the time calculation file 18-1 and searches for the required time (0.01 × 8).
(× 18000 = 24 minutes) is calculated and transmitted to the host computer Host, and the PLU totaling process is performed. Then, the processing result is written in the result file 18-2. On the other hand, the host computer Host refers to the charging table 7-1 based on the required time transmitted from the master device Pos1 to determine whether or not the line may be disconnected. In this case, it is better to disconnect the line, so 30
After the lapse of minutes, the line is connected again. Next, result file 1
8-2 is instructed to be searched, and if the result is normal termination, data is downloaded from the master device Pos1.

【0016】なお、上記実施例においてはマスタ装置P
os1側で所要時間を算出するようにしたがホストコン
ピュータHost側で所要時間を算出するようにしても
よい。また、上記実施例は時間算出ファイル18−1の
内容を参照して所要時間を算出するようにしたが、例え
ば、ファイル処理毎の処理時間を固定的に記憶させても
よい。
In the above embodiment, the master device P
The required time is calculated on the os1 side, but the required time may be calculated on the host computer Host side. Further, in the above embodiment, the required time is calculated with reference to the contents of the time calculation file 18-1, but the processing time for each file processing may be fixedly stored.

【0017】[0017]

【発明の効果】この発明によれば、所定の要求装置から
処理結果の返送を必要とする処理要求があった場合、そ
の処理結果を得るのに時間を要することを送信してお
き、上記要求装置とは通信接続を一旦切断させておくこ
とで、そのデータ処理の実行途中にあっても長時間にわ
たって通信接続状態を保持しつづけることを不要とし、
そしてその処理要求に対するデータ処理の実行で処理結
果が得られた際は、そのことを上記要求装置に対して応
答してその要求装置とは再度の通信接続を行なって、そ
の処理結果をその要求装置に対して直ちに送信するよう
にしたので、要求装置にあっては、処理要求に対するデ
ータ処理の実行途中にあっても長時間にわたって通信接
続状態を保持しつづける、といったことが不要となり、
且つ処理結果についてはその処理結果が得られた段階で
その結果を直ちに取得することができる。
According to the present invention, when there is a processing request from a predetermined requesting device that needs to return the processing result, it is transmitted that it takes time to obtain the processing result, and the request is sent. By temporarily disconnecting the communication connection with the device, it is not necessary to keep the communication connection state for a long time even during the execution of the data processing,
Then, when a processing result is obtained by executing the data processing for the processing request, the requesting device responds to the request by making another communication connection with the requesting device, and the processing result is sent to the requesting device. Since it is transmitted immediately to the device, in the requesting device, it becomes unnecessary to keep the communication connection state for a long time even while the data processing for the processing request is being executed,
In addition, as for the processing result, the result can be immediately obtained when the processing result is obtained.

【図面の簡単な説明】[Brief description of drawings]

【図1】POSシステムの全体を示したシステム構成
図。
FIG. 1 is a system configuration diagram showing the entire POS system.

【図2】ホストコンピュータHostのブロック構成
図。
FIG. 2 is a block diagram of a host computer Host.

【図3】マスタ装置Pos1のブロック構成図。FIG. 3 is a block configuration diagram of a master device Pos1.

【図4】課金テーブル7−1の構成を示した図。FIG. 4 is a diagram showing a configuration of a charging table 7-1.

【図5】時間算出ファイル18−1の構成を示した図。FIG. 5 is a diagram showing a configuration of a time calculation file 18-1.

【図6】結果ファイル18−2の構成を示した図。FIG. 6 is a diagram showing the configuration of a result file 18-2.

【図7】ホストコンピュータHostとマスタ装置Po
s1との間においてデータの送受信動作を示したフロー
チャート。
FIG. 7: Host computer Host and master device Po
The flowchart which showed the transmission / reception operation | movement of data between s1.

【図8】図8で示した判定処理を詳細に示したフローチ
ャート。
8 is a flowchart showing in detail the determination process shown in FIG.

【図9】所要時間に基づいて回線を接続させたままとす
るか切るかを判定する際の具体例を示した図。
FIG. 9 is a diagram showing a specific example of determining whether to keep the line connected or disconnect it based on the required time.

【図10】ホストコンピュータHostとマスタ装置P
os1とのデータ送受信状態を具体的に示した図。
FIG. 10: Host computer Host and master device P
The figure which specifically showed the data transmission / reception state with os1.

【符号の説明】[Explanation of symbols]

Host ホストコンピュータ Pos1 マスタ装置 Pos2、Pos3 スレーブ装置 M1、M2 モデム ONL 公衆回線 1、11 CPU 2、12 ROM 7−1 課金テーブル 15 インライン制御部 18−1 時間算出ファイル Host host computer Pos1 master device Pos2, Pos3 slave device M1, M2 modem ONL public line 1, 11 CPU 2,12 ROM 7-1 Billing table 15 In-line control unit 18-1 hour calculation file

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.7 識別記号 FI G07G 1/12 341 G07G 1/14 1/14 H04L 13/00 307A (58)調査した分野(Int.Cl.7,DB名) H04L 29/08 H04M 15/00 G06F 13/00 354 G06F 15/00 310 G07G 1/00 331 G07G 1/12 311 G07G 1/12 341 G07G 1/14 ─────────────────────────────────────────────────── ─── Continuation of front page (51) Int.Cl. 7 identification code FI G07G 1/12 341 G07G 1/14 1/14 H04L 13/00 307A (58) Fields investigated (Int.Cl. 7 , DB name) ) H04L 29/08 H04M 15/00 G06F 13/00 354 G06F 15/00 310 G07G 1/00 331 G07G 1/12 311 G07G 1/12 341 G07G 1/14

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 所定の要求装置との通信接続を行い、そ
の要求装置からの処理要求によりデータ処理を実行する
データ処理装置であって、 上記要求装置からの処理要求が、その処理結果の返送を
必要とする処理要求である場合に、その処理要求に対応
するデータ処理の実行により処理結果を得るのに時間を
要することを当該要求装置に対して送信する第1送信手
段と、 上記処理要求に対するデータ処理の実行でその処理結果
が得られた際は、そのデータ処理の実行の間に通信接続
が一旦切断された上記要求装置に対して、上記処理結果
が得られたことの応答を行い、上記要求装置との再度の
通信接続後に、上記処理結果を当該要求装置に対して送
信する第2送信手段と、 を具備したことを特徴とするデータ処理装置。
1. A data processing device for performing communication connection with a predetermined requesting device and executing data processing according to a processing request from the requesting device, wherein the processing request from the requesting device returns the processing result. If the request is a processing request, a first transmitting means for transmitting to the requesting device that it takes time to obtain a processing result by executing the data processing corresponding to the processing request, and the processing request When the processing result is obtained by executing the data processing with respect to, a response indicating that the processing result is obtained is sent to the requesting device whose communication connection is temporarily disconnected during the execution of the data processing. A second transmission means for transmitting the processing result to the requesting device after re-communication connection with the requesting device.
【請求項2】 通信接続される所定の要求装置からの処
理要求によりデータ処理を実行するデータ処理方法であ
って、 上記要求装置からの処理要求が、その処理結果の返送を
必要とする処理要求である場合に、その処理要求に対応
するデータ処理の実行により処理結果を得るのに時間を
要することを当該要求装置に対して送信し、 上記処理要求に対するデータ処理の実行でその処理結果
が得られた際は、そのデータ処理の実行の間に通信接続
が一旦切断された上記要求装置に対して、上記処理結果
が得られたことの応答を行い、上記要求装置との再度の
通信接続後に、上記処理結果を当該要求装置に対して送
信する、 ようにしたことを特徴とするデータ処理方法。
2. A data processing method for executing data processing according to a processing request from a predetermined requesting device connected by communication, wherein the processing request from the requesting device requires the return of the processing result. If it is, it transmits to the requesting device that it takes time to obtain the processing result by executing the data processing corresponding to the processing request, and the processing result is obtained by executing the data processing for the processing request. When the data processing is performed, a response that the processing result has been obtained is sent to the requesting device whose communication connection was once disconnected during the execution of the data processing, and after the communication connecting again with the requesting device. A data processing method, wherein the processing result is transmitted to the requesting device.
JP2001217445A 2001-07-18 2001-07-18 Data processing device and data processing method Expired - Lifetime JP3424677B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001217445A JP3424677B2 (en) 2001-07-18 2001-07-18 Data processing device and data processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001217445A JP3424677B2 (en) 2001-07-18 2001-07-18 Data processing device and data processing method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP03619593A Division JP3343978B2 (en) 1993-02-02 1993-02-02 Data processing device and data processing method

Publications (2)

Publication Number Publication Date
JP2002135356A JP2002135356A (en) 2002-05-10
JP3424677B2 true JP3424677B2 (en) 2003-07-07

Family

ID=19051764

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001217445A Expired - Lifetime JP3424677B2 (en) 2001-07-18 2001-07-18 Data processing device and data processing method

Country Status (1)

Country Link
JP (1) JP3424677B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103366471A (en) * 2013-06-26 2013-10-23 福建联迪商用设备有限公司 Online service concurrent processing method, system and server

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6528528B2 (en) 2015-04-30 2019-06-12 セイコーエプソン株式会社 Network system, control method of network system, and printer
JP2016212491A (en) 2015-04-30 2016-12-15 セイコーエプソン株式会社 Network system, network system control method, and control device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103366471A (en) * 2013-06-26 2013-10-23 福建联迪商用设备有限公司 Online service concurrent processing method, system and server

Also Published As

Publication number Publication date
JP2002135356A (en) 2002-05-10

Similar Documents

Publication Publication Date Title
US20040148525A1 (en) Software providing system, software providing apparatus and method, recording medium, and program
US8532640B2 (en) Software key control for mobile devices
EP1083503A2 (en) Method and system for providing an on-line service and computer readable storage medium
JP2001344199A (en) Distributed processing system and method, and recording medium
JP3424677B2 (en) Data processing device and data processing method
JP2002203057A (en) Added value data warehouse system
JP2002251478A (en) Electronic mall system
KR100640734B1 (en) Method and apparatus for billing for usage of contents
JP3343978B2 (en) Data processing device and data processing method
JPH09179806A (en) File transfer system
JP2002132564A (en) System and method for distribution of master file
JP3921055B2 (en) POS system, server computer, POS terminal maintenance system, and POS terminal maintenance method
JP2002073192A (en) System and method for software version-up service
JPH0981631A (en) Software data distributing and selling device
JP3886076B2 (en) Communication system and communication equipment
JP2002091598A (en) System and method for processing information and recording medium recorded with information processing program operating on computer
JP3502859B2 (en) POS data management method
JP2000076159A (en) Terminal controller
JP2015197769A (en) Privilege provision device, program, privilege provision system, and privilege provision method
JPS5812068A (en) Group managing system for electronic cash register
JP2002358433A (en) System and method for contents sale management
JP6047472B2 (en) Database management method and database management system
JP2001325537A (en) System for ordering and order reception through internet
JP2002094504A (en) Billing system for internet utility charge
JP2002288549A (en) User support system, user support management device, support service providing method, recording medium and program

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080502

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090502

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090502

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100502

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110502

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110502

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120502

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120502

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130502

Year of fee payment: 10

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130502

Year of fee payment: 10