JP3423214B2 - How to assemble a tube with a spiral guideway - Google Patents

How to assemble a tube with a spiral guideway

Info

Publication number
JP3423214B2
JP3423214B2 JP10470698A JP10470698A JP3423214B2 JP 3423214 B2 JP3423214 B2 JP 3423214B2 JP 10470698 A JP10470698 A JP 10470698A JP 10470698 A JP10470698 A JP 10470698A JP 3423214 B2 JP3423214 B2 JP 3423214B2
Authority
JP
Japan
Prior art keywords
pipe
guide path
spiral guide
spiral
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP10470698A
Other languages
Japanese (ja)
Other versions
JPH11293754A (en
Inventor
裕英 中川
孝育 吉井
俊秀 野中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP10470698A priority Critical patent/JP3423214B2/en
Publication of JPH11293754A publication Critical patent/JPH11293754A/en
Application granted granted Critical
Publication of JP3423214B2 publication Critical patent/JP3423214B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明は、自然流下式の垂直
下水管路等に好適に使用される、螺旋案内路付き管の組
立方法に関するものである。 【0002】 【従来の技術】マンホール内に自然流下によって下水を
流入させる際に、マンホール内を流下する下水を減衰さ
せるために、例えば特開平8−41915号公報に開示
されているように、下水用縦管(ドロップシャフト)を
配置する方法が実施されている。下水用縦管の内部に
は、下水が直線的に流下しないように屈曲させる案内路
が設けられており、この案内路に沿って下水が流下する
ことにより、下水は減衰状態になる。減衰状態になった
下水は、下水用縦管の下端部から側方に流出されて、マ
ンホール内に排出される。従って、マンホールの底部等
に、流下する下水が強く衝突するおそれがなく、マンホ
ールの底部の摩耗が抑制される。 【0003】このような下水用縦管は、管本体部の内側
に螺旋案内路が取り付けられており、例えば、強度的に
優れたガラス繊維強化樹脂等の繊維強化樹脂によって、
管本体部と螺旋案内路とを、ハンドレアップ法等によっ
て、一体的に形成されるようになっているので、その組
立作業性が悪いという問題点がある。 【0004】又、表面が摩耗したときに、繊維強化樹脂
製の管本体部と螺旋案内路とが一体に形成されている
と、螺旋案内路が破損することによって、下水用縦管全
体を取り替えねばならなくなる。下水用縦管を取り替え
る場合には、下水の流通を停止させなければならず、し
かも、取り替え作業に長時間を要するという問題点があ
る。 【0005】 【発明が解決しようとする課題】本発明は、このような
従来の問題点を解決し、ある程度の止水を期待できるよ
うに組立作業性よく螺旋案内路を管本体部の内側に設け
ることができ、管本体部内に流入する流体の衝撃によっ
て螺旋案内路が破損したような場合にも螺旋案内路のみ
を簡単に取り替えることができる螺旋案内路付き管の組
立方法を提供することを目的としてなされたものであ
る。 【0006】 【課題を解決するための手段】本発明は、管本体部の内
側に螺旋案内路が設けられた螺旋案内路付き管の組立方
法であって、前記螺旋案内路として、外周縁部がやや外
側に開いたL字状をなすように上方に屈曲され、その先
端縁が前記管本体部の内径よりも若干大きい外径を有す
るものを用いて、該螺旋案内路を前記管本体部内にその
上方から強制的に所定位置まで挿入することにより、そ
の先端縁近傍を前記管本体部の内周面に対して弾圧状態
に係止する螺旋案内路付き管の組立方法である。 【0007】 【作用】本発明の螺旋案内路付き管の組立方法は、前記
螺旋案内路として、外周縁部がやや外側に開いたL字状
をなすように上方に屈曲され、その先端縁が前記管本体
部の内径よりも若干大きい外径を有するものを用いて、
該螺旋案内路を前記管本体部内にその上方から強制的に
所定位置まで挿入するだけで、その先端縁近傍を前記管
本体部の内周面に対して弾圧状態に係止することができ
るので、螺旋案内路を管本体部の内側に設ける際の組立
作業性に優れており、又、管本体部内に流入する流体の
衝撃によって螺旋案内路が破損したような場合にも、螺
旋案内路の先端縁付近が管本体部の内周面に弾圧状態と
されているだけで、固着されているわけではないので、
管本体部内により螺旋案内路のみを容易に抜き去って、
短時間で新たな螺旋案内路に取り替えることができる。 【0008】 【発明の実施の形態】以下、本発明の実施の形態を、図
面に基づいて詳細に説明する。図1は、本発明により組
み立てられる螺旋案内路付き管の一部断面図である。こ
の螺旋案内路付き管10は、樹脂によって製造された直
管状の管本体部11と、この管本体部11の内側に螺旋
状に設けられた樹脂製の螺旋案内路12とを有してい
る。 【0009】この螺旋案内路付き管10は、図2に示す
ように、螺旋案内路12として、全長にわたって外周縁
部121がやや外側に開いたL字状をなすように上方に
屈曲され、その先端縁が管本体部11の内径よりも若干
大きい外径を有するものが用いられる。 【0010】次に、本発明の螺旋案内路付き管を組立方
法を図3及び図4を参照して説明する。図3に示すよう
に、螺旋案内路12を管本体部11内にその上方から強
制的に所定位置まで挿入する。これにより、図4に示す
ように、螺旋案内路12は、その先端縁近傍121aが
管本体部11の内周面に対して弾圧状態に係止される。
螺旋案内路付き管10の螺旋案内路12は、管本体部1
1からその内径の1/20〜5/12程度にわたって内
側に突出した状態になっており、従って、管本体部11
の軸心部は、全長にわたって空洞部になっている。 【0011】この状態において、螺旋案内路12の先端
縁近傍は管本体部11の内周面に対して弾圧状態となっ
ているので、ある程度の止水性は期待することができ
る。又、この組立方法によると、螺旋案内路12を管本
体部11内にその上方から強制的に所定位置まで挿入す
るだけで、その先端縁近傍を管本体部11の内周面に対
して弾圧状態に係止することができるので、螺旋案内路
12を管本体部11の内側に設ける際の組立作業性に優
れている。 【0012】又、管本体部11内に流入する流体の衝撃
によって螺旋案内路12が破損したような場合にも、螺
旋案内路12の先端縁付近が管本体部11の内周面に弾
圧状態とされているだけで固着されているわけではない
ので、管本体部11内により螺旋案内路12のみを容易
に抜き去って、短時間で新たな螺旋案内路に取り替える
ことができる。 【0013】螺旋案内路12は、熱可塑性樹脂、熱硬化
性樹脂等によって製造される。熱可塑性樹脂としては、
塩化ビニル樹脂、オレフィン系樹脂(ポリエチレン、ポ
リプロピレン等)、メタクリル樹脂等が用いられる。ま
た、熱硬化性樹脂としては、不飽和ポリエステル樹脂も
ビニルエステル樹脂、エポキシ樹脂等が用いられる。さ
らに、無機繊維、ガラス繊維、有機繊維、炭素繊維、ア
ラミド繊維、ビニロン繊維等の繊維によって強化した樹
脂も使用することができる。 【0014】管本体部11も、熱可塑性樹脂、熱硬化性
樹脂等によって製造される。熱可塑性樹脂としては、塩
化ビニル樹脂、オレフィン系樹脂(ポリエチレン、ポリ
プロピレン等)、メタクリル樹脂等が用いられる。ま
た、熱硬化性樹脂としては、不飽和ポリエステル樹脂、
ビニルエステル樹脂、エポキシ樹脂等が用いられ、ま
た、無機繊維、ガラス繊維、有機繊維、炭素繊維、アラ
ミド繊維、ビニロン繊維等の繊維によって強化したもの
も使用することができる。 【0015】管本体部11を、繊維強化樹脂によって製
造する場合には、螺旋案内路12を、塩化ビニル樹脂、
不飽和ポリエステル樹脂を使用した繊維強化樹脂によっ
て製造することが経済的であり好ましい。 【0016】 【発明の効果】本発明の螺旋案内路付き管の組立方法
は、上記のようにされているので、ある程度の止水を期
待できるように組立作業性よく螺旋案内路を管本体部の
内側に設けることができ、管本体部内に流入する流体の
衝撃によって螺旋案内路が破損したような場合にも螺旋
案内路のみを簡単に取り替えることができる。 【0017】
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for assembling a pipe with a spiral guideway, which is preferably used for a natural drainage vertical sewer pipe or the like. 2. Description of the Related Art In order to attenuate sewage flowing down in a manhole when the sewage flows into the manhole by natural flow, for example, as disclosed in JP-A-8-41915, A method of arranging vertical pipes (drop shafts) has been implemented. A guide path is provided inside the vertical pipe for sewage so as to bend so that the sewage does not flow down linearly. The sewage flows down along the guide path, so that the sewage is in an attenuated state. The sewage in the damped state is discharged laterally from the lower end of the vertical sewage pipe and discharged into the manhole. Therefore, there is no possibility that the sewage flowing down will strongly collide with the bottom of the manhole, and the wear of the bottom of the manhole will be suppressed. Such a vertical pipe for sewage is provided with a spiral guideway inside a pipe main body, and is made of, for example, a fiber reinforced resin such as a glass fiber reinforced resin having excellent strength.
Since the pipe main body and the spiral guideway are formed integrally by a hand-re-up method or the like, there is a problem that the assembling workability is poor. Further, when the surface of the pipe is formed integrally with the fiber main body made of fiber reinforced resin when the surface is worn, the spiral guide path is broken and the entire vertical pipe for sewage is replaced. I have to do it. When the vertical pipe for sewage is replaced, there is a problem that the circulation of the sewage must be stopped and the replacement operation takes a long time. SUMMARY OF THE INVENTION The present invention solves such a conventional problem and provides a spiral guideway inside the pipe body with good assembling work so that a certain degree of water stoppage can be expected. A method for assembling a pipe with a spiral guide path that can be provided and that can easily replace only the spiral guide path even when the spiral guide path is damaged by the impact of fluid flowing into the pipe main body. It was made for the purpose. The present invention relates to a method of assembling a pipe with a spiral guide path provided with a spiral guide path inside a pipe main body, wherein the spiral guide path has an outer peripheral edge portion. The spiral guide path is bent upward so as to form an L-shape that is slightly opened outward, and has a tip edge whose outer diameter is slightly larger than the inner diameter of the pipe main body. A method for assembling a pipe with a spiral guide path, which forcibly inserts a top end of the pipe into a predetermined position to lock the vicinity of the leading end edge against the inner peripheral surface of the pipe main body in a resilient state. According to the method of assembling a pipe with a spiral guideway of the present invention, the spiral guideway is bent upward so that the outer peripheral edge thereof forms an L-shape slightly opened outward, and the leading edge thereof is formed. Using a tube having an outer diameter slightly larger than the inner diameter of the pipe body,
By merely forcibly inserting the spiral guideway into the tube main body from above to a predetermined position, the vicinity of the leading edge can be locked in an elastic pressure state with respect to the inner peripheral surface of the tube main body. It is excellent in the workability of assembling when the spiral guideway is provided inside the pipe main body, and even when the spiral guideway is broken by the impact of the fluid flowing into the pipe main body, Since the vicinity of the tip edge is merely pressed against the inner peripheral surface of the tube body, it is not fixed.
Easily pull out only the spiral guideway inside the pipe body,
It can be replaced with a new spiral guideway in a short time. Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a partial sectional view of a tube with a spiral guideway assembled according to the present invention. The pipe 10 with a spiral guide path has a straight tubular pipe body 11 made of resin, and a resin spiral guide path 12 spirally provided inside the pipe body 11. . As shown in FIG. 2, the pipe 10 with a spiral guide path is bent upward as a spiral guide path 12 so that the outer peripheral edge 121 has an L-shape that opens slightly outward over the entire length. One having a distal end edge having an outer diameter slightly larger than the inner diameter of the tube body 11 is used. Next, a method for assembling the tube with a spiral guideway of the present invention will be described with reference to FIGS. As shown in FIG. 3, the spiral guide path 12 is forcibly inserted into the pipe main body 11 from above to a predetermined position. As a result, as shown in FIG.
The spiral guide path 12 of the pipe 10 with the spiral guide path is connected to the pipe main body 1.
1 and protrudes inward over about 1/20 to 5/12 of its inner diameter.
Has a hollow portion over its entire length. In this state, the vicinity of the leading edge of the spiral guide path 12 is in a state of being resiliently pressed against the inner peripheral surface of the pipe main body 11, so that a certain degree of waterproofness can be expected. Further, according to this assembling method, the spiral guide path 12 is simply inserted into the pipe main body 11 from above to a predetermined position, and the vicinity of the leading edge is pressed against the inner peripheral surface of the pipe main body 11. Since it can be locked in the state, the assembling workability when the spiral guide path 12 is provided inside the pipe main body 11 is excellent. Also, in the case where the spiral guide path 12 is damaged by the impact of the fluid flowing into the pipe main body 11, the vicinity of the leading edge of the spiral guide path 12 is resiliently pressed against the inner peripheral surface of the pipe main body 11. , It is not fixed, so that only the spiral guide path 12 can be easily pulled out from the pipe main body 11 and replaced with a new spiral guide path in a short time. The spiral guide path 12 is made of a thermoplastic resin, a thermosetting resin, or the like. As a thermoplastic resin,
Vinyl chloride resin, olefin resin (polyethylene, polypropylene, etc.), methacrylic resin and the like are used. As the thermosetting resin, an unsaturated polyester resin such as a vinyl ester resin or an epoxy resin is used. Further, resins reinforced with fibers such as inorganic fibers, glass fibers, organic fibers, carbon fibers, aramid fibers, and vinylon fibers can also be used. The tube body 11 is also made of a thermoplastic resin, a thermosetting resin or the like. As the thermoplastic resin, a vinyl chloride resin, an olefin resin (eg, polyethylene, polypropylene), a methacryl resin, or the like is used. As the thermosetting resin, unsaturated polyester resin,
A vinyl ester resin, an epoxy resin, or the like is used, and a fiber reinforced with a fiber such as an inorganic fiber, a glass fiber, an organic fiber, a carbon fiber, an aramid fiber, and a vinylon fiber can also be used. When the pipe body 11 is made of fiber reinforced resin, the spiral guide path 12 is made of vinyl chloride resin,
It is economical and preferable to produce with a fiber reinforced resin using an unsaturated polyester resin. The method for assembling a pipe with a spiral guideway according to the present invention is performed as described above, so that the spiral guideway is connected to the pipe body with good assembling work so that a certain degree of water stoppage can be expected. In the case where the spiral guideway is broken by the impact of the fluid flowing into the pipe main body, only the spiral guideway can be easily replaced. [0017]

【図面の簡単な説明】 【図1】本発明により得られる螺旋案内路付き管の一例
を示す一部断面図である。 【図2】本発明に使用される螺旋案内路の一例を示す断
面図である。 【図3】本発明の螺旋案内路付き管の組立方法の一例の
前半の工程を説明する断面図である。 【図4】本発明の螺旋案内路付き管の組立方法の一例の
後半の工程を説明する断面図である。 【符号の簡単な説明】 10 螺旋案内路付き管 11 管本体部 12 螺旋案内路 121 先端縁部 121a 先端縁近傍
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a partial sectional view showing an example of a tube with a spiral guideway obtained by the present invention. FIG. 2 is a sectional view showing an example of a spiral guideway used in the present invention. FIG. 3 is a cross-sectional view illustrating the first half of an example of the method for assembling a tube with a spiral guideway according to the present invention. FIG. 4 is a cross-sectional view illustrating the latter half of an example of the method for assembling a tube with a spiral guideway according to the present invention. BRIEF DESCRIPTION OF THE REFERENCE NUMERALS 10 Pipe with helical guideway 11 Pipe main body 12 Spiral guideway 121 Tip edge 121a Near tip edge

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E03F 5/02 E03F 5/04 F16L 9/00 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) E03F 5/02 E03F 5/04 F16L 9/00

Claims (1)

(57)【特許請求の範囲】 【請求項1】 管本体部の内側に螺旋案内路が設けられ
た螺旋案内路付き管の組立方法であって、前記螺旋案内
路として、外周縁部がやや外側に開いたL字状をなすよ
うに上方に屈曲され、その先端縁が前記管本体部の内径
よりも若干大きい外径を有するものを用いて、該螺旋案
内路を前記管本体部内にその上方から強制的に所定位置
まで挿入することにより、その先端縁近傍を前記管本体
部の内周面に対して弾圧状態に係止することを特徴とす
る螺旋案内路付き管の組立方法。
(57) [Claim 1] A method of assembling a pipe with a spiral guide path provided with a spiral guide path inside a pipe main body, wherein the spiral guide path has a slightly outer peripheral edge. The spiral guide path is bent inside the pipe body using a pipe whose upper edge is bent upward so as to form an L-shape that opens outward, and has a tip edge having an outer diameter slightly larger than the inner diameter of the pipe body. A method for assembling a pipe with a spiral guide path, comprising: forcibly inserting the pipe from the upper side to a predetermined position so as to resiliently lock the vicinity of the distal end against the inner peripheral surface of the pipe main body.
JP10470698A 1998-04-15 1998-04-15 How to assemble a tube with a spiral guideway Expired - Lifetime JP3423214B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10470698A JP3423214B2 (en) 1998-04-15 1998-04-15 How to assemble a tube with a spiral guideway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10470698A JP3423214B2 (en) 1998-04-15 1998-04-15 How to assemble a tube with a spiral guideway

Publications (2)

Publication Number Publication Date
JPH11293754A JPH11293754A (en) 1999-10-26
JP3423214B2 true JP3423214B2 (en) 2003-07-07

Family

ID=14387937

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10470698A Expired - Lifetime JP3423214B2 (en) 1998-04-15 1998-04-15 How to assemble a tube with a spiral guideway

Country Status (1)

Country Link
JP (1) JP3423214B2 (en)

Also Published As

Publication number Publication date
JPH11293754A (en) 1999-10-26

Similar Documents

Publication Publication Date Title
JP3423214B2 (en) How to assemble a tube with a spiral guideway
JP4643282B2 (en) Building drainage system and appliance drainage pipe unit used therefor
JP3357256B2 (en) Fluid pipe with guideway
JP3306295B2 (en) Pipe with spiral guideway
JP3387737B2 (en) Pipe with spiral guideway
JP3348041B2 (en) Vertical tube installation structure
JP3545936B2 (en) Pipe with spiral guideway
JP3561393B2 (en) Vertical pipe with guideway
JP2007308961A (en) Horizontal piping joint and drain pipeline structure using it
JP4235737B2 (en) Tube with internal spiral guideway
JP4495996B2 (en) Synthetic resin double-layer corrugated pipe and method for repairing the pipe through which this corrugated pipe is inserted into an aged existing pipe
JP3545941B2 (en) Tube with internal spiral guideway
JPH0333954B2 (en)
JP3416079B2 (en) Vertical tube installation structure
JP2000146036A (en) Vertical pipe with spiral guide route
JP4082526B2 (en) Pipe with spiral guide
JP5285957B2 (en) Vertical pipe with spiral guide
JP4132345B2 (en) Vertical pipe line
JP3317752B2 (en) Drainage basin
JP4140933B2 (en) Tube with internal spiral guideway
CN107724509A (en) A kind of easily inserting floor drain
JP2005315055A (en) Tube with spiral guiding passage
JPH11140931A (en) Drain pipe
KR100629726B1 (en) The structure duplication pipe of water works
JPH11210061A (en) Pipe with spiral guide passage

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080425

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090425

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090425

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100425

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120425

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130425

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140425

Year of fee payment: 11

EXPY Cancellation because of completion of term