JP3413642B2 - Method and apparatus for erection of stake for mountain stay - Google Patents

Method and apparatus for erection of stake for mountain stay

Info

Publication number
JP3413642B2
JP3413642B2 JP31085092A JP31085092A JP3413642B2 JP 3413642 B2 JP3413642 B2 JP 3413642B2 JP 31085092 A JP31085092 A JP 31085092A JP 31085092 A JP31085092 A JP 31085092A JP 3413642 B2 JP3413642 B2 JP 3413642B2
Authority
JP
Japan
Prior art keywords
loading platform
erection
cut
jack
pillars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP31085092A
Other languages
Japanese (ja)
Other versions
JPH06136759A (en
Inventor
利昭 安斉
伸茂 武内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP31085092A priority Critical patent/JP3413642B2/en
Publication of JPH06136759A publication Critical patent/JPH06136759A/en
Application granted granted Critical
Publication of JP3413642B2 publication Critical patent/JP3413642B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、山留用切粱の架設方法
および架設装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and a device for erection cuts for mountain retaining.

【0002】[0002]

【従来の技術】地中を大きく掘削する場合に周囲の土砂
が崩壊してこないように、水平方向に支持しておく部材
が切粱である。その使用例を図 に示すが、切粱aを設
置のために従来は地上部に位置するクレーンから切粱を
所定の設置一に吊り下げ、それを地下で柱間に固定する
方法を採用している。
2. Description of the Related Art When a large excavation is performed in the ground, a member for supporting horizontally in order to prevent the surrounding earth and sand from collapsing is cut and cut. An example of its use is shown in the figure. In order to install the cut rice a, a method of suspending the cut rice from a crane located above the ground in a predetermined installation position and fixing it between pillars underground is adopted. ing.

【0003】[0003]

【発明が解決しようとする問題点】前記したような従来
の山留用切粱の架設方法にあっては、次のような問題点
がある。 <イ>切粱が大型になると、水平方向に長い距離を重量
の大きい切粱を吊ることのできるクレーンが必要とな
り、不経済である。 <ロ>深度が大きくなると多数段の切粱が必要となり、
クレーンで吊り上げた状態でセットする架設方法は手間
がかかる。 <ハ>さらに深い位置まで切粱を吊り下げる場合に、上
部に架設してある多数の切粱の間をぬって所定の位置ま
で吊り下ろすことになり、作業に時間がかかるとともに
上下の合図が不確実となりやすく、安全性に問題があっ
た。
The above-mentioned conventional method for constructing cut shavings for yamadome has the following problems. <a> When the cut cake becomes large, it is uneconomical because a crane that can suspend a heavy cut cake over a long distance in the horizontal direction is required. <B> As depth increases, many stages of cuttings are required,
The erection method of setting in a state of being lifted by a crane is troublesome. <C> When suspending the cuts to a deeper position, the gap between a large number of cuts that are erected on the upper part of the cuts will be hung down to a predetermined position, and it will take time and the upper and lower cues will be signaled. It was easy to become uncertain and there was a problem with safety.

【0004】[0004]

【本発明の目的】本発明は上記のような従来の問題を解
決するためになされたもので、経済的で安全に山留用切
粱の架設を行うことのできる方法および架設装置を提供
することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned conventional problems, and provides a method and a erection device capable of economically and safely erection cuts for mountain retaining. With the goal.

【0005】[0005]

【問題点を解決するための手段】すなわち本発明は、地
下構造物の柱間に切粱を架設する方法であって、まず柱
を地中に設置し、次に柱間の土砂を一階層ごとに掘削を
行い、一階層の掘削の終了後に、既製の切粱を掘削盤ま
で吊り下げ、この既成切粱を昇降自在の荷台を備えた台
車の荷台上に搭載して柱間に運搬し、所定の柱間の所定
の高さに支持して切粱の両端を柱間に固定して行う、山
留用切粱の架設方法である。また本発明は走行装置の上
部に旋回自在に取り付けた架台と、アウトリガーと、架
台に対して側方にスライド自在に設置した荷台とよりな
り、アウトリガーを側方に張り出すためのジャッキと、
荷台を側方に移動するためのジャッキと、荷台を上下動
するためのジャッキと、荷台の上端の荷受け板を進行方
向に前後移動するためのジャッキとより構成した、架設
装置である。
[Means for Solving the Problems] That is, the present invention is a method of constructing a cut slag between pillars of an underground structure. First, the pillars are installed in the ground, and then the earth and sand between the pillars is made one layer. Excavation is carried out for each stage, and after the completion of one level of excavation, the ready-made cuttings are hung up to the excavator, and the ready-made cuttings are mounted on the loading platform of a truck equipped with a vertically movable loading platform and transported between pillars. A method of constructing a cut lees for mountain retaining, in which both ends of the cut lees are fixed between the columns while being supported at a predetermined height between predetermined columns. Further, the present invention comprises a pedestal rotatably attached to the upper part of the traveling device, an outrigger, and a loading platform slidably installed laterally with respect to the gantry, and a jack for laterally extending the outrigger,
The erection device includes a jack for moving the loading platform to the side, a jack for moving the loading platform up and down, and a jack for moving the loading plate at the upper end of the loading platform back and forth in the traveling direction.

【0006】[0006]

【本発明の構成】以下図面を参照しながら本発明の山留
用切粱の架設方法および架設装置について説明する。ま
ず本発明の架設方法に使用する装置について説明する。
DETAILED DESCRIPTION OF THE INVENTION The method and apparatus for constructing cut shavings for mountain retaining of the present invention will be described below with reference to the drawings. First, an apparatus used in the erection method of the present invention will be described.

【0007】<イ>全体の構成 本発明の架設装置は、走行装置1の上部に旋回自在に取
り付けた架台2と、アウトリガー3と、架台2に可動式
に取り付けた2基の荷台4とより構成する。走行装置1
は、不整地を走行可能で小半径で回転できるよう、ブル
ドーザなどと同様の履帯走行機構を採用する。この走行
装置1の上部には、架台2を旋回自在に搭載する。架台
2には横断方向(走行方向に対する横断方向の意味。以
下同じ)に前後2本の伸縮ビーム21を設置しこの伸縮
ビーム21の両端にはアウトリガー3を取り付ける。こ
のアウトリガー3は、走行中に方向変更の際に、地盤を
荒らすことを避けるために使用できる。あるいは履帯走
行機構と荷台全体を浮かせた状態にし、履帯走行機構を
任意の位置に旋回させてその場で方向を転換をするため
に使用することができる。
<A> Overall Configuration The erection device of the present invention comprises a pedestal 2 rotatably attached to the upper part of the traveling device 1, an outrigger 3, and two loading platforms 4 movably attached to the pedestal 2. Constitute. Traveling device 1
Adopts a crawler track traveling mechanism similar to a bulldozer so that it can travel on rough terrain and can rotate in a small radius. A pedestal 2 is rotatably mounted on top of the traveling device 1. Two extensible beams 21 are installed in the gantry 2 in the transverse direction (meaning the transverse direction with respect to the traveling direction; the same applies hereinafter), and outriggers 3 are attached to both ends of the extensible beam 21. This outrigger 3 can be used in order to avoid breaking the ground when changing the direction while traveling. Alternatively, the crawler belt traveling mechanism and the entire loading platform can be left floating, and the crawler belt traveling mechanism can be used to turn the crawler belt traveling mechanism to an arbitrary position to change the direction on the spot.

【0008】<ロ>荷台4 荷台4は重量の大きい切粱を搭載するための台である。
この荷台4は次のような作動を行う。 1・進行方向に対して横断方向の移動 2・大きな高さの上下動と小さい上下動 3・進行方法に平行な移動 以上の作動を行うために、次のような構成を採用する。
架台2には横断方向にレールを設け、荷台4全体をこの
レールの上に搭載する。2基の荷台4は、架台2の中心
から両側に設置する。さらに各荷台4は、上下方向に向
けて2段に伸縮するよう、外枠41と中枠42と内枠4
3とを鉛直方向に順に嵌合して構成する。(図3) 外枠41の内部に鉛直に配置した中枠42昇降ジャッキ
は、中枠42を大きい寸法だけ昇降させる。中枠42の
内部に鉛直に配置した内枠43昇降ジャッキは、内枠4
3を微妙に昇降させて正確な位置を設定する。さらに内
枠43の上面には前後方向に移動が可能なスライド荷受
け板44を取り付ける。したがって運搬の対象となる切
粱は、このスライド荷受け板44の上に搭載されること
になる。
<B> Loading platform 4 The loading platform 4 is a platform for mounting heavy cuts.
The platform 4 operates as follows. 1. ・ Transverse movement with respect to the traveling direction 2 ・ Large vertical movement and small vertical movement 3 ・ Parallel movement in parallel to the traveling method The following configuration is adopted.
Rails are provided on the gantry 2 in the transverse direction, and the entire loading platform 4 is mounted on the rails. The two loading platforms 4 are installed on both sides from the center of the gantry 2. Further, each cargo bed 4 has an outer frame 41, a middle frame 42, and an inner frame 4 so as to expand and contract in two stages in the vertical direction.
3 and 3 are fitted in this order in the vertical direction. (FIG. 3) The middle frame 42 lifting jack vertically arranged inside the outer frame 41 moves the middle frame 42 up and down by a large size. The inner frame 43 lifting jack arranged vertically inside the middle frame 42 is
Move 3 up and down slightly to set the correct position. Further, a slide load receiving plate 44 that is movable in the front-rear direction is attached to the upper surface of the inner frame 43. Therefore, the scraps to be transported are mounted on the slide load receiving plate 44.

【0009】<ハ>ジャッキの配置 以上の構成のために、複数のジャッキを配置する。(図
2) アウトリガー3を側方に張り出すためにアウトリガージ
ャッキ31を、架台2に反力が取れるように配置する。
荷台4を側方に移動するためには荷台移動ジャッキ45
を、やはり架台2に反力が取れるように配置する。荷台
4を上下移動させるためには、前記したように中枠昇降
ジャッキと、内枠昇降ジャッキとを鉛直方向に配置す
る。さらに荷台4の上面の荷受け用のスライド荷受け板
44を進行方向に前後移動させるためのスライドジャッ
キ46は、内枠43に反力が取れるように水平に配置す
る。
<C> Arrangement of Jacks A plurality of jacks are arranged for the above configuration. (FIG. 2) The outrigger jacks 31 are arranged so as to pull out the outriggers 3 laterally so that reaction force can be exerted on the pedestal 2.
In order to move the loading platform 4 to the side, the loading platform moving jack 45
Is also arranged so that the reaction force can be applied to the gantry 2. In order to move the loading platform 4 up and down, the middle frame lifting jack and the inner frame lifting jack are arranged in the vertical direction as described above. Further, a slide jack 46 for moving the slide load receiving plate 44 for receiving the load on the upper surface of the load platform 4 back and forth in the traveling direction is arranged horizontally so that a reaction force can be applied to the inner frame 43.

【0010】[0010]

【作動】次に上記の装置を使用した切粱の架設方法につ
いて説明する。 <イ>架設の目的 まず多数本の柱を地中に設置し、この柱群の間の土砂を
一階層ごとに掘削を行い、柱の間に切粱を架け渡すこと
が目的である。(図5) 切粱の形状はたとえば鉄骨の周囲をコンクリートで包囲
したSRC切粱を使用する。こうした切粱は工場、ある
いは地上で良好な品質管理のもとで製造したものを使用
する。
[Operation] Next, a method of constructing cut shavings using the above apparatus will be described. <a> Purpose of erection First of all, the purpose is to install a large number of pillars in the ground, excavate the earth and sand between the pillars layer by layer, and bridge cuts between the pillars. (FIG. 5) The shape of the cut cake is, for example, SRC cut cake in which the periphery of a steel frame is surrounded by concrete. Such cuts are produced at the factory or on the ground under good quality control.

【0011】<ロ>切粱の吊り下ろし 一階層の掘削の終了ごとに、上記したような既製の切粱
を掘削盤まで吊り下げる。こうして切粱を地下まで吊り
下ろす工程は従来の方法と同様である。しかし従来の方
法では切粱を架設する位置に正確に直接吊り下ろす必要
があった。しかし本発明の架設方法では、切粱はいった
ん地下の掘削面に吊り下ろした後に掘削面で水平運搬を
行う方法であるから、切粱を吊り下ろす位置は自由に選
択できる。したがって上部空間に切粱などの障害物が少
ない位置、クレーンのブームを長く延ばして使用しない
ですむような位置に吊り下ろすことができる。
<B> Suspension of cut shavings Every time one layer of excavation is completed, the above-mentioned ready-made cut shavings are suspended to the excavator. In this way, the process of suspending cut cakes underground is the same as the conventional method. However, in the conventional method, it was necessary to hang the cut cake directly at the position where it was erected. However, in the erection method of the present invention, since the cut soil is once suspended on the underground excavation surface and then horizontally transported on the excavation surface, the position at which the cut soil is suspended can be freely selected. Therefore, the crane can be hung at a position where there are few obstacles such as cuts in the upper space, and a position where the boom of the crane can be extended and not used.

【0012】<ハ>掘削盤での運搬 この切粱を前記した本発明の装置の上に搭載して仮固定
する。そして走行装置1を駆動して掘削盤上を移動し、
架設装置を所定の柱間に進入させて停止する。
<C> Transportation by excavator This cut cake is mounted on the above-mentioned apparatus of the present invention and temporarily fixed. And drive the traveling device 1 to move on the excavator,
Insert the erection device between the specified columns and stop.

【0013】<ニ>切粱の設置 切粱は両側に突出した継手51と、柱にあらかじめ取り
付けられたブラケットとをボルトで固定した後に溶接す
る。したがってきわめて正確にボルト穴を一致させなけ
ればならず、不整地上で停止した架設装置の姿勢ではと
うてい正確に穴の一致は期待できない。しかし前記した
ように本発明の架設装置を使用した場合に、切粱は昇降
自在でかつ前後移動自在のスライド荷受板の上に搭載し
てある。したがって上下、前後、左右の三次元方向に対
して微妙な位置調整をきわめて容易に行うことができ、
正確にボルト穴を一致させることができる。ボルトを使
用しない他の方法の場合ももちろん同様である。
<D> Installation of cuts The cuts are welded after fixing the joints 51 protruding on both sides and the brackets previously attached to the columns with bolts. Therefore, the bolt holes must be aligned very accurately, and it is difficult to expect the holes to be aligned accurately when the erection device is stopped on an irregular ground. However, as described above, when the erection device of the present invention is used, the cut cake is mounted on the slide load receiving plate which can be moved up and down and can be moved back and forth. Therefore, it is extremely easy to make fine position adjustments in the up-down, front-rear, and left-right three-dimensional directions.
The bolt holes can be matched exactly. The same applies to other methods that do not use bolts.

【0014】[0014]

【発明の効果】本発明の山留用切粱の架設方法および架
設装置は以上説明したようになるから次のような効果を
得ることができる。 <イ>切粱はいったん地下の掘削面に吊り下ろした後に
掘削面で水平運搬を行う方法である。したがって、切粱
を吊り下ろす位置は自由に選択でき、上部に切粱などの
障害物が少なく、クレーンのブームを長く使用しないで
すむような位置に吊り下ろすことができる。そのために
大きな吊り能力を備えた高価なクレーンを使用する必要
がなく経済的である。 <ロ>深度の大きい掘削を行う場合に、従来の方法では
多数段の切粱の間をぬって新たな切粱を吊り下ろす必要
があった。そのために慎重な作業が要求され、手数を要
するとともに上部に切粱に衝突したらバランスを崩して
落下するといった安全面での問題もあった。しかし本発
明の方法では吊り下ろす位置を、設置する位置に対して
自由に選択できるから広い空間を利用して迅速にかつ安
全に吊り下ろすことができ、きわめて経済的である。 <ハ>セットすべき柱間に停止させた架設装置によって
直接切粱をセットする方法である。したがって高い上部
からクレーンで吊り下ろして位置決めを行うような方法
に比較して微妙な位置調整が、安全迅速かつ正確に行う
ことができる。
As described above, since the method and apparatus for constructing cut shavings for mountain retaining of the present invention are as described above, the following effects can be obtained. <I> Kiritani is a method of temporarily suspending the material from the underground excavation surface and then carrying it horizontally on the excavation surface. Therefore, it is possible to freely select the position at which the cut bar is hung, there are few obstacles such as cut bar at the top, and the crane can be hung at a position where the boom is not used for a long time. Therefore, there is no need to use an expensive crane with a large lifting capacity, which is economical. <B> When excavating at a large depth, it has been necessary to hang a new cut cake through the gaps between the cut cakes in the conventional method. For this reason, careful work is required, and it is troublesome and there is a safety problem that the balance is lost and the robot falls if it hits the upper part in a cut. However, in the method of the present invention, the hanging position can be freely selected with respect to the installation position, so that it can be quickly and safely hung using a wide space, which is extremely economical. <C> This is a method of directly setting cuts by an erection device stopped between columns to be set. Therefore, delicate position adjustment can be performed safely, quickly, and accurately as compared with a method in which positioning is performed by hanging the crane from a high upper part.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の山留用切粱の架設装置の概念図FIG. 1 is a conceptual diagram of an erection device for shavings for mountain retaining of the present invention.

【図2】その平面図[Figure 2] Plan view

【図3】荷台部分の説明図[Fig. 3] Explanatory drawing of the loading platform

【図4】走行状態と架設時の説明図[Fig. 4] Explanatory diagram of running state and installation

【図5】切粱を架設する状況の説明図[Fig. 5] An explanatory view of a situation where a cut stalk is installed.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平4−174130(JP,A) 特開 昭57−141394(JP,A) 特開 平3−21798(JP,A) 実開 平2−49987(JP,U)   ─────────────────────────────────────────────────── ─── Continued front page       (56) Reference JP-A-4-174130 (JP, A)                 JP-A-57-141394 (JP, A)                 JP-A-3-21798 (JP, A)                 Actual Kaihei 2-49987 (JP, U)

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】走行装置の上部に旋回自在に取り付けた架
台と、 架台に伸縮ビームを介して取り付けたアウトリガーと、 架台に対して側方にスライド自在に設置した荷台とより
なり、 アウトリガーを側方に張り出すためのジャッキと、 荷台を側方に移動するためのジャッキと、 荷台を上下動するためのジャッキと、 荷台の上端の荷受け板を進行方向に前後移動するための
ジャッキとより構成した、 架設装置。
1. A rack rotatably attached to an upper portion of a traveling device.
The platform, the outriggers attached to the gantry via the telescopic beam, and the loading platform that is installed slidably to the side of the gantry.
In order to move the outrigger to the side, the jack to move the loading platform to the side, the jack to move the loading platform up and down, and the load receiving plate at the upper end of the loading platform to move back and forth in the traveling direction. of
An erection device consisting of a jack .
【請求項2】地下構造物の柱間に切梁を架設する方法で
あって、 まず柱を地中に設置し、 次に柱間の土砂を一階層ごとに掘削を行い、 一階層の掘削の終了後に、既製の切梁を掘削盤まで吊り
下げ、 前記既製切梁を請求項1記載の架設装置の荷台上に搭載
して柱間に運搬し、 三次元方向に対して微妙な位置調整をおこないながら所
定の柱間の所定の高さに支持して切梁の両端を柱間に固
定して行う、 山留用切梁の架設方法。
2. A method of constructing a crossbeam between columns of an underground structure.
So , first install the pillars in the ground, then excavate the earth and sand between the pillars in each layer, and after finishing the excavation of one layer, suspend the ready-made beams to the excavator.
Lower, mounting the prefabricated Setsuhari on the bed of the installation apparatus of claim 1, wherein
And then transport it between the pillars, and adjust the position delicately in the three-dimensional direction.
Support the fixed height between the columns and secure both ends of the beam to the columns.
The method of erection of the girder for Yamadome.
JP31085092A 1992-10-27 1992-10-27 Method and apparatus for erection of stake for mountain stay Expired - Fee Related JP3413642B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31085092A JP3413642B2 (en) 1992-10-27 1992-10-27 Method and apparatus for erection of stake for mountain stay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31085092A JP3413642B2 (en) 1992-10-27 1992-10-27 Method and apparatus for erection of stake for mountain stay

Publications (2)

Publication Number Publication Date
JPH06136759A JPH06136759A (en) 1994-05-17
JP3413642B2 true JP3413642B2 (en) 2003-06-03

Family

ID=18010147

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31085092A Expired - Fee Related JP3413642B2 (en) 1992-10-27 1992-10-27 Method and apparatus for erection of stake for mountain stay

Country Status (1)

Country Link
JP (1) JP3413642B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648374A (en) * 2020-05-31 2020-09-11 张达芬 Foundation ditch side slope reinforcing apparatus for building engineering

Also Published As

Publication number Publication date
JPH06136759A (en) 1994-05-17

Similar Documents

Publication Publication Date Title
US4394911A (en) Heavy duty crane
JP2918475B2 (en) Pier construction method, pier dismantling method and lift-up / rotation device
US4483448A (en) Heavy duty crane
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
JP2006028881A (en) Self-propelled pc floor slab erecting machine and pc floor slab erecting method
JP3413642B2 (en) Method and apparatus for erection of stake for mountain stay
JP3356048B2 (en) Construction method of elevated structure using building girder
JP2001213584A (en) Large-scale elevation stage and lifting method and reversely driving technique using the same
JPH11147690A (en) Low head space reinforcing bar building-in device
JPH0768877B2 (en) Construction method and removal method of earth retaining frame in lateral construction
CN113833495A (en) Equipment for slope tunnel inverted arch construction and construction method thereof
JP3139935B2 (en) Pipe handling equipment
JP3049406B2 (en) Handling device and building method using the same
JP2552997B2 (en) Bridge girder construction method and its equipment
JP3115544B2 (en) Loading method of abutment bearing device
JP3151116B2 (en) Tunnel excavation method and gantry used for this method
JPH05230846A (en) Construction method of underground structure by reverse-placing construction method
JP2019206848A (en) Box body suspension device
JP2003322000A (en) Tunnel invert construction method by movable pier and the movable pier
JP2000179286A (en) Open shield machine
JPH0543809B2 (en)
JP2001200633A (en) On-slope transportation work device for machine and material and construction method therefor
JPH0957661A (en) Scaffold device for wall surface work
CN210621485U (en) Station hoisting system for hoisting corrugated steel web
JP2001164586A (en) Jack-up method for drive-into working platform and jack- up device therefor

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees